Loading...
Resolution 2820-06 ~ ~ ~ 29 30 1 2 3 4 5 RESOLUTION NO. 2820-06 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT AUTHORIZING DESIGNATED PERSONNEL TO DETERMINE IF PROJECT CONTRACTORS ARE IN SUBSTANTIAL COMPLIANCE WITH THE FIRST 50% OF PROJECT, AND AT THEIR DISCRETION, REDUCE THE RETENTION TO 5% OF THE TOTAL PROJECT 6 7 8 BE IT RESOLVED, by the Board of Directors of the South Tahoe Public Utility 9 District, County of EI Dorado, State of California, as follows: 10 General Manager, Assistant General Manager/Engineer, and Engineering Department Manager are hereby authorized to ascertain on behalf of the District, the 12 substantial completion of the first 50% of a construction project, and at their discretion, 13 reduce retention from 10% to 5% of the total project value in accordance with the 14 project specifications. 11 15 16 WE, THE UNDERSIGNED, do hereby certify that the above and foregoing 17 Resolution was duly adopted and passed by the Board of Directors of the South Tahoe 18 Public Utility District at a regularly scheduled meeting held on the 16th day of 19 November, 2006, by the following vote: 20 21 AYES: Directors \vallace, Jones, Schafer, Farrell, Mosbacher 22 23 24 25 26 27 28 ATTEST: NOES: None ABSENT: None