AP 09-20-01SOUTH TAHOE PUBLIC UTILITY DISTRICT
"Basic Services for a Complex World"
REGULAR BOARD MEETING AGENDA
Thursday, September 20, 2001
2:00 P.M.
City Council Chambers
1900 Lake Tahoe Boulevard, South Lake Tahoe, California
Robert G. Baer, General Mana• er
Richard Solbri•, Assistant Mana.er
Duane Wallace, President
BOARD MEMBERS
James R. Jones, Vice President
Christopher H. Strohm, Director Mary Lou Mosbacher, Director Eric W. Schafer, Director
irvTZZLOW./2•55a,W.Nze12. vauvcr .aeo::rasxauzrov-r1mr...,4,43,79444,sasrMrRsea «a's^.zr <rrrssss;Z.s
1. CALL TO ORDER REGULAR MEETING - PLEDGE OF ALLEGIANCE
2. COMMENTS FROM THE AUDIENCE (Short non - agenda items - 5 minute limit. No action will be
taken.)
3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR
4. ADOPTION OF CONSENT CALENDAR (Approved by a single vote. Any item can be discussed
and considered separately upon request.)
5. CONSENT ITEMS BROUGHT FORWARD FOR ACTION / DISCUSSION
6. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION
a. Financial Transaction Authorization Adopt Resolution No. 2724 -01 Authorizing
(Debbie Henderson) Certain Staff to Conduct Financial Trans-
actions, Superseding Resolution
No. 2682 -98
b. Survey and Aerial Photography
(John Thiel)
Approve Professional Services Contract
with GS Concepts in an Amount Not to
Exceed $24,000
. REGULAR BOARD MEETING AGENDA - SEPTEMBER 20, 2001 PAGE - 2
(
c. GIS System Development Approve Task Order No. 16 for Geotrans
(Richard Soibrig) to Continue the Development Phase for
the District's GIS System in an Amount Not
to Exceed $94,645
d. Payment of Claims Approve Payment in the Amount of
$712, 850. 82
7. BOARD MEMBER COMMITTEE REPORTS
a. Executive Committee (Wallace / Jones)
b. Finance Committee (Wallace / Schafer)
c. Water & Wastewater Operations Committee (Jones / Strohm)
d. Planning Committee (Mosbacher / Schafer)
8. BOARD MEMBER AD HOC COMMITTEE REPORTS
a. Federal Legislative Ad Hoc Committee (Wallace / Jones)
b. Park Avenue Redevelopment Ad Hoc Committee (Jones / Schafer)
c. Lakeside Park Ad Hoc Committee (Jones / Strohm)
d. Special Litigation Ad Hoc Committee (Strohm / Jones)
9. BOARD MEMBER REPORTS
10. GENERAL MANAGER / STAFF REPORTS
Assistant Manager I Engineer
a. Tallac Pump Station Force Main Repair Emergency of 07/05/01
11. NOTICE OF PAST AND FUTURE MEETINGS / EVENTS
Past Meetings / Events
09/07/01 - Carson Water Subconservancy District Meeting re: ICR TMDL
09/17/01 - Operations Committee Meeting
09/17/01 - STPUD Recycled Water Master Plan District Customers' EIR/EIS Scoping Mtg.
09/18/01 - STPUD Recycled Water Master Plan Alpine Co. Residents' EIR/EIS Scoping Mtg.
09/18/01 - Finance Committee Meeting
Future Meetings / Events
09/24/01 - AWWA Conference in San Diego
10/01/01 - 4:00 p.m. - Operations Committee Meeting at District Office
10/04/01 - 2:00 p.m. - STPUD Regular Board Meeting at City Council Chambers
12. CLOSED SESSION (Please note Closed Sessions are not open to the public)
a. Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel
Existing Litigation: Mountain Cascade Inc., and Valley Engineers, Inc. vs.
STPUD Board of Directors and STPUD, Countv of EI Dorado, Superior Court
Case No. SC20000050
b. Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel
Existinq Litiqation: STPUD vs. ARCO, et al, San Francisco County Superior
Court Case No. 999128
REGULAR BOARD MEETING AGENDA • SEPTEMBER 20, 2001 PAGE - 3
c. Pursuant to Government Code Section 54956.9(c)/Conference with Legai Counsel:
Anticipated Litigation (one cas� ' �
d. Pursuant to Government Code Section 54956.8/Conference with Real Property
NeQOtiators
Negotiating Parties: Board of Directors, Robert Baer / General Manager
Under Negotiation: Consideration of Property Purchase
Property Identification: APN 1-080-80, APN 1-080-81, APN 1-080-82, APN 1-080-56,
APN 1-080-60, APN 1-200-01, APN 1-200-10, APN 1-200-11
e. Pursuant to Government Code Section 54956.9(a)/Conference with Leqal Counsel-
Existinq LitiQation: STPUD vs. LAKESIDE PARK ASSOCIATION, et al County of
EI Dorado, Superior Court Case No. SC20010165
13. ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION
14. ADJOURNMENT (To the next regular meeting, October 4, 2001, 2:00 p.m.)
The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A
complete agenda packet, including all backup lnformation is available for review at the District office during the hours
of 8:00 a.m. - 5:00 p.m. Monday through Friday. Items on this agenda are numbered for identification purposes only and
will not necessarily be considered in the order in which they appear on the agenda. Designated times are for particular
items only, Public hearings will not be called to order prior to the time specified.
Participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the
agenda items are heard; comments should be brief and directed to specifics of the item being considered. Comments
on items not on the agenda can be heard during °Comments from the Audience;" however, action cannot be taken on
items not included on agenda. Please provide the Clerk of the Board with a copy of all written material presented at the
meeting.
Tape recordings are made of each Board meeting and these tapes are retained in the Board Clerk's office for two years.
South Tahoe Public Utility District • 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 • Phone 530.544.6474 • Facsimile 530.541.0614
�oVTH TayoF
-.�...�_ . -._._.,:. �.�
s ° - °�
V s � e � • 1 • `�'� ��
e �� C ul'ILITY '���
CONSENT CALENDAR
SEPTEMBER 20, 2001
ITEMS REQUESTED ACTION
a. Water Disconnection Procedures: Authorize Implementation of the Two-
Failure to Perform Annual Backflow Week Disconnection Procedures on the
Assembfy(ies) Test Property Located at 2500 Highway 50,
(Tim Rieger) APN 33-100-221
b. Water Disconnection Procedures: Authorize Implementation of the Two-
Failure to Perform Annual Backflow Week Disconnection Procedures on the
Assembly(ies) Test Property Located at 2155 South Ave.,
(Tim Rieger) APN 23-392-03
c. Purchase of Three Electric Carts Authorize Staff to Advertise for Bids
(Randy Curtis)
d. Geotechnical Evaluations Approve Professional Services Contract
(John Thiel) with AMEC for Geotechnical Evaluations
in an Amount Not to Exceed $28,000
e. Janitorial Services Contract Authorize Renewal of Contract with J& L
(Linda Brown) Pro Kleen in the Amount of $2,747 per
Month
f. Special Board Meeting Minutes: Approve Minutes
August 9, 2001
g. Regular Board Meeting Minutes: Approve Minutes
August 16, 2001
h. Special Board Meeting Minutes: Approve Minutes
August 30, 2001
South Tahoe Public Utility District • 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 • Phone 530/544-6474 • Facsimile 530/541-0614
SOUTH TAHOE PUBLIC UTILITY DISTRICT
BOARD AGENDA ITEM
� TO: BOARD OF DIRECTORS
FR: Tim Rieaer. Inspections Supervisor
RE: BOARD MEETING Seqtember 20. 2001 AGENDA ITEM:
ACTION ITEM NO: CONSENT CALENDAR ITEM NO: a•
ITEM-PROJECT NAME: WATER DISCONNECTION PROCEDURES: FAILURE TO PERFORM
ANNUAL BACKFLOW ASSEMBLY(IES� TEST
REQUESTED BOARD ACTION: Authorize implementation of the finro-week disconnection
procedures on the property located at 2500 Highway 50. APN 33-100-221
DISCUSSION: The property owner has failed to perform the annual test(s) on backflow
prevention assembly(ies). as required under State law and District Administrative Code 3.3.9.
SCHEDULE:
COSTS: ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS: Letters of Correspondence
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: �
GENERAL MANAGER: YES NO GENERAL
CHIEF FINANCIAL OFFICER: YE WATER X
/ SEWER
CE�TI�'��D �IL
�
� \ � l�9 � � � �
�. .
��� ' :� 1�u �I ic U f i ' ' '
`` � nl5�rlct
�:�_�� y
__ �
Au ust 29 2001 127� Me�do�ri Cre�: Drivz � 5cuih La�ce TG-�ce • C/; 9c i�0
g ' i'hone 530 ��4-6G74 � FGx 530 ��1-O�i�
�j�S�O� �z � M'�a 6-/�,�
M� G r¢ -t' ? t PU i' s Tti f
American Golf Corp. � y y/��
2500 Highway 50
South Lake Tahoe CA 96150
Subject: 2500 HiQhway 50 / APN 33-100-221
Dear Customer:
You are in danger of having your water service disconnected. Please be advised that on
Septernber 20, 2001 at 2:00 p.m. there will be a me�ting of the Board of Directors of the
South Tahoe Public Utility District. The meeting is being held in the Ciiy Council
Chambers, 1900 Lake Tahoe Boulevard, South Lake Tahoe, California. At the m�eting
staff will make a request to the Board of Directors to authorize disconnection proceedings
of your water service.
On June 29, 2001, the District Inspectors notified you of the annual requirer�ent to test
approved bacfcflow assembly(ies) on the water service line to your property. To my
knowledge, this test has not been completed. If you have completed the test, please call
the District Inspections Department immediately, because we show no record of it. To
avoid disconnection proceedings, please have all required tests completed immediately
and send the necessary test reports to our office. The annual tests ensure the proper
operation of devices that protect the municipal water supply from potential sources of �
backflow contamination. No further extensions can be granted.
As explained in your initial test due letter, the administrative costs of enforcement are now
being asszssed to your account. All enforcement costs will be added to your regular water
account with the District. To avoid any further costs, your immediate attention is required.
You may appeal your case to the Board of Directors by attending a schedufed Board •
meeting. If you plan to attend the meeting, pleas2 contact the Clerk of the Board no later
than September 12, 2001 at (530) 544-6474.
Sincerely,
���� ���
�
Tim Rieger
Inspections Supervisor
TR:mm
T:UvlinisterlCUSTSVC\TI M18 Db1TDIC.TR.wpd
�—�` _ �
; '� / '.. ��� � ��
. : � �- , �, , , �
�� �'u bf �c U �,� lty bl5 �,
;
�-�._ - -- —
--_�
�275 r� eadow Cre:,; Drive � 5ou;n Lakz TGr�ae 0 CF. 96i;;G
, Pnone 5� �G'.�� � F�x 530 ��1-0�;='
6/29/2001 Occupancy Type: ASMBL
American Goli Corp. �
Lake Tahoe Country Club
2500 Highway 50
So. Lake Tahoe CA 96150-5206
Attention: Lake Tahoe Country Club
Subj ect : P.NNU�1, TEST FOR BACi�FLOW PREVENTION ASSEMBLIES
As a courtesy to customers, the District sends an annual reminder of testing
requirements for backflow prevention assemblies. Please be informed that
your backflow assembly described below is due for its perodic test as
required by STPUD and California state law. I have enclosed a list of
certified cross-connection control testers for your use.
The tester you select will need to complete the necessary reports durir_g the
test and provide cop?es of the test results to you, the Health Department,
and the Utility District, plus retain a copy for ris files. If the test
discloses that the assembly is not operating properly, please have the
necessary repairs made and the assembly retested.
The test ensures the proper operation of back`low assemblies that protect
municipal water supplies from possible contamination. Please have all
testing completed by the due date listed beloiv. Failure to comply could
r�sult in ir_terruption of water service and admir_istrat?ve costs. Thank you.
�../ �'�'" I< �!'- .;
. ^ �'L.
, 1li?t tZ.l@Ctc / .
Ir�BU@CLC1" �
hUi.r�O':'? tV: SOliL'_� luf?02 Fublic TJ�7.� 1ty 1�1StY'1C� AC�^11?'L1St=GL� V; COClc 3. 3. 9
Te�t Due Date: 8/ 7/2001 S�rv_ce Num:er: 33-100-221
Back�-ow arev�^ter =v�e: R? Ass2r;tblv Num�er: R5788 M�t�-r:
SOUTH TAHOE PUBLIC UTILITY DISTRICT
BOARD AGENDA ITEM
TO: BOARD OF DIRECTORS
FR: Tim Rie ec�, r, Inspections Supervisor
RE: BOARD MEETING September 20. 2001 AGENDA ITEM:
ACTION ITEM NO: CONSENT CALENDAR ITEM NO: b•
ITEM-PROJECT NAME: WATER DISCONNECTION PROCEDURES: FAILURE TO PERFORM
ANNUAL BACKFLOW ASSEMBLY(IES) TEST
REQUESTED BOARD ACTION: Authorize implementation of the two-week disconnection
procedures on the property located at 2155 South Ave. APN 23-392-03
DISCUSSION: The property owner has failed to perform the annual test(s) on backflow
prevention assembly(ies). as required under State law and District Administrative Code 3.3.9.
SCHEDULE:
COSTS: ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS: Letters of Correspondence
CONCURRENCE WITH REQUESTED ACTION: CATEGORY:
GENERAL MANAGER: YES NO GENERAL
CHIEF FINANCIAL OFFICER: YE WATER X
SEWER
C�R3'I���� MAIL
�`---..
��-� o � �
',' ` . • � � �
,.
---=��-.. ,.....�.. .._. ----
``�- � ����� � �ublic Utilit I�iSZric
,`;� y
IL7� M eadow Crz�� Drive � JJ4i L�k� T�hce • CF, 9615G
August 29, 2001 � Fhone 5�0 ���--��74 v rGX ��O �G�
Alpine Pro�essional Building
PO Box 9578
So Lake Tahoe CA 96158-2578
Subject: 2155 South Ave / APN 23-392-03
Dear Customer:
You are in danger of having your water service disconnected. Please be advis�d that on
September 20, 2001 at 2:00 p.m. there wiil be a meeting of the Board of Directors of the
South Tahoe Public Utility District. The meeting is being held in the City Council
Chambers, 1900 Lake Tahoe Boulevard, South Lake Tahoe, California. At the meeting
staffwill make a request to the Board of Directors to authorize disconnection proceedings
of your water service.
On June 29, 2001, the District Inspectors notified you of the annual requirement to test
approved bacicilow assembly(ies) on the water service line to your property. To my
knowledge, this test has not been completed. If you have completed the test, pleasa call
the District Inspections Department immediately, because we show no record of it. To
avoid disconnection proceedings, please have all required tests completed immediately
and send the necessary test reports to our office. The annual tesis ensure the proper
operation of devices that protect the municipal water supply from potential sources of
backflow contamination. No further extensions can be granted.
As explained in your initial test due letter, the adrninistrative costs of enforcement are now
being assessed to your account. All enforcement costs will be added to your regular water
account with the District. To avoid any further costs, your immediate attention is requir2d.
You may appeal your case to the Board of Directors by attending a scheduled Board �
meeting. If you plan to aitend the meeting, please contact the Clerk of the Board no later
than September 12, 2001 at (530) 544-647�.
Sincerely,
��'/yi , �1�'` . ,
��
Tim Rieger � �
Inspections Supervisor
TR:mm .
T:\MinisterlCUSTSVC\TifvAB D MTDIC.TR.wpd
� �--_� � �\
��------, . , � � � � � � —�
;, � �
�°` �Ub�1G Utlllt �iG�riGi.
. / y
127� Mea�cw Cr��t Drive � 5ou:� L�kc TG^o: � Cf�. 9.i;;�
�i1GYi� ' �G'' - GG7�; m FGX :J�G :JG " �iG
6/29/2001 Occupancy Type: EEPS,T
Alpine P Bldg
2155 South Ave / 1113 Fourth St
P.O. Box 9573
So. Lake Tahoe CP_ 96158-2578
P_ttention: Steve Salberg
Subject: ANNtTAL TEST FOR HACKFLOW PREVENTION ASSEM3LIES
, As a courtesy to customers, the District sends an annual reminder of testing
requirements Lor backflow prevention assemblies. Pleasz be informed that
you backflow assembly described below is due for its perodic test as
recruired by STPUD and California state law. I have enclosed a list of
certified cross-connection control testers for your use.
The tester you select will need to complete the r_ecessary reports during the
test and provide copies of the test results to you, the Health Department,
and the Utility District, plus retain a copy for his files. If the test
discloses that the assembly is not operating properly, please have the
necessary repairs made and the assembly retested.
The test ensures the proper operation of backflow assemblies that protect
municipal water supplies from possible contamination. Please have all
testing completed by the due date listed below. Failure to comply could.
result in interruption oi water �ervice and administrative costs. Thank you.
�� y ��;.��
o�� �
^1im Rieger
Ir_sp�cto=
Author_�.y; Sou�r Tahoe Fublic lit�lity District Admi �?�strative Code 3.3.9
Te�� Due Da�e: 8/i0/200i Service Number: 23-392-031
'��ck_1o�v Pr�se-��_ T��2. R� �sse:ribly �vum,:�e=. Q9120 yiz��r.
SOUTH TAHOE PUBLIC UTILITY DISTRICT
� BOARD AGENDA ITEM
TO: BOARD OF DIRECTORS
FR: Randy Curtis. Heavy Maintenance Supervisor
RE: BOARD MEETING September 20. 2001 AGENDA ITEM:
ACTION ITEM NO: CONSENT CALENDAR ITEM NO: �•
ITEM-PROJECT NAME: PURCHASE OF THREE ELECTRIC CARTS
REQUESTED BOARD ACTION: Authorize staff to advertise for bids
DISCUSSION: The Maintenance Department needs to replace three electric 15-year old ca�ts.
These carts no longer perForm as needed and replacement parts for repairs are difficult to find.
SCHEDULE: As soon as possible
COSTS: $21.000 (estimated) ACCOUNT NO: 1004-8215: 1004-8216. 1004-8222
BUDGETED AMOUNT REMAINING: $21.000
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED TION: CATEGORY:
GENERAL MANAGER: YES NO GENERAL
CHIEF FINANCIAL OFFICER: YE O WATER
SEWER X
SOUTH TAHOE PUBLIC UTILITY DISTRICT
BOARD AGENDA ITEM
T0: BOARD OF DIRECTORS
FR: John Thielt Senior Engineer
RE: BOARD MEETING September 20. 2001 AGENDA ITEM:
ACTION ITEM NO: CONSENT CALENDAR ITEM NO: d•
ITEM-PROJECT NAME: GEOTECHNICAL EVALUATIONS
REQUESTED BOARD ACTION: Approve professional services contract with AMEC for
geotechnical evaluations in an amount not to exceed $28.000
DISCUSSION: Staff requires detailed geotechnical evaluations at several sites to continue
desiQn work over the winter. These sites include the corridor for the AI Tahoe Plant Access Road:
tank replacement sites at Echo View. Country Club. and Keller; and certain areas north of the
treatment plant which are likely locations for new centrifuge and solids handling facilities.
SCHEDULE: Begin the week of September 24. 2001, complete in October 2001
COSTS: Not to exceed $28.000 ACCOUNT NO: 1029-8130 ACCSRD ($6.500�
1029-8235 CENREP ($3.000): 2029-8156 ECVWTK ($18.500)
BUDGETED AMOUNT REMAINING: $818.350: $87.548: $20.000
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION: CATEGORY:
GENERAL MANAGER: YES NO GENERAL
CHIEF FINANCIAL OFFICER: YE WATER X
SEWER X
SOUTH TAHOE PUBLIC UTILITY DISTRICT
BOARD AGENDA ITEM
TO: BOARD OF DIRECTORS
FR: Linda Brown. Purchasing Agent
RE: BOARD MEETING: September 20, 2001 AGENDA ITEM:
ACTION ITEM NO: CONSENT CALENDAR ITEI� NO: e•
ITEM-PROJECT NAME: JANITORIAL SERVICES CONTRACT
REQUESTED BOARD ACTION: Authorize renewal of contract with J& L Pro Kleen in the
amount of $2,747 per month
DISCUSSION: Bids were solicited for annual janitorial services in February 1997. with an
option to renew the contract for four additional one-year terms. Staff is satisfied with the service
provided by J& L Pro Kleen and recommends extending their contract for another one-year term.
SCHEDULE: 10/10/01 through 10/09/02
COSTS: $2.747 per month ACCOUNT NO: 1039/2039-6074
BUDGETED AMOUNT REMAINING: $29.114 (00-01 Total Budget $34.500)
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION: CATEGORY:
GENERAL MANAGER: YES NO GENERAL X
CHIEF FINANCIAL OFFICER: YE WATER
SEWER
Consent Item f.
S� VTH -rq'y
� � :..- �:.....�� _ < D
� '""�,' . ' -._.�.. `� �-- ' �
, � ��
� � ,p, s . .:,:'`:�:::... '. ac � r
V g� ' e r ' 1950 •`�'�st �
o C UTiLITY ���
SOUTH TAHOE PUBLIC UTILITY DISTRICT
"Basic Services for a Complex World"
Robert G. Baer, General Mana er Richard Solbri Assistant Mana er
Duane Wallace, President BOARD MEMBERS James R. Jones, Vice President
Christopher H. Strohm, Director Mary Lou Mosbacher, Director Eric W. Schafer Director
SPECIAL MEETING OF THE BOARD OF DIRECTORS
SOUTH TAHOE PUBLIC UTILITY DISTRICT
AUGUST 9, 2001
MINUTES
The Board of Directors of the South Tahoe Public Utility District met in a Special Session at
1:30 p.m. on August 9, 2001, 1275 Meadow Crest Drive, South Lake Tahoe, California.
BOARD OF DIRECTORS: ROLL CALL
President Wallace, Directors Schafer, Jones, Strohm,
Mosbacher
STAFF:
Baer, Sharp, McFarlane, Hydrick, Cocking.
Attorney Kvistad and Attorney Sher participated via
speakerphone.
1:30 P.M. ADJOURNMENT TO CLOSED
SESSION
2:00 P.M. RECONVENE TO REGULAR
SESSION
ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION
No reportable Board action. Pursuant to Government Code
Section 54956.9(a)/Conference
with Legal Counsel - Existing
Litigation: STPUD vs. ARCO, et. al,
San Francisco County Superior
Court Case No. 999128
SPECIAL BOARD MEETING MINUTES - AUGUST 9, 2001 PAGE - 2
(1:50 p.m. - Director Jones left the meeting at
this point.)
. No reportable Board action. Pursuant to Government Code
Section 54956.8JConference with
Real Property Negotiators -
Negotiating Parties: Board of Di-
rectors, Robert Baer/General Man-
ager. Under Negotiation: Consider-
ation of Property Purchase; Prop-
erty Identification: APN 1-080-80,
APN 1-080-81, APN 1-080-82,
APN 1-080-56, APN 1-080-60,
APN 1-Z00-01, APN 1-200-10,
APN 1-200-11
2:00 P.M. ADJOURNMENT
Duane Wallace, Board President
South Tahoe Public Utility District
ATTEST:
Kathy Sharp, Clerk of Board
South Tahoe Public Utility District
Consent Item �_
��VTH Tq y�F
------ �� �'�
� ��� � ���
� �•�!� • 1�50 •w�� �
� �C
� UTILIi1f
�
�
SOUTH TAHDE PUBL.IC UTILITY DISTRICT
"Basic Services for a Comp/ex World"
Robert G. Baier, General Ma r Richard Solbri , Assistarrt Mana r
Duane Wal(ace, President BOARD MEMBER James R. Jones, Vice President
Christ her H. Strohm Director Ma Lou Mosbacher Directo� Eric W. Schafer Director
REGULAR MEETING OF THE BOARD OF DIRECTORS
SOUTH TAHOE PUBLtC UTILITY DtSTRICT
AUGUST 16, 2001
- MINUTES
The Board of Directors of the South Tahoe Public Utility District met in a regular session, August 16,
2001, 2 :00 P.M City Council Chambers,1900 Lake Tahoe Boulevard, South Lake Tahoe, Califomia.
BOARD OF DtRECTORS ROLI CALL
President Wallace, Directors Schafer, Jones, Strohm,
Mosbacher
STAFF:
Baer, Solbrig, Sharp, McFartane, Cocking, Frye, Swain,
M. Aisbury, Coyner, Garcia, Schroeder, Eddy, R. Johnson,
Hydrick, Bird, Boyson, Brown, Attomey Kvistad
GUESTS
Ron Kaetze{/Municipal Information System Association
of Califomia (MISAC), David Kelly, Roy Hampson
Ron Kaetrel, MISAC, presented Carol Swain, Information
Systems Manager, with MISAC's Award for Excellence
in Information Technology Practices. Swain and staff
were praised for their support of technology.
Staff requested Action Items a. and b. (related to Arrow CORRECTIONS TO THE AGENDA
head Welt No. 3: Construction of Wellhead Treatment for OR CONSENT CALENDAR
REGULAR BOARD MEETINO MINUTES - AUGUST 18, 2001 PAGE - 2
MTBE Removal) be removed from the agenda due to CORRECTIONS TO THE AGENDA
timing problems encountered with pipe fitting suppliers. OR CONSENT CALENDAR
In order to allow more time, a Special Board Meeting (continued)
wilt be held August 23"� to consider these items.
Moved Schafer / Second Jones / Passed Unanimouslv CONSENT CALENDAR
to approve the Consent Calendar as submitted:
a. Authorized implementation of the iwo-week sewer
and/or water disconnection procedures for
delinquent accounts; .
b. SCADA Moscad RTU's (Remote Terminal Unitsj -
(1) Waived bidding procedures as outlined in the
Purchasing Policy, for standardized equipment
requiring compatibility with existing equipment
and to be purchased from the existing supplier; and
(2) Approved the purchase of five Moscad RTU's
from Globa{ Data Specialists, Inc., in the amount of
$24,586 plus shipping;
c. Purchase of Hydro Truck - Awarded bid to the lowest
responsive, responsible bidder, Wec� Industries, Inc.�
in the amount of $100,989.77;
d. Alpine County Office and Equipment -(1) Approved
Project Ctoseout Agreement and Release of Claims;
and {z) Authorized staff to file a Notice of Completion
with the Alpine County Clerk;
e. Temporary Help for Operations Department - Authorized
agreement with The Substitute Personnel & Business
Services in the amount of $25,000;
f. Revised Pension Plan Document -(1) Adopted Resolu-
tion No. 2723-01, approving the revised pension plan
document; and (2) Approved submission of the plan
document to the Intemal Revenue Service for a deter-
mination ietter in the amount of $700;
g. Capital Outlay Acounts Rollover - Authorized staff to
rollover funds budgeted in 2000-2001 fiscat year to
2001-2002 fiscal year;
h. QualServe Review - Approved QualServe Participating
Utility Agreement in the amount of $27,040.
REGULAR BOARD MEETING MINUTES - AUGUST 16, 20 PAGE - 3
ITEMS FUR BOARD ACTION
Richard Solbrig reported bids for this pro;ect will be TALLAC PUMP STATION FORCE
opened September 5, and included on the September 6 MAIN REPAIR
Board Agenda for approval. The Operations Committee
reviewed this item and recommended approval.
Moved Strohm / Second Jones / Passed U nanimouslv
to authorize staff to solicit bids for construction.
Moved Jones / Second Schafer / Passed Unanimouslv PAYMENT OF CLAIMS
to approve payment in the amount of $2,386,746.67.
Finance Committee: The committee met August 9. Tapics BOARD MEMBER STANDING
of discussion included: Lake Tahoe Comn�unity Collrge�s COMMITTEE REPORTS
request for exemption from water connection fees for
recreational water service (the reques# was deniPd j;
propane tanks installed by Fallen Leaf Lake (FLL)
association on District-owned property at rL�; ard
non-potable water rate report for STAR ba!Ifialds.
Min�tES of the meeiing are 2vaii�E�I� ��pan re��i�;a�.
Water and Wastetivat�r C"��t�r�akians (;ammittce l+r��
committee met August 13. h�linut�s c,f tf�e meeting a; �:
available upon request.
Federal Leqislative Ad Hoc Committee: Direcior Wall�ce BOARD MEMBER AD HOC
and Dennis Cocking will travel to Washington D.C. to COMMITTEE REPORTS
seek funding on the District's behalf. The LaEce Tahoe
Basin Restoration Summit will be held August 21 and
should provide an opportunity to speak to legislators
about TMDL issues.
Director Mosbacher questioned if the Board had evsr BOARD MEMBER REPORTS
taken a position on ethanol. Dennis Cocking explained
the Board never developed a stance specifically on
ethanol; however, it did support the Governor's position
that oxygenate requirements for gasoline should be waived.
Director Strohm stated he will include the third bathroom �
residential sewer rate issue on the next Board agenda for
discussion.
Director Jones reported ACWA is seeking sUgges�ions
on state legislative priorities and changes in existing
legislation.
REGULAR BOARD MEETING MINUTES - AU 16, 2041 PAGE - 4
Director Schafer reported on two items: BOARD MEMBER REPORTS
(continued)
1) There were no deciarations of candida�y received for
Board Seat #5. Since he is running unopposed, he can
continue to focus on District business.
2) He thanked Attorney Kvistad for his quick response in
developing an opinion letter. Thi will erisure tne 1�9�
LaSalle bank loan refinancing will close an sc��dule.
President Wallace reported three candid�-�tes �n�ere vying
for Board Seat #1. Director Strohm, incurnb�;nt, wiil nat
run for a third term. Candidates for his �eat are: David
Kelty, Roy Hampson, and Cathie Becker.
General Manaqer: Bob Baer reported he has been con- GENERAL MANAGER REPORT
tacted by representatives of Spring Creek Tract who
are interested in having the District supply tf�eir water.
Tallac Pump Station Force Main Repair Erner�ency of STATUS OF EMERGENCY
7/5/01: In order to ensure the contractor h�s sufficient PROJECT
time to finish the projec#, the District ���ra�ased � ��imb�r
of piping materials needed i� sli�a-I�r;t:;1.�Gi.� #���:t t�fi �,ip:?,
in the approxi,mate amc�ur�t rf $�0,�3��0. 'i �rn�:, :�nc�
Associates were paid �1,50� f ��r surveying sr�rv;ces.
Steel fittings were als purchased for a�proximately
$1,078.
District General Counsel: Gary Kvistand report�d an STAFF REPORT
agreement for the District to provide backup water
service has been given to the U.S. ForESt Servica for
their consideration.
2:45 P.M. MEETING BREAK
3:05 P.M. MEETING RESUMED AND
ADJOURNED TO CLOSED
SESSION
4:00 P.M. RECONVENE TO REGULAR
SESSION
REGULAR BOARD MEETING MINUTES - AUGUST 16, 2001 PAGE - 5
ACTION / REPORT ON ITEMS DISCUSSED DURING EXECUTIVE SESSION
No reportabie Board action. Pursuant to Government Code
Section 54956.9(a)/Conference
with Legal Counsel - Existing
Litigation: Mountain Cascade, Inc.,
and Valley Engineers, Inc. vs.
STPUD Board of Directors and
STPUD, County of EI Dorado,
Superior Court Case No.
SC20000050
Legal Counsel reported this lawsuit was dismissed by Pursuant to Government Code
the plaintiff. Section 54956.9(a)/Conference
with Legal Counsel - Existing
Litigation: Schwake vs. STPUD,
Federal Case No. CV-N-93-851-
DWH
No reportable Board action. Pursuant to Government Code
Section 54956.9(a)/Conference
witi� Legat �ouns�l - Existing
Litigation: STPUD vs. ARCO, et. al.,
San Francisco County Superior
Court Case No. 999128
No reportable Board action. Pursuant to Government Code
Section 54956.8/Conference with
Real Property Negotiators -
. Negotiating Parties: Board of
Directors, Robert Baer/General
Manager. Under Negotiation:
Consideration of Property
Purchase; Property Identification:
APN 1-080-$0, APN 1-080-81,
APN 1-080-82, APN 1-080-56,
APN 1-080-60, APN 1-200-01,
APN 1-200-10. APN 1-200-11
No reportable Board action. Pursuant to Government Code
Section 54956.9(a)/Conference with
Legal Counsel - Existing Litigation:
STPUD vs. Lakeside Park Associa-
tion, et al, County of EI Dorado,
Superior Court Case No.
SC20010165
�
" REGULAR BOARD MEETING MINUTES - AUGUST 16, 2001 PAGE - 6
4:00 P.M. ADJOURNMENT
Duane Wallace, Board President
Sauth Tahoe Public Utility District
ATTEST:
Kathy Sharp, Clerk of the Board
South Tahoe Public Utility District ,
Consent Item h.
y�VTH TqhoF
� � �
-_..... _ -._.,�,::. �
� '"s?-� `' �
S • �t �
� W�� � � ����
� � 85�
C UTlLRY O�
SOUTH TAHOE PUBLIC UTILITY DlSTRI�T
"Basic Services for a Complex World"
Robert G. Baer, Generai Mana er Richard Solbri Assistant Man er
Duane Wallace, President BOARD MEMBERS James R. Jones, Y+ce President
Christopher H Strohm, Director Mary Lou M�her, Director Eric W. Sc hafer, Director
e. ��, .--a-- R R s � E�..a : � a e a a
SPECIAL MEETING OF THE BOARD OF DIRECTORS .
SOUTH TAHOE PUBLfC UTILITY DISTRICT
AUGUST 30, 2001
MINUTES
The Board of Directors of the South Tahoe Public Utility District met in a Special Session at
3:00 p.m. on August 30, 2001, District Office, 1275 Meadow Crest Drive, South Lake Tahoe,
Califomia.
BOARD OF DIRECTORS ROLL CALL
President Wallace, Directors Strohm, Mosbacher.
Director Schafer participated via teleconference.
Director Jones was late.
STAFF:
Baer, Sofbrig, Sharp, McFarlane. Attorney Kvistad,
Attomey Sher, and Attomey Miller participated via
teleconference.
3:00 P.nn. ADJOURNMENT TO CLOSED
SESSION
(3:17 p.m. - Director Jones amved at the meeting at
this point.)
- 3:53 P.M. RECONVENE TO REGULAR
SESSION
SPECIAL BOARD MEETING MINUTES - AUGUST 30, 2001 PAGE - 2
ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION
No reaortable Board action. Pursuant to Government Code
Section 54956.9(a)/Conference
with Legal Counsel - Exi�ting
Litigation: STPUD vs. ARCO, et. al,
San Francisco County Superior
Court Case No. 999128
ITEMS FOR BOARD ACTION
Richard Solbrig reported the instailation project for the ARROWHEAD WELL NO. 3:
well treatment system was bid on August 21, with the CONSTRUCTION OF WELLHEAD
District receiving no bids for the work. This was after TREATMENT FOR MTBE REMOVAL
the District delayed the bid opening by one week to
allow pipe suppliers to complete their costing of the -
project. The short time frame to complete the under-
ground portion of the job, as well as current work loads,
were cited by local contractors as reasons for not
bidding the entire project.
In order to have the treatment system operational by
next summer, the only option the District has is to negotiate
a series of agreements with contractors and suppliers to
complete various sitework portions of the project. Staff has
concluded there will be no competitive advantage to waiving
the bidding requirements, since no bids were received
during the extended bidding period. In mid-October, District
staff will reevaluate how to accomplish the above ground
portion of the project.
Moved Wallace / Second Strohm / Passed Unanimouslv
to: (1) Waive the public contract bidding requirements;
and (2) Authorize staff to enter into a series of negotiated
contracts to complete the underground and site work
portions of the project prior to October 15, 2001.
The Arrowhead Well treatment project will require an on- ARROWHEAD WELL NO. 3:
site oxygen supply to be converted to ozone through an CONSTRUCTION OF WELLHEAD
on-site ozone generator. TREATMENT FOR MTBE
REMOVAL - OXYGEN SERVICES
Moved Strohm / Second Jones / Schafer Abstained /
Passed to authorize entering into a seven (7) year
agreement wi#h BOC Gases for oxygen services in the
estimated annual amount of $10,720, with an initial on-
site set up fee in the amount o# $2,500.
SpECIAL BOARD MEETING MINUTES - AUGUST 30, 2001 PAGE - 3
In order to power the new facilities, a new, targ�r electr- ARROWHEAD WELL NO. 3:
ical service is required. The new service agreement CONSTRUCTION OF WELLHEAD
with Sierra Pacific Power Company (SPPCo) has been TREATMENT FOR MTBE
previously approved. SPPCo is requesting an easement REMOVAt - EASEMENT FOR
on the subject property in order to install the new ELECTRICAL SERVICE
electrical cables.
Moved Strohm / Second Mosbacher / Passed Unanimouslv
to approve easement on District property for Sierra Pacific
Power Company to introduce electric service.
4:10 P.nn. ADJOURNMENT
Duane Wallace, Board President
South Tahoe Public Utiiity Dis#rict
aTTEST:
Kathy Sharp, Clerk of Board
South Tahoe Public Utiiity District
SOUTH TAHOE PUBLIC UTILITY DISTRICT
BOARD AGENDA ITEM
TO: BOARD OF DIRECTORS
FR: Debbie Henderson. Accounting Manager
RE: BOARD MEETING September 20. 2001 AGENDA ITEM:
ACTION ITEM NO: 6 • a CONSENT CALENDAR ITEM NO:
ITEM-PROJECT NAME: FINANCIAL TRANSACTION AUTHORIZATION
REQUESTED BOARD ACTION: Adopt Resolution No. 2724-01 authorizing certain staff to
conduct financial transactions, superseding Resolution No. 2682-98
DISCUSSION: This resolution authorizes the following staff to perForm transfers between
authorized bank accounts and wire transfers between authorized banks of U.S. Bank and Local
Agency Investment Funds:
Rhonda McFarlane Chief Financial Officer
Deborah Henderson. Accountinq Manaper
Kathryn Taylor. Special Projects Manager
Douqlas Metz. Accounting Technician (conditions set forth in resolution)
SCHEDULE:
COSTS: ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS: Resolution No. 2724-01
CONCURRENCE WITH REQUESTED A TION: CATEGORY:
GENERAL MANAGER: YES NO GENERAL X
CHIEF FINANCIAL OFFICER: YE�\,� .R _��NO WATER
SEWER
i
2 RESOLUTION NO. 2724-01
3
A RESOLUTION OF THE BOARD OF DIRECTORS
4 OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT
AUTHORIZING CERTAIN STAFF TO CONDUCT
5 FINANCIAL TRANSACTIONS, SUPERSEDING
RESOLUTION NO. 2682-98
6
7 WHEREAS, the Board of Directors needs the District's financiai staff to conduct
8 business on behalf of the South Tahoe Public Utility District; and
9 WHEREAS, the Board of Directors of the South Tahoe Public Utility District (District)
10 authorizes Rhonda McFarlane, Chief Financial Officer, Deborah Henderson, Accounting
11 Manager, and Kathryn Taylor, Special Projects Manager, to perform the following
12 transactions:
13 1. Transfer funds between authorized bank accounts and investment pools.
14 2. Purchase or redeem investment instruments, as provided by the District's
15 Investment Policy.
16 3. Execute wire fund transfers between authorized District bank accounts.
17 4. Establish wire fund transfers or approve electronic fund transfers to pay
18 District obligations.
19 WHEREAS, the Board of Directors of the South Tahoe Public Utility District
20 authorizes Douglas Metz, Accounting Technician, to perform the following financial
21 transactions under the direction of or in the absence of either Rhonda McFarlane, Chief
22 Financial Officer, Deborah Henderson, Accounting Manager, and Kathryn Taylor, Special
23 Projects Manager.
24 1. Transfer funds between authorized bank accounts and investment pools.
25 2. Execute wire fund transfers befinreen authorized District bank account.
26 3. Execute pre-established wire fund transfers to pay District obligations.
27 /////////// �
28 //////////
�
Resolution No. 2724-01
Page 2
1 NOW, THEREFORE, BE IT RESOLVED, that this authorization will remain in full
2 force until the Board gives written notice to the contrary.
3 PASSED AND ADOPTED at a duly held Regular Meeting of the Board of Directors
` 4 of the South Tahoe Public Utility District on the 20 day of September, 2001, by the
�
5 following vote:
6 AYES:
7 NOES:
$ ABSENT:
. 9
10
11
12
13 Duane Wallace, Board President
South Tahoe Public Utility District
14
15 ATTEST:
16
17 Kathy Sharp, Clerk of the Board and
Ex-officio Secretary to the Board of Directors
18
19
20 �
21
22
23
24
25
26
27
28
SOUTH TAHOE PUBLIC UTILITY DISTRICT
BOARD AGENDA ITEM
T0: BOARD OF DIRECTORS
FR: John Thiel. Senior Engineer
RE: BOARD MEETING September 20. 2001 AGENDA ITEM:
ACTION ITEM NO: 6.b CONSENT CALENDAR ITEM NO:
ITEM-PROJECT NAME: SURVEY AND AERIAL PHOTOGRAPHY
REQUESTED BOARD ACTION: Approve professional services contract with GS Concepts in
an amount not to exceed $24,000
DISCUSSION: The District seeking detailed survey information, including individual tree
locations for a 500-foot wide area befinreen the wastewater treatment plant and AI Tahoe Blvd.
This 15-acre area will encompass project areas forthe access road and related drainage facilities,
potential centrifuge and solids handlinq facilities, related access paving, and potential future
administrative building facilities.
New plant projects, including the access road, will precipitate the need for TRPA (Tahoe
Reaional Planning Agency) approved coverage information for the plant site. Durinq the course
of permitting the last few plant projects, the District has promised the TRPA that staff would
quantifv and evaluate coverages. and mitiaate over coveraqe as necessary. While this effort has
been initiated in the past, it has never been finalized and approved.
GS Concepts will set up ground control and calibrate aerial photographs resulting in a digital
map of the 18.5-acre plant parcel. This information will allow for consummate review of coverage
and coverage calculations by the TRPA, and will provide a basis for current and future facilities
planning.
SCHEDULE: Begin the week of September 24, 2001, complete in October 2001
COSTS: Not to exceed $24.000 ACCOUNT NO: 1029-8130 DSTHDQ/ACCSRD
BUDGETED AMOUNT REMAINING: $818.350
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED A TION: CATEGORY:
GENERAL MANAGER: YES NO GENERAL
CHIEF FINANCIAL OFFICER: YE WATER
SEWER X
SOUTH TAHOE PUBLIC UTILITY DISTRICT
BOARD AGENDA ITEM
TO: BOARD OF DIRECTORS
FR: Richard Solbria. Assistant Manaaer/Engineer
RE: BOARD MEETING September 20. 2001 AGENDA ITEM:
ACTION ITEM NO: 6 • � CONSENT CALENDAR ITEM NO:
ITEM-PROJECT NAME: GIS SYSTEM DEVELOPMENT
REQUESTED BOARD ACTION: Approve Task Order No. 16 for Geotrans to continue the
development phase for the District's GIS system in an amount not to exceed $94 645
DISCUSSION: Geotrans has completed and delivered to the District a final report on a
needs assessment for a District-wide GIS system. They have also prepared a scope of work (see
attached copy) to proceed with the development of the complete system District staff requests
authorization to proceed with tasks 1. 2. 3. 4.1, 4.2.1. and 6. These tasks would complete the
work throuqh the pilot program grid map conversion After completion of the pilot program the
final decision will be made as to the most cost effective method for converting qrid sheets to an
electronic format. Another task order would then be issued to complete the conversion with a
more accurate cost estimate for the work than could be made now.
SCHEDULE:_Current Task Order to be completed by mid-April 2002
COSTS: Not to exceed $94,645 ACCOUNT NO: 10/20-37-8262-GISSFT
BUDGETED AMOUNT REMAINING: $87.553 / $58.400
ATTACHMENTS: Task Order No. 16. Geotrans Proposal. an enlaraed version of the Project
Schedule is available at the District office or upon request to the Clerk of the Board
CONCURRENCE WITH REQUESTED A TION: CATEGORY:
GENERAL MANAGER: YES NO GENERAL X
CHIEF FINANCIAL OFFICER: YE WATER
SEWER
GEOTRANS
TASK ORDER NO. 16
ENGINEERING SERVICES
This Agreement is made and entered into as of the 20 th day of September 2001 by and
between South Tahoe Public Utility District, hereinafter referred to as "DISTRICT" and
GEOTRANS, hereinafter referred to as "ENGINEER".
In
Agreement dated October 3� , 1991 and as specifically hereinafter set forth, the parties do
hereby agree as follows:
I. PURPOSE
The purpose of this Task Order is for Information Management System and GI�
Development services.
2. SCOPE OF WORK
The items of work are outlined in the Engineer's proposa) letter dated September 10,
2001 identified as Tasks 1, 2, 3, 4.1, 4.2.1 & 6, comprised of Software/Hardware
purchase, support, installation, and configuration; Data warehouse implementation;
Data
& Grid mappilot; and ProjectManagement. Thisproposal becomesapartofthisTask
Order by reference herein. The District reserves the right to seek alternatives for the
GPSsurvey,therebypossiblyel iminatingtheneedforthepurchaseofGPSequipment
and accessories.
3. STAFFI NG
Staffing will be under the direction of Jeffrey C. Bensch, P.E., Project Manager and
Alexander M. Johnson, P.E., Subconsultant, Arete Systems. ENGINEER shall not
change staffing without approva) by DISTRICT. Any changes shall provide fo
equivalent qualifications as far as possible and practical.
4. TIME OF PERFORMANCE
ENGINEER estimates that the project will require approximately seven (7) months to
compl
the grid map pilot phase. Services can be completed between September, 2001 and
Apri I, 2002.
5. PAYMENT
Payment to ENGINEER for services performed under this Task Order shall be in
accordancewith ENGINEER'Sfeeschedulefortheperson assignedtotheprojecttask.
The cost cei I ing for th is Task Order is $94,645.00 and wi I I not be exceeded except as
provided in Article IV of the Master Agreement
6. LABOR CODE REQUIREMENTS
AIIStateofCaliforniaprevailingwagelawsmustbecompliedwith intheperformance
of work related to this Task Order. These include, but are not limited to, Labor Code
Sections 1720 through 1860.
7. EFFECTIVE DATE
ThisTaskOrderNo.16wi I I becomeeffectiveuponexecutionbybothpartiesandshal I
serve as a Notice to Proceed upon execution by District.
IN WITNESS WHEREOF, this Agreement is executed by the General Manager and
Clerk of the Board of the South Tahoe Public Utility District, and ENGINEER has caused this
Agreement to be executed the day and year first above written.
September 20, 2001
ROBERT G. BAER, GENERAL MANAGER Board Approval Date
SOUTH TAHOE PUBLIC UTILITY DISTRICT
ATTEST:
KATHY SHARP, CLERK OF BOARD
SOUTH TAHOE PUBLIC UTILITY DISTRICT
JEFFREY C. BENSCH, P.E.
GEOTRANS
Sacramento Operations Manager
3035 Prospect Park Drive
�eO Suite 40
ATETRAIECNCOMPANY rans Inc Rancho Cordova, CA 95670-6070
www.geotransinc.com 916-853-1800 FAX 916-$53-1860
September 10, 2001
P:IPROJECTSISTPUD\PROPOSALS\PHASE 11\PH2_PROPOSAL V3.DOC
Ms. Wanda Stanley
South Tahoe Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Subject: Proposal for Information Management System and GIS Development
Services
South Tahoe Public Utility District
Dear Ms. Stanley:
Pursuant to our meeting on August, 3 2001, this letter presents a proposed scope of work,
schedule, and estimated budget to implement a geographic information system (G{S) for the
South Tahoe Public Utility District (the District). The proposed services comprise
implementation of the system defined in our final Information Management Needs Assessment
and Geographic Information Systems Design report (the Needs Assessment), dated August
2001
Implementing an organization-wide GIS represents a fundamentally new way of operating the
D'sstrict's business. As we have discussed, a phased implementation will ease the transition
into this new operating mode. In addition, the phased approach will ensure that each
component of the system will inter-operate with your existing information technology
infrastructure, while fulfilling the mapping needs af the users across yoUr organization.
SCOPE OF WORK
Over the past several months, GeoTrans has completed an analysis of the District's data
management and Geographic Information System (GIS) needs. In the resulting Information
Management Needs Assessment and Geographic Information Systems Design report,
GeoTrans identified the District's business processes and data flow, evaluated data sources,
identifed potential applications, and presented an implementation plan for a system. This
proposal presents the scope of work, schedufe, and estimated budget to implement the
recommende� system.
The project is to be implemented through a phased approach, with pilot programs to address
uncertain or potentially expensive undertakings. These pilots will help refine and guide the
development process to tailor the applications specifically to their user's needs.
• The first phase wilf build the system infrastructure, including software, hardware, databases,
maintenance tools, and interfaces to the District's other systems. This will establish the ,
foundation for building the complete GIS.
�
, Ms. Wanda Stanley
South Tahoe Public Utility District
September 6, 2001
Page 2
• Next, data will be converted and imported into the system.
• Once the data import activities are underway and a data resource begins to grow, tools will
be deployed so users can access this growing data store. User-specific applications will be
built, tested and installed immediately thereafter.
GeoTrans will implement the system as identified in the Information Management Needs
Assessment and Geographic Information Systems Design report. This includes the following
taslcs:
• Task 1. Software/Hardware purchase support, installation, and configuration
o Task 2: Data warehouse implementation
• Task 3: Data warehouse maintenance application
• Task 4: Data conversion
+ Task 5: Application development
• Tas� 6: Project Management
Tusk 1: Software Purchase Support, Installation, and Configuration
The selection of software for the GtS requires a careful analysis of compatibility between
software versions and the District's current software and hardware assets. It also requires that
installation and configuration be compatible with the District's current systems and the overall
project goals.
Based on the findings of the GIS Needs Assessment, GeoTrans will assist District personnel in
purchasing the appropriate hardware and software system components. GeoTrans will provide
the District recommended software specifications, lists of potential vendors, and assist in
discussions with the selected vendors. These support services will be provided throughout the
system development process. This will ensure smooth system development and integration.
Software to be purchased includes:
• ESRI ArcEditor 8.1
• ESRI ArView 8.1
o ESRI ArcSDE
• ESRI ArcPad
• Oracle Spatial Extension
Hardware to be purchased includes:
• Trimble Pathfinder ProXRS GPS Receiver(s)
• TDS Ranger GPS Data Collector(s)
• Associated cables and accessories
� GIS Manager Workstation (potential)
GeoTrans,,n�.
Ms. Wanda Stanley
South Tahoe Public Utility District
September 6, 2001
Page 3
After the software is purchased, GeoTrans will install and configure it on the necessary
workstations in conjunction with the District's Information Technology (IT) staff. GeoTrans will
also assist in the installation and configuration of the hardware components listed above.
Installing and configuring the server-side software is included in Task 2: Data Warehouse
Implementation.
Task 2: Data Warehouse Implementation
This data storage mechanism must be carefully planned and implemented, so that it will
function smoothly for the expected system components that will be built upon it. The data
warehouse needs to accurately reflect the business data model for the District, and it must be
capable of efficiently storing the data that are necessary for efficient district operations.
The GIS Needs Assessment identifies the District's business processes and data elements.
Implementing the data warehouse will transform this analysis into a working data mode! that
reflects these business processes and data elements. Implementing the district's data
warehouse will involve four primary sub-tasks:
Subtask 2. 9: ArcFM data model review and extension
GeoTrans will begin by reviewing and extending the ArcFM data model to tailor it to the
District's needs. This will be an iterative process with careful involvement of District personnel.
Subtask 2.2: Server-side software installation and con�guration
Once the data model is complete, GeoTrans will install and configure Oracle and ArcSDE for
implementation of the data model on the District's systems. This subtask will be performed co-
operatively with the District's IT staff.
Subtask 2.3: lmalementation of the dafa model
Next, the data model will be implemented in the software. This will create a working database
ready for reception of new data.
Subtask 2.3: Documentation of the data model
Finally, the data model and its implementation will be documented in a Data Dictionary and
Data Maintenance Procedures Manual.
TaSk 3: Data 1�1/arehouse Maintenance Application
6efore data can be entered into the new data warehouse, specialized tools should be available
to ease data entry and maintenance. These tools are contained in the Data Warehouse
Maintenance Application. As outlined in the Needs Assessment, this is not a stand-alone
"application" in the literal sense. It is to be a collection of tools added to the standard ArcEditor
interFace.
To develop this system component, GeoTrans will first develop a set of functional and technical
specifications in close coordination with the District personnel who will be responsible for
GeoTrans, ���.
Ms. Wanda Stanley
South Tahoe Public Utility District
September 6, 2001
Page 4
maintenance of the GIS data. These specifications will identify the application's user-interface
elements and their functionality through the use of screen mockups/storyboards, flowcharts,
and program pseudocode. Once the specifications are accepted and complete, development
will begin. GeoTrans will develop an extension to the standard ArcEditor interFace that will
include all user-interface elements identified in the specifications. These will include data entry
: forms, specialized graphic selection tools, interfaces to the Customer Service database, and
interfaces to the Hansen database.
GeoTrans anticipates that development of this system component will be substantially complete
before the Data Conversion task is started, but recognizes it may need to be modified as the
Data Conversion task proceeds and new or unanticipated requirements are identified. Finally,
this extension will be documented in a Data Warehouse Maintenance Application User's Guide.
Task 4: Data Conversion
The District's data assets are currently in many different storage locations and different formats.
The Data Conversion task will take these diverse data and import them into the Data
Warehouse developed in Task 2.
This task is divided in to four major sub-tasks:
• Basemap implementation,
• Grid Map conversion,
• Permit conversion, and
• Other data conversion
Subtask Task 4.1: Basemap Conversion
An accurate basemap is required so the District's Grid Maps can be imported and accurately
registered to a real-world coordinate system.
As presented in the Needs Ass�ssment, there are two primary options for creating the
basemap: using the forthcoming Sierra Pacific basemap; or using the EI Dorado County
- ARC/Info parcel coverage. For this proposal, GeoTrans assumes that the basemap will be
created from the Ei Dorado County ARC/Info parcel coverage. The accuracy of this coverage,
however, is not high enough for the District's purposes. Therefore GeoTrans will import the
coverage and use the District's existing Global Positioning System (GPS) control points to
increase the accuracy. If the existing control network is not sufficient, GeoTrans will conduct a
GPS survey of District assets to bring the basemap accuracy up to the required standard. This
proposal assumes that the GPS survey will be necessary. The completion of this task will
provide an accurate basemap that can be used to accurately import the District's hardcopy and
CAD grid maps.
GeoTrans, ���.
Ms. Wanda Stanley
South Tahoe Public Utility District
September 6, 2001
Page 5
Subtask 4.2: Grid Maa Conversion
The primary source of the District's infrastructure information is its Grid Maps. This subtask
converts the grid maps from their current form to the standard electronic storage format defined
in the data warehouse. The subtask will consist of three parts:
1) a pilot project,
2) conversion of the hardcopy grid maps, and
3) conversion of the CAD-format grid maps.
The pilot project will allow the District and GeoTrans to evaluate the most efficient way to
convert the District's hardcopy maps to electronic form. For the pilot project, GeoTrans will scan
up to 10 adjacent maps (5 water and 5 sewer maps), register them to the basemap, and
convert each of them in two ways: by a) on-screen digitizing, and by b) using raster-to-vector
conversion software. Further activities include:
• Entering attribute data for each feature,
• Checking the basemap data (from EI Dorado county) against the parcel data on the
scanned maps and against the customer service database,
• Correlating the features with entries in the Hansen system,
o Edgematching the individual maps sheets, and
o Affixing annotation to the completed features.
Upon completion of the data entry, GeoTrans will perForm a time and cost analysis. This
analysis will identify the most e�cient way to convert the hardcopy maps (either digitizing or
using automated raster-to-vector conversion). At this time, GeoTrans and the District will use
the analysis to review the project budget estimate, and revise it if necessary.
GeoTrans will then convert the remaining grid maps. Each hardcopy map will go through the
following workflow:
• Scan the map,
• Register the scan to the basemap and archive,
e Convert to electronic format (either by digitizing or automation),
• Enter feature attributes,
= Check the basemap data (from EI Dorado county) against the parcel data on the scanned
maps and against the customer service database,
• Correlate the features with the Hansen entries,
� Edgematch with adjacent sheets, and
• Affix annotation �
GeoTrans assumes 250 gird maps sheets will be processed in this manner.
GeoTrans Inc.
Ms. Wanda Stanley
South Tahoe Public Utility District
September 6, 2001
Page 6
The CAD-format grid maps will go through a slightly different process:
- • Import the CAD file and archive the original,
• Register the CAD file to the basemap and archive,
• Enter feature attributes,
• Check the basemap data (from EI Dorado county) against the parcel data on the scanned
maps and against the customer service database,
• Correlate the features with the Hansen entries,
• Edgematch with adjacent sheets, and
• Affix annotation
GeoTrans assumes 250 CAD files will be processed in this manner.
At the conclusion of this subtask, the grid maps will be stored in a consistent format in the data
warehouse, and the attribute information will be accessible to any application that can make a
connection to the Data Warehouse.
Subtask 4.3: Permit Conversion
The hardcopy sewer and water connection permits contain data that should be made available
to GIS users. This task involves inputting that information into the Data Warehouse and making
it available through the GIS. It is assumed that 5,000 permits will be entered. GeoTrans will
enter unique permit information into the database, correlate that information with data from the
customer service database, and scan additional information from the permits (e.g. the stick
drawings). GeoTrans will enter these scans into the database, and ensure permit attribute
information is accessible to the GIS system. This will allow GIS users easy access to permit
and connection data.
Subtask 4.4: Other Data Conversion
The District has identified other miscellaneous data that shoutd be accessible to the GIS. This
includes information such as as-built drawings, grid map notes, and various project
documentation. This subtask provides for entry of that information. GeoTrans will import the
following data into the data warehouse:
1) As-built drawings for approximately 25 recent construction projects where electronic
drawing files are readily available. The budget estimate assumes approximately five
AutoCAD drawings per project,
2) Miscellaneous grid map notes for each hardcopy and CAD file impo�ted: The budget
estimate assumes approximately 5 notes per map sheet, and
3) Approximately 20 project reports from recent or critical studies conducted by the district.
GeoTrans, �n�.
Ms. Wanda Stanley
South Tahoe Public Utility District
September 6, 2001
Page 7
Task 5: Application Development
GeoTrans and the District want to make the GIS useful to District staff as ear(y in the system
development as possible. This first requires that useful data exist with which to work. Once
population of the data warehouse begins, that body of data will be available. Therefore, it is
possible and desirable for the development of user-interface applications to begin at this stage.
Five user applications were identified for development in the Needs Assessment:
1) Grid Map Automation Application,
2) Customer Service Application,
3) Field Service Application,
4) Construction, As-built, and Documentation Application, and
5) Technical and Engineering Application.
Each application will be developed to meet the conceptual designs outlined in the Needs
Assessment.
GeoTrans will develop each application following a consistent workflow:
o Functional and technical specifications development,
e Pilot project,
� Full development,
• Documentation, and
• Installation, acceptance, and testing
For purposes of this proposal, GeoTrans has provided a defined budget for developing the
functional and technical specifications for each application. However, a reasonably accurate
estimate for full development of each application is not possible until after the specifications are
complete. Budget-level estimates for the development of each of these applications are
provided in the table below, but are not included in the budget estimate. Thus, the current
estimates will be reviewed and revised at the completion of each application's specifications.
Budqet-Level Application Development Costs:
Grid Ma Book Automation A lication $ 5,000
Customer Service A lication $ 10,000
, Field Service A lication $ 30,000
Construction, As-built Drawin and Documentation A lication $ 10,000
Technical and En ineerin A lication $ 5,000
Completion of the user applications will provide the District with a complete and functional
system, and a solid foundation for future expansion and extension.
Geo Trans , Inu
Ms. Wanda Stanley
South Tahoe Public Utility District
September 6, 2001
Page 8
Task 6: Project Management
The project management task includes project meetings, schedule and budget tracking by the
Project Manager and miscellaneous duties conducted by support staff, such as file
maintenance and administration. Semi-monthly project meetings are anticipated during the
project and will be coordinated with District staff. Progress reports will be provided to the
District on a semi-monthly basis by e-mail. In addition, Arete Systems will provide a web site
for posting of project status information, reports, and general information.
SCHEDULE
After receiving the notice to proceed, GeoTrans can immediately begin the Data Warehouse
Implementation Task. Assuming a start date of Mid-September 2001, some major project
milestones are:
Data Warehouse com lete Nov. 2001
Data Warehouse Maintenance A lication com lete Jan. 2002
Basema com lete Feb.2002
Basic GIS Software installed and functional A r. 2002
Grid ma conversion com lete Se t. 2002
Data conversion com lete Se t. 2002
Functional S ecifications Com lete Au . 2002
The project will require approximately 1.5 to 2 years to complete from data warehouse
development to the final application development. A project schedule is attached that shows
the duration of major and minor tasks, sequence of activities, and milestones.
ESTIMATED BUDGET
The budget assumes a core project team consisting of the following personnel:
Project Manager: Jeff Bensch, P.E., GeoTrans, Inc.
Project GIS Lead: Scott Flory, GeoTrans, Inc.
Lead Designer and Systems Consultant: Alexander Johnson, P.E., Arete Systems
The total estimated budget for GIS development and support is $ 257,000 . Estimated task
budgets are summarized in the table below, and details are provided in the attached table.
Geo'I'rans, �,�.
Ms. Wanda Stanley
South Tahoe Public Utility District
September 6, 2001
Page 9
Task 1: Software/hardware purchase support, instailation, and 3,000
configu�ation
Task 2: Data warehouse implementation 23,000
Task 3: Data warehouse maintenance application 21,000
Task 4: Data conversion 168,000
Task 5: Application development 30,000
Task 6: Project Management 13,000
TOTAL: $ 257,000
The work will be performed on a time and reimbursable expense basis and in accordance with
the Master Services Agreement between the District and GeoTrans. If changes to the project
Gnd the estimated budget occur, GeoTrans will notiiy the District and request approval prior to
exceeding approved budgets. GeoTrans understands that formal approva{ of this proposal and
authorization to begin work will be provided through a Task Order issued by the District.
We look forward to providing the South Tahoe Public Utility District with continued GIS and
database development and support services. Please call Jeff Bensch at (916) 853-1800 or
Alex Johnson at (831) 420-0772 if you have any questions.
Sincerely,
GEOTRANS, INC.
, ey C. Bensch, P.E.
Sacramento Operations Manager
AR�TE SYSTEMS
Alexander M. Johnson, P.E. �
Principa!
cc: Chris Benedict
Attachments: Project Schedule
Estimated Budget
GeoTrans,,,,�.
y
South Tahoe PUD GIS, Phase II
Budget Estimate
� ua � _ c; � � nc�� � � ti�oQa;w•
Tu � on: o. o �.� 6' �
f7ate (3/�our) 180 5125 5100 E80 585 S50 S50 � S85
. 1. Softwaa SupDOrt
1.1 Purcahse SuODOrt for ArcSDE 5794 5420 5374 EO 1.0 4.0 5.0 4.0
1.2 Purchase SuODOrt Oracle Spatial 5634 5260 5374 SO 4.0 4.0 4.0
1.3 Purcahse AroEdltor 8 install (2 copies, Indudinp license manag E634 E280 5374 50 4.0 4.0 4.0
1.4 Purchase ArcView & insfall (2 coDies, lloatlng Iicenses) 5317 5130 5187 EO 2.0 2.0 2.0
1.5 ArcView workstation installations (uD �0 10) 5834 5280 E374 SO 4.0 4.0 4.0
E3,013 57,330 51,683 SO 50 EO SO S - S -
2. Data Wanhouse ImplarrnnWGon
2.1 ArcfM data model review 8 exlension S15 430 57 840 57 480 110 4.0 4.0 8.0 80.0 4.0 100.0 100 80.0
2.2 02c1e SDatlal & ArcSDE. installatlon & wnfipurdtio� S2 538 E1 040 S7 498 EO 16.0 t8.0 16.0
2.3 Data rtrodel Implementatio� S7 455 5520 5935 EO 8.0 8.0 10.0
2.4 Data warehouse documenfatian 53158 52.280 St 498 SO 4.0 2.0 2.0 8.0 8.0 24.0 18.0
523,177 511,880 511,407 5110 SO 5100 SO S • S -
.. �. Dah Wanhous� Malnkmncs Application
3.1 Functional speGfinGan development E2 180 S1 170 5935 E55 2.0 10.0 4.0 16.0 50 10.0
� 3.2 ArcEOitor attribute entry fortn development S2 235 S1 300 5935 EO 20.0 20.0 10.0
3.3 Pertnit entry fortns S7 268 E520 5748 EO 8.0 8.0 8.0
.. 3.4 Flansen database intarhace S9 880 52 290 57.370 EO 4.0 8.0 10.0 22.0 20.0 5 000.00
3.5 Customer Service database interface 53 858 S2 160 S7 496 SO 4.0 8.0 B.0 20.0 16.0
� 3.8 Documenta6on E2 305 S1 370 5935 SO 2.0 10.0 8.0 20.0 10.0
521,284 38,810 512,419 E55 SO 550 SO S • �,000.00
� 4. DaU Convarsian
� 4.1 BasemaD implemenfaUon
�.1.1 Importcove2pe 51268 5520 5748 SO 8.0 8.0 8.0
_ 4.1.2 Evalate existinp confrol point nelwork 51 588 3840 5748 EO 2.0 B.0 10.0 8.0
4.1.3 Re-repister cover 6 thedc RMS ertor E1 975 51 040 5935 SO 18.0 16.0 10.0
4.1.4 GPS survey for hpher control point densiry
(2 DeBOn uew fa 2 weeks) E20 473 511 895 b2.81B SB 180 2.0 175.0 177.0 3,600 2 000 28.0
525,304 574,095 55,049 E6,160 53,600 52.000 50 5 - S -
4.2 GAd Map conversion
� 4.2.1 Gdd map DilOt
4.2.1.1 Scan 10 maos (5 water, 5 sewer) 57 867 5580 5737 3550 2.0 4.0 6.0 500 2.0 500
4.2.1.2 Repister s�ans to basemap 5419 5325 SB4 SO 5.0 5.0 1.0
4.T.1.3 D'qitlze maos 5837 E650 5187 SO 10.0 10.0 2.0
- 4.2.1.4 Raster-to-vector maos E837 5850 5187 SO 10.0 10.0 2.0
4.2.1.5 Attribute entry 5837 5850 5187 SO 10.0 10.0 2.0
4.2.1.8 Basemap checklupdate E707 5520 5187 SO B.0 B.0 2.0
4.2.1.7 Cortelate feaNres w/ Hansen 5793 E325 E468 SO 5.0 5.0 5.0
42.1.8 Edgematchinp E419 E325 594 SO 5.0 5.0 7.0
42.2.7 Affuc annotauon 51 084 E97o E94 50 2.0 10.0 72.0 t.0
4.2.1.10 Time/cost anatyis 3734 E360 E374 SO 4.0 2.0 6.0 4.0
� 4 2.7.11 Review data rnnversion project es6male E794 5420 5374 SO 1.0 4.0 5.0 4.0
E9,308 55,775 52,981 5550 5500 SO SO S • S -
� 4.2.2 Hardcopy conversion
4.2.2.1 Scan ma0s (250 maps � S�tO each) 511 834 5260 St 1 374 EO 4.0 4.0 4.0 10 000
4.2.2.2 Convert maps (250 maps, 0.5 hr each) E7 838 E7 090 5748 50 2.0 8.0 125.0 135.0 8.0
t.2.2.3 Data enW (250 maos ¢,� 0.5 hr each) E8 55B E7 B10 5748 SO 24.0 125.0 149.0 8.0
4.22.4 Base map check (250 maps Q 0.5 �r each) S10 054 E7 B10 52.244 SO 24.0 725.0 149.0 24.0
4.2.2.5 Cortelate w/ Hansen (250 maps �.5 hr each) 513 858 E9 370 54.488 SO 48.0 125.0 173.0 48.0
. 4.2.2.8 EOgematchinp (250 maps p) .25 hr each) E8 55B t7 B10 5748 EO 24.0 125.0 149.0 B.0
4.2.2.7 A(fiz annotalion (250 maps Q thr each) 314 BOB E14 O80 E748 SO 24.0 250.0 274.0 8.0
575,308 S54 ,z,a az,,asa ao so ao so s- a -
4.2.3 CAD map conversion
�� 4.2.3.7 Convert maps (250 maps ,.25 hr each) 55,981 E4 485 51 496 EO 2.0 18.0 62.5 80.5 18.0
4.2.3.2 Data envy (250 maps Q.5 hr each) 57 518 EB 770 5748 EO 8.0 125.0 133.0 8.0
4.2.3.3 Base map chedc (250 maps Q.5 hr each) 57 518 E8 770 E748 SO 8.0 125.0 133.0 8.0
� 4.2.3.4 Correlate w/ Flansen (250 maps �.5 hr each) S13.B58 E9 370 54.488 SO 48.0 125.0 173.0 48.0
� 4.2.3.5 Edpematching (250 maps p 25 hr each) 55 661 S4 165 51 496 EO 18.0 62.5 78.5 16.0
4.2.3.8 Affix annotation (250 maps Q.25 hr each) 35 661 E4 185 S7 496 SO 18.0 62.5 78.5 18.o
548,797 E35,725 510,472 SO SO SO 50 S - 5 -
4.3 Pertnit conversion
4.3.7 Scan Dertnits (5000 �.50 each) 53 384 5260 53.124 50 4.0 4.0 4.0 2 500
4.3.2 Enter in database E2 777 E2 403 E374 SO 2.0 41.7 43.7 4.0
56,181 52.883 53,498 EO SO $0 SO E 2.500 S -
4.1 Olher data conversion
4.4.1 As-buiils (125 AutoCad files) 52.874 52 300 5374 SO 2.0 12.0 24.0 38.0 4.0
4.42 Project Reports (20 PDF reports) E589 E495 E94 SO 3.0 6.0 9.0 1.0
53,263 E2.795 5468 SO SO SO SO S - S -
4.5 Data conversion letter report b2 163 51 360 b748 S55 4.0 8.0 4.0 16.0 E 50 8.0
' S. Applintion DevelOpment
5.1 Grid Map Book Automation ADPliption
5.1.1 Funcponal specificatlons ES 907 E2.880 S2 992 555 0.5 2.0 32.0 4.0 38.5 5 50 32.0
5.2 Customer Service aDP���tion
_ 5.2.1 Functional specifipUOns 35 907 52 860 S2 992 E55 0.5 2.0 32.0 4.0 38.5 S 50 32.0
5.3 Field SeMte Appllption
5.3.1 Funclional speciflcaUons 55 907 E2 880 52 992 E55 0.5 2.0 32.0 4.0 38.5 E 50 32.0
5.4 ConsWdlon, as-built d2winp, and documentaGOn appliption
5.4.1 Functlonal speciflptions 35 907 32 880 52 992 555 0.5 2.0 J2.0 4.0 38.5 S 50 32�.0
5.5 Technipl8 EnBineerinp Ap0liplion ,
5.5.1 Functional s0acifications 55 907 E2 880 E2 992 E55 0.5 2.0 32.0 4.0 38.5 S 50 32.0
9. ProJect Manapament
ProBress Meepnps (7) 55 569 E3 805 E1 984 EO 14.0 21.0 35.0 21.0
Prolect T2cking/Reporting SB 992 E4 000 52 992 SO 12.0 32.0 44.0 32.0
512,561 57,805 54,958 SO SO SO SO 5 • S -
257,271 160,328 89,738 7,205 62.5 24.0 10.0 18.0 986.0 1509.2 50.0 2857.7 4,100 2,150 0 748.0 2,500 5,000
Total Estlmated Budget � 3257,271 ' Subcontrauor eoscs are muked up 10%.
' • Othtt dimt cwb (ODG) aze marlced up IOY..
Y,...�� .�.,
.,�,�..,. �
. ... .�..�.�a_�. ,
_- _ =- —_ - � --.
— -- --- — �
_ _ - — �
�_S—w� _ —'. _
— __— .� _ __'___ : h". i
' � � � — "4-- I I � I . '
_ _ _'_'__ _'_ ^—'
� �� � — �
—:5.—i��.: _` _"'__—_ 'Y
��.a'�_�� �'
— .�_"F�� _'_ — .
�_ _ _ — _ —_ . �~�
a w r��� �.
—_— ____—"__ .��
—_ � _ _ i�
_����` _
�.v r.�� .. .... �
�':i—_—e���.� ___ . . .
_ —_ — �
— T."� — z� "r���_ _— _
_. .
. --
..._— — — . �_
. , i ...... '
. a L .r� �_ . . :
__ — _ �
, _ . -
. �� . . . ...._ .� :
— _ �_ I
_ .
.
— _ —_ : ......�.:
.._ ._— _.. . ;
. . I I .... .: _._ � _ .
— — I
_ _ � — J_ � �r.
W��.
__" _ _ __ —_—
• n��� ti.�+�.. - . .
_
_ _—
. .
� . j
• —__n�_—ra'— _ . . .
. ♦
r ^� �...r �'—.` —'�Tj' r�� O �...�. �� r �ti � ��� �� ���. ♦ r i•
Action Item 6.d
Payment of Claims
September 20, 2001
Ck# Name Amount
FOR APPROVAL SEPTEMBER 20, 2001
Payroll 9-6-01 $11,385.35
Payroll 9-5-01 $254,532.62
Total Payroll $265,917.97
Cost Containment - health care payments $77,823.11
IGI Resources - natural gas
LaSalle Bank - fund transfers
Total Vendo� EFT $�� 823 � �
Accounts Payable Checks Sewer Fund $189,470.15
Accounts Payable Checks Water Fund 179,557.23
Accounts Payable Checks Self-funded Ins
Accounts Payable Checks Grant Funds 82.36
Total Accounts Payable �$369,109.74
Grand Tota/ a712,850.82
PAYROLL RELATED CHECKS 09/05/01
EFT URM & Dependent Care/AFLAC 1,694.72
EFT Employment Dev Dept 12,039.51
EFT Direct Deposit 121,327.16
EFT The Hartford 1,358.84
EFT ManuLife Pension 0.00
EFT ManuLife Pension Loan Payments 6,896.76
EFT Orchard Trust Co. 10,349.58
EFT US Bank 70,359.91
EFT Time Out Fitness 0.00
EFT United Way 77,18
Child Support Collection Program 37.50
Stanislaus Co Family Support Div 134.50
Stationary Engineers Local 39 0.00
Net Payroll 30,236.96
Adjustments 0.00
Sub-total $254, 512.62
T:WCCTUT1aPSPREADWMTOFCLM.W02 1MSep-01
Payment of Claims
September 20, 2001
Page 2
PAYROLL RELATED CHECKS 09/0
EFT URM & Dependent Care/AFLAC 0.00
EFT Employment Dev Dept 591.23
` EFT Direct Deposit 0.00
EFT The Hartford 0.00
EFT ManuLife Pension 0.00
EFT ManuLife Pension Loan Payments 1,191.18
EFT Orchard Trust Co. 0.00
EFT US Bank 4,330.66
EFT Time Out Fitness 0.00
EFT United Way 0.00
# Child Support Collection Program 0.00
# Stanislaus Co Family Support Div 0.00
# Stationary Engineers Local 39 0.00
Net Payroll 5,272.28
Adjustments 0.00
Sub-total $11, 385.35
Sue Bolger's & Matt Persic's final checks.
T:UCC11AT1aPSPREAD\PMTOFCIM.WB2 14•Sep-01
V7/1-1/U1 YAYMbN1 Of• LA1MS REPORT 09/07/2001-09/20/2001 Page 1
THU, SEP 13. 2001. 5:19 PM --req: DOUGLAS---leg: GL JL--loc: ONSITE----job: 22985e #J1218---prog: CK509 <1A06>--report id: CKRECSPC
Default Selection: Check Stock ID: AP Check Types: MW,HW,RV,VH
!A Vendor Name Account # Department Description
dAcWARFRV1c_FR CORP (AR( 1 10-n0-2530-GENERALADMINISTRATION--EMPLOYEE- VISION-INS 2.274.80
d Check Total:
;1
-1
!_i_Ar_=1_CHEMICAL_INC____ ' 10-00=0422 GENERAL-&_ADMINISTRATION - JANITORIAL SUPPLIES INVENTOR. -239,64
,ul
Amount Check # Type
2,274.80 00047767 MW
Check Total: 239.64 00047768 MW
IABTFcw RYRTEMS_INC in-37=4840-INFORMATION SYSTEMS DISTRICT-COMPUTER SUPPLIES- - 473,40
I, ADIRONDACK DIRECT
13
0
27; -
AFLAC
.>-71
!II_ALEENL.E1
17
18
10
20-37-4840 INFORMATION SYSTEMS
DISTRICT COMPUTER SUPPLIES
Check Total:
10-21-6621 ADMINISTRATION INCENTIVE & RECOGNITION PRGR
20-21-6621 ADMINISTRATION INCENTIVE & RECOGNITION PRGR
Cha-c-k Total:
137.30
610.40 00047769 MW .
159.00
106.00
265.00 00047770 MW
a
0
8
8
10-00-2532 GENERAL & ADMINISTRATION INSURANCE SUPPLEMENT 986.46
10=00=2538 _GENERAL &ADMINISTRATION_____AFLAc .FEE.-DEDUCTION _
Check Total: 1.116.46 00047771 MW
O_GENERAL&_AOKIN/STRATION- SUPPLIES-
20-00-6520 GENERAL & ADMINISTRATION SUPPLIES
ALPINE METALS
10-04-6041 HEAVY MAINTENANCE
10-04-6021 HEAVY MAINTENANCE
APOLLO PLUMBING,& HEATING INC 10-01-6052 UNDERGROUND REPAIR
1
14
ARAMARK UNIFORM SERVICES
ARNOLD MACHINERY
AVISTA UTILITIES
2
Check Total:
BUILDINGS
PRIMARY EQUIPMENT
Check Total--
PIPE, COVERS, & MANHOLES
- - - Chec k Total : - - 00047774 MI-
60.30
40.20
100.50 00047772 MW
El 1
i (I
605.90 El
599.52
- i
-00047773 4414
_ , •
..= . _. ...
E
m
m
10-00-2518 GENERAL & ADMINISTRATION UNIFORM/RUGS/TOWELS PAYABLE 2,492.29
Check-Total; 2,492-29-00047775 -MW
90-05-6011 EQUIPMENT REPAIR AUTOMOTIVE & GENERATORS , - A32.68
Check-Total:.- __Lt.:32-68-00047776 -MW
10-00-6350 GENERAL & ADMINISTRATION
20-00-6350_DENERAL_&_ADMINISTRATIOM
:111118&HBENEFII_DESIGNS 10=227-4405_4UMAN RESOURCES.
20-22-4405 HUMAN RESOURCES DIRECTOR
NATURAL GAS
NATURAL.-GAS - . _
Check Total:
.
CONTRACTUAL--SERVICES
CONTRACTUAL SERVICES
Check Total:
48
5,640.21
40.55
5,680.76 00047777 MW
-750-00
500.00
1,250.00 00047778 MW
1B8PTHERMAL SYSTEMS INC
10-04-6024 HEAVY MAINTENANCE
BECK & GARRIDO, DR
FURNACE EQUIPMENT
Check Total:
, 2,103.27
2,103.27 00047779 MW '
20-02-6075 PUMPS SAFETY EQUIPMENT/PHYSICALS 207.50
10-02-6075 PUMPS SAFETY EQUIPMENT/PHYSICALS 207.50
CheckTotal; 415-00-00047780 MW
,; •
r ,1 7 19 r _ N i u t C L n 1 h S R E P O R T 09/07/2001- 09/20/2001 Page 2
, SEP 115, 2001, 5:19 PM - -req: DOUGLAS -- -leg: GL JL - -loc: ONSITE - -- -job: 229852 #J1218-- -prog: CK509 <1A06 > -- report id: CKRECSPC
, Default Selection: Check Stock ID: AP ; Check Types: MW,HW,RV,VH
it
'_ Vendor Name Account # Department Description Amount Check # Type
====a = =====a =aaa =x= =a=asaa ==aa ========= as = = ==xsaa =a =a =======commas == ====== ======= ========= saa =========.===as ======afl smma
BFNOFR. JEFFREY J 1.0- Q6 -6P00 OPERATIONS- - TRAVEL /MEET- INGS/€DUCATION 170.00
Check Total: 170.00 00047781 MW
'SHERRY- HTNCKI EY INn(I.RTRTFR _10-00 -0415- GENERAL & ADMINISTRATION - -- GASOLINE INVENTORY 120-53
Check Total:
iI
__ 1INf MATER I Al R
3
Pn- n1- An52_UNDERGROUND- REPAIR PIPE + -- COVERS. =&- MANHOLES
S BLUE RIBBON TEMP PFRRfWNFL 1n- 39 -44Q5 FINANCE
BOVIF FNGINFPRTNG CnRP
20- n2 -R076 PUMPS
RRnwN L CAI J1WFI I rnNgllLXAh1TS- Pn-19- 4405 FINANCE
ANY, C H
in -n4 -6021-HEAVY-MAINTENANCE--
Check Total:
CONTRACTUAL-SERVICES
- SOYLE- S-TUDY
Check Total:
Check Total:
CONTRACTUAL-SERVICES-
SHOP-SUPPLIES
2,120.53 00047782 MW
2.501.78-
2,501.78 00047783 MW
Check Total:
Check Total: •
1 0- On -04? 1 GENERAL. --&- ADMINISTRATION. - -..- _ SHOP-SUPPLY--INVENTORY
10 -00 -0425 GENERAL & ADMINISTRATION SAFETY SUPPLIES INVENTORY
10 -00 -0422 GENERAL & ADMINISTRATION JANITORIAL SUPPLIES INVENTOR
10- 39 -A077 FINANCE - INVENTORY-- FREIGHTIDISCOUNTS
Check Total:
C SR M A �O -n1 -4521 UNDERGROUND REPAIR
C W F A to-01-6250_LNDERGROUND_REPAIR-
ARBON_CORP 20 224405_PUMPS-
-CAI IF JFPT nF AFNFRAI SERVICES 10 -n2 -6520 PUMPS -
_LIE DEELQF HEALTH SFRVIC. ES- 10-_- 01=6250_UNDERGROUND__ REPAIR
__CALLEORNIA OVERT p0- 074810_LABORATORY
10 -07 -4810 LABORATORY
10 -28 -8285 ALPINE COUNTY
CANADA LIFE
10 -00 -2539 GENERAL & ADMINISTRATION
— CSRMA -L.-I -ARIL ITX -- CLAIMS
670.50
1'
2
3
4
5
6
9
10
11
12
13
14
15
16
670.50 00047784 MW
17
18
19
20
21
22
23
24
:42.19, 00047785 MW - 26
21
28
1.414.22
Check Total:
DUES. - &- MEMBERSHIPS
Check Total:
CONTRACTUAL-SERVICES
Check Total:
SUP-PL -I ES
1,414.22 00047786 MW
1.075.35 ---
29
m
31
32
33
34
1,075:35 00047787 MW
2275.43
121.98
259.65
40-, -00
697.06 00047788 MW
Check Total:
_DUES &- MEMBERSHIPS - -- - _-- - - - - --
Check Total:
.POSTAGE - EXPENSES
POSTAGE EXPENSES
ALPINE CNTY MASTER PLAN
- - --... _-- -. -- --
-Check-Total:
374,10
374.10 00047789 MW
38-: 00- _ ....
38.00 00047790 MW
895,- 80- _... -- ._...
37,
38
324,14 -- 324.14 00047792 MW
LONG TERM DISABILITY, UNION
Chez-k- Tot:a14-
70 -,00 —
70.00 00047793 MW
76.60
22.50
265-80 00047794 . -- MW
2,609.56
45
46
47'
46
49
w
51
892.20 00047791 MW
52
s
56
57
56
59
60
61
62
63
64
65
66
67
68
69
76
71
2,609,-56-00047795- - MW 72
73
74
Ti 4
s
n Y M h N T OF C L A I M S R E P O R T 09/07/2001 - 09/20/2001 Page 3
THU, SEP 13, 2001, 5 :19 PM - -req: DOUGLAS -- -leg: GL JL - -loc: ONSITE - -- -job: 229852 #J1218-- -prog: CK509 C1A06 > -- report id: CKRECSPC
Default Selection: Check Stock ID: AP s Check Types: MW.HW,RV,VH
1
Vendor Name
Account # Department Description
7
7
4
Amount Check # Type
=m= = = = =V____ = = = = =ww ww =m = = = = == == == = = = = =_ = = = =se = = = =r= =ass = ====a===a1a= ___ == = = ==a=e = = =a = = == == = == =ma ss== =sea = == = =_______ = =m= = ==am =Bi=d
CAREER ASG00[ATES TNC 1.0=22=4405-HUMAN-RESOURCES CONTRACTUAL SERVICED- 66.00
• 20 -22 -4405 HUMAN RESOURCES DIRECTOR CONTRACTUAL SERVICES 44.00
CHEVRON USA
2
10 -04 -4610 HEAVY MAINTENANCE
' COBRA PRO
5
10 -22 -4405 HUMAN RESOURCES
Check Total:
GASOLINE - _ --
Check Total:
CONTRACTUAL SERVICES
Check Total:
110.00 00047796 MW
10
11
12
16.31
16.31 00047797 MW
40.00
40.00 00047798 MW
13
14
15
16
17
18
19
20
5 CURTIS, RANDY
7
10 -04 -6200 HEAVY MAINTENANCE
TRAVEL /MEETINGS /EDUCATION
Check Total:
312.00
312.00 00047799 MW
e D & H TRANSPORTATION INC
20 -29 -8157 ENGINEERING
DAVI LABORATORIES
•
!4
DICK'S FULLER -
TANK, GARDNER MTN #1, REPLAC
Check Total:
450.00
450.00 00047800 MW
10 -07 -4760 LABORATORY LABORATORY SUPPLIES
20 -07 -4760 LABORATORY LABORATORY SUPPLIES
- - C h-e-c k T o4a-1:
10- 06- 6041.OPERATIONS BUILDINGS
__10-68 -6042 ALPINE -COUNT GROUNDS_- &- MA- INTENANCE
10 -04 -6023 HEAVY MAINTENANCE FILTER EQUIP /BLDG
10 -04 -6071 HEAVY MAINTENANCE SHOP SUPPLIES
* —Check T -o -ta4:
_,DOUGLAS DISPOSAL
3
4
EL DORADO ROOFING INC
21
22
23
24
25
28
676.20
450.80 31
1.127.00 -- 00047801 -MW 32
33
34t
37 [
37
Ea
404.39 •
20:12'
98.93
47.00
570.1i 00047802 MW
10 -00 -6370 GENERAL & ADMINISTRATION REFUSE DISPOSAL - 75,'0___
Ch e k 4lsto l 75 ^00—' `00 ;47803 -M
10 -02 -7399 PUMPS
7
e FAST FABRICATORS INC.
9
10 -02 -8987 PUMPS
10-0P -7345 PUMPR
20 -29 -8157 ENGINEERING
FEDEX
FORD COMPANY. GENE
GEOTRANS INC
10 -29 -8235 ENGINEERING
10 -19 -4820 BOARD OF DIRECTORS
- __- 20 -19 -4 RP f l- BOARILOE'_D_IR EC TDR S
20 -07 -4810 LABORATORY
10 -07 -6650 LABORATORY
P0- 07 —AA5O LABORATORY
10- 04-AOP3 HEALY_MAINTENANCE
.20=01 -8155 _UNDERGROUND -REPAIR -
20-38 -8161 CUSTOMER SERVICE
ROOF, CAMP RICHARDSON
--Check-Total., .4.950.00. 00047804- - -MW
4,950.00
BIJOU PS EQUIP UPGRADE 64:20
TALLAC-- PUMP- 3TATIDN BYPASS L -711 :55
TANK, GARDNER MTN #1, REPLAC 3,589.85
Check Total: 4,365.60 00047805 MW
DEWATERING IMP
OFFICE SUPPLIES
OFFICE-SUPPLIES-
POSTAGE EXPENSES
OPERATING PERMITS
OPERATING-PERMITS-
Check Total:
FILTER EOUIPIBLDG
Check Total:
GLOBAL -- POSITIONING- SYSTEM
GIS PILOT PROD
39
40
`1
43
44
45
48
a7
48
49
42.48
4.74.
3.16
15.81
9.97
6. 64-
82.80 00047806 MW
2.856.61
51
52
53
54
55
56
57
58
81
62
64
65
66
57
88
2,856.61 00047807 MW
7. 370- • -59- --
2.326.59
89
70
71
72
73
74
75
1§
-
-
-
-
-
—
-
-
'
. m . o r o � AIMS
t--71n-61;;-171;e ur« = Department Description
-
_
,
-. _
'__
-
Amount -
_
-~
-_'
G*o"- ~NTON LL
10-0' _*760 LABORATORY SUPPLIES
Check , 258'50 0o04781*
� �- --
�
CONTRACTS
'
GUARDIAN.
��
.
-
�- '
' -.�_- -s�-~~ �--~ ' z ` -
_
-
�
'
m
_- --
`_
_
'
---
--
.
.
_
~~
_
�~_
_'
_
. ' __~~
-
4
-
7 -_- -
-'
--
~-- _ _
Check Total: 594
7* 0005 MW
120.-17=303 ru*`~' zVeg_ SERVICE CONTRACTS 159'*5
HEwLE`' ~.,�— °~~ v-~' .=FICE SUPPLIES ' _ 57_14 '
n'~ OFFICE SUPPLIES
HOBAN CO, DON .~." ENGINEERING _ 170'67
Check Total: 232.79 00047817
M- - -
_4
-4 'Ck'~ ~-m_ - -1_ ^'_o M~°
W
"
_- -
. - ~��-
.-
_ '- �
�'
- �- �t9 �r, ~
-�--'---- -
_ pnm
L
�
A"
~�
°_
-=
-
�
~
-
-
w
�
t
e
t_ =
.
--_o
V-
-__-
- =-
-
-- ~
_ -
-
~
-
-
-Check
.
7
_
M
fault Selection: ~'' Stock ID: A� Check Types: MW,n~''wH
��_BAL DATA SPECIALISTS. SHOP
-- _____.----� TR
ELECTRICAL �$
S~,~' p$
SCADA FL/. PS �1. 02
4'871.te
4`*/,' 6p
to-ml- SHOP SCwDA JOHNSON S
sc^�k.oijzU p� '
'— --
/BLDG
Check Total: 2�`9/p'-
M-
-
_
-
—
- ~
_
--
_
--
�_--
---
-
.
°
-
W
171'.00
aVz'
AVY "- yNTEw~°C- ~Check Total: 615' 96 mmv~' M
_-
W
~~- .
_
-
-
--
- _ V-�w- �
-�
�
_
- _
- Hsw°-- _~ - FILTER E
^
_
AUDIT7N
AUDITING
-39-4470 FINANCE
-
-
_
-
p-u:
_
_
20_39~*470 F
1 GENERAL m ADMINISTRATION LONG �sn Ch z0
-
_-
-
-
�--
-
-
_
-
.
- _c
r-
- -
^- 4.0o
R� DISABILITY, p�T , 1.661.59
'
��mm`~'` SUPPLIES,. M%
_
--_
-
-
-
--
-
-
--T
'
-
- --
-
-
-
.
.
~
. /_4' 00
____-2.00'476p _LABrRA~~' --' - � Check Total. `~.-
~
to-"~ -
TAvW~' Fpw=S- °~'_- --
-`
'
e
_
_
-
A ' o .
20-19~6520
GOVERNMENT o»�"^-- 10-1' ���r~- 'FINANCE _-_ -_--'----- SUPPLIES
-
~_
.---' -_---
n�sT^~~-_D..~`'-
' _-__
r 21 Y r3 t N T 0 1-
C L A I M S R E P O R T 09/07/2001 - 09/20/2001 Page 5
THU, SEP 13, 2001, 5:19 PM - -req: DOUGLAS -- -leg: GL JL - -loc: ONSITE - -- -job: 229852 4J1218 -- -prog: CK509 <1A06 > -- report id: CKRECSPC
a
11 Default Selection: Check Stock ID: AP s Check Types: MW, HW, RV, VH
Jq Vendor Name Account # Department Description Amount Check 4 Type
s( == === == w== = == = = = = == == s== = == = == rn= a= = = ==== a= = = ==a== == = = == = == =a == = =as= ===== a ==:=aaa== = =a = == _sa=es= == = === =aria = =ass ===== ===fl= =l = = ==
6 An -P1 -6200 ADM ISSTRATI- N.
91
roiil
17
2,
16 16
18
re
21
22
20 -19 -6200 BOARD OF DIRECTORS
20 -02 -6200 PUMPS
2n-nP-4RP0._RI1MP-S--
10-28 -8285 ALPINE COUNTY
10 -28 -6042 ALPINE COUNTY
1 O- PR -APOO- ALPINE -00IJ T1..
10 -28 -4820 ALPINE COUNTY
10 -00 -6520 GENERAL & ADMINISTRATION
P0- 00 -65Pn OFblFRAI 1L AfM T N tSTRATI-ON
10 -27 -6200 DISTRICT INFORMATION
20 -27 -6200 DISTRICT INFORMATION
1f- P7 -AAP° IUSTRICI-INFORMAIION
20 -27 -6620 DISTRICT INFORMATION
10 -38 -6200 CUSTOMER SERVICE
Pfl -1R -A00 CUSTOMER SERVICE
10 -04 -6071 HEAVY MAINTENANCE
10 -37 -6200 INFORMATION SYSTEMS
Pn- 37- A200- INFORMATION SYSTEMS-
23
24
251
26
a
61
a
9
0
1
1
10 -38 -4820
20 -38 -4820
1n- 34 -APOO
20 -39 -6200
10 -29 -6200
P0- 29 -APOQ
10 -22 -6670
CUSTOMER SERVICE
CUSTOMER SERVICE
FINANCE
FINANCE
ENGINEERING
ENGINEERING
HUMAN RESOURCES
TRAVEL /ME€rINGSJEDUCATION-
TRAVEL /MEETINGS /EDUCATION
TRAVEL /MEETINGS /EDUCATION
OFFICE - - SUPPLIES
ALPINE CNTY MASTER PLAN
GROUNDS & MAINTENANCE
-- TRAVELIMEE_TINGSI EDUCAT -ION
OFFICE SUPPLIES
SUPPLIES
SUPPLIES
TRAVEL /MEETINGS /EDUCATION
TRAVEL /MEETINGS /EDUCATION
PUBLIC-RELATIONS-EXPENSE
PUBLIC RELATIONS EXPENSE
TRAVEL /MEETINGS /EDUCATION
TRAVEL/MEETINGSIEDUCATION
SHOP SUPPLIES
TRAVEL /MEETINGS /EDUCATION
TRAVEL/MEETINGS /EDUCATION
13.45
1,834.91
1.789.49
34.22
552.00
49,4.31
669.00
262.54
5.40
3.60
432.02
288.00
35--1-
23.47
. 34.58
23.04
235.84
648.61
419.09
75.60
50.39
225.45
113.70
479.24
,306, -10
7.96
30-00
20.00
40.63
347,50
110.57
811.06
.,�.,, nay -83-.
70.54
447.95
695. -00 -
, 695.00
46.68
12-58
8.34
15.59
10.39
5.45
X3.62
74.78
74.78
33.00
83.21
363.00
OFFICE SUPPLIES
OFFICE SUPPLIES
TRAVEL/IMEET INGS/EDUCATI-ON-
TRAVEL /MEETINGS /EDUCATION
TRAVEL /MEETINGS /EDUCATION
TRAVELIMEETINGSIEDUCAT -I-CNN
•PERSONNEL EXPENSE •
20 -22 -6670 HUMAN RESOURCES DIRECTOR PERSONNEL EXPENSE,_
10- P2-AP0n HUMAN-RFROURCES- I-RAVEL/MEETINGSIEDUCATIDN-
20 -22 -6200 HUMAN RESOURCES DIRECTOR TRAVEL /MEETINGS /EDUCATION
20 -29 -8290 ENGINEERING TREATMENT, ARROWHEAD WL *3
1n- nP -6P0n PUMPS -TRAVEL/MEETINGSAEDUCATION-
10 -06 -4820 OPERATIONS OFFICE SUPPLIES
10 -06 -6200 OPERATIONS TRAVEL /MEETINGS /EDUCATION
10- n7 -476Q 1 ABORATORY.__ LABORATORY - SUPPLIES - - --
20 -07 -4760 LABORATORY LABORATORY SUPPLIES
10 -07 -6200 LABORATORY TRAVEL /MEETINGS /EDUCATION
P0- O1 -6 ?00 tNnFR(efLIND REPAIR- - TRAVELIMEEIINGSIEDUCAT-ION
10 -04 -6200 HEAVY MAINTENANCE TRAVEL /MEETINGS /EDUCATION
10 -37 -8262 INFORMATION SYSTEMS SOFTWARE, GIS
- - • - S ADVISORY-
20 -37 -4440
10 -37 -6520
P0- 37 -65Pn
10 -29 -4820
20 -29 -4820
10- 0P -6oR7
20 -02 -6083
20 -02 -6054
PO-P9-70e1
10 -19 -6200
INFORMATION SYSTEMS
INFORMATION SYSTEMS
TNFIIRMATTf7N SYSTFMR
ENGINEERING
ENGINEERING
Pl IMPR
PUMPS
PUMPS
ENGINEERING
BOARD OF DIRECTORS
ADVISORY
SUPPLIES
RI IPRI 3P99
OFFICE SUPPLIES
OFFICE SUPPLIES
STA CCUMNDBY ODAIIONS-.-
STANDBY ACCOMODATIONS
REPAIR /MNTC WATER TANKS
_PUMP HOUSE, - CARD -MTN -WELL
TRAVEL /MEETINGS /EDUCATION
6
7,
8
9
0
11
12
13
14
155
16
17
16,
19
20
21
22
24
25
26
29
3o
71,
32
� 6
37
Ta,
39
40
45
46
•
48
49
50
51
62
53
54
55
56
5
60
61
62
63
--
65 -
67
69
70
71
f.+.. l/r I.W.L. W711.7/1.11
THU, SEP 13, 2001, 5:19 PM - -req:
VA Y M L N I O F C L A I M S R E P O R T 09/07/2001- 09/20/2001 Page 6
DOUGLAS -- -leg: GL JL - -loc: ONSITE - -- -job: 229852 #J1218-- -prog: CK509 <1A06 > -- report id: CKRECSPC
' Default Selection: Check Stock ID: AP i Check Types: MW, HW, RV. VH
!_ti Vendor Name
Account #
so= == ==a= =a = === ====a= = == = = = = == oma= = = = = ==
Department Description Amount Check # Type
==== ==== === == ====== == = = == == = === == = = =m=a = = = == ova= == =aa== == == == = =ma == =a == =a a= =a =aa =a aaaa
.1 IN -SITU INC
20 -02 -6050 PUMPS
10
/S INDUSTRIAL SAFETY
12
10 -02 -6075 PUMPS
19
15
INSTY- PRINTS
20 -02 -4820 PUMPS
16
17
16
INTERSTATE SAFETY & SUPPLY
21
10 -00 -0421
10- 00 -04PS
10 -39 -6077
GENERAL & ADMINISTRATION
rmFRAL & ADMINISTRAT-I-ON
FINANCE
r_
22
24
JENSEN, PAUL
10 -00 -2002
GENERAL & ADMINISTRATION
13. 085.52 00047822 MW
WELLS - 254.57
Check Tata1 -• -254-. 57 X00471 -6-3 RV
SAFETY EQUIPMENT /PHYSICALS 629.60
Ch"ec- k-- T'otad: -629,-60 -00047823 MW
OFFICE SUPPLIES 54.94
Chac-k- rata4. -5494----000478a4-- -MW
SHOP SUPPLY INVENTORY
SAFETY--SUPPLIES-INVENTORY
INVENTORY FREIGHT /DISCOUNTS
Check Total:
224.70
215.07
15.00
454.77 00047825 MW
B
0
B
m�1
LL
0
0
5
5
5
5
e
5
0
5
E
5
5
5
5
5
UTILITY BILLING SUSPENSE - 2,100.00
Check Total: - 2,100.00 00047693 RV
25
JENSEN, PAUL
10 -00 -2002 GENERAL & ADMINISTRATION
UTILITY BILLING SUSPENSE
Check Total:.,.
26
,s
30
�In =41 1 r1 IG,L
10
11
12
RTMARY r.ARF 10 -05 -6075 EQUTPMENT-.REP-AIR-
20- 05- 6075'EQUIPMENT REPAIR
10 -03 -6075 ELECTRICAL SHOP
P0- 03- A075'E ECTRTCA SHO2_
10 -06 -6075 OPERATIONS
20 -01 -6075 UNDERGROUND REPAIR
10 -0P -6075 PUMPS
20 -02 -6075 PUMPS
10 -38 -6075 CUSTOMER SERVICE
P0-19 6075 CIl TfMER- SFRUjCE
10
151
10 -39 -6075 FINANCE
20 -39 -6075 FINANCE
10 -P9 -6075 _ENGINEERING
20 -29 -6075 ENGINEERING
10 -04 -6075 HEAVY MAINTENANCE
ie
KINNEY'S CARPET CARE
10 -01 -4520 UNDERGROUND REPAIR
Vendor Total:
- SAFETY -EGU I PMENT/PH! SICAL S-
SAFETY EQUIPMENT /PHYSICALS
SAFETY EQUIPMENT /PHYSICALS
SAFETY EQUIPMENT/PHYSICALS
SAFETY EQUIPMENT /PHYSICALS
SAFETY EQUIPMENT /PHYSICALS
- SAFETY EQU.IRMENTLPHYSICALS
SAFETY EQUIPMENT /PHYSICALS
SAFETY EQUIPMENT /PHYSICALS
-SAFETY_, EQ_IPMENT/PHY.3ICALS -_
SAFETY EQUIPMENT /PHYSICALS
SAFETY EQUIPMENT /PHYSICALS
SAFETY EG lTPMENT/P-HYSICALS-
SAFETY EQUIPMENT /PHYSICALS
SAFETY EQUIPMENT /PHYSICALS
- -C h -ec-k- To#a,1
is
KOMATSU EQUIPMENT CO
A
20 -01 -8287 UNDERGROUND REPAIR
LAERDAL
3
6
10 -07 -4760 LABORATORY
PO -Q7- 47-60_ LABORATORY
MISC LIABILITY CLAIMS
Ch-ec -k To -ta-1-
WTRLN, SANTA CLAUS- INHOUSE
- C ec-k -Tata1
LABORATORY SUPPLIES
LABORATORY - SUPPLIES
Check Total
2.'100.:00
`2,100.00 00047826 MW
0.00
87.50
:27.50`
100.00
100:00
325.00
160.00
157.50
157.50
44.00
129.00
86.00
66.00
44.00
, 105:00
1-.- 595 -.-00- 00047-827 MW
75.00
75.00 - -00047828 MW
3,217.50
• ----3,24-7-50-00047829 -MW
376.85
251-24-
- 628.09 00047830 MW
y r _�ivl r A r P1 t N 1 OF C L A I M S R E P O R T 09/07/2001- 09/20/2001 Page 7
SEP 13, 2001, 5:19 PM - -req: DOUGLAS -- -leg: GL JL - -loc: ONSITE-- - -fob: 229852 #J1218-- -prog: CK509 <1A06 >-- report id: CKRECSPC
.j Default Selection: Check Stock ID: AP t Check Types: MW. HW, RV, VH
•
Vendor Name Account # Department
= = = = ==.p = == = = =________________ ========== ___________==== =can =s =ram = = =
NS—INC —10=02 395 RUMPS-
-
LAKESIDE_ NAPA- _...
10 -02 -6051
• 20 -02 -6054
20 -02= 6073 -P
10 -03 -6071
UNDERGROUND - REPAIR
PUMPS
PUMPS
UMPS._. -
ELECTRICAL SHOP
20 -39 -6709 FINANCE
20 -39 -6710 FINANCE
Description
Amount Check # Type
=== cam=== == = ==a= = == == = = = = = == == = = = = == == = = = = == == = = = = =_ = == ====
TALLAC- PUMP - STATION- BYPASS L-
Check Total:
MOBILE EQUIPMENT
PUMP STATIONS
REPAIR /MNTC WATER TANKS
SMALL-TOOLS-- . - .. _.
SHOP SUPPLIES
MOBILE EQUIPMENT
- PRIMARY -- EQUIPMENT
BUILDINGS
SHOP SUPPLIES
- -SMALL TOOLS -
SMALL TOOLS
AUTOMOTIVE & GENERATORS
AUTOMOTIVE & - GENERATORS • --
MOBILE EQUIPMENT
WATER METERS
Chec k -- Total :
BUILDINGS
5,000.00 00047831 MW
5561._.
28.86
2.5.66
2,50
15.01
50.64
6-82
14.96
28.39
3.9-7
'72.23
667.12
14.55
15.01
--1i -5 S--52 00047832 MW
500.00
Check Total:- - - -- -- ----- -• - - -- 500-:-00 - - 00047833 MW
AUTOMOTIVE & GENERATORS 1,318.96
- .AUTOMOTIVE -& - GENERATORS- - - - -.. - -- - - - -- 843. 49 - - - -- - -. .
Check Total: ,1,562.45 00047834 MW
SERVICE CONTRACTS - - - -
SERVICE CONTRACTS
Check Total:
CONTRACTUAL SERVICES
CONTRACTUAL SERVICES
Check Total:
....$9:21-...... -- .
199.48
498.69 00047835 MW
TELEPHONE
- ..TELEPHONE - - - - - -- -
Check Total:
SMALL..- TOOLS
SMALL TOOLS
Check Total:
265.84
177.24
•------ •443 .-08 - - 00047836 • -MW
3.39
- - -- 2,-26•
5.65 00047837 MW
458.56
917.62 00047838 MW
TRAVEL /MEETINGS /EDUCATION
Check Total:
102.00
102.00 00047839 MW
LOAN PRINCIPAL PAYMENTS
INTEREST EXPENSE
Check-Total:
3.901.89
3,740.68
-7, 642. -57 - -00047840 MW
10 -04 -6012 HEAVY MAINTENANCE
__10-43-402-1 -HEAVY MAINTENANCE_.•
10 -04 -6041 HEAVY MAINTENANCE
10 -04 -6071 HEAVY MAINTENANCE
1 n- na- x.073- HEAVY-- MAINTENANCE - - --
10 -05 -6073 EQUIPMENT REPAIR
10 -05 -6011 EQUIPMENT REPAIR
20=05- 6011- .EQU-IPMENT...REP-AIR - .
20 -01 -6012 UNDERGROUND REPAIR
20 -38 -6045 CUSTOMER SERVICE
''
'
`
'
B
6 LIFT EQUIPMENT CERT. CO. INC.
10 -04 -6041 HEAVY MAINTENANCE
B
' LILLY'S TIRE SERVICE INC.
10 -05 -6011 EQUIPMENT REPAIR
pn- 05- 6011EQUIP.MEN•_REPAIR-._.. -- .--
'
1.0.-.38 -6030_ CUSTOMER-SERVICE
20-38-6030 CUSTOMER SERVICE
_LOOIS
,
LOOMIS FARGO & CO.
10 -39 -4405 FINANCE
20 -39 -4405 FINANCE
M C I WORLDCOM
10 -39 -6310 FINANCE
__ D- 39=6310 FINANCE
02- 6013__'UMPS__
20 -02 -6073 PUMPS
' S_C INDUSTRIAL _ BSJPPLY _.CIl___.._.1.0=
MAC LEAN, RODERICK
10 -06 -6200 OPERATIONS
IJAf WT1.1 f1f11.1A, f\ 1 O. WIAA If1n TT
20 -39 -6709 FINANCE
20 -39 -6710 FINANCE
Description
Amount Check # Type
=== cam=== == = ==a= = == == = = = = = == == = = = = == == = = = = == == = = = = =_ = == ====
TALLAC- PUMP - STATION- BYPASS L-
Check Total:
MOBILE EQUIPMENT
PUMP STATIONS
REPAIR /MNTC WATER TANKS
SMALL-TOOLS-- . - .. _.
SHOP SUPPLIES
MOBILE EQUIPMENT
- PRIMARY -- EQUIPMENT
BUILDINGS
SHOP SUPPLIES
- -SMALL TOOLS -
SMALL TOOLS
AUTOMOTIVE & GENERATORS
AUTOMOTIVE & - GENERATORS • --
MOBILE EQUIPMENT
WATER METERS
Chec k -- Total :
BUILDINGS
5,000.00 00047831 MW
5561._.
28.86
2.5.66
2,50
15.01
50.64
6-82
14.96
28.39
3.9-7
'72.23
667.12
14.55
15.01
--1i -5 S--52 00047832 MW
500.00
Check Total:- - - -- -- ----- -• - - -- 500-:-00 - - 00047833 MW
AUTOMOTIVE & GENERATORS 1,318.96
- .AUTOMOTIVE -& - GENERATORS- - - - -.. - -- - - - -- 843. 49 - - - -- - -. .
Check Total: ,1,562.45 00047834 MW
SERVICE CONTRACTS - - - -
SERVICE CONTRACTS
Check Total:
CONTRACTUAL SERVICES
CONTRACTUAL SERVICES
Check Total:
....$9:21-...... -- .
199.48
498.69 00047835 MW
TELEPHONE
- ..TELEPHONE - - - - - -- -
Check Total:
SMALL..- TOOLS
SMALL TOOLS
Check Total:
265.84
177.24
•------ •443 .-08 - - 00047836 • -MW
3.39
- - -- 2,-26•
5.65 00047837 MW
458.56
917.62 00047838 MW
TRAVEL /MEETINGS /EDUCATION
Check Total:
102.00
102.00 00047839 MW
LOAN PRINCIPAL PAYMENTS
INTEREST EXPENSE
Check-Total:
3.901.89
3,740.68
-7, 642. -57 - -00047840 MW
SEP 13. 2001
229252 J121g ~ ~ -p_ __.
DOUGLAS---leg:
OUGLAS" -1 e9 • C' Amaun ¢ .........
5; 14
Selection: Check
Fault
u r CLAIMS
b
r H r `" t L JL - -Ioc:
QN51TL
_- - •- -_`�._ 1. -
0000000000 00000==000.0000000000=000000 � .. -- ` s00ffi40saas c sa =aaSaa s
� ate
=
_-IOINXNRAYMEPTf y
-
Stock ID, AP � Check Types: MW.H V.VH
Acco unt 4 Department �8ICTipti °n
N TEE T P�gECh e C k Total:
AL PAYMENTS
20_39. -010 FINANCE LOAN PRINCIP
INTEREST EXPENSE
heyk�atal= ' �—
��q- FI _ CONTRACTUAL � ect T 1:
S LABORATORY �_ _ f MP STATIONS
2
A mo=°Name
aaar aas AS
MARTIN- WOBELLAS. LOUISE
MATYINGER, DANIEL
-- - -- FINANCE
20-19-6709 10 NANCE
0 -07 ~440 - -- --'".. A PUMP STATION
0-02--6051 PUMPS LUTHER
s �.Chec-k- N°.ta1�
•-+ 6045 PUMPS SHOP
ctUP LIES
10 -02- PUMPS � P _•. ---.�
20 --`- -- U.ILDI
MEEWS BUILDING CENTER
MAINTENANCE
- 02 -bQ50 SH NGS--- -__ENANGE
MAINTENANCE ROUNDS �` EQUIPMENT
6071 HEAVY INTENANGE- SECONDARY E p1ANG-
10`04 042 HEAVY MAINTENANCE ANGE GR0IDSPASS PUMP STATION
10'04 b
10..04'
6022Ah1E
-6048 PUMPS
-6073 PUMPS
"3.740.62
' 70. 00047841 MW
7.642.57 '-
1.811 2.
1.716.67 04,7842..._
70.47
7
13.75
41.26
58
MAINTENANCE LUTHER TOOLS
11-67
-
UNT`t SMALL Q1.S 24 5O
ari"1. -�U MAINTENANCE
q . 04
.
GROUNDS
BUILDINGS
30.39
10-Q
UMP _
D 02 60 ¢ REP�LR -` P PLIES -BRA.{ WAS HE -- -~ "�'5
20-0'` ^6042 PUMPS
'20-02-604110031
- - 41• SUP HE
to-e9- 05 ENGINEERING e HI OVER _- MANH.: ---'"
to-2q -652 .EE Y PI OOLS-PR NAB
0-01-'8229 UNDERGROUND REPAI S- ' IRQt1 dI EQUIP/BLDG `..
10~ UND FILTER
20 01 6 ,. + NG WELL -S-'-"
052 :� .►
10-04-6021 6 ENGINEERING YEMAINTENANCE
-. -b071 PUMPS
20 02 ~6071 PUMPS
MID MOUNTAIN MOBILE COMM.
MOSBACHER, MARY LOU
10 -p2 -6073 PUMPS REPAIR
._056 UNDERGROUND
SHOP SUPPLIES
taL�
SHOP SUPPLIES-- ����,4g
TOOLS 1, 12'-x•92 00047246 MW
5MALL Lc�- CE ENT
/REPLACEMENT
REPLA Total: q0
REPAIRS
Check 0047847
72.51
568.32
4.60
4.60 ,.nn4784``f"
512.25
A
RADIO
/EDUCATION
TRA EL/MEE TINGS /1
TRAVEL /M _s-"__
V 6200 BOAR DIRECTORS DIRECTORS
20-19-6200
0-1 -'6200 BOARD OF
L A I M S R E P O R T 09/07/2001- 09/20/2001 Page 9
THU, SEP 13, 2001, 5:19 PM - -req: DOUGLAS -- -leg: GL JL - -1oc: ONSITE - -- -fob: 229852 #J1218-- -prag: CK509 <1A06 > -- report id: CKRECSPC
Default Selection: Check Stock ID: AP s Check Types: MW,HW,RV,VH
Vendor Name Account # Department Description
11
2
Amount Check # Type
5 = === = == =x ===- xx =a == xs = = = = =_ == == == xa= == x=== = = == == = = ==== ====== _== === ==== ====== = - = =x= == ===== = = = === === = = == == ====
Z.11 . ' . 9 . _
• -•
5 a
0
1..1
15
16
53
19
.3
4
1
e
7
IRk1ENT-RERAIR
10 -06 -6042 OPERATIONS
20-02 -6042 PUMPS
1n-OP-7395_RUMPS--
20-02 -6050 PUMPS
10 -02 -6048 PUMPS
1n- nP -60 &1 PUMPS
20 -02 -6051 PUMPS
10 -02 -6073 PUMPS
Pn- O. -An73 PUMPS
10 -02 -6071 PUMPS
20 -02 -6071 PUMPS
10 -411-6051 FLErTRICAL RHI1P
10 -03 -6073 ELECTRICAL SHOP
10 -04 -6041 HEAVY MAINTENANCE
- AUTOMOTIVE- &-GENERATORS 4.80
GROUNDS & MAINTENANCE 164.03
GROUNDS & MAINTENANCE 39.56
- T- ALLAC - -- PUMP -STAT I ON- BYPASS-1. 20.57
WELLS 12.83
LUTHER PASS PUMP STATION 9.93
PUMP-STATIONS- 1�,,
PUMP STATIONS 16.03
SMALL TOOLS 0.79
- SMALL- -TOOLS 0.78
SHOP SUPPLIES 2.67
SHOP SUPPLIES 2.67
__-PUMP-STATIONS 8.06
SMALL TOOLS 30.68
' BUILDINGS 46.37,
_ ___10 -04- 6071._HEAVaLMA.IN-TENANCE_ -SHOP-SUPPLIES 11.24 --
10 -06 -6027 OPERATIONS OFFICE EQUIPMENT REPAIR 11.75
10 -28 -6042 ALPINE COUNTY GROUNDS & MAINTENANCE 48.57
1n- IR -A071 rUSIDMER-- SERVICE - SHOP - SUPPLIES - - 9.89
20 -38 -6071 CUSTOMER SERVICE SHOP SUPPLIES
s NEVADA ENERGY SYSTEMS INC
1 9
0
10 -02 -7393 PUMPS
10 -02 -7392 PUMPS
Check Total:
_ Y
2 NEWARK ELECTRONICS -
10- 03 -605i ELECTRICAL SHOP
4
OFFICE DEPOT BUSINESS SERV DIV 10 -21 -4820 ADMINISTRATION
PO- P1 -4REn ADMINISTRATION.
7 10 -29 -8235 ENGINEERING
20 -29 -8290 ENGINEERING
9 10- 39 -4RPn FINANCE
20 -39 -4820 FINANCE
10 -37 -4840
PO -17 -4
10 -38 -4820
20 -38 -4820
1Q-17-48P0
20 -37 -4820
10 -00 -0428
in- PR -4RPn
90 -98 -8829
INFORMATION SYSTEMS
P40
INFORMATION-SYSTEMS
CUSTOMER SERVICE
CUSTOMER SERVICE
INFORMATION. SYSTEMS_
INFORMATION SYSTEMS
GENERAL & ADMINISTRATION
Al P T NE-CO( wNTY
EXPORT PIPELINE GRANT
OLMSTEAD, CLIFFORD & LOU
CONTROL, GEN ENG, TALLAC PS
CONTROL, GEN ENG, CAMP RICH
- -Gh ec k To ta1-:
PUMP STATIONS
Ch-eck Total.-;-
5
6
8
9
10
11
12
13
14
15
16
17
15
19
20
21
22
23
24
464.10. 00047848 MW
2,500.00
2,659.64
25
26
27
28
29
30
31
32
33
37
39
39
5.159,464--00,047849 M!4 ,
42
44
OFFICE SUPPLIES
- OFFICE- SUPPLIES
DEWATERING IMP
TREATMENT, ARROWHEAD WL #3
OFFICE SUPPLIES
OFFICE SUPPLIES
DISTRICT COMPUTER SUPPLIES
DISTRICT-COMPUTER-SUPPLIES
OFFICE SUPPLIES
OFFICE SUPPLIES
OFFICE --SUPP -LIES
OFFICE SUPPLIES
OFFICE SUPPLIES INVENTORY
_oEE ICE -SUPPLI ES_-
ALINE PHASE II DIP TO END
Check Total:
244..,30,,
244.30=00047850 --MW
49.46
32.96
96.03
35.25
29:59
19.72
38.51
25.67-
61.07
40.69
13.98
9.32
967.48
684-43
64.04
2,110.40 00047852 MW.
10 -00 -3401 GENERAL & ADMINISTRATION CONNECTION FEES
10 -00 -0500 GENERAL & ADMINISTRATION UB CUSTOMER RECEIVABLE
Check Total:
45
46
47
4s
49
5o
51
52
53
54
55
55
57
ss
59
so
2,255.00
23.67
--2, --278- s7 -00047853 MW
69
70
71
72
73
74
75
ig
147/1.2/V1. r v N N 1 0 F CLAIMS REPORT 09/07/2001-09/20/2001 Page 10
THU, SEP 13, 2001, 5:19 PM --req: DOUGLAS---leg: GL JL--loc: ONSITE----job: 229852 #J1218---prog: CK509 <1A06)--report id: CKRECSPC
2 Default Selection: Check Stock ID: AP I Check Types: MW,HW,RV,VH
! Vendor Name Account # Department
4 __=
6,..eozaxac
9
• • ,
!.)
1-00-0-631.0-GENERAL -&-ADMINISTRATION--
10-01-6310 UNDERGROUND REPAIR
20-01-6310 UNDERGROUND REPAIR
40,-02-..6310 PUMPS
10-06-6310 OPERATIONS
10-07-6310 LABORATORY
20-07=6310 LABORATORY
10-22-6310 HUMAN RESOURCES
20-22-6310 HUMAN RESOURCES DIRECTOR
10=37r-6310-INFORMATION-SYSTEMS-
20-37-6310 INFORMATION SYSTEMS
20-02-6310 PUMPS
11.
-
? PEARSON deRIDDER & JOHNSON INC 20-29-8270 ENGINEERING
I PIONEER AMERICAS INC
PRO LEISURE
OWNVOLD'S
I R SUPPLY
RADIO_SHACK
RANDYS LOCKSMITH
' REED ELECTRIC
10-06-4750 OPERATIONS
10-21-6621 ADMINISTRATION
20-21-6621 ADMINISTRATION
/0-02-6075
20-02-6075
PUMPS
PUMPS
20-01-8287 UNDERGROUND REPAIR
20-01-6052 UNDERGROUND REPAIR
10-29-8235 ENGINEERING -
10-27-4840
20-37-4840
10-29-4820
__Mr:29-4820
10-02-6051
20-02-6051
10-04-6071
jn-P7-4RPG
20-27-4820
INFORMATION SYSTEMS
INFORMATION SYSTEMS
ENGINEERING
ENGINEERING
PUMPS
PUMPS
HEAVY MAINTENANCE
_DISTRICT-INFORMATION
DISTRICT INFORMATION
Description
-ATLEPHONE
TELEPHONE
TELEPHONE
-TELEPHONE
TELEPHONE
TELEPHONE
TELEPHONE.
TELEPHONE
TELEPHONE
TELEPHONE
TELEPHONE
TELEPHONE
= =
Check • Total:
WATER RESOURCES EXPLOR 2001
Check Total: •
CHLORINE
INCENTIVE
INCENTIVE
Check Total:.
& RECOGNITION PROR
& RECOGNITION PRGR
Check Total:
SAFETY EQUIPMENT/PHYSICALS.
SAFETY EQUIPMENT/PHYSICALS
Check Total:
WTRLN, SANTA CLAUS-INHOUSE
PIPE, COVERS, & MANHOLES
DEWATERING IMP
Check Total:
DISTRICT COMPUTER SUPPLIES
DISTRICT COMPUTER SUPPLIES
OFFICE SUPPLIES
OFFICE SUPPLIES
PUMP STATIONS
PUMP STATIONS
-Check Total:
SHOP SUPPLIES
OFFICE---SUPPLIES-
OFFICE SUPPLIES
Check Total:
10-03-6051 ELECTRICAL SHOP PUMP STATIONS
REMEL. INC (CHRISOPE) 10-07-4760 LABORATORY
Amount Check # Type
== == ====== ====
-676-w-33
7.75
7.75
---1-7.36--
15.32
9.55
9.57
6.38
-1-21.79-
81.19
17.36
-9764-71 00047854 MW
6,250.00
- - -6,25000 - 00047855 MW —
2,805.75
2,80575 00047856
170.95
441.-96
284.91 00047857 MW
73,57
73.56
147.13 00047858 MW
147.98
1,235.72
188.95
1,572.65 00047859 MW
---• 23,09 -
15.39
B.01
5,34
18.72
18.72
-89,27 ..... 00047860
MW
12.31
-2-.-95
1.97
17.23 00047861 MW
Check Total:
LABORATORY SUPPLIES
10,165.38
10,165.38 00047862 MW
- -
80.38
2
4
5
5
16
7
20
21
64
65
sE' ^~' 2m0t.
l
^
N« ` O= m'
'
5:1q
PM
--r
�u
: DOUGLAS---leg:
-- w8'
GL
,./-//1.-, ^,/`_ Selection: Check Stock ID: - Check Types:
*l
ndor Name
'
E
p«~
g:
_' -�~= ===~- -
.w
R�
u-
'V
r
-~��
'
jw: =='-- wJ12^~ --
u-
=_
_ -_ - - - -- ---- _-. _-___-' _-
= Department Description
--
•
Check Amount
Type
-------LABORATORY-SUPPLIVr 130.64 00047863 MW
nvn
RICH'S SMALL ENGINE SERVICE
SACRAMENTO BEE, THE
SAFETY u`EEN CORP.
ENGINEERING
x-6J71 UNDERGROUND mE
ENGINEERING TREn~_
PUMPS
OTHER SUPPLIES
Check Total:
. 6 00047864 AAW
52.93
-o`=~- -' 119 84 0004786
~ M
N
~" BvpApS -
95.31
-'-
"~
__
=
M
W
Ea=~_4m._ __ c� ' - u"~
10 -07 -4 SHOP REPAIRIMNTC WATER TANKS 24.27 _ _
UN=_
PUMPS
^
�
' x
-U
�u'
tTotal:
10-28-6042 ALPINE COZEpopt____ & MAINTENANCE
•
ELECTRICAL
_-
.
a
Check Total:
_'__ e°°~ 1 MW
Check Total:
tae �'
Check Total:
Check Total: =v=..-
t6*' 66 00047 Mw
' '-
70 MW
vW te 00047871
-
Total: 47,334.41
'' --
ELECTRICITY
wv-°--- -
__
00047874
10-00-6310 GENERAL & ADMINISTRATION
MW
.. may, 1.71 Ui
5:19 PM .-re4:
gEP 13, 2001,
,RV•VH = ms®n =•
F Check MW :HW t�e�CT�ptlofln =sn= EDUGAT�
k ID; AP k Types: =nmss =n =nc AVE l SET-1 "Gheck Total:
Check 5toc � #- DePartment _--- --
Selection. IR�R—
Account = nsn = == ENSfr".�-
afau1t 00 -..BOA VATIONeck
= =snn b2 WATER CONSER Gheck Total:
endor Name °____¢_ - _
= -n = =ns
== ss =a = =R�:_ J.__ - INPORMATIDN TORS- --
=A =`"�'mI Gl3A GENERA
IIISTRICx IuEr TORS
F CLAIMS - h 22R85 0J1218 ^"_Pro9: CK509
r y M GL JL" -loo; ON5ITE-
Ddt]GLAS- --
50-BRIO 20 =2 -6660 _ _.AU' QM GENERA
AUTOMOTIVE & Check Total:
�_EG►�-� T REPAIR &
20-05-6011 10-!3°1-1-EQUIPMENT-REPAIR.,-
0 1 EQUIPMENT COVER Check Total:
5,
GROUND REPAIR
�O -01 -6052 UNDER _--- -" PUMP STATIONS
f9,
EN -PREP AIR. -_-- -.
- -� _ Type
Amount Check
MW
47976
0047877
48.00
MW
6.29 00047878 MW
33 00047879 MW
20.33
--- --` WELLS TC- NATER--TANKS
R EQUIPMENT
- •- --•""�- " 15-09. '• 47880
PMPS-- ��`_ N SHOPASUPPLIES - 736.38
CK EPAIR�MN
10-02 -6051 PUMPS
SUPPLY 20-02-6050 kR EQ
MBING NTENA
SOUTH TAHOE BLOCK
SOUTH TAHOE PLU
- ,17.85
847.28
15.61
146.08
TOOLS Total:
14 6021 HEAVY MAINTENAN�,�- SMALL Check T
10-04-6071
+ •3 �lEAY UND R
0 -0 17" -
0- 04"6071 pINTE REPAIR 146.64 __. M
+ ^+ ... UNDERGROUND
T LILI I-{ DIST
KG EXPENSE
TI �pOQ47981
20 ^01 ^6073 IGH -- 2,014.43
ADMINISTRATION STREET UTILITIES - Ap ININISTRA OTHER
GENERAL && ADMINISTRATIONA
Check
10-00 -67 Qn GENERAL s enMSNI�RAT�N --
9
Total:
1, 311.00 000
rAL 1,411.60
47982
SAL tal: A 49
MW
ISTRATION- .__R
. +_• + -- G�GENF�L. & ADDS NISTRATI011
10'00 ^6370 GE
-
20 -24 ^4820 ENGINEERING 10N
6621 R1�7'- IDN"""`"�� ~_
10-21`_ DMT ADMINISTRATION
SPEED 10 -21 -6520 ADMINISTRATION
20- 21-6520 ADMINISTRATION _ _ ..
9 ___ 1SL-r^'Z^66620_ DISTRICT INFORMATION 2p'R7- PUMPS
02-7345 ENGxNEERING. -__
_-__.20_ 2_48 o PUMPS p1PELINE GRANT
20 -02 4820 B�RAN�
40 -98 -8824 EXPO t; P_I ELIN
5i-
1 p-ERATIONS -- -___
.8.920 -Jy UND REPAIR
;--- "� Y_ - Q 0 -4820 UNDERGROUND REPAIR
01 -4820 UNDERGROUND
BRAT I-ON -- --
20- _ DNIMI
20 -21 -6520 ADMINISTRATION
ED PHOTO
EASE' � S q
REFUSE Check To
,66
SUPPLIES RECOGNITION PRGR __:__._._._______5_ 0 09
OFFICE EGO •ZION- R _ _
INCENTIVE VX- RECOGNI- - RRG _... -.
.. ".INCEN --"- 4'.6e� ---
SUPpLIES __ _ - 3.08
EXPENSE - 8.(2
SUPPLIES "_� i.g...2,6- -'-- -_.
PUBLIC RELATIONS BYPASS L _ -_ 4.51
PUBLIC RELA
TALLAC PUMP STATION D -MTN . WELL --- - - -.._ • i8 91
kfOU5E. --G �______. Q4 Q0047993 MW
OFFICE SUPPLIES TO END
OFFICEPHA96 II DIP -'
BLINE BRASS 1-AKE k To
21.77
21.77
HYDRANTS
OFFICE SUPPLIES
OFFICE SUPPLIES _--"
SUPPLIES
2.69
n SEPn r 13, 2001
ault Se
5tbck
,action: Check
oe-g9 S0 sa �� =so egg=
ndor
•
aERT
SUBSTITUTE PERSONNEL &
A TECH INC.
SUNGARD BI,-
LYNN M.
: S UTER ASSOCIATES
1:
DIGITAL SOLUTIONS
al
Acc
RSERVICE
CLAIMS °b 28s85g #J1218 °wPro9
ONSITE
P A Y M E N T
_ -1°c:
_..leg Type
Amount asnsy mes �Sa
-�� t i on = °�_ °_._ �- 28.63
Check Types: MW�HW,R Description
escriP ,.�'z =s�gsss 04047884.. MW
j __ __¢ wx= =w � .,1===IEB = 1 001.37
t Department
eP ��� ssa =a�r� s -E1F LIES tat'
M4� --
OFFICE SUPPLIES Check Total:
CKau-,
._._ 600.54
54
GENERATORS AUTOMOTIVE & GENERATORS
AUTOMOTIVE �` Check...T_otaia SERVICES
20-38 -4820 CUSTOT
10 -05 -6011 EQUIPMENT REPAIR
20-05 -6411 EQUIPMENT REPAIR
----'
REPAIR
GROUND REPA TRACTUAL SERVICES
iQ�01 -4445 UNDERGROUND
I 'CONTRACTUAL�k_Ta" �J 949.60
D REPAIR ,--- -"_._�0_.. OOQ47887
• - ' 4445 UNDERGROUND -_-.__-
�0 Ob -44Q5 OPERATIONS SERVICE CONTRACT k Total:- - - - ---
Ch e c . 3 'i- --04478137
TION SYSTEMS ......- ... .
INFORMATION
SERVICES
14'3 �"b030 CONTRACTUAL Tats 1:- .._. --- 3+ 149. $4 ..-
CONTRAC
.Check_.
AXON 0444788
INFORM ___.. 3, 214.71
7 -44p5 DISTRICT _- TRACTS
ERVICE CONTRACTS -... al-
CONTRACTUAL
GONTRAOTUA�
boa• 0p047885
2, 173.72
ES 1308.00
SERAIC €� 104b 2---00047886-
SERVICES
-MW
10-2 GONTR
- _`— ADMINISTRATION
5ERVIGE Check T°
10 -21 -6030 ADMIN ISTRAT SON OLEra
_ 20_.21sb030- -ADMIN - COVERg'' -84- MAN k T ota
._. PIPE.-- Che
MW
47890 MW
55.00 000 l
11 965 00047891 MW
NR
_DERGRQUND REP AI ...-
_ L 6052 DISPOSAL ck T
1y1STRATION - REFUSE Che L
C_...._1 •
ERAL a,_ A ARROWHEA tal
,
Total:
1 QQ04789R MW
DMI D W #3
GEN To ;
1p- 00^#,324 - TREATMENT'... Check
R11IGE 8b
_ BYPASS. L _.._..._.- 57 MW -.
�� ¶ALLAC PUMP_ STATION Og- _40047893
°� _- ....._ AD5JLEG NOTICES k - T °tal:- _- ...._-
ADSJLEGAL Chec 16.86 86 0047894.... -MW
10_21'"4930 ADMINISTRATION I. _
• � _- __- __ - - -._ ._.�
20,81 -4930 - Check Ta
5t
10- 395.L'DMIN ATION
i _ ■. N
�_ -- - REPAIR
d 20_41 -4620 UNDERGROUND DS & Mp ANbpLES
CHEVRON _-- - -- -._- -- ._-
TAHOE PARADISE��_r- 20`02- 64452�P�RO�IWD EEPAIR.. _ --'- rrr__ --
s--r_ SUPPLIES DERQROUND- REPAIR - SHOP 6052- ELECTRICAL SHOP
ar cUPp1Y..b071 ELECTRICAL
2Q 0 -bb0 0 P1iMP� _."_.._..._SHOP
20- 03•-6041 ELECTRICAL
DIESEL
1,027.54 MW
2:309.67 00047895 INTENANCE _-
GROUNDS OuERS+ heck Tatal: ------334-3 g._•
5P-C ,__b g6
MANHOLES- 105.31
COVERS,- 56 56
IEg _..... ------ 9b, 5b
SH SUPPLIES
SHOP
BUILDINGS
rt TAHOE SAND
iU, SEP 13, 2001,
5:19 PM --req:
p F
r H Y TI h N 1 ]QC:
DOUGLAS -- -leg. GL JL --
- t Check # Type
Types: MW'HW'RV,
tment
<1A06)-<1A06 ?_—Teo"'"
REPORT CK509
ONcaIL A 13ob5 229652 #J1215- -Prop:
Amount
sasm sass =6S =as
=mam=as -r_
Description
aaaaaaa as =aaaaaaa =¢ma °a
DNS-- -
- --85'- 00047897 MW
3, 485.11
Check T VH
a=== =3
OR -_
ID. AAP
Check Stock ,_____-
amsa = = =my==== .�-- ----�� 672.75 00047896 MW
Check Total
)efault Selection Account #
1.0 =c 6051'ELECTOR ICAL-
1�Og 6051
a=='= =seam'== =m9
==smassammfc=a=
Jendor Name
Depar
1 X287_- UNDERGROUND - REPAIR -
�'.kil- RiLOENER9T�-- 1- -20=(?
8
9
UNITED RENTALS
a2
: W R CORPORATION
COMPUTER SUPPLY INC
VISIBLE
WACHS��COMPANIES
9
ENVIRONMENT FEDERATION
WATER
POLICY REPORT }
WATER
WECO INDUSTRIES INC
. a
2Q-38_6250 CUSTOMER SERVICE
_. DUES _�c..- .MEMBERSHIP- '"- -`-�_-
- - DUES & MEMBERSHIPS
WTRLN.- - -SANTA - CLAUS =INHOUSE - -"
Check Total:
At3TOMOTI�1E- &.GENCheck Total:
Total:
ER-SERVICE. ST OI N BYPASS L
LAC PUMP NCE -- _
10 -02 -7395 PUMPS
10 -04 -6042 HEAVY MAINTENANCE
MAINTENANCE SUPPLIES
10,Oq. -604] HEAVY LABORATORY Check Total:
- _ 1011.77
20-37-4820 INFORMATION SYSTEMS
LABORATORY 3].62
20 -Q7 -4760
OFFICE SUPPLIES
- INFORMATION SYSTEMS OFFICE SUPPLIES c metal
- - 55.47 -00047898 MW
TAL MAINTENA
GROUNDS & _, . - Ch -ec�_ • 205.06
BUILDINGS 23 26
�LlP_ELIES•- ._-- ..._... - - --
0.80 00047899 MW
j.. 598.56
97 10047900 - -_MW
1.,-119
.146.91. 00047901
20-05-6011 EQUIPMENT REPAIR
10- 04"6200 HEAVY MAINTENANCE __-
6660 DISTRICT INFORMATION
_68
2Q -27-- SHOP SUPPLIES
11071 UNDERGROUND REPAIR
10 -01°
--`C 384.35
° _:.38A•r35• . -00Q47903 -MW
& GENERATORS o. a
---- 910.00 0047904 -MW
9-10--00
7RAVELIMEE�Ch�c,Ak_..T o�l ` -�J ----910,-00-00047904---
-
'650. 00 00047905 •- MW
EXPENSE _ 50..0a _
WATER ____ ---Che fatal . MW
68b•4'S 00047906
AUTOMOTIVE _ RATO-
10_03 -6041 ELECTRICAL SHOP
C��3IS�L --. ---
$-a - ELECTRICAL SHOP
10-03"607] SHOP
10 -03 -6024 ELECTRICAL .1,
20- 03-6073 ELECTRICAL CHOP
20-03-6050 ELECTRICAL
WEDCO INC
�_• - -' REPAIR
20_01 --6052 UNDERGROUND
5 Q79.09
BUILDINGS - -- 19.88
97.22
- SUPPLIER 19.88 -�
FURNACE EQUIPMENT ELECTO _ 90.77
SMALL TOOLS
Ch 47907 MW
WELLS _ ,877.
OE 000
_V CL ck Total:
52257.51
PIPE, COVERS. & MANHOLES
. - - _ ... ..... .... .. . r . V„ 3J, W. r n r n t 1\ 1 U r C L A I M S R E P O R T 09/07/2001- 09/20/2001 Page 15
THU, SEP 13, 2001, 5:19 PM - -req: DOUGLAS -- -leg: GL JL - -loc: ONSITE - -- -job: 229852 #J1218-- -prog: CK509 <1A06 > -- report id: CKRECSPC
8 3
ii Default Selection: Check Stock ID: AP s Check Types: MW,HW,RV,VH
Vendor Name Account # Department Description Amount Check # Type (�
5 a= = xa=== amxxaxmex= Hama =xs= xxml= a = =x= x== x =maeatarsa>axxoxxoavm�ax�ax >ex= ssexaaa�>= atammes= maw= xneaxamx _.=__.__... as =m======= = ===
61 10- 04-6021 HEAVY MAI-NT- ENANCE PRIMARY-EQUIPMENT- 490. 18 8
10 -04 -6023 HEAVY MAINTENANCE FILTER EQUIP /BLDG 471.13 M
8 10 -04 -6073 HEAVY MAINTENANCE SMALL TOOLS 69.75
9 +n- -,04a A rl4E COUNT-Y- GROUNDS MAINTENANCE 71.88
_2g --&-
13 10 -02 -6073 PUMPS SMALL TOOLS 36.15 m
20 -02 -6073 PUMPS SMALL TOOLS 36.14
12 fin- 04-,07 HEAVY- MAINTENANCE- SHOP- SUPPL 44 -02
- -LES
20 -02 -6050 PUMPS WELLS 78.13 ie
10 -02 -6071 PUMPS SHOP SUPPLIES 7.39 m
16 PO -OP•- "071 PUMP8 SHOP SUPPLIES- .. 7.38— 20
- 21
16 Check Total: 1,593.86 00047908 MW EI
9A - - • HEAVY 10 -07 -4760 LABORATORY LABORATORY SUPPLIES- 100 0-
il - --
Is ili
Check Total: 100.90 00047909 MW p
nxvr,FN RFRVICE 10- 07- 476O._- LABORATORY LABORATORY-SUPPLIES 26 -
nw -3:-48
z 20 -07 -4760 LABORATORY LABORATORY SUPPLIES 175.65 M
d 10-02 -6071 PUMPS SHOP SUPPLIES 104.20 at
?- PUMPS SHOP SUPPLIES 104.19
PO -0 1071 --
j10 -01 -6071 UNDERGROUND REPAIR SHOP SUPPLIES
d 10 -04 -6071 HEAVY MAINTENANCE SHOP SUPPLIES 282.87_.
607-1x ELECTRICAL SHOP-SUPPLIES 19.07
— 20-03 - - -SHOP
Check Total: 958.88 00047910 MW
9
DAVF -6n4P NECOUNTY-------------GROUNDS-Ai-MAINTENANCE 3.120.00
6 7E11 MFR. X0_28 -ALPI_
Check Total: 3,420 00 °.00047911 MW t;m
.
FnR( TFNCFR WATER €SOURCES- EXRLOR 18.713:75 -=
INC .__20_-2_9=--8270-ENGINEERING - - - -R -2001
B
Check Total: 18,713.75 00047912 MW
° 6 +0 1 AR0RATOR
MONITORING- 5,590.50--
nQY
X_ENVTROTE0HNn1 _- 20-07 -Y
10 -07 -6110 LABORATORY MONITORING . . <.421.00 M
6 Check Total: ' .6,011."50 - 00047913 MW -"
iii
0
Grand Total: 369,109.74 m
E
i
m
m
R
0
) m
I
E
m
E
m
m
SOUTH TAHOE PUBLIC UTILITY DISTRICT
BOARD AGENDA ITEM
TO: BOARD OF DIRECTORS
FR: Richard Soibria, Assistant Manager/Engineer
RE: BOARD MEETING September 20. 2001 AGENDA ITEM: 12.a
ACTION ITEM NO: CONSENT CALENDAR ITEM NO:
ITEM-PROJECT NAME: CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION:
MOUNTAIN_CASCADE. INC.. AND VALLEY ENGINEERS. INC. VS. STPUD BOARD OF
DIRECTORS AND STPUD. COUNTY OF EL DORADO. SUPERIOR COURT CASE NO.
SC20000050
REQUESTED BOARD ACTION: Direct staff
DISCUSSION: Pursuant to Government Code Section 54956.9(a), Closed Session may be
held for conference with legal counsel regarding existing litigation.
SCHEDULE:
COSTS: ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED TION: CATEGORY:
GENERAL MANAGER: YES NO GENERAL
CHIEF FINANCIAL OFFICER: Y �C1F��...,Q.,,,._NO WATER X
SEWER
SOUTH TAHOE PUBLIC UTILITY DISTRICT
� BOARD AGENDA ITEM
T0: BOARD OF DIRECTORS
FR: Robert Baer. General Manager
RE: BOARD MEETING September 20, 2001 AGENDA ITEM: 12 . b
ACTION ITEM NO: CONSENT CALENDAR ITEM NO:
ITEM-PROJECT NAME: CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION:
STPUD VS. ARCO ETAL SAN FRANCISCO COUNTY SUPERIOR COURT CASE NO. 999128
REQUESTED BOARD ACTION: Direct staff
DISCUSSION: Pursuant to Government Code Section 54956.9�a), Closed Session may be
held for conference with legal counsel regarding existing litigation.
SCHEDULE:
COSTS: ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED A TION: CATEGORY:
GENERALMANAGER: YES NO GENERAL
CHIEF FINANCIAL OFFICER: YE �w..�.NO WATER X
r
� SEWER
SOUTH TAHOE PUBLIC UTILITY DISTRICT
BOARD AGENDA ITEM
TO: BOARD OF DIRECTORS
FR: Robert Baer. General Manager
RE: BOARD MEETING September 20. 2001 AGENDA ITEM: 12 . c
ACTION ITEM NO: CONSENT CALENDAR ITEM NO:
ITEM-PROJECT NAME: CONFERENCE WITH LEGAL COUNSEL - ANTICIPATED
LITIGATION �ONE CASE)
REQUESTED BOARD ACTION: Direct legal counsel
DISCUSSION: Pursuant to Government Code Section 54956.9 (c). Closed Session may be
held for conference with legal counsel regarding pending litigation.
SCHEDULE:
COSTS: ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED CTION: CATEGORY:
GENERAL MANAGER: YES NO GENERAL
CHIEF FINANCIAL OFFICER: Y C`('��c�Q�,�. iN0 WATER
SEWER
SOUTH TAHOE PUBLIC UTILITY DISTRICT
. BOARD AGENDA ITEM
TO: BOARD OF DIRECTORS
FR: Robert Baer. General Manager
RE: BOARD MEETING September 20. 2001 AGENDA ITEM: 12. d
ACTION ITEM NO: CONSENT CALENDAR ITEM NO:
ITEM-PROJECT NAME: CONFERENCE WITH REAL PROPERTY NEGOTIATORS
REQUESTED BOARD ACTION: Direct negotiators
DISCUSSION: Pursuant to Government Code Section 54956.8. Closed Session may be held
for conference regarding property negotiations.
Negotiating Parties: Board of Directors. Robert Baer / General Manaqer
Under Negotiation: Consideration of Property Purchase
Property Identification: APN 1-080-80
APN 1-080-81
APN 1-080-82
APN 1-080-56
APN 1-200-60
APN 1-200-01
APN 1-200-10
APN 1-200-11
SCHEDULE:
COSTS: ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS: �
CONCURRENCE WITH REQUESTED TION: CATEGORY:
GENERAL MANAGER: YES NO GENERAL
CHIEF FINANCIAL OFFICER: YE O WATER
SEWER X
SOUTH TAHOE PUBLIC UTILITY DISTRICT
BOARD AGENDA ITEM
TO: BOARD OF DIRECTORS
FR: Robert Baer. General Manaaer
RE: BOARD MEETING September 20. 2001 AGENDA ITEM: 12. e
ACTION ITEM NO: CONSENT CALENDAR ITEM NO:
ITEM-PROJECT NAME: CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION:
STPUD VS. LAKESIDE PARK ASSOCIATION SUPERIOR COURT CASE NO SC20010165
. REQUESTED BOARD ACTION: Direct staff
DISCUSSION: Pursuant to Govemment Code Section 54956.9(a�. Closed Session may be held
for conference with legal counsel reaarding existing litigation.
SCHEDULE:
COSTS: ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED TION: CATEGORY:
GENERAL MANAGER: YES NO GENERAL
CHIEF FINANCIAL OFFICER: YE ��tMQ�w�NO WATER X
SEWER