AP 03-06-08
SOUTH TAHOE PUBLIC UTILITY DISTRICT
"Basic Services for a Complex World"
REGULAR BOARD MEETING AGENDA
Thursday, March 6, 2008
2:00 P.M.
District Board Room
1275 Meadow Crest Drive, South lake Tahoe, California
Richard Solbrig, General Manager
Mary Lou Mosbacher, President
BOARD MEMBERS
Paul Sciuto, Assistant Manager
Dale Rise, Vice President
James R. Jones, Director
Eric W. Schafer, Director
Ernie Claudio, Director
1. CALL TO ORDER REGULAR MEETING - PLEDGE OF ALLEGIANCE
2. COMMENTS FROM THE AUDIENCE (Short non-agenda items that are within the subject
matter jurisdiction of the District. Five-minute limit. No action will be taken.)
3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR
4. ADOPTION OF CONSENT CALENDAR (Any item can be discussed and considered
separately upon request.)
5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE ACTION
6.
ITEMS FOR BOARD ACTION
REQUESTED BOARD ACTION
a. Twin Peaks Booster Station and
Pg.19 Waterline Replacement
(Jim Hoggatt)
Approve a Task Order to Carollo
Engineers to Provide Planning
and Design Services, in the Amount
of $463,550
b.
Pg.25
General Manager Contract and
Salary Range
(Nancy Hussmann)
(Note: The Board will convene to Closed
Session at the end of the meeting and then
reconvene to Open Session to take action
on th is item)
(1 ) Establish 2008 Salary Range
(2) Correct Clerical Error in General
Manager Contract; and
(3) Authorize Execution of Same
REGULAR BOARD MEETING AGENDA - MARCH 6, 2008
PAGE - 2
c. Payment of Claims
Pg.27
Approve Payment in the Amount
of $1 ,013,247.41
7. BOARD MEMBER STANDING COMMITTEE REPORTS
(Discussions may take place; however, no action will be taken)
a. Water & Wastewater Operations Committee (Jones / Claudio)
b. Finance Committee (Schafer / Rise)
c. Executive Committee (Mosbacher / Rise)
d. Planning Committee (Mosbacher / Schafer)
8. EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVE REPORT
9. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken)
10. GENERAL MANAGER REPORT (Discussions may take place; however, no action will be taken)
a. Joint Management Conference
11. STAFF I ATTORNEY REPORTS (Discussions may take place; however, no action will be taken)
a. Proposed State Discharge Requirements (Paul Sciuto)
12. NOTICE OF PAST AND FUTURE MEETINGS I EVENTS
Past Meetinas I Events
02/25/08 - 02/29/08 - A WW A Conference
02/25/08 - 02/29/08 - ACWA Washington D.C. Conference
02/27/08 - ECC (Employee Communications Committee)
03/03/08 - Operations Committee Meeting
Future Meetinas I Events
03/11/08 -10:30 a.m. - Planning Committee Meeting at District Office
03/12/08 - 9:00 a.m. - EI Dorado County Water Agency Meeting in Shingle Springs
03/12/08 - 7:00 p.m. - Lahontan Regular Board Meeting in Truckee
03/13/08 - 1 :30 p.m. - Board Budget Workshop at District Office
03/14/08 - 9:00 a.m. - Tahoe Interagency Executives Meeting on North Shore
03/17/08 - 9:30 a.m. - Alpine County Contracts Commission Meeting in Markleeville
03/17/08 - 3:30 p.m. - Water and Wastewater Operations Committee Meeting at District
03/18/08 - 9:00 a.m. - Alpine County Supervisors Regular Meeting in Markleeville
03/20/08 - 2:00 p.m. - STPUD Regular Board Meeting at District Office
03/24/08 - 9:00 a.m. - EI Dorado County Water Agency Strategic Planning Session
in Shingle Springs
13. CLOSED SESSION (Closed Sessions are not open to the public)
a. Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel-
Pg.39 Existing Litigation re: Meyers Landfill Site: United States of America vs. EI Dorado
County and City of South Lake Tahoe and Third Party Defendants, Civil Action No.
S-01-1520 LKK GGH, United States District Court for the Eastern District of CA
REGULAR BOARD MEETING AGENDA - MARCH 6, 2008
PAGE - 3
b. Pursuant to Government Code Section 54957.6(a)/Conference with Labor
Pg. 41 Negotiators
Unrepresented Employee Position: General Manager
Agency Negotiators: Executive Committee, Board of Directors
14. ACTION I REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION
15. ADJOURNMENT (To the next regular meeting, March 20, 2008,2:00 p.m.)
The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete
agenda packet, including all backup information is available for review at the meeting and at the District office during the hours of
8:00 a.m. - 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after minutes of the meeting have
been approved. Items on this agenda are numbered for identification purposes only and will not necessarily be considered in the
order in which they appear on the agenda. Designated times are for particular items only. Public Hearings will not be called to order
prior to the time specified.
Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda
items are heard; comments should be brief and directed to the specifics of the item being considered. Comments on items not on
the agenda can be heard during "Comments from the Audience;" however, action cannot be taken on items not on the agenda.
Please provide the Clerk of the Board with a copy of all written material presented at the meeting.
The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of
the disabled in all of the District's public meetings. If particular accommodations for the disabled are needed (i.e., disability-related
aids, or other services), please contact the Clerk of the Board at 530.544.6474, extension 6203, at least 24 hours in advance of the
meeting.
ITEMS
CONSENT CALENDAR
MARCH 6, 2008
REQUESTED ACTION
a.
Pg. 1
b.
Pg.3
C-"
Pg. 7
~13
Country Club Tank and Waterline Replacement
(Julie Ryan)
Authorize Staff to Advertise for
Bids for Construction of the
Replacement Tank and Waterline
at Country Club Heights
Collection System Master Plan
(Paul Sciuto)
Approve Amendment No.2 to
Brown & Caldwell for Additional
Flow Monitoring Services, in the
Amount of $100,500.
Regular Board Meeting Minutes:
February 7,2008
(Kathy Sharp)
Approve Minutes
Regular Board Meeting Minutes:
February 21, 2008
(Kathy Sharp)
Approve Minutes
South Tahoe Public Utility District. 1275 Meadow Crest Drive · South Lake Tahoe, CA 96150
Phone 530.544.6474 · Facsimile 530.541.0614 · www.stpud.us
~.~
~H..5cliJrie
South Tahoe
Public UtUityDiatrict
~
Erar!JQwdIo
~.. ..Jotw
MatyLou.~
0.. RIM
1215' M.aawens. .Ortv#- 5ou1;h LakB iabH -CI\l6l&
f'hcrt8580~74 · Fax. 5!0844~
BOARD AGENDA ITEM 4a
TO:
Board of Directors
FROM:
Julie Ryan, Senior Engineer
MEETING DATE:
March 6,2008
ITEM - PROJECT NAME: Country Club Tank and Waterline Replacement
REQUESTED BOARD ACTION: Authorize staff to advertise for bids for construction of
the replacement tank and waterline at Country Club Heights.
DISCUSSION: On November 15,2007, the Board approved the proposal from Brown
and Caldwell to design the tanks, coatings, and cathodic protection for replacement of
the existing tanks at Angora Highlands and Country Club Heights. Subsequently, the
Angora Highlands project was delayed, and staff is pursuing a permanent access road
to the tank site prior to commencing construction. The Country Club Tank, however, is
proceeding as planned, and staff expects to build this summer. The project will be bid
under two separate contracts: (1) site grading, tank foundation and pipeline replacement
and (2) tank construction, including cathodic protection and coatings application. The
tank construction contract will also include re-coating at Forest Mountain Tank, to repair
the damage incurred during the 2007 Angora Fire.
Brown and Caldwell has completed the 90% tank plans and technical specifications for
the project, which are currently being reviewed by District staff. District staff has
completed the 50% site grading plans and is working on compiling the specifications for
the project. Once the bid documents are received and compiled by the District on March
14, 2008, the schedule for the bid period and construction will be as follows.
Advertise for bids
Mandatory pre-bid meeting
Open bids
Board Award Contract
Notice of Award
Notice to Proceed
Foundation Complete
Site Stabilization Complete
Site Gradino Contract
March 19,2008
April 08, 2008
April 15, 2008
April 17,2008
April 18,2008
May 12,2008
July 21,2008
October 15, 2008
-1-
or
Julie Ryan
March 6, 2008
Page 2
Tank Construction Contract
Advertise for bids April 07, 2008
Mandatory pre-bid meeting April 22, 2008
Open bids April 29, 2008
Board Award Contract May 01, 2008
Notice of Award May 02, 2008
Notice to Proceed May 27, 2008
Mobilize to Site July 21, 2008
Project Complete October 15, 2008
To garner support and gather input from the neighbors, Staff will be holding a project
planning meeting for the public on Saturday, March 8, 2008, at 10:00 a.m. in the Board
Room at the District Offices. Items to be discussed are the size and color of the tank,
new site security and site stabilization measures, and any other topics of interest to the
residents regarding this project.
The total amount budgeted for the replacement of Country Club Tank, including
consultant services and construction management, is $900,000. Brown and Caldwell
expects that the tank, foundation, cathodic protection and coatings will cost between
$480,500 and $572,000. This estimate does not include costs for waterline replacement
and related appurtenances, electrical components, site stabilization and site security at
the Country Club Tank site; a cost estimate for these elements will be prepared by staff
prior to advertisement. The estimate also does not include the cost for re-coating Forest
Mountain Tank; a cost estimate for this element will be prepared prior to advertisement.
The Forest Mountain Tank recoating will be funded by the District's insurance carrier.
SCHEDULE: See above
COSTS:- See above
ACCOUNT NO: 2029-7063; 2029-8995
BUDGETED AMOUNT REMAINING: $145,163; $670,000 (2008/09 proposed budget)
ATTACHMENTS: None
CONCURRENCE WITH REQUESTEcZ:
GENERAL MANAGER: YES - NO
CHIEF FINANCIAL OFFICER: YES NO
CATEGORY: Water
-2-
South Tahoe
Public Utility Diatrict
~I"""
mdlMll H. Wrft
~
EntIo.~
J*"WI. J(IJW
Mary lDu ~
.,..me.
1215 MtIfItAaw er..t. Drive << South tats. iahotJ · .CA.8Eft6(
f"htJl16 t530 644-6474 . Fax. fS3O. 54f~
BOARD AGENDA ITEM 4b
TO:
Board of Directors
FROM:
Paul A. Sciuto, Assistant General Manager
MEETING DATE:
March 6, 2008
ITEM - PROJECT NAME: Collection System Master Plan.
REQUESTED BOARD ACTION: Approve Amendment NO.2 to Brown & Caldwell for
additional flow monitoring services, in the amount of $100,500.
DISCUSSION: Flow monitoring at selected points in the collection system during wet
weather and dry weather flow periods is included in Brown & Caldwell's scope of
services for the Collection System Master Plan project. However, due to the lack of rain
and runoff in 2007 the wet weather flow monitoring performed did not show adequate
results and collection system response. To adequately calibrate the hydraulic model for
the sanitary sewer collection system wet weather flow monitoring, the process should
be performed again in 2008. The proposed flow monitoring will include 16 flow monitors
and five rain gauges for 45 days.
Amendment NO.2 will be to Task Order 6 for the development of the Collection System
Master Plan.
SCHEDULE: Master Plan complete by March 2009.
COSTS: $100,500.
ACCOUNT NO: 1029-8721/CSMSPL
BUDGETED AMOUNT REMAINING: $4,073 (2007-08); $400,000 (2008/09 proposed
budget)
ATTACHMENTS: Amendment No.2.
CONCURRENCE WITH REQUESTED AC
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
CATEGORY: Sewer
NO
NO
-3-
AMENDMENT NO. 2 TO
AGREEMENT FOR CDNSULTING SERVICES
BETWEEN SOUIB TAHOE PUBUC unUTI DIS1RICf
AND BROWN AND CAIDWELL
FOR WASlEWATER CDLLECTION MASTERPLAN CDNSULTING SERVICES
n-nS AMENDMENT NO. 2 to the Agreement for Consulting Semces dated February 6, 2007
between South Tahoe Public Utility District, hereinafter referred to as "Client", and Brown and
Caldwell, Environmental Engineering and Consulting, a California corporntion, hereinafter referred to
as "Consultant," is made and entered into this day of March, 2008.
REaTALS:
WHEREAS, Client and Consultant entered into an agreement for consulting semces dated February
6,2007 (hereinafter referred to as the "Agreement");
WHEREAS, Client desires to perform additional wet weather flow monitoring; and
WHEREAS, Client has requested changes in the Scope of Semces;
NOW, lHEREFORE, Client and Consultant agree to amend the Agreement as follows:
1. SmPE OF CDNSUL TING SERVICES
The Scope of Semces in the Agreement is amended to provide:
Task 32
· Conduct flow monitoring with 16 flow monitors and five rain gauges for 45 days (each season)
during the wet weather flow monitoring seasons in 2007 and 2008. Flow monitors and rain
gauges will be installed at the locations designated in the Flow Monitoring Plan dated March
15,2007.
II. Sa-IEDULE
Consultant is authorized to proceed with the modified Scope of SeIVices effective on the date of this
Amendment. The 2008 wet weather flow monitoring semces shall be completed by May 15, 2008.
III. CDMPENSATION
Compensation for the semces provided under Article I of this Amendment shall be calculated on the
same basis as in the Agreement. The labor hours and cost estimates for completing the setvices
defined in this Amendment are shown in Attachment A The estimated compensation for the setvices
perlonned .under this Amendment is $100,550 which increases the total estimated compensation under
the Agreement to $636,300.
-5-
AMEND (June 30, 1999)
Page 1 of2
All other tenns and conditions of the Agreement and any amendments thereto remain unchanged
SOUIHTAHOE PUBUCunU1YDISlRICf
Signature:
Printed Name:
T me:
BROWN AND CALDWEll
ENVIRONMENTAL ENGINEERING AND CONSULTING
Signature:
Printed Name:
Tide:
-6-
AMEND (June 30, 1999)
Page 2 of2
~~\\ ~
,\\.\~ t\~\~ ~4t>~ J
~vi-~V u If.~~
SOUTH TAHOE PUBLIC UTILITY DISTRICT 'is
"Basic Services for a Complex World"
Richard Solbri~, General Manager
Mary Lou Mosbacher, President
BOARD MEMBERS
Paul Sciuto, Assistant Manager
Dale Rise, Vice President
James R. Jones, Director
Eric W. Schafer, Director
Ernie Claudio, Director
REGULAR MEETING OF THE BOARD OF DIRECTORS
SOUTH TAHOE PUBLIC UTILITY DISTRICT
FEBRUARY 7, 2008
MINUTES
The Board of Directors of the South Tahoe Public Utility District met in a regular session,
February 7, 2008, 2:00 P.M., District Office, 1275 Meadow Crest Drive, South Lake
Tahoe, California.
BOARD OF DIRECTORS:
President Mosbacher, Directors Jones, Rise, Schafer,
Claudio
ROLL CALL
STAFF:
Solbrig, Sciuto, McFarlane, Whalen, Cocking, Coyner,
Adams, W. Stanley, Hussmann, Brown, Swain, Frye
M. Alsbury, C. Skelly, Bergsohn, Attorney Kvistad
GUEST:
Tom Pavletic /Municipal Financial Services, Adam
Jensen/Tahoe Daily Tribune, John Runnels, John
Cefalu
Paul Sciuto led the pledge to the flag.
Moved Schafer / Second Rise I Passed Unanimouslv
to approve the Consent Calendar as submitted:
a. NeoGov Recruitment System Software Program -
Authorized staff to enter into an agreement with
NeoGov to provide on-line application and recruit-
ment program services, in the amount of $8,600;
PLEDGE OF ALLlGIANCE
CONSENT CALENDAR
b. Carlson Water Main Extension - Adopted Resolution
No. 2843-08 accepting the Carlson Water Main
Extension;
-7-
~
REGULAR BOARD MEETING MINUTES - FEBRUARY 7, 2008
PAGE-2
c. Dump Truck: Five to Six Yard Capacity -
A warded bid to the lowest responsive, responsible
bidder, Western Truck Parts and Equipment Co., in
the amount of $70,006.25;
CONSENT CALENDAR
(continued)
d. Indian Creek Reservoir TMDL Mitigation Project -
Approved proposal from Stephen R. McAdams, P.E.,
to assist District staff to relocate an oxygen generator
from the Bakersfield site for use,at Indian Creek
Reservoir, in the amount not to exceed $11,000;
e. South Upper Truckee Well No.3 Corrosion Control
Treatment Facility - Approved Change Order No.4
to Thomas Haen Company, In., in the amount of
$13,096;
f. Arrowhead Well Arsenic Treatment Facility -
Authorized staff to advertise for bids for the pre-
purchase of a 1,000 gallon per minute iron-based
adsorptive media water treatment system;
g. Approved Regular Board Meeting Minutes:
January 3, 2008.
ITEMS FOR BOARD ACTION
Moved Schafer / Second Claudio I Passed Unanimouslv PA YMENT OF CLAIMS
to approve payment in the amount of $1,879,805.80.
Water & Wastewater Operation Committee: The BOARD MEMBER STANDING
committee met on February 4, 2008. Minutes of the COMMITTEE REPORTS
meeting are available upon request.
Finance Committee: The committee met on
January 25, 2008, and January 31, 2008. Minutes of
these meetings are available upon request. The committee
also met on February 5 and 6, 2008, to review the draft
proposed budget and the 10-year forecast, in preparation
for the upcoming Board Budget Workshop. The budget
process time line is early this year and in compliance with
Proposition 218 (Big Horn Bill).
Executive Committee: The committee was to meet on
February 8, 2008, however, this meeting has been
cancelled and will be rescheduled.
The agency has not met since the last Board meeting,
however, Directors Jones and Rise, and Richard Solbrig
attended an orientation presentation held at the District for
new Board members. The presentation, given by water
agency staff was very informative. The agency's next
regularly scheduled meeting is on February 13. 2008.
EL DORADO COUNTY WATER
AGENCY PURVEYOR
REPRESENTATIVE REPORT
-8-
REGULAR BOARD MEETING MINUTES - FEBRUARY 7, 2008
PAGE-3
Director Schafer reported he attended the recent CASA
Conference in Indian Wells, California, held on
January 9-12,2008. A summary of his conference notes
were distributed to the Board members for their review.
BOARD MEMBER REPORTS
Director Claudio reported he attended the South Lake
Tahoe City Council meeting and the Citizen's Alliance for
Responsible Government meeting.
General Manaoer: Richard Solbrig gave an update on the GENERAL MANAGER REPORT
waterline funding grant process being pursued by the Lake
Tahoe coalition. The initial write-up on the grant is due at the
Congressional offices February 15, 2008, and the Senate
offices on March 1, 2008. The grant is looking at short-term
projects for the next four years with an emphasis on plan-
ned capital projects to improve firefighting capabilities of
utility agencies, surrounding the basin.
The coalition level request is being pursued through the
Tahoe Restoration Act, on a regional-wide basis, to
maximize chances for further earmarks in Congress.
2:33 P.M. PUBLIC HEARING
SEWER CAPACITY CHARGES
Note: Notices of this Public Hearing were published
in the Tahoe Daily Tribune on January 30,2008, and
February 7,2008.
President Mosbacher opened the public hearing.
Rhonda McFarlane, Chief Financial Officer, introduced
Tom Pavletic, Municipal Financial Service, who prepared
the current study. The last time sewer capacity charges
were reviewed by the Board was in 1999. Typically the
fees are revisited every five years. She reported that the
original intention was to line up review of these fees to
coincide with Pathway 2007 however that process is
moving slowly. Staff, with the Board's approval decided to
proceed with this study.
The Finance Committee has met with Tom Pavletic and
Marv Winer and has reviewed the details of the report.
Mr. Pavletic proceeded with a PowerPoint presentation
of the methodology of determining a sewer capacity fee
that included:
-9-
REGULAR BOARD MEETING MINUTES - FEBRUARY 7,2008
PAGE.4
. Setting Capacity Charges must:
o Demonstrate a nexus between new develop-
ment and the need to replace, expand or
build facilities to accommodate it.
o Not be arbitrary of discriminatory in its
application to individuals or customer classes.
o Meet the requirements of California
Government Code Sections 66012-66014.
. Most prominent requirement of the code is that the
fee be reasonable.
. Calculation Methodology Average Cost Method for
Capacity Charge (replacement value, debt, capacity
and demand.)
. List of Sewer System Assets.
. Sewer Units.
. Current, Calculated and Recommended Unit Costs.
. Unit Costs and Capacity Charges - 4% Inflation.
. Projected Revenue from Capacity Charges (4% Infl.)
Mr. Pavletic ended his presentation and answered
questions for the Board.
Director Rise questioned whether these funds generated
from the increase in sewer capacity charges are only
used to improve the infrastructure of the District. Rhonda
McFarlane confirmed this statement and also included that
this is a law of the State of California that these fees are
dedicated to infrastructure and cannot be used for anything
else.
Director Jones stated he felt implementing this increase
would be the prudent thing to do. The District needs to
replace thousands of feet of lines as they are reaching
the end of their life expectancy.
Wanda Stanley addressed the Board with concerns
regarding whether the public will be able to afford to
build new homes or remodel their existing homes with
these increases. Director Rise responded that the recom-
mended increase for the first year, 2008, was not the full
16% increase, but reduced to 11.8% to try to help the
economy.
-10-
SEWER CAPACITY CHARGES
(continued)
REGULAR BOARD MEETING MINUTES - FEBRUARY 7, 2008
PAGE-5
Director Claudio would like to see incentives built into the
plan to distinguish whether it is a local resident or whether
it is a second home. President Mosbacher informed him
that making distinctions like that are not legal, and would
be considered discrimination.
SEWER CAPACITY CHARGES
(continued)
Rhonda McFarlane commented that District customers are
receiving a tangible product when they pay fees. Waste-
water is transported and processed. Potable water is
delivered to their homes or businesses. Operating costs
need to be collected either by initial connection to the
system, in the form of a capacity fee, or passed on to the
ratepayer.
John Cefalu expressed his concerns regarding the high
costs of fees for the public who wants to build or remodel
residences andlor businesses who wish to come into the
community or expand their existing businesses. He asked
the Board to consider this increase carefully. He received
clarification from the Board and Rhonda McFarlane regard-
ing depreciation accounts savings and why a consultant
was hired on this project.
Rhonda McFarlane pointed out that the consultant's
recommendation is being phased in over a five year
period with the first year increase taking effect in 60 days.
Director Jones received clarification that the TRPA
Mitigation Fee of 5% may be eliminated during negotia-
tions. Any savings will be applied to the ratepayer.
John Runnels addressed the Board. He attended the
Finance Committee meetings that discussed this report
and sees this fee increase as protecting the existing
ratepayers. He also received clarification on how this
meeting was advertised to the public.
The Public Hearing was closed at 3:39 P.M.
Motion Jones 1 Second Claudio 1 Passed Unanimously
to Enact Ordinance No. 502-08 to update the charges.
Increase to be effective April 7, 2008, and to escalate on
a four year progression.
Chief Financial Officer: Rhonda McFarlane gave a STAFF REPORTS
report on the budget process, especially for the new
Board members. On March 13, 2008, a Board workshop
is scheduled regarding the draft proposed budget. She
reminded the Board that during this period, the
-11-
REGULAR BOARD MEETING MINUTES - FEBRUARY 7, 2008
PAGE. 6
documents are not legally public information and are
considered "a work in progress" and should not be
distributed to the public during this initial phase. On
April 11, 2008, the "proposed budget" will be made
available to the public. On May 15, 2008, a public
meeting will be held. .
3:47 P.M. to 4:04 P.M.
Manaaer of Customer Service: Lisa Coyner gave the
Board a brief overview of the "Claims Reporting
Process". She reported that staff receives annual
training from CSRMA (California Sanitation
Risk Management Authority).
Network/Telecom Svstems Administrator: Bill Frye
reported on the District's internet security. He
extended an invitation to the Board for a tour of the
server room, and to contact him with any questions
they may have regarding the District's system.
Leaal Counsel: Gary Kvistad updated the Board on the
ongoing negotiations with Heavenly Resort. Heavenly
would like to obtain more water for snowmaking ability
in the upcoming years.
STAFF REPORTS
(continued)
MEETING BREAK
ACTION I REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION
No reportable Board action.
5:08 P.M.
Pursuant to Government Code
Section 54956.9(a)/Conference
with Legal Counsel - Existing
Litigation re: Meyers Landfill Site:
United States of America vs. EI
Dorado County and City of South
Lake Tahoe and Third Party
Defendants, Civil Action No.
S-01-1520 LKK GGH, U.S. District
Court for the Eastern District of Ca.
ADJOURNMENT
Mary Lou Mosbacher, Board President
South Tahoe Public Utility District
ATTEST:
Kathy Sharp, Clerk of the Board
By: Chris Whalen, Assistant Board Clerk
South Tahoe Public Utility District
-12-
t.'~\~
1\~t~ "l
~~,\,< \~
ltIlIOpllJJ .
Al4'~
SOUTH TAHOE PUBLIC UTILITY DISTRICT ~
"Basic Services for a Complex World"
Richard Sol brig, General Manager
Mary Lou Mosbacher, President
BOARD MEMBERS
Paul Sciuto, Assistant Manai:.
Dale Rise, Vice President
James R. Jones, Director
Eric W. Schafer, Director
Ernie Claudio, Director
REGULAR MEETING OF THE BOARD OF DIRECTORS
SOUTH TAHOE PUBLIC UTILITY DISTRICT
FEBRUARY 21, 2008
MINUTES
The Board of Directors of the South Tahoe Public Utility District met in a regular session,
February 21, 2008, 2:00 P.M., District Office, 1275 Meadow Crest Drive, South Lake
Tahoe, California.
BOARD OF DIRECTORS:
President Mosbacher, Directors Schafer, Rise, Claudio. ATTENDEES
Director Jones was excused.
STAFF:
Solbrig, Sharp, Henderson, Cullen, Hammond, Bird,
W. Stanley, R. Johnson, Hussmann, Ryan, Coyner,
Nolan, Curtis, Hoggatt, Pinkel, Cocking, Attorney
Kvistad.
GUEST:
John Runnels.
Ross Johnson led the pledge to the flag.
PLEDGE OF ALLlGIANCE
Moved Schafer 1 Second Rise / Jones Excused 1 Passed CONSENT CALENDAR
to approve the Consent Calendar as submitted:
a. Liability Claim Against STPUD Received from
Melody Martinez - Rejected claim;
b. Intergovernmental Agreement with Alpine County-
(1) Authorized the Chief Financial Officer to notify
the County of Alpine (County) of its intention to
extend the Intergovernmental Agreement Providing
for Grant Coordinator Services by the South Tahoe
Public Utility District for the County;
-13-
:~
REGULAR BOARD MEETING MINUTES - FEBRUARY 21,2008
PAGE. 2
(2) Authorized the Chief Financial Officer to
negotiate an update to Attachment A of the agree-
ment with the County and the Grant Coordinator;
and (3) Authorized the Board President to sign
the extended agreement;
c. Customer Service, Operations & Laboratory Facility
Landscaping Plan - (1) Approved the Project Close-
out Agreement and Release of Claims for Aspen
Hollow Nursery; and (2) Authorized staff to file a
Notice of Completion with the EI Dorado County
Clerk;
d. Approved Regular Meeting Minutes:
January 17, 2008.
CONSENT CALENDAR
(continued)
ITEMS FOR BOARD ACTION
The purpose of this Ordinance is to adopt certain
amendments and additions to the Administrative
Code regarding the District's authority to levy fines
on an escalating basis for violations of the District's
Ordinances, rules or regulations regarding either
water or sewer work or connection(s).
Currently, District staff (inspections, underground
repair) has no ability to fine property owners who do
not adhere to a correction notice issued to them to
correct water andlor sewer violations. District staff
can disconnect water andlor sewer services, but
staff considers the disconnection process as a last
resort. Having the ability to issue escalating fines will
provide the District with an alternative mechanism
through which to protect the public safety. Fines
would be added to the customer's quarterly bill.
Lisa Coyner and Cuz Cullen reported the District does
not fully exercise the right to disconnect water and
sewer services to a home when a correction notice
is ignored out of concern for the residents in the home.
Disconnecting service means the occupants would
have to vacate the residence since Department of
Health laws will not allow occupancy without sewer
andlor water service. If customers know the District has
the ability to fine, they would be more likely to correct
the violation and avoid the fine process altogether.
A lengthy discussion took place that covered: the
current correction notice and disconnection procedures,
the reasons why this ability is beneficial to the District
and its customers, the need to clarify the escalating
fining schedule, the fact that ignoring correction
-14-
FINING AUTHORITY
REGULAR BOARD MEETING MINUTES - FEBRUARY 21,2008
PAGE - 3
notices puts the entire water system at risk of
contamination from backflow devices, the public's
perception of additional regulations, the percentage of
sewer versus water customers who have correction
notices issued to them, the administrative costs and
savings to implement the ordinance, the need to treat
violators consistently according to the severity of each
fine, and staff's discretion to determine the scope of
the violation and whether to issue a fine at all.
Moved Rise 1 Second Claudio 1 Jones Excused 1
Passed to enact Ordinance No. 503-08 as written,
providing additional fining authority pursuant to
Government Code Section 53069.4; and directed
staff to revisit the Ordinance with the Board if higher
fining authorization is needed in order to protect
the District's systems.
Per discussions that took place when the Finance
Committee met to discuss the budget, engineering
staff has looked at the feasibility of hiring a new
Junior Engineer for the 2008 construction season.
The addition of an engineer was to mitigate what
the District spends on consultant inspectors during
the building season. With the current project work-
load, the District will potentially need to hire two
outside inspectors from May through October 2008.
Based on the projected 1 0- Year Capital Improvement
Plan (CIP), the need for two outside inspectors would
not diminish, but could be reduced by one by hiring
an additional engineer. There is a lot of extra work
this position could be responsible for during the
winter months.
The District will not be able to entirely eliminate the
need for consultant services with a new hire due to
the ongoing need of materials and testing services
by a certified lab. In addition, in some years the
number of projects in the CIP would mandate the
need for four inspectors. Therefore, at times an
additional outside inspector will need to be hired.
The recruitment would be predicated on the new
position being a field inspector from May through
November for at least a four year period. The
proposed salary is based on a survey of comparable
agencies.
Moved Schafer 1 Second Claudio 1 Jones Excused 1
Passed to authorize staff to advertise for a Juniorl
Assistant Engineer.
-15-
FINING AUTHORITY
(continued)
STAFFING - JUNIOR 1 ASSISTANT
ENGINEER
REGULAR BOARD MEETING MINUTES - FEBRUARY 21, 2008
PAGE. 4
An inspector is needed to provide construction
inspection for the final pump station and to perform
materials testing for all projects for the time period
between March to October 2008.
Jim Hoggatt reported the previous Board action
eliminated the need to contract for a second
inspector.
The Board discussed travel time included in the
contract, the feasibility of using a courier for
delivering testing samples, and doing testing in-
house. There are strict procedures that must be
followed, and tests must be performed by a lab that
is certified to do those specific types of tests as an
objective party.
Moved Schafer 1 Second Claudio 1 Jones Excused 1
Passed to approve proposal from Stantec Consulting,
Inc., to provide one construction inspector and per-
form all materials testing in the amount of $210,000.
2008 CONSTRUCTION
INSPECTION AND MATERIAL
TESTING
Moved Schafer 1 Second Rise 1 Jones Excused 1 Passed PAYMENT OF CLAIMS
to approve payment in the amount of $685,916.08.
Water and Wastewater Operations Committee: The
meeting scheduled for February 19 was cancelled.
Executive Committee: The committee met to discuss
provisions of the general manager's employment
contract.
3:20 - 3:35 P.M.
Directors Jones and Rise, Dennis Cocking, and Richard
Solbrig attended the February 13 board meeting. Director
Jones questioned several expenditures since none
were of benefit to South Lake Tahoe. The next
meeting will be held March 12.
Director Claudio relayed his thoughts on the sewer
capacity plan that was approved February 7. He
objected to the process (i.e., use of consultants,
timing).
General Manager: Richard Sol brig reported that the
sewer lateral inspection and testing issue will be
discussed during the Water and Wastewater Operations
Committee meeting on March 3, and also at the
Technical Review Committee meeting that staff will
hold for local contractors to gather their input.
-16-
BOARD MEMBER STANDING
COMMITTEE REPORTS
MEETING BREAK
EL DORADO COUNTY WATER
AGENCY PURVEYOR
REPRESENTATIVE REPORT
BOARD MEMBER REPORT
GENERAL MANAGER REPORT
REGULAR BOARD MEETING MINUTES - FEBRUARY 21,2008
PAGE. 5
District Information Officer: Dennis Cocking reported
on the State of California's budget shortfall of $1 6
billion dollars. It is likely the State will make another
attempt to raid special districts of their property tax
revenues, which would have a huge negative impact
on the District.
He also reported a Lake Tahoe Fire Commission was
formed to make findings as a result of the Angora fire.
The District submitted a finding related to waterline
funding that was supported by fire chiefs, which
might help in Washington.
General Counsel and Land Application Manager:
Gary Kvistad and Hal Bird reported on the State
Water Resources Control Board's recycled water
policy to develop on a uniform basis how recycled
water could be used. The District submitted
comments, and there will be another public comment
time period. The final policy could significantly impact
the development of the master plan in Alpine County.
STAFF REPORTS
ACTION I REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION
No reportable Board action.
No reportable Board action.
4:55 P.M.
Pursuant to Government Code
Section 54956.9{b)/Liability Claim
Received from Melodv Martinez
. Pursuant to Government Code
Section 54956.9{a)/Conference
with Legal Counsel - Existing
Litigation re: Meyers Landfill Site:
United States of America vs. EI
Dorado County and City of South
Lake Tahoe and Third Party
Defendants, Civil Action No.
S-01-1520 LKK GGH, U.S. District
Court for the Eastern District of Ca.
ADJOURNMENT
Mary Lou Mosbacher, Board President
South Tahoe Public Utility District
ATTEST:
Kathy Sharp, Clerk of the Board
South Tahoe Public Utility District
-17-
South Tahoe
Public Utility Diatrict
~I~
Ii'.Ii:NN.H. ~
~
f!ntfo,t::lMJlib
"'fi.~
~1..Du ~
0..
1215 M.aow~'~' South Laka".k_..CA~
PhQI1S.-530 !54+0474 · Fe<fS!()t541~
BOARD AGENDA ITEM 6a
TO:
FROM:
Board of Directors
Jim Hoggatt, Construction ManagerlEngineer
MEETING DATE:
March 6, 2008
ITEM - PROJECT NAME: Twin Peaks Booster Station and Waterline Replacement
REQUESTED BOARD ACTION: Approve a Task Order to Carollo Engineers to
provide planning and design services, in the amount of $463,550.
DISCUSSION: A Booster Station to boost the water from the main zone to the Twin
Peaks and Flagpole zones has been in our 10-year planning budget for the last five or
six years. The project never met the requirements to move up the priority list until the
Angora Fire. After the Angora Fire, District staff met and determined this project should
move up on the priority list to improve our source of water to these zones. It was
scheduled to be constructed in 2012. The current schedule is to design in 2008 and
construct in 2009 and 2010.
District staff received and reviewed proposals from several engineering firms and
determined Carollo Engineers had the best proposal.
SCHEDULE: As soon as possible.
COSTS: $463,550
ACCOUNT NO: 2029-7071/TPBSTR
BUDGETED AMOUNT REMAINING: $500,000 2008/09 proposed budget;
$1,500,000 (2009/10 proposed 10-Year Plan)
ATTACHMENTS: Proposal, scope of work from Carollo Engineers.
CONCURRENCE WITH REQUESTED AC
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
CATEGORY: Water
NO
NO
-19-
C c;a,""1
Engineers... Working Wonders With Water""
February 15,2008
South Tahoe Public Utility District
Mr. Jimmie Hoggatt
Engineering Department Manager
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Subject:
Cost Proposal for the Twin Peaks Booster Station and Waterline Replacement
Project
Dear Mr. Hoggatt,
Our fee proposal for engineering services related to the Twin Peaks Booster Station and
Waterline Replacement Project is attached. The information contained herein is proprietary and
we request that it be kept confidential to the extent possible.
The Estimated Engineering Hours and Costs worksheet is attached. The not to exceed cost for the
required tasks contained in the Scope of Services provided in the Appendix is $41 ,'. FG. The final
Scope of Services shall be discussed based on the District's desired level of effort for each of these
tasks and any optional tasks. Engineering fees will be based on the current rates in effect at the time
work is performed. This estimate utilizes our current (2007-2008) rates, which have been escalated to
2008-09 rates based on our best projections at this time, as our salaries are adjusted in March.
Please note that while Flow Science has agreed to be part of the Carollo team should an in-depth
. surge analysis be required for the project, we have not included. hours or costs for their services at this
time. A preliminary assessment of the surge potential will be conducted in-house as part of Subtask
1.6, with results provided to the District for review, prior to moving forward with a more advanced
evaluation through Flow Science.
We will be pleased to discuss the Scope of Work and the Labor Hour and Cost Estimate at the City's
convenience. Please contact us if you have any questions or if you desire additional
information regarding our proposal.
Sincerely,
/~7Z:'P.c.
Scott E. Parker, P.E.
Partner-in-ChargelProject Manager
SEP:kh
Enclosures
~~~~.:.;..
. . ,0', '. '". . y
Jimmie Hog~att
From:
Sent:
To:
Cc:
Subject:
Robert Gillette [RGillette@carollo.com]
Wednesday, February 27. 20084:23 PM
Jimmie Hoggatt
Tim Taylor; Scott Parker
Twin Peaks Project
Fee - Twin Peaks PS & Waterline.xls
Attachments:
.
=ee - Twin Peaks PS
& Waterlln...
Hi Jim,
I talked to Scott and Tim about our discussion today. First, we are all really excited
about being able to work with you on this project.
Based on those discussions we have made a number of changes to the hours and fees
spreadsheets. These are:
1. I am no longer shown on the team and have no hours.
2. We will use Tim Taylor as the checker for the civil and mechanical portions of this
project. The 3 hours per sheet for P&S checking have been moved to Tim's hours.
3. I changed checking for the E, I&C hours to a senior engineer not a partner.
4. I moved a few of the QA/QC hours from my hours column to Scott's hours column to check
various deliverables.
5. This increased Auerbach's hours and fees and decreased Carollo's hours and fees.
If you would like a revised organization chart we can provide that.
You also asked what Tim's Role on the project will be. I have separated out Tim's hour on
the hours spreadsheet as best I understand them so you can see these. Tim's role is
separate from the rest of Auerbach's hours, so Tim will be doing the following:
1. All work with permitting. This includes coordination with the District on the permit
issues and if you would like to add the total permitting task, Tim can add this too.
2. QA/QC on all submittals and especial the detailed checking of the Civil and Mechanical
drawing.
3. All the Civil Design at the pump station including the plans and specifications.
4. Responsibility for incorporating the BMPs for the entire project as required by the
TRPA, the Lahontan RWQCB, etc.
5. Coordination with the Auerbach surveying team.
6. Utility location.
7. Engineering Services during Construction for the civil portion of the work and
coordination with regulators as required.
8. Auerbach Project Management - so attendance at project meetings.
Hope this answers your questions. Let me know if you have any more.
Again we (at least Scott and Tim) look forward to working with you on this project.
Bob
Robert A. Gillette, P.E.
Partner
2500 Venture Oaks Way, Suite 320
Sacramento, CA 95833
P: 916-565-4888
F: 916-565-4880
rgillette@carollo.com
http:\\www.carollo.com
-~2-
TASK
CAROLLO
AUERBACH
tl
r
O
a
Y
n 4
O
Ai
1
th
O
4
o 7r
I
c
i
c
99
t 3
' �
t1
a
c
C
C
'
:
a
t.
F
Total
Hours
Total
Hours
Column
1
2
4
5
8
7
7
8
9
10
11
12
13
14
TASK 1 - PROJECT INITIATION & DATA COLLECTION
1.0 Project Kldc-05
6
8
0
0
0
0
0
12
0
2
0
4
4
2.0 Review Master Plan and assodeted reports
2
4
0
0
0
0
0
8
4
2
0
0
0
3.0 Local may Companies, record maps for gas, tele, power, etc
0
2
0
0
0
0
0
8
0
1
0
48
48
4.0 Hydraulic Analysis Coordination
2
2
0
0
0
0
0
8
0
0
0
4
4
5.0 12 Inch Line Condition Assessment
2
2
0
0
0
0
0
0
0
0
0
0
0
6.0 Pump Station Evaluation
2
12
0
0
2
2
2
22
0
0
0
0
0
7.0 Surveying
0
2
0
0
0
0
0
0
0
0
199
4
203
8.0 Geotedmkal
0
2
0
0
0
0
0
0
0
0
0
0
0
9.0 Bask of Design Report
4
4
2
0
1
1
4
36
0
16
0
4
4
Task 1 Total Hours
18
38
32
2
0
3
3
6
94
4
21
_-..
199
64
263
TASK 2- PROJECT SCHEDULE
1.0 Develop Project Schedule
2
2
2
0
0
0
0
0
4
0
0
10
2.0 Maintain Project Schedule
10
0
12
0
0
0
0
0
4
0
0
26
Task 2 Total Hours
12
2
14
0
0
0
0
0
8
0
1
37
TASK 3 - DEVELOP PLANS AND SPECIFICATIONS
1.0 prepare 50% Plans and Specifications
4
16
16
2
0
40
20
30
70
220
32
112
56
166
2.0 Prepare 90% Picts and Spedficallons
4
16
16
2
0
40
20
30
70
220
32
20
36
106
3.0 Assist District to Obtain Permas
2
0
4
0
0
0
0
0
0
0
0
30
16
46
4.0 Complete Plats and SpedBCatlons
a
24
24
8
27
36
16
24
64
160
24
18
115
133
Task 3 Total Hours
18
56
60
12
27
116
56
84
204
600
88
1321
230
223
453
TASK 4 - ENGINEERING SERVICES DURING CONSTRUCTION
0 o o 070 o 0 0 0 0 0
A a 0 g a o o o m m m
1.0 Bidding Asstakoos
4
4
2
4
0
2
2
1
14
0
2
35
2.0 Review Shop Drawings
2
4
2
0
0
6
6
4
92
0
1
117
3.0 Revises and Answer RFla
2
4
0
0
0
4
4
4
60
0
1
79
4.0 Assist 1 Preparation of Change Orders
2
4
0
0
0
2
2
2
12
0
1
25
5.0 Prepare Cost Estlemtes forExtra Work
2
4
0
0
0
0
0
4
12
0
1
23
6.0 Construction Meetings
1
4
24
0
0
0
0
0
0
0
1
30
7.0 Prepare Record Drawings
1
18
16
0
0
4
4
0
0
76
0
117
Task 4 Total Hours
14
40
44
4
0
18
18
15
190
76
7
426
TASK 8 - PROJECT MANAGEMENT
1.0 Coordination
a
0
0
0
0
0
0
0
0
0
.0
a
2.0 Project Management
24
8
0
0
0
0
0
0
0
0
0
32
3.0 Monthly meetings
12
9
0
0
0
0
0
0
0
0
0
21
Task S Total Hours
44
17
0
0
0
0
0
0
0
0
0
61
0
16
18
TOTALS
hours
106
153
150
16
27
137
77
105
496
880
117
2066
437 1
333 1
770
ESTIMATED ENGINEERING HOURS AND COSTS
South Tahoe Public Utility District
Twin Peaks Booster Pump Station and Waterline Replacement
TASK
CAROU.O I OTHER DIRECT COSTS
COST SUMMARY
ui
O S Z W
W W yy�� fqS�
W 4 0
4 4 G V W 4 1 8 (�
$231 $210 $184 $194 $194 $194 $194. $194 $127 $125 S55
Subtotals
Hours Budost
PECE
$9.50
Subcorants
p Qum. Subtotals
Survey Oaotsctr
Sub
contractor Travel
10.0%
Total ODCa
Total
Column 1 2 3 4 5 6 7 7 a 9 10
11 1 12
13
14 1 15 1 113
19 1 20 1 21
22
23
6 8 12 2
2 4 8 2
0 2 8 1
2 2 8
2 2 0
2 12 22
0 2 0
0 2 0
4 4 36 1
$342
$228
$161
$114
t441
S19
3584
$800 $0 $600
$0 SO SO
$5,000 SO $5,000
$600 $0 $600
SO SO SO
SO $2Z000 $22,000
$800 SO 3600
$660 550 SO
$0 SO $120
$5,500 SO $0
$660 SO $120
SO to to
$24.203 SO $120
MO $103 $0
!
18 38 32 94 21
$4,158 67,983 $6,223 $389 $0 $553 $563 it 54 $11,527 $400 $1,956
2 2 2 0 0 0 0 0 4 0 0
10 0 12 0 0 0 0 0 4 0 0
6.
$110,910
12 2 14 0 0 0 0 0 8 0 1
If If
$
111
iji I i
:1 111
0000 0 000° o o 000
h�Nri� h.�NA m rw
$2,771 $420 $2,723 SO SO $0 $0 40 81,015 $0 455
4 18 16 2 0 40 20 30 70 220 32
4 16 18 2 0 40 20 30 70 220 32
2 0 4 0 0 0 0 0 0 0 0
8 24 24 Q 27 36 16 24 64 160 24
S�S �p�p�pp _n SnS 1 '- � � x p$p p6p � � q!
Miri I ^ 410 f
q§....1 R,.. p ggs El otI
as a N
M sass a a N M N a l a N sal
8 M N N f + M M M M N M l f Sat
1 1151 1 1551ii gil
87,370
I
N
$70,100
18 56 60 13 27 .116 56 e4 204 600 88
$4,185 811.754 811,589 $2,334 $5,238 $22,680 $10,551 $16,255 $25,884 $74550 $7,779
4 4 2 4 2 2 1 14 2
2 4 2 0 8 8 4 92 1
2 4 0 0 4 4 4 60 1
2 4 0 0 2 2 2 12 1
2 4 0 0 0 0 4 12 1
1 4 24 0 0 0 0 0 1
1 16 111 0 4 4 0 Q 76 0
14 40 44 4 0 18 18 15 190 76 7
$3,232 $6,403 68, 557 $ 775 $0 $3. 501 43,501 $2,910 $24,107 99,455 $010
8 0 0 0 0 0 0 0 0 0 0
24 8 0 0 0 0 0 0 0 0 0
12 9 0 0 0 0 0 0 0 0
44 17 0 0 0 0 U 0 0 0 0
$10,159 $5,571 $0 $0 $0 $0 $0 $0 $0 $0 $0
$580
$1,800 $0 $1,500
$1,750 $0 $240
$2,550
$18,310
108 143 150 18 27 137 77 105 499 855 11
$24,473 $32 ,142 $29,172 43,501 45,238 $20,444 $14975 $20,370 $62,932 $54,154 $10,343
$19,520
$105,450 $22,000 4128,450
$141,300 $1,250 $1,800
$153,560
$483,550
ESTIMATED ENGINEERING HOURS AND COSTS
South Tahoe Public Utility District
Twin Peaks Booster Pump Station and Waterline Replacement
South Tahoe
Public Utility Diatrict
~I""'"
~ H.ec6rte
~
EmIe .CIaUdIO
J4mw K. Jotw
t.uty I.Dl.f ~
".u JaM
1215.M6adowCnt&t ~. South labs Tahoe. CA ~
Phone 5!0 544 0474' PIJx 5eiO 541~
BOARD AGENDA ITEM 6b
TO:
Board of Directors
FROM:
MEETING DATE:
Nancy Hussmann, Human Resources Director
March 6, 2008
ITEM - PROJECT NAME: General Manager Contract and Salary Range
REQUESTED BOARD ACTION: (1) Establish 2008 salary range for General Manager;
(2) Correct clerical error in General Manager Contract; and (3) Authorize execution of
same.
DISCUSSION: The contract for the General Manager provides for a salary adjustment
effective January 24, 2008, which shall be set between 95% and 105% of the survey
maximum for the three industry surveys utilized for the General Manager position. All
survey figures have been received, and presented to the Executive Committee. The
General Manager met with the Executive Committee and a recommendation will be
made to the full Board.
During review of the contract, a clerical error was discovered, which is a discrepancy
between the contract term and term date. The intent was for the contract to be in effect
for three and a half years starting May 31, 2007. This would make the contract
expiration date as January 20, 2011 (not January 20, 2010, as stated in the contract).
SCHEDULE: Notify payroll of salary adjustment retroactive to January 24, 2008 and
correct contract.
COSTS:
ACCOUNT NO: 1021-2021-4101
BUDGETED AMOUNT REMAINING: $69,699
ATTACHMENTS:
CONCURRENCE WITH REQUESTE~A N:
GENERAL MANAGER: YES _ NO
CHIEF FINANCIAL OFFICER: YES <- NO
CATEGORY: General
-25-
PAYMENT OF CLAIMS
FOR APPROVAL
March 6, 2008
Payroll 2/27/08
Total Payroll
BNY Western Trust Company
CDS-health care payments
Brownstein/HyatUFarber/Schreck legal services
LaSalle Bank
Union Bank
Total Vendor EFT
Accounts Payable Checks-Sewer Fund
Accounts Payable Checks-Water Fund
Accounts Payable Checks-Self-funded Insurance
Accounts Payable Checks-Grants Fund
Total Accounts Payable
Grand Total
Pavroll EFTs & Checks
EFT
EFT
EFT
CHK
EFT
EFT
CHK
EFT
CHK
EFT
CHK
AFLAC Medical & Dependent Care
CA Employment Taxes & W/H
Federal Employment Taxes & W/H
CalPERS Contributions
John Hancock Pension Loan Pmts
Great West Deferred Comp
Stationary Engineers Union Dues
United Way Contributions
CA State Disbursement Unit
Employee Direct Deposits
Employee Paychecks
Total
-27-
2/27/08
4,117.15
14,056.20
86,417.03
25,585.26
2,134.01
15,926.05
2,083.58
86.00
460.15
189,654.26
14,372.61
354,892.30
354,892.30
354,892.30
0.00
42,747.89
22,351.98
0.00
0.00
65,099.87
191,838.03
382,660.14
18,757.07
0.00
593,255.24
1,013,247.41
Vendor Name
ACWA SERVICES CORP (ASC)
Department / Proi Name
GEN & ADMIN
PAYMENT OF CLAIMS
Description
VISION INS
Acct# / Proi Code Amon Check Num Type
1000 - 2530 2,543.58
Check Total: 2,543.58 AP -00068924 MW
ADMINISTRATIVE PROFESSIONAL ADMINISTRATION SUBSCRIPTIONS 1021 - 4830 36.50
ADMINISTRATIVE PROFESSIONAL ADMINISTRATION SUBSCRIPTIONS 2021 - 4830 36.50
Check Total: 73.00 AP- 00068925 MW
AIR PERFECTION DIAMOND VLY RNCH GROUNDS & MNTC 1028 - 6042 50.90
Check Total: 50.90 AP -00068926 MW
ALPEN SIERRA COFFEE COMPANY FINANCE OFC SUPPLY ISSUE 1039 - 6081 181.00
Check Total: 181.00 AP -00068927 MW
ALPINE EYECARE LLC HUMAN RESOURCES SAFETY/EQUIP/PHY 1022 - 6075 248.00
ALPINE EYECARE LLC HUMAN RESOURCES SAFETY/EQUIP/PHY 2022 - 6075 248.00
Check Total: 496.00 AP -00068928 Mw
ALSBURY, JAY HEAVY MAINT TRAVEUMEETINGS 1004 - 6200 224.68
Check Total: 224.68 AP- 00068929 MW
AMERIGAS - SO LAKE TAHOE DIAMOND VLY RNCH PROPANE 1028 - 6360 85.80
1
N Check Total: 85.80 AP- 00068930 MW
w
ARAMARK UNIFORM SERVICES GEN & ADMIN UNIFORM PAYABLE 1000 - 2518 1,274.08
Check Total: 1 274708 AP -00068931 MW
ARCE, DANIEL LABORATORY TRAVEUMEETINGS 1007 - 6200 77.93
ARCE, DANIEL LABORATORY TRAVEUMEETINGS 2007 - 6200 77.92
Check Total: 155.85 AP -00068932 MW
ARETE SYSTEMS INFORMATION SYS - GIS SOFTWARE GIS IMPL 1037 - 8638 - GISSFT 6,525.00
Check Total: 6.525.00 AP -00068933 MW
ASPEN PUBLISHERS INC. FINANCE OFFICE SUPPLIES 1039 - 4820 148.54
ASPEN PUBLISHERS INC. FINANCE SUBSCRIPTIONS 1039 - 4830 79.37
ASPEN PUBLISHERS INC. FINANCE OFFICE SUPPLIES 2039 - 4820 148.54
ASPEN PUBLISHERS INC. FINANCE SUBSCRIPTIONS 2039 - 4830 79.36
Check Total: 455.81 AP -00068934 MW
ASSOCIATED LABORATORIES LABORATORY MONITORING 1007 - 6110 315.00
Check Total: 315.00 AP -00068935 MW
AT &T GEN & ADMIN SIGNAL CHARGES 1000 - 6320 27.88
User: THERESA Page: 1 Current Date: 02/28/2008
Report: OH_PMT_CLAIMS_BK Current Time: 09:59:28
Vendor Name
AT &T /CALNET 2
AT &T /CALNET 2
AT &T /CALNET 2
AT &T /CALNET 2
AT &T /CALNET 2
AT &T /CALNET 2
AT &T /CALNET 2
AT &T/MCI
AUERBACH ENGINEERING CORP
BAY TOOL & SUPPLY INC
BB &H BENEFIT DESIGNS
BB &I BENEFIT DESIGNS
BI STATE PROPANE
BING MATERIALS
BING MATERIALS
BING MATERIALS
BLUE RIBBON TEMP PERSONNEL
BLUE RIBBON TEMP PERSONNEL
BLUE RIBBON TEMP PERSONNEL
BLUE RIBBON TEMP PERSONNEL
BLUE RIBBON TEMP PERSONNEL
BLUE RIBBON TEMP PERSONNEL
BLUE RIBBON TEMP PERSONNEL
BLUE RIBBON TEMP PERSONNEL
User: THERESA
Report: OH_PMT_CLAIMS BK
Department / Prof Name
GEN &ADMIN
PUMPS
OPERATIONS
INFORMATION SYS
GEN & ADMIN
PUMPS
INFORMATION SYS
PUMPS
ENGINEERING - UPPER DRESSLER
GEN & ADMIN
HUMAN RESOURCES
HUMAN RESOURCES
GEN & ADMIN
DIAMOND VLY RNCH
DIAMOND VLY RNCH
ENGINEERING - AIRPORT WL EVAL
FINANCE
FINANCE - WTRLN,AL TAHOE
FINANCE - UPPER DRESSLER
FINANCE - ICR TMDL
FINANCE - LT WTRTRT PTSHP
FINANCE
FINANCE - WTRLN/WATER CNSV
FINANCE - WTR CONS PROG
PAYMENT OF CLAIMS
Page: 2
Description
TELEPHONE
TELEPHONE
TELEPHONE
TELEPHONE
TELEPHONE
TELEPHONE
TELEPHONE
TELEPHONE
DRSSLR DTCH,UPR
SMALL TOOLS INV
CONTRACT SERVICE
CONTRACT SERVICE
PROPANE
GROUNDS & MNTC
ROAD CONST,DVR
AIRPORT WL EVAL
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
Acct# / Pro1 Code
1000 - 6310
1002 - 6310
1006 - 6310
1037 - 6310
2000 - 6310
2002 - 6310
2037 - 6310
1002-6310
Check Total:
Check Total:
Check Total:
1029 - 7062 - DRSSLR
Check Total:
1000 - 0423
1022 - 4405
2022-4405
1000 - 6360
Check Total:
Check Total:
Check Total:
1028 - 6042
1028 - 8687
2029 - 7068 - AIRWLI
Check Total:
1039 - 4405
2039 - 4405 - ATWL08
2039 - 4405 - DRSSLR
2039 - 4405 - ICTMDL
2039 - 4405 - LTWWIP
2039 - 4405
2039 - 4405 - PROP50
2039 - 4405 - WCPROG
Current Date: 02/28/2008
Current Time: 09:59:28
Amount Check Num Tvpe
27.88 AP- 00068938 MW
7.76
20.84
21.85
82.74
7.76
20.83
82.73
244.51 AP -00068936
0.37
0.37 AP -00068937
186.75
186.75 AP -00068939
463.22
463.22 AP -00068940
624.50
624.50
1,249.00 AP -00068941
68.67
68.67 AP -00068942
221.84
139.67
418.35
MW
MW
MW
MW
MW
MW
779.86 AP -00068943 MW
915.89
82.02
136.70
136.70
82.02
915.89
54.68
300.74
Vendor Name
BOYLE ENGINEERING CORP
BROWN & CALDWELL CONSULTANTS
BROWN & CALDWELL CONSULTANTS
BROWN, LINDA
BROWN, LINDA
BSK ANALYTICAL LABS
BSK ANALYTICAL LABS
CALIF BOARD OF EQUALIZATION
CAMPBELL AUD, NANCI
CAMgBELL AUD, NANCI
CAPITOL WEBWORKS LLC
CAPITOL WEBWORKS LLC
CARDINALE
CARDINALE
CAROLLO ENGINEERS
CARTER, LARRY
CARTER, LARRY
CDS GROUP HEALTH
CDW - G CORP
User: THERESA
Report: OH_PMT CLAIMS_BK
Department / Proi Name Description
ENGINEERING - SUT WELL REDRILL SUT WELL REDRILL
ENGINEERING - C CLUB TNK REPL
ENGINEERING - ANGORA TNK REPL
FINANCE
FINANCE
LABORATORY - ARHD3 TRTMT EXP
LABORATORY - HERBST
ENGINEERING
HUMAN RESOURCES
HUMAN RESOURCES
DIO
DIO
EQUIPMENT REP
EQUIPMENT REPAIR
ENGINEERING - ARSENIC STUDY
HUMAN RESOURCES
HUMAN RESOURCES
SELF FUNDED INS
ENGINEERING
PAYMENT OF CLAIMS
TANK, COUNTRY CL
TANK, ANGORA
Acct# / Proi Code
TRAVEL/MEETINGS 1039 - 6200
TRAVEL/MEETINGS 2039 - 6200
MONITORING
MONITORING
OPERATING PERMIT 2029 - 6650
SAFETY/EQUIP/PHY 1022 - 6075
SAFETY/EQUIP/PHY 2022 - 6075
CONTRACT SERVICE 1027 - 4405
CONTRACT SERVICE 2027 - 4405
AUTOMOTIVE 1005 - 6011
AUTOMOTIVE 2005 - 6011
ARSNC TRTMNT
CONTRACT SERVICE 1022 - 4405
CONTRACT SERVICE 2022 - 4405
PPO FEE 3000 - 6742
OFFICE SUPPLIES 1029 - 4820
Page: 3
Check Total:
2029 - 8463 - RWSUTR
Check Total:
2029 - 7063 - CLUBTK
2029 - 7064 - ANGOTK
Check Total:
Check Total:
2007 - 6110 - AH3EXP
2007 - 6110 - HERBST
Check Total:
Check Total:
Check Total:
Check Total:
Check Total:
2029 - 8864 - ARSNIC
Check Total:
Check Total:
Check Total:
Current Date: 02/28/2008
Current Time: 09:59:28
Amount Check Num TIM
2 624.64 AP -00068944 MW
11,411.16
127.26
45.00
45.00
90.00
8.52
5.11
5.10
11,411.16 AP -00068945 MW
6,223.85
6,223.85
12,447.70 AP -00068946 MW
63.63
63.63
AP -00068947 MW
AP -00068948 MW
8.52 AP -00068949 MW
26.00
26.00
52.00 AP -00068950 MW
22.50
22.50
45.00 AP -00068951 MW
10.21 AP -00068952 MW
4,581.00
4,581.00 AP -00068953 MW
AP -00068954 MW
AP- 00068955 MW
300.00
300.00
600.00
2,273.75
2,273.75
323.70
Vendor Name
CDW - G CORP
CDW - G CORP
CHERNAGO, BRIAN
CHERNAGO, BRIAN
CREEK ENVIRONMENTAL LABS
CREEK ENVIRONMENTAL LABS
CREEK ENVIRONMENTAL LABS
CREEK ENVIRONMENTAL LABS
CREEK ENVIRONMENTAL LABS
CROSSPOINTE PARTNERS LLC
CROSSPOINTE PARTNERS LLC
CWEI
CWEA
CWEA
CWEA SIERRA SECTION
CWEA SIERRA SECTION
CWEA SIERRA SECTION
EMPIRE SAFETY & SUPPLY
ENTRIX INC
ENTRIX INC
FAMILY ENTERPRISES
FERGUSON ENTERPRISES INC.
FERGUSON ENTERPRISES INC.
User: THERESA
Report: OH_PMT CLAIMS BK
Department / Prol Name
ENGINEERING
INFORMATION SYS
LABORATORY
LABORATORY
LABORATORY
LABORATORY
LABORATORY -
LABORATORY -
LABORATORY-
DIO
DIO
UNDERGROUND REP
ELECTRICAL SHOP
CUSTOMER SERVICE
OPERATIONS
LABORATORY
LABORATORY
GEN & ADMIN
- ARHD3 TRTMT EXP
BEACON CONTAM
BKRFLD TRTMT EXP
HERBST
ENGINEERING - AIRPORT WL EVAL
ENGINEERING - SUT WELL REDRILL
DIO - PR EXP - EXTERNAL
HEAVY MAINT
OPERATIONS
PAYMENT OF CLAIMS
Page: 4
Description
OFFICE SUPPLIES
SFTWR, DIS RECVR
TRAVEL/MEETINGS
TRAVEL/MEETINGS
MONITORING
MONITORING
MONITORING
MONITORING
MONITORING
CONTRACT SERVICE
CONTRACT SERVICE
DUES/MEMB /CERT
DUES/MEMB /CERT
DUES/MEMB /CERT
TRAVEL/MEETINGS
TRAVEL/MEETINGS
TRAVEL/MEETINGS
SAFETY INVENTORY
AIRPORT WL EVAL
SUT WELL REDRILL
PUB RELATIONS
GUTTERS EQUIP RE
REPL POLY PUMP
Acct# / Proi Code
2029 - 4820
2037 - 8899
1007 - 6200
2007 - 6200
1007 - 6110
2007 - 6110 - AH3EXP
2007 - 6110 - BEACON
2007 - 6110 - BKRFLD
2007 - 6110 - HERBST
Check Total:
1027 - 4405
2027 - 4405
1001 - 6250
1003 - 6250
2038 - 6250
1006 - 6200
1007 - 6200
2007 - 6200
1000 - 0425
1004 - 7542
1006 - 8859
Check Total:
Check Total:
Check Total:
Check Total:
Check Total:
Check Total:
2029 - 7068 - AIRWLI
2029 - 8463 - RWSUTR
Check Total:
2027 - 6620 - PREEXT
Check Total:
Current Date: 02/28/2008
Current Time: 09:59:28
Amount Check Num Type
323.72
2,021.37
2.668.79 AP -00068956 MW
86.18
86.17
172.35 AP -00068957 MW
610.00
190.00
190.00
190.00
190.00
1,370.00 AP -00068958 MW
2,750.00
2,750.00
5,500.00 AP -00068959 MW
81.00
61.00
110.00
252.00 AP -00068961 MW
35.00
52.50
52.50
140.00
239.03
239.03
6,021.60
1,213.22
7,234.82
475.00
47 5.00
839.68
64.56
AP -00068960 MW
AP- 00068962 MW
AP -00068963 MW
AP- 00068964 MW
Vendor Name
Department / Proi Name Description Acct# / Proi Code Amount Check Num Type
Check Total: 904.24 AP -00068965 MW
FISHER SCIENTIFIC LABORATORY LAB SUPPLIES 1007 - 4760 366.89
FISHER SCIENTIFIC LABORATORY LAB SUPPLIES 2007 - 4760 437.04
Check Total: 803.93 AP- 00068966 MW
FRYE, WILLIAM INFORMATION SYS TRAVEL/MEETINGS 1037 - 6200 93.43
FRYE, WILLIAM INFORMATION SYS TRAVEL/MEETINGS 2037 - 6200 93.42
Check Total: 186.85 AP -00068967 MW
GERBER LIFE INSURANCE COMPANY SELF FUNDED INS EXCESS INSURANCE 3000 - 6744 15,822.52
Check Total: 15,822.52 AP -00068968 MW
GRAINGER GEN & ADMIN SHOP SUPPLY INV 1000 - 0421 60.12
GRAINGER GEN & ADMIN SMALL TOOLS INV 1000 - 0423 258.34
GRAINGER HEAVY MAINT BUILDINGS 1004 - 6041 103.70
GRAINGER EQUIPMENT REP GENERATORS 1005 - 6013 253.34
Check Total: 675.50 AP -00068969 MW
HAEN CO INC, THOMAS ENGINEERING - SUT WELL REDRILL CONST RETAINAGE 2029 - 2605 - RWSUTR - 654.80
HAEWCO INC, THOMAS ENGINEERING - SUT WELL REDRILL SUT WELL REDRILL 2029 - 8463 - RWSUTR 196,197.54
tv
Check Total: 195,542.74 AP -00068970 MW
HARTFORD, THE GEN & ADMIN LIFE INS 1000 - 2512 1,962.09
HARTFORD, THE GEN & ADMIN LTD, UNION 1000 - 2539 1,758.62
HOLT OF CALIFORNIA
HOLT OF CALIFORNIA
INDUSTRIAL SAFETY
INSTY- PRINTS INC
INSTY- PRINTS INC
INSTY- PRINTS INC
INSTY- PRINTS INC
INSTY - PRINTS INC
INTERSTATE SAFETY & SUPPLY
PAYMENT OF CLAIMS
EQUIPMENT REP AUTOMOTIVE 1005 - 6011 106.60
EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 106.60
Check Total: 213.20 AP -00068972 MW
HEAVY MAINT DOCKING STN 1004 - 7548 2,670.05
Check Total: 2,670.05 AP -00068973 MW
OPERATIONS SHOP SUPPLIES 1006 - 6071 224.42
DIO PRINTING 1027 - 4920 1,538.26
FINANCE OFFICE SUPPLIES 1039 - 4820 375.61
DIO PRINTING 2027 - 4920 1,789.39
FINANCE OFFICE SUPPLIES 2039 - 4820 375.60
Check Total: 4.303.28 AP -00068974 MW
GEN & ADMIN SAFETY INVENTORY 1000 - 0425
User: THERESA Page: 5
Report: OH_PMT_CLAIMS_BK
Check Total: 3,720.71 AP -00068971 MW
542.40
Current Date: 02/28/2008
Current Time: 09:59:28
Vendor Name
Department / Proi Name
INTERSTATE SAFETY & SUPPLY OPERATIONS
Acct# / Proi Code Amount Check Num Tvoe
1006 - 4760 130.65
Check Total: 673.05 AP -00068975 MW
JANITORIAL SERV 1039 - 6074 1,603.50
JANITORIAL SERV 2039 - 6074 1,603.50
Check Total: 3,207.00 AP -00068976 MW
JEFFCO INC FINANCE OFFICE SUPPLIES 1039 - 4820 17.69
JEFFCO INC FINANCE OFFICE SUPPLIES 2039 - 4820 17.70
Check Total: 35.39 AP -00068977 MW
KAMAN INDUSTRIAL TECHNOLOGIES HEAVY MAINT BUILDINGS 1004 - 6041 64.10
Check Total: 64.10 AP -00068978 MW
KRLT & KOWL RADIO DIO - PR EXP- EXTERNAL PUB RELATIONS 2027 - 6620 - PREEXT 1,860.00
J &L PRO KLEEN INC
J &L PRO KLEEN INC
User: THERESA
Report: OH_PMT CLAIMS_BK
FINANCE
FINANCE
PAYMENT OF CLAIMS
Description
LAB SUPPLIES
Check Total: 1,860.00 AP -00068979 MW
LAKE VALLEY FIRE DISTRICT PUMPS LAND & BUILDINGS 2002 - 5010 5,049.42
1
W Check Total: 5.049.42 AP -00068981 MW
LIVE WIRE MEDIA PARTNERS DIO - PR EXP- EXTERNAL PUB RELATIONS 2027 - 6620 - PREEXT 336.00
Check Total: 336.00 AP -00068982 MW
MC MASTER CARR SUPPLY CO HEAVY MAINT SHOP SUPPLIES 1004 - 6071 22.42
MC MASTER CARR SUPPLY CO ENGINEERING - SUT WELL REDRILL SUT WELL REDRILL 2029 - 8463 - RWSUTR 648.35
Check Total: 670.77 AP -00068983 MW
McQUEARY EXCAVATING INC, MARV GEN & ADMIN - WTRLN,GRD MTN CONST RETAINAGE 2000 - 2605 - GMWL07 61,800.38
Check Total: 61,800.38 AP -00068984 MW
MID MOUNTAIN COMMUNICATIONS EQUIPMENT REP AUTOMOTIVE 1005 - 6011 1,510.18
MID MOUNTAIN COMMUNICATIONS DIAMOND VLY RNCH GROUNDS & MNTC 1028 - 6042 18.75
Check Total: 1,528.93 AP -00068985 MW
MORISON, ROBERT GEN & ADMIN UB SUSPENSE 1000 - 2002 81.45
MORISON, ROBERT GEN & ADMIN UB SUSPENSE 2000 - 2002 111.40
Check Total: 192.85 AP- 00068986 MW
MWH LABORATORIES LABORATORY MONITORING 1007 - 6110 10.00
Check Total: 10.0Q AP- 00068987 MW
Page: 6 Current Date: 02/28/2008
Current Time: 09:59:28
Vendor Name
MY OFFICE PRODUCTS
MY OFFICE PRODUCTS
NEOGOV
NEOGOV
NEOGOV
NEOGOV
NEOGOV
NEOGOV
NEVADA BLUE
NEVADA BLUE
NEVADA GENERATOR SYSTEMS
NEXI.EVEL INFORMATION TECH INC
NEXLEVEL INFORMATION TECH INC
NORTHWEST HYD. CONSULT INC
NORTHWEST HYD. CONSULT INC
OFFICE MAX
OFFICE MAX
OFFICE MAX
OFFICE MAX
OFFICE MAX
OLIN CHLOR ALKALI PRODUCTS
P K SAFETY SUPPLY
PDM STEEL
User: THERESA
Report: OH_PMT CLAIMS_BK
Department / Proi Name
CUSTOMER SERVICE
CUSTOMER SERVICE
HUMAN RESOURCES
HUMAN RESOURCES,
HUMAN RESOURCES
HUMAN RESOURCES
HUMAN RESOURCES
HUMAN RESOURCES
ENGINEERING
ENGINEERING
EQUIPMENT REP
INFORMATION SYS - IT STRATEGC PLN CONTRACT SERVICE
INFORMATION SYS - IT STRATEGC PLN CONTRACT SERVICE
ENGINEERING - CTC GRNT -BMPs
ENGINEERING - CTC GRNT -BMPs
GEN & ADMIN
ENGINEERING
FINANCE
ENGINEERING
FINANCE
OPERATIONS
PUMPS
HEAVY MAINT
PAYMENT OF CLAIMS
Description
OFFICE SUPPLIES
OFFICE SUPPLIES
CONTRACT SERVICE
ADS /LGL NOTICES
SERVICE CONTRACT
CONTRACT SERVICE
ADS/LGL NOTICES
SERVICE CONTRACT
OFFICE SUPPLIES
OFFICE SUPPLIES
GEN, LPPS
BMP PROJECTS
BMP PROJECTS
OFFICE INVENTORY
OFFICE SUPPLIES
OFFICE SUPPLIES
OFFICE SUPPLIES
OFFICE SUPPLIES
HYPOCHLORITE
SAFETY /EQUIP/PHY
BUILDINGS
Page: 7 ._. _.
Acct# / Proi Code
1038 - 4820
2038 - 4820
1022 - 4405
1022 - 4930
1022 - 6030
2022 - 4405
2022 - 4930
2022 - 6030
1029 - 4820
2029 - 4820
Check Total:
Check Total:
Check Total:
1005 - 7539 13,887.60
Check Total: 13,887.60 AP- 00068991 MW
1037 - 4405 - ITPLAN 11,492.50
2037 - 4405 - ITPLAN 11,492.50
Check Total: 22,985.00 AP- 00068992 MW
1029 - 8737 - CTCBMP 6,490.57
2029 - 8745 - CTCBMP 6,490.56
Check Total: 12,981.13 AP- 00068993 MW
1000 - 0428 670.55
1029 - 4820 102.98
1039 - 4820 58.88
2029 - 4820 106.91
2039 - 4820 58.89
Check Total: 998.21 AP- 00068995 MW
1006 - 4755 3,856.09
Check Total: 3,856.09 AP- 00068996 Mw
1002 - 6075 609.84
Check Total: 609.84 AP- 00068997 MW
1004 -6041 119.41
Current Date: 02/28/2008
Current Time: 09:59:28
Amount Check Num Type
57.11
57.11
114.22 AP- 00068988 MW
625.00
300.00
1,500.00
625.00
300.00
1,500.00
4,850.00 AP- 00068989
124.72
111.63
MW'
236.35 AP- 00068990 MW
Vendor Name
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
w
PRAXAIR 174
PRAXAIR 174
PROGRESSIVE BUSINESS
PROGRESSIVE BUSINESS
RACO INDUSTRIES
RACO INDUSTRIES
RENO GAZETTE- JOURNAL
ROMINGER, ROSE MARIE
ROMINGER, ROSE MARIE
RSN SPORTS NETWORK
User: THERESA
Report: OH_PMT_CLAIMS_BK
Peoartment / Prol Name
OPERATIONS
BOARD OF DIR
ADMINISTRATION
DIAMOND VLY RNCH
CUSTOMER SERVICE
FINANCE
FINANCE
FINANCE
BOARD OF DIR
ADMINISTRATION
CUSTOMER SERVICE
FINANCE
FINANCE
FINANCE
LABORATORY
LABORATORY
HUMAN RESOURCES
HUMAN RESOURCES
LABORATORY
LABORATORY
ENGINEERING - ARSENIC STUDY
GEN & ADMIN
GEN & ADMIN
DIO - PR EXP- EXTERNAL
PAYMENT OF CLAIMS
Description
DUES/MEMB /CERT
TRAVEL/MEETINGS
INCNTV & RCGNTN
TRAVEL/MEETINGS
OFFICE SUPPLIES
POSTAGE EXPENSES
OFFICE SUPPLIES
TRAVEUMEETINGS
TRAVEUMEETINGS
INCNTV & RCGNTN
OFFICE SUPPLIES
POSTAGE EXPENSES
OFFICE SUPPLIES
TRAVEUMEETINGS
LAB SUPPLIES
LAB SUPPLIES
SAFETY PROGRAMS
SAFETY PROGRAMS
OFFICE SUPPLIES
OFFICE SUPPLIES
ARSNC TRTMNT
CAPACITY CHARGE
CAPACITY CHARGE
PUB RELATIONS
Page: 8
Acct# / Prol Code
1006 - 6250
1019 - 6200
1021 - 6621
1028 - 6200
1038 - 4820
1039 - 4810
1039 - 4820
1039 - 6200
2019 - 6200
2021 - 6621
2038 - 4820
2039 - 4810
2039 - 4820
2039 - 6200
1007 - 4760
2007 - 4760
1022 - 6079
2022 - 6079
1007 - 4820
2007 - 4820
2027 - 6620 - PREEXT
Check Total:
Check Total:
Check Total:
Check Total:
Check Total:
2029 - 8864 - ARSNIC
Check Total:
2000 - 3401
2000 - 3401
Check Total:
Check Total:
Current Date: 02/28/2008
Current Time: 09:59:28
Amount
119.41
32.25
10.71
37.84
10.00
50.62
4.13
1.61
14.92
10.69
37.84
50.61
4.12
1.60
14.91
Check Nunn T_YN
AP -00068998 MW
281.85 AP -00068999 MW
103.99
103.98
207.97 AP -00069000 MW
432.00
432.00
864.00 AP -00069001 MW
74.55
88.59
163.14 AP -00069002 MW
112.90
112.90 AP -00069003 MW
2,734.00
2,734.00 AP -00069004 MW
709.00
709.00 AP -00069005 MW
2,087.00
PAYMENT OF CLAIMS
Vendor Name Department / Proi Name Description
SACRAMENTO BEE, THE ENGINEERING - ARSENIC STUDY ARSNC TRTMNT
SCHWAB TIRES, LES EQUIPMENT REPAIR AUTOMOTIVE
SIANO, CHRIS OPERATIONS TRAVEL/MEETINGS
Acct# / Proi Code
Check Total:
2029 - 8864 - ARSNIC
Check Total:
Check Total:
Check Total:
2005 - 6011
1006-6200
SOUTH SHORE MOTORS EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 44.32
Amount Check Num I n
2,087.00 AP -00069006 MW
632.26
632.26 AP -00069007 MW
522.25
522.25 AP -00069008 MW
237.00
237.00 AP -00069009 MW
SIERRA NEVADA CLASSIFIEDS ENGINEERING - ARSENIC STUDY ARSNC TRTMNT 2029 - 8864 - ARSNIC 144.20
Check Total: 144.20 AP -00069010 MW
SIERRA PACIFIC POWER GEN & ADMIN ELECTRICITY 1000 - 6330 78,081.15
SIERRA PACIFIC POWER GEN & ADMIN ELECTRICITY 2000 - 6330 23,105.86
Check Total: 101 87.01 AP -00069011 MW
SIERRA SPRINGS GEN & ADMIN SAFETY INVENTORY 1000 - 0425 1,107.11
SIERRA SPRINGS UNDERGROUND REP SUPPLIES 1001 - 6520 36.07
SIERRA SPRINGS PUMPS SUPPLIES 1002 - 6520 2.43
SIERA SPRINGS ELECTRICAL SHOP SUPPLIES 1003 - 6520 12.02
SIERRA SPRINGS HEAVY MAINT SUPPLIESi 1004 - 6520 36.07
SIERRA SPRINGS EQUIPMENT REP SUPPLIES 1005 - 6520 12.02
SIERRA SPRINGS OPERATIONS SUPPLIES 1006 - 6520 36.07
SIERRA SPRINGS DIAMOND VLY RNCH SUPPLIES 1028 - 6520 12.02
SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 1038 - 6520 12.02
SIERRA SPRINGS UNDERGROUND REP SUPPLIES 2001 - 6520 36.07
SIERRA SPRINGS PUMPS SUPPLIES 2002 - 6520 9.63
SIERRA SPRINGS ELECTRICAL SHOP SUPPLIES 2003 - 6520 12.02
SIERRA SPRINGS EQUIPMENT REPAIR SUPPLIES 2005 - 6520 12.02
SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 2038 - 6520 12.02
Check Total: 1,347.59 AP -00069012 MW
SKELLY, CHRIS INFORMATION SYS TRAVEL/MEETINGS 1037 - 6200 88.38
SKELLY, CHRIS INFORMATION SYS TRAVEL/MEETINGS 2037 - 6200 88.37
Check Total: 176.75 AP -00069013 MW
Check Total: 44.32 AP- 00069014 MW
User: THERESA Page: 9 Current Date: 02/28/2008
Report: OH_PMT CLAIMS_BK Current Time: 09:59:28
Vendor Name
SOUTH TAHOE NEWSPAPER AGENCY
SOUTH TAHOE NEWSPAPER AGENCY
Acct# / Proi Code Amount Check Num IYR
1021 - 4830 26.94
2021 - 4830 26.94
Check Total: 53.88 AP -00069015 MW
SOUTHWEST GAS GEN & ADMIN NATURAL GAS 1000 - 6350 229.65
SOUTHWEST GAS GEN & ADMIN NATURAL GAS 2000 - 6350 188.29
Check Total: 417.94 AP -00069016 MW
SOUTHWEST VALVE LLC ENGINEERING - C CLUB TNK REPL TANK, COUNTRY CL 2029 - 7063 - CLUBTK 2,506.28
Check Total: 2,506.28 AP -00069017 MW
SRECO FLEXIBLE EQUIPMENT REP AUTOMOTIVE 1005 - 6011 565.24
Check Total: 565.24 AP -00069018 MW
SUBSTITUTE PERSONNEL & ENGINEERING - COLL SYS MASTER COLL SYS MST PLN 1029 - 8721 - CSMSPL 5,640.70
Check Total: 5,640.70 AP -00069019 MW
SUNGARD BI -TECH INC. INFORMATION SYS - IFAS MIGRATION IFAS REPL/ENHAN 1037 - 8448 - NUIFAS 825.00
Check Total: 825.00 AP -00069020 MW
SUTER ASSOCIATES, LYNN M. DIO CONTRACT SERVICE 1027 - 4405 1,225.00
SUTER ASSOCIATES, LYNN M. DIO CONTRACT SERVICE 2027 - 4405 1,225.00
Check Total: 2 50.00 AP -00069021 MW
TAHOE BLUEPRINT ENGINEERING - C CLUB TNK REPL TANK, COUNTRY CL 2029 - 7063 - CLUBTK 120.08
TAHOE BLUEPRINT ENGINEERING - SUT WELL REDRILL SUT WELL REDRILL 2029 - 8463 - RWSUTR 42.88
Check Total: 162.96 AP -00069022 MW
TAHOE MOUNTAIN NEWS DIO - PR EXP- EXTERNAL PUB RELATIONS 2027 - 6620 - PREEXT 250.00
Check Total: 250.00 AP -00069023 MW
UNIVERSAL HEALTH NETWORK SELF FUNDED INS ADMIN FEE 3000 - 6741 660.80
Check Total: 660.80 AP -00069024 MW
USA BLUE BOOK PUMPS UPGR FLL ES6,7 &9 1002 - 8712 4,774.11
Check Total: 4 774.11 AP -00069025 MW
USA MOBILITY WIRELESS INC EQUIPMENT REP TELEPHONE 1005 - 6310 5.41
USA MOBILITY WIRELESS INC EQUIPMENT REPAIR TELEPHONE 2005 - 6310 5.40
Check Total: 10.81 AP -00069026 MW
VERIZON DIAMOND VLY RNCH TELEPHONE 1028 - 6310 195.55
User: THERESA
Department / Proi Name
ADMINISTRATION
ADMINISTRATION
PAYMENT OF CLAIMS
Description
SUBSCRIPTIONS
SUBSCRIPTIONS
Page: 10 Current Date: 02/28/2008
Report: OH_PMT CLAIMS_BK Current Time: 09:59:28
Check Total: 195.55 AP -00069027 MW
Vendor Name
VWR CORPORATION
VWR CORPORATION
WATER EDUCATION FOUNDATION
WATER EDUCATION FOUNDATION
WECO INDUSTRIES INC
WESTERN ENERGETIX INC
WESTERN ENERGETIX INC
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
a
WINZLER & KELLY CONSULT ENGRS
ZEE MEDICAL INC
ZEE MEDICAL INC
Department / Proi Name
LABORATORY
LABORATORY
ADMINISTRATION
ADMINISTRATION
UNDERGROUND REP
GEN & ADMIN
DIAMOND VLY RNCH
UNDERGROUND REP - ANGORA FIRE 07 G PIPE /CVRS /MHLS
ENGINEERING - AIRPORT WL EVAL
ENGINEERING - SUT WELL REDRILL
CUSTOMER SERVICE
ENGINEERING - EFFLUENT EVAL
GEN & ADMIN
GEN & ADMIN
User: THERESA Page: 11
Report: OH_PMT_CLAIMS BK
PAYMENT OF CLAIMS
Description
LAB SUPPLIES
LAB SUPPLIES
DUES/MEMB /CERT
DUES/MEMB /CERT
PIPE /CVRS /MHLS
GASOLINE INV
DIESEL
AIRPORT WL EVAL
SUT WELL REDRILL
WATER METERS
REP EXP PUMPS
SAFETY/EQUIP/PHY
SAFETY/EQU I P/PHY
Acct# / Proi Code
1007 - 4760
2007 - 4760
1021 - 6250
2021 - 6250
1001 - 6052
1000 - 0415
1028 - 4620
1000 - 6075
2000 - 6075
Check Total:
Check Total:
Check Total:
Check Total:
2001 - 6052 - FANG07
2029 - 7068 - AIRWLI
2029 - 8463 - RWSUTR
2038 - 6045
Check Total:
1029 - 8676 - EFFLEV
Check Total:
Check Total:
Grand Total:
Current Date: 02/28/2008
Current Time: 09:59:28
Amount Check Num Type
152.52
114.79
267.31 AP -00069028 MW
249.50
249.50
499.00 AP -00069029 MW
737.20
737.20 AP -00069030 MW
10,813.98
1,613.04
12,427.02 AP- 00069031 MW
- 1,671.31
752.20
38.94
10,516.40
9.636.23 AP -00069032 MW
9,612.16
9,612.16 AP -00069033 MW
551.94
551.92
1103.86 AP -00069034 MW
593,255.24
South Tahoe
PubHc Utility Diatrict
~ .......
fl:Id1M4 H. &IIrie
~
EmIe.Cblu4Io
J....1t ~
M.uyL(l(.I ~
D.~
1Z16 MBStJow ~ Pr1v8 · South Laktt. Tattoo · CA 96U5C
f"hCJl18 !530 544 6414. F.. 530. 541-00~
BOARD AGENDA ITEM 13a
TO:
FROM:
Board of Directors
Richard H. Solbrig, General Manager
MEETING DATE: March 6, 2008
ITEM - PROJECT: Conference with Legal Counsel- Existing Litigation
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding existing
litigation: Meyers Landfill Site - United States of America vs. EI Dorado Gounty and City
of South Lake Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK
GGH, United States District Court for the Eastern District of California.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED A
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
CATEGORY: Sewer
NO
NO
-39-
South Tahoe
Pul?Uc Utility Diatrict
~I""'"
~H.~
~
&ttIo.~
.....~ Jotw
~.LDu~
~~
t2$ MBSlAow Cnwt; DrIv8 · Sou1th Lak4.rahoo.CA saU5c
PhOl'te 5!0 544-0414' .a.. eao~
BOARD AGENDA ITEM 13b
TO:
Board of Directors
FROM:
Executive Committee (Mosbacher 1 Rise)
MEETING DATE:
March 6, 2008
ITEM - PROJECT NAME: Conference with Labor Negotiators
REQUESTED BOARD ACTION: Direct Negotiators
DISCUSSION: Pursuant to section 54957.6(a) of the California Government Code,
Closed Session may be held regarding contract negotiations for unrepresented
employee position.
Unrepresented Employee Position: General Manager
Agency Negotiators: Executive Committee, Board of Directors
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUeSTE~D AC .N:
GENERAL MANAGER: YES . NO
CHIEF FINANCIAL OFFICER: YES :c.... NO
CATEGORY: General
-41-
.~
~w
...
,.
tIJtIItr.r1w
We're here to get you there: - 14
-/....1.'-' ...",~.J::::},.I /)tJ) 6; r-:-
('L....... · ,,~, . '.. ,/'C:J /7~
Strategic Plan 2007-2012
Departmental Overview
TRANSPORTATION BOND PACKAGE IMPLEMENTATION
OVERVIEW:
The transportation portion of the bond package (Proposition 1 B)
includes $19.925 billion for safety improvements and repairs to
State highways, upgrades to freeways to reduce congestion repairs
to local streets and roads, improvements to the seismic safety of
local bridges, expansion of public transit, reduction of air pollution,
and improvements to anti-terrorism security at the ports.
The package also includes protection of any future Proposition 42
transfers (Proposition 1 A). It would allow the State to borrow the
money, but pay it back within three years. It also would restrict the
State to only two such transactions every ten years.
Finally, the package includes legislation (AB 1039) to streamline
the environmental process while safeguarding environmental
protections. It also includes legislation (AB 1467) that authorizes
the State and regional agencies to engage in public-private
partnerships, as it relates to goods movement, to attract private
investment for the development of transportation infrastructure in
the State.
Proposition 1 B - Highway Safety, Traffic Reduction, Air Quality,
and Port Security Fund of 2006
Category of Investment
Total Bonds(in Billions)
Corridor Mobility Improvement Account
State Route 99 Corridor
Ports Infrastructure, Security and Air Quality
School Bus Retrofit for Air Quality
State Transportation Improvement Program (STIP)
Augmentation
Public Transportation Modernization, Improvement,
and Service Enhancement
Transit System Safety, Security, and Disaster
Response Account
State-Local Partnership Program Account
Local Bridge Seismic Retrofit
Highway-Railroad Crossing Safety Account
State Highway Operation and Protection Program
(SHOPP)
Local Street and Roads, Congestion Relief, and
Traffic Safety Account of 2006
$4.500
$1,000
$3.100
$0.200
$2.000
$4.000
$1.000
$1.000
$0.125
$0.250
$0.750
$2.000
TOTAL
$19.925
,.
lIIII1rItr
Performance Measures:
PM4.3A-C Statewide average for
Maintenance Level of Service in the
areas of:
Litter and Debris
Striping
Guardrail/
PM4.4A Percent of projects that have
updated environmental commitment
records and a Certificate of Environ-
mental Compliance at project close-
out.
PM4.4B Percentage of projects that
have an Enviromental Certification,
including an updated Environmental
Committements Record, at the ready-
to-list (RTL) milestone.
We're here to get you there! ..- 51
.
"t
~,
Strategic Plan 2007 -2012
Goals, Objectives, Strategies, and Performance Measures
Objective 4.3: By 2012, Increase Maintenance level of service
(LOS) scores to:
· 80 in Litter and Debris;
· 95 in Striping;
· 95 in Guardrail.
Strategies .
4.3.1 Improve the process of incorporating higher-performance,
lower-maintenance guardrail systems into projects.
4.3.2 Resource Maintenance based on inventory and workload in
order to meet Maintenance levels of service.
4.3.3 Research, procure, and utilize more durable materials for
striping.
4.3.4 Develop a comprehensive anti-litter campaign.
Objective 4.4: Each year, ensure environmental commitments
are documented and implemented on 100% of projects.
Strateaies:
4.4.1 Implement long-term planning of the management of
mitigation properties as part of Caltrans' stewardship
responsibility.
4.4.2 Initiate a collaborative effort to standardize GIS practices
throughout the State.
4.4.3 Create and populate the STEVE database and tracking tool.
Create standard operating procedures for using STEVE.
4.4.4 Better define environmental commitments through more
formal agreements and MOUe with regulatory agencies.
4.4.5 Continue to develop and implement the LD/IGR
statewide work plan designed to engage private and
public stakeholders to ensure mitigation strategies are
implemented.
4.4.6 Develop flexible funding for environmental commitments.
~~
(&n~ h"'ft2~
.,
CalTrans meeting and Presentation at SL T City Council
March 4,2008
Presentations by:
CalTrans District 3 Deputy Director: Wayne Lewis
Caltrans District 3 Chief Team Tahoe: Tom Brannon (530) 682-2969
CalTrans projects should be considered, "Events". If a planned project is
not able to remove all it's roadblocks before its scheduled start, then it
dies. In the old days the project would be delayed and not have to start
from scratch.
The project demands on CalTrans are so great that forming partnerships
with community entities is now the best way to get a project completed.
CalTrans has it's own toolbox. Unfortunately, some of these tools, like
those dealing with water filtration, are no long sufficient.
*"
Our expertise is building and maintaining roads not water filtration. We
would welcome a partnership with the South Tahoe Public Utility District to
design, build and maintain the needed filtration facilities.
''''
Email between the City ofSTL and TRPA
,
From: David Jinkens
Sent: Wednesday, March 05, 2008
To: Charles Emmett
Cc: City Council
Subject: Hwy 50 Update I issues
I have been a part of the discussions to move forward the Highway 50 Project for over
5 1/2 years. We have pressed Caltrans to do its part. I believe they are doing their
share and want them to do more. The Region needs to step up to the plate and
recognize and support that a fully funded and completed project is better than a piece-
meal approach. Until the Region, as part of its recommendations for the STIP,
recommend full funding for all segments and improvements, Caltrans is not obliged to
recommend or seek full funding from a variety of sources for the project as I have
been told in the past because it is not clear to them what our priorities are all about. It
has to be first to the region before we can argue that it has to be first
for Caltrans. Tom Brennan made this point perfectly clear in hs response to a
question at the City Council. Caltrans, TRPA, TTD and other supporters need to make
clear our Region's number 1 priority.
We need State, Federal, SNLPA, and other funds to make it happen. Caltrans needs
to do its part, and so does the region.
---------------------------------------------------------------------
---------------------------------------------------------------------
From: Charles Emmett
Sent: Wed 3/5/2008
To: David Jinkens
Cc: City Council
Subject: Hwy 50 Update I issues
Caltrans is pursuing this project under the heading of water quality. Although this
project provides suitable water quality benefits between Trout Creek and Lakeview,
there are only very limited improvements North of Lakeview. For this reason, the
Lakeview to Stateline portion of this project is not that critical for water quality
improvements. Further, the Executive Director of the Lahontan Water Board stated
that he concurred with this and suggested that he would rather delay this portion
of the water quality improvements until Caltrans was willing to
incorporate the more advanced water quality treatment measures that
have been used in other areas. So, although the treatment of this area is indeed
crucial to water quality, what is being proposed by Caltrans is not considered prudent
at this time for water quality purposes.
-'"
t
t-k::i.fcLtl_.~ () ,_.)-1-. b j J'-'"",",
t:NS
--{A ESOURCES}--
MEMORANDUM
TO:
FROM:
DATE:
SUBJECT:
Richard Solbrig, General Manager
David R. French
February 28, 2008
Washington Visit
On February 25 and 26, meetings where held with the District's congressional
delegation to discuss the fiscal year 2009 appropriations request. Attending the
meetings on behalf of District were Director Jim Jones and Public Information
Officer Dennis Cocking.
FY 2009 Appropriations Request
lake Tahoe Community Fire Protection Project
The District is seeking $5 million in federal assistance for planning, design,
permitting, materials, installation, and construction costs for water system
infrastructure (including waterlines, water storage tanks, booster pump stations,
multi-agency interconnections, and emergency power generation equipment)
which has a direct relationship to wildland fire suppression.
Summary
As a result of the meetings, the District's congressional delegation agreed to
pursue funding in the FY 2009 appropriations for the Lake Tahoe Community
Fire Protection Project. Expanding the request to include the entire Lake Tahoe
basin was recognized in the meetings as a positive means to elevate the regional
significance and focus on the extent of the threat of catastrophic fire to the
region. The meetings demonstrated that the District's congressional delegation
strongly supports its efforts to respond to catastrophic fire, as authorized under
the Tahoe Restoration Act.
ENS Resources, Inc.
1747 Pennsylvania Avenue, N.W., / Suite 420
Washington, D.C. 20006/ Telephone (202) 466-3755
Telefax: (202) 466-3787
www.ensresources.com
i
~
Congressional Meetings
A comprehensive PowerPoint presentation was prepared for all of the meetings
and used after an introduction by Director Jones. Dennis Cocking lead all of the
meeting participants through a background of the issue, basin-wide needs,
federal role and budget. Strengthening the presentation was awareness of
recent fires in the basin as highlighted by background pictures on the slides of
the Angora Fi reo
The first meeting was with Ryan Hunt, staff to Senator Feinstein, who worked
with the District last year on the successful request and is very familiar with the
issues. Hunt appreciated that the District took to heart the desire of the Senator
to focus FY09 appropriations on projects with regional significance. He
suggested that a single letter, signed by the entire partnership, be sent to
Senator Feinstein and Senator Reid.
This letter should address the need, note how priorities for the funds are
determined, include the requested funding level and acknowledge that the
District will receivelmanage the funds. The District ended the meeting by
expressing their appreciation for the efforts of the Senator to assist the district on
an array of issues and for her dedication to protect the region from catastrophic
fire.
The second meeting was with Brian McKeon, staff to Senator Boxer, who also
worked on the FY08 request. He appreciated the regional nature of the request
and expressed that it was a solid proposal that fits with the Senator's priorities.
He plans to work with Senator Feinstein's office as the appropriations process
moves forward.
The final meeting was with Congressman Doolittle and his Legislative Director
Evan Goitein. The Congressman was very interested in the Angora fire and how
efforts by the District helped prepare for and respond to the fire. He also wanted
to know how the FY09 request would improve the ability of those in the basin to
respond to future fires. Congressman Doolittle stated that he would do all he
could to support this request and at the same time expressed concern about the
outcomeltiming of FY09 appropriations. In closing, the District thanked
Congressman Doolittle for his many efforts on their behalf over the years.
Action Items
· Finalize Partnership letter for Senate Delegation (March)
· Arrange for District Congressional staff to visit the Partnership to discuss
the request and tour basin (March-April-May)
· Create a detailed budget for the project (March)
· Arrange meeting with the Office of Senator Reid together with the Incline
Village Washington representative (ENS)
2
,
'I
· Solicit letters of support for the request from a diverse cross-section of the
community (Ongoing)
· Transmit letter of thanks to meeting attendees
Outlook
The submittal of project requests to congressional offices jumpstarts the annual
appropriation process. Each member has their own procedure for the review of
these requests, which if approved will be submitted to the appropriation
subcommittees with jurisdiction over specific federal agencies or departments.
These subcommittees will then hold hearings, review the Administration's budget
proposal and begin the process of drafting individual spending bills.
Theoretically, all FY 2009 appropriations bills are to be signed into law by the
President by September 30, 2008, the last day of the FY 2008 federal fiscal year.
In recent years, Congress has failed to pass final spending bills until November,
December or even January. The following is a general timeline for congressional
action.
February to June - Subcommittees hold budget oversight hearings.
March and April - House and Senate Budget Committees pass a budget
resolution by April 15, setting the 302(a) allocation, or "top-line" for all
discretionary federal spending. (It is increasingly common that a formal budget
resolution is not agreed upon)
March/April/May - After reviewing appropriations requests from multiple
constituencies, Members and Senators will submit their priority requests to the
Appropriations Subcommittees.
May - House and Senate Appropriations Committees subdivide their allocations
which are distributed among the Subcommittees in the House and Senate.
May to July - Committees begin the "markup" process, setting targets for funding
of both national programs and earmarks.
Fall 2008/Spring 2009 - Conference reports are negotiated, passed and enacted
with funding outcomes for appropriations projects finalized and signed by the
President.
3
Lake Tahoe Community Fire
Prevention Partnership
2008/09 Update
D
• South Tahoe PUD (California) � ,
1)
• North Tahoe PUD (California) ?(),,
• Tahoe City PUD (California) ke
• Incline Village GID (Nevada) (A-
• Round Hill GID (Nevada) d �
• Douglas County Community Development (Nevada)
1
Background
• Prior to 1960's - Majority of water systems were
either small independent water companies or
private domestic wells
• Passage of Clean Water Act (1972) motivated
many small private system owners to seek
buyers due to increased regulations
• Public agencies began purchasing these
systems and interconnecting infrastructure
• Basin -wide, public water agencies serve over
20,000 residential customers and over 1,000
commercial customers
Background
• In most cases, agencies mandated to
provide domestic water service not fire
flows
• Systems were never designed, nor
intended, to provide water volumes and
pressures currently required by fire codes
• New fire codes can be adopted much
faster than infrastructure can be replaced
Local Water Agencies Response
• STPUD—Sincel994
— $25 million for waterline replacement
— $9 million for supply wells
— $1.5 million for booster pump stations
— $5.3 million for water storage tanks
— $6.2 million for emergency generators
• Similar expenditures by water agencies
basin -wide
The Federal Component
• TRA Sec. 2 (8) approximately 40 percent of the
trees in the Lake Tahoe basin are either dead or
dying, and the increased quantity of combustible
forest fuels has significantly increased the risk of
catastrophic forest fire in the Lake Tahoe basin;
• TRA Sec.2 (9) as the largest land manager in the
Lake Tahoe basin, with 77 percent of the land, the
Federal Government has a unique responsibility for
restoring environmental health to Lake Tahoe
• Long - standing policy of fire suppression in Lake
Tahoe Basin
• Long - standing history (until recently) of limited forest
thinning and fuel reduction /removal in Lake Tahoe
Basin
• With increased development, these policies have
created a "perfect storm" scenario for wild land fire
The Challenge
• South Tahoe PUD
— Recent study identified 185,000 lineal feet of
undersized waterlines (4" or less)
— Six -inch or larger lines necessary to provide
approximately 1,000 gpm fire flows
— Replacement costs for 6 -10" lines are estimated at
$300 /foot
— Project cost: $54 million in today's dollars
— At current agency budgetary levels - 20+ years to
complete
• Similar infrastructure challenges exist within
virtually all Lake Tahoe Basin water agencies
The Challenge
• In addition to waterlines, new storage tanks,
multi- agency interconnections, booster pump
stations, emergency generators, and additional
hydrants are also necessary.
• Sierra winters and TRPA grading requirements
narrow construction window to 5 -6 months per
year.
The Challenge
• The Gondola Fire, the Angora Fire, and the
Washoe Fire demonstrate that wildfire can move
from the forest to developed areas, from
developed areas to the forest, and does not
honor ten -year capital improvement plans.
• Federal and state funds will accelerate the
replacement of water infrastructure to enhance
the ability to fight the fires when they occur.
• They will occur
• Now is the time to act
Thank You