Loading...
AP 11-15-07 SOUTH TAHOE PUBLIC UTILITY DISTRICT tlBasic Services for a Complex World" REGULAR BOARD MEETING AGENDA Thursday, November 15, 2007 2:00 P.M. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Richard Solbrig, General Mana~er Eric W. Schafer, President BOARD MEMBERS Paul Sciuto, Assistant Manager James R. Jones, Vice President Duane Wallace, Director Mary Lou Mosbacher, Director Kathleen Farrell, Director 1. CALL TO ORDER REGULAR MEETING - PLEDGE OF ALLEGIANCE 2. COMMENTS FROM THE AUDIENCE (Short non-agenda items that are within the subject matter jurisdiction of the District. Five-minute limit. No action will be taken.) 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR 4. ADOPTION OF CONSENT CALENDAR (Any item can be discussed and considered separately upon request.) 5. CONSENT ITEMS BROUGHT FORWARD FOR ACTION I DISCUSSION 6. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION a. Customer Assistance Program Pg.31 (Rhonda McFarlane, Lisa Coyner) Enact Ordinance No. 501-07 Adding Section 6.1.9 to Division 6 of the Administrative Code Regarding the Low-Income Customer Assistance Program b. Self-Insured Medical Plan - Third Party Pg. 37 Administrator (Hussmann, McFarlane, Solbrig) (1 ) Approve Staff Recommendation for Third Party Administrator; and (2) Authorize Staff to Enter into Contract with Successful Bidder (Results will be presented at the Board meeting.) REGULAR BOARD MEETING AGENDA - NOVEMBER 15, 2007 PAGE-2 c. Water Meter Legislation and Installation Pg.39 (Paul Sciuto, Lisa Coyner) Provide Direction to Staff on Installing Water Meters on Waterline Capital Projects d. Pg.41 Replacement of Angora Tank and Country Club Tank (Julie Ryan) Approve Proposal from Selected Consultant (to be determined) for Structural and Civil Engineering Services (Staff recommendation will be presented prior to, and at the Board meeting.) e. Engineering Department 2008 Project Pg. 43 Priority List (Jim Hoggatt) Approve Priorities f. Payment of Claims Pg.51 Approve Payment in the Amount of $915,321.47 7. BOARD MEMBER STANDING COMMITTEE REPORTS (Discussions may take place; however, no action will be taken) a. Water & Wastewater Operations Committee (Jones 1 Farrell) b. Finance Committee (Wallace / Schafer) c. Executive Committee (Schafer / Jones) d. Planning Committee (Mosbacher / Schafer) 8. EL DORADO COUNTY WATER AGENCY REPRESENTATIVE REPORT 9. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken) 10. GENERAL MANAGER REPORT (Discussions may take place; however, no action will be taken) a. Corp of Engineers Meeting re: 219 Funding b. City of SL T Affordable Housing Meeting , 11. STAFF I ATTORNEY REPORTS (Discussions may take place; however, no action will be taken) a. Budget Schedule (Debbie Henderson) b. Angora Fire Customer Service Issue (Sandy Gray) c. Election Results (Kathy Sharp) d. Hatch & Parent Merger (Brad Herrema) 12. NOTICE OF PAST AND FUTURE MEETINGS I EVENTS Past Meetinas I Events 11/06/07 - STPUD Board Elections 11/07/07 - EI Dorado County Agency Board Meeting 11/13/07 - Water and Wastewater Operations Committee Meeting Future Meetinos I Events 11/20107 - 9:00 a.m. - Alpine County Supervisors Regular Meeting in Markleeville 11/27/07 - 11/30/07 - ACWA Fall Conference in Indian Wells, Ca. 11/28/07 - 8:00 a.m. - ECC (Employee Communications Committee) Meeting at District Office (President Schafer is Board representative) REGULAR BOARD MEETING AGENDA - NOVEMBER 15, 2007 PAGE-3 Future Meetinas I Events (con't.) 12/03/07 - 4:00 p.m. - Water and Wastewater Operations Committee Meeting at District 12/04/07 - 9:00 a.m. - Alpine County Supervisors Regular Meeting in Markleeville 12/06/07 - 2:00 p.m. - STPUD Regular Board Meeting at District 13. CLOSED SESSION (Closed Sessions are not open to the public) a. Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel- Pg.69 Existing Litigation re: Meyers Landfill Site: United States of America vs. EI Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK GGH, United States District Court for the Eastern District of CA 14. ACTION I REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION 15. ADJOURNMENT (To the next regular meeting, December 6,2007,2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete agenda packet, including all backup information is available for review at the meeting and at the District office during the hours of 8:00 a.m. - 5:00 p.m., Monday through Friday. Items on this agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear on the agenda. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified. Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Comments on items not on the agenda can be heard during .Comments from the Audience;" however, action cannot be taken on items not on the agenda. Please provide the Clerk of the Board with a copy of all written material presented at the meeting. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings. If particular accommodations for the disabled are needed (Le., disability-related aids, or other services), please contact the Clerk of the Board at 530.544.6474, extension 6203, at least 24 hours in advance of the meeting. CONSENT CALENDAR NOVEMBER 15, 2007 ITEMS REQUESTED ACTION a. Information Technology Strategic Plan Pg. 1 (Carol Swain) Authorize Staff to Enter into a Contract with NexLevellnformation Technology, Inc.; for Professional Services to Develop an Information Technology Strategic Plan, in the Amount of $41 ,725 b. Luther Pass Pump Station Seismic Upgrade Pg.13 (Julie Ryan) Approve Change Order No.2 from Thomas Haen Company, Inc., for a Credit in the Amount of <$5,327> c. New Ford 350 4X4 Trucks for Heavy Maintenance Pg. 17 Equipment Repair (Randy Curtis) Authorize Staff to Solicit Bids from Ford Dealers for the Purchase of Two (2) F-350 4X4 Trucks d. New Trucks for Underground Repair Water and Pg. 19 Pump Station Crews (Randy Curtis) Authorize Staff to Advertise for Bids for the Purchase of One New 2-Door ~ Ton 4X4 Pick-Up and One 2-Door % Ton 4X4 Pick-Up e. Upper Dressler Ditch Phase 1 Project Pg.21 (Jim Hoggatt) (1 ) Approve the Project Closeout Agreement and Release of Claims for T&S Construction Co. Inc., and (2) Authorize Staff to File the Notice of Completion with the Alpine County Clerk South Tahoe Public Utility District. 1275 Meadow Crest Drive. South Lake Tahoe, CA 96150 Phone 530.544.6474. Facsimile 530.541.0614 · www.stpud.us South Tahoe Public Utility District ~......... ........... D'irlIct.cn ~ F...,... .MrnN ft~ Marylou ~ ~~ !ric 5c:Mfer 1275 ~er.t~.South f..af:e TaI1oe-CA961!5O-1<401 f'ttone'530544--6474.Aax5!0541..oe14-www~ BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Carol Swain, Information Systems Manager MEETING DATE: November 15, 2007 ITEM - PROJECT NAME: Information Technology Strategic Plan REQUESTED BOARD ACTION: Authorize staff to enter into a contract with NexLevel Information Technology, Inc., for professional services to develop an Information Technology Strategic Plan, in the amount of $41 ,725. DISCUSSION: The District's Information Technology Strategic Plan was initially created using the consulting services of KPMG Peat Marwick in December of 1997. It was then updated by staff in December of 2000. It was time to do a major review of the District's technology processes and direction, by utilizing the services of a technology consultant who would be familiar with current trends and future direction in the field. The resulting plan, titled the Information Technology Strategic Plan, will serve as a roadmap for the strategic and tactical implementation of IT infrastructure and services over the next five to six years. It will provide a framework for introducing new technology in a phased approach that takes into consideration organizational needs, District budget, as well as current capabilities and technology trends. It would assure that the District expends the right resources in the right areas for the right reasons, and that the customers' money is not wasted on unnecessary or incomplete systems. On August 2, 2007, the Board authorized staff to develop and send RFPs to technology consultants for development of an IT Strategic Plan. Eleven RFPs were sent out; three responses were received. After staff reviewed the proposals, called references, and interviewed two of the respondents, staff concluded that NexLevellnformation Technology, Inc. would best meet the District's needs. -1- ". "t Carol Swain November 15, 2007 Page 2 SCHEDULE: November 16,2007 - June 30,2008 COSTS: $41,725 ACCOUNT NO: 1037-4405,2037-4405 BUDGETED AMOUNT REMAINING: $57,730 ATTACHMENTS: NexLevel Company Overview, Security Assessment Approach, Project Cost Summary CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YESJ!1i"- NO CHIEF FINANCIAL OFFICER: YES , NO CATEGORY: Sewer & Water -2- /October 5,2007 Information Technology Strategic Plan Proposal I 1 Engagement Overview In today's environment, public sector organizations are challenged to do more with less, and at the same time, to provide increased levels of service and information security. To help meet this challenge, organizations must increase their reliance on information technology (IT) and its related infrastructure. With this said, technology is not an end in and of itself; technology must support an organization's business objectives. Technology is used to increase service delivery effectiveness and efficiency, and is typically an enabler and component of an organization's strategic business plan. Strategy itself is critical to the proper planning, procurement, implementation, and management of IT. The strategic IT planning process provides an opportunity for all management levels to review, discuss, and integrate their technology needs into a common framework. It promotes a common understanding of an organization's technology plans and priorities, and serves as a tool to provide an overall picture of what is to be accomplished and why. It is clear that the South Tahoe Public Utility District recognizes the importance of IT to support current operations, as well as to help achieve future business goals. An IT Strategic Plan is an important step in providing a roadmap and framework for the District's use of technology for the next five to six years. Recognizing this, the District has released an RFP seeking a firm to lead the District through a formal IT assessment and planning process. NexLevellnformation Technology, Inc. (NexLevel) is an information technology consulting company focused exclusively on California public sector clients. A core competency for NexLevel is working with public sector clients to develop realistic and attainable IT strategic plans. Our extensive experience in completing enterprise-wide IT assessments and facilitating the development of IT Plans for public sector clients will benefit the District by ensuring a high quality, comprehensive IT Strategic Plan. NexLevel offers the District experienced consultants that are well versed in public sector technologies. Our consultants have extensive hands-on experience in the application of technologies, as well as current and proven experience in applying our strategic planning methodology to develop effective plans. Our experience allows us to offer our clients recommendations that fully consider the organizational, technological, and operational impact to their organization, and we pride ourselves on our ability to bring this global perspective to our projects. In addition, since our primary function is consulting, we offer our clients objective and vendor independent consultation. A significant challenge for an organization investing in an IT Strategic Plan is how to keep it current so that it can be useful to future decision making. While the publishing of an IT Strategic Plan is a major milestone, it is also important that an organization implement processes to update the IT Strategic Plan on a regular basis. If an IT Strategic Plan becomes stagnant, it will not be an effective tool to guide day-to-day management decisions regarding technology. NexLevel offers the District, as part of our offering, the use of our Project Tracking Tool referred to as PlanlT. Plan IT will provide the District with a web-based tool to assist in the management, tracking, and reporting on the initiatives and projects that make up an IT Strategic Plan. PlanlT allows management and staff to check on the details pertaining to an existing project, edit information, add a new project, and/or produce reports. In Section 8 we provide more information on this unique tool. Prepared for outh Tahoe Public Utility District -3- 1 L::V::L Informatloft T.~h"olo&y.lnc. !October 5. 2007 Information Technology Strategic Plan Proposal 2 Qualifications 2.1.1 NexLevel Overview The NexLevel team has extensive experience in completing needs assessments and creating IT strategic plans for public sector clients. Our considerable consulting and planning experience in California will be of value to the District and will result in an IT Plan with a specific recommended direction for the District's IT program for the next five to six years. NexLevel is a California-based management consulting firm that helps public sector clients enhance their use of IT. NexLevel evaluates a client's current operational environment, identifies future challenges and/or issues that need to be addressed, and develops plans, processes, and/or tools that help clients meet these challenges and achieve their objectives. Specifically, NexLevel has a strong track record of success in helping clients. .:. Complete Technology Assessments .:. Make Attainable Technology Decisions .:. Create Technology Plans .:. Update/Enhance Existing Technology Plans .:. Manage Technology Procurements .:. Manage/Implement Technology Projects NexLevel has worked with numerous California state and local government agencies to complete Strategic Plans, GIS Master Plans, Network Assessments, IS Service Level Assessments, Policy/Procedure Documentation, Project Management, Feasibility Studies, and Procurement Support. Our experience spans virtually all technologies used by California governments including Document Imaging, GIS, Finance/HR Systems, Utility Billing, SCADA, Public Safety (CAD/RMS/MDT), Permitting, Call Center Systems, AMR/AMI/MDMA System, Business Intelligence/Reporting Systems, and more. The foundation of our corporation is in talented, high-caliber individuals guided by personal and professional principles such as honesty, integrity, quality, and a commitment to client satisfaction. This foundation and associated ethics help us to attract and retain veteran staff that inspires confidence in our clients. NexLevel's staff includes numerous Project Management Institute, and/or the Institute of Management Certified consultants. Both organizations require members to pledge and adhere to a strict code of professional conduct, which, along with the diverse business and technology backgrounds of our team, result in highly credible recommendations, attainable IT road maps, and the implementation of successful-cost effective solutions. Since our inception in 1999, NexLevel has invested in and developed methodologies, tools, and supporting processes designed specifically for the unique needs and requirements of California local government agencies. Each of our consultants has access to NexLevel Toolkits that provide the processes, tools, and methodologies supporting our assessment, planning, project management, IT governance, business continuity, and project management office (PMO) service offerings. The knowledge base included in these toolkits are constantly being improved and expanded as our consultants enhance them based on real life experience with our clients. NexLevel clients benefit directly from our processes, tools, and methodologies as we share these with our clients and in working collaboratively with our clients are able to leave behind the tools, processes, and methodologies to be used in future projects. With the current pace of technological change, local governments face significant challenges in not only managing their current technologies, but in implementing new technologies demanded by citizens and businesses. NexLevel assists organizations in meeting these challenges by providing a full range of IT services. As depicted in the figure on the following page, NexLevel is we!1 equipped to provide a full range of IT consulting . !Prepared for [Fauth Tahoe Public Utility District -4-2 " bEY,~yk I /October 5, 2007 Information Technology Strategic Plan Proposal . ~ NexLevel Services Framework NexLevel is committed to providing high quality and affordable management consulting services to California public sector clients. NexLevel's primary market focus is the California public sector market. In fact, 100% of our current revenue is the result of work performed for a public agency. NexLevel is debt- free and maintains a healthy cash flow to meet all current and future needs. NexLevel started modestly with two full-time employees. Today, NexLevel has 23 full-time employees that serve our customers. Prepared for outh Tahoe Public Utility District -5-3 L:;:V::L InformadOft T.chnololY. "IC. N = L Information Technology, Inc. "Taking Information Technology to the Next Level" Project initiation ✓ : ' C onfirm, ; So{e '' ' 1 "Hold Kickoff .4 Distribute, Questionnaires 'Update Scope IT /GIS Assessment ✓= Review Doct mtieiita "tio - ✓` ^:Complete Interviews I FDraft IT Assessmen External Network Vulnerability Approach and Methodology ✓ Perform Vulnerability Scan Validate Findings -: , ,. r Draft`Report Strategy Development i 1Arialy e Fin dings` ✓ Research Benchmarks ✓. Recommt Prioritization Works Plan Development oR Identify Visi. = _ e„ _ Draft Plan Final Pian % Strategic Plan Presentation South Tahoe Public Utility District IT Strategic Plan Interview pctober 5, 2007 Information Technology Strategic Plan Proposal 6 Cost Proposal 6.1 Project Cost NexLevel will complete this project on a time and materials basis but is willing to commit to a not-to-exceed price as presented below. Under this arrangement, NexLevel will bill the District based on actual hours worked up to the not-to-exceed price. The following two tables provide our hourly rates by resource and our estimated project cost by major task. Hourly Rate Table Principal Consultant (Terry Hackelman) $150 Managing Consultant (Rich Klutz) $135 Farallon GIS Consultant $200 8T INS Consultant (for Optional Services) $200 Project Cost - By Task Task 1 - Project Initiation Engagement Manager (NexLevel) Project Consultant (NexLevel) GIS Consultant (Farallon) Task 2 -IT/GIS Assessment , Engagement Manager (NexLevel) Project Consultant (NexLevel) GIS Consultant (Farallon) Task 3 - External Network Vulnerability Fixed Fee for scanning two Class C based subnets and five live IP addresses Task 4 - IT Strategy Development Engagement Manager (NexLevel) Project Consultant (NexLevel) GIS Consultant (Farallon). Task 4 - IT Strategic Plan Development 5 10 4 33 75 32 nfa 10 20 4 Prepared for outh Tahoe Public Utility District -719 ( $150 $135 $200 \ q \:Jfl $150 $135 $200 1 ~ \Jv" nla $4,500 $150 $135 $200 $1,500 ,~ \JP $2,700 $800 / L::V::L Information TechnolOQ'.lnc. pctober 5, 2007 Information Technology Strategic Plan Proposal I Engagement Manager (NexLevel) Project Consultant (NexLevel) GIS Consultant (Farallon) Total Not.to.Exceed Price 12 30 10 245 $150 $135 $200 $1,800 $4,050 $2,000 $41,725 Jvv )SJ NexLevel recognizes that the District may have a limited budget for this project. If this is the case, NexLevel is willing to perform each activity as a standalone project. The following table provides the price by major activity. IT Assessment and Planning (NexLevel) GIS Assessment and Planning (Farallon) External Vulnerability Assessment (8T INS) Total Not.to.Exceed $27,225 $10,000 $4,500 $41,725 6.2 Project Reporting NexLevel will diligently track and report the level of effort expended on the project. NexLevel will review this information with the District to ensure the project is meeting requirements and expectations. If NexLevel believes the completion of the project shall exceed the original estimate, we shall notify the District of our revised estimate and provide supporting documentation for the revised estimate. At that time, the District can determine the appropriate course of action, whether to complete tasks internally or revise the NexLevel approved hours. 6.3 PlanlT Cost NexLevel will provide the District with a Project Tracking System (PlanlT) that will assist in the tracking of projects. NexLevel will provide a 12-month subscription to this system at no additional charge as part of this project. If the District wishes to continue to use PlanlT after the 12-month subscription expires, NexLevel will charge a $250/month flat fee for unlimited users and unlimited access via the Internet. 6.4 Not to Exceed Cost NexLevel estimates this project will be completed within six months of contract signing, and based on that, has estimated the level of effort and not to exceed price for all activities. NexLevel understands that its cost cannot exceed the total amount identified in this proposal without prior written approval. With this understanding, NexLevel will make all reasonable efforts to complete the proposed scope of work under the proposed "not to exceed cost." The District will only be billed foc~ctual hours worked. Prepared for outh Tahoe Public Utility District -8- 20 LE:V=L InrOf'madon Ttchnolol)'.lnc. !October 5, 2007 Information Technology Strategic Plan Proposal 6.5 Invoicing NexLevel will invoice the District at the end of each month for the level of effort expended the previous month. A detailed project status report will accompany the invoice. The project status report will identify time spent by day, by consultant, including a short description of the tasks performed. In addition, the project status report will discuss the status of the project according to the agreed upon project schedule, as well as identify any issues or constraints that are adversely impacting the project schedule. 7 Vendor Neutrality NexLevel provides independent consulting services and has an established policy for avoiding bias and potential conflicts of interest. To ensure vendor neutrality, NexLevel does not pursue sales or marketing agreements with hardware and software vendors. The credibility of NexLevel and our recommendations can be weakened if consultants are perceived as being biased. It is recognized that each individual ~ho is knowledgeable about a subject brings experiences and preferences to any consulting engagement. These guidelines are provided to ensure that opinions are balanced'and that conflicts of interest are avoided in NexLevel recommendations and decision-making processes. A further intent of the policy is to provide the framework for a common understanding of what constitutes bias and conflict of interest. The identification of such influences inherently involves the application of judgment. It is to be expected that a range of perspectives and interpretations will be voiced in the review of specific systems, products, or organizations. However, recommendations and decisions must be based on factual information a,l3d a position of neutrality and objectivity. 8 PlanlT Summary . Based on our experience, NexLevel has developed a tool designed exclusively for local governments to facilitate the ongoing management and reporting of IT projects. The most .. critical components, as well as the largest portions of any IT plan, are those sections containing information about the many initiatives/projects. NexLevel has designed and developed PlanlT to improve the executive management and reporting on IT projects. PlanlT, if the District desires, can be made available via an Intranet so that project managers located throughout the District can easily update progress on IT projects. Plan IT improves management, reporting, and communication of the status of projects, and allows executive management to obtain valuable IT Project information with a few clicks of a mouse. PlanlT is a browser-based application designed using the Microsoft product suite. The system uses ASP.net for the user interface and a SQL server database on the backend to manage data. Users will access the system through a standard browser. As part of this project, NexLevel will provide the District with an exclusive, non-transferable license to use PlanlT. NexLevel will also provide detailed installation instructions, user and system administration guides, and the initial training. NexLevel's proposal does not include the hardware or the database licenses necessary to implement Plan IT, or implementation assistance. If the District is interested in including the hardware, database licenses, and/or Implementation assistance as part of our offering, we would welcome the opportunity to address those requirements separately. Prepared for outh Tahoe Public Utility District -921 L=V=L WO"",dOl'l TechnOIOIY,lnc. Secu rity Securing your business for the future A robust security posture protects your company's network and infonnation assets. It also helps your business grow, not just survive. Security enhances your company's reputation and allows you to create more-and more profitable- business value from your IT infrastructure. INS's Security Consulting Portfolio enables you to gain this important business advantage. We help reduce risk and mitigate vulnerabilities that represent a threat to your business through sOlllld practices, applied security technology, and a continuous inlprovement framework Unsurpassed Security Expertise Our Security Portfolio comprises one of the largest and most experienced security con- sulting teams in the world, who are deeply engaged in the science, technology, and art of information protection. Our Security consultants maintain certifications across leading security disciplines and technologies, and have extensive lmowledge and experience with current security standards, best practices, and govenunent regulations, including 150-17799/85-7799, HIPAA, 5arbanes-Oxley, and Gramm-Leach BUley. Because of the strength of our security expertise and scope of our portfolio, we are an ojJicial go-to- pa1tner for Mf:ct'Osojt Security. Holistic, Business-Centric Approach We take a business-centric approach to Security, helping you harness the power of technology, people, policy, and process to create a sound security posture that aligns \\'ith and protects the value of your business. Leveraging leading technologies, industry standards, best practices, and our structured NSA-certified engagement processes, our security consultants can help you build a resilient and scalable security program that helps reduce risk and enable business growth. Superior Engagement Methodologies Our consultants have developed the most comprehensive set of proven methodologies and intellectual capital used in the industry today. Our highly structured Network Engagement Methodology guides each phase of a Security engagement to help ensure optimal results \\'ith minimal business dislUptiOll. Our Security Assessment Methodologies are certified by the National Security Agency (NSA), and our KnowledgeQuest Security Training cunicultu11 is accepted for continuing education credits by the International Infonnatioll Systems Security Certifications COnsOrtitu11 [(ISC)2]: The know/edge behind the network:' -10- '"The knowltd.e behind the network" is a resistered u'ademarit of International Networ\( services. All other trademarks and registered trademarks are properties of their respective holders. This document is for planning purposes only and is not intended to modify or supplement any specifications or warranties relaung to INS products or services. (t'l 200~ International Networ\( Services Inc. All rights reserved. Printed in U.S.A. Marketins: Communications. ds.SEC.0904 PORTFOLIO HIGHLIGHTS Fulllifecycle of Solutions including security strategy and business align- ment, operational risk and security assessments, security technology design and implementation, identity management, vulnerability and incident management, security compliance and testing, and managed services. Endorsements .. Security Assessment Methodology is certified by the NSA .. Security Training Curriculum is accepted for continuing education credits by (lSC) 2 INS maintains a centralized Ethical Hacking Center of Excellence (COE) in the U.S. and U.K., each comprising a dedicated team of security experts focused on the development and delivery of security penetration services. Technology Certifications and Competencies .. 20% of consulting staff is dedicated to Security, with CISSP and CISA certifications .. Intrusion Detection/Prevention Systems .. Information Security Management Systems .. Authentication and Access .. Risk Management Standards & Regulations .. 150-17799 .. BS-7799 .. HIPAA .. GlBA ... Sarbanes-Oxley .. Basel II Partnerships .. Microsoft Certified Gold Partner for Security Solutions .. Counterpane .. BindView .. Lumeta .. Qualys Publications .. The Ethical Hack: A Framework for Business Value Penetration Testing .. Information Systems Security Journal (Nov/Dec '03) .. The Hacker's Handbook .. Curing the Patch Management Headache .. Complete Book of Remote Access: Connectivity and Security .. Information Security Management Handbook .. Hack Proofing Your Wireless Network > !- :;) U i.lJ 'J") Portfolio Datasheet I Security , Overview International Network Services Full L1fecycle of Solutions Our Security Consulting Portfolio encompasses a full lifecycle of solutions, addressing Security needs for Risk Assessment, Defense Planning, and Architecture and Infrastructure, Whether you're delivering business applications to employees or providing e-corrunerce to millions of customers, INS can help you secure the future of your business. ~.,~ ~r--'~~.;- \ I - -., \H~' , ' I Operating "" Stora e "'" Network,and ":' t IT StratellY ' . IT ,., Systemsand '.'. I g.. ., I Prolecl , and Planning}' Infrastructure Directory 't1 Systems and l!u, Systems r; Management . ~._ .,' ,'. ,~~I , " .' .Pl Servfc!!.-lrj se~kes" ,,~IManaltment~;! '.' 'r' RISK ASSESSMENT services help you determine the scope of your existing security posture, compare it with industry accepted sound practices, and formulate an approach to obtaining the desired lcvel of security. Services . Ethical Hacking provides a battle simulation that helps identify susceptibility to application, network, and operating system breaches. . Risk AnalysiS identifies and determines the value of information assets and the likelihood of loss based on the exposure to threats. . Security Assessment compares measured security against accepted industry practices and established rules, guidelines, or industry regulations. Benefits ~ Proactive identification of vulnerabilities helps protect your IT assets and corporate reputation. . Comprehensive testing and analysis of systems, networks, operations, and procedures helps identify exposure to known threats. . Proper design and formulation of the best approach to address identified risks helps ensure your network is properly protected. DEFENSE PLANNING services help you manage your risk, develop security policies and procedures, and identify the appropriate security tcchnology and safcguards for your organizational sccurity needs, Services Benefits . Security Policies and Procedures develops a complete, custom corporate . Application of a corporate security policy safeguards your IT resources, networks, security policy that aligns with your IT and business goals. applications, information, reputation, employees, and intangible assets. . Security Operations designs and implements an operational model for . Development of a robust Information Security Management System helps ensure maintaining a desired security posture across the organization. security is realized throughout all functions of your organization. .. Incident Management designs an effective incident preparedness process . Implementation of a sound incident response process enables you to handle and management framework. incidents quickly and maximize your ability to recoup losses. . Awareness Training trains your employees on sound security practices and . Comprehensive training arms personnel with the security tools and knowledge policies, and ensures your defined security policy is thoroughly communicated. they need to protect corporate assets on a daily basis. ARCHITECTURE AND INFRASTRUCTURE services help you identify and integrate the best-in-class technologies that will protect your netvlOrk infrilstructure and investment. Services . Authentication & Access determines overall access requirements to design and implement a unified authentication and authorization solution. . Security Architecture assesses existing infrastructure to identify and mitigate gaps or weaknesses in security. . Technical Infrastructure integrates security technologies, such as VPNs, PKI, IDS, firewalls, virus protection, content filtering, and AAA solutions. Benefits . Implementation of a unified authentication and access solution ensures business data services are comprehensively managed throughout your organization. . Proper planning, design, and implementation of a robust security architecture helps reduce risks and mitigate vulnerabilities. . Comprehensive planning. design, and integration of complex security technologies help maximize their utilization and effectiveness and realize rapid return from security investments. SOLUTIONS combine several services from one or more consulting portfolios to offer a co III plcte solution, . TrustCheckAssessment provides an Objective and comprehensive evaluation . Network Intelligence Services address the essential requirement for and gap analysis of your entire information security program vis-a-vis industry infrastructure visibility in order to improve network economics and security standards and regulations, and similar organizations in your market. by enabling informed decision making. . Patch Management defines and establishes a robust patch management . Secure Storage assesses your environment for risk, plans and designs a secure process and tools, and integrates them into your daily security operations. architecture and infrastructure, implements the secure design, and manages . Cyber Security for Utilities helps power industry participants assess their your storage environment. security posture and perform a gap analysis vis-a-vis federally mandated . VolP Security provides a comprehensive approach to meeting the demands requirements to plan, design, and implement a comprehensive solution. of securing a converged infrastructure and can be leveraged to enhance the .lntegrated.Security Operations Center OSOC) provides a truly comprehensive, security capabilities of existing converged networks. intelligent approach to managing vulnerabilities, transforming the security · Wireless Security assists in all phases required to plan, design, and implement function from one of reactive risk response to proactive risk management. a secure wireless network. _ P1 Managed Security Services provide real-time security monitoring, device management, managed vulnerability scanning. and active response to ensure optimal protection against security breaches in large, complex IT environments. ~......... ~H."" South Tahoe Public Utility District ~ ~ Farl'IlI ~.ft ..IoIw MaJyI..ClU~ 0uMil WdaccJ !tic 9cNfer 12'15 ~en.tOrW.South LakI fahoe.CA 96150-1401 Phone 530544-6414~ FmtfmO !541-o614ewwwstpud.ue BOARD AGENDA ITEM 4b TO: Board of Directors FROM: Julie Ryan, Senior Engineer MEETING DATE: November 15, 2007 ITEM - PROJECT NAME: Luther Pass Pump Station Seismic Upgrade REQUESTED BOARD ACTION: Approve Change Order No.2 from Thomas Haen Company, Inc., for a credit in the amount of <$5,327>. DISCUSSION: This seismic upgrade project called for existing shingles be removed and replaced around the perimeter of the roof, in the amount $6,575. However, during the project it came to staff's attention that the roof was in poor condition and should be replaced. The additional cost for replacing the roof was approved as Change Order No. 1. Prior to the approval of Change Order No.1, a portion of the perimeter roofing work had already been performed, in the amount $1,248. As such, Change Order NO.2 is a credit back to the District for that portion of the perimeter roofing work that was eliminated from the contract <$5,327>. Staff recommends approval of Change Order No.2. SCHEDULE: As soon as possible COSTS: <$5,327> ACCOUNT NO: 1029-8720/LPSEIS BUDGETED AMOUNT REMAINING: $38,396 ATTACHMENTS: Change Order NO.2 CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES ~4 CHIEF FINANCIAL OFFICER: YES' ~ CATEGORY: Sewer NO NO -13- CHANGE ORDER NUMBER .1 Project Luther Pass Seismic Uparade Proiect Contractor THOMAS HAEN COMPANY, INC Dat~: November 15, 2007 PO # P19074 The Contract Shall Be Changed As Follows: A. Amend bid item 24, to exclude a portion of patching of Luther Pass Pump Station Roof for a credit of $5,327.00. According to the schedule of values, $6,575.00 was allotted for roof patching. After the approval of CO #1, roof patching was no longer necessary, but a portion of the work was already completed in the amount of $1,248.00. TOTAL FOR ITEM A IS <$5,327.00> TOTAL FOR CHANGE ORDER NUMBER 2 IS A = <$5,327.00> Ori inal Contract 303,500.00 Previous Chan e Orders 24,650.00 Current Contract 328,150.00 THIS CHANGE ORDER <5,327.00> New Contract Total 322,823.00 Contractor agrees to make the hereln-clescribed changes In accordance with the terms hereof. The change In contract price and/or contract time noted Is full settlement for costs Incurred as a result of the change(s) described, unless specifically noted In Individual descrlptlon(s). Date: Authorized By STPUD Board President Date: Accepted By Contractor Date: Reviewed By -15- 1 110V UOJ CUU, "I';OJ.lrn I nunnOJ nnl:.n--\,.;u L Il\,.; OJ.::JUOJ"I'.l.l.lOJ.::J f""C: THOMAS HAEN COMPANY, INC. General Englneerh & Building Cantrac1;1 CONTRACTOR'S L CA #447064 NV #001433 P.O BOX 8998 1012 INOUSTRIAL A\ SOUTH LAKE TAHOE, CA 961 (530) 541-4700 FA)( (530) 541-11 November S, 2007 South Tahoe Public Utility District 1275 Meadow Crest Drive S.Lake Tahoe, CA 96150 .Attn: Julie Ryan Re: Luther Pau Pump StatioD Seismic Upgrade Projeet - STPUD 2007 Credit for Roof Costs at Luther Pass Pump Station Dear Julie, Con1ract Credit for Item #7 Roof Patching Add 2 men @8hrs = 16brs @ $78.00= < $ 6,575.00> 1.248.00 < $5,327.00> Total Contract Credit- ~~ Thomas Haen Company -16- III ~")M:.... ........... South Tahoe PubllcUtUity Di61;rlct Dlrec1:or& ~FamI Janet ft..lolw MaJyI..ClU.~. 0uMil~ !J1c; l!lc:Mtiw 1275 ~a.t.OrW.South... r...CAge1!5O-1<401 Phc:lrI6 53054+6414-Fax 530 541-0614eWLWIstpltJ t,. BOARD AGENDA ITEM 4c TO: Board of Directors FROM: Randy Curtis, Manager of Field Operations MEETING DATE: November 15, 2007 ITEM - PROJECT NAME: New Ford 350 4X4 trucks for Heavy Maintenance Equipment Repair. REQUESTED BOARD ACTION: Authorize staff to solicit bids from Ford dealers for the purchase of two (2) F-350 4X4 trucks. DISCUSSION: The Heavy Maintenance Department and the Equipment Repair Department are requesting to replace two (2) existing service trucks. Both vehicles have reached the end of their useful life: (1) Truck #19 Heavy Maintenance 1995 % ton Chevrolet, 89,400 miles used as a welding and heavy service truck; (2) Truck #11 Equipment Repair Service Truck 1 ton Dodge Dually, 70,500 miles very weak motor currently not taken out of the basin. Both trucks are on vehicle replacement list schedule. The Ford F-350 is on the District's standardized (sole brand) list. The F-350 Model is used because of the heavy duty front end that is capable of handling the plow attachments used by the District. SCHEDULE: As soon as possible COSTS: ACCOUNT NO: 1005-8881 ($30,000), 1005-8816 ($30,000) BUDGETED AMOUNT REMAINING: 1005-8881 ($30,000), 1005-8816 ($30,000) ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES ~_ NO CHIEF FINANCIAL OFFICER: YES ~ NO CATEGORY: Sewer -17- ~~ ~H."" South Tahoe Public UtilIty District Oinlc:l;cn ~ F...... ~ It..lolw MaJyLClu ~ 0uMil~ Eric 9cNfer 1215 ~~~.6outh t..akt ratw-CA 96150-1401 fl'tlontJ 530&4J1 6414- Fax 530 541-06M-wwwstpud.ue BOARD AGENDA ITEM 4d TO: Board of Directors FROM: Randy Curtis, Manager of Field Operations MEETING DATE: November 15,2007 ITEM - PROJECT NAME: New trucks for Underground Repair Water and Pump Station crews. REQUESTED BOARD ACTION: Authorize staff to advertise for bids for the purchase of one new 2-door % ton 4X4 pick-up and one 2-door % ton 4X4 pick-up. DISCUSSION: These two pick-up trucks are to replace: (1) Truck #32 1998 GMC 2500 water service truck 86,201 miles; and (2) Truck #13 1998 GMC Sonoma pump crew service truck 91,700. Both vehicles are on our 8-10 year replacement plan. This plan includes looking at vehicle condition and mileage as factors for replacement. SCHEDULE: As soon as possible COSTS: ACCOUNT NO: Trk. #32 2005-8857, Trk. #13 2005-8884 BUDGETED AMOUNT REMAINING: Trk. #32 2005-8857 $35,000 Trk. #13 2005-8884 $30,000 ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES ~1J"/ CHIEF FINANCIAL OFFICER: YES~ CATEGORY: Water NO NO -19- South Tahoe Public Utility District ~.~lt,... IIcft.lIi...... ~ ~ F....... "--It~ "ry I..ClU ........ OuMilW~ !tic 5dWtr 1275 Moadow a.t t1rivlte6cM:n....... rahc>>-CA 96150-1<401 Phone 530 544-6474.Fmt 530 !541-06'14-www~ BOARD AGENDA ITEM 4e TO: Board of Directors FROM: MEETING DATE: Jim Hoggatt, Construction Manager/Engineer November 15, 2007 ITEM - PROJECT NAME: Upper Dressler Ditch Phase I Project REQUESTED BOARD ACTION: (1) Approve the Project Closeout Agreement and Release of Claims for T & S Construction Co., Inc., and (2) Authorize staff to file the Notice of Completion with the Alpine County Clerk. DISCUSSION: Staff held a final inspection for the project and found that T&S Construction Inc. has completed the project according to the Plan and Specification. Staff recommends approval of the project Closeout Agreement and Release of Claims, and the filing of the Notice of Completion with the Alpine County Clerk. SCHEDULE: As soon as possible COSTS: None ACCOUNT NO: 1029-7062 BUDGETED AMOUNT REMAINING: $121,230 ATTACHMENTS: Closeout Agreement and Release of Claims, Notice of Completion. CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES ~ NO CATEGORY: Sewer -21- CLOSEOUT AGREEMENT AND RELEASE OF CLAIMS THIS AGREEMENT AND RELEASE OF CLAIMS (Agreement) is made in South Lake Tahoe, California, this _ day of November, 2007 by and between South Tahoe Public Utility District, (DISTRICT), and T&S Construction Co., Inc., (CONTRACTOR). KNOW ALL PERSONS BY THESE PRESENTS: 1. That the undersigned, as the authorized representative of CONTRACTOR, and for each of its successors, assigns and partners, for and in consideration of Seven Hundred Fifty Thousand, Six Hundred Sixty-five Dollars ($750,665.00), the original Contract amount, and the sum of Five Thousand Seven Hundred Sixty-six Dollars and Seventy Cents ($5,766.70) for Contract Change Order No. 1, receipt of which is acknowledged, does release and forever discharge the DISTRICT, and each of its successors, assigns, directors, officers, agents, servants, volunteers and employees, from any and all rights, claims, causes of action, demands, debts, obligations, liabilities, actions, damages, costs and expenses (including but not limited to attorneys', paralegal and experts' fees, costs and expenses) and other claims, which may be asserted against DISTRICT by reason of any matter or thing which was the subject matter of or basis for: A. The performance of all terms and conditions of that certain agreement dated Apri/6, 2007 for Purchase Order No. P18802 and PI8802A, DISTRICT project described as Upper Dressler Ditch - Phase r. B. Change Orders No.1, as approved by the parties, pertaining to Purchase Order No. P18802 and P18802A and shown in Payment Request No.6, dated November 15, 2007. 2. Nothing contained in this Agreement shall waive or alter the rights, privileges, and powers of the DISTRICT or the duties, liabilities and obligations of the CONTRACTOR and its surety(ies) in respect to any portions of the Contract Documents for Purchase Order No. P18802 and PI8802A. 3. The District has received the following claims from the Contractor: None. Except as expressly provided in this section, the DISTRICT has received no other claims from the CONTRACTOR. 4. Upon execution of this Agreement, the DISTRICT agrees to promptly record a NOTICE OF COMPLETION with the EI Dorado County Recorder. -23- 1 5. The current retention amount is Original Contract amount Total Change Order Amount Less: Amount Previously Paid (Request Nos. 1 through 6) Retainage BALANCE: $ 37,821.59 $750,665.00 $ 5,766.70 $718,610.11 $ 37,821.59 $ -0- The retainage will be released to the CONTRACTOR at the expiration of thirty-five (35) calendar days after date of recording a NOTICE OF COMPLETION by Alpine County Recorder or when all stop notices have been released, whichever last occurs. The release provided pursuant to this Agreement shall not apply to CONTRACTOR'S right to the retention amount until and .to the extent such amounts are received ~y CONTRACTOR. 6. CONTRACTOR and DISTRICT agree that the total adjusted Contract price and time of performance for Purchase Order No. P18802 and P18802A, after the execution of change orders, is as follows: Original Contract Price $750,665.00 Original Calendar Days 120 Adjusted Contract Price $756,431.70 Adjusted Calendar Days None 7. It is understood and agreed by Contractor that the facts with respect to which the release provided pursuant to this Agreement is given may turn out to be other than or different from the facts as now known or believed to be, and Contractor expressly assumes the risk of the facts turning out to be different than they now appear, and agrees that the release provided pursuant to this Agreement shall be, in all respects, effective and not subject to termination or rescission by any such difference in facts and Contractor expressly waives any and all rights it has or may have under California Civil Code Section 1542, which provides as follows: "A general release does not extend to claims which the creditor does not know or suspect to exist in his favor at the time of executing the Release which if known by him must have materially affected his settlement with the debtor." 8. The release made by the CONTRACTOR is not to be construed as an admission or admissions of liability and the Contractor denies any such liability. Contractor agrees that it will forever refrain and forebear from commencing, instituting or prosecuting any lawsuit, action or other proceeding against the District based on, arising out of, or in any way connected with the subject matter of this release. 9. The CONTRACTOR releases the DISTRICT from all claims, including but not limited to those of its Subcontractors for all delay and impact costs, if any. -24- 2 10. The CONTRACTOR represents and. warrants to the DISTRICT that the CONTRACTOR has not assigned or transferred or purported to assign or transfer to any person, firm, corporation, association or entity any of the rights, claims, warranties, demands, debts, obligations, liabilities, actions, causes of action, damages, costs, expenses and other claims and the CONTRACTOR agrees to indemnify and hold harmless the DISTRICT, its successors, assigns, directors, officers, agents, servants, volunteers and employees, from and against, without limitation, any and all rights, claims, warranties, demands, debts, obligations, liabilities, actions, causes of action, damages, costs, expenses and other claims, including but not limited to attorneys', paralegal and experts' fees, costs and expenses arising out of or connected with any such assignment or transfer or purported assignment or transfer. 11. The parties acknowledge that they have been represented by counsel of their own choice in connection with the preparation and execution of this Agreement. The parties acknowledge and represent that they understand and voluntarily consent and agree to each and every provision contained in this Agreement. 12. The parties further acknowledge and represent that no promise, inducement or agreement, not expressed in this Agreement, have been made and that this Agreement contains the entire agreement among the parties and that the terms of the Agreement are contractual and not a mere recital. 13. The persons executing this Agreement represent and warrant to the other party that the execution and performance of the terms of this Agreement have been duly authorized by all corporate, partnership, individual, or other entity requirements and that said persons have the right, power, legal capacity and authority to execute and enter into this Agreement. SOUTH TAHOE PUBLIC UTILITY DISTRICT RICHARD H. SOLBRIG, GENERAL MANAGER November 15, 2007 BOARD APPROVAL DATE ATTEST: KATHY SHARP, CLERK OF BOARD T&S CONSTRUCTION CO., INC. DATED By: ARTHUR SPINELLA, VICE PRESIDENT DATED -25- 3 Recording Reqltested By: Heidi Donovan SOUTH TAHOE PUBLIC UTILITY DISTRICT And When Recorded, Mail To: South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 SPACE ABOVE THIS LINE RESERVED FOR RECORDER'S U&E TITLE(S) NOTICE OF COMPLETION UPPER DRESSLER DITCH - PHASE 1 PROJECT -26- RECORDING REQUESTED BY: Heidi C. Donovan South Tahoe Public Utility District WHEN RECORDED MAIL TO: SOUTH TAHOE PUBUC UTIUlY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 SPACE ABOVE lliIS UNE FOR RECORDER'S USE APN: NOTICE OF COMPLETION . NOTICE IS HEREBY GIVEN THAT: 1. The undersigned is OWNER or agent of the OWNER of the interest or estate stated below in the property hereinafter described. 2. The FULL NAME of the OWNER is SOUTH TAHOE PUBUC UTIUlY DISTRICf 3. The FULL ADDRESS of the OWNER is 1275 Meadow Crest Drive, South lake Tahoe, CA 96150 4. The NATURE OF THE INTEREST or ESTATE of the undersigned is: In fee. (If other than fee, strike "in fee" and insert here, for example, "purchaser under contract of purchase," or "lessee." 5.. The FULL NAMES and FULL ADDRESSES of ALL PERSONS, if any, WHO HOLD SUCH INTEREST or ESTATE with the undersigned as JOINT TENANTS or as TENANTS IN COMMON are: Name & Address Name & Address 6. The FULL NAMES of FULL ADDRESSES OF THE PREDECESSORS in INTEREST of the undersigned if the property was transferred subsequent to the commencement of the work of improvement herein referred to: Name & Address Name & Address 7. A work of improvement on the property hereinafter described was COMPLETED on 10/9/07. 8. The work of improvement completed is described as follows: Upper Dressler Ditch - Phase I. 9. The NAME OF THE ORIGINAL CONTRACfOR, if any, for such work of improvement is T&S Construction Co. Inc.. 10. The street address of said property Is See Exhibit "A" attached.. 11. The property on which said work of improvement was completed is in the Oty of Woodfords County of Alpine, State of California, and is described as follows: As shown in Exhibit "A" attached hereto and made a part hereof, and commonly known as DATE: November 15. 2007 SIGNAlURE OF OWNER OR AGENT OF OWNER VERIFICATION FORINDMDUAL OWNER: ~RIC SCHAFER, BOARD PRESIDENT I, the undersigned, declare under penalty of perjury under the laws of the State of California that I am the owner of the aforesaid Interest or estate In the property described in the above notice; that I have read said notice, that I know and understand the contents thereof, and the facts stated therein are true and correct. DATE AND PLACE SIGNAlURE OF OWNER NAMED IN PARAGRAPH 2 VERIFICATION FOR NON-INDMDUAL OWNER: I, the undersigned, declare under penalty of perjury under the laws of the State of California that I am the oar res 1 ent of the aforesaid interest or estate in the property described In the above notice; that I have read the said notice, that I know and understand the contents thereof, and that the facts stated therein are true and correct. November 16, 2007 at South Lake Tahoe, CA DATE AND PLACE SIGNAlURE OF PERSON SIGNING ON BEHALF OF OWNER ERIC SCHAFER -27- Notice of COmpletion EXHIBIT "A" The site of work for the Upper Dressler Ditch - Phase I project is located within Diamond Valley and the Indian Creek Recreation Lands at the Upper Dressler Ditch in Woodfords, California. The work performed consists of the construction of approximately 1,891 lineal feet of the raw water conveyance pipeline and begins at the lower silt basin at Station 38+41 and continues upstream to Station 19+50 terminating at the temporary transition structure as shown on the plans. Phase I includes completion of modifications to the lower silt basin, 1,891 lineal feet of 48" closed conduit, .nine (9) fitting manholes, one overflow manhele with drain piping, reconstruction of the overflow outfall apron at Station 27+58, and construction of the temporary transition structure at Station 19+50, and other related work as detailed in the plans and specifications. /1/ /1/ /1/ EXHIBIT" A" -28- South Tahoe Public Utility District 1275 Meadow Crest Drive. South Lake Tahoe. CA 96150-7401 Phone 530 544-6474. Fax 530 541-0614. www.s'tpud.us November 15, 2007 I HEREBY CERTIFY on November _,2007, before me, the undersigned Clerk of the Board of Directors of the South Tahoe Public Utility District, personally appeared ERIC SCHAFER, Board President, known to me to be the person whose name subscribed to the within instrument and acknowledge that he executed the same. WITNESS my hand and official seal. Kathy Sharp, Clerk of the Board -3- -29- South Tahoe PubUc Utnlty District ~ Mllrrl!.... ....tt... ~ ~ F...... ~ 1t.Jon/le M8ryl..ClU~ 0uMil~ E'ric 9c:tlilfIIr 1275 ~~Driw.9outh"'.TaJw.CA 96150-1401 ~530544-6474. Fmt 58Q.f541..061.4ewww.stpucI.us BOARD AGENDA ITEM 6a TO: Board of Directors FROM: Rhonda McFarlane, Chief Financial Officer Lisa Coyner, Manager of Customer Service MEETING DATE: November 15,2007 ITEM - PROJECT NAME: Customer Assistance Program REQUESTED BOARD ACTION: Enact Ordinance No. 501-07 adding Section 6.1.9 to Division 6 of the Administrative Code regarding the Low-Income Customer Assistance Program. DISCUSSION: Staff has met with the District's Finance Committee regarding the establishment of a customer assistance program to help low-income homeowners with paying their water and sewer bills. Staff received support from the Finance Committee and would like to move forward with establishing this program effective January 1, 2008. A powerpoint presentation will be given with details of this program. SCHEDULE: Effective January 1,2008 COSTS: $76,000 ACCOUNT NO: 10000/2000-6690 BUDGETED AMOUNT REMAINING: $76,000 ATTACHMENTS: Ordinance No. 501-07, Application for Customer Assistance Program CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES---Bta::.- NO CATEGORY: Sewer & Water -31- ORDINANCE NO. 501-07 AN ORDINANCE OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT ADDING SECTION 6.1.9 TO DIVISION 6 OF THE ADMINISTRATIVE CODE REGARDING THE LOW-INCOME CUSTOMER ASSISTANCE PROGRAM Be it enacted by the Board of Directors of the South Tahoe Public Utility District, County of EI Dorado, State of California, as follows: SECTION 1 - POLICY AND PURPOSE The purpose of this Ordinance is to adopt certain additions to the Administrative Code regarding the District's Low-Income Customer Assistance Program. SECTION II - DEFINITIONS For the purpose of this Ordinance, the terms used herein are defined as follows: A. The District - The South Tahoe Public Utility District. B. District. The Board - The Board of Directors of the South Tahoe Public Utility C. Administrative Code - The compilation and codification of all of the Administrative, Water, Sewer, Street Lighting and Groundwater Management Plan Ordinances of the District, which establish the authority and the principles for decisions of the District, and provide the public with guidelines applicable to District operations. SECTION III-FINDINGS The Board of Directors of the South Tahoe Public Utility District, County ofEI Dorado, State of California, make the following findings: 1. The District's recent customer service survey demonstrated that the majority of the District's customers were in favor of providing assistance to low-income homeowners with paying their water and sewer bills. 2. Several other local utility companies offer a similar financial assistance programs for their low-income customers. 3. The District desires to amend the Administrative Code to provide relief to those individuals and families who meet the qualifications of the Program. 4. The Board of Directors has determined that it is in the best interest of the District and community to adopt this Ordinance with respect to offering financial assistance to low-income customers. -33- 5. The Low-Income Customer Assistance Program will not be funded with customer's service charges but with District revenue from property tax receipts that is not utilized in the District's ratemaking process. SECTION IV - SECTION 6.1.9 ADDED TO DIVISION 6 OF THE ADMINISTRATIVE CODE The following section shall be added to Division 6 of the Administrative Code and inserted as Section 6.1.9: "6.1.9 The District offers a Low-Income Customer Assistance Program for qualifYing residential customers. The District's customer is the record owner of a parcel served by a water and/or sewer connection. The Property must be owner occupied. Program specifications are as follows: a.) Eligibility is based upon current participation in the Sierra Pacific Power Company's Care Program. b.) The amount of the rebate is 20% ofthe standard residential water and sewer rate. c.) The Program does not apply to rental properties or second homes. d.) The Program is subject to annual renewal and may require additional proof of eligibility. e.) The District, at its discretion, may remove the applicant from the Program if it has reason to believe the applicant is no longer eligible or does not meet Program requirements." SECTION V - SEVERABILITY If any section, subsection, subdivision, paragraph, sentence, clause or phrase of this Ordinance and its implementing rules and regulations is for any reason held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portions of this Ordinance or the Administrative Code. The Board of Directors declares and determines that it would have passed section, subsection, subdivision, paragraph, sentence, clause or phrase thereof of this Ordinance and its implementing rules and regulations and the Administrative Code irrespective ofthe fact that anyone or more sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases may be determined to be unconstitutional or invalid. -34- SECTION VI - EFFECTIVE DATE This Ordinance adding the above referenced section to the Administrative Code shall take effect January 1, 2008. PASSED AND ADOPTED by the Board of Directors of the South Tahoe Public Utility District at its duly held regular meeting on the 15th of November 2007 by the following vote: AYES: NOES: ABSENT: Eric Schafer, President South Tahoe Public Utility District ArrEST: Kathy Sharp, Clerk of the Board! Executive Services Manager -35- South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 (530) 544-6474 Application for Customer Assistance Program Proaram Description The South Tahoe Public Utility District offers a customer assistance program (CAP) for qualifying residential customers. The District's customer is the record owner of a parcel served by a water or sewer connection. The amount of the rebate is 20% of the standard residential sewer and water rate. Eligible customers will receive their rebate as a credit to their quarterly utility bill. Proaram Reauirements 1. Current participation in the Sierra Pacific Power Company's CARE Program is required. Please attach a copy of your most recent billing showing participation in the CARE Program. The CARE Program address must agree with the address applied for below. 2. The address applied for must be your primary residence. 3. Each application shall be for one residence only. 4. The rebate is not transferable to a new address or another person. If you move, you may reapply for the Program for the new address. 5. You must apply for the Program annually to continue to receive the rebate. 6. The District may, at its discretion, require additional proof of eligibility and may remove you from the Program if it has reason to believe that you are no longer eligible or meet Program requirements. 7. The Program does not apply to rental properties or second homes. Customer Information Application Date Customer Name (Please Print) Address to Receive Assistance Account Number Shown on Bill Daytime Telephone Number Customer Sianature and Attest I have read and understand and agree to abide by the above Customer Assistance Program requirements, and attest that all information provided is true and correct. Signature Return your completed application together with attachment to: STPUD - RRP, 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 For District Use Only Acet. No. Maximum Household Income # of Persons in Household Total Combined Annual Income 1 or 2 .......................................... ....$29,300 3......... ......................................... ..$34,400 4. . . .. . .. . . . . . .. . . . . . . .. . . .. . . . .. . . .. . . . . .. . .. .. . .. . .$41 ,500 5......... ......................................... ..$48,600 6...... ... ....................................... ....$55,'7Qtl6- Add $7,104 for each additional family member Approved: Disapproved: Date: South Tahoe PubflcUtfllty District ~....... RtohJnIH.... ~ ~ F...... ~ It..lolw ~1..ClU~ 0uMil w.a.c:o EIic 9c:fuIflIIr 12'15 ~cnet..Drlvo.South .....T~.CA961eO-14OI fl'hon6 53054+6414.Fmt 530 541..o614eWtNWstpud.ue BOARD AGENDA ITEM 6b TO: Board of Directors FROM: Nancy Hussmann, Human Resources Director Rhonda McFarlane, Chief Financial Officer Richard Solbrig, General Manager MEETING DATE: November 15, 2007 ITEM - PROJECT NAME: Self-Insured Medical Plan - Third Party Administrator REQUESTED BOARD ACTION: (1) Approve staff recommendation for Third Party Administrator; and (2) Authorize staff to enter into contract with successful bidder. DISCUSSION: Requests for Proposal from Third Party Administrators was solicited in October, 2007, to determine the best Third Party Administrator to administer claims for the District's health plan. Proposals were received by the October 22,2007, due date and were evaluated by a committee consisting of the District Shop Stewards and applicable staff. Interviews were conducted on November 5th, site visit was conducted on November 9th, and a Finance Committee meeting is scheduled for November 1ih, . whereby staff will provide the Finance Committee with its recommendation for Third Party Administrator services. Due to the fact that all review information is not available at the time of publication of the agenda, staff will present its recommendation to the Board at the November 15th, Board meeting. SCHEDULE: Implement any possible change in Third Party Administrator by 1/1/08. COSTS: Vary depending upon proposer. ACCOUNT NO: Various BUDGETED AMOUNT REMAINING: $992,200 ATTACHMENTS: To be presented at the Board meeting. CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ CHIEF FINANCIAL OFFICER: YES CATEGORY: General NO NO -37- .~Mr~ ~tt.... South Tahoe Public Utility District l>Iract.onJ ~ FamIl ,.,..,. It ..IoIw ~Lou~ l:luftI ~ Eric~ 1275 ~CtcrslDrivo. South l.at.e r...CA 96150-7.1101 f"hDn6 530 54+-6474-Fax 530 !541--0614.wwwstpud.ue BOARD AGENDA ITEM 6c TO: Board of Directors FROM: Paul A. Sciuto, Assistant General Manager Lisa Coyner, Customer Service Manager MEETING DATE: November 15, 2007 ITEM - PROJECT NAME: Water Meter Legislation and Installation REQUESTED BOARD ACTION: Provide direction to staff on installing water meters on waterline capital projects. DISCUSSION: The District does not currently install water meters on water services on waterline capital projects. AB 2572 requires that all water systems in California have water meters on all service connections by January 1, 2025. The intent of the AB 2572 is to account for water, and ultimately conserve water for use throughout California. The District is currently seeking an exception to this legislation because the District is part of the Nevada watershed. Based on a recent waterline project, the cost for installation of a standard ~-inch water meter is approximately $3000, $3500 for a 1-inch water meter, and $4500 for a 2-inch water meter. At a minimum, District staff believes it is consistent with past practice to install water meters on all existing water services 1-inch in diameter and greater. As an example, for the 2008 AI Tahoe Waterline project this would add approximately $150,000 to the project. Staff also believes it is prudent to increase the water service diameter for multi- family dwellings to be consistent with Uniform Plumbing Code recommendations. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: -39- Paul A. Sciuto Lisa Coyner November 15, 2007 Page 2 CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES ~ NO -40- CATEGORY: Water Otnnf~ ........... South Tahoe Public Utility District ~ ~ F...,.. .Janw.1t ...Icllw Maryl..ClU~ ~W~ Eric; 9cfulliIr 1215 ~o.t,DriYe-eouth L..aD rattoe-CA 9615()."<<>1 f"hon6 5305+4-6414-Fmt530 f54'H)614ewwwstpud.ue BOARD AGENDA ITEM 6d TO: Board of Directors FROM: MEETING DATE: Julie Ryan, Senior Engineer November 15, 2007 ITEM - PROJECT NAME: Replacement of Angora Tank and Country Club Tank REQUESTED BOARD ACTION: Approve proposal from selected consultant (to be determined) for structural and civil engineering services. DISCUSSION: Staff is working on the design of the Angora Tank and Country Club Tank replacements. This project is on a fast-track, with a goal of starting construction May 1, 2008. Due to constraints of current workload and a need for specialty experience, staff has sought engineering support from three qualified engineering firms. Proposals from these firms are due on Monday, November 12. Staff will review the proposals, identify the most qualified firm, and recommend a preferred consultant to the Board prior to, and at the board meeting. SCHEDULE: November 2007 to October 2008 COSTS: TSD ACCOUNT NO: 2029-7064 and 2029-7063 BUDGETED AMOUNT REMAINING: $146,901/ $154,650 ATTACHMENTS: To be distributed prior to, and at the Board meeting. CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES J<;H J CHIEF FINANCIAL OFFICER: YES RfY1<. CATEGORY: Water NO NO -41- South Tahoe Public Utility District lit- Co~ \\-\S-olj Richard Sol brig, General Manager D '-f r tI'V\ Board Members Kathleen Farrell James R. Jones Mary Lou Mosbacher Duane Wallace Eric Schafer Memorandum Date: November 15, 2007 To: STPUD BDard Members From: Julie Ryan, Senior Engineer Cc: Richard Solbrig, General Manager Paul Sciuto, Assistant General Manager Subject: Replacement of Angora and Country Club Tanks Recommendation of Design Consultant The District received three proposals for consulting services in support of the replacement of Angora and Country Club Tanks. Staff reviewed the proposals from the three consultants based on a pre- determined set of criteria (attached). The Staff's preferred consultant is Brown and Caldwell, selected based on their scores with respect to these criteria. Staff will further confirm this selection by contacting the references provided in the proposal. Brown and Caldwell proposes to provide the requested services for $95,555. The breakdown of costs is attached. Staff recommends that the Board accept the proposal from Brown and Caldwell to provide design support services for the replacement of Angora and Country Club Tanks in the amount not to exceed $95,555. This price will be used as a starting point for negotiations, which will commence upon Board approval of the recommendation. South Tahoe Public Utility District. 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Phone 530.544.6474 . Facsimile 530.541.0614. www.stpud.us SOUTH TAHOE PUBLIC UTILITY DISTRICT TANKS REPLACMENT 2008 PROJECT CODE: ANGOTKlCLUBTK PROPOSAL EVALUATION & SELECTION CRITERIA On a scale of 1 to 10 (1 = weak to 10 = strong) rank the proposals using the following criteria and enter your scores on the accompanying scoring sheet. CRITERIA DESCRIPTION WEIGHTING 1 Rank the overall completeness of the proposal. Does it provide for the components requested in the RFP, including plans, specs and estimates for foundations, tanks, cathodic protection and coatings? Rank the project team in terms of relevant experience planning and designing tanks. Rank the propDsal in terms of the consultant's overall grasp of the issues that may be encountered at the sites (esp. constraints of cold and fire), and expertise to address them (esp., corrosion issues). Does the proposal meet the scheduling cDnstraints outlined int the RFP? If not, is the consultant's proposed alternate schedule seem achievable and appropriate for construction starting May 1? 2 3 4 5 Rank the project team in terms of experience working within the unique regulatory climate in Lake TahDe. Using the proposal and your previous project experience with the consultant as guides, rate your confidence in the project team with respect tD responsiveness, availability, and ability to communicate technical issues. Rank the proposal in terms of offering unique approaches or key considerations to completing the project. 6 7 " ConsultanUist.xls 1 0.10 0.15 0.20 0.10 0.10 0.15 0.20 1.00 11/12/2007 Suite 115, 201 North Civic Drive Walnut Creek, California 94596-3864 Tel: (925) 937-9010 Fax: (925) 937-9026 November 12,2007 BROWN AND CALDWELL Julie H. Ryan, PE Senior Engineer South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150-7401 Dear Ms. Ryan: We have prepared and enclosed a cost proposal in accordance with the proposed scope of work contained in our 2008 Tanks Replacement Project proposal. Our scope of work and estimated level of effort are based on our understanding of the project as described in the Request for Proposal dated October 31, 2007 and during our discussions with District staff. Rates are based on those established in our Master Service Agreement with the District. Associated Project Cost consists of $8 per each labor hour for copying, phone, computer, etc. The estimated level of effort is based on the assumption that we will prepare eight design drawings and associated technical specifications for the project. Brown and Caldwell's civil engineer Richard Mattucci and electrical engineer Gary Barrett are available for general civil, site grading, and electrical and instrumentation design work should the need arise. We welcome the opportunity to discuss this in detail at your convenience. If you have questions, please feel free to contact Bill Faisst at 925-210-2384 or Jill Cunningham at 925-210-2229. We look forward to working with the South Tahoe Public Utility District on this important project. Very truly yours, BROWN AND CALDWELL ~q;J- William K. Faisst, PhD, PE Project Officer Jill Cunningham, PE Project Manager Environmental Eng neers & Consultants 1 - Project Management South Tahoe Publ 2008 Tanks Repl~ Level of EtIo Novembet Task 2 - 50 Percent Design 3 - 90 Percent Design 4 - Final Design 5 - Engineering Services During Constroction Notes 1 The level of effort and cost is based on the scope of work provided in Brown and Caldwell's letter proposal dated November 12, 2007. 2 Brown and Caldwell will prepare eight design drawings: two mechanical, three strocturaJ, and three cathodic protection. 3 Other Direct Costs consist of$8 per each labor hour for Associated Project Costs (copying, phone, computer, etc.) and travel costs. .-/. Utility District ~ment Project and Cost ~, 2007 32,330 2,160 34,490 21,057 1,376 22,433 11,074 648 11,722 6,184 304 6,488 85,809 4,736 90,545 1,000 1,000 1,000 1,200 4,200 1,050 1,050 1,050 1,260 4,410 35,540 23,483 12,772 7,748 95,555 B R 0 \\' l\ A" D C :\ L D \\ ILL ~ ......... ~H."" . South Tahoe PubUc Utility District ~ ~ F.tmII ..JlInIlw It..ton. MaryL.Ql.l~ Ou.tlne.~ Eric~ 1275 ~en.t0rMt-5outh... Tafw.CA 98100-1401 ~530544-6414.Fmt 530 541-0614ewwwstpud.ue BOARD AGENDA ITEM 6e TO: Board of Directors FROM: Jim Hoggatt, Construction Manager/Engineer MEETING DATE: November 15, 2007 ITEM - PROJECT NAME: Engineering Department 2008 Project Priority List REQUESTED BOARD ACTION: Approve priorities. DISCUSSION: The Engineering staff has met with Operations and Maintenance managers and supervisors to review projects listed on the 10-year budget and to establish a priority list. SCHEDULE: As soon as possible COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: Project Priority List CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES~ NO CATEGORY: Water & Sewer -43- n e t'R�eLse ' 7 FF/^' A IOYE P- 304 € TOTALS 3,942,400 2,000,000 50,000 4,180,000 180,000 84,500 210,000 390,000 300,000 2,500,000 180,000 9,200,000 150,000 3,800,000 500,000 3,700,000 2,000,000 RISK PRIORITY PROJECTS 08-09 09 -10 10-11 11 -12 12 -13 13-14 14-15 15-16 16-17 17 -18 ENGINEER BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET Budget 1o0 1 (W) EROSION CONTROL PROJECTS (21) PS,JH,JT,JR,IB,RC 300,000 306,200 328,000 350,600 375,100 401,400 429,500 459,600 492,000 500,000 100 2 (W) ARSENIC TREATMENT SYSTEM PS,JH,IB,JT 1,000,00o 1,000,000 loo 3 (W) South Upper Truckee Well Building & Equipment JH,JT,IB,TR 50,000 100 4 (W) Granite, Iron Mt, Tata and Al Tahoe Waterline Replacement JH,JT,TR,MM 4,180,000 100 5 (W) BMP Projects JH,JR 60,000 60,000 60,000 100 6 (W & S) GIS WS 39,500 6,000 7,000 7,000 8,000 8,000 9,000 100 7 (S) BMP PROJECTS JH,JR 110,000 100,000 at. I 1dfl 8 (S) SEWER COLLECTION SYSTEM MASTER PLAN PS, JT, RC 380,000 10,000 100 9 (S) B-IJNE REVEGETATION PS 150,000 100,000 50,000 + 100 10 (S) OXYGEN SYSTEM ICR/TMDL PS,JH,JT,IB,HB 150,000 1,200,000 50,000 1,100,000 100 11 (S) Monitoring Wells for Nitrate PS,JH,IB,HB 60,000 60,000 60,000 80 12 (S) FINAL EXPORT PUMPS AND VFD REPLACEMENT PS,JH,JR,RJ 3,000,000 6,200,000 80 13 (W) WATER EVALUATIONS - FLAGPOLE AND AIRPORT PS, JH, JT, RC 150,000 72 14 (S) SECONDARY & FILTER REHAB PS,JR,RJ 300,000 2,000,000 1,500,000 64 15 (W) ANGORA HIGHLANDS TANK JH,JT,JR 250,000 250,000 64 16 (W) Stanley Waterline (12" LTB) PS,JH,JT,RC 500,000 3,200,000 64 17 (W) TWIN PEAKS BOOSTER STATION JH,JT,RC 500,000 1,500,000 n e t'R�eLse ' 7 FF/^' A IOYE P- 304 € TOTALS 3,942,400 2,000,000 50,000 4,180,000 180,000 84,500 210,000 390,000 300,000 2,500,000 180,000 9,200,000 150,000 3,800,000 500,000 3,700,000 2,000,000 RISK PRIORITY PROJECTS 08-09 09 -10 10-11 11 -12 12 -13 13 -14 14-15 15-16 16-17 17 -18 ENGINEER BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET Budget TOTALS 64 18 (S) FALLEN LEAF LAKE SYSTEM IMPROVEMENTS PS,JH,JT,RC 1,500,000 1,500,000 63 19 (W) COUNTRY CLUB TANK JH,JT,JR,RC 250,000 250,000 500,000 60 20 (W) Iroquois BOOSTER and PIPE IMPROVEMENTS JH,JT,RC 250,000 300,000 2,000,000 2,550,000 60 21 (S) HARVEY PLACE EMERGENCY STORAGE BASIN PS,JH,IB,HB 400,000 2,000,000 2,400,000 60 22 (S) C -LINE Rerouting PS,JH,HB 25,000 1,100,000 1,100,000 2,225,000 56 23 (W) GRIZZLY MT. BOOSTER JH,JT 250,000 250,000 2,000,000 2,500,000 49 24 (S) HEADWORKS IMPROVEMENT PROJECT PS,JH,RJ 400,000 4,500,000 4,000,000 8,900,000 I 4i 25 (S) ERB POND LINER REPLACEMENT PS,JH,RJ 3,000,000 3,000,000 48 26 (W) Forest Mt. Booster Rehab" JH,JT,RC 100,000 100,000 48 27 (S) LPPS TRANSFORMERS PS,JH,JR,RC 100,000 100,000 40 28 (S) Primary Clarifier Floors PS,JH,RJ 500,000 500,000 40 29 (W) Julie Lane Waterline -(City paving in 2009 or 2010) JH,JT,TR,MM 100,000 1,200,000 1,300,000 32 30 (S) COLLECTION SYSTEM IMPROVEMENTS (many years) PS,JT,RC 1,000,000 1,967,100 2,000,000 4,967,100 32 31 (W) ECHO VIEW TANK JH,JR,RC 50,000 400,000 450,000 32 32 (S) LPPS GENERATOR PS,JT,RC 500,000 2,000,000 2,500,000 • 30 33 (S) C -LINE INSPECTION PS,JH,HB 60,000 60,000 30 34 (S) Treatment Plant Generator PS,RJ 2,000,000 2,000,000 RISK PRIORITY PROJECTS 08-09 09-10 10-11 11 -12 12 -13 13-14 14-15 15-16 16-17 17 -18 ENGINEER BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET Budget TOTALS 28 35 (S) BALLAST POND LINER PS,RJ 750,000 28 36 (W) BOOSTER STATION GENERATORS & BLDG KELLER, DAVID JH,JT,RC 400000 750.000 400,000 25 37 (S) DIAMOND VALLEY MASTER PLAN & EIR PS,JH,HB 50,000 50,000 25 38 (S) SNOWSHOE THOMPSON PHASE 1 JH,HB 2,200,000 2,200,000 25 39 (S) CATHODIC PROTECTION PS,RC,RJ 25,000 25,000 24 41 (W) KELLER TANK JH,JT,JR 150,000 550,000 700,000 21 42 (W) WATERLINE - SIERRA TRACT (crossings) JH,TR,MM 250,000 250000 2d 43 (S) HARVEY PLACE EMERG STORAGE PONDS PHASE 2 PS,JH,HB 1,100,000 1,100,000 20 44 (S) WWTP PIPING REPLACEMENT PS,RJ 250,000 750,000 1,000,000 20 45 (S) LPPS SCADA PS,RC,RJ 110,000 110,000 20 46 (S) Forcemain Bypass - Al Tahoe PS,RC,RJ 50,000 50,000 16 48 (W) RALPH and Tata TANKS Demolition PS,RC, 50,000 50,000 16 49 (W) FUTURE MTBE TREATMENT PS,JH,JT,IB,RC ' 2,600,000 2,600,000 16 50 (S) LPPS PUMP & MOTOR UPGRADE PS,JH,JR,RC 900,000 4,200,000 5,100,000 15 51 (W) Waterlines - Priority List PS,JH,JT,JR,RC 1,500,000 1,500,000 1,500,700 1,606,000 1,718,100 1,838,500 1,967,200 2,200,000 13,830,500 15 52 (W) DATA LOGGERS, MONITORING WELL IB,RC 20,000 Y0,000 53 CATHODIC PROTECTION 0 RISK PRIORITY PROJECTS 08-09 09-10 10-11 11 -12 12 -13 13 -14 14-15 15-16 16 -17 17 -18 ENGINEER BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET Budget TOTALS 15 54 (W) TRANSDUCERS - AH, Bakers., Paloma, Sunset IB,RC 15,000 15,000 15 55 (W) Well Destructions - BR #1, MV, Tata #1, CC IB,RC 200,000 200000 9 56 (W) Fire Hydrants on 6 -inch lines PS,JH,JT,JR 0 6 56 (S) CARBON ODOR SCRUBBER PS,RJ 300.000 300,000 4 57 ,(W) GARDNER MT. ALTITUDE VALVE PS,RC 50,000 50,000 0 58 (W) WWTP Revegetation and BMP JT 400,000 400,000 0 59 (S) WWTP FUTURE CONNECTIONS PS,RJ 250,000 250,000 I 0 60 (S) Lower Shop Vehicle Parking PS,RJ 500,000 500,000 0 61 (S) DVR Improvements PS,HB 0 0 62 (S) LOWER & FOUNTAIN SHOP BUILDING IMPROVE. PS,RJ 500,000 500,000 0 64 (S) Harvey Channel Culvert PS,HB 110,000 110,000 0 65 (W) Lookout Tank Recoating JH,JR,RC 50,000 50,000 0 66 (W) Groundwater Modeling Services IB, 25,000 25,000 0 67 (W) Bayview Flushing Line IB 100,000 100,000 BUDGET TOTAL 12,754,500 21,757,200 6,748,000 14,757,600 11,232,800 11,215,400 7,655,600 3,907,100 4,926,300 4,700,000 99,654,500 _ _ . L PRIORITY PROJECTS Sciuto Hoggatt Thiel Ryan Bergsohn Rieger Mendoza Stanley TOTALS N- N CO (W) EROSION CONTROL PROJECTS (21) 2.00% 3.00% 3.00% 3.00% 3.00% 14.00% (W) ARSENIC TREATMENT SYSTEM 2.00% 2.00% 3.00% 15.00% 22.00% (W) South Upper Truckee Well Building & Equipment 3.00% 1.00% 20.00% 20.00% 5.00% 49.00% 102.00% 4 (W) Granite, Iron Mt, Tata and Al Tahoe Waterline Replacement 2.00% 8.00% 2.00% 35.00% 55.00% 5 (W) BMP Projects 1.00% 5.00% 6.00% 6 (W & S) GIS 1.00% 75.00% 76.00% 7 (S) BMP PROJECTS 1.00% 10.00% 11.00% 8 (S) SEWER COLLECTION SYSTEM MASTER PLAN 10.00% 20.00% 30.00% 9 (S) B REVEGETATION 2.00% 2.00% 10 (S) OXYGEN SYSTEM ICR/TMDL 5.00% 2.00% 10.00% 20.00% 37.00% e 11 (S) Monitoring Wells for Nitrate 1.00% 2.00% 7.00% 10.00% 1 12 (S) FINAL EXPORT PUMPS AND VFD REPLACEMENT 10.00% 4.00% 25.00% 39.00% 13 (W) WATER EVALUATIONS - FLAGPOLE AND AIRPORT 3.00% 3.00% 5.00% 11.00% 14 (S) SECONDARY & FILTER REHAB 10.00% 8.00% 18.00% 15 (W) ANGORA HIGHLANDS TANK 3.00% 10.00% 13.00% 16 (W) Stanley Waterline (12" LTB) 2.00% 5.00% 3.00% 10.00% 17 (W) TWIN PEAKS BOOSTER STATION 3.00% 10.00% 13.00% 19 (W) COUNTRY CLUB TANK 3.00% 2.00% 10.00% 15.00% 20 (W) Iroquois BOOSTER and PIPE IMPROVEMENTS 4.00% 15.00% 19.00% 21 (S) HARVEY PLACE EMERGENCY STORAGE BASIN 5.00% 8.00% 5.00% 18.00% 22 (S) C - LINE Rerouting 5.00% 5.00% 10.00% 26 (W) Forest Mt. Booster Rehab*" 1.00% 1.00% 2.00% 27 (S) LPPS TRANSFORMERS 3.00% 1.00% 4.00% 8.00% PRIORITY PROJECTS Sciuto Hoggatt Thiel Ryan Bergsohn Rieger Mendoza Stanley TOTALS 29 (W) Julie Lane Waterline -(City paving in 2009 or 2010) 2.00% 5.00% 2.00% 2.00% 20.00% 15.00% 46.00% 30 (S) COLLECTION SYSTEM IMPROVEMENTS (many years) 15.00% 10.00% 25.00% 31 (W) ECHO VIEW TANK 1.00% 5.00% 6.00% 33 (S) C - LINE INSPECTION 2.00% 3.00% 5.00% 37 EIR 2.00% 12.00% 14.00% 39 (S) CATHODIC PROTECTION 2.00% 2.00% 40 (crossings) 3.00% 15.00% 10.00% 28.00% 45 (S) LPPS SCADA 5.00% 5.00% 46 (S) Forcemain Bypass - Al Tahoe 1.00% 1.00% 50 (S) LPPS PUMP & MOTOR UPGRADE 5.00% 1.00% 3.00% 9.00% 51 (W) Waterlines - Priority List 1.00% 5.00% 5.00% 5.00% 16.00% 52 WELL 2.00% 54 . Paloma, Sunset 2.00% 2.00% 55 #1, CC 5.00% 5.00% A 58 (W) WWTP Revegetation and BMP 1.00% 1.00% 59 (S) WWTP FUTURE CONNECTIONS 2.00% 2.00% 64 (S) Harvey Channel Culvert 5.00% 5.00% 65 (W) Lookout Tank Recoating 5.00% 5.00% 66 (W) Groundwater Modeling Services 2.00% 2.00% 105.00% 96.00% 94.00% 90.00% 81.00% 90.00% 85.00% 75.00% PAYMENT OF CLAIMS FOR APPROVAL November 15, 2007 Payroll 11/07/07 Total Payroll BNY Western Trust Company FirstTier Administrators-health care pmts Hatch & Parent-legal services LaSalle Bank Total Vendor EFT Accounts Payable Checks-Sewer Fund Accounts Payable Checks-Water Fund Accounts Payable Checks-Seff-funded Ins Accounts Payable Checks-Grant Fund Total Accounts Payable Grand Total Payroll EFTs & Checks EFT EFT EFT CHK EFT EFT CHK EFT CHK CHK EFT CHK AFLAC Medical & Dependent Care CA Employment Taxes & W/H Federal Employment Taxes & WIH CalPERS Contributions John Hancock Pension Loan Pmts Great West Deferred Comp Stationary Engineers Union Dues United Way Contributions CA State Disbursement Unit CA State Franchise Tax Board Employee Direct Deposits Employee Paychecks Adjustments-prior period correction Total -51- 11/07/07 3,402.40 12,949.75 81,602.43 25,733.06 2,442.46 15,314.05 2,076.32 86.00 460.15 15.00 193,578.91 12,712.69 0.00 350,373.22 350,373.22 350,373.22 0.00 122,789.55 21,350.55 0.00 144,140.10 210,509.35 192,217.66 18,081.14 0.00 420,808.15 915,321.47 Vendor Name Department / Proi Name Description Acct# / Proi Code Amount Check Num Tvpe ACCOUNTEMPS FINANCE CONTRACT SERVICE 1039 - 4405 1,890.00 ACCOUNTEMPS FINANCE CONTRACT SERVICE 2039 - 4405 1,890.00 Check Total: 3 780.00 AP- 00068004 MW ACE HARDWARE OF SO LAKE TAHOE HEAVY MAINT SHOP SUPPLIES 1004 - 6071 337.32 Check Total: 337.32 AP- 00068005 M W ACWA SERVICES CORP (ASC) GEN & ADMIN VISION INS 1000 - 2530 2,489.76 Check Total: 2,489.76 AP -00068006 MW ADVANTAGE LASER PRODUCTS INC INFORMATION SYS PRINTING 1037 - 4920 154.00 ADVANTAGE LASER PRODUCTS INC INFORMATION SYS PRINTING 2037 - 4920 154.00 Check Total: 308.00 AP- 00068007 MW ALL ELECTRIC MOTORS INC PUMPS PUMP STATIONS 1002 - 6051 530.40 Check Total: 530.40 AP- 00068008 MW ALPEN SIERRA COFFEE COMPANY FINANCE OFC SUPPLY ISSUE 1039 - 6081 209.50 ALPINE, COUNTY OF ENGINEERING - ICR TMDL O2SYS/TMDL,ICR 1029 - 8605 - ICTMDL 1,850.00 to N Check Total: 1,850.00 AP- 00068010 MW ALSBURY, MARY INFORMATION SYS TRAVEL/MEETINGS 1037 - 6200 76.07 ALSBURY, MARY INFORMATION SYS TRAVEL/MEETINGS 2037 - 6200 76.07 Check Total: 152.14 AP- 00068011 MW AMERIGAS - SO LAKE TAHOE GEN & ADMIN PROPANE 1000 - 6360 596.72 Check Total: 596.72 AP- 00068012 M W ANDERSON AUDIO VISUAL ADMINISTRATION SERVICE CONTRACT 1021 - 6030 2,750.00 ANDERSON AUDIO VISUAL ADMINISTRATION SERVICE CONTRACT 2021 - 6030 2,750.00 Check Total: 5,500.00 AP- 00068013 MW ARAMARK UNIFORM SERVICES GEN & ADMIN UNIFORM PAYABLE 1000 - 2518 1,420.53 Check Total: 1,420.53 AP -00068014 MW AT &T INFORMATION SYS TELEPHONE 1037 - 6310 13.69 AT &T INFORMATION SYS TELEPHONE 2037 - 6310 13.68 Check Total: 27.37 AP -00068018 MW AT &T MOBILITY LABORATORY TELEPHONE 1007 - 6310 4.73 User: LAVERNE PAYMENT OF CLAIMS Page: 1 Current Date: 11/08/2007 Report: OH_PMT_CLAIMS_V2 Current Time: 15:57:25 Check Total: 209.50 AP -00068009 MW PAYMENT OF CLAIMS Vendor Name Department / Prof Name Description. Acct# / Proi Code Amount Check Num Type AT &T MOBILITY LABORATORY TELEPHONE 2007 - 6310 4.72 Check Total: 9.45 AP- 00068015 MW AT &T MOBILITY UNDERGROUND REP TELEPHONE 1001 - 6310 9.50 AT &T MOBILITY ELECTRICAL SHOP TELEPHONE 1003 - 6310 16.66 AT &T MOBILITY HEAVY MAINT TELEPHONE 1004 - 6310 8.35 AT &T MOBILITY LABORATORY TELEPHONE 1007 - 6310 4.18 AT &T MOBILITY DIO TELEPHONE 1027 - 6310 8.35 AT &T MOBILITY ENGINEERING TELEPHONE 1029 - 6310 13.33 AT &T MOBILITY CUSTOMER SERVICE TELEPHONE 1038 - 6310 0.00 AT &T MOBILITY UNDERGROUND REP TELEPHONE 2001 - 6310 40.25 AT &T MOBILITY ELECTRICAL SHOP TELEPHONE 2003 - 6310 16.65 AT &T MOBILITY LABORATORY TELEPHONE 2007 - 6310 4.17 AT &T MOBILITY ENGINEERING TELEPHONE 2029 - 6310 13.32 AT &T MOBILITY CUSTOMER SERVICE TELEPHONE 2038 - 6310 10.74 Check Total: 145.50 AP -00068016 MW I AT &'/MCI GEN & ADMIN TELEPHONE 1000 - 6310 579.31 AT &T/MCI PUMPS TELEPHONE 1002 - 6310 169.50 AT &T/MCI GEN & ADMIN TELEPHONE 2000 - 6310 579.31 AT &T/MCI PUMPS TELEPHONE 2002 - 6310 118.05 Check Total: 1,446.17 AP -00068017 MW AVINA, FRANCISCO UNDERGROUND REP TRAVEL/MEETINGS 1001 - 6200 126.10 Check Total: 126.10 AP -00068019 MW BARNES, SHELLY CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 127.07 Check Total: 127.07 AP -00068020 MW BAY TOOL & SUPPLY INC GEN & ADMIN SHOP SUPPLY INV 1000 - 0421 60.77 BAY TOOL & SUPPLY INC GEN & ADMIN SMALL TOOLS INV 1000 - 0423 162.14 Check Total: 222.91 AP- 00068021 MW BB &H BENEFIT DESIGNS HUMAN RESOURCES CONTRACT SERVICE 1022 - 4405 624.50 BB &H BENEFIT DESIGNS HUMAN RESOURCES CONTRACT SERVICE 2022 - 4405 624.50 Check Total: 1,249.00 AP -00068022 MW User: LAVERNE Page: 2 Current Date: 11/08/2007 Report: OH PMT_CLAIMS_V2 Current Time: 15:57:25 Vendor Name Department / Proi Name BENIGNOS TREE SERVICE INC, JOE HEAVY MAINT PAYMENT OF CLAIMS Description Acct# / Proi Code GROUNDS & MNTC 1004 - 6042 Amount Check Num Type 1,100.00 Check Total: 1,100.00 AP -00068023 MW BENTLY AGROWDYNAMICS OPERATIONS SLUDGE DISPOSAL 1006 - 6652 713.56 Check Total: 713.56 AP -00068024 MW BI STATE PROPANE UNDERGROUND REP PROPANE 2001 - 6360 77.66 Check Total: 77.66 AP -00068025 MW BING MATERIALS UNDERGROUND REP PIPE/CVRS/MHLS 2001 - 6052 1,094.20 Check Total: 1,094.20 AP -00068026 MW BOURLAND- MADISON, PEGGY CUSTOMER SERVICE - WTR CNSRV INCNT WTR CONS EXPENSE 2038 - 6660 - WCNCTV 250.00 Check Total: 250.00 AP -00068027 MW BOYAR PHD, VIRGINIA M. HUMAN RESOURCES TRAVEUMEETINGS 1022 - 6200 1,200.00 BOYAR PHD, VIRGINIA M. HUMAN RESOURCES TRAVEUMEETINGS 2022 - 6200 1,200.00 Check Total: CALIF BOARD OF EQUALIZATION UNDERGROUND REP PIPE/CVRS /MHLS 1001 - 6052 84.68 CALIF BOARD OF EQUALIZATION UNDERGROUND REP SMALL TOOLS 1001 - 6073 44.87 un CALF BOARD OF EQUALIZATION PUMPS PUMP STATIONS 1002 - 6051 47.37 CALIF BOARD OF EQUALIZATION PUMPS BEECHER PS UPGR 1002 - 8630 66.81 CALIF BOARD OF EQUALIZATION PUMPS IMPLRS, TRT CRK 1002 - 8804 761.36 CALIF BOARD OF EQUALIZATION ELECTRICAL SHOP PUMP STATIONS 1003 - 6051 30.96 CALIF BOARD OF EQUALIZATION EQUIPMENT REP GENERATORS 1005 - 6013 16.77 CALIF BOARD OF EQUALIZATION LABORATORY LAB SUPPLIES 1007 - 4760 28.06 CALIF BOARD OF EQUALIZATION DIAMOND VLY RNCH SAFETY /EQUIP /PHY 1028 - 6075 17.74 CALIF BOARD OF EQUALIZATION LABORATORY LAB SUPPLIES 2007 - 4760 28.05 CALIF BOARD OF EQUALIZATION INFORMATION SYS PRINTING 2037 - 4920 10.85 2,400.00 AP -00068028 MW Check Total: 1,137.52 AP-00068029 MW CALIF BOARD OF EQUALIZATION FINANCE SUPPLIES 1039 - 6520 8.00 CALIF BOARD OF EQUALIZATION FINANCE SUPPLIES 2039 - 6520 8.00 Check Total: 16.00 AP -00068030 MW CALIF DEPT OF CONSUMERS FINANCE DUES /MEMB /CERT 1039 - 6250 100.00 CALIF DEPT OF CONSUMERS FINANCE DUES /MEMB /CERT 2039 - 6250 100.00 User: LAVERNE Page: 3 Current Date: 11/08/2007 Report: OH_PMT_CLAIMS_V2 Current Time: 15:57:25 Vendor Name CALIF DEPT OF HEALTH SERVICES CALIF DEPT OF PESTICIDE CALIF WATER RESOURCES CTRL BD CALIF WATER RESOURCES CTRL BD CALIF WATER RESOURCES CTRL BD CALIF WATER RESOURCES CTRL BD CDW - G CORP CDW - G CORP CDW - G CORP i t,n COMMUNICATIONS INSTALLATION CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CURTIS & SONS, L.N. D &L FOUNDRY & SUPPLY Dhawan, Prem N. Dhawan, Prem N. User: LAVERNE Report: OH_PMT_CLAIMS_V2 Department / Proi Name PUMPS DIAMOND VLY RNCH OPERATIONS CUSTOMER SERVICE CUSTOMER SERVICE PUMPS GEN & ADMIN INFORMATION SYS INFORMATION SYS INFORMATION SYS LABORATORY LABORATORY - ARHD3 TRTMT EXP LABORATORY - BEACON CONTAM LABORATORY - BKRFLD TRTMT EXP LABORATORY - HERBST DIAMOND VLY RNCH UNDERGROUND REP FINANCE FINANCE PAYMENT OF CLAIMS Description Acct# / Proi Code DUES /MEMB /CERT 2002 - 6250 60.00 AP- 00068032 MW DUES/MEMB /CERT 1028 - 6250 30.00 30.00 AP -00068033 MW 190.00 85.00 85.00 360.00 AP- 00068034 MW OPERATING PERMIT 2002 - 6650 928.29 928.29 AP -00068035 MW OFFICE INVENTORY 1000 - 0428 944.25 OFFICE SUPPLIES 1037 - 4820 15.64 OFFICE SUPPLIES 2037 - 4820 15.63 975.52 AP -00068036 MW FIBER WAN LS 1037 - 8697 985.00 985.00 AP- 00068037 MW MONITORING 1007 - 6110 190.00 MONITORING 2007 - 6110 - AH3EXP 380.00 MONITORING 2007 - 6110 - BEACON 190.00 MONITORING 2007 - 6110 - BKRFLD 380.00 MONITORING 2007 - 6110 - HERBST 570.00 Check Total: 1,710.00 AP -00068038 MW GROUNDS & MNTC 1028 - 6042 15.62 15.62 AP -00068039 MW PIPE /CVRS /MHLS 1001 - 6052 4,529.05 4,529.05 AP -00068040 MW LOAN PRINCIPAL 2039 - 6709 3,924.58 INTEREST EXPENSE 2039 - 6710 34.34 Check Total: 3.958.92 AP -00068041 MW DUES/MEMB /CERT 1006 - 6250 DUES /MEMB /CERT 1038 - 6250 DUES /MEMB /CERT 2038 - 6250 Page: 4 Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Current Date: 11/08/2007 Current Time: 15:57:25 Amount Check Num Tvpe 200.00 AP -00068031 MW 60.00 Vendor Name Department / Proi Name DIAMOND DITCH MUTUAL WATER DIAMOND VLY RNCH PAYMENT OF CLAIMS Description Acct# / Proi Code LAND & BUILDINGS 1028 - 5010 DICK'S FULLER - PUMPS BUILDINGS 1002 - 6041 DICK'S FULLER - OPERATIONS GROUNDS & MNTC 1006 - 6042 DOUGLAS DISPOSAL GEN & ADMIN REFUSE DISPOSAL 1000 - 6370 EL DORADO COUNTY ENGINEERING SUPPLIES 1029 - 6520 EL DORADO COUNTY ENGINEERING SUPPLIES 2029 - 6520 ENRIQUEZ, JESUS S. UNDERGROUND REP DUES /MEMB /CERT 2001 - 6250 FEDEX FINANCE POSTAGE EXPENSES 1039 - 4810 FEDEX FINANCE POSTAGE EXPENSES 2039 - 4810 L FERiUSON ENTERPRISES INC. HEAVY MAINT SECONDARY EQUIP 1004 - 6022 FERGUSON ENTERPRISES INC. HEAVY MAINT FILTER EQ/BLDG 1004 - 6023 FERGUSON ENTERPRISES INC. HEAVY MAINT BUILDINGS 1004 - 6041 FERGUSON ENTERPRISES INC. PUMPS PUMP STATIONS 2002 - 6051 FIRS TIER ADMINISTRATORS SELF FUNDED INS ADMIN FEE 3000 - 6741 FIRS TIER ADMINISTRATORS SELF FUNDED INS PPO FEE 3000 - 6742 FOLLIS, JAMES GEN & ADMIN UB SUSPENSE 1000 - 2002 FRYE, WILLIAM INFORMATION SYS TRAVEL/MEETINGS 1037 - 6200 FRYE, WILLIAM INFORMATION SYS TRAVEL/MEETINGS 2037 - 6200 Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: User: LAVERNE Page: 5 Current Date: 11/08/2007 Report: OH_PMT_CLAIMS_V2 Current Time: 15:57:25 Amount Check Num TYPO 3,085.00 3,085.00 AP- 00068042 MW 166.65 269.58 436.23 AP- 00068043 MW 514.66 514.66 AP- 00068044 MW 19.75 19.75 39.50 AP- 00068045 MW 28.00 28.00 AP -00068046 MW 2.80 2.80 5.60 AP -00068047 MW 160.37 28.20 10.27 13.78 212.62 AP -00068048 MW 660.80 1,975.96 2,636.76 AP -00068049 MW 81.45 81.45 AP -00068050 MW 112.75 112.75 Check Total: 225.50 AP- 00068051 MW GB GENERAL ENG CONTRACTOR INC GEN & ADMIN - WTR MN,CARLSON CONST RETAINAGE 2000 - 2605 - CARLSN - 1,197.10 GB GENERAL ENG CONTRACTOR INC UNDERGROUND REP - WTR MN,CARLSON MAIN EXT,CARLSON 2001 - 7536 - CARLSN 11,971.00 Vendor Name GERBER LIFE INSURANCE COMPANY SELF FUNDED INS GFOA GFOA GRAINGER GRAINGER GRAINGER HACH - GLI International HAEN CO INC, THOMAS HAR1 iF,ORD, THE HAR1iFORD, THE Department / Prol Name FINANCE FINANCE GEN & ADMIN PUMPS HEAVY MAINT ELECTRICAL SHOP GEN & ADMIN GEN & ADMIN HASLER FINANCIAL SERVICES LLC CUSTOMER SERVICE HASLER FINANCIAL SERVICES LLC CUSTOMER SERVICE HENDERSON, DEBBIE HENDERSON, DEBBIE HENDERSON, DEBBIE FINANCE INFORMATION SYS FINANCE HIGH SIERRA BUSINESS SYSTEMS CUSTOMER SERVICE HIGH SIERRA BUSINESS SYSTEMS CUSTOMER SERVICE INSITE LAND SURVEYS INSITE LAND SURVEYS User: LAVERNE Report: OH PMT_CLAIMS_V2 ENGINEERING - C CLUB TNK REPL ENGINEERING - ANGORA TNK REPL PAYMENT OF CLAIMS Description ENGINEERING - ANGORA TNK REPL TANK, ANGORA Acct# / Pro! Code EXCESS INSURANCE 3000 - 6744 DUES /MEMB /CERT 1039 - 6250 DUES/MEMB /CERT 2039 - 6250 SAFETY INVENTORY 1000 - 0425 LUTHER PASS 1002 - 6048 SHOP SUPPLIES 1004 - 6071 SECONDARY EQUIP 1003 - 6022 LIFE INS 1000 - 2512 LTD, UNION 1000 - 2539 EQUIP RENT /LEASE 1038 - 5020 EQUIP RENT/LEASE 2038 - 5020 TRAVEL/MEETINGS 1039 - 6200 TRAVEL/MEETINGS 2037 - 6200 TRAVEL/MEETINGS 2039 - 6200 SERVICE CONTRACT 1038 - 6030 SERVICE CONTRACT 2038 - 6030 TANK, COUNTRY CL TANK, ANGORA Page: 6 Check Total: Check Total: Check Total: Check Total: Check Total: 2029 - 7064 - ANGOTK Check Total: Check Total: Check Total: Check Total: Check Total: 2029 - 7063 - CLUBTK 2029 - 7064 - ANGOTK Check Total: Current Date: 11/08/2007 Current TIme: 15:57:25 m nt Check Num Type 10,773.90 AP -00068052 MW 14,929.38 14,929.38 AP -00068053 MW 75.00 75.00 150.00 AP- 00068054 MW 233.95 201.51 170.66 606.12 AP -00068055 MW 1,630.20 1,630.20 AP -00068056 MW 1,440.00 1,440.00 AP- 00068057 MW 1,962.09 1,758.62 3,720.71 AP- 00068058 MW 122.57 122.57 245.14 AP -00068059 MW 38.80 0.00 38.80 77.60 AP -00068060 MW 196.49 196.49 392.98 AP -00068061 MW 950.00 5,600.00 _ 6 550.00 AP -00068062 MW Vendor Name Department / Proi Name INTERSTATE SAFETY & SUPPLY GEN & ADMIN INTERSTATE SAFETY & SUPPLY GEN & ADMIN User: LAVERNE PAYMENT OF CLAIMS Description Acct# / Proi Code Amount Check Num T3Pe SHOP SUPPLY INV 1000 - 0421 527.83 SAFETY INVENTORY 1000 - 0425 122.62 Check Total: 650.45 AP- 00068063 Mw JENSEN PRECAST UNDERGROUND REP PIPE /CVRS/MHLS 1001 - 6052 368.51 JENSEN PRECAST CUSTOMER SERVICE SMALL TOOLS 2038 - 6073 88.89 Check Total: 457.40 AP- 00068064 MW JONES HALL GEN & ADMIN - DEBT ISSUE 07 07 Def Debt Exp 1000 -1607 - DEBT07 30,951.00 Check Total: 30.951.00 AP- 00068065 MW KAISER PERMANENTE SELF FUNDED INS CLAIMS 3000 - 6745 515.00 Check Total: 515.00 AP- 00068066 MW KOSCIOLEK, LINDA HUMAN RESOURCES TRAVEL/MEETINGS 1022 - 6200 83.32 KOSCIOLEK, LINDA HUMAN RESOURCES TRAVEUMEETINGS 2022 - 6200 83.32 Check Total: 166.64 AP- 00068067 MW LAKE TAHOE SOUTH SHORE ENGINEERING TRAVEUMEETINGS 1029 - 6200 200.00 LAKE, TAHOE SOUTH SHORE ENGINEERING TRAVEL/MEETINGS 2029 - 6200 200.00 co Check Total: 400.00 AP- 00068068 MW 1 MARTIN, DONALD L & MARJORIE FINANCE LOAN PRINCIPAL 2039 - 6709 7,849.17 MARTIN, DONALD L & MARJORIE FINANCE INTEREST EXPENSE 2039 - 6710 68.67 Check Total: 7,917.84 AP- 00068069 MW MARTIN, JAMES H. FINANCE LOAN PRINCIPAL 2039 - 6709 3,924.59 MARTIN, JAMES H. FINANCE INTEREST EXPENSE 2039 - 6710 34.33 Check Total: 3,958.92 AP- 00068070 MW MARTIN - KOBELLAS, LOUISE FINANCE LOAN PRINCIPAL 2039 - 6709 3,644.11 MARTIN- KOBELLAS, LOUISE FINANCE INTEREST EXPENSE 2039 - 6710 31.88 Check Total: 3,675.99 AP- 00068071 MW MC FARLANE, RHONDA FINANCE TRAVEL/MEETINGS 1039 - 6200 36.00 MC FARLANE, RHONDA FINANCE TRAVEUMEETINGS 2039 - 6200 36.00 Check Total: 72.00 AP- 00068072 MW MC MASTER CARR SUPPLY CO PUMPS PUMP STATIONS 1002 - 6051 237.03 Check Total: 237.03 AP- 00068073 MW Page: 7 Current Date: 11/08/2007 Report: OH_PMT_CLAIMS_V2 Current Time: 15:57:25 Vendor Name Deoartment / frol Name McQUEARY EXCAVATING INC, MARV GEN & ADMIN - WTRLN,GRD MTN McQUEARY EXCAVATING INC, MARV ENGINEERING - WTRLN,GRD MTN MID MOUNTAIN COMMUNICATIONS MID MOUNTAIN COMMUNICATIONS MSC INDUSTRIAL SUPPLY CO MY OFFICE PRODUCTS MY OFFICE PRODUCTS MY OFFICE PRODUCTS MY OFFICE PRODUCTS NATIONAL NOTARY ASSOCIATION NATIONAL NOTARY ASSOCIATION (xi NELS TAHOE HARDWARE NELS TAHOE HARDWARE NELS TAHOE HARDWARE NELS TAHOE HARDWARE NELS TAHOE HARDWARE NELS TAHOE HARDWARE NELS TAHOE HARDWARE NELS TAHOE HARDWARE NELS TAHOE HARDWARE NELS TAHOE HARDWARE NELS TAHOE HARDWARE NEVADA GENERATOR SYSTEMS User: LAVERNE Report: OH_PMT_CLAIMS_V2 UNDERGROUND REP UNDERGROUND REP PUMPS CUSTOMER SERVICE FINANCE CUSTOMER SERVICE FINANCE ADMINISTRATION ADMINISTRATION PUMPS PUMPS PUMPS HEAVY MAINT HEAVY MAINT UNDERGROUND REP UNDERGROUND REP PUMPS PUMPS PUMPS PUMPS EQUIPMENT REP PAYMENT OF CLAIMS Description CONST RETAINAGE WTRLN, GARD MTN MOBILE EQUIP RADIO- RPRS/RPLCM UPGRADE SHOP EQ OFFICE SUPPLIES OFFICE SUPPLIES OFFICE SUPPLIES OFFICE SUPPLIES DUES /MEMB /CERT DUES/MEMB /CERT SHOP SUPPLIES SMALL TOOLS STANDBY ACCOMODA BUILDINGS SMALL TOOLS PIPE /CVRS/MHLS SMALL TOOLS WELLS RPR/MNTC WTR TKS SHOP SUPPLIES SMALL TOOLS GENERATORS Page: 8 Acct# / Proi Code Amount Check Num Type 2000 - 2605 - GMWL07 - 4,356.85 2029 - 7065 - GMWL07 87,338.92 Check Total: 82,982.07 AP- 00068074 MW 2001 - 6012 38.71 2001 - 6056 206.57 Check Total: 2002 - 8706 Check Total: 3.777.03 AP- 00068076 1038 - 4820 51.13 1039 - 4820 41.14 2038 - 4820 51.15 2039 - 4820 41.12 Check Total: Check Total: Check Total: Current Date: 11/08/2007 Current Time: 15:57:25 245.28 AP -00068075 3,777.03 MW MW 184.54 AP -00068077 MW 1021 - 6250 37.00 2021 - 6250 37.00 74.00 AP- 00068078 MW 1002 - 6071 24.30 1002 - 6073 3.23 1002 - 6083 10.22 1004 - 6041 5.38 1004 - 6073 17.83 2001 - 6052 11.12 2001 - 6073 21.74 2002 - 6050 8.77 2002 - 6054 5.92 2002 - 6071 24.29 2002 - 6073 13.45 Check Total: 146.25 AP -00068079 MW 1005 - 6013 231.36 231.36 AP- 00068080 MW Vendor Name NEVADA, STATE OF NEVADA, STATE OF OFFICE DEPOT OFFICE DEPOT OFFICE DEPOT OFFICE DEPOT OFFICE DEPOT OFFICE DEPOT OFFICE MAX OFFICE MAX OFFICE MAX OFFICE MAX User: LAVERNE Department / Prot Name EQUIPMENT REP EQUIPMENT REPAIR PAYMENT OF CLAIMS Description Acct# / Proi Code Amount Check Num Tvpe DUES /MEMB /CERT 1005 - 6250 28.13 DUES/MEMB /CERT 2005 - 6250 28.12 Check Total: 56.25 AP- 00068081 MW HUMAN RESOURCES OFFICE SUPPLIES 1022 - 4820 0.57 CUSTOMER SERVICE OFFICE SUPPLIES 1038 - 4820 130.91 FINANCE OFFICE SUPPLIES 1039 - 4820 11.62 HUMAN RESOURCES OFFICE SUPPLIES 2022 - 4820 0.57 CUSTOMER SERVICE OFFICE SUPPLIES 2038 - 4820 130.92 FINANCE OFFICE SUPPLIES 2039 - 4820 11.63 Check Total: 286.22 AP- 00068082 MW GEN & ADMIN OFFICE INVENTORY 1000 - 0428 987.20 UNDERGROUND REP OFFICE SUPPLIES 1001 - 4820 76.35 FINANCE OFFICE SUPPLIES 1039 - 4820 168.75 FINANCE OFFICE SUPPLIES 2039 - 4820 168.75 Check Total: 1,401.05 AP -00068083 MW 1 OTTIg VICTOR W. CUSTOMER SERVICE TRAVEL/MEETINGS 1038 - 6200 52.63 OTTd, VICTOR W. CUSTOMER SERVICE TRAVEUMEETINGS 2038 - 6200 52.62 Check Total: 105.25 AP -00068084 MW PAC MACHINE CO HEAVY MAINT PRIMARY EQUIP 1004 - 6021 2,214.19 Check Total: 2,214.19 AP -00068085 MW PAYNE, DALE Y CUSTOMER SERVICE - WTR CNSRV INCNT WTR CONS EXPENSE 2038 - 6660 - WCNCTV 175.00 Check Total: 175.00 AP -00068086 MW PDM STEEL HEAVY MAINT GROUNDS & MNTC 1004 - 6042 245.83 Check Total: 245.83 AP -00068087 MW PINKEL,MICHELE ADMINISTRATION INCNTV & RCGNTN 1021 - 6621 184.55 PINKEL,MICHELE ENGINEERING TRAVEL/MEETINGS 1029 - 6200 134.69 PINKEL,MICHELE ADMINISTRATION INCNTV & RCGNTN 2021 - 6621 184.54 PINKEL,MICHELE ENGINEERING TRAVEUMEETINGS 2029 - 6200 134.69 Page: 9 Current Date: 11/08/2007 Report: OH_PMT_CLAIMS_V2 Current Time: 15:57:25 Check Total: 638.47 AP- 00068088 MW PIONEER AMERICAS LLC OPERATIONS HYPOCHLORITE 1006 - 4755 3,905.50 Vendor Name PRAXAIR 174 PRAXAIR 174 PRAXAIR 174 PRAXAIR 174 PRAXAIR 174 PUBLIC AGENCY RETIREMENT PUBLIC AGENCY RETIREMENT PUBLIC AGENCY RETIREMENT PUBLIC AGENCY RETIREMENT RECORD - COURIER, THE i REED ELECTRIC & FIELD SERVICE REED ELECTRIC & FIELD SERVICE REED ELECTRIC & FIELD SERVICE REED ELECTRIC & FIELD SERVICE RENNER EQUIPMENT CO RENO DRAIN OIL SERVICE RENO GAZETTE- JOURNAL ROTO ROOTER RUDE BROS BAGEL RUDE BROS BAGEL User: LAVERNE Report: OH_PMT_CLAIMS V2 Department / Proi Name PUMPS HEAVY MAINT LABORATORY PUMPS LABORATORY FINANCE - MANULIFE ADMIN FINANCE - MANULIFE ADMIN FINANCE - MANULIFE ADMIN FINANCE - MANULIFE ADMIN DIAMOND VLY RNCH PUMPS ELECTRICAL SHOP HEAVY MAINT ELECTRICAL SHOP EQUIPMENT REP LABORATORY - BKRFLD TRTMT EXP ENGINEERING - EFFLUENT EVAL UNDERGROUND REP HUMAN RESOURCES HUMAN RESOURCES PAYMENT OF CLAIMS SHOP SUPPLIES SHOP SUPPLIES LAB SUPPLIES SHOP SUPPLIES LAB SUPPLIES ADVISORY ADVISORY ADVISORY ADVISORY SUBSCRIPTIONS PUMP STATIONS PUMP STATIONS FILTER EQ/BLDG PUMP STATIONS AUTOMOTIVE MONITORING REP EXP PUMPS MISC LIAB CLAIMS TRAVEL/MEETINGS TRAVEL/MEETINGS Page: 10 D Acct# / Proi Code 1002-6071 1004 - 6071 1007 - 4760 2002 - 6071 2007 - 4760 1028-4830 1002 - 6051 1003 -6051 1004 - 6023 2003 - 6051 1005-6011 2001 - 4520 1022 - 6200 2022 - 6200 Check Total: Check Total: 1039 - 4440 - MANULF 2039 - 4440 - MANULF Check Total: 1039 - 4440 - MANULF 2039 - 4440 - MANULF Check Total: Check Total: Check Total: Check Total: 2007 - 6110 - BKRFLD Check Total: 1029 - 8676 - EFFLEV Check Total: Check Total: Current Date: 11/08/2007 Current TIme: 15:57:25 Amount 3,905.50 26.91 385.69 123.22 26.91 123.20 685.93 AP -00068090 MW 500.00 500.00 1,000.00 AP -00068091 MW 3,000.00 3,000.00 6.000.00 AP -00068092 M W 40.00 40.00 AP- 00068093 MW 77.65 88.11 72.84 9.20 247.80 AP- 00068094 MW 551.41 195.87 Check Num Type AP -00068089 MW 551.41 AP -00068095 MW 75.00 75.00 AP -00068096 MW 178.75 178.75 AP -00068097 MW 195.87 AP -00068098 MW 71.75 71.75 Vendor Name SAFETY KLEEN CORP. SAFETY KLEEN CORP. SCHWAB TIRES, LES SCHWAB TIRES, LES SCOTTYS HARDWARE SCOTTYS HARDWARE SCOTTYS HARDWARE SCOTTYS HARDWARE SCOTTYS HARDWARE SCOTTYS HARDWARE SCOTTYS HARDWARE SCOITYS HARDWARE SCO2CYS HARDWARE SETON IDENTIFICATION PRODUCTS SIEMENS WATER TECHNOLOGIES SIEMENS WATER TECHNOLOGIES SIERRA CHEMICAL CO SIERRA FOOTHILL LABORATORY SIERRA NEVADA CLASSIFIEDS SIERRA NEVADA CLASSIFIEDS SIERRA NEVADA CLASSIFIEDS SIERRA NEVADA CLASSIFIEDS Department / Proi Name PUMPS PUMPS EQUIPMENT REP EQUIPMENT REPAIR PUMPS PUMPS HEAVY MAINT EQUIPMENT REP UNDERGROUND REP PUMPS PUMPS PUMPS EQUIPMENT REPAIR DIAMOND VLY RNCH LABORATORY LABORATORY PUMPS ENGINEERING - ICR TMDL HUMAN RESOURCES ENGINEERING - EFFLUENT EVAL PUMPS HUMAN RESOURCES PAYMENT OF CLAIMS Description OIL & LUBE OIL & LUBE User: LAVERNE Page: 11 AUTOMOTIVE AUTOMOTIVE SHOP SUPPLIES SMALL TOOLS BUILDINGS AUTOMOTIVE SMALL TOOLS WELLS SHOP SUPPLIES SMALL TOOLS AUTOMOTIVE SAFETY /EQUIP/PHY LAB SUPPLIES LAB SUPPLIES HYPOCHLORITE O2SYS/TMDL,ICR ADS/LGL NOTICES REP EXP PUMPS PMP /MTR,KLR (2) ADS /LGL NOTICES Acct# / Proi Code 1002 - 4630 2002 - 4630 1005 - 6011 2005 - 6011 1002 - 6071 1002 - 6073 1004 - 6041 1005 - 6011 2001 - 6073 2002 - 6050 2002 - 6071 2002 - 6073 2005 - 6011 1028 - 6075 1007 - 4760 2007 - 4760 2002 - 4755 1022 - 4930 1029 - 8676 - EFFLEV 2002 - 8854 2022 - 4930 Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: 1029 - 8605 - ICTMDL Check Total: Current Date: 11/08/2007 Report: OH_PMT_CLAIMS_V2 Current Time: 15:57:25 Amount Check Num Type 143.50 AP -00068099 MW 116.50 116.50 233.00 AP -00068100 MW 2,951.35 646.73 3,598.08 AP -00068101 MW 19.04 5.38 17.23 69.38 4.30 15.73 1.72 5.38 69.38 207.54 AP -00068102 MW 252.99 252.99 AP -00068103 MW 160.03 160.03 320.06 AP -00068104 MW 902.29 902.29 AP -00068105 MW 390.00 390.00 AP- 00068106 MW -18.08 234.22 69.96 -18.08 PAYMENT OF CLAIMS Vendor Name Department / Proi Name Description Acct# / Proi Code Amopat Check Num Tyne Check Total: 268.02 AP -00068107 MW SIERRA PACIFIC POWER GEN & ADMIN ELECTRICITY 1000 - 6330 68,258.81 SIERRA PACIFIC POWER GEN & ADMIN ST LIGHTING EXP 1000 - 6740 1,492.34 SIERRA PACIFIC POWER GEN & ADMIN ELECTRICITY 2000 - 6330 23,244.50 Check Total: 92,995.65 AP -00068108 MW SIERRA SPRINGS GEN & ADMIN SAFETY INVENTORY 1000 - 0425 482.40 SIERRA SPRINGS UNDERGROUND REP SUPPLIES 1001 - 6520 39.48 SIERRA SPRINGS PUMPS SUPPLIES 1002 - 6520 2.65 SIERRA SPRINGS ELECTRICAL SHOP SUPPLIES 1003 - 6520 13.16 SIERRA SPRINGS HEAVY MAINT SUPPLIES 1004 - 6520 39.48 SIERRA SPRINGS EQUIPMENT REP SUPPLIES 1005 - 6520 13.16 SIERRA SPRINGS OPERATIONS SUPPLIES 1006 - 6520 39.48 SIERRA SPRINGS DIAMOND VLY RNCH SUPPLIES 1028 - 6520 13.16 SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 1038 - 6520 13.16 SIERRA SPRINGS UNDERGROUND REP SUPPLIES 2001 - 6520 39.48 1 SIETA SPRINGS PUMPS SUPPLIES 2002 - 6520 10.53 SIERRA SPRINGS ELECTRICAL SHOP SUPPLIES 2003 - 6520 13.16 SIERRA SPRINGS EQUIPMENT REPAIR SUPPLIES 2005 - 6520 13.16 SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 2038 - 6520 13.16 Check Total: 745.62 AP -00068109 MW SKELLY, ROBERT OPERATIONS DUES/MEMB /CERT 1006 - 6250 170.00 Check Total: 170.00 AP -00068110 MW SOUND STRATEGIES /OFC INC. DIO - WTR CONS PROG WTR CONS EXPENSE 2027 - 6660 - WCPROG 98.00 Check Total: 98.00 AP -00068111 MW SOUTH LAKE TAHOE, CITY OF UNDERGROUND REP PIPE /CVRS /MHLS 2001 - 6052 4,640.00 Check Total: 4,640.00 AP -00068112 MW SOUTH TAHOE REFUSE GEN & ADMIN REFUSE DISPOSAL 1000 - 6370 - 2,769.85 SOUTH TAHOE REFUSE GEN & ADMIN REFUSE DISPOSAL 2000 - 6370 - 421.78 SOUTH TAHOE REFUSE PUMPS GROUNDS & MNTC 2002 - 6042 -7.15 REVERSED Check Total: - 3,198.78 AP -00067850 RV User: LAVERNE Page: 12 Current Date: 11/08/2007 Report: OH_PMT_CLAIMS_V2 Current Time: 15:57:25 Vendor Name SOUTH TAHOE REFUSE SOUTH TAHOE REFUSE SOUTH TAHOE REFUSE SOUTH TAHOE REFUSE SOUTH TAHOE REFUSE SOUTH TAHOE REFUSE SOUTHWEST GAS SOUTHWEST GAS STANDARD INSURANCE COMPANY SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & rn T &S CONSTRUCTION CO INC T &S CONSTRUCTION CO INC TAHOE ASPHALT INC TAHOE BASIN CONTAINER SERVICE GEN & ADMIN TAHOE BASIN CONTAINER SERVICE OPERATIONS TAHOE BLUEPRINT TAHOE BLUEPRINT TAHOE FIRE CONTROL TAHOE FIRE CONTROL TAHOE FIRE CONTROL Department / Prol Name GEN & ADMIN PUMPS FINANCE GEN &ADMIN PUMPS FINANCE GEN & ADMIN GEN & ADMIN GEN & ADMIN ENGINEERING - DVR EIR PUMPS EQUIPMENT REP DIAMOND VLY RNCH EQUIPMENT REPAIR PAYMENT OF CLAIMS User: LAVERNE Page: 13 Report: OH_PMT CLAIMS_V2 Description REFUSE DISPOSAL GROUNDS & MNTC SUPPLIES REFUSE DISPOSAL GROUNDS & MNTC SUPPLIES NATURAL GAS NATURAL GAS LNG TRM DIS,MGMT UNDERGROUND REP CONTRACT SERVICE OPERATIONS CONTRACT SERVICE UNDERGROUND REP CONTRACT SERVICE GEN & ADMIN - UPPER DRESSLER CONST RETAINAGE ENGINEERING - UPPER DRESSLER DRSSLR DTCH,UPR UNDERGROUND REP PIPE /CVRS /MHLS REFUSE DISPOSAL SLUDGE DISPOSAL DIAM VLY MP /EIR OFFICE SUPPLIES SAFETY/EQUIP /PHY SAFETY/EQUIP /PHY SAFETY/EQUIP/PHY Acct# / Proi Code 1000 - 6370 1002 - 6042 1039 - 6520 2000 - 6370 2002 - 6042 2039 - 6520 1000 - 6350 2000 - 6350 1000 - 2531 1001 - 4405 1006 - 4405 2001 - 4405 2001 - 6052 1000 - 6370 1006 - 6652 1005 - 6075 1028 - 6075 2005 - 6075 Check Total: Check Total: Check Total: Check Total: 1000 - 2605 - DRSSLR 1029 - 7062 - DRSSLR Check Total: Check Total: Check Total: 1029 - 8725 - DVREIR 2002 - 4820 Check Total: Current Date: 11/08/2007 Current Time: 15:57:25 Amount Check Num Tvae 5,676.69 10.70 21.45 768.24 10.70 21.45 6,509.23 AP- 00068113 MW 4,353.26 196.41 4,549.67 AP -00068114 MW 1,465.74 1,465.74 AP -00068115 MW 1,932.00 1,844.70 2,896.38 6,673.08 AP -00068116 MW - 288.34 5,766.70 5,478.36 AP- 00068117 MW 2,835.00 2,835.00 AP -00068118 MW 520.92 7,987.50 8,508.42 AP- 00068119 MW 17.20 2.42 19.62 AP -00068120 MW 558.40 318.44 558.40 Vendor Name Department / Prof Name TAHOE SAND & GRAVEL UNDERGROUND REP TAHOE TRADING POST UNDERGROUND REP TAHOE TRADING POST HEAVY MAINT TAHOE TRADING POST CUSTOMER SERVICE TAHOE TRADING POST CUSTOMER SERVICE TAHOE VALLEY ELECTRIC SUPPLY ELECTRICAL SHOP TESCO CONTROLS INC ELECTRICAL SHOP U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE rn U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE User: LAVERNE Report: OH_PMT CLAIMS_V2 UNDERGROUND REP UNDERGROUND REP PUMPS PUMPS PUMPS HEAVY MAINT HEAVY MAINT EQUIPMENT REP OPERATIONS OPERATIONS OPERATIONS LABORATORY ADMINISTRATION ADMINISTRATION HUMAN RESOURCES HUMAN RESOURCES HUMAN RESOURCES HUMAN RESOURCES PAYMENT OF CLAIMS Page: 14 Description PIPE /CVRS/MHLS SAFETY /EQUIP /PHY . SAFETY /EQUIP /PHY SAFETY/EQUIP /PHY SAFETY/EQUIP /PHY BUILDINGS PUMP STATIONS SAFETY /EQUIP /PHY TRAVEUMEETINGS OFFICE SUPPLIES STANDBY ACCOMODA TRAVEUMEETINGS BUILDINGS BIOSOL EQUP /BLDG TRAVEUMEETINGS OFFICE SUPPLIES SAFETY/EQUIP /PHY TRAVEUMEETINGS TRAVEUMEETINGS OFFICE SUPPLIES TRAVEUMEETINGS SUBSCRIPTIONS SAFETY /EQUIP/PHY TRAVEUMEETINGS DUES /MEMB /CERT Acct# / Prof Code 2001 - 6052 1001 - 6075 1004 - 6075 1038 - 6075 2038 - 6075 1003 - 6041 1003 - 6051 1001 - 6075 1001 - 6200 1002 - 4820 1002 - 6083 1002 - 6200 1004 - 6041 1004 - 6653 1005 - 6200 1006 - 4820 1006 - 6075 1006 - 6200 1007 - 6200 1021 - 4820 1021 - 6200 1022 - 4830 1022 - 6075 1022 - 6200 1022 - 6250 Check Total: Check Total: Check Total: Check Total: Check Total: Current Date: 11/08/2007 Current Time: 15:57:25 Amount Check Num DI 1,435.24 AP -00068121 MW 966.71 966.71 AP -00068122 MW 201.49 201.49 119.07 119.06 641.11 AP- 00068123 MW 204.14 204.14 AP -00068124 MW 350.00 350.00 AP -00068125 MW 126.06 54.38 13.55 129.07 350.00 349.66 32.33 63.43 91.05 12.18 108.71 20.15 28.06 195.14 52.25 15.51 133.93 55.00 PAYMENT OF CLAIMS Vendor Name Department / Proi Name Description Acct# / Proi Code Amount Check Num Type U S BANK CORPORATE DIO TRAVEUMEETINGS 1027 - 6200 219.25 U S BANK CORPORATE DIO - PR EXP- EXTERNAL PUB RELATIONS 1027 - 6620 - PREEXT 23.25 U S BANK CORPORATE DIAMOND VLY RNCH UNIFORMS 1028 - 4308 95.40 U S BANK CORPORATE DIAMOND VLY RNCH GROUNDS & MNTC 1028 - 6042 12.24 U S BANK CORPORATE DIAMOND VLY RNCH TRAVEUMEETINGS 1028 - 6200 325.00 U S BANK CORPORATE DIAMOND VLY RNCH FENCE, DVR 1028 - 8689 1,409.40 U S BANK CORPORATE ENGINEERING OFFICE SUPPLIES 1029 - 4820 1,464.18 U S BANK CORPORATE ENGINEERING TRAVEUMEETINGS 1029 - 6200 1,428.94 U S BANK CORPORATE ENGINEERING DUES /MEMB /CERT 1029 - 6250 74.50 U S BANK CORPORATE ENGINEERING - DVR EIR DIAM VLY MP /EIR 1029 - 8725 - DVREIR 229.25 U S BANK CORPORATE INFORMATION SYS OFFICE SUPPLIES 1037 - 4820 61.99 U S BANK CORPORATE INFORMATION SYS TRAVEUMEETINGS 1037 - 6200 2,428.98 U S BANK CORPORATE CUSTOMER SERVICE OFFICE SUPPLIES 1038 - 4820 40.53 U S BANK CORPORATE CUSTOMER SERVICE TRAVEUMEETINGS 1038 - 6200 61.86 U S BANK CORPORATE FINANCE OFFICE SUPPLIES 1039 - 4820 1.24 U S BAANK CORPORATE FINANCE TRAVEUMEETINGS 1039 - 6200 760.63 rn U S BANK CORPORATE UNDERGROUND REP TRAVEUMEETINGS 2001 - 6200 48.78 U S BANK CORPORATE PUMPS OFFICE SUPPLIES 2002 - 4820 13.54 U S BANK CORPORATE PUMPS STANDBY ACCOMODA 2002 - 6083 129.06 U S BANK CORPORATE PUMPS TRAVEUMEETINGS 2002 - 6200 403.31 U S BANK CORPORATE EQUIPMENT REPAIR TRAVEUMEETINGS 2005 - 6200 63.43 U S BANK CORPORATE LABORATORY TRAVEUMEETINGS 2007 - 6200 20.15 U S BANK CORPORATE ADMINISTRATION OFFICE SUPPLIES 2021 - 4820 28.06 U S BANK CORPORATE ADMINISTRATION TRAVEUMEETINGS 2021 - 6200 195.14 U S BANK CORPORATE HUMAN RESOURCES SUBSCRIPTIONS 2022 - 4830 52.25 U S BANK CORPORATE HUMAN RESOURCES SAFETY/EQUIP/PHY 2022 - 6075 15.50 U S BANK CORPORATE HUMAN RESOURCES TRAVEUMEETINGS 2022 - 6200 133.92 U S BANK CORPORATE HUMAN RESOURCES DUES /MEMB /CERT 2022 - 6250 55.00 U S BANK CORPORATE DIO TRAVEUMEETINGS 2027 - 6200 219.25 U S BANK CORPORATE DIO - PR EXP- EXTERNAL PUB RELATIONS 2027 - 6620 - PREEXT 23.25 U S BANK CORPORATE ENGINEERING OFFICE SUPPLIES 2029 - 4820 1,532.90 User: LAVERNE Page: 15 Current Date: 11/08/2007 Report: OH_PMT_CLAIMS_V2 Current Time: 15:57:25 PAYMENT OF CLAIMS Vendor Name Department / Proi Name Description Acct# / Proi Code Amount Check Num Iym U S BANK CORPORATE ENGINEERING TRAVEL/MEETINGS 2029 - 6200 1,428.93 U S BANK CORPORATE ENGINEERING DUES /MEMB /CERT 2029 - 6250 74.50 U S BANK CORPORATE INFORMATION SYS OFFICE SUPPLIES 2037 - 4820 61.98 U S BANK CORPORATE INFORMATION SYS TRAVEUMEETINGS 2037 - 6200 2,428.96 U S BANK CORPORATE CUSTOMER SERVICE OFFICE SUPPLIES 2038 - 4820 40.52 U S BANK CORPORATE CUSTOMER SERVICE TRAVEL/MEETINGS 2038 - 6200 143.50 U S BANK CORPORATE FINANCE OFFICE SUPPLIES 2039 - 4820 1.23 U S BANK CORPORATE FINANCE TRAVEL/MEETINGS 2039 - 6200 760.62 Check Total: 18,340.88 AP- 00068128 MW UNITED RENTALS UNDERGROUND REP PIPE /CVRS/MHLS 2001 - 6052 20.02 UNITED RENTALS UNDERGROUND REP SMALL TOOLS 2001 - 6073 20.02 Check Total: 40.04 AP- 00068129 MW USA BLUE BOOK UNDERGROUND REP SMALL TOOLS 1001 - 6073 600.06 USA BLUE BOOK PUMPS PUMP STATIONS 1002 - 6051 694.16 USA BLUE BOOK PUMPS PUMP STATIONS 2002 - 6051 42.08 rn Check Total: 1,336.30 AP-00068130 MW VERIBANC INC FINANCE ADVISORY 1039 - 4440 64.00 VERIBANC INC FINANCE ADVISORY 2039 - 4440 64.00 Check Total: 128.00 AP -00068131 MW VERIZON DIAMOND VLY RNCH TELEPHONE 1028 - 6310 38.39 Check Total: 38.39 AP -00068132 MW WEDCO INC ELECTRICAL SHOP BUILDINGS 1003 - 6041 455.46 WEDCO INC ELECTRICAL SHOP BUILDINGS 2003 - 6041 136.57 Check Total: 592.03 AP -00068133 MW WESTERN ENERGETIX INC DIAMOND VLY RNCH GASOLINE 1028 - 4610 1,064.44 WESTERN ENERGETIX INC DIAMOND VLY RNCH DIESEL 1028 - 4620 1,216.59 Check Total: 2,281.03 AP- 00068134 MW WESTERN ENVIRONMENTAL LABORATORY MONITORING 2007 - 6110 90.00 Check Total: 90.00 AP- 00068135 MW WESTERN NEVADA SUPPLY UNDERGROUND REP PIPE/CVRS/MHLS 1001 - 6052 99.82 User: LAVERNE Page: 16 Current Date: 11/08/2007 Report: OH PMT_CLAIMS V2 Current Time: 15:57:25 Vendor Name WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY XEROX CORP XEROX CORP ZELLMER, DAVE ZELLMER, DAVE a, 0o User: LAVERNE Report: OH_PMT_CLAIMS_V2 Department / Proi Name HEAVY MAINT HEAVY MAINT HEAVY MAINT HEAVY MAINT DIAMOND VLY RNCH UNDERGROUND REP UNDERGROUND REP PUMPS UNDERGROUND REP UNDERGROUND REP DIAMOND VLY RNCH DIAMOND VLY RNCH PAYMENT OF CLAIMS Description PRIMARY EQUIP SECONDARY EQUIP GROUNDS & MNTC SHOP SUPPLIES GROUNDS & MNTC PIPE/CVRS /MHLS SMALL TOOLS PUMP STATIONS SERVICE CONTRACT SERVICE CONTRACT GROUNDS & MNTC ROAD CONST,DVR Acct# / Proi Code 1004 - 6021 1004 - 6022 1004 - 6042 1004 - 6071 1028 - 6042 2001 - 6052 2001 - 6073 2002 - 6051 1001 - 6030 2001 - 6030 1028 - 6042 1028 - 8687 Check Total: Check Total: Check Total: Grand Total: Page: 17 Current Date: 11/08/2007 Current Time: 15:57:25 Amount Check Num Tvoe 1,613.76 646.29 80.46 185.93 710.28 2,421.99 199.14 165.54 6,123.21 AP- 00068136 MW 30.02 30.01 60.03 AP -00068137 MW 2,000.00 4,880.00 6,880.00 AP -00068138 MW 420,808.15 South Tahoe Public Utility District ~""""JIf ~H."" ~ ~ FMnlI J.... 1t.JclMJ MluyLou.~ DI.UtrIlJ ~ Eric.~ 1m ~Crestt)rM,.South.Lake.Tahoe.CA 96150-1401 ~f530544-6414.Fax530541..()614.www~ BOARD AGENDA ITEM 13a TO: FROM: Board of Directors Richard H. Solbrig, General Manager MEETING DATE: November 15, 2007 ITEM - PROJECT: Conference with Legal Counsel - Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9{a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Meyers Landfill Site - United States of America vs. EI Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK GGH, United States District Court for the Eastern District of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES-Rtn<... NO CATEGORY: Sewer -69- South Tahoe Public Utility District Proposed Customer Assistance Program Customer Assistance Program WHY • District rates are very affordable for the average District customer • Not every District customer is average • Eligible customers will have income about 38% below the median City of South Lake Tahoe household income Customer Assistance Program NEEDED • Sewer and Water Services are essential for healthy living • Customers cannot opt out due to lack of funds • Keeping up with the cost of living is difficult for low- income customers Customer Assistance Program LEGAL • • Program meets federal laws — Federal law favors rate subsidies for Low Income Customers • 40 CRF 35.929 • Public Law 100 -4, Title II, section 204(b)(1) • Program meets state laws — Funding via property taxes is key to being able to legally provide the Program — Under Proposition 218 service charges must be based on the proportional cost of service to the affected parcel — Under Proposition 13 service charges must be based on the reasonable cost of providing service to avoid being deemed a special tax Customer Assistance Program BUDGETED • The Board included $77,000 in the current budget to provide financial assistance to eligible customers • This will provide a rebate to about 500 customers • The proposed rebate is 20% or about $154 per year Customer Assistance Program COMMUNITY SUPPORT • The 2006 Customer Satisfaction Survey confirmed that the majority of residential customers endorsed this type of program with 65.3% of those polled in support of it. Household Members Maximum Household Income 1 - 2 $29,300 3 $34,400 4 $41,500 5 $48,600 6 $55,700 >6 + $7104 Each Customer Assistance Program Income Qualifications Customer Assistance Program Eligibility • Participant in Sierra Pacific Power Company's CARE program • Residential Property • Primary Home • Excludes Rental Property Customer Assistance Program Administration • Proposed effective date is January 1, 2008 • Customer completes program application • A current Sierra Pacific Power billing showing participation in CARE is submitted annually to deem eligibility PROPOSED 2007 -2008 ENGINEERING PROJECTS PRIORITY LIST PROCESS TO PRIORITIZE PROJECTS • Existing 10 -Yr Capital Outlay • Angora Fire Response Assessment • Staff Assessment and Prioritization • Proposed Project List • Proposed Capital Outlay Revisions • Engineering Scheduling and Workload Assessment • Board Action • Approve Engineering Project Priority List PROCESS TO PRIORITIZE PROJECTS Assessment Criteria • Ongoing Projects • Angora Fire Response • Regulatory Requirements • Grant Funding • Erosion Control Projects • Existing Obligations PROCESS TO PRIORITIZE PROJECTS Asset Management Approach • Probability of Failure • Consequence of Failure • Risk Assessment • Priority Ranking Proposed PRIORITY PROJECT LIST • Water Engineering • Arsenic Treatment — Arrowhead Well - PO • South Upper Truckee Well #3 - c • Waterlines • Granite / Iron Mountain - D.0 • Al Tahoe - In • Tata - D.0 • Julie - u•c ( ?) • Waterline Assessments (Airport, Flagpole) - P.D.c Proposed PRIORITY PROJECT LIST • Water Engineering • Angora and Country Club Tanks - RIX • Lookout Tank Coating - PIK • Forest Mountain Booster Improvements - PD.c • Twin Peaks Booster Station - PD • Lake Tahoe Blvd Waterline - PD • Iroquois Booster / Waterline Improvements - P • Grizzly Mountain Booster - P • Erosion Control Projects (21) - RC • District BMPs - PD Proposed PRIORITY PROJECT LIST • Water Engineering • Echo View, Keller Tanks - P • David Lane Booster - P • Demo Ralph and Tata Tanks - P • Future Waterlines - P • Fire Hydrants - P • Well Projects - P.D.c • Data Loggers • Transducers • Destructions • Bayview Flushing Line Proposed PRIORITY PROJECT LIST • Sewer Engineering • Final Export Pumps / VFDs - c • Sewer Collection System Master Plan - P • Fallen Leaf Lake System Improvements • Collection System Improvements • Diamond Valley Master Plan / EIR - PD • Monitoring Wells — Nitrates • Harvey Place Emergency Storage Basin • C -Line Rerouting Proposed PRIORITY PROJECT LIST • Sewer Engineering • ICR Oxygenation System - In • Harvey Channel Culvert - Pin • Erosion Control Projects (21) - P.c • District BMPs - PD • Secondary and Filter Rehab - P Proposed PRIORITY PROJECT LIST • Sewer Engineering • Al Tahoe Forcemain / Bypass - P • LPPS Pumps, Motors, SCADA - P • Carbon Odor Scrubber - P • Lower Shops Buildings, Parking - P PROPOSED 2007 -2008 ENGINEERING PROJECTS PRIORITY LIST WATERLINE REPLACEMENT PRIORITIZATION PROPOSED 2007 ENGINEERING PROJECTS PRIORITY LIST