Loading...
AP 01-14-00 SpecialSOUTH TAHOE PUBLIC UTILITY DISTRICT "Basic Services for a Complex World" NOTICE OF SPECIAL BOARD MEETING [Revised Agenda] Friday, January 14, 2000 10:00 A.M. District Conference Room 1275 Meadow Crest Drive, South Lake Tahoe, California Robert G. Baer, General Manager Christopher H. Strohm, President James Jones, Director BOARD MEMBERS Ma Lou Mosbacher, Director Richard Solbrig, Assistant Manager Pembroke Gochnauer, Vice President Duane Wallace, Director AGENDA 1. CALL SPECIAL MEETING TO ORDER 2. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION a. U.S.D.A. FOREST SERVICE SPECIAL USE PERMIT FOR GARDNER MOUNTAIN WELL b. GARDNER MOUNTAIN WELL PUMP AND CONTROL BUILDING (Richard Solbrig) 3. ADJOURNMENT AUTHORIZE TERMS OF LONG -TERM SPECIAL USE PERMIT APPROVE CONSULTANT SERVICES FOR CAROLLO ENGINEERS TO DESIGN ELECTRICAL COMPONENTS FOR THE WELL IN THE AMOUNT OF $33,200 South Tahoe Public Utility District • 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 • Phone: 530/544 -06474 • Facsimile: 530/541 -0614 SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Nick Zaninovich, Staff Engineer RE: BOARD MEETING , January 14 , 2000 AGENDA ITEM: ACTION ITEM NO: b CONSENT CALENDAR ITEM NO: ITEM- PROJECT NAME: GARDNER MOUNTAIN WELL PUMP AND CONTROL BUILDING REQUESTED BOARD ACTION: Approve consultant services for Carollo Engineering to design electrical components for the well in the amount of $33,200. DISCUSSION: Staff has solicited a proposal from Carollo Engineers for the design of the electrical components of the Gardner Mountain Well. Design services under this proposal shall include electrical pump control, lighting, heating, backup generator, and limited telemetry - related design. Staff recommends the Board approve the proposal in the amount of $33,200. SCHEDULE: Electrical design to be complete January 24, 2000. COSTS: $33,200. ACCOUNT NO: 2029 - 7021 /GMPUMP BUDGETED AMOUNT REMAINING: ($1,999.) ATTACHMENTS Carollo proposal. CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES�n NO CHIEF FINANCIAL OFFICER: YES NO CATEGORY: GENERAL WATER X SEWER 12/28/99 TUE 12:00 FAX 916 565 4880 4 carOLLD e n G l n e e r s December 28, 1 999 300.84 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, California 96150 CAROLLO ENGINEERS —SACTO STPUD Dediealed to creative!, rrsiurttsive, rperth:1; {t sultttitrnc ,for those toe woe. Attention: Mr. Nick Zaninovich Subject: Gardner Mountain Water Well Electrical Design Assistance Dear Nick: Carollo Engineers (Carollo) is pleased to submit this proposal to assist the South Tahoe Public Utility District (District) with the electrical design and construction for the new Gardner Mountain Water Well. This proposal is based on our understanding of the engineering services requested by the District (as discussed with District staff and presented in our memorandum of December 20, 1999). The services to be provided by Carollo under this proposal are limited to the design of the electrical system for the new Gardner Mountain Water Well and emergency generator. The new generator is to be designed to run the 150 horsepower well pump and station appurtenances during power outage events. The system will be designed for a manual start, an automatic transfer switch is not included. Specifications will be developed for the electrical work undertaken as part of this design. The District will complete all other required drawings, specifications, and other related work for the remainder of the installation including grading, paving, pipe identification and Installation, Carollo will provide shop drawing review for submittals on the electrical system as requested by the District. Our Scope of Work (Exhibit A, attached) is based upon our understanding of the project. The proposed engineering cost for the completion of the tasks contained in the Scope is $33,200. The development of this cost is detailed in the attached Labor Hour and Cost Estimate (Exhibit B). It is our understanding that this project will be administered under the 1988 Master Agreement (as amended to allow the engineer to carry errors and omissions insurance not less than $5,000,000 aggregate with a deductible of not more than $500,000) between Carollo Engineers and the District. Engineering fees will be based on the current fee schedule (Exhibit C). The project team for the completion of this project will be Mr. Robert Gillette, Principal -in- charge, Mr. Jack Burnam, Project Manager and Mr. George Hughes, Project Engineer. H: \9D SAC\Stpud SAC\Gardno►Ltr.wpd 2500 VENTURE OAKS WAY, SUITE 320 • SACRAMENTO, CALIFORNIA 95833 • (916) 565 -4888 • FAX (916) 565 -4880 0002 12/28/99 TUE 12101 FAX 916 565 4880 Mr. Nick Zaninovich South Tahoe Public Utility District December 28, 1999 Page No. 2 CAROLLO ENGINEERS -SACTO STPUD Please review the material contained herein and, if acceptable, submit them to the Board of Directors for approval. Please feel free to contact us with any questions. Sincerely, CAROLLO ENGINEERS, P.C. Robert A. Gillette, Principal viszt„L. Jack Burnam II, P.E. RAG /JLB:kjp Attachments: Exhibit A - Scope of Work Exhibit B - Labor Hour and Cost Estimate Exhibit C - Fee Schedule H: \BD SAC\Stpud_SAC\QadrurLtr.wpd 2500 VENTURE OAKS WAY, SUITE 320 • SACRAMENTO, CALIFORNIA 95833 • (916) 565 -4888 • FAX (916) 565 -4880 Ij O03 12/28/99 TUE 12:01 FAX 916 565 4880 CAROLLO ENGINEERS -SACTO STPUD EXHIBIT A SOUTH TAHOE PUBLIC UTILITY DISTRICT GARDNER MOUNTAIN WATER WELL ELECTRICAL DESIGN Scope of Work The following describes the Scope of Work for the engineering effort to complete the design, bidding, and construction services associated with the electrical design for the new Gardner Mountain Water Well. These engineering services are to be provided by Carollo Engineers (Engineer) as requested by the South Tahoe Public Utility District (District). The District is to provide all required geotechnical, topographic survey and plan and profile drawings of the existing building that will house the new electrical system for the Gardner Mountain Water Well site. This proposal assumes that the District will develop the bidding documents for this project. Technical specifications will be provided by the engineer for the work included in the electrical design. Task 1 - Design Electrical System for the new Gardner Mountain Water Well Consultant shall develop plans for the complete electrical system for this water well pump station. District shall have the power dropped from the nearest power source and brought to the building. Consultants work shall begin here. All electrical equipment shall be installed in the existing building. District shall provide a plan of the building and shall indicate any areas that are not to be used in the electrical layout. It is the intent of the District to run all conduit connecting the equipment to the controls under the new slab floor that is to be poured. This means that the electrical layout has to be completed before the slab can be poured. Electrical equipment shall include: 1. Well pump - Well pump motor is 150 horsepower. Well pump shall be operated by a VFD designed as part of this project. 2. PLC - PLC will be capable of accepting an automatic transfer switch at a later date If the District should so decide. No automatic transfer switch is to be installed as part of this project. Switching from land power to emergency power shall be done manually, 3. Emergency Generator - Consultant shall size the new emergency generator based on data supplied from the District on pump horsepower, fan motors, lighting, etc. The emergency generator shall be sized to operate all station components during a power outage including: pump, lights, fans, building heater, etc. NOTE, the recommended emergency generator shall be capable of operating a VFD. Because the switch from land power to emergency power shall be manual there may be significant time between power loss and start up of the emergency generator. For this reason, the design shall also include a panel either in the main panel or separate from it that will allow a small portable generator to be plugged in to light 2 to 3 lights within the building and that can power up the block heater on the emergency generator. This will be used to warm the unit before starting after shutdown. Louvers shall be manually operated. H:18D_S C Stpud_SAMOardne swpe.wpd 1 Z 004 12/28/99 TUE 12:02 FAX 916 565 4880 CAROLLO ENGINEERS -SACTO --'-O STYLI@ 4. Automatic Transfer Switch (ATS) - will not be provided as part of this project but a spot should be designated for its future installation and conduit between the PLC and the ATS location should be installed to ease future installation. 5. Variable Frequency Drive (VFD) - well pump shall be operated by a VFD that will be integrated into the system. 6. Other electrical controls to be included in the design include: block heater for the emergency generator, building (space) heater, battery charger, lighting • circuits, signals to and from the discharge flow meter, electronic pressure meter, draw down meter, chlorine feed (metering pumps), etc. 7. The District will coordinate with Sierra Pacific Power to have a power drop installed for the new pump station. However, the Consultant shall assist the District with the likely installation of a pad mounted step down transformer on the outside of the new building and an electric meter inside the building. Sierra Pacific Power employees will be allowed access to the building to read the meter. 8. The design shall include an "emergency power kill" button located within the building but accessible from a pedestrian door without requiring an employee to actually enter the building. 9. Power will also have to be provided to the District installed telemetry, this system will also have to be powered by the emergency power system. Partial list of signals that will be sent to the treatment plant via the telemetry system include: pump status, generator on /off, discharge flow, draw down meter, and any alarm signals. 10. NOTE: The well pump is located approximately 500 feat from the pump building and at a depth of approximately 300 feet. Overall length of the wires to the pump from the pump building could be 800 feet for power and signal for the down -hole sensor. This will have to be considered in the design of the system. The Engineer will make recommendations regarding the need to prepurchase long lead time electrical equipment based on the District's proposed construction completion schedule. Task 2 - Electrical Specifications Engineer shall develop technical specifications for the electrical work to be completed in this project. The District shall develop front end documents and any technical specifications required to complete work on other parts of the new well location. Task 3 - Construction Services Engineer shall review shop drawing submittals relating to the electrical system and standby power and respond to questions on an "as needed" basis, at District request. The Labor Hour and Cost Estimate for this Item is based on review of 6 shop drawings at 8 hours per shop drawing and a total time of eight (8) hours responding to questions forwarded by the District. Effort exceeding that stated will be considered a change in scope. H: \8D_SAC\Stpud 9AC\GwdnnScops.wpd 2 f� 005 12/28/99 TUE 12:03 FAX 916 565 4880 CAROLLO ENGINEERS -SACTO STPUI) DISTRICT PROVIDED INFORMATION 1. Site plans and profiles for the existing building to house the new electrical egi]ipment (profiles to include inside walls that the new electrical equipment Is to be attached to.) Data should be supplied in AutoCAD 14.0 format. 2. Shop drawings for review. 3. Questions from the District or forwarded by the District for response. CAROLLO ENGINEERS DELIVERABLES 1. CAD drawings (1 hard copy (stamped and signed) and electronic file In AutoCAD Release 14.0 each site) for the electrical design for the Gardner Mountain Water Well. 2. Specifications for the electrical equipment for the Gardner Mountain Water Well. 3. Written review comments on shop drawings submitted for review by the Contractor to the District ( and forwarded by the District to Carollo Engineers). SCHEDULE Board Approval of Contract Plans and Profiles of the existing well building Design Review with District Staff /Site Visit 100% Design Submittal H: \BO 8AC\8tpud 8AC\3s dnutSoops.wpd 3 January 6, 2000 January 6, 2000 January 10, 2000 January 24, 2000 l006 12/28/99 TUE 12:03 FAX 916 565 4880 Task No. CAROLLO ENGINEERS -SACTO - -' STPUD EXHIBIT SOUTH TAHOE PUBLIC UTIUTY DISTRICT GARDNER MOUNTAIN WATER WELL ELECTRICAL DESIGN Labor Hour and Cost Estimate) Labor Hours Cost Estimate Task 1 - Electrical System Design Principal (P) Engineer ( EVIII) Engineer (EV) Engineer Technician (ETVI) Word Processing Subtotal Task 1 Task 2 - Electrical Specifications Principal (P) Engineer (EVIII) Engineer (EV) Engineer Technician (ETVI) Word Processing Subtotal Task 2 Q007 Estimate Rate Total 1 32 16 40 4 93 1 32 24 0 16 $180.00 $180.00 $174.50 $5,584.00 $133.00 $2,128.00 $88.50 $3,540.00 $87.50 $270.00 $180.00 8174.50 $133.00 $88.50 $87.50 $11,702.00 $180.00 $5,584.00 $3,192.00 50,00 51,080.00 73 $10,036.00 Task 3 - Construction Services Principal (P) 2 $180.00 5380.00 Engineer (EVIII) 32 $174.50 $5,584.00 Engineer (EV) 24 $133.00 33,192.00 Engineer Technician (ETVI) 4 $88.50 $354.00 Word Processing 4 $87.50 3270.00 Subtotal Task 5 e9 39,760.00 Subtotal $31,498.00 OTHER DIRECT COSTS Mileage - 2 trips at Reproduction Word Processing Time@ CAD Processing Time@ Eng. Computer Time @ Subtotal Other Direct Costs SUBTOTAL USE $0.35 per mile $12,00 per hour $18.00 per hour $12.00 per hour 14:100_8Arn8OUd-BAMOadnaGfuet 1 500 miles 19.00 hours 35.00 hours 13.00 hours $175.00 $500.00 $228.00 $830.00 $158.00 ease= 51,689.00 $33,167.00 ' 533,200.00 1 12/28/99 TUE 12:03 FAX 916 565 4880 CAROLLO ENGINEERS -SACTO -*-* -* STPUD CAROLLO ENGINEERS, PC 2000 FEE SCHEDULE Hourly Rate Engineers /Sclentists (E /S) E/S I $78.75 E/S II 88.50 E/S III 102.50 E/S IV 116.50 E/S V 133.00 E/S VI 142.50 E/S VII 158.00 E/S VIII 174.50 Principal 180.00 Engineering Aides (EA) EA I 35.00 EA II 67.50 EA III 73.75 EA IV 87.50 EA V 98.50 EA VI 110.75 EA VII 121.00 Engineering Technicians (ET) ET I 42.25 ET II 48.25 ET III 55.00 ET IV 61.50 ETV 76.25 ET VI 88.50 ET VII 101.50 Support Staff Office Aides 35.25 Clerical 54.25 Word Processors 67.50 Computer Computer Equipment (PC) 12.00 Word Processor (Processing Time) 12.00 CAD (Processing Time) 18.00 Travel and Subsistence at cost Mileage .35 /mile Subconsultant Cost + 10% Other Direct Costs Cost + 10% \19ao-wp\ DATA \WP■KMANUAL \FEE\Peg2000,WPD 1 Zoos