AP 09-03-09I
Qa, for • 1850 . s 2d
SOUTH TAHOE PUBLIC UTILITY DISTRICT
"Basic Services for a Complex World"
REGULAR BOARD MEETING AGENDA
Thursday, September 3, 2009
2:00 P.M.
District Board Room
1275 Meadow Crest Drive, South Lake Tahoe, California
Richard Solbri , General Manager Paul Sciuto, Assistant General Mana er
Mary Lou Mosbacher, President BOARD MEMBERS Dale Rise, Vice President
James R. Jones, Director Eric W. Schafer, Director Ernie Claudio, Director
1. CALL TO ORDER REGULAR MEETING — PLEDGE OF ALLEGIANCE
2. COMMENTS FROM THE AUDIENCE (Short non - agenda items that are within the subject
matter jurisdiction of the District. Five - minute limit. No action will be taken.)
3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR
4. ADOPTION OF CONSENT CALENDAR (Any item can be discussed and considered
separately upon request)
5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION / ACTION
6. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION
a.
Request to Appear Before the Board
Consider Request for District to
Pg. 25
Received from Joyce Blackstone
Reimburse $125 for Cleaning Roots
(Randy Curtis)
from Sewer Line
Wastewater Treatment Plant Rehabilitation
Approve Proposal from Brown &
.29
(Julie Ryan)
Caldwell Consulting Engineers for
Design Services (The Scope of Work
and Cost Estimate will be provided prior to,
and at the Board meeting.)
REGULAR BOARD MEETING AGENDA — SEPTEMBER 3, 2009 PAGE — 2
C. 2:30 P.M. PUBLIC HEARING
Pg. 31 South Tahoe Public Utility District Recycled Hold a Public Hearing to Take Public
Water Facilities Master Plan Comments on the Master Plan
(Jim Hoggatt) Draft Environmental Impact Report
d. Payment of Claims
Pg. 35
Approve Payment in the Amount of
$1,716,477.39
7. BOARD MEMBER STA NDING COMMITTEE REPORTS
(Discussions may take place; however, no action will be taken)
a. Water & Wastewater Operations Committee (Jones / Rise)
b. Finance Committee (Schafer / Claudio)
C. Executive Committee (Mosbacher / Rise)
d. Planning Committee (Mosbacher / Schafer)
8. BOARD MEMBER AD HOC COMMITTEE REPORTS
a. Heavenly Snowmaking Ad Hoc Committee (Schafer /Rise)
b. Management and Union Negotiations Ad Hoc Committee (Schafer /Rise)
9. EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVES REPORT
10. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken)
11. GENERAL MANAGER REPORTS (Discussions may take place; however, no action will be taken)
a. Integrated Regional Water Management Plan and Prop. 84
b. City Water MOU
12.
13.
ASSISTANT MANAGER REPORTS (Discussions may take place; however, no action will be taken)
STAFF / ATTORNEY REPORTS (Discussions may take place; however, no action will be taken)
a. ERB Waste Violation (Ross Johnson)
14. NOTICE OF PAST AND FUTURE MEETINGS / EVENTS
Past Meetinas / Events
08/21109 — CSDA Module 4: Board's Role in Human Resources Conference
08/26/09 — Employee Negotiations Ad Hoc Committee Meeting
08/27/09 & 08/28/09 — ACWA Region 3 Two -Day Bus Tour of Alpine County Facilities and
Angora Fire Area
08/31/09 — Water and Wastewater Operations Committee Meeting
09/03/09 — Board Workshop: Water Metering
Future Meetinas / Events
09/07/09 — Labor Day Holiday (District Office Closed)
09/09/09 — El Dorado County Water Agency Regular Meeting in Shingle Springs
09/14/09 — 3:30 p.m. — Water and Wastewater Operations Committee Meeting at District
09/15/09 — 9:00 a.m. — Alpine County Regular Board Meeting in Markleeville
09/17/09 — 2:00 p.m. — STPUD Regular Board Meeting at District
REGULAR BOARD MEETING AGENDA — SEPTEMBER 3, 2009 PAGE — 3
15. CLOSED SESSION (Closed Sessions are not open to the public)
a. Pursuant to Government Code Section 54956.9(b)Conference with Legal Counsel —
Pg. 51 Anticipated Litigation (one case)
b. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel —
Pg. 53 Existing Litigation re: Meyers Landfill Site: United States of America vs. El Dorado
County and City of South Lake Tahoe and Third Party Defendants, Civil Action
No. S -01 -1520 LKK GGH, United States District Court for the Eastern District of CA
C. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel -
Pg. 55 Existing Litigation: Tahoe Asphalt, Inc. and Tahoe Asphalt Materials Company, LLC,
vs. STPUD, Case No. SC20090104, El Dorado Superior Court
16. ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION
17. ADJOURNMENT (To the next regular meeting, September 17, 2009, 2:00 p.m.)
The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete
agenda packet, including all backup information is available for review at the meeting and at the District office during the hours of
8:00 a.m. — 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after minutes of the meeting have
been approved. Items on this agenda are numbered for identification purposes only and will not necessarily be considered in the
order in which they appear on the agenda. Designated times are for particular items only. Public Hearings will not be called to order
prior to the time specified, but may occur slightly later than the specified time.
Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda
items are heard; comments should be brief and directed to the specifics of the item being considered. Comments on items not on
the agenda can be heard during "Comments from the Audience;" however, action cannot be taken on items not on the agenda.
Please provide the Clerk of the Board with a copy of all written material presented at the meeting. Backup to any agenda item(s)
not included with the Board packet will be made available when finalized at the District office, at the Board meeting, and upon
request to the Clerk of the Board.
The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of
the disabled in all of the District's public meetings. If particular accommodations for the disabled are needed (i.e., disability- related
aids, or other services), please contact the Cleric of the Board at 530.544.6474, extension 6203, at least 24 hours in advance of the
meeting.
s
9er. � � r • 19 S it ' �
CONSENT CALENDAR
SEPTEMBER 3, 2009
ITEMS REQUESTED ACTION
a. Portable Engine Driven Generator
Pg. 1 (Randy Curtis)
b. California Air Resources Mandated Emission
Pg. 7 Control Measures
(Randy Curtis)
C. Arsenic Treatment Funding and Water Meter
Pg. 13 Installation
(Lynn Nolan)
Regular Board Meeting Minutes:
Pg. 19 August 6, 2009
(Kathy Sharp)
(1) Waive Bidding Procedures, as
Outlined in the District's Purchasing
Procedures Policy, for Standardized
Equipment from the Sole Area
Supplier; and (2) Approve Purchase
of One Katolight Generator (Model
MTU CD50J6T3) from Nevada
Generator Systems, Inc., in the
Amount of $32,587.20, plus Tax and
Shipping
Authorize Staff to Advertise for Bids
for Particulate Filters
Adopt Resolution No. 2870 -09 and
2871 -09 Entering into Agreements
for Revised Funding with the
California Department of Public
Health
Approve Minutes
South Tahoe Public Utility District ■ 1274 Meadow Crest Drive ■ South Lake Tahoe, CA 96150
Phone 530.544.6474 ■ Facsimile 530.541.0614 • www.stpud.us
General M,"ager
Richard H. 9olbrig
I'ah EnM Claudio �/� .Aw"ft i:. Joys
Mary LM Mwmdw
rumic Utloty P15tria M"
, *.
BOARD AGENDA ITEM 4a
TO: Board of Directors
FROM: Randy Curtis, Manager of Field Operations
MEETING DATE: September 3, 2009
ITEM — PROJECT NAME: Portable Engine Driven Generator
REQUESTED BOARD ACTION: (1) Waive bidding procedures, as outlined in the
District's Purchasing Policy, for standardized equipment from the sole area supplier;
and (2) Approve purchase of one Katolight Generator (Model MTU CD50PJ6T3) from
Nevada Generator Systems, Inc., in the amount of $32,587.20, plus tax and shipping.
DISCUSSION: The gen -set will replace an older Deutz generator which does not meet
California Air Resources Board emission requirements. The Deutz gen -set can no
longer be permitted through the El Dorado County Air Board.
This gen -set is used to provide back up power to many individual stations that do not
have a permanent redundant power supply and are served by generator quick connect-'
disconnect features. This would include most water booster stations, small wells and
small sewer stations examples:
• Apache Booster
• David Lane Booster
• Keller Booster
• Sunset Well
• Helen Well
• Beecher Sewer Station
On December 18, 2008, the Board made a finding that Nevada Generator Systems,
Inc., is the sole area supplier.
-1-
Randy Curtis
September 3, 2009
Page 2
SCHEDULE: As soon as possible
COSTS: $32,587.20
ACCOUNT NO: 2005 -8056
BUDGETED AMOUNT REMAINING: $35,000
ATTACHMENTS: Proposal from Nevada Generator Systems
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES j
4Z NO
CHIEF FINANCIAL OFFICER: YES NO
-2-
Nevada Generator Systems
1520 Glendale Avenue
Sparks, Nevada 89431
775- 356 -8010
775 - 356 -8017 (fax)
Proposal
July 28, 2009
Paul Carrion
South Lake Tahoe P.U.D.
1275 Meadow Crest Drive South Lake Tahoe CA 9615o
53015448474 (Phone)
530/544.6359 (Fax)
pcarrion@Mpud.datca.us
Nevada Generator submits the following proposal for the project: 50kW, Diesel Fueled, Enclosed, Trailer Mounted
Generator Set with Voltage Selector Switch.
MTU ONSITE ENERGY MODEL: (Qty -1) - CD54PJST3
GENERATOR: 50 kW, 62.5 kVA
(File #: 545 / Catalog #: 80020615)
VOLTAGE: 277 1480 ACV 3- Phase, 120/208 ACV 3- Phase, 1201240 VAC 1 -Phase
ENGINE: John Deere 4024HF285, 60 Hz Diesel, 1800 RPM
Standard Features Included:
Steel Sub Base, Be" Cables, Battery Box, Flex Fuel Connector, Oil grain Extension, Lube Oil and An &freeze
Selected Model Features Included:
Isochronous Governor + / -.25%
2 (Two) Year / 3000 Hour Bask Standby Limited Warranty
150 degree Temperature Rise - 361 CSL1601
UL2200
Voltage Selector Switch: 277/480 3ph, 120/208 3 ph, 120/2401 ph.
120V male receptacte outside enclosure to power battery charger and block heater.
CONTROL PANEL: Model 50 Control Panel
12 LIGHT CONTROL PANEL: 50 Series, generator - vibration mounted, NEMA 1 enclosure
Voltmeter - (3 -1/21, 2% accuracy, Ammeter - (3-1/2'), 2% accuracy, 4 position combination voltmeter /ammeter selector
switch. Frequency meter, dial type - (3- 1/2'x, Panel lights and switch, Running time meter - (2'), Battery voltmeter - (2"),
Water temperature gauge - (2'), Oil pressure gauge - (2')
AUTOMATIC ENGINE CONTROL - KASSEC, single or cyclic cranking with 12 indicating fights for.
Low oil pressure shutdown and light, High water temperature shutdown and light, Low water level shutdown and light
combined with high engine temperature, Overspeed shutdown and light, Overcrank shutdown and fight, Low battery voltage
light, Charger malfunction light, EPS supplying load light, Low water temperature light, High engine temperature preshutdown
and light, Low oil pressure preshutdown and light, Low fuel light, Unit not in auto light, 3 position manual- off - automatic switch,
Repetitive alarm buzzer and silencing switch
Included Accessories
Voltage Adjust Potentionmeter
ENCLOSURE: Weather Prof
Weather Proof Enclosure includes bolt together sheet metal enclosure constructed with 14 -gauge material, lockable hinged
doors, keyed alike, a fixed storm proof air intake louver and expanded metal air discharge, muffler support brackets and
exhaust piping allowing the muffler to be mounted on top of the roof; including rain cap.
Included Accessories:
1.5" Sound Attenuated Foam
-3-
COOLING SYSTEM: Unit Mounted Radiator
CIRCUIT BREAKER: 100 AMP 480V Three Phase - Mounted and Wired in a NEMA 1 Enclosure (Qty: 1)
BATTERY: Lead Acid Battery 950 CCA Q 0 F
Included Accessories:
Unit Mounted Steel Rack (Per Battery)
BLOCK HEATER: Standard Q 20 F 1000 Watts
Included Accessories:
Heater wired to a Terminal
VIBRATION ISOLATION: Vibration Pads
BATTERY CHARGER: LC 1243.5 - 500.213 (12 Volt, 3.5 Amp)
Included Accessories:
LC 12.3.5- 500-28 - Mounted -Wired AC & DC
MUFFLER: Critical Muffler Mounted Inside Enclosure 2112"
Included Accessories:
Rain Cap - 212 "
SUB BASE TANK: Custom Sub Base Tank
Fuel tank(s) factory installed. Features include double wall UL142 approved, constructed in accordance to NFPA 30, fuel leak
detection standard (low fuel level alarm standard), 1.5 " normal vent cap, 2" fill with lockable fill cap, 2-6" NPT opening for
emergency vent.
TRAILER: 7000T4 (Cant' Wgt - 65471 Wgt Only -1353, OA Size -158 x 821n. / Bed 110 x 601n.)
Trailer chassis is box type consisting of channel iron construction with heavy -gauge steel plate bed and built -in bumpers.
Trailers are painted with one Coat of primer and one black finish coat.
Included Accessories:
7000T4 - Trailer Mounted Fuel Tank -130 gis.,1300 lbs.
Electric Fuel Gauge (Mounted In Control Panel)
Stabilizing jack (each)
Stabilizing jack (each)
Stabilizing jack (each)
Stabilizing jack (each)
Towing ring 3"
Spare tire and rim
MISCELLANEOUS:
Paint - White
Testing - Standard Commercial Test
Manual - One Instruction Manual
Startup and commissioning service
NOTES:
1. This proposal Is our Interpretation of your requirement and Includes only the items listed. Should there be other
requirements or specifications, we will requote accordingly.
2. Seller reserves the privilege of requoting upon receipt of written specifications and drawings.
3. We take a general exception to competing manufacturer's proprietary components, methods of manufacture,
testing or fabrication. This proposal is based upon providing a functional equal that is manufactured to current
Industry standards.
4. Local regulatory agencies have final jurisdiction regarding permits at the time of application. Any required
equipment or control devices that are not included In the bill of materials of this proposal are not included in the
quoted price.
5. Taxes, Permits or Licenses are not included In this proposal.
6. Offloading or installation of equipment is by others unless specifically included in the bill of materials of this
proposal.
7. Fuel for any purpose is not included in this proposal and is by others.
S. Fees for cancelled, changed or returned orders will be charged to the buyer based upon our cost
9. Material is invoiced from date of shipment from the manufacturer and upon approval of credit is payable in full 30
days afterward. All risk of loss passes to the buyer as soon as goods are loaded on the carrier. 1.5% per month will
-4-
be added to past due balances.
10. Current estimated delivery schedule Is 12 ton 14 weeks upon submittal approval and release to production.
This is subject to change. We are not liable for losses or delays occasioned by circumstances that are beyond our
direct control.
11. FOB South Lake Tahoe, CA
Proposal Summary:
TOTAL PROPOSAL PRICE: 32,587.20
Quoted prices do not include Federal, State or Local taxes which may be applicable. Quoted prices Include normal
testing, packaging and instructional literature. Special testing, packaging, additional instructional literature, parts,
provisioning lists or prints are not Included, and prices will be quoted separately.
Quotation Firm For 30 Day(s)
Delivery Notes:
BY:
Nevada Generator
David Bardelli
-5-
Portable Generator
To Replace Deutz
50 KW will run the following Stations:
WELLS
1.
Helen Well
2.
Chris Well
3.
Sunset Well
4.
Paloma Well
5.
Helen Well
Water Booster Stations
1.
Apache Booster
2.
Keller Booster
3.
David Lane Booster
4.
H Street Booster
5.
Boulder Mountain Booster
Sewer Stations
1. Beecher Pump Station
2. Fallen Leaf Electric Stations
-6-
General Manager
5 ou th ard K 9olbrtg
( J Ern CtsuAlo
Tah oe. �✓ ,taenas It ,k�rAs UM mooftow
ruwlc Utility L)Iotrict
's1 .2 FL 10 V> 1 MIN 7;
BOARD AGENDA ITEM 4b
TO: Board of Directors
FROM: Randy Curtis, Manager of Field Operations
MEETING DATE: September 3, 2009
ITEM — PROJECT NAME: California Air Resources Mandated Emission Control
Measures
REQUESTED BOARD ACTION: Authorize staff to advertising for bid for particulate
filters.
DISCUSSION: The California Air Resources Board has mandated emission control
measures (Title 13 California Code of Regulations, section 2022), be installed on all
on -road diesel powered trucks and has given certain timeframes for selected years
listed below:
• Vehicle age 1960 —1987 60% installed by 2009
• Vehicle age 1988 — 2002 60% installed by 2009
• Vehicle age 2003 — 2006 50% installed by 2009
These emission devices are installed on the vehicle exhaust system usually in place of
the muffler to remove particulate matter from the exhaust gas. Each unit has
regeneration capabilities to prevent plugging or fouling of the filter. Part of the bid specs
will be to train District Equipment Repair employees to do the installations on District
vehicles. Preliminary costs have ranged from $8,500 to $12,500 per unit installed. The
District will need to retrofit six trucks to be in compliance with state regulations. Staff has
reviewed each affected department's budget and can meet budget requirements. Staff
will remove some capital purchase items and transfer funds for this purchase. Training
costs will come from Equipment Repair training budget.
SCHEDULE: As soon as possible
COSTS: $80,000
ACCOUNT NO: Unbudgeted capital to be drawn from affected departments
BUDGETED AMOUNT REMAINING:
ATTACHMENTS: Bid Specification and TWk Specification
Randy Curtis
September 3, 2009
Page 2
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
CATEGORY: Sewer & Water
NO NO
-8-
Bid Specifications
Diesel Particulate Filter Systems
• Diesel Particulate Filter will be an Active System using electrical
regeneration.
• To include all installation parts ie; clamps, wiring, hangers and associated
hardware.
• Provide Vehicle assessment to determine Diesel Particulate filter for each
listed model engine.
• All provided filters must meet California Air Resources Board and EPA
Certification/Verification with written Executive Order.
• Capability to train District personnel for in -house installations.
California Air Resources Board (CARB)
C.A.R.B. Diesel Particulate Filters for the following Group 2 Vehicles range 1988 -2002:
1. (insert vehicle id/info) Truck 34
2. (insert vehicle id/info) Truck 25
3. (insert vehicle id/info) Truck 58
C.A.R.B. Diesel Particulate Filter for the following Group 3 Vehicles range 2003 -2007:
1. (insert vehicle id/info) Truck 27
2. (insert vehicle id/info) Truck 36
3. (insert vehicle id/info) Truck 57
-9-
TRK 25
;**** Test Number; 7
;Test Date; 03 -13 -09
;Test Time; 14:39:51
;Tested by; CLIFF BARTLETT
;Vehicle ID; TRK 25
;Engine Manufacturer, FORD
;Year & Make; 2000 FORD F55
;Engine Yr; 2000
;Vehicle Mileage; 41896
;Exhaust Stack Dia (in inches); 3
;Engine Power (in BHp);
;Test Temperature; 59.5 F
;Test Relative Humidity; 24.9 %
;Test Barometric Pressure; 23.88 inHg
;Cleanout #1; 6.72 %
;Cleanout #2; 5.46 %
;Cleanout #3; 5.51 %
;Raw Test #1; 4.52 %
;Raw Test #2; 5.37 %
;Raw Test #3; 5.17 %
;Corrected Test #1; 4.52 %
;Corrected Test #2; 5.37 %
;Corrected Test #3; 5.17 %
;3 Test Avg; 5.02 %
;Atmos Correction Enabled; Y
;OPACITY TEST PASS /FAIL; P
;Visual Inspection Pass /Fail; p
;Calibration Date; 03 -06 -09
;Calibration Time; 08:38:34
;Vin # 1 FDAF57F54EE27954
;License # 1040335
TRK 58
;Test Number; 1
;Test Date; 03 -10 -09
;Test Time; 17:30:07
;Tested by; CLIFF BARTLETT
;Vehicle ID; TRK 58
;Engine Manufacturer; CAT 3126
;Year & Make; 2002 FORD F 750
;Engine Yr, 2002
;Vehicle Mileage; 70318
;Exhaust Stack Dia (in inches);
;Engine Power (in BHp); 250
;Test Temperature; 64.8 F
;Test Relative Humidity; 30.4 %
;Test Barometric Pressure; 23.78 inHg
;Cleanout #1; 10.9 %
;Cleanout #2; 11.1 %
; Cleanout #3; 10.1 %
;Raw Test #1; 10.3 %
;Raw Test #2; 9.85 %
;Raw Test #3; 10.1 %
;Corrected Test #1; 10.3 %
;Corrected Test #2; 9.85 %
;Corrected Test #3; 10.1 %
;3 Test Avg; 10.1 %
;Atmos Correction Enabled; Y
;OPACITY TEST PASS /FAIL; P
;Visual Inspection Pass /Fail; p
;Calibration Date; 03 -06-09
;Calibration Time; 08:38:34
;Calibration Filter, 50.2
;Vin #3FDXF75RXZMA19969
;License # 1099266
TRK 34
;"'"' Test Number, 12
;Test Date; 03 -24-09
;Test Time; 11:55:36
;Tested by; CLIFF BARTLETT
;Vehicle ID; TRK 34
;Engine Manufacturer, FORD 7.3
;Year & Make; 1999
;Engine Yr, 1999
;Vehicle Mileage; 37893
;Exhaust Stack Dia (in inches); 3
;Engine Power (in BHp);
;Test Temperature; 63.8 F
;Test Relative Humidity; 30.9 %
;Test Barometric Pressure; 23.99 inHg
;Cleanout #1; 5.02 %
;Cleanout #2; 2.18 %
; Cleanout #3; 0.959 %
;Raw Test #1; 1.19 %
;Raw Test #2; 1.42 %
;Raw Test #3; 1.27 %
;Corrected Test #1; 1.19 %
;Corrected Test #2; 1.42 %
;Corrected Test #3; 1.27 %
;3 Test Avg; 1.3 %
;Atmos Correction Enabled; Y
;OPACITY TEST PASS /FAIL; P
;Visual Inspection Pass /Fail; p
;Calibration Date; 03 -17 -09
;Calibration Time; 12:28:14
;Calibration Filter; 50.2
;Vin # 1 FDAFOXEE78194
;License #1019831
TRK 57
; * * ** Test Number; 5
;Test Date; 03 -13 -09
;Test Time; 12:39:32
;Tested by; CLIFF BARTLETT
;Vehicle ID; TRK 57
;Engine Manufacturer; CAT 3126
;Year & Make; 2003
;Engine Yr; 2003
;Vehicle Mileage; 17728
;Exhaust Stack Dia (in inches);
;Engine Power (in BHp); 300
;Test Temperature; 58.4 F
;Test Relative Humidity; 29 %
;Test Barometric Pressure; 23.92 inHg
;Cleanout #1; 12.2 %
;Cleanout #2; 9.42 %
;Cleanout #3; 8.55 %
;Raw Test #1; 8.27 %
;Raw Test #2; 9.16 %
;Raw Test #3; 10 %
;Corrected Test #1; 8.27 %
;Corrected Test #2; 9.16 %
;Corrected Test #3; 10 %
;3 Test Avg; 9.15 %
;Atmos Correction Enabled; Y
;OPACITY TEST PASS /FAIL; P
;Visual Inspection Pass/Fail; p
;Calibration Date; 03 -06-09
;Calibration Time; 08:38:34
;Calibration Filter, 50.2
;Vin #2FZHAK34AM18017
;license # 1155912
TRK 27
;**** Test Number; 10
;Test Date; 03 -17 -09
;Test Time; 13:16:21
;Tested by; CLIFF BARTLETT
;Vehicle ID; TRK 27
;Engine Manufacturer; CAT C7
;Year & Make; 2005 STERLING
;Engine Yr; 2005
;Vehicle Mileage; 5153
;Exhaust Stack Dia (in inches);
;Engine Power (in BHp); 300
;Test Temperature; 62.4 F
;Test Relative Humidity; 34.8 %
;Test Barometric Pressure; 24.03 inHg
;Cleanout #1; 14.3 %
;Cleanout #2; 15.4 %
;Cleanout #3; 16.8 %
;Raw Test #1; 24.5 %
;Raw Test #2; 14.9 %
;Raw Test #3; 14.1 %
;Corrected Test #1; 24.5 %
;Corrected Test #2; 14.9 %
;Corrected Test #3; 14.1 %
;3 Test Avg; 17.8 %
;Atmos Correction Enabled; Y
;OPACITY TEST PASS /FAIL; I
;Visual Inspection Pass /Fail; p
;Calibration Date; 03 -17 -09
;Calibration Time; 12:28:14
;Calibration Filter; 50.2
;Vin # 2FZACODC15AU73493
;License # 1099337
GRov 3
TRK 36
;**** Test Number, 11
;Test Date; 03 -24-09
;Test Time; 11:09:39
;Tested by; CLIFF BARTLETT
;Vehicle ID; TRK 36
;Engine Manufacturer MERCEDS 4MBX6370JA
;Year & Make; 2004 STERLING
;Engine Yr; 2004
;Vehicle Mileage; 6786
;Exhaust Stack Dia (in inches);
;Engine Power (in BHp); 250
;Test Temperature; 61 F
;Test Relative Humidity; 31.4 %
;Test Barometric Pressure; 23.99 inHg
;Cleanout #1; 56.5 %
;Cleanout #2; 19.8 %
;Cleanout #3; 12.7 %
;Raw Test #1; 12.5 %
;Raw Test #2; 11.2 %
;Raw Test #3; 11.8 %
;Corrected Test #1; 12.5 %
;Corrected Test #2; 11.2 %
;Corrected Test #3; 11.8 %
;3 Test Avg; 11.8 %
;Atmos Correction Enabled; Y
;OPACITY TEST PASS /FAIL; P
;Visual Inspection Pass /Fail; p
;Calibration Date; 03 -17 -09
;Calibration Time; 12:28:14
;Calibration Filter 50.2
;Vin # 2FZACGCS55AN79339
;License # 1136931
�..♦
r• > #
BOARD AGENDA ITEM 4c
TO: Board of Directors
FROM: Lynn Nolan, Grants Coordinator
MEETING DATE: September 3, 2009
ITEM — PROJECT NAME: Arsenic Treatment Funding and Water Meter Installation
REQUESTED BOARD ACTION: Adopt Resolution No. 2870 -09 and Resolution No.
2871 -09 entering into agreements for revised funding with the California Department of
Public Health.
DISCUSSION: The grant staff submitted two applications to the California Department
of Public Health (CDPH) for funding from the Safe Drinking Water State Revolving Fund
for Water Meter Installation and Arsenic Treatment for Arrowhead Well. On June 4,
2009, staff received a Notice of Application Acceptance for each project for funding as
follows: $4,387,500 in grant funding for the installation of Water Meters, and $515,300
in loan funding and $515,300 in grant funding for Arsenic Treatment for Arrowhead
Well.
CDPH staff called on August 25, 2009, to inform STPUD staff that they had changed the
Arsenic Treatment for Arrowhead Well project from half loan funding and half grant
funding to full grant funding. In addition, they increased the grant funding amount for this
project to $1, 185,221. They also revised the required resolutions to remove any
references to loan funding on both of these projects. This action will require the two
revised resolutions to be re- adopted by the board.
Attached are the resolutions to accept funding for the projects referenced above, as
required by the CDPH.
SCHEDULE: Submission of resolutions by September 4, 2009
COSTS: No costs associated with the resolution submission
ACCOUNT NO: N/A
BUDGETED AMOUNT REMAINING: N/A
ATTACHMENTS: Resolution No. 2870 -09 and Resolution No. 2871 -09
-13-
coom ai Ma MIW
Rkhard H. Sol"
15
Tah
E slim"
/
Jal:r ws IC. ,1b+�s
(�
PuRc
lt��
U t ili ty
P
�..♦
r• > #
BOARD AGENDA ITEM 4c
TO: Board of Directors
FROM: Lynn Nolan, Grants Coordinator
MEETING DATE: September 3, 2009
ITEM — PROJECT NAME: Arsenic Treatment Funding and Water Meter Installation
REQUESTED BOARD ACTION: Adopt Resolution No. 2870 -09 and Resolution No.
2871 -09 entering into agreements for revised funding with the California Department of
Public Health.
DISCUSSION: The grant staff submitted two applications to the California Department
of Public Health (CDPH) for funding from the Safe Drinking Water State Revolving Fund
for Water Meter Installation and Arsenic Treatment for Arrowhead Well. On June 4,
2009, staff received a Notice of Application Acceptance for each project for funding as
follows: $4,387,500 in grant funding for the installation of Water Meters, and $515,300
in loan funding and $515,300 in grant funding for Arsenic Treatment for Arrowhead
Well.
CDPH staff called on August 25, 2009, to inform STPUD staff that they had changed the
Arsenic Treatment for Arrowhead Well project from half loan funding and half grant
funding to full grant funding. In addition, they increased the grant funding amount for this
project to $1, 185,221. They also revised the required resolutions to remove any
references to loan funding on both of these projects. This action will require the two
revised resolutions to be re- adopted by the board.
Attached are the resolutions to accept funding for the projects referenced above, as
required by the CDPH.
SCHEDULE: Submission of resolutions by September 4, 2009
COSTS: No costs associated with the resolution submission
ACCOUNT NO: N/A
BUDGETED AMOUNT REMAINING: N/A
ATTACHMENTS: Resolution No. 2870 -09 and Resolution No. 2871 -09
-13-
RESOLUTION FOR FUNDING AGREEMENT WITH CA. DEPT. OF PUBLIC HEALTHI
RESOLUTION NO. 2870-09
RESOLUTION OF the South Tahoe Public Utility District (STPUD) Board of Directors
AUTHORIZING the General Manager (GM), Assistant General Manager (AGM) or the Chief Financial Officer
(CFO) TO SIGN FUNDING AGREEMENT AND AMENDMENTS FOR FUNDING UNDER THE SAFE DRINKING
WATER STATE REVOLVING FUND AMERICAN RECOVERY AND REINVESTMENT ACT; AUTHORIZING the
GM, AGM and /or the CFO TO APPROVE CLAIMS FOR REIMBURSEMENT; AUTHORIZING the GM, CFO,
and AGM TO EXECUTE BUDGET AND EXPENDITURE SUMMARY; AUTHORIZING AGM TO SIGN THE
CONTRACTOR'S RELEASE FORM AND AGM TO SIGN THE CERTIFICATION OF PROJECT COMPLETION.
WHEREAS, on 2/23/2009 , the STPUD made application to the California Department of Public
Health for funding under the California Safe Drinking Water State Revolving Fund and the federal AMERICAN
RECOVERY AND REINVESTMENT ACT of 2009 for a project commonly known and described as
Arsenic Treatment for Arrowhead Well (herein the project); and
WHEREAS, on 06/04/2009 , said STPUD Board of Directors adopted a project budget totaling
$ 1,744,976, and
WHEREAS, it is anticipated that the Funding Agreement under the California Safe Drinking Water State
Revolving Fund and the federal AMERICAN RECOVERY AND REINVESTMENT ACT of 2009 will provide for a
loan in the amount of $ 1,185,221 , of which $ 1,185,221 will be provided as additional subsidization in the
form of principle forgiveness.
WHEREAS, prior to the California Department of Public Health's issuance of said Funding Agreement,
STPUD Board of Directors is required to pass a resolution authorizing an officer to execute said Funding
Agreement and amendments, authorizing an officer to execute all certifications and reports required of funding
recipients under the California Safe Drinking Water State Revolving Fund and the federal American Recovery and
Reinvestment Act of 2009; designating a person to approve claims for reimbursement, designating a person
(registered engineer) to sign the Budget and Expenditure Summary, designating a person (registered engineer) to
sign Certification of Project Completion, and designating a person to sign the Contractor's Release Form.
NOW, THEREFORE, BE IT RESOLVED AND ORDERED, that the STPUD General Manager,
Assistant General Manager and /or the Chief Financial Officer is hereby authorized to sign the Safe Drinking
Water State Revolving Fund program Funding Agreement and any amendments thereto; and
BE IT FURTHER RESOLVED AND ORDERED, that the STPUD General Manager, Assistant General
Manner and/or the Chief Financial Officer is hereby authorized to sign all certifications and reports required
of funding recipients under the California Safe Drinking Water State Revolving Fund program and /or the federal
American Recovery and Reinvestment Act of 2009, and
BE IT FURTHER RESOLVED AND ORDERED, that the STPUD General Manager, Assistant
General Manager and /or the Chief Financial Officer is hereby authorized to approve Claims for
Reimbursement under the Safe Drinking Water State Revolving Fund program; and
BE IT FURTHER RESOLVED AND ORDERED, that the STPUD General Manager, Assistant
General Manager and /or the Chief Financial Officer is hereby authorized to execute the Budget and
Expenditure Summary for the Safe Drinking Water State Revolving Fund program; and
Revised June 11, 2009 -15- Page 1 of 2
Enclosure No. 14
BE IT FURTHER RESOLVED AND ORDERED, that the STPUD Assistant General Manager is
hereby authorized to sign the Contractor's Release Form for the Safe Drinking Water State Revolving Fund
Program; and
BE IT FURTHER RESOLVED AND ORDERED, that the STPUD Assistant General Manacer is
hereby authorized to certify that the project is complete and ready for final inspection; and
BE IT FURTHER RESOLVED AND ORDERED, that the project infrastructure investment is an
appropriate use of taxpayer dollars.
Passed and adopted by the STPUD Board of Directors on 9/312009, by the following vote:
AYES: Directors
NOES: Directors
EXCUSED: Directors
ATTEST:
Kathy Sharp, Clerk of the Board
Revised June 11, 2009
, President
Mary Lou Mosbacher
Page 2 of 2
-16-
(RESOLUTI FOR FUNDING AGREEMENT WITH CA. DEPT. OF PUBLIC HEALTHI
RESOLUTION NO. 2871-09
RESOLUTION OF the South Tahoe Public Utility District (STPUD) Board of Directors
AUTHORIZING the General Manager (GM), Assistant General Manager (AGM) or the Chief Financial Officer
(CFO) TO SIGN FUNDING AGREEMENT AND AMENDMENTS FOR FUNDING UNDER THE SAFE DRINKING
WATER STATE REVOLVING FUND AMERICAN RECOVERY AND REINVESTMENT ACT; AUTHORIZING the
GM, AGM and /or the CFO TO APPROVE CLAIMS FOR REIMBURSEMENT; AUTHORIZING the GM, CFO and
AGM TO EXECUTE BUDGET AND EXPENDITURE SUMMARY; AUTHORIZING AGM TO SIGN THE
CONTRACTOR'S RELEASE FORM AND AGM TO SIGN THE CERTIFICATION OF PROJECT COMPLETION.
WHEREAS, on 2/23/2009 , the STPUD made application to the California Department of Public
Health for funding under the California Safe Drinking Water State Revolving Fund and the federal AMERICAN
RECOVERY AND REINVESTMENT ACT of 2009 for a project commonly known and described as Water
Meter Installation (herein the orolect): and
WHEREAS, on 06104/2009 , said STPUD Board of Directors adopted a project budget totaling
$4,387,500 and;
WHEREAS, it is anticipated that the Funding Agreement under the California Safe Drinking Water State
Revolving Fund and the federal AMERICAN RECOVERY AND REINVESTMENT ACT of 2009 will provide for a
loan in the amount of $4,387,500, of which $ 4,387,500 will be provided as additional subsidization in the
form of principle forgiveness.
WHEREAS, prior to the California Department of Public Health's issuance of said Funding Agreement,
STPUD Board of Directors is required to pass a resolution authorizing an officer to execute said Funding
Agreement and amendments, authorizing an officer to execute all certifications and reports required of funding
recipients under the California Safe Drinking Water State Revolving Fund and the federal American Recovery and
Reinvestment Act of 2009; designating a person to approve claims for reimbursement, designating a person
(registered engineer) to sign the Budget and Expenditure Summary, designating a person (registered engineer) to
sign Certification of Project Completion, and designating a person to sign the Contractor's Release Form.
NOW, THEREFORE, BE IT RESOLVED AND ORDERED, that the STPUD General Manager,
Assistant General Manager and /or the Chief Financial Officer is hereby authorized to sign the Safe Drinking
Water State Revolving Fund program Funding Agreement and any amendments thereto; and
BE IT FURTHER RESOLVED AND ORDERED, that the STPUD General Manager, Assistant General
Manager and /or the Chief Financial Officer is hereby authorized to sign all certifications and reports required
of funding recipients under the California Safe Drinking Water State Revolving Fund program and /or the federal
American Recovery and Reinvestment Act of 2009, and
BE IT FURTHER RESOLVED AND ORDERED, that the STPUD General Manager, Assistant
General Manager and/or the Chief Financial Officer is hereby authorized to approve Claims for
Reimbursement under the Safe Drinking Water State Revolving Fund program; and
BE IT FURTHER RESOLVED AND ORDERED, that the STPUD General Manager, Assistant
General Manager and /or the Chief Financial Officer is hereby authorized to execute the Budget and
Expenditure Summary for the Safe Drinking Water State Revolving Fund program; and
BE IT FURTHER RESOLVED AND ORDERED, that the STPUD Assistant General Manager is
hereby authorized to sign the Contractor's Release Form for the Safe Drinking Water State Revolving Fund
Program; and
Revised June 11, 2009 -17- Page 1 of 2
Enclosure No. 14
BE IT FURTHER RESOLVED AND ORDERED, that the STPUD Assistant General Manasler is
hereby authorized to certify that the project is complete and ready for final inspection; and
BE IT FURTHER RESOLVED AND ORDERED, that the project infrastructure investment is an
appropriate use of taxpayer dollars.
Passed and adopted by the STPUD Board of Directors) on 9/3/2009, by the following vote:
AYES: Directors
NOES: Directors
EXCUSED: Directors
, President
Mary Lou Mosbacher
ATTEST:
Kathy Sharp, Clerk of the Board
Revised June 11, 2009
Page 2 of 2
-18-
NO
SOUTH
y H Tq o
O lt
Ie� • 1950 •`N
TAHOE PUBLIC UTIL
"Basic Services for a Comp /ex World"
Richard Solbrig, General Man
Paul Sciuto, Assistant M
Mary Lou Mosbacher, President
BOARD MEMBERS
Dale Rise, Vice President
James R. Jones, Director Eric W. Schafer, Director Ernie Claudio, Director
REGULAR MEETING OF THE BOARD OF DIRECTORS
SOUTH TAHOE PUBLIC UTILITY DISTRICT
AUGUST 6, 2009
MINUTES
The Board of Directors of the South Tahoe Public Utility District met in a regular session,
August 6, 2009, 2:00 P.M., District Office, 1275 Meadow Crest Drive, South Lake Tahoe,
California.
BOARD OF DIRECTORS ATTENDEES
President Mosbacher, Directors Rise, Claudio, Schafer,
Jones.
STAFF
Solbrig, Sharp, Sciuto, Hughes, C. Stanley, Adams,
Callian, Coyner, Henderson, Morse, Ryan, Nolan,
R. Johnson, Barnes, Hoggatt, Baugh, W. Stanley
Thiel, Curtis, Attorney Kvistad
GUESTS:
Joyce Blackstone, Peggy Cocores, John Runnels,
Ken Curtzwiler, David Makovec, Vicki InFerrera,
Paul Morris, Chris Cefalu, Scott Swift, Donna Rise
Paul Morris led the pledge to the flag.
PLEDGE OF ALLEGIANCE
Ken Curtzwiler read aloud a statement (on file) he pre- COMMENTS FROM THE AUDIENCE
pared stating his views on an August 5 letter to the
editor printed in the Tahoe Daily Tribune from Wanda
Stanley. John Runnels and Wanda Stanley added to
the comments.
Moved Schafer / Second Rise / Passed Unanimously CONSENT CALENDAR
to approve the Consent Calendar as submitted:
a. 2009 Sonora Waterline Replacement Project -
Approved Change Order No. 1 to Campbell
Construction Co., Inc., in the amount of
$ 128,045.81;
-19-
REGULAR BOARD MEETING MINUTES - AUGUST 6, 2009 PAGE - 2
b. Unpaid Assessments — Adopted Resolution CONSENT CALENDAR
No. 2867 -09, authorizing delinquent accounts (continued)
be added to the 2009/20 El Dorado County Tax
Assessor's Roll;
c. InfraMap Software Purchase — Authorized purchase
of six licenses of InfraMap software from iWater,
Inc., for $2,459 each, for a total of $14,754, plus
tax;
d. GIS Maintenance and Development — Approved Task
Order No. 10 amendment to ArOte Systems, to provide
additional consulting and support services, in the to,
estimated amount of $49,000;
e. 2009 Water Meter Installation Project — Authorized
staff to advertise for bids; ,
f. Final and Secondary Efflluent Pump Station —,
Approved Change Order No. 7 to Pacific Mechanical
pP 9
Corporation, in the amount of $8,259.99; i
g. Rocky Point Erosion Control — Authorized staff to
pay invoice received from City of South Lake Tahoe
for water and sewer relocation, in the amount of
$10,890;
h. Annual Software Support Costs for Financial /Payroll
Software — Approved payments to SunGard Public
Sector for annual maintenance costs in the amount
of $15,921.46, plus tax.
ITEMS FOR BOARD ACTION
During routine camera viewing of the District's sewer main,
roots were discovered in the lateral located at 2290
Montana Avenue. Staff sent a letter notifying property
owner, Joyce Blackstone, of the roots as a courtesy
since roots can eventually lead to a clog. The customer is
required to maintain the sewer lateral from their property to
the main. Roots were located a couple of feet up the lateral
from the main, and not in the District's main.
REQUEST TO APPEAR BEFORE
THE BOARD RECEIVED FROM
JOYCE BLACKSTONE
Ms. Blackstone appeared before the Board and presented
photos taken by Apollo Plumbing, and stated the photos
confirm the roots were not from her property. She requested
the Board approve reimbursement of $307.50 for the amount
incurred to have the sewer line cleaned of roots, and also
requested continued maintenance by STPUD of this area
to prevent reoccurrence.
-20-
REGULAR BOARD MEETING MINUTES - AUGUST 6, 2009 PAGE - 3
Ms. Blackstone attended the August 3 Water and
Wastewater Operations Committee, where ownership
and maintenance of private sewer laterals was
discussed. On their recommendation, she approached
the Helping Hands program for financial assistance and
found that the program only helps those who are in
arrears in paying their bills, and she did not meet that
criteria, hence her request for reimbursement.
Moved Claudio / Second Mosbacher / to split associated
costs with Ms. Blackstone. The motion was subsequently
withdrawn because the invoice from Apollo Plumbing
included labor costs incurred to bring her sewer cleanout
up to grade. She will reappear before the Board at a later
date with a revised bill.
No Board action.
David Makovec filed a claim with the District in excess of
$21,000 as a result of work performed to excavate and
remove an old septic tank as well as replace a sewer
lateral that was in need of repair due to root intrusion.
Mr. Makovec claimed it was the District's responsibility as
he was not aware of the septic tank and subsequent
research showed a District permit card which said that the
septic tank was "pumped and filled." Mr. Makovec stated
that had the septic tank been properly inspected, the sewer
overflow would not have occurred.
Lisa Coyner and Mike Adams explained that Mr. Makovec
should have been aware of the existence of the septic tank
as his Grant Deed listed a leach field, which is used for a
septic tank. The District also notified the owner, every year
for three years, that his sewer lateral continued to back sew -
ge out of the cleanouts because there was root intrusion
and he needed to replace or repair his sewer lateral (which is
his property and not the District's responsibility). Mr. Makovec
did not repair his sewer lateral until there was another backup
in April of this year.
REQUEST TO APPEAR BEFORE THE
BOARD RECEIVED FROM JOYCE
BLACKSTONE
(continued)
LIABILITY CLAIM AGAINST STPUD
RECEIVED FROM DAVID
MAKOVEC
The District's claim adjuster, Carl Warren & Company, agreed
that this is not the District's responsibility and recommended the
claim be rejected.
Pursuant to Section 54956.9(b) of the California
Government Code, the Board adjourned to closed
session at 3:20 p.m. to discuss the merits of the claim
with legal counsel and staff. They reconvened to
open session at 3:40 p.m.
-21-
REGULAR BOARD MEETING MINUTES - AUGUST 6, 2009 PAGE - 4
Moved Claudio / Second Schafer / Passed Unanimously LIABILITY CLAIM AGAINST STPUD
to reject claim in accordance with Government Code RECEIVED FROM DAVID
Section 913. MAKOVEC
(continued)
Moved Schafer / Second Jones / Passed Unanimously
to approve payment in the amount of $3,796,757.37.
Water and Wastewater Operations Committee: The
committee met August 3. Minutes of the meeting are
available upon request.
PAYMENT OF CLAIMS
BOARD MEMBER STANDING
COMMITTEE REPORTS
The next meeting of the Water Agency will be held at EL DORADO COUNTY WATER
the District on August 12. There are problems with AGENCY WATER PURVEYOR
Policy 4 (guidelines for funding of purveyors' cost -share REPORT
projects) that are being worked on.
Director Jones relayed his exasperation with a Board BOARD MEMBER REPORTS
member over an article in the Tahoe Daily Tribune
that accused the District of not being transparent. Other
Board members added to the comments.
Director Claudio distributed a typed report and reported
on the July 22 Board workshop, questions he had on the
agenda, the recycled water EIR, and his concerns about
sprinkling recycled water in Alpine County.
Director Schafer reported he will attend the next CASA
Conference and would bring back information if anyone is
interested in anything listed on the agenda that is posted
on their web site.
Director Mosbacher reported water shortages are a serious
problem in some areas, and some are forced to purchase
it from others.
General Manager: Richard Solbrig reported on the July 22 GENERAL MANAGER REPORTS
Board workshop, outreach for the metering program, the
status of the City Water MOU, and that District projects
plus the 2/3 reimbursement for utility relocations will be
included in the reauthorized Lake Tahoe Restoration Act.
4:40 — 4:55 P.M.
MEETING BREAK
Grants Coordinator: Lynn Nolan reported that the water STAFF REPORTS
audit program was cut from the metering grant. She
distributed a report showing the status of all grants
applied for, and received to date.
-22-
REGULAR BOARD MEETING MINUTES - AUGUST 6, 2009 PAGE - 5
Water Conservation Specialist: Shelly Barnes distributed STAFF REPORTS
a handout and reported on the status of the successful turf- (continued)
buy back program, which concludes at the end of this
growing season. She also reported on educational outreach
plans.
Chief Financial Officer: Paul Hughes gave an update on
the impacts of the state budget that was recently passed.
pT r ES � i
Clerk of the Board: Kathy Sharp gave an update on thef...�!
-gml -
list of candidates running for seats on the Board in the
November elections.
5:30 P.M.
ADJOURNMENT TO CLOSED
SESSION
ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION
No reportable Board action.
Pursuant to Section 54956.9(b)/
Conference with Legal Counsel -
Anticipated Litigation (One Case)
See Page 3 for action on this item.
No reportable Board action.
No reportable Board action.
6:15 P.M.
Pursuant to Government Code
Section 54956.9(b) /Conference
with Legal Counsel re: Liability
Claim Against STPUD Received
from David Makovec
Pursuant to Government Code
Section 54956.9(a) /Conference
with Legal Counsel - Existing
Litigation re: Meyers Landfill Site:
United States of America vs. El
Dorado County and City of South
Lake Tahoe and Third Party
Defendants, Civil Action No.
S -01 -1520 LKK GGH, U.S. District
Court for the Eastern District of Ca.
Pursuant to Government Code
Section 54956.9(a) /Conference
with Legal Counsel - Existing
Litigation: Tahoe Asphalt, Inc., and
Tahoe Asphalt Materials Company,
LLC, vs. STPUD, Case No.
SC20090104, El Dorado Superior
Court
ADJOURNMENT
-23-
REGULAR BOARD MEETING MINUTES - AUGUST 6, 2009 PAGE - 6
Mary Lou Mosbacher, Board President
South Tahoe Public Utility District
ATTEST:
Kathy Sharp, Clerk of the Board
South Tahoe Public Utility District
-24-
SOUTH TAHOE PUBLIC UTILITY DISTRICT
• 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 -
- Phone 530.544.6474 • Facsimile 530.541.0614
Agenda Item 6a
NOTE: COMPLETION OF THE ABOVE INFORMATION IS VOLUNTARY AND NOT A PRECONDITION FOR ATTENDANCE.
REQUEST TO APPEAR BEFORE THE BOARD
(Use Separate Sheet if Necessary)
1. Name: Jovice Blackstone
2. Street Address: 2290 Montana Avenue
3. Mailing Address: P.O. Box 686, South Lake Tahoe. Ca 96156
4. Phone No: 530 - 544 -2195 Date: 07 -21 -09
5. Date I wish to appear: Before committee: N/A Before full Board: 09 -03 -09
6. 1 have discussed this matter with a member of District staff: Yes X No
If "Yes ": Name /Department of District contact: Mike Adams
7. Staff Introduction: Mike Adams, UGR Sewer Supervisor notified Ms. Joyce Blackstone
via mail that the sewer lateral from her property had a root growth Droblem. The roots
were noticed during CCTVing of the main she is connected. CCTV indicate roots
starting a couple feet up lateral from the main.
8. Customer Comments: I was asked after my appearance on this issue in front of the
Board on 08- 06 -09, to reappear and submit a revised bill from Apollo for cleaning of the
root intrusion.
9. Action I am requesting Board take: Request reimbursement of $125.00 to Joyce
Blackstone.
10. Staff Comments / Recommendation: Randy Curtis — Manager Field Operations: Per
the Administrative Code. the Customer shall maintain sewer laterals of the property
served as per: Section 4.7 Maintenance and Repair of Sewers. paragraph 4.7.2
Maintenance of Sewer Laterals. Recommend not waiving the Administrative Code due to
the precedent it would set. This is a maintenance item not an installation problem. Per
legal counsel, if the Board decides to waive the Administrative Code, it must state so for
the record and give justification as to why.
Attachments: Revised bill from Terry's Appollo Plumbing and Heating. Inc.
-25-
Aug 1b U9 UVWa
• Commerdal
• Residential
• space Planning
• Coasdtation
• Wallcoverings
• Wiodowcovexings
a Lighting
Floorcoverhngs
• Furniture
• Kitchen & Bath Design
P.O. Box 686
South Lake Tabor,
CA 96156
(530)544 -2195
Fax: (530) 541 -7168
JOYCE W. BLACKSTONE ASID
INTERIOR DESIGN
NCIDQ 13282 - Nevada Registered Interior Designer
August 25, 2009
Kathy Sharp, Clerk of the Board
South Tahoe Public Utility District
Dear Kathy:
Per the request of the STPUD Board at their meeting of
August 6, 2009, attached please find the revised invoice
from Terry's Apollo Plumbing and Heating noting the
clearing of roots out of main sewer cost of $125.00.
I am requesting of the Board to approve reimbursement
to me of $125.00. - .
Thar
I Joycl
-27-
P.1
Hug LD Uy Lrj1 Ye
Invoice
Terry'sApollo Plumbing and Heating, Inc CA Uc#813437
PO Box 2535
South Lake Tahoe, CA 96150
Ph 530 544 8404 / Fx 530 542 1020
apoll oplumbingilgicharter.net
Bill To:
JOYCEBLACKSTONE
P.O. BOX 686
SLT, CA 96156
530 544 2195 530 957 3419 CL
p.c
June 25, 2009
14M/Qty
Summary:
PLUMBING
Invoice #:
1394 -60818
Tech:
35 STEVE 3
Due Date:
711312009
Job Date:
6/2512009
Job Name:
2290 MONTANA
JOYCE
SLT, CA 96150
530 544 2195
Item Code Description
14M/Qty
Price
Amount
Video inspect 4" sewer lateral from vent pipe to c ty sewer line locate & mark where roots have grown into lateral -
Also locate S raise 4" cleanout access to ground level
307.50
$307.50
Note: Cost to clear roots out of main sewer $125.00
LABOR STEVE
1.00
105.00
105.00
LABOR TERRY
1.00
105.00
105.00
DISCOUNT OFFERED ON LABOR
1.00
-52.50
-52.50
EQUIPMENT - CAMRA
1.00
150.00
150.00
Labor
Other
Subtotal
Total
210.00
97.50
307.50
$307.50
Ali material is guaranteed to be as specified. All work to be completed in a professional manner
according to standard practices. Any alteration or deviation from above specifications involving extra
costs will be executed only upon written orders and will become an extra charge over and above the
estimate. AN agreernents contingent upon delays beyond our control Purchaser agrees to pay all costs
of collection, Including attorney's tees.
i
Terms: Net 30
THANK YOU FOR YOUR BUSINESS
Credits: $307.50 CR
Balance: $0.00
-28-
Ganes! Manow
Kichard H. Solbrlg
10% Dwaafto
Ernie QwAp
15outh Tahou James R. Jorreas
Pumic Utility C)i6trict Lou Mosbaaw
IM MesAw Crwt Prim + ftM Lako Tahm & CA 96150
Fhons 530 544 -0474 s Fox 530 X41 -06114
BOARD AGENDA ITEM 6b
TO: Board of Directors
FROM: Julie Ryan, Senior Engineer
MEETING DATE: September 3, 2009
ITEM — PROJECT NAME: Wastewater Treatment Plant Filter Rehabilitation
REQUESTED BOARD ACTION: Approve proposal from Brown & Caldwell Consulting
Engineers (B &C) for design services.
DISCUSSION: Staff is currently designing the Filters 5 and 6 Rehabilitation Project at
the Wastewater Treatment Plant. To support that design, B &C recently prepared a filter
inspection and evaluation report. In this report B &C recommended not only
rehabilitation of the filter vessels and piping, but also replacement of the valves,
instrumentation and electrical systems for all six filters. Staff has requested that B &C
prepare a proposal for the following additional tasks in support of the filter rehabilitation
project.
1) Evaluate the applicable options for valves, valve actuators, instrumentation and
SCADA upgrades.
2) Prepare a Basis of Design Memo, 90% Design, Bid Documents and Engineer's
Estimate for these elements of the filter rehabilitation project.
3) Provide as- needed services during the bid period and construction.
Staff is currently negotiating the terms of the agreement, and will provide the Scope of
Work and Cost Estimate for Board Consideration prior to, and at the Board meeting.
SCHEDULE: September 2009 to December 2010
COSTS: To be determined
ACCOUNT NO: 1029 - 8066 /FILTER
BUDGETED AMOUNT REMAINING: $149,245
ATTACHMENTS: To be distributed prior to, and at the Board meeting.
-29-
Ganaml Manager
Richard H. Sal"
u Tah oc; E Claudio
.James 1C. ,1a+es
Public Utility Di
1 7_11
AVA
t � I' =# # if .► � j
BOARD AGENDA ITEM 6c
TO: Board of Directors
FROM: Jim Hoggatt, Engineering Department Manager
MEETING DATE: September 3, 2009
ITEM — PROJECT NAME: South Tahoe Public Utility District Recycled Water Facilities
Master Plan
2:30 P.M. PUBLIC HEARING
REQUESTED BOARD ACTION: Hold a Public Hearing to take public comments on the
Master Plan Draft Environmental Impact Report.
DISCUSSION: At 2:30 p.m. open public hearing to receive public comments on the
South Tahoe Public Utility District Recycled Water Facilities Master Plan Draft
Environmental Impact Report.
SCHEDULE:
COSTS: N/A
ACCOUNT NO: N/A
BUDGETED AMOUNT REMAINING: N/A
ATTACHMENTS: Notice
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES A NO
-31-
NOTICE OF AVAILABILITY
SOUTH TAHOE PUBLIC UTILITY DISTRICT
RECYCLED WATER FACILITIES MASTER PLAN
DRAFT ENVIRONMENTAL IMPACT REPORT
This notice is to inform you that a 45 -day public comment period for the Recycled Water Facilities Master Plan Draft EIR commenced on
July 23, 2009 and concludes on September 6, 2009. Comments are solicited and will be incorporated into the final EIR. Comments
received after September 6, 2009 may not be included in the final document. Public comments may be submitted in writing and mailed, or
emailed to:
Mail: South Tahoe Public Utility District Email: jhoggatt@stpud.dst.ca.us
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
The South Tahoe Public Utility District Recycled Water Facilities Master Plan includes a combination of actions to dispose of treated
effluent and associated actions to convey and apply reclaimed water to District lands and manage fresh water resources. The plan updates
the 1989 Master Plan and includes new and revised information on increases in system demands and disposal opportunities and constraints.
Copies of the Draft EIR are available for public review during normal business hours at the South Tahoe Public Utility District Office (1275
Meadow Crest Drive, South Lake, CA), the Markleeville Library and Archives (270 Laramie Street, Markleeville, CA) and the El Dorado
County Library (345 Fair Lane, Placerville, CA). A PDF of the Draft EIR is available to download on the District's website at: http://
www.stpud.us/.
Two public hearings are scheduled to solicit comments on the Draft EIR:
September 2, 2009: 1:00 p.m. to 3:00 p.m. at Turtle Rock Park, 99 Water Street, Markleeville, CA.
September 3, 2009: South Tahoe Public Utility District Board Meeting, 2:30 p.m. to 3:30 p.m. at the District Office,
1275 Meadow Crest Drive, South Lake Tahoe, CA.
For additional information, please contact Jim Hoggatt at (530) 543 -6206 or email jhoggatt@stpud.dst.ca.us.
—33—
PAYMENT OF CLAIMS
FOR APPROVAL
September 3, 2009
Payroll 8/26/09
Payroll 8/19/09
- rbtal Payroll
BNY Western Trust Company
CDS- health care payments
Brownstein /Hyatt/Farber /Schreck legal services
Bank of America
Union Bank
Total Vendor EFT
Accounts Payable Checks -Sewer Fund
Accounts Payable Checks -Water Fund
Accounts Payable Checks - Self - funded Insurance
Accounts Payable Checks - Grants Fund
Total Accounts Payable
Grand Total
Payroll EFTs & Checks
EFT
AFLAC Medical & Dependent Care
EFT
CA Employment Taxes & W/H
EFT
Federal Employment Taxes & W/H
EFT
CalPERS Contributions
EFT
Great West Deferred Comp
CHK
Stationary Engineers Union Dues
EFT
United Way Contributions
CHK
CA State Disbursement Unit
CHK
El Dorado County Sheriffs Dept
EFT
Employee Direct Deposits
CHK
Employee Paychecks
Total
430,152.80
3,131.67
433, 284.47
0.00
156, 388.19
13,748.82
0.00
M
170,137.01
8/26/09
264.13
17,404.45
92,429.53
72,646.14
16, 385.85
2,415.27
156.00
460.15
184.62
219,656.95
8,149.71
189, 090.96
898,731.61
0.00
25,233.34
1,113,055.91
1, 716,477.39
8/19/09
0.00
177.01
1,186.38
0.00
115.00
0.00
0.00
0.00
0.00
1,653.28
0.00
430,152.80 3,131.67
-35-
PAYMENT OF CLAIMS
Vendor Name Department / Proi Name Description Acct# / Proi Code Amount Check Num Tvoe
ACCURATE PROCESS HUMAN RESOURCES PERSONNEL EXPENS 1022 - 6670 25.00
ACCURATE PROCESS HUMAN RESOURCES PERSONNEL EXPENS 2022 - 6670 25.00
Check Total: 50.00 AP -00073572 MW
ACWA HEALTH BENEFITS AUTHORITY GEN & ADMIN VISION INS 1000 - 2530 2,717.50
Check Total: 2.717.50 AP -00073573 MW
AERVOE- PACIFIC UNDERGROUND REP PIPE /CVRS /MHLS 2001 - 6052 216.22
Check Total: 216.22 AP- 00073574 MW
AFLAC GEN & ADMIN SUPP INS W/H 1000 - 2532 875.37
AFLAC GEN & ADMIN AFLAC FEE DED 1000 - 2538 115.00
Check Total: 890.37 AP -00073575 MW
AHERN RENTALS HEAVY MAINT GROUNDS & MNTC 1004 - 6042 110.93
AHERN RENTALS DIAMOND VLY RNCH - HARVEY CHANNEL HARVEY CHANNEL 1028 - 8830 - HARVEY 6,693.76
Check Total: 6,804.69 AP-00073576 MW
ALPEN SIERRA COFFEE GEN & ADMIN OFC SUPPLY ISSUE 1000 - 6081 310.00
Check Total: 310.00 AP -00073577 MW
ALP( E EYECARE LLC FINANCE SAFETY /EQUIP /PHY 1039 - 6075 145.00
ALPINE EYECARE LLC FINANCE SAFETY /EQUIP /PHY 2039 - 6075 145.00
Check Total: 290.00 AP- 00073578 MW
ALPINE METALS HEAVY MAINT GROUNDS & MNTC 1004 - 6042 108.64
ALPINE METALS HEAVY MAINT BIOSOL EQUP/BLDG 1004 - 6653 763.43
ALSBURY, MARY
ALSBURY, MARY
Check Total: 149.00 AP -00073580 MW
AMERIGAS DIAMOND VLY RNCH PROPANE 1028 - 6360 105.00
Check Total: 105.00 AP- 00073581 MW
AMERIPRIDE UNIFORM SERVICES GEN & ADMIN UNIFORM PAYABLE 1000 - 2518 1,025.53
Check Total: 1,025.53 AP- 00073582 MW
ARCE, DANIEL LABORATORY TRAVEL/MEETINGS 1007 - 6200 33.28
ARCE, DANIEL LABORATORY TRAVEUMEETINGS 2007 - 6200 33.27
Check Total: 66.55 AP- 00073583 MW
User: THERESA
Report: OH_PMT_CLAIMS_BK
Check Total: 872.07 AP- 00073579 MW
INFORMATION SYS TRAVEUMEETINGS 1037 - 6200 74.50
INFORMATION SYS TRAVEUMEETINGS 2037 - 6200 74.50
Page: 1 Current Date: 08/28/2009
Current Time: 09:52:52
PAYMENT OF CLAIMS
Vendor Name Department / Proi Name Description Acct# / Proi Code Amount Check Num Tvae
ARIZONA INSTRUMENT CORP OPERATIONS SERVICE CONTRACT 1006 - 6030 975.00
Check Total: 975.00 AP -00073584 MW
AT &T /CALNET 2 GEN & ADMIN TELEPHONE 1000 - 6310 15.67
AT&TICALNET 2 PUMPS TELEPHONE 1002 - 6310 82.49
AT &T /CALNET 2 OPERATIONS TELEPHONE 1006 - 6310 30.45
AT &T /CALNET 2 INFORMATION SYS TELEPHONE 1037 - 6310 82.83
AT &T /CALNET 2 GEN & ADMIN TELEPHONE 2000 - 6310 15.66
AT &T /CALNET 2 PUMPS TELEPHONE 2002 - 6310 36.16
AT &T /CALNET 2 INFORMATION SYS TELEPHONE 2037 - 6310 82.82
Check Total: 346.08 AP -00073585 MW
AVINA, FRANCISCO UNDERGROUND REP TRAVEL/MEETINGS 1001 - 6200 121.60
Check Total: 121.60 AP- 00073586 MW
AXELSON IRON SHOP PUMPS PUMP STATIONS 1002 - 6051 30.00
Check Total: 30.00 AP -00073587 MW
CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 59.95
BARNES, SHELLY
BAY +OOL & SUPPLY INC
Check Total: 59.95 AP- 00073588 MW
GEN & ADMIN SMALL TOOLS INV 1000 - 0423 37.45
Check Total: 37.45 AP -00073589 MW
BB &H BENEFIT DESIGNS HUMAN RESOURCES CONTRACT SERVICE 1022 - 4405 624.50
BB &H BENEFIT DESIGNS HUMAN RESOURCES CONTRACT SERVICE 2022 - 4405 624.50
Check Total: 1,249.00 AP -00073590 MW
BENTLY AGROWDYNAMICS OPERATIONS SLUDGE DISPOSAL 1006 - 6652 2,717.40
Check Total: 2,717.40 AP -00073591 MW
BI STATE PROPANE UNDERGROUND REP SHOP SUPPLIES 1001 - 6071 24.98
Check Total: 24.98 AP -00073592 MW
BING MATERIALS UNDERGROUND REP PIPE /CVRS /MHLS 2001 - 6052 648.30
Check Total: 648.30 AP-00073593 MW
BIRD, HAL DIAMOND VLY RNCH TRAVEL/MEETINGS 1028 - 6200 141.00
Check Total: 141.00 AP -00073594 MW
BRAKE, PERRY LABORATORY OFFICE SUPPLIES 1007 - 4820 9.92
BRAKE, PERRY LABORATORY OFFICE SUPPLIES 2007 - 4820 7.50
User: THERESA
Page: 2 Current Date: 08/28/2009
Report: OH_PMT_CLAIMS_BK Current Time: 09:52:52
Vendor Name
BROWN & CALDWELL CONSULTANTS
BROWN & CALDWELL CONSULTANTS
BROWN & CALDWELL CONSULTANTS
BSNUG
BSNUG
BUCKMAN, AARON
CAMPBELL CONSTRUCTION CO INC
CAMPBELL CONSTRUCTION CO INC
CAMPBELL CONSTRUCTION CO INC
CAMPBELL CONSTRUCTION CO INC
CAPgp INC
CAPF INC
CAROLLO ENGINEERS
CARSON PUMP
CASHMAN EQUIPMENT
CDS GROUP HEALTH
CENTERPOINT
CITY NATIONAL BANK
COLE - PARMER INSTRUMENT CO
Department / Proi Name
OPERATIONS - FILTER ASSMNT
ENGINEERING - ANGORA TNK REPL
ENGINEERING - ECHO TANK REPL
INFORMATION SYS
INFORMATION SYS
OPERATIONS
GEN & ADMIN - AL TAHOE WTR -09
GEN & ADMIN - SONORA AVE WTRLN
ENGINEERING - SONORA AVE WTRLN
ENGINEERING - AL TAHOE WTR -09
FINANCE
FINANCE
ENGINEERING - ARSENIC FACILITY
PUMPS
EQUIPMENT REPAIR
SELF FUNDED INS
PAYMENT OF CLAIMS
DIAMOND VLY RNCH - HARVEY CHANNEL HARVEY CHANNEL
GEN & ADMIN - EFFLUENT EVAL CONST RETAINAGE
LABORATORY LAB SUPPLIES
User: THERESA Page: 3
Report: OH_PMT_CLAIMS_BK
Description
FLTR BLD ASSMNT
TANK, ANGORA
TANK, ECHO
TRAVEL/MEETINGS
TRAVEL/MEETINGS
TRAVEL/MEETINGS
CONST RETAINAGE
CONST RETAINAGE
WTRLN,SNRA/SK RN
WTLN AL TAHOE 09
TRAVEL/MEETINGS
TRAVEL/MEETINGS
ARSNC TRTMNT
WELLS
AUTOMOTIVE
ADMIN FEE
Acct# / Proi Code
1006 - 8862 - FILTER
2029 - 7064 - ANGOTK
2029 - 8809 - ECHOTK
Check Total:
1037 - 6200
2037 - 6200
1006-6200
Check Total:
2000 - 2605 - ATWL09
2000 - 2605 - SONORA
2029 - 7911 - SONORA
2029 - 8065 - ATWL09
Check Total:
1039 - 6200
2039 - 6200
2029 - 8864 - ARSNIC
Check Total:
Check Total:
Check Total:
Check Total:
2002 - 6050
2005 - 6011
3000 - 6741
1028 - 8830 - HARVEY
Check Total:
1000 - 2605 - EFFLEV
Check Total:
1007-4760
Check Total:
Check Total:
Check Total:
Current Date: 08/28/2009
Current Time: 09:52:52
Amount Check Num Tvae
17.42 AP -00073595 MW
833.72
2,013.17
691.31
3,538.20 AP -00073596 MW
250.00
250.00
500.00 AP -00073597 MW
206.09
206.09 AP- 00073598 MW
- 26,293.46
- 8,285.47
82,854.72
262,934.50
311,210.29 AP- 00073599 MW
50.00
50.00
100.00 AP -00073600 MW
4,343.25
4,343.25 AP -00073601 MW
3,800.00
3,800.00 AP- 00073602 MW
1,138.63
1,138.63 AP -00073603 MW
2,311.10
2,311.10 AP -00073604 MW
AP- 00073605 MW
AP -00073606 MW
662.00
662.00
413.00
413.00
143.41
PAYMENT OF CLAIMS
Vendor Name Department / Proi Name Description Acct# / Proi Code Amount Check Num Type
COLE - PARMER INSTRUMENT CO LABORATORY LAB SUPPLIES 2007 - 4760 162.11
Check Total: 305.52 AP -00073607 MW
CONSTRUCTION MATERIALS ENG INC ENGINEERING - TWIN PEAKS BS BSTR, TWN PEAKS 2029 - 7070 - TPBSTR 655.00
Check Total: 655.00 AP-00073608 MW
CREEK ENVIRONMENTAL LABS LABORATORY - ARHD3 TRTMT EXP MONITORING 2007 - 6110 - AH3EXP 265.00
CREEK ENVIRONMENTAL LABS LABORATORY - BKRFLD TRTMT EXP MONITORING 2007 - 6110 - BKRFLD 455.00
CREEK ENVIRONMENTAL LABS LABORATORY - HERBST MONITORING 2007 - 6110 - HERBST 220.00
CREEK ENVIRONMENTAL LABS LABORATORY MONITORING 2007 - 6110 2,150.00
Check Total: 3,090.00 AP -00073609 MW
CWEA HEAVY MAINT DUES /MEMB /CERT 1004 - 6250 132.00
Check Total: 132.00 AP -00073610 MW
D &L FOUNDRY & SUPPLY GEN & ADMIN FRAME/COVERS INV 1000 - 0410 2,582.76
D &L FOUNDRY & SUPPLY UNDERGROUND REP PIPE/CVRS /MHLS 1001 - 6052 75.00
D &L FOUNDRY & SUPPLY GEN & ADMIN BOXES /LIDS /INV 2000 - 0403 1,828.74
Check Total: 4486.50 AP- 00073611 MW
DAT%) SERVICES CORP HUMAN RESOURCES SAFETY PROGRAMS 1022 - 6079 182.00
DATdO SERVICES CORP HUMAN RESOURCES SAFETY PROGRAMS 2022 - 6079 182.00
Check Total: 364.00 AP - 00073612 MW
DAVI LABORATORIES LABORATORY MONITORING 2007 - 6110 1,125.00
Check Total: 1,125.00 AP 00073613 MW
DIVERSIFIED CONCRETE CUTTING UNDERGROUND REP - ROCKY POINT WL WTLN,IN HS UPSIZ 2001 - 8905 - ROCWTR 970.00
Check Total: 970.00 AP - 00073614 MW
E- FILLIATE CORP INFORMATION SYS DIST.COMP SPPLIS 1037 - 4840 3.68
E- FILLIATE CORP INFORMATION SYS DIST.COMP SPPLIS 2037 - 4840 3.69
Check Total: 7.37 AP - 00073615 MW
EL DORADO COUNTY PUMPS OPERATING PERMIT 1002 - 6650 3,500.00
EL DORADO COUNTY PUMPS OPERATING PERMIT 2002 - 6650 2,250.00
Check Total: 5,750.00 AP- 00073616 MW
EMPIRE SAFETY & SUPPLY UNDERGROUND REP SAFETY/EQUIP /PHY 1001 - 6075 375.23
Check Total: 375.23 AP - 00073617 MW
ENTRIX INC ENGINEERING - SUT WELL REDRILL SUT WELL REDRILL 2029 - 8463 - RWSUTR 336.91
User: THERESA
Page: 4 Current Date: 08/28/2009
Report: OH_PMT_CLAIMS_BK Current Time: 09:52:52
Vendor Name
ENVIRONMENTAL EXPRESS
ENVIRONMENTAL EXPRESS
User: THERESA
FEDEX FREIGHT WEST
PAYMENT OF CLAIMS
Department / Proi Name Description Acct# / Proi Code Amount Check Num Tyne
Check Total: 336.91 AP -00073618 MW
LABORATORY LAB SUPPLIES 1007 - 4760 375.00
LABORATORY LAB SUPPLIES 2007 - 4760 391.28
Check Total:
FEDEX DIO POSTAGE EXPENSES 1027 - 4810
FEDEX DIO POSTAGE EXPENSES 2027 - 4810 18.21
Check Total: 36.43 AP-00073621 M W
1002 - 6051 109.41
Check Total: 109.41 AP -00073620 MW
FISHER SCIENTIFIC LABORATORY LAB SUPPLIES 1007 - 4760 75.91
FISHER SCIENTIFIC LABORATORY LAB SUPPLIES 2007 - 4760 78.85
Check Total: 154.76 AP-00073622 MW
FOCUS ON HEALTHY AGING ADMINISTRATION SUBSCRIPTIONS 1021 - 4830 10.00
FOCUS ON HEALTHY AGING ADMINISTRATION SUBSCRIPTIONS 2021 - 4830 10.00
Check Total: 20.00 AP- 00073623 MW
i
G B gENERAL ENG CONTRACTOR INC UNDERGROUND REP PIPE /CVRS/MHLS 2001 - 6052 24,431.38
i Check Total: 24,431.38 AP- 00073624 MW
GERBER LIFE INSURANCE COMPANY SELF FUNDED INS EXCESS INSURANCE 3000 - 6744 22,244.64
Check Total: 22,244.64 AP -00073625 MW
GOEPFRICH, KARL GEN & ADMIN UB SUSPENSE 1000 - 2002 57.02
GOEPFRICH, KARL GEN & ADMIN CAPACITY CHARGE 1000 - 3401 8,500.00
Check Total: 8,557.02 AP -00073626 MW
GRAINGER GEN & ADMIN JANIT /SUPPLY INV 1000 - 0422 245.05
GRAINGER GEN & ADMIN SAFETY INVENTORY 1000 - 0425 96.40
GRAINGER HEAVY MAINT GROUNDS & MNTC 1004 - 6042 178.52
PUMPS PUMP STATIONS
766.28 AP- 00073619 MW
Check Total: 519.97 AP -00073627 MW
HARDY DIAGNOSTICS LABORATORY LAB SUPPLIES 1007 - 4760 115.57
Check Total: 115.57 AP -00073628 MW
HARTFORD, THE GEN & ADMIN LIFE INS 1000 - 2512 2,042.14
HARTFORD, THE GEN & ADMIN LTD, UNION 1000 - 2539 2,547.82
Page: 5 Current Date: 08/28/2009
Report: OH_PMT_CLAIMS_BK Current Time: 09:52:52
18.22
Check Total: 4,589.96 AP-00073629 MW
Vendor Name
HENDERSON, JOEL
HOME DEPOT CREDIT
HOOVER, RUTH
INTERSTATE SAFETY & SUPPLY
ITT WATER & WASTEWATER
WATER INC
J &L PRO KLEEN INC
J &L PRO KLEEN INC
i
JENb�EN PRECAST
KG WALTERS CONSTRUCTION
KG WALTERS CONSTRUCTION
KG WALTERS CONSTRUCTION
KG WALTERS CONSTRUCTION
KIMBALL MIDWEST
KIMBALL MIDWEST
KIPKE -LEE, ALISON
LAKE TAHOE EYE CARE
LONG, WES
User: THERESA
Report: OH_PMT_CLAIMS_BK
PAYMENT OF CLAIMS
Department / Proi Name Description
CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE
DIAMOND VLY RNCH
CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE
GEN & ADMIN
PUMPS
INFORMATION SYS
FINANCE
FINANCE
UNDERGROUND REP
GEN & ADMIN - ANGORA TNK REPL
GEN & ADMIN - ARSENIC FACILITY
ENGINEERING - ANGORA TNK REPL
ENGINEERING - ARSENIC FACILITY
HEAVY MAINT
UNDERGROUND REP
GROUNDS & MNTC
SAFETY INVENTORY
PUMP STATIONS
LIC GIS SFTWR
JANITORIAL SERV
JANITORIAL SERV
PIPE /CVRS /MHLS
CONST RETAINAGE
CONST RETAINAGE
TANK, ANGORA
ARSNC TRTMNT
SHOP SUPPLIES
PIPE /CVRS /MHLS
CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE
UNDERGROUND REP
DIAMOND VLY RNCH
SAFETY/EQUIP /PHY
TRAVEUMEETINGS
Page: 6
Acct# / Proi Code
2038 - 6660 - WCPROG
Check Total:
1028 - 6042
2038 - 6660 - WCPROG
Check Total:
Check Total:
Check Total:
Check Total:
1000 - 0425
1002 - 6051
1037 - 8080
1039 - 6074
2039 - 6074
1001-6052
2000 - 2605 - ANGOTK
2000 - 2605 - ARSNIC
2029 - 7064 - ANGOTK
2029 - 8864 - ARSNIC
Check Total:
1004 - 6071
2001 - 6052
2038 - 6660 - WCPROG
Check Total:
Check Total:
Check Total:
1001 -6075
1028-6200
Check Total:
Check Total:
Check Total:
Check Total:
Current Date: 08/28/2009
Current Time: 09:52:52
A un Check Num Ty0
497.25
497.25 AP -00073630 MW
43.05
43.05 AP -00073631 MW
1,312.00
1,312.00 AP -00073632 MW
525.10
525.10 AP -00073633 MW
1,532.86
1,532.86 AP -00073634 MW
16,046.15
16.046.15 AP- 00073635 MW
1,603.50
1,603.50
3,207.00 AP- 00073636 MW
951.57
951.57 AP -00073637 MW
- 13,418.50
- 15,814.73
134,185.00
158,147.27
263,099.04 AP -00073638 MW
418.86
198.08
616.94 AP -00073639 MW
4,134.00
4,134.00 AP -00073640 MW
190.00
190.00 AP -00073641 MW
99.00
99.00 AP -00073642 MW
Vendor Name
LOOMIS
LOOMIS
MANNA CONSULTING
MC CONNAUGHEY, SCOTT
MC CONNAUGHEY, SCOTT
MC CONNAUGHEY, SCOTT
MC MASTER CARR SUPPLY CO
MC MASTER CARR SUPPLY CO
MIDWEST COMMUNICATIONS INC
MIERAS, DEAN
N
MITCHELL INSTRUMENT CO.
MITCHOFF, TERRI
MME MUNICIPAL MAINTENANCE
MUIR, BETTY
MY OFFICE PRODUCTS
MY OFFICE PRODUCTS
MY OFFICE PRODUCTS
NEXLEVEL INFORMATION TECH INC
OFFICE MAX
User: THERESA
Report: OH_PMT_CLAIMS_BK
Department / Proi Name
FINANCE
FINANCE
FINANCE
GEN & ADMIN
GEN & ADMIN
GEN & ADMIN
PUMPS
PUMPS
UNDERGROUND REP
ELECTRICAL SHOP
ENGINEERING
UNDERGROUND REP
GEN & ADMIN
ADMINISTRATION
ADMINISTRATION
INFORMATION SYS
GEN & ADMIN
PAYMENT OF CLAIMS
Description
CONTRACT SERVICE
CONTRACT SERVICE
ADP HR INTFC
UB SUSPENSE
UB SUSPENSE
METER SALE
LUTHER PASS
PUMP STATIONS
RADIO- RPRS/RPLCM
CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE
SAFETY/EQU I P/PHY
MISC LIAB CLAIMS
PIPE /CVRS/MHLS
CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE
OFFICE INVENTORY
OFFICE SUPPLIES
OFFICE SUPPLIES
STR PLN IMPL
OFFICE INVENTORY
Page: 7
Acct# / Proi Code
1039 - 4405
2039 - 4405
1039 - 7582
1000 - 2002
2000 - 2002
2000 - 3545
1002 - 6048
1002 -6051
1001 - 6056
Check Total:
Check Total:
Check Total:
Check Total:
Check Total:
2038 - 6660 - WCPROG
Check Total:
Check Total:
Check Total:
Check Total:
1003 - 6075
2029 - 4520
1001 - 6052
2038 - 6660 - WCPROG
Check Total:
1000 - 0428
1021 - 4820
2021 - 4820
1037 - 8078
1000 - 0428
Check Total:
Check Total:
Current Date: 08/28/2009
Current Time: 09:52:52
Amount Check Num I
295.31
295.31
590.62 AP -00073643 MW
3,250.00
3,250.00 AP -00073644 MW
13,198.40
3,911.60
597.00
17,707.00 AP -00073645 MW
642.86
448.68
1,091.54 AP -00073646 MW
150.50
150.50 AP- 00073647 MW
649.05
649.05 AP -00073648 MW
1,869.59
1,869.59 AP- 00073649 MW
258.80
258.80 AP -00073650 MW
1,127.72
1,127.72 AP- 00073651 MW
800.00
800.00 AP -00073652 MW
2,145.09
42.15
42.14
2,229.38 AP -00073653 MW
500.00
500.00 AP -00073654 MW
403.75
Vendor Name
OFFICE MAX
ONTRAC
ONTRAC
ONTRAC
ONTRAC
ONTRAC
ONTRAC
PACIFIC MECHANICAL CORP
PACIFIC MECHANICAL CORP
PARR, KEITH
PRAXAIR 174
PROIcST, MRS. MARISSA
RADIO SHACK
RADIO SHACK
REDWOOD PRINTING
REDWOOD PRINTING
RELIANCE STANDARD
RELIANCE STANDARD
RESORT SPORTS NETWORK
RESOURCE DEVELOPMENT INC
RESOURCE DEVELOPMENT INC
User: THERESA
Report: OH_PMT_CLAIMS_BK
Department / Proi Name
CUSTOMER SERVICE
ENGINEERING
LABORATORY -
LABORATORY -
LABORATORY
ENGINEERING
ENGINEERING
ENGINEERING
ENGINEERING
GEN & ADMIN
GEN & ADMIN
- EFFLUENT EVAL
ARHD3 TRTMT EXP
BKRFLD TRTMT EXP
- ANGORA TNK REPL
- TWIN PEAKS BS
GEN & ADMIN - EFFLUENT EVAL
ENGINEERING - EFFLUENT EVAL
UNDERGROUND REP
PUMPS
UNDERGROUND REP
UNDERGROUND REP
ENGINEERING - WT METERING PRJ
GEN & ADMIN - TWIN PEAKS BS
ENGINEERING - TWIN PEAKS BS
PAYANT OF CLAIMS
tftgdgfta
OFFICE SUPPLIES
REP EXP PUMPS
POSTAGE EXPENSES
POSTAGE EXPENSES
POSTAGE EXPENSES
TANK, ANGORA
BSTR, TWN PEAKS
CONST RETAINAGE
REP EXP PUMPS
TRAVEL/MEETINGS
SHOP SUPPLIES
MISC LIAB CLAIMS
SUPPLIES
SUPPLIES
SHOP SUPPLIES
WTR METERING/NEW
LIFE INS MGMT
LNG TRM DIS,MGMT
CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE
CONST RETAINAGE
BSTR, TWN PEAKS
Page: 8
Acct# / Proi Cede
2038 - 4820
Check Total:
1029 - 8676 - EFFLEV
2007 - 4810 - AH3EXP
2007 - 4810 - BKRFLD
2007 - 4810
2029 - 7064 - ANGOTK
2029 - 7070 - TPBSTR
Check Total:
1000 - 2605 - EFFLEV
1029 - 8676 - EFFLEV
Check Total:
1001 - 6200
1002 - 6071
2001 - 4520
1029 - 6520
2029 - 6520
Check Total:
Check Total:
Check Total:
Check Total:
2001 - 6071
2029 - 7078 - METERS
Check Total:
1000 - 2525
1000 - 2531
Check Total:
2038 - 6660 - WCPROG
Check Total:
2000 - 2605 - TPBSTR
2029 - 7070 - TPBSTR
Current Date: 08/28/2009
Current Time: 09:52:52
Amount Check Num Tyne
304.55
708.30 AP -00073655 MW
19.50
3.00
3.00
36.00
20.00
17.00
98.50 AP -00073656 MW
- 413.00
26,259.99
25,846.99 AP 00073657 MW
291.00
291.00 AP- 00073658 MW
46.90
46.90 AP- 00073659 MW
71.17
71.17 AP -00073660 MW
111.46
111.46
222.92 AP -00073661 MW
257.74
739.50
997.24 AP -00073662 MW
511.85
1,269.01
1,780.86 AP -00073663 MW
1,461.25
1,461.25 AP-00073664 MW
- 20,289.90
202,898.92
PAYMENT OF CLAIMS
Vendor Name Deoartment / Proi Name Description Acct# / Proi Code Amount Check Num In
Check Total: 182.609.02 AP -00073665 MW
RICH'S SMALL ENGINE SERVICE UNDERGROUND REP SHOP SUPPLIES 1001 - 6071 51.98
Check Total: 51.98 AP- 00073666 MW
ROBERT DYKES OD, DR. OPERATIONS SAFETY /EQUIP /PHY 1006 - 6075 255.00
Check Total: 255.00 AP -00073667 MW
ROOTX UNDERGROUND REP PIPE/CVRS /MHLS 1001 - 6052 2,681.22
Check Total: 2,681.22 AP- 00073668 MW
RYAN, JULIE H. CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 600.00
Check Total: 600.00 AP- 00073669 MW
SCHLANGE, PAUL DIAMOND VLY RNCH TRAVEL/MEETINGS 1028 - 6200 102.30
Check Total: 102.30 AP -00073670 MW
SHEPPARD MULLIN HUMAN RESOURCES PERSONNEL LEGAL 1022 - 4445 465.75
SHEPPARD MULLIN HUMAN RESOURCES PERSONNEL LEGAL 2022 - 4445 465.75
Check Total: 931.50 AP -00073671 MW
SHIELDS HARPER & CO INC HEAVY MAINT GROUNDS & MNTC 1004 - 6042 519.72
Check Total: 519.72 AP -00073672 MW
1
SIANO, CHRIS OPERATIONS TRAVEL/MEETINGS 1006 - 6200 190.27
Check Total: 190.27 AP- 00073673 MW
SIEMENS WATER TECHNOLOGIES LABORATORY SERVICE CONTRACT 1007 - 6030 144.97
SIEMENS WATER TECHNOLOGIES LABORATORY SERVICE CONTRACT 2007 - 6030 142.85
Check Total: 287.82 AP- 00073674 MW
SIERRA CHEMICAL CO OPERATIONS HYPOCHLORITE 1006 - 4755 3,759.85
Check Total: 3.759.85 AP -00073675 MW
SIERRA CRANE AND HOIST INC HEAVY MAINT BUILDINGS 1004 - 6041 4,500.00
Check Total: 4,500.00 AP -00073676 MW
SIERRA FOOTHILL LABORATORY LABORATORY - IND CRK RES MONT MONITORING 1007 - 6110 - INDIAN 390.00
Check Total: 390.00 AP -00073677 MW
SIERRA PACIFIC POWER GEN & ADMIN ELECTRICITY 1000 - 6330 13,219.61
SIERRA PACIFIC POWER GEN & ADMIN ELECTRICITY 2000 - 6330 40,448.94
Check Total: 53,668.55 AP- 00073678 MW
SIERRA SPRINGS GEN & ADMIN SAFETY INVENTORY 1000 - 0425 482.40
User: THERESA
Page: 9 Current Date: 08/28/2009
Report: OH_PMT_CLAIMS_BK Current Time: 09:52:52
PAYMENT OF CLAIMS
Vendor Name Department / Proi Name ftlabgali Acct# / Proi code Amount Check Num Tvoe
SIERRA SPRINGS UNDERGROUND REP SUPPLIES 1001 - 6520 19.98
SIERRA SPRINGS PUMPS SUPPLIES 1002 - 6520 1.33
SIERRA SPRINGS ELECTRICAL SHOP SUPPLIES 1003 - 6520 6.66
SIERRA SPRINGS HEAVY MAINT SUPPLIES 1004 - 6520 19.98
SIERRA SPRINGS EQUIPMENT REP SUPPLIES 1005 - 6520 6.66
SIERRA SPRINGS OPERATIONS SUPPLIES 1006 - 6520 19.98
SIERRA SPRINGS DIAMOND VLY RNCH SUPPLIES 1028 - 6520 6.66
SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 1038 - 6520 6.66
SIERRA SPRINGS UNDERGROUND REP SUPPLIES 2001 - 6520 19.98
SIERRA SPRINGS PUMPS SUPPLIES 2002 - 6520 5.31
SIERRA SPRINGS ELECTRICAL SHOP SUPPLIES 2003 - 6520 6.66
SIERRA SPRINGS EQUIPMENT REPAIR SUPPLIES 2005 - 6520 6.66
SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 2038 - 6520 6.66
Check Total: 615.58 AP- 00073679 MW
SOUTH TAHOE TOWING PUMPS LUTHER PASS 1002 - 6048 225.00
,i Check Total: 225.00 AP -00073680 MW
til
SOUTHWELL CONTROLS LABORATORY LABORATORY EQUIP 1007 - 6025 234.00
SOUTHWELL CONTROLS LABORATORY LABORATORY EQUIP 2007 - 6025 234.00
Check Total: 468.00 AP -00073681 MW
SOUTHWEST GAS GEN & ADMIN NATURAL GAS 1000 - 6350 57.90
SOUTHWEST GAS GEN & ADMIN NATURAL GAS 2000 - 6350 54.49
Check Total: 112.39 AP -00073682 MW
SUBSTITUTE PERSONNEL & UNDERGROUND REP CONTRACT SERVICE 1001 - 4405 3,908.80
SUBSTITUTE PERSONNEL & LABORATORY CONTRACT SERVICE 1007 - 4405 1,175.68
SUBSTITUTE PERSONNEL & ENGINEERING CONTRACT SERVICE 1029 - 4405 1,537.80
SUBSTITUTE PERSONNEL & ENGINEERING - FILTER ASSMNT REHAB FLTR 5 &6 1029 - 8066 - FILTER 559.20
SUBSTITUTE PERSONNEL & INFORMATION SYS CONTRACT SERVICE 1037 - 4405 92.52
SUBSTITUTE PERSONNEL & CUSTOMER SERVICE CONTRACT SERVICE 1038 - 4405 277.56
SUBSTITUTE PERSONNEL & UNDERGROUND REP CONTRACT SERVICE 2001 - 4405 3,974.51
SUBSTITUTE PERSONNEL & LABORATORY CONTRACT SERVICE 2007 - 4405 1,175.67
SUBSTITUTE PERSONNEL & ENGINEERING - WT METERING PRJ CONTRACT SERVICE 2029 - 4405 - METERS 83.88
SUBSTITUTE PERSONNEL & ENGINEERING CONTRACT SERVICE 2029 - 4405 1,398.00
User. THERESA
Report: OH_PMT_CLAIMS_BK
Page: 10 Current Date: 08/28/2009
Current Time: 09:52:52
Vendor Name
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUNGARD PUBLIC SECTOR
SUNGARD PUBLIC SECTOR
TAHOE BLUEPRINT
TAHOE MOUNTAIN NEWS
0
TAHOE PARADISE CHEVRON
TAHOE SAND & GRAVEL
TAHOE VALLEY ELECTRIC SUPPLY
UNITED RENTALS INC
UNIVERSAL HEALTH NETWORK
UNIVERSITY ENTERPRISES INC
UNIVERSITY ENTERPRISES INC
UNIVERSITY ENTERPRISES INC
USA BLUE BOOK
User: THERESA
Report: OH_PMT_CLAIMS_BK
Department / Proi Name
ENGINEERING - ANGORA TNK REPL
ENGINEERING - TWIN PEAKS BS
ENGINEERING - WT METERING PRJ
ENGINEERING - SONORA AVE WTRLN
ENGINEERING - ARSENIC FACILITY
INFORMATION SYS
CUSTOMER SERVICE
CUSTOMER SERVICE - WTR CONS PROG
INFORMATION SYS
INFORMATION SYS
HEAVY MAINTENANC
DIO - PR EXP- EXTERNAL
UNDERGROUND REP
UNDERGROUND REP
ELECTRICAL SHOP
SELF FUNDED INS
ENGINEERING - ERB LINER REPL
ENGINEERING - HEADWORKS
ENGINEERING - REPL GEN, LPPS
UNDERGROUND REP
PAYMENT OF CLAIMS
Description
TANK, ANGORA
BSTR, TWN PEAKS
WTR METERING/NEW
WTRLN,SNRA/SK RN
ARSNC TRTMNT
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
TRAVEL/MEETINGS
TRAVEL/MEETINGS
BUILDINGS
PUB RELATIONS
DIESEL
PIPE/CVRS /MHLS
BUILDINGS
DIAMOND VLY RNCH - HARVEY CHANNEL HARVEY CHANNEL
PPO FEE
REPLACE ERB LINE
HDWKS IMP PROJ
REPL GEN LPPS
SHOP SUPPLIES
Acct# / Pr91 Code
2029 - 7064 - ANGOTK
2029 - 7070 - TPBSTR
2029 - 7078 - METERS
2029 - 7911 - SONORA
2029 - 8864 - ARSNIC
2037 - 4405
2038 - 4405
2038 - 4405 - WCPROG
Check Total:
1037 - 6200
2037 - 6200
2004 - 6041
2001 - 4620
2001 - 6052
2003 - 6041
3000 - 6742
1001 - 6071
Check Total:
Check Total:
2027 - 6620 - PREEXT
Check Total:
Check Total:
Check Total:
Check Total:
1028 - 8830 - HARVEY
Check Total:
Check Total:
1029 - 7581 - ERBLNR
1029 - 8033 - HDWORK
1029 - 8933 - RGLPPS
Check Total:
Page: 11 Current Date: 08/28/2009
Current Time: 09:52:52
Amount Check Num TvPe
57.83
300.70
223.68
792.47
75.16
92.52
3,981.56
3,800.16
23.507.70 AP -00073684 MW
850.00
850.00
1,700.00 AP -00073685 MW
100.80
100.80 AP- 00073686 MW
200.00
200.00 AP- 00073687 MW
63.03
63.03 AP- 00073688 MW
458.40
458.40 AP -00073689 MW
629.40
629.40 AP -00073690 MW
1,103.52
1,103.52 AP -00073691 MW
677.60
677.60 AP- 00073692 MW
572.62
572.63
453.00
1,598.25 AP- 00073693 MW
717.89
PAYMENT OF CLAIMS
Vendor Name Department / Proi Name Description Acct# / Proi Code Amount Check Num Type
USA BLUE BOOK UNDERGROUND REP SMALL TOOLS 1001 - 6073 199.74
Check Total: 917.63 AP- 00073694 MW
VERIZON DIAMOND VLY RNCH TELEPHONE 1028 - 6310 198.88
Check Total: 158.88 AP- 00073695 MW
WECO INDUSTRIES INC UNDERGROUND REP SHOP SUPPLIES 1001 - 6071 346.97
Check Total: 346.97 AP 00073696 MW
WEDCO INC ELECTRICAL SHOP BUILDINGS 2003 - 6041 614.76
WEDCO INC ELECTRICAL SHOP PUMP STATIONS 2003 - 6051 197.47
Check Total: 812.23 AP- 00073697 MW
WESTERN ENERGETIX INC GEN & ADMIN DIESEL INVENTORY 1000 - 0416 572.49
Check Total: 572.49 AP 00073698 MW
WESTERN NEVADA SUPPLY UNDERGROUND REP SHOP SUPPLIES 1001 - 6071 58.44
WESTERN NEVADA SUPPLY PUMPS PUMP STATIONS 1002 - 6051 22.24
WESTERN NEVADA SUPPLY PUMPS SMALL TOOLS 1002 - 6073 546.02
WESTERN NEVADA SUPPLY HEAVY MAINT SECONDARY EQUIP 1004 - 6022 40.98
WESERN NEVADA SUPPLY HEAVY MAINT EXPORT/FRCE MAIN 1004 - 6047 185.85
WESTERN NEVADA SUPPLY GEN & ADMIN BOXES/LIDS/INV 2000 - 0403 2,776.13
WESTERN NEVADA SUPPLY GEN & ADMIN REPAIR CLMP INV 2000 - 0406 5,052.67
WESTERN NEVADA SUPPLY GEN & ADMIN HYDRANTS/FL INV 2000 - 0409 539.49
WESTERN NEVADA SUPPLY UNDERGROUND REP PIPE /CVRS/MHLS 2001 - 6052 1,112.26
WESTERN NEVADA SUPPLY PUMPS SMALL TOOLS 2002 - 6073 546.02
Check Total: 10,880.10 AP 00073699 MW
WHITE CAP CUSTOMER SERVICE - WT MTR MU INST MTR RTFT MXU'S 2038 - 8074 - MTRMXU 3,121.13
Check Total: 3,121.13 AP- 00073700 MW
WINZLER & KELLY CONSULT ENGRS OPERATIONS - MAP UG UTILITIES PLANT GIS 1006 - 8921 - GISMAP 12,743.52
WINZLER & KELLY CONSULT ENGRS ENGINEERING - EFFLUENT EVAL REP EXP PUMPS 1029 - 8676 - EFFLEV 17,574.81
Check Total: 30,318.33 AP MW
WOLF ENVIRONMENTAL LINING SYS OPERATIONS EMRGNCY RET/BAS 1006 - 6040 4,415.00
Check Total: 4,415.00 AP 00073702 MW
ZEE MEDICAL INC GEN & ADMIN SAFETY /EQUIP/PHY 1000 - 6075 492.46
ZEE MEDICAL INC GEN & ADMIN SAFETY/EQUIP /PHY 2000 - 6075 492.45
User: THERESA
Page: 12 Current Date: 08/28/2009
Report: OH_PMT_CLAIMS_BK Current Time: 09:52:52
Vendor Name
User: THERESA
PAYMENT OF CLAIMS
Department / Proi Name Description
Acct# / Proi Code
Check Total:
Grand Total:
1,115,868.48
Page: 13 Current Date: 08/28/2009
Report: OH_PMT_CLAIMS_BK Current Time: 09:52:52
Amount Check Num 'RN
984.91 AP -00073703 MW
0 G
Saith 'Dare P.U.D.
M:N, PM 24, 2009, 11
Check Payee ID.
AP00073264 V48136
08/24/09
:01 PM - - -req:
Pa Na e
PION RENTALS
GRAND TOTALS:
Total Void Nadine Written
Total Void Hand Written
Tbtal Machirn W itten
Total Hand Written
Total Reversals
Total Cancelled
GRAND TOTAL
VOID, TYPED & A,/P GIEICK REGISTER
G. 'JL - - -lo : CNSTIE - - - -j : 440888 #J645- - - -pp: EE200 <1.19>
Date Check Pr cunt Type Subs Rel Tb Abte
08/06/09 2,812.57 RV TR wed
0.00
0.00
0.00
0.00
2,812.57
0.00
2,812.57
timber of Checks Processed:
Njrber of Clerks accessed:
NUr er of Checks Processed:
N.x±er of Checks Processed:
Nutter of Checks Processed:
Niter of Checks Processed:
0
0
0
0
1
0
rpt id: CIT -1
BOARD AGENDA ITEM 15a
TO: Board of Directors
FROM: Richard Solbrig, General Manager,
Paul Sciuto, Assistant General Manager /Engineer
MEETING DATE: September 3, 2009
ITEM — PROJECT: Conference with Legal Counsel — Anticipated Litigation (one case)
REQUESTED BOARD ACTION: Direct legal counsel.
DISCUSSION: Pursuant to Section 54956.9(b) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding anticipated
litigation.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
NO
NO
CATEGORY:
-51-
Cis! Manaw
Rkhard H. Sol"
15o uth
Tahoe
���
Jen+ea R. Jones
(� '{''' Detrict
Utili
1 uNic
y
D�Mw
C J- d_!__
BOARD AGENDA ITEM 15a
TO: Board of Directors
FROM: Richard Solbrig, General Manager,
Paul Sciuto, Assistant General Manager /Engineer
MEETING DATE: September 3, 2009
ITEM — PROJECT: Conference with Legal Counsel — Anticipated Litigation (one case)
REQUESTED BOARD ACTION: Direct legal counsel.
DISCUSSION: Pursuant to Section 54956.9(b) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding anticipated
litigation.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
NO
NO
CATEGORY:
-51-
BOARD AGENDA ITEM 15b
TO: Board of Directors
FROM: Richard H. Solbrig, General Manager
MEETING DATE: September 3, 2009
ITEM — PROJECT: Conference with Legal Counsel — Existing Litigation
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding existing
litigation: Meyers Landfill Site - United States of America vs. El Dorado County and City
of South Lake Tahoe and Third Party Defendants, Civil Action No. S -01 -1520 LKK
GGH, United States District Court for the Eastern District of California.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
NO
NO
CATEGORY: Sewer
—53—
Gtf Manager
Kichard H. Sol"
50 ut - h
J�tn�s R Junes
PuHic Utility Pletric
eM
owe MW
BOARD AGENDA ITEM 15b
TO: Board of Directors
FROM: Richard H. Solbrig, General Manager
MEETING DATE: September 3, 2009
ITEM — PROJECT: Conference with Legal Counsel — Existing Litigation
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding existing
litigation: Meyers Landfill Site - United States of America vs. El Dorado County and City
of South Lake Tahoe and Third Party Defendants, Civil Action No. S -01 -1520 LKK
GGH, United States District Court for the Eastern District of California.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
NO
NO
CATEGORY: Sewer
—53—
,� ,. ► w. .w
BOARD AGENDA ITEM 15c
TO: Board of Directors
FROM: Richard Solbrig, General Manager
MEETING DATE: September 3, 2009
ITEM — PROJECT NAME: Conference with Legal Counsel — Existing Litigation
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government code,
Closed Session may be held for conference with legal counsel regarding existing
litigation: Tahoe Asphalt, Inc., and Tahoe Asphalt Materials Company, LLC, vs. South
Tahoe Public Utility District, Civil Action No. SC20090104, Superior Court, County of El
Dorado, State of California.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
-55-
Ga"Wal m anaw
KiChA d H. Sol"
50 ut
Ta h oe.
.;MW
FuHio Utility Dietr�iGt
M"M&" 0*$U"
Frk
,� ,. ► w. .w
BOARD AGENDA ITEM 15c
TO: Board of Directors
FROM: Richard Solbrig, General Manager
MEETING DATE: September 3, 2009
ITEM — PROJECT NAME: Conference with Legal Counsel — Existing Litigation
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government code,
Closed Session may be held for conference with legal counsel regarding existing
litigation: Tahoe Asphalt, Inc., and Tahoe Asphalt Materials Company, LLC, vs. South
Tahoe Public Utility District, Civil Action No. SC20090104, Superior Court, County of El
Dorado, State of California.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
-55-
TerryrsApollo Plumbing and Heating, Inc CA LiC #813437
PO Box 2535
South Lake Tahoe, CA 96150
Ph 530 544 8404 1 Fx 530 542 1020
apolloplumbing @charter.net
Bill To:
JOYCE BLACKSTONE
SLT, CA 96150
530 544 2195
Invoice
June 25, 2009
Summary:
Invoice #:
Tech:
Due Date:
Job Date:
PLUMBING
1394 -60818
35 STEVE 3
7/13/2009
6/25/2009
Job Name:
2290 MONTANA
JOYCE
SLT, CA 96150
530 544 2195
Item Code Description Hm /Qty Price Amount
Video inspect 4" sewer lateral from vent pipe to city sewer line locate & mark where roots have grown into lateral -
Also locate & raise 4" cleanout access to ground level
LABOR STEVE
1.00
105.00
105.00
LABOR TERRY
1.00
105.00
105.00
DISCOUNT OFFERED ON LABOR
1.00
-52.50
-52.50
EQUIPMENT - CAMRA
1.00
150.00
150.00
Labor
Other
Subtotal
Total
210.00
97.50
307:50
$307.50
All material is guaranteed to be as specified. All work to be completed in a professional manner
according to standard practices. Any alteration or deviation from above specifications involving extra
costs will be executed only upon written orders and will become an extra charge over and above the
estimate. All agreements contingent upon delays beyond our control. Purchaser agrees to pay all costs
of collection, including attorney's fees.
Terms: Net 30
THANK YOU FOR YOUR BUSINESS
/R I l I,,
/ 144) f'v I� 8 /3 1 / 0 9
Receive Comments
Is the setting appropriately described?
Are the impact criteria appropriate?
• Are the alternatives appropriate?
Is the analysis technically correct?
Are the mitigation measures
appropriate?
°. PIN
8 /31/09
Oral Comments will be recorded
Written Comments will be received
Each environmental comment will be
numbered
Each environmental comment receives a
response
EIR modified based on comments
Final EIR documents comments,
responses, and edits
Evaluates Four Alternatives
Identifies Significant and
Unavoidable Environmental
Impacts
. Recommends Mitigation
Pq
8 /3 1 / 0 9
8 /3 1 /°9
Operation and Maintenance of existing facilities
* Indian Creek Reservoir
Snowshoe Thompson Ditch 1 & 2
Millich Ditch
Upper Dressler Ditch
Indian Creek Diversion
Upper and Lower Harvey Channel
a Alpine Decree surface water rights
4
8 /3 1 /°9
i - Provide recycled water to new von - irrigated, permitted
land
x - Make recycled water available to irrigators In Nevada
3 - Cipacity and conveyance improvements in the Diamond
Ditch stem
4 -- Provide pressurized recycled w -nerio the Fredericksburg
system
6 - Provide pressurized recycled water through Wade Valley
6 - Provide pressurized recycled water to the Ranclhettes
7 - Non -flood irrigation: application syatern
8 - improve recycled water quality
9 - Groundwater recharge using infiltratiou basins
w - Construct zero- discharge basins
it - Construct irrigation fields with pumping back to HPR
12 - Grow bloinam crops for pulp production using recycled
water
1 3 - Welland sad and seed production
W - Pipe recycled water systems to minimize setbacks mud
human contact
15 - Mitigation wetland creation usms freshwater
16 - Subsnrfnce recycled water irrigation in public contart of
buffer areas
3 - Capaciw and conveyance improvements in the
Diamond Ditch system
4 Provide pressurized recycled water to the
Fredericksburg system
6 provide pressurized recycled water to the Ranchettes
n - Construct irrigation fields with pumping baler to HPR
18 - Optimize application rate on existing irrigated Lands
19 - Pursuc permitting of more land in Alpine Counh
a2 - Parallel recycled water pipeline along existing
Diamond Ditch
17 - Increase Snowshoe. Thompson Na i cou: ice
capacity
1R - Optimize application rate on existing irrigated lands
z9 - Pursue permitting of more land In Alpine County
20 - Improve operation of the Diamond Ditch system to
meet District and user needs
21- IAkyehop taihmter control system
22- Parallel recycled water pipeline along existing Diamond
Ditch
23 - Route. Mud Like whiter Rows through ICR
24 .- , rmnsfer additional water rights to storage in IC R
z9 - Irrigate the District Pasture
3o Irrigate thedungle with Recycled Water
31 - hired Stonnwater Flow away frrnn HPR and to ICR
32 - ICR Spdhvay Channel
29 - Irrigate the District Pasture
30 - irrigate the Jungle with Recycled Water
8 /3 1 / 0 9
i - Provide recycled water to new non- irrig:med,
1wrrnitted land
2 - Make recycled water mailable to inigators in Nevada
3 - Capacity and cone once improve ntenu in the
Diamond Ditch system
q - Provide pressurized renrled water to the
Fredericksburg system
6 - Provide pressurized rec water t,, the Ranchettes
7 Non -flood irrigation application system
ii - Constmet irrigation fields with pumping back to HPR
tq - Pipe rMcied water systems to minimize setbacks
and bn min contact
t6 Subsurface recyelcd water irrigation in public contact
of buffer arras
17- Increase Suow-choe Thompson No. r conveyance
capacity
18 - Optimize application rate on existing irrigated lands
r9 - Pursue permitting of more land in Alpine County
22 - Parallel renTled water pipeline along existing
Diamond Ditch
23 - Route 61ud IA winter floss through {CR
2.1 - Transfer additional water nghts to storage in JCR
29 - Irrigate the District Pasture
3o - Irrigate the Jungle with Ree Water
31 - Diverl Stormwater Am, away from HPR and to ICR
8 /3 1 /09
8 /3 1 /°9
S.T.P.U.D. Board Report from Director Claudio
Water, which flows through pipes, offers the potential to generate
clean electricity year- round. Over - pressurization occurs where
water is stored at significantly higher elevations than the customers
it serves and must flow to lower levels to reach them.
Pressure reduction valves (PRVs) reduce excess pressure
to more acceptable levels, dissipating a clean energy source
during the process. Rentricity's Flow - to-Wire system mimics the
functionality of PRVs and converts that excess pressure into clean
electric power.
Individually, a Flow- to-Wire system produces between 20
kilowatts (kW) and 300 kW. However, in aggregate, the
Flow- to-Wire systems can generate megawatts of clean power.
The autonomous devices operate pollution -free and structurally
enhance adjacent pipe infrastructure. Flow- to-Wire systems need
minimal maintenance and have useful lives up to 40 years.
Rentricity's power generation can benefit potable water systems
that implement pressure regulation in mandated reservoir flows
and reservoir transfers. Wastewater is also an addressable
application. In Renewable Portfolio Standard states, Rentricity
can enhance the power production revenue with clean
energy credits.
Technical Highlights
• Integral Flywheel Design for Flow and Grid Transients
• Water Facing Materials Compatible with Public
Health Standards
Deislgn C.cmpliant wfth EkK tric,Util)ty Grllade
trtt�r�or#r�t
Rf p
q , Sppp.
"«
POMR Of"
r �
INTERNET
COMMUNICATION
INTERCONNECT
settow" aetWt
REMOTE
MONITORING
COUA►MMATM WNfolt
Forwarded by: Garry Bowen ,
o il
Co- founder Tahoe Sustainability Group WATER FLOW L
MIMICS PRESSURE REDUCTION VALVES IN UNDERGROUND VAULTS
Page Submitted to the South Tahoe Public Utility District Board on September 3, 2009
40 kW Flow -to -Wire System
Wastewater
S.T. P. U. D. Board Report from Director Claudio
Why the Board's Role in
Human Resources is Important
• Shapes workplace culture at the district
— Defines the kind of place the district is
• Either positive, supportive work environment or
a negative, repressive place to work.
— Establishes a framework of expectations
• Compliance with HR rules and regulations
• Stewardship role
Copyright 4 2003 by CSDA N
Evaluating the General Manager
• A formal evaluation process of the
general manager offers:
—The opportunity to clarify performance
expectations to check progress on
achieving previously agreed upon goals
— Making decisions about employment
renewal and compensation
Copyrighl0 2003 by CSDA
Page Submitted to the South Tahoe Public Utility District Board on September 3, 2009
S.T.P.U.D. Board Report from Director Claudio
Edwards Deming - Total Quality Management & Deming's 14 Points
Edwards Deming was an American statistician, considered the father of the modern quality movement.
Edwards Deming strongly influenced Japanese industry post WWII with
Statistical Process Control (SPC) and Total Quality Management (TQM).
In 1982 Edwards Deming published "Out of the Crisis" identifying 14 points for management.
1. Create constancy of purpose and continual improvement — long term planning must replace
short term reaction
2. Adopt the new philosophy — by management and workers alike.
3. Do not depend on (quality) inspection — build quality into the product and process
4. Choose quality suppliers over low cost suppliers — to minimize variation in raw materials and
supply.
5. Improve constantly — to reduce variation in all aspects e.g. planning, production, and service.
6. Training on the job — for workers and management, to reduce variation in how job is done.
7. Leadership not supervision — to get people to do a better job, not just meet targets.
8. Eliminate fear — encourage two -way communication, encourage employees to work in the
organization's interest.
9. Break down internal barriers — department's in an organization are "internal customers" to
each other and must work together.
10. Eliminate slogans (exhortations) — processes make mistakes not people. Management
harassment of workers will create bad relations if no effort made to improve processes.
11. Eliminate numerical targets — management by objectives (targets) encourages low quality.
12. Remover barriers to worker satisfaction — abolish annual appraisals
13. Encourage self- improvement and education for all
14. Everyone is responsible for continual improvement in quality and productivity — particularly
top management
Page Submitted to the South Tahoe Public Utility District Board on September 3, 2009
S.T.P.U.D. Board Report from Director Claudio
08 -24
08 -21
LA QUINTA INN OAKLAND CA
74323019233576776010467
3516
74.65CR
08 -24
08 -21
SAFEWAY STORE00006387 OAKLAND CA
24164079234221017560794
5411
4.99
STATEMENT DATE
I DISPUTED AMOUNT
P U R ID: 169233696992595 TAX: 0.00
08 -24 -09
$ .00
OTHER CHARGES $177.17
08 -24
08 -22
STARBUCKS USA 00079574 STOCKTON CA
24164079234355466082551
5814
2.60
$ 0.00
P U R I D: TAX: 0.00
C/O U.S. BANCORP SERVICE CENTER, INC
08 -24
08 -21
KFC ##284 25302845 STOCKTON CA
24164079234389310851572
5814
13.07
FARGO, ND 58125 -6335
P U R I D: TAX: 0.00
TOTAL ACTIVITY $102.52
08 -24
08 -21
LA QUINTA INN OAKLAND CA
24323019233576776010454
3516
74.65
073483 ARRIVAL: 08 -20 -09
08 -24
08 -20
IN -N -OUT BURGER 000000139 PLACERVILLE CA
24445009233885312101071
5814
4.17
P U R ID: 00000000000000000 TAX: 0.00
08 -24
08 -21
DAYS INNS OAKLAND AIRPORT OAKLAND CA
24610439235072002339768
3510
77.69
0821000009973 ARRIVAL: 08 -21 -09
Default Accounting Code: 1019 -2019
ACCOUNT NUMBER
ACCOUNT SUMMARY
CUSTOMER SERVICE CALL
4246 - 0441 - 0101 -6982
PREVIOUS BALANCE .00
PURCHASES &
800- 344 -5696
STATEMENT DATE
I DISPUTED AMOUNT
08 -24 -09
$ .00
OTHER CHARGES $177.17
CASH ADVAN .00
SEND BILLING INQUIRIES TO:
AMOUNT DUE
$ 0.00
CASH ADVANCE FEE .00
C/O U.S. BANCORP SERVICE CENTER, INC
U.S. BANK NATIONAL ASSOCIATION ND
DO NOT REMIT
P.O. BOX 6335
CREDITS $74.65
FARGO, ND 58125 -6335
TOTAL ACTIVITY $102.52
Total mileage: 400
Times .55 per mile
Total $110.00
Page Submitted to the South Tahoe Public Utility District Board on September 3, 2009
NOTICE OF CONTINUANCE OF REGULAR MEETING OF THE
El DORADO COUNTY WATER AGENCY
Notice is hereby given that the regularly scheduled meeting of the El Dorado County
Water Agency for September 9, 2009 at 9:00 a.m. is, pursuant to Government Code
Section 54955.1, continued to September 16, 2009 at 9:00 a.m. to be held at the El
Dorado County Water Agency Board Meeting Room, 3932 Ponderosa Road, Suite 200,
Shingle Springs, CA 95682.
Dated: September 3, 2009
By: Tami Scowcroft
Deputy Clerk
El Dorado County Water Agency
Kathy Sharp
From: Dennis Cocking
Sent: Wednesday, September 02, 2009 10:58 AM
To: Dale Rise (drise01 @charter.net); Eric Shafer (E- mail); Ernie Claudio
(ernieclaudio @sbcglobal.net); jrjones @etahoe.com; Mary Lou
Mosbacher (BAR- MAR @etahoe.com)
Cc: Richard Solbrig; Kathy Sharp
Subject: Meter Letters for Workshop
Attachments: 2010watermeterprojectunder1 inch.doc;
2009watermeterprojectunder1 inch.doc; 2009MXUprogram.doc;
meterlawin CA.doc; Picture (Metafile)
Good morning all:
Per the Board's direction, I have prepared the DRAFT customer outreach letters for you all to read prior to the metering
workshop tomorrow. I have attached four separate documents. They are:
1. 2009 MXU Program letter
2. 2009 Water Meter Program letter
3. 2010 Water Meter Program letter
4. Water Metering Fact Sheet
Bear in mind these are draft documents and we will have the opportunity to fine tune them prior to their distribution. I look
forward to seeing you all tomorrow.
Dennis
�1_ It 1 �1 1 �1
2010watermAerpro2009waterm? terpro2009MXU program. d mete rlawin CA.doc
jectunderlinc... jectunderlinc... oc (29 KB) (34 KB)
4� F
1954 . W►���
'�►(IC t,1'i'Y D�
Public /Legislative Affairs Office
Dennis Cocking
Public Information Officer
530.543.6208 direct
530.541.0614 fax
530.208.8540 cellular
dcocking @stpud.dst.ca.us
April 1, 2010
RE: 2010 Water Meter Installation Project (3/4" Service)
Dear Property Owner:
On September 29, 2004 Governor Schwarzenegger signed into law Assembly Bill 2572 that
mandates all water systems in California to be fully metered by 2025. On or about May 1,
2010, District contractors will begin work on the 2010 Water Meter Installation Project. As
part of the District's compliance plan a water meter and water meter vault will be installed on
your property, however you will not be billed based on actual usage and will continue to be
billed on a flat rate basis until January 1, 2011. After that date, state law requires all homes
with a meter to be billed on the volume of water actually used. Installation of the new meter
vault may require some disruption of landscaping on your property. The District's contractors
will repair any damage to your landscaping as close as possible to its original condition. At a
later date, District crews will install a Meter Transceiver Unit (MXU) to facilitate the District's
Automated Meter Reading (AMR) program.
With all public works projects, there is a certain amount of disruption and inconvenience.
The District will make every effort to minimize the impact of this project for our customers.
Per TRPA requirements, work hours on this project will be Monday- Friday 8:00 a.m. — 6:00
p.m. For any planned shut -offs you will be notified prior to the event. For obvious reasons,
unplanned emergency shut -offs cannot be anticipated and may occur. For this reason, the
District suggests each household have at least five gallons of water available for such
emergencies. Should you or a family member have a medical condition that makes an
uninterrupted water supply a necessity, please notify the District so we can accommodate
your needs.
Water is a precious and finite resource in the Sierra. The District encourages you to practice
efficient water use which will conserve water resources and minimize the cost of your water.
On the reverse of this letter is a fact sheet regarding mandated water meters installation and
the District's plans to comply with the law. Please feel free to call Dennis Cocking, Public
Information Officer, at 530.543.6208 if you have any questions.
If you have any questions regarding your water meter or billing issues, please feel free to call
me at 530.543.6221. If you have questions or concerns regarding construction related
issues, please call Jim Hoggatt, Engineering Department Manager at 530.543.6206.
Sincerely,
Lisa Coyner
Manager of Customer Service ** Turn over for more information **
September 7, 2009
RE: 2009 Water Meter Installation Project (3/4" Service)
Dear Property Owner:
On September 29, 2004 Governor Schwarzenegger signed into law Assembly Bill 2572 that
mandates all water systems in California to be fully metered by 2025. On or about October
1, 2009, District contractors will begin work on the 2009 Water Meter Installation Project.
As part of the District's compliance plan a water meter and water meter vault will be installed
on your property, however you will not be billed based on actual usage and will continue to
be billed on a flat rate basis until January 1, 2011. After that date, state law requires all
homes with meters be billed on the volume of water actually used. Installation of the new
meter vault may require some disruption of landscaping on your property. The District's
contractors will repair any damage to your landscaping as close as possible to its original
condition. At a later date, District crews will install a Meter Transceiver Unit (MXU) to
facilitate the District's Automated Meter reading ((AMR) program.
With all public works projects, there is a certain amount of disruption and inconvenience.
The District will make every effort to minimize the impact of this project for our customers.
Per TRPA requirements, work hours on this project will be Monday- Friday 8:00 a.m. — 6:00
p.m. For any planned shut -offs you will be notified prior to the event. For obvious reasons,
unplanned emergency shut -offs cannot be anticipated and may occur. For this reason, the
District suggests each household have at least five gallons of water available for such
emergencies. Should you or a family member have a medical condition that makes an
uninterrupted water supply a necessity, please notify the District so we can accommodate
your needs.
Water is a precious and finite resource in the Sierra. The District encourages you to practice
efficient water use which will conserve water resources and minimize the cost of your water.
On the reverse of this letter is a fact sheet regarding mandated water meters installation and
the District's plans to comply with the law. Please feel free to call Dennis Cocking, Public
Information Officer, at 530.543.6208 if you have any questions.
If you have any questions regarding your water meter or billing issues, please feel free to call
me at 530.543.6221. If you have questions or concerns regarding construction related
issues, please call Jim Hoggatt, Engineering Department Manager at 530.543.6206.
Sincerely,
Lisa Coyner
Manager of Customer Service ** Turn over for more information **
September 7, 2009
RE: 2009 Water Meter Transceiver Unit (MXU) Installation Program
Dear Property Owner:
On September 29, 2004 Governor Schwarzenegger signed into law Assembly Bill 2572 that
mandates all water systems in California to be fully metered by 2025. Beginning May 2009,
District crews have been installing Meter transceiver Units (MXU) on existing water meters.
This installation is part of the District's compliance plan with the state's metering
requirements. Installation of this unit will not change your billing and you will continue to be
billed on a flat rate until January 1, 2011. After that date, state law requires all homes and
businesses with meters to be billed on the basis of the amount of water actually used. This
installation should require little or no disruption to your landscaping. However, should any
occur, the District will repair any damage to your landscaping as close as possible to its
original condition.
Water is a precious and finite resource in the Sierra. The District encourages you to practice
efficient water use which will conserve water resources and minimize the cost of your water.
On the reverse of this letter is a fact sheet regarding mandated water meters installation and
the District's plans to comply with the law. Please feel free to call Dennis Cocking, Public
Information Officer, at 530.543.6208 if you have any questions.
If you have any questions regarding your water meter or billing issues, please feel free to call
me at 530.543.6221. If you have questions or concerns regarding construction related
issues, please call Jim Hoggatt, Engineering Department Manager at 530.543.6206.
Sincerely,
Lisa Coyner
Manager of Customer Service ** Turn over for more information **
South Tahoe
Public Utility District
Pulplic /Legislative Affairs Office
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Contact Information:
Dennis Cocking
Public Information Officer
530.543.6208 direct
530.541.0614 fax
530.208.8540 cellular
www.stpud.us
WATER METERS IN CALIFORNIA FACT SHEET
• On September 29, 2004 Governor Schwarzenegger signed into law Assembly Bill 2752
authored by then Assembly Member Christine Kehoe. This bill was chaptered on the
same day and is currently Chapter 884 of the California Code. The District sought a
legislative exemption from the law, but was unsuccessful. Whether you agree or
disagree with water meters and water conservation, it is a reality in California.
• The bill requires an urban water supplier, as defined (any public water system with 3,000
or more connections), on or before January 1, 2025 to install water meters on all
municipal and industrial water connections that are located within its service area. The
District meets this definition and must comply with the law.
• The bill also requires an urban water supplier, beginning on or before January 1, 2010 to
charge each customer that has a service connection for which a water meter has been
installed, based on the actual volume of deliveries, as measured by a water meter.
• The bill provides an exception in order to provide customers with experience in volume -
based water service charges. An urban water supplier that is subject to this law may
delay, for the 2010 seasonal cycle of water use, the use of meter -based charges for
service connections that are being converted from nonvolume -based billing to volume -
based billing. That means, for most residential customers, volume -based billing will not
begin until January 2011. From January 1, 2010 through December 31, 2010, residential
customers with meters will receive their normal flat rate bill and additional information that
will demonstrate what their bill would have been if billed volumetrically.
• Finally, the bill authorizes a water purveyor to recover the cost of providing services
related to the purchase, installation, and operation of a water meter from rates, fees, or
charges. At this point, it is the District's intent to seek federal and state funding to cover
as much of the costs of meter installation as possible. Where outside funding is not
available, costs will be paid through the general rates incurred by all District customers.
The District has applied for and received a $4.387 million grant (no matching dollars)
through the State Revolving Fund (SRF). These funds were provided via the American
Recovery and Reinvestment Act (ARRA) of 2009. These funds will allow the installation
of approximately 1,500 water meters on waterlines that have been replaced in recent
years. Generally speaking, these projects are entirely within the City limits and in older
neighborhoods (The Y, Gardner Mtn., Al Tahoe, and Stateline as that is where the oldest
and smallest lines are located).
• For additional information please contact Dennis Cocking, Public Information Officer at
543.6208 or visit the District's webpage at www.stpud.us.