Loading...
AP 11-20-08SOUTH TAHOE PUBLIC UTILITY DISTRICT "Basic Services for a Complex World" REGULAR BOARD MEETING AGENDA James R. Jones, Director Thursday, November 20, 2008 2:00 P.M. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Richard Solbrig, General Mana•er now Mary Lou Mosbacher, President a. Payment of Claims Pg. 47 b. 2:30 P.M. Public Hearing Pg. 65 Local Hazard Mitigation Plan (Ross Johnson) BOARD MEMBERS Eric W. Schafer, Director Paul Sciuto, Assistant General Mana•er Dale Rise, Vice President 1. CALL TO ORDER REGULAR MEETING — PLEDGE OF ALLEGIANCE Ernie Claudio, Director 2. COMMENTS FROM THE AUDIENCE (Short non - agenda items that are within the subject matter jurisdiction of the District. Five - minute limit. No action will be taken.) 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR 4. ADOPTION OF CONSENT CALENDAR (Any item can be discussed and considered separately upon request) 5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION / ACTION 6. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION Approve Payment in the Amount of $1,059,331.37 Hold a Public Hearing to Take Public Comments on the Draft Local Hazard Mitigation Plan REGULAR BOARD MEETING AGENDA - NOVEMBER 20, 2008 PAGE - 2 7. BOARD MEMBER STANDING COMMITTEE REPORTS (Discussions may take place; however, no action will be taken) a. Water & Wastewater Operations Committee (Jones / Claudio) b. Finance Committee (Schafer / Rise) c. Executive Committee (Mosbacher / Rise) d. Planning Committee (Mosbacher / Schafer) 8. BOARD MEMBER AD HOC COMMITTEE REPORTS a.' City of South Lake Tahoe Issues Ad Hoc Committee (Mosbacher / Jones) b. Management Negotiations Ad Hoc Committee (Schafer / Rise) 9. EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVES REPORT 10. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken) 11. GENERAL MANAGER REPORTS (Discussions may take place; however, no action will be taken) a. Integrated Regional Water Management Plan & Proposition 84 b. Drink Tahoe Tap Campaign 12. STAFF I ATTORNEY REPORTS (Discussions may take place; however, no action will be taken) 13. NOTICE OF PAST AND FUTURE MEETINGS I EVENTS Past Meetinas I Events 11/11/08 - Management Negotiations Ad Hoc Committee Meeting 11/12/08 - EI Dorado County Water Agency Regular Board Meeting 11/17/08 - Water and Wastewater Operations Committee Meeting 11/18/08 - ECC (Employee Communications Committee) Meeting 11/20/08 - Finance Committee Meeting Future Meetinas I Events 11/27/08 & 11/28/08 - Thanksgiving Holiday (District Office Closed) 12/01/08 - 3:30 p.m. - Water and Wastewater Operations Committee Meeting at District 12/02/08 - ACW A Conference Begins 12/02/08 - 9:00 a.m. - Alpine County Supervisors Regular Board Meeting in Markleeville 12/04/08 - 2:00 p.m. - STPUD Regular Board Meeting at District Office 12/08/08 - 1 :00 p.m. - Ethics Training at Turtle Rock Park 12/10/08 - 9:00 a.m. - EI Dorado County Water Agency Meeting in Shingle Springs 14. CLOSED SESSION (Closed Sessions are not open to the public) a. Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel- Pg. 67 Existing Litigation re: Meyers Landfill Site: United States of America vs. EI Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK GGH, United States District Court for the Eastern District of CA b. Pursuant to Government Code Section 54957.6(a)/Conference with Labor Pg. 69 Negotiators Agency Negotiators: General Manager, Board of Directors Employee Organization: STPUD Management Staff REGULAR BOARD MEETING AGENDA - NOVEMBER 20, 2008 PAGE - 3 15. ACTION I REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION 16. ADJOURNMENT (To the next regular meeting, December 4,2008,2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete agenda packet, including all backup infonnation is available for review at the meeting and at the District office during the hours of 8:00 a.m. - 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after minutes of the meeting have been approved. Items on this agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear on the agenda. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified. Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Comments on items not on the agenda can be heard during "Comments from the Audience;" however, action cannot be taken on items not on the agenda. Please provide the Clerk of the Board with a copy of all written material presented at the meeting. *Backup to any agenda item(s) not included with the Board packet will be made available when finalized at the District office, at the Board meeting, and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings. If particular accommodations for the disabled are needed (Le., disability-related aids, or other services), please contact the Clerk of the Board at 530.544.6474, extension 6203, at least 24 hours in advance of the meeting. CONSENT CALENDAR NOVEMBER 20,2008 ITEMS REQUESTED ACTION a. Cattle Grazing Permit 2009 - Alpine County Pg. 1 (Hal Bird) b. Human Resource Software Conversion Services Pg. 13 (Carol Swain) c. Country Club Tank and Waterline Replacement - Pg. 17 Sitework (Julie Ryan) d. Final and Secondary Effluent Pump Station Pg.23 (Julie Ryan) e. Angora Tank Replacement and Access Road Pg.27 (Julie Ryan) f. 2008 AI Tahoe Waterline Replacement Pg. 33 (John Thiel) g. Regular Board Meeting Minutes: Pg.41 November 6,2008 (Kathy Sharp) Award Contract to the Highest Responsive, Responsible Bidder, Urrutia Ranch, in the Amount of $13,280 Approve Addendum to Software License Agreement for Professional Services to Assist with the Implementation of the Base Version of the Human Resource Software, in an Amount Not to Exceed $24,380 (1 ) Approve the Project Closeout Agreement and Release of Claims for Hangtown General Engineering, and (2) Authorize Staff to File a Notice of Completion with the EI Dorado County Clerk Approve Change Order No.3 to Pacific Mechanical Corporation, in the Amount of $14,405.68 Approve Proposal from Stantec for Additional Geotechnical Services, in an Amount Not to Exceed $9,400 Approve Change Order No.3 to Cruz Excavating, in the Amount of $49,017.52 Approve Minutes South Tahoe Public Utility District. 1275 Meadow Crest Drive. South Lake Tahoe, CA 96150 Phone 530.544.6474. Facsimile 530.541.0614. www.stpud.us South Tahoe Put7Uc Utility Diatrict ~I~ ~rtJ H. SoIrit ~ EmlcJ ClMb JMw,.1l JOIM MMyLou ~ D.tItlJ ~ 12'15 ~.CI"IA 0rtv.J · aouth.l.flk8,..8hotJ · CA HIIO Phonsf5!O !544-6414. fiaK..5aO 54t~ BOARD AGENDA ITEM 4a TO: FROM: Board of Directors Hal Bird, Land Application Manager MEETING DATE: November 20, 2008 ITEM - PROJECT NAME: Cattle Grazing Permit 2009 - Alpine County REQUESTED BOARD ACTION: Award contract to the highest responsive, responsible bidder, Urrutia Ranch, in the amount of $13,280. DISCUSSION: Bids were opened on November 10,2008. Three grazing proposals were received ranging from $8,500 to $13,280 a month. Staff recommends awarding the bid to the highest bidder, Urrutia Ranch. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: Grazing Permit, Proposal Urrutia Ranch. CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES-pe- NO CATEGORY: Sewer -1- SOUTH TAHOE PUBLIC UTILITY DISTRICT GRAZING PERMIT This Grazing Permit (Permit) is made and entered into on November 20. 2008 by and between the South Tahoe Public Utility District (District), a California public agency formed in 1950 pursuant to the Public Utility District Act, and Urrutia Ranch (Permittee), at South Lake Tahoe, California, with reference to the following facts and intentions: A. The District is the owner of certain real property and improvements located in Alpine County, California, generally described as assessor parcel numbers 01-080-56, 01-080-60, 01-080-80, 01-080-81,01-080-82,01-200-01,01-200-10, and 01-200-11 and more particularly described in the map attached as Exhibit A, which is incorporated by this reference (collectively Property); B. Permittee is in the business of raising cattle and requires the use of pasture land to graze .~ttle during certain portions of the year; C. A certain portion of the Property consists of pasture land that is irrigated with water from the West Fork of the Carson River; and D. Permittee desires to receive from the District and the District agrees to provide Permittee, the right to graze cattle on a portion of the Property pursuant to the terms and conditions of this Permit. NOW, THEREFORE, the parties agree as follows: 1. Grazina Rlaht. District grants Permittee the right to graze cattle on that portion of the Property depicted on the attached Exhibit A (Permitted Grazing Area). Other than as expressly provided in this Permit, Permittee shall not have any other rights with respect to the Property and improvements located on the Property. 2. Term. The term of this Permit shall commence on Mav 1. 2009 (Commencement Date) and end on October 1. 2009 (Termination Date), unless adjusted pursuant to the provisions of this Perm it. 3. Possession. District shall be deemed to have delivered possession of the Permitted Grazing Area to Permittee and Permittee shall be deemed to have taken possession of the Permitted Grazing Area as of the Commencement Date subject to the terms and conditions of this Permit. 4. Permit Fee. Permittee agrees to pay the District the sum of $ 13.280.00 per month during the Term (Permit Fee). Permittee shall pay the Permit Fee to District monthly on or before the fifth (5th) day of each and every month during the Term. If Permittee does not make any payment of the Permit Fee within ten (10) days when due then Permittee shall pay to the District, in addition to such payment, a late charge equal to ten (10) percent of such late payment. Permittee shall pay, in a timely manner, all sums of money or charges required to be paid by Permittee under this Permit. If such an amount or charge is not paid at the time provided in this Permit, it shall never the less be collectible with the next installment of the Permit Fee or any other charge thereafter falling due. However, nothing contained in this Permit shall be deemed to suspend or delay the payment of any amount of money or charge at the time the same becomes due and payable, or to limit any remedy of the District. 5. Use of Permitted Grazlna Area. 5.1 Use. The Permitted Grazing Area shall be used for grazing cattle and for no other use without the express written consent of the District. The District expressly disclaims any representation or warranty or any liability or damage as to quality or quantity of grass growing on the Permitted Grazing Area at anytime during the Term. Permittee covenants and agrees to conduct its SB 336572 v4:OO7627.0065 1 -3- operations, as allowed by this Permit, in a good and ranching-like manner according to the industry practices for cattle ranching operations. Permittee shall be responsible for keeping its cattle within the Permitted Grazing Area and shall promptly return any cattle that leave the Permitted Grazing Area. The maximum number of cattle that Permittee is entitled to locate on the Permitted Grazing Area is the number of cattle necessary to graze the grass in the Permitted Grazing Area to a height less than ten (10) inches but no less than two (2) inches. The District reserves the right to require Permittee to move or remove the cattle within/from the Permitted Grazing Area due to overgrazing or if the cattle otherwise cause harm to the Permitted Grazing Area, as determined in the District's sole discretion. Cattle shall only be moved on county roads in accordance with the permission of the county and In compliance with applicable laws. The gates located on the paved access road to Harvey Place Reservoir shall be operated by the District. Permittee shall not operate the gates without the District's prior written consent. Permittee shall not allow other animals, including horses, on the Permitted Grazing Area without the prior written consent of the District, (which may be separately negotiated with the District). Permittee shall remove any dead cattle within 72 hours. 5.2 Other Facilities. Permittee shall be entitled to use the cattle pens and chutes for loading and unloading cattle. Vaccination of cattle is an allowed procedure provided Permittee complies with all federal, state and local laws and regulations in performing vaccinations including, but not limited to, disposal of vaccination supplies. . Permittee shall notify District of its desire to use such facilities and receive District's prior written consent. District and Permittee shall agree upon the schedule and other requirements related to the use of such facilities. The District reserves the right to allow other persons to use the cattle pens and chutes periodically, which use shall be coordinated with Permittee operations. 5.3 Compliance of Law. Permittee shall, at Permittee's sole cost and expense, comply with all applicable local, state and federal statutes, ordinances, rules, regulations, orders and" requirements in effect that relate to the use of the Permitted Grazing Area by Permittee. Permittee shall not use or allow the use of the Permitted Grazing Area in any manner that would tend to create waste or a nuisance or which would tend to disturb the District's use of the Property. 5.4 District Operations. Permittee acknowledges that this Permit only entitles Permittee to use a Permitted Grazing Area, which is only a portion of the Property. Permittee further acknowledges and understands that the District will be utilizing other portions of the Property for its recycled water operations. The District shall also have the right to use portions of the Permitted Grazing Area for recycled water operations, which includes the right to construct improvements and/or make modifications to the Permitted Grazing Area, provided such uses do not unreasonably interfere with Permittee's use of the Permitted Grazing Area. Permittee may be required to move cattle from one portion of the Permitted Grazing Area to another portion of the Permitted Grazing Area while the District performs work in the Permitted Grazing Area. The District shall be allowed to graze one (1) horse on the Permitted Grazing Area. In 2009, the District will have shallow monitoring wells Installed on the property. The Permittee may be required to move their ~attle from one field to another during the Installation which Is estimated to be of a 2 to 3 week duration. The District will give a minimum of 48 hours notice of any requirement to move cattle. Be advised that the drilling will result In some noise In the area. 5.5 Other Restrictions. Permittee shall not be allowed to use the house nor shall Permittee store any equipment, trucks or trailers on the Permitted Grazing Area without the prior written consent of the District. Permittee shall not use or allow firearms, drugs or alcohol on the Property or Permitted Grazing Area at any time, the violation of which shall entitle the District to immediately terminate this Permit without any prior written notice. 6. Maintenance and ODeratlon/Surrender. 6.1 Condition of Permitted Grazing Area. Permittee accepts the Permitted Grazing Area in its present condition, and Permittee agrees that it will, at all times during the Term, keep all improvements located within the Permitted Grazing Area, including, but not limited to, fences and gates, except as otherwise provided in this Permit, in good condition and repair, reasonable use, wear and damage by fire, act of God, or the elements excepted, at its own expense, and without any expense 5B 336572 v4:007627.0065 2 -4- whatsoever to the District. Permittee further agrees, on the last day of the Term or earlier termination of this Permit, to surrender the Permitted Grazing Area in the same condition as when received, reasonable use, wear and damage by fire, act of God or the elements excepted, and to remove all of Permittee's personal property from the Permitted Grazing Area. 6.2 Fertilizers and Chemicals. Permittee shall not apply any fertilizers, herbicides, insecticides or other chemicals on the Permitted Grazing Area without the District's prior written consent. The application of such fertilizers, herbicides, insecticides, sprays and chemicals, if consented to by the District, shall be applied in accordance with applicable federal, state and local laws, statutes, ordinances and regulations. 6.3 Toxic or Hazardous Materials. Permittee shall not cause or permit any hazardous or toxic materials to be brought upon, kept or used in or about the Permitted Grazing Area by Permittee, its agents, employees, invitees or authorized representatives, without the prior written consent of the District, which consent shall not be unreasonably withheld, so long as Permittee demonstrates to the District's reasonable satisfaction that such toxic materials, and the quantities thereof, are necessary or useful to Permittee's operations and use of the Permitted Gfazing Area and such materials will be used, kept and stored in a manner that complies with all toxic substance laws. Permittee shall, at its sole cost, comply with all federal, state and local laws, statutes, ordinances, codes, regulations and orders relating to receiving, handling, use, storage, accumulation, transportation, generation, spillage, migration, discharge, release and disposal of any toxic or hazardous materials. 6.4 Irrigation. The water for irrigation of the Permitted Grazing Area is obtained by' the District from the West Fork of the Carson River and transported from a diversion structure through ditches to the Permitted Grazing Area. District shalf use reasonable efforts to keep and maintain the irrigation facilities in good condition and repair in order to irrigate the Permitted Grazing Area. The District shall be responsible for irrigating the Permitted Grazing Area but, notwithstanding the above, does not guarantee that any specific quantity of water will be available for application on the Permitted Grazing Area or for use by Permittee's cattle. The District shall use reasonable efforts to irrigate the Permitted Grazing Area as long as irrigation water from the Carson River is available to be diverted by the District. Permittee expressly acknowledges that the quantity of water available for irrigation of the Permitted Grazing Area varies from year to year and month to month, that the failure of the diversion structures and/or irrigation facilities may make delivery of irrigation water impossible or impractical for certain periods of time and that the grasses growing on the Permitted Grazing Area may be affected by these circumstances. The District expressly disclaims to Permittee any liability or damage for any shortage of irrigation water used to irrigate the Permitted Grazing Area and the quality or quantity of the water supplied to the Permitted Grazing Area. 7. Rlaht of Entrv. The District and its authorized representatives may enter the Permitted Grazing Area at any time for the purpose of inspecting the Permitted Grazing Area and Permittee's use of and operations on the Permitted Grazing Area. Permittee covenants and agrees that the District may enter the Permitted Grazing Area at any time to make any necessary repairs to the Permitted Grazing Area and perform any work desired by the District that does not unreasonably interfere with Permittee's use of the Permitted Grazing Area or that the District may deem necessary to prevent waste or deterioration in connection with Permittee's use of the Permitted Grazing Area. 8. Alterations and ImDrovements. Permittee shall not make any alterations or improvements to the Permitted Grazing Area without the prior written consent of the District. Any alterations or improvements to the Permitted Grazing Area shall be done in a good and workmanlike manner and diligently prosecuted until completion. Upon termination of this Permit, such alterations and improvements shall be considered improvements to the Permitted Grazing Area and shall not be removed by Permittee, and will become part of the Property unless the District requests Permittee to remove all or any portion of such improvements, in which case the Permittee shall restore the Property to its former condition, at Permittee's sole cost and expense. Permittee shall pay all costs and expenses of any such alterations or improvements on the Permitted Grazing Area. Permittee will keep the Property free and clear of all mechanics' liens and other liens on account of such work done for Permittee. 9. Taxes. SO 336572 v4:007627,0065 3 -5- 1 ~1 j 9.1 District. District shall pay all real property taxes including, but not limited to, special and general assessments, licensing fees, commercial rental taxes, improvement bonds and any other tax, levy and bond that is based upon District's ownership interest in the Property. 9.2 Permittee. Permittee shall pay before delinquency all taxes, assessments, license fees and public charges levied, assessed or imposed upon its business operations, as well as its trade fixtures and other personal property in, on or upon the Permitted Grazing Area. ~J ,~ , 10. Indemnltvand L1abilitv. 10.1 To the fullest extent permitted by law, Permittee shall defend, indemnify and hold harmless the District, its elected officials, officers, employees, agents and contractors, from and against any and all claims, damages, losses, liabilities and expenses, including attorneys' fees, paralegal and legal fees and costs, which arise out of, relate to or result from, Permittee's use of the Permitted Grazing Area or from this Permit. In the event any action or proceeding is brought against the District, Permittee, upon notice from the District, shall defend the same at Permittee's sole cost and expense by legal counsel approved by the District. Permittee, as a material part of the consideration to the District, assumes all risk of damage to the Permitted Grazing Area or injury to persons in, upon or about the Permitted Grazing Area from any cause whatsoever except that which is caused by the failure of the District to observe any of the terms and conditions- of Ulis -Permlt-and -such- failll! e nas-- fJt:1 ~il:itedforarr- unreasonable period of time after written notice of such failure, and Permittee waives all of its claims with respect thereof against the District. 10.2 Exemption From liability. The District shall not be liable for injury to Permittee's business or any loss of income or for damage to the property of Permittee, Permittee's employees, invitees, customers or any other person in or about the Permitted Grazing Area, nor shall the District be liable for injury to the person of Permittee, Permittee's employees, agents or contractors, whether such damage or injury Is caused by or results from fire, explosion, electricity, gas, water, rain, or from any other cause, whether such damage or injury results from conditions arising upon the Permitted Grazing Area or the Property, or from other sources or places, and regardless of whether the cause of such damage or injury or the means of repairing the same is inaccessible. 11. Insurance. 11.1 Commercial General Liability Insurance. The Permittee shall, at its sole cost and expense, maintain in effect at all times during the Term, commercial general liability insurance which shall include, but shall not be limited to, protection against claims arising from death, bodily or personal injury or damage to property resulting from actions, failures to act, operations or equipment of the insured, or by its employees, agents, consultants or by anyone directly or indirectly employed by the insured. The amount of insurance should not be less than Two Million Dollars ($2,000,000) combined single limit per occurrence coverage applying to bodily and personal injury and property damage. The commercial general liability insurance coverage shall also include the following provisions and/or endorsements. a. Cross liability and severability of interest. b. The insurer shall waive and all transfer rights of recovery (subrogation) it may have against the name and/or additional insureds for claims and/or losses. 11.2 Business Automobile Liability Insurance. The Permittee shall, at its sole cost and expense, maintain in effect at all times during the Term, business automobile liability insurance which shall include, but shall not be limited to, protection against claims arising from death, bodily or personal injury, or damage to property resulting from actions, failures to act, operations or equipment of the insured, or by its employees, agents, consultants, or by anyone directly or indirectly employed by the insured. The amount of insurance should not be less than Two Million Dollars ($2,000,000) combined single limit per accident coverage applying to bodily and personal injury and property damage. Coverage shall insure all owned, nonowned and hired automobiles. 11.3 Endorsements. The insurance coverages required by this Permit shall include the following provisions and endorsements: SB 336S72 v4:007627.006S 4 -6- a. The South Tahoe Public Utility District and its elected officials, officers and employees will be a named or an additional insured in regard to liability. b. Written notice shall be given to the District at least thirty (30) days prior to termination, suspension, voiding, cancellation or reduction of coverage in the policy, except that if cancellation is for nonpayment of premiums, written notice shall be given to the District at least ten (10) calendar days prior to cancellation. c. The insurance shall be primary as with respect to the interest of the named and/or additional insureds, any other insurance maintained by the named and/or additional insureds is excess and not contributing insurance. d. The insurance, subject to all of its other terms and conditions, applies to the liability assumed by the Permittee under this Permit. 11.4 General Insurance Requirements. The Permittee shall not be entitled to occupy the Permitted Grazing Area until all required insurance has been obtained, required submittals delivered to the District and the submittals reviewed and approved by the District for general conformance with this Permit. The procurement and maintenance of the insurance required by this section is a material element of this Permit and failure to timely procure and/or maintain such insurance shall be a material breach of this Permit. The Permittee shall deliver the following to the District: a. A copy of each insurance policy that provides insurance required by this section (and additional copies as requested by the District in writing). Each policy copy shall be certified by placing a statement on the policy(ies) stating that "this copy of the policy is certified to be true, correct and complete" and signed by an authorized representative of the insurer. The copy of each policy shall include each and every cover page, declaration page, form, schedule, endorsement, etc. that is a part of the policy; b. Certificate(s) of Insurance, issued in duplicate, covering all policies. Such certificates shall make explicit reference to each of the provisions and endorsements required in this section, and shall be signed on behalf of the insurer by an authorized representative; c. Original endorsements for each policy of insurance required by this section and signed on behalf of the insurer by an authorized representative. d. All insurance required by this section shall be placed with insurance companies authorized to transact business in the State of California for the types or insurance required by the Contract. Each insurance company shall have a current A. M. Best Insurance Guide rating of not less than A-Nil unless prior written approval is secured from the District as to the use of such insurer. e. The requirements as to the types, limits, deductibles and the District's review and/or approval of insurance coverages to be maintained by the Permittee are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by the Permittee under this Permit. Further, the District's review and approval of any section, unless specifically stated in writing and signed by the District, shall not release or relieve the Permittee or its subcontractors from complying with the requirements of this section. f. Any policy of insurance required by this section shall be an "occurrence" policy. g. In the event the Permittee changes any insurance company(ies) providing the insurance coverage required by this section, the Permittee shall timely resubmit to the District for review and approval, the insurance documents required by this section for each new insurance company providing insurance coverage. The Permittee shall submit such documents at least thirty (30) days prior to the change in any required insurance to enable the District to timely review and approve the insurance coverages provided by such new insurance company(ies). . sa 336572 v4:OO7627.0065 5 -7- h. Insurance policies providing coverage which contains self-insured retention shall not be acceptable except with the prior written approval of the District regardless of the amount of the self-insured retention. 12. Default. 12.1 Definition of Default. The occurrence of one or more of the following events shall constitute a material default and breach of this Permit by Permittee: a. Permit Fee Default. Failure by Permittee to make, as and when due, any payment of Permit Fee payable by Permittee where such failure has continued for a period of ten (10) days after written notice from the District to Permittee; provided, however, that any such notice shall be in lieu of, and not in addition to, any notice required under section 1161 of the Code of Civil Procedure of California. b. Abandonment. The abandonment or vacation of the Permitted Grazing Area by Permittee. Abandonment is defined to include, without limitation,. any absence of Permittee from the Permitted Grazing Area for five (5) days or longer while in default of any provision of this Permit. Notwithstanding anything to the contrary, so long as Permittee is current with payment of all Permit Fees and other monetary obligations, there can be no abandonment. c. Breach of Contract. Failure by Permittee to observe or perform any of the express or implied nonmonetary covenants, promises, agreements or provisions of this Permit to be observed or performed, where such failure has continued for a period of thirty (30) days after written notice from the District to Permittee specifying the particulars of such failure; provided, however, that such notice shall be in lieu of and not in addition to any notice required under section 1161 of the Code of Civil Procedure. d. Bankruptcy and Insolvency. The making by Permittee of any general assignment or general arrangement for the benefit of creditors; the filing by or against Permittee of a petition to have Permittee judged bankrupt or a petition for reorganization or arrangements under any law relating to bankruptcy (unless, in the case of a petition filed against Permittee, the same is dismissed within sixty (60) days); the appointment of a trustee or receiver to take possession of substantially all of Permittee's assets located on the Permitted Grazing Area, or of Permittee's interest in this Permit, where possession is not restored to Permittee within thirty (30) days; or the attachment, execution or other judicial procedure substantially all of Permittee's assets located on the Permitted Grazing Area or of Permittee's interest in this Permit, where such procedure is not discharged within thirty (30) days. 12.2 Remedies Upon Default. If Permittee breaches this Permit, the District shall have an immediate right of reentry, with or without notice, and the right to take possession of all animals and personal property. The District, at its election, shall become the owner of all animals of which it has so take possession and, except where it elects to proceed under the following paragraph, will be obligated to compensate Permittee for them. If the District elects to reenter as provided above, or to take possession under legal proceedings or under any notice provided by law: (a) District may terminate this Permit; (b) District may from time to time, without terminating this Permit, re-issue the entire or any part of the Permitted Grazing Area for such terms (which may extend beyond the Term of this Permit), and at such permit fee and other conditions as the District in its sole discretion deems advisable. On each re-permitting, Permittee shall be immediately liable to pay the District the expenses of re-permitting and any making or alterations or repairs incurred by the District and all other indebtedness, except Permit Fee due under the Permit; (c) the District, or its agents or assigns, or receiver appointed at its instance may: (i) perform any of these duties under this Permit and such things as maintaining the Permitted Grazing Area and growing and managing the cattle located on the Permitted Grazing Area; (ii) charge the proceeds of the cattle with all reasonable costs of maintenance and husbandry; and (iii) divide the remainder of the proceeds with the Permittee in the same proportion as the cattle would have been divided between the District and Permittee if Permittee had faithfully performed under this Permit. If the cost exceeds the proceeds from the cattle, Permittee shall be responsible for payment of any such deficiency; or (iv) District may exercise SO 336572 v4:007627.006Ss 6 -8- all other rights that are available to it under any federal, state or local law, statute, or regulation if Permittee breaches or defaults any of its obligations under this Permit. 13. Holding Over. If the permitee has not vacated the premises at the end of the term, the permittee will accrue charges in the amount of $2500 per day beginning on the fifth day after the end of the contract term. All other terms and conditions remain the same as specified in this Permit. 14. Damage or Destruction. In the event the Permitted Grazing Area is damaged by fire, flood or other perils through no fault of Permittee, the Permit Fee shall be abated in proportion to the area of the Permitted Grazing Area that Permittee can no longer utilize as contemplated under this Permit, unless caused in whole or part by Permittee, in which event the Permit fee shall not be abated. If more than fifty (50) percent of the Permitted Grazing Area is damaged or destroyed such that Permittee may no longer use it for its intended purposes, Permittee may elect to terminate this Permit, unless caused tn whole or part by Permittee, in which event Permittee shall not have the right to terminate this Permit. Other than as provided above in this paragraph, Permittee shall not be entitled to any compensation or damages from the District for loss of use of all or any portion of the Permitted Grazing Area regardless of the cause. 15. General Provisions. 15.1 Recitals. The recitals stated at the beginning of this Permit of any matters or facts shall be conclusive proof of the truthfulness thereof and the terms and conditions of the recitals, if any, shall be deemed a part of this Permit. 15.2 Notices. All notices, approvals, acceptances, requests, demands and other communications required or permitted, to be effective, shall be in writing and shall be delivered, either in person or by mailing the same by United States mail (postage prepaid, registered or certified, return receipt requested) or by Federal Express or other similar overnight delivery service, to the party to whom the notice is directed at the address of such party as follows: To: District South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Attn: General Manager With a copy to: Gary Kvistad, Esq. Hatch & Parent 21 East Carrillo Street Santa Barbara, CA 93101 To: Permittee Mike Urrutia PO Box 226 Friant, CA 93626 With a copy to: N/A Any communication given by mail shall be deemed delivered two (2) business days after such mailing date, and any written communication given by overnight delivery service shall be deemed delivered one (1) business day after the dispatch date. Either party may change its address by giving the other party written notice of its new address. 15.3 Successors and Assigns. This Permit shall be binding on and shall inure to the benefit of the parties and their respective heirs, successors and assigns. Nothing in this Permit, express or implied, is intended to confer on any person other than the parties or their respective heirs, successors and assigns, any rights, remedies, obligations or liabilities under or by reason of this Permit. sa 336572 v4:007627.0065 7 -9- 15.4 Assignability. Permittee shall not assign this Permit, or any rights to it, and shall not sublet the entire or any part of the Permitted Grazing Area or any right or privilege appurtenant to the Permitted Grazing Area or permit or transfer interest therein without first obtaining the written consent of the District, which may be withheld by the District in its sole and absolute discretion. Any assignment or subletting without the District's consent shall be void and shall, at the District's option, terminate this permit. No interest of Permittee in this Permit shall be assignable by operation law without the District's prior written consent. 15.5 Waiver. No waiver by any party of any of the provisions shall be effective unless explicitly stated in writing and executed by the party so waiving. Except as provided in the preceding sentence, no action taken pursuant to this Permit, including, without limitation, any investigation by or on behalf of any party, shall be deemed to constitute a waiver by the party taking such action of compliance with any representations, warranties, covenants, or agreements contained in this Permit, and in any documents delivered or to be delivered pursuant to this Permit. The waiver by any party of a breach of any provision of this Permit shall not operate or be construed as a waiver of any subsequent breach. No waiver of any of the provisions of this Permit shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any waiver constitute a continuing waiver. 15.6 Severability. If any term, provision, covenant or condition of this Permit shall be or become illegal, null, void or against public policy, or shall be held by any court of competent jurisdiction to be illegal, null, void or against policy, the remaining provisions of this Permit shall remain in full force and effect, and shall not be affected, impaired or invalidated. The term, provision, covenant or condition that is so invalidated, voided or held to be unenforceable, shall be modified or changed by the parties to the extent possible to carry out the intentions and directives set forth in this Permit. 15.7 Counterparts. This Permit may be executed in any number of counterparts, each of which shall be deemed to be an original, but all of which shall constitute one and the same instrument. 15.8 Governing Law. This Permit shall be governed by, and interpreted in accordance with, the laws of the State of California to the extent California Law is applicable to the United States, with venue proper only in the County of EI Dorado, State of California. 15.9 Attorney Fees. If any legal proceeding (lawsuit, arbitration, etc.), including an action for declaratory relief, is brought to enforce or interpret the provisions of this Permit, the prevailing party shall be entitled to recover actual attorneys' fees and costs, which may be determined by the court in the same action or in a separate action brought for that purpose. The attorneys' fees award shall be made as to fully reimburse for all attorneys' fees, paralegal fees. costs and expenses actually incurred in good faith, regardless of the size of the judgment, it being the intention of the parties to fully compensate for all attorneys' fees, paralegal fees, costs and expenses paid or incurred in good faith. 15.10 Good Faith. The parties agree to exercise their best efforts and utmost good faith to effectuate all the terms and conditions of this Permit and to execute such further instruments and documents as are necessary or appropriate to effectuate all of the terms and conditions of this Permit. 15.11 Construction. The provisions of this Permit should be liberally construed to effectuate its purposes. The language of all parts of this Permit shall be construed simply according to its plain meaning and shall not be construed for or against either party, as each party had the opportunity to have their counsel review it. Whenever the context and construction so requires, all words used in the singular shall be deemed to be used in the plural, all masculine shall include the feminine and neuter, and vice versa. 15.12 Several Obligations. Except where specifically stated in this Permit to be otherwise, the duties, obligations, and liabilities of the parties are intended to be several and not joint or collective. Nothing contained in this Permit shall be construed to create an association, trust, partnership, or joint venture or impose a trust or partnership duty, obligation, or liability on or with regard to either party. Each party shall be individually and severally liable for its own obligations under this Permit. sa 336S72 v4:007627.006S 8 -10- 15.13 Authority. The individuals executing this Permit represent and warrant that they have the authority to enter into this Permit and to perform all acts required by this Permit, and that the consent, approval or execution of or by any third party is not required to legally bind either party to the terms and conditions of this Permit. 15.14 Entire Permit. This Permit contains the entire understanding and Permit of the parties, and supersedes all prior agreements and understandings, oral and written, between the parties. There have been no binding promises, representations, agreements, warranties or undertakings by any of the parties, either oral or written, of any character or nature, except as stated in this Permit. This Permit may be altered, amended or modified only by an instrument in writing, executed by the parties to this Permit and by no other means. Each party waives its future right to claim, contest or assert that this Permit was modified, canceled, superseded or changed by any oral Permit, course of conduct, waiver or estoppel. IN WITNESS WHEREOF, the parties have executed this Permit on the day and year and at the place first written above. DISTRICT PERMITTEE South Tahoe Public Utility District By: MaryLou Mosbacher, Board President Urrutia Ranch By: Mike Urrutia, owner ATTEST: SB 336572 v4:OO7627.0065 9 -11- --- PROPOSAL TO SOUTH TAHOE PUBLIC UllLllY D1S00Cf For: Grazing Pennit as desaibed in the "Invitation for Proposal- documents, site visit, and any applicable addendums. Proposal Receiving Deadline & Opening Date: November 10. 2008 Time 2:00 D.m. For Further Information contact Linda Brown. Purchasina Aaent or Hal Bird. Land AooHcation Manaaer The undersigned, as proposer, declares that the only persons or parties interested in this proposal are those named herein, and proposes and agrees that if their proposal is accepted, they will provide to the South Tahoe Public Utility District the sum of: I)AO J J,~~~ - loer month . Sum in words: ;;;/~Y/$~ICJ ~~tS#p.L) /(P~ ~~~lars . ' . IT/c-//Tv -~. - ?.eL. M?J~ Any exceptions to the Inv~aoon 'for proposal ~rrmt-contract, must be listed here: ~:i~(-r)~~~:) ~/~ftt2/.J/L16 ~,r:;.. T~ -r- Jlt>t-l tS-A-'r7 ,IJ A:J tJ A J ~I JtB'7 () A.J ~ t/ I4-I-f r "I -U-iX:J.I- . -... 2ff!! In compliance with the above, the undersigned offers and agrees, (if this offer is accepted within 45 days) to furnish the stated sum for each month during the lease period of May 1, 2009 through September 30, 2009, and sign and abide by the permit. Address .. Individual or Firm Name t/ ~~i:{ T1 R ~ ~(J k ?., Vb ';~ ~~)-) City Stat(1f.Zip '13 6 ~ -- Signed Date . Print Name & Title //4/e/?:: U /e L-L-l 7"/ /1 Phone # (s5"'? " .J> ~~- 2-~ 3 9 ~.I= Fax # ( . .5~<f ;h?/ -b6 /b ~ ~~~ ) A//rr- " South Tahoe Public Utility Dlatrict Gctl1lh1 .....~ ~rwI H. 5o/t1rft DIrectora Emle a.u.lfo J-... It .Jotow htaI:y LDIt ~ C>lIIe F:JlN 12'15 MUtJQWCI'86t Drfvtt. 50uth ~Tshoe. CA 96U50 f"hons 5!O 544-6474 f FIx ~'fS41-oow. BOARD AGENDA ITEM 4b TO: Board of Directors FROM: Carol Swain, Information Systems Manager MEETING DATE: November 20, 2008 ITEM - PROJECT NAME: Human Resource Software Conversion Services REQUESTED BOARD ACTION: Approve Addendum to Software License Agreement for professional services to assist with the implementation of the base version of the Human Resource software, in an amount not to exceed $24,380. DISCUSSION: The District has used a "custom" version of SunGard Bi-Tech's Human Resource software module for the past thirteen years. Support for this software will soon sunset. Since we already own the license for SunGard's Human Resource module, the only potential costs to be incurred for the migration to the "base" (or standard) version would be professional services in the areas of set up, conversion of data, and training. Though the quote lists 156 hours, this would reflect a very high estimate of anticipated need. The professional services will be billed after delivery. SCHEDULE: November, 2008 - March, 2009 COSTS: Not to exceed $24,380 ACCOUNT NO: 1037-4405,2037-4405 and 1037-8448 BUDGETED AMOUNT REMAINING: $13,875, $25,875 and $19,936 ATTACHMENTS: Addendum to Software License Agreement CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES----F-- NO CATEGORY: Sewer & Water -13- ADDENDUM TO THE Sor fWARE LICENSE AGr~[EMENl I. Understanding This Addendum to the Software License Agreement dated November 4, 1992, is by and between SunGard Public Sector BI-Tech LLC, hereinafter referred to as SunGard, and South Tahoe Public Utilities Department, hereinafter referred to as Customer. Whereas Customer previously licensed SunGard's Human Resources module, hereinafter referred to as Software; whereas Customer is ready to begin the migration from the "Custom" version of Software to the "Base" version of Software, whereas Customer requires professional services from SunGard to complete Software migration; therefore, this Addendum includes the following professional services from SunGard to assist Customer in the implementation of the Software. II. Professional Services SunGard shall provide the following professional services to Customer at the rates set forth below. "^ -. ,;:r':f4I:~ileh'll.ervicesQuote Hours Professlo n al Total Price Services Base HR Implementation Servioes - Consulting 48 7,200 7,200 - Training 80 12,000 12,000 - Spatial Needs 28 5,180 5,180 IT~1a] 156 hrs $24,380 $24,380 NOTE: Customer has declined the additional services of SunGard project management and will coordinate all resources independently. Customer will also enter all historical data into system by hand; the services above do not include any hours for data conversion. III. Payment and Expense Reimbursement The parties agree that the above professional services will be billed to Customer as the services are delivered by SunGard. Any associated Travel, Meals, and Lodging will be billed to Customer as incurred. Whenever any services are provided by SunGard at a Customer location or any other location requested by Customer other than one of SunGard's locations. Customer shall reimburse SunGard for reasonable travel (including travel from origination points other than SunGard's headquarters location), lodging, meal and related expenses incurred by SunGard personnel in providing such services. Airfares shall be coach or economy. Meal reimbursement for consulting or training or travel days will be at the per diem rate for Customer's area as set by the IRS. Ground transportation may include rental cars (intermediate or economy), bus, taxi/shuttle (including tips) and/or personal car mileage (at current IRS rate). Lodging arrangements will be made with safety, cost, proximity to the Customer, and reputation of the facility in mind. Items of a personal nature will not be charged to Customer. 1 CONFIDENTIAL -15- r The parties understand that most trips to Customer's location will Include approximately four (4) days of training/consulting per trip. If travel expenses can be minimized by staying over a weekend, the Customer wilt provide reimbursement for such weekend stays. The Customer will be provided with a copy of the Traveler's expense report; however copies of receipts will not be provided without an additional handling charge. BY: ector BI-Tech llC South Tahoe Public Utilities District BY: PRINT NAME: PRINT TITLE: General Manager /(-1~ot DATE SIGNED: PRINT TITLE: DATE SIGNED: 2 -16- CONFIDENTIAL (hnlhl ~ ~rd H. So/lIrfe South Tahoe Puf:1Uc Utility Diatrict ~ EnWI GIlIulIo Jam&l It JOfW IioWy Lou ~ "*~ 1215 MIIltdow ~ 0rfvtJ · .Sout,h. ~bJT~ · CA M1eO f'hona 530 ~14 .'.530 64t~ BOARD AGENDA ITEM 4c TO: Board of Directors FROM: MEETING DATE: Julie Ryan, Senior Engineer November 20, 2008 ITEM - PROJECT NAME: Country Club Tank and Waterline Replacement - Sitework REQUESTED BOARD ACTION: (1) Approve the Project Closeout Agreement and Release of Claims for Hangtown General Engineering and (2) Authorize staff to file a Notice of Completion with the EI Dorado County Clerk. DISCUSSION: Staff has performed a final inspection of the project and found that Hangtown General Engineering, has met all the contract requirements. Staff recommends approval of the project Closeout Agreement and Release of Claims, and the filing of a Notice of Completion with the EI Dorado County Clerk. SCHEDULE: As soon as possible COSTS: N/A ACCOUNT NO: 2029-7063/CLUBTK BUDGETED AMOUNT REMAINING: <$161,547> ATTACHMENTS: Closeout Agreement and Release of Claims, Notice of Completion CONCURRENCE WITH REQUESTED ACTIO~: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES~ NO CATEGORY: Water -17- RECORDING REQUESTED BY: South Tahoe Public Utility District Attention: Heidi Donovan WHEN RECORDED MAIL TO: Heidi Donovan South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 SPACE ABOVE lliIS UNE FOR RECORDER'S USE APN: 34-771-01 NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN THAT: 1. The undersigned is OWNER or agent of the OWNER of the interest or estate stated below in the property hereinafter described. 2. The FUll NAME of the OWNER is SOUTH TAHOE PUBUC UTIUTY DISTRICT 3. The FULL ADDRESS of the OWNER is 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 4. The NATURE OF THE INTEREST or ESTATE of the undersigned Is: In fee. (If other than fee, strike "in fee" and insert here, for example, "purchaser under contract of purchase," or "lessee." 5. The FUll NAMES and FULL ADDRESSES of ALL PERSONS, if any, WHO HOLD SUCH INTEREST or ESTATE with the undersigned as JOINT TENANTS or as TENANTS IN COMMON are: Name & Address Name & Address 6. The FULL NAMES of FULL ADDRESSES OF THE PREDECESSORS in INTEREST of the undersigned if the property was transferred subsequent to the commencement of the work of improvement herein referred to: Name & Address Name & Address 7. A work of improvement on the property hereinafter described was COMPLETED onOctober 21, 2008. 8. The work of improvement completed is described as follows: Country Oub Tank and Waterline Replacement - Sitework. 9. The NAME OF THE ORIGINAL CONTRACTOR, if any, for such work of improvement is .Hangtown General Engineering. 10. The street address of said property is 1705 Skyline @ Crystal Air Drive. 11. The property on which said work of improvement was completed is in the aty of South Lake Tahoe County of EI Dorado, State of California, and is described as follows: As shown in Exhibit "A" attached hereto and made a,part hereof, and commonly known as DATE: November 20, 2008 SIGNAlURE OF OWNER OR AGENT OF OWNER VERIFICATION FORINDMDUAlOWNER: Mary Lou Mosbacher, Board President I, the undersigned, declare under penalty of perjury under the laws of the State of Califomla that I am the owner of the aforesaid interest or estate in the property described in the above notice; that I have read said notice, that I know and understand the contents thereof, and the facts stated therein are true and correct. SIGNAlURE OF OWNER NAMED IN PARAGRAPH 2 DATE AND PlACE VERIFICATION FOR NON-INDMDUAl OWNER: SO 11TH TAHOF PIIRI Ie IlTII TTY nrSTRJCT I, the undersigned, declare under penalty of perjury under the laws of the State of Califomia that I am the Rn;lrn Prpc:; ; n~nt of the aforesaid interest or estate in the property described in the above notice; that I have read the said notice, that I know and understand the contents thereof, and that the facts stated therein are true and correct. Novemher 20. 200R at South lake Tahoe, CA DATE AND PLACE SIGNAlURE OF PERSON SIGNING ON BEHALF OF OWNER MARY LOU MOSBACHER -19- Notice of Completion .~ '.: ~I EXHJBIT "A" Notice of Completion Country Club Tank and Waterline Replacement - Sitework Project The site of the work is located in the Country Club Highlands Neighborhood near South Lake Tahoe in the County of EI Dorado; between 1695 and 1705 Skyline Drive. The work consisted of demolition of the existing tank and appurtenances on the tank site, grading and sitework to prepare the site for construction of the new tank foundation, construction of a concrete ringwall foundation and concrete footing, construction of a concrete overflow box, installation of a tank drain and drain vault with connection to the sanitary sewer, replacement of approximately 450 I.f. of 6" waterline with a new PVC or DIP waterline of like size, replacement of approximately 175 I.f. of a" waterline (tank inleVoutlet pipe) with a new PCV or DIP waterline of like size, installation of site improvements for stabilization and security, and other related activities fully described in the plans and specifications. Notice of Completion Country Club Tank and Waterline Replacement - Sltework Project EXHIBIT "A" -20- General Manager Richard H. 50lbrig South Tahoe Public Utility District Directors Ernie Claudio James R. Jones Mary Lou Mosbacher Dale Rise Eric Schafer 1275 Meadow Crest Drive - South Lake Tahoe - CA 96150-7401 Phone 530 544-6474- Fax 530541-0614- www.5tpud.us CERTIFICATION I hereby certify that the foregoing is a full, true, and correct copy of the Notice of Completion that was approved by the Board. of Directors of the South Tahoe Public Utility District, County of EI Dorado, State of California, and executed by Board President, Mary Lou Mosbacher. Date Approved: Certified by: Kathy Sharp, Clerk of the Board -21- South Tahoe Pub:Uc UtUlty Dlatrfct ~I~ ttdull'd H. $o/IIrrfe ~ EnN CIaulfJo ~R.~ MMyLou.~ Dtlre1ltW 12'15 MlJIItJow ~ ~..&otah f..skB TahooftCA 96150 f'hoM.15O 544-6414. Fax ~541..0fM4 BOARD AGENDA ITEM 4d TO: FROM: Board of Directors Julie Ryan, Senior Engineer MEETING DATE: November 20, 2008 ITEM - PROJECT NAME: Final and Secondary Effluent Pump Station REQUESTED BOARD ACTION: Approve Change Order No.3 to Pacific Mechanical Corporation, in the amount $14,405.68. DISCUSSION: Change Order NO.3 addresses four work items that are beyond the scope of the Contract, one credit for a cost-saving change in work, and a change to the first liquidated damages deadline. 1. While making connections at an existing communications pull box, the Contractor notified the District that the existing fiber-optic splices for the Effluent Pump Station and the south gate communications were in poor condition. The Contractor replaced the splices and relocated them into the new splice box. This additional work to replace and relocated the splices was performed on a Lump Sum Basis for an additional cost of $1,539.38. 2. During electrical work at the Blower Building, the Contractor encountered conditions that differ from the Contract Documents, allowing the District to eliminate an alternator panel and breaker from the Contract Work. This modification to the work has resulted in a Lump Sum cost savings in the amount <$1,199.15>. 3. As a result of normal District operations, the existing 6" pond drain pipe was pressurized and began to leak into the Contractor's excavation. Upon further inspection, the break in the 6" pipe appears to have occurred prior to the start of construction. The Contractor stabilized the excavation and repaired the pipe. The adaitional work to repair the 6" pond drain was performed on a Time & Materials basis for an additional cost of $2,093.59. 4. After delivery of the 12" MOV-300 modulating valve, the Contractor discovered that the specified valve was incompatible with the power supply to the Pump Station. Rather than change the valve, the District has elected to install a transformer at the Pump -23- Julie Ryan November 20, 2008 Page 2 Station electrical panel to supply the valve with the appropriate feed. The additional work purchase and install the transformer was performed on a Lump Sum basis for an additional cost of $2,181.17. 5. In the Contract Documents, the instructions for rerouting the electrical feed to motor control center 9MMC was incorrect and incomplete. Upon further investigation, the District identified the appropriate routing for this feed, which required additional conduit and cabling not included in the Contract Work. The additional work to install the electrical feed to 9MMC was performed on a combined Lump Sum I Time & Materials basis for an additional cost of $9,790.69. 6. Due to differing conditions at the tie-in of the new Final Effluent pipe to the A-Line, completion of earthwork-related activities was delayed by four weeks. The actual configuration of the A-Line did not match the Contract Documents, requiring staff and the Contractor to work together to re-design the tie-in and re-fabricate the new pipe and fittings. Staff recommends that the first Liquidated Damages Deadline be extended by twenty-eight days (to November 14, 2008) to account for these delays. Staff does not recommend any additional compensation due to the delay, and the costs for the additional work will be addressed separately. SCHEDULE: As soon as possible COSTS: $14,405.68 ACCOUNT NO: 1029-8676/EFFLEV BUDGETED AMOUNT REMAINING: $1,266,361 ATTACHMENTS: Change Order NO.3 CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES--r-- NO -24- CATEGORY: Sewer CHANGE ORDER NUMBER .1 Project Final and Secondary Effluent Pump Station Contractor PACIFIC MECHANICAL CORPORATION Date: November 20. 2008 The Contract Shall Be Changed As Follows: PO # P19831 A. Amend Bid Item 23, to include labor, equipment, materials and subcontractor costs necessary to repair pre-existing damage to fiber optic splices at COMM-3 for an additional cost of $1 ,539.38 as detailed in Change Order Quote No. 00026 (attached). This item addresses in full the additional cost for the work requested by the District in Construction Memo #21, dated August 11,2008. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM A IS $1,539.38 TOTAL FOR CHANGE ORDER # 31S A + B + C + D + E + F = $14,405.68 Ori inal Contract $ 6,011,817.00 Previous Chan e Orders $ 32,617.80 Current Contract $ 6,044,434.80 THIS CHANGE ORDER $ 14,405.68 New Contract Total $ 6,058,840.48 Contractor agrees to make the hereln-descrlbed changes In accordance with the terms hereof. The change In contract price and/or contract time noted Is full settlement for costs Incurred as a result of the change(s) described, unless specifically noted In Individual descrlptlon(s). Date: Authorized By STPUD Board President Accepted By Contractor Date: Date: Reviewed By -25- 1 B. Amend Bid Item 21 to include a credit for all labor, equipment, materials and subcontractor costs associated with installation of an alternator panel and breaker at the Blower Building. The net difference in cost for this item is -$1,199.15 as detailed in Change Order Quote No. 00018 (attached). This item addresses in full the elimination of work requested by the District in Response to RFI No. 65, dated August 19, 2008. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM B IS ($1,199.15) C. Add Bid Item 27 to include all labor, equipment, materials and subcontractor costs necessary to repair a pre-existing break in the 6" Pond Drain. The net difference in cost for this item is $2,093.59 as detailed in Change Order Quote No. 00021 (attached). This item addresses in full the additional cost for the work requested by the District in the Construction Memorandum #28, dated October 2, 2008. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM C IS $2,093.59 D. Amend Bid Item 21 to include all labor, equipment, materials and subcontractor costs associated with adding a transformer to the power supply for the modulating valve MOV-300. The net difference in cost for this item is $2,181.17 as detailed in Change Order Quote No. 00025 (attached). This item addresses in full the additional cost for the work requested by the District in the Response to RFI #113, dated October 21, 2008. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM 0 IS $2,181.17 E. Amend Bid Item 23 to include all labor, equipment, materials and subcontractor costs associated with installing electrical trenches and cabling for 9MCC, which was called out incorrectly in the Contract Documents. The net difference in cost for this item is $9,790.69 as detailed in Change Order Quote No. 00022 (attached). This item addresses in full the additional cost for the work requested by the District in the Response to RFI No. 42, dated June 13, 2008, SUPPLEMENTAL Response to RFI No. 42, dated June 13, 2008, and Second Supplemental Response to RFI No. 42, dated August 28, 2008. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM E IS $9,790.69 F. Change the first intermediate deadline for liquidated damages identified in Section 00 72 00, General Conditions, Part 2.4.A, and modified in Change Order No.2, from October 17, 2008, to November 14, 2008, to account for delays due to unforeseen conditions at the A-line tie-in as described in Construction Memorandum #32, dated October 9, 2008. No compensation is awarded due to the delay, and any additional costs for the work related to this item will be addressed separately. This item does not address any impacts to Contract Time resulting from these changes in work. TOTAL FOR ITEM F IS $0.00 TOTAL FOR CHANGE ORDER # 3 IS A + B + C + 0 + E + F = $14,405.68 2 -26- South Tahoe Public Utility Diatrict G~~ ~n4 .H. 50lltrie DIrec1:oni Etftlo Claudio ...~ JoMf MMy Lou ~ DlIfe Il:Jee 1Z15 Madower.t f'rfwt. 50uth La~ Tahoe., CA96150 ",OM f5S0~14''''' fSSOM1-0614 BOARD AGENDA ITEM 4e TO: FROM: Board of Directors Julie Ryan, Senior Engineer MEETING DATE: November 20, 2008 ITEM - PROJECT NAME: Angora Tank Replacement and Access Road REQUESTED BOARD ACTION: Approve proposal from Stantec for additional geotechnical services, in an amount not to exceed $9,400. DISCUSSION: In September 2007, Stantec performed a geotechnical investigation and prepared a report with design recommendations for the replacement of the Angora Tank. That work was performed under the 2007 task order for materials testing and inspection services. Since the original investigation was performed, the configuration of the project site has changed and the scope of the project has expanded to include construction of an access road. These changes to the project warrant additional investigation and revised recommendations to support design of the tank and access road. The attached scope of work and cost estimate from Stantec provides a description of the additional work needed to complete the project, including updating and finalizing the original report, providing additional recommendations for site grading, performing additional site investigation and laboratory testing for the access road alignment, and performing as-needed geotechnical services during construction. The work will be completed as a task order under the existing Master Services Agreement with Stantec. SCHEDULE: November 2008 to December 2009 COSTS: $9,400 ACCOUNT NO: 2029-7064/ANGOTK BUDGETED AMOUNT REMAINING: $726,888 ATTACHMENTS: Geotechnical Investigation Additional Work. -27- Julie Ryan November 20,2008 Page 2 CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YEST- NO -28- CATEGORY: Water StIntec Consulllnc Inc. 6980 Sierra Center Parkway Suite 100 Reno tN 89511 Tel: (775) 85fNJm Fax: fT(5) 850-0787 Stantec exhibit "A" October 30, 2008 Revision #1 Ms. Julie Ryan, PE SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, California 96150-7401 RE: ,Geotechnical Investigation Additional Work Angora Water Tank Replacement Project South Lake Tahoe Dear Ms. Ryan: stantec Consulting Inc. Is pleased to submit the following proposal to provide additional work for the Angora Water Tank Replacement Project Geotechnical Investigation 'at South Lake Tahoe, California. This revised proposal replaces our previous proposal, dated October 27, and combines all anticipated fees for the project Including finalizing the existing report, additional work for the access road, and consultation during construction. 1.0 PROJECT DESCRIPTION It is understood that an access road is proposed to be constructed from the end of Aberdeen Circle to the new Angora water tank. This access roadway is. paved with a width of 10 feet and a length of about 550 feel Proposed grading consists of cuts and fills up to 10 feet. Except for proposed cut slopes adjacent to the tank site, cut and fill Slopes have been designed for a 2H:1V slope gradient. Cut slopes adjacent to the tank have been designed for a 1H:1V slope gradient. . 2.0 SCOPE OF WORK The proposal addresses the following Items: ~ Finalize the geotechnical Investigation for the water tank; ~ Review the project specifications and design details from the tank designer and provide a follow-up letter; ~ Additional exploration and recommendations for the access roadway; ~ Construction consultation. 2.1 Finalize the Existing Report Besides updating the report to reflect planned tank location and elevation, the report will address the following additional items: ~ Provide stabilization recommendations for 1H:1V and 2H:1V slope gradients including rip-rap specifications; ~ Retaining wall design recommendations, if required to reduce slope gradients; ~ Preliminary design recommendations for the access roadway including: -29- ~ -,., \ ,1 Stantec Ms. Julie Ryan, PI: SOUTH TAHOE PUBLIC UTILITY DISTRICT October 30, 2008 Page 2 of 3 . Site preparation and grading recommendations; . Cut and fill slope gradient recommendations; . Anticipated construction diffICulties. 2.2 Review letter for the Construction Specifications and Design Details This letter provides review comments on whether the design complies with the recommendations given In the geotechnical Investigation. 2.3 AddlUonal Work for Access Roadway 2.3.1 Field Exploration Currently, accessibility to the project site is obtained by walking through Forest Service property from the terminus of Aberdeen Circle. The site Is located at the top of an east to west trending ridge with steep side slopes. Due to terrain restrictions and the anticipated geologic profile (shallow overburden solis underlain by granitic bedrock), it is recommended that exploration is performed wlth a trackhoe. It Is assumed with this proposal that STPUD will hire the trackhoe contractor. Also, It Is understood that the field exploration will occur next spring before the bid date for the project. Field exploration will consist of excavating 2 to 3 test pits at various locations to depths of. up to 10 feet or to refusal on hard, or impenetrable surfaces. Our geotechnical personnel will log material encountered during exploration In the field. The ground water surface will be measured, if encountered. Representative samples will be returned to our Reno, Nevada laboratory for testing. 2.3.2 Laboratory Testing Representative samples of each significant soli type will be tested in the laboratory as to Index properties, such as moisture content, grain size distribution, and plasticity. These Index properties are Indicative of mechanical behavior of the solis. 2.3.3 Report Preparation Upon completion of our field, laboratory, and office studies, an addendum letter to our geotechnical investigation report will be provided. Based on the field investigation results, this addendum win address whether changes to the design recommendations presented in the geotechnical Investigation are required and include the following: ~ Description of the project site with the approximate locations of our explorations, shown on a Site Plan; ~ Descriptive logs of the explorations performed for this study; ~ General summary of the site solis and geology; ~ Results of laboratory tests and a description of test methods; 3.0 SCHEDULE The geotechnical Investigation will be finalized within one to two weeks upon written authorization to proceed. Field exploration for the access road will occur next spring. Verbal geotechnical recommendations -30- Stantec Ms. Julie Ryan, PE SOUTH TAHOE PUBLIC UTILITY DISTRICT October 30, 2008 Page 3 of 3 can be provided within one week following the completion of field exploration. A written report will be available within about 2 weeks after the completion of the field Investigation. 4.0 FEES We will provide our services, as described in this proposal, on a time and materials basis. Estimated costs for each individual phase of the project are as follows: Finalize geotechnical investigation: $2,900 Review design and provide letter: $1,000 Additional work for access roadway: $3,500. Consultation during construction: $2,000. This includes one site visit. We thank you for the opportunity to submit this proposal, and look forward to its favorable consideration. If you have any questions, please call. ~pn>mo\2IIOI\ITPUo.~_.......__TPUD _-.......-...odll'I__.-lt1- -31-:- ~l~ f&Nrtl H. 50lllrft South Tahoe Puf1Uc Utility Di~trict Dlrector& E.mIo a.ualo ....... It JONlt MMyLou~ De ll:IN 1Z15 M.aow~ PrIvet..5auf,h lM8iM1fc6. CA 96150 PhOnd f550 .544. 6474. Fsx !53O.541..o614 BOARD AGENDA ITEM 4f TO: Board of Directors FROM: MEETING DATE: John Thiel, Principal Engineer November 20, 2008 ITEM - PROJECT NAME: 2008 AI Tahoe Waterline Replacement REQUESTED BOARD ACTION: Approve Change Order No.3 to Cruz .Excavating, in the amount of $49,017.52. DISCUSSION: This Change Order NO.3 has two parts: Part A, in the amount of $24,835.00, is for additional paving work; changing to an increased pipe rating which was necessary when the new waterline was within 10 feet of the sewer; and two additional meter installations. These are detailed on Attachment A. Part B, in the amount of $24,182.52, is for additional work performed by the Contractor on a time and materials basis from June 4, 2008, to October 16, 2008. These are detailed on Attachment B. SCHEDULE: All waterline components are now in service. COSTS: $49,017.52 ACCOUNT NO: 2029-8811/ATWL08 BUDGETED AMOUNT REMAINING: <$27,875> ATTACHMENTS: Change Order No.3. CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES~ NO CATEGORY: Water -33- CHANGE ORDER NUMBER 3 Project 2008 AI Tahoe Waterline Reolacement Contractor Cruz Excavating, Inc. Date November 20, 2008 The Contract Shall Be Changed As Follows: PO # P20152 A. Provide 2" mill and overlay on Capistrano Ave., increase pipe rating from DR 18 to DR 14 on Paloma Ave. and Placer Ave., and install. two 1" meters on Capistrano Ave. for the unit prices listed in Attachment A and not to exceed price of $24,835.00. TOTAL FOR ITEM A: $24,835.00 B. Extra work performed on a time and materials basis from 6/04/08 to 10/16/08, as detailed on Attachment B. TOTAL FOR ITEM B: $24,182.52 TOTAL FOR CHANGE ORDER #3, IS $49,017.52 Ori inal Contract Previous Chan e Orders Current Contract THIS CHANGE ORDER New Contract Total $1,638,315.00 $ 599,878.00 $2,238,193.00 $ 49,017.52 $2,287,210.52 Contractor agrees to make the herein-described changes in accordance with the terms hereof. The change in contract price and/or contract time noted is full settlement for costs incurred as a result of the changers) described, unless specifically noted in individual description(s). Date: Authorized By STPUD Board President Date': Accepted By Contractor Date: Reviewed By -35- 1 CHANGE ORDER NO.3 Cruz Excavating, Inc. 2008 AI Tahoe Waterline Replacement Project. ATTACHMENT A -36- ATTACHMENT A Change Order No.3 CONSTRUCTION OF 2008 AL TAHOE WATERLINE REPLACEMENT PROJECT FOR SOUTH LAKE TAHOE PUBLIC UTILITY DISTRICT (Additional Block on Capistrano Avenue) Item Description Approx. Unit Amount No. Quantitv Price 1 Provide and install 2" trick 3,949 SF $5.00 $19,745.00 mill and asphalt overlay at Capistrano Ave. complete and in place for the square foot price of dollars and cents. 2 Increase 8" PVC C900 pipe 250 LF $2.00 $500.00 rating from DR 18 to DR 14 on Paloma Ave. complete and in place for linear foot price of dollars and cents. 3 Increase 8" PVC C900 pipe 445 LF $2.00 $890.00 rating from DR 18 to DR 14 on Placer Ave. complete and in place for linear foot price of dollars and cents. Item 4 shall be for transfer of water service connections to the new water main andlor installation of water meters, per the standard Detail Drawings, including new valve boxes and covers, meters, tapping saddles, piping fittings, new corp stops, new curb stops, tracer wire, excavation (including trench less method), bedding, backfill, compaction and testing, abandoning existing services, complete and in place for: 4 Provide and install 1 " water 2EA $1,850.00 $3,700.00 meters on Capistrano Ave. each for the price of dollars and cents. Total CHANGE ORDER NO.3 $24,835.00 -37- CHANGE ORDER NO.3 Cruz Excavating, Inc. 2008 AI Tahoe Waterline Replacement Project. ATTACHMENT B -38- ,,' 4#ctc~m-e,,;I- .8 C"h~"'(J~ C/r/e.... ~. 3' ",; ~,.. ';.r .~;~!i ,. ,,,- ., ~', ;.' ~ "'-.'- ; "', ',-. Extra Work Summary , Project Title: AI Tahoe 2008 location: Sl T, CA Date Work Report # Performed Reason for Extra Cost 1833 4-Jun-08 Unmarked water main repair $ 2.001.48 1838 1-Jul-08 New Riser on valve $ 203.15 1840 7-Jul-08 Vertical offset over sewer $ 1,2~ 3.32 1841 10-Jul-08 Vertical offset off hot tap to get over sewer $ 1,995.59 1843 20-MaY-08 6" cap blew off unknown main $ 1,374.60 1844 23-Jul-08 Leak in existina curb stop $ 1,365.38 1845 24-Jul-08 Tee blew off existina pipe $ 6,645.45 1976 10-Sep-D8 1 1/2" WM in Capistrano $ 2,270.90 1977 18-Aug-08 Service @ 872 Alameda $ 896.99 1978 25-Aug-08 Service @ 3120 AJameda/936 Pasadena $ 881.31 1979 various Concrete collars around G-5's as directed $ 869.87 1980 16-Sep-08 Water service @ 829 Capistrano $ 569.21 1982 16-Sep-QB Service Tee @ 837 Capistrano $ 227.18 1985 18-Sep-OB Trench to house with service @ 796 Capistrano $ 1,360.29 1986 16-0ct-08 Inspect for leak in existina $ 269.47 1987 13-0ct-08 2 services @ 873 Capistrano $ 695.59 1988 16-0ct-OB 2 Bollards in front of hydrant $ 1,342.74 / $ 24,182.SV ~3 -39- ~1&~ "16,,,.. _ ~\~'.~ ... SOUTH TAHOE PUBLIC UTILITY DISTRICT "Basic Services for a Complex World" Richard Solbrig, General Mana~er Mary Lou Mosbacher, President BOARD MEMBERS Paul Sciuto, Assistant Mana~ Dale Rise, Vice President James R. Jones, Director Eric W. Schafer, Director Ernie Claudio, Director REGULAR MEETING OF THE BOARD OF DIRECTORS SOUTH TAHOE PUBLIC UTILITY DISTRICT NOVEMBER 6, 2008 MINUTES The Board of Directors of the South Tahoe Public Utility District met in a regular session, November 6, 2008, 2:20 P.M., District Office, 1275 Meadow Crest Drive, South Lake Tahoe, California. BOARD OF DIRECTORS: President Mosbacher, Directors Rise, Jones, Claudio, Schafer ATTENDEES STAFF: Solbrig, Sharp, Sciuto, Hughes, Brown, Ryan, Coyner, Nolan, Curtis, Attorney Kvistad Guests: John Runnels/Citizens Alliance, Andrew Strain and Casey Blann/Heavenly Valley, Cathy Monagahanl EI Dorado County Water Agency, Adam Jensenl Tahoe Daily Tribune Linda Brown led the pledge to the flag. PLEDGE OF ALLEGIANCE John Runnels distributed a typed statement he read COMMENTS FROM THE AUDIENCE aloud urging the District to assist ratepayers in sharing the burden of the current economic conditions. Moved Jones 1 Second Schafer / Passed Unanimously CONSENT CALENDAR to approve the Consent Calendar as submitted: a. License Agreement with Heavenly Land, Lmited Partnership - Authorized execution of a license agreement with Heavenly Valley allowing access to the David Lane Booster Station property for soils investigation; . -41- j .~ REGULAR BOARD MEETING MINUTES - NOVEMBER 6, 2008 PAGE-2 b. Pickup Truck: % Ton Regular Cab - A warded bid to CONSENT CALENDAR the lowest responsive, responsible bidder, Hansel (continued) Ford, Inc., in the amount of $20,578.23; c. Forklift - (1) Waived the minor bid irregularity; and (2) Awarded bid to the lowest responsive, responsible bidder, Case Power and Equipment, in the amount of $54,301.25; d. Country Club Tank and Waterline Replacement Site work - Approved Change Order No.1 to Hangtown General Engineering, in the amount of $1,488.82 e. 2008 AI Tahoe Waterline Replacement - Approved Change Order No.2 to Cruz Excavating, in the amount of $64,890; f. Association of California Water Agencies (ACWA): 2009 Annual Membership Dues - Approved Payment to ACWA, in the amount of $16,475; g. Approved Regular Board Meeting Minutes: October 16, 2008. ITEMS FOR BOARD ACTION Heavenly Valley would like to increase the quantity and improve the reliability of water that the District supplies to them for snowmaking. This agreement will provide the framework for the planning, design, and construction of facilities through which the District can deliver increased water supplies, including the development of terms and conditions for supplying such water. It also defines reimbursement provisions for District incurred costs and costs related to the agreement, and the facilities. A rate and/or agreement for water service for snowmaking will also be developed. Heavenly will pay for all improvements unless some of the projects benefit the District. Andrew Strain, Heavenly Valley, reported the agreement was developed in a spirit of cooperation, with benefits for both. Moved Jones I Second Claudio I Passed Unanimouslv to: (1) Authorize execution of a Water Facility Agreement with Heavenly Valley; and (2) Allow staff to negotiate minor changes to the draft agreement. WATER FACILITY AGREEMENT WITH HEAVENLY VALLEY, LIMITED PARTNERSHIP ll!ADOPRD MINUTES REGULAR BOARD MEETING MINUTES - NOVEMBER 6, 2008 PAGE - 3 In order for Heavenly Valley to increase their water supply HEAVENLY VALLEY SNOWMAKING for snowmaking, and prior to committing capital dollars to the construction of any facilities, they would like the District to provide an analysis of water service rates for their off- season water consumption. Municipal Financial Services submitted a proposal to provide a comprehensive analysis of both water service rates and capacity charges for Heavenly Valley's unique situation. Heavenly will pay for the rate study which will be based on numerous variables specific to snowmaking, existing and needed facilities, volume of water, etc. Groundwater recharge capabilities will also be assessed to ensure there will be no detrimental impacts to the District's customers. Staff pointed out the quantity of water requested is not extremely large, and the demand will be only for short periods of time during the winter. Moved Schafer / Second Jones 1 Passed Unanimously to approve the proposal from Municipal Financial Services to evaluate the capital and operating costs, in the amount of $21 ,760. Moved Schafer 1 Second Rise / Passed Unanimously to approve payment in the amount of $2,365,636.58. Water and Wastewater Operations Committee: The committee met November 3. Minutes of the meeting are available upon request. Randy Curtis gave a brief report on the collection system master plan. Plannina Committee: The committee attended two public meetings in Alpine County regarding the Diamond Valley Ranch Master Plan. PAYMENT OF CLAIMS BOARD MEMBER STANDING COMMITTEE REPORTS , City of South Lake Tahoe Issues Ad Hoc Committee: BOARD MEMBER AD HOC Richard Solbrig reported he will meet with the City COMMITTEE REPORTS Manager to develop an agenda for the respective Board ad hoc committees. The City appointed Council members Bidwell and Crawford to serve as their ad hoc committee. Manaaement Negotiations Ad Hoc Committee: The committee met to discuss the Koff salary study and requested additional information before their next meeting. Director Jones introduced Cathy Monaghan, from the water agency. She gave a brief report concerning a recent water and power authority meeting. EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVES REPORT UNADO.PTfD ~1INUTES REGULAR BOARD MEETING MINUTES - NOVEMBER 6, 2008 PAGE - 4 Director Jones reported EI Dorado County is cutting staff in the Tahoe Basin. Plan checks will have to be sent to Placerville next year. BOARD MEMBER REPORTS Director Claudio thanked staff for the presentation on the Diamond Valley Ranch Master Plan. Director Mosbacher reported on her attendance at the Meyers Roundtable meeting. The California Conservation Corp must relocate due to complaints from neighbors and expressed interest in the District's Santa Fe property (which is not available for use). General Manaoer: Richard Solbrig reported on two items: GENERAL MANAGER REPORTS 1) Integrated Regional Water Management Plan - Lynn Nolan is running the regional meetings and has set up templates for partners to describe projects they want to submit. The use of consultants to help with components is under consideration. 2) An emergency scenario drill was held that tested communications between several agencies during a disaster. Participation in this drill is a requirement if FEMA funding is ever needed. 3:30 - 3:45 P.M. MEETING BREAK Customer Service Manaoer: Lisa Coyner gave an update STAFF REPORTS on the impacts of the excess sewer unit transfer ordinance. A letter was sent to customers who have five sewer units or more, resulting in 34 properties that suspended billing (totaling a loss of $103,000 per year in revenue). There are still 75 commercial properties and 30 more residential properties remaining that need their sewer units counted. Assistant General Manaoer I Enoineer: Paul Sciuto reported on his meeting with City staff regarding Lahontan requirements. He also reported on his attendance at the WEFTEC conference, where he presented his paper on Angora fire response. He also informed the Board that the retention on the AI Tahoe and Julie Lane waterline projects was reduced to 5%. Chief Financial Officer: Paul Hughes reported District investments have not been impacted since his last report. ADJOURNMENT TO CLOSED SESSION 4:40 P.M. {'~;IAnoprm '~'.~~"~TES REGULAR BOARD MEETING MINUTES - NOVEMBER 6, 2008 PAGE - 5 5:05 P.M. RECONVENED TO OPEN SESSION ACTION I REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION No reoortable Board action. Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel - Existing Litigation re: Meyers Landfill Site: United States of America vs. EI Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK GGH, U.S. District Court for the Eastern District of Ca. 5:05 P.M. ADJOURNMENT Mary Lou Mosbacher, Board President South Tahoe Public Utility District ATTEST: Kathy Sharp, Clerk of the Board South Tahoe Public Utility District ii' '~,lAU' , 'ur" ;r'J','-tfJ':-',' ",' t.,>.,U' '1"[""'" ", , '.,. ,VUlt' , ;) PAYMENT OF CLAIMS FOR APPROVAL November 20, 2008 Payroll 11/5/08 Total Payroll BNYWestern Trust Company CDS-health care payments Brownstein/HyattlFarberlSchreck legal services LaSalle Bank Union Bank Total Vendor EFT Accounts Payable Checks-Sewer Fund Accounts Payable Checks-Water Fund Accounts Payable Checks-Self-funded Insurance Accounts Payable Checks-Grants Fund Total Accounts Payable Grand Total Payroll EFTs & Checks' EFT EFT EFT CHK EFT CHK EFT CHK EFT CHK AFLAC Medical & Depend~nt Care CA Employment Taxes & W/H Federal EmploymentTaxes & W/H CalPERS Contributions Great West Deferred Comp Stationary Engineers Union Dues United Way Contributions CA State Disbursement Unit Employee Direct Deposits Employee Paychecks Total -47- 11/5/08 588.39 15,172.00 88,713.61 27,228.86 18,442.49 2,328.30 32.00 460.15 202,182.57 13,330.02 368,478.39 368,478.39 368,478.39 0.00 89,045.88 0.00 0.00 0.00 89,045.88 139,322.72 461,907.38 577.00 0.00 601,807.10 1,059,331.37 PAYMENT OF CLAIMS Description Acct# / Prol Code Amount Check Num T_ypg CONTRACT SERVICE 1039 - 4405 1.013.32 CONTRACT SERVICE 2039 - 4405 1,013.32 Check Total: 2,026.64 AP -00071197 MW ACWA HEALTH BENEFITS AUTHORITY GEN & ADMIN VISION INS 1000 - 2530 2,608.80 Check Total: 2,608.80 AP -00071198 MW AFLAC GEN & ADMIN SUPP INS W/H 1000 - 2532 904.76 Check Total: 904.76 AP- 00071199 MW ALPEN SIERRA COFFEE FINANCE OFC SUPPLY ISSUE 1039 - 6081 77.00 Check Total: 77.00 AP-00071200 MW ALSBURY, JAY ENGINEERING - ICR TMDL O2SYS/TMDL,ICR 1029 - 8605 - ICTMDL 269.83 Check Total: 269.83 AP-00071201 MW AMERIGAS DIAMOND VLY RNCH PROPANE 1028 - 6360 328.84 Check Total: 328.84 AP -00071202 MW AMERIPRIDE UNIFORM SERVICES GEN & ADMIN UNIFORM PAYABLE 1000 - 2518 854.86 I Check Total: 854.86 AP- 00071203 MW ARE RET SYSTEMS ENGINEERING - COLL SYS MASTER COLL SYS MST PLN 1029 - 8721 - CSMSPL 420.00 ARETE SYSTEMS INFORMATION SYS SOFTWARE, CMMS 2037 - 8982 2,861.25 Vendor Name ACCOUNTEMPS ACCOUNTEMPS Deparynent / Proi Name FINANCE FINANCE Check Total: 3.281.25 AP -00071204 MW AT &T GEN & ADMIN TELEPHONE 1000 - 6310 294.50 AT &T GEN & ADMIN TELEPHONE 2000 - 6310 294.50 Check Total: 589.00 AP- 00071206 MW AT &T MOBILITY UNDERGROUND REP TELEPHONE 1001 - 6310 8.33 AT &T MOBILITY ELECTRICAL SHOP TELEPHONE 1003 - 6310 9.09 AT &T MOBILITY LABORATORY TELEPHONE 1007 - 6310 8.90 AT &T MOBILITY ENGINEERING TELEPHONE 1029 - 6310 12.22 AT &T MOBILITY UNDERGROUND REP TELEPHONE 2001 - 6310 8.33 AT &T MOBILITY ELECTRICAL SHOP TELEPHONE 2003 - 6310 9.08 AT &T MOBILITY LABORATORY TELEPHONE 2007 - 6310 8.89 AT &T MOBILITY ENGINEERING TELEPHONE 2029 - 6310 12.21 Check Total: 77.05 AP- 00071205 MW BACHELDER, JON C PUMPS TRAVEL/MEETINGS 1002 - 6200 22.00 User: MICHAEL Page: 1 Report: OH_PMT_CLAIMS_BK Current Date: 11/10/2008 Current Time: 14:51:41 PAYMENT OF CLAIMS Amiss lama Department / Proi Name Dpi Acct# / Prol Code BACHELDER, JON C Amount Check Num Woe PUMPS DUES/MEMB/CERT 1002 - 6250 30 BACHELDER, JON C PUMPS TRAVEL/MEETINGS 2002 - 6200 22.00 BACHELDER, JON C PUMPS DUES/MEMB /CERT 2002 - 6250 30.00 Check Total: 10400 . AP- 00071207 MW BAY TOOL & SUPPLY INC GEN & ADMIN SHOP SUPPLY INV 1000 - 0421 233.91 BAY TOOL & SUPPLY INC GEN & ADMIN SMALL TOOLS INV 1000 - 0423 472.59 Check Total: 706.50 AP -00071208 MW BENTLY AGROWDYNAMICS OPERATIONS SLUDGE DISPOSAL 1006 - 6652 846.27 Check Total: 846.27 AP -00071209 MW BERGSOHN, IVO ENGINEERING TRAVEL/MEETINGS 2029 - 6200 70.20 Check Total: 70.20 AP -00071210 MW BING MATERIALS DIAMOND VLY RNCH GROUNDS & MNTC 1028 - 6042 348.57 BING MATERIALS ENGINEERING - ICR TMDL O2SYS/TMDL,ICR 1029 - 8605 - ICTMDL 1,251.83 Check Total: 1.600.40 AP- 00071211 MW BRODY, JOEL ENGINEERING MISC LIAB CLAIMS 2029 - 4520 377.99 to Check Total: 377.99 AP- 00071212 MW BUTZ, GARTH UNDERGROUND REP TRAVEL/MEETINGS 2001 - 6200 127.53 Check Total: 127.53 AP- 00071213 MW CALIF BOARD OF EQUALIZATION FINANCE SUPPLIES 1039 - 6520 8.00 CALIF BOARD OF EQUALIZATION FINANCE SUPPLIES 2039 - 6520 8.00 Check Total: 16.00 AP -00071214 MW CALIF WATER RESOURCES CTRL BD OPERATIONS DUES/MEMB /CERT 1006 - 6250 170.00 Check Total: 170.00 AP -00071215 MW CALIFORNIA MUNICIPAL FINANCE ADVISORY 1039 - 4440 150.00 CALIFORNIA MUNICIPAL FINANCE ADVISORY 2039 - 4440 150.00 Check Total: 300.00 AP -00071216 MW CAMPBELL AUD, NANCI HUMAN RESOURCES SAFETY /EQUIP/PHY 1022 - 6075 27.50 CAMPBELL AUD, NANCI HUMAN RESOURCES SAFETY/EQUIP/PHY 2022 - 6075 27.50 Check Total: 55.00 AP -00071217 MW CARDINALE EQUIPMENT REP AUTOMOTIVE 1005 - 6011 486.17 Check Total: 486.17 AP -00071218 MW User: MICHAEL Page: Report: OH_PMT_CLAIMS_BK Current Time: 14:51:41 Current Date: 11/10/2008 Ven Name CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CRUZ EXCAVATING INC CRUZ EXCAVATING INC CRUZ EXCAVATING INC CRUZ EXCAVATING INC CRUZ EXCAVATING INC CRUZ EXCAVATING INC CRUZ EXCAVATING INC kn 0 CRUD EXCAVATING INC CWEA CWEA CWEA CWEA CWEA DAVI LABORATORIES DIAMOND DITCH MUTUAL WATER DLT SOLUTIONS INC DOUGLAS DISPOSAL User: MICHAEL Report: OH_PMT_CLAIMS_BK Department / Prof Name LABORATORY - ALP CO MTBE CONT LABORATORY - ARHD3 TRTMT EXP LABORATORY - BEACON CONTAM LABORATORY - BKRFLD TRTMT EXP LABORATORY - HERBST LABORATORY GEN & ADMIN - WTRLN,AL TAHOE GEN & ADMIN - WL,GRANITE/IRON GEN & ADMIN - WTRLN, TATA ENGINEERING - WL,GRANITE /IRON ENGINEERING -WTRLN,AL TAHOE ENGINEERING - WTRLN, TATA ENGINEERING - WTRLN, TATA ENGINEERING - WTRLN,AL TAHOE UNDERGROUND REP ELECTRICAL SHOP ENGINEERING UNDERGROUND REP ENGINEERING LABORATORY DIAMOND VLY RNCH ENGINEERING GEN & ADMIN PAYMENT OF CLAIMS Description MONITORING MONITORING MONITORING MONITORING MONITORING MONITORING CONST RETAINAGE CONST RETAINAGE CONST RETAINAGE WL,GRANITE MTN WTLN, AL TAHOE WTRLN, TATA LN WTRLN, TATA LN WTLN, AL TAHOE DUES/MEMB /CERT DUES/MEMB/CERT DUES/MEMB/CERT DUES/MEMB/CERT DUES/MEMB/CERT MONITORING LAND & BUILDINGS AUTOCAD CIVIL 3D REFUSE DISPOSAL Page: 3 Acct# / Prol Code 1007 - 6110 - ACMTBE 2007 - 6110 - AH3EXP 2007 - 6110 - BEACON 2007 - 6110 - BKRFLD 2007 - 6110 - HERBST 2007 - 6110 Check Total: 2000 - 2605 - ATWLO8 2000 - 2605 - GRANWL 2000 - 2605 - TATAWL 2029 - 7069 - GRANWL 2029 - 8811 - ATWLO8 2029 - 8866 - TATAWL Check Total: 2029 - 8866 - TATAWL Check Total: 2029 - 8811 - ATWL08 Check Total: 1001 - 6250 1003 - 6250 1029 - 6250 2001 - 6250 2029 - 6250 2007 - 6110 1028 - 5010 1029-7566 1000 - 6370 Check Total: Check Total: Check Total: Check Total: Current Date: 11/ I0/2008 Current lime: 14:51:41 Amount Check Num TIPe 190.00 190.00 190.00 190.00 380.00 190.00 1,330.00 AP- 00071219 MW - 2,450.88 - 746.00 - 2,567.50 7,460.00 73,929.52 25,675.00 101.300.14 AP-00071220 MW 103,670.50 103,670.50 AP- 00071221 MW 71,346.00 71,346.00 AP- 00071222 MW 392.00 132.00 35.50 132.00 35.50 727.00 AP -00071223 MW 219.00 219.00 AP- 00071224 MW 3,085.00 3,085.00 AP -00071225 MW 3,012.70 3,012.70 AP - 00071226 MW 537.83 PAYMENT OF CLAIMS Vendor Name Department / Proi Name Description Acct# / Proi Code Amount Check Num Type Check Total: 537.83 AP- 00071227 MW EMPIRE SAFETY & SUPPLY GEN & ADMIN SAFETY INVENTORY 1000 - 0425 120.39 Check Total: 12049 AP- 00071228 MW ETS LABORATORY MONITORING 1007 - 6110 735.00 Check Total: 735.00 AP- 00071229 MW FEDEX FINANCE POSTAGE EXPENSES 1039 - 4810 2.94 FEDEX FINANCE POSTAGE EXPENSES 2039 - 4810 2.93 Check Total: 5.87 AP -00071230 MW FERGUSON ENTERPRISES INC. HEAVY MAINT SECONDARY EQUIP 1004 - 6022 6.69 Check Total: 6.69 AP- 00071231 MW FRYE, WILLIAM INFORMATION SYS TRAVEL/MEETINGS 1037 - 6200 204.00 FRYE, WILLIAM INFORMATION SYS TRAVEL/MEETINGS 2037 - 6200 204.00 Check Total: 408.00 AP- 00071232 MW GBC SCIENTIFIC EQUIP INC LABORATORY SERVICE CONTRACT 1007 - 6030 2,074.58 GBC SCIENTIFIC EQUIP INC LABORATORY SERVICE CONTRACT 2007 - 6030 2,074.58 tri 1-. Check Total: 4,149.16 AP- 00071233 MW GFOA FINANCE ADVISORY 1039 - 4440 207.50 GFOA FINANCE ADVISORY 2039 - 4440 207.50 Check Total: 415.00 AP- 00071234 MW GRAINGER GEN & ADMIN SHOP SUPPLY INV 1000 - 0421 124.65 GRAINGER HEAVY MAINT SECONDARY EQUIP 1004 - 6022 71.59 Check Total: 196.24 AP -00071235 MW HACH - GLI International LABORATORY REPL RAW SMPLR 1007 - 8922 5,098.75 Check Total: 5,098.75 AP -00071236 MW HANGTOWN GENERAL ENGINEER GEN & ADMIN - C CLUB TNK REPL CONST RETAINAGE 2000 - 2605 - CLUBTK -74.46 HANGTOWN GENERAL ENGINEER ENGINEERING - C CLUB TNK REPL TANK, COUNTRY CL 2029 - 7063 - CLUBTK 9,771.79 Check Total: 9,697.33 AP- 00071237 MW HASLER FINANCIAL SERVICES LLC CUSTOMER SERVICE EQUIP RENT/LEASE 1038 - 5020 122.57 HASLER FINANCIAL SERVICES LLC CUSTOMER SERVICE EQUIP RENT/LEASE 2038 - 5020 122.57 Check Total: 245.14 AP- 00071238 MW HENDERSON, DEBBIE FINANCE TRAVELMIEETINGS 1039 - 6200 50.46 User: MICHAEL Report: OH_PMT_CLAIMS_BK Page: 4 Current Date: 11/10/2008 Current Time: 14:51:41 Vendor Name JIA -DER DAY KAISER PERMANENTE KIMBALL MIDWEST User: MICHAEL Report: OH_PMT_CLAIMS_BK PAYMENT OF CLAIMS Deoa ieM / Prol Name HENDERSON, DEBBIE FINANCE HERNANDEZ, LAZARO UNDERGROUND REP TRAVELJMEETINGS Descrlotlo_n TRAVEL/MEETINGS HIGH SIERRA BUSINESS SYSTEMS HUMAN RESOURCES SERVICE CONTRACT HIGH SIERRA BUSINESS SYSTEMS CUSTOMER SERVICE SERVICE CONTRACT HIGH SIERRA BUSINESS SYSTEMS HUMAN RESOURCES SERVICE CONTRACT HIGH SIERRA BUSINESS SYSTEMS CUSTOMER SERVICE SERVICE CONTRACT HUGHES, PAUL FINANCE TRAVEL/MEETINGS HUGHES, PAUL FINANCE TRAVEL/MEETINGS Acct# / Prof Code 2039 - 6200 2001 - 6200 1022 - 6030 1038 - 6030 2022 - 6030 2038 - 6030 1039 - 6200 2039 - 6200 HUSSMANN, NANCY HUMAN RESOURCES TRAVEL/MEETINGS 1022 - 6200 HUSSMANN, NANCY HUMAN RESOURCES TRAVEL/MEETINGS 2022 - 6200 Check Total: Check Total: Check Total: Check Total: Check Total: Page: 5 Current Date: 11/10/2008 Current Time: 14:51:41 Amount Check Num TYP 50.45 100.91 AP 00071239 MW 81.90 81.90 AP -00071240 MW 15.76 26.68 15.76 26.67 84.87 AP-00071241 MW 19.36 19.35 38.71 AP- 00071242 MW 54.00 54.00 108.00 AP- 00071243 MW IDEXDISTRIBUTION CORP. LABORATORY LAB SUPPLIES 1007 - 4760 1,217.59 IDEXA DISTRIBUTION CORP. LABORATORY LAB SUPPLIES 2007 - 4760 1,285.76 Check Total: 2,503.35 AP- 00071244 MW INFOSEND INC. CUSTOMER SERVICE POSTAGE EXPENSES 1038 - 4810 1,258.02 INFOSEND INC. CUSTOMER SERVICE PRINTING 1038 - 4920 150.00 Check Total: 1,408.02 AP -00071245 MW INTERSTATE SAFETY & SUPPLY GEN & ADMIN SHOP SUPPLY INV 1000 - 0421 457.72 INTERSTATE SAFETY & SUPPLY GEN & ADMIN SAFETY INVENTORY 1000 - 0425 156.13 INTERSTATE SAFETY & SUPPLY DIAMOND VLY RNCH GROUNDS & MNTC 1028 - 6042 263.12 Check Total: 876.97 AP -00071246 MW GEN & ADMIN UB SUSPENSE 1000 - 2002 11,065.53 Check Total: 11.065.53 AP -00071247 MW SELF FUNDED INS CLAIMS 3000 - 6745 577.00 Check Total: 577,00 AP- 00071248 MW EQUIPMENT REP AUTOMOTIVE 1005 - 6011 43.11 Check Total: 43.11 AP- 00071249 MW Vendor Name KOFF & ASSOCIATES INC KOFF & ASSOCIATES INC KRLT & KOWL RADIO KRLT & KOWL RADIO LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAVALLEE, PETER LAVALLEE, PETER LEE, JEFF Les Schwab Tires Les Schwab Tires User: MICHAEL Report: OH_PMT_CLAIMS BK Department / Proi Name ADMINISTRATION ADMINISTRATION DIO - PR EXP- EXTERNAL DIO - PR EXP - EXTERNAL GEN & ADMIN UNDERGROUND REP PUMPS PUMPS PUMPS HEAVY MAINT EQUIPMENT REP EQUIPMENT REP EQUIPMENT REP EQUIPMENT REP UNDERGROUND REP PUMPS PUMPS EQUIPMENT REPAIR EQUIPMENT REPAIR EQUIPMENT REPAIR ENGINEERING ENGINEERING OPERATIONS EQUIPMENT REP EQUIPMENT REPAIR PAYMENT OF CLAIMS Description CONTRACT SERVICE CONTRACT SERVICE PUB RELATIONS PUB RELATIONS SHOP SUPPLY INV SHOP SUPPLIES PUMP STATIONS SHOP SUPPLIES SMALL TOOLS SECONDARY EQUIP AUTOMOTIVE GENERATORS SHOP SUPPLIES SMALL TOOLS SMALL TOOLS SHOP SUPPLIES SMALL TOOLS AUTOMOTIVE SHOP SUPPLIES SMALL TOOLS TRAVEUMEETINGS TRAVEUMEETINGS TRAVEUMEETINGS AUTOMOTIVE AUTOMOTIVE Page: 6 Acct# / Proi Code 1021 - 4405 2021 - 4405 Check Total: 1027 - 6620 - PREEXT 2027 - 6620 - PREEXT Check Total: 1000 - 0421 1001 - 6071 1002 - 6051 1002 - 6071 1002 - 6073 1004 - 6022 1005 -6011 1005 -6013 1005 - 6071 1005 - 6073 2001 - 6073 2002 - 6071 2002 - 6073 2005 - 6011 2005 - 6071 2005 - 6073 1029 - 6200 2029 - 6200 1006 - 6200 1005 -6011 2005 - 6011 Check Total: Check Total: Check Total: Current Date: 11/10/2008 Current Time: 14:51:41 Amount Check Num Um 810.00 810.00 1,620.00 AP -00071250 MW 306.00 306.00 612.00 AP- 00071251 MW 348.72 9.09 42.00 1.07 27.49 37.88 1,030.84 458.68 78.50 19.71 45.09 1.07 27.48 481.72 78.47 19.71 2,707.52 AP- 00071253 MW 175.50 175.50 351.00 127.54 127.54 747.07 1,842.59 AP- 00071254 MW AP- 00071255 MW Vendor Name LOOMIS FARGO & CO. LOOMIS FARGO & CO. MARSHALL, REX B MARSHALL, REX B MC MASTER CARR SUPPLY CO MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER a MEEI�S BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER User: MICHAEL Report: OH_PMT_CLAIMS_BK Department / Pro' Name FINANCE FINANCE CUSTOMER SERVICE CUSTOMER SERVICE UNDERGROUND REP PUMPS PUMPS PUMPS ELECTRICAL SHOP ELECTRICAL SHOP HEAVY MAINT HEAVY MAINT HEAVY MAINT HEAVY MAINT HEAVY MAINT HEAVY MAINT DIAMOND VLY RNCH ENGINEERING - ICR TMDL CUSTOMER SERVICE PUMPS PUMPS PIMPS PUMPS PUMPS ELECTRICAL SHOP ELECTRICAL SHOP HEAVY MAINTENANC PAYMENT OF CLAIMS Page: 7 Descriation CONTRACT SERVICE CONTRACT SERVICE TRAVEUMEETINGS TRAVEUMEETINGS SHOP SUPPLIES PUMP STATIONS SHOP SUPPLIES SMALL TOOLS PUMP STATIONS SMALL TOOLS SECONDARY EQUIP BUILDINGS GROUNDS & MNTC SHOP SUPPLIES SMALL TOOLS BIOSOL EQUPBLDG GROUNDS & MNTC O2SYS/TMDL,ICR SMALL TOOLS GROUNDS & MNTC PUMP STATIONS RPR/MNTC WTR TKS SHOP SUPPLIES SMALL TOOLS SHOP SUPPLIES SMALL TOOLS BUILDINGS Acct# / Prol Code 1039 - 4405 2039 - 4405 1038 - 6200 2038 - 6200 1001 - 6071 1002 -6051 1002 - 6071 1002 - 6073 1003 - 6051 1003 - 6073 1004 - 6022 1004 -6041 1004 - 6042 1004 - 6071 1004 - 6073 1004 - 6653 1028 - 6042 1029 - 8605 - ICTMDL 1038 - 6073 2002 - 6042 2002 - 6051 2002 - 6054 2002 - 6071 2002 - 6073 2003 - 6071 2003 - 6073 2004 - 6041 Check Total: Check Total: Check Total: Check Total: Check Total: Amount Check Num RN 2,589.66 AP -00071256 MW 300.40 300.40 600.80 109.50 109.50 219.00 80.92 80.92 103.55 3.16 21.54 21.40 101.35 20.73 7.08 188.87 94.73 30.75 32.48 34.26 1,665.80 10.63 21.44 25.36 25.61 3.16 21.54 126.01 112.39 5.09 Current Date: 11/10/2008 Current Time: 14:51:41 AP- 00071257 MW AP -00071258 MW AP -00071259' MW 2,676.93 AP -00071260 MW PAYMENT OF CLAIMS Vendor Name Deoartment / Prof Name DeaCrotion Acct# / Prol Code Amount Check Num Type MID MOUNTAIN COMMUNICATIONS DIAMOND VLY RNCH GROUNDS & MNTC 1028 - 6042 122.33 Check Total: 122.33 AP -00071261 MW MSC INDUSTRIAL SUPPLY CO UNDERGROUND REP SHOP SUPPLIES 1001 - 6071 109.22 Check Total: 109.22 AP -00071262 MW MY OFFICE PRODUCTS ENGINEERING OFFICE SUPPLIES 1029 - 4820 162.50 MY OFFICE PRODUCTS FINANCE OFFICE SUPPLIES 1039 - 4820 16.17 MY OFFICE PRODUCTS ENGINEERING OFFICE SUPPLIES 2029 - 4820 162.49 MY OFFICE PRODUCTS FINANCE OFFICE SUPPLIES 2039 - 4820 16.16 Check Total: 357.32 AP -00071263 MW NEVADA BLUE ENGINEERING OFFICE SUPPLIES 1029 - 4820 57.64 NEVADA BLUE ENGINEERING OFFICE SUPPLIES 2029 - 4820 53.87 Check Total: 111.51 AP -00071264 MW NORTHTOWN COMPANY CUSTOMER SERVICE WATER METERS 2038 - 6045 608.58 Check Total: 608.58 AP-00071265 MW NORTHWEST HYD. CONSULT INC ENGINEERING - CTC GRNT -BMPs BMP PROJECTS 1029 - 8737 - CTCBMP 9,297.24 NORn4WEST HYD. CONSULT INC ENGINEERING - CTC GRNT -BMPs BMP PROJECTS 2029 - 8745 - CTCBMP 9,297.24 I Check Total: 18,594.48 AP -00071266 MW OFFICE MAX HUMAN RESOURCES OFFICE SUPPLIES 1022 - 4820 92.83 OFFICE MAX FINANCE OFFICE SUPPLIES 1039 - 4820 7.85 OFFICE MAX HUMAN RESOURCES OFFICE SUPPLIES 2022 - 4820 92.83 OFFICE MAX FINANCE OFFICE SUPPLIES 2039 - 4820 7.86 Check Total: 201.37 AP -00071267 MW OLIN CORPORATION OPERATIONS HYPOCHLORITE '1006 - 4755 3,937.03 Check Total: 3,937,03 AP -00071268 MW ONTRAC OPERATIONS - FILTER ASSMNT FLTR BLD ASSMNT 1006 - 8862 - FILTER 8.00 ONTRAC LABORATORY POSTAGE EXPENSES 1007 - 4810 20.00 ONTRAC LABORATORY - HERBST POSTAGE EXPENSES 2007 - 4810 - HERBST 9.50 ONTRAC LABORATORY POSTAGE EXPENSES 2007 - 4810 37.00 Check Total: 74.50 AP -00071269 MW PETERBILT TRUCK PARTS EQUIPMENT REP AUTOMOTIVE 1005 - 6011 17.55 Check Total: 17.55 AP -00071270 MW User: MICHAEL Page: 8 Current Date: 11/10/2008 Report: OH_PMT CLAIMS_BK Current Time: 14:51:41 Vendor Name PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PETTY CASH PAYMENT OF CLAIMS Description Acct# / Prof Code Amount Check Num TRAVEUMEETINGS 1021 - 6200 6.50 SUPPLIES 1021 - 6520 33.59 OFFICE SUPPLIES 1022 - 4820 377 SUPPLIES 1022 - 6520 21.63 TRAVEL/MEETINGS 1029 - 6200 19.31 SUPPLIES 1029 - 6520 2.69 SUPPLIES 1039 - 6520 5.70 TRAVEUMEETINGS 2021 - 6200 6.50 SUPPLIES 2021 - 6520 33.58 OFFICE SUPPLIES 2022 - 4820 3.76 SUPPLIES 2022 - 6520 21.63 TRAVEL/MEETINGS 2029 - 6200 19.30 SUPPLIES 2029 - 6520 2.69 SUPPLIES 2039 - 6520 5.70 Check Total: 186.35 AP- 00071271 MW PRA ,dR 174 PUMPS SHOP SUPPLIES 1002 - 6071 32.36 PRAAIR 174 HEAVY MAINT SHOP SUPPLIES 1004 - 6071 257.97 PRAXAIR 174 LABORATORY LAB SUPPLIES 1007 - 4760 386.39 i PRAXAIR 174 UNDERGROUND REP PIPE/CVRS/MHLS 2001 - 6052 29.42 PRAXAIR 174 PUMPS SHOP SUPPLIES 2002 - 6071 32.36 PRAXAIR 174 LABORATORY LAB SUPPLIES 2007 - 4760 386.39 Check Total: 1,124.89 AP- 00071272 MW QUALITY ASSURANCE SOLUTION LLC LABORATORY TRAVEL/MEETINGS 1007 - 6200 159.51 QUALITY ASSURANCE SOLUTION LLC LABORATORY TRAVEUMEETINGS 2007 - 6200 159.52 Check Total: 319.03 AP -00071273 MW RADIO SHACK . UNDERGROUND REP TELEPHONE 1001 - 6310 15.69 RADIO SHACK PUMPS TELEPHONE 1002 - 6310 53.85 RADIO SHACK PUMPS TELEPHONE 2002 - 6310 53.85 Check Total: 123.39 AP -00071274 MW RICH'S SMALL ENGINE SERVICE UNDERGROUND REP SMALL TOOLS 2001 - 6073 4.21 Check Total: 4.21 AP -00071275 MW ROCKWELL ENGINEERING & EQUIP PUMPS REP JNSN PMP #3 1002 - 8902 11,114.87 User MICHAEL Department / Proi Name ADMINISTRATION ADMINISTRATION HUMAN RESOURCES HUMAN RESOURCES ENGINEERING ENGINEERING FINANCE ADMINISTRATION ADMINISTRATION HUMAN RESOURCES HUMAN RESOURCES ENGINEERING ENGINEERING FINANCE Page: 9 Current Date: 11/10/2008 Report: OH_PMT_CLAIMS_BK Current lime: 14:51:41 Vendor Name SABAD, VICKI A. SABAD, VICKI A. SABAD, VICKI A. SABAD, VICKI A. SABAD, VICKI A. SCHLANGE, PAUL SCOTTYS HARDWARE SCOTTYS HARDWARE SCOTTYS HARDWARE SHARP, KATHY SHARP, KATHY cn SIERRA CHEMICAL CO SIERRA ENVIRONMENTAL SIERRA FOOTHILL LABORATORY SIERRA FOOTHILL LABORATORY SIERRA NEVADA MEDIA GROUP SIERRA NEVADA MEDIA GROUP SIERRA NEVADA MEDIA GROUP SIERRA NEVADA MEDIA GROUP SIERRA NEVADA MEDIA GROUP SIERRA NEVADA MEDIA GROUP SIERRA NEVADA MEDIA GROUP SIERRA NEVADA MEDIA GROUP SIERRA NEVADA MEDIA GROUP User: MICHAEL Report: OH_PMT CLAIMS_BK Department / Proi Name GEN & ADMIN FINANCE GEN & ADMIN GEN & ADMIN FINANCE DIAMOND VLY RNCH PUMPS ENGINEERING ENGINEERING ADMINISTRATION ADMINISTRATION PUMPS LABORATORY LABORATORY - IND CRK RES MONT ENGINEERING - ICR TMDL EQUIPMENT REP HUMAN RESOURCES DIAMOND VLY RNCH CUSTOMER SERVICE FINANCE HUMAN RESOURCES ENGINEERING - TWIN PEAKS BS CUSTOMER SERVICE FINANCE PAYMENT OF CLAIMS Description UB SUSPENSE INTEREST EXPENSE UB SUSPENSE METER SALE INTEREST EXPENSE TRAVEL/MEETINGS PUMP STATIONS SMALL TOOLS SMALL TOOLS TRAVEL/MEETINGS TRAVEL/MEETINGS HYPOCHLORITE MONITORING MONITORING O2SYS/TMDL,ICR REPL VEH 26 ADS /LGL NOTICES SUPPLIES ADS/LGL NOTICES ADS /LGL NOTICES ADS/LGL NOTICES BSTR, TWN PEAKS ADS/LGL NOTICES ADS/LGL NOTICES Acct# / Prol Code 1000 - 2002 1039 - 6710 2000 - 2002 2000 - 3545 2039 - 6710 1028-6200 1002 -6051 1029 - 6073 2029 - 6073 1021 - 6200 2021 - 6200 2002-4755 1007-6110 Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: 1007 - 6110 - INDIAN 1029 - 8605 - ICTMDL Check Total: 1005 - 8916 1022 - 4930 1028 - 6520 1038 - 4930 1039 - 4930 2022 - 4930 2029 - 7070 - TPBSTR 2038 - 4930 2039 - 4930 Page: 10 Current Dote: 11/10/2008 Current Time: 14:51:41 Amount Check Num Type 11.114.87 AP -00071276 MW 9,587.88 287.64 2,923.32 286.00 96.28 13,181.12 AP -00071277 MW 36.27 36.27 AP -00071278 MW 3.37 26.60 26.60 56.57 AP -00071279 MW 61.43 61.42 122.85 AP -00071280 MW 1,129.98 1,129.98 AP -00071281 MW 380.00 380.00 AP -00071282 MW 390.00 195.00 585.00 AP -00071283 MW 69.11 450.48 79.50 159.71 42.00 450.48 167.58 159.71 41.99 SUBSTITUTE PERSONNEL & User: MICHAEL Department / Proi Name PAYMENT OF CLAIMS Description Acct# / Pro! Code Check Total: SIERRA PACIFIC POWER GEN & ADMIN ST LIGHTING EXP 1000 - 6740 SIERRA PACIFIC POWER GEN & ADMIN ELECTRICITY 2000 - 6330 16,850.28 Check Total: 18.228.83 AP- 00071285 MW SIERRA SPRINGS GEN & ADMIN SAFETY INVENTORY 1000 - 0425 482.40 SIERRA SPRINGS UNDERGROUND REP SUPPLIES 1001 - 6520 35.64 SIERRA SPRINGS PUMPS SUPPLIES 1002 - 6520 2.38 SIERRA SPRINGS ELECTRICAL SHOP SUPPLIES 1003 - 6520 11.88 SIERRA SPRINGS HEAVY MAINT SUPPLIES 1004 - 6520 35.64 SIERRA SPRINGS EQUIPMENT REP SUPPLIES 1005 - 6520 11.88 SIERRA SPRINGS OPERATIONS SUPPLIES 1006 - 6520 35.64 SIERRA SPRINGS DIAMOND VLY RNCH SUPPLIES 1028 - 6520 11.88 SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 1038 - 6520 11.88 SIERRA SPRINGS UNDERGROUND REP SUPPLIES 2001 - 6520 35.64 SIERRA SPRINGS PUMPS SUPPLIES 2002 - 6520 9.51 SIERRA SPRINGS ELECTRICAL SHOP SUPPLIES 2003 - 6520 11.88 co SIERRA SPRINGS EQUIPMENT REPAIR SUPPLIES 2005 - 6520 11.88 SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 2038 - 6520 11.88 Check Total: 720.01 AP- 00071286 MW SOUTH TAHOE NEWSPAPER AGENCY ADMINISTRATION SUBSCRIPTIONS 1021 - 4830 56.04 SOUTH TAHOE NEWSPAPER AGENCY ADMINISTRATION SUBSCRIPTIONS 2021 - 4830 56.02 Check Total: SOUTH TAHOE REFUSE GEN & ADMIN REFUSE DISPOSAL 1000 - 6370 3,167.78 SOUTH TAHOE REFUSE PUMPS PUMP STATIONS 1002 - 6051 4.60 SOUTH TAHOE REFUSE GEN & ADMIN REFUSE DISPOSAL 2000 - 6370 207.42 Check Total: 3,379.80 AP -00071288 MW SOUTH TAHOE TOWING EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 175.00 Check Total: SOUTHWEST GAS GEN & ADMIN NATURAL GAS 1000 - 6350 SOUTHWEST GAS GEN & ADMIN NATURAL GAS 2000 - 6350 Check Total: HUMAN RESOURCES CONTRACT SERVICE 1022 - 4405 969.95 Page: 11 Current Date: 11/10/2008 Report: OH_PMT_CLAIMS_BK Current Time: 14:51:41 Amami Nttm TYPe 1,620.56 AP -00071284 MW 1,378.55 112.06 AP -00071287 MW 175.00 AP -00071289 MW 20.08 163.33 183.41 AP -00071290 MW Vendor Name SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SWAIN, CAROL SWAIN, CAROL THANG DUC VU AND THANG DUC VU AND THAN DUC VU AND THANb DUC VU AND THANG DUC VU AND THANG DUC VU AND THANG DUC VU AND THOMAS HAEN CO INC U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE User: MICHAEL Report: OH PMT CLAIMS_BK Department / Proi Name ENGINEERING - EFFLUENT EVAL HUMAN RESOURCES ENGINEERING - WTRLN, JULIE LN ENGINEERING - WTRLN, GLEN RD ENGINEERING - WTRLN,AL TAHOE ENGINEERING - WTRLN, TATA INFORMATION SYS INFORMATION SYS TAHOE BASIN CONTAINER SERVICE GEN & ADMIN TAHOE BASIN CONTAINER SERVICE OPERATIONS GEN & ADMIN GEN & ADMIN FINANCE GEN &ADMIN GEN & ADMIN GEN & ADMIN FINANCE GEN & ADMIN - SUT WELL REDRILL GEN & ADMIN - NASTT 08 CONF UNDERGROUND REP UNDERGROUND REP PUMPS PUMPS HEAVY MAINT EQUIPMENT REP EQUIPMENT REP OPERATIONS PAYMENT OF CLAIMS Page: 12 Description REP EXP PUMPS CONTRACT SERVICE WTRLN, JULIE WTLN, GLEN RD WTLN, AL TAHOE WTRLN, TATA LN TRAVEL/MEETINGS TRAVEL/MEETINGS REFUSE DISPOSAL SLUDGE DISPOSAL UB SUSPENSE PERMIT FEE REV INTEREST EXPENSE UB SUSPENSE NEW SERV /ADMIN METER SALE INTEREST EXPENSE CONST RETAINAGE MISC INCOME SAFETY/EQUIP/PHY TRAVEL/MEETI NGS STANDBY ACCOMODA TRAVEL/MEETINGS SUPPLIES OFFICE SUPPLIES TRAVEL/MEETINGS OTHER SUPPLIES Acct# / Pro! Code 1029 - 8676 - EFFLEV 2022 - 4405 2029 - 7067 - JULIE7 2029 - 8714 - GLENWL 2029 -8811 - ATWL0.8 2029 - 8866 - TATAWL Check Total: 1037 - 6200 2037 - 6200 1000 - 6370 1006 - 6652 1000 - 2002 1000 - 3301 1039 - 6710 2000 - 2002 2000 - 3530 2000 - 3545 2039 - 6710 Check Total: Check Total: Check Total: 2000 - 2605 - RWSUTR Check Total: 1000 - 3540 - NASTO8 1001 - 6075 1001 - 6200 1002 - 6083 1002 - 6200 1004 - 6520 1005 - 4820 1005 - 6200 1006 - 4790 Current Date: 11/10/2008 Current Tune: 14:51:41 Amount Check Num Tvoe 835.00 969.95 73.62 39.26 302.87 137.41 3,328.06 AP -00071291 MW 76.05 76.05 152.10 AP -00071292 MW 292.99 8,165.00 8,457.99 AP- 00071293 MW 15,979.80 50.00 399.50 4,632.44 150.00 311.00 103.30 21,626.04 AP-00071294 MW 112,008.85 112,008.85 AP -00071295 MW 1,264.25 129.25 50.04 191.12 98.55 10.76 14.91 35.31 50.58 Vendor Name U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S i NK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE User: MICHAEL Report: OH_PMT_CLAIMS_BK Department / Proi Name OPERATIONS OPERATIONS OPERATIONS LABORATORY LABORATORY LABORATORY BOARD'OF DIR BOARD OF DIR ADMINISTRATION ADMINISTRATION ADMINISTRATION HUMAN RESOURCES HUMAN RESOURCES HUMAN RESOURCES DIO DIO DIO - PR EXP- EXTERNAL DIAMOND VLY RNCH DIAMOND VLY RNCH ENGINEERING ENGINEERING ENGINEERING - FS EASEMENTS ENGINEERING - ICR TMDL ENGINEERING - COLL SYS MASTER ENGINEERING - DVR EIR INFORMATION SYS INFORMATION SYS INFORMATION SYS INFORMATION SYS - IFAS MIGRATION INFORMATION SYS CUSTOMER SERVICE CUSTOMER SERVICE PAYMENT OF CLAIMS Page: Description OFFICE SUPPLIES SMALL TOOLS TRAVEUMEETINGS OFFICE SUPPLIES SAFETY/EQUIP /PHY TRAVEL/MEETINGS OFFICE SUPPLIES TRAVEUMEETINGS OFFICE SUPPLIES TRAVEUMEETINGS INCNTV & RCGNTN OFFICE SUPPLIES TRAVEL/MEETINGS PERSONNEL EXPENS PRINTING TRAVEL/MEETINGS PUB RELATIONS OFFICE SUPPLIES TRAVEL/MEETINGS GASOLINE TRAVEL/MEETINGS SUPPLIES O2SYS/TMDL,ICR COLL SYS MST PLN DIAM VLY MP/EIR OFFICE SUPPLIES DIST.COMP SPPLIS TRAVEL/MEETINGS TRAVEL/MEETINGS IFAS REPL/ENHAN OFFICE SUPPLIES TRAVEL/MEETINGS Acct# / Proi Code 1006 - 4820 1006 - 6073 1006 - 6200 1007 - 4820 1007 - 6075 1007 - 6200 1019 -4820 1019 -6200 1021 - 4820 1021 - 6200 1021 -6621 1022 - 4820 1022 - 6200 • 1022 - 6670 1027 -4920 1027 - 6200 1027 - 6620 - PREEXT 1028 - 4820 1028 - 6200 1029 - 4610 1029 - 6200 1029 - 6520 - FSESMT 1029 - 8605 - ICTMDL 1029 - 8721 - CSMSPL 1029 - 8725 - DVREIR 1037 - 4820 1037 - 4840 1037 - 6200 1037 - 6200 - NUIFAS 1037 - 8448 1038 - 4820 1038 - 6200 13 Current Date: 11/10/2008 Current Time: 14:51:41 Amount Check Num Tvne 321.70 146.43 130.78 104.84 51.56 485.75 32.63 347.50 9.79 228.61 29.79 27.94 99.00 30.80 215.13 347.50 44.76 261.97 169.36 20.00 763.89 321.25 1,672.75 114.58 187.66 11.31 43.10 66.15 892.43 267.70 185.73 694.98 Vendor Name U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S B CORPORATE U S INK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE User: MICHAEL Report: OH PMT CLAIMS BK Department / Prof Name FINANCE FINANCE FINANCE FINANCE FINANCE UNDERGROUND REP UNDERGROUND REP UNDERGROUND REP PUMPS PUMPS HEAVY MAINTENANC EQUIPMENT REPAIR EQUIPMENT REPAIR LABORATORY LABORATORY LABORATORY BOARD OF DIR BOARD OF DIR ADMINISTRATION ADMINISTRATION ADMINISTRATION HUMAN RESOURCES HUMAN RESOURCES HUMAN RESOURCES DIO DIO DIO - PR EXP- EXTERNAL ENGINEERING ENGINEERING ENGINEERING INFORMATION SYS INFORMATION SYS PAYMENT OF CLAIMS Description ADVISORY OFFICE SUPPLIES SUBSCRIPTIONS TRAVEL/MEETINGS SUPPLIES PIPE /CVRS/MHLS TRAVEL/MEETINGS DUES/MEMB/CERT STANDBY ACCOMODA TRAVEUMEETINGS BUILDINGS OFFICE SUPPLIES TRAVEUMEETINGS OFFICE SUPPLIES SAFETY /EQUIP/PHY TRAVEL/MEETINGS OFFICE SUPPLIES TRAVEUMEETINGS OFFICE SUPPLIES TRAVEUMEETINGS INCNTV & RCGNTN OFFICE SUPPLIES TRAVEUMEETINGS PERSONNEL EXPENS PRINTING TRAVEUMEETINGS PUB RELATIONS GASOLINE OFFICE SUPPLIES TRAVEUMEETINGS OFFICE SUPPLIES DIST.COMP SPPLIS Acct# / Prol Code 1039 - 4440 1039 - 4820 1039 - 4830 1039 - 6200 1039 - 6520 2001 - 6052 2001 - 6200 2001 - 6250 2002 - 6083 2002 - 6200 2004 - 6041 2005 - 4820 2005 6200 2007 - 4820 2007 - 6075 2007 - 6200 2019 - 4820 2019 - 6200 2021 - 4820 2021 - 6200 2021 - 6621 2022 - 4820 2022 - 6200 2022 - 6670 2027 - 4920 2027 - 6200 2027 - 6620 - PREEXT 2029 -4610 2029 - 4820 2029 - 6200 2037 - 4820 2037 - 4840 Page: 14 Current Date: 11/10/2008 Current Time: 14:51:41 Amour Check Num Type 62.50 166.54 47.58 398.50 2.48 214.25 136.72 80.00 191.12 98.55 1.046.71 14.91 35.30 104.83 51.55 485.75 32.62 347.50 9.78 252.87 29.78 27.94 99.00 30.80 215.12 347.50 44.76 20.00 37.64 1,005.77 11.30 43.09 Vendor Name U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE USA BLUE BOOK WECO INDUSTRIES INC WEDCO INC WED& INC WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY ZELLMER, DAVE User: MICHAEL Report: OH_PMT_CLAIMS_BK Department / Proi Name INFORMATION SYS INFORMATION SYS - IFAS MIGRATION CUSTOMER SERVICE CUSTOMER SERVICE FINANCE FINANCE FINANCE FINANCE FINANCE PUMPS UNDERGROUND REP ELECTRICAL SHOP ELECTRICAL SHOP PUMPS HEAW MAINT HEAW MAINT HEAW MAINT HEAW MAINT ENGINEERING - ICR TMDL PUMPS WINZLER & KELLY CONSULT ENGRS OPERATIONS - MAP UG UTILITIES DIAMOND VLY RNCH PAYMENT OF CLAIMS Description TRAVEL/MEETINGS TRAVELMIEETINGS OFFICE SUPPLIES TRAVEL/MEETINGS ADVISORY OFFICE SUPPUES SUBSCRIPTIONS TRAVEUMEETINGS SUPPLIES WELLS INFILTRTN/INFLOW PUMP STATIONS SHOP SUPPLIES PUMP STATIONS PRIMARY EQUIP SECONDARY EQUIP GROUNDS & MNTC BIOSOL EQUP/BLDG O2SYS/TMDL,ICR PUMP STATIONS PLANT GIS CONTRACT SERVICE Page: 15 Acct# I Proi Code 2037 - 6200 2037 - 6200 - NUIFAS 2038 - 4820 2038 - 6200 2039 - 4440 2039 - 4820 2039 - 4830 2039 - 6200 2039 - 6520 2002 - 6050 1001 - 6055 1003 -6051 1003 -6071 1028 - 4405 602 44.00 - 377.99- 601'807.10 *+ 1002 - 6051 1004 - 6021 1004 - 6022 1004 - 6042 1004 - 6653 1029 - 8605 - ICTMDL 2002 - 6051 Check Total: Check Total: Check Total: Check Total: Check Total: 1006 - 8921 - GISMAP Check Total: Check Total: Grand Total: Current Date: 11/10/2008 Current Time: 14:51:41 Amount Check Num Tvne 66.14 892.43 185.73 694.97 62.50 166.54 47.57 398.48 2.47 18.381.73 747.06 747.06 614.11 AP-00071299 MW AP -00071300 MW 614.11 AP- 00071301 MW 408.96 42.90 451.86 AP -00071302 21.66 126.16 36.01 33.25 42.32 346.05 58.06 M W 663.51 AP -00071303 MW 5,922.12 5,922.12 AP- 00071304 MW 2,000.00 2,000.00 AP -00071305 MW 602,229.09 00 sbut Tabce P.U.D. FRI, N 11/07 08 A � NN 07, 2008, 2:39 FM - -- � obp Check rnq: - - -]eg: G ,, T aEIIE - - - -j : 423272 *3001- pgn: E 200 <1.19> ipt id: QR -1 - ID. Nerve Date Clack P a Type Subs Ref It) Nate . AP00070776 E1560 10/02/08 8 AP00070975 V17895 ` 10/16/08 rn w WHEELER, JCN C !C GEE PIL BIl3 & HEM GRAND TOTALS: Tb a1 Void Machira . Written. Total Void Hard Written Total Ntire Written Tbta1 Hand Written 'Total Reversals Tbta1 Coshed GRAND TOTAL 0 44.00 RV TR 377.99 RV 112 0.00 0.00 0.00 0.00 421.99 0.00 421.9 Reversed Reversed Hither of Checks Prcoessed• N.nter of Checks Pxc • Nutter of Checks Pte. Nurber of Checice Processed: N.mber of Checks Processed: Nutter of Checks Prcoessed: 0 0 0 0 2 0 South Tahoe pub'no Utility D'i6trict ~l~ ~ H. 50Ibrtg ~ ~ CIIluMQ JftW ~ ..lorIN ~LDu~ PM .. 1275 M__~ OM · South, "".1__. CA I618Q f'hOM 530 544 6414- flax e30541-00t4 BOARD AGENDA ITEM 6b TO: FROM: Board of Directors Ross Johnson, Manager of Plant Operations MEETING DATE: November 20, 2008 ITEM - PROJECT NAME: Local Hazard Mitigation Plan 2:30 P.M. PUBLIC HEARING REQUESTED BOARD ACTION: Hold a Public Hearing to take public comments on the draft Local Hazard Mitigation Plan. DISCUSSION: The South Tahoe Public Utility District has prepared a draft Local Hazard Mitigation Plan in October of 2008 in accordance with Federal Emergency Management Agency (FEMA) guidelines and requirements. The plan provides a blueprint for future hazard mitigation, defined as, "any sustained actions to reduce or eliminate the long-term risk to human life and property from a range of hazards." Public comment is an integral part of the development and approval of the plan, and the South Tahoe Public Utility District welcomes public input on the draft plan prior to formal adoption by the District's Board in the spring of 2009. SCHEDULE: Spring 2009 COSTS: N/A ACCOUNT NO: NIA BUDGETED AMOUNT REMAINING: ATTACHMENTS: Due to its length, the draft plan can be obtained from the Board Clerk upon request. CONCURRENCE WITH REQUESTED ACTIO GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES CATEGORY: Sewer NO NO -65- w w STPUD INPUT ON H AZ. A:;, M 1 T 1 GAT 1'0 N '. ... () \1 r it '" II 0 ( I 111 I I' ') III I [ '\' U t L" I? I ( 1 1275 M..dow Crest Drtve SOuth Leke Tahoe, CA 96:150 Phone: 53Q.544-6474 Fax: 530-541-oe14 www.lltpud.U8 INQ IN PI'" THE LocAL The South Tahoe Public Utility District Mitigation Plan In accordance wtt~t~~e ment Agency (FEMA) gUidelines a.rt$j r vldes a blueprint for future ha.td tnl talned actions to reduce or eliminate life and property from a range of Integral part of the developmentli trlct welcomes pUblic input on th tlon by the Dlstrlct's Board of Df~. In the following formats: -wwW..tPUd.u.....ourr.nLr:lC~tl~OO.LH. . Comments on the draft plaA m vember 20, 2008 Board m~ > MItigation Plan~1275 Meadow 96150. For additional Information. vice Department at 530.544.6474. Local Hazard Mitigation Plan DRAFT CHAPTER I--INTRODUCTION A. BACKGROUND The Robert T. Stafford Disaster Relief and Emergency Assistance Act provide the statutory framework for a Presidential declaration of an emergency or a declaration of a major disaster. Such declarations open the way for a wide range of federal resources to be made available to assist in dealing with the emergency or major disaster involved. The Stafford Act structure for the declaration process reflects the fact that federal resources under this act supplement state and local resources for disaster relief and recovery. (Robert T. Stafford Disaster Relief and Emergency Assistance Act.) In an effort to be pro-active regarding known hazards, The Disaster Mitigation Act of 2000 amended the Robert T. Stafford Disaster Relief and Emergency Services Act. The Act requires that local government and special districts have in place a Local Hazard Mitigation Plan (LHMP). In order to be eligible to receive federal hazard mitigation project funding, the LHMP must be approved by the Federal Emergency Management Agency (FEMA). South Tahoe Public Utility District (STPUD) has the option to file a stand alone plan or an addendum to El Dorado County's Plan. The South Tahoe Public Utility District staff has chosen to prepare the LHMP as an addendum to the El Dorado County Plan. B. PURPOSE The purpose of the Disaster Mitigation Act of 2000 is to establish a national disaster mitigation program- 1.) to reduce the loss of life and property, human suffering, economic disruption, and disaster assistance costs resulting from disasters, and 2.) to provide a source of pre disaster hazard mitigation funding that will assist States and local governments in implementing effective hazard mitigation measures that are designed to ensure the continued functionality of critical services and facilities after a natural disaster. * *(Disaster Mitigation Act of 2000) The South Tahoe Public Utility District's LHMP was created as a planning tool for use by the District in an effort to reduce future losses from natural and/or man-made hazards. The main purpose of the plan is to assist the District in mitigating potential hazards to personnel, property, and the public. Information within the Plan was developed through the use of contract personnel and in-house staff with mitigation training. 1 To continue program eligibility DMA 2000 also requires local jurisdictions to review and if necessary, update the mitigation plan annually. CHAPTER II--DISTRICT PROFILE A. INTRODUCTION The South Tahoe Public Utility District, a public agency chartered in 1950, operates at the south shore of Lake Tahoe in El Dorado County. The District supplies drinking water and provides wastewater collection and treatment. In addition, the District recycles 100 percent of its wastewater and sends it to Alpine County where its application benefits agricultural land. Lake Tahoe's seasonal tourism and the large number of part-time residents cause wide fluctuations in both daily water production and wastewater flows. The District serves water to more than 13,900 homes and businesses. Annual water production is nearly 2.6 billion gallons. Fourteen active wells, 22 water tanks, 15 booster stations, and 370 miles of water mainline make up the District's water system. The sewage collection system consists of more than 420 miles of collection lines and 42 lift stations, providing service to more than 17,800 homes and businesses. The wastewater treatment plant capacity is 7.7 million gallons per day. The design and operation of the wastewater treatment plant makes it possible to achieve water quality that allows water and biosolids recycling. Each year the plant treats and exports more than 1.6 billion gallons of recycled water that meets high reuse standards. Under provisions of the 1968 Porter-Cologne Water Quality Control Act, the District transports the recycled water nearly 26 miles out of the Tahoe Basin to the District-owned and operated Harvey Place Dam and Reservoir. The recycled water facilities, known as the Diamond Valley Ranch (DVR,) are near Woodfords, California in neighboring Alpine County. The District's state-certified laboratory performs more than 30,000 tests annually to monitor a variety of chemicals and microorganisms in the drinking water, wastewater treatment, and recycled water export systems. These tests on groundwater, surface water, and soils safeguard District customers and the environment. As part of providing a high-level of customer service, the District diligently alerts and educates customers on matters affecting their water supply and water quality. The District also provides all customers an annual Consumer Confidence Report (CCR) that easily explains critical drinking water information. The CCR is available on the District's web site at www.stpud.us. B. PAST DEVELOPMENT TRENDS The District's unique water distribution system is an amalgam of small private water systems dating back to the late 1940s. The District began acquiring these private water companies in the 1970s after the passage of the Clean Water Act when many of these companies sought to sell their systems instead of complying with the new, costly regulations. In addition to regulatory challenges, most of the waterlines in the systems did not meet the District's present standards as to size. Smaller waterline size impacts potable water pressure and also delivery of fire fighting water. 2 For the last thirteen years the District has worked diligently on replacing waterlines to improve water quality, quantity, and fire suppression capabilities. While not a legal mandate, waterline projects include fire hydrant installation at SOO-foot intervals. The District considers the upsizing of waterlines and the installation of fire hydrants to be a public service for community safety. Since 1994, eight major waterline projects have taken place. These improvements are a key resource for fire fighters. Contributing to the operational success are three new water wells, three new booster stations, and six new water storage tanks built during that same time frame. In total, since 1994 the District has spent more than $22 miilion for waterline replacement, $9 million for new supply wells, $1.S million for booster pump stations, and $S.9 million for water tank replacement or rehabilitation. During the past fiscal year, District crews or contractors replaced more than 22,000 lineal feet of water lines (complete or in progress) ala cost of over $S million. Finally, the District's ten-year capital improvement plan includes another $21 million for future waterline replacement projects. Clearly, the District has made waterline replacement and fire flow enhancement a high priority. Nearly eleven years ago, laboratory tests detected the presence of Methyl Tertiary Butyl Ether (MTBE) in the District's drinking water supply. MTBE is a fuel oxygenate designed to improve air quality by making gasoline combust more completely. It is a suspected carcinogen and imparts a turpentine-like taste and odor to drinking water at incredibly low levels, rendering the water undrinkable. In addition, it is extremely water-soluble and moves very quickly with groundwater. Due to MTBE contamination or threatened contamination, more than one-third of the District's drinking water wells were closed. This represented a 36% water production loss. Efforts to restore the lost production have been ongoing since that time. The District is a leader in MTBE treatment technology. Advanced oxidation MTBE treatment systems were placed at the Arrowhead and Bakersfield Wells in 2002 and 2004, respectively. Both treatment facilities, located in Meyers, are distinctive in being the only MTBE treatment systems approved by California Department of Health Services (DHS) to treat to non-detect levels and then safely return the treated water into the potable water supply. In addition to wellhead treatment, the District is concurrently pursuing an aggressive drinking water well development program. The new Bayview Well, put on line last summer, is the third new well replacing water production lost to MTBE contamination. The Bayview Well, producing 3,600 gallons of water per minute, is the District's highest producing well. Its strategic location is in the heart of the water distribution system. To accommodate the size of the well, a larger transmission line was also put in service. With completion of this well, the District has nearly returned to pre-MTBE production capability. Funding for these projects came from the District's landmark lawsuit against the oil companies responsible for the contamination. After successful litigation, the Board of Directors wisely directed all MTBE settlement funds be used exclusively for MTBE-related projects. Experts expect the MTBE contamination to impact the water system for many years. The remaining MTBE settlement funds are set aside to address the impacts of MTBE plumes reaching additio~al District wells in the future. 3 In addition, the Tahoe Restoration Act (TRA) provides federal funds specifically for MTBE studies and clean up. The TRA funding is the result of the District's successful legislative advocacy program. TRA funds, matched by District dollars, paid to destroy four MTBE- contaminated District wells when treatment systems were not cost effective. Well destruction reduces the risk of these defunct wells being a possible conduit for future groundwater contamination. C. CURRENT DEVELOPMENT TRENDS In 2000 the District hired consultants to develop a Master Plan for the recycled water and freshwater facilities in Alpine County. The Master Plan's objective is to provide guidance for the District's recycled water system in regards to operations and regulatory compliance for the next twenty years or more. During the initial development of the Master Plan, the need to obtain additional District property in Alpine County became evident. The property is necessary to provide more operational flexibility. The Master Plan was temporarily put on hold as the District pursued the purchase of 1,443 acres of land in Alpine County, now known as Diamond Valley Ranch. Since completing the purchase nearly two years ago, progress on the Master Plan has resumed. After public input and environmental considerations, the preferred alternative will be chosen to .best meet the District's needs for security, reliability, and economy for its freshwater and recycled water programs in Alpine County. Various triggers, such as the loss of existing privately owned recycled water application sites, coupled with higher recycled water flow rates and volumes, will set the priorities for 18 improvement projects resulting from the Master Plan. During the year, more than $14 million was invested in infrastructure replacement. To further enhance the infrastructure planning process, the District is using asset management technology. This database allows the District to predict asset failure and establishes optimal replacement schedules to achieve service goals. An active grant-seeking program is also in place to bring in additional resources for both infrastructure and operations. In fiscal year 2007, $3.7 million in new grants were awarded to the District for future projects and programs. Careful stewardship of financial resources, along with a focus on long.term financial planning, provides the District with a firm financial base. The District has shown its fmancial abilities in capably responding to the huge expense associated with the MTBE problems and responsibly investing in infrastructure replacement. The Board of Directors' policies carefully coordinate grant funding, reasonable rate increases, and prudent borrowing to meet the District's mission. 4 CHAPTER lII--HAZARD RISK ASSESSMENT A. WHAT ARE THE HAZARDS? The Lake Tahoe Basin is susceptible to a number of natural hazards. These include: wildland fires, thunderstorms, flooding, drought, landslide, avalanche, high winds, severe winter storms, and earthquakes. In addition we have identified human and technological hazards which may impact our operations. B. DEFINITIONS OF NATURAL HAZARDS Wildland fires: Wildfire is an unplanned, unwanted wildland fire, including authorized and unauthorized human-caused fires, lightening strikes, escaped wildland fire use events, and escaped prescribed fire projects. Fires are particularly prevalent in the summer and fall, when fallen branches, leaves, and other material can dry out and become highly flammable. Wildfires tend to be most common and severe during years of drought and on days of strong winds. With extensive urbanization, these fires often involve destruction of suburban homes located in the wildland urban interface, a zone of transition between developed areas and undeveloped wildland. The District's facilities and infrastructure are at risk due to the fire load and terrain setting. A wildfire storm could potentially destroy power facilities, interfere with water delivery & storage, create water contamination, cause environmental damage, and cause potential injury and/or death to staff and the public. Severe Thunderstorms: A thunderstorm forms when moist, unstable air is lifted vertically into the atmosphere. Severe weather associated with these storms includes hail, strong winds, thunder, lightning, and intense rain. Some can form into more severe storms if the conditions exist to enhance and prolong development. Severe thunderstorms are defined as convective storms with frequent lighting, accompanied by local wind gusts of 60 miles per hour, or hail that is 2 centimeters in diameter or larger. Lightning heats nearby air to about 18,000 degrees instantly, almost twice the temperature of the Sun's surface. The heating creates a shock wave that is heard as thunder. Dry lightning is a term for thunderstorms which produce no precipitation at the surface. This type of lightning is the most common natural cause of wildfires. Lightning strikes can also cause death, injury, and property damage. Flooding: A flood is a temporary overflow of an expanse of water that submerges land, such as from a river or lake. As a result some of the water flows or sits outside of the normal perimeter of the body of water. Causes can range from abnormal snow melt due to untimely warm weather during the winter, to storm events depositing too much rain on already saturated soil. Floods may cause loss of life, property damage, water supply contamination, and loss of power. Drought: A drought is an extended period of months or years when a region experiences a deficiency in its water supply. This occurs when a region receives consistently below average precipitation, either in the form of rain or snow. It can have a substantial impact on the ecosystem, tourism and agriculture of the affected region. Although droughts can persist for several years, even a short, intense drought can cause significant damage and harm the local 5 '1 economy. Having adequate drought mitigation strategies in place can greatly reduce the impact. Landslides: Landslides are caused when the stability of a slope changes from a stable to an unstable condition. Natural causes include erosion due to loss of vegetation and soil structure. Weakening of a slop"e can also occur through saturation by snowmelt, or heavy rains. The potential for this type of landslide increases after a wildfire event. Earthquakes can add loads to barely-stable slopes causing liquefaction and destabilizing of slopes. STPUD has facilities, water, and waste water conveyance systems that have been identified as being in geologically active zones. Additionally, human causes which include earthwork, construction, and forestry activities can alter the shape of a slope, or imposes new loads on an existing slope. Avalanches: Avalanches are caused by an over-burden of snow pack that is too massive and unstable for the slope that supports it. An avalanche could impact STPUD personnel, water, and waste conveyance systems and roadways, especially in remote areas. A massive avalanche could potentially damage and interrupt service for extended periods of time. High Winds: Significantly high winds can occur at all times of the year, especially during winter storms and thunderstorms. Falling objects, property damage, downed trees and downed power lines are dangerous risks associated with high winds. Ice & Snow Events: A winter storm is an event in which the dominant varieties of precipitation are. forms that only occur at cold temperatures, such as snow or sleet, or a rainstorm where ground temperatures are cold enough to allow ice to form.. Large snowstorms can be quite dangerous. A 6 inch snowstorm can make unplowed roads impassible, and it is possible for roofs to collapse due to the weight of the snow load. Standing trees and power lines can also be brought down by the weight of the snow, especially if it is wet or very dense. Even a few inches of dry snow can form drifts many feet high under windy conditions. Snowstorms are usually considered less dangerous than ice storms. However, the snow brings secondary dangers. Mountain snowstorms can produce cornices and avalanches. An additional danger, following a snowy winter, is spring flooding if the snow melts suddenly due to a dramatic rise in air temperature. An ice storm involves rain, which freezes upon impact. Ice forming on the roa4s will make them impassable, disrupting travel and making emergency response and repairs difficult. An ice coating one-fourth inch in thickness is heavy enough to damage trees, and overhead wires disrupting power and communication. Earthquakes: California has often been associated with geologic events and there are several active and inactive faults within the Lake Tahoe basin. Earthquakes can cause a variety of hazards including damage to buildings and bridges, disruption of communications, gas, electric, water, recycled water, and sewer lines. Earthquakes can also often cause flash floods, fires, landslides, and avalanches. 6 Lakes in seismically active areas, such as Lake Tahoe, are significantly at risk from tsunami and seiches. Geological evidence indicates that the shores of Lake Tahoe may have been hit by seiches and tsunamis as much as 33 feet high in prehistoric times. Local researchers have called for the risk to be factored into emergency plans for the region. The University of Reno is actively researching the potential threat of a level 6 or 7 earthquake in the Tahoe basin area. More information is available at the university's website (http://www.seismo.unr.edu/htdocs/WGB/LakeTahoeTsunami/) Information and the potential threat to STPUD operations and its customers will be further reviewed. C. DEFINITIONS OF HUMAN HAZARDS Contamination: The uncontrolled distribution of material in a given environment. The hazards to people and the environment from contamination depend on the nature of the contaminant, the level of contamination, and the extent of the spread of contamination. Waterborne Disease: Waterborne diseases are caused by pathogenic microorganisms which are directly transmitted when contaminated drinking water is consumed. Contaminated drinking water, used in the preparation of food, can be the source of food borne disease through consumption of the same microorganisms. Fire/Arson: Arson is the crime of maliciously, voluntarily, and willfully setting fire to woodlands or to the buildings, or property of others. Loss of key Staff: Loss of critical management decision makers and/or loss of on site personnel necessary to maintain or repair equipment and critical water and sewer systems. Fuel Shortage: An inadequate supply of fuel necessary for emergency response vehicles and back up generators and pumps. Dam Failure: Breech of a dam can occur with little warning. Intense storms may produce a flood in a few hours or even minutes from upstream locations. Flash floods occur within six hours of the beginning of heavy rainfall, and dam failure may occur within hours of the first signs ofbreeching. Terrorism/Sabotage: The willful destruction or impairment of facilities or equipment necessary for the continued operation of water and sewer systems. Canal Failure: Flooding due to a breech of an embankment or channel allowing the uncontrolled flow of water. Chemical Spill: Chemicals have the ability to react when exposed to other chemicals under certain physical conditions. When chemical reactions are not properly managed, they can create harmful or catastrophic consequences, such as toxic fumes, fires, and explosions. These reactions may result in death and injury to people, damage to physical property, and severe effects on the environment. Wastewater Spill: Uncontrolled discharge of sewage or unprocessed waste causing contamination of drinking water, recreational facilities, and the environment. D. DEFINITIONS OF TECHNOLOGICAL HAZARDS Power Outage: Power failure can be a defect in a power station, damage to a power line or other part of the distribution system, a short circuit, or the overloading of electricity mains. Natural Gas Outage: An unexpected disruption in natural gas supply. Utility services are. often jeopardized by natural and man-made disasters. Weather related occurrences can lead to loss of heat, resulting in frozen pipes and safety hazards such as fire and explosion. HV AC Failure: Plumbing & HV AC failures have been the cause of leakages and flooding in numerous buildings. This results in lost time and damage to property, due to failure of boilers, fire water pipes, drainage lines, and can cause associated electric fires. Leakages in 7 plumbing systems are caused by improper assembly of joints, sub-standard fittings, corrosion, pressure surges, traffic loads and non compatible pumping equipment. Road Closure: Inability to respond to and move material, personnel, and supplies where needed. Communication Failure: Inability to communicate with the staff or public regarding safety, and the efficient movement of material, personnel, supplies and equipment. SCADA Failure: Refers to an industrial control system monitoring and coordinating a process. The process can include water treatment and distribution, wastewater collection and treatment, electrical power transmission and distribution, and large communication systems. Computer Failure: Computers are performing more tasks in the office and workplace than ever before. Computer failure can affect the districts ability to maintain control of monitoring equipment. It can also affect communication, information systems, engineering, accounting, purchasing, billing, payables and payroll. 8 E. SUMMARY OF VALUES STPUD has conducted an assessment of the many hazards listed above that could impact our facilities and infrastructure. Insured replacement cost values for structures and contents (as of2008) are as follows: Description Building Contents Appraised Estimated South Tahoe Public Utility Treatment Insurable Cash Replacement Plant Value Cost Administration Building 12,000,000 4,000,000 Grit Building 567,937 467,028 Headworks Building 906,757 745,401 Emergency Pump Station 625,216 705,167 Furnace Building 2,339,698 806,242 Filter Building 1,972,704 680,433 Secondary Clarifiers 6,749,230 739,214 RAS Building 434,940 529,910 Chlorine Storage Building 181,563 54,658 Maintenance Building #1 219,205 43,336 Maintenance Building #2 427,462 86,600 Maintenance Building #3 153,754 123,742 Maintenance Building #4 138,838 0 Maintenance Building #5 167,615 0 Cold Storage Building 211,651 67,073 Primary Clarifiers 4,498,211 1,022,334 Blower Building 748,557 496,967 Flow Equalization Basin 1,305,817 91,806 Aeration Basins 7,579,188 1,038,187 Ballast Ponds 3,463,862 387,659 Final Pumping Station 434,957 248,457 Emergency Generator Building 125,259 152,602 Emergency Retention Basin - Valve House 31,087 38,664 Emergency Retention Basin 469,702 0 Asphalt Storage 146,612 0 Rectangular Primary Clarifier 1,246,610 622,708 Office Trailers (2) 78,790 20,672 2400 KW Emergency Generator 0 928,063 Utility Treatment Plant - Sludge Storage 394,700 90,000 Utility Treatment Plant - Bio Building 6,108,430 2,000,000 Utility Treatment Plant - Chemical Feed 212,700 77,000 Underground Process Piping - In Plant 1,523,081 0 9 s Pump tatlons Trout Creek Pump Station 373,741 247,483 Black Bart Lift Station 140,428 147,433 Luther Pass Lift Station 1 ,188,420 2,492,834 Baldwin Beach Lift Station 140,428 147,433 Taylor Creek Lift Station 140,428 147,433 Kiva Beach Lift Station 140,428 147,433 Camp Richardson Lift Station 140,428 147,433 St. Mortiz Lift Station 140,428 147,433 Tahoe Keys Lift Station 356,166 250,483 Upper Truckee Lift Station 356,076 311,354 Pope Beach Lift Station # 1 118,122 61,871 Pope Beach Lift Station # 2 118,122 61,871 Gardner Mt. Lift Station 941 ,452 51,680 Bellview Lift Station 140,428 147,433 AI Tahoe Lift Station # 1 355,266 311,354 AI Tahoe Storage Lift Station 414,777 234,953 Bijou Lift Station # 1 173,779 76,497 Bijou Lift Station # 2 593,310 435,096 Beecher Lift Station 140,428 147,433 Stateline Lift Station 140,428 147,433 Johnson Lift Station 356,166 250,483 Venice Lift Station 140,428 147,433 Pioneer Village Lift Station 140,428 147,433 Ski Run Lift Station 296,655 185,613 Ponderosa Lift Station 593,310 247,483 Iroquois Shed 38,846 4,846 Stanford Generator 69,757 9,284 T allac Lift Station 140,428 147,433 Fallen Leaf Lake Lift Station 296,655 248,483 Fallen Leaf Lake Electric Lift Station # 1 90,367 61,871 Fallen Leaf Lake Electric Lift Station # 2 90,367 61,871 Fallen Leaf Lake Electric Lift Station # 3 90,367 61,871 Fallen Leaf Lake Electric Lift Station # 5 90,367 61,871 Fallen Leaf Lake Electric Lift Station # 6 90,367 61,871 Fallen Leaf Lake Electric Lift Station # 7 90,367 61,871 Fallen Leaf Lake Electric Lift Station # 8 90,367 61,871 Fallen Leaf Lake Electric Lift Station # 9 90,367 61,871 Fallen Leaf Lake Vacuum Valve Station # 3 90,367 61,871 Fallen Leaf Lake Vacuum Valve Station # 4 90,367 61,871 Fallen Leaf Lake Vacuum Valve Station # 5 90,367 61,871 Fallen Leaf Lake Vacuum Valve Station # 6 90,367 61,871 Fallen Leaf Lake Vacuum Valve Station # 7 90,367 61,871 Fallen Leaf Lake Vacuum Valve Station # 8 90,367 61,871 10 Water Wells Airport Well 181,589 128,884 AI Tahoe Well # 2 272,901 235,047 AI Tahoe Storage Building 33,012 8,762 Blackrock Well # 1 & # 2 165,135 117,555 College Well 327,276 267,018 Elk's Club Well 908,669 350,161 Glenwood Well # 2 143,880 111,972 Helen Well # 1 65,046 52,609 Helen Well # 2 126,335 90,728 Industrial Well # 2 7,945 5,772 Martin Ave Well 148,610 103,311 . Mountain View Well 62,923 44,366 South Upper Truckee Wells # 1 & # 2 0 0 Tata Well # 4 5,603 4,123 Paloma Well 189,372 154,658 Sunset Well 20,392 16,505 Bakersfield Well 1,380,296 255,437 Arrowhead Well # 3 1,393,781 258,400 Valhalla Well 199,301 180,437 Chris Ave Well 73,270 75,000 Booster Stations Keller Booster Station 58,307 48,560 David Lane Booster Station 123,278 75,245 Boulder Mt. Booster Station 111,758 86,619 Apache Booster Station 27,262 26,816 Cornelian Booster Station 571,644 150,438 Cold Creek Filter Plant 115,584 113,409 Ralph Booster A 117,546 114,476 Ralph Booster B 56,288 110,367 Cold Creek Booster Station 48,564 47,448 Black Bart Booster Station 8,566 6,083 H Street Booster Station 26,261 18,580 Clement Airstripper 447,696 485,623 Forest Mt Booster Station 401,050 123,742 Flag Pole Booster 157,338 134,056 Airport Booster Station 15,481 12,785 Steel Water Tanks Lookout Water Tank 450,772 0 Keller Water Tank # 1 1,969,932 0 Keller Water Tank # 2 309,672 0 Heavenly Water Tank 569,970 0 Angora Water Tank 133,991 0 Echo View Water Tank 305,732 0 Arrowhead Water Tank 569,970 0 11 Gardner Mt. Water Tank # 1 305,732 0 Gardner Mt. Water Tank # 2 305,732 0 Country Club Water Tank 306,702 0 IroQuois Water Tank (2) 645,592 0 Iroquois Water Tank # 2 257,740 0 Christmas Valley Water Tank 305,722 0 Cold Creek Water Tank 369,484 0 H Street Water Tank 167,479 0 Ralph Water Tank 305,722 0 Forest Mt. Water Tank 305,722 0 Tata Water Tank 305,722 0 Stateline Water Tank # 1 890,742 0 Stateline Water Tank # 2 569,970 0 Flag Pole Water Tank # 1 305,722 0 Flag Pole Water Tank # 2 305,722 0 Luther Water Tank # 1 569,970 0 Luther Water Tank # 2 369,484 0 Stateline Water Tank - Control Building 59,210 56,000 Arrowhead Water Tank - Valve Building 26,320 25,000 w S F Tti aste toraae aC11 es Fountain Ave. Storage 41,810 10,318 Fountain Shop 78,374 16,501 Fountain Vehicle Storage 40,842 11,359 Tahoe Paradise Offices 135,246 19,602 Tahoe Paradise Storage 66,080 18,576 Dams Harvey Place Dam 13,324,664 0 Harvey Reservoir Outlet 483,516 100,053 Harvey Place Compressor Building 41,742 14,023 Harvey Place Auxiliary Dam 3,927,399 0 Harvey Channel Irrigation Structure 399,740 0 Diamond Ditch 1,971,700 0 Indian Creek Dam 4,009,399 0 Indian Creek Compressor Building 19,452 48,497 Reservoirs Harvey Place. Reservoir Indian Creek Reservoir 150,000 1,500,000 o o Lift Stations Flanders Waste Lift Station Taggerts Waste Lift Station 89,867 89,867 61,871 61,871 12 AI ine Count Ranch House Maintenance Shop 115,900 281,700 11,700 115,400 I Underground Piping Throughout District 01 01 TOTAL: 111,344,581 Dlt h A . d 29,235,868 B kV I c es cqUlre 00 a ue Dressler on farm Ditch Reoair 148,923 91,836 Parshall Flume Ditch 4,745 0 Snowshoe Thom oson Ditch # 1 362,363 262,835 Diamond Ditch Culvert 5,792 1,014 Diamond Ditch Concrete Liner 544,265 149,673 Diamond Ditch Improvement 2,896 1,014 Subtotal: 1,068,984 506,371 R d A . d B kV I oa s cqulre 00 a ue Harvev Place Road Imorovement 23,392 12,086 Alpine County SldQ Road 2,660 0 Diamond Valley Ranch Road 45,401 44,644 Stateline Reservoir Road 36,589 13111 Keller Tank Road 26,862 8,506 Santa Fe Access Road 1,236,602 972,616 Subtotal: 1,371,506 1,050,963 Grand Total: 113,785,070 30,793,201 13 CHAPTER IV--THE DISTRICT'S NATURAL HAZARD MITIGATION STRATEGY A. MITIGATION GOALS The South Tahoe Public Utility District's Local Hazard Mitigation Plan has identified the hazards, both human and natural, that could impact our operations, staff, the public, and local residents. It is the intent of this Mitigation Plan to address STPUD's vulnerabilities and identify mitigation strategies. The goals identified in the STPUD Local Hazard Mitigation Plan are to: · Save lives and protect property. · Ensure adequate resources for continued operation. · Accelerate recovery from disasters. · Enable post-disaster funding. · Reduce the impact of future disaster events. The goals listed above are applicable to all hazards identified in this plan. The objectives of South Tahoe Public Utility District's Local Hazard Mitigation Plan have been formulated by these goals. The objectives are arranged to individually address each hazard. B. PRIORITIZING MITIGATION MEASURES The Hazard and Risk Assessments from Chapter III of this plan have been quantified and scaled in order to recognize which hazards pose the greatest threat to STPUD's operations and to provide an overall assessment of where those threats lie. From this matrix, a measure of the identified hazards was calculated. This Hazard Probability/Risk Assessment Scoring Matrix provides the foundation from which to build a more refmed comprehension and plan of action to mitigate hazardous threats within the district. In the event of a disaster, we have assessed out facilities and determined a restoration priority list. This list will assist us in prioritizing which facilities will have the greatest impact and allow for the highest level of continued operation. C. HAZARD ANALYSIS This hazard assessment provides a perspective of the different types of emergencies that our utility may experience. The information gathered in this vulnerability analysis will be used to detennine how specific facilities within the utility's system may be affected by various types of emergencies. The utility may then develop hazard-specific response plans and mitigation measures for responding to an emergency. D. MATRIX VALUES The matrix is divided into two sections, Hazard analysis and Vulnerability analysis. Hazard Analysis is further broken down into Hazard Type, Probability of Occurrence, Reaction Factor and Hazard Factor. The hazard matrix is numerically scaled from 1 being low risk to 10 being high risk. Vulnerability analysis is divided into System Impact and Weight. System impact is prioritized from I to 3, one being the highest'priority. Weight assigns a numeric factor to the risk assessment. An Emergency Response and Recovery Plan was approved by the Board of Directors in January, 2008. 14 Facility Locations Administration Bijou, Ski Run, and Al Tahoe Force Mains Booster Stations City's Primary EOC District EOC & Operations Emergency Retention Basin Export System A-Line Export System B-Line Export System C- Line Fallen Leaf Lake Force Main Fallen Leaf Lake Sewer System Finance Division-Accounting Fountain Shop Gravity Sewer, Mainline Side (laterals) Gravity Sewer, Mainline Trunk (mainline down street) Harvey Channel Harvey Place Reservoir Information Systems Indian Creek Reservoir Johnson Boulevard Force Main' Luther Pass Pump Station Maintenance Office and Buildings On-farm System (Alpine County) Phones Pioneer Village Force Main PRV Stations Purchasing Sewage Pump Stations Snowshoe Ditch No.1 (Alpine County) Tahoe Keys Force Main Tallac Force Main Upper Dressler Ditch Upper Truckee Force Main Wastewater Treatment Plant Water Distribution, Primary Lines (lines going down the street) Water Distribution, Secondary Lines (service lines to individual properties) Water Interties and Zone Isolation Valves Water Storage Tanks Wells 15 Facilities Restoration Prioritv List Highest Priority = 1 Medium Priority = 2 Lowest Priority List = 3 Priority 1 o Water Tanks o Wells o Gravity Sewer - Main Line Side o Gravity Sewer - Main Trunk Line o Water Distribution - Primary Lines o Bijou Force Main o Upper Truckee Force Main o Tahoe Keys / Al Tahoe Force Main o Johnson Boulevard Force Main o Purchasing o Wastewater Treatment Plant o Booster Stations o Sewage Pump Stations o SCADA System o Phone System Priority 2 o Maintenance Shop o Radio Communications Equipment o Water Distribution - Secondary Lines o Export System: A-Line o Export System: B-Line o Luther Pass Pump Station o Finance Division / Accounting o Emergency Retention Basin (ERB) o Information Systems o PRV's Priority 3 o Customer Service Operations o Administration Building o Water Interties o Pioneer Village Force Main o Fallen Leaf Lake Force Main o Fallen Leaf Lake Sewer System o Export System: C-Line o Harvey Place Reservoir o Diamond Ditch 16 South Tahoe Public Utility District Location: Administration Administration Building Date of Analysis: April 16, 1999 I I Natural Events Earthquake 2 3 6 3 18 Forest Fire 2 2 4 3 12 Severe Storm 3 2 6 2 12 High Winds (7O+mph) 2 2 4 1 4 Heavy Snow 3 2 6 1 6 Avalanche 1 3 3 2 6 Landside 1 3 3 2 6 Flood 3 2 6 3 18 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 3 18 Waterbome Disease 1 3 3 3 9 Fire/Arson 2 3 6 3 18 Loss of Key Staff 2 2 4 3 12 Fuel Shorta~e 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabota~e 2 3 6 3 18 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 2 12 Wastewater Spill 3 3 9 2 18 Technolosdcal Events Power Outa~e 3 3 9 3 27 Natural Gas Outa~e 2 3 6 2 12 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 3 27 Communication Failure 2 3 6 2 12 SCADA Failure 2 3 6 0 0 Computer Failure I 3 3 3 12 17 ;~ South Tahoe Public Utility District Location: Bijou, Ski Run, and Al Tahoe Force Main Date of Analysis: April 19, 1999 I I Natural Events Earthquake 2 3 6 2 12 Forest Fire 2 2 4 0 0 Severe Storm 3 2 6 1 6 High Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 0 0 Avalanche 1 3 3 0 0 Landside 1 3 3 0 0 Flood 3 2 6 0 0 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterborne Disease 1 3 3 0 0 Fire/Arson 2 3 6 0 0 Loss of Key Staff 2 2 4 0 0 Fuel Shorta~e 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabota~e 2 3 6 2 12 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 0 0 Technoloe:ical Events Power Outage 3 3 9 0 0 Natural Gas Outa~e 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 0 0 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 18 South Tahoe Public Utility District Location: Booster Stations Date of Analysis: June 18, 1999 Hazard Assessment Vulnerabili Anal sis Natural Events Earthquake 2 3 6 2 12 Forest Fire 2 2 4 2 8 Severe Storm 3 2 6 2 12 High Winds (70+mph) 2 2 4 2 8 Heavy Snow 3 2 6 2 12 Avalanche 1 3 3 2 6 Landside 1 3 3 2 6 Flood 3 2 6 2 12 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 1 3 3 3 9 Waterborne Disease 1 3 3 3 9 Fire/Arson 2 3 6 3 18 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 2 8 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 3 18 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 0 0 Technoloe:ical Events Power Outage 3 3 9 1 9 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 1 6 SCADA Failure 2 3 6 1 6 Computer Failure 1 3 3 0 0 19 South Tahoe Public Utility District Location: District EOC & Operations 1275 Meadow Crest Drive Date of Analysis: January 2008 I I Natural Events Earthquake 2 3 6 2 12 Forest Fire 2 2 4 2 8 Severe Stonn 3 2 6 1 6 High Winds (70+mph) 2 2 4 1 4 Heavy Snow 3 2 6 1 6 Avalanche 1 3 3 0 0 Landside 1 3 3 0 0 Flood 3 2 6 1 6 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterborne Disease 1 3 3 0 0 Fire/Arson 2 3 6 1 6 Loss of Key Staff 2 2 4 3 12 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 2 12 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 1 6 Wastewater Spill 3 3 9 1 9 Technolo2ical Events Power Outage 3 3 9 2 18 Natural Gas Outage 2 3 6 1 6 HV AC Failure 2 3 6 1 6 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 3 18 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 3 9 20 South Tahoe Public Utility District Location: Emergency Retention Basin Date of Analysis: August 8, 1999 Hazard Assessment Vulnerabili Anal sis Natural Events Earthquake 3 3 9 3 27 Forest Fire 3 2 6 2 12 Severe Storm 2 2 4 1 4 High Winds (70+mph) 3 2 6 1 6 Heavy Snow 2 2 4 2 8 Avalanche 1 3 3 1 3 Landside 1 2 2 2 4 Flood 1 2 2 2 4 Droucllt 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterbome Disease 0 3 0 0 0 Fire/Arson 2 2 4 2 8 Loss of Key Staff 2 3 6 3 18 Fuel Shorta~e 0 1 0 0 0 Dam Failure 1 3 3 3 9 Terrorism/Sabotage 2 3 6 3 18 Canal Failure 0 3 0 0 0 Chemical Spill 0 3 0 0 0 Wastewater Spill Technoloe:ical Events Power Outa~e 0 3 0 0 0 Natural Gas Outage 0 3 0 0 0 HV AC Failure 0 3 0 0 0 Millennium Bug 0 3 0 0 0 Road Closure 2 3 6 1 6 Communication Failure 0 3 0 0 0 SCADA Failure 0 3 0 0 0 Computer Virus 0 3 0 0 0 21 South Tahoe Public Utility District Location: Export System: A-Line Date of Analysis: April 1999 I Natural Events Earthquake 2 3 6 3 18 Forest Fire 2 2 4 0 0 Severe Storm 3 2 6 1 6 High Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 0 0 Avalanche 1 3 3 0 0 Landside 1 3 3 1 3 Flood 3 2 6 1 6 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterbome Disease 1 3 3 0 0 Fire/Arson 2 3 6 0 0 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 3 18 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 0 0 Technoloe:ical Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 0 0 Communication Failure 2 3 6 0 0 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 22 South Tahoe Public Utility District Location: Export System: B-Line Date of Analysis: April 1999 I Natural Events Earthquake 2 3 6 3 18 Forest Fire 2 2 4 0 0 Severe Stonn 3 2 6 1 6 High Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 0 0 Avalanche 1 3 3 1 3 Landside 1 3 3 2 6 Flood 3 2 6 3 18 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterbome Disease 1 3 3 0 0 Fire/Arson 2 3 6 0 0 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 T errorisrn/Sabota~e 2 3 6 3 18 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 0 0 Technololdcal Events Power Outage 3 3 9 0 0 Natural Gas Outa~e 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 0 0 Communication Failure 2 3 6 0 0 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 23 South Tahoe Public Utility District Location: Export System: C-Line Date of Analysis: April 16, 1999 I Natural Events Earthquake 2 3 6 3 18 Forest Fire 2 2 4 0 0 Severe Storm 3 2 6 1 6 Hicl1 Winds (7O+mph) 2 2 4 0 0 Heavy Snow 3 2 6 0 0 Avalanche 1 3 3 1 3 Landside 1 3 3 2 6 Flood 3 2 6 2 12 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterbome Disease 1 3 3 0 0 Fire/Arson 2 3 6 0 0 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 T errorismlSabotage 2 3 6 3 18 Canal Failure 2 3 9 0 0 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 0 0 Technoloe:ical Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 0 0 Communication Failure 2 3 6 0 0 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 24 South Tahoe Public Utility District Location: Fallen Leaf Lake Force Main Date of Analysis: April 19, 1999 Hazard Assessment Vulnerabili Anal sis Natural Events Earthquake 2 3 6 2 12 Forest Fire 2 2 4 0 0 Severe Storm 3 2 6 1 6 High Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 1 6 Avalanche 1 3 3 1 3 Landside 1 3 3 1 3 Flood 3 2 6 1 6 Droucl1t 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterbome Disease 1 3 3 0 0 Fire/Arson 2 3 6 0 0 Loss of Key Staff 2 2 4 0 0 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 2 12 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 0 0 Technolo2ical Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 0 0 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 25 South Tahoe Public Utility District Location: Fallen Leaf Lake Sewage System Date of Analysis: June 18, 1999 I I Natural Events Earthquake 2 3 6 3 18 Forest Fire 2 2 4 3 12 Severe Storm 3 2 6 2 12 HiM Winds (70+mph) 2 2 4 2 8 Heavy Snow 3 2 6 3 18 Avalanche 1 3 3 3 9 Landside 1 3 3 3 9 Flood 3 2 6 3 18 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 3 18 Waterbome Disease 1 3 3 3 9 Fire/Arson 2 3 6 3 18 Loss of Key Staff 2 2 4 2 8 Fuel Shortage 2 2 4 3 12 Dam Failure 2 3 6 0 0 T errorismlSabotage 2 3 6 3 18 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 0 0 Technoloe:ical Events Power Outage 3 3 9 3 27 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 3 27 Communication Failure 2 3 6 3 18 SCADA Failure 2 3 6 3 18 Computer Failure 1 3 3 0 0 26 South Tahoe Public Utility District Location: Finance Division - Accounting Date of Analysis: April 6, 1999 I I Natural Events Earthquake 2 3 6 2 12 Forest Fire 2 2 4 2 8 Severe Storm 3 2 6 1 6 High Winds (70+tnph) 3 2 6 1 6 Heavy Snow 3 2 6 1 6 Avalanche 0 3 0 0 0 Landside 0 3 0 0 0 Flood 1 2 2 1 2 DrouWIt 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterborne Disease 1 3 3 0 0 Fire/Arson 2 3 6 2 12 Loss of Key Staff 2 2 4 3 12 Fuel Shortage 2 2 4 1 4 Dam Failure 0 3 0 0 0 Terrorism/Sabotage .2 3 6 1 6 Canal Failure 0 3 0 0 0 Chemical Spill 2 3 6 1 6 Wastewater Spill Technoloeical Events Power Outage 1 3 3 2 6 Natural Gas Outage 1 3 3 1 3 HV AC Failure 2 3 6 1 6 Millennium Bug 1 1 1 1 1 Road Closure 3 3 9 1 9 Communication Failure 1 3 3 3 9 SCADA Failure 0 3 0 0 0 Computer Virus 1 3 3 1 3 27 -~ South Tahoe Public Utility District Location: Gravity Sewers Mainline Side Date of Analysis: April 19, 1999 I Natural Events Earthquake 2 3 6 1 6 Forest Fire 2 2 4 0 0 Severe Storm 3 2 6 1 6 High Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 1 6 Avalanche 1 3 3 1 3 Landside 1 3 3 1 3 Flood 3 2 6 1 6 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 1 6 Waterbome Disease 1 3 3 0 0 Fire/Arson 2 3 6 0 0 Loss ofKev Staff 2 2 4 0 0 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 2 12 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 1 6 Wastewater Spill 3 3 9 1 9 Technoloeical Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 0 0 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 6 0 0 28 South Tahoe Public Utility District Location: Gravity Sewers Mainline Trunk Date of Analysis: April 19, 1999 Hazard Assessment Vulnerabili Anal sis Natural Events Earthquake 2 3 6 3 18 Forest Fire 2 2 4 0 0 Severe Stonn 3 2 6 1 6 High Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 1 6 Avalanche 1 3 3 1 3 Landside 1 3 3 1 3 Flood 3 2 6 2 12 Drou~t 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 2 12 Waterbome Disease 1 3 3 0 0 Fire/Arson 2 3 6 0 0 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 2 12 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 2 18 Technoloe:ical Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 0 0 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 29 South Tahoe Public Utility District Location: Harvey Channel Alpine County Date of Analysis: Apri112,1999 Hazard Assessment Vulnerabill Anal sis Natural Events Earthquake 2 3 6 1 6 Forest Fire 2 2 4 1 4 Severe Storm 3 2 6 2 12 High Winds (70+mph) 2 2 4 1 4 Heavy Snow 3 2 6 1 6 Avalanche 1 3 3 2 6 Landside 1 3 3 3 9 Flood 3 2 6 3 18 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterbome Disease 1 3 3 0 0 Fire/Arson 2 3 6 1 6 Loss of Key Staff 2 2 4 1 4 Fuel Shortaj?;e 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 3 18 Canal Failure 3 3 9 3 27 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 1 9 Technoloe:ical Events Power Outaj?;e 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 0 0 Communication Failure 2 3 6 2 12 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 30 South Tahoe Public Utility District Location: Harvey Place Reservoir Alpine County Date of Analysis: April 12, 1999 Hazard Assessment Vulnerabili Anal sis Natural Events Earthquake 2 3 6 3 18 Forest Fire 2 2 4 2 8 Severe Storm 3 2 6 1 6 High Winds (70+mph) 2 2 4 1 4 Heavy Snow 3 2 6 1 6 Avalanche 1 3 3 1 3 Landside 1 3 3 1 3 Flood 3 2 6 2 12 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 3 18 Waterborne Disease 1 3 3 2 6 Fire/Arson 2 3 6 2 12 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 1 4 Dam Failure 2 3 6 3 18 Terrorism/Sabotage 2 3 6 3 18 Canal Failure 3 3 9 1 9 Chemical Spill 2 3 6 2 12 Wastewater Spill 3 3 9 3 27 Technolo2ical Events Power Outage 3 3 9 2 18 Natural Gas Outage 2 3 6 1 6 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 2 18 Communication Failure 2 3 6 2 12 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 31 South Tahoe Public Utility District Location: Infonnation Systems Administration Building Date of Analysis: April 16, 1999 I I Natural Events Earthquake 2 3 6 2 18 Forest Fire 2 2 4 2 8 Severe Stonn 3 2 6 1 6 High Winds (70+mph) 2 2 4 1 4 Heavy Snow 3 2 6 1 6 Avalanche 1 3 3 0 0 Landside 1 3 3 0 0 Flood 3 2 6 1 6 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterbome Disease 1 3 3 0 0 Fire/Arson 2 3 6 2 12 Loss of Key Staff 2 2 4 3 12 Fuel Shortage 2 2 4 1 4 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 2 12 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 1 6 Wastewater Spill 3 3 9 0 0 Technoloe;ical Events Power Outage 3 3 9 3 27 Natural Gas Outage 2 3 6 1 6 HV AC Failure 2 3 6 1 6 Road Closure 3 3 9 2 18 Communication Failure 2 3 6 3 18 SCADA Failure 2 3 6 1 6 Computer Failure 1 3 3 3 9 32 South Tahoe Public Utility District Location: Indian Creek Reservoir Alpine County Date of Analysis: April 12, 1999 I Natural Events Earthquake 2 3 6 3 18 Forest Fire 2 2 4 2 8 Severe Storm 3 2 6 1 6 High Winds (70+mph) 2 2 4 1 4 Heavy Snow 3 2 6 1 6 Avalanche 1 3 3 1 3 Landside 1 3 3 1 3 Flood 3 2 6 3 18 Drought 2 1 2 1 2 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 2 12 Waterborne Disease 1 3 3 2 6 Fire/Arson 2 3 6 2 12 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 , 6 3 18 Terrorism/Sabotage 2 3 6 3 18 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 2 12 Wastewater Spill 3 3 9 0 0 Technolo.;cal Events Power Outage 3 3 9 2 18 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 0 0 Communication Failure 2 3 6 2 12 SCADA Failure 2 3 6 2 12 Computer Failure 1 3 3 0 0 33 South Tahoe Public Utility District Location: Johnson Boulevard Force Main Date of Analysis: April 19, 1999 I I Natural Events Earthquake 2 3 6 2 12 Forest Fire 2 2 4 0 0 Severe Storm 3 2 6 1 6 High Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 0 0 Avalanche 1 3 3 0 0 Landside 1 3 3 0 0 Flood '3 2 6 0 0 Droucl1t 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterbome Disease 1 3 3 0 0 Fire/Arson 2 3 6 0 0 Loss of Key Staff 2 2 4 0 0 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 T errorismlSabotage 2 3 6 1 6 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 0 0 Technolo,dcal Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 0 0 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 34 South Tahoe Public Utility District Location: Luther Pass Pump Station Date of Analysis: June 18, 1999 Hazard Assessment Vulnerabili Anal sis Natural Events Earthquake 2 3 6 3 18 Forest Fire 2 2 4 3 12 Severe Stonn 3 2 6 2 12 High Winds (70+mph) 2 2 4 2 8 Heavy Snow 3 2 6 2 12 Avalanche 1 3 3 2 6 Landside 1 3 3 0 0 Flood 3 2 6 0 0 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterborne Disease 1 3 3 0 0 Fire/Arson 2 3 6 3 18 Loss of Key Staff 2 2 4 3 12 Fuel Shortage 2 2 4 3 12 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 3 18 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 2 12 Wastewater Spill 3 3 9 0 0 Technolo2ical Events Power Outage 3 3 9 2 18 Natural Gas Outage 2 3 6 1 6 HV AC Failure 2 3 6 1 6 Road Closure 3 3 9 2 18 Communication Failure 2 3 6 2 12 SCADA Failure 2 3 6 2 12 Computer Failure 1 3 3 0 0 35 South Tahoe Public Utility District Location: Maintenance Office and Buildings Date of Analysis: April 19, 1999 Hazard Assessment Vulnerabili Anal sis Natural Events Earthquake 2 3 6 1 6 Forest Fire 2 2 4 1 4 Severe Storm 3 2 6 1 6 High Winds (70+mph) 2 2 4 1 4 Heavy Snow 3 2 6 1 6 Avalanche 1 3 3 0 0 Landside 1 3 3 0 0 Flood 3 2 6 1 6 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 1 6 Waterborne Disease 1 3 3 1 3 Firel Arson 2 3 6 3 18 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 1 4 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 2 12 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 1 6 Wastewater Spill 3 3 9 1 9 Technoloe:ical Events Power Outage 3 3 9 2 18 Natural Gas Outage 2 3 6 2 12 HV AC Failure 2 3 6 1 6 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 1 6 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 1 3 36 South Tahoe Public Utility District Location: On-Farm Alpine County Date of Analysis: April 12, 1999 Hazard Assessment Vulnerabili Anal sis Natural Events Earthquake 2 3 6 1 6 Forest Fire 2 2 4 1 4 Severe Storm 3 2 6 2 12 Hifdl Winds (70+mph) 2 2 4 1 4 Heavy Snow 3 2 6 1 6 Avalanche 1 3 3 0 0 Landside 1 3 3 1 3 Flood 3 2 6 3 18 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 1 6 Waterbome Disease I 3 3 1 3 Fire/Arson 2 3 6 1 6 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 2 12 Terrorism/Sabotage 2 3 6 2 12 Canal Failure 3 3 9 3 27 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 1 9 Technoloe:ical Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road ClosUre 3 3 9 2 18 Communication Failure 2 3 6 2 12 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 37 South Tahoe Public Utility District Location: Phones Administration Building Date of Analysis: April 16, 1999 I I Natural Events Earthquake 2 3 6 3 18 Forest Fire 2 2 4 3 12 Severe Stonn 3 2 6 2 12 High Winds (70+mph) 2 2 4 2 8 Heavy Snow 3 2 6 1 6 Avalanche 1 3 3 0 0 Landside 1 3 3 0 0 Flood 3 2 6 1 6 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterbome Disease I 3 3 0 0 Firel Arson 2 3 6 3 18 Loss of Key Staff 2 2 4 3 12 Fuel Shortage 2 2 4 1 4 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 2 12 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 1 6 Wastewater Spill 3 3 9 0 0 Technoloe:ical Events Power Outage 3 3 9 3 27 Natural Gas Outage 2 3 6 1 6 HV AC Failure 2 3 6 2 12 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 3 18 SCADA Failure 2 3 6 1 6 Computer Failure 1 3 3 3 9 38 South Tahoe Public Utility District Location: Pioneer Village Force Main Date of Analysis: April 19, 1999 I Natural Events Earthquake 2 3 6 2 12 Forest Fire 2 2 4 0 0 Severe Storm 3 2 6 1 6 Hi.ldt Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 0 0 Avalanche 1 3 3 0 0 Landside I 3 3 0 0 Flood 3 2 6 0 0 Drought 2 I 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterborne Disease 1 3 3 0 0 Fire/Arson 2 3 6 0 0 Loss of Key Staff 2 2 4 0 0 Fuel Shortage 2 2 4 0 0 Dam FailUre 2 3 6 0 0 Terrorism/Sabotage 2 3 6 2 12 Canal Failure . 3 3 9 0 0 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 0 0 Technolowcal Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 0 0 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 39 South Tahoe Public Utility District Location: PR V's Date of Analysis: June 18, 1999 I Natural Events Earthquake 2 3 6 3 18 Forest Fire 2 2 4 0 0 Severe Storm 3 2 6 0 0 High Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 2 12 Avalanche 1 3 3 0 0 Landside 1 3 3 0 0 Flood 3 2 6 1 6 Drought 2 I 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterborne Disease 1 3 3 0 0 Fire/Arson 2 3 6 0 0 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 2 12 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 2 12 Wastewater Spill 3 3 9 2 18 Technological Events Power Outage 3 3 9 o. 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 2 18 Communication Failure 2 3 6 1 6 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 40 South Tahoe Public Utility District Location: Purchasing Administration Building Date of Analysis: April 1999 I Natural Events Earthquake 2 3 6 3 18 Forest Fire 2 2 4 3 12 Severe Storm 3 2 6 3 18 Hi.ldt Winds (70+mph) 2 2 4 3 12 Heavv Snow 3 2 6 3 18 Avalanche 1 3 3 2 6 Landside 1 3 3 2 6 Flood 3 2 6 3 18 Drought 2 1 2 1 2 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterborne Disease 1 3 3 0 0 Fire/Arson 2 3 6 1 6 Loss of Key Staff 2 2 4 0 0 Fuel Shortage 2 2 4 2 8 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 2 12 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 2 12 Wastewater Spill 3 3 9 0 0 Technological Events Power Outage 3 3 9 2 18 Natural Gas Outage 2 3 6 1 6 HV AC Failure 2 3 6 1 6 Road Closure 3 3 9 2 18 Communication Failure 2 3 6 3 18 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 1 3 41 South Tahoe Public Utility District Location: Sewage Pump Stations Date of Analysis: June 18, 1999 I I Natural Events Earthquake 2 3 6 3 18 Forest Fire 2 2 4 3 12 Severe Storm 3 2 6 3 18 High Winds (70+mph) 2 2 4 3 12 Heavy Snow 3 2 6 3 18 Avalanche 1 3 3 1 3 Landside 1 3 3 1 3 Flood 3 2 6 3 18 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterborne Disease 1 3 3 0 0 Fire/Arson 2 3 6 3 18 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 3 12 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 3 18 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 0 0 Technological Events Power Outage 3 3 9 2 18 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 1 6 Road Closure 3 3 9 3 27 Communication Failure 2 3 6 3 18 SCADA Failure 2 3 6 3 18 Computer Failure I 3 3 0 0 42 South Tahoe Public Utility District Location: Snowshoe Thompson Ditch No. 1 Alpine County Date of Analysis: April 12, 1999 I I Natural Events Earthquake 2 3 6 2 12 Forest Fire 2 2 4 2 8 Severe Storm 3 2 6 3 18 High Winds (70+mph) 2 2 4 1 4 Heavy Snow 3 2 6 1 6 Avalanche 1 3 3 1 3 Landside 1 3 3 3 9 Flood 3 2 6 3 18 Drought 2 1 2 1 2 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 1 6 Waterborne Disease 1 3 3 1 3 Fire/Arson 2 3 6 2 12 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 3 18 Canal Failure 3 3 9 3 27 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 0 0 Technological Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HVAC Failure 2 3 6 0 0 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 2 12 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 43 South Tahoe Public Utility District Location: Tahoe Keys Force Main Date of Analysis: April 19, 1999 Hazard Assessment Vulnerabili Anal sis Natural Events Earthquake 2 3 6 2 12 Forest Fire 2 2 4 0 0 Severe Storm 3 2 6 I 6 High Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 0 0 Avalanche 1 3 3 0 0 Landside 1 3 3 0 0 Flood 3 2 6 1 6 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterborne Disease 1 3 3 0 0 Fire/Arson 2 3 6 0 0 Loss of Key Staff 2 2 4 0 0 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 1 6 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 0 0 Technological Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 0 0 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 44 South Tahoe Public Utility District Location: Tallac Force Main Date of Analysis: April 19, 1999 Hazard Assessment Vulnerabili Anal sis Natural Events Earthquake 2 3 6 2 12 Forest Fire 2 2 4 0 0 Severe Storm 3 2 6 1 6 Hi.ldt Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 0 0 Avalanche 1 3 3 0 0 Landside 1 3 3 0 0 Flood 3 2 6 0 0 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterborne Disease 1 3 3 0 0 Firel Arson 2 3 6 0 0 Loss of Key Staff 2 2 4 0 o. Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 2 12 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 ,0 0 Technological Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 0 0 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 45 South Tahoe Public Utility District Location: Upper Dressler Ditch Alpine County Date of Analysis: April 12, 1999 I I Natural Events Earthquake 2 3 6 2 12 Forest Fire .2 2 4 1 4 Severe Storm 3 2 6 1 6 High Winds (70+mph) 2 2 4 1 4 Heavy Snow 3 2 6 1 6 Avalanche 1 3 3 1 3 Landside 1 3 3 2 6 Flood 3 2 6 3 18 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterborne Disease 1 3 3 0 0 Fire/Arson 2 3 6 1 6 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 2 12 Canal Failure 3 3 9 3 27 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 0 0 Technological Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 0 0 Communication Failure 2 3 6 1 6 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 46 South Tahoe Public Utility District Location: Upper Truckee Force Main Date of Analysis: April 19, 1999 Hazard Assessment Vulnerabili Anal sis Natural Events Earthquake 2 3 6 2 12 Forest Fire 2 2 4 0 0 Severe Storm 3 2 6 1 6 High Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 0 0 Avalanche 1 3 3 0 0 Landside 1 3 3 0 0 Flood 3 2 6 1 6 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterborne Disease 1 3 3 0 0 Fire/Arson 2 3 6 0 0 Loss of Key Staff 2 2 4 0 0 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 2 12 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 0 0 Technological Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 0 0 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 47 South Tahoe Public Utility District Location: Wastewater Treatment Plant Date of Analysis: August 1999 I I Natural Events Earthquake 3 3 9 3 27 Forest Fire 3 2 6 2 12 Severe Storm 2 ""- 2 4 2 8 Hi.ldt Winds (70+mph) 3 2 6 2 12 Heavy Snow 2 2 4 2 8 Avalanche 1 3 3 1 3 Landside 1 2 2 1 2 Flood 2 2 4 2 8 Drou.ldtt 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 0 0 Waterborne Disease 2 3 6 0 0 F ire/Arson 2 2 4 2 8 Loss of Key Staff 2 3 6 3 18 Fuel Shortage 2 1 2 1 2 Dam Failure 1 3 3 1 3 Terrorism/Sabotage 2 3 6 3 18 Canal Failure 0 3 0 0 0 Chemical Spill 2 3 6 1 6 Wastewater Spill Technological Events Power Outage 3 3 9 1 9 Natural Gas Outage 3 3 9 1 9 HV AC Failure 2 3 6 1 6 Road Closure 2 3 6 1 6 Communication Failure 2 3 6 1 6 SCADA Failure 2 3 6 1 6 Computer Failure 2 3 6 1 6 48 South Tahoe Public Utility District Location: Water Distribution, Primary Lines Date of Analysis: April 19, 1999 I I Natural Events Earthquake 2 3 6 2 12 Forest Fire 2 2 4 0 0 Severe Storm 3 2 6 0 0 High Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 0 0 Avalanche 1 3 3 0 0 Landside 1 3 3 1 3 Flood 3 2 6 1 6 Drou.ldtt 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 3 18 Waterborne Disease 2 3 6 3 18 Fire/Arson 2 3 6 0 0 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 3 18 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 3 18 Wastewater Spill 3 3 9 0 0 Technological Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 0 0 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 49 South Tahoe Public Utility District Location: Water Distribution, Secondary Date of Analysis: April 1999 I Natural Events Earthquake 2 3 6 1 6 Forest Fire 2 2 4 0 0 Severe Storm 3 2 6 0 0 High Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 0 0 Avalanche 1 3 3 0 0 Landside 1 3 3 1 3 Flood 3 2 6 1 6 Drought 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 3 18 Waterborne Disease 2 3 6 3 18 Fire/Arson 2 3 6 0 0 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 3 18 Canal Failure 3 3 ,9 0 0 Chemical Spill 2 3 6 3 18 Wastewater Spill 3 3 9 0 0 Technological Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 0 0 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 50 South Tahoe Public Utility District Location: Water Interties Date of Analysis: April 19, 1999 Hazard Assessment Vulnerabili Anal sis Natural Events Earthquake 2 3 6 1 6 Forest Fire 2 2 4 0 0 Severe Storm 3 2 6 0 0 Hi.ldt Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 1 6 Avalanche 1 3 3 0 0 Landside 1 3 3 0 0 Flood 3 2 6 1 6 Drou.ldtt 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 1 3 3 1 3 Waterborne Disease 1 3 3 1 3 Fire/Arson 0 0 0 0 0 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 0 0 0 0 0 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 1 6 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 1 6 Wastewater Spill 3 3 9 0 0 Technological Events Power Outage 3 3 9 0 0 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 0 0 SCADA Failure 2 3 6 0 0 Computer Failure 1 3 3 0 0 51 South Tahoe Public Utility District Location: Water Storage Tanks Date of Analysis: June 18, 1999 I I Natural Events Earthquake 2 3 6 3 18 Forest Fire 2 2 4 1 4 Severe Storm 3 2 6 0 0 Hi.ldt Winds (70+mph) 2 2 4 0 0 Heavy Snow 3 2 6 0 0 Avalanche 1 3 3 2 6 Landside 1 3 3 2 6 Flood 3 2 6 0 0 Droumt 2 1 2 0 0 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 3 18 Waterborne Disease 2 3 6 3 18 Fire/Arson 2 3 6 0 0 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 1 4 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 3 18 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 0 0 Wastewater Spill 3 3 9 0 0 Technoloe:ical Events Power Outage 3 3 9 2 18 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 2 3 9 1 9 Communication Failure 2 2 4 1 4 SCADA Failure 2 2 4 1 4 Computer Failure 1 3 3 0 0 52 South Tahoe Public Utility District Location: Wells Date of Analysis: June 18, 1999 Hazard Assessment Vulnerabili Anal sis Natural Events Earthquake 2 3 6 3 18 Forest Fire 2 2 4 2 8 Severe Storm 3 2 6 2 12 Hi.ldt Winds (70+mph) 2 2 4 2 8 Heavy Snow 3 2 6 2 12 Avalanche 1 3 3 0 0 Landside 1 3 3 0 0 Flood 3 2 6 1 6 Drought 2 1 2 1 2 Hurricane 0 2 0 0 0 Man-made Events Contamination 2 3 6 3 18 Waterborne Disease 2 3 6 3 18 Fire/Arson 2 3 6 3 18 Loss of Key Staff 2 2 4 1 4 Fuel Shortage 2 2 4 2 8 Dam Failure 2 3 6 0 0 Terrorism/Sabotage 2 3 6 3 18 Canal Failure 3 3 9 0 0 Chemical Spill 2 3 6 2 12 Wastewater Spill 3 3 9 2 18 Technological Events Power Outage 3 3 9 2 18 Natural Gas Outage 2 3 6 0 0 HV AC Failure 2 3 6 0 0 Road Closure 3 3 9 1 9 Communication Failure 2 3 6 3 18 SCADA Failure 2 3 6 3 18 Computer Failure 1 3 3 0 0 53 ~ E. MITIGATION OBJECTIVES Following is a list of objectives developed in conjunction with the overall goals of this plan. Each objective involves one or more actions designed to accomplish the objective. The objectives are organized by specific natural and man made hazards and are arranged in order of priority, as identified in the Natural Hazard Rating Table. The highest priority objectives and actions are listed first; the lowest priority objectives and actions listed last. WILDLAND FIRES Objective #1: Minimize the threat to lives and property posed by the possibility of wildland fire within STPUD boundaries. Action 1.1: Create defensible space by eliminating fuel sources within identified District areas subject to wildland fires. Cut and remove trees and vegetation adjacent to structures. Timeframe: On-going. Funding: Funding required. Staff: STPUD personnel, Contractor, U.S. Forest Service, and affected government agencies. Action 1.2: Install Solar Powered Battery backup at each water tank location. Needed to maintain communication and monitor tank levels, ensuring that pumps will activate and water levels remain sufficient for fire suppression. Timeframe: On-going. Funding: Funding required. Staff: STPUD staff, Contractor. Action 1.3: Improve fire flows by a) increasing water delivery pipe size and b) increasing number of pumps and pump capacity. Timeframe: On-going Funding: Funding required. Staff: STPUD staff, Contractor. Action 1.4: Model fire flows throughout zones. Timeframe: 5 years. Funding: No funding required at this time. Staff: STPUD staff. Action 1.5: Increase number of delivery wells, water tanks, and hydrants throughout service district. Timeframe: On-going Funding: Funding required. Staff: STPUD staff, Contractor. Action 1.6: Partner with Fire Safety Council to protect District structures. Timeframe: On-going. Funding: No funding required at this time. Staff: STPUD staff, Fire Safety Council staff. Action 1.7: Determine high risk areas and improve water supply in those areas. Timeframe: On-going. Funding: Funding required. Staff: STPUD staff. SEVERE STORMS Objective #2: Minimize storm related damage from all types of severe storms that impact district facilities. Action 2.1: Review snow removal, snow removal equipment, and snow storage and drainage capability. Review backup generator capacity and fuel storage. 54 Timeframe: 5 years. Funding: Funding required. Staff: STPUD staff, Contractor. Action 2.2: Assess existing older building snow load and wind load. Timeframe: 3 years. Funding: Funding required. Staff: Consultant Action 2.3: Assess and remove hazard trees. Timeframe: 3 years Funding: Funding required. Staff: STPUD staff, Contractor. EARTHQUAKES Objective #3: Minimize the threat to lives and property as a result of a possible earthquake with the Lake Tahoe Basin. Action 3.1: Inspect all District facilities, including pipes, treatment and pumping structures, roads and dams. Where applicable, upgrade structures to withstand earthquake events. Timeframe: Ongoing. Funding: Funding required. Staff: Outside contract specialists. Action 3.2: Distribute an employee guide on techniques to prepare for an earthquake, currently being developed by Community Council. Timeframe: 5 year. Funding: Funding required. Staff: STPUD staff, Consultant. FLOODS / SEICHE WAVE Objective #4: Minimize the threat to lives and property posed by the possibility of flood within STPUD jurisdiction. Action 4.1: Review recognized flood-prone areas and match to exposures of personnel, facilities and equipment. Review protection of collection system from I & I. Timeframe: 1 year. Funding: No funding required at this time. Staff: Planning Department. Action 4.2: Build a sufficient inventory of pumps, sandbags and related equipment to ensure an adequate supply to combat erosion during flood events. Develop a quick response team. Timeframe: Ongoing. Funding: Funding required. Staff: To be determined Action 4.3: Establish a safety zone and prepare an evacuation plan in the event of seismic induced tsunami and/or seiche wave activity. Timeframe: Ongoing. Funding: Funding required. Staff: To be determined Action 4.4: Consider structured improvements ofthose pump stations that are within 45 feet of the maximum lake level. Timeframe: 3 years. Funding: No funding required at this time. Staff: STPUD staff, Contractor. 55 LANDSLIDES Objective #5: Reduce soil erosion and possible landslide occurrences within STPUD property jurisdiction. Action 5.1: As part of the District Erosion Control Program, inspect road cuts and fills for signs of slope failure. If necessary, stabilize slopes. Timeframe: On-going. Funding: Funding may be required. Staff: Internal work crews. Action 5.2: Identify questionable hillsides. Construct "rock pens" and drill & anchor points, and provide cut and fill techniques for finished slopes at the angle of repose. Timeframe: 3 years. Funding: Funding required. Staff: Internal and external support. DROUGHT Objective #6: Minimize the threat to the natural environment and property posed by the possibility of drought within the Lake Tahoe Basin. Action 6.1: Develop and distribute a Resident's guide to water conservation techniques. Timeframe: Current and on-going. Funding: Grant Funded. Staff: Water Conservation Coordinator. Action 6.2: Initiate landscaping rebates, commercial water saving programs, and incentive rebates for customer purchase of water saving devices. Timeframe: Current and on-going. Funding: Grant Funded. Staff: Water Conservation Coordinator. Action 6.3: Improve back-up well capacity. Timeframe: 3 years Funding: Funding required. Staff: STPUD staff. Action 6.4: Investigate expanded use of reclaimed water to mitigate drought impact. Timeframe: On-going. Funding: No funding required at this time. Staff: STPUD staff. AVALANCHE Objective #7: To diminish the threat to lives and property posed by the potential for avalanche by developing effective techniques of informing workers and the public on the level of avalanche danger within the STPUD's backcountry regions. Action 7.1: Educate District personnel on cold weather survival, avalanche survival techniques, and travel by skis and snowshoes. Timeframe: On-going. Funding: Funding required. Staff: Search and Rescue employees, cold weather survival school, and ski resort personnel. Action 7.2: Train additional personnel in the safe operation of the Districts Snow Cat vehicles and become a "mutual aid" resource. Timeframe: On-going. Funding: Funding required. 56 Staff: Vendor. Action 7.3: Assess threat to District facilities and install additional protection where appropriate. Timeframe: On-going Funding: Funding required Staff: STPUD staff SECURITY Objective #8: To protect District infrastructure from security breeches. Action 8.1: Perform a SCADA vulnerability assessment and add upgrades to improve security. Timeframe: On-going. Funding: Funding required. Staff: Consultant. Action 8.2: Perform facility security assessment for 50+ out buildings to include lighting, fencing, CCTV, and intrusion alarms. Timeframe: 3-5 years. Funding: Funding required. Staff: Contractor. F. IMPLEMENTING MITIGATION STRATEGIES The STPUD Hazard Mitigation Plan is designed to function as an enhancement to preexisting plans, ordinance, rules and regulations. Some of the mitigating actions are new and are not a part of any preexisting government requirement. The implementation of these action strategies will be contingent upon the necessary approvals from the appropriate governmental agencies. Implementation is also dependant on securing necessary funding from yet to be determined sources. STPUD will seek to secure funding for natural hazard mitigation through a variety of avenues including, but not limited to, consulting the Federal Emergency Management Agency's website for a comprehensive list of available federal and state natural hazard mitigation grant funding and federal mitigation programs. We have placed a primary emphasis on implementing actions that provide the highest cost- to-benefit ratio. The greatest natural hazard threat to lives and property in our area is wildland fIre. We have placed a high priority on mitigation activities that will reduce the threat of wildland fires in the District and provide the greatest benefit. G. PLAN MAINTENANCE STPUD's Local Hazard Mitigation Plan will be evaluated, at a minimum, every year to determine its continued effectiveness. The annual evaluations of the natural hazard mitigation strategies will be examined to assess the number of projects completed and in process. Also examined will be their effectiveness in relation to any prevailing land use requirements, and experience gained from dealing withdactual events. A mandatory update to STPUD's Plan will occur every five years in conjunction with the annual plan evaluation process. 57 Responsibility for organizing all Plan updates and/or reviews will be assigned to the District's Engineering and Operations Departments. Timing will be coordinated with the El Dorado County Office of Emergency Services. The need for any plan update in excess of the fixed five-year update period will be determined and assessed by the OES. South Tahoe Public Utility District is committed to public involvement within this hazard mitigation plan. For all plan review evaluations and updates, a public hearing may be held by the STPUD Board. The hearing will be announced and the public will be asked for comment concerning the plan. In conjunction with EI Dorado County, South Tahoe Public Utility District will strive to continue to develop our Local Plan as an excellent planning tool. It is our goal and hope that we can help the citizens and customers of STPUD to create a safer place to live, work, and play. ATTACHMENT "A" DISTRICT BOUNDARY MAP (Next Page) Plan Submitted by: Lynn Nolan. STPUD Grants Coordinator 58 ~I~ RldlartJ H. SoIbrtg South Tahoe Public Utility piiatrict ~ Emlcs ~ ~ R. Jonet hWy Lou Moeiutoher o.1tIIIe 1215 M.a.~OrIv6. aouth Laka 1a~. CA 96150 f'he.5!O 544 6414' r:. e30 541-0614 BOARD AGENDA ITEM 14a TO: FROM: Board of Directors Richard H. Solbrig, General Manager MEETING DATE: November 20, 2008 ITEM - PROJECT: Conference with Legal Counsel- Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Meyers Landfill Site - United States of America vs. EI Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK GGH, United States District Court for the Eastern District of Califomia. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES----fI=J-- NO CATEGORY: Sewer -67- South Tahoe Pui1Hc Utility Di6trict ~l~ ~ra H. 501hit ~ EmkiI CIUIo .,.....~J-. M.Iry Lou ~ ~J:hN .127e WMdowCrNt Orfve. .~ tstB.T.m.. CA 96U5O PhOM f530 544 &414. Aibc.!5!O. E541..oe14 BOARD AGENDA ITEM 14b TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: November 20,2008 ITEM - PROJECT NAME: Conference with Labor Negotiators REQUESTED BOARD ACTION: Direct negotiators. DISCUSSION: Pursuant to Section 54957.6(1) of the California Government Code, Closed Session may be held regarding contract negotiations. Agency Negotiators: Richard Solbrig, Board of Directors Employee Organization: STPUD Management Staff SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES~ NO ATEGORY: General -69- .. SANTA MONICA SUSTAINABLE CITY PLAN Adopted September 20, 1994 Update Adopted February 11,2003 Revised October 24, 2006 C.ol\se"Vt' Tad.:,}'. ~if)~ -......--...... P'''ese.'ve. TL'Il'O~'14,-....\V. Sanr. Monlea A Sustainable Community Introduction We live in a time in which increased population growth, high levels of consumption and the desire to feed growing economies have created escalating demands on our resources - natural, human and social - on a local, regional, and global scale. These demands negatively impact the natural environment, our communities and the quality of our lives. In the face ofthese challenges, people worldwide have developed a growing concern for the environment and a desire to live sustainably. In 1994 the Santa Monica City Council took steps to address these pressures locally by adopting the Santa Monica Sustainable City Program. The Sustainable City Program was initially proposed in 1992 by the City's Task Force on the Environment to ensure that Santa Monica can continue to meet its current needs - environmental, economic and social - without compromising the ability of future generations to do the same. It is designed to help us as a community begin to think, plan and act more sustainably - to help us address the root causes of problems rather than the symptoms ofthose problems, and to provide criteria for evaluating the long-term rather than the short-term impacts of our decisions - in short, to help us think about the future when we are making decisions about the present. The program includes goals and strategies, for the City government and all sectors of the community, to conserve and enhance our local resources, safeguard human health and the environment, maintain a healthy and diverse economy, and improve the livability and quality of life for all community members in Santa Monica. To check our progress toward meeting these goals, numerical indicators were developed and specific targets were set for the city to achieve by the year 2000 in four goal areas - 1) Resource Conservation, 2) Transportation, 3) Pollution Prevention and Public Health Protection, and 4) Community and Economic Development. 1 .. j Santa Monica Sustainable City Plan GOAL / INDICATOR MATRIX The matrix below lists all ofthe Sustainable City indicators down the left side and the eight Sustainable City goal areas across the top. For each indicator dots are shown for every goal area that the indicator provides infonnation about. While each indicator was developed to measure progress toward meeting goals in one goal area, this matrix shows that many of the indicators measure the conditions, impacts or effectiveness of our actions in several goal areas. This demonstrates the linkages between each ofthe goal areas and the impact of our decisions across environmental, economic and social boundaries. n~ d'tTJ ~ t;itTJ t""'O ::t:: ntTJn ~ o 0 O"'~ o () ~"O 0 .... Q. 0 = tIl ~ < 0 Q.g ~ ~. ~ !3 tn 0 - _. o 0 tIl () () o ~ .... .., tn -0 "'t:Ia!3 ~ () 0 "0 C\/J S' ~ 6 ~S 0 o !3 -'S ~ (S. tn"O (JQ t;i ~ 0 :4 o p., ~ g _. .... p., 0 a () .... q .... o' 0 ~ -0 .... 0 0 ~. ~ 0 g..... 0 .... ~ "t:l Q. ~. p., 0 - a ~ Q. g' Q. Resource Conservation Indicators Solid waste generation . . Water use . . . . Energy use . . . . . Renewable energy use . . . . Greenhouse gas emissions . . . . . . Ecological Footprint for Santa Monica . . . . . . Indicator of sustainable procurement . . . "Green" construction . . . . Environmental and Public Health Indicators Santa Monica Bay - beach closures . . Wastewater (sewage) generation . . . Vehicle miles traveled . . . . . Air quality . . . . Residential household hazardous waste . City purchases of hazardous materials . Toxic air contaminant releases . Urban runoff reduction . . . . Fresh, local, organic produce . . . Organic produce - Farmer's markets . . . Restaurant produce purchases . . . Food choices . . . . Transportation Indicators Modal split . . . . Residential use of sustainable trans. options . . . . . Sufficiency of transportation options . Bicycle lanes and paths . . Vehicle ownership . . . . 3 .. HOUSING Goals 1. Achieve and maintain a mix of affordable, livable and green housing types throughout the city for people of all socio-economic / cultural/household groups (including seniors, families, singles, and disabled). Indicators - Svstem Level Tareets Availability of Affordable Housing Percent of all existing and new housing in (Target to be developed by City staff in Santa Monica affordable to very low, low, 2008 with the next update of the City's moderate, and upper income households Housing Element) Distribution of Affordable Housing Distribution of low income housing by (no target) neighborhood Indicators - Proeram Level Affordable Housing for Special Needs Groups Number of new or rehabilitated affordable housing units for families, seniors, the disabled and other special needs groups as a percentage of all new or rehabilitated affordable housing development Production of "Livable" Housing · Number of new housing units in non- residential zone districts as a percentage of the total new housing · Percent of new units within Y4 mile of: . transit stop . open space . grocery store Production of "Green" Housing Percent of new and substantially- rehabilitated housing that complies with Green Building Ordinance # 1995 as a percentage ofthe total new and rehabilitated housing Tareets Upward trend Upward trend Upward trend Upward trend 5 " HUMAN DIGNITY ~ Santa Monica will be a community in which: 1. All its members are able to meet their basic needs and are empowered to enhance the quality of their lives; and 2. There is access among community members to housing, health services, education, economic opportunity, and cultural and recreational resources; and 3. There is respect for and appreciation ofthe value added to the community by differences among its members in race, religion, gender, age, economic status, sexual orientation, disabilities, immigration status and other special needs. Indicators - Svstem Level Tare:ets Basic Needs - Shelter · Number of homeless living in Santa (no target) Monica · Percent of Santa Monica homeless Upward trend population served by the city shelter that transition to penn anent housing Basic Needs - Health Care · Percent of residents with health Upward trend insurance · Capacity of local health service Upward trend providers to meet the basic health care needs of Santa Monica residents Basic Needs - Economic Opportunity Percent of Santa Monica residents who Downward trend work more than 40 hours per week in order to meet their basic needs Basic Needs - Public Safety Crime rate per capita - report by Downward trend neighborhood/reporting district, and by type (property, violent, hate) 1- .. " other non-fossil fuel, renewable energy technologies), and small wind generators; 2) electricity generated by high efficiency (Le., meeting or exceeding efficiency of large natural gas power plants) natural gas generators and fuel cells using hydrogen generated through a natural gas catalyst; and 3) medium scale, high-efficiency co-generation systems (powered by natural gas) serving many properties located within close proximity of each other. Clean distributed generation does not include electricity generated by gasoline or diesel powered generators. diversion: in reference to solid waste, diversion refers to all waste that is kept out of a landfill through recycling, beneficial reuse, composting, or other means. ecological footprint: The ecological footprint is a tool to help measure human impacts on local and global ecosystems. The ecological footprint of a given population (household, community, country) is the total area of ecologically productive land and water used exclusively to produce all the resources (including food, fuel, and fiber) consumed and to assimilate all the wastes generated by that population. Since we use resources from all over the world and affect far away places with our wastes, the footprint is a sum of these ecological areas - wherever that land and water may be on the planet. Thus the ecological footprint of Santa Monica is that area of productive land inside and outside its borders that is appropriated for its resource consumption or waste assimilation. There is a finite area of ecologically productive land and water on the Earth, which must be shared among 6 billion people as well as all of the planet's other species. The amount of ecologically productive land available globally at today's current population is approximately 5 acres per person. The ecological footprint of the average American is approximately 25 acres, far exceeding the "fair earthshare". The ecological footprint is an excellent tool for illustrating the magnitude ofthe change necessary for our world to become sustainable. It is also useful for evaluating and comparing the total environmental impact of specific activities and in this way, helpful for decision-making. environmentally preferable: a product, service, activity or process that has a lesser or reduced effect on human health and the environment when compared to other products, services, activities or processes that serve the same purpose. extended producer responsibility: responsibility of producers or manufacturers across the entire life cycle oftheir products, particularly to the post-consumer stage (after products are discarded and become waste). Typically once a product is sold to a consumer the responsibility of disposing of that product becomes the responsibility of the consumer. Extended producer responsibility requires that the producer of the product maintain responsibility for recycling or proper disposal ofthe product once it has surpassed its useful life. green: for the purpose of this document, green is used as shorthand to refer to any environmentally preferable product, activity, service or process. '::y