AP 09-18-03REGULAR BOARD MEF..~iNG AGENDA -SEPH::MBER 18, 2003
PAGE- 2
Pg. 23
B-line: Phase 3 Export Pipeline
Replacement
(Jim Hoggatt)
Authorize Staff to Advertise for Bids for the
Construction of Alternative E
Pg. 25
Al Tahoe Access Road
(Richard Solbrig)
Authorize Execution of the Road
Maintenance Agreement, Subject to
Negotiation with the City of the Final Terms
and Conditions by District Staff and Legal
Counsel
Pg. 33
Al Tahoe Access Road
(Richard Solbrig)
Authorize Execution of the Reimbursement
Agreement, Subject to Negotiation of the
Final Terms and Conditions by District
Staff and Legal Counsel
f. Payment of Claims
Pg. 41
Approve Payment in the Amount of
$1,338,745.61
BOARD MEMBER STANDING COMMITTEE REPORT~
a. Executive Committee (Jones / Schafer)
b. Finance Committee (Wallace / $chafer)
c. Water & Wastewater Operations Committee (Jones / Comte)
d. Planning Committee (Mosbacher / Schafer)
BOARD MEMBER AD HOC COMMITTEE REPORT~
a. Legislative Ad Hoc Committee (Wallace / Jones)
b. Administration Building Ad Hoc Committee (Jones / Schafer)
EL DORADO COUNTY WATER AGENCY REPRESENTATIVE REPORT
10. BOARD MEMBER REPORTS
11. GENERAL MANAGER I STAFF REPORTR
12. NOTICE OF PAST AND FUTURE MEETINGS ! EVENT~
Past Meetinqs / Event~
09/12/03 - El Dorado County Water Agency Board Meeting
09/15/03- Operations Committee Meeting at District Office
09/17/03 - B-line Phase 3 Tour with Agencies
Future Meetings I Events
09/19/03- 9:00 a.m. -ACWA Region 3 Meeting at Tahoe City PUD
09/24~03- 9:30 a.m. -TRPA Governing Board Meeting at North Tahoe
09/29/03- 4:00 p.m. - Operations Committee Meeting at District Office
10/02/03 - 2:00 p.m. - STPUD Regular Board Meeting at City Council Chambers
REGULAR BOARD MEETING AGENDA - SEPTEMBER t8, 2003 PAGE - 3
13.
14.
CLOSED SESSION
a. Pursuant to Government Code Section 54956.9(c)/Conference with Legal Counsel-
Pg. 61 Anticipated Litigation: Pioneer Trail Waterline Replacement Near Filter Plant
Pg. 63
Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel-
Existing Litigation: Ronald Rasmussen vs. Dr. Bruce Daugherty, Tamarack
Rentals, Villa Tahoe Condominiums 1-75, Case No. SC20010082, Superior Court of
El Dorado County
Pg. 65
Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel-
Existing Litigation: STPUD vs. John Breese Mumford, et al., El Dorado County
Superior Court Case No. SC20020030
Pg. 67
Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel-
Existing Litigation: STPUD vs. ARCO et al. San Francisco County Superior Court
Case No. 999128 '
Pg. 69
Pursuant to Government Code Section 54956.9(a) Conference with Legal Counsel-
Existing Litigation: STPUD vs. F. Heise Land & Live Stock Company, Inc., William
Weaver, Eddie R. Snyder, Crockett Enterprises, Inc., ClV S-02-0238 MLS JFM
United States District Court for the Eastern District of California, Sacramento, CA
Pg. 71
Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel-
Existing Litigation re: Meyers Landfill Site: United States of America vs. El Dorado
County and City of South Lake Tahoe and Third Party Defendants, Civil Action No.
S-01-1520 LKK GGH, United States District Court for the Eastern District of Ca.
Pg. 73
Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel-
Existing Litigation: STPUD vs. Lakeside Park Association, et al., County of El
Dorado, Superior Court Case No. SC20010165
ACTION I REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION
15. ADJOURNMENT (To the next regular meeting, October 2, 2003, 2:00 p.m.)
The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete
agenda packet, including all backup information is available for review at the meeting and at the District office dudng the hours of
8:00 a.m. - 5:00 p.m., Monday through Friday. Items on this agenda are numbered for identification purposes only and will not
necessarily be considered in the order in which they appear on the agenda. Designated times are for particular items only. Public
Hearings will not be called to order pdort the time specified.
Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda
items are heard; comments should be brief and directed to the specifics of the item being considered. Comments on items not on
the agenda can be heard during "Comments from the Audience;" however, action cannot be taken on items not on the agenda.
Please provide the Clerk of the Board with a copy of all written material presented at the meeting.
The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation
of the disabled in all of the District's public meetings. If particular accommodations for the disabled are needed (i.e., disability-
related aids, or other services), please contact the Clerk of the Board at (530) 544-6474, extension 203, at least 24 hours in
advance of the meeting.
South Tahoe Public Utility Distdct · 1275 Meadow Crest Ddve · South Lake Tahoe, CA 96150
Phone 530.544.6474 · Facsimile 530.541.0614
CONSENT CALENDAR
September t8, 2003
ITEMS REQUESTED ACTION
a. Sludge Handling and Odor Control Facilities Approve Change Order No. 2 to Pacific
Pg. 1 (Jim Hoggatt) Mechanical Corporation in the Amount
of $154,787.33
Pg. 5
Flagpole and Elks Club Well Drilling Project
(Ivo Bergsohn)
Approve Change Order No.1 to Zim
Industries, Inc., in the Amount of
$41,5O3.25
Co
Pg. 9
Bakersfield Well Treatment
(Rick Hydrick, Richard Solbrig)
Adopt Resolution Authorizing District Staff
to Negotiate Directly with U.S. Filter for
Treatment of MTBE, and Possibly Arsenic,
at the Bakersfield Well in Lieu of
Competitive Bidding
Pg. 11
Regular Board Meeting Minutes:
August 21, 2003
(Kathy Sharp)
Approve Minutes
South Tahoe Public Utility District · 1275 Meadow Crest Drive · South Lake Tahoe, CA 96150
Phone 530.544.6474 · Facsimile 530.541.0614
South Tahoe
Public Utility DiStrict
1275 Meadow Crest Drive · South Lake Tahoe, · CA 96150-7401
Phone 530 544-6474 · Fax 530 541-0614
BOARD AGENDAITEM
NO. 4.a
TO:
Board of Directors
FROM:
Jim Hoggatt, Construction Manager/Engineer
MEETING DATE: September 18,2003
ITEM - PROJECT: Sludge Handling and Odor Control Facilities
REQUESTED BOARD ACTION: Approve Change Order No: 2 to Pacific Mechanical
Corporation (PMC), in the amount of $154,787.33.
DISCUSSION: The itemized parts of Change Order No. 2 are as follows:
Part A, in the amount of $2,960.63, is for the relocation of an existing power pole
that was not identified on the original Plans.
Part B, in the amount of $22,208.27, is for adding control joints to both interior
and exterior masonry walls. The original plans did not identify control joints.
Part C, in the amount of $74,950.82, was for the removal of sludge deposits
found in the Sludge Handling Building foundation, and the sub-grade of the service
road. Work was performed on time and materials basis, and District staff authorized
PMC to accelerate their schedule to cover the delays.
Part D, in the amount of $46,102.56, is for revisions to the entry of the service
road off Al Tahoe Blvd., and to the drainage requirements of the new service road that
were not identified on the original plans.
Part E, in the credit amount of $2,890.00, is for changing the specified PBA-6B
oil to AC-20 oil for the service road asphalt. At the time the paving was to be done, the
availability of PBA-6B oil had a two-week delay, and the AC-20 oil with lime additive (an
equal but cheaper oil) was available with no delaYs.
Part F, in the amount of $10,003.17, is for changes to the roof and deck
insulation to improve the quality of the roof insulation. The original roof insulation of
~-inch perlite and 3-inch foam insulation was changed to 1~ inches of composite
insulation, a vapor barrier, and 3-inches of foam insulation.
Part G, in the amount of $1,451.88, is for the installation of Schlange 6-pin locks
to accommodate the use of the Cyber brand locks and keys that the District is now
using for security purposes.
Staff recommends the Board approve Change Order No. 2 to Pacific Mechanical
Corporation for $154,787.33.
SCHEDULE: As soon as possible
COSTS: $154,787.33
ACCOUNT NO: SCFOCP
BUDGETED AMOUNT REMAINING: $696,524
ATTACHMENTS: Change Order No. 2, Budget Remaining Analysis
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES 'J~//.dg NO
CHIEF FINANCIAL OFFICER: YES
CATEGORY: Sewer
SOLIDS HANDLING FACILITY AND ODOR CONTROL PROJECT
Accounts: 1029-8234-8236, 8349, 2029-8130
BUDGET REMAINING ANALYSIS:
03/04 All Years
Spent to date 1,434,072 6,228,907
Outstanding Purchase Orders-
Alpine Metals 0 0
Carollo Engineers 71,625 71,625
Pacific Mechanical Corp. 3,170,169 3,170,169
Turner & Associates 2,500 2,500
Westfalia Separator Inc. 147,973 147,973
Total Encumbrance 3,392,267 3,392,267
Total Spent & Encumbered 4,826,338 9,621,173
Budget FY 2004 5,522,862 10,614,504
Remaining Budget 696~524 993,331
South Tahoe
Public Utility District
1275 Meadow Crest Drive · South Lake Tahoe, · CA 96150-7401
Phone 530 544-6474 · Fax 530 541-0614
BOARD AGENDA ITEM
NO. 4 .b
TO:
Board of Directors
FROM:
Ivo Bergsohn, Hydro-Geologist
MEETING DATE: September 18, 2003
ITEM - PROJECT: Flagpole and Elks Club Well Drilling project
REQUESTED BOARD ACTION: Approve Change Order No. '1 to Zim Industries, Inc.,
in the amount of $41,503.25
DISCUSSION: All of the following changes were necessary due to unexpected
conditions that occurred during the drilling process. The itemized parts of Change
Order No. 1 are as follows:
Part A, in the amount of $3,400.11, is for furnishing and installing cement to
stabilize collapsing borehole conditions encountered during the drilling of the Flagpole
test hole.
Part B, in the amount of $4,491.27, is for drilling fluid additives required to
stabilize collapsing borehole wall and artesian flow conditions encountered during the
drilling of the Flagpole test hole.
Part C, in the amount of $402.50, is for adding a caliper log to the borehole
geophysical logging suite for the Flagpole test hole. The caliper log was used to identify
the location and extent of borehole washout zones through the Flagpole test hole. A
caliper log was not specified when this project was designed.
Part D, in the amount of $4,359.37, is for providing two 500-barrel mobile fluid
storage tanks for the temporary containment of artesian groundwater flow encountered
during the drilling of the Flagpole test hole. Requirement for these storage tanks was
not specified, as artesian conditions were not expected when this project was designed.
Part E, in the amount of $13,800.00, is for added drilling time required to stabilize
and clean caved borehole conditions encountered during the drilling of the Flagpole test
hole.
Part F, in the amount of $2,000.00, is for added drilling time spent re-drilling
cemented zones used to stabilize collapsing borehole conditions encountered during
the drilling of Flagpole test hole.
Part G, in the amount of $200.00, is for added standby time waiting for delivery of
cement used to stabilize collapsing borehole zones encountered during the drilling of
the Flagpole test hole.
-6-
Part H, in the amount of $12,850.00, is for added crew time required to handle
and manage the additional drill cuttings and groundwater generated during the drilling
and testing of the Flagpole test hole. The crew time required to handle and manage
these added construction wastes were not specified when this project was designed.
Staff recommends the Board approve Change Order No. 1 to Zim Industries, Inc.
SCHEDULE: As soon as possible.
COSTS: $41,503.25
ACCOUNT NO: 2029-8440/FLAGWL
BUDGETED AMOUNT REMAINING: $429,178
ATTACHMENTS: Change Order No. 1
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES ,'~ '~.~J) NO
CHIEF FINANCIAL OFFICER: YES~r.~-,p
CATEGORY: Water
CHANGE ORDER NUMBER
Project Fla(]Dole and Elks Club Well Drillino Proiect
Contractor ZIM INDUSTRIES, INC.
Date September PO #
_,01
P13706
The Contract Shall Be Changed As Follows:
A)
Furnish and install twenty-seven (27) cubic yards of 8-sack sand-cement slurry to
stabilize flowing sands and wash-out of the borehole wall between 70 to 90 feet below
ground surface during the drilling of the Flagpole Test Hole for $125.93 per cubic yard.
TOTAL FOR ITEM A IS $3,400.11
B) Provide drilling fluid additives for the drilling, testing and control of unstable borehole
wall and artesian flow conditions encountered during the drilling and formation water
quality testing of the Flagpole Test Hole for the lump sum cost of $4,491.27
TOTAL FOR ITEM B IS $4,491.27
See attached sheet for additional items.
D°llar Am°unts Contract Time
Original Contract $ 493,185.00
Previous Chan~le Order $0.00
Current Contract $493,185.00
THIS CHANGE ORDER $41,503.25
New Contract Total $534,688.25
This Change Order constitutes full and mutual accord and satisfaction for all time and all costs related to this change.
By acceptance of this Change Order the contractor agrees that the Change Order represents an equitable adjustment to
the contract price and time, and further agrees to waive all right to file a claim arising out of or as a result of this change.
Authorized By STPUD Board President
Date:
Accepted By Contractor
Date:
Reviewed By
Date:
-?-
Flagpole and Elks Club Well Drilling Project
Change Order No. 1
Page 2
C) Add Caliper Log to borehole geophysical logging suite for the Flagpole Test Hole for the
lump sum cost of 402.50.
TOTAL FOR ITEM C IS $402.50
D)
Provide two 500-barrel mobile fluid storage tanks for the temporary containment of
artesian groundwater flow encountered during the formation water quality testing of the
Flagpole Test Hole for the lump sum cost of $4,359.37.
TOTAL FOR ITEM D IS $4,359.37
E)
Additional drilling time spent stabilizing and cleaning caved hole conditions
encountered during the drilling of the Flagpole Test Hole for 69 hours at $200.00 per
hour.
TOTAL FOR ITEM E IS $13,800.00
F)
Additional drilling time spent re-drilling cement pumped to stabilize flowing sands and
wash-out of the borehole wall between 70 to 90 feet below ground surface during the
drilling of the Flagpole Test Hole for 10 hours at $200.00 per hour.
TOTAL FOR ITEM F IS $2,000.00
G) Additional stand-by time with personnel waiting-on cement to stabilize unstable
borehole conditions encountered between 70 to 90 feet below ground surface during the
drilling of the Flagpole Test Hole for 2 hours at $100.00 per hour.
TOTAL FOR ITEM G IS $200.00
H) Additional crew time required for the handling and management of the soil cutting
materials and fluids resulting from unstable borehole and artesian flow conditions
encountered during the drilling and formation water quality testing of the Flagpole Test
Hole for 128.50 hours at $100.00 per hour.
TOTAL FOR ITEM H IS $12,850.00
TOTAL FOR CHANGE ORDER NUMBER 1 IS A + B + C + D + E + F + G + H = $41,503.25
-8-
South Tahoe
PublicUtility District
1275 Meadow Crest Drive · South Lake Tahoe, · CA 96150-7401
Phone 530 544-6474 · Fax 530 541-0614
BOARD AGENDA ITEM
NO. 4. c
TO:
Board of Directors
FROM:
Rick Hydrick, Manager of Water Operations
Richard Solbrig, General Manager
MEETING DATE: September 18, 2003
ITEM - PROJECT: Bakersfield Well Treatment
REQUESTED BOARD ACTION: Adopt resolution authorizing District staff to negotiate
directly with U.S. Filter for treatment of MTBE, and possibly arsenic, at the Bakersfield
Well in lieu of competitive bidding.
DISCUSSION: Bakersfield Well must be treated for MTBE. District staff pilot tested
granular activated carbon and advanced oxidation, both of which are suitable treatment
technologies. The U.S. Filter's granular activated carbon treatment process proved to
be the best technology for removing MTBE at the current and anticipated levels at
Bakersfield Well. This technology may also reduce arsenic to below the current federal
standard.
There are no other companies that offer the type of granular activated carbon treatment
process used by U. S. Filter. As a result, competitive bidding would not affect the final
result nor produce any competitive advantage. Consequently, the District is best served
by entering into negotiations with U.S. Filter for an MTBE treatment system at the
Bakersfield Well.
SCHEDULE: Treatment must be installed by early June 2004.
COSTS: Unknown at this time
ACCOUNT NO: MTBE Fund
BUDGETED AMOUNT REMAINING: Unbudgeted
ATTACHMENTS: Resolution to be distributed pdor to, or at, the Board meeting.
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES ,~-.~'/ NO
CHIEF FINANCIAL OFFICER: YES ~v~- ~..~-.d~;~.~-NO
CATEGORY: 'Water
CONSEB~ ITt~i NO. - 4 .d
D AFT DP, AF?
SOUTH TAHOE PUBLIC UTILITY DISTRICT
"Basic Services for a Complex World"
Richard Solbdg. General Manager
james R~' ,Jones. preSident BoARD'MEMBERs Eric W. Scliafer, vice PreSident
Duane Wallace, Director Mary Lou Mosbacher, Director Tom Comte, Director
REGULAR MEETING OF THE BOARD OF DIRECTORS
SOUTH TAHOE PUBLIC UTILITY DISTRICT
AUGUST 21, 2003
MINUTES
The Board of Directors of the South Tahoe Public Utility Distdct met in a regular session,
August 21, 2003, 2:00 P.M., City Council Chambers, 1900 Lake Tahoe Boulevard, South Lake
Tahoe, California.
BOARD OF DIRECTORS:
Vice President Schafer, Directors Wallace, Comte,
Mosbacher. President Jones was excused due to
District business.
ROLL CALL
STAFF:
Solbrig, Sharp, McFarlane, Frye, Coyner, Hoggatt,
Thiel, Hydrick, Swain, Eddy, Attorney Kvistad
GUESTS:
Nancy MarzokolLeadership Lake Tahoe Program,
Brad Vidro/City of South Lake Tahoe, Dale Smith
and Forrest Huisman/Smith Design Group
Nancy Marzoko, Leadership Lake Tahoe Program,
stated their group is raising money to donate towards
the rehabilitation of Linear Park and is working with the
City of South Lake Tahoe on this project. She suggested
that some of the wells in that area be rehabilitated in
order to provide irrigation water, and requested Board
direction and technical support.
COMMENTS FROM THE AUDIENCE
-11-
REGULAR BOARD MEETING MINUTES- AUGUST 21, 2003 PAGE - 2
Consent Item b. was brought forward for discussion
prior to Board action.
CORRECTIONS TO THE AGENDA
OR CONSENT CALENDAR
Moved Comte / Second Mosbacher / Jones Excused /
Passed to approve the Consent Calendar as amended:
CONSENT CALENDAR
Flagpole and Elks Club Well Control Buildings-
Authorized Change Order increase to Fast Fabricators,
Inc., for Purchase Order No. P13827, in the amount of
$6,184;
b. See Consent Items Brought Forward;
Statement of Investment Policy- Adopted Resolution
No. 2773-03 establishing policy for management of
District investments, superseding Resolution Nos.
2619, 2664, 2687-98, 2703-99, 2714-00, 2730-01,
and 2749-02;
do
Deferred Compensation Plan Document Restatement -
Adopted Resolution No. 2774-03 restating all previous
plan documents since the plan's original adoption on
September 1, 1977, superseding Resolution Nos.
2581, 2582, 2663, 2731-01, 2751-03, 2754-03;
Capital Outlay Accounts Rollover - Authorized staff
to direct rollover funds budgeted in 2002-2003 fiscal
year to the 2003-2004 fiscal year;,
f.
Unpaid Assessments - Adopted Resolution No. 2775-03
authorizing delinquent accounts to be added to the
2003/2004 County Tax Assessor's Roll amending
Resolution No. 2771-03.
coNSENT ITEMS BROUGHT FORWARD FOR DISCUSSION / ACTION
Director Mosbacher received clarification regarding
wording in the license agreement.
Moved Comte / Second Mosbacher / Jones Excused /
Passed to authorize execution of agreement between
El Dorado County and the District to install, maintain,
and operate two small County weather stations.
INSTALLATION OF WEATHER
STATIONS AT LUTHER PASS
PUMP STATION AND COUNTRY
CLUB TANKS
(Consent Item b.)
-12-
REGULAR BOARD MEETING MINUTES - AUGUST 2'1, 2003 PAGE - 3
ITEMs FOR BOARD ACTION
Lisa Coyner reported on the request received from
property owner, Mrs. Allen, for reimbursement of
costs that will be incurred to replace her sewer lateral.
CUSTOMER REQUEST RECEIVED
FROM ALLEN / EVANS,
APN 27-313-131-0
The property, located on Tamarack Avenue, is being
remodeled. As a result, and in accordance with the
District Administrative Code, a sewer air test was
performed on the sewer lateral, which failed. When
the test was performed, it was discovered that SBC
placed their fiber optic cable on the lateral and damaged
it. SBC will pay to replace that section, but the rest
of the lateral located in the public right-of-way does not
pass the test. The property owner contends that since
the lateral is in the public right-of-way, replacement of
that section should be the District's responsibility.
In response to the property owner's request that
Administrative Code Section 1.1.113 be reviewed for
fairness, Coyner outlined the history of why the
Administrative Code Section 1.1.113 defines a sewer
lateral as being the homeowner's responsibility from
the house to the District's sewer main.
The Operations Committee reviewed this item and
recommended upholding the District's Administrative
Code. Staff recommended the property owner seek
reimbursement from SBC for repair costs.
Moved Wallace / Second Comte / Jones Excused /
Passed to uphold Administrative Code Section 1.1.113
and to direct staff to work with the property owner to
develop an agreeable repair schedule.
John Thiel reported three bids were received for this
project. Since then, the Flagpole well test hole revealed
very high arsenic levels. Thiel requested this item be
removed from the agenda to allow staff time to evaluate
the situation.
FLAGPOLE AND ELKS CLUB WELL
CONTROL BUILDINGS
No Board action.
Jim Hoggatt reported four bids were received at the
August 19 bid opening.
PIONEER TRAIL WATERLINE
2003 PROJECT
-13-
REGULAR BOARD MEETING MINUTES - AUGUST 21, 2003
Moved Mosbacher / Second Comte / Jones Excused /
Passed to award bid to the lowest responsive, responsible
bidder, C.B. Ebright Co., Inc., in the amount of
$195,470.30.
Director Mosbacher disqualified herself from participation
in this item per a previously disclosed potential conflict of
interest. She did not read the material associated with this
agenda item, and she left the room while it was being
discussed and voted on.
Richard Solbrig reported he is hopeful the environmental
documents and project alternative will be approved at the
TRPA Governing Board meeting on August 27.
In order to receive approval for the recommended alter-
native, additional work, staff write-ups, and extra document
printings were required. If the project is approved, permit
work will need to proceed immediately with TRPA, the
USFS, and Lahontan, in order to be able to include permit
conditions in the construction bid documents.
Moved Wallace / Second Comte / Mosbacher Abstained /
Jones Excused / Passed to approve Task Order for
Parsons in the amount of $43,000.
Moved Mosbacher/Second Comte / Jones Excused /
Passed to approve payment in the amount of $663,446.61.
PAGE- 4
PIONEER TRAIL WATERLINE
2003 PROJECT
(continued)
B-LINE: PHASE 3 EXPORT
PIPELINE REPLACEMENT
PAYMENT OF CLAIMS
Water and Wastewater Operations Committee: The
committee met August 18. Minutes of the meeting are
available upon request.
Legislative Ad Hoc Committee: Director Wallace
reported representatives from Congressman Doolittle's
office toured the B-line project site, and the Meyers
landfill site off of Pioneer Trail.
Administration Building Ad Hoc Committee: The
committee met August 14 and discussed updates to
the building plans.
Director Wallace reported that El Dorado County won
the County of Origin lawsuit against the State Water
Board. This will protect the water rights of El Dorado
County and other counties.
BOARD MEMBERS STANDING
COMMITTEE REPORTS
BOARD MEMBERS AD HOC
COMMITTEE REPORTS
EL DORADO COUNTY WATER
AGENCY REPRESENTATIVE
REPORT
-14-
REGULAR BOARD MEt:lING MINUTES- AUGUST 21, 2003
John Thiel distributed project site maps to Board members.
Architect Dale Smith reviewed in detail the inadequacies
in the existing building and trailers, and how the sizes and
needs of the new facilities were determined. Two buildings
will be built - one will be a customer service facility, and
the other will house the laboratory, Operations Department,
and the emergency command center. He gave a Power
Point presentation that showed the proposed site plan, the
layout of the customer service facility, the schematic view
of the lower levels of each facility and their relationships
with each area.
Director Comte reported he attended a meeting held by a
woman who has been advertising by radio on the health
dangers of MTBE. She stated her intention was to raise
funding for research. District staff attended and did an
outstanding job of answering questions and providing
information.
Director Wallace reported Assemblyman Leslie will
conduct a town meeting in South Lake Tahoe on
September 2.
General Manager: Richard Solbrig reported on two items:
1 ) A letter was received from Mayor Judy Brown request-
ing the District consider Linear Park as a park/recreation
project and thus be able to allow water connection at a
substantially reduced charge or for no charge. President
Jones will assign the request to the Operations Committee
to review.
2) An alert was received from ACWA urging support for
AB 1051, which will preserve the ability for special
districts to set fees. It was the consensus of the Board
that a letter of support should be sent.
Mana,qer of Water Operations: Rick Hydrick reported
on four items: the test well at Flagpole, Country Club
well MTBE contamination, cleanup problems with Shell
Oil Company, and the District's water conservation
efforts.
5:00 -- 5:10 P.M.
5:10 P.M.
PAGE- 5
PRESENTATION: CUSTOMER
SERVICE FACILITY (Dale Smith,
Smith Design Group)
BOARD MEMBER REPORTS
GENERAL MANAGER REPORT
STAFF REPORTS
MEETING BREAK
ADJOURNED TO CLOSED
SESSION
-15-
REGULAR BOARD ME~- i lNG MINI.J~-S - AUGUST 21, 2003 PAGE - 6
6:35 P.M.
RECONVENED TO REGULAR
SESSION
ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION
No reportable Board action
Pursuant to Government Code
Section 54956.9(c)/Conference with
Legal Counsel- Anticipated Litigation:
Pioneer Trail Waterline
Replacement Near Filter Plant
.No reportable Board action.
Pursuant to Government Code
Section 54956.9(a)/Conference with
Legal Counsel- Existing Litigation:
Ronald Rasmussen vs. Dr. Bruce
Daugherty, Tamarack Rentals, Villa
Tahoe Condominiums 1-75, Case No.
SC20010082, Supedor Court of
El Dorado County
No reportable Board action.
Pursuant to Government Code
Section 54956.(a)/Conference with
Legal Counsel - Existing Litigation:
STPUD vs. John Breese Mumford,
et al., El Dorado County Superior
Court Case No. SC20020030
No reportable Board action.
Pursuant to Government Code
Section 54956(a)/Conference with
Legal Counsel - Existing Litigation:
STPUD vs. ARCO et. al., San
Francisco County Superior Court
Case No. 999128
No reportable Board action.
Pursuant to Government Code
Section 54956(a)/Conference with
Legal Counsel - Existing Litigation:
STPUD vs. F. Heise Land & Live
Stock Company, Inc., William
Weaver, Eddie R. Snyder, Crockett
Enterprises, Inc., CIV S-02-0238
MLS JFM United States District
Court for the Eastern District of
California, Sacramento, CA
-16-
REGULAR BOARD ME~-I lNG MINIJ/~-S- AUGUST 21, 2003
PAGE- 7
No reportable Board action.
No reportable Board action.
6:35 P.M.
Pursuant to Govemment Code
Section 54956.9(a)/Conference with
Legal Counsel - Existing Litigation
re: Meyers Landfill Site: United
States of America vs. El Dorado
County and City of South Lake
Tahoe and Third Party Defendants,
Civil Action No. S-01-1520 LKK
GGH, United States District Court
for the Eastern District of Ca.
Pursuant to Government Code
Section 54957.6(a)/Conference with
Legal Counsel - Existing Litigation:
STPUD vs. Lakeside Park
Association, et al., County of El
Dorado, Superior Court Case
No. SC20010165
ADJOURNMENT
James R. Jones, Board President
South Tahoe Public Utility Distdct
ATTEST:
Kathy Sharp, Clerk of the Board
South Tahoe Public Utility Distdct
-17-
South Tahoe
Public Utility DiStrict
1275 Meadow Crest Drive · South Lake Tahoe, · CA 96150-7401
Phone 530 544-6474, Fax 530 541-0614
BOARD AGENDA ITEM
NO. 6 .a
TO:
Board of Directors
FROM:
Lisa Coyner, Manager of Customer Service
MEETING DATE: September 18, 2003
ITEM - PROJECT: Customer request received from Dorothy Weinstein -
APN 25-413-08
REQUESTED BOARD ACTION: Direct staff regarding responsibility for sewer lateral
repair.
DISCUSSION: Dorothy Weinstein requested an appearance before the Board to seek
relief from her excavation and plumbing bills incurred for one of her homes in South
Lake Tahoe. Ms. Weinstein added an additional bathroom at her home on Glenwood
Way, and as a result and in accordance with District Administrative Code, a sewer air
test was performed on her sewer lateral. Her sewer lateral failed the air test (home
was built in the eady 1960's) and had to be replaced. District Administrative Code
Section 1.1.113 defines a sewer lateral as being the homeowners responsibility, from
the house to the District's sewer main. Administrative Code Section 1.1.102 defines
remodeling and includes the addition or deletion of plumbing fixtures. Administrative
Code Section 4.3.9 states that existing sewer laterals may be used in connection with
remodeling only when they have passed an air test within the last seven (7) years. Staff
recommends that the Board uphold the Administrative Code.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION:
FINANCIAL OFFICER: YES~l'~qc'~'~,~,~.~.. NO
CHIEF
CATEGORY: 'Sewer
-19-
South Tahoe
Public Utility DiStrict
1275 Meadow Crest Drive · South Lake Tahoe, · CA 96150-7401
Phone 530 544-6474 · Fax 530 541-0614
BOARD AGENDAITEM
NO. 6 .b
TO:
Board of Directors
FROM:
Jim Hoggatt, Construction Manager/Engineer
MEETING DATE: September 18, 2003
ITEM - PROJECT: Elks Club Well Control Building
REQUESTED BOARD ACTION: Award bid to. the lowest responsive, responsible
bidder.
DISCUSSION: Staff provided revised Plans and Specifications for the Elks Club Well
Control Building to K.G. Walters Construction, Thomas Haen Company, and White
Rock Construction, for their review and bidding. Bids will be opened on September 16,
2003. A summary of all bids, along with staff recommendation, will be distributed prior
to and at the Board meeting.
SCHEDULE: As soon as possible
COSTS: $550,000
ACCOUNT NO: 2029-8460/RWELKS
BUDGETED AMOUNT REMAINING: $461,052
ATTACHMENTS: To be distributed prior to, and at the Board meeting.
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES /'~,~;~ NO
CHIEF FINANCIAL OFFICER: YES!~Y'x~'~v.~,¥v,,.~_ NO
CATEGORY: .Water
-21-
South Tahoe
Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe CA 96150
(530) 544-6474 FAX (530) 541-0614
Memorandum
Fr:
Re:
Board Members, Richard Solbrig, Jim Hoggatt
Heidi Donovan, Contracts Administrator
Elks Club Well Control Building
Date: September 17, 2003
At two o'clock this afternoon we received and opened two (2) sealed bids for the above-
referenced project. Bids ranged from a Iow of $588,165.00 to a high of $637,470.00.
The engineer's estimate was $668,322.00. A careful review and analysis of each bid
showed no deviations. See attached spreadsheets for a full breakdown of each bid.
White Rock Construction Inc. is the apparent Iow bidder. White Rock's bid was free of
any deviations or omissions.
I contacted the Contractors License Board and was given the following information:
)~ License Number 640958 is current and active.
> The company is a corporation.
)~ White Rock Construction Inc. holds a Class A - General Engineering license.
Cc: Linda Brown, Nick Zaninovich, John Thiel
Page missing from Original Scan.
ELKS CLUB WELL CONTROL BUILDING
Bid Summa
Engineer's
Estimate
White Rock Construction
Thomas Haen Company, Inc.
ITEM
DESCRIPTION
UNIT
QTY.
Amount
Unit Price
Amount
Unit Price
Amount
ELKS CLUB WELL CONTROL BUILDING
1
Mobilization /demobilization
LS
1
$59,000.00
$30,000.00
$30,000.00
$60,000.00
$60,000.00
2
Clearing, grubbing, tree removal, etc.
LS
1
$6,000.00
$5,000.00
$5,000.00
$4,200.00
$4,200.00
3
Install 2" Sched. 40 PVC conduit, etc.
LF
100
$1,800.00
$26.50
$2,650.00
$40.00
$4,000.00
4
Provide site reveg, at Elks Club site, etc.
SF
2,500
$3,000.00
$0.60
$1,500.00
$1.00
$2,500.00
5
Provide site reveg at Flagpole Booster
Pump Sta, etc.
SF
6,000
$7,200.00
$0.60
$3,600.00
$0.50
$3,000.00
6
Install gas line from existing bldg to new
meter locations, etc.
LS
1
$1,050.00
$1,500.00
$1,500.00
$600.00
$600.00
7
Provide asphalt pavement, remove &
dispose of existing asphalt, etc.
SF
2,600
$24,960.00
$8.50
$22,100.00
$11.00
$28,600.00
8
Install 4" Sched. 40 conduit, inclg.
Excavation, backfill and compaction, etc.
LF
100
$2,400.00
$50.00
$5,000.00
$40.00
$4,000.00
9
Install Jensen Pre -Cast HP 1000 holding
tank
EA
1
$5,000.00
$4,500.00
$4,500.00
$4,500.00
$4,500.00
10
Install 4" Sched. 40 PVC sanitary sewer
lateral, etc.
LF
30
$2,160.00
$60.00
$1,800.00
$50.00
$1,500.00
11
Install snow stakes
EA
58
$1,740.00
$25.00
$1,450.00
$30.00
$1,740.00
12
Install drip line infiltration trench, etc.
LS
1
$1,800.00
$1,500.00
$1,500.00
$600.00
$600.00
13
Paint complete exterior of existing and
new structure
LS
1
$3,600.00
$5,300.00
$5,300.00
$4,000.00
$4,000.00
14
Paint complete interior walls and ceiling
of new addition, etc.
LS
1
$2,400.00
$3,500.00
$3,500.00
$4,000.00
$4,000.00
15
Provide and install 180 LF of 1" PVC pipe
soundin tube w/ pressure transducer, etc.
LS
1
$1,920.00
$2,600.00
$2,600.00
$4,000.00
$4,000.00
16
Install District - provided pitless adapter
unit, etc.
EA
1
$5,000.00
$4,200.00
$4,200.00
$3,500.00
$3,500.00
17
Provide and install new pump, motor,
column pipe, check valve, etc.
LS
1
$42,000.00
$70,000.00
$70,000.00
$59,000.00
$59,000.00
18
Install well control header, incl pressure
gauges, transmitters, valves, etc.
LS
1
$30,000.00
$49,000.00
$49,000.00
$43,300.00
$43,300.00
19
Install all domestic water service copper
piping, incl. Backflow device, etc.
LF
30
$1,260.00
$102.00
$3,060.00
$110.00 ,
$3,300.00
South Tahoe
Public Utility DiStrict
1275 Meadow Crest Drive · South Lake Tahoe, · CA 96150-7401
Phone 530 544-6474. Fax 530 541-0614
BOARD AGENDA ITEM
NO. 6.c
TO:
Board of Directors
FROM:
Jim Hoggatt, Construction Manager/Engineer
MEETING DATE: September 18, 2003
ITEM - PROJECT: B-Line: Phase 3 Export Pipeline Replacement
REQUESTED BOARD ACTION: Authorize staff to advertise for bids for the
construction of Alternative E.
DISCUSSION: The Board previously directed staff to have Carollo Engineers complete
the design of Alternative E of the Environmental Impact Report before the document
was certified, to stay on sChedule for construction in 2004 season. The schedule is as
follows:
Advertise for bids
Mandatory Pre-bid
Open Bids
Board Award Contract
Notice to proceed
(submit shop drawings
and manufacture pipe)
Notice to Proceed (construction)
October 1 to November 13, 2003
October 15, 2003
November 13, 2003
December 18, 2003
January 14, 2004
May 1,2004
SCHEDULE: See above
COSTS: $6,000,000
ACCOUNT NO: 9098-8828/BLNIII
BUDGETED AMOUNT REMAINING: $2,023,580
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES "~L, ~,~ NO
CHIEF FINANCIAL OFFICER: YES'~-'~'~p.,~.. NO
CATEGORY: 'Sewer
-23-
South Tahoe
Public Utility DiStrict
1275 Meadow Crest Drive · South Lake Tahoe, · CA 96150-7401
Phone 530 544-6474 · Fax 530 541-0614
BOARD AGENDAITEM
NO. 6.d
TO:
Board of Directors
FROM:
Richard H. Solbrig, General Manager
MEETING DATE: September 18, 2003
ITEM - PROJECT: Al Tahoe Access Road
REQUESTED BOARD ACTION: Authorize execution of the Road Maintenance
Agreement, subject to negotiation with the City of the final terms and conditions by
District staff and legal counsel.
DISCUSSION: The District is exchanging a portion of the Al Tahoe Access Road for
Meadow Crest Drive pursuant to the Exchange Agreement previously approved by the
Board. After the property exchange is complete, the City will own the portion of the Al
Tahoe Access Road from Al Tahoe to the turnoff to the ballfield access (except for a
small triangular piece of property at Al Tahoe that is still owned by the CTC). Prior to
executing the Exchange Agreement, the City is requesting that the District enter into a
maintenance agreement concerning the access road. A copy of the proposed
Maintenance Agreement is attached to this agenda item.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS: Road Maintenance Agreement
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES /~ ~-,~ NO
CHIEF FINANCIAL OFFICER: YES,~
CATEGORY: 'General
-25-
DP AF?
ROAD MAINTENANCE AGREEMENT
This Road Maintenance Agreement (Agreement) is made by and between the South
Tahoe Public Utility District, a California public agency formed in 1950 pursuant to the Public
Utility District Act (District) and the City of South Lake Tahoe, a municipal corporation (City),
on this __ day of September, 2003, at South Lake Tahoe, California, with reference to the
following facts and intentions:
A. The City is acquiring ownership from the District of certain real property,
including road improvements (Access Road), located within the City of South Lake Tahoe,
County of E1 Dorado, California, which is depicted on the map attached as Exhibit A and
incorporated by this reference;
B. The Access Road provides access to future public ball fields to be constructed on
certain property located adjacent to the Access Road and to the District's facilities; and
C. The City and District desire to provide for the maintenance of the Access Road
pursuant to the terms and conditions of this Agreement.
NOW, THEREFORE, the parties agree as follows:
1. Maintenance Obligations.
1.1 GeneraL Except as othenvise provided in this Agreement, the City, at its
sole cost and expense, shall maintain, reconstruct, repair and replace the improvements
constituting the Access Road as necessary and appropriate to maintain such improvements in
good, clean and safe condition.
1.2 Reimbursement. As part of the City's maintenance of the Access Road,
the City shall install asphalt overlays at such times as reasonably determined by the City and
consistent with the City's asphalt overlay program of other streets and roads that are owned and
maintained by the City. The City shall provide the District at least ninety (90) days notice of its
intent to install an asphalt overlay on the Access Road. At the same time, the City shall provide
the District with the cost for installing the asphalt overlay as obtained by competitive bidding
procedures. The City and District shall meet and confer and mutually agree upon the schedule
and cost for the asphalt overlay of the Access Road. The District shall reimburse the City the
mutually agreed cost of the asphalt overlay within thirty (30) days atter the asphalt overlay
installation is completed.
1.3 Snow Removal. The District shall be responsible for snow removal on
the Access Road since the ball fields are not intended to be utilized during the winter months, ff
the ball fields are subsequently used when the District is performing snow removal operations,
then the District and the City shall be responsible for the proportionate cost of snow removal
based upon the amount of the District's use of the Access Road as compared to the public's use
of the Access Road for accessing the ball fields.
SB 338037 vi :007627.0105
-27-
2. Damage to Improvements.
If the District shall cause damage to the Access Road, other than ordinary wear
and tear, the District shall, at its sole cost and expense, repair or replace the damaged portion of
the road or reimburse the City for the actual cost and expense for repairing the damage. Except
as noted above, the City shall be responsible, at its sole cost and expense, for repairing or
replacing any damage to the Access Road as part of the City's maintenance obligations pursuant
to section 1.a., above.
3. Indemnification.
3.1 District. District shall indemnify, defend and hold harmless City, its
directors, elected officials, officers, agents and employees, from and against any and all claims,
damages, losses, liabilities and expenses, including attorneys' fees, paralegal and legal fees and
costs, which arise out of; relate to or result from the District's use of the Access Road except to
the extent caused by the City's active negligence or willful misconduct.
3.2 City. The City shall indemnify, defend and hold harmless the District its,
its directors, elected officials, officers, agents and employees, from and against any and all
claims, damages, losses, liabilities and expenses, including attorneys' fees, paralegal and legal
fees and costs, which arise out of, relate to or result fi-om the City's or public's use of the Access
Road, except to the extent caused by the District's active negligence or willful misconduct.
4. Dispute Resolution.
If the parties are unable to agree as to any controversy or difference arising
between and among themselves with regard to this Agreement, the parties shall attempt to
resolve such controversy or difference in good faith and using their best efforts. However, if the
parties cannot agree upon a resolution of the controversy or difference within fifteen (15) days,
the dispute shall be submitted to mediation within thirty (30) days after expiration of the original
15-day period. Each party shall bear their own costs through mediation. Any party refusing to
mediate shall not be entitled to recover its attorneys' fees and costs incurred in any subsequent
litigation. The prevailing party in any litigation shall be entitled to payment of their attorney's
fees and costs.
5. Effective Date.
This Agreement shall be effective upon the District's transfer of the real property
and road improvements, as depicted in Exhibit A, pursuant to the Exchange Agreement entered
into between the City and the District concurrently with this Agreement.
SB 338037 vl :007627.0105
2
-28-
6. General Provisions.
6.1 Recitals. The recitals stated at the beginning of this Agreement of any
matters or facts shall be conclusive proof of the truthfulness thereof and the terms and conditions
of the recitals, if any, shall be deemed a part of this Agreement.
6.2 Notices. All notices, approvals, acceptances, requests, demands and other
communications required or permitted, to be effective, shall be in writing and shall be delivered,
either in person or by mailing the same by United States mail (postage prepaid, registered or
certified, return receipt requested) or by Federal Express or other similar overnight delivery
service, to the party to whom the notice is directed at the address of such party as follows:
To: District
South Tahoe Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Attn: General Manager
With a copy to:
Gary Kvistad, Esq.
Hatch & Parent
21 East Carrillo Street
Santa Barbara, California 93101
To: City
City of South Lake Tahoe
1052 Tala Lane
South Lake Tahoe, CA 96150
Attn: City Manager
With a copy to:
Catherine DiCamillo, City ^ttomey
City Attorneys' Office
City of South Lake Tahoe
1052 Tata Lane
South Lake Tahoe, CA 96150
Any communication given by mail shall be deemed delivered two (2) business days after such
mailing date, and any written communication given by overnight delivery service shall be
deemed delivered one (1) business day after the dispatch date. Either party may change its
address by giving the other party written notice of its new address.
6.3 Successors and Assigns. This Agreement shall be binding on and shall
inure to the benefit of the parties and their respective heks, successors and assigns. Nothing in
this Agreement, express or implied, is intended to confer on any person other than the parties or
their respective heirs, successors and assigns, any rights, remedies, obligations or liabilities under
or by reason of this Agreement.
6.4 Assignability. This Agreement shall not be assignable without the prior
written consent of the District and the City, who shall have the discretion to consent or not to
SB 338037 vl :007627.0105
-29-
consent to any proposed assignment. Any attempted assignment without the approval of both
the District and the City shall be void.
6.5 Waiver. No waiver by any party of any of the provisions shall be
effective unless explicitly stated in writing and executed by the party so waiving. Except as
provided in the preceding sentence, no action taken pursuant to this Agreement, including,
without limitation, any investigation by or on behalf of any party, shall be deemed to constitute a
waiver by the party taking such action of compliance with any representations, warranties,
covenants, or agreements contained in this Agreement, and in any documents delivered or to be
delivered pursuant to this Agreement. The waiver by any party of a breach of any provision of
this Agreement shall not operate or be construed as a waiver of any subsequent breach. No
waiver of any of the provisions of this Agreement shall be deemed, or shall constitute, a waiver
of any other provision, whether or not similar, nor shall any waiver constitute a continuing
waiver.
6.6 Severability. I/any term, provision, covenant or condition of this
Agreement shall be or become illegal, null, void or against public policy, or shall be held by any
court of competent jurisdiction to be illegal, null, void or against policy, the remaining
provisions of this Agreement shall remain in full force and effect, and shall not be affected,
impaired or invalidated. The term, provision, covenant or condition that is so invalidated, voided
or held to be unenforceable, shall be modified or changed by the parties to the extent possible to
carry out the intentions and directives set forth in this Agreement.
6.7 Counterparts. This Agreement may be executed in any number of coun-
terparts, each of which shall be deemed to be an original, but all of which shall constitute one
and the same instrmnent.
6.8 Governing Law. This Agreement shall be governed by, and interpreted
in accordance with, the laws of the State of California to the extent California Law is applicable
to the United States, with venue proper only in the County of El Dorado, State of California.
6.9 Attorney Fees. If any legal proceeding (lawsuit, arbitration, etc.),
including an action for declaratory relief, is brought to enforce or interpret the provisions of this
Agreement, the prevailing party shall be entitled to recover actual attorneys' fees and costs,
which may be determined by the court in the same action or in a separate action brought for that
purpose. The attorneys' fees award shall be made as to fully reimburse for all attorneys' fees,
paralegal fees, costs and expenses actually incurred in good faith, regardless of the size 0fthe
judgment, it being the intention of the parties to fully compensate for all attorneys' fees, paralegal
fees, costs and expenses paid or incurred in good faith.
6.10 Good Faith. The parties agree to exercise their best efforts and utmost
good faith to effectuate all the terms and conditions of this Agreement and to execute such
further instruments and documents as are necessary or appropriate to effectuate all of the terms
and conditions of this Agreement.
SB -.a3gO-~7 v1:007627.0105
4
-30-
6.11 Construction. The provisions of this Agreement should be liberally
construed to eff'ectuate its purposes. The language of all parts of this Agreement shall be
construed simply according to its plain meaning and shall not be construed for or against either
party, as each party has participated in the drafting of this document and had the opportunity to
have their counsel review it. Whenever the context and construction so requires, all words used
in the singular shall be deemed to be used in the plural, all masculine shall include the feminine
and neuter, and vice versa.
6.12 Several Obligations. Except where specifically stated in this Agreement
to be otherwise, the duties, obligations, and liabilities of the parties are intended to be several and
not joint or collective. Nothing contained in this Agreement shall be construed to create an
association, trust, partnership, or joint venture or impose a trust or partnership duty, obligation,
or liability on or with regard to either party. Each party shall be individually and severally liable
for its own obligations under this Agreement.
6.13 Authority. The individuals executing this Agreement represent and
warrant that they have the authority to enter into this Agreement and to perform all acts required
by this Agreement, and that the consent, approval or execution of or by any third party is not
required to legally bind either party to the terms and conditions of this Agreement.
6.14 Entire Agreement. This Agreement contains the entire understanding
and agreement of the parties, and supersedes all prior agreements and understandings, oral and
written, between the parties. There have been no binding promises, representations, agreements,
warranties or undertakings by any of the parties, either oral or written, of any character or nature,
except as stated in this Agreement. This Agreement may be altered, amended or modified only
by an instrument in writing, executed by the parties to this Agreement and by no other means.
Each party waives its future right to claim, contest or assert that this Agreement was modified,
canceled, superseded or changed by any oral agreement, course of conduct, waiver or estoppel.
IN WITNESS WHEREOF, the parties have executed this Agreement on the day and year and
at the place first written above.
DISTRICT CITY
South Tahoe Public Utility District
City of South Lake Tahoe
By:. By:
James IL Jones, Board President
(Signatures continued on following page)
SB 338037 v1:007627.0105
ATTEST: ATTEST:
By:
Kathy Sharp, Clerk of the Board/
Executive Secretary
By:
., Clerk
SB 338037v1:007627.0105
6
-32-
~or A~
South Tahoe
Public Utility DiStrict
1275 Meadow Crest Drive · South Lake Tahoe, · CA 96150-7401
Phone 530 544-6474, Fax 530 541-0614
BOARD AGENDAITEM
NO. 6 .e
TO:
Board of Directors
FROM:
Richard H. Solbrig, General Manager
MEETING DATE: September 18, 2003
ITEM - PROJECT: Al Tahoe Access Road
REQUESTED BOARD ACTION: Authorize execution of the Reimbursement
Agreement subject to negotiation of the final terms and conditions by District staff and
legal counsel.
DISCUSSION: The improvements required to utilize the Access Road are complete
except for construction of the left hand turn lane from Al Tahoe Boulevard onto the
Access Road. The JPA is responsible for construction of the left hand turn lane but is
not able to timely bid and construct the improvements this year. District staff
recommends entering into a reimbursement agreement with the JPA. The agreement
would provide for the District to construct the left hand turn lane improvements in the Al
Tahoe Boulevard and the JPA would reimburse the District the cost of constructing the
imProvements. A copy of the proposed Reimbursement Agreement is attached to this
agenda item.
SCHEDULE:
COSTS: $14,000
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS: Reimbursement Agreement
CONCURRENCE WITH REQUESTED ACTION:
E.ER^L M^.A ER: YES , .o
CHIEF FINANCIAL OFFICER.'~ES / NO
CATEGORY: General
-33-
DRAFT
REIMBURSEMENT AGREEMENT
This Reimbursement Agreement (Agreement) is made by and between the South Tahoe
Public Utility District, a California public agency formed in 1950 pursuant to the Public Utility
District Act (District) and the South Lake Tahoe Recreation Facilities Joint Powers Authority
(/PA), on this day of ,2003, at South Lake Tahoe, California, with
reference to the following facts and intentions:
A. The/PA, in cooperation with the California Tahoe Conservancy, the City of
South Lake Tahoe (City) and the County of E1 Dorado, is developing certain real property to be
utilized as ball fields by the public (Ball Fields);
B. The City is acquiring certain real property, including road improvements (Access
Road), located within the City of South Lake Tahoe, County of El Dorado, California, which is
depicted on the map attached as Exhibit A and incorporated by this reference;
C. The Access Road provides access to the Ball Fields and to the District's facilities;
D. A right hand exit lane and a left hand turn lane on A1 Tahoe Boulevard are
required by the City to provide access from A1 Tahoe Boulevard to the Access Road (collectively
Project). The District completed construction of the right hand turn lane when it constructed the
Access Road; and
E. The/PA and the District desire to provide for the construction of the remaining
portion of the Project (left hand turn lane) and reimbursement for the cost of the Project pursuant
to the terms and conditions of this Agreement.
NOW, TIIEREFORE, the parties agree as follows:
1. Construction.
The District shall construct the remaining portion of the Project (left hand turn
lane) pursuant to plans and specifications approved by the public works department for the City
of South Lake Tahoe. The District shall obtain all permits and approvals necessary for
construction of the remaining portion of the Project and construct it in compliance with all
federal, state and local laws, statutes, ordinances and regulations. The District shall use its best
efforts to complete construction during the 2003 building season or as soon as reasonably
possible.
2. Reimbursement.
2.1 Project Cost. IPA shall reimburse the District a portion of the actual total
cost of constructing the Project, including change orders, permit fees, and District costs and
expenses, as provided in this section. The estimated cost to construct the Project is $$33,500,
which includes $5,500 for construction of the right hand exit lane and $28,000 for construction
SB 338116 vl:007627.0009
of the left hand turn lane. The JPA shall reimburse the District $19,500, which includes the total
cost of the right hand exit lane and one-half the total cost of the left hand turn lane.
2.2 Payment. After the Project is completed, the District will provide the JPA
with an accounting of all costs and expenses related to construction of the Project. The JPA shall
reimburse the District the total cost for construction of the Project within six (6) months after the
total costs are provided by the District to the JPA. If payment is not received within thirty (30)
days of the date of the total Project costs are submitted to the JPA, the unpaid balance shall
accrue interest at the rate of__ percent (__%) until payment in full.
3. General Provisions.
3.1 Recitals. The recitals stated at the beginning of this Agreement of any
matters or facts shall be conclusive proof of the truthfulness thereof and the terms and conditions
of the recitals, if any, shall be deemed a part of this Agreement.
3.2 Notices. All notices, approvals, acceptances, requests, demands and other
communications required or permitted, to be effective, shall be in writing and shall be delivered,
either in person or by mailing the same by United States mail (postage prepaid, registered or
certified, return receipt requested) or by Federal Express or other similar overnight delivery
service, to the party to whom the notice is directed at the address of such party as follows:
To: District
South Tahoe Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Attn: General Manager
With a copy to:
Gary Kvistad, Esq.
Hatch & Parent
21 East Carrillo Street
Santa Barbara, California 93101
To: JPA
The South Tahoe Recreation
Facilities Joint Powers Authority
Post Office Box 13212
South Lake Tahoe, CA 96156
Attn: Dave Solaro
With a copy to:
Any communication given by mail shall be deemed delivered two (2) business days after such
mailing date, and any written communication given by overnight delivery service shall be
SB 338116 v 1:007627.0009
2
deemed delivered one (1) business day after the dispatch date. Either party may change its
address by giving the other party written notice of its new address.
3.3 Successors and Assigns. This Agreement shall be binding on and shall
inure to the benefit of the parties and their respective heirs, successors and assigns. Nothing in
this Agreement, express or implied, is intended to confer on any person other than the parties or
their respective heirs, successors and assigns, any rights, remedies, obligations or liabilities under
or by reason of this Agreement.
3.4 Assignability. This Agreement shall not be assignable without the prior
written consent of the District and the City, who shall have the discretion to consent or not to
consent to any proposed assignment. Any attempted assignment without the approval of both
the District and the City shall be void.
3.5 Waiver. No waiver by any party of any of the provisions shall be
effective unless explicitly stated in writing and executed by the party so waiving. Except as
provided in the preceding sentence, no action taken pursuant to this Agreement, including,
without limitation, any investigation by or on behalf of any party, shall be deemed to constitute a
waiver by the party taking such action of compliance with any representations, warranties,
covenants, or agreements contained in this Agreement, and in any documents delivered or to be
delivered pursuant to this Agreement. The waiver by any party of a breach of any provision of
this Agreement shall not operate or be construed as a waiver of any subsequent breach. No
waiver of any of the provisions of this Agreement shall be deemed, or shall constitute, a waiver
of any other provision, whether or not similar, nor shall any waiver constitute a continuing
waiver.
3.6 Severability. If any term, provision, covenant or condition of this
Agreement shall be or become illegal, null, void or against public policy, or shall be held by any
court of competent jurisdiction to be illegal, null, void or against policy, the remaining
provisions of this Agreement shall remain in full force and effect, and shall not be affected,
impaired or invalidated. The term, provision, covenant or condition that is so invalidated, voided
or held to be unenforceable, shall be modified or changed by the parties to the extent possible to
carry out the intentions and directives set forth in this Agreement.
3.7 Counterparts. This Agreement may be executed in any number of coun-
terparts, each of which shall be deemed to be an original, but all of which shall constitute one
and the same instrument.
3.8 Governing Law. This Agreement shall be governed by, and interpreted
in accordance with, the laws of the State of California to the extent California Law is applicable
to the United States, with venue proper only in the County of El Dorado, State of California.
3.9 Attorney Fees. If any legal proceeding (lawsuit, arbitration, etc.),
including an action for declaratory relief, is brought to enforce or interpret the provisions of this
Agreement, the prevailing party shall be entitled to recover actual attorneys' fees and costs,
which may be determined by the court in the same action or in a separate action brought for that
338116 v1:007627.0009
-37-
purpose. The attorneys' fees award shall be made as to fully reimburse for all attorneys' fees,
paralegal fees, costs and expenses actually incurred in good faith, regardless of the size of the
judgment, it being the intention of the parties to fully compensate for all attorneys' fees, paralegal
fees, costs and expenses paid or incurred in good faith.
3.10 Good Faith. The parties agree to exercise their best efforts and utmost
good faith to effectuate all the terms and conditions of this Agreement and to execute such
further instruments and documents as are necessary or appropriate to effectuate all of the terms
and conditions of this Agreement.
3.11 Construction. The provisions of this Agreement should be liberally
construed to effectuate its purposes. The language of all parts of this Agreement shall be
construed simply according to its plain meaning and shall not be construed for or against either
party, as each party has participated in the draffing of this document and had the opportunity to
have their counsel review it. Whenever the context and construction so requires, all words used
in the singular shall be deemed to be used in the plural, all masculine shall include the feminine
and neuter, and vice versa.
3.12 Several Obligations. Except where specifically stated in this Agreement
to be otherwise, the duties, obligations, and liabilities of the parties are intended to be several and
not joint or collective. Nothing contained in this Agreement shall be construed to create an
association, trust, partnership, or joint venture or impose a trust or partnership duty, obligation,
or liability on or with regard to either party. Each party shall be individually and severally liable
for its own obligations under this Agreement.
3.13 Authority. The individuals executing this Agreement represent and
warrant that they have the authority to enter into this Agreement and to perform all acts required
by this Agreement, and that the consent, approval or execution of or by any third party is not
required to legally bind either party to the terms and conditions of this Agreement.
3.14 Entire Agreement. This Agreement contains the entire understanding
and agreement of the parties, and supersedes all prior agreements and understandings, oral and
written, between the parties. There have been no binding promises, representations, agreements,
warranties or undertakings by any of the parties, either oral or written, of any character or nature,
except as stated in this Agreement. This Agreement may be altered, amended or modified only
by an instrument in writing, executed by the parties to this Agreement and by no other means.
Each party waives its future right to claim, contest or assert that this Agreement was modified,
canceled, superseded or changed by any oral agreement, course of conduct, waiver or estoppel.
~B 338116 vl :007627.0009
4
-38-
IN WITNESS WHEREOF, the parties have executed this Agreement on the day and
year and at the place first written above.
DISTRICT
South Tahoe Public Utility District
JPA
South Tahoe Recreation Facilities Joint
Powers Authority
By:
James R. Jones, Board President
By:
Dave Solaro,
ATTEST:
ATTEST:
By:
Kathy Sharp, Clerk of the Board/
Executive Secretary
By:
, Clerk
BB 338116 v1:007627.0009
-39-
PAYMENT OF CLAIMS
FOR APPROVAL
September 18, 2003
ACTION ITEM NO.
6.f
Payroll 9~3/03
Total Payroll
Bank of New York - debt repayment
Cost Containment - health care payments
IGI Resources - natural gas
Hatch & Parent -legal services
Total Vendor EFT
Accounts Payable Checks Sewer Fund
Accounts Payable Checks Water Fund
Accounts Payable Checks Self-funded Ins
Accounts Payable Checks Grant Funds
Total Accounts Payable
300,888.82
300,888.82
0.00
66,781.18
0.00
95,803.36
162,584.54
652,559.58
221,355.35
333.00
1,024.32
875,272.25
Grand Total
1,338,745.61
.Payroll EFTs & Checks
EFT
EFT
EFT
EFT
EFT
EFT
CHK
EFT
AFLAC Medical & Dependent Care
CA Employment Taxes & W/H
Federal-Employment Taxes & W/H
CALPERS Contributions
ManuLife Pension Loan Payments
Orchard Trust Deferred Comp
Stationary Engineers Union Dues
United Way Contributions
~--I ..... I'-~
09/03/03
125.00
11 875.29
67.512.69
39 493.00
5 233.45
11,670.6O
1 511.75
125.00
0
~co
I
I
-49.-
South Thce P.U.D. 09/11/03 PAYMENT OF CLAIMS REPORT 09/05/2003-09/18/2003 � 1
THU Q�
, SDP 11, 2003, 3:52 RBI - -req: DCCCLAS -- -leg: CL JL - -loc: 151'1E - -- -jab: 285416 #J4310<1.07>--report 09 <1.07>--report id: C
Defy f1 t Selecticn: Check Stock ID: AP ; Check Types: M , HW, RV, VH
Verrbr Narre Account # Dapartrrent
A T & T LNIVE SAL C7PD 10 -37 -6200 INECRVATTCN SYSTEMS
A -1 CHEMICAL INC
20 -37 -6200 INFICET/ TICN SYSTEMS
10 -00 -6520 COAL & AUv NISIRATICN
20 -00 -6520 GENERAL & AUvuISTRATICN
10 -00 -0422 GENERAL & ALMINTISIRATICN
A -1 CLASS SERVICE INC 10 -02 -8304 PUNIPS
ALPEN SIERRA COFFEE CI:MPANY
ALPINE METALS
10 -00 -6520 COAL & AUv ISIRATICN
20 -00 -6520 COAL &ALMINISTRATICN
20 -02 -6050 PUMPS
ANTS EARTH & ENVIRONEWIAL INC 20 -29 -8438 ENGINEERING
ARA ARK UNIFORM SERVICES 10 -00 -2518 GENERAL & AUVENISIRATICN
20 -27 -6660 DISIRICT INFIDWATICN
ASCXM HASLER LEASING 10 -38 -5020
20 -38 -5020
AUItIDTIVE SERVICE EQUIPMENT 20 -05 -8471
AVISIA IJITLTIIES 10 -00 -6350
CUSICMER SERVICE
CLb'IC vER SERVICE
EQUIPMENT REPAIR
GENERAL & ALM NISIRATICN
Descripticn
Check Total:
SUPPLIES
SUPPLIES
JANITORIAL SUPPLIES INVENTOR
Check Ittal:
JOHNSON PS PERU=
Check Total:
SUPPLIES
SUPPLIES
Check Total:
WELLS
Check Tbtal:
BSIR SIN, STAN (RAPE)
Check Total:
UNIFGRQUMELS PAYABLE
WATER CN EXPENSE
Check Total:
EXIPM NT PENTPL /LEASE
E IAENT Rl~NlAL /LEASE
Check Thal
ROSTLIFT (REPL)
NATURAL CAS
Check Tbfial :
Aro ult Check # Type
228.50
228.50
457.00 00054393 M'
109.72
109.72
152.00
371.44 00054394 NW
219.02
219.02 00054395 MAT
79.00
79.00
158.00 00054396 W7
124.41
124.41 00054397 Ma
1,998.88
1,998.88 00054398 M'
1,045.64
5.08
1,050.72 00054399 I4'1
67.43
67.43
134.86 00054400 MAI
8,596.09
8,596.09 00054401 MW
4,365.66
South Tahoe P.U.D. 09/11/03 P A Y M ENT OF CLAIMS REPORT 09/05 2003 - 09/18/2003 CI<�
THU, SEP 11, 2003, 3:52 FM --mg: t UTAS -- -leg: GL 0L-_loo: CNSl'1E - -- -jab: 285416 #J4310-- -prog: 09 <1.07 > - -report id:
I>'far rl t Selection: Check Stock ID: AP ; Check Types: MCI, HMI, RV, VH
Vendor Narre Account # Department
B M H OCCUPATICINAL IvEDICENE
BAY TOOL & SUPPLY INC
EEMSCEN, IVO
BERRY-HENCE= =f.1SM=
FP
BI SATE P13OPAI E
BIND MATERIALS
RT I IF Rim„: TIIvlp P R N 1EL
C C P INELSIR.IES INC.
20 -00 -6350 GENERAL & ALMINISIRATICN
10 -22 -6075 HCNAN R aLECES
20 -22 -6075 HLM N RESOJRC,ES DIRECIC
10 -00 -0421 COAL & AEMINISIRATICN
10 -00 -0423 COAL & AUv1INISIRATICN
20 -02 -6310 PUTS
10 -00 -0415 COAL & ALMINISIRATICN
10 -00 -0416 COAL & AININISIRATICN
10 -28 -6360 ALPINE CaNIY
20 -01 -6052 LI ND REPAIR
10 -05 -4405 EQUIPMENT ENT REPAIR
20 -05 -4405 EQUIPMENT REPAIR
10 -00 -0425 GENERAL & ALMINISIRATICN
Descripticn
I\TATURAL GAS
Check Tbt'a1 :
SA
SAFEEI E JIMvIENI' /PHYSICALS
Check Total:
SHOP SUPPLY INVENIOY
SvALL TOOLS INVENICRY
Check Total:
TEI—E
Check Total:
GASOLINE I VaTIMC
DIESEL INVFNIORY
Check Total
PROPANE
Check Total:
PIPE, COVERS, & NIANEDLES
Check Total:
C NIRACIUAL SERVICES
CCNIRACTUAL SERVICFS
Check Total:
Amount Check # Type
34.42
4,400.08
55.00
55.00
110.00
508.29
334.82
843.11
00054402 Ma
00054403 Ma
00054404 MAI
84.96
84.96 00054405 MST
3,492.15
3,747.94
7,240.09 00054406 Ma
2.36
2.36 00054407 Ma
4,394.90
4,394.90 00054408 Ma
861.51
861.51
1,723.02 00054409 Ma
SAFETY SUPPLIES INVallrl.tf 83.66
Check Total: 83.66 00054411 Ma
South Tahoe P.U.D. 09/11/03 PAYMENT O F CLAIMS R E P O R T 09/05/2003-09/18/2003 3 3
THU, SEP 11, 2003, 3:52 HK - -req: DCX)GLAS- - -le3: GL 3L- -loc: CNS1'IE - -- -fob: 285416 #J4310-- -pacg: C 09 <1.07 >- -report id: FC
Default t Selecticn: Check Stock ID: AP ; Check Types: Mai, HW, RV, VH
Vendor Narre Account # Dapartrrent
CALIF DEPT OF MJKC R VEHICLES 10 -01 -6250 L1 ND REPAIR
CALIF REG WATER QC]AL MUTIR ED 90 -98 -8828 Ems' PIPELINE CRANT
CALIFC RNIA OVER it
CALLIAN, JFRALEE
01
' D S K CLMPANY
D T N ENGINEERIIT INC
tAVI LABORATCRIES
DICK'S FULLER -
EAI.E PIC ER
10 -00 -4810
20 -00 -4810
10 -07 -4810
20 -07 -4810
10 -29 -4810
20 -29 -4810
COAL & AtIvIINISIRATICN
GENERAL & LABATUS'IRATICN
LABBRATC RY
ENGINEERIM
ENGINEERING
10 -21 -6200 AEMI IISIRATTCN
20 -21 -6200 ALMINISIRATICN
10 -07 -4760
20 -07 -4760
20 -29 -8460
20 -29 -8440
20 -29 -8440
LABATCRY
LAB:RAT -CRY
Ei\UNEERI NG
IlNEERIM
ENGIlNEHRI M
10 -04 -6042 HEAVY NAINTEM C E
20 -02 -6050 PLMPS
10 -07 -4760 LABZRATC RY
Description
LLES/NB` SHIPS /CflTIFICATI
Check Tbta1:
BLTNE PHS III LPPS -T
Check Total:
MACE
PCSMSE
PCSIYGE
PCSIPOE
POSTAGE
EXPENSES PCSDNGE
EMENSES
EXPENSES
EXPENSES
EXPENSES
EXPENSES
Check Tbtal:
TRA _
TRA �'IC%T
/Check Total:
L SUPPLIES
LABORATCRY SUPPLIES
Check Total
ELKS ClIB WELL , Ran r ,
NET ,, FLPOPOLE
Check Total:
.1i 0 1 Co
HELL, FILE
Check Tbtal:
GUMS & WOMEN-AKE
WELLS
Check Total:
LABORATORY SUPPLIES
Arnazit Check # Type
34.00
34.00 00054412 MI
700.00
700.00 00044993 HW
4.17
4.17
70.92
70.92
58.41
58.41
267.00 00054413 Ma
16.56
16.56
33.12 00054414 Ma
53.92
53.93
107.85 00054415 Ma
3,102.50
3,102.50
6,205.00 00054416 MAI
948.00
948.00 00054417 Ma
91.56
9.64
101.20 00054418 MI
59.53
South T a h o e P.U.D. 09/11/03 PAYMENT O F CLAIMS REPORT 09/05/2003-09/18/2003
THU, SEP 11, 2003, 3:52 PM - -req: t U AS -- -leg: GL JL- -loo: CNS1'1 ± - -- -job: 285416 #J4310 - - -pic : 09 <1.07 >- -report id:
Default Selection: Check Stock ID: AP ; Check Types: Ma,HW,RV,VH
Vercbr Notre Aiccc nit # Dartrtent
ELICIT BUILDIIZ CD INC
20 -07 -4760 LABORATORY
20 -02 -8332 FU`9PS
SYSIIIVE RESEARCH 10 -37 -6030
20 -37 -6030
FEDEK FREIGHT WEST
FISHER SCIFNTtFIC
m
FRYE, WII.LLAM
GFSCHEMICAL
10 -07 -4810
20 -07 -4810
10 -07 -4760
20 -07 -4760
10 -37 -6200
20 -37 -6200
10 -07 -4760
20 -07 -4760
INFCRIAATICN SYSTEMS
INKETIATICN SYSIIIvE
LABORATORY
LABAZY
LAB:MICRC
LABCRAT'
INFCRVATICN SYSTEMS
INFCRVATICN SYSTEMS
LABC 2AICRY
LAE1 AT 1
G L I INIERNATTCNAL - BACH CD 10 -06 -4760 OPERATION
GRA K ER INC, W. W.
10 -00 -0421 COAL & ALMINISIRATICN
10 -04 -6042 HEAVY 1 fl1 N NC.E
FBI FAINTING & DECCRAM73 10 -01 -6055 LI VID REPAIR
Description
LABORATORY SUPPLIES
Check Total:
FCXIATIC U, CLEMENT BARN
Check Tbta1:
SERVICE CSNIRACIS
SERVICE CCNIPACTS
Check Total:
PO= EXPENSES
PCS'IAM SE'S
Check Total:
LABORATDRY SUPPLIES
IAB RATCRY SUPPLIES
Check Total:
IRA i o 1 c. /EEU:ATICN
TRAVEL 0 I e. /Tar
Check Tbt'al :
LAECRAICRY SUPPLIES
LABCRATCRY SUPPLIES
Check Total:
LABORATORY SUPPL EES
Check Total:
SHDP GROUNDS & SUPPLY
Check Total:
INFILTRATION & INFLI I
Amount Check # Type
59.53
119.06 00054419 Ma
32,247.00
32,247.00 00054420 MAI
2,244.74
2,092.99
4,337.73 00054421 Ma
41.16
41.15
82.31 00054422 Ma
245.27
254.68
499.95 00054423 Ma
209.75
209.75
419.50 00054424 W1
102.21
102.20
204.41 00054425 Ma
141.85
141.85 00054426 MAI
272.98
585.20
858.18 00054427 MAI
2,000.00
S o u t h Tahoe P.U.D. 09/11/03 PAYMENT O F C L A I M S REPORT 09/05 2003 - 09/18/2003 P 5
THU, SEP 11, 2003, 3:52 PM - -req: DCL .AS -- -leg: C4L, JL - -loc: CNS_LIE - -- -job: 285416 #J4310- - -prog: 05.09 <1.07 > - -w � ort id: PC
Default Selection: Check Stock ID: AP ; Check Types: Ma, H R, RV, VH
Vendor Narre Acocxmt # Department
I M P A C GOVE LC SERVICES
10 -22 -6200 HUM RED
20 -22 -6200 RPM RESOURCES DIRECICR
10 -19 -6200
20 -19 -6200
10 -01 -4520
20 -02 -4820
20 -02 -6050
10 -28 -6310
10 -28 -6042
10 -28 -6200
10 -27 -4920
20 -27 -4920
10 -27 -6200
20 -27 -6200
10 -27 -4830
20 -27 -4830
10 -38 -6200
20 -38 -6200
10 -38 -4520
20 -38 -4520
10 -04 -6200
20 -02 -6200
20 -07 -4810
10 -39 -6200
20 -39 -6200
10 -29 -4610
20 -29 -4610
10 -29 -6200
20 -29 -6200
20 -29 -8354
BOARD OF DDS
INCERSMUND REPAIR
PIMPS
PIMPS
ALPINE MINTY
ALPINE CCINIY
DISTRICT INECRMATTCN
DISTRICT INECIdvATICN
DISTRICT INECRNATTCN
DISIRICT IITICN
DISTRICT I[EITICN
DISTRICT CUSICMER SERVCE I�I ICE
CUSICNER SERVICE
C1USI NER SERVICE
HEAVY
PIMPS Nk7
LABZPRATCRY
MANCE
FINANCE
EMI:NEE:RIM
ENSINEIERTI3
EMTNEERINB
EIZINEERINTh
ENGINEERIM
Description
TRA
TRA
4 ID 1 es
91 ICI 1 es
Check Total:
/ELLEATICLI Total :
TRA Il 1 e.../Ea7=CN
TRA D i:+ 1 A/E UCATTCN
MISC • :ILITY CCAIIVS
OrCSE SUPPLIES
GROUNDS &
'IRA=SETTCN
TRA
TRAVEL
ID 1e.
0 I
Ow
/E�TZCN
IT PPLICNSCIZ
: 1 e°- /TTCN
TTY CN
IT
=TY
ve
TRAVEL
TRAVEL
VA v4 1
e'• .. 11
TRA Iii 1 e. /EDfT_ATICN
TRAVEL 1 e+. E TTCN
WIRLN, LAKE EL (HI SCH
ti...MTTCN
I9!
ExiA13E. E UMTTCN
/E,TICN
ID
ID
Amxnt check # Type
2,000.00 00054428 Ma
24.35
24.35
48.70 00054429 Ma
99.54
132.51
307.80
107.88
121.55
31.86
1,011.51
22.79
65.56
65.56
231.84
231.84
53.40
53.39
63.49
63.49
330.55
330.54
454.53
1,861.59
103.67
271.45
271.45
16.86
16.86
- 238.28
- 181.15
93.48
S o u t h T a h o e P.U.D. 09/11/03 PAYMENT O F CLAIMS REPORT 09/05/2003-09/18/2003 6 Paces
T71111, SEP 11, 2003, 3:52 PM - -req: DC AS -- -leg: GL JL - -loc: CNSI'1E-- - -job: 285416 ##34310---grog: Q 09 <1.07 >-- report id: PC
Default Selection: Cock Stock ID: AP ; Check Types: MST, HW, RV, VH
Verrbr Nam Amount # Departirent
20 -29 -8152
10 -22 -4820
20 -22 -4820
10 -22 -6670
20 -22 -6670
10 -22 -6200
20 -22 -6200
10 -06 -6200
10 -06 -6023
10 -39 -6520
10 -07 -6025
20 -07 -6025
10 -07 -6200
20 -07 -6200
10 -01 -6200
20 -01 -6200
10 -01 -6041
10 -37 -6200
20 -37 -6200
90 -98 -8828
10 -21 -6200
20 -21 -6200
10 -29 -8235
10 -37 -4820
20 -37 -4820
10 -02 -6071
20 -02 -6071
10 -02 -6200
20 -01 -6083
10 -02 -6083
20 -02 -6083
20 -29 -8264
El\ZINE RIND
alvAN RESaRCES
HI1vV,N RESOURCES DIRECTOR
HIVAN RE9>RCES
HI1AN RESOURCES DIRFFCIt R
IiM N RESOURCES
RYAN
TRH J S DIRE=
OPERATICNS
FINANCE
LAECRATCRY
LA
'AB:RA.1C
LABORATCRY
LINID REPAIR
UNDERGROUND REPAIR
LIEERGRalND REPAIR
INECIEdvATICN SYSTEMS
EXEU T PIPIELIN GRANT
ALMENISIRATICN
INECRWsTICN SYSTEMS
INFORNATICN SYSTEMS
PEPS
PCMPS
D REPAIR
PLIAPS
PUIPS
Descr-iption
WIRLN CECAR AVE
OFFICE SUPPLIES
OEr'ICE SUPPLIES
PFR.KNN L E
*a-v o ,FUSE
'IRA ID I t./,��AT� CN
'IRA i:+ I e../EaTATICN
TRAVEL e. /
FILTER EQUIP B J33 �ZCN
SUPPLIES
LAECIRATURY EQUIPMENT
TRAVEL TRAVEL /RCN
TRAVEL • /ETTCN
END
TRAVEL, • t c./ CN
TRAVEL, • 1 e. ETICN
ELME -CMPGRaN
TRAVEL, c. /EETTCN
TRA i 1 et EEU:ATICN
�r FACILfY
ONr10E SUPPLIES
OrnCE SUPPLIES
SHDP SUPPLIES
SHOP SUPPLIES
TRAVEL, Acmcn/ TETICN
CNS
M,
Check Tbt'a1
Arro nt Check # Type
98.90
89.29
89.28
19.56
19.56
27.50
27.50
2,050.20
537.13
3.49
74.62
74.62
508.74
508.73
136.83
136.83
21.44
387.33
387.32
277.40
54.93
54.93
34.92
30.47
30.47
14.79
14.79
17.99
268.73
67.74
67.74
26.15
12,155.48 00054432 Ml
S o u t h Tahoe P.U.D. 09/11/03 PAYMENT O F C L A I M S REPORT 09/05 2003 - 09/18/2003 Pc 7
THU, SPP 11, 2003, 3:52 FM - -req: DC GCAS -- -leg: GL JL - -loc: CNS1.1E - -- -job: 285416 ##J4310-- -prig: 09 <1.07 >--report id: PC
Default Selecticn: Check Stock ID: AP ; Check Types: I41, HW, RV, VH
Verrbr Nane Account # Departrrent T sc ripticaz Arrount Check # Type
I T T FLYGT CCRFCRATICN 10 -02 -6051 P MPS FLIT SIATICNS 655.18
Check Total: 655.18 00054433 Mai
=X DISIRIBUTICN CORP. 10 -07 -4760 LAB3RATCRY
20 -07 -4760 LAB3RATCRy LABORATORY �P'� 811.41 LABORAIM SUP Check Ibtal : 1,622.80 00054434 Ma
IMPACT STRATEGIES 10 -27 -4405 DISTRICT INECRWITICN CCNIRACTIAL SERVICES 5,000.00
20 -27 -4405 DISTRICT INECENATICN CENIRACIUAL SERVICES 5,000.00
Check Total: 10,000.00 00054435 M'
INSIDE /EPA 10 -21 -4830 ALMINISIRATICN SUB9CRIPITCNS EXPEN3E 317.50
20 -21 -4830 ADMINISTRATION' SUa9CRIPTICNS EXPENSE 317.50
Check Ibtal: 635.00 00054436 Mo7
20-27-6660 DISTRICT �� O �� EXPENSE 137.8 FF. 1--40 LA C 37.28 LAB:RATCRY O1.1.10E SUPPLIES
37.27
Check Total:
234.23 00054437 Ma
JATCD INC 10 -29 -6520 ENGINEERILZ SUPPLIES 52.71
20 -29 -6520 IIUME:RIM SUPPLIES 40.56
Check Total: 93.27 00054438 MAI
JCNES, J R 20 -19 -6200 BOARD OF DIIS TRA
/ Check Ibtal: 183.00 00054439 MAI
MICHAEL 10 -06 -6200 OPERAT'ICNS 'IRAVEL/MEETIQ''S /E T'Ic r 68.00
Check 'Total: 68.00 00054440 Ma
JORDAN'S TRIG & TRAILER EQUIP 10 -05 -6011 EQUIPMENT REPAIR ALTICNOITVE 20 -05 -6011 EQUIPMENT REPAIR 139.85
139.96
Check Total: 279.81 00054441 Ma
Page missing from Original Scan.
S c u t h T a h o e P.U.D. 09/11/03 PAYMENT O F CLAIMS REPORT 09/2152003-09418/2003 Pa 9
'II{J, SFP 11, 2003, 3:52 RBI - -rag: DCR AS -- -leg: GL 0L - -loc: CNS1'1E - -- -jab: 285416 #J4310-- -prog: 09 <1.07 > - -tort id: CIKRIFC
Detain t Selecticaz: Check Stock ID: AP ; Check 'Types: M1AI, HW, RV, VH
Vendor Narre Arcount # Department
T .TT 1 Y'S TIRE SERVICE INC. 10 -05 -6011 EQUIPMENT REPAIR
LCJCMIS FARGO & CO.
MARTIN, DCIvALD L & WIRICRIE
MARTIN, GERALD E & THELMA. V
MART'. N -IEC? AS, L( ISF;
cn
NC FARIANE, RE}:INQA
MC MASTER. CARR SUPPLY CD
MEEECS HUED= CENTER
10 -39 -4405 FINANCE
20 -39 -4405 FINANCE
20 -39 -6709 FINANCE
20 -39 -6710 F1[NAITE
20 -39 -6709 FINANCE
20 -39 -6710 FINANCE
20 -39 -6709 FINANCE
20 -39 -6710 FINANCE
10 -39 -6200 FINANCE
20 -39 -6200 FINANCE
10 -04 -6071 HEAVY MAINIENANCE
10 -04 -6042 HEAVY M INIE ANCE
10 -01 -6073
20 -01 -6073
20 -01 -7464
10 -02 -6071
20 -02 -6071
20 -02 -6050
10 -02 -6051
LIND REPAIR.
it ND REPAIR
UNCERGRaND REPAIR
RIPS
PIMPS
RMPS
P[NPS
1 scriptia
AUICKEIVE
Check Ibtal:
CZNIRACTIAL SERVICES
SERVICES
Check Tot-al :
LCAN PRJNcIPAL PAYMENTS
NIS
INTEREST EKPENSE
Check Tbi-al :
LCAN PRINCIPAL INTEREST EXPENSE
Check Tbtal:
LC AN PRINCIPAL PAYMENTS
= EXPENSE
Check Total:
IRAVEL TRAVEL/ /DcTT=
MIETMICISEDUCATI
Check Total:
SEDP SUPPLIES
CiNDS & MAINTENANCE
Check Tbtal:
SMALL IOOLS
SMALL TOOLS
SOUTH UPPER MIME KEE VFD AF M
SHOP SUPPLIES
S DP SUPPLIES
WELLS
PCMP STAITCNS
Arrt*.nt Check # Type
747.07
747.07
240.34
240.34
480.68
4,809.29
2,833.28
7,642.57
4,809.29
2,833.28
7,642.57
2,232.79
1,315.40
3,548.19
12.00
12.00
24.00
34.75
109.30
144.05
-17.33
139.04
97.70
81.53
81.52
46.13
130.81
00054448 MAT
00054449 WI
00054450 Ma
00054451 MW
00054452 M'
00054453 Mai
00054454 Ma
Page missing from Original Scan.
South 'I`ah e P.U.D.
THU, SEP 11, 2003, 3:52
tea,
fl t Selection: Check
vendor Naire
09/11/03 PAYMENT O F
RH - -req: D AS -- -lag: GL 3L- -lcc:
C L A I MS R E P O R T 09/05/2003-09/18/2003 11
CNS1'1E - -- -jab: 285416 #J4310-- -prag: 09 <1.07 >-- report id: CPC
Stock ID: AP ; Check Types: MA7, HW, RV, VH
A x unt # Department
IERK EID=NICS
NIMBUS ENaNEERS INC
NORIEI AMERICAN TIDING
OFeiCE DEEOT
to
PDMSaki,
10 -04 -6071 HEAVY MAINTENANCE
20 -38 -6071 CCE'IQt SE4ZVICE
10 -03 -6071 ELECTRICAL SEDP
10 -03 -6041 ELECTRICAL S1JP
20 -29 -8440 F 3INEERINS
20 -39 -6709 FINANCE
20 -39 -6710 FINANCE
10 -00 -0428
10 -07 -4820
20 -07 -4820
10 -38 -4820
20 -38 -4820
10 -37 -4820
20 -37 -4820
10 -37 -4840
20 -37 -4840
10 -03 -4820
GENERAL & ALMINISTRATICN
LAECRATMY
LABCRATCR.Y
CUSICMER SERVICE
C USICMER SERVICE
INECRNATICN SYSTEMS
INECRNATICN SYSTEMS
INECT&ATICN SYSTEM
INFORVATICN SYSYSI�
20 -01 -6052 LEND REPAIR
10 -28 -6042 ALPINE CCXTIY
P W T PLASTIC WELDING TECH 10 -04 -8425 HEAVY NAI IE E
Description
SEIJP SUPPLIES
SEDP SUPPLE
SHOP SUPPLIES
BUILDINGS
WE'LL, F 3E:OLE
Check Total :
Check Total:
Check Tbtal:
INTEREST LOAN PRINCIPAL PAYMENTS
Check 'Ibtal :
OEF'iCE SUPPLIES INVENICY
O1F'10E SUPPLIES
anCE SUPPLIES
anCE SUPPLIES
anCE SUPPLIES
OLF'iCE SUPPLIES
anCE SUPPLIES
DISTRICT COMPUTER SUPPLIES
DISTRICT 031= SUPPLIES
anCE SUPPLIES
Check Tbtal:
PIMCC�7FSM ,N&MAN-TJLBS
Check Tbtal
PLASTIC WELDIN3 GIN
Check Tbtal:
Amount not Check # 'Type
6.13
5.12
205.16 00054459 M'
1,005.33
42.81
1,048.14 00054460 MAI
43,351.95
43,351.95 00054461 M'
804.55
52.88
857.43 00054462 MW
1,262.14
17.27
17.27
4.25
4.25
13.87
13.86
37.45
37.44
115.37
1,523.17 00054463 MAT
1,580.46
603.20
2,183.66 00054464 M4
5,611.94
5,611.94 00054465 M4
S o u t h T a h o e P.U.D. 09/11/03 PAYMENT O F CLAIMS REPORT 09/05/2003-09418/2003 PP 13
THU, SEP 11, 2003, 3:52 FM - -req: DIHJ S -- -leg: GL JL - -loc: C SLIE - -- -jab: 285416 #J4310-- -prag: 09 <1.07 >-- report id: PC
Default Selection: Check Stock ID: AP ; Check Types: NW, HW, RV, VH
VerEbr Nacre Amount # Department
PETTY, DCN
PIONEER. AMERICAS ]NC
ERO LEISURE
R SUPPLY
RADIO SHACK
RCSS, HEATHER.
SQ IPDMPP, GREG
20 -21 -6200
20 -21 -6621
20 -22 -4820
20 -22 -6200
20 -22 -6520
20 -29 -6200
20 -37 -6200
20 -38 -6200
20 -38 -6520
20 -39 -4820
20 -39 -6200
AIIMINISTRATICN
AIMNISTRATTCN
HA AN RE93.RCES DIRE✓IOR
1-111vAN RESOURCES DIRECTOR
HIP AN RESOURCES DIRECTOR
EiUIlNEERI M
INFCIRVATTCN CLEILt SERVICE
CUSICMER SERVICE
FIl,E
FINANCE
10 -01 -6200 INCERGEUND REPAIR
10 -06 -4750 OFERATICNS
10 -21 -6621 AIINENISIRATICN
20 -21 -6621 POUNISIRATICT
20 -01 -6052 UI ND REPAIR
20 -29 -7034 ENGINEERIN3
10 -01 -4820 UI ND REPAIR
20 -38 -6250 QJSICNER. SERVICE
10 -21 -6621 AEFENISIRATICN
Description
TRAVEL _ /ITTFICN
OEr'lCE SUPPL>FS��CIVITICN PRGR
TRAVEL o 1 e./ TICN
.. I ._
TRA I 1 e. /EDUmTTCN
RA
ID 1 e. /ECUCATICN
/EDUCATICN
OORACE SUPPLIES
_
TEL/MEETM3S/CN heck TbTbtal :
TRAVEL /NEEIl3S /E TICK
Check Tbtal:
C HLCRIlNE
Clerk Tbi-al :
fl t NI VE & RDIGNITECN PR, Z
ENCEN TVE & RDECCNITICN PPM
Check Tbtal:
PIPE, COVERS & N LES
PINE ELVD YFLDEE REPIACEM
Check Tbtal:
Orr'10E SUPPLIES
Check Tbt-al :
I / MMIPS /CERTIFICATI
Check Tbtal:
INCENITVE & RD3CCNITICN P1CR2
Amount creak # Type
8.50
11.33
11.77
8.50
2.25
8.50
18.08
17.00
24.00
3.19
8.50
555.56 00054468 Ma
70.00
70.00 00054469 MAI
2,538.28
2,538.28 00054470 WI
242.79
242.79
485.58 00054471 M1
144.47
1,050.19
1,194.66 00054472 MA
24.10
24.10 00054473 M
60.00
60.00 00054474 M4
25.00
ELKS CLUB WELL CONTROL BUILDING
Bid Summa
Engineer's
Estimate
White Rock Construction
Thomas Haen Company, Inc.
ITEM
DESCRIPTION
UNIT
QTY.
Amount
Unit Price
Amount
Unit Price
Amount
ELKS CLUB WELL CONTROL BUILDING
1
Mobilization /demobilization
LS
1
$59,000.00
$30,000.00
$30,000.00
$60,000.00
$60,000.00
2
Clearing, grubbing, tree removal, etc.
LS
1
$6,000.00
$5,000.00
$5,000.00
$4,200.00
$4,200.00
3
Install 2" Sched. 40 PVC conduit, etc.
LF
100
$1,800.00
$26.50
$2,650.00
$40.00
$4,000.00
4
Provide site reveg, at Elks Club site, etc.
SF
2,500
$3,000.00
$0.60
$1,500.00
$1.00
$2,500.00
5
Provide site reveg at Flagpole Booster
Pump Sta, etc.
SF
6,000
$7,200.00
$0.60
$3,600.00
$0.50
$3,000.00
6
Install gas line from existing bldg to new
meter locations, etc.
LS
1
$1,050.00
$1,500.00
$1,500.00
$600.00
$600.00
7
Provide asphalt pavement, remove &
dispose of existing asphalt, etc.
SF
2,600
$24,960.00
$8.50
$22,100.00
$11.00
$28,600.00
8
Install 4" Sched. 40 conduit, inclg.
Excavation, backfill and compaction, etc.
LF
100
$2,400.00
$50.00
$5,000.00
$40.00
$4,000.00
9
Install Jensen Pre -Cast HP 1000 holding
tank
EA
1
$5,000.00
$4,500.00
$4,500.00
$4,500.00
$4,500.00
10
Install 4" Sched. 40 PVC sanitary sewer
lateral, etc.
LF
30
$2,160.00
$60.00
$1,800.00
$50.00
$1,500.00
11
Install snow stakes
EA
58
$1,740.00
$25.00
$1,450.00
$30.00
$1,740.00
12
Install drip line infiltration trench, etc.
LS
1
$1,800.00
$1,500.00
$1,500.00
$600.00
$600.00
13
Paint complete exterior of existing and
new structure
LS
1
$3,600.00
$5,300.00
$5,300.00
$4,000.00
$4,000.00
14
Paint complete interior walls and ceiling
of new addition, etc.
LS
1
$2,400.00
$3,500.00
$3,500.00
$4,000.00
$4,000.00
15
Provide and install 180 LF of 1" PVC pipe
soundin tube w/ pressure transducer, etc.
LS
1
$1,920.00
$2,600.00
$2,600.00
$4,000.00
$4,000.00
16
Install District - provided pitless adapter
unit, etc.
EA
1
$5,000.00
$4,200.00
$4,200.00
$3,500.00
$3,500.00
17
Provide and install new pump, motor,
column pipe, check valve, etc.
LS
1
$42,000.00
$70,000.00
$70,000.00
$59,000.00
$59,000.00
18
Install well control header, incl pressure
gauges, transmitters, valves, etc.
LS
1
$30,000.00
$49,000.00
$49,000.00
$43,300.00
$43,300.00
19
Install all domestic water service copper
piping, incl. Backflow device, etc.
LF
30
$1,260.00
$102.00
$3,060.00
$110.00 ,
$3,300.00
Page missing from Original Scan.
South Tahoe
Public Utility District
1275 Meadow Crest Drive · South Lake Tahoe, · CA 96150-7401
Phone 530 5~-6474, Fax 530 541-0614
BOARD AGENDA ITEM 13.a
TO:
Board of Directors
FROM:
Jim Hoggatt/Construction Manager/Engineer, Gary Kivstad/Legal
Counsel
MEETING DATE: September 18, 2003
ITEM - PROJECT: Conference with Legal Counsel - Anticipated Litigation - Pioneer
Trail Waterline Replacement near Filter Plant
REQUESTED BOARD ACTION: Direct legal counsel.
DISCUSSION: Pursuant to Section .54956.9(c) of the California Government Code,
CloSed Session may be held for the Conference with legal counsel regarding anticipated
litigation.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES ~,.~. NO
CHIEF FINANCIAL OFFICER: YES q~'
CATEGORY: Water
-Gl-
South Tahoe
Public Utility District
1275 Meadow Crest Drive · South Lake Tahoe,, CA 96150-7401
Phone 530 544-6474, Fax 530 541-0614
BOARD AGENDA ITEM 13.b
TO:
Board of Directors
FROM:
Rhonda McFarlane, Chief Financial Officer
MEETING DATE: September 18, 2003
ITEM - PROJECT: Conference with Legal Counsel- Existing Litigation: Ronald
Rasmussen vs. Dr. Bruce Daugherty, Tamarack Rentals, Villa Tahoe Condominiums
1-75, Case No. SC20010082, Superior Court, El Dorado County
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding existing
litigation.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES /f~ _~ _,"~ NO
CHIEF FINANCIAL OFFICER: YES_~..~,-.,- NO
CATEGORY: General
-63-
SoUth Tahoe
Public Utility District
1275 Meadow Crest Drive · South Lake Tahoe, · CA 96150-7401
Phone 530 544-6474, Fax 530 541-0614
BOARD AGENDA ITEM 13.c
TO:
FROM:
MEETING DATE:
Board of Directors
Richard H. Solbrig, General Manager
September 18, 2003
ITEM - PROJECT: Conference with Legal Counsel - Existing Litigation: STPUD vs.
John Breese Mumford, et al., El Dorado County Superior Court Case No. SC20020030
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding existing
litigation.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES ~f~ ~c]-.~ NO
CHIEF FINANCIAL OFFICER: YES~,F~C~r~_[~c ..... ~ NO
CATEGORY: Sewer
South Tahoe
Public Utility DiStrict
1275 Meadow Crest Drive · South Lake Tahoe, · CA 96150-7401
Phone 530 544-6474, Fax 530 541-0614
BOARD AGENDA ITEM 13.d
TO:
FROM:
MEETING DATE:
Board of Directors
Richard H. Solbrig, General Manager
September 18, 2003
iTEM - PROJECT: Conference with Legal Counsel - Existing Litigation: STPUD vs.
ARCO, et al., San Francisco County Superior Court Case No. 999128
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding existing
litigation.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION:
YES ~'~,~. ~' NO
GENERAL
MANAGER:
CHIEF FINANCIAL OFFICER: YES
CATEGORY: Water
-67-
Taho
?ubli¢ Utility lPi rict
1275 Meadow Crest Drive · South Lake Tahoe, · CA 96150-7401
Phone 530 544-6474. Fax 530 541-0614
BOARD AGENDA ITEM 13.e
TO:
Board of Directors
FROM:
Richard H. Solbrig/General Manager, Gary Kvistad/Legal Counsel
MEETING DATE: September 18, 2003
ITEM - PROJECT: Conference with Legal Counsel - Existing Litigation: STPUD vs.
F. Heise Land & Livestock Company, Inc., William Weaver, Eddie R. Snyder, Crockett
Enterprises, Inc., ClV S-02-0238 MLS JFM United States District Court for the Eastem
District of California, Sacramento, CA
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding existing
litigation.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES ~-~i),~ NO
CHIEF FINANCIAL OFFICER:
CATEGORY: Sewer
69
South Tahoe
1275 Meadow Crest Drive · South Lake Tahoe,, CA 96150-7401
Phone 530 544-6474, Fax 530 541-0614
BOARD AGENDA ITEM 13.f
TO:
Board of Directors
FROM:
Richard H. Solbrig, General Manager
MEETING DATE: September 18, 2003
ITEM - PROJECT: Conference with Legal Counsel - Existing Litigation re: Meyers
Landfill Site: United States of America vs. El Dorado County and City of South Lake
Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK GGH, United States
District Court for the Eastern District of California.
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956~9(a) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding existing
litigation,
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES ¢/1 ~,,~ NO
CHIEF FINANCIAL OFFICER: YES~_~-'~'~'f,_ ~.., ~..,.~_NO
CATEGORY: General
-71-
South Tahoe
· Public Utility DiStrict
1275 Meadow Crest Drive · South Lake Tahoe, · CA 96150-7401
Phone 530 54d-6474. Fax 530 541-0614
BOARD AGENDA ITEM 13.q
TO:
Board of Directors
FROM:
Richard H. Solbrig, General Manager
MEETING DATE: September 18, 2003
ITEM - PROJECT: Conference with Legal Counsel - Existing Litigation: STPUD vs.
Lakeside Park Association, et al., County of El Dorado, Superior Court Case No.
SC20010165
REQUESTED BOARD ACTION: Direct staff
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code,
ClOsed Session may be held for conference with legal counsel regarding existing
litigation.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES ~ _~/~ NO
CHIEF FINANCIAL OFFICER: YES \.~,~¥.~'r×,,t.~..,_~ ~_~O
CATEGORY: Water
-73-
ELKS CLUB WELL CONTROL BUILDING
Bid Summa
Engineer's
Estimate
White Rock Construction
Thomas Haen Company, Inc.
ITEM
DESCRIPTION
UNIT
QTY.
Amount
Unit Price
Amount
Unit Price
Amount
ELKS CLUB WELL CONTROL BUILDING
1
Mobilization /demobilization
LS
1
$59,000.00
$30,000.00
$30,000.00
$60,000.00
$60,000.00
2
Clearing, grubbing, tree removal, etc.
LS
1
$6,000.00
$5,000.00
$5,000.00
$4,200.00
$4,200.00
3
Install 2" Sched. 40 PVC conduit, etc.
LF
100
$1,800.00
$26.50
$2,650.00
$40.00
$4,000.00
4
Provide site reveg, at Elks Club site, etc.
SF
2,500
$3,000.00
$0.60
$1,500.00
$1.00
$2,500.00
5
Provide site reveg at Flagpole Booster
Pump Sta, etc.
SF
6,000
$7,200.00
$0.60
$3,600.00
$0.50
$3,000.00
6
Install gas line from existing bldg to new
meter locations, etc.
LS
1
$1,050.00
$1,500.00
$1,500.00
$600.00
$600.00
7
Provide asphalt pavement, remove &
dispose of existing asphalt, etc.
SF
2,600
$24,960.00
$8.50
$22,100.00
$11.00
$28,600.00
8
Install 4" Sched. 40 conduit, inclg.
Excavation, backfill and compaction, etc.
LF
100
$2,400.00
$50.00
$5,000.00
$40.00
$4,000.00
9
Install Jensen Pre -Cast HP 1000 holding
tank
EA
1
$5,000.00
$4,500.00
$4,500.00
$4,500.00
$4,500.00
10
Install 4" Sched. 40 PVC sanitary sewer
lateral, etc.
LF
30
$2,160.00
$60.00
$1,800.00
$50.00
$1,500.00
11
Install snow stakes
EA
58
$1,740.00
$25.00
$1,450.00
$30.00
$1,740.00
12
Install drip line infiltration trench, etc.
LS
1
$1,800.00
$1,500.00
$1,500.00
$600.00
$600.00
13
Paint complete exterior of existing and
new structure
LS
1
$3,600.00
$5,300.00
$5,300.00
$4,000.00
$4,000.00
14
Paint complete interior walls and ceiling
of new addition, etc.
LS
1
$2,400.00
$3,500.00
$3,500.00
$4,000.00
$4,000.00
15
Provide and install 180 LF of 1" PVC pipe
soundin tube w/ pressure transducer, etc.
LS
1
$1,920.00
$2,600.00
$2,600.00
$4,000.00
$4,000.00
16
Install District - provided pitless adapter
unit, etc.
EA
1
$5,000.00
$4,200.00
$4,200.00
$3,500.00
$3,500.00
17
Provide and install new pump, motor,
column pipe, check valve, etc.
LS
1
$42,000.00
$70,000.00
$70,000.00
$59,000.00
$59,000.00
18
Install well control header, incl pressure
gauges, transmitters, valves, etc.
LS
1
$30,000.00
$49,000.00
$49,000.00
$43,300.00
$43,300.00
19
Install all domestic water service copper
piping, incl. Backflow device, etc.
LF
30
$1,260.00
$102.00
$3,060.00
$110.00 ,
$3,300.00
Page missing from Original Scan.
Page missing from Original Scan.
Page missing from Original Scan.
Page missing from Original Scan.
Page missing from Original Scan.
ELKS CLUB WELL CONTROL BUILDING
ITEM
DESCRIPTION
UNIT
QTY.
' 1 aArmoun mmnry
Unit Price
Amount
Unit Price
Amount
20
Install 1" Schedule 40 PVC conduit w/
ridig sweeps for chemical feed lines, etc.
LF
24
$432.00
$40.00
$960.00
$30.00
$720.00
21
Construct new reinforced concrete floor,
incl. Excavation, over excavation,
backfill, compaction, etc.
LS
1
$30,000.00
$13,500.00
$13,500.00
$9,960.00
$9,960.00
22
Construct new addition to existing
structure, incl. All concrete block, mortar,
rebar, trusses, filler wall, etc.
LS
1
$42,000.00
$35,000.00
$35,000.00
$52,500.00
$52,500.00
23
Install 3'4" exterior steel fire door, frame
and hardware, etc.
EA
1
$1,800.00
$2,500.00
$2,500.00
$1,600.00
$1,600.00
24
Install 3' -0" exterior steel fire door, frame,
sawcutting /structural modifications, etc.
EA
1
$1,800.00
$1,800.00
$1,800.00
$2,500.00
$2,500.00
25
Install all electrical appurtenances, per
electrical design, etc.
LS
1
$259,300.00
$185,000.00
$185,000.00
$224,000.00
$224,000.00
26
Remove existing generator set and
deliver to 1275 Meadow Crest Drive,etc.
EA
1
$78,700.00
$75,000.00
$75,000.00
$54,000.00
$54,000.00
27
Install 3" waterline, incl. Pipe restraints,
fittings, valves, connection to pitiess
adapter, etc.
LF
65
$3,000.00
$53.00
$3,445.00
$50.00
$3,250.00
28
Install 10" waterline, incl. Pipe restraints,
reducers, fittings, connection to pitiess
adapter, valves, etc.
LF
240
$28,800.00
$110.00
$26,400.00
$125.00
$30,000.00
29
Install District- provided 3" steel pipe riser,
incl. Contractor - provided FCA's,
restraints, etc.
EA
1
$1,000.00
$2,000.00
$2,000.00
$1,500.00
$1,500.00
30
Install District - provided 10" steel pipe
risers incl. Contractor - provided FCA's,
restraints, concrete encasement, etc.
EA
2
$4,800.00
$2,500.00
$5,000.00
$3,000.00
$6,000.00
31
Provide intertie connection to existing
water distribution system in Bel Aire
Circle and on site, etc.
EA
2
$4,800.00
$6,500.00
$13,000.00
$4,750.00
$9,500.00
32
Install Fire Hydrant assembly, incl approx
20 LF of 6" pipe, valves, tee, bend, etc.
EA
1
$7,200.00
$4,800.00
$4,800.00
$4,400.00
$4,400.00
33 locations,
Abandon existing water main in two
etc.
EA
2
$2,400.00
$750.00
$1,500.00
$600.00
$1,200.00
Total:
$668,322.00
$588,165.00
$637,470.00
Page missing from Original Scan.