Loading...
AP 03-06-08 SOUTH TAHOE PUBLIC UTILITY DISTRICT "Basic Services for a Complex World" REGULAR BOARD MEETING AGENDA Thursday, March 6, 2008 2:00 P.M. District Board Room 1275 Meadow Crest Drive, South lake Tahoe, California Richard Solbrig, General Manager Mary Lou Mosbacher, President BOARD MEMBERS Paul Sciuto, Assistant Manager Dale Rise, Vice President James R. Jones, Director Eric W. Schafer, Director Ernie Claudio, Director 1. CALL TO ORDER REGULAR MEETING - PLEDGE OF ALLEGIANCE 2. COMMENTS FROM THE AUDIENCE (Short non-agenda items that are within the subject matter jurisdiction of the District. Five-minute limit. No action will be taken.) 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR 4. ADOPTION OF CONSENT CALENDAR (Any item can be discussed and considered separately upon request.) 5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE ACTION 6. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION a. Twin Peaks Booster Station and Pg.19 Waterline Replacement (Jim Hoggatt) Approve a Task Order to Carollo Engineers to Provide Planning and Design Services, in the Amount of $463,550 b. Pg.25 General Manager Contract and Salary Range (Nancy Hussmann) (Note: The Board will convene to Closed Session at the end of the meeting and then reconvene to Open Session to take action on th is item) (1 ) Establish 2008 Salary Range (2) Correct Clerical Error in General Manager Contract; and (3) Authorize Execution of Same REGULAR BOARD MEETING AGENDA - MARCH 6, 2008 PAGE - 2 c. Payment of Claims Pg.27 Approve Payment in the Amount of $1 ,013,247.41 7. BOARD MEMBER STANDING COMMITTEE REPORTS (Discussions may take place; however, no action will be taken) a. Water & Wastewater Operations Committee (Jones / Claudio) b. Finance Committee (Schafer / Rise) c. Executive Committee (Mosbacher / Rise) d. Planning Committee (Mosbacher / Schafer) 8. EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVE REPORT 9. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken) 10. GENERAL MANAGER REPORT (Discussions may take place; however, no action will be taken) a. Joint Management Conference 11. STAFF I ATTORNEY REPORTS (Discussions may take place; however, no action will be taken) a. Proposed State Discharge Requirements (Paul Sciuto) 12. NOTICE OF PAST AND FUTURE MEETINGS I EVENTS Past Meetinas I Events 02/25/08 - 02/29/08 - A WW A Conference 02/25/08 - 02/29/08 - ACWA Washington D.C. Conference 02/27/08 - ECC (Employee Communications Committee) 03/03/08 - Operations Committee Meeting Future Meetinas I Events 03/11/08 -10:30 a.m. - Planning Committee Meeting at District Office 03/12/08 - 9:00 a.m. - EI Dorado County Water Agency Meeting in Shingle Springs 03/12/08 - 7:00 p.m. - Lahontan Regular Board Meeting in Truckee 03/13/08 - 1 :30 p.m. - Board Budget Workshop at District Office 03/14/08 - 9:00 a.m. - Tahoe Interagency Executives Meeting on North Shore 03/17/08 - 9:30 a.m. - Alpine County Contracts Commission Meeting in Markleeville 03/17/08 - 3:30 p.m. - Water and Wastewater Operations Committee Meeting at District 03/18/08 - 9:00 a.m. - Alpine County Supervisors Regular Meeting in Markleeville 03/20/08 - 2:00 p.m. - STPUD Regular Board Meeting at District Office 03/24/08 - 9:00 a.m. - EI Dorado County Water Agency Strategic Planning Session in Shingle Springs 13. CLOSED SESSION (Closed Sessions are not open to the public) a. Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel- Pg.39 Existing Litigation re: Meyers Landfill Site: United States of America vs. EI Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK GGH, United States District Court for the Eastern District of CA REGULAR BOARD MEETING AGENDA - MARCH 6, 2008 PAGE - 3 b. Pursuant to Government Code Section 54957.6(a)/Conference with Labor Pg. 41 Negotiators Unrepresented Employee Position: General Manager Agency Negotiators: Executive Committee, Board of Directors 14. ACTION I REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION 15. ADJOURNMENT (To the next regular meeting, March 20, 2008,2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete agenda packet, including all backup information is available for review at the meeting and at the District office during the hours of 8:00 a.m. - 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after minutes of the meeting have been approved. Items on this agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear on the agenda. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified. Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Comments on items not on the agenda can be heard during "Comments from the Audience;" however, action cannot be taken on items not on the agenda. Please provide the Clerk of the Board with a copy of all written material presented at the meeting. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings. If particular accommodations for the disabled are needed (i.e., disability-related aids, or other services), please contact the Clerk of the Board at 530.544.6474, extension 6203, at least 24 hours in advance of the meeting. ITEMS CONSENT CALENDAR MARCH 6, 2008 REQUESTED ACTION a. Pg. 1 b. Pg.3 C-" Pg. 7 ~13 Country Club Tank and Waterline Replacement (Julie Ryan) Authorize Staff to Advertise for Bids for Construction of the Replacement Tank and Waterline at Country Club Heights Collection System Master Plan (Paul Sciuto) Approve Amendment No.2 to Brown & Caldwell for Additional Flow Monitoring Services, in the Amount of $100,500. Regular Board Meeting Minutes: February 7,2008 (Kathy Sharp) Approve Minutes Regular Board Meeting Minutes: February 21, 2008 (Kathy Sharp) Approve Minutes South Tahoe Public Utility District. 1275 Meadow Crest Drive · South Lake Tahoe, CA 96150 Phone 530.544.6474 · Facsimile 530.541.0614 · www.stpud.us ~.~ ~H..5cliJrie South Tahoe Public UtUityDiatrict ~ Erar!JQwdIo ~.. ..Jotw MatyLou.~ 0.. RIM 1215' M.aawens. .Ortv#- 5ou1;h LakB iabH -CI\l6l& f'hcrt8580~74 · Fax. 5!0844~ BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Julie Ryan, Senior Engineer MEETING DATE: March 6,2008 ITEM - PROJECT NAME: Country Club Tank and Waterline Replacement REQUESTED BOARD ACTION: Authorize staff to advertise for bids for construction of the replacement tank and waterline at Country Club Heights. DISCUSSION: On November 15,2007, the Board approved the proposal from Brown and Caldwell to design the tanks, coatings, and cathodic protection for replacement of the existing tanks at Angora Highlands and Country Club Heights. Subsequently, the Angora Highlands project was delayed, and staff is pursuing a permanent access road to the tank site prior to commencing construction. The Country Club Tank, however, is proceeding as planned, and staff expects to build this summer. The project will be bid under two separate contracts: (1) site grading, tank foundation and pipeline replacement and (2) tank construction, including cathodic protection and coatings application. The tank construction contract will also include re-coating at Forest Mountain Tank, to repair the damage incurred during the 2007 Angora Fire. Brown and Caldwell has completed the 90% tank plans and technical specifications for the project, which are currently being reviewed by District staff. District staff has completed the 50% site grading plans and is working on compiling the specifications for the project. Once the bid documents are received and compiled by the District on March 14, 2008, the schedule for the bid period and construction will be as follows. Advertise for bids Mandatory pre-bid meeting Open bids Board Award Contract Notice of Award Notice to Proceed Foundation Complete Site Stabilization Complete Site Gradino Contract March 19,2008 April 08, 2008 April 15, 2008 April 17,2008 April 18,2008 May 12,2008 July 21,2008 October 15, 2008 -1- or Julie Ryan March 6, 2008 Page 2 Tank Construction Contract Advertise for bids April 07, 2008 Mandatory pre-bid meeting April 22, 2008 Open bids April 29, 2008 Board Award Contract May 01, 2008 Notice of Award May 02, 2008 Notice to Proceed May 27, 2008 Mobilize to Site July 21, 2008 Project Complete October 15, 2008 To garner support and gather input from the neighbors, Staff will be holding a project planning meeting for the public on Saturday, March 8, 2008, at 10:00 a.m. in the Board Room at the District Offices. Items to be discussed are the size and color of the tank, new site security and site stabilization measures, and any other topics of interest to the residents regarding this project. The total amount budgeted for the replacement of Country Club Tank, including consultant services and construction management, is $900,000. Brown and Caldwell expects that the tank, foundation, cathodic protection and coatings will cost between $480,500 and $572,000. This estimate does not include costs for waterline replacement and related appurtenances, electrical components, site stabilization and site security at the Country Club Tank site; a cost estimate for these elements will be prepared by staff prior to advertisement. The estimate also does not include the cost for re-coating Forest Mountain Tank; a cost estimate for this element will be prepared prior to advertisement. The Forest Mountain Tank recoating will be funded by the District's insurance carrier. SCHEDULE: See above COSTS:- See above ACCOUNT NO: 2029-7063; 2029-8995 BUDGETED AMOUNT REMAINING: $145,163; $670,000 (2008/09 proposed budget) ATTACHMENTS: None CONCURRENCE WITH REQUESTEcZ: GENERAL MANAGER: YES - NO CHIEF FINANCIAL OFFICER: YES NO CATEGORY: Water -2- South Tahoe Public Utility Diatrict ~I""" mdlMll H. Wrft ~ EntIo.~ J*"WI. J(IJW Mary lDu ~ .,..me. 1215 MtIfItAaw er..t. Drive << South tats. iahotJ · .CA.8Eft6( f"htJl16 t530 644-6474 . Fax. fS3O. 54f~ BOARD AGENDA ITEM 4b TO: Board of Directors FROM: Paul A. Sciuto, Assistant General Manager MEETING DATE: March 6, 2008 ITEM - PROJECT NAME: Collection System Master Plan. REQUESTED BOARD ACTION: Approve Amendment NO.2 to Brown & Caldwell for additional flow monitoring services, in the amount of $100,500. DISCUSSION: Flow monitoring at selected points in the collection system during wet weather and dry weather flow periods is included in Brown & Caldwell's scope of services for the Collection System Master Plan project. However, due to the lack of rain and runoff in 2007 the wet weather flow monitoring performed did not show adequate results and collection system response. To adequately calibrate the hydraulic model for the sanitary sewer collection system wet weather flow monitoring, the process should be performed again in 2008. The proposed flow monitoring will include 16 flow monitors and five rain gauges for 45 days. Amendment NO.2 will be to Task Order 6 for the development of the Collection System Master Plan. SCHEDULE: Master Plan complete by March 2009. COSTS: $100,500. ACCOUNT NO: 1029-8721/CSMSPL BUDGETED AMOUNT REMAINING: $4,073 (2007-08); $400,000 (2008/09 proposed budget) ATTACHMENTS: Amendment No.2. CONCURRENCE WITH REQUESTED AC GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES CATEGORY: Sewer NO NO -3- AMENDMENT NO. 2 TO AGREEMENT FOR CDNSULTING SERVICES BETWEEN SOUIB TAHOE PUBUC unUTI DIS1RICf AND BROWN AND CAIDWELL FOR WASlEWATER CDLLECTION MASTERPLAN CDNSULTING SERVICES n-nS AMENDMENT NO. 2 to the Agreement for Consulting Semces dated February 6, 2007 between South Tahoe Public Utility District, hereinafter referred to as "Client", and Brown and Caldwell, Environmental Engineering and Consulting, a California corporntion, hereinafter referred to as "Consultant," is made and entered into this day of March, 2008. REaTALS: WHEREAS, Client and Consultant entered into an agreement for consulting semces dated February 6,2007 (hereinafter referred to as the "Agreement"); WHEREAS, Client desires to perform additional wet weather flow monitoring; and WHEREAS, Client has requested changes in the Scope of Semces; NOW, lHEREFORE, Client and Consultant agree to amend the Agreement as follows: 1. SmPE OF CDNSUL TING SERVICES The Scope of Semces in the Agreement is amended to provide: Task 32 · Conduct flow monitoring with 16 flow monitors and five rain gauges for 45 days (each season) during the wet weather flow monitoring seasons in 2007 and 2008. Flow monitors and rain gauges will be installed at the locations designated in the Flow Monitoring Plan dated March 15,2007. II. Sa-IEDULE Consultant is authorized to proceed with the modified Scope of SeIVices effective on the date of this Amendment. The 2008 wet weather flow monitoring semces shall be completed by May 15, 2008. III. CDMPENSATION Compensation for the semces provided under Article I of this Amendment shall be calculated on the same basis as in the Agreement. The labor hours and cost estimates for completing the setvices defined in this Amendment are shown in Attachment A The estimated compensation for the setvices perlonned .under this Amendment is $100,550 which increases the total estimated compensation under the Agreement to $636,300. -5- AMEND (June 30, 1999) Page 1 of2 All other tenns and conditions of the Agreement and any amendments thereto remain unchanged SOUIHTAHOE PUBUCunU1YDISlRICf Signature: Printed Name: T me: BROWN AND CALDWEll ENVIRONMENTAL ENGINEERING AND CONSULTING Signature: Printed Name: Tide: -6- AMEND (June 30, 1999) Page 2 of2 ~~\\ ~ ,\\.\~ t\~\~ ~4t>~ J ~vi-~V u If.~~ SOUTH TAHOE PUBLIC UTILITY DISTRICT 'is "Basic Services for a Complex World" Richard Solbri~, General Manager Mary Lou Mosbacher, President BOARD MEMBERS Paul Sciuto, Assistant Manager Dale Rise, Vice President James R. Jones, Director Eric W. Schafer, Director Ernie Claudio, Director REGULAR MEETING OF THE BOARD OF DIRECTORS SOUTH TAHOE PUBLIC UTILITY DISTRICT FEBRUARY 7, 2008 MINUTES The Board of Directors of the South Tahoe Public Utility District met in a regular session, February 7, 2008, 2:00 P.M., District Office, 1275 Meadow Crest Drive, South Lake Tahoe, California. BOARD OF DIRECTORS: President Mosbacher, Directors Jones, Rise, Schafer, Claudio ROLL CALL STAFF: Solbrig, Sciuto, McFarlane, Whalen, Cocking, Coyner, Adams, W. Stanley, Hussmann, Brown, Swain, Frye M. Alsbury, C. Skelly, Bergsohn, Attorney Kvistad GUEST: Tom Pavletic /Municipal Financial Services, Adam Jensen/Tahoe Daily Tribune, John Runnels, John Cefalu Paul Sciuto led the pledge to the flag. Moved Schafer / Second Rise I Passed Unanimouslv to approve the Consent Calendar as submitted: a. NeoGov Recruitment System Software Program - Authorized staff to enter into an agreement with NeoGov to provide on-line application and recruit- ment program services, in the amount of $8,600; PLEDGE OF ALLlGIANCE CONSENT CALENDAR b. Carlson Water Main Extension - Adopted Resolution No. 2843-08 accepting the Carlson Water Main Extension; -7- ~ REGULAR BOARD MEETING MINUTES - FEBRUARY 7, 2008 PAGE-2 c. Dump Truck: Five to Six Yard Capacity - A warded bid to the lowest responsive, responsible bidder, Western Truck Parts and Equipment Co., in the amount of $70,006.25; CONSENT CALENDAR (continued) d. Indian Creek Reservoir TMDL Mitigation Project - Approved proposal from Stephen R. McAdams, P.E., to assist District staff to relocate an oxygen generator from the Bakersfield site for use,at Indian Creek Reservoir, in the amount not to exceed $11,000; e. South Upper Truckee Well No.3 Corrosion Control Treatment Facility - Approved Change Order No.4 to Thomas Haen Company, In., in the amount of $13,096; f. Arrowhead Well Arsenic Treatment Facility - Authorized staff to advertise for bids for the pre- purchase of a 1,000 gallon per minute iron-based adsorptive media water treatment system; g. Approved Regular Board Meeting Minutes: January 3, 2008. ITEMS FOR BOARD ACTION Moved Schafer / Second Claudio I Passed Unanimouslv PA YMENT OF CLAIMS to approve payment in the amount of $1,879,805.80. Water & Wastewater Operation Committee: The BOARD MEMBER STANDING committee met on February 4, 2008. Minutes of the COMMITTEE REPORTS meeting are available upon request. Finance Committee: The committee met on January 25, 2008, and January 31, 2008. Minutes of these meetings are available upon request. The committee also met on February 5 and 6, 2008, to review the draft proposed budget and the 10-year forecast, in preparation for the upcoming Board Budget Workshop. The budget process time line is early this year and in compliance with Proposition 218 (Big Horn Bill). Executive Committee: The committee was to meet on February 8, 2008, however, this meeting has been cancelled and will be rescheduled. The agency has not met since the last Board meeting, however, Directors Jones and Rise, and Richard Solbrig attended an orientation presentation held at the District for new Board members. The presentation, given by water agency staff was very informative. The agency's next regularly scheduled meeting is on February 13. 2008. EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVE REPORT -8- REGULAR BOARD MEETING MINUTES - FEBRUARY 7, 2008 PAGE-3 Director Schafer reported he attended the recent CASA Conference in Indian Wells, California, held on January 9-12,2008. A summary of his conference notes were distributed to the Board members for their review. BOARD MEMBER REPORTS Director Claudio reported he attended the South Lake Tahoe City Council meeting and the Citizen's Alliance for Responsible Government meeting. General Manaoer: Richard Solbrig gave an update on the GENERAL MANAGER REPORT waterline funding grant process being pursued by the Lake Tahoe coalition. The initial write-up on the grant is due at the Congressional offices February 15, 2008, and the Senate offices on March 1, 2008. The grant is looking at short-term projects for the next four years with an emphasis on plan- ned capital projects to improve firefighting capabilities of utility agencies, surrounding the basin. The coalition level request is being pursued through the Tahoe Restoration Act, on a regional-wide basis, to maximize chances for further earmarks in Congress. 2:33 P.M. PUBLIC HEARING SEWER CAPACITY CHARGES Note: Notices of this Public Hearing were published in the Tahoe Daily Tribune on January 30,2008, and February 7,2008. President Mosbacher opened the public hearing. Rhonda McFarlane, Chief Financial Officer, introduced Tom Pavletic, Municipal Financial Service, who prepared the current study. The last time sewer capacity charges were reviewed by the Board was in 1999. Typically the fees are revisited every five years. She reported that the original intention was to line up review of these fees to coincide with Pathway 2007 however that process is moving slowly. Staff, with the Board's approval decided to proceed with this study. The Finance Committee has met with Tom Pavletic and Marv Winer and has reviewed the details of the report. Mr. Pavletic proceeded with a PowerPoint presentation of the methodology of determining a sewer capacity fee that included: -9- REGULAR BOARD MEETING MINUTES - FEBRUARY 7,2008 PAGE.4 . Setting Capacity Charges must: o Demonstrate a nexus between new develop- ment and the need to replace, expand or build facilities to accommodate it. o Not be arbitrary of discriminatory in its application to individuals or customer classes. o Meet the requirements of California Government Code Sections 66012-66014. . Most prominent requirement of the code is that the fee be reasonable. . Calculation Methodology Average Cost Method for Capacity Charge (replacement value, debt, capacity and demand.) . List of Sewer System Assets. . Sewer Units. . Current, Calculated and Recommended Unit Costs. . Unit Costs and Capacity Charges - 4% Inflation. . Projected Revenue from Capacity Charges (4% Infl.) Mr. Pavletic ended his presentation and answered questions for the Board. Director Rise questioned whether these funds generated from the increase in sewer capacity charges are only used to improve the infrastructure of the District. Rhonda McFarlane confirmed this statement and also included that this is a law of the State of California that these fees are dedicated to infrastructure and cannot be used for anything else. Director Jones stated he felt implementing this increase would be the prudent thing to do. The District needs to replace thousands of feet of lines as they are reaching the end of their life expectancy. Wanda Stanley addressed the Board with concerns regarding whether the public will be able to afford to build new homes or remodel their existing homes with these increases. Director Rise responded that the recom- mended increase for the first year, 2008, was not the full 16% increase, but reduced to 11.8% to try to help the economy. -10- SEWER CAPACITY CHARGES (continued) REGULAR BOARD MEETING MINUTES - FEBRUARY 7, 2008 PAGE-5 Director Claudio would like to see incentives built into the plan to distinguish whether it is a local resident or whether it is a second home. President Mosbacher informed him that making distinctions like that are not legal, and would be considered discrimination. SEWER CAPACITY CHARGES (continued) Rhonda McFarlane commented that District customers are receiving a tangible product when they pay fees. Waste- water is transported and processed. Potable water is delivered to their homes or businesses. Operating costs need to be collected either by initial connection to the system, in the form of a capacity fee, or passed on to the ratepayer. John Cefalu expressed his concerns regarding the high costs of fees for the public who wants to build or remodel residences andlor businesses who wish to come into the community or expand their existing businesses. He asked the Board to consider this increase carefully. He received clarification from the Board and Rhonda McFarlane regard- ing depreciation accounts savings and why a consultant was hired on this project. Rhonda McFarlane pointed out that the consultant's recommendation is being phased in over a five year period with the first year increase taking effect in 60 days. Director Jones received clarification that the TRPA Mitigation Fee of 5% may be eliminated during negotia- tions. Any savings will be applied to the ratepayer. John Runnels addressed the Board. He attended the Finance Committee meetings that discussed this report and sees this fee increase as protecting the existing ratepayers. He also received clarification on how this meeting was advertised to the public. The Public Hearing was closed at 3:39 P.M. Motion Jones 1 Second Claudio 1 Passed Unanimously to Enact Ordinance No. 502-08 to update the charges. Increase to be effective April 7, 2008, and to escalate on a four year progression. Chief Financial Officer: Rhonda McFarlane gave a STAFF REPORTS report on the budget process, especially for the new Board members. On March 13, 2008, a Board workshop is scheduled regarding the draft proposed budget. She reminded the Board that during this period, the -11- REGULAR BOARD MEETING MINUTES - FEBRUARY 7, 2008 PAGE. 6 documents are not legally public information and are considered "a work in progress" and should not be distributed to the public during this initial phase. On April 11, 2008, the "proposed budget" will be made available to the public. On May 15, 2008, a public meeting will be held. . 3:47 P.M. to 4:04 P.M. Manaaer of Customer Service: Lisa Coyner gave the Board a brief overview of the "Claims Reporting Process". She reported that staff receives annual training from CSRMA (California Sanitation Risk Management Authority). Network/Telecom Svstems Administrator: Bill Frye reported on the District's internet security. He extended an invitation to the Board for a tour of the server room, and to contact him with any questions they may have regarding the District's system. Leaal Counsel: Gary Kvistad updated the Board on the ongoing negotiations with Heavenly Resort. Heavenly would like to obtain more water for snowmaking ability in the upcoming years. STAFF REPORTS (continued) MEETING BREAK ACTION I REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION No reportable Board action. 5:08 P.M. Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel - Existing Litigation re: Meyers Landfill Site: United States of America vs. EI Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK GGH, U.S. District Court for the Eastern District of Ca. ADJOURNMENT Mary Lou Mosbacher, Board President South Tahoe Public Utility District ATTEST: Kathy Sharp, Clerk of the Board By: Chris Whalen, Assistant Board Clerk South Tahoe Public Utility District -12- t.'~\~ 1\~t~ "l ~~,\,< \~ ltIlIOpllJJ . Al4'~ SOUTH TAHOE PUBLIC UTILITY DISTRICT ~ "Basic Services for a Complex World" Richard Sol brig, General Manager Mary Lou Mosbacher, President BOARD MEMBERS Paul Sciuto, Assistant Manai:. Dale Rise, Vice President James R. Jones, Director Eric W. Schafer, Director Ernie Claudio, Director REGULAR MEETING OF THE BOARD OF DIRECTORS SOUTH TAHOE PUBLIC UTILITY DISTRICT FEBRUARY 21, 2008 MINUTES The Board of Directors of the South Tahoe Public Utility District met in a regular session, February 21, 2008, 2:00 P.M., District Office, 1275 Meadow Crest Drive, South Lake Tahoe, California. BOARD OF DIRECTORS: President Mosbacher, Directors Schafer, Rise, Claudio. ATTENDEES Director Jones was excused. STAFF: Solbrig, Sharp, Henderson, Cullen, Hammond, Bird, W. Stanley, R. Johnson, Hussmann, Ryan, Coyner, Nolan, Curtis, Hoggatt, Pinkel, Cocking, Attorney Kvistad. GUEST: John Runnels. Ross Johnson led the pledge to the flag. PLEDGE OF ALLlGIANCE Moved Schafer 1 Second Rise / Jones Excused 1 Passed CONSENT CALENDAR to approve the Consent Calendar as submitted: a. Liability Claim Against STPUD Received from Melody Martinez - Rejected claim; b. Intergovernmental Agreement with Alpine County- (1) Authorized the Chief Financial Officer to notify the County of Alpine (County) of its intention to extend the Intergovernmental Agreement Providing for Grant Coordinator Services by the South Tahoe Public Utility District for the County; -13- :~ REGULAR BOARD MEETING MINUTES - FEBRUARY 21,2008 PAGE. 2 (2) Authorized the Chief Financial Officer to negotiate an update to Attachment A of the agree- ment with the County and the Grant Coordinator; and (3) Authorized the Board President to sign the extended agreement; c. Customer Service, Operations & Laboratory Facility Landscaping Plan - (1) Approved the Project Close- out Agreement and Release of Claims for Aspen Hollow Nursery; and (2) Authorized staff to file a Notice of Completion with the EI Dorado County Clerk; d. Approved Regular Meeting Minutes: January 17, 2008. CONSENT CALENDAR (continued) ITEMS FOR BOARD ACTION The purpose of this Ordinance is to adopt certain amendments and additions to the Administrative Code regarding the District's authority to levy fines on an escalating basis for violations of the District's Ordinances, rules or regulations regarding either water or sewer work or connection(s). Currently, District staff (inspections, underground repair) has no ability to fine property owners who do not adhere to a correction notice issued to them to correct water andlor sewer violations. District staff can disconnect water andlor sewer services, but staff considers the disconnection process as a last resort. Having the ability to issue escalating fines will provide the District with an alternative mechanism through which to protect the public safety. Fines would be added to the customer's quarterly bill. Lisa Coyner and Cuz Cullen reported the District does not fully exercise the right to disconnect water and sewer services to a home when a correction notice is ignored out of concern for the residents in the home. Disconnecting service means the occupants would have to vacate the residence since Department of Health laws will not allow occupancy without sewer andlor water service. If customers know the District has the ability to fine, they would be more likely to correct the violation and avoid the fine process altogether. A lengthy discussion took place that covered: the current correction notice and disconnection procedures, the reasons why this ability is beneficial to the District and its customers, the need to clarify the escalating fining schedule, the fact that ignoring correction -14- FINING AUTHORITY REGULAR BOARD MEETING MINUTES - FEBRUARY 21,2008 PAGE - 3 notices puts the entire water system at risk of contamination from backflow devices, the public's perception of additional regulations, the percentage of sewer versus water customers who have correction notices issued to them, the administrative costs and savings to implement the ordinance, the need to treat violators consistently according to the severity of each fine, and staff's discretion to determine the scope of the violation and whether to issue a fine at all. Moved Rise 1 Second Claudio 1 Jones Excused 1 Passed to enact Ordinance No. 503-08 as written, providing additional fining authority pursuant to Government Code Section 53069.4; and directed staff to revisit the Ordinance with the Board if higher fining authorization is needed in order to protect the District's systems. Per discussions that took place when the Finance Committee met to discuss the budget, engineering staff has looked at the feasibility of hiring a new Junior Engineer for the 2008 construction season. The addition of an engineer was to mitigate what the District spends on consultant inspectors during the building season. With the current project work- load, the District will potentially need to hire two outside inspectors from May through October 2008. Based on the projected 1 0- Year Capital Improvement Plan (CIP), the need for two outside inspectors would not diminish, but could be reduced by one by hiring an additional engineer. There is a lot of extra work this position could be responsible for during the winter months. The District will not be able to entirely eliminate the need for consultant services with a new hire due to the ongoing need of materials and testing services by a certified lab. In addition, in some years the number of projects in the CIP would mandate the need for four inspectors. Therefore, at times an additional outside inspector will need to be hired. The recruitment would be predicated on the new position being a field inspector from May through November for at least a four year period. The proposed salary is based on a survey of comparable agencies. Moved Schafer 1 Second Claudio 1 Jones Excused 1 Passed to authorize staff to advertise for a Juniorl Assistant Engineer. -15- FINING AUTHORITY (continued) STAFFING - JUNIOR 1 ASSISTANT ENGINEER REGULAR BOARD MEETING MINUTES - FEBRUARY 21, 2008 PAGE. 4 An inspector is needed to provide construction inspection for the final pump station and to perform materials testing for all projects for the time period between March to October 2008. Jim Hoggatt reported the previous Board action eliminated the need to contract for a second inspector. The Board discussed travel time included in the contract, the feasibility of using a courier for delivering testing samples, and doing testing in- house. There are strict procedures that must be followed, and tests must be performed by a lab that is certified to do those specific types of tests as an objective party. Moved Schafer 1 Second Claudio 1 Jones Excused 1 Passed to approve proposal from Stantec Consulting, Inc., to provide one construction inspector and per- form all materials testing in the amount of $210,000. 2008 CONSTRUCTION INSPECTION AND MATERIAL TESTING Moved Schafer 1 Second Rise 1 Jones Excused 1 Passed PAYMENT OF CLAIMS to approve payment in the amount of $685,916.08. Water and Wastewater Operations Committee: The meeting scheduled for February 19 was cancelled. Executive Committee: The committee met to discuss provisions of the general manager's employment contract. 3:20 - 3:35 P.M. Directors Jones and Rise, Dennis Cocking, and Richard Solbrig attended the February 13 board meeting. Director Jones questioned several expenditures since none were of benefit to South Lake Tahoe. The next meeting will be held March 12. Director Claudio relayed his thoughts on the sewer capacity plan that was approved February 7. He objected to the process (i.e., use of consultants, timing). General Manager: Richard Sol brig reported that the sewer lateral inspection and testing issue will be discussed during the Water and Wastewater Operations Committee meeting on March 3, and also at the Technical Review Committee meeting that staff will hold for local contractors to gather their input. -16- BOARD MEMBER STANDING COMMITTEE REPORTS MEETING BREAK EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVE REPORT BOARD MEMBER REPORT GENERAL MANAGER REPORT REGULAR BOARD MEETING MINUTES - FEBRUARY 21,2008 PAGE. 5 District Information Officer: Dennis Cocking reported on the State of California's budget shortfall of $1 6 billion dollars. It is likely the State will make another attempt to raid special districts of their property tax revenues, which would have a huge negative impact on the District. He also reported a Lake Tahoe Fire Commission was formed to make findings as a result of the Angora fire. The District submitted a finding related to waterline funding that was supported by fire chiefs, which might help in Washington. General Counsel and Land Application Manager: Gary Kvistad and Hal Bird reported on the State Water Resources Control Board's recycled water policy to develop on a uniform basis how recycled water could be used. The District submitted comments, and there will be another public comment time period. The final policy could significantly impact the development of the master plan in Alpine County. STAFF REPORTS ACTION I REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION No reportable Board action. No reportable Board action. 4:55 P.M. Pursuant to Government Code Section 54956.9{b)/Liability Claim Received from Melodv Martinez . Pursuant to Government Code Section 54956.9{a)/Conference with Legal Counsel - Existing Litigation re: Meyers Landfill Site: United States of America vs. EI Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK GGH, U.S. District Court for the Eastern District of Ca. ADJOURNMENT Mary Lou Mosbacher, Board President South Tahoe Public Utility District ATTEST: Kathy Sharp, Clerk of the Board South Tahoe Public Utility District -17- South Tahoe Public Utility Diatrict ~I~ Ii'.Ii:NN.H. ~ ~ f!ntfo,t::lMJlib "'fi.~ ~1..Du ~ 0.. 1215 M.aow~'~' South Laka".k_..CA~ PhQI1S.-530 !54+0474 · Fe<fS!()t541~ BOARD AGENDA ITEM 6a TO: FROM: Board of Directors Jim Hoggatt, Construction ManagerlEngineer MEETING DATE: March 6, 2008 ITEM - PROJECT NAME: Twin Peaks Booster Station and Waterline Replacement REQUESTED BOARD ACTION: Approve a Task Order to Carollo Engineers to provide planning and design services, in the amount of $463,550. DISCUSSION: A Booster Station to boost the water from the main zone to the Twin Peaks and Flagpole zones has been in our 10-year planning budget for the last five or six years. The project never met the requirements to move up the priority list until the Angora Fire. After the Angora Fire, District staff met and determined this project should move up on the priority list to improve our source of water to these zones. It was scheduled to be constructed in 2012. The current schedule is to design in 2008 and construct in 2009 and 2010. District staff received and reviewed proposals from several engineering firms and determined Carollo Engineers had the best proposal. SCHEDULE: As soon as possible. COSTS: $463,550 ACCOUNT NO: 2029-7071/TPBSTR BUDGETED AMOUNT REMAINING: $500,000 2008/09 proposed budget; $1,500,000 (2009/10 proposed 10-Year Plan) ATTACHMENTS: Proposal, scope of work from Carollo Engineers. CONCURRENCE WITH REQUESTED AC GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES CATEGORY: Water NO NO -19- C c;a,""1 Engineers... Working Wonders With Water"" February 15,2008 South Tahoe Public Utility District Mr. Jimmie Hoggatt Engineering Department Manager 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Subject: Cost Proposal for the Twin Peaks Booster Station and Waterline Replacement Project Dear Mr. Hoggatt, Our fee proposal for engineering services related to the Twin Peaks Booster Station and Waterline Replacement Project is attached. The information contained herein is proprietary and we request that it be kept confidential to the extent possible. The Estimated Engineering Hours and Costs worksheet is attached. The not to exceed cost for the required tasks contained in the Scope of Services provided in the Appendix is $41 ,'. FG. The final Scope of Services shall be discussed based on the District's desired level of effort for each of these tasks and any optional tasks. Engineering fees will be based on the current rates in effect at the time work is performed. This estimate utilizes our current (2007-2008) rates, which have been escalated to 2008-09 rates based on our best projections at this time, as our salaries are adjusted in March. Please note that while Flow Science has agreed to be part of the Carollo team should an in-depth . surge analysis be required for the project, we have not included. hours or costs for their services at this time. A preliminary assessment of the surge potential will be conducted in-house as part of Subtask 1.6, with results provided to the District for review, prior to moving forward with a more advanced evaluation through Flow Science. We will be pleased to discuss the Scope of Work and the Labor Hour and Cost Estimate at the City's convenience. Please contact us if you have any questions or if you desire additional information regarding our proposal. Sincerely, /~7Z:'P.c. Scott E. Parker, P.E. Partner-in-ChargelProject Manager SEP:kh Enclosures ~~~~.:.;.. . . ,0', '. '". . y Jimmie Hog~att From: Sent: To: Cc: Subject: Robert Gillette [RGillette@carollo.com] Wednesday, February 27. 20084:23 PM Jimmie Hoggatt Tim Taylor; Scott Parker Twin Peaks Project Fee - Twin Peaks PS & Waterline.xls Attachments: . =ee - Twin Peaks PS & Waterlln... Hi Jim, I talked to Scott and Tim about our discussion today. First, we are all really excited about being able to work with you on this project. Based on those discussions we have made a number of changes to the hours and fees spreadsheets. These are: 1. I am no longer shown on the team and have no hours. 2. We will use Tim Taylor as the checker for the civil and mechanical portions of this project. The 3 hours per sheet for P&S checking have been moved to Tim's hours. 3. I changed checking for the E, I&C hours to a senior engineer not a partner. 4. I moved a few of the QA/QC hours from my hours column to Scott's hours column to check various deliverables. 5. This increased Auerbach's hours and fees and decreased Carollo's hours and fees. If you would like a revised organization chart we can provide that. You also asked what Tim's Role on the project will be. I have separated out Tim's hour on the hours spreadsheet as best I understand them so you can see these. Tim's role is separate from the rest of Auerbach's hours, so Tim will be doing the following: 1. All work with permitting. This includes coordination with the District on the permit issues and if you would like to add the total permitting task, Tim can add this too. 2. QA/QC on all submittals and especial the detailed checking of the Civil and Mechanical drawing. 3. All the Civil Design at the pump station including the plans and specifications. 4. Responsibility for incorporating the BMPs for the entire project as required by the TRPA, the Lahontan RWQCB, etc. 5. Coordination with the Auerbach surveying team. 6. Utility location. 7. Engineering Services during Construction for the civil portion of the work and coordination with regulators as required. 8. Auerbach Project Management - so attendance at project meetings. Hope this answers your questions. Let me know if you have any more. Again we (at least Scott and Tim) look forward to working with you on this project. Bob Robert A. Gillette, P.E. Partner 2500 Venture Oaks Way, Suite 320 Sacramento, CA 95833 P: 916-565-4888 F: 916-565-4880 rgillette@carollo.com http:\\www.carollo.com -~2- TASK CAROLLO AUERBACH tl r O a Y n 4 O Ai 1 th O 4 o 7r I c i c 99 t 3 ' � t1 a c C C ' : a t. F Total Hours Total Hours Column 1 2 4 5 8 7 7 8 9 10 11 12 13 14 TASK 1 - PROJECT INITIATION & DATA COLLECTION 1.0 Project Kldc-05 6 8 0 0 0 0 0 12 0 2 0 4 4 2.0 Review Master Plan and assodeted reports 2 4 0 0 0 0 0 8 4 2 0 0 0 3.0 Local may Companies, record maps for gas, tele, power, etc 0 2 0 0 0 0 0 8 0 1 0 48 48 4.0 Hydraulic Analysis Coordination 2 2 0 0 0 0 0 8 0 0 0 4 4 5.0 12 Inch Line Condition Assessment 2 2 0 0 0 0 0 0 0 0 0 0 0 6.0 Pump Station Evaluation 2 12 0 0 2 2 2 22 0 0 0 0 0 7.0 Surveying 0 2 0 0 0 0 0 0 0 0 199 4 203 8.0 Geotedmkal 0 2 0 0 0 0 0 0 0 0 0 0 0 9.0 Bask of Design Report 4 4 2 0 1 1 4 36 0 16 0 4 4 Task 1 Total Hours 18 38 32 2 0 3 3 6 94 4 21 _-.. 199 64 263 TASK 2- PROJECT SCHEDULE 1.0 Develop Project Schedule 2 2 2 0 0 0 0 0 4 0 0 10 2.0 Maintain Project Schedule 10 0 12 0 0 0 0 0 4 0 0 26 Task 2 Total Hours 12 2 14 0 0 0 0 0 8 0 1 37 TASK 3 - DEVELOP PLANS AND SPECIFICATIONS 1.0 prepare 50% Plans and Specifications 4 16 16 2 0 40 20 30 70 220 32 112 56 166 2.0 Prepare 90% Picts and Spedficallons 4 16 16 2 0 40 20 30 70 220 32 20 36 106 3.0 Assist District to Obtain Permas 2 0 4 0 0 0 0 0 0 0 0 30 16 46 4.0 Complete Plats and SpedBCatlons a 24 24 8 27 36 16 24 64 160 24 18 115 133 Task 3 Total Hours 18 56 60 12 27 116 56 84 204 600 88 1321 230 223 453 TASK 4 - ENGINEERING SERVICES DURING CONSTRUCTION 0 o o 070 o 0 0 0 0 0 A a 0 g a o o o m m m 1.0 Bidding Asstakoos 4 4 2 4 0 2 2 1 14 0 2 35 2.0 Review Shop Drawings 2 4 2 0 0 6 6 4 92 0 1 117 3.0 Revises and Answer RFla 2 4 0 0 0 4 4 4 60 0 1 79 4.0 Assist 1 Preparation of Change Orders 2 4 0 0 0 2 2 2 12 0 1 25 5.0 Prepare Cost Estlemtes forExtra Work 2 4 0 0 0 0 0 4 12 0 1 23 6.0 Construction Meetings 1 4 24 0 0 0 0 0 0 0 1 30 7.0 Prepare Record Drawings 1 18 16 0 0 4 4 0 0 76 0 117 Task 4 Total Hours 14 40 44 4 0 18 18 15 190 76 7 426 TASK 8 - PROJECT MANAGEMENT 1.0 Coordination a 0 0 0 0 0 0 0 0 0 .0 a 2.0 Project Management 24 8 0 0 0 0 0 0 0 0 0 32 3.0 Monthly meetings 12 9 0 0 0 0 0 0 0 0 0 21 Task S Total Hours 44 17 0 0 0 0 0 0 0 0 0 61 0 16 18 TOTALS hours 106 153 150 16 27 137 77 105 496 880 117 2066 437 1 333 1 770 ESTIMATED ENGINEERING HOURS AND COSTS South Tahoe Public Utility District Twin Peaks Booster Pump Station and Waterline Replacement TASK CAROU.O I OTHER DIRECT COSTS COST SUMMARY ui O S Z W W W yy�� fqS� W 4 0 4 4 G V W 4 1 8 (� $231 $210 $184 $194 $194 $194 $194. $194 $127 $125 S55 Subtotals Hours Budost PECE $9.50 Subcorants p Qum. Subtotals Survey Oaotsctr Sub contractor Travel 10.0% Total ODCa Total Column 1 2 3 4 5 6 7 7 a 9 10 11 1 12 13 14 1 15 1 113 19 1 20 1 21 22 23 6 8 12 2 2 4 8 2 0 2 8 1 2 2 8 2 2 0 2 12 22 0 2 0 0 2 0 4 4 36 1 $342 $228 $161 $114 t441 S19 3584 $800 $0 $600 $0 SO SO $5,000 SO $5,000 $600 $0 $600 SO SO SO SO $2Z000 $22,000 $800 SO 3600 $660 550 SO $0 SO $120 $5,500 SO $0 $660 SO $120 SO to to $24.203 SO $120 MO $103 $0 ! 18 38 32 94 21 $4,158 67,983 $6,223 $389 $0 $553 $563 it 54 $11,527 $400 $1,956 2 2 2 0 0 0 0 0 4 0 0 10 0 12 0 0 0 0 0 4 0 0 6. $110,910 12 2 14 0 0 0 0 0 8 0 1 If If $ 111 iji I i :1 111 0000 0 000° o o 000 h�Nri� h.�NA m rw $2,771 $420 $2,723 SO SO $0 $0 40 81,015 $0 455 4 18 16 2 0 40 20 30 70 220 32 4 16 18 2 0 40 20 30 70 220 32 2 0 4 0 0 0 0 0 0 0 0 8 24 24 Q 27 36 16 24 64 160 24 S�S �p�p�pp _n SnS 1 '- � � x p$p p6p � � q! Miri I ^ 410 f q§....1 R,.. p ggs El otI as a N M sass a a N M N a l a N sal 8 M N N f + M M M M N M l f Sat 1 1151 1 1551ii gil 87,370 I N $70,100 18 56 60 13 27 .116 56 e4 204 600 88 $4,185 811.754 811,589 $2,334 $5,238 $22,680 $10,551 $16,255 $25,884 $74550 $7,779 4 4 2 4 2 2 1 14 2 2 4 2 0 8 8 4 92 1 2 4 0 0 4 4 4 60 1 2 4 0 0 2 2 2 12 1 2 4 0 0 0 0 4 12 1 1 4 24 0 0 0 0 0 1 1 16 111 0 4 4 0 Q 76 0 14 40 44 4 0 18 18 15 190 76 7 $3,232 $6,403 68, 557 $ 775 $0 $3. 501 43,501 $2,910 $24,107 99,455 $010 8 0 0 0 0 0 0 0 0 0 0 24 8 0 0 0 0 0 0 0 0 0 12 9 0 0 0 0 0 0 0 0 44 17 0 0 0 0 U 0 0 0 0 $10,159 $5,571 $0 $0 $0 $0 $0 $0 $0 $0 $0 $580 $1,800 $0 $1,500 $1,750 $0 $240 $2,550 $18,310 108 143 150 18 27 137 77 105 499 855 11 $24,473 $32 ,142 $29,172 43,501 45,238 $20,444 $14975 $20,370 $62,932 $54,154 $10,343 $19,520 $105,450 $22,000 4128,450 $141,300 $1,250 $1,800 $153,560 $483,550 ESTIMATED ENGINEERING HOURS AND COSTS South Tahoe Public Utility District Twin Peaks Booster Pump Station and Waterline Replacement South Tahoe Public Utility Diatrict ~I""'" ~ H.ec6rte ~ EmIe .CIaUdIO J4mw K. Jotw t.uty I.Dl.f ~ ".u JaM 1215.M6adowCnt&t ~. South labs Tahoe. CA ~ Phone 5!0 544 0474' PIJx 5eiO 541~ BOARD AGENDA ITEM 6b TO: Board of Directors FROM: MEETING DATE: Nancy Hussmann, Human Resources Director March 6, 2008 ITEM - PROJECT NAME: General Manager Contract and Salary Range REQUESTED BOARD ACTION: (1) Establish 2008 salary range for General Manager; (2) Correct clerical error in General Manager Contract; and (3) Authorize execution of same. DISCUSSION: The contract for the General Manager provides for a salary adjustment effective January 24, 2008, which shall be set between 95% and 105% of the survey maximum for the three industry surveys utilized for the General Manager position. All survey figures have been received, and presented to the Executive Committee. The General Manager met with the Executive Committee and a recommendation will be made to the full Board. During review of the contract, a clerical error was discovered, which is a discrepancy between the contract term and term date. The intent was for the contract to be in effect for three and a half years starting May 31, 2007. This would make the contract expiration date as January 20, 2011 (not January 20, 2010, as stated in the contract). SCHEDULE: Notify payroll of salary adjustment retroactive to January 24, 2008 and correct contract. COSTS: ACCOUNT NO: 1021-2021-4101 BUDGETED AMOUNT REMAINING: $69,699 ATTACHMENTS: CONCURRENCE WITH REQUESTE~A N: GENERAL MANAGER: YES _ NO CHIEF FINANCIAL OFFICER: YES <- NO CATEGORY: General -25- PAYMENT OF CLAIMS FOR APPROVAL March 6, 2008 Payroll 2/27/08 Total Payroll BNY Western Trust Company CDS-health care payments Brownstein/HyatUFarber/Schreck legal services LaSalle Bank Union Bank Total Vendor EFT Accounts Payable Checks-Sewer Fund Accounts Payable Checks-Water Fund Accounts Payable Checks-Self-funded Insurance Accounts Payable Checks-Grants Fund Total Accounts Payable Grand Total Pavroll EFTs & Checks EFT EFT EFT CHK EFT EFT CHK EFT CHK EFT CHK AFLAC Medical & Dependent Care CA Employment Taxes & W/H Federal Employment Taxes & W/H CalPERS Contributions John Hancock Pension Loan Pmts Great West Deferred Comp Stationary Engineers Union Dues United Way Contributions CA State Disbursement Unit Employee Direct Deposits Employee Paychecks Total -27- 2/27/08 4,117.15 14,056.20 86,417.03 25,585.26 2,134.01 15,926.05 2,083.58 86.00 460.15 189,654.26 14,372.61 354,892.30 354,892.30 354,892.30 0.00 42,747.89 22,351.98 0.00 0.00 65,099.87 191,838.03 382,660.14 18,757.07 0.00 593,255.24 1,013,247.41 Vendor Name ACWA SERVICES CORP (ASC) Department / Proi Name GEN & ADMIN PAYMENT OF CLAIMS Description VISION INS Acct# / Proi Code Amon Check Num Type 1000 - 2530 2,543.58 Check Total: 2,543.58 AP -00068924 MW ADMINISTRATIVE PROFESSIONAL ADMINISTRATION SUBSCRIPTIONS 1021 - 4830 36.50 ADMINISTRATIVE PROFESSIONAL ADMINISTRATION SUBSCRIPTIONS 2021 - 4830 36.50 Check Total: 73.00 AP- 00068925 MW AIR PERFECTION DIAMOND VLY RNCH GROUNDS & MNTC 1028 - 6042 50.90 Check Total: 50.90 AP -00068926 MW ALPEN SIERRA COFFEE COMPANY FINANCE OFC SUPPLY ISSUE 1039 - 6081 181.00 Check Total: 181.00 AP -00068927 MW ALPINE EYECARE LLC HUMAN RESOURCES SAFETY/EQUIP/PHY 1022 - 6075 248.00 ALPINE EYECARE LLC HUMAN RESOURCES SAFETY/EQUIP/PHY 2022 - 6075 248.00 Check Total: 496.00 AP -00068928 Mw ALSBURY, JAY HEAVY MAINT TRAVEUMEETINGS 1004 - 6200 224.68 Check Total: 224.68 AP- 00068929 MW AMERIGAS - SO LAKE TAHOE DIAMOND VLY RNCH PROPANE 1028 - 6360 85.80 1 N Check Total: 85.80 AP- 00068930 MW w ARAMARK UNIFORM SERVICES GEN & ADMIN UNIFORM PAYABLE 1000 - 2518 1,274.08 Check Total: 1 274708 AP -00068931 MW ARCE, DANIEL LABORATORY TRAVEUMEETINGS 1007 - 6200 77.93 ARCE, DANIEL LABORATORY TRAVEUMEETINGS 2007 - 6200 77.92 Check Total: 155.85 AP -00068932 MW ARETE SYSTEMS INFORMATION SYS - GIS SOFTWARE GIS IMPL 1037 - 8638 - GISSFT 6,525.00 Check Total: 6.525.00 AP -00068933 MW ASPEN PUBLISHERS INC. FINANCE OFFICE SUPPLIES 1039 - 4820 148.54 ASPEN PUBLISHERS INC. FINANCE SUBSCRIPTIONS 1039 - 4830 79.37 ASPEN PUBLISHERS INC. FINANCE OFFICE SUPPLIES 2039 - 4820 148.54 ASPEN PUBLISHERS INC. FINANCE SUBSCRIPTIONS 2039 - 4830 79.36 Check Total: 455.81 AP -00068934 MW ASSOCIATED LABORATORIES LABORATORY MONITORING 1007 - 6110 315.00 Check Total: 315.00 AP -00068935 MW AT &T GEN & ADMIN SIGNAL CHARGES 1000 - 6320 27.88 User: THERESA Page: 1 Current Date: 02/28/2008 Report: OH_PMT_CLAIMS_BK Current Time: 09:59:28 Vendor Name AT &T /CALNET 2 AT &T /CALNET 2 AT &T /CALNET 2 AT &T /CALNET 2 AT &T /CALNET 2 AT &T /CALNET 2 AT &T /CALNET 2 AT &T/MCI AUERBACH ENGINEERING CORP BAY TOOL & SUPPLY INC BB &H BENEFIT DESIGNS BB &I BENEFIT DESIGNS BI STATE PROPANE BING MATERIALS BING MATERIALS BING MATERIALS BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL User: THERESA Report: OH_PMT_CLAIMS BK Department / Prof Name GEN &ADMIN PUMPS OPERATIONS INFORMATION SYS GEN & ADMIN PUMPS INFORMATION SYS PUMPS ENGINEERING - UPPER DRESSLER GEN & ADMIN HUMAN RESOURCES HUMAN RESOURCES GEN & ADMIN DIAMOND VLY RNCH DIAMOND VLY RNCH ENGINEERING - AIRPORT WL EVAL FINANCE FINANCE - WTRLN,AL TAHOE FINANCE - UPPER DRESSLER FINANCE - ICR TMDL FINANCE - LT WTRTRT PTSHP FINANCE FINANCE - WTRLN/WATER CNSV FINANCE - WTR CONS PROG PAYMENT OF CLAIMS Page: 2 Description TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE DRSSLR DTCH,UPR SMALL TOOLS INV CONTRACT SERVICE CONTRACT SERVICE PROPANE GROUNDS & MNTC ROAD CONST,DVR AIRPORT WL EVAL CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE Acct# / Pro1 Code 1000 - 6310 1002 - 6310 1006 - 6310 1037 - 6310 2000 - 6310 2002 - 6310 2037 - 6310 1002-6310 Check Total: Check Total: Check Total: 1029 - 7062 - DRSSLR Check Total: 1000 - 0423 1022 - 4405 2022-4405 1000 - 6360 Check Total: Check Total: Check Total: 1028 - 6042 1028 - 8687 2029 - 7068 - AIRWLI Check Total: 1039 - 4405 2039 - 4405 - ATWL08 2039 - 4405 - DRSSLR 2039 - 4405 - ICTMDL 2039 - 4405 - LTWWIP 2039 - 4405 2039 - 4405 - PROP50 2039 - 4405 - WCPROG Current Date: 02/28/2008 Current Time: 09:59:28 Amount Check Num Tvpe 27.88 AP- 00068938 MW 7.76 20.84 21.85 82.74 7.76 20.83 82.73 244.51 AP -00068936 0.37 0.37 AP -00068937 186.75 186.75 AP -00068939 463.22 463.22 AP -00068940 624.50 624.50 1,249.00 AP -00068941 68.67 68.67 AP -00068942 221.84 139.67 418.35 MW MW MW MW MW MW 779.86 AP -00068943 MW 915.89 82.02 136.70 136.70 82.02 915.89 54.68 300.74 Vendor Name BOYLE ENGINEERING CORP BROWN & CALDWELL CONSULTANTS BROWN & CALDWELL CONSULTANTS BROWN, LINDA BROWN, LINDA BSK ANALYTICAL LABS BSK ANALYTICAL LABS CALIF BOARD OF EQUALIZATION CAMPBELL AUD, NANCI CAMgBELL AUD, NANCI CAPITOL WEBWORKS LLC CAPITOL WEBWORKS LLC CARDINALE CARDINALE CAROLLO ENGINEERS CARTER, LARRY CARTER, LARRY CDS GROUP HEALTH CDW - G CORP User: THERESA Report: OH_PMT CLAIMS_BK Department / Proi Name Description ENGINEERING - SUT WELL REDRILL SUT WELL REDRILL ENGINEERING - C CLUB TNK REPL ENGINEERING - ANGORA TNK REPL FINANCE FINANCE LABORATORY - ARHD3 TRTMT EXP LABORATORY - HERBST ENGINEERING HUMAN RESOURCES HUMAN RESOURCES DIO DIO EQUIPMENT REP EQUIPMENT REPAIR ENGINEERING - ARSENIC STUDY HUMAN RESOURCES HUMAN RESOURCES SELF FUNDED INS ENGINEERING PAYMENT OF CLAIMS TANK, COUNTRY CL TANK, ANGORA Acct# / Proi Code TRAVEL/MEETINGS 1039 - 6200 TRAVEL/MEETINGS 2039 - 6200 MONITORING MONITORING OPERATING PERMIT 2029 - 6650 SAFETY/EQUIP/PHY 1022 - 6075 SAFETY/EQUIP/PHY 2022 - 6075 CONTRACT SERVICE 1027 - 4405 CONTRACT SERVICE 2027 - 4405 AUTOMOTIVE 1005 - 6011 AUTOMOTIVE 2005 - 6011 ARSNC TRTMNT CONTRACT SERVICE 1022 - 4405 CONTRACT SERVICE 2022 - 4405 PPO FEE 3000 - 6742 OFFICE SUPPLIES 1029 - 4820 Page: 3 Check Total: 2029 - 8463 - RWSUTR Check Total: 2029 - 7063 - CLUBTK 2029 - 7064 - ANGOTK Check Total: Check Total: 2007 - 6110 - AH3EXP 2007 - 6110 - HERBST Check Total: Check Total: Check Total: Check Total: Check Total: 2029 - 8864 - ARSNIC Check Total: Check Total: Check Total: Current Date: 02/28/2008 Current Time: 09:59:28 Amount Check Num TIM 2 624.64 AP -00068944 MW 11,411.16 127.26 45.00 45.00 90.00 8.52 5.11 5.10 11,411.16 AP -00068945 MW 6,223.85 6,223.85 12,447.70 AP -00068946 MW 63.63 63.63 AP -00068947 MW AP -00068948 MW 8.52 AP -00068949 MW 26.00 26.00 52.00 AP -00068950 MW 22.50 22.50 45.00 AP -00068951 MW 10.21 AP -00068952 MW 4,581.00 4,581.00 AP -00068953 MW AP -00068954 MW AP- 00068955 MW 300.00 300.00 600.00 2,273.75 2,273.75 323.70 Vendor Name CDW - G CORP CDW - G CORP CHERNAGO, BRIAN CHERNAGO, BRIAN CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CROSSPOINTE PARTNERS LLC CROSSPOINTE PARTNERS LLC CWEI CWEA CWEA CWEA SIERRA SECTION CWEA SIERRA SECTION CWEA SIERRA SECTION EMPIRE SAFETY & SUPPLY ENTRIX INC ENTRIX INC FAMILY ENTERPRISES FERGUSON ENTERPRISES INC. FERGUSON ENTERPRISES INC. User: THERESA Report: OH_PMT CLAIMS BK Department / Prol Name ENGINEERING INFORMATION SYS LABORATORY LABORATORY LABORATORY LABORATORY LABORATORY - LABORATORY - LABORATORY- DIO DIO UNDERGROUND REP ELECTRICAL SHOP CUSTOMER SERVICE OPERATIONS LABORATORY LABORATORY GEN & ADMIN - ARHD3 TRTMT EXP BEACON CONTAM BKRFLD TRTMT EXP HERBST ENGINEERING - AIRPORT WL EVAL ENGINEERING - SUT WELL REDRILL DIO - PR EXP - EXTERNAL HEAVY MAINT OPERATIONS PAYMENT OF CLAIMS Page: 4 Description OFFICE SUPPLIES SFTWR, DIS RECVR TRAVEL/MEETINGS TRAVEL/MEETINGS MONITORING MONITORING MONITORING MONITORING MONITORING CONTRACT SERVICE CONTRACT SERVICE DUES/MEMB /CERT DUES/MEMB /CERT DUES/MEMB /CERT TRAVEL/MEETINGS TRAVEL/MEETINGS TRAVEL/MEETINGS SAFETY INVENTORY AIRPORT WL EVAL SUT WELL REDRILL PUB RELATIONS GUTTERS EQUIP RE REPL POLY PUMP Acct# / Proi Code 2029 - 4820 2037 - 8899 1007 - 6200 2007 - 6200 1007 - 6110 2007 - 6110 - AH3EXP 2007 - 6110 - BEACON 2007 - 6110 - BKRFLD 2007 - 6110 - HERBST Check Total: 1027 - 4405 2027 - 4405 1001 - 6250 1003 - 6250 2038 - 6250 1006 - 6200 1007 - 6200 2007 - 6200 1000 - 0425 1004 - 7542 1006 - 8859 Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: 2029 - 7068 - AIRWLI 2029 - 8463 - RWSUTR Check Total: 2027 - 6620 - PREEXT Check Total: Current Date: 02/28/2008 Current Time: 09:59:28 Amount Check Num Type 323.72 2,021.37 2.668.79 AP -00068956 MW 86.18 86.17 172.35 AP -00068957 MW 610.00 190.00 190.00 190.00 190.00 1,370.00 AP -00068958 MW 2,750.00 2,750.00 5,500.00 AP -00068959 MW 81.00 61.00 110.00 252.00 AP -00068961 MW 35.00 52.50 52.50 140.00 239.03 239.03 6,021.60 1,213.22 7,234.82 475.00 47 5.00 839.68 64.56 AP -00068960 MW AP- 00068962 MW AP -00068963 MW AP- 00068964 MW Vendor Name Department / Proi Name Description Acct# / Proi Code Amount Check Num Type Check Total: 904.24 AP -00068965 MW FISHER SCIENTIFIC LABORATORY LAB SUPPLIES 1007 - 4760 366.89 FISHER SCIENTIFIC LABORATORY LAB SUPPLIES 2007 - 4760 437.04 Check Total: 803.93 AP- 00068966 MW FRYE, WILLIAM INFORMATION SYS TRAVEL/MEETINGS 1037 - 6200 93.43 FRYE, WILLIAM INFORMATION SYS TRAVEL/MEETINGS 2037 - 6200 93.42 Check Total: 186.85 AP -00068967 MW GERBER LIFE INSURANCE COMPANY SELF FUNDED INS EXCESS INSURANCE 3000 - 6744 15,822.52 Check Total: 15,822.52 AP -00068968 MW GRAINGER GEN & ADMIN SHOP SUPPLY INV 1000 - 0421 60.12 GRAINGER GEN & ADMIN SMALL TOOLS INV 1000 - 0423 258.34 GRAINGER HEAVY MAINT BUILDINGS 1004 - 6041 103.70 GRAINGER EQUIPMENT REP GENERATORS 1005 - 6013 253.34 Check Total: 675.50 AP -00068969 MW HAEN CO INC, THOMAS ENGINEERING - SUT WELL REDRILL CONST RETAINAGE 2029 - 2605 - RWSUTR - 654.80 HAEWCO INC, THOMAS ENGINEERING - SUT WELL REDRILL SUT WELL REDRILL 2029 - 8463 - RWSUTR 196,197.54 tv Check Total: 195,542.74 AP -00068970 MW HARTFORD, THE GEN & ADMIN LIFE INS 1000 - 2512 1,962.09 HARTFORD, THE GEN & ADMIN LTD, UNION 1000 - 2539 1,758.62 HOLT OF CALIFORNIA HOLT OF CALIFORNIA INDUSTRIAL SAFETY INSTY- PRINTS INC INSTY- PRINTS INC INSTY- PRINTS INC INSTY- PRINTS INC INSTY - PRINTS INC INTERSTATE SAFETY & SUPPLY PAYMENT OF CLAIMS EQUIPMENT REP AUTOMOTIVE 1005 - 6011 106.60 EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 106.60 Check Total: 213.20 AP -00068972 MW HEAVY MAINT DOCKING STN 1004 - 7548 2,670.05 Check Total: 2,670.05 AP -00068973 MW OPERATIONS SHOP SUPPLIES 1006 - 6071 224.42 DIO PRINTING 1027 - 4920 1,538.26 FINANCE OFFICE SUPPLIES 1039 - 4820 375.61 DIO PRINTING 2027 - 4920 1,789.39 FINANCE OFFICE SUPPLIES 2039 - 4820 375.60 Check Total: 4.303.28 AP -00068974 MW GEN & ADMIN SAFETY INVENTORY 1000 - 0425 User: THERESA Page: 5 Report: OH_PMT_CLAIMS_BK Check Total: 3,720.71 AP -00068971 MW 542.40 Current Date: 02/28/2008 Current Time: 09:59:28 Vendor Name Department / Proi Name INTERSTATE SAFETY & SUPPLY OPERATIONS Acct# / Proi Code Amount Check Num Tvoe 1006 - 4760 130.65 Check Total: 673.05 AP -00068975 MW JANITORIAL SERV 1039 - 6074 1,603.50 JANITORIAL SERV 2039 - 6074 1,603.50 Check Total: 3,207.00 AP -00068976 MW JEFFCO INC FINANCE OFFICE SUPPLIES 1039 - 4820 17.69 JEFFCO INC FINANCE OFFICE SUPPLIES 2039 - 4820 17.70 Check Total: 35.39 AP -00068977 MW KAMAN INDUSTRIAL TECHNOLOGIES HEAVY MAINT BUILDINGS 1004 - 6041 64.10 Check Total: 64.10 AP -00068978 MW KRLT & KOWL RADIO DIO - PR EXP- EXTERNAL PUB RELATIONS 2027 - 6620 - PREEXT 1,860.00 J &L PRO KLEEN INC J &L PRO KLEEN INC User: THERESA Report: OH_PMT CLAIMS_BK FINANCE FINANCE PAYMENT OF CLAIMS Description LAB SUPPLIES Check Total: 1,860.00 AP -00068979 MW LAKE VALLEY FIRE DISTRICT PUMPS LAND & BUILDINGS 2002 - 5010 5,049.42 1 W Check Total: 5.049.42 AP -00068981 MW LIVE WIRE MEDIA PARTNERS DIO - PR EXP- EXTERNAL PUB RELATIONS 2027 - 6620 - PREEXT 336.00 Check Total: 336.00 AP -00068982 MW MC MASTER CARR SUPPLY CO HEAVY MAINT SHOP SUPPLIES 1004 - 6071 22.42 MC MASTER CARR SUPPLY CO ENGINEERING - SUT WELL REDRILL SUT WELL REDRILL 2029 - 8463 - RWSUTR 648.35 Check Total: 670.77 AP -00068983 MW McQUEARY EXCAVATING INC, MARV GEN & ADMIN - WTRLN,GRD MTN CONST RETAINAGE 2000 - 2605 - GMWL07 61,800.38 Check Total: 61,800.38 AP -00068984 MW MID MOUNTAIN COMMUNICATIONS EQUIPMENT REP AUTOMOTIVE 1005 - 6011 1,510.18 MID MOUNTAIN COMMUNICATIONS DIAMOND VLY RNCH GROUNDS & MNTC 1028 - 6042 18.75 Check Total: 1,528.93 AP -00068985 MW MORISON, ROBERT GEN & ADMIN UB SUSPENSE 1000 - 2002 81.45 MORISON, ROBERT GEN & ADMIN UB SUSPENSE 2000 - 2002 111.40 Check Total: 192.85 AP- 00068986 MW MWH LABORATORIES LABORATORY MONITORING 1007 - 6110 10.00 Check Total: 10.0Q AP- 00068987 MW Page: 6 Current Date: 02/28/2008 Current Time: 09:59:28 Vendor Name MY OFFICE PRODUCTS MY OFFICE PRODUCTS NEOGOV NEOGOV NEOGOV NEOGOV NEOGOV NEOGOV NEVADA BLUE NEVADA BLUE NEVADA GENERATOR SYSTEMS NEXI.EVEL INFORMATION TECH INC NEXLEVEL INFORMATION TECH INC NORTHWEST HYD. CONSULT INC NORTHWEST HYD. CONSULT INC OFFICE MAX OFFICE MAX OFFICE MAX OFFICE MAX OFFICE MAX OLIN CHLOR ALKALI PRODUCTS P K SAFETY SUPPLY PDM STEEL User: THERESA Report: OH_PMT CLAIMS_BK Department / Proi Name CUSTOMER SERVICE CUSTOMER SERVICE HUMAN RESOURCES HUMAN RESOURCES, HUMAN RESOURCES HUMAN RESOURCES HUMAN RESOURCES HUMAN RESOURCES ENGINEERING ENGINEERING EQUIPMENT REP INFORMATION SYS - IT STRATEGC PLN CONTRACT SERVICE INFORMATION SYS - IT STRATEGC PLN CONTRACT SERVICE ENGINEERING - CTC GRNT -BMPs ENGINEERING - CTC GRNT -BMPs GEN & ADMIN ENGINEERING FINANCE ENGINEERING FINANCE OPERATIONS PUMPS HEAVY MAINT PAYMENT OF CLAIMS Description OFFICE SUPPLIES OFFICE SUPPLIES CONTRACT SERVICE ADS /LGL NOTICES SERVICE CONTRACT CONTRACT SERVICE ADS/LGL NOTICES SERVICE CONTRACT OFFICE SUPPLIES OFFICE SUPPLIES GEN, LPPS BMP PROJECTS BMP PROJECTS OFFICE INVENTORY OFFICE SUPPLIES OFFICE SUPPLIES OFFICE SUPPLIES OFFICE SUPPLIES HYPOCHLORITE SAFETY /EQUIP/PHY BUILDINGS Page: 7 ._. _. Acct# / Proi Code 1038 - 4820 2038 - 4820 1022 - 4405 1022 - 4930 1022 - 6030 2022 - 4405 2022 - 4930 2022 - 6030 1029 - 4820 2029 - 4820 Check Total: Check Total: Check Total: 1005 - 7539 13,887.60 Check Total: 13,887.60 AP- 00068991 MW 1037 - 4405 - ITPLAN 11,492.50 2037 - 4405 - ITPLAN 11,492.50 Check Total: 22,985.00 AP- 00068992 MW 1029 - 8737 - CTCBMP 6,490.57 2029 - 8745 - CTCBMP 6,490.56 Check Total: 12,981.13 AP- 00068993 MW 1000 - 0428 670.55 1029 - 4820 102.98 1039 - 4820 58.88 2029 - 4820 106.91 2039 - 4820 58.89 Check Total: 998.21 AP- 00068995 MW 1006 - 4755 3,856.09 Check Total: 3,856.09 AP- 00068996 Mw 1002 - 6075 609.84 Check Total: 609.84 AP- 00068997 MW 1004 -6041 119.41 Current Date: 02/28/2008 Current Time: 09:59:28 Amount Check Num Type 57.11 57.11 114.22 AP- 00068988 MW 625.00 300.00 1,500.00 625.00 300.00 1,500.00 4,850.00 AP- 00068989 124.72 111.63 MW' 236.35 AP- 00068990 MW Vendor Name PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH w PRAXAIR 174 PRAXAIR 174 PROGRESSIVE BUSINESS PROGRESSIVE BUSINESS RACO INDUSTRIES RACO INDUSTRIES RENO GAZETTE- JOURNAL ROMINGER, ROSE MARIE ROMINGER, ROSE MARIE RSN SPORTS NETWORK User: THERESA Report: OH_PMT_CLAIMS_BK Peoartment / Prol Name OPERATIONS BOARD OF DIR ADMINISTRATION DIAMOND VLY RNCH CUSTOMER SERVICE FINANCE FINANCE FINANCE BOARD OF DIR ADMINISTRATION CUSTOMER SERVICE FINANCE FINANCE FINANCE LABORATORY LABORATORY HUMAN RESOURCES HUMAN RESOURCES LABORATORY LABORATORY ENGINEERING - ARSENIC STUDY GEN & ADMIN GEN & ADMIN DIO - PR EXP- EXTERNAL PAYMENT OF CLAIMS Description DUES/MEMB /CERT TRAVEL/MEETINGS INCNTV & RCGNTN TRAVEL/MEETINGS OFFICE SUPPLIES POSTAGE EXPENSES OFFICE SUPPLIES TRAVEUMEETINGS TRAVEUMEETINGS INCNTV & RCGNTN OFFICE SUPPLIES POSTAGE EXPENSES OFFICE SUPPLIES TRAVEUMEETINGS LAB SUPPLIES LAB SUPPLIES SAFETY PROGRAMS SAFETY PROGRAMS OFFICE SUPPLIES OFFICE SUPPLIES ARSNC TRTMNT CAPACITY CHARGE CAPACITY CHARGE PUB RELATIONS Page: 8 Acct# / Prol Code 1006 - 6250 1019 - 6200 1021 - 6621 1028 - 6200 1038 - 4820 1039 - 4810 1039 - 4820 1039 - 6200 2019 - 6200 2021 - 6621 2038 - 4820 2039 - 4810 2039 - 4820 2039 - 6200 1007 - 4760 2007 - 4760 1022 - 6079 2022 - 6079 1007 - 4820 2007 - 4820 2027 - 6620 - PREEXT Check Total: Check Total: Check Total: Check Total: Check Total: 2029 - 8864 - ARSNIC Check Total: 2000 - 3401 2000 - 3401 Check Total: Check Total: Current Date: 02/28/2008 Current Time: 09:59:28 Amount 119.41 32.25 10.71 37.84 10.00 50.62 4.13 1.61 14.92 10.69 37.84 50.61 4.12 1.60 14.91 Check Nunn T_YN AP -00068998 MW 281.85 AP -00068999 MW 103.99 103.98 207.97 AP -00069000 MW 432.00 432.00 864.00 AP -00069001 MW 74.55 88.59 163.14 AP -00069002 MW 112.90 112.90 AP -00069003 MW 2,734.00 2,734.00 AP -00069004 MW 709.00 709.00 AP -00069005 MW 2,087.00 PAYMENT OF CLAIMS Vendor Name Department / Proi Name Description SACRAMENTO BEE, THE ENGINEERING - ARSENIC STUDY ARSNC TRTMNT SCHWAB TIRES, LES EQUIPMENT REPAIR AUTOMOTIVE SIANO, CHRIS OPERATIONS TRAVEL/MEETINGS Acct# / Proi Code Check Total: 2029 - 8864 - ARSNIC Check Total: Check Total: Check Total: 2005 - 6011 1006-6200 SOUTH SHORE MOTORS EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 44.32 Amount Check Num I n 2,087.00 AP -00069006 MW 632.26 632.26 AP -00069007 MW 522.25 522.25 AP -00069008 MW 237.00 237.00 AP -00069009 MW SIERRA NEVADA CLASSIFIEDS ENGINEERING - ARSENIC STUDY ARSNC TRTMNT 2029 - 8864 - ARSNIC 144.20 Check Total: 144.20 AP -00069010 MW SIERRA PACIFIC POWER GEN & ADMIN ELECTRICITY 1000 - 6330 78,081.15 SIERRA PACIFIC POWER GEN & ADMIN ELECTRICITY 2000 - 6330 23,105.86 Check Total: 101 87.01 AP -00069011 MW SIERRA SPRINGS GEN & ADMIN SAFETY INVENTORY 1000 - 0425 1,107.11 SIERRA SPRINGS UNDERGROUND REP SUPPLIES 1001 - 6520 36.07 SIERRA SPRINGS PUMPS SUPPLIES 1002 - 6520 2.43 SIERA SPRINGS ELECTRICAL SHOP SUPPLIES 1003 - 6520 12.02 SIERRA SPRINGS HEAVY MAINT SUPPLIESi 1004 - 6520 36.07 SIERRA SPRINGS EQUIPMENT REP SUPPLIES 1005 - 6520 12.02 SIERRA SPRINGS OPERATIONS SUPPLIES 1006 - 6520 36.07 SIERRA SPRINGS DIAMOND VLY RNCH SUPPLIES 1028 - 6520 12.02 SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 1038 - 6520 12.02 SIERRA SPRINGS UNDERGROUND REP SUPPLIES 2001 - 6520 36.07 SIERRA SPRINGS PUMPS SUPPLIES 2002 - 6520 9.63 SIERRA SPRINGS ELECTRICAL SHOP SUPPLIES 2003 - 6520 12.02 SIERRA SPRINGS EQUIPMENT REPAIR SUPPLIES 2005 - 6520 12.02 SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 2038 - 6520 12.02 Check Total: 1,347.59 AP -00069012 MW SKELLY, CHRIS INFORMATION SYS TRAVEL/MEETINGS 1037 - 6200 88.38 SKELLY, CHRIS INFORMATION SYS TRAVEL/MEETINGS 2037 - 6200 88.37 Check Total: 176.75 AP -00069013 MW Check Total: 44.32 AP- 00069014 MW User: THERESA Page: 9 Current Date: 02/28/2008 Report: OH_PMT CLAIMS_BK Current Time: 09:59:28 Vendor Name SOUTH TAHOE NEWSPAPER AGENCY SOUTH TAHOE NEWSPAPER AGENCY Acct# / Proi Code Amount Check Num IYR 1021 - 4830 26.94 2021 - 4830 26.94 Check Total: 53.88 AP -00069015 MW SOUTHWEST GAS GEN & ADMIN NATURAL GAS 1000 - 6350 229.65 SOUTHWEST GAS GEN & ADMIN NATURAL GAS 2000 - 6350 188.29 Check Total: 417.94 AP -00069016 MW SOUTHWEST VALVE LLC ENGINEERING - C CLUB TNK REPL TANK, COUNTRY CL 2029 - 7063 - CLUBTK 2,506.28 Check Total: 2,506.28 AP -00069017 MW SRECO FLEXIBLE EQUIPMENT REP AUTOMOTIVE 1005 - 6011 565.24 Check Total: 565.24 AP -00069018 MW SUBSTITUTE PERSONNEL & ENGINEERING - COLL SYS MASTER COLL SYS MST PLN 1029 - 8721 - CSMSPL 5,640.70 Check Total: 5,640.70 AP -00069019 MW SUNGARD BI -TECH INC. INFORMATION SYS - IFAS MIGRATION IFAS REPL/ENHAN 1037 - 8448 - NUIFAS 825.00 Check Total: 825.00 AP -00069020 MW SUTER ASSOCIATES, LYNN M. DIO CONTRACT SERVICE 1027 - 4405 1,225.00 SUTER ASSOCIATES, LYNN M. DIO CONTRACT SERVICE 2027 - 4405 1,225.00 Check Total: 2 50.00 AP -00069021 MW TAHOE BLUEPRINT ENGINEERING - C CLUB TNK REPL TANK, COUNTRY CL 2029 - 7063 - CLUBTK 120.08 TAHOE BLUEPRINT ENGINEERING - SUT WELL REDRILL SUT WELL REDRILL 2029 - 8463 - RWSUTR 42.88 Check Total: 162.96 AP -00069022 MW TAHOE MOUNTAIN NEWS DIO - PR EXP- EXTERNAL PUB RELATIONS 2027 - 6620 - PREEXT 250.00 Check Total: 250.00 AP -00069023 MW UNIVERSAL HEALTH NETWORK SELF FUNDED INS ADMIN FEE 3000 - 6741 660.80 Check Total: 660.80 AP -00069024 MW USA BLUE BOOK PUMPS UPGR FLL ES6,7 &9 1002 - 8712 4,774.11 Check Total: 4 774.11 AP -00069025 MW USA MOBILITY WIRELESS INC EQUIPMENT REP TELEPHONE 1005 - 6310 5.41 USA MOBILITY WIRELESS INC EQUIPMENT REPAIR TELEPHONE 2005 - 6310 5.40 Check Total: 10.81 AP -00069026 MW VERIZON DIAMOND VLY RNCH TELEPHONE 1028 - 6310 195.55 User: THERESA Department / Proi Name ADMINISTRATION ADMINISTRATION PAYMENT OF CLAIMS Description SUBSCRIPTIONS SUBSCRIPTIONS Page: 10 Current Date: 02/28/2008 Report: OH_PMT CLAIMS_BK Current Time: 09:59:28 Check Total: 195.55 AP -00069027 MW Vendor Name VWR CORPORATION VWR CORPORATION WATER EDUCATION FOUNDATION WATER EDUCATION FOUNDATION WECO INDUSTRIES INC WESTERN ENERGETIX INC WESTERN ENERGETIX INC WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY a WINZLER & KELLY CONSULT ENGRS ZEE MEDICAL INC ZEE MEDICAL INC Department / Proi Name LABORATORY LABORATORY ADMINISTRATION ADMINISTRATION UNDERGROUND REP GEN & ADMIN DIAMOND VLY RNCH UNDERGROUND REP - ANGORA FIRE 07 G PIPE /CVRS /MHLS ENGINEERING - AIRPORT WL EVAL ENGINEERING - SUT WELL REDRILL CUSTOMER SERVICE ENGINEERING - EFFLUENT EVAL GEN & ADMIN GEN & ADMIN User: THERESA Page: 11 Report: OH_PMT_CLAIMS BK PAYMENT OF CLAIMS Description LAB SUPPLIES LAB SUPPLIES DUES/MEMB /CERT DUES/MEMB /CERT PIPE /CVRS /MHLS GASOLINE INV DIESEL AIRPORT WL EVAL SUT WELL REDRILL WATER METERS REP EXP PUMPS SAFETY/EQUIP/PHY SAFETY/EQU I P/PHY Acct# / Proi Code 1007 - 4760 2007 - 4760 1021 - 6250 2021 - 6250 1001 - 6052 1000 - 0415 1028 - 4620 1000 - 6075 2000 - 6075 Check Total: Check Total: Check Total: Check Total: 2001 - 6052 - FANG07 2029 - 7068 - AIRWLI 2029 - 8463 - RWSUTR 2038 - 6045 Check Total: 1029 - 8676 - EFFLEV Check Total: Check Total: Grand Total: Current Date: 02/28/2008 Current Time: 09:59:28 Amount Check Num Type 152.52 114.79 267.31 AP -00069028 MW 249.50 249.50 499.00 AP -00069029 MW 737.20 737.20 AP -00069030 MW 10,813.98 1,613.04 12,427.02 AP- 00069031 MW - 1,671.31 752.20 38.94 10,516.40 9.636.23 AP -00069032 MW 9,612.16 9,612.16 AP -00069033 MW 551.94 551.92 1103.86 AP -00069034 MW 593,255.24 South Tahoe PubHc Utility Diatrict ~ ....... fl:Id1M4 H. &IIrie ~ EmIe.Cblu4Io J....1t ~ M.uyL(l(.I ~ D.~ 1Z16 MBStJow ~ Pr1v8 · South Laktt. Tattoo · CA 96U5C f"hCJl18 !530 544 6414. F.. 530. 541-00~ BOARD AGENDA ITEM 13a TO: FROM: Board of Directors Richard H. Solbrig, General Manager MEETING DATE: March 6, 2008 ITEM - PROJECT: Conference with Legal Counsel- Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Meyers Landfill Site - United States of America vs. EI Dorado Gounty and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK GGH, United States District Court for the Eastern District of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED A GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES CATEGORY: Sewer NO NO -39- South Tahoe Pul?Uc Utility Diatrict ~I""'" ~H.~ ~ &ttIo.~ .....~ Jotw ~.LDu~ ~~ t2$ MBSlAow Cnwt; DrIv8 · Sou1th Lak4.rahoo.CA saU5c PhOl'te 5!0 544-0414' .a.. eao~ BOARD AGENDA ITEM 13b TO: Board of Directors FROM: Executive Committee (Mosbacher 1 Rise) MEETING DATE: March 6, 2008 ITEM - PROJECT NAME: Conference with Labor Negotiators REQUESTED BOARD ACTION: Direct Negotiators DISCUSSION: Pursuant to section 54957.6(a) of the California Government Code, Closed Session may be held regarding contract negotiations for unrepresented employee position. Unrepresented Employee Position: General Manager Agency Negotiators: Executive Committee, Board of Directors SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUeSTE~D AC .N: GENERAL MANAGER: YES . NO CHIEF FINANCIAL OFFICER: YES :c.... NO CATEGORY: General -41- .~ ~w ... ,. tIJtIItr.r1w We're here to get you there: - 14 -/....1.'-' ...",~.J::::},.I /)tJ) 6; r-:- ('L....... · ,,~, . '.. ,/'C:J /7~ Strategic Plan 2007-2012 Departmental Overview TRANSPORTATION BOND PACKAGE IMPLEMENTATION OVERVIEW: The transportation portion of the bond package (Proposition 1 B) includes $19.925 billion for safety improvements and repairs to State highways, upgrades to freeways to reduce congestion repairs to local streets and roads, improvements to the seismic safety of local bridges, expansion of public transit, reduction of air pollution, and improvements to anti-terrorism security at the ports. The package also includes protection of any future Proposition 42 transfers (Proposition 1 A). It would allow the State to borrow the money, but pay it back within three years. It also would restrict the State to only two such transactions every ten years. Finally, the package includes legislation (AB 1039) to streamline the environmental process while safeguarding environmental protections. It also includes legislation (AB 1467) that authorizes the State and regional agencies to engage in public-private partnerships, as it relates to goods movement, to attract private investment for the development of transportation infrastructure in the State. Proposition 1 B - Highway Safety, Traffic Reduction, Air Quality, and Port Security Fund of 2006 Category of Investment Total Bonds(in Billions) Corridor Mobility Improvement Account State Route 99 Corridor Ports Infrastructure, Security and Air Quality School Bus Retrofit for Air Quality State Transportation Improvement Program (STIP) Augmentation Public Transportation Modernization, Improvement, and Service Enhancement Transit System Safety, Security, and Disaster Response Account State-Local Partnership Program Account Local Bridge Seismic Retrofit Highway-Railroad Crossing Safety Account State Highway Operation and Protection Program (SHOPP) Local Street and Roads, Congestion Relief, and Traffic Safety Account of 2006 $4.500 $1,000 $3.100 $0.200 $2.000 $4.000 $1.000 $1.000 $0.125 $0.250 $0.750 $2.000 TOTAL $19.925 ,. lIIII1rItr Performance Measures: PM4.3A-C Statewide average for Maintenance Level of Service in the areas of: Litter and Debris Striping Guardrail/ PM4.4A Percent of projects that have updated environmental commitment records and a Certificate of Environ- mental Compliance at project close- out. PM4.4B Percentage of projects that have an Enviromental Certification, including an updated Environmental Committements Record, at the ready- to-list (RTL) milestone. We're here to get you there! ..- 51 . "t ~, Strategic Plan 2007 -2012 Goals, Objectives, Strategies, and Performance Measures Objective 4.3: By 2012, Increase Maintenance level of service (LOS) scores to: · 80 in Litter and Debris; · 95 in Striping; · 95 in Guardrail. Strategies . 4.3.1 Improve the process of incorporating higher-performance, lower-maintenance guardrail systems into projects. 4.3.2 Resource Maintenance based on inventory and workload in order to meet Maintenance levels of service. 4.3.3 Research, procure, and utilize more durable materials for striping. 4.3.4 Develop a comprehensive anti-litter campaign. Objective 4.4: Each year, ensure environmental commitments are documented and implemented on 100% of projects. Strateaies: 4.4.1 Implement long-term planning of the management of mitigation properties as part of Caltrans' stewardship responsibility. 4.4.2 Initiate a collaborative effort to standardize GIS practices throughout the State. 4.4.3 Create and populate the STEVE database and tracking tool. Create standard operating procedures for using STEVE. 4.4.4 Better define environmental commitments through more formal agreements and MOUe with regulatory agencies. 4.4.5 Continue to develop and implement the LD/IGR statewide work plan designed to engage private and public stakeholders to ensure mitigation strategies are implemented. 4.4.6 Develop flexible funding for environmental commitments. ~~ (&n~ h"'ft2~ ., CalTrans meeting and Presentation at SL T City Council March 4,2008 Presentations by: CalTrans District 3 Deputy Director: Wayne Lewis Caltrans District 3 Chief Team Tahoe: Tom Brannon (530) 682-2969 CalTrans projects should be considered, "Events". If a planned project is not able to remove all it's roadblocks before its scheduled start, then it dies. In the old days the project would be delayed and not have to start from scratch. The project demands on CalTrans are so great that forming partnerships with community entities is now the best way to get a project completed. CalTrans has it's own toolbox. Unfortunately, some of these tools, like those dealing with water filtration, are no long sufficient. *" Our expertise is building and maintaining roads not water filtration. We would welcome a partnership with the South Tahoe Public Utility District to design, build and maintain the needed filtration facilities. '''' Email between the City ofSTL and TRPA , From: David Jinkens Sent: Wednesday, March 05, 2008 To: Charles Emmett Cc: City Council Subject: Hwy 50 Update I issues I have been a part of the discussions to move forward the Highway 50 Project for over 5 1/2 years. We have pressed Caltrans to do its part. I believe they are doing their share and want them to do more. The Region needs to step up to the plate and recognize and support that a fully funded and completed project is better than a piece- meal approach. Until the Region, as part of its recommendations for the STIP, recommend full funding for all segments and improvements, Caltrans is not obliged to recommend or seek full funding from a variety of sources for the project as I have been told in the past because it is not clear to them what our priorities are all about. It has to be first to the region before we can argue that it has to be first for Caltrans. Tom Brennan made this point perfectly clear in hs response to a question at the City Council. Caltrans, TRPA, TTD and other supporters need to make clear our Region's number 1 priority. We need State, Federal, SNLPA, and other funds to make it happen. Caltrans needs to do its part, and so does the region. --------------------------------------------------------------------- --------------------------------------------------------------------- From: Charles Emmett Sent: Wed 3/5/2008 To: David Jinkens Cc: City Council Subject: Hwy 50 Update I issues Caltrans is pursuing this project under the heading of water quality. Although this project provides suitable water quality benefits between Trout Creek and Lakeview, there are only very limited improvements North of Lakeview. For this reason, the Lakeview to Stateline portion of this project is not that critical for water quality improvements. Further, the Executive Director of the Lahontan Water Board stated that he concurred with this and suggested that he would rather delay this portion of the water quality improvements until Caltrans was willing to incorporate the more advanced water quality treatment measures that have been used in other areas. So, although the treatment of this area is indeed crucial to water quality, what is being proposed by Caltrans is not considered prudent at this time for water quality purposes. -'" t t-k::i.fcLtl_.~ () ,_.)-1-. b j J'-'"",", t:NS --{A ESOURCES}-- MEMORANDUM TO: FROM: DATE: SUBJECT: Richard Solbrig, General Manager David R. French February 28, 2008 Washington Visit On February 25 and 26, meetings where held with the District's congressional delegation to discuss the fiscal year 2009 appropriations request. Attending the meetings on behalf of District were Director Jim Jones and Public Information Officer Dennis Cocking. FY 2009 Appropriations Request lake Tahoe Community Fire Protection Project The District is seeking $5 million in federal assistance for planning, design, permitting, materials, installation, and construction costs for water system infrastructure (including waterlines, water storage tanks, booster pump stations, multi-agency interconnections, and emergency power generation equipment) which has a direct relationship to wildland fire suppression. Summary As a result of the meetings, the District's congressional delegation agreed to pursue funding in the FY 2009 appropriations for the Lake Tahoe Community Fire Protection Project. Expanding the request to include the entire Lake Tahoe basin was recognized in the meetings as a positive means to elevate the regional significance and focus on the extent of the threat of catastrophic fire to the region. The meetings demonstrated that the District's congressional delegation strongly supports its efforts to respond to catastrophic fire, as authorized under the Tahoe Restoration Act. ENS Resources, Inc. 1747 Pennsylvania Avenue, N.W., / Suite 420 Washington, D.C. 20006/ Telephone (202) 466-3755 Telefax: (202) 466-3787 www.ensresources.com i ~ Congressional Meetings A comprehensive PowerPoint presentation was prepared for all of the meetings and used after an introduction by Director Jones. Dennis Cocking lead all of the meeting participants through a background of the issue, basin-wide needs, federal role and budget. Strengthening the presentation was awareness of recent fires in the basin as highlighted by background pictures on the slides of the Angora Fi reo The first meeting was with Ryan Hunt, staff to Senator Feinstein, who worked with the District last year on the successful request and is very familiar with the issues. Hunt appreciated that the District took to heart the desire of the Senator to focus FY09 appropriations on projects with regional significance. He suggested that a single letter, signed by the entire partnership, be sent to Senator Feinstein and Senator Reid. This letter should address the need, note how priorities for the funds are determined, include the requested funding level and acknowledge that the District will receivelmanage the funds. The District ended the meeting by expressing their appreciation for the efforts of the Senator to assist the district on an array of issues and for her dedication to protect the region from catastrophic fire. The second meeting was with Brian McKeon, staff to Senator Boxer, who also worked on the FY08 request. He appreciated the regional nature of the request and expressed that it was a solid proposal that fits with the Senator's priorities. He plans to work with Senator Feinstein's office as the appropriations process moves forward. The final meeting was with Congressman Doolittle and his Legislative Director Evan Goitein. The Congressman was very interested in the Angora fire and how efforts by the District helped prepare for and respond to the fire. He also wanted to know how the FY09 request would improve the ability of those in the basin to respond to future fires. Congressman Doolittle stated that he would do all he could to support this request and at the same time expressed concern about the outcomeltiming of FY09 appropriations. In closing, the District thanked Congressman Doolittle for his many efforts on their behalf over the years. Action Items · Finalize Partnership letter for Senate Delegation (March) · Arrange for District Congressional staff to visit the Partnership to discuss the request and tour basin (March-April-May) · Create a detailed budget for the project (March) · Arrange meeting with the Office of Senator Reid together with the Incline Village Washington representative (ENS) 2 , 'I · Solicit letters of support for the request from a diverse cross-section of the community (Ongoing) · Transmit letter of thanks to meeting attendees Outlook The submittal of project requests to congressional offices jumpstarts the annual appropriation process. Each member has their own procedure for the review of these requests, which if approved will be submitted to the appropriation subcommittees with jurisdiction over specific federal agencies or departments. These subcommittees will then hold hearings, review the Administration's budget proposal and begin the process of drafting individual spending bills. Theoretically, all FY 2009 appropriations bills are to be signed into law by the President by September 30, 2008, the last day of the FY 2008 federal fiscal year. In recent years, Congress has failed to pass final spending bills until November, December or even January. The following is a general timeline for congressional action. February to June - Subcommittees hold budget oversight hearings. March and April - House and Senate Budget Committees pass a budget resolution by April 15, setting the 302(a) allocation, or "top-line" for all discretionary federal spending. (It is increasingly common that a formal budget resolution is not agreed upon) March/April/May - After reviewing appropriations requests from multiple constituencies, Members and Senators will submit their priority requests to the Appropriations Subcommittees. May - House and Senate Appropriations Committees subdivide their allocations which are distributed among the Subcommittees in the House and Senate. May to July - Committees begin the "markup" process, setting targets for funding of both national programs and earmarks. Fall 2008/Spring 2009 - Conference reports are negotiated, passed and enacted with funding outcomes for appropriations projects finalized and signed by the President. 3 Lake Tahoe Community Fire Prevention Partnership 2008/09 Update D • South Tahoe PUD (California) � , 1) • North Tahoe PUD (California) ?(),, • Tahoe City PUD (California) ke • Incline Village GID (Nevada) (A- • Round Hill GID (Nevada) d � • Douglas County Community Development (Nevada) 1 Background • Prior to 1960's - Majority of water systems were either small independent water companies or private domestic wells • Passage of Clean Water Act (1972) motivated many small private system owners to seek buyers due to increased regulations • Public agencies began purchasing these systems and interconnecting infrastructure • Basin -wide, public water agencies serve over 20,000 residential customers and over 1,000 commercial customers Background • In most cases, agencies mandated to provide domestic water service not fire flows • Systems were never designed, nor intended, to provide water volumes and pressures currently required by fire codes • New fire codes can be adopted much faster than infrastructure can be replaced Local Water Agencies Response • STPUD—Sincel994 — $25 million for waterline replacement — $9 million for supply wells — $1.5 million for booster pump stations — $5.3 million for water storage tanks — $6.2 million for emergency generators • Similar expenditures by water agencies basin -wide The Federal Component • TRA Sec. 2 (8) approximately 40 percent of the trees in the Lake Tahoe basin are either dead or dying, and the increased quantity of combustible forest fuels has significantly increased the risk of catastrophic forest fire in the Lake Tahoe basin; • TRA Sec.2 (9) as the largest land manager in the Lake Tahoe basin, with 77 percent of the land, the Federal Government has a unique responsibility for restoring environmental health to Lake Tahoe • Long - standing policy of fire suppression in Lake Tahoe Basin • Long - standing history (until recently) of limited forest thinning and fuel reduction /removal in Lake Tahoe Basin • With increased development, these policies have created a "perfect storm" scenario for wild land fire The Challenge • South Tahoe PUD — Recent study identified 185,000 lineal feet of undersized waterlines (4" or less) — Six -inch or larger lines necessary to provide approximately 1,000 gpm fire flows — Replacement costs for 6 -10" lines are estimated at $300 /foot — Project cost: $54 million in today's dollars — At current agency budgetary levels - 20+ years to complete • Similar infrastructure challenges exist within virtually all Lake Tahoe Basin water agencies The Challenge • In addition to waterlines, new storage tanks, multi- agency interconnections, booster pump stations, emergency generators, and additional hydrants are also necessary. • Sierra winters and TRPA grading requirements narrow construction window to 5 -6 months per year. The Challenge • The Gondola Fire, the Angora Fire, and the Washoe Fire demonstrate that wildfire can move from the forest to developed areas, from developed areas to the forest, and does not honor ten -year capital improvement plans. • Federal and state funds will accelerate the replacement of water infrastructure to enhance the ability to fight the fires when they occur. • They will occur • Now is the time to act Thank You