Loading...
AP 09-03-09I Qa, for • 1850 . s 2d SOUTH TAHOE PUBLIC UTILITY DISTRICT "Basic Services for a Complex World" REGULAR BOARD MEETING AGENDA Thursday, September 3, 2009 2:00 P.M. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Richard Solbri , General Manager Paul Sciuto, Assistant General Mana er Mary Lou Mosbacher, President BOARD MEMBERS Dale Rise, Vice President James R. Jones, Director Eric W. Schafer, Director Ernie Claudio, Director 1. CALL TO ORDER REGULAR MEETING — PLEDGE OF ALLEGIANCE 2. COMMENTS FROM THE AUDIENCE (Short non - agenda items that are within the subject matter jurisdiction of the District. Five - minute limit. No action will be taken.) 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR 4. ADOPTION OF CONSENT CALENDAR (Any item can be discussed and considered separately upon request) 5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION / ACTION 6. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION a. Request to Appear Before the Board Consider Request for District to Pg. 25 Received from Joyce Blackstone Reimburse $125 for Cleaning Roots (Randy Curtis) from Sewer Line Wastewater Treatment Plant Rehabilitation Approve Proposal from Brown & .29 (Julie Ryan) Caldwell Consulting Engineers for Design Services (The Scope of Work and Cost Estimate will be provided prior to, and at the Board meeting.) REGULAR BOARD MEETING AGENDA — SEPTEMBER 3, 2009 PAGE — 2 C. 2:30 P.M. PUBLIC HEARING Pg. 31 South Tahoe Public Utility District Recycled Hold a Public Hearing to Take Public Water Facilities Master Plan Comments on the Master Plan (Jim Hoggatt) Draft Environmental Impact Report d. Payment of Claims Pg. 35 Approve Payment in the Amount of $1,716,477.39 7. BOARD MEMBER STA NDING COMMITTEE REPORTS (Discussions may take place; however, no action will be taken) a. Water & Wastewater Operations Committee (Jones / Rise) b. Finance Committee (Schafer / Claudio) C. Executive Committee (Mosbacher / Rise) d. Planning Committee (Mosbacher / Schafer) 8. BOARD MEMBER AD HOC COMMITTEE REPORTS a. Heavenly Snowmaking Ad Hoc Committee (Schafer /Rise) b. Management and Union Negotiations Ad Hoc Committee (Schafer /Rise) 9. EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVES REPORT 10. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken) 11. GENERAL MANAGER REPORTS (Discussions may take place; however, no action will be taken) a. Integrated Regional Water Management Plan and Prop. 84 b. City Water MOU 12. 13. ASSISTANT MANAGER REPORTS (Discussions may take place; however, no action will be taken) STAFF / ATTORNEY REPORTS (Discussions may take place; however, no action will be taken) a. ERB Waste Violation (Ross Johnson) 14. NOTICE OF PAST AND FUTURE MEETINGS / EVENTS Past Meetinas / Events 08/21109 — CSDA Module 4: Board's Role in Human Resources Conference 08/26/09 — Employee Negotiations Ad Hoc Committee Meeting 08/27/09 & 08/28/09 — ACWA Region 3 Two -Day Bus Tour of Alpine County Facilities and Angora Fire Area 08/31/09 — Water and Wastewater Operations Committee Meeting 09/03/09 — Board Workshop: Water Metering Future Meetinas / Events 09/07/09 — Labor Day Holiday (District Office Closed) 09/09/09 — El Dorado County Water Agency Regular Meeting in Shingle Springs 09/14/09 — 3:30 p.m. — Water and Wastewater Operations Committee Meeting at District 09/15/09 — 9:00 a.m. — Alpine County Regular Board Meeting in Markleeville 09/17/09 — 2:00 p.m. — STPUD Regular Board Meeting at District REGULAR BOARD MEETING AGENDA — SEPTEMBER 3, 2009 PAGE — 3 15. CLOSED SESSION (Closed Sessions are not open to the public) a. Pursuant to Government Code Section 54956.9(b)Conference with Legal Counsel — Pg. 51 Anticipated Litigation (one case) b. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel — Pg. 53 Existing Litigation re: Meyers Landfill Site: United States of America vs. El Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S -01 -1520 LKK GGH, United States District Court for the Eastern District of CA C. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel - Pg. 55 Existing Litigation: Tahoe Asphalt, Inc. and Tahoe Asphalt Materials Company, LLC, vs. STPUD, Case No. SC20090104, El Dorado Superior Court 16. ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION 17. ADJOURNMENT (To the next regular meeting, September 17, 2009, 2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete agenda packet, including all backup information is available for review at the meeting and at the District office during the hours of 8:00 a.m. — 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after minutes of the meeting have been approved. Items on this agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear on the agenda. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified, but may occur slightly later than the specified time. Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Comments on items not on the agenda can be heard during "Comments from the Audience;" however, action cannot be taken on items not on the agenda. Please provide the Clerk of the Board with a copy of all written material presented at the meeting. Backup to any agenda item(s) not included with the Board packet will be made available when finalized at the District office, at the Board meeting, and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings. If particular accommodations for the disabled are needed (i.e., disability- related aids, or other services), please contact the Cleric of the Board at 530.544.6474, extension 6203, at least 24 hours in advance of the meeting. s 9er. � � r • 19 S it ' � CONSENT CALENDAR SEPTEMBER 3, 2009 ITEMS REQUESTED ACTION a. Portable Engine Driven Generator Pg. 1 (Randy Curtis) b. California Air Resources Mandated Emission Pg. 7 Control Measures (Randy Curtis) C. Arsenic Treatment Funding and Water Meter Pg. 13 Installation (Lynn Nolan) Regular Board Meeting Minutes: Pg. 19 August 6, 2009 (Kathy Sharp) (1) Waive Bidding Procedures, as Outlined in the District's Purchasing Procedures Policy, for Standardized Equipment from the Sole Area Supplier; and (2) Approve Purchase of One Katolight Generator (Model MTU CD50J6T3) from Nevada Generator Systems, Inc., in the Amount of $32,587.20, plus Tax and Shipping Authorize Staff to Advertise for Bids for Particulate Filters Adopt Resolution No. 2870 -09 and 2871 -09 Entering into Agreements for Revised Funding with the California Department of Public Health Approve Minutes South Tahoe Public Utility District ■ 1274 Meadow Crest Drive ■ South Lake Tahoe, CA 96150 Phone 530.544.6474 ■ Facsimile 530.541.0614 • www.stpud.us General M,"ager Richard H. 9olbrig I'ah EnM Claudio �/� .Aw"ft i:. Joys Mary LM Mwmdw rumic Utloty P15tria M" , *. BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Randy Curtis, Manager of Field Operations MEETING DATE: September 3, 2009 ITEM — PROJECT NAME: Portable Engine Driven Generator REQUESTED BOARD ACTION: (1) Waive bidding procedures, as outlined in the District's Purchasing Policy, for standardized equipment from the sole area supplier; and (2) Approve purchase of one Katolight Generator (Model MTU CD50PJ6T3) from Nevada Generator Systems, Inc., in the amount of $32,587.20, plus tax and shipping. DISCUSSION: The gen -set will replace an older Deutz generator which does not meet California Air Resources Board emission requirements. The Deutz gen -set can no longer be permitted through the El Dorado County Air Board. This gen -set is used to provide back up power to many individual stations that do not have a permanent redundant power supply and are served by generator quick connect-' disconnect features. This would include most water booster stations, small wells and small sewer stations examples: • Apache Booster • David Lane Booster • Keller Booster • Sunset Well • Helen Well • Beecher Sewer Station On December 18, 2008, the Board made a finding that Nevada Generator Systems, Inc., is the sole area supplier. -1- Randy Curtis September 3, 2009 Page 2 SCHEDULE: As soon as possible COSTS: $32,587.20 ACCOUNT NO: 2005 -8056 BUDGETED AMOUNT REMAINING: $35,000 ATTACHMENTS: Proposal from Nevada Generator Systems CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES j 4Z NO CHIEF FINANCIAL OFFICER: YES NO -2- Nevada Generator Systems 1520 Glendale Avenue Sparks, Nevada 89431 775- 356 -8010 775 - 356 -8017 (fax) Proposal July 28, 2009 Paul Carrion South Lake Tahoe P.U.D. 1275 Meadow Crest Drive South Lake Tahoe CA 9615o 53015448474 (Phone) 530/544.6359 (Fax) pcarrion@Mpud.datca.us Nevada Generator submits the following proposal for the project: 50kW, Diesel Fueled, Enclosed, Trailer Mounted Generator Set with Voltage Selector Switch. MTU ONSITE ENERGY MODEL: (Qty -1) - CD54PJST3 GENERATOR: 50 kW, 62.5 kVA (File #: 545 / Catalog #: 80020615) VOLTAGE: 277 1480 ACV 3- Phase, 120/208 ACV 3- Phase, 1201240 VAC 1 -Phase ENGINE: John Deere 4024HF285, 60 Hz Diesel, 1800 RPM Standard Features Included: Steel Sub Base, Be" Cables, Battery Box, Flex Fuel Connector, Oil grain Extension, Lube Oil and An &freeze Selected Model Features Included: Isochronous Governor + / -.25% 2 (Two) Year / 3000 Hour Bask Standby Limited Warranty 150 degree Temperature Rise - 361 CSL1601 UL2200 Voltage Selector Switch: 277/480 3ph, 120/208 3 ph, 120/2401 ph. 120V male receptacte outside enclosure to power battery charger and block heater. CONTROL PANEL: Model 50 Control Panel 12 LIGHT CONTROL PANEL: 50 Series, generator - vibration mounted, NEMA 1 enclosure Voltmeter - (3 -1/21, 2% accuracy, Ammeter - (3-1/2'), 2% accuracy, 4 position combination voltmeter /ammeter selector switch. Frequency meter, dial type - (3- 1/2'x, Panel lights and switch, Running time meter - (2'), Battery voltmeter - (2"), Water temperature gauge - (2'), Oil pressure gauge - (2') AUTOMATIC ENGINE CONTROL - KASSEC, single or cyclic cranking with 12 indicating fights for. Low oil pressure shutdown and light, High water temperature shutdown and light, Low water level shutdown and light combined with high engine temperature, Overspeed shutdown and light, Overcrank shutdown and fight, Low battery voltage light, Charger malfunction light, EPS supplying load light, Low water temperature light, High engine temperature preshutdown and light, Low oil pressure preshutdown and light, Low fuel light, Unit not in auto light, 3 position manual- off - automatic switch, Repetitive alarm buzzer and silencing switch Included Accessories Voltage Adjust Potentionmeter ENCLOSURE: Weather Prof Weather Proof Enclosure includes bolt together sheet metal enclosure constructed with 14 -gauge material, lockable hinged doors, keyed alike, a fixed storm proof air intake louver and expanded metal air discharge, muffler support brackets and exhaust piping allowing the muffler to be mounted on top of the roof; including rain cap. Included Accessories: 1.5" Sound Attenuated Foam -3- COOLING SYSTEM: Unit Mounted Radiator CIRCUIT BREAKER: 100 AMP 480V Three Phase - Mounted and Wired in a NEMA 1 Enclosure (Qty: 1) BATTERY: Lead Acid Battery 950 CCA Q 0 F Included Accessories: Unit Mounted Steel Rack (Per Battery) BLOCK HEATER: Standard Q 20 F 1000 Watts Included Accessories: Heater wired to a Terminal VIBRATION ISOLATION: Vibration Pads BATTERY CHARGER: LC 1243.5 - 500.213 (12 Volt, 3.5 Amp) Included Accessories: LC 12.3.5- 500-28 - Mounted -Wired AC & DC MUFFLER: Critical Muffler Mounted Inside Enclosure 2112" Included Accessories: Rain Cap - 212 " SUB BASE TANK: Custom Sub Base Tank Fuel tank(s) factory installed. Features include double wall UL142 approved, constructed in accordance to NFPA 30, fuel leak detection standard (low fuel level alarm standard), 1.5 " normal vent cap, 2" fill with lockable fill cap, 2-6" NPT opening for emergency vent. TRAILER: 7000T4 (Cant' Wgt - 65471 Wgt Only -1353, OA Size -158 x 821n. / Bed 110 x 601n.) Trailer chassis is box type consisting of channel iron construction with heavy -gauge steel plate bed and built -in bumpers. Trailers are painted with one Coat of primer and one black finish coat. Included Accessories: 7000T4 - Trailer Mounted Fuel Tank -130 gis.,1300 lbs. Electric Fuel Gauge (Mounted In Control Panel) Stabilizing jack (each) Stabilizing jack (each) Stabilizing jack (each) Stabilizing jack (each) Towing ring 3" Spare tire and rim MISCELLANEOUS: Paint - White Testing - Standard Commercial Test Manual - One Instruction Manual Startup and commissioning service NOTES: 1. This proposal Is our Interpretation of your requirement and Includes only the items listed. Should there be other requirements or specifications, we will requote accordingly. 2. Seller reserves the privilege of requoting upon receipt of written specifications and drawings. 3. We take a general exception to competing manufacturer's proprietary components, methods of manufacture, testing or fabrication. This proposal is based upon providing a functional equal that is manufactured to current Industry standards. 4. Local regulatory agencies have final jurisdiction regarding permits at the time of application. Any required equipment or control devices that are not included In the bill of materials of this proposal are not included in the quoted price. 5. Taxes, Permits or Licenses are not included In this proposal. 6. Offloading or installation of equipment is by others unless specifically included in the bill of materials of this proposal. 7. Fuel for any purpose is not included in this proposal and is by others. S. Fees for cancelled, changed or returned orders will be charged to the buyer based upon our cost 9. Material is invoiced from date of shipment from the manufacturer and upon approval of credit is payable in full 30 days afterward. All risk of loss passes to the buyer as soon as goods are loaded on the carrier. 1.5% per month will -4- be added to past due balances. 10. Current estimated delivery schedule Is 12 ton 14 weeks upon submittal approval and release to production. This is subject to change. We are not liable for losses or delays occasioned by circumstances that are beyond our direct control. 11. FOB South Lake Tahoe, CA Proposal Summary: TOTAL PROPOSAL PRICE: 32,587.20 Quoted prices do not include Federal, State or Local taxes which may be applicable. Quoted prices Include normal testing, packaging and instructional literature. Special testing, packaging, additional instructional literature, parts, provisioning lists or prints are not Included, and prices will be quoted separately. Quotation Firm For 30 Day(s) Delivery Notes: BY: Nevada Generator David Bardelli -5- Portable Generator To Replace Deutz 50 KW will run the following Stations: WELLS 1. Helen Well 2. Chris Well 3. Sunset Well 4. Paloma Well 5. Helen Well Water Booster Stations 1. Apache Booster 2. Keller Booster 3. David Lane Booster 4. H Street Booster 5. Boulder Mountain Booster Sewer Stations 1. Beecher Pump Station 2. Fallen Leaf Electric Stations -6- General Manager 5 ou th ard K 9olbrtg ( J Ern CtsuAlo Tah oe. �✓ ,taenas It ,k�rAs UM mooftow ruwlc Utility L)Iotrict 's1 .2 FL 10 V> 1 MIN 7; BOARD AGENDA ITEM 4b TO: Board of Directors FROM: Randy Curtis, Manager of Field Operations MEETING DATE: September 3, 2009 ITEM — PROJECT NAME: California Air Resources Mandated Emission Control Measures REQUESTED BOARD ACTION: Authorize staff to advertising for bid for particulate filters. DISCUSSION: The California Air Resources Board has mandated emission control measures (Title 13 California Code of Regulations, section 2022), be installed on all on -road diesel powered trucks and has given certain timeframes for selected years listed below: • Vehicle age 1960 —1987 60% installed by 2009 • Vehicle age 1988 — 2002 60% installed by 2009 • Vehicle age 2003 — 2006 50% installed by 2009 These emission devices are installed on the vehicle exhaust system usually in place of the muffler to remove particulate matter from the exhaust gas. Each unit has regeneration capabilities to prevent plugging or fouling of the filter. Part of the bid specs will be to train District Equipment Repair employees to do the installations on District vehicles. Preliminary costs have ranged from $8,500 to $12,500 per unit installed. The District will need to retrofit six trucks to be in compliance with state regulations. Staff has reviewed each affected department's budget and can meet budget requirements. Staff will remove some capital purchase items and transfer funds for this purchase. Training costs will come from Equipment Repair training budget. SCHEDULE: As soon as possible COSTS: $80,000 ACCOUNT NO: Unbudgeted capital to be drawn from affected departments BUDGETED AMOUNT REMAINING: ATTACHMENTS: Bid Specification and TWk Specification Randy Curtis September 3, 2009 Page 2 CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES CATEGORY: Sewer & Water NO NO -8- Bid Specifications Diesel Particulate Filter Systems • Diesel Particulate Filter will be an Active System using electrical regeneration. • To include all installation parts ie; clamps, wiring, hangers and associated hardware. • Provide Vehicle assessment to determine Diesel Particulate filter for each listed model engine. • All provided filters must meet California Air Resources Board and EPA Certification/Verification with written Executive Order. • Capability to train District personnel for in -house installations. California Air Resources Board (CARB) C.A.R.B. Diesel Particulate Filters for the following Group 2 Vehicles range 1988 -2002: 1. (insert vehicle id/info) Truck 34 2. (insert vehicle id/info) Truck 25 3. (insert vehicle id/info) Truck 58 C.A.R.B. Diesel Particulate Filter for the following Group 3 Vehicles range 2003 -2007: 1. (insert vehicle id/info) Truck 27 2. (insert vehicle id/info) Truck 36 3. (insert vehicle id/info) Truck 57 -9- TRK 25 ;**** Test Number; 7 ;Test Date; 03 -13 -09 ;Test Time; 14:39:51 ;Tested by; CLIFF BARTLETT ;Vehicle ID; TRK 25 ;Engine Manufacturer, FORD ;Year & Make; 2000 FORD F55 ;Engine Yr; 2000 ;Vehicle Mileage; 41896 ;Exhaust Stack Dia (in inches); 3 ;Engine Power (in BHp); ;Test Temperature; 59.5 F ;Test Relative Humidity; 24.9 % ;Test Barometric Pressure; 23.88 inHg ;Cleanout #1; 6.72 % ;Cleanout #2; 5.46 % ;Cleanout #3; 5.51 % ;Raw Test #1; 4.52 % ;Raw Test #2; 5.37 % ;Raw Test #3; 5.17 % ;Corrected Test #1; 4.52 % ;Corrected Test #2; 5.37 % ;Corrected Test #3; 5.17 % ;3 Test Avg; 5.02 % ;Atmos Correction Enabled; Y ;OPACITY TEST PASS /FAIL; P ;Visual Inspection Pass /Fail; p ;Calibration Date; 03 -06 -09 ;Calibration Time; 08:38:34 ;Vin # 1 FDAF57F54EE27954 ;License # 1040335 TRK 58 ;Test Number; 1 ;Test Date; 03 -10 -09 ;Test Time; 17:30:07 ;Tested by; CLIFF BARTLETT ;Vehicle ID; TRK 58 ;Engine Manufacturer; CAT 3126 ;Year & Make; 2002 FORD F 750 ;Engine Yr, 2002 ;Vehicle Mileage; 70318 ;Exhaust Stack Dia (in inches); ;Engine Power (in BHp); 250 ;Test Temperature; 64.8 F ;Test Relative Humidity; 30.4 % ;Test Barometric Pressure; 23.78 inHg ;Cleanout #1; 10.9 % ;Cleanout #2; 11.1 % ; Cleanout #3; 10.1 % ;Raw Test #1; 10.3 % ;Raw Test #2; 9.85 % ;Raw Test #3; 10.1 % ;Corrected Test #1; 10.3 % ;Corrected Test #2; 9.85 % ;Corrected Test #3; 10.1 % ;3 Test Avg; 10.1 % ;Atmos Correction Enabled; Y ;OPACITY TEST PASS /FAIL; P ;Visual Inspection Pass /Fail; p ;Calibration Date; 03 -06-09 ;Calibration Time; 08:38:34 ;Calibration Filter, 50.2 ;Vin #3FDXF75RXZMA19969 ;License # 1099266 TRK 34 ;"'"' Test Number, 12 ;Test Date; 03 -24-09 ;Test Time; 11:55:36 ;Tested by; CLIFF BARTLETT ;Vehicle ID; TRK 34 ;Engine Manufacturer, FORD 7.3 ;Year & Make; 1999 ;Engine Yr, 1999 ;Vehicle Mileage; 37893 ;Exhaust Stack Dia (in inches); 3 ;Engine Power (in BHp); ;Test Temperature; 63.8 F ;Test Relative Humidity; 30.9 % ;Test Barometric Pressure; 23.99 inHg ;Cleanout #1; 5.02 % ;Cleanout #2; 2.18 % ; Cleanout #3; 0.959 % ;Raw Test #1; 1.19 % ;Raw Test #2; 1.42 % ;Raw Test #3; 1.27 % ;Corrected Test #1; 1.19 % ;Corrected Test #2; 1.42 % ;Corrected Test #3; 1.27 % ;3 Test Avg; 1.3 % ;Atmos Correction Enabled; Y ;OPACITY TEST PASS /FAIL; P ;Visual Inspection Pass /Fail; p ;Calibration Date; 03 -17 -09 ;Calibration Time; 12:28:14 ;Calibration Filter; 50.2 ;Vin # 1 FDAFOXEE78194 ;License #1019831 TRK 57 ; * * ** Test Number; 5 ;Test Date; 03 -13 -09 ;Test Time; 12:39:32 ;Tested by; CLIFF BARTLETT ;Vehicle ID; TRK 57 ;Engine Manufacturer; CAT 3126 ;Year & Make; 2003 ;Engine Yr; 2003 ;Vehicle Mileage; 17728 ;Exhaust Stack Dia (in inches); ;Engine Power (in BHp); 300 ;Test Temperature; 58.4 F ;Test Relative Humidity; 29 % ;Test Barometric Pressure; 23.92 inHg ;Cleanout #1; 12.2 % ;Cleanout #2; 9.42 % ;Cleanout #3; 8.55 % ;Raw Test #1; 8.27 % ;Raw Test #2; 9.16 % ;Raw Test #3; 10 % ;Corrected Test #1; 8.27 % ;Corrected Test #2; 9.16 % ;Corrected Test #3; 10 % ;3 Test Avg; 9.15 % ;Atmos Correction Enabled; Y ;OPACITY TEST PASS /FAIL; P ;Visual Inspection Pass/Fail; p ;Calibration Date; 03 -06-09 ;Calibration Time; 08:38:34 ;Calibration Filter, 50.2 ;Vin #2FZHAK34AM18017 ;license # 1155912 TRK 27 ;**** Test Number; 10 ;Test Date; 03 -17 -09 ;Test Time; 13:16:21 ;Tested by; CLIFF BARTLETT ;Vehicle ID; TRK 27 ;Engine Manufacturer; CAT C7 ;Year & Make; 2005 STERLING ;Engine Yr; 2005 ;Vehicle Mileage; 5153 ;Exhaust Stack Dia (in inches); ;Engine Power (in BHp); 300 ;Test Temperature; 62.4 F ;Test Relative Humidity; 34.8 % ;Test Barometric Pressure; 24.03 inHg ;Cleanout #1; 14.3 % ;Cleanout #2; 15.4 % ;Cleanout #3; 16.8 % ;Raw Test #1; 24.5 % ;Raw Test #2; 14.9 % ;Raw Test #3; 14.1 % ;Corrected Test #1; 24.5 % ;Corrected Test #2; 14.9 % ;Corrected Test #3; 14.1 % ;3 Test Avg; 17.8 % ;Atmos Correction Enabled; Y ;OPACITY TEST PASS /FAIL; I ;Visual Inspection Pass /Fail; p ;Calibration Date; 03 -17 -09 ;Calibration Time; 12:28:14 ;Calibration Filter; 50.2 ;Vin # 2FZACODC15AU73493 ;License # 1099337 GRov 3 TRK 36 ;**** Test Number, 11 ;Test Date; 03 -24-09 ;Test Time; 11:09:39 ;Tested by; CLIFF BARTLETT ;Vehicle ID; TRK 36 ;Engine Manufacturer MERCEDS 4MBX6370JA ;Year & Make; 2004 STERLING ;Engine Yr; 2004 ;Vehicle Mileage; 6786 ;Exhaust Stack Dia (in inches); ;Engine Power (in BHp); 250 ;Test Temperature; 61 F ;Test Relative Humidity; 31.4 % ;Test Barometric Pressure; 23.99 inHg ;Cleanout #1; 56.5 % ;Cleanout #2; 19.8 % ;Cleanout #3; 12.7 % ;Raw Test #1; 12.5 % ;Raw Test #2; 11.2 % ;Raw Test #3; 11.8 % ;Corrected Test #1; 12.5 % ;Corrected Test #2; 11.2 % ;Corrected Test #3; 11.8 % ;3 Test Avg; 11.8 % ;Atmos Correction Enabled; Y ;OPACITY TEST PASS /FAIL; P ;Visual Inspection Pass /Fail; p ;Calibration Date; 03 -17 -09 ;Calibration Time; 12:28:14 ;Calibration Filter 50.2 ;Vin # 2FZACGCS55AN79339 ;License # 1136931 �..♦ r• > # BOARD AGENDA ITEM 4c TO: Board of Directors FROM: Lynn Nolan, Grants Coordinator MEETING DATE: September 3, 2009 ITEM — PROJECT NAME: Arsenic Treatment Funding and Water Meter Installation REQUESTED BOARD ACTION: Adopt Resolution No. 2870 -09 and Resolution No. 2871 -09 entering into agreements for revised funding with the California Department of Public Health. DISCUSSION: The grant staff submitted two applications to the California Department of Public Health (CDPH) for funding from the Safe Drinking Water State Revolving Fund for Water Meter Installation and Arsenic Treatment for Arrowhead Well. On June 4, 2009, staff received a Notice of Application Acceptance for each project for funding as follows: $4,387,500 in grant funding for the installation of Water Meters, and $515,300 in loan funding and $515,300 in grant funding for Arsenic Treatment for Arrowhead Well. CDPH staff called on August 25, 2009, to inform STPUD staff that they had changed the Arsenic Treatment for Arrowhead Well project from half loan funding and half grant funding to full grant funding. In addition, they increased the grant funding amount for this project to $1, 185,221. They also revised the required resolutions to remove any references to loan funding on both of these projects. This action will require the two revised resolutions to be re- adopted by the board. Attached are the resolutions to accept funding for the projects referenced above, as required by the CDPH. SCHEDULE: Submission of resolutions by September 4, 2009 COSTS: No costs associated with the resolution submission ACCOUNT NO: N/A BUDGETED AMOUNT REMAINING: N/A ATTACHMENTS: Resolution No. 2870 -09 and Resolution No. 2871 -09 -13- coom ai Ma MIW Rkhard H. Sol" 15 Tah E slim" / Jal:r ws IC. ,1b+�s (� PuRc lt�� U t ili ty P �..♦ r• > # BOARD AGENDA ITEM 4c TO: Board of Directors FROM: Lynn Nolan, Grants Coordinator MEETING DATE: September 3, 2009 ITEM — PROJECT NAME: Arsenic Treatment Funding and Water Meter Installation REQUESTED BOARD ACTION: Adopt Resolution No. 2870 -09 and Resolution No. 2871 -09 entering into agreements for revised funding with the California Department of Public Health. DISCUSSION: The grant staff submitted two applications to the California Department of Public Health (CDPH) for funding from the Safe Drinking Water State Revolving Fund for Water Meter Installation and Arsenic Treatment for Arrowhead Well. On June 4, 2009, staff received a Notice of Application Acceptance for each project for funding as follows: $4,387,500 in grant funding for the installation of Water Meters, and $515,300 in loan funding and $515,300 in grant funding for Arsenic Treatment for Arrowhead Well. CDPH staff called on August 25, 2009, to inform STPUD staff that they had changed the Arsenic Treatment for Arrowhead Well project from half loan funding and half grant funding to full grant funding. In addition, they increased the grant funding amount for this project to $1, 185,221. They also revised the required resolutions to remove any references to loan funding on both of these projects. This action will require the two revised resolutions to be re- adopted by the board. Attached are the resolutions to accept funding for the projects referenced above, as required by the CDPH. SCHEDULE: Submission of resolutions by September 4, 2009 COSTS: No costs associated with the resolution submission ACCOUNT NO: N/A BUDGETED AMOUNT REMAINING: N/A ATTACHMENTS: Resolution No. 2870 -09 and Resolution No. 2871 -09 -13- RESOLUTION FOR FUNDING AGREEMENT WITH CA. DEPT. OF PUBLIC HEALTHI RESOLUTION NO. 2870-09 RESOLUTION OF the South Tahoe Public Utility District (STPUD) Board of Directors AUTHORIZING the General Manager (GM), Assistant General Manager (AGM) or the Chief Financial Officer (CFO) TO SIGN FUNDING AGREEMENT AND AMENDMENTS FOR FUNDING UNDER THE SAFE DRINKING WATER STATE REVOLVING FUND AMERICAN RECOVERY AND REINVESTMENT ACT; AUTHORIZING the GM, AGM and /or the CFO TO APPROVE CLAIMS FOR REIMBURSEMENT; AUTHORIZING the GM, CFO, and AGM TO EXECUTE BUDGET AND EXPENDITURE SUMMARY; AUTHORIZING AGM TO SIGN THE CONTRACTOR'S RELEASE FORM AND AGM TO SIGN THE CERTIFICATION OF PROJECT COMPLETION. WHEREAS, on 2/23/2009 , the STPUD made application to the California Department of Public Health for funding under the California Safe Drinking Water State Revolving Fund and the federal AMERICAN RECOVERY AND REINVESTMENT ACT of 2009 for a project commonly known and described as Arsenic Treatment for Arrowhead Well (herein the project); and WHEREAS, on 06/04/2009 , said STPUD Board of Directors adopted a project budget totaling $ 1,744,976, and WHEREAS, it is anticipated that the Funding Agreement under the California Safe Drinking Water State Revolving Fund and the federal AMERICAN RECOVERY AND REINVESTMENT ACT of 2009 will provide for a loan in the amount of $ 1,185,221 , of which $ 1,185,221 will be provided as additional subsidization in the form of principle forgiveness. WHEREAS, prior to the California Department of Public Health's issuance of said Funding Agreement, STPUD Board of Directors is required to pass a resolution authorizing an officer to execute said Funding Agreement and amendments, authorizing an officer to execute all certifications and reports required of funding recipients under the California Safe Drinking Water State Revolving Fund and the federal American Recovery and Reinvestment Act of 2009; designating a person to approve claims for reimbursement, designating a person (registered engineer) to sign the Budget and Expenditure Summary, designating a person (registered engineer) to sign Certification of Project Completion, and designating a person to sign the Contractor's Release Form. NOW, THEREFORE, BE IT RESOLVED AND ORDERED, that the STPUD General Manager, Assistant General Manager and /or the Chief Financial Officer is hereby authorized to sign the Safe Drinking Water State Revolving Fund program Funding Agreement and any amendments thereto; and BE IT FURTHER RESOLVED AND ORDERED, that the STPUD General Manager, Assistant General Manner and/or the Chief Financial Officer is hereby authorized to sign all certifications and reports required of funding recipients under the California Safe Drinking Water State Revolving Fund program and /or the federal American Recovery and Reinvestment Act of 2009, and BE IT FURTHER RESOLVED AND ORDERED, that the STPUD General Manager, Assistant General Manager and /or the Chief Financial Officer is hereby authorized to approve Claims for Reimbursement under the Safe Drinking Water State Revolving Fund program; and BE IT FURTHER RESOLVED AND ORDERED, that the STPUD General Manager, Assistant General Manager and /or the Chief Financial Officer is hereby authorized to execute the Budget and Expenditure Summary for the Safe Drinking Water State Revolving Fund program; and Revised June 11, 2009 -15- Page 1 of 2 Enclosure No. 14 BE IT FURTHER RESOLVED AND ORDERED, that the STPUD Assistant General Manager is hereby authorized to sign the Contractor's Release Form for the Safe Drinking Water State Revolving Fund Program; and BE IT FURTHER RESOLVED AND ORDERED, that the STPUD Assistant General Manacer is hereby authorized to certify that the project is complete and ready for final inspection; and BE IT FURTHER RESOLVED AND ORDERED, that the project infrastructure investment is an appropriate use of taxpayer dollars. Passed and adopted by the STPUD Board of Directors on 9/312009, by the following vote: AYES: Directors NOES: Directors EXCUSED: Directors ATTEST: Kathy Sharp, Clerk of the Board Revised June 11, 2009 , President Mary Lou Mosbacher Page 2 of 2 -16- (RESOLUTI FOR FUNDING AGREEMENT WITH CA. DEPT. OF PUBLIC HEALTHI RESOLUTION NO. 2871-09 RESOLUTION OF the South Tahoe Public Utility District (STPUD) Board of Directors AUTHORIZING the General Manager (GM), Assistant General Manager (AGM) or the Chief Financial Officer (CFO) TO SIGN FUNDING AGREEMENT AND AMENDMENTS FOR FUNDING UNDER THE SAFE DRINKING WATER STATE REVOLVING FUND AMERICAN RECOVERY AND REINVESTMENT ACT; AUTHORIZING the GM, AGM and /or the CFO TO APPROVE CLAIMS FOR REIMBURSEMENT; AUTHORIZING the GM, CFO and AGM TO EXECUTE BUDGET AND EXPENDITURE SUMMARY; AUTHORIZING AGM TO SIGN THE CONTRACTOR'S RELEASE FORM AND AGM TO SIGN THE CERTIFICATION OF PROJECT COMPLETION. WHEREAS, on 2/23/2009 , the STPUD made application to the California Department of Public Health for funding under the California Safe Drinking Water State Revolving Fund and the federal AMERICAN RECOVERY AND REINVESTMENT ACT of 2009 for a project commonly known and described as Water Meter Installation (herein the orolect): and WHEREAS, on 06104/2009 , said STPUD Board of Directors adopted a project budget totaling $4,387,500 and; WHEREAS, it is anticipated that the Funding Agreement under the California Safe Drinking Water State Revolving Fund and the federal AMERICAN RECOVERY AND REINVESTMENT ACT of 2009 will provide for a loan in the amount of $4,387,500, of which $ 4,387,500 will be provided as additional subsidization in the form of principle forgiveness. WHEREAS, prior to the California Department of Public Health's issuance of said Funding Agreement, STPUD Board of Directors is required to pass a resolution authorizing an officer to execute said Funding Agreement and amendments, authorizing an officer to execute all certifications and reports required of funding recipients under the California Safe Drinking Water State Revolving Fund and the federal American Recovery and Reinvestment Act of 2009; designating a person to approve claims for reimbursement, designating a person (registered engineer) to sign the Budget and Expenditure Summary, designating a person (registered engineer) to sign Certification of Project Completion, and designating a person to sign the Contractor's Release Form. NOW, THEREFORE, BE IT RESOLVED AND ORDERED, that the STPUD General Manager, Assistant General Manager and /or the Chief Financial Officer is hereby authorized to sign the Safe Drinking Water State Revolving Fund program Funding Agreement and any amendments thereto; and BE IT FURTHER RESOLVED AND ORDERED, that the STPUD General Manager, Assistant General Manager and /or the Chief Financial Officer is hereby authorized to sign all certifications and reports required of funding recipients under the California Safe Drinking Water State Revolving Fund program and /or the federal American Recovery and Reinvestment Act of 2009, and BE IT FURTHER RESOLVED AND ORDERED, that the STPUD General Manager, Assistant General Manager and/or the Chief Financial Officer is hereby authorized to approve Claims for Reimbursement under the Safe Drinking Water State Revolving Fund program; and BE IT FURTHER RESOLVED AND ORDERED, that the STPUD General Manager, Assistant General Manager and /or the Chief Financial Officer is hereby authorized to execute the Budget and Expenditure Summary for the Safe Drinking Water State Revolving Fund program; and BE IT FURTHER RESOLVED AND ORDERED, that the STPUD Assistant General Manager is hereby authorized to sign the Contractor's Release Form for the Safe Drinking Water State Revolving Fund Program; and Revised June 11, 2009 -17- Page 1 of 2 Enclosure No. 14 BE IT FURTHER RESOLVED AND ORDERED, that the STPUD Assistant General Manasler is hereby authorized to certify that the project is complete and ready for final inspection; and BE IT FURTHER RESOLVED AND ORDERED, that the project infrastructure investment is an appropriate use of taxpayer dollars. Passed and adopted by the STPUD Board of Directors) on 9/3/2009, by the following vote: AYES: Directors NOES: Directors EXCUSED: Directors , President Mary Lou Mosbacher ATTEST: Kathy Sharp, Clerk of the Board Revised June 11, 2009 Page 2 of 2 -18- NO SOUTH y H Tq o O lt Ie� • 1950 •`N TAHOE PUBLIC UTIL "Basic Services for a Comp /ex World" Richard Solbrig, General Man Paul Sciuto, Assistant M Mary Lou Mosbacher, President BOARD MEMBERS Dale Rise, Vice President James R. Jones, Director Eric W. Schafer, Director Ernie Claudio, Director REGULAR MEETING OF THE BOARD OF DIRECTORS SOUTH TAHOE PUBLIC UTILITY DISTRICT AUGUST 6, 2009 MINUTES The Board of Directors of the South Tahoe Public Utility District met in a regular session, August 6, 2009, 2:00 P.M., District Office, 1275 Meadow Crest Drive, South Lake Tahoe, California. BOARD OF DIRECTORS ATTENDEES President Mosbacher, Directors Rise, Claudio, Schafer, Jones. STAFF Solbrig, Sharp, Sciuto, Hughes, C. Stanley, Adams, Callian, Coyner, Henderson, Morse, Ryan, Nolan, R. Johnson, Barnes, Hoggatt, Baugh, W. Stanley Thiel, Curtis, Attorney Kvistad GUESTS: Joyce Blackstone, Peggy Cocores, John Runnels, Ken Curtzwiler, David Makovec, Vicki InFerrera, Paul Morris, Chris Cefalu, Scott Swift, Donna Rise Paul Morris led the pledge to the flag. PLEDGE OF ALLEGIANCE Ken Curtzwiler read aloud a statement (on file) he pre- COMMENTS FROM THE AUDIENCE pared stating his views on an August 5 letter to the editor printed in the Tahoe Daily Tribune from Wanda Stanley. John Runnels and Wanda Stanley added to the comments. Moved Schafer / Second Rise / Passed Unanimously CONSENT CALENDAR to approve the Consent Calendar as submitted: a. 2009 Sonora Waterline Replacement Project - Approved Change Order No. 1 to Campbell Construction Co., Inc., in the amount of $ 128,045.81; -19- REGULAR BOARD MEETING MINUTES - AUGUST 6, 2009 PAGE - 2 b. Unpaid Assessments — Adopted Resolution CONSENT CALENDAR No. 2867 -09, authorizing delinquent accounts (continued) be added to the 2009/20 El Dorado County Tax Assessor's Roll; c. InfraMap Software Purchase — Authorized purchase of six licenses of InfraMap software from iWater, Inc., for $2,459 each, for a total of $14,754, plus tax; d. GIS Maintenance and Development — Approved Task Order No. 10 amendment to ArOte Systems, to provide additional consulting and support services, in the to, estimated amount of $49,000; e. 2009 Water Meter Installation Project — Authorized staff to advertise for bids; , f. Final and Secondary Efflluent Pump Station —, Approved Change Order No. 7 to Pacific Mechanical pP 9 Corporation, in the amount of $8,259.99; i g. Rocky Point Erosion Control — Authorized staff to pay invoice received from City of South Lake Tahoe for water and sewer relocation, in the amount of $10,890; h. Annual Software Support Costs for Financial /Payroll Software — Approved payments to SunGard Public Sector for annual maintenance costs in the amount of $15,921.46, plus tax. ITEMS FOR BOARD ACTION During routine camera viewing of the District's sewer main, roots were discovered in the lateral located at 2290 Montana Avenue. Staff sent a letter notifying property owner, Joyce Blackstone, of the roots as a courtesy since roots can eventually lead to a clog. The customer is required to maintain the sewer lateral from their property to the main. Roots were located a couple of feet up the lateral from the main, and not in the District's main. REQUEST TO APPEAR BEFORE THE BOARD RECEIVED FROM JOYCE BLACKSTONE Ms. Blackstone appeared before the Board and presented photos taken by Apollo Plumbing, and stated the photos confirm the roots were not from her property. She requested the Board approve reimbursement of $307.50 for the amount incurred to have the sewer line cleaned of roots, and also requested continued maintenance by STPUD of this area to prevent reoccurrence. -20- REGULAR BOARD MEETING MINUTES - AUGUST 6, 2009 PAGE - 3 Ms. Blackstone attended the August 3 Water and Wastewater Operations Committee, where ownership and maintenance of private sewer laterals was discussed. On their recommendation, she approached the Helping Hands program for financial assistance and found that the program only helps those who are in arrears in paying their bills, and she did not meet that criteria, hence her request for reimbursement. Moved Claudio / Second Mosbacher / to split associated costs with Ms. Blackstone. The motion was subsequently withdrawn because the invoice from Apollo Plumbing included labor costs incurred to bring her sewer cleanout up to grade. She will reappear before the Board at a later date with a revised bill. No Board action. David Makovec filed a claim with the District in excess of $21,000 as a result of work performed to excavate and remove an old septic tank as well as replace a sewer lateral that was in need of repair due to root intrusion. Mr. Makovec claimed it was the District's responsibility as he was not aware of the septic tank and subsequent research showed a District permit card which said that the septic tank was "pumped and filled." Mr. Makovec stated that had the septic tank been properly inspected, the sewer overflow would not have occurred. Lisa Coyner and Mike Adams explained that Mr. Makovec should have been aware of the existence of the septic tank as his Grant Deed listed a leach field, which is used for a septic tank. The District also notified the owner, every year for three years, that his sewer lateral continued to back sew - ge out of the cleanouts because there was root intrusion and he needed to replace or repair his sewer lateral (which is his property and not the District's responsibility). Mr. Makovec did not repair his sewer lateral until there was another backup in April of this year. REQUEST TO APPEAR BEFORE THE BOARD RECEIVED FROM JOYCE BLACKSTONE (continued) LIABILITY CLAIM AGAINST STPUD RECEIVED FROM DAVID MAKOVEC The District's claim adjuster, Carl Warren & Company, agreed that this is not the District's responsibility and recommended the claim be rejected. Pursuant to Section 54956.9(b) of the California Government Code, the Board adjourned to closed session at 3:20 p.m. to discuss the merits of the claim with legal counsel and staff. They reconvened to open session at 3:40 p.m. -21- REGULAR BOARD MEETING MINUTES - AUGUST 6, 2009 PAGE - 4 Moved Claudio / Second Schafer / Passed Unanimously LIABILITY CLAIM AGAINST STPUD to reject claim in accordance with Government Code RECEIVED FROM DAVID Section 913. MAKOVEC (continued) Moved Schafer / Second Jones / Passed Unanimously to approve payment in the amount of $3,796,757.37. Water and Wastewater Operations Committee: The committee met August 3. Minutes of the meeting are available upon request. PAYMENT OF CLAIMS BOARD MEMBER STANDING COMMITTEE REPORTS The next meeting of the Water Agency will be held at EL DORADO COUNTY WATER the District on August 12. There are problems with AGENCY WATER PURVEYOR Policy 4 (guidelines for funding of purveyors' cost -share REPORT projects) that are being worked on. Director Jones relayed his exasperation with a Board BOARD MEMBER REPORTS member over an article in the Tahoe Daily Tribune that accused the District of not being transparent. Other Board members added to the comments. Director Claudio distributed a typed report and reported on the July 22 Board workshop, questions he had on the agenda, the recycled water EIR, and his concerns about sprinkling recycled water in Alpine County. Director Schafer reported he will attend the next CASA Conference and would bring back information if anyone is interested in anything listed on the agenda that is posted on their web site. Director Mosbacher reported water shortages are a serious problem in some areas, and some are forced to purchase it from others. General Manager: Richard Solbrig reported on the July 22 GENERAL MANAGER REPORTS Board workshop, outreach for the metering program, the status of the City Water MOU, and that District projects plus the 2/3 reimbursement for utility relocations will be included in the reauthorized Lake Tahoe Restoration Act. 4:40 — 4:55 P.M. MEETING BREAK Grants Coordinator: Lynn Nolan reported that the water STAFF REPORTS audit program was cut from the metering grant. She distributed a report showing the status of all grants applied for, and received to date. -22- REGULAR BOARD MEETING MINUTES - AUGUST 6, 2009 PAGE - 5 Water Conservation Specialist: Shelly Barnes distributed STAFF REPORTS a handout and reported on the status of the successful turf- (continued) buy back program, which concludes at the end of this growing season. She also reported on educational outreach plans. Chief Financial Officer: Paul Hughes gave an update on the impacts of the state budget that was recently passed. pT r ES � i Clerk of the Board: Kathy Sharp gave an update on thef...�! -gml - list of candidates running for seats on the Board in the November elections. 5:30 P.M. ADJOURNMENT TO CLOSED SESSION ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION No reportable Board action. Pursuant to Section 54956.9(b)/ Conference with Legal Counsel - Anticipated Litigation (One Case) See Page 3 for action on this item. No reportable Board action. No reportable Board action. 6:15 P.M. Pursuant to Government Code Section 54956.9(b) /Conference with Legal Counsel re: Liability Claim Against STPUD Received from David Makovec Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel - Existing Litigation re: Meyers Landfill Site: United States of America vs. El Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S -01 -1520 LKK GGH, U.S. District Court for the Eastern District of Ca. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel - Existing Litigation: Tahoe Asphalt, Inc., and Tahoe Asphalt Materials Company, LLC, vs. STPUD, Case No. SC20090104, El Dorado Superior Court ADJOURNMENT -23- REGULAR BOARD MEETING MINUTES - AUGUST 6, 2009 PAGE - 6 Mary Lou Mosbacher, Board President South Tahoe Public Utility District ATTEST: Kathy Sharp, Clerk of the Board South Tahoe Public Utility District -24- SOUTH TAHOE PUBLIC UTILITY DISTRICT • 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 - - Phone 530.544.6474 • Facsimile 530.541.0614 Agenda Item 6a NOTE: COMPLETION OF THE ABOVE INFORMATION IS VOLUNTARY AND NOT A PRECONDITION FOR ATTENDANCE. REQUEST TO APPEAR BEFORE THE BOARD (Use Separate Sheet if Necessary) 1. Name: Jovice Blackstone 2. Street Address: 2290 Montana Avenue 3. Mailing Address: P.O. Box 686, South Lake Tahoe. Ca 96156 4. Phone No: 530 - 544 -2195 Date: 07 -21 -09 5. Date I wish to appear: Before committee: N/A Before full Board: 09 -03 -09 6. 1 have discussed this matter with a member of District staff: Yes X No If "Yes ": Name /Department of District contact: Mike Adams 7. Staff Introduction: Mike Adams, UGR Sewer Supervisor notified Ms. Joyce Blackstone via mail that the sewer lateral from her property had a root growth Droblem. The roots were noticed during CCTVing of the main she is connected. CCTV indicate roots starting a couple feet up lateral from the main. 8. Customer Comments: I was asked after my appearance on this issue in front of the Board on 08- 06 -09, to reappear and submit a revised bill from Apollo for cleaning of the root intrusion. 9. Action I am requesting Board take: Request reimbursement of $125.00 to Joyce Blackstone. 10. Staff Comments / Recommendation: Randy Curtis — Manager Field Operations: Per the Administrative Code. the Customer shall maintain sewer laterals of the property served as per: Section 4.7 Maintenance and Repair of Sewers. paragraph 4.7.2 Maintenance of Sewer Laterals. Recommend not waiving the Administrative Code due to the precedent it would set. This is a maintenance item not an installation problem. Per legal counsel, if the Board decides to waive the Administrative Code, it must state so for the record and give justification as to why. Attachments: Revised bill from Terry's Appollo Plumbing and Heating. Inc. -25- Aug 1b U9 UVWa • Commerdal • Residential • space Planning • Coasdtation • Wallcoverings • Wiodowcovexings a Lighting Floorcoverhngs • Furniture • Kitchen & Bath Design P.O. Box 686 South Lake Tabor, CA 96156 (530)544 -2195 Fax: (530) 541 -7168 JOYCE W. BLACKSTONE ASID INTERIOR DESIGN NCIDQ 13282 - Nevada Registered Interior Designer August 25, 2009 Kathy Sharp, Clerk of the Board South Tahoe Public Utility District Dear Kathy: Per the request of the STPUD Board at their meeting of August 6, 2009, attached please find the revised invoice from Terry's Apollo Plumbing and Heating noting the clearing of roots out of main sewer cost of $125.00. I am requesting of the Board to approve reimbursement to me of $125.00. - . Thar I Joycl -27- P.1 Hug LD Uy Lrj1 Ye Invoice Terry'sApollo Plumbing and Heating, Inc CA Uc#813437 PO Box 2535 South Lake Tahoe, CA 96150 Ph 530 544 8404 / Fx 530 542 1020 apoll oplumbingilgicharter.net Bill To: JOYCEBLACKSTONE P.O. BOX 686 SLT, CA 96156 530 544 2195 530 957 3419 CL p.c June 25, 2009 14M/Qty Summary: PLUMBING Invoice #: 1394 -60818 Tech: 35 STEVE 3 Due Date: 711312009 Job Date: 6/2512009 Job Name: 2290 MONTANA JOYCE SLT, CA 96150 530 544 2195 Item Code Description 14M/Qty Price Amount Video inspect 4" sewer lateral from vent pipe to c ty sewer line locate & mark where roots have grown into lateral - Also locate S raise 4" cleanout access to ground level 307.50 $307.50 Note: Cost to clear roots out of main sewer $125.00 LABOR STEVE 1.00 105.00 105.00 LABOR TERRY 1.00 105.00 105.00 DISCOUNT OFFERED ON LABOR 1.00 -52.50 -52.50 EQUIPMENT - CAMRA 1.00 150.00 150.00 Labor Other Subtotal Total 210.00 97.50 307.50 $307.50 Ali material is guaranteed to be as specified. All work to be completed in a professional manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. AN agreernents contingent upon delays beyond our control Purchaser agrees to pay all costs of collection, Including attorney's tees. i Terms: Net 30 THANK YOU FOR YOUR BUSINESS Credits: $307.50 CR Balance: $0.00 -28- Ganes! Manow Kichard H. Solbrlg 10% Dwaafto Ernie QwAp 15outh Tahou James R. Jorreas Pumic Utility C)i6trict Lou Mosbaaw IM MesAw Crwt Prim + ftM Lako Tahm & CA 96150 Fhons 530 544 -0474 s Fox 530 X41 -06114 BOARD AGENDA ITEM 6b TO: Board of Directors FROM: Julie Ryan, Senior Engineer MEETING DATE: September 3, 2009 ITEM — PROJECT NAME: Wastewater Treatment Plant Filter Rehabilitation REQUESTED BOARD ACTION: Approve proposal from Brown & Caldwell Consulting Engineers (B &C) for design services. DISCUSSION: Staff is currently designing the Filters 5 and 6 Rehabilitation Project at the Wastewater Treatment Plant. To support that design, B &C recently prepared a filter inspection and evaluation report. In this report B &C recommended not only rehabilitation of the filter vessels and piping, but also replacement of the valves, instrumentation and electrical systems for all six filters. Staff has requested that B &C prepare a proposal for the following additional tasks in support of the filter rehabilitation project. 1) Evaluate the applicable options for valves, valve actuators, instrumentation and SCADA upgrades. 2) Prepare a Basis of Design Memo, 90% Design, Bid Documents and Engineer's Estimate for these elements of the filter rehabilitation project. 3) Provide as- needed services during the bid period and construction. Staff is currently negotiating the terms of the agreement, and will provide the Scope of Work and Cost Estimate for Board Consideration prior to, and at the Board meeting. SCHEDULE: September 2009 to December 2010 COSTS: To be determined ACCOUNT NO: 1029 - 8066 /FILTER BUDGETED AMOUNT REMAINING: $149,245 ATTACHMENTS: To be distributed prior to, and at the Board meeting. -29- Ganaml Manager Richard H. Sal" u Tah oc; E Claudio .James 1C. ,1a+es Public Utility Di 1 7_11 AVA t � I' =# # if .► � j BOARD AGENDA ITEM 6c TO: Board of Directors FROM: Jim Hoggatt, Engineering Department Manager MEETING DATE: September 3, 2009 ITEM — PROJECT NAME: South Tahoe Public Utility District Recycled Water Facilities Master Plan 2:30 P.M. PUBLIC HEARING REQUESTED BOARD ACTION: Hold a Public Hearing to take public comments on the Master Plan Draft Environmental Impact Report. DISCUSSION: At 2:30 p.m. open public hearing to receive public comments on the South Tahoe Public Utility District Recycled Water Facilities Master Plan Draft Environmental Impact Report. SCHEDULE: COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT REMAINING: N/A ATTACHMENTS: Notice CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES A NO -31- NOTICE OF AVAILABILITY SOUTH TAHOE PUBLIC UTILITY DISTRICT RECYCLED WATER FACILITIES MASTER PLAN DRAFT ENVIRONMENTAL IMPACT REPORT This notice is to inform you that a 45 -day public comment period for the Recycled Water Facilities Master Plan Draft EIR commenced on July 23, 2009 and concludes on September 6, 2009. Comments are solicited and will be incorporated into the final EIR. Comments received after September 6, 2009 may not be included in the final document. Public comments may be submitted in writing and mailed, or emailed to: Mail: South Tahoe Public Utility District Email: jhoggatt@stpud.dst.ca.us 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 The South Tahoe Public Utility District Recycled Water Facilities Master Plan includes a combination of actions to dispose of treated effluent and associated actions to convey and apply reclaimed water to District lands and manage fresh water resources. The plan updates the 1989 Master Plan and includes new and revised information on increases in system demands and disposal opportunities and constraints. Copies of the Draft EIR are available for public review during normal business hours at the South Tahoe Public Utility District Office (1275 Meadow Crest Drive, South Lake, CA), the Markleeville Library and Archives (270 Laramie Street, Markleeville, CA) and the El Dorado County Library (345 Fair Lane, Placerville, CA). A PDF of the Draft EIR is available to download on the District's website at: http:// www.stpud.us/. Two public hearings are scheduled to solicit comments on the Draft EIR: September 2, 2009: 1:00 p.m. to 3:00 p.m. at Turtle Rock Park, 99 Water Street, Markleeville, CA. September 3, 2009: South Tahoe Public Utility District Board Meeting, 2:30 p.m. to 3:30 p.m. at the District Office, 1275 Meadow Crest Drive, South Lake Tahoe, CA. For additional information, please contact Jim Hoggatt at (530) 543 -6206 or email jhoggatt@stpud.dst.ca.us. —33— PAYMENT OF CLAIMS FOR APPROVAL September 3, 2009 Payroll 8/26/09 Payroll 8/19/09 - rbtal Payroll BNY Western Trust Company CDS- health care payments Brownstein /Hyatt/Farber /Schreck legal services Bank of America Union Bank Total Vendor EFT Accounts Payable Checks -Sewer Fund Accounts Payable Checks -Water Fund Accounts Payable Checks - Self - funded Insurance Accounts Payable Checks - Grants Fund Total Accounts Payable Grand Total Payroll EFTs & Checks EFT AFLAC Medical & Dependent Care EFT CA Employment Taxes & W/H EFT Federal Employment Taxes & W/H EFT CalPERS Contributions EFT Great West Deferred Comp CHK Stationary Engineers Union Dues EFT United Way Contributions CHK CA State Disbursement Unit CHK El Dorado County Sheriffs Dept EFT Employee Direct Deposits CHK Employee Paychecks Total 430,152.80 3,131.67 433, 284.47 0.00 156, 388.19 13,748.82 0.00 M 170,137.01 8/26/09 264.13 17,404.45 92,429.53 72,646.14 16, 385.85 2,415.27 156.00 460.15 184.62 219,656.95 8,149.71 189, 090.96 898,731.61 0.00 25,233.34 1,113,055.91 1, 716,477.39 8/19/09 0.00 177.01 1,186.38 0.00 115.00 0.00 0.00 0.00 0.00 1,653.28 0.00 430,152.80 3,131.67 -35- PAYMENT OF CLAIMS Vendor Name Department / Proi Name Description Acct# / Proi Code Amount Check Num Tvoe ACCURATE PROCESS HUMAN RESOURCES PERSONNEL EXPENS 1022 - 6670 25.00 ACCURATE PROCESS HUMAN RESOURCES PERSONNEL EXPENS 2022 - 6670 25.00 Check Total: 50.00 AP -00073572 MW ACWA HEALTH BENEFITS AUTHORITY GEN & ADMIN VISION INS 1000 - 2530 2,717.50 Check Total: 2.717.50 AP -00073573 MW AERVOE- PACIFIC UNDERGROUND REP PIPE /CVRS /MHLS 2001 - 6052 216.22 Check Total: 216.22 AP- 00073574 MW AFLAC GEN & ADMIN SUPP INS W/H 1000 - 2532 875.37 AFLAC GEN & ADMIN AFLAC FEE DED 1000 - 2538 115.00 Check Total: 890.37 AP -00073575 MW AHERN RENTALS HEAVY MAINT GROUNDS & MNTC 1004 - 6042 110.93 AHERN RENTALS DIAMOND VLY RNCH - HARVEY CHANNEL HARVEY CHANNEL 1028 - 8830 - HARVEY 6,693.76 Check Total: 6,804.69 AP-00073576 MW ALPEN SIERRA COFFEE GEN & ADMIN OFC SUPPLY ISSUE 1000 - 6081 310.00 Check Total: 310.00 AP -00073577 MW ALP( E EYECARE LLC FINANCE SAFETY /EQUIP /PHY 1039 - 6075 145.00 ALPINE EYECARE LLC FINANCE SAFETY /EQUIP /PHY 2039 - 6075 145.00 Check Total: 290.00 AP- 00073578 MW ALPINE METALS HEAVY MAINT GROUNDS & MNTC 1004 - 6042 108.64 ALPINE METALS HEAVY MAINT BIOSOL EQUP/BLDG 1004 - 6653 763.43 ALSBURY, MARY ALSBURY, MARY Check Total: 149.00 AP -00073580 MW AMERIGAS DIAMOND VLY RNCH PROPANE 1028 - 6360 105.00 Check Total: 105.00 AP- 00073581 MW AMERIPRIDE UNIFORM SERVICES GEN & ADMIN UNIFORM PAYABLE 1000 - 2518 1,025.53 Check Total: 1,025.53 AP- 00073582 MW ARCE, DANIEL LABORATORY TRAVEL/MEETINGS 1007 - 6200 33.28 ARCE, DANIEL LABORATORY TRAVEUMEETINGS 2007 - 6200 33.27 Check Total: 66.55 AP- 00073583 MW User: THERESA Report: OH_PMT_CLAIMS_BK Check Total: 872.07 AP- 00073579 MW INFORMATION SYS TRAVEUMEETINGS 1037 - 6200 74.50 INFORMATION SYS TRAVEUMEETINGS 2037 - 6200 74.50 Page: 1 Current Date: 08/28/2009 Current Time: 09:52:52 PAYMENT OF CLAIMS Vendor Name Department / Proi Name Description Acct# / Proi Code Amount Check Num Tvae ARIZONA INSTRUMENT CORP OPERATIONS SERVICE CONTRACT 1006 - 6030 975.00 Check Total: 975.00 AP -00073584 MW AT &T /CALNET 2 GEN & ADMIN TELEPHONE 1000 - 6310 15.67 AT&TICALNET 2 PUMPS TELEPHONE 1002 - 6310 82.49 AT &T /CALNET 2 OPERATIONS TELEPHONE 1006 - 6310 30.45 AT &T /CALNET 2 INFORMATION SYS TELEPHONE 1037 - 6310 82.83 AT &T /CALNET 2 GEN & ADMIN TELEPHONE 2000 - 6310 15.66 AT &T /CALNET 2 PUMPS TELEPHONE 2002 - 6310 36.16 AT &T /CALNET 2 INFORMATION SYS TELEPHONE 2037 - 6310 82.82 Check Total: 346.08 AP -00073585 MW AVINA, FRANCISCO UNDERGROUND REP TRAVEL/MEETINGS 1001 - 6200 121.60 Check Total: 121.60 AP- 00073586 MW AXELSON IRON SHOP PUMPS PUMP STATIONS 1002 - 6051 30.00 Check Total: 30.00 AP -00073587 MW CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 59.95 BARNES, SHELLY BAY +OOL & SUPPLY INC Check Total: 59.95 AP- 00073588 MW GEN & ADMIN SMALL TOOLS INV 1000 - 0423 37.45 Check Total: 37.45 AP -00073589 MW BB &H BENEFIT DESIGNS HUMAN RESOURCES CONTRACT SERVICE 1022 - 4405 624.50 BB &H BENEFIT DESIGNS HUMAN RESOURCES CONTRACT SERVICE 2022 - 4405 624.50 Check Total: 1,249.00 AP -00073590 MW BENTLY AGROWDYNAMICS OPERATIONS SLUDGE DISPOSAL 1006 - 6652 2,717.40 Check Total: 2,717.40 AP -00073591 MW BI STATE PROPANE UNDERGROUND REP SHOP SUPPLIES 1001 - 6071 24.98 Check Total: 24.98 AP -00073592 MW BING MATERIALS UNDERGROUND REP PIPE /CVRS /MHLS 2001 - 6052 648.30 Check Total: 648.30 AP-00073593 MW BIRD, HAL DIAMOND VLY RNCH TRAVEL/MEETINGS 1028 - 6200 141.00 Check Total: 141.00 AP -00073594 MW BRAKE, PERRY LABORATORY OFFICE SUPPLIES 1007 - 4820 9.92 BRAKE, PERRY LABORATORY OFFICE SUPPLIES 2007 - 4820 7.50 User: THERESA Page: 2 Current Date: 08/28/2009 Report: OH_PMT_CLAIMS_BK Current Time: 09:52:52 Vendor Name BROWN & CALDWELL CONSULTANTS BROWN & CALDWELL CONSULTANTS BROWN & CALDWELL CONSULTANTS BSNUG BSNUG BUCKMAN, AARON CAMPBELL CONSTRUCTION CO INC CAMPBELL CONSTRUCTION CO INC CAMPBELL CONSTRUCTION CO INC CAMPBELL CONSTRUCTION CO INC CAPgp INC CAPF INC CAROLLO ENGINEERS CARSON PUMP CASHMAN EQUIPMENT CDS GROUP HEALTH CENTERPOINT CITY NATIONAL BANK COLE - PARMER INSTRUMENT CO Department / Proi Name OPERATIONS - FILTER ASSMNT ENGINEERING - ANGORA TNK REPL ENGINEERING - ECHO TANK REPL INFORMATION SYS INFORMATION SYS OPERATIONS GEN & ADMIN - AL TAHOE WTR -09 GEN & ADMIN - SONORA AVE WTRLN ENGINEERING - SONORA AVE WTRLN ENGINEERING - AL TAHOE WTR -09 FINANCE FINANCE ENGINEERING - ARSENIC FACILITY PUMPS EQUIPMENT REPAIR SELF FUNDED INS PAYMENT OF CLAIMS DIAMOND VLY RNCH - HARVEY CHANNEL HARVEY CHANNEL GEN & ADMIN - EFFLUENT EVAL CONST RETAINAGE LABORATORY LAB SUPPLIES User: THERESA Page: 3 Report: OH_PMT_CLAIMS_BK Description FLTR BLD ASSMNT TANK, ANGORA TANK, ECHO TRAVEL/MEETINGS TRAVEL/MEETINGS TRAVEL/MEETINGS CONST RETAINAGE CONST RETAINAGE WTRLN,SNRA/SK RN WTLN AL TAHOE 09 TRAVEL/MEETINGS TRAVEL/MEETINGS ARSNC TRTMNT WELLS AUTOMOTIVE ADMIN FEE Acct# / Proi Code 1006 - 8862 - FILTER 2029 - 7064 - ANGOTK 2029 - 8809 - ECHOTK Check Total: 1037 - 6200 2037 - 6200 1006-6200 Check Total: 2000 - 2605 - ATWL09 2000 - 2605 - SONORA 2029 - 7911 - SONORA 2029 - 8065 - ATWL09 Check Total: 1039 - 6200 2039 - 6200 2029 - 8864 - ARSNIC Check Total: Check Total: Check Total: Check Total: 2002 - 6050 2005 - 6011 3000 - 6741 1028 - 8830 - HARVEY Check Total: 1000 - 2605 - EFFLEV Check Total: 1007-4760 Check Total: Check Total: Check Total: Current Date: 08/28/2009 Current Time: 09:52:52 Amount Check Num Tvae 17.42 AP -00073595 MW 833.72 2,013.17 691.31 3,538.20 AP -00073596 MW 250.00 250.00 500.00 AP -00073597 MW 206.09 206.09 AP- 00073598 MW - 26,293.46 - 8,285.47 82,854.72 262,934.50 311,210.29 AP- 00073599 MW 50.00 50.00 100.00 AP -00073600 MW 4,343.25 4,343.25 AP -00073601 MW 3,800.00 3,800.00 AP- 00073602 MW 1,138.63 1,138.63 AP -00073603 MW 2,311.10 2,311.10 AP -00073604 MW AP- 00073605 MW AP -00073606 MW 662.00 662.00 413.00 413.00 143.41 PAYMENT OF CLAIMS Vendor Name Department / Proi Name Description Acct# / Proi Code Amount Check Num Type COLE - PARMER INSTRUMENT CO LABORATORY LAB SUPPLIES 2007 - 4760 162.11 Check Total: 305.52 AP -00073607 MW CONSTRUCTION MATERIALS ENG INC ENGINEERING - TWIN PEAKS BS BSTR, TWN PEAKS 2029 - 7070 - TPBSTR 655.00 Check Total: 655.00 AP-00073608 MW CREEK ENVIRONMENTAL LABS LABORATORY - ARHD3 TRTMT EXP MONITORING 2007 - 6110 - AH3EXP 265.00 CREEK ENVIRONMENTAL LABS LABORATORY - BKRFLD TRTMT EXP MONITORING 2007 - 6110 - BKRFLD 455.00 CREEK ENVIRONMENTAL LABS LABORATORY - HERBST MONITORING 2007 - 6110 - HERBST 220.00 CREEK ENVIRONMENTAL LABS LABORATORY MONITORING 2007 - 6110 2,150.00 Check Total: 3,090.00 AP -00073609 MW CWEA HEAVY MAINT DUES /MEMB /CERT 1004 - 6250 132.00 Check Total: 132.00 AP -00073610 MW D &L FOUNDRY & SUPPLY GEN & ADMIN FRAME/COVERS INV 1000 - 0410 2,582.76 D &L FOUNDRY & SUPPLY UNDERGROUND REP PIPE/CVRS /MHLS 1001 - 6052 75.00 D &L FOUNDRY & SUPPLY GEN & ADMIN BOXES /LIDS /INV 2000 - 0403 1,828.74 Check Total: 4486.50 AP- 00073611 MW DAT%) SERVICES CORP HUMAN RESOURCES SAFETY PROGRAMS 1022 - 6079 182.00 DATdO SERVICES CORP HUMAN RESOURCES SAFETY PROGRAMS 2022 - 6079 182.00 Check Total: 364.00 AP - 00073612 MW DAVI LABORATORIES LABORATORY MONITORING 2007 - 6110 1,125.00 Check Total: 1,125.00 AP 00073613 MW DIVERSIFIED CONCRETE CUTTING UNDERGROUND REP - ROCKY POINT WL WTLN,IN HS UPSIZ 2001 - 8905 - ROCWTR 970.00 Check Total: 970.00 AP - 00073614 MW E- FILLIATE CORP INFORMATION SYS DIST.COMP SPPLIS 1037 - 4840 3.68 E- FILLIATE CORP INFORMATION SYS DIST.COMP SPPLIS 2037 - 4840 3.69 Check Total: 7.37 AP - 00073615 MW EL DORADO COUNTY PUMPS OPERATING PERMIT 1002 - 6650 3,500.00 EL DORADO COUNTY PUMPS OPERATING PERMIT 2002 - 6650 2,250.00 Check Total: 5,750.00 AP- 00073616 MW EMPIRE SAFETY & SUPPLY UNDERGROUND REP SAFETY/EQUIP /PHY 1001 - 6075 375.23 Check Total: 375.23 AP - 00073617 MW ENTRIX INC ENGINEERING - SUT WELL REDRILL SUT WELL REDRILL 2029 - 8463 - RWSUTR 336.91 User: THERESA Page: 4 Current Date: 08/28/2009 Report: OH_PMT_CLAIMS_BK Current Time: 09:52:52 Vendor Name ENVIRONMENTAL EXPRESS ENVIRONMENTAL EXPRESS User: THERESA FEDEX FREIGHT WEST PAYMENT OF CLAIMS Department / Proi Name Description Acct# / Proi Code Amount Check Num Tyne Check Total: 336.91 AP -00073618 MW LABORATORY LAB SUPPLIES 1007 - 4760 375.00 LABORATORY LAB SUPPLIES 2007 - 4760 391.28 Check Total: FEDEX DIO POSTAGE EXPENSES 1027 - 4810 FEDEX DIO POSTAGE EXPENSES 2027 - 4810 18.21 Check Total: 36.43 AP-00073621 M W 1002 - 6051 109.41 Check Total: 109.41 AP -00073620 MW FISHER SCIENTIFIC LABORATORY LAB SUPPLIES 1007 - 4760 75.91 FISHER SCIENTIFIC LABORATORY LAB SUPPLIES 2007 - 4760 78.85 Check Total: 154.76 AP-00073622 MW FOCUS ON HEALTHY AGING ADMINISTRATION SUBSCRIPTIONS 1021 - 4830 10.00 FOCUS ON HEALTHY AGING ADMINISTRATION SUBSCRIPTIONS 2021 - 4830 10.00 Check Total: 20.00 AP- 00073623 MW i G B gENERAL ENG CONTRACTOR INC UNDERGROUND REP PIPE /CVRS/MHLS 2001 - 6052 24,431.38 i Check Total: 24,431.38 AP- 00073624 MW GERBER LIFE INSURANCE COMPANY SELF FUNDED INS EXCESS INSURANCE 3000 - 6744 22,244.64 Check Total: 22,244.64 AP -00073625 MW GOEPFRICH, KARL GEN & ADMIN UB SUSPENSE 1000 - 2002 57.02 GOEPFRICH, KARL GEN & ADMIN CAPACITY CHARGE 1000 - 3401 8,500.00 Check Total: 8,557.02 AP -00073626 MW GRAINGER GEN & ADMIN JANIT /SUPPLY INV 1000 - 0422 245.05 GRAINGER GEN & ADMIN SAFETY INVENTORY 1000 - 0425 96.40 GRAINGER HEAVY MAINT GROUNDS & MNTC 1004 - 6042 178.52 PUMPS PUMP STATIONS 766.28 AP- 00073619 MW Check Total: 519.97 AP -00073627 MW HARDY DIAGNOSTICS LABORATORY LAB SUPPLIES 1007 - 4760 115.57 Check Total: 115.57 AP -00073628 MW HARTFORD, THE GEN & ADMIN LIFE INS 1000 - 2512 2,042.14 HARTFORD, THE GEN & ADMIN LTD, UNION 1000 - 2539 2,547.82 Page: 5 Current Date: 08/28/2009 Report: OH_PMT_CLAIMS_BK Current Time: 09:52:52 18.22 Check Total: 4,589.96 AP-00073629 MW Vendor Name HENDERSON, JOEL HOME DEPOT CREDIT HOOVER, RUTH INTERSTATE SAFETY & SUPPLY ITT WATER & WASTEWATER WATER INC J &L PRO KLEEN INC J &L PRO KLEEN INC i JENb�EN PRECAST KG WALTERS CONSTRUCTION KG WALTERS CONSTRUCTION KG WALTERS CONSTRUCTION KG WALTERS CONSTRUCTION KIMBALL MIDWEST KIMBALL MIDWEST KIPKE -LEE, ALISON LAKE TAHOE EYE CARE LONG, WES User: THERESA Report: OH_PMT_CLAIMS_BK PAYMENT OF CLAIMS Department / Proi Name Description CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE DIAMOND VLY RNCH CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE GEN & ADMIN PUMPS INFORMATION SYS FINANCE FINANCE UNDERGROUND REP GEN & ADMIN - ANGORA TNK REPL GEN & ADMIN - ARSENIC FACILITY ENGINEERING - ANGORA TNK REPL ENGINEERING - ARSENIC FACILITY HEAVY MAINT UNDERGROUND REP GROUNDS & MNTC SAFETY INVENTORY PUMP STATIONS LIC GIS SFTWR JANITORIAL SERV JANITORIAL SERV PIPE /CVRS /MHLS CONST RETAINAGE CONST RETAINAGE TANK, ANGORA ARSNC TRTMNT SHOP SUPPLIES PIPE /CVRS /MHLS CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE UNDERGROUND REP DIAMOND VLY RNCH SAFETY/EQUIP /PHY TRAVEUMEETINGS Page: 6 Acct# / Proi Code 2038 - 6660 - WCPROG Check Total: 1028 - 6042 2038 - 6660 - WCPROG Check Total: Check Total: Check Total: Check Total: 1000 - 0425 1002 - 6051 1037 - 8080 1039 - 6074 2039 - 6074 1001-6052 2000 - 2605 - ANGOTK 2000 - 2605 - ARSNIC 2029 - 7064 - ANGOTK 2029 - 8864 - ARSNIC Check Total: 1004 - 6071 2001 - 6052 2038 - 6660 - WCPROG Check Total: Check Total: Check Total: 1001 -6075 1028-6200 Check Total: Check Total: Check Total: Check Total: Current Date: 08/28/2009 Current Time: 09:52:52 A un Check Num Ty0 497.25 497.25 AP -00073630 MW 43.05 43.05 AP -00073631 MW 1,312.00 1,312.00 AP -00073632 MW 525.10 525.10 AP -00073633 MW 1,532.86 1,532.86 AP -00073634 MW 16,046.15 16.046.15 AP- 00073635 MW 1,603.50 1,603.50 3,207.00 AP- 00073636 MW 951.57 951.57 AP -00073637 MW - 13,418.50 - 15,814.73 134,185.00 158,147.27 263,099.04 AP -00073638 MW 418.86 198.08 616.94 AP -00073639 MW 4,134.00 4,134.00 AP -00073640 MW 190.00 190.00 AP -00073641 MW 99.00 99.00 AP -00073642 MW Vendor Name LOOMIS LOOMIS MANNA CONSULTING MC CONNAUGHEY, SCOTT MC CONNAUGHEY, SCOTT MC CONNAUGHEY, SCOTT MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO MIDWEST COMMUNICATIONS INC MIERAS, DEAN N MITCHELL INSTRUMENT CO. MITCHOFF, TERRI MME MUNICIPAL MAINTENANCE MUIR, BETTY MY OFFICE PRODUCTS MY OFFICE PRODUCTS MY OFFICE PRODUCTS NEXLEVEL INFORMATION TECH INC OFFICE MAX User: THERESA Report: OH_PMT_CLAIMS_BK Department / Proi Name FINANCE FINANCE FINANCE GEN & ADMIN GEN & ADMIN GEN & ADMIN PUMPS PUMPS UNDERGROUND REP ELECTRICAL SHOP ENGINEERING UNDERGROUND REP GEN & ADMIN ADMINISTRATION ADMINISTRATION INFORMATION SYS GEN & ADMIN PAYMENT OF CLAIMS Description CONTRACT SERVICE CONTRACT SERVICE ADP HR INTFC UB SUSPENSE UB SUSPENSE METER SALE LUTHER PASS PUMP STATIONS RADIO- RPRS/RPLCM CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE SAFETY/EQU I P/PHY MISC LIAB CLAIMS PIPE /CVRS/MHLS CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE OFFICE INVENTORY OFFICE SUPPLIES OFFICE SUPPLIES STR PLN IMPL OFFICE INVENTORY Page: 7 Acct# / Proi Code 1039 - 4405 2039 - 4405 1039 - 7582 1000 - 2002 2000 - 2002 2000 - 3545 1002 - 6048 1002 -6051 1001 - 6056 Check Total: Check Total: Check Total: Check Total: Check Total: 2038 - 6660 - WCPROG Check Total: Check Total: Check Total: Check Total: 1003 - 6075 2029 - 4520 1001 - 6052 2038 - 6660 - WCPROG Check Total: 1000 - 0428 1021 - 4820 2021 - 4820 1037 - 8078 1000 - 0428 Check Total: Check Total: Current Date: 08/28/2009 Current Time: 09:52:52 Amount Check Num I 295.31 295.31 590.62 AP -00073643 MW 3,250.00 3,250.00 AP -00073644 MW 13,198.40 3,911.60 597.00 17,707.00 AP -00073645 MW 642.86 448.68 1,091.54 AP -00073646 MW 150.50 150.50 AP- 00073647 MW 649.05 649.05 AP -00073648 MW 1,869.59 1,869.59 AP- 00073649 MW 258.80 258.80 AP -00073650 MW 1,127.72 1,127.72 AP- 00073651 MW 800.00 800.00 AP -00073652 MW 2,145.09 42.15 42.14 2,229.38 AP -00073653 MW 500.00 500.00 AP -00073654 MW 403.75 Vendor Name OFFICE MAX ONTRAC ONTRAC ONTRAC ONTRAC ONTRAC ONTRAC PACIFIC MECHANICAL CORP PACIFIC MECHANICAL CORP PARR, KEITH PRAXAIR 174 PROIcST, MRS. MARISSA RADIO SHACK RADIO SHACK REDWOOD PRINTING REDWOOD PRINTING RELIANCE STANDARD RELIANCE STANDARD RESORT SPORTS NETWORK RESOURCE DEVELOPMENT INC RESOURCE DEVELOPMENT INC User: THERESA Report: OH_PMT_CLAIMS_BK Department / Proi Name CUSTOMER SERVICE ENGINEERING LABORATORY - LABORATORY - LABORATORY ENGINEERING ENGINEERING ENGINEERING ENGINEERING GEN & ADMIN GEN & ADMIN - EFFLUENT EVAL ARHD3 TRTMT EXP BKRFLD TRTMT EXP - ANGORA TNK REPL - TWIN PEAKS BS GEN & ADMIN - EFFLUENT EVAL ENGINEERING - EFFLUENT EVAL UNDERGROUND REP PUMPS UNDERGROUND REP UNDERGROUND REP ENGINEERING - WT METERING PRJ GEN & ADMIN - TWIN PEAKS BS ENGINEERING - TWIN PEAKS BS PAYANT OF CLAIMS tftgdgfta OFFICE SUPPLIES REP EXP PUMPS POSTAGE EXPENSES POSTAGE EXPENSES POSTAGE EXPENSES TANK, ANGORA BSTR, TWN PEAKS CONST RETAINAGE REP EXP PUMPS TRAVEL/MEETINGS SHOP SUPPLIES MISC LIAB CLAIMS SUPPLIES SUPPLIES SHOP SUPPLIES WTR METERING/NEW LIFE INS MGMT LNG TRM DIS,MGMT CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE CONST RETAINAGE BSTR, TWN PEAKS Page: 8 Acct# / Proi Cede 2038 - 4820 Check Total: 1029 - 8676 - EFFLEV 2007 - 4810 - AH3EXP 2007 - 4810 - BKRFLD 2007 - 4810 2029 - 7064 - ANGOTK 2029 - 7070 - TPBSTR Check Total: 1000 - 2605 - EFFLEV 1029 - 8676 - EFFLEV Check Total: 1001 - 6200 1002 - 6071 2001 - 4520 1029 - 6520 2029 - 6520 Check Total: Check Total: Check Total: Check Total: 2001 - 6071 2029 - 7078 - METERS Check Total: 1000 - 2525 1000 - 2531 Check Total: 2038 - 6660 - WCPROG Check Total: 2000 - 2605 - TPBSTR 2029 - 7070 - TPBSTR Current Date: 08/28/2009 Current Time: 09:52:52 Amount Check Num Tyne 304.55 708.30 AP -00073655 MW 19.50 3.00 3.00 36.00 20.00 17.00 98.50 AP -00073656 MW - 413.00 26,259.99 25,846.99 AP 00073657 MW 291.00 291.00 AP- 00073658 MW 46.90 46.90 AP- 00073659 MW 71.17 71.17 AP -00073660 MW 111.46 111.46 222.92 AP -00073661 MW 257.74 739.50 997.24 AP -00073662 MW 511.85 1,269.01 1,780.86 AP -00073663 MW 1,461.25 1,461.25 AP-00073664 MW - 20,289.90 202,898.92 PAYMENT OF CLAIMS Vendor Name Deoartment / Proi Name Description Acct# / Proi Code Amount Check Num In Check Total: 182.609.02 AP -00073665 MW RICH'S SMALL ENGINE SERVICE UNDERGROUND REP SHOP SUPPLIES 1001 - 6071 51.98 Check Total: 51.98 AP- 00073666 MW ROBERT DYKES OD, DR. OPERATIONS SAFETY /EQUIP /PHY 1006 - 6075 255.00 Check Total: 255.00 AP -00073667 MW ROOTX UNDERGROUND REP PIPE/CVRS /MHLS 1001 - 6052 2,681.22 Check Total: 2,681.22 AP- 00073668 MW RYAN, JULIE H. CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 600.00 Check Total: 600.00 AP- 00073669 MW SCHLANGE, PAUL DIAMOND VLY RNCH TRAVEL/MEETINGS 1028 - 6200 102.30 Check Total: 102.30 AP -00073670 MW SHEPPARD MULLIN HUMAN RESOURCES PERSONNEL LEGAL 1022 - 4445 465.75 SHEPPARD MULLIN HUMAN RESOURCES PERSONNEL LEGAL 2022 - 4445 465.75 Check Total: 931.50 AP -00073671 MW SHIELDS HARPER & CO INC HEAVY MAINT GROUNDS & MNTC 1004 - 6042 519.72 Check Total: 519.72 AP -00073672 MW 1 SIANO, CHRIS OPERATIONS TRAVEL/MEETINGS 1006 - 6200 190.27 Check Total: 190.27 AP- 00073673 MW SIEMENS WATER TECHNOLOGIES LABORATORY SERVICE CONTRACT 1007 - 6030 144.97 SIEMENS WATER TECHNOLOGIES LABORATORY SERVICE CONTRACT 2007 - 6030 142.85 Check Total: 287.82 AP- 00073674 MW SIERRA CHEMICAL CO OPERATIONS HYPOCHLORITE 1006 - 4755 3,759.85 Check Total: 3.759.85 AP -00073675 MW SIERRA CRANE AND HOIST INC HEAVY MAINT BUILDINGS 1004 - 6041 4,500.00 Check Total: 4,500.00 AP -00073676 MW SIERRA FOOTHILL LABORATORY LABORATORY - IND CRK RES MONT MONITORING 1007 - 6110 - INDIAN 390.00 Check Total: 390.00 AP -00073677 MW SIERRA PACIFIC POWER GEN & ADMIN ELECTRICITY 1000 - 6330 13,219.61 SIERRA PACIFIC POWER GEN & ADMIN ELECTRICITY 2000 - 6330 40,448.94 Check Total: 53,668.55 AP- 00073678 MW SIERRA SPRINGS GEN & ADMIN SAFETY INVENTORY 1000 - 0425 482.40 User: THERESA Page: 9 Current Date: 08/28/2009 Report: OH_PMT_CLAIMS_BK Current Time: 09:52:52 PAYMENT OF CLAIMS Vendor Name Department / Proi Name ftlabgali Acct# / Proi code Amount Check Num Tvoe SIERRA SPRINGS UNDERGROUND REP SUPPLIES 1001 - 6520 19.98 SIERRA SPRINGS PUMPS SUPPLIES 1002 - 6520 1.33 SIERRA SPRINGS ELECTRICAL SHOP SUPPLIES 1003 - 6520 6.66 SIERRA SPRINGS HEAVY MAINT SUPPLIES 1004 - 6520 19.98 SIERRA SPRINGS EQUIPMENT REP SUPPLIES 1005 - 6520 6.66 SIERRA SPRINGS OPERATIONS SUPPLIES 1006 - 6520 19.98 SIERRA SPRINGS DIAMOND VLY RNCH SUPPLIES 1028 - 6520 6.66 SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 1038 - 6520 6.66 SIERRA SPRINGS UNDERGROUND REP SUPPLIES 2001 - 6520 19.98 SIERRA SPRINGS PUMPS SUPPLIES 2002 - 6520 5.31 SIERRA SPRINGS ELECTRICAL SHOP SUPPLIES 2003 - 6520 6.66 SIERRA SPRINGS EQUIPMENT REPAIR SUPPLIES 2005 - 6520 6.66 SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 2038 - 6520 6.66 Check Total: 615.58 AP- 00073679 MW SOUTH TAHOE TOWING PUMPS LUTHER PASS 1002 - 6048 225.00 ,i Check Total: 225.00 AP -00073680 MW til SOUTHWELL CONTROLS LABORATORY LABORATORY EQUIP 1007 - 6025 234.00 SOUTHWELL CONTROLS LABORATORY LABORATORY EQUIP 2007 - 6025 234.00 Check Total: 468.00 AP -00073681 MW SOUTHWEST GAS GEN & ADMIN NATURAL GAS 1000 - 6350 57.90 SOUTHWEST GAS GEN & ADMIN NATURAL GAS 2000 - 6350 54.49 Check Total: 112.39 AP -00073682 MW SUBSTITUTE PERSONNEL & UNDERGROUND REP CONTRACT SERVICE 1001 - 4405 3,908.80 SUBSTITUTE PERSONNEL & LABORATORY CONTRACT SERVICE 1007 - 4405 1,175.68 SUBSTITUTE PERSONNEL & ENGINEERING CONTRACT SERVICE 1029 - 4405 1,537.80 SUBSTITUTE PERSONNEL & ENGINEERING - FILTER ASSMNT REHAB FLTR 5 &6 1029 - 8066 - FILTER 559.20 SUBSTITUTE PERSONNEL & INFORMATION SYS CONTRACT SERVICE 1037 - 4405 92.52 SUBSTITUTE PERSONNEL & CUSTOMER SERVICE CONTRACT SERVICE 1038 - 4405 277.56 SUBSTITUTE PERSONNEL & UNDERGROUND REP CONTRACT SERVICE 2001 - 4405 3,974.51 SUBSTITUTE PERSONNEL & LABORATORY CONTRACT SERVICE 2007 - 4405 1,175.67 SUBSTITUTE PERSONNEL & ENGINEERING - WT METERING PRJ CONTRACT SERVICE 2029 - 4405 - METERS 83.88 SUBSTITUTE PERSONNEL & ENGINEERING CONTRACT SERVICE 2029 - 4405 1,398.00 User. THERESA Report: OH_PMT_CLAIMS_BK Page: 10 Current Date: 08/28/2009 Current Time: 09:52:52 Vendor Name SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUNGARD PUBLIC SECTOR SUNGARD PUBLIC SECTOR TAHOE BLUEPRINT TAHOE MOUNTAIN NEWS 0 TAHOE PARADISE CHEVRON TAHOE SAND & GRAVEL TAHOE VALLEY ELECTRIC SUPPLY UNITED RENTALS INC UNIVERSAL HEALTH NETWORK UNIVERSITY ENTERPRISES INC UNIVERSITY ENTERPRISES INC UNIVERSITY ENTERPRISES INC USA BLUE BOOK User: THERESA Report: OH_PMT_CLAIMS_BK Department / Proi Name ENGINEERING - ANGORA TNK REPL ENGINEERING - TWIN PEAKS BS ENGINEERING - WT METERING PRJ ENGINEERING - SONORA AVE WTRLN ENGINEERING - ARSENIC FACILITY INFORMATION SYS CUSTOMER SERVICE CUSTOMER SERVICE - WTR CONS PROG INFORMATION SYS INFORMATION SYS HEAVY MAINTENANC DIO - PR EXP- EXTERNAL UNDERGROUND REP UNDERGROUND REP ELECTRICAL SHOP SELF FUNDED INS ENGINEERING - ERB LINER REPL ENGINEERING - HEADWORKS ENGINEERING - REPL GEN, LPPS UNDERGROUND REP PAYMENT OF CLAIMS Description TANK, ANGORA BSTR, TWN PEAKS WTR METERING/NEW WTRLN,SNRA/SK RN ARSNC TRTMNT CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE TRAVEL/MEETINGS TRAVEL/MEETINGS BUILDINGS PUB RELATIONS DIESEL PIPE/CVRS /MHLS BUILDINGS DIAMOND VLY RNCH - HARVEY CHANNEL HARVEY CHANNEL PPO FEE REPLACE ERB LINE HDWKS IMP PROJ REPL GEN LPPS SHOP SUPPLIES Acct# / Pr91 Code 2029 - 7064 - ANGOTK 2029 - 7070 - TPBSTR 2029 - 7078 - METERS 2029 - 7911 - SONORA 2029 - 8864 - ARSNIC 2037 - 4405 2038 - 4405 2038 - 4405 - WCPROG Check Total: 1037 - 6200 2037 - 6200 2004 - 6041 2001 - 4620 2001 - 6052 2003 - 6041 3000 - 6742 1001 - 6071 Check Total: Check Total: 2027 - 6620 - PREEXT Check Total: Check Total: Check Total: Check Total: 1028 - 8830 - HARVEY Check Total: Check Total: 1029 - 7581 - ERBLNR 1029 - 8033 - HDWORK 1029 - 8933 - RGLPPS Check Total: Page: 11 Current Date: 08/28/2009 Current Time: 09:52:52 Amount Check Num TvPe 57.83 300.70 223.68 792.47 75.16 92.52 3,981.56 3,800.16 23.507.70 AP -00073684 MW 850.00 850.00 1,700.00 AP -00073685 MW 100.80 100.80 AP- 00073686 MW 200.00 200.00 AP- 00073687 MW 63.03 63.03 AP- 00073688 MW 458.40 458.40 AP -00073689 MW 629.40 629.40 AP -00073690 MW 1,103.52 1,103.52 AP -00073691 MW 677.60 677.60 AP- 00073692 MW 572.62 572.63 453.00 1,598.25 AP- 00073693 MW 717.89 PAYMENT OF CLAIMS Vendor Name Department / Proi Name Description Acct# / Proi Code Amount Check Num Type USA BLUE BOOK UNDERGROUND REP SMALL TOOLS 1001 - 6073 199.74 Check Total: 917.63 AP- 00073694 MW VERIZON DIAMOND VLY RNCH TELEPHONE 1028 - 6310 198.88 Check Total: 158.88 AP- 00073695 MW WECO INDUSTRIES INC UNDERGROUND REP SHOP SUPPLIES 1001 - 6071 346.97 Check Total: 346.97 AP 00073696 MW WEDCO INC ELECTRICAL SHOP BUILDINGS 2003 - 6041 614.76 WEDCO INC ELECTRICAL SHOP PUMP STATIONS 2003 - 6051 197.47 Check Total: 812.23 AP- 00073697 MW WESTERN ENERGETIX INC GEN & ADMIN DIESEL INVENTORY 1000 - 0416 572.49 Check Total: 572.49 AP 00073698 MW WESTERN NEVADA SUPPLY UNDERGROUND REP SHOP SUPPLIES 1001 - 6071 58.44 WESTERN NEVADA SUPPLY PUMPS PUMP STATIONS 1002 - 6051 22.24 WESTERN NEVADA SUPPLY PUMPS SMALL TOOLS 1002 - 6073 546.02 WESTERN NEVADA SUPPLY HEAVY MAINT SECONDARY EQUIP 1004 - 6022 40.98 WESERN NEVADA SUPPLY HEAVY MAINT EXPORT/FRCE MAIN 1004 - 6047 185.85 WESTERN NEVADA SUPPLY GEN & ADMIN BOXES/LIDS/INV 2000 - 0403 2,776.13 WESTERN NEVADA SUPPLY GEN & ADMIN REPAIR CLMP INV 2000 - 0406 5,052.67 WESTERN NEVADA SUPPLY GEN & ADMIN HYDRANTS/FL INV 2000 - 0409 539.49 WESTERN NEVADA SUPPLY UNDERGROUND REP PIPE /CVRS/MHLS 2001 - 6052 1,112.26 WESTERN NEVADA SUPPLY PUMPS SMALL TOOLS 2002 - 6073 546.02 Check Total: 10,880.10 AP 00073699 MW WHITE CAP CUSTOMER SERVICE - WT MTR MU INST MTR RTFT MXU'S 2038 - 8074 - MTRMXU 3,121.13 Check Total: 3,121.13 AP- 00073700 MW WINZLER & KELLY CONSULT ENGRS OPERATIONS - MAP UG UTILITIES PLANT GIS 1006 - 8921 - GISMAP 12,743.52 WINZLER & KELLY CONSULT ENGRS ENGINEERING - EFFLUENT EVAL REP EXP PUMPS 1029 - 8676 - EFFLEV 17,574.81 Check Total: 30,318.33 AP MW WOLF ENVIRONMENTAL LINING SYS OPERATIONS EMRGNCY RET/BAS 1006 - 6040 4,415.00 Check Total: 4,415.00 AP 00073702 MW ZEE MEDICAL INC GEN & ADMIN SAFETY /EQUIP/PHY 1000 - 6075 492.46 ZEE MEDICAL INC GEN & ADMIN SAFETY/EQUIP /PHY 2000 - 6075 492.45 User: THERESA Page: 12 Current Date: 08/28/2009 Report: OH_PMT_CLAIMS_BK Current Time: 09:52:52 Vendor Name User: THERESA PAYMENT OF CLAIMS Department / Proi Name Description Acct# / Proi Code Check Total: Grand Total: 1,115,868.48 Page: 13 Current Date: 08/28/2009 Report: OH_PMT_CLAIMS_BK Current Time: 09:52:52 Amount Check Num 'RN 984.91 AP -00073703 MW 0 G Saith 'Dare P.U.D. M:N, PM 24, 2009, 11 Check Payee ID. AP00073264 V48136 08/24/09 :01 PM - - -req: Pa Na e PION RENTALS GRAND TOTALS: Total Void Nadine Written Total Void Hand Written Tbtal Machirn W itten Total Hand Written Total Reversals Total Cancelled GRAND TOTAL VOID, TYPED & A,/P GIEICK REGISTER G. 'JL - - -lo : CNSTIE - - - -j : 440888 #J645- - - -pp: EE200 <1.19> Date Check Pr cunt Type Subs Rel Tb Abte 08/06/09 2,812.57 RV TR wed 0.00 0.00 0.00 0.00 2,812.57 0.00 2,812.57 timber of Checks Processed: Njrber of Clerks accessed: NUr er of Checks Processed: N.x±er of Checks Processed: Nutter of Checks Processed: Niter of Checks Processed: 0 0 0 0 1 0 rpt id: CIT -1 BOARD AGENDA ITEM 15a TO: Board of Directors FROM: Richard Solbrig, General Manager, Paul Sciuto, Assistant General Manager /Engineer MEETING DATE: September 3, 2009 ITEM — PROJECT: Conference with Legal Counsel — Anticipated Litigation (one case) REQUESTED BOARD ACTION: Direct legal counsel. DISCUSSION: Pursuant to Section 54956.9(b) of the California Government Code, Closed Session may be held for conference with legal counsel regarding anticipated litigation. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO CATEGORY: -51- Cis! Manaw Rkhard H. Sol" 15o uth Tahoe ��� Jen+ea R. Jones (� '{''' Detrict Utili 1 uNic y D�Mw C J- d_!__ BOARD AGENDA ITEM 15a TO: Board of Directors FROM: Richard Solbrig, General Manager, Paul Sciuto, Assistant General Manager /Engineer MEETING DATE: September 3, 2009 ITEM — PROJECT: Conference with Legal Counsel — Anticipated Litigation (one case) REQUESTED BOARD ACTION: Direct legal counsel. DISCUSSION: Pursuant to Section 54956.9(b) of the California Government Code, Closed Session may be held for conference with legal counsel regarding anticipated litigation. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO CATEGORY: -51- BOARD AGENDA ITEM 15b TO: Board of Directors FROM: Richard H. Solbrig, General Manager MEETING DATE: September 3, 2009 ITEM — PROJECT: Conference with Legal Counsel — Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Meyers Landfill Site - United States of America vs. El Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S -01 -1520 LKK GGH, United States District Court for the Eastern District of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO CATEGORY: Sewer —53— Gtf Manager Kichard H. Sol" 50 ut - h J�tn�s R Junes PuHic Utility Pletric eM owe MW BOARD AGENDA ITEM 15b TO: Board of Directors FROM: Richard H. Solbrig, General Manager MEETING DATE: September 3, 2009 ITEM — PROJECT: Conference with Legal Counsel — Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Meyers Landfill Site - United States of America vs. El Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S -01 -1520 LKK GGH, United States District Court for the Eastern District of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO CATEGORY: Sewer —53— ,� ,. ► w. .w BOARD AGENDA ITEM 15c TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: September 3, 2009 ITEM — PROJECT NAME: Conference with Legal Counsel — Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government code, Closed Session may be held for conference with legal counsel regarding existing litigation: Tahoe Asphalt, Inc., and Tahoe Asphalt Materials Company, LLC, vs. South Tahoe Public Utility District, Civil Action No. SC20090104, Superior Court, County of El Dorado, State of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -55- Ga"Wal m anaw KiChA d H. Sol" 50 ut Ta h oe. .;MW FuHio Utility Dietr�iGt M"M&" 0*$U" Frk ,� ,. ► w. .w BOARD AGENDA ITEM 15c TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: September 3, 2009 ITEM — PROJECT NAME: Conference with Legal Counsel — Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government code, Closed Session may be held for conference with legal counsel regarding existing litigation: Tahoe Asphalt, Inc., and Tahoe Asphalt Materials Company, LLC, vs. South Tahoe Public Utility District, Civil Action No. SC20090104, Superior Court, County of El Dorado, State of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -55- TerryrsApollo Plumbing and Heating, Inc CA LiC #813437 PO Box 2535 South Lake Tahoe, CA 96150 Ph 530 544 8404 1 Fx 530 542 1020 apolloplumbing @charter.net Bill To: JOYCE BLACKSTONE SLT, CA 96150 530 544 2195 Invoice June 25, 2009 Summary: Invoice #: Tech: Due Date: Job Date: PLUMBING 1394 -60818 35 STEVE 3 7/13/2009 6/25/2009 Job Name: 2290 MONTANA JOYCE SLT, CA 96150 530 544 2195 Item Code Description Hm /Qty Price Amount Video inspect 4" sewer lateral from vent pipe to city sewer line locate & mark where roots have grown into lateral - Also locate & raise 4" cleanout access to ground level LABOR STEVE 1.00 105.00 105.00 LABOR TERRY 1.00 105.00 105.00 DISCOUNT OFFERED ON LABOR 1.00 -52.50 -52.50 EQUIPMENT - CAMRA 1.00 150.00 150.00 Labor Other Subtotal Total 210.00 97.50 307:50 $307.50 All material is guaranteed to be as specified. All work to be completed in a professional manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon delays beyond our control. Purchaser agrees to pay all costs of collection, including attorney's fees. Terms: Net 30 THANK YOU FOR YOUR BUSINESS /R I l I,, / 144) f'v I� 8 /3 1 / 0 9 Receive Comments Is the setting appropriately described? Are the impact criteria appropriate? • Are the alternatives appropriate? Is the analysis technically correct? Are the mitigation measures appropriate? °. PIN 8 /31/09 Oral Comments will be recorded Written Comments will be received Each environmental comment will be numbered Each environmental comment receives a response EIR modified based on comments Final EIR documents comments, responses, and edits Evaluates Four Alternatives Identifies Significant and Unavoidable Environmental Impacts . Recommends Mitigation Pq 8 /3 1 / 0 9 8 /3 1 /°9 Operation and Maintenance of existing facilities * Indian Creek Reservoir Snowshoe Thompson Ditch 1 & 2 Millich Ditch Upper Dressler Ditch Indian Creek Diversion Upper and Lower Harvey Channel a Alpine Decree surface water rights 4 8 /3 1 /°9 i - Provide recycled water to new von - irrigated, permitted land x - Make recycled water available to irrigators In Nevada 3 - Cipacity and conveyance improvements in the Diamond Ditch stem 4 -- Provide pressurized recycled w -nerio the Fredericksburg system 6 - Provide pressurized recycled water through Wade Valley 6 - Provide pressurized recycled water to the Ranclhettes 7 - Non -flood irrigation: application syatern 8 - improve recycled water quality 9 - Groundwater recharge using infiltratiou basins w - Construct zero- discharge basins it - Construct irrigation fields with pumping back to HPR 12 - Grow bloinam crops for pulp production using recycled water 1 3 - Welland sad and seed production W - Pipe recycled water systems to minimize setbacks mud human contact 15 - Mitigation wetland creation usms freshwater 16 - Subsnrfnce recycled water irrigation in public contart of buffer areas 3 - Capaciw and conveyance improvements in the Diamond Ditch system 4 Provide pressurized recycled water to the Fredericksburg system 6 provide pressurized recycled water to the Ranchettes n - Construct irrigation fields with pumping baler to HPR 18 - Optimize application rate on existing irrigated Lands 19 - Pursuc permitting of more land in Alpine Counh a2 - Parallel recycled water pipeline along existing Diamond Ditch 17 - Increase Snowshoe. Thompson Na i cou: ice capacity 1R - Optimize application rate on existing irrigated lands z9 - Pursue permitting of more land In Alpine County 20 - Improve operation of the Diamond Ditch system to meet District and user needs 21- IAkyehop taihmter control system 22- Parallel recycled water pipeline along existing Diamond Ditch 23 - Route. Mud Like whiter Rows through ICR 24 .- , rmnsfer additional water rights to storage in IC R z9 - Irrigate the District Pasture 3o Irrigate thedungle with Recycled Water 31 - hired Stonnwater Flow away frrnn HPR and to ICR 32 - ICR Spdhvay Channel 29 - Irrigate the District Pasture 30 - irrigate the Jungle with Recycled Water 8 /3 1 / 0 9 i - Provide recycled water to new non- irrig:med, 1wrrnitted land 2 - Make recycled water mailable to inigators in Nevada 3 - Capacity and cone once improve ntenu in the Diamond Ditch system q - Provide pressurized renrled water to the Fredericksburg system 6 - Provide pressurized rec water t,, the Ranchettes 7 Non -flood irrigation application system ii - Constmet irrigation fields with pumping back to HPR tq - Pipe rMcied water systems to minimize setbacks and bn min contact t6 Subsurface recyelcd water irrigation in public contact of buffer arras 17- Increase Suow-choe Thompson No. r conveyance capacity 18 - Optimize application rate on existing irrigated lands r9 - Pursue permitting of more land in Alpine County 22 - Parallel renTled water pipeline along existing Diamond Ditch 23 - Route 61ud IA winter floss through {CR 2.1 - Transfer additional water nghts to storage in JCR 29 - Irrigate the District Pasture 3o - Irrigate the Jungle with Ree Water 31 - Diverl Stormwater Am, away from HPR and to ICR 8 /3 1 /09 8 /3 1 /°9 S.T.P.U.D. Board Report from Director Claudio Water, which flows through pipes, offers the potential to generate clean electricity year- round. Over - pressurization occurs where water is stored at significantly higher elevations than the customers it serves and must flow to lower levels to reach them. Pressure reduction valves (PRVs) reduce excess pressure to more acceptable levels, dissipating a clean energy source during the process. Rentricity's Flow - to-Wire system mimics the functionality of PRVs and converts that excess pressure into clean electric power. Individually, a Flow- to-Wire system produces between 20 kilowatts (kW) and 300 kW. However, in aggregate, the Flow- to-Wire systems can generate megawatts of clean power. The autonomous devices operate pollution -free and structurally enhance adjacent pipe infrastructure. Flow- to-Wire systems need minimal maintenance and have useful lives up to 40 years. Rentricity's power generation can benefit potable water systems that implement pressure regulation in mandated reservoir flows and reservoir transfers. Wastewater is also an addressable application. In Renewable Portfolio Standard states, Rentricity can enhance the power production revenue with clean energy credits. Technical Highlights • Integral Flywheel Design for Flow and Grid Transients • Water Facing Materials Compatible with Public Health Standards Deislgn C.cmpliant wfth EkK tric,Util)ty Grllade trtt�r�or#r�t Rf p q , Sppp. "« POMR Of" r � INTERNET COMMUNICATION INTERCONNECT settow" aetWt REMOTE MONITORING COUA►MMATM WNfolt Forwarded by: Garry Bowen , o il Co- founder Tahoe Sustainability Group WATER FLOW L MIMICS PRESSURE REDUCTION VALVES IN UNDERGROUND VAULTS Page Submitted to the South Tahoe Public Utility District Board on September 3, 2009 40 kW Flow -to -Wire System Wastewater S.T. P. U. D. Board Report from Director Claudio Why the Board's Role in Human Resources is Important • Shapes workplace culture at the district — Defines the kind of place the district is • Either positive, supportive work environment or a negative, repressive place to work. — Establishes a framework of expectations • Compliance with HR rules and regulations • Stewardship role Copyright 4 2003 by CSDA N Evaluating the General Manager • A formal evaluation process of the general manager offers: —The opportunity to clarify performance expectations to check progress on achieving previously agreed upon goals — Making decisions about employment renewal and compensation Copyrighl0 2003 by CSDA Page Submitted to the South Tahoe Public Utility District Board on September 3, 2009 S.T.P.U.D. Board Report from Director Claudio Edwards Deming - Total Quality Management & Deming's 14 Points Edwards Deming was an American statistician, considered the father of the modern quality movement. Edwards Deming strongly influenced Japanese industry post WWII with Statistical Process Control (SPC) and Total Quality Management (TQM). In 1982 Edwards Deming published "Out of the Crisis" identifying 14 points for management. 1. Create constancy of purpose and continual improvement — long term planning must replace short term reaction 2. Adopt the new philosophy — by management and workers alike. 3. Do not depend on (quality) inspection — build quality into the product and process 4. Choose quality suppliers over low cost suppliers — to minimize variation in raw materials and supply. 5. Improve constantly — to reduce variation in all aspects e.g. planning, production, and service. 6. Training on the job — for workers and management, to reduce variation in how job is done. 7. Leadership not supervision — to get people to do a better job, not just meet targets. 8. Eliminate fear — encourage two -way communication, encourage employees to work in the organization's interest. 9. Break down internal barriers — department's in an organization are "internal customers" to each other and must work together. 10. Eliminate slogans (exhortations) — processes make mistakes not people. Management harassment of workers will create bad relations if no effort made to improve processes. 11. Eliminate numerical targets — management by objectives (targets) encourages low quality. 12. Remover barriers to worker satisfaction — abolish annual appraisals 13. Encourage self- improvement and education for all 14. Everyone is responsible for continual improvement in quality and productivity — particularly top management Page Submitted to the South Tahoe Public Utility District Board on September 3, 2009 S.T.P.U.D. Board Report from Director Claudio 08 -24 08 -21 LA QUINTA INN OAKLAND CA 74323019233576776010467 3516 74.65CR 08 -24 08 -21 SAFEWAY STORE00006387 OAKLAND CA 24164079234221017560794 5411 4.99 STATEMENT DATE I DISPUTED AMOUNT P U R ID: 169233696992595 TAX: 0.00 08 -24 -09 $ .00 OTHER CHARGES $177.17 08 -24 08 -22 STARBUCKS USA 00079574 STOCKTON CA 24164079234355466082551 5814 2.60 $ 0.00 P U R I D: TAX: 0.00 C/O U.S. BANCORP SERVICE CENTER, INC 08 -24 08 -21 KFC ##284 25302845 STOCKTON CA 24164079234389310851572 5814 13.07 FARGO, ND 58125 -6335 P U R I D: TAX: 0.00 TOTAL ACTIVITY $102.52 08 -24 08 -21 LA QUINTA INN OAKLAND CA 24323019233576776010454 3516 74.65 073483 ARRIVAL: 08 -20 -09 08 -24 08 -20 IN -N -OUT BURGER 000000139 PLACERVILLE CA 24445009233885312101071 5814 4.17 P U R ID: 00000000000000000 TAX: 0.00 08 -24 08 -21 DAYS INNS OAKLAND AIRPORT OAKLAND CA 24610439235072002339768 3510 77.69 0821000009973 ARRIVAL: 08 -21 -09 Default Accounting Code: 1019 -2019 ACCOUNT NUMBER ACCOUNT SUMMARY CUSTOMER SERVICE CALL 4246 - 0441 - 0101 -6982 PREVIOUS BALANCE .00 PURCHASES & 800- 344 -5696 STATEMENT DATE I DISPUTED AMOUNT 08 -24 -09 $ .00 OTHER CHARGES $177.17 CASH ADVAN .00 SEND BILLING INQUIRIES TO: AMOUNT DUE $ 0.00 CASH ADVANCE FEE .00 C/O U.S. BANCORP SERVICE CENTER, INC U.S. BANK NATIONAL ASSOCIATION ND DO NOT REMIT P.O. BOX 6335 CREDITS $74.65 FARGO, ND 58125 -6335 TOTAL ACTIVITY $102.52 Total mileage: 400 Times .55 per mile Total $110.00 Page Submitted to the South Tahoe Public Utility District Board on September 3, 2009 NOTICE OF CONTINUANCE OF REGULAR MEETING OF THE El DORADO COUNTY WATER AGENCY Notice is hereby given that the regularly scheduled meeting of the El Dorado County Water Agency for September 9, 2009 at 9:00 a.m. is, pursuant to Government Code Section 54955.1, continued to September 16, 2009 at 9:00 a.m. to be held at the El Dorado County Water Agency Board Meeting Room, 3932 Ponderosa Road, Suite 200, Shingle Springs, CA 95682. Dated: September 3, 2009 By: Tami Scowcroft Deputy Clerk El Dorado County Water Agency Kathy Sharp From: Dennis Cocking Sent: Wednesday, September 02, 2009 10:58 AM To: Dale Rise (drise01 @charter.net); Eric Shafer (E- mail); Ernie Claudio (ernieclaudio @sbcglobal.net); jrjones @etahoe.com; Mary Lou Mosbacher (BAR- MAR @etahoe.com) Cc: Richard Solbrig; Kathy Sharp Subject: Meter Letters for Workshop Attachments: 2010watermeterprojectunder1 inch.doc; 2009watermeterprojectunder1 inch.doc; 2009MXUprogram.doc; meterlawin CA.doc; Picture (Metafile) Good morning all: Per the Board's direction, I have prepared the DRAFT customer outreach letters for you all to read prior to the metering workshop tomorrow. I have attached four separate documents. They are: 1. 2009 MXU Program letter 2. 2009 Water Meter Program letter 3. 2010 Water Meter Program letter 4. Water Metering Fact Sheet Bear in mind these are draft documents and we will have the opportunity to fine tune them prior to their distribution. I look forward to seeing you all tomorrow. Dennis �1_ It 1 �1 1 �1 2010watermAerpro2009waterm? terpro2009MXU program. d mete rlawin CA.doc jectunderlinc... jectunderlinc... oc (29 KB) (34 KB) 4� F 1954 . W►��� '�►(IC t,1'i'Y D� Public /Legislative Affairs Office Dennis Cocking Public Information Officer 530.543.6208 direct 530.541.0614 fax 530.208.8540 cellular dcocking @stpud.dst.ca.us April 1, 2010 RE: 2010 Water Meter Installation Project (3/4" Service) Dear Property Owner: On September 29, 2004 Governor Schwarzenegger signed into law Assembly Bill 2572 that mandates all water systems in California to be fully metered by 2025. On or about May 1, 2010, District contractors will begin work on the 2010 Water Meter Installation Project. As part of the District's compliance plan a water meter and water meter vault will be installed on your property, however you will not be billed based on actual usage and will continue to be billed on a flat rate basis until January 1, 2011. After that date, state law requires all homes with a meter to be billed on the volume of water actually used. Installation of the new meter vault may require some disruption of landscaping on your property. The District's contractors will repair any damage to your landscaping as close as possible to its original condition. At a later date, District crews will install a Meter Transceiver Unit (MXU) to facilitate the District's Automated Meter Reading (AMR) program. With all public works projects, there is a certain amount of disruption and inconvenience. The District will make every effort to minimize the impact of this project for our customers. Per TRPA requirements, work hours on this project will be Monday- Friday 8:00 a.m. — 6:00 p.m. For any planned shut -offs you will be notified prior to the event. For obvious reasons, unplanned emergency shut -offs cannot be anticipated and may occur. For this reason, the District suggests each household have at least five gallons of water available for such emergencies. Should you or a family member have a medical condition that makes an uninterrupted water supply a necessity, please notify the District so we can accommodate your needs. Water is a precious and finite resource in the Sierra. The District encourages you to practice efficient water use which will conserve water resources and minimize the cost of your water. On the reverse of this letter is a fact sheet regarding mandated water meters installation and the District's plans to comply with the law. Please feel free to call Dennis Cocking, Public Information Officer, at 530.543.6208 if you have any questions. If you have any questions regarding your water meter or billing issues, please feel free to call me at 530.543.6221. If you have questions or concerns regarding construction related issues, please call Jim Hoggatt, Engineering Department Manager at 530.543.6206. Sincerely, Lisa Coyner Manager of Customer Service ** Turn over for more information ** September 7, 2009 RE: 2009 Water Meter Installation Project (3/4" Service) Dear Property Owner: On September 29, 2004 Governor Schwarzenegger signed into law Assembly Bill 2572 that mandates all water systems in California to be fully metered by 2025. On or about October 1, 2009, District contractors will begin work on the 2009 Water Meter Installation Project. As part of the District's compliance plan a water meter and water meter vault will be installed on your property, however you will not be billed based on actual usage and will continue to be billed on a flat rate basis until January 1, 2011. After that date, state law requires all homes with meters be billed on the volume of water actually used. Installation of the new meter vault may require some disruption of landscaping on your property. The District's contractors will repair any damage to your landscaping as close as possible to its original condition. At a later date, District crews will install a Meter Transceiver Unit (MXU) to facilitate the District's Automated Meter reading ((AMR) program. With all public works projects, there is a certain amount of disruption and inconvenience. The District will make every effort to minimize the impact of this project for our customers. Per TRPA requirements, work hours on this project will be Monday- Friday 8:00 a.m. — 6:00 p.m. For any planned shut -offs you will be notified prior to the event. For obvious reasons, unplanned emergency shut -offs cannot be anticipated and may occur. For this reason, the District suggests each household have at least five gallons of water available for such emergencies. Should you or a family member have a medical condition that makes an uninterrupted water supply a necessity, please notify the District so we can accommodate your needs. Water is a precious and finite resource in the Sierra. The District encourages you to practice efficient water use which will conserve water resources and minimize the cost of your water. On the reverse of this letter is a fact sheet regarding mandated water meters installation and the District's plans to comply with the law. Please feel free to call Dennis Cocking, Public Information Officer, at 530.543.6208 if you have any questions. If you have any questions regarding your water meter or billing issues, please feel free to call me at 530.543.6221. If you have questions or concerns regarding construction related issues, please call Jim Hoggatt, Engineering Department Manager at 530.543.6206. Sincerely, Lisa Coyner Manager of Customer Service ** Turn over for more information ** September 7, 2009 RE: 2009 Water Meter Transceiver Unit (MXU) Installation Program Dear Property Owner: On September 29, 2004 Governor Schwarzenegger signed into law Assembly Bill 2572 that mandates all water systems in California to be fully metered by 2025. Beginning May 2009, District crews have been installing Meter transceiver Units (MXU) on existing water meters. This installation is part of the District's compliance plan with the state's metering requirements. Installation of this unit will not change your billing and you will continue to be billed on a flat rate until January 1, 2011. After that date, state law requires all homes and businesses with meters to be billed on the basis of the amount of water actually used. This installation should require little or no disruption to your landscaping. However, should any occur, the District will repair any damage to your landscaping as close as possible to its original condition. Water is a precious and finite resource in the Sierra. The District encourages you to practice efficient water use which will conserve water resources and minimize the cost of your water. On the reverse of this letter is a fact sheet regarding mandated water meters installation and the District's plans to comply with the law. Please feel free to call Dennis Cocking, Public Information Officer, at 530.543.6208 if you have any questions. If you have any questions regarding your water meter or billing issues, please feel free to call me at 530.543.6221. If you have questions or concerns regarding construction related issues, please call Jim Hoggatt, Engineering Department Manager at 530.543.6206. Sincerely, Lisa Coyner Manager of Customer Service ** Turn over for more information ** South Tahoe Public Utility District Pulplic /Legislative Affairs Office 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Contact Information: Dennis Cocking Public Information Officer 530.543.6208 direct 530.541.0614 fax 530.208.8540 cellular www.stpud.us WATER METERS IN CALIFORNIA FACT SHEET • On September 29, 2004 Governor Schwarzenegger signed into law Assembly Bill 2752 authored by then Assembly Member Christine Kehoe. This bill was chaptered on the same day and is currently Chapter 884 of the California Code. The District sought a legislative exemption from the law, but was unsuccessful. Whether you agree or disagree with water meters and water conservation, it is a reality in California. • The bill requires an urban water supplier, as defined (any public water system with 3,000 or more connections), on or before January 1, 2025 to install water meters on all municipal and industrial water connections that are located within its service area. The District meets this definition and must comply with the law. • The bill also requires an urban water supplier, beginning on or before January 1, 2010 to charge each customer that has a service connection for which a water meter has been installed, based on the actual volume of deliveries, as measured by a water meter. • The bill provides an exception in order to provide customers with experience in volume - based water service charges. An urban water supplier that is subject to this law may delay, for the 2010 seasonal cycle of water use, the use of meter -based charges for service connections that are being converted from nonvolume -based billing to volume - based billing. That means, for most residential customers, volume -based billing will not begin until January 2011. From January 1, 2010 through December 31, 2010, residential customers with meters will receive their normal flat rate bill and additional information that will demonstrate what their bill would have been if billed volumetrically. • Finally, the bill authorizes a water purveyor to recover the cost of providing services related to the purchase, installation, and operation of a water meter from rates, fees, or charges. At this point, it is the District's intent to seek federal and state funding to cover as much of the costs of meter installation as possible. Where outside funding is not available, costs will be paid through the general rates incurred by all District customers. The District has applied for and received a $4.387 million grant (no matching dollars) through the State Revolving Fund (SRF). These funds were provided via the American Recovery and Reinvestment Act (ARRA) of 2009. These funds will allow the installation of approximately 1,500 water meters on waterlines that have been replaced in recent years. Generally speaking, these projects are entirely within the City limits and in older neighborhoods (The Y, Gardner Mtn., Al Tahoe, and Stateline as that is where the oldest and smallest lines are located). • For additional information please contact Dennis Cocking, Public Information Officer at 543.6208 or visit the District's webpage at www.stpud.us.