Loading...
AP 11-05-0919 so SOUTH TAHOE PUBLIC UTILITY DISTRICT "Basic Services for a Complex World" REGULAR BOARD MEETING AGENDA Thursday, November 5, 2009 2:00 P.M. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Richard Solbri , General Manager Paul Sciuto, Assistant General Mana er Mary Lou Mosbacher, President BOARD MEMBERS Dale Rise, Vice President James R. Jones, Director Eric W. Schafer, Director Ernie Claudio, Director 1. CALL TO ORDER REGULAR MEETING — PLEDGE OF ALLEGIANCE 2. COMMENTS FROM THE AUDIENCE (Short non - agenda items that are within the subject matter jurisdiction of the District. Five - minute limit. No action will be taken.) 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR 4. ADOPTION OF CONSENT CALENDAR (Any item can be discussed and considered separately upon request) 5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION / ACTION 6. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION a. Time Limits on Sewer Permits Board Discussion and Direct Staff Pg. 81 (Paul Hughes, Diane Noble) b. Payment of Claims Approve Payment in the Amount of Pg. 87 $2,193,085.35 7. BOARD MEMBER STANDING COMMITTEE RE PORTS (Discussions may take place; however, no action will be taken) a. Water & Wastewater Operations Committee (Jones / Rise) b. Finance Committee (Schafer / Claudio) C. Executive Committee (Mosbacher / Rise) d. Planning Committee (Mosbacher / Schafer) REGULAR BOARD MEETING AGENDA — NOVEMBER 5, 2009 PAGE — 2 8. BOARD MEMBER AD HOC COMMITTEE REPORTS a. Management and Union MOU Ad Hoc Committee (Schafer /Rise) 9. EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVES REPORT 10. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken) 11. GENERAL MANAGER REPORTS (Discussions may take place; however, no action will be taken) a. City Water Agreement 12. STAFF / ATTORNEY REPORTS (Discussions may take place; however, no action will be taken) 13. NOTICE OF PAST AND FUTURE MEETINGS / EVENTS Past Meetings / Events 10/28/09 — ECC (Employee Communications Committee) Meeting 10/29/09 — Special Board Meeting (Meter and Vault Bid Award) 11/02/09 — Water and Wastewater Operations Committee Meeting 11/04/09 — El Dorado County Water Agency Board Meeting Future Meetinas / Events 11/11/09 — Veterans Day (District Office Closed) 11/16/09 — 3:30 p.m. — Water and Wastewater Operations Committee Meeting at District 11/17/09 — 9:00 a.m. — Alpine County Supervisors Regular Meeting in Markleeville 11/19/09 — 2:00 p.m. — STPUD Regular Board Meeting at District 14. CLOSED SESSION (Closed Sessions are not open to the public) a. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel— Pg. 103 Existing Litigation re: Meyers Landfill Site: United States of America vs. El Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S -01 -1520 LKK GGH, United States District Court for the Eastern District of CA b. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel - Pg. io5 Existing Litigation: Tahoe Asphalt, Inc. and Tahoe Asphalt Materials Company, LLC, vs. STPUD, Case No. SC20090104, El Dorado Superior Court 15. ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION 16. ADJOURNMENT (To the next regular meeting, November 19, 2009, 2:00 p.m.) South Tahoe Public Utility District ■ 1274 Meadow Crest Drive ■ South Lake Tahoe, CA 96150 Phone 530.544.6474 ■ Facsimile 530.541.0614 • www.stpud.us October 23, 2009 Richard Solbrig and Board of Directors STPUD 1275 Meadow Crest Drive South Lake Tahoe, Ca 96150 Dear Mr. Solbrig and the Board of Directors, Y" J I wish to give you my view on the proposed Ordinance No. 518 -09 both as a member of the public and candidate for the District's director seat. As a contractor and customer: I feel this ordinance limits timing and planning for future projects development. As a contractor and customer of the District I believe any action or decision to implement time restraints and increased fees to developers is a further insult to an already nearly deceased new development market. From 2006 to 2009 the District has already increased new construction capacity charges for water and sewer by 150% and 37% ( $3,026 & $3,474) respectively. I view these increases as extraordinary and feel the district should re -visit these increases for validity. Recently other agencies have increased their fees for new development without consideration for the community or this severe economic recession. As a prospective Candidate for the Board of Directors: From my investigation, this issue surfaced and is being acted upon due to one of the board members personally taking issue with it because it affected one of his clients. Generally I believe real -life issues concerning District policy should be discussed between management and the board — but not necessarily acted upon immediately with an ordinance. I can understand the necessity for the District to do surveys and maintain fees structures in parity with other agencies. But the District should have consideration for this community during what I consider one of the most severe economic down -turns we will experience. Looking back, these recent extraordinary water and sewer increases were imposed during the very same years this severe recession took hold. I would suggest that this only serves to further discourage new development by both contractors and regular folks hoping to build their own home. Without prosperous growth — this community will not flourish and the District will suffer revenue loss along with ability to upgrade its facilities. I would like to investigate how the District might diversify future rate increases without typically imposing the bulk of increases to new construction and developers. Finally, regarding this ordinance — I do believe that all outstanding seasoned permits should be compliant with current District and building codes at installation. My suggestion is for District Management and the Board of Directors to table any action on this ordinance for further debate after this community's economy has recovered. Sincerely, John Adamski leM 18 5 • '� CONSENT CALENDAR NOVEMBER 5, 2009 ITEMS REQUESTED ACTION a. Cul De Sac Holdings, LLC, Water Main Extension Adopt Corrected Resolution Pg. 1 (Diane Noble, Paul Hughes) No. 2873 -09 Accepting the Cul De Sac Holdings Water Main Extension b. SCADA Upgrade Field Interface Units Pg.9 (John Boyson) C. Cattle Grazing Permit 2010 — Diamond Valley Pg. 17 Ranch (Hal Bird) (1) Waive Bidding Procedures as Outlined in the Purchasing Policy for Standardized Equipment Requiring Compatibility with Existing Equip- ment and to be Purchased from the Existing Supplier; and (2) Authorize Purchasing of Units from Global Data Specialists, Inc., in the Amount of $34,691.25 Plus Shipping Award Contract to the Highest Responsive, Responsible Bidder, Urrutia Ranch, in the Monthly Amount of $13,280 d. Nutrient Management Plan — Alpine County Approve Addendum to Existing Task Pg. 29 (Hal Bird) Order No. 1 to Wood Rogers, Inc., for Additional Consulting Services, in the Amount of $3,685.20 Qg e LPPS (Luther Pass Pump Station) Standby Power Authorize an Increase to Purchase . 33 Generation Facility Order P21709 to AECOM for (Ivo Bergsohn) Additional Engineering Services for Design of a Fire Suppression System, in the Amount of $50,000 f. Final and Secondary Effluent Pump Station Approve Change Order No. 9 to Pg. 37 (Julie Ryan) Pacific Mechanical Corporation, in the Amount of $96,171.37 CONSENT CALENDAR - NOVEMBER 5, 2009 PAGE - 2 g. Twin Peaks Booster Station and Waterline Pg. 47 (John Thiel) h. 2009 Sonora Waterline Replacement Pg. 51 (Jim Hoggatt) (' i'\ 2 008 Al Tahoe Waterline Replacement __P9. 55 (Jim Hoggatt) j. 2008 Al Tahoe Waterline Replacement .59 (Jim Hoggatt) k. 2008 Tata Lane /Granite Mountain Waterline g.65 Replacement (Jim Hoggatt) I. Twin Peaks Booster Station Pg. 71 (Jim Hoggatt) M. Regular Board Meeting Minutes: Pg. 73 October 15, 2009 (Kathy Sharp) n. Special Board Meeting Minutes: Pg. 79 October 29, 2009 (Kathy Sharp) Approve Change Order No. 1 to Resource Development Company, Inc., in the Amount of $57,187.51 Approve Change Order No. 3 for Campbell Construction Co., Inc., in the Amount of $87,760.99 Approve a $22,822.12 Deductive Change Order No. 5 to Cruz Excavating, Inc. (1) Approve the Project Closeout Agreement and Release of Claims for Cruz Excavating; and (2) Authorize Staff to File a Notice of Completion with the El Dorado County Clerk (1) Approve the Project Closeout Agreement and Release of Claims for Cruz Excavating; and (2) Authorize Staff to File a Notice of Completion with the El Dorado County Clerk Increase Task Order for Carollo Engineer's to Provide Construction Services, in the Amount of $59,435 Approve Minutes Approve Minutes The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete agenda packet, including all backup information is available for review at the meeting and at the District office during the hours of 8:00 a.m. — 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after minutes of the meeting have been approved. Items on this agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear on the agenda. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified, but may occur slightly later than the specified time. Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Comments on items not on the agenda can be heard during "Comments from the Audience;" however, action cannot be taken on items not on the agenda. Please provide the Clerk of the Board with a copy of all written material presented at the meeting. Backup to any agenda item(s) not included with the Board packet will be made available when finalized at the District office, at the Board meeting, and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings. If particular accommodations for the disabled are needed (i.e., disability- related aids, or other services), please contact the Clerk of the Board at 530.544.6474, extension 6203, at least 24 hours in advance of the meeting. Ir 1 I paws Mai./ SOUTH TAHOE PUBLIC UTILITY DISTRICT "Basic Services for a Complex World" REGULAR BOARD MEETING AGENDA ADDENDUM NO. 1 Thursday, November 5, 2009 District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Richard Solbrig, General Manager Paul Sciuto, Assistant Manager Mary Lou Mosbacher, President BOARD MEMBERS Dale Rise, Vice President James R. Jones, Director Eric W. Schafer, Director Ernie Claudio, Director Note: This item was received subsequent to the Regular Board Meeting Agenda being posted. Adding it to the Agenda will require a separate vote with approval by two- thirds of the Board members present (or all Board members if less than two- thirds are present), and determine there is a need for immediate action. 6. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION 2010 Water Meter Installation Project — Phase 2 Authorize Staff to Advertise for (John Thiel) Construction Bids V , w 0"dral Mw*w Kick" K 9olb* Mrwtmv 15ou" --J 1 - '.** h Ta hoc .1[iunes V-,Jlorw rumic Utility District BOARD AGENDA ITEM TO: Board of Directors FROM: John Thiel, Principal Engineer MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: 2010 Water Meter Installation Project — Phase 2 REQUESTED BOARD ACTION: Authorize staff to advertise for construction bids. DISCUSSION: The California Department of Health Services (CDHS) awarded STPUD a $4,387,500 grant for the installation of water meters. The grant is already being used for the 2009 Meter Project which is nearly complete with 163 meters in place, and the 2010 (Phase 1) Meter Project that has been awarded to Teichert and will have 1,525 meter installations in place in 2010. There is approximately $2M left in the grant which is available for approximately 1,300 additional meter installations. Staff estimates that a total of 3,000 meter installations will be installed under this grant. The grant funding is part of the American Recovery and Reinvestment Act (ARRA) with requirements for Disadvantaged Business Enterprises, Davis Bacon wage rates, Buy - American Certifications, etc. The grant also precludes the use of STPUD staff for any construction or installation of the water meters. The funds can be used for engineering, construction inspection, and grant administration time. The State is also requiring that we have a contractor in place with a signed contract and a Notice to Proceed, no later than 12/24/09. Construction will begin May 2010. SCHEDULE: Advertise 11/06/09; PreBid 11/17/09; Open Bids 12/11/09; Board Approval 12/17/09; Notice to Proceed by 12/22/09. COSTS: $ 2,000,000 Estimate ACCOUNT NO: 2029 - 7078 /METERS BUDGETED AMOUNT REMAINING: Approximately $4.3 million ATTACHMENTS: None & 11 . 10 �r 7850 SOUTH TAHOE PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING AGENDA ADDENDUM NO.2 Thursday, November 5, 2009 District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Richard Solbri , General Manager Paul Sciuto, Assistant Mana er Mary Lou Mosbacher, President BOARD MEMBERS Dale Rise, Vice President James R. Jones, Director Eric W. Schafer, Director Ernie Claudio, Director Note: This item was received subsequent to the Regular Board Meeting Agenda being posted. Adding this emergency item to the Agenda will require a separate vote with approval by four -fifths vote of the Board members present, and determine there is a need for immediate action. 6. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION Snowshoe Thompson Ditch No. 1 / Millich Ditch Washout (Paul Sciuto) (1) Determine an Emergency Exists Pursuant to Section 1102 of the Public Contract Code; (2) Determine Substantial Evidence has been Presented to Authorize an Exception be made to Section 22050 of the Public Contract Code that this Emergency will Not Permit a Delay Resulting from a Competitive Solicitation for Bids and that this Action is Necessary to Respond to the Emergency; (3) Adopt Resolution No. 2876 -09 Delegating Authority to the General Manager and Assistant General Manager /Engineer to Order any Action Necessary to Respond to this Emergency and Determine this Project is Exempt from CEQA; (4) Approve Expenditures Necessary to Start Emergency Repairs, in the Estimated Amount of $50,000 Gonera! Manages Richard H. Sol" I'ah E ciaudb 5 .fames It' ,Jonas PuRc Utility L "`� `�' � iw 1ZM MwWow Crmt PrW 6 South Lake Tahoe s CA W150 Phorne W 4-6474 * Fox 5W 541 -W14 BOARD AGENDA ITEM TO: Board of Directors FROM: Paul A. Sciuto, Assistant General Manager MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: Snowshoe Thompson Ditch No. 1 / Millich Ditch Washout REQUESTED BOARD ACTION: (1) Determine an emergency exists pursuant to Section 1102 of the Public Contact Code; (2) Determine substantial evidence has been presented to authorize an exception be made to Section 22050 of the Public Contract Code that this emergency will not permit a delay resulting from a competitive solicitation for bids and that this action is necessary to respond to the emergency; (3) Adopt Resolution No. 2876 -09 delegating authority to the General Manager and Assistant General Manager /Engineer to order any action necessary to respond to this emergency and determine this project is exempt from CEQA; (4) Approve expenditures necessary to start emergency repairs, estimated to be $50,000. DISCUSSION: On Wednesday, November 4, 2009 some erosion damage was discovered at Millich Ditch and Snowshoe Thompson Ditch No. 1. The damage was at the site of the repairs that were completed in June of 2009. There is evidence of sliding and accumulation of material under the erosion control blankets on the slope between Snowshoe Thompson No. 1 and Millich Ditch. In addition there are approximately six areas where the erosion control blankets separated and allowed the deposition of material down the slope and towards adjacent properties. There is also minor cutting of the slope by surface water. Staff intends to commence repairs as soon as authorized utilizing District staff and an outside erosion control contractor. The repairs will include but not be limited to installation of fiber rolls, perforated pipes, and drain rock to divert surface water away from affected areas, and application of mulch and hydroseed to stabilize the site. Paul Sciuto November 5, 2009 Page 2 SCHEDULE: Repairs expected to be completed by December 3, 2009 COSTS: $50,000 (estimated) for Millich Ditch and Snowshoe Thompson No. 1 Ditch ACCOUNT NO: 1029- 7075 /SNOBLO; 1029 - 7076 /MILBLO BUDGETED AMOUNT REMAINING: Unbudgeted ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 RESOLUTION NO. 2876-09 A Resolution of the South Tahoe Public Utility District Declaring an Emergency, Authorizing Contracts without Bids, Delegating Authority to Order Emergency Action and Determining CEQA Exemption WHEREAS, the South Tahoe Public Utility District (District) is engaged in the collection, treatment and disposal of wastewater; and WHEREAS, Millich Ditch and Snowshoe Thompson Ditch No. 1 washed out near Woodfords, California; and WHEREAS, Millich Ditch and Snowshoe Thompson Ditch No. 1 was repaired under Resolution No. 2857 -09 in April through June 2009; and WHEREAS, Millich Ditch and Snowshoe Thompson Ditch No. 1 is exhibiting some erosion damage due to recent rainfall; and WHEREAS, the Millich Ditch and Snowshoe Thompson Ditch No. 1 need to be repaired to eliminate potential damage to the ditches and adjacent property owners; and WHEREAS, the damage related to the Millich Ditch and Snowshoe Thompson Ditch No. 1 is an unexpected occurrence posing a clear and imminent danger which could lead to the loss or impairment of health, property and /or essential public services; WHEREAS, substantial evidence has been provided to the District which demonstrates immediate action is necessary to prevent this loss or impairment, repair these facilities, and enter into agreements which contractors to design and perform such repair necessary to maintain service; and WHEREAS, emergency project are exempts from the requirements of the California Environmental Quality Act (CEQA) pursuant to CEQA guidelines sections 15269 and 15369. NOW, THEREFORE BE IT RESOLVED AS FOLLOWS: 1. The damage related to the Millich Ditch and Snowshoe Thompson Ditch No. 1 is a sudden, unexpected occurrence that poses a clear and imminent danger requiring immediate action to prevent or mitigate the loss or impairment of health, property and essential services and is therefore an emergency. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 2. The emergency will not permit a delay resulting from a competitive solicitation for bids. 3. Immediate actions directly related to the emergency, including repair of the Millich Ditch and Snowshoe Thompson Ditch No. 1 and surrounding areas and action to procure the necessary equipment, services and supplies are necessary to respond to the emergency and shall be made without giving notice for bids to let contracts. 4. The General Manager and Assistant General Manager /Engineer of the District is hereby authorized and directed to order any action necessary and appropriate to respond to the emergency including repair of the Millich Ditch and Snowshoe Thompson Ditch No. 1 and surrounding areas, and the procurement of any necessary equipment, services and supplies, without giving notice for bids to let contracts. 5. Emergency repairs related to the damage for the Millich Ditch and Snowshoe Thompson Ditch No. 1 are necessary to maintain service and repair actions are necessary to mitigate the emergency and are thus exempt from the requirements of CEQA. 6. This Resolution shall take effect immediately. WE, THE UNDERSIGNED, do hereby certify that the above and foregoing Resolution was duly adopted and passed by the Board of Directors of the South Tahoe Public Utility District at a Board meeting held on the 5th day of November, 2009, by the following vote: AYES: NOES: ABSENT: Mary Lou Mosbacher, Board President South Tahoe Public Utility District 1 ATTEST: Kathy Sharp, Clerk of the Board tae WW1 M &Ukdar i�JChmd H. So" 15o% a Ernes Clinidin K. Jdetas PUMIG Utility m5trict �uw 0016 r4a -.• BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Diane Noble, Interim Customer Service Manager Paul Hughes, Chief Financial Officer MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: Cul De Sac Holdings, LLC Water Main Extension REQUESTED BOARD ACTION: Adopt corrected Resolution No. 2873 -09 accepting the Cul Del Sac Holdings Water Main Extension. DISCUSSION: The previous resolution approved by the Board on October 15, 2009, contained a clerical error. The money amount in the last paragraph of page one should read "Seventeen Thousand Five Hundred Eighty Dollars ($17,580.00) ". The correction is shown on the attached red -line version. This corrected resolution will take its place. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: Corrected Resolution No. 2873 -09, Certificate of Acceptance CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES _ NO CHIEF FINANCIAL OFFICER: YES NO -1- RESOLUTION NO 297349 A RESOLUTION 8Y 71JE BOARD OF QUMTORS OF THE SOUTH TAHOE PUBLIC UTUM 013TRICT ACCEPTING THE CXML DE SAC ELOLDO+[G5, LLC WATER ICI EXTENSION WHEREAS, 9* 1316W ovms. and opts a waW treaknent aW cg*ftdioi system (System) for the beneficig use by Me DisW and #s custDrners. located whin the City of South Lake. Tahoe and art. portions of the County of B Dorado, Ciftmta; and WHEREAS, Cul De Sac Holdings, LLC (Ox iw) owns corlain reW pity and 11 12 eta boated at 1772 D Stre4 8 Dada County, Cakkmla, as "mm �� {,, ■ n p d �i� In Vie Water Maln - Extension Malt-Extension Agreement,. moiled below, and WHEREAS, cMVMM of project reclund a vAatter mm @7d ow and WHEREAS, the Distrio t3oamd 0t0k8c6xs awmved OwneeS r i R r P Fifor watermain wftision (Maim Extension) on May 1, 2008, tQ ejeec rmi ota VVater Main Extension AWeerwnt, Whtch was ego afti by the Ow mwand by the DmUxt on May 1.20M (Agreement); and 21 WHEWAS. Ovmw meted man of the Water Main Extension which Consists of approxknateiy t,= Lest of an &4fwh pone fa vrhit OWW fM SOM* Thousand Four Hundred Dollars W0,4MMQ ; add one (1) addBanal fire hyftnt, and add connection vatm for use by potential future custorneW aad. WHEREAS, the Mbkt paid Severgeen Thoitad Five. Hundred t3�hty t)a#a 'l � Q ` Bo.00 to up -s � Wese I i«i__�� ►e kCr, s - i tD 8 — i ... ieke.* 7,aenos and add appna6nately &V feet of vraterservice; -3- WHEREAS, Ownem executed an fnvmwft Marto Dedk*e the Wader _Main Extension to the District, dated Ate 6, 2809 (DedWatiort), and WHEREAS, the irrevocable Our to Dedmft vias-r o ded -in the C=* Recorder's Office on August 21, 2009; and, WHEREAS, Ow, m rs desire the District to accept the Water Main Extension and provide regular wad service b Ow above did Prvpeft. -NOW T ER , be it resokied Nut the Beard of Dkedors accepts Ste 11 dedle Mon of the Cut De Sae Holdings, MC Wad[ Main Extension and authorizes the 12 President of the Board of Mxxftm to m3atfs the COORMO ofAcoeptanoe of the 13 Dedication. 14 is WE, THE EiNDfRSiGNED, do hereby ce* that the above -M foregoing 1 ResokAon was duly adopted and passed by the Board of Direciore of the Salt- Tahoe 1 t Pubtie tltlHty Dishfct at a regularly adwKkfied mesong held on the SM day of November, 20M, by the 1 11, d g vow 20I AYES: 21 NOES: 22 23 ABSENT: Marylou Moabadw, Bowd i errt South Taboo Ptdle l tlhty DbbxA ATTEST: 30 Kathy Sharp, Clerk of the Board -4- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 RESOLUTION NO. 2873-09 A RESOLUTION BY THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT ACCEPTING THE CUL DE SAC HOLDINGS, LLC WATER MAIN EXTENSION WHEREAS, the District owns and operates a water treatment and distribution system (System) for the beneficial use by the District and its customers located within the City of South Lake Tahoe and certain portions of the County of El Dorado, I California; and WHEREAS, Cul De Sac Holdings, LLC (Owner) owns certain real property and improvements located at 1772 D Street, El Dorado County, California, as more particularly described in the Water Main Extension Agreement, defined below; and WHEREAS, completion of project required a water main extension; and WHEREAS, the District's Board of Directors approved Owner's request for the water main extension (Main Extension) on May 1, 2008, subject to execution of a Water Main Extension Agreement, which was executed by the Owner and by the District on May 1, 2008 (Agreement); and WHEREAS, Owner completed construction of the Water Main Extension which consists of approximately 1,280 feet of an 8 -inch pipeline for which Owner paid Seventy Thousand Four Hundred Dollars ($70,400.00); add one (1) additional fire hydrant, and add connection valves for use by potential future customers; and WHEREAS, the District paid Seventeen Thousand Five Hundred Eighty Dollars ;$17,580.00 ) to up -size the Water Main Extension pipeline from 6 - inches to 8 — inches and add approximately 330 feet of water service; -5- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 WHEREAS, Owners executed an Irrevocable Offer to Dedicate the Water Main Extension to the District, dated August 6, 2009 (Dedication); and WHEREAS, the Irrevocable Offer to Dedicate was recorded in the County Recorder's Office on August 21, 2009; and, WHEREAS, Owners desire the District to accept the Water Main Extension and provide regular water service to Owner's above described property. NOW THEREFORE, be it resolved that the Board of Directors accepts the dedication of the Cul De Sac Holdings, LLC Water Main Extension and authorizes the President of the Board of Directors to execute the Certificate of Acceptance of the Dedication. WE, THE UNDERSIGNED, do hereby certify that the above and foregoing Resolution was duly adopted and passed by the Board of Directors of the South Tahoe Public Utility District at a regularly scheduled meeting held on the 5th day of November, 2009, by the following vote: AYES: 101 ABSENT: Mary Lou Mosbacher, Board President South Tahoe Public Utility District ATTEST: Kathy Sharp, Clerk of the Board -6- RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: South Tahoe Public Utility District c% Lisa M. Coyner 1275 Meadow Crest Drive South Lake Tahoe, California 96150 THIS SPACE RESERVED FOR RECORDER ONLY (Gov. Code § 27361.6) CERTIFICATE OF ACCEPTANCE THIS IS TO CERTIFY that the interest conveyed by the Irrevocable Offer to Dedicate Water Main Extension dated August 6, 2009 to the South Tahoe Public Utility District (District), a governmental agency, is hereby accepted by the undersigned officer or agent on behalf of the District pursuant to authority conferred by resolution of the District's Board of Directors adopted on November 5, 2009, and the District consents to the recording of this Acceptance by its duly authorized officer or agent. SOUTH TAHOE PUBLIC UTILITY DISTRICT Dated: November 5, 2009 Mary Lou Mosbacher, Board President South Tahoe Public Utility District ATTEST: Kathy Sharp, Clerk of the Board -7- oai 5o s"* a f"UH1 Dietrich M" `� �. • ha !�' i " " : i it � « �r BOARD AGENDA ITEM 4b TO: Board of Directors FROM: John Boyson, Electrical Instrumentation Supervisor MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: SCADA Upgrade Field Interface Units REQUESTED BOARD ACTION: (1) Waive bidding procedures as outlined in the Purchasing Policy for standardized equipment requiring compatibility with existing equipment and to be purchased from the existing supplier; and 2) Authorize purchase of units from Global Data Specialists Inc., in the amount of $34,691.25 plus shipping. DISCUSSION: This request is to replace two existing Field Interface Units (FIU) that use the MOSCAD platform with units that use the ACE3600 platform. The MOSCAD units are no longer being sold and have been replaced by the ACE3600. The existing units have been in service since 1994. This order includes the programming and software that is required for the ACE3600. The FIUs process the data from the Field SCADA units (radio) and send it to the desktop computers for the operators to use (alarms, tank levels, pump status, etc.). ACE3600 is a Motorola product purchased under sole source standardized equipment purchase policy. SCHEDULE: COSTS: $34,691.25 plus shipping ACCOUNT NO: 1003 -8007 BUDGETED AMOUNT REMAINING: $30,000. ATTACHMENTS: Global Data Specialists quote. CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES O CHIEF FINANCIAL OFFICER: YES NO -9- GLEBAL DATA SPECIAL 1 8 T S 1815 W. First Ave., Suite 110, Mesa, AZ 85202 Phone: 480461 -3401 FAX: 480461 -3411 QUOTE: MDM03537A July 17, 2009 by Duane Moody 480 - 461 -3401, Ext. 223, duane(@ gbl- data.com Expires 15- Oct -09 Quoted To: John Boyson Phone: 261 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Phone: 530 - 544 -6474 FAX: 530 - 544 -6359 Description Please find attached the quotation for the ACE3600 RTU equipment as per your request. Please note the following: a. This quotation is equipment only and does not include any programming or integration/start-up services. b. As an option, we have included in the Optional Materials section of the quote an interface kit that GDSI created with mounting on a panel for wall mount or installation within a separate housing (delete housing cost from Materials section). This kit was created for the following issues. 1. The maximum wiring guage for the terminals on the ACE36001/0 modules is 18 ga. 2. The relays in the DO and Mixed 1/0 modules do not have a high capacity compared to the MOSCAD RTU's. As a result, interpose relays may need to be required. The interface kit includes 7 -1OA relays to provide higher capacity relays than those included with the ACE 1/0 modules. 3. The terminals provided with the interface kit allow for easier installation and up to 12ga wiring. If you have any questions or need additional information please let me know. Best Regards, Duane Moody Sales Manager —11— Pagel of3 MATERIALS QTY Part No Description Unit Price Extended 0001 F7563 ACE3600 WITH CDM750136 -174 MHZ ........................... $ 430.00 0001 V118 ADD: 4 AO MODULE .................................................................. ..............................$ 1,800.00 ........................$ 1,800.00 0001 V103 ADD: 31 /O SLOTS FRAME ........................... $ 495.00 0001 V261 ADD: AC PS 85 -264 V WITH BATTERY CHARGER ....................................................................... ..............................$ 70.00 ............................. $ 70.00 0001 V228 ADD: 5OX50 CM PAINTED METAL HOUSING 310.00 ........................... $ 310.00 0001 V114 ..................................................................... ..............................$ 300.00 ........................... $ 300.00 Includes a metal chassis and fits either the 6.5 Ah or the l OAh battery. It does not include a padlock. 0001 V245 ADD: 16DI 4DO EE 4AI + / -20MA Extended 0001 GD6152 Panel, 29" x 21 ", with ACE3600 and Interface Kit Mounted. No Housing. ..................................................................... ..............................$ 430.00 ........................... $ 430.00 0001 V118 ADD: 4 AO MODULE GD3572 -Mixed Mixed 1/0 Interface Kit ..................................................................... ..............................$ 495.00 ........................... $ 495.00 0001 V261 ADD: AC PS 85 -264 V WITH BATTERY CHARGER ..................................................................... ..............................$ 225.00 ........................... $ 225.00 ..................................................................... ..............................$ 310.00 ........................... $ 310.00 0001 V114 ADD: 6.5 AH BACKUP BATTERY ............................................ ............................... ........................$100.00 ........................... $ 100.00 0001 V446 ADD: ACE CPU3640 ..................................................................... ..............................$ 100.00 ........................... $ 100.00 0001 V184 ADD: PLUG -IN RS -232 PORT ..................................................................... ..............................$ 100.00 ........................... $ 100.00 0001 FPN1653 ASSEMBLY,POWER SUPPLY,24V PS PLUG IN KIT ....................................................................... ..............................$ 75.00 ............................. $ 75.00 Provides floating 24V to the module TB. Fits DI, Al, Mixed UO and Mixed AI/A0 modules. The 32 DI module can hold up to two PS, all other modules just one PS. 0001 GD7336 Federal Express Ground ....................................................................... ..............................$ 40.00 ............................. $ 40.00 Materials Sub -Total $ 3,820.00 TOTALS Materials $ 3,820.00 TOTAL $ 3,820.00 OPTIONAL MATERIALS (Not Included in Quote Totals QTY Part No Description Unit Price Extended 0001 GD6152 Panel, 29" x 21 ", with ACE3600 and Interface Kit Mounted. No Housing. ..................................................................... ..............................$ 250.00 ........................... $ 250.00 0001 GD3572 -Mixed Mixed 1/0 Interface Kit ..................................................................... ..............................$ 335.00 ........................... $ 335.00 0001 GD3572 -4AO 4 AO Interface Kit ..................................................................... ..............................$ 225.00 ........................... $ 225.00 -12- Page 2 of 3 Payment: .......... 100% Upon Receipt of Invoice, Net 30 Days. I% discount if payment is received Net 15. We also accept Visa, Master Card, and American Express. Delivery:........... TBD Upon Order Placement Validity: ............ Quotation is valid for 90 days. The above quotation is based upon the information provided at the time of quotation. Global Data Specialists is not responsible for any information that is missing or incorrect. Any new information that is received after the quotation has been submitted may result in a revised quotation being issued to cover the costs of additional equipment or services as identified. Shipment:......... Global Data Specialists, Mesa, AZ. Warranty:......... The Motorola equipment is warranted for 1 year upon shipment for parts and labor. Non - Motorola equipment warranties are vendor specific and will apply. No additional warranties are expressed or implied. Cancellation:.... 10% Penalty prior to 30 days of shipment, 25% Penalty less than 30 days prior to shipment. Note: ................ Please reference quotation number on all correspondence. -13- Page 3 of 3 GLOBAL DATA S P E C I A L I S T S 1815 W. First Ave., Suite 110, Mesa, AZ 85202 Phone: 480 -461 -3401 FAX: 480461 -3411 QUOTE: MDM03536A July 17, 2009 by Duane Moody 480 - 461 -3401, Ext. 223, duane -gbl- data.com Expires 15- Oct -09 Quoted To: John Boyson Phone: 261 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Phone: 530 - 544 -6474 FAX: 530 - 544 -6359 Description Global Data Specialists is pleased to provide you with the following quotation for the 2 new ACE3600 FIU's as per your request. This includes the necessary hardware and Engineering Servcies for the programming and on -site integration/start- up of the FIU's. If you have any questions or need additional information please let me know. Best Regards, Duane Moody Sales Manager —14— Page 1 of ENGINEERING SERVICES Configuration, FIU Application Software The System Engineer will configure the FIU application according to the system requirements. Integration, On -site at Customer Location Test communications between FIU and RTUs Test and Debug as needed Obtain signoff and acceptance Engineering Services Sub -Total $ 8,923.00 MATERIALS QTY Part No Description Unit Price Extended 0002 F7563 ACE3600 WITH CDM750 136 -174 MHZ ......................... ..............................$ 1,800.00 ........................$ 3,600.00 The model default includes CDM750 136 -174 MHz radio, radio installation kit, PS 12V DC, CPU3610 ,basic frame (no I/O slots) and plug -in radio port for CPU. Must be ordered with Metal chassis or housing option. CDM750 is only shipped to North America at this time 0002 V276 ADD: 40X40 CM PAINTED METAL HOUSING ..................................................................... ..............................$ 220.00 ........................... $ 440.00 0002 V261 ADD: AC PS 85 -264 V WITH BATTERY CHARGER ..................................................................... ..............................$ 310.OU ........................... $ 620.00 0002 V114 ADD: 6.5 AH BACKUP BATTERY ..................................................................... ..............................$ 100.00 ........................... $ 200.00 0002 V446 ADD: ACE CPU3640 ..................................................................... ..............................$ 100.00 ........................... $ 200.00 0002 V184 0002 V377 0001 GD5677 -ACE 0001 GD7336 ADD: PLUG -IN RS -232 PORT ..................................................................... ..............................$ 100.00 ............ ADD: 3 RD PARTY PROTOCOL LICENSE ..................................................................... ..............................$ 100.00 ............ ACE3600 RTU /FIU Application Program .................................................................. ..............................$ 2,600.00 ............ Federal Express Ground ....................................................................... ..............................$ 80.00 ............ ............... $ 200.00 ............... $ 200.00 ............ $ 2,600.00 ................. $ 80.00 Materials Sub -Total $ 8,140.00 TOTALS Engineering Services Materials $ 8,923.00 $ 8,140.00 TOTAL $ 17,063.00 -15- Page 2 of 3 TERMS Payment: .......... 100% Upon Receipt of Invoice, Net 30 Days. 1 % discount if payment is received Net 15. We also accept Visa, Master Card, and American Express. Delivery:........... TBD Upon Order Placement Validity: ............ Quotation is valid for 90 days. The above quotation is based upon the information provided at the time of quotation. Global Data Specialists is not responsible for any information that is missing or incorrect. Any new information that is received after the quotation has been submitted may result in a revised quotation being issued to cover the costs of additional equipment or services as identified. Shipment:......... Global Data Specialists, Mesa, AZ. Warranty:......... The Motorola equipment is warranted for 1 year upon shipment for parts and labor. Non - Motorola equipment warranties are vendor specific and will apply. No additional warranties are expressed or implied. Cancellation:.... 10% Penalty prior to 30 days of shipment, 25% Penalty less than 30 days prior to shipment. Note: ................ Please reference quotation number on all correspondence. -16- Page 3 of i- 1 w o w � i BOARD AGENDA ITEM 4c TO: Board of Directors FROM: Hal Bird, Land Application Manager MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: Cattle Grazing Permit 2010 — Diamond Valley Ranch REQUESTED BOARD ACTION: Award contract to the highest responsive, responsible bidder, Urrutia Ranch, in the monthly amount of $13,280. DISCUSSION: The Invitation for Proposals was advertised and mailed to nine addresses. Proposals were opened on October 27, 2009 with only one rancher responding. Urrutia Ranch proposes the same amount that they paid last year. SCHEDULE: May 1, 2010 — September 30, 2010 REVENUE: $66,400 ACCOUNT NO: 1000 -3514 BUDGETED AMOUNT REMAINING: $72,440 ATTACHMENTS: Grazing Permit CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES - 17 - NO CATEGORY: Sewer Gen" M01 fthem H. 5d" 5o Aft veta" J~ R. ,Jones MDOWNW M"' rumic- Util ity District . a.&- i- 1 w o w � i BOARD AGENDA ITEM 4c TO: Board of Directors FROM: Hal Bird, Land Application Manager MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: Cattle Grazing Permit 2010 — Diamond Valley Ranch REQUESTED BOARD ACTION: Award contract to the highest responsive, responsible bidder, Urrutia Ranch, in the monthly amount of $13,280. DISCUSSION: The Invitation for Proposals was advertised and mailed to nine addresses. Proposals were opened on October 27, 2009 with only one rancher responding. Urrutia Ranch proposes the same amount that they paid last year. SCHEDULE: May 1, 2010 — September 30, 2010 REVENUE: $66,400 ACCOUNT NO: 1000 -3514 BUDGETED AMOUNT REMAINING: $72,440 ATTACHMENTS: Grazing Permit CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES - 17 - NO CATEGORY: Sewer 50UTH TAHOE PUBLIC UTILITY P15TRICT GRAZING PERMIT This Grazing Permit (Permit) is made and entered into on November 5. 2009 by and between the South Tahoe Public Utility District (District), a California public agency formed in 1950 pursuant to the Public Utility District Act, and Urrutia Ranch (Permittee), at South Lake Tahoe, California, with reference to the following facts and intentions: A. The District is the owner of certain real property and improvements located in Alpine County, California, generally described as assessor parcel numbers 01- 080 -56, 01 -080 -60, 01 -080 -80, 01 -080 -81, 01 -080 -82, 01- 200 -01, 01- 200 -10, and 01- 200 -11 and- more particularly described in the map attached as Exhibit A, which is incorporated by this reference (collectively Property); B. Permittee is in the business of raising cattle and requires the use of pasture land to graze cattle during certain portions of the year; C. A certain portion of the Property consists of pasture land that is irrigated with water from the West Fork of the Carson River; and D. Permittee desires to receive from the District and the District agrees to provide Permittee, the right to graze cattle on a portion of the Property pursuant to the terms and conditions of this Permit. NOW, THEREFORE, the parties agree as follows: 1. Grazina Riaht. District grants Permittee the right to graze cattle on that portion of the Property depicted on the attached Exhibit A (Permitted Grazing Area). Other than as expressly provided in this Permit, Permittee shall not have any other rights with respect to the Property and improvements located on the Property. 2. Term. The term of this Permit shall commence on May 1. 2010 (Commencement Date) and end on October 1. 2010 (Termination Date), unless adjusted pursuant to the provisions of this Permit. 3. Possession. District shall be deemed to have delivered possession of the Permitted Grazing Area to Permittee and Permittee shall be deemed to have taken possession of the Permitted Grazing Area as of the Commencement Date subject to the terms and conditions of this Permit. 4. Permit Fee. Permittee agrees to pay the District the sum of $ 13.280.00 per month during the Term (Permit Fee). Permittee shall pay the Permit Fee to District monthly on or before the fifth (5 day of each and every month during the Term. If Permittee does not make any payment of the Permit Fee within ten (10) days when due then Permittee shall pay to the District, in addition to such payment, a late charge equal to ten (10) percent of such late payment. Permittee shall pay, in a timely manner, all sums of money or charges required to be paid by Permittee under this Permit. If such an amount or charge is not paid at the time provided in this Permit, it shall never the less be collectible with the next installment of the Permit Fee or any other charge thereafter falling due. However, nothing contained in this Permit shall be deemed to suspend or delay the payment of any amount of money or charge at the time the same becomes due and payable, or to limit any remedy of the District. 5. Use of Permitted Grazina Ar 5.1 Use. The Permitted Grazing Area shall be used for grazing cattle and for no other use without the express written consent of the District. The District expressly disclaims any representation or warranty or any liability or damage as to quality or quantity of grass growing on the Permitted Grazing Area at anytime during the Term. Permittee covenants and agrees to conduct its operations, as allowed by this Permit, in a good and ranching -like manner according to the industry practices for cattle ranching operations. Permittee shall be responsible for keeping its cattle within the Permitted Grazing Area and shall promptly return any cattle that leave the Permitted Grazing Area. The SB 336572 v4:007627.0065 _19- maximum number of cattle that Permittee is entitled to locate on the Permitted Grazing Area is the number of cattle necessary to graze the grass in the Permitted Grazing Area to a height less than ten (10) inches but no less than two (2) inches. The District reserves the right to require Permittee to move or remove the cattle within /from the Permitted Grazing Area due to overgrazing or if the cattle otherwise cause harm to the Permitted Grazing Area, as determined in the District's sole discretion. Cattle shall only be moved on county roads in accordance with the permission of the county and in compliance with applicable laws. The gates located on the paved access road to Harvey Place Reservoir shall be operated by the District. Permittee shall not operate the gates without the Districts prior written consent. Permittee shall not allow other animals, including horses, on the Permitted Grazing Area without the prior written consent of the District, (which may be separately negotiated with the District). Permittee shall remove any dead cattle from the Property within 72 hours. 5.2 Other Facilities. Permittee shall be entitled to use the cattle pens and chutes for loading and unloading cattle. Vaccination of cattle is an allowed procedure provided Permittee complies With all federal, state and local laws and regulations in performing vaccinations including, but not limited to, disposal of vaccination supplies. Permittee shall notify District of its desire to use such facilities and receive District's prior written consent. District and Permittee shall agree upon the schedule and other requirements related to the use of such facilities. The District reserves the right to allow other persons to use the cattle pens and chutes periodically, which use shall be coordinated with Permittee operations. 5.3 Compliance of Law. Permittee shall, at Permittee's sole cost and expense, comply with all applicable local, state and federal statutes, ordinances, rules, regulations, orders and requirements in effect that relate to the use of the Permitted Grazing Area by Permittee. Permittee shall not use or allow the use of the Permitted Grazing Area in any manner that would tend to create waste or a nuisance or which would tend to disturb the District's use of the Property. 5.4 District Operations. Permittee acknowledges that this Permit only entities Permittee to use a Permitted Grazing Area, which Is only a portion of the Property. Permittee further acknowledges and understands that the District will be utilizing other portions of the Property for its recycled water operations. The District shall also have the right to use portions of the Permitted Grazing Area for recycled water operations, which includes the right to construct improvements and /or make modifications to the Permitted Grazing Area, provided such uses do not unreasonably interfere with Permittee's use of the Permitted Grazing Area. Permittee may be required to move cattle from one portion of the Permitted Grazing Area to another portion of the Permitted Grazing Area while the District performs work in the Permitted Grazing Area. In 2010, the District will be fencing off a 250' X 300' section of ther Grazing Area for a pipeline installation. The Permittee will not have use of that section throughout the term of the Permit. 5.5 Other Restrictions. Permittee shall not be allowed to use the house nor shall Permittee store any equipment, trucks or trailers on the Permitted Grazing Area without the prior written consent of the District. Permittee shall not use or allow firearms, drugs or alcohol on the Property or Permitted Grazing Area at any time, the violation of which shall entitle the District to immediately terminate this Permit without any prior written notice. 6. Maintenance and Operation /Surrender. 6.1 Condition of Permitted Grazing Area. Permittee accepts the Permitted Grazing Area in its present condition, and Permittee agrees that it will, at all times during the Term, keep all improvements located within the Permitted Grazing Area, including, but not limited to, fences and gates, except as otherwise provided in this Permit, in good condition and repair, reasonable use, wear and damage by fire, act of God, or the elements excepted, at its own expense, and without any expense whatsoever to the District. Permittee further agrees, on the last day of the Term or earlier termination of this Permit, to surrender the Permitted Grazing Area in the same condition as when received, reasonable use, wear and damage by fire, act of God or the elements excepted, and to remove all of Permittee's personal property from the Permitted Grazing Area. 6.2 Fertilizers and Chemicals. Permittee shall not apply any fertilizers, herbicides,, insecticides or other chemicals on the Permitted Grazing Area without the District's prior written consent. The application of such fertilizers, herbicides, insecticides, sprays and chemicals, if consented to by the 2 SB 336572 v4.W7627.0065 -20- District, shall be applied in accordance with applicable federal, state and local laws, statutes, ordinances and regulations. 6.3 Toxic or Hazardous Materials. Permittee shall not cause or permit any hazardous or toxic materials to be brought upon, kept or used in or about the Permitted Grazing Area by Permittee, its agents, employees, invitees or authorized representatives, without the prior written consent of the District, which consent shall not be unreasonably withheld, so long as Permittee demonstrates to the District's reasonable satisfaction that such toxic materials, and the quantities thereof, are necessary or useful to Permittee's operations and use of the Permitted Grazing Area and such materials will be used, kept and stored in a manner that complies with all toxic substance laws. Permittee shall, at its sole cost, comply with all federal, state and local laws, statutes, ordinances, codes, regulations and orders relating to receiving, handling, use, storage, accumulation, transportation, generation, spillage, migration, discharge, release and disposal of any toxic or hazardous materials. 6.4 Irrigation. The water for irrigation of the Permitted Grazing Area is obtained by the District from the West Fork of the Carson River and transported from a diversion structure through ditches to the Permitted Grazing Area. District shall use reasonable efforts to keep and maintain the irrigation facilities in good condition and repair in order to irrigate the Permitted Grazing Area. The District shall be responsible for irrigating the Permitted Grazing Area but, notwithstanding the above, does not guarantee that any specific quantity of water will be available for application on the Permitted Grazing Area or for use by Permittee's cattle. The District shall use reasonable efforts to irrigate the Permitted Grazing Area as long as irrigation water from the Carson River is available to be diverted by the District. Permittee expressly acknowledges that the quantity of water available for irrigation of the Permitted Grazing Area varies from year to year and month to month, that the failure of the diversion structures and /or irrigation facilities may make delivery of irrigation water impossible or impractical for certain periods of time and that the grasses growing on the Permitted Grazing Area may be affected by these circumstances. The District expressly disclaims to Permittee any liability or damage for any shortage of irrigation water used to irrigate the Permitted Grazing Area and the quality or quantity of the water supplied to the Permitted Grazing Area. 7. Riaht of Entry, The District and its authorized representatives may enter the Permitted Grazing Area at any time for the purpose of inspecting the Permitted Grazing Area and Permittee's use of and operations on the Permitted Grazing Area. Permittee covenants and agrees that the District may enter the Permitted Grazing Area at any time to make any necessary repairs to the Permitted Grazing Area and perform any work desired by the District that does not unreasonably interfere with Permittee's use of the Permitted Grazing Area or that the District may deem necessary to prevent waste or deterioration in connection with Permittee's use of the Permitted Grazing Area. 8. Alterations and Improvements. Permittee shall not make any alterations or Improvements to the Permitted Grazing Area without the prior written consent of the District. Any alterations or improvements to the Permitted Grazing Area shall be done in a good and workmanlike manner and diligently prosecuted until completion. upon termination of this Permit, such alterations and improvements shall be considered Improvements to the Permitted Grazing Area and shall not be removed by Permittee, and will become part of the Properly unless the District requests Permittee to remove all or any portion of such improvements, in which case the Permittee shall restore the Property to its former condition, at Permittee's sole cost and expense. Permittee shall pay all costs and expenses of any such alterations or improvements on the Permitted Grazing Area. Permittee will keep the Property free and clear of all mechanics' liens and other liens on account of such work done for Permittee. 9. Taxes. 9.1 District. District shall pay all real property taxes including, but not limited to, special and general assessments, licensing fees, commercial rental taxes, improvement bonds and any other tax, levy and bond that is based upon District's ownership interest in the Property. 9.2 Permittee. Permittee shall pay before delinquency all taxes, assessments, license fees and public charges levied, assessed or imposed upon its business operations, as well as its trade fixtures and other personal property in, on or upon the Permitted Grazing Area. 3 SB336572 v4. -21- 10. Indemnity and Liability. 10.1 To the fullest extent permitted by law, Permittee shall defend, indemnify and hold harmless the District, its elected officials, officers, employees, agents and contractors, from and against any and all claims, damages, losses, liabilities and expenses, including attorneys' fees, paralegal and legal fees and costs, which arise out of, relate to or result from, Permittee's use of the Permitted Grazing Area or from this Permit. In the event any action or proceeding is brought against the District, Permittee, upon notice from the District, shall defend the same at Permittee's sole cost and expense by legal counsel approved by the District. Permittee, as a material part of the consideration to the District, assumes all risk of damage to the Permitted Grazing Area or injury to persons in, upon or about the Permitted Grazing Area from any cause whatsoever except that which is caused by the failure of the District to observe any of the terms and conditions of this Permit and such failure has persisted for an unreasonable period of time ,after written notice of such failure, and Permittee waives all of its claims with respect thereof against the District. 10.2 Exemption From Liability. The District shall not be liable for injury to Permittee's business or any loss of income or for damage to the property of Permittee, Permittee's employees, invitees, customers or any other person in or about the Permitted Grazing Area, nor shall the District be liable for injury to the person of Permittee, Permittee's employees, agents or contractors, whether such damage or injury is caused by or results from tire, explosion, electricity, gas, water, rain, or from any other cause, whether such damage or Injury results from conditions arising upon the Permitted Grazing Area or the Property, or from other sources or places, and regardless of whether the cause of such damage or injury or the means of repairing the same is inaccessible. 11. Insurance. 11.1 Commercial General Liability Insurance. The Permittee shalt, at its sole cost and expense, maintain in effect at all times during the Term, commercial general liability insurance which shall include, but shall not be limited to, protection against claims arising from death, bodily or personal Injury or damage to property resulting from actions, failures to act, operations or equipment of the insured, or by its employees, agents, consultants or by anyone directly or indirectly employed by the insured. The amount of insurance should not be less than Two Million Dollars ($2,000,000) combined single limit per occurrence coverage applying to bodily and personal injury and property damage. The commercial general liability insurance coverage shall also include the following provisions and /or endorsements. a. Cross liability and severability of interest. b. The Insurer shall waive and all transfer rights of recovery (subrogation) it may have against the name and /or additional insureds for claims and /or losses. 11.2 Business Automobile Liability Insurance. The Permittee shall, at its sole cost and expense, maintain in effect at all times during the Term, business automobile liability insurance which shall include, but shall not be limited to, protection against claims arising from death, bodily or personat injury, or damage to property resulting from actions, failures to act, operations or equipment of the insured, or by its employees, agents, consultants, or by anyone directly or indirectly employed by the insured. The amount of insurance should not be less than Two Million Dollars ($2,000,000) combined single limit per accident coverage applying to bodily and personal injury and property damage. Coverage shall Insure all owned, nonowned and hired automobiles. 11.3 Endorsements. The insurance coverages required by this Permit shall include the following provisions and endorsements: a. The South Tahoe Public Utility District and its elected officials, officers and employees will be a named or an additional insured in regard to liability. b. Written notice shall be given to the District at least thirty (30) days prior to termination, suspension, voiding, cancellation or reduction of coverage in the policy, except that if cancellation is for nonpayment of premiums, written notice shall be given to the District at least ten (10) calendar days prior to cancellation. 4 SB 336572 v4:007627.0065 -22- C. The insurance shall be primary as with respect to the interest of the named and /or additional insureds, any other insurance maintained by the named and /or additional insureds is excess and not contributing insurance. d. The insurance, subject to all of its other terms and conditions, applies to the liability assumed by the Permittee under this Permit. 11.4 General Insurance Requirements. The Permittee shall not be entitled to occupy the Permitted Grazing Area until all required insurance has been obtained, required submittals delivered to the District and the submittals reviewed and approved by the District for general conformance with this Permit. The procurement and maintenance of the insurance required by this section is a material element of this Permit and failure to timely procure and /or maintain such insurance shall be a material breach of this Permit. The Permittee shall deliver the following to the District: a. A copy of each insurance policy that provides insurance required by this section (and additional copies as requested by the District in writing). Each policy copy shall be certified by placing a statement on the policy(ies) stating that "this copy of the policy is certified to be true, correct and complete" and signed by an authorized representative of the Insurer. The copy of each policy shall include each and every cover page, declaration page, form, schedule, endorsement, etc. that is a part of the policy; b. Certificate(s) of Insurance, issued in duplicate, covering all policies. Such certificates shall make explicit reference to each of the provisions and endorsements required in this section, and shall be signed on behalf of the insurer by an authorized representative; C. Original endorsements for each policy of insurance required by this section and signed on behalf of the insurer by an authorized representative. d. All insurance required by this section shall be placed with insurance companies authorized to transact business in the State of California for the types or insurance required by the Contract. Each insurance company shall have a current A. M. Best Insurance Guide rating of not less than A -NI I unless prior written approval Is secured from the District as to the use of such insurer. e. The requirements as to the types, limits, deductibles and the District's review and /or approval of insurance coverages to be maintained by the Permittee are not Intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by the Permittee under this Permit. Further, the District's review and approval of any section, unless specifically stated in writing and signed by the District, shall not release or relieve the Permittee or its subcontractors from complying with the requirements of this section. f. Any policy of insurance required by this section shall be an "occurrence" policy. g. In the event the Permittee changes any Insurance company(ies) providing the insurance coverage required by this section, the Permittee shall timely resubmit to the District for review and approval, the insurance documents required by this section for each new insurance company providing insurance coverage. The Permittee shall submit such documents at least thirty (30) days prior to the change in any required insurance to enable the District to timely review and approve the insurance coverages provided by such new insurance company(ies). h. Insurance policies providing coverage which contains self- insured retention shall not be acceptable except with the prior written approval of the District regardless of the amount of the self- insured retention. 12. Default. 12.1 Definition of Default. The occurrence of one or more of the following events shall constitute a material default and breach of this Permit by Permittee: a. Permit Fee Default. Failure by Permittee to make, as and when due, any payment of Permit Fee payable by Permittee where such failure has continued for a period of ten (10) SB 336572 v4:007627.0065 -23- days after written notice from the District to Permittee; provided, however, that any such notice shall be in lieu of, and not in addition to, any notice required under section 1161 of the Code of Civil Procedure of California. b. Abandonment. The abandonment or vacation of the Permitted Grazing Area by Permittee. Abandonment is defined to include, without limitation, any absence of Permittee from the Permitted Grazing Area for five (5) days or longer while in default of any provision of this Permit. Notwithstanding anything to the contrary, so long as Permittee is current with payment of all Permit Fees and other monetary obligations, there can be no abandonment. C. Breach of Contract. Failure by Permittee to observe or perform any of the express or implied nonmonetary covenants, promises, agreements or provisions of this Permit to be observed or performed, where such failure has continued for a period of thirty (30) days after written notice from the District to Permittee specifying the particulars of such failure; provided, however, that such notice shall be in lieu of and not in addition to any notice required under section 1161 of the Code of Civil Procedure. d. Bankruptcy and Insolvency. The making by Permittee of any general assignment or general arrangement for the benefit of creditors; the filing by or against Permittee of a petition to have Permittee judged bankrupt or a petition for reorganization or arrangements under any law relating to bankruptcy (unless, in the case of a petition filed against Permittee, the same is dismissed within sixty (60) days); the appointment of a trustee or receiver to take possession of substantially all of Permittee's assets located on the Permitted Grazing Area, or of Permittee's interest in this Permit, where possession is not restored to Permittee within thirty (30) days; or the attachment, execution or other judicial procedure substantially all of Permittee's assets located on the Permitted Grazing Area or of Permittee's interest in this Permit, where such procedure is not discharged within thirty (30) days. 12.2 Remedies Upon Default. If Permittee breaches this Permit, the District shall have an immediate right of reentry, with or without notice, and the right to take possession of all animals and personal property. The District, at its election, shall become the owner of aU animals of which it has so take possession and, except where it elects , to proceed under the following paragraph, will be obligated to compensate Permittee for them. If the District elects to reenter as provided above, or to take possession under legal proceedings or under any notice provided by law: (a) District may terminate this Permit; (b) District may from time to time, without terminating this Permit, re -Issue the entire or any part of the Permitted Grazing Area for such terms (which may extend beyond the Term of this Permit), and at such permit fee and other conditions as the District in its sole discretion deems advisable. On each re- permitting, Permittee shall be immediately liable to pay the District the expenses of re- permitting and any making or alterations or repairs incurred by the District and all other indebtedness, except Permit Fee due under the Permit; (c) the District, or its agents or assigns, or receiver appointed at its instance may: (i) perform any of these duties under this Permit and such things as maintaining the Permitted Grazing Area and growing and managing the cattle located on the Permitted Grazing Area; (ii) charge the proceeds of the cattle with all reasonable costs of maintenance and husbandry; and (111) divide the remainder of the proceeds with the Permittee in the same proportion as the cattle would have been divided between the District and Permittee if Permittee had faithfully performed under this Permit. If the cost exceeds the proceeds from the cattle, Permittee shall be responsible for payment of any such deficiency; or (iv) District may exercise all other rights that are available to it under any federal, state or local law, statute, or regulation if Permittee breaches or defaults any of its obligations under this Permit. 13. Holdina Over. If the permitee has not vacated the premises at the end of the term, the permittee will accrue charges in the amount of $2500 per day beginning on the fifth day after the end of the contract term. All other terms and conditions remain the same as specified in this Permit. 14. Damaae or Destruction, In the event the Permitted Grazing Area is damaged by fire, flood or other perils through no fault of Permittee, the Permit Fee shall be abated in proportion to the area of the Permitted Grazing Area that Permittee can no longer utilize as contemplated under this Permit, unless caused in whole or part by Permittee, in which event the Permit fee shall not be abated. If more than fifty (50) percent of the Permitted Grazing Area is damaged or destroyed such that Permittee may no longer use it for its intended purposes, Permittee may elect to terminate this Permit, unless caused in whole or part by Permittee, in which event Permittee shall not have the right to terminate this Permit. 6 SB 336572 v4:007627.0065 -24- Other than as provided above in this paragraph, Permittee shall not be entitled to any compensation or damages from the District for loss of use of all or any portion of the Permitted Grazing Area regardless of the cause. 15. General Provisions. 15.1 Recitals. The recitals stated at the beginning of this Permit of any matters or facts shall be conclusive proof of the truthfulness thereof and the terms and conditions of the recitals, if any, shall be deemed a part of this Permit. 15.2 Notices. All notices, approvals, acceptances, requests, demands and other communications required or permitted, to be effective, shall be in writing and shall be delivered, either in person or by mailing the same by United States mail (postage prepaid, registered or certified, return receipt requested) or by Federal Express or other similar overnight delivery service, to the party to whom the notice is directed at the address of such party as follows: To: District South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Attn: General Manager With a copy to: Brad Herrema, Esq. /Gary Kvistad, Esq. Brownstein Hyatt Farber Schreck 21 East Carrillo Street Santa Barbara, CA 93101 To: Permittee Mike Urrutia PO Box 226 Friant, CA 93626 With a copy to: N/A Any communication given by mail shall be deemed delivered two (2) business days after such mailing date, and any written communication given by overnight delivery service shall be deemed delivered one (1) business day after the dispatch date. Either party may change its address by giving the other party written notice of its new address. 15.3 Successors and Assigns. This Permit shall be binding on and shall inure to the benefit of the parties and their respective heirs, successors and assigns. Nothing in this Permit, express or implied, is intended to confer on any person other than the parties or their respective heirs, successors and assigns, any rights, remedies, obligations or liabilities under or by reason of this Permit. 15.4 Assignability. Permittee shall not assign this Permit, or any rights to it, and shall not sublet the entire or any part of the Permitted Grazing Area or any right or privilege appurtenant to the Permitted Grazing Area or permit or transfer interest therein without first obtaining the written consent of the District, which may be withheld by the District in its sole and absolute discretion. Any assignment or subletting without the District's consent shall be void and shall, at the District's option, terminate this permit. No interest of Permittee in this Permit shall be assignable by operation law without the District's prior written consent. 15.5 Waiver. No waiver by any party of any of the provisions shall be effective unless explicitly stated in writing and executed by the party so waiving. Except as provided in the preceding sentence, no action taken pursuant to this Permit, including, without limitation, any investigation by or on behalf of any party, shall be deemed to constitute a waiver by the party taking such action of compliance with any representations, warranties, covenants, or agreements contained in this Permit, and in any documents delivered or to be delivered pursuant to this Permit. The waiver by any party of a breach of any provision of this Permit shall not operate or be construed as a waiver of any subsequent breach. No 7 SB 336372 v4:007627.0065 -25- waiver of any of the provisions of this Permit shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any waiver constitute a continuing waiver. 15.6 Severability. If any term, provision, covenant or condition of this Permit shall be or become illegal, null, void or against public policy, or shall be held by any court of competent jurisdiction to be illegal, null, void or against policy, the remaining provisions of this Permit shall remain in full force and effect, and shall not be affected, impaired or invalidated. The term, provision, covenant or condition that is so invalidated, voided or held to be unenforceable, shall be modified or changed by the parties to the extent possible to carry out the intentions and directives set forth in this Permit. 15.7 Counterparts. This Permit may be executed in any number of counterparts, each of which shall be deemed to be an original, but_ all of which shall constitute one and the same Instrument. 15.8 Governing Law. This Permit shall be governed by, and interpreted in accordance with, the laws of the State of California to the extent California Law is applicable to the United States, with venue proper only in the County of El Dorado, State of California. 15.9 Attorney Fees. If any legal proceeding (lawsuit, arbitration, etc.), including an action for declaratory relief, is brought to enforce or interpret the provisions of this Permit, the prevailing party shall be entitled to recover actual attorneys' fees and costs, which may be determined by the court in the same action or in a separate action brought for that purpose. The attorneys' fees award shall be made as to fully reimburse for all attorneys' fees, paralegal fees, costs and expenses actually incurred in good faith, regardless of the size of the judgment, it being the intention of the parties to fully compensate for all attorneys' fees, paralegal fees, costs and expenses paid or incurred in good faith. 15.10 Good Faith. The parties agree to exercise their best efforts and utmost good faith to effectuate all the terms and conditions of this Permit and to execute such further Instruments and documents as are necessary or appropriate to effectuate all of the terms and conditions of this Permit. 15.11 Construction. The provisions of this Permit should be liberally construed to effectuate its purposes. The language of all parts of this Permit shall be construed simply according to its plain meaning and shall not be construed for or against either party, as each party had the opportunity to have their counsel review it. Whenever the context and construction so requires, all words used in the singular shall be deemed to be used in the plural, all masculine shall include the feminine and neuter, and vice versa. 15.12 Several Obligations. Except where specifically stated in this Permit to be otherwise, the duties, obligations, and liabilities of the parties are intended to be several and not joint or collective. Nothing contained in this Permit shall be construed to create an association, trust, partnership, or joint venture or impose a trust or partnership duty, obligation, or liability on or with regard to either party. Each party shall be individually and severally liable for its own obligations under this Permit. 15.13 Authority. The individuals executing this Permit represent and warrant that they have the authority to enter into this Permit and to perform all acts required by this Permit, and that the consent, approval or execution of or by any third party is not required to legally bind either party to the terms and conditions of this Permit. 15.14 Entire Permit. This Permit contains the entire understanding and Permit of the parties, and supersedes all prior agreements and understandings, oral and written, between the parties. There have been no binding promises, representations, agreements, warranties or undertakings by any of the parties, either oral or written, of any character or nature, except as stated in this Permit. This Permit may be altered, amended or modified only by an instrument in writing, executed by the parties to this Permit and by no other means. Each party waives its future right to claim, contest or assert that this Permit was modified, canceled, superseded or changed by any oral Permit, course of conduct, waiver or estoppel. 8 SB 336572 x4:007627.0065 -26- IN WITNESS WHEREOF, the parties have executed this Permit on the day and year and at the place first written above. DISTRICT South Tahoe Public Utility District By: Marylou Mosbacher, Board President PERMITTEE Urrutia Ranch By: Mike Urrutia, owner ATTEST: By: Kathy Sharp, Clerk of the Board/ Executive Services Manager 4 _ SB 336572 v4:007627.0065 Z G"rtl K*ww Kfdwrd H. 5o*4 mwtmv out F umicUtility Dietrict �,u�� cJ NwIV IWV BOARD AGENDA ITEM 4d TO: Board of Directors FROM: Hal Bird, Land Application Manager MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: Nutrient Management Plan — Alpine County REQUESTED BOARD ACTION: Approve addendum to existing Task Order No. 1 to Wood Rodgers Inc. for additional consulting services, in the amount of $3,685.20. DISCUSSION: The purpose of this addendum is to increase the budget to include additional consulting services associated with review and interpretation of data to determine infiltration rates, review geotech reports, provide recommendations and guidance regarding irrigation fields and infiltration /permeability of insitu - soils, and edit the final Nutrient Management Plan SCHEDULE: Complete October 2009 COSTS: $3,685.20 ACCOUNT NO: 1028 -8993 DVRNUT BUDGETED AMOUNT REMAINING: $134,143 ATTACHMENTS: Task Order Addendum CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES ! NO CHIEF FINANCIAL OFFICER: YES NO -29- WOOD RODGERS, INC. CONS LIT [NO SERVICES This Task Order is made and entered into as of the day of October, 20%by and between South Tahoe Public Ut111ty District, hereinafter referred to as "DISTRICT' and Wood Rodgers, Inc., hereinafter referred to as "CONSUL: ANT'. In consideration of the mutual promises, covenants, and conditions as addressed in the Master Agreement dated March 19, 2008 and as specifically hereinafter set forth, the parties do hereby agree as follows: The purpose of this Task Order 1C (addendum) is to increase the budgt to include additional consulting services associated with review and interpretation of data to determine Infiltration rates, review geotech reports, ppro vide recommendations and guidance regarding Irrigation fields and intiltr4tlonlpermeability of In s, edit final nutrient, management plan, etc. for the South Tahoe Public Utility District's Mond Vabey Ranch Nutrient Management Plan. 2. SCOPE OF WORK The items of work are oulkned in the Consultants written Incurred Costs email between Leslie Bumslde and Hal Bird dated October 8 2009. Said written documentation is attached here as Exhibit A, Incorporated herein and by this reference Is made a part of this Task Order 1 C. 3. STAFFING Staffing will be under the directlon of Lesko Burnside as Associate Program Manapr and liaison wRh the District; Mark Gookin, P.E., Nect Principal, and Mike Wilhelm, P.E., Civil Engineer. CONSULTANT shall not change staffing without approval by DISTRICT. Any changes shall provide for equivalent qualifications as far as practical. 4. TIME OF PERFORMANCE The services for this Task Order have already been completed. 5. P Payment to CONSULTANT for services performed under this Task Order 1C shalt be In accordance with CONSULTANT's Incurred Costs correspondence dated 1018/09. The cost ceilin for this Task Order 1 C shall be Three Thousand Six Hundred Ei rh -Five Dollars and Twenty Cents F$3,685.20) and shall not be exceeded except as provided in Article of the Master Agreement. -31- 6. LABOR CODE REQUIREMENTS All State of California prevailing wage laws must be complied with in the performance of work related to this Task Order. These include, but are not Orriked to, Labor Code Sections '1720 through 1860. 7'1 l WAM&E C01 9 L CONSULTANTs Errors & Omissions coverage shall be $5,000,000 aggregate with a deductible of not more than $500,000 for the duration of this Task Order. 8. EFFECTIVE DA'T'E This Task Order No. 1C is akead In effect due to roject and work constraints. District, via Hat Bird, Land Applfcaflons Manager, p a verbal Notice to Proceed for this work in early September 2009 as the axe became necessary. K. W rrNESS WHEREOF, this Agreement is wouted by the General Man r aril Clerk of the Board of ft Sm►Ah Tahoe Pubic Utility Dlstrfct, W Consultant has caused this Agreement to b r executed the day and year first above written. SOUTH TAHOE PUBLIC UTILITY DISTRICT ATTEST: KATHY SHAD', Clerk of the BoW (MOOD RODGERS, INC. By] MARK GO IN, .E., Principal Dense #50160; Expiration: 6/30/2009 Dated 2 -32- vwr w.sn. s.wrw w.,}v. K"" K SORB u Tah Lt77�EalFa�O PUblic Utility Pietrict Mary UU BOARD AGENDA ITEM 4e TO: Board of Directors FROM: No Bergsohn, Hydro - Geologist MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: LPPS Standby Power Generation Facility REQUESTED BOARD ACTION: Authorize an increase to Purchase Order P21709 to AECOM for additional engineering services for design of a fire suppression system, in the amount of $50,000. DISCUSSION: During regulatory review, Gareth Harris, Lake Valley Fire Protection District, requested that the District provide plans for a fire protection system for the planned standby power generator building. Currently, the District cannot provide fire flows to the Luther Pass Pump Station (LPPS) as the water system does not extend to Grass Lake Road, and the Porter - Cologne Act prohibits the use of treated effluent for structural fires in the Lake Tahoe Basin. Because the LPPS and planned standby generator building are critical components in the treated effluent transport system, District staff requested that AECOM investigate fire suppression systems that could be used for both the existing pump station and the planned standby power generator building. District staff believes that extending a water line down Grass Lake Road would cost about 1.3 million dollars. Preliminary estimates for a dedicated fire suppression system range from $140,000 to $185,000 dollars. District staff recommends that the Board approve the cost increase for added engineering services to design a fire suppression system for the existing pump station and planned standby generator building as part of the LPPS Standby Power Generator Facility project. Inclusion of the fire suppression system would provide a cost - effective solution for a critical link in the treated effluent system. Approval of the requested increase will raise the contract ceiling to a total amount of $290,224. -33- No Bergsohn November 5, 2009 Page 2 SCHEDULE: As soon as possible COSTS: $50,000 ACCOUNT NO: 1029 - 8933 /RGLPPS BUDGETED AMOUNT REMAINING: $378,937 ATTACHMENTS: Contract Amendment for Addition of Fire Suppression Systems, AECOM, October 28, 2009. CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES / O CHIEF FINANCIAL OFFICER: YES NO -34- = AECOM 1360 E. Spruce Avenue, Strife 101, Fresno, CA 93720 T 559.448.8222 F 554.448.828 wwwvaeeorrr.com Mr. lv Bergsohn South Tahoe Publia UMky`DisM 1275 Meadow Crest Oftd South Lake Tahoe, Ckiet o S ubject , Luther l asi :fit ' cn , $t�s dby Power Project r[traot Amenc rri�ttf or ,�tt & a of Mra *�rppmston Systems Ttte p qV" of the tom` VD: Est authorl n to pw%rm additicatttlf cmftzosr Luther` Fuss Pump . lrt Power .rdor Facilityr pr and t qu rt dated hVrease to the notes+ d • bir District Purt base Order P21M In respartsae to c on*W* ts%; Oy Chief Gareth Hems, l aloe Vary Ff t* ProtWCpft D*ft, they D*60 has requested systems be added to the d: LttttN rfts Pump ftbon gsrre tpr bulldtng +d' , pttrzsp bwf�. Because there Is M 90WA ]of V0 w*ter at the site and the Fc ter -Cols d Aotfrallift the use of reclaimed weer for f Ica °kt i TTtt+oe islrr, the fire suppression spas a4 the buildings will need to be of the dry comMoal Or pM type. tatty the thm Moot fe suppression system configuratlons.'aW + Dry Chemical. the le *WmW of the three Residue, man and poftftft run-off from any Introduced, water oun a.a paoble m FM 2W (c shed cq ewd gas). Uses a 7% design «qnow*qft. MMOWMW#M dry 1 heroical. SVOWm M oe cost is very high and tht~ Pm *n, ssl bc#Mi sa� for this applY�sn t1ct;� ttw+ #dari�d. E#iver►eass mil! lily d� cm � ll�htr of � aWotures. tt►tergsn ('triert Holon replacement. Will haft the higtomt las Ullatio rt but s ystsin recharge cost is much l than FM-200. System uses: at tarp Aurnber. 3f b .. ssurd'-gas cylinders ('will new � tft rootm$). Sys don a high. dew . co ntwoon (38%) d is kft fteftdehl on ft M t be$tng air - ttght. Will be a more 009" firs auppc sane than FM- ZDO for ft. rtcs"atly uno=pied area. The coizstructlon coast fo r tyre t e<ftpprss9lon syttems at the two buildit has ora*wnady estimated to be between MPG wW $100,000 for the pump budding sul burl 5AW and $85,000 for the aerator building, A rhft ai curate oost estim ato be ma -t r 'a fint Oatie tninaddo on the type ofWatem that will be used. hfhg the fire suppression "tem will r"ulre additional mechanical, electrlbil archWursal ond prof fthagernent dosIgn efbd and would be.consldeted Additiorol :. r1ces und6tthe terrns Of Our C01MVIM9 Services Agrb6ineft Bated on our prelimiroy a0seaftent cif tN tstuot 8001 With add _ 8rb suppression sy sM 6 the pmojwt we moots that ff% �t net titttll riot 85Q��. This fee will Inaludb1tw folli It g tsftew. AF M Water -35- South Tahoe PUD . Site visit by an AECOM Fire Protection Engineer Page 2 • Research and coordnation with the District to sect a lke suppression technology for both buildings • to rate Oro sWroselan systems i ft.0P$ � Power PM construction P40%. sp c - opinW. tnc iu s e I din for gas supply shut -off and VOMWAi r sum Interlocks. Prepare pb�tstntd pecilcstrs tar t pressor system. + Additional constr . +a bft of bedding assistance. submittal review; and M review. . Additional pma+t'r " ;, M .5 6..: & ° . l. ! i.:t F. A� .+f�S9 �' • 4! :7 A Ir i ♦a .. :.'a ' fir,. � 6`4. & -: +`t .��:' ?1 }(;,•a is ( =i a a •.�� Pkwe Heel free to cadt ne #t tow any questlons-rogwdkV this request Yours Singly, I(CoWn 8 r+V OLL e . Assistant nt M"ing, & ice` P" GOO AMI -36- t OWW Mm"i- RIGhA d H. 90" Mrfttav 5outh Tahoe. &WACWUft .k+ Wbowichw FWic Utility 019trict s , � `w : � it �w � •r' BOARD AGENDA ITEM 4f TO: Board of Directors FROM: Julie Ryan, Senior Engineer MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: Final and Secondary Effluent Pump Station REQUESTED BOARD ACTION: Approve Change Order No. 9 to Pacific Mechanical Corporation, in the amount $96,171.37. DISCUSSION: Change Order No. 9 addresses 17 work items that are beyond the scope of the contract, 1 reduction in work, and a change to the contract time. 1. Due to a discrepancy between the Plans and the Specifications for the Project, the requirement for concrete encasement of underground conduit was ambiguous. Staff directed PMC to install the concrete, and provided additional instruction for its completion. Accordingly, staff has agreed to split the cost for the concrete encasement with PMC, who has provided receipts for the concrete delivery. The additional cost to the District for this work is $7,384.70. 2. During construction of the pump station and the adjacent retaining wall, PMC proposed a modification to the connection between these two structures. Staff allowed this modification with the condition that the savings be passed on to the District. The cost savings associated with this modification is <$85.00 >. 3. The Contract Drawings show two of the above - ground pipe supports at the pump station to be founded on concrete, when they are actually located over asphalt. PMC performed the additional work to install concrete footings for these pipe supports on a Time and Materials Basis for an additional cost of $1,825.83. 4. Due to ambiguity in the Contract Documents with respect to sizing the conduit boxes at the pump motors, PMC was charged an additional fee by the pump supplier for the large size boxes selected by staff. Accordingly, staff has agreed to split the cost for the large size boxes with PMC. The additional cost to the District for this item is $4,624.44. —37— Julie Ryan November 5, 2009 Page 2 5. During construction it was brought to staff's attention that the insulation board at the Electrical and Generator Building roof could be delaminated by hand, and that it was being installed without fasteners. This problem was not identified until the roof was nearly installed, and responsibility for the oversight is not clear. Staff required that the roof be repaired to comply with the installation instructions for the alternate insulation product that was submitted by the roofer (Yancey /Gudgel Roofing). Yancey /Gudgel subsequently filed a claim against the District for the amount of their contract with PMC. Staff and PMC have agreed to split the cost of re- roofing, and Yancey /Gudgel will release the claim. The additional cost to the District for this item is $7,000, half of which the District has recovered from Winzler & Kelly (the Design Engineer). 6. During construction it was brought to staff's attention that current fire code requires that interior fuel tanks require venting to the exterior of the structure. While the Contract Documents required the venting by reference, they provided insufficient detail for PMC to construct the vent system. Staff directed PMC to install the tank vents on a Time and Materials basis. The additional cost to the District for this work is $11,519.16. 7. During construction, PMC notified staff that with the approved modifications to the structural steel trusses for the Electrical and Generator Building roof, the firewall between the two rooms could not be installed as designed. Staff directed PMC to perform the additional work on a Time & Materials basis, with a credit for the work that was eliminated. This net cost to the District for this additional work is $4,027.76. 8. During construction, staff noticed that the Contract Documents did not call for insulation and heat tracing to protect the differential pressure tubing from freezing. PMC installed insulation, heat trace and a fabricated stainless steel box to further protect the instrumentation at staffs request. The additional work was performed on a Time & Materials basis for a cost of $3,759.15. 9. During construction, it was brought to staffs attention that the installed insulation and heat trace at the injection lances /sampling ports on the secondary header are difficult to work around. At staffs request, PMC modified the thermal protection to include a stainless steel box over the lances and ports. The additional work was performed on a Time & Materials basis for a cost of $3,759.15. 10. With Change Order No. 6, the Board approved additional cost incurred by the electrical subcontractor to add hardware to send an alarm to SCADA in the event the heat trace system fails. After that Change Order was approved, the insulation subcontractor mobilized to the field in support of that work. The work by the insulation subcontractor was performed on a Time & Materials basis for the additional cost of $864.62. 11. After the Electrical and Generator Building was substantially complete, staff found that the temperature in the electrical room ran high, even at night and with the fan running. Subsequently, Winzler & Kelly revisited the design for the ventilation system, and found the installed system to be inadequate. At staffs request, PMC has upgraded the ventilation system following Winzler & Kelly's recommendations. The additional -38- Julie Ryan November 5, 2009 Page 3 amount due to PMC for the modifications to the ventilation system is $26,565.44; the entire cost has been recovered from Winzler & Kelly. 12. At the early stages of the project, staff worked with the structural steel subcontractor to optimize the design for the Electrical and Generator Building. However, during this time the price of steel rose beyond the bid price. Because the redesign was driven by both the subcontractor and staff, it was agreed to split the cost difference for the price escalation. The additional cost to the District is $692.27. 13. During construction, staff directed PMC to install a seal at the gaps in the structural steel at the Sampler Building, as none was shown on the Contract Drawings. This work was performed on a Time & Materials Basis for a total cost of $580.77. 14. During construction, PMC encountered an error in the Plans, which failed to show two elbows that were needed to route an existing 18" CMP around a duct bank. Staff directed PMC in the field to proceed with the work. The additional cost to the District for this work is $821.01. 15. During construction of the Electrical and Generator Building, it was brought to staffs attention that exterior soffits had been omitted from the building design. After consideration, staff directed PMC to install soffits for weather - resistance and aesthetics. The additional work was performed on a Time & Materials Basis for a cost of $9,488.75. 16. PMC attempted to install 1 Y2" HDPE tubing into an existing 3" conduit, as directed by the Contract Documents, but found that this type of tubing was too stiff to pull. With staff consent, they installed 1 '/" Tygon tubing instead. The time lost attempting to pull the HDPE and researching a suitable alternative product has been charged to the District on a Lump Sum basis for $816.85. 17. During excavation for the new pump station, PMC encountered unexpected water. The labor, equipment and material costs for handling the water have been charged to the District on a Lump Sum basis for $6,637.43. 18. During capping of existing piping after the old pump station was demolished, PMC encountered two conditions that needed to be addressed. First, the design called for welded caps on active pipes, which do not allow for the interior of the weld to be coated. Staff directed PMC to use slip -on flanges with blinds instead. Second, PMC encountered an unrestrained fitting on an existing welded steel pipe. In response, staff directed PMC to pour thrust blocks at the point of abandonment here, and on the A -line. The additional work for these items was performed on a Time & Materials basis for a net cost of $6,507.42. 19. Since September, the Contractor has continued to work on items outside the original scope, and to troubleshoot problems with Contract items (SCADA and heat trace). The Contractor is on schedule to complete this work by November 10, 2009. Staff recommends that the Contract Time be extended by sixty (60) days to allow time for the completion of this work. There is no cost impact associated with this time extension. -39- Julie Ryan November 5, 2009 Page 4 SCHEDULE: As soon as possible COSTS: $96,171.37 ACCOUNT NO: 1029 - 8676 /EFFLEV BUDGETED AMOUNT REMAINING: $954,937 ATTACHMENTS: Change Order No. 9 CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -40- u� CHANGE ORDER NUMBER 9 Project Final and Secondary Effluent Pump Station folk Contractor PACIFIC MECHANICAL CORPORATION Date: November 5.2009 PO # P19831 The Contract Shall Be Changed As Follows: A. Amend Bid Item 23, to include all labor, equipment, materials and subcontractor costs necessary to install concrete encasement at underground conduit, for an additional cost of $7,384.70, which is half of the amount detailed in Change Order Quote No. 00091 (attached). This item addresses in full the additional cost for the work detailed in PMC's Change -In- Contract #2, dated May 27, 2008. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM A IS $7,384.70 TOTAL FOR CHANGE ORDER #9 IS A+ B+ C+ D +E +F +G +H +I +J +K +L +M +N +O +P +Q +R +S= $96,171.37 Original Contract $ 6 533 Previous Change Orders $ 295,990.40 65 Current Contract $ 6 598 THIS CHANGE ORDER $ 96,171.37 60 New Contract Total $ 6 1135 Contractor agrees to make the herein - described changes In accordance with the terms hereof. The change In contract price and /or contract time noted is full settlement for costs incurred as a result of the change(s) described, unless specifically noted In Individual description(s). Date: Authorized By STPUD Board President Date: Accepted By Contractor Reviewed By -41- Date: 1 B. Amend Bid Item 13 to include all labor, equipment, materials and subcontractor cost savings incurred by installing epoxy dowel connections in lieu of cast -in -place rebar connecting the holding pond retaining wall to the pump station. The cost savings associated with this modification is $85.00 as detailed in Change Order Quote No. 00093 (attached). This item addresses in full the cost savings for the work modification allowed by the District in the Response to RFI #58, dated July 1, 2008. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM B IS <$85.00> C. Amend Bid Item 13 to include all labor, equipment, materials and subcontractor costs necessary to install concrete footings for two pipe supports at the pump station, for an additional cost of $1,825.83 as detailed in Change Order Quote No. 00046 (attached). This item addresses in full the additional cost for the work requested by the District in the Response to RFI #80, dated August 26, 2008. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM C IS $1,825.83 D. Amend Bid Items 14 and 15 to include all labor, equipment, materials and subcontractor costs necessary to provide conduit boxes with a 4" conduit cut -out. The additional cost for this item is $4,624.44, to be split equally between Bid Items 14 and 15, which is half of the amount detailed in Change Order Quote No. 00095 (attached). This item addresses in full the additional work requested Change -In- Contract #4, dated July 29, 2008. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM D IS $4,624.44 E. Amend Bid Item 16 to include all labor, equipment, materials and subcontractor costs necessary to replace the roof and repair the insulation at the Electrical and Generator Building. The additional cost for this item is $7,000.00 as detailed in the letter from PMC regarding this matter, dated October 8, 2009 (attached). This item addresses in full the District's responsibility for the work requested by the District in Construction Memoranda #44A, dated December 23, 2008. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM E IS $7,000.00 F. Amend Bid Item 16 to include all labor, equipment, materials and subcontractor costs necessary to install roof vents for the sub -base tank of the generator at the Electrical and Generator Building. The additional cost for this item is $11,519.16 as detailed in Change Order Quote No. 00099 (attached). This item addresses in full the additional work requested by the District in Construction Memorandum #46, dated January 12, 2009. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work.. TOTAL FOR ITEM F IS $11,519.16 G. Amend Bid Item 16 to include all labor, equipment, materials and subcontractor costs necessary to modify the firewall between the Electrical Room and the Generator Room, for an additional cost of $4,027.76 as detailed in Change Order Quote No. 00065 -42- 2 (attached). This item addresses in full the additional cost for the work requested in the District's Response to RFI #123, dated December 4, 2008. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM G IS $4,027.76 H. Amend Bid Item 12 to include all labor, equipment, materials and subcontractor costs necessary to protect the differential pressure instrumentation from freezing. The additional cost for this item is $3,759.15 as detailed in Change Order Quote No. 00075 (attached). This item addresses in full the additional cost for the work requested in the District's Response to RFI #131, dated January 23, 2009. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM H IS $3,759.15 I. Amend Bid Item 12 to include all labor, equipment, materials and subcontractor costs necessary to modify the thermal protection of the lances and ports at the secondary header. The additional cost for this item is $3,140.77 as detailed in Change Order Quote No. 00090 (attached). This item addresses in full the additional cost for the work requested in Construction Memorandum #59, dated April 24, 2009. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM I IS $3,140.77 J. Amend Bid Item 22 to include all labor, equipment, materials and subcontractor costs necessary to modify the heat trace system to send an alarm signal to SCADA. The additional cost for this item is $864.62 as detailed in Change Order Quote No. 00098 (attached). This item addresses the remainder of the additional cost for the work requested in Construction Memorandum #57, dated May 14, 2009 (the first portion of this work was paid on Change Order No. 6). This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM J IS $864.62 K. Amend Bid Item 16 to include all labor, equipment, materials and subcontractor costs necessary to modify the ventilation system at the electrical room, for an additional cost of $26,565.44 as detailed in Change Order Quote No. 00094 (attached). This item addresses in full the additional cost for the work requested in Construction Memorandum #72, dated June 25, 2009. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM K IS $26,565.44 L. Amend Bid Item 16 to include all labor, equipment, materials and subcontractor costs resulting in the escalation of the cost of the steel for the Electrical and Generator Building trusses. The additional cost for this item is $692.27 as detailed in Change Order Quote No. 00055 (attached). This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM L IS $692.27 -43- M. Add Bid Item 20 to include all labor, equipment, materials and subcontractor costs necessary to install a seal at the gaps in the structural steel at the Sampler Building. The additional cost for this item is $580.77 as detailed in Change Order Quote No. 00087 (attached). This item addresses in full the work requested by field directive from District Staff. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM M IS $580.77 N. Amend Bid Item 12 to include all labor, equipment, materials and subcontractor costs necessary to modify an existing 18" CMP to convey drainage around a duct bank. The additional cost for this item is $821.01, as detailed in Change Order Quote No. 00097 (attached). This item addresses in full the work requested by field directive from District Staff. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM N IS $821.01 O. Amend Bid Item 16 to include all labor, equipment, materials and subcontractor costs necessary to install soffits at the Electrical and Generator Building for an additional cost of $9,488.75, as detailed in Change Order Quote No. 00064 (attached). This item addresses in full the additional cost for the work requested in Construction Memorandum #36, dated November 5, 2008. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM O IS $9,488.75 P. Amend Bid Item 12 to include all labor, equipment, materials and subcontractor costs necessary to unsuccessfully pull HDPE through an existing 3" conduit for an additional cost of $816.85, as detailed in Change Order Quote No. 00088 (attached). This item addresses in full the additional cost for the work requested in the District's Response to RFI #129, dated January 6, 2009. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM P IS $816.85 Q. Amend Bid Item 26 to include all labor, equipment, materials and subcontractor costs necessary to address unexpected water conditions at the excavation for the Pump Station for an additional cost of $6,637.43 as detailed in Change Order Quote No. 00096 (attached). This item addresses in full the additional cost for the work requested in Items 1 and 3 of Construction Memorandum #7, dated April 28, 2008. This item does not address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM Q IS $6,637.43 R. Amend Bid Item 12 to include all labor, equipment, materials and subcontractor costs necessary to install thrust blocks and replace weld caps with slip -on flanges with blinds at pipe abandonments for a net additional cost of $6,507.42, as detailed in Change Order Quote No. 00082 (attached). This item addresses in full the additional cost for the work requested in Construction Memorandum #63 and the District's Revised Response to RFI #141 dated May 29, 2009, and May 13, 2009, respectively. This item does not -44- 4 address any impacts to Contract Time or intermediate deadlines resulting from this change in work. TOTAL FOR ITEM R IS $6,507.42 S. Change the Contract Time, identified in Section 007200, Part 2.4, of the Contract Specifications, and modified in Change Order #6, from five hundred ninety -eight (598) days to six hundred fifty -eight (658) days account for delays in completing project due to extra work and troubleshooting Contract items. This item does not address any costs impacts associated with the changes in work. TOTAL FOR ITEM S IS $0.00 TOTAL FOR CHANGE ORDER #9 IS A+ B+ C+ D +E +F +G +H +I +J +K +L +M +N +O +P +Q +R +S= $96,171.37 -45- C"n"I koulodr Richard H. 5dbrlg a' a J� Ends G�11MW 15 erid6 F- rumic Utility. Piet-not 7 1, M77 U - 7 • �� BOARD AGENDA ITEM 4g TO: Board of Directors FROM: John Thiel, Principal Engineer MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: Twin Peaks Booster Station and Waterline REQUESTED BOARD ACTION: Approve Change Order No. 1 to Resource Development Company, Inc., in the amount of $57,187.51. DISCUSSION: Part A, in the amount of $27,368.31, is for additional excavation depth, valves, hydrant extensions, and fittings required to avoid existing utilities in Lake Tahoe Boulevard, and to complete a revised pipe alignment outside the new booster station. This was completed on a time and materials basis. Part Bin the amount of $550.00, is for pavement striping following the paving and construction operations along Lake Tahoe Boulevard which was not included in the bid. This was completed on a time and materials basis. Part C, in the amount of $2,537.70, is for a revised, thicker pavement section along the edge of Lake Tahoe Boulevard to achieve a more durable road patch. The 4,614 square foot of paving was completed at $0.55 per square foot for the added pavement thickness. Part D, in the amount of $16,179.00, is for the abandonment of the old water zone connections at the intersection of Lake Tahoe Boulevard and Viking Road. This work was scheduled to be included in the next phase of the Lake Tahoe Boulevard waterline replacement project. The District was able to complete the abandonment this year which avoids additional disruption and repaving next year. This was completed on a time and materials basis. -47- John Thiel November 5, 2009 Page 2 Part E, in the amount of $10,552.50, is for 3,015 square feet of additional paving required to complete the road patch on Lake Tahoe Boulevard from the pump station site to Industrial Avenue. This was completed at the contractor's unit bid price of $3.50 per square foot. SCHEDULE: Pending Board approval. COSTS: $57,187.51 ACCOUNT NO: 2029 -7070 / TPBSTR BUDGETED AMOUNT REMAINING: <$69,572> ATTACHMENTS: Change Order No. 1 CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES *-48- NO NO CATEGORY: Water o T CHANGE ORDER NUMBER 1 Project Twin Peaks Booster Station and Waterline �,�"�► • 1950 Contractor Resource Development Company, Inc. Date November 5. 2009 PO # P21334 The Contract Shall Be Changed As Follows: A. Increase Contract Amount $27,368.31 for additional excavation depth, valves, hydrant extensions, and fittings required to avoid existing utilities in Lake Tahoe Blvd. and to complete a revised pipe alignment outside the new booster station. This was completed on a time and materials basis. Total for Item 1A is $27,368.31 B. Increase Contract Amount $550.00 for pavement striping following the paving and construction operations along Lake Tahoe Blvd. and which was not included in the bid. This was completed on a time and materials basis. Total for Item 1 B is $550.00 TOTAL FOR CHANGE ORDER NUMBER 1 IS A +B +C +D +E= $57,187.51 Original Contract $1,743,395.00 Previous Change Orders $ 0.00 Current Contract $1,743,395.00 THIS CHANGE ORDER $ 57,187.51 New Contract Total $1,800,582.51 Contractor agrees to make the herein - described changes in accordance with the terms hereof. The change In contract price and /or contract time noted Is full settlement for costs incurred as a result of the change(s) described, unless specifically noted in Individual descrlption(s). Authorized By STPUD Board President Date: Date: Accepted By Contractor Date: Reviewed By -49- 1 C. Increase Contract Amount $2,537.70 for a revised, thicker pavement section along the edge of Lake Tahoe Blvd. The 4,614 square foot of paving was completed at an additional $0.55 per square foot for the added pavement thickness. Total for Item 1 C is $2,537.70 D. Increase Contract Amount $16,179.00 for the abandonment at the intersection of Lake Tahoe Blvd. and Viking Road. This was completed on a time and materials basis. Total for Item 1 D is $16,179.00 E. Increase Contract Amount $10,552.50 for 3,015 square feet of additional paving required to complete the road patch on Lake Tahoe Blvd. from the pump station site to Industrial Ave. This was completed at the unit bid price of $3.50 per square foot. Total for Item 1 E Is $10,552.50 TOTAL FOR CHANGE ORDER NUMBER 1 IS A +B +C +D +E= $57,187.51. -50- 4 G neml kV41W Richard H. 5olbrig 15outh 'iahoc Enft CWk* Jra+4arr IL k W FuHIG Utility Pty' tri g BOARD AGENDA ITEM 4h TO: Board of Directors FROM: Jim Hoggatt, Engineering Department Manager MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: 2009 Sonora Waterline Replacement Project REQUESTED BOARD ACTION: Approve Change Order No. 3 for Campbell Construction Co. Inc., in the amount of $87,760.99. DISCUSSION: The itemized parts of Change Order No. 3 are as follows: Part A, in the amount of $61,484.00, is for the 15,371 square feet of extra 3 -inch thick asphalt trench patch that was required in the Sonora area of the project. The extra cost is calculated at the Contract Unit Price of $4.00 per square foot. Part B, a credit in the amount of <- $39,312.00 >, is for the deletion of the 4 -inch thick asphalt trench patch on Ski Run, Contract bid Item 5A. This trench patch was added to the City's overlay project in which the District will pay the City as agreed to in the Reimbursement Agreement the Board approved at the August 20 Board meeting. Part C, in the amount of $22,767.50, is for the 9,107 square feet of extra 2 -inch thick mill and asphalt overlay required in the Sonora area. The contract unit price of $2.50 per square foot was used in calculating this extra cost. Part D, a credit in the amount of <- $2,711.25 >, is for adjusting the bid quantity for Bid Item 7, 1 -inch thick asphalt trench patch for the Sonora Area. Part E, in the amount of $45,532.74, is for installing traffic rated meter lids in the Sonora area of the project. The plans did not identify the traffic area lids and the work was done on time and material basis. SCHEDULE: As soon as possible COSTS: $87,760.50 ACCOUNT NO: 2029 - 7911 /SONORA BUDGETED AMOUNT REMAINING: $300,287 ATTACHMENTS: Change Order No. 3 —51— Jim Hoggatt November 5, 2009 Page 2 CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -52- �H CHANGE ORDER NUMBER 3 Project 2009 Sonora Waterline Replacement Project °► Contractor Campbell Construction Co. Inc. Date November 5, 2008 PO # P21429 The Contract Shall Be Changed As Follows: A. Increase Contract Bid Quantity for 3 -inch thick asphalt trench patch, Contract Bid Item 5, by 15,371 square feet @ unit price of $4.00 per square foot for a total increase of $61,484.00. TOTAL FOR ITEM A IS $61,484.00 B. Delete Contract Bid item 5A 4 -inch thick asphalt trench patch for a total deduction of <$39,312.00 >. TOTAL FOR ITEM B IS <$39,312.00> C. Increase Contract Bid Quantity for 2 -inch mill and asphalt overlay, Contract Bid Item 6, by 9,107 square feet @ contract unit price of $2.50 per square foot for a total increase of $22,767.50. TOTAL FOR ITEM C IS $22,767.50 TOTAL FOR CHANGE ORDER NUMBER 3 IS A +B +C +D +E= $87,760.99 Original Contract $2,523,932.35 Previous Change Orders $ 308,588.71 Current Contract $2,832,521.06 THIS CHANGE ORDER $ 87,760.99 New Contract Total $2,92 0,282.05 Contractor agrees to make the herein- described changes In accordance with the terms hereof. The change in contract price and/or contract time noted is full settlement for costs Incurred as a result of the change(s) described, unless specifically noted In Individual description(s). Authorized By STPUD Board President Date: Date: Accepted By Contractor Reviewed By Date: -53- D. Adjust the Contract Bid Quantity for Bid Item 7 to 2,544 square feet for a deduction of <$2,711.25 >. TOTAL FOR ITEM D IS <$2,711.25> E. Provide 58, (23 on Larch, 17 on Birch, 5 on Spruce, 6 on Willow and 7 on Sonora), concrete collars for traffic rate water meter boxes on time and material for a lump sum amount of $45,532.74. See attachment E for a break down of all cost. TOTAL FOR ITEM E IS $45,532.74 TOTAL FOR CHANGE ORDER NUMBER 3 IS A +B +C +D +E= $87,760.99 -54- 2 0VWW KIChArd K Se" 15o uth T FUH10 Utility Pletrict 4 wc;o*A;'uww �R. Jrx�err a ,� :� 0d �::n -i ; BOARD AGENDA ITEM 41 TO: Board of Directors FROM: Jim Hoggatt, Engineering Department Manager MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: 2008 Al Tahoe Waterline Replacement Project REQUESTED BOARD ACTION: Approve a $22,822.12 deductive Change Order No. 5 to Cruz Excavating, Inc. DISCUSSION: On September 17, 2009, the Board authorized District staff to hire a contractor to complete the necessary asphalt repairs that Cruz Excavating had not completed per prior agreements. After this date, staff continued providing Cruz Excavating extensions until October 14, 2009, at which time all communications ceased. Staff contact GB General Engineering and they completed the work on time and material basis. SCHEDULE: As soon as possible COSTS: <- $22,822.12> ACCOUNT NO: ATWL08 BUDGETED AMOUNT REMAINING ($19,462) ATTACHMENTS: Change Order Number 5 CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -55- u CHANGE ORDER NUMBER 5 Project: 2008 Al Tahoe Waterline Replacement �,� ° ► Contractor: Cruz Excavating, Inc. Date: November 5, 2009 PO # P20152 The Contract Shall Be Changed As Follows: A. Per the District Letter dated October 14, 2009 delete, $22,822.12 identified in GB General Engineering Contractor invoices for providing the asphalt sand slurry to complete the agreed upon asphalt trench patch repairs for the All Tahoe Waterline Replacement Project. TOTAL FOR CHANGE ORDER NUMBER 5 IS <$22,822.12> Original Contract $1,638,315.00 Previous Change Orders $ 596,551.52 Current Contract $ 2 THIS CHANGE ORDER $ . 22,822.12 New Contract Total $ 2 Contractor agrees to make the herein - described changes in accordance with the terms hereof. The change in contract price and/or contract time noted is full settlement for costs incurred as a result of the change(s) described, unless specifically noted in individual description(s). Date: Authorized By STPUD Board President Date: Accepted By Contractor Reviewed By Date: -57- 1 . r CLOSEOUT AGREEMENT AND RELEASE OF CLAIMS f ✓ THIS AGREEMENT AND RELEASE OF CLAIMS (Agreement) is made in South Lake Tahoe, California, this 5th day of November, 2009 by and between South Tahoe Public Utility District, (DISTRICT), and Cruz Excavating, Inc. (CONTRACTOR). KNOW ALL PERSONS BY THESE PRESENTS: 1. The DISTRICT and CONTRACTOR entered into that agreement for Purchase Order No. P20152, DISTRICT project described as 2008 Al Tahoe Waterline Replacement on April 23, 2008 C' Agreement's. The contract was amended through Change Orders No. 1, 2, 3, 4, and 5, as approved by the Parties, pertaining to Purchase Order No. P20152, and dated August 21, 2008, November 6, 2008, November 20, 2008, December 18, 2008, and November 5, 2009, respectively. The contract additionally was the subject of the Parties' Partial Closeout Agreement and Release of Claims, dated December 18, 2008. 2. That the undersigned, as the authorized representative of CONTRACTOR, and for each of its successors, assigns and partners, for and in consideration of One Million, Six Hundred Thirty-Eight Thousand, Three Hundred Fifteen Dollars and Zero Cents ($1,638,315.00), the original Contract amount, and the sum of Five Hundred Seventy -Three Thousand, Seven Hundred Twenty -Nine Dollars and Forty Cents ($573,729.40) for Contract Change Orders Nos. 1, 2, 3, 4 and 5, receipt of which is acknowledged, does release and forever discharge the DISTRICT, and each of its successors, assigns, directors, officers, agents, servants, volunteers and employees, from any and all rights, claims, causes of action, demands, debts, obligations, liabilities, actions, damages, costs and expenses (including but not limited to attorneys', paralegal and experts' fees, costs and expenses) and other claims, which may be asserted against DISTRICT by reason of any matter or thing which was the subject matter of or basis for: A. The performance of all terms and conditions of that certain agreement dated April 23, 2008 for Purchase Order No. P20152, DISTRICT project described as 2008 AL TAHOE WATERLINE REPLACEMENT. B. Change Orders No. 1, 2, 3, 4 and 5, as approved by the parties, pertaining to Purchase Order No. P20152 and dated August 21, 2008, November 6, 2008, November 20, 2008, December 18, 2008, and November 5, 2009 respectively. C. Partial Closeout Agreement and Release of Claims, as approved by the Parties, dated December 18, 2008. le 1 3. Nothing contained in this Agreement shall waive or alter the rights, privileges, and powers of the DISTRICT or the duties, liabilities and obligations of the CONTRACTOR and its surety(ies) in respect to any portions of the Contract Documents for Purchase Order No. P20152. 4. The District has received the following claims from the Contractor: None. Except as expressly provided in this section, the DISTRICT has received no other claims from the CONTRACTOR. 5. Upon execution of this Agreement, the DISTRICT agrees to promptly record a NOTICE OF COMPLETION with the El Dorado County Recorder. 6. The current retention amount is $ 126,177.88 Original Contract amount $ 1,638,315.00 Total Change Orders Amount $ 573,729.40 Less: Amount Previously Paid (Request Nos. 1 through 10) $ 2,049,159.99 Retainage $ 126,177.88 BALANCE: $ -0- The retainage will be released to the CONTRACTOR at the expiration of thirty-five (35) calendar days after date of recording a NOTICE OF COMPLETION by El Dorado County Recorder or when all stop notices have been released, whichever last occurs. The release provided pursuant to this Agreement shall not apply to CONTRACTOR'S right to the retention amount until and to the extent such amounts are received by CONTRACTOR. 7. CONTRACTOR and DISTRICT agree that the total adjusted Contract price and time of performance for Purchase Order No. P20152, after the execution of change orders, is as follows: Original Contract Price $ 1,638,315.00 Adjusted Contract Price $ 2,212,044.40 8. It is understood and agreed by Contractor that the facts with respect to which the release provided pursuant to this Agreement is given may turn out to be other than or different from the facts as now known or believed to be, and Contractor expressly assumes the risk of the facts turning out to be different than they now appear, and agrees that the release provided pursuant to this Agreement shall be, in all respects, effective and not subject to termination or rescission by any such difference in facts and Contractor expressly waives any and all rights it has or may have under California Civil Code Section 1542, which provides as follows: z -i i "A general release does not extend to claims which the creditor does not know or suspect to exist in his favor at the time of executing the Release which if known by him must have materially affected his settlement with the debtor." 9. The release made by the CONTRACTOR is not to be construed as an admission or admissions of liability and the Contractor denies any such liability. Contractor agrees that it will forever refrain and forebear from commencing, instituting or prosecuting any lawsuit, action or other proceeding against the District based on, arising out of, or in any way connected with the subject matter of this release. 10. The CONTRACTOR releases the DISTRICT from all claims, including but not limited to those of its Subcontractors for all delay and impact costs, if any. 11. The CONTRACTOR represents and warrants to the DISTRICT that the CONTRACTOR has not assigned or transferred or purported to assign or transfer to any person, firm, corporation, association or entity any of the rights, claims, warranties, demands, debts, obligations, liabilities, actions, causes of action, damages, costs, expenses and other claims and the CONTRACTOR agrees to indemnify and hold harmless the DISTRICT, its successors, assigns, directors, officers, agents, servants, volunteers and employees, from and against, without limitation, any and all rights, claims, warranties, demands, debts, obligations, liabilities, actions, causes of action, damages, costs, expenses and other claims, including but not limited to attorneys', paralegal and experts' fees, costs and expenses arising out of or connected with any such assignment or transfer or purported assignment or transfer. 12. The parties acknowledge that they have been represented by counsel of their own choice in connection with the preparation and execution of this Agreement. The parties acknowledge and represent that they understand and voluntarily consent and agree to each and every provision contained in this Agreement. 13. The parties further acknowledge and represent that no promise, inducement or agreement, not expressed in this Agreement, have been made and that this Agreement contains the entire agreement among the parties and that the terms of the Agreement are contractual and not a mere recital. 14. The persons executing this Agreement represent and warrant to the other party that the execution and performance of the terms of this Agreement have been duly authorized by all corporate, partnership, individual, or other entity 9 I requirements and that said persons have the right, power, legal capacity and authority to execute and enter into this Agreement. SOUTH TAHOE PUBLIC UTILITY DISTRICT RICHARD H. SOLBRIG, GENERAL MANAGER ATTEST: KATHY SHARP, CLERK OF BOARD CRUZ EXCAVATING, INC. SCOTT FREIDUS, CEO November 5, 2009 BOARD APPROVAL DATE DATED DATED r M CLOSEOUT AGREEMENT AND RELEASE OF CLAIMS THIS AGREEMENT AND RELEASE OF CLAIMS (Agreement) is made in South Lake Tahoe, California, this 5 day of November, 2009 by and between South Tahoe Public Utility District, (DISTRICT), and Cruz Excavating, Inc. (CONTRACTOR). KNOW ALL PERSONS BY THESE PRESENTS: 1. The DISTRICT and CONTRACTOR entered into that agreement for Purchase Order No. P20493, District project described as 2008 Tata Lane / Granite Mountain Waterline Replacement on July 26, 2008 ("Agreement "). The contract was amended through Change Order No. 1, as approved by the Parties, pertaining to Purchase Order No. P20493, and dated December 18, 2008. The contract additionally was the subject of the Parties' Partial Closeout Agreement and Release of Claims, dated December 18, 2008. 2. That the undersigned, as the authorized representative of CONTRACTOR, and for each of its successors, assigns and partners, for and in consideration of Eight Hundred Ninety -Seven Thousand, Six Hundred Fifty -Five Dollars and Zero Cents ($897,655.00) the original Contract amount, and the sum of Ten Thousand, Five Hundred Eighty -Two Dollars and Fifty Cents ($10,582.50) for Contract Change Order No. 1, receipt of which is acknowledged, does release and forever discharge the DISTRICT, and each of its successors, assigns, directors, officers, agents, servants, volunteers and employees, from any and all rights, claims, causes of action, demands, debts, obligations, liabilities, actions, damages, costs and expenses (including but not limited to attorneys', paralegal and experts' fees, costs and expenses) and other claims, which may be asserted against DISTRICT by reason of any matter or thing which was the subject matter of or basis for: A. The performance of all terms and conditions of that certain agreement dated July 16, 2008 for Purchase Order No. P20493, DISTRICT project described as 2008 TATA LANE / GRANITE MOUNTAIN WATERLINE REPLACEMENT. B. Change Order No. 1, as approved by the parties, pertaining to Purchase Order No. P20493, and dated December 18, 2008. C. Partial Closeout Agreement and Release of Claims, as approved by the Parties, dated December 18, 2008. LM SB 522900 v1:007627.0009 1 IV 3. Nothing contained in this Agreement shall waive or alter the rights, privileges, and powers of the DISTRICT or the duties, liabilities and obligations of the CONTRACTOR and its surety(ies) in respect to any portions of the Contract Documents for Purchase Order No. P20493. 4. The District has received the following claims from the Contractor: None. Except as expressly provided in this section, the DISTRICT has received no other claims from the CONTRACTOR. 5. Upon execution of this Agreement, the DISTRICT agrees to promptly record a NOTICE OF COMPLETION with the El Dorado County Recorder. 6. The current retention amount is $ 133,000.00 Original Contract amount $ 897,655.00 Total Change Order Amount $ 10,582.50 Less: Amount Previously Paid (Request Nos. 1 through 7) $ 724,110.30 Retainage $ 133,000.00 BALANCE: $ -0- The retainage will be released to the CONTRACTOR at the expiration of thirty -five (35) calendar days after date of recording a NOTICE OF COMPLETION by El Dorado County Recorder or when all stop notices have been released, whichever last occurs. The release provided pursuant to this Agreement shall not apply to CONTRACTOR'S right to the retention amount until and to the extent such amounts are received by CONTRACTOR. 7. CONTRACTOR and DISTRICT agree that the total adjusted Contract price and time of performance for Purchase Order No. P20493, after the execution of change orders, is as follows: Original Contract Price $ 897,655.00 Adjusted Contract Price $ 908,237.50 8. It is understood and agreed by Contractor that the facts with respect to which the release provided pursuant to this Agreement is given may turn out to be other than or different from the facts as now known or believed to be, and Contractor expressly assumes the risk of the facts turning out to be different than they now appear, and agrees that the release provided pursuant to this Agreement shall be, in all respects, effective and not subject to termination or rescission by any such difference in facts and Contractor expressly waives any and all rights it has or may have under California Civil Code Section 1542, which provides as follows: SB 522900 x1:007627.0009 2 f. I "A general release does not extend to claims which the creditor does not know or suspect to exist in his favor at the time of executing the Release which if known by him must have materially affected his settlement with the debtor." 9. The release made by the CONTRACTOR is not to be construed as an admission or admissions of liability and the Contractor denies any such liability. Contractor agrees that it will forever refrain and forebear from commencing, instituting or prosecuting any lawsuit, action or other proceeding against the District based on, arising out of, or in any way connected with the subject matter of this release. 10. The CONTRACTOR releases the DISTRICT from all claims, including but not limited to those of its Subcontractors for all delay and impact costs, if any. 11. The CONTRACTOR represents and warrants to the DISTRICT that the CONTRACTOR has not assigned or transferred or purported to assign or transfer to any person, firm, corporation, association or entity any of the rights, claims, warranties, demands, debts, obligations, liabilities, actions, causes of action, damages, costs, expenses and other claims and the CONTRACTOR agrees to indemnify and hold harmless the DISTRICT, its successors, assigns, directors, officers, agents, servants, volunteers and employees, from and against, without limitation, any and all rights, claims, warranties, demands, debts, obligations, liabilities, actions, causes of action, damages, costs, expenses and other claims, including but not limited to attorneys', paralegal and experts' fees, costs and expenses arising out of or connected with any such assignment or transfer or purported assignment or transfer. 12. The parties acknowledge that they have been represented by counsel of their own choice in connection with the preparation and execution of this Agreement. The parties acknowledge and represent that they understand and voluntarily consent and agree to each and every provision contained in this Agreement. 13. The parties further acknowledge and represent that no promise, inducement or agreement, not expressed in this Agreement, have been made and that this Agreement contains the entire agreement among the parties and that the terms of the Agreement are contractual and not a mere recital. 14. The persons executing this Agreement represent and warrant to the other party that the execution and performance of the terms of this Agreement have been M SB 522900 x1:007627.0009 3 duly authorized by all corporate, partnership, individual, or other entity requirements and that said persons have the right, power, legal capacity and authority to execute and enter into this Agreement. SOUTH TAHOE PUBLIC UTILITY DISTRICT RICHARD H. SOLBRIG, GENERAL MANAGER ATTEST: KATHY SHARP, CLERK OF BOARD CRUZ EXCAVATING, INC. November 5, 2009 BOARD APPROVAL DATE DATED n SCOTT FREIDUS, CEO DATED F] SB 522900 x1:007627.0009 4 G""I mo" r trd H. 501" th . Tah oe &"W Ct�u�a �` ,f�lliAf R. J4new his Utility 016 r BOARD AGENDA ITEM 4j TO: Board of Directors FROM: Jim Hoggatt, Engineering Department Manager MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: 2008 Al Tahoe Waterline Replacement REQUESTED BOARD ACTION: (1) Approve the Project Closeout Agreement and Release of Claims for Cruz Excavating; and (2) Authorize staff to file Notice of Completion with the El Dorado County Clerk. DISCUSSION: Cruz Excavating completed 50% of the repairs for 2008 Al Tahoe Waterline Replacement Project. The other 50% District staff entered into an agreement with GB Construction to complete the repairs on time and material. This amount will be deducted from money due Cruz Excavation SCHEDULE: As soon as possible. COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: Closeout Agreement and Notice of Completion CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -59- RECORDING REQUESTED BY: Heidi C. Baugh, Contracts Administrator South Tahoe Public Utility District WHEN RECORDED MAIL TO: SOUTH TAHOE PUBLIC UTILITY DISTRICT Attn: Heidi C. Baugh 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 APN NA NOTICE OF COMPLETION RECORDERS NOTICE IS HEREBY GIVEN THAT: 1. The undersigned Is OWNER or agent of the OWNER of the interest or estate stated below in the property hereinafter described. 2. The FULL NAME of the OWNER is SOUTH TAHOE PUBLIC UTILITY DISTRICT 3. The FULL ADDRESS of the OWNER is 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 4. The NATURE OF THE INTEREST or ESTATE of the undersigned is: In fee. (If other than fee, strike "in fee" and insert here, for example, "purchaser under contract of purchase," or "lessee." S. The FULL NAMES and FULL ADDRESSES of ALL PERSONS, if any, WHO HOLD SUCH INTEREST or ESTATE with the undersigned as JOINT TENANTS or as TENANTS IN COMMON are: Name & Address Name & Address 6. The FULL NAMES of FULL ADDRESSES OF THE PREDECESSORS in INTEREST of the undersigned if the property was transferred subsequent to the commencement of the work of improvement herein referred to: Name & Address Name & Address 7. A work of improvement on the property hereinafter described was COMPLETED on 10/26/2009. 8. The work of improvement completed is described as follows: 2008 Al Tahoe Waterline Replacement Project. 9. The NAME OF THE ORIGINAL CONTRACTOR, if any, for such work of improvement is Cruz Excavating, Inc. 10. The street address of said property is See Exhibit A attached. 11. The property on which said work of improvement was completed is in the City of South Lake Tahoe, County of El Dorado, State of California, and is described as follows: As shown in Exhibit "A" attached hereto and made a part hereof, and commonly known as DATE: November 5, 2009 CATION FOR INDIVIDUAL OWNER: Yt ffiff ff A ' W�F A OPP i dent VERIFICATION I, the CATI N FOR declare under South Tahoe Pub] i C Utility Di gtri rt penalty of perjury under the laws of the State of California that I am the owner of the aforesaid interest or estate in the property described in the above notice; that I have read said notice, that I know and understand the contents thereof, and the facts stated therein are true and correct. DATE AND PLACE SIGNATURE OF OWNER NAMED IN PARAGRAPH 2 VERIFICATION FOR NON - INDIVIDUAL OWNER South Tahoe Public Ut Distri I, the undersigned, declare under penalty of perjury under the laws of the State of California that I am the Rnard PrPS i dent of the aforesaid interest or estate in the property described in the above notice; that I have read the said notice, that I know and understand the contents thereof, and that the facts stated therein are true and correct. .1115/2009 at South Lake Tahoe, California bATEAND PLACE E1 Dorado County SIGNATURE OF PERSON SIGNING ON BEHALF OF OWNER MARY LOU MOSBACHER, Board President South Tahoe Public Utility District -61- Notice of Completion EXHIBIT " A " Notice of Completion 2008 AL TAHOE WATERLINE REPLACEMENT PROJECT The site of the work is located on Bellevue Avenue to Lakeview Avenue, west on Lily Avenue at Bellevue Avenue to the dead end of Lily Avenue. East on San Jose Avenue to Berkeley Avenue, Continue east on San Jose Avenue at Fresno Avenue to dead end on San Jose Avenue. East on Alameda Avenue at Bellevue Avenue to Nevada Avenue, continue east on Alameda Avenue at Sacramento Avenue to Alameda Avenue and Harrison Avenue. East on Tallac Avenue at Bellevue Avenue to Nevada Avenue, continue east on Tallac Avenue at Sacramento Avenue to Tallac Avenue and Harrison Avenue; on Capistrano from El Dorado Avenue to Sacramento Avenue; on Paloma Avenue from Nevada Avenue to Oakland Avenue; and on Placer Avenue from Sacramento Avenue to Oakland Avenue in the City of South Lake Tahoe, California. The work to be performed consists of construction of approximately 12,205 linear feet of new 8" waterline, services, meters, fire hydrants, interties and appurtenant work, including paving, striping, erosion control and traffic control. Notice of Completion 2008 AL TAHOE WATERLINE REPLACEMENT PROJECT EXHIBIT " A " -62- South Tahoe Public Utility District 1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401 Phone 530 544-6474 - Fax 530 541 -0614 - www.stpud.us CERTIFICATION I hereby certify that the foregoing is a full; true, and correct copy of the Notice of Completion that was approved by the Board of Directors of the South Tahoe Public Utility District, County of El Dorado, State of California, and executed by Board President, Mary Lou Mosbacher. Date Approved: Certified by: Kathy Sharp, Clerk of the Board -63- G-ffw l guard H. Sol" 5outh Ta&V*Cwww J>e► FuHlc ftfffty Maria : 0 - 1 0!*11i rZ I MA + it' 6► BOARD AGENDA ITEM 4k TO: Board of Directors FROM: Jim Hoggatt, Engineering Department Manager MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: 2008 Tata Lane /Granite Mountain Waterline Replacement REQUESTED BOARD ACTION: (1) Approve the Project Closeout Agreement and Release of Claims for Cruz Excavating; and (2) staff to file Notice of Completion with the El Dorado County Clerk. DISCUSSION: Cruz Excavation completed all asphalt repairs for the 2008 Tata Lane /Granite Mountain Waterline Replacement Project. SCHEDULE: As soon as possible. COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: Closeout Agreement and Notice of Completion CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES i 9V NO CHIEF FINANCIAL OFFICER: YES YP4 NO —65— RECORDING REQUESTED BY: Heidi C. Baugh, Contracts Administrator South Tahoe Public Utility District WHEN RECORDED MAIL TO: SOUTH TAHOE PUBLIC UTILITY DISTRICT Attn: Heidi C. Baugh 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 APN NA NOTICE OF COMPLETION FOR RECORDER'S USE NOTICE IS HEREBY GIVEN THAT: 1. The undersigned is OWNER or agent of the OWNER of the interest or estate stated below in the property hereinafter described. 2. The FULL NAME of the OWNER is South Tahoe Public Utility District 3. The FULL ADDRESS of the OWNER is 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150. 4. The NATURE OF THE INTEREST or ESTATE of the undersigned is: In fee. (If other than fee, strike "in fee" and insert here, for example, "purchaser under contract of purchase," or "lessee." 5. The FULL NAMES and FULL ADDRESSES of ALL PERSONS, if any, WHO HOLD SUCH INTEREST or ESTATE with the undersigned as JOINT TENANTS or as TENANTS IN COMMON are: Name & Address Name & Address 6. The FULL NAMES of FULL ADDRESSES OF THE PREDECESSORS in INTEREST of the undersigned if the property was transferred subsequent to the commencement of the work of improvement herein referred to: Name & Address Name & Address 7. A work of improvement on the property hereinafter described was COMPLETED on 10/26/2009. 8. The work of improvement completed is described as follows: 2008 Tata Lane /Granite Mountain Waterline Replacement Project. 9. The NAME OF THE ORIGINAL CONTRACTOR, if any, for such work of improvement is Cruz Excavating, Inc. 10. The street address of said properly is See attached Exhibit "A ". 11. The property on which said work of improvement was completed is in the City of South Lake Tahoe, County of El Dorado, State of California, and is described as follows: As shown in Exhibit "A" attached hereto and made a part hereof, and commonly known as SIGNATU OF QQyy(( ppJj�� GEFQ OF O VERIFICATION FOR INDIVIDUAL OWNER: MARY LOU MU$�Ht�, lioar R I I, the undersigned, declare under penalty of perjury under the laws of the StateVEWIMPI 994 e oresa nter or estate in the property described in the above notice; that I have read said notice, that I know and understand the contents thereof, and the facts stated therein are true and correct. DATE AND PLACE SIGNATURE OF OWNER NAMED IN PARAGRAPH 2 VERIFICATION FOR NOWINDIVIDUAL OWNER: I, the undersigned, declare under penalty of perjury under the laws of the fate of Califomia that I am the Board Presid of the aforesaid interest or estate in the property described in the above notice; that I have read the said notice, that I know and understand the contents thereof, and that the facts stated therein are true and correct. Tahoe 11�S12CIC)q at South Lake California DATE ND PLACE E1 Dorado County SIGNATURE OF PERSON SIGNING ON BEHALF OF OWNER MARY LOU MOSBACHER, Board President South Tahoe Public Utility District —67— Notice of Completion EXHIBIT " A " Notice of Completion 2008 TATA LANE/GRANITE MOUNTAIN WATERLINE REPLACEMENT PROJECT The site of the work is located in two areas: 1) Tata Lane, the section which lies northwest of Lake Tahoe Boulevard in the City of South Lake Tahoe, and 2) Iron Mountain, between the streets of Forest Mountain Drive, Granite Mountain Circle, and Iroq Mountain Circle in the County of El Dorado, California. The work to be performed consists of the installation of approximately 5,470 linear feet of new 8" waterline, services, meters, fire hydrants, interties, temporary by -pass, and associated work including paving, temporary erosion control and traffic control. Notice of Completion 2008 TATA LANE/GRANITE MOUNTAIN WATERLINE REPLACEMENT PROJECT EXHIBIT " A " -68- South Tahoe Public Utility District 1275 Meadow Crest Drive - South Lake Tahoe - CA 96150 -7401 Phone 530 544-6474 - Fax 530 541 -0614 - www.stpud.us CERTIFICATION I hereby certify that the foregoing is a full, true, and correct copy of the Notice of Completion that was approved by the Board of Directors of the South Tahoe Public Utility District, County of El Dorado, State of Galifornia, and executed by Board President, Mary Lou Mosbacher. Date Approved: Certified by: Kathy Sharp, Clerk of the Board -69- o&�M~ r icharW a. South Tahoe, Public UtIfty District �nie t�udm JaMr►ad��..Jt1�r MMY BOARD AGENDA ITEM 41 TO: Board of Directors FROM: Jim Hoggatt, Engineering Department Manager MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: Twin Peaks Booster Station REQUESTED BOARD ACTION: Increase Task Order for Carollo Engineer's to provide construction services, in the amount of $59,435. DISCUSSION: The largest amount of this request is having to review shop drawings two and three times as they are submitted by the contractor for the Twin Peaks Booster Station. Normally District staff review and approve the less complicated or technical submittals. Due to District staffs work load, Carollo Engineers has been asked to review all of the submittals. SCHEDULE: As soon as possible COSTS: $59,435.00 ACCOUNT NO: 2029- 7070/TPBSTR BUDGETED AMOUNT REMAINING: <$69,572> ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES_ "A NO CHIEF FINANCIAL OFFICER: YES NO -71- S� •1850•` SOUTH TAHOE PUBLIC UTILITY DISTRICT "Basic Services for a Comp /ex World" Richard Solbrig, Genera Manager Paul Sciuto, Assistant General Manager Mary Lou Mosbacher, President BOARD MEMBERS Dale Rise, Vice President James R. Jones, Director Eric W. Schafer, Director Ernie Claudio, Director REGULAR MEETING OF THE BOARD OF DIRECTORS SOUTH TAHOE PUBLIC UTILITY DISTRICT OCTOBER 15, 2009 MINUTES The Board of Directors of the South Tahoe Public Utility District met in a regular session, October 15, 2009, 2:00 P.M., District Office, 1275 Meadow Crest Drive, South Lake Tahoe, California. BOARD OF DIRECTORS ROLL CALL President Mosbacher, Directors Rise, Claudio, Jones, Schafer. STAFF Solbrig, Hughes, Whalen, Cocking, Coyner, Henderson Brown, Ryan, Curtis, Hoggatt, Carrion, Kosciolek, Butz, Swain, Hussmann, Nolan, Attorney Kvistad. GUESTS: i Tom Pavletic, Marvin Winer/Municipal Financial Services, , Andrew Strain, Blaise Carrig, Casey Blann /Heavenly Valley, John Runnels, Peggy Cocoras, John Adamski. Lisa Coyner led the pledge to the flag. Consent Item c. (Alpine County Annual Impact /Mitiga- tion /Compensation Fee) was brought forward for separate Board action. Moved Schafer / Second Rise / Passed Unanimously to approve the Consent Calendar as amended: a. Cul De Sac Holdings, LLC Water Main Extension — Adopted Resolution No. 2873 -09 accepting the Cul De Sac Holdings Water Main Extension; PLEDGE OF ALLEGIANCE CORRECTION TO THE AGENDA OR CONSENT CALENDAR CONSENT CALENDAR -73- REGULAR BOARD MEETING MINUTES — OCTOBER 16, 2009 PAGE - 2 b. Cul De Sac Holdings, LLC Sewer Main Extension - CONSENT CALENDAR Adopted Resolution No. 2874 -09 accepting the Cul (continued) De Sac holdings Sewer Main Extension; c. See Consent Items Brought Forward; d. Wastewater Treatment Plant Filter Rehabilitation - Approved proposal from Brown & Caldwell Consulting Engineers for design services, in the amount of $38,204; e. Angora Water Tank Replacement Sitework - Approved Change Order No. 1 to KG Walters Construction Company, in the amount of $3,990.57; f. Arrowhead Well No. 3 Arsenic Treatment Facility - Approved Change Order No. 3 to KG Walters Construction, Inc., in the amount of $4,716.33; g. Luther Pass Pump Station Standby Power Generation Facility - Authorized an increase to Purchase Order P21709 to AECOM for additional engineering services for design of a removable roof panel, in the amount of $5,214; h. Harvey Place Reservoir Bypass Pipeline - Approved proposal from c2me Engineering Services in general accordance with the DVR Pipeline Proposal dated September 29, 2009, in the amount of $26,290; L Diesel Particulate Filters - (1) Rejected low bid for non-responsiveness; A bid to the and (2) warded asnm lowest responsive, responsible bidder A -Z Emissions Tti Solutions, in the amount of $73,255.56; UTES j. Pump Run Service Truck - Authorized staff to advertise for bids for one 4x4 %s ton pickup truck; k. Proposition 1 A Securitization Program - (1) Adopted Resolution No. 2875 -09 approving the form of and authorizing the execution and delivery of a purchase and sale agreement and related documents with respect to the sale of the seller's Proposition 1 A receivable from the State; and (2) Directing and authorizing certain other actions in connections therewith; 1. Approved regular Board meeting minutes dated September 17, 2009; m. Approved regular Board meeting minutes dated October 1, 2009. —74— REGULAR BOARD MEETING MINUTES - OCTOBER 15, 2009 PAGE - 3 CONSENT ITEM BROUGHT FORWARDFOR BOARD ACTION Debbie Henderson addressed the Board and provided a ALPINE COUNTY ANNUAL IMPACT spreadsheet for the current year figure. The agreement MITIGATION /COMPENSATION FEE between the District and the County of Alpine, dated (Consent Item c.) June 2, 1982, provides for an annual payment to compensate for and mitigate the impacts of Harvey Place Dam Project. She explained the current year obligation is a decrease and is attributed to District Ordinance No. 506 -08 regarding relief for excess sewer capacity. Previous year obligation was $ 115,700. The current year obligation is $ 115,200. C RIB Moved Schafer / Second Rise / Passed Unanimously to authorize payment of District's annual mitigation fee to '`':v °'<? Alpine County in the amount of $115,200. PROPOSITION 218 MAJORITY PROTEST PUBLIC HEARING President Mosbacher opened the public hearing at 2:05 p.m. Pursuant to the requirements of Proposition 218, Paul REPORT ON CUSTOMER Hughes reported that on August 28, 2009, Heavenly NOTIFICATION Valley was mailed notification of the proposed rate change which met the 45 day notification requirement. Tom Pavletic and Marvin Winer of Municipal Financial PRESENTATION OF SNOWMAKING Services presented a PowerPoint presentation of the WATER RATES FOR HEAVENLY Calculation of Rates to be Assessed for Water Delivered VALLEY for Snow - making Purposes. It included justification for calculating rates on a special /contractual basis; factors and values used in calculating annual revenue requirements; calculation figures of annual revenue requirements; factors used in the calculation of rates; calculation of rates and rationale for not assessing a capacity charge. Heavenly Valley filed no protest. REPORT ON PROTEST RECEIVED The Public Hearing was closed at 2:22 p.m. ITEMS FOR BOARD ACTION District staff and Heavenly representatives have HEAVENLY / DISTRICT WATER developed a new water service facilities for supplying SERVICE AGREEMENT snowmaking water to Heavenly in order to meet its increased water demands. This agreement would provide Heavenly up to 750 acre feet of water each calendar year, October 1 through March 31 at a maximum delivery rate of 4,500 gallons per minute, with certain scheduled exceptions. Municipal Financial Services developed rates for this new usage agreement and determined an annual -75- REGULAR BOARD MEETING MINUTES - OCTOBER 16, 2009 PAGE - 4 service charge of $202,000, and a metered consumption HEAVENLY / DISTRICT WATER rate of $0.404 per 100 cubic feet. This rate structure SERVICE AGREEMENT covers the District's costs. The rates shall be subject to (continued) adjustment in an amount equal to the average percentage adjustment of any future rate changes. The agreement does not require a capacity charge as Heavenly will be bearing the costs of all infrastructure improvements. This proposed agreement will commence on October 1 of the calendar year in which Heavenly has completed the necessary improvements and requests the District to make the water available. Moved Schafer / Second Rise / Passed Unanimously to authorize execution of the Water Service Agreement with Heavenly Valley Limited Partnership. Paul Hughes reported that staff will re -visit the language ORDINANCE NO. 518 -09: TIME pertaining to penalties versus an administrative fee for LIMITS ON SEWER PERMITS renewing a permit or letting a permit expire. He requested the Board discuss the issue, but take no action at this time. Lisa Coyner explained the reasons for this amendment. Currently, the Administrative Code does not have a time limit or expiration date for sewer permits. There are many outstanding permits, some over ten years old, in which connections to the sewer system have not been made. This has caused some confusion for property owners holding outstanding permits as to which of the District's Ordinances, rules, or regulations apply. An 940P amendment would make the permitting and inspection TED 7 r process clearer and also provide a reasonable time to complete construction to the District's sewer system. Board discussion followed. Staff was directed to re- submit the item with amended language at the next Board meeting. No Board Action. Richard Solbrig reported that the Management MOU Ad Hoc Committee and the District's management negotiating team met to discussed the employment contract. It was agreed this would be a one year contract effective January 27, 2010, to January 5, 2011, and that there would be no adjustment to the salary scale for 2010. It was also agreed that the managers will have representatives and participate in any future discussions conducted between the District and the Union employees concerning medical insurance coverage or changes to the wellness program during the upcoming process of renew- ing the Union MOU. The Union MOU is due to expire at the end of June, 2010. MANAGEMENT MEMORANDUM OF UNDERSTANDING -76- REGULAR BOARD MEETING MINUTES - OCTOBER 15, 2009 PAGE - 5 Moved Claudio / Second Schafer / Passed unanimously MANAGEMENT MEMORANDUM OF to approve one year contract. UNDERSTANDING (continued) Moved Schafer / Second Claudio / Passed Unanimously PAYMENT OF CLAIMS to approve payment in the amount of $1,552,885.52. Water and Wastewater Operations Committee: The committee met October 12. Minutes of the meeting are available upon request. Management and Union MOU Ad Hoc Committee met on October 13. Results of the meeting are reflected above. Grizzly Flats is experiencing water shortage issues, a failing system, and the State has asked them to prove their water rights. The State took $189,000 due to Proposition 1 A. They will be applying for the Loan Securitization Program. The Water Agency Legislation and Policy 4 guidelines were supposed to be discussed but were continued to the next meeting. The agency is having personnel issues. Director Claudio reported he has received comments from the public regarding water meters and concerns how it may impact their bills. Director Schafer announced that he will be living in South Lake Tahoe for the next four years. BOARD MEMBER STANDING COMMITTEE REPORTS BOARD MEMBER AD HOC COMMITTEE REPORTS EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVE REPORT BOARD MEMBER REPORTS General Manager: Richard Solbrig reported on two GENERAL MANAGER REPORTS items: 1) Integrated Regional Water Management Plan and Proposition 84 - The partnership met and projects were submitted by all the partners. There will be future meetings to prioritize the submitted projects with a possible grant submission sometime in Summer 2010. 2) City Water MOU - Is on the City Council's agenda o Tuesday, ctober 20 for discussion. ssion. It was suggested that Director Claudio and a District management staff member who is familiar with the MOU attend this meeting. District Information Officer: Dennis Cocking reported on STAFF REPORTS five items: 1) SB 802, which would have forced project retainages to 5 %, has been vetoed by the Governor. 2) SB 67 Securitization of Proposition 1 A passed the Senate and is on the Governor's desk for signature. WIN Ir 17 -77- REGULAR BOARD MEETING MINUTES - OCTOBER 16, 2009 PAGE - 6 3) The Department of Interior passed a spending bill that included $5M for the Lake Tahoe Community Fire Protection Partnership group, is out of conference committee, and should be on the President's desk for signature in the next two weeks. 4) The reauthorization of the LTRA (Lake Tahoe Res- toration Act), now called LTRA 2, is ready to be introduced. 5) He has been elected to ACWA Region 3 Board of Directors 3:23 - 3:31 P.M. STAFF REPORTS (continued) MEETING BREAK AND ADJOURN- MENT TO CLOSED SESSION ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION No reportable Board action. No reportable Board action. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel - Existing Litigation: Tahoe Asphalt, Inc., and Tahoe Asphalt Materials Company, LLC, vs. STPUD, Case No. SC20090104, El Dorado Superior Court Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel - Existing Litigation re: Meyers Landfill Site: United States of America vs. El Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S -01 -1520 LKK GGH, U.S. District ourt for the Eastern District of Ca. ADJOURNMENT Mary Lou Mosbacher, Board President South Tahoe Public Utility District ATTEST: By Chris Whalen, Assistant Clerk of the Board Kathy Sharp, Clerk of the Board South Tahoe Public Utility District -78- L IAe •9950•` SOUTH TAHOE PUBLIC UTILITY DISTRIp "Basic Services for a Comp /ex World" Richard Solbri Mosbacher, President James R. Jones, Director MEMBERS Eric W. Schafer, Director Paul Sciuto, Assistant SPECIAL MEETING OF THE BOARD OF DIR SOUTH TAHOE PUBLIC UTILITY DISTJ 4 OCTOBER 29, 2009 MINUTES The Board of Directors of the South Tahoe Public istrict met in a special session, October 29, 2009, 3:00 P.M., District Office, 12 adow Crest Drive, South Lake Tahoe, California BOARD OF DIRECTORS President Mosbacher, Directors Rise, C , Jones, Schafer STAFF Solbrig, Sharp, Sciuto, Hughe , Cocking, Hoggatt, Cullen, Nolan, Thiel, Brown. ey Herrema participated via teleconfer GUESTS: Andrew Sidenus, rneson, Pak Hughes/ Western Nevada p ; Jay Corazza, Scott Ayers/ Ferguson Lynn Nolag,"e pledge to the flag. ROLL CALL PLEDGE OF ALLEGIANCE t ITEMS FOR BOARD ACTION is ?oject includes the installation of 1,519 res ential water meters and new meter pits in several different neighborhoods within the City of South Lake Tahoe. The meters are being installed in areas where waterline replacement projects have been completed over the past twelve years. This project is being funded by the American Recovery and Reinvestment Act and administered by the California Department of Health Services. 2009 AND 2010 WATER METER INSTALLATION PROJECT -79- SPECIAL BOARD MEETING MINUTES - OCTOBER 29, 2009 PAGE - 2 Eight bids were opened at the October 26 bid opening. Staff has confirmed that the lowest bid, received from Teichert Construction, met all of the good faith efforts required by the grant conditions. Moved Schafer / Second Jones / Passed Unanimously to award bid to the lowest responsive, responsible bidder, Teichert Construction, in the amount of $1,989,500. 3:15 P.M. 2009 AND 2010 WATER METER INSTALLATION PROJECT (continued) ADJOURNMENT 0 O Mares Lj�T Mosbacher, Board President Sot ahoe Public Utility District Kathy SharndONArZoUffie Board South TahefqNklic Utility District XV I t � 19, -80- Can" MWM4W Richard K 5olbrig ,5 outh Ta hoe. Nwic. U vilty C)10tr1Gt �'" it • . r ` r r . •'� i rt BOARD AGENDA ITEM 6a TO: Board of Directors FROM: Paul Hughes, Chief Financial Office Diane Noble, Interim Customer Service Manager MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: Time Limits on Sewer Permits REQUESTED BOARD ACTION: Board discussion and direct District staff. DISCUSSION: During the October 15 Board meeting, staff presented an amendment to the administrative code placing time limits on sewer permits. The original proposed amendment included language stating that if the permit holder did not construct the connection by the end of three years, they could apply for a one -year extension provided they' the then applicable sewer capacity charge less any capacity charge ,+ previously paid for the same connection. Staff recommended that this language be revised, charging the applicant an administrative fee for the one year extension instead of the current capacity charge. Staff also recommended that if the permit holder did not construct the connection by the end of year four, which includes the one year extension, the permit would expire, the District would refund the applicable previously paid capacity , charge, and the customer would be required to reapply at some point in the future and pay the then applicable capacity charge. Staff was under the impression that the Board understood the recommendation and was intending to bring the revised Code k " Amendment to the November 5, 2009, Board meeting for action. Since the October 15 Board meeting, District staff has received several calls from Board members and citizens disagreeing with the proposed code amendment. It appears there may have been some misunderstanding of the staff recommendation. The main concern appears to be the requirement of the customer to pay the most current capacity charge if they let their permit expire and reapply at a later date. Staff is seeking direction from the Board to determine if the draft code amendment should be approved as is, revised, or not brought forward for action at all. -81- Paul Hughes Diane Noble November 5, 2009 Page 2 SCHEDULE: N/A COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT REMAINING: N/A ATTACHMENTS: Draft Ordinance No. 518 -09 CONCURRENCE WITH REQUESTED ACTIO : CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -82- ORDINANCE NO. 518-09 AN ORDINANCE OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT AMENDING SECTION 4.L10 OF THE ADMINISTRATIVE COPE_ REGARDING TIME LIMITS ON SEWER PERMITS BE IT ENACTED by the Board Directors of the South Tahoe Public Utility District, County of ET Dorado, State of California, as follows: SEC'T'ION 1- POLICY AND PURPOSE The purpose ofthis Ordinance is to adopt certain changes to the Administrative Code mprdtng time limits for permits allowing connection to the District's sewer system. SECTION H - DEFINIT ..ONS For the purposes of this Ordinance, the terms used herein are defined as follows: A. The Di rict - The South Tahoe Public Utility District. B. The Board The Board of Directors of the South Tahoe Public Utility Dist m C: Administrative Code - The compilation and codification of all"of tho Administrative, Water, Sewer, Street Lighting and Groundwater Management Plan Ordinances of the District, which establish the authority and the principles for the decisions of the District, and provide the public with guidelines applicable to District operations. SECTION III - FINDINGS The Board Directors of the South Tahoe Public utility District, County of El Dorado, State of California, make the following findings: L The District allows connection to its sewer system pursuant to the applicable provisions of the Ordinances, rules, and regulations of the District and specifications for sewer service. 2. The Administrative Code presently does not limit the time in which the holder of a permit to connect to the District's sewer system must make such connection. As a result, there are many outstanding permits pursuant to which connection has not bma m&, BB_ $2009 YI.WM7,9019 -83- 3. There has been confusion among those holding outstanding permits as to whether their permits are subject to changes in the District's Ordinances, rules, and regulations and specifications for sewer service Between the time the permit is issued and connection to the District's Sewer System is accomplished 4. The proposed" amendment is designed to make clear to which of the District's Ordinances, rules, and regulations and specifications for sewer service a permit is subject. The proposed amendment will the reduction of outstanding permits by limiting the time frame in which a permittee may conned to the District's sewer system pursuant to the District's Ordinances, rules, and regulations and specifications for sewer service at the time the permit was issued 6. The proposed amendment is intended to provide the holders of outstanding permits a reasonable time to complete connection to the District's sewer system, pursuant to a defined set of District Ordinances, rules, and regulations and specifications for sewer service. The Board has determined that it is in the best interest of the health and safety of District residents to adopt an ordinance to add certain provisions to the Administrative Code regarding the installation of water' and' sewer services to and "the b for the same, of common interest developments. SECTION IV - AMEND SECTION 41.10 OF THE ADM NISTRATIVE CODE Administrative Code Sidon 42- 10 to be amended as fallow -: (a) A permit for construction of ar lateral shall mit the connection to the District's sewer-service, in with provisions of the rules, and regulations of the District and specifications for sewer service as existing at the date of Permitting; fora period of three (3) years from the date the permit is issued f& at the expiration of the three (3) year initial permit term, the permittee has yet to construct the - permitted connection -to- the -District's serer system; drepermifte -miry extend the permit term for one (1) additional one (1) year term, provided that the permittee pays4W -- - administrative fee of one hundred fifty dollars ($150.00) extended pursuant to this subsection shall be subject to the tmm of the DisftWs AdminisftWve Code and regulations as exerting at the date ofcxtensivn. If upon the termination of the permit term including any term extended pursuant to this section, as applicable, the permittee has not connected to the District's sewer Ordinance No. 518-09 Tmic Umj% on, Sewer Permits Page 2 ss s vJM7, 7mio {DdeOalk prtdic « Odi�4e�es appiierble�eeLr �e�rr oaeectiea, pesmt b AdamenlaWn Code mh m 4.5, Ids any Embpevin* pad Wpwtvfnidfee Dd+eQedc T -84- service. the District shall refund to the permittee the applicable fee for sewer connection pursuant to Administrative Code section 4.5. paid by the permittee upon receipt of its permit Upon termination of the permit term the permittee shall not be entitled to a refund of any administrative fees paid for extension of the permit term as applicable �f b' Ftitos �ermiits fpr "cot after l t� have been issued mior rto__ . the effective .date of Ordinance No. 518-01 shall permit the connection to the District's p'"�_` or sewer service hraccoudanm with applicable provisions ofthe rules, and regulations of the District and specifications for sewer service as existing at the date of Permitting, fora period of three (3) years from the effective date of Ordinance" No. 518- 09. It at the expiration of this three (3) year term, the permittm has yet to construct the permitted connection to the District's sewer system, the pmnittee may extend the permit t+enm for one (I -) addition ow (1) yew term, Provided OW tht pernifttee pays an administrative fee of one hundred fifty dollars ($150.00 permit extended pursuant to this subsection shall be subject to the tan ns of the District's Administrative Code and regulations as existing at the date of exte (c) Any pwaitte may cimse toe 1y with dmgm i tke WUMMe provisions of the Ordinances, rules, and regulations of the'District and for sewer service made after the date of permitting but prior to connection to the District's sewer service, (d) Notwithstanding the above, a sewer permit for construction of a sewer faberal be and void. 1) If construdaon project is not accepted by County or City for the proposed improvement to be served by the sewer; or 2) If the County or City voids or cancels either the application or permit for construction of the proposed improvement to be served by the sewer. SI TION V - SEYERAIBILITY rf any section, subsection, subdivision, paragraph„ sentence, clause or phrase of this Ordnance and its implementing rules and regulations is for any mason held to be unconstitutional - or invalid, such decision shall not affect the validity of the remaining portions of this Ordinance or the Administrative Code. IU Board of Directors declares and determines that it would passed section, subsection, subdivision, paragraph, sentence, clause or phrase thereof of this Ordinance and its implementing rules and regulations and the Administrative Code irrespective of the fact that any one or more sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases may be determined to be unconstitutional or invalid. Ordinance No. 518-09 Time Limits on Sewer PenW4 Page 3 sa SWW vi:007627A010 DdlEDIk Qe flee appi'w�Dkfee� sewer cammCEise. Pamsnat to ABminitudive Code section 4.5, ku any 16rk Peeviosdy PW"as Pmt0rW id*e. n�ereretre S ounce* Fd&. as -85- SBUWK VI - EFFECTIVE DATE This Ordinance amending the above referenced sections to the Administrative Code shall take effed Why days after its passage. PASSED AND ADOPTED the Board of Directors of the South Tahoe Public Utility District at its duty field regular meeting on the 15th day of October, 2009 by the Mowing vote: AYES: NOES: ABSENT: Mary Lou Mosbacher, President South Tahoe Public Utfl y District ATTEST: Kathy Sharp, Clerk of the Board Ordinance No. 518-09 Tinto Limits on Sewer Pmuts Page 4 p 5pM v1:0076t7.0010 -86- PAYMENT OF CLAIMS FOR APPROVAL November 5, 2009 Payroll 10/21/09 430,568.84 Payroll 10/16/09 11,692.64 Total Payroll 442,261.48 BNY Western Trust Company 0.00 CDS- health care payments 117,941.49 ADP 0.00 Brownstein /Hyatt/Farber /Schreck legal services 0.00 Bank of America 0.00 Union Bank 0.00 Total Vendor EFT 117,941.49 Accounts Payable Checks -Sewer Fund 485,210.49 Accounts Payable Checks -Water Fund 1,103,222.68 Accounts Payable Checks - Self - funded Insurance 24,889.21 Accounts Payable Checks - Grants Fund 19,560.00 Total Accounts Payable 1,632,882.38 Grand Total 2,193,085.35 Payroll EFTs & Checks 10/21/09 10/16/09 EFT AFLAC Medical & Dependent Care 3,336.19 0.00 EFT CA Employment Taxes & W/H 16,850.88 627.77 EFT Federal Employment Taxes & W/H 90,569.85 4,180.58 EFT CalPERS Contributions 73,070.37 0.00 EFT Great West Deferred Comp 17,410.85 0.00 CHK Stationary Engineers Union Dues 2,394.70 0.00 EFT United Way Contributions 156.00 0.00 EFT Employee Direct Deposits 216,032.59 6,884.29 CHK Employee Garnishments 1,116.54 0.00 CHK Employee Paychecks 9,630.87 0.00 Total 430,568.84 11,692.64 -sT- Vendor Name ABC SERVICES INC User: THERESA Department / Proi Name PAYMENT OF CLAIMS Description Acct# 1 Proi Code Amount Check Num Tyye UNDERGROUND REP INFILTRTN/INFLOW 1001 - 6055 29,797.00 Check Total: 29.797.00 AP- 00074063 MW ACWA HEALTH BENEFITS AUTHORITY GEN & ADMIN VISION INS 1000 - 2530 2,608.80 Check Total: 2,608.80 AP -00074064 MW AECOM USA INC ENGINEERING - REPL GEN, LPPS REPL GEN LPPS 1029 - 8933 - RGLPPS 63,419.10 Check Total: 63.419.10 AP -00074065 MW AFLAC GEN & ADMIN AFLAC FEE DED 1000 - 2538 115.00 Check Total: 115.00 AP- 00074066 MW AHERN RENTALS UNDERGROUND REP SAFETY/EQUIP/PHY 2001 - 6075 87.00 Check Total: 87.00 AP- 00074067 MW ALEXANDER HAMILTON INSTITUTE HUMAN RESOURCES SUBSCRIPTIONS 1022 - 4830 34.49 ALEXANDER HAMILTON INSTITUTE HUMAN RESOURCES SUBSCRIPTIONS 2022 - 4830 34.49 Check Total: 68.98 AP- 00074068 Mw ALL SEASONS PLUMBING & HEATING ENGINEERING MISC LIAB CLAIMS 2029 - 4520 100.00 1 Check Total: 100.00 AP- 00074069 MW o ALPO?! SIERRA COFFEE GEN & ADMIN OFC SUPPLY ISSUE 1000 - 6081 231.50 Check Total: 231.50 AP- 00074070 MW ALPINE, COUNTY OF DIAMOND VLY RNCH OPERATING PERMIT 1028 - 6650 115,200.00 Check Total: 115,200.00 AP-00074062 MW ALSBURY, MARY INFORMATION SYS TRAVEL/MEETINGS 1037 - 6200 197.94 ALSBURY, MARY INFORMATION SYS TRAVEL/MEETINGS 2037 - 6200 197.94 Check Total: 395.88 AP-00074071 MW AMERIPRIDE UNIFORM SERVICES GEN & ADMIN UNIFORM PAYABLE 1000 - 2518 1,473.57 Check Total: 1,473.57 AP -00074072 MW ARETE SYSTEMS ENGINEERING - GIS SOFTWARE GIS DEVELOPMENT 2029 - 8062 - GISSFT 11,235.00 Check Total: 11,235.00 AP -00074073 MW AT &T /CALNET 2 GEN & ADMIN TELEPHONE 1000 - 6310 23.43 AT &T /CALNET 2 PUMPS TELEPHONE 1002 - 6310 81.76 AT &T /CALNET 2 OPERATIONS TELEPHONE 1006 - 6310 30.39 AT &T /CALNET 2 INFORMATION SYS TELEPHONE 1037 - 6310 82.79 AT &T /CALNET 2 CUSTOMER SERVICE TELEPHONE 1038 - 6310 7.17 Page: 1 Current Date: 10/29/2009 Report OH_PMT CLAIMS BK Current Time: 09:35:42 PAYM€NT OF CLAIMS yendgr Name Department / Proi Name Descritrtion A ccrif (Poi Code Amou to Check Num TvDe AT &T /CALNET 2 GEN & ADMIN TELEPHONE 2000 - 6310 23.43 AT &T /CALNET 2 PUMPS TELEPHONE 2002 - 6310 35.79 AT &T /CALNET 2 INFORMATION SYS TELEPHONE 2037 - 6310 82.79 AT &T /CALNET 2 CUSTOMER SERVICE TELEPHONE 2038 - 6310 7.17 Check Total: 374.72 AP- 00074074 MW AWWA CAL -NEV SECTION CUSTOMER SERVICE DUES/MEMB /CERT 2038 - 6250 100.00 Check Total: 100.00 AP- 00074075 MW B &B MICROSCOPE SERVICE LABORATORY MICSCP /CAMERA 1007 - 8023 220.10 Check Total: 220.10 AP -00074076 MW BARNES, SHELLY CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 244.75 Check Total: 244.75 AP -00074077 MW BB &H BENEFIT DESIGNS HUMAN RESOURCES CONTRACT SERVICE 1022 - 4405 624.50 BB &H BENEFIT DESIGNS HUMAN RESOURCES CONTRACT SERVICE 2022 - 4405 624.50 Check Total: 1.249.00 AP-00074078 MW BENTIN AGROWDYNAMICS OPERATIONS SLUDGE DISPOSAL 1006 - 6652 3,515.68 m t Check Total: 3,515.68 AP- 00074079 MW BLUE RIBBON TEMP PERSONNEL CUSTOMER SERVICE CONTRACT SERVICE 1038 - 4405 1,814.40 BLUE RIBBON TEMP PERSONNEL CUSTOMER SERVICE CONTRACT SERVICE 2038 - 4405 1,814.40 Check Total: 3,628.80 AP -00074080 MW Bolger, Doug CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 2,120.00 Check Total: 2,120.00 AP -00074081 MW BROWN, LINDA FINANCE TRAVEL/MEETINGS 1039 - 6200 69.85 BROWN, LINDA FINANCE TRAVEL/MEETINGS 2039 - 6200 69.85 Check Total: 139.70 AP -00074082 MW BSK ANALYTICAL LABS LABORATORY MONITORING 2007 - 6110 5,950.00 Check Total: 5.950.00 AP -00074083 MW C2ME ENGINEERING CUSTOMER SERVICE - WT MTR MXU INST MTR RTFT MXU'S 2038 - 8074 - MTRMXU 7,410.00 Check Total: 7,410.00 AP -00074084 MW CALIF DEPT OF HEALTH SERVICES OPERATIONS DUES/MEMB /CERT 1006 - 6250 190.00 CALIF DEPT OF HEALTH SERVICES CUSTOMER SERVICE DUES/MEMB /CERT 1038 - 6250 170.00 Check Total: 360.00 AP-00074085 MW User: THERESA Report: OH PMT CLAIMS_BK Page: 2 Current Date: 10/29/2009 Current Time: 09:35:42 Vendor Name Department / ProI Name CALIF DEPT OF HEALTH SERVICES ENGINEERING CALIF DEPT OF HEALTH SERVICES CUSTOMER SERVICE CALIF WATER AWARENESS CAMPGN 010 - PR EXP- EXTERNAL CAMPBELL CONSTRUCTION CO INC CAMPBELL CONSTRUCTION CO INC CAMPBELL CONSTRUCTION CO INC CAMPBELL CONSTRUCTION CO INC CAPITAL FORD CAPITAL FORD CAPITAL RUBBER CO LTD CAR .LO ENGINEERS CARRELL, George & Margo CARRELL, George & Margo CARRELL, George & Margo CASHMAN EQUIPMENT CCH INC CCH INC CDS GROUP HEALTH CDW - G CORP CDW - G CORP CDW - G CORP GEN & ADMIN - AL TAHOE WTR-09 GEN & ADMIN - SONORA AVE WTRLN ENGINEERING - SONORA AVE WTRLN ENGINEERING - AL TAHOE WTR -09 EQUIPMENT REP EQUIPMENT REPAIR HEAVY MAINT ENGINEERING - TWIN PEAKS BS GEN & ADMIN GEN & ADMIN GEN & ADMIN EQUIPMENT REPAIR HUMAN RESOURCES HUMAN RESOURCES SELF FUNDED INS UNDERGROUND REP INFORMATION SYS INFORMATION SYS PAYMENT OF CLAIMS User: THERESA Page: 3 Report: OH_PMT_CLAIMS_BK Description OPERATING PERMIT DUES/MEMB /CERT DUES/MEMB /CERT CONST RETAINAGE CONST RETAINAGE WTRLN,SNRA/SK RN WTLN AL TAHOE 09 Acct# / Proi Code 2029 - 6650 2038 - 6250 AUTOMOTIVE 1005 - 6011 AUTOMOTIVE 2005 - 6011 EXPORT/FRCE MAIN 1004 - 6047 BSTR, TWN PEAKS UB SUSPENSE 1000 - 2002 UB SUSPENSE 2000 - 2002 METER SALE 2000 - 3545 AUTOMOTIVE 2005 - 6011 SAFETY/EQUIP/PHY 1022 - 6075 SAFETY/EQUIP/PHY 2022 - 6075 ADMIN FEE 3000 - 6741 INFILTRTN/INFLOW DIST.COMP SPPLIS DIST.COMP SPPLIS 1001 - 6055 1037 - 4840 2037 - 4840 Check Total: 2027 - 6250 - PREEXT Check Total: 2000 - 2605 - ATWL09 2000 - 2605 - SONORA 2029 - 7911 - SONORA 2029 - 8065 - ATWL09 Check Total: Check Total: Check Total: 2029 - 7070 - TPBSTR Check Total: Check Total: Check Total: Check Total: Check Total: 500.00 - 29,283.68 - 13,494.79 134,947.99 292,836.75 Current Date: 10/29/2009 Current Time: 09:35:42 Amount Check Num 14,006.85 60.00 14,066.85 AP-00074086 500.00 AP- 00074087 MW 385,006.27 AP- 00074088 739.91 739.92 Type MW MW 1,479.83 AP-00074089 MW 596.32 596.32 AP- 00074090 MW 48,431.28 48.431.28 AP- 00074091 MW 12,783.84 2,923.32 286.00 15,993.16 AP -00074092 MW 509.60 509.60 AP- 00074093 MW 1,150.00 1,150.00 2,300.00 AP -00074094 MW 2,292.00 2.292.00 AP-00074095 MW 87.46 73.42 73.40 Ceko, John CFM CFM CFM CITY OF SOUTH LAKE TAHOE COCKING, DENNIS COCKING, DENNIS CONSTRUCTION MATERIALS ENG INC CONSTRUCTION MATERIALS ENG INC CON §TRUCTION MATERIALS ENG INC CONSRUCTION MATERIALS ENG INC CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CREEK ENVIRONMENTAL LABS CSRMA CSRMA CUES INCORPORATED CWEA CWEA CWEA CWEA User: THERESA Report: OH_PMT_CLAIMS_BK Department / Proi Name CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE ELECTRICAL SHOP ELECTRICAL SHOP ELECTRICAL SHOP UNDERGROUND REP DIO DIO ENGINEERING - SNOWSHOE DITCH R ENGINEERING - ANGORA TNK REPL ENGINEERING - TWIN PEAKS BS ENGINEERING - SONORA AVE WTRLN LABORATORY LABORATORY - BEACON CONTAM LABORATORY - BKRFLD TRTMT EXP LABORATORY - HERBST UNDERGROUND REP DIAMOND VLY RNCH UNDERGROUND REP UNDERGROUND REP HEAVY MAINT CUSTOMER SERVICE UNDERGROUND REP PAYMENT OF CLAIMS Description PUMP STATIONS WELLS PUMP STATIONS OPERATING PERMIT TRAVEL/MEETINGS TRAVEL/MEETINGS SNOSHU REPAIR TANK, ANGORA BSTR, TWN PEAKS WTRLN,SNRA/SK RN MONITORING MONITORING MONITORING MONITORING CSRMA LIAB CLAIM CSRMA LIAB CLAIM INFILTRTN /INFLOW DUES/MEMB/CERT DUES/MEMB /CERT DUES/MEMB /CERT DUES/MEMB/CERT Page: 4 Act / Proi C Check Total: 2038 - 6660 - WCPROG Check Total: 1003 - 6051 2003 - 6050 2003 - 6051 2001 - 6650 1027 - 6200 2027 - 6200 Check Total: Check Total: Check Total: 1029 - 7075 - SNOBLO 2029 - 7064 - ANGOTK 2029 - 7070 - TPBSTR 2029 - 7911 - SONORA Check Total: 1007 - 6110 2007 - 6110 - BEACON 2007 - 6110 - BKRFLD 2007 - 6110 - HERBST Check Total: 1001 - 4521 1028 -4521 1001 - 6055 1001 - 6250 1004 - 6250 1038 - 6250 2001 - 6250 Check Total: Check Total: Current Date: 10/29/2009 Current Time: 09:35:42 Amount Check Num Type 234.28 AP -00074096 MW 4,969.50 4,969.50 AP- 00074097 MW 779.05 381.71 859.13 2,019.89 AP- 00074098 MW 4,200.00 4,200.00 AP -00074099 MW 157.03 157.02 314.05 AP- 00074100 MW 19,643.58 2,065.18 75.00 11,403.71 33,187.47 AP- 00074101 MW 245.00 190.00 190.00 190.00 815.00 AP -00074102 MW 11,918.05 2,154.60 14,072.65 AP -00074103 MW 303.37 303.37 AP -00074104 MW 264.00 132.00 132.00 132.00 Vendor Name Department / Proi Name Dedonder, Brian P. GEN & ADMIN Dedonder, Brian P. GEN & ADMIN Dedonder, Brian P. GEN & ADMIN DELL MARKETING L P INFORMATION SYS E- FILUATE CORP INFORMATION SYS E- FILLIATE CORP INFORMATION SYS PAYMENT OF CLAIMS ED SENIOR & SON PLUMBING ENGINEERING - SONORA AVE WTRLN WTRLN,SNRA/SK RN 2029 - 7911 - SONORA 89.00 Check Total: 89.00 AP- 00074109 MW EL DORADO COUNTY CUSTOMER SERVICE SUPPLIES 1038 - 6520 15.00 Check Total: 15.00 AP-00074110 MW EL DORADO COUNTY PUMPS OPERATING PERMIT 1002 - 6650 5,388.00 up EL DORADO COUNTY OPERATIONS OPERATING PERMIT 1006 - 6650 1,528.00 EL DORADO COUNTY PUMPS OPERATING PERMIT 2002 - 6650 3,833.00 Check Total: 10,749.00 AP-00074111 MW ENS RESOURCES INC DIO CONTRACT SERVICE 1027.4405 3,177.84 ENS RESOURCES INC DIO CONTRACT SERVICE 2027 - 4405 3,177.84 Check Total: 6,355.68 AP-00074112 MW ENVIRONMENTAL EXPRESS LABORATORY LAB SUPPLIES 1007 - 4760 602.00 ENVIRONMENTAL. EXPRESS LABORATORY LAB SUPPLIES 2007 - 4760 752.58 Check Total: 1,354.58 AP-00074113 MW ENVIRONMENTAL RESOURCES ASSO LABORATORY LAB SUPPLIES 1007 - 4760 71.50 ENVIRONMENTAL RESOURCES ASSO LABORATORY LAB SUPPLIES 2007 - 4760 63.00 Check Total: 134.50 AP- 00074114 MW ETS LABORATORY MONITORING 1007 - 6110 992.25 Check Total: 992.25 AP -00074115 MW FARO & SON LLC GEN & ADMIN - T &M UB CASH BRD MISC INCOME 2000 - 3540 - TMCBUB 2,000.00 User: THERESA Page: 5 D Llretinam Acct# 1 Pro! Code Amount Check Num Tvoe Check Total: 660.00 AP- 00074105 MW UB SUSPENSE 1000 - 2002 11,322.12 UB SUSPENSE 2000 - 2002 4,161.88 METER SALE 2000 - 3545 1,097.00 Check Total: 16,581.00 AP -00074106 MW COMP, ENG WKST 1 2037 - 8072 3,101.52 Check Total: 3,101.52 AP -00074107 MW DIST.COMP SPPLIS 1037 - 4840 297.38 DIST.COMP SPPLIS 2037 - 4840 297.35 Check Total: 594.73 AP -00074108 MW Check Total: 2,000.00 AP- 00074116 MW Current Date: 10/29/2009 Report: OH_PMT_CLAIMS_BK Current Time: 09:35:42 Vendor Nana FERGUSON ENTERPRISES INC. FERGUSON ENTERPRISES INC. FERGUSON ENTERPRISES INC. FERGUSON ENTERPRISES INC. FERGUSON ENTERPRISES INC. FERGUSON ENTERPRISES INC. FERGUSON ENTERPRISES INC. FERGUSON ENTERPRISES INC. FISHER SCIENTIFIC FISHER SCIENTIFIC Forte, Douglas FRYE WILLIAM FRYC CADDIS INC GFS CHEMICAL GFS CHEMICAL GFS CHEMICAL GORMAN, JIM User. THERESA Report: OH_PMT_CLAIMS_BK Department / Proi Name PUMPS ELECTRICAL SHOP HEAVY MAINT HEAVY MAINT HEAVY MAINT HEAVY MAINT UNDERGROUND REP HEAVY MAINTENANC LABORATORY LABORATORY CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE INFORMATION SYS INFORMATION SYS PUMPS GB GENERAL ENG CONTRACTOR INC UNDERGROUND REP GB GENERAL ENG CONTRACTOR INC ENGINEERING - WTRLN,AL TAHOE GERBER LIFE INSURANCE COMPANY SELF FUNDED INS LABORATORY LABORATORY LABORATORY PAYMENT OF CLAIMS DeacriaUon PUMP STATIONS BUILDINGS BUILDINGS SHOP SUPPLIES SMALL TOOLS BIOSOL EQUP/BLDG PIPE/CVRS/MHLS BUILDINGS LAB SUPPLIES LAB SUPPLIES TRAVEL/MEETINGS TRAVELIMEETINGS PUMP STATIONS PIPE /CVRS/MHLS WTLN, AL TAHOE EXCESS INSURANCE LAB SUPPLIES LAB SUPPLIES LAB SUPPLIES CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE Page: 6 Agct# 1 Pro! Code 1002 -6051 1003 - 6041 1004 - 6041 1004 - 6071 1004 - 6073 1004 - 6653 2001 - 6052 2004 - 6041 1007 - 4760 2007 - 4760 2038 - 6660 - WCPROG Check Total: 1037 - 6200 2037 - 6200 1002 -6051 3000 - 6744 2007 - 4760 1007 - 4760 2007 - 4760 Check Total: Check Total: Check Total: Check Total: 2001 - 6052 7,388.00 2029 - 8811 - ATWL08 22,822.12 Check Total: Check Total: Check Total: Check Total: 2038 - 6660 - WCPROG Check Total: Current Date: 10/29/2009 Current Time: 09:35:42 Amount Check Num Tvoe 14.66 104.34 57.03 262.91 219.40 18.40 89.32 155.12 921.18 AP -00074117 MW 335.51 430.44 765.95 AP -00074118 MW 3,099.00 3,099.00 AP-00074119 MW 157.85 157.85 315.70 AP-00074120 MW 173.18 173.18 AP- 00074121 MW 30.210.12 AP -00074122 21,925.21 3,750.00 21,925.21 AP -00074123 MW 106.80 106.80 AP- 00074124 MW 104.05 62.25 166.30 AP-00074125 MW 3,750.00 AP- 00074126 MW Vendor Name GRAINGER GRAINGER GROVE MADSEN GROVE MADSEN HACH - GLI International HACH - GLI International HARTFORD, THE HARTFORD, THE Hawken, Chris k0 HUGNES,PAUL HUGHES, PAUL ILANO, EILEEN INSITE LAND SURVEYS INTERSTATE SAFETY & SUPPLY JOHNSON, DAVID P JOHNSON, DAVID P Johnson, Joyce Kabour, Make Kabour, Mike User: THERESA Report: OH_PMT_CLAIMS_BK Department / Pro1 Name GEN & ADMIN PUMPS INDUSTRIES INC ELECTRICAL SHOP INDUSTRIES INC ELECTRICAL SHOP LABORATORY LABORATORY GEN & ADMIN GEN & ADMIN FINANCE FINANCE GEN & ADMIN CUSTOMER SERVICE CUSTOMER SERVICE PUMPS FINANCE PAYMENT OF CLAIMS EhumWALen SHOP SUPPLY INV PUMP STATIONS TRAVEL/MEETINGS BUILDINGS LAB SUPPLIES LAB SUPPLIES LIFE INS LTD, UNION CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE TRAVEL/NEETINGS TRAVELMIEETINGS CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE ENGINEERING - ECHO TANK REPL TANK, ECHO SHOP SUPPLY INV TRAVEL/MEETINGS TRAVEL/MEETINGS CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE UB SUSPENSE INTEREST EXPENSE Page: 7 Acct# / Pro; Code 1000 - 0421 1002 -6051 1003 - 6200 1003 -6041 1007 - 4760 2007 - 4760 1000 - 2512 1000 - 2539 Check Total: Check Total: Check Total: Check Total: Check Total: 2038 - 6660 - WCPROG Check Total: 1039 - 6200 2039 - 6200 1000 -0421 1038 - 6200 2038 - 6200 1002 - 2002 1039 - 6710 Check Total: 2038 - 6660 - WCPROG Check Total: 2029 - 8809 - ECHOTK Check Total: Check Total: Check Total: 2038 - 6660 - WCPROG Check Total: Current Date: 10/29/2009 Current Tine: 09:35:42 Amnunt Check Num Type 140.95 159.06 300.01 AP-00074127 MW 2,920.00 2,920.00 AP- 00074128 MW 1,477.77 1,477.77 AP- 00074129 MW 31.51 47.47 78.98 AP -00074130 MW 2,020.56 2,551.79 4,572.35 AP- 00074131 MW 1,702.00 1,702.00 AP -00074132 MW 56.10 56.10 112.20 AP- 00074133 MW 976.00 976.00 AP -00074134 MW 300.00 300.00 AP -00074135 MW 410.53 410.53 AP -00074136 MW 60.50 60.50 121.00 AP -00074137 MW 800.00 800.00 AP- 00074138 MW 12,223.84 427.83 Vendor Name Kabour, Mike Kabour, Mike Kabour, Mike KAESER COMPRESSORS INC KELLEY EROSION CONTROL INC KG WALTERS CONSTRUCTION KG WALTERS CONSTRUCTION KG WALTERS CONSTRUCTION KG WALTERS CONSTRUCTION KOSCIOLEK, LINDA KOSCIOLEK, LINDA to KRLT FM/KOWL AM KRLT FM/KOWL AM KRLT FM/KOWL AM KTHO RADIO KTHO RADIO L A PERKS PLUMBING & HEAT INC LAVALLEE, PETER LAVALLEE, PETER LOOMIS LOOMIS User: THERESA Report: OH_PMT CLAIMS_BK Department / Proi Name GEN & ADMIN GEN & ADMIN FINANCE DIAMOND VLY RNCH EXPORT PIPELINE - B LINE REVEG GEN & ADMIN - ANGORA TNK REPL GEN & ADMIN - ARSENIC FACILITY ENGINEERING - ANGORA TNK REPL ENGINEERING - ARSENIC FACILITY CUSTOMER SERVICE CUSTOMER SERVICE PAYMENT OF CLAIMS Des¢rtotion UB SUSPENSE METER SALE INTEREST EXPENSE GROUNDS & MNTC BLINE REVEG CONST RETAINAGE CONST RETAINAGE TANK, ANGORA ARSNC TRTMNT TRAVEL/MEETINGS TRAVEL/MEETINGS DIO - PR EXP- EXTERNAL PUB RELATIONS DIO - PR EXP- EXTERNAL PUB RELATIONS CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE DIO - PR EXP- EXTERNAL DIO - PR EXP - EXTERNAL HEAVY MAINT ENGINEERING ENGINEERING FINANCE FINANCE PUB RELATIONS PUB RELATIONS GROUNDS & MNTC SUPPLIES SUPPLIES CONTRACT SERVICE CONTRACT SERVICE Page: 8 Acker / Proi Code 2000 - 2002 2000 - 3545 2039 - 6710 1028 - 6042 Check Total: Check Total: 9098 - 8736 - BLNVEG Check Total: 2000 - 2605 - ANGOTK 2000 - 2605 - ARSNIC 2029 - 7064 - ANGOTK 2029 - 8864 - ARSNIC Check Total: 1038 - 6200 2038 - 6200 Check Total: 1027 - 6620 - PREEXT 2027 - 6620 - PREEXT 2038 - 6660 - WCPROG Check Total: 1027 - 6620 - PREEXT 2027 - 6620 - PREEXT Check Total: 1004 - 6042 1029 - 6520 2029 - 6520 1039 - 4405 2039 - 4405 Check Total: Check Total: Check Total: 90.26 954.38 19,560.00 250.00 250.00 1,100.00 Current Date: 10/29/2009 Current Time: 09:35:42 Amount Check Num Tvoe 2,578.92 135.00 15,455.85 AP- 00074139 MW 954.38 AP- 00074140 MW 19,560.00 AP -00074141 MW - 199.53 - 235.81 184,925.57 53,315.15 237,805.38 AP -00074142 MW 25.50 25.50 51.00 AP -00074143 MW 293.00 293.00 1,952.00 2,538.00 AP -00074144 MW 500.00 AP- 00074145 MW 1,100.00 AP -00074146 32.57 32.57 MW 65.14 AP -00074147 MW 296.59 296.59 593.18 AP- 00074148 MW Vendor Name MARSH, RON MARTIN, BROOKS Matera, Richard MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO McKenzie, Elaine MORSE, DONIELLE MORE, DONIELLE MOTEL 6 MOTEL 6 MOTEL 6 MUNICIPAL FINANCIAL SERVICES MWH LABORATORIES MWH LABORATORIES NAVARRO, ROMUALDO NEXLEVEL INFORMATION TECH INC NORTHWEST HYD. CONSULT INC NORTHWEST HYD. CONSULT INC User: THERESA Report: OH_PMT_CLAIMS_BK PAYMENT OF CLAIMS Department / Proi Name Description CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE PUMPS PUMPS PUMPS PUMPS FINANCE FINANCE PUMPS UNDERGROUND REP PUMPS ENGINEERING - CTC GRNT -BMPs ENGINEERING - CTC GRNT -BMPs SHOP SUPPLIES SMALL TOOLS SHOP SUPPLIES SMALL TOOLS CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE TRAVEL/MEETINGS TRAVEL/MEETINGS STANDBY ACCOMODA STANDBY ACCOMODA STANDBY ACCOMODA ENGINEERING - HV VLY ADDL WTR CONTRACT SERVICE LABORATORY - IND CRK RES MONT MONITORING LABORATORY MONITORING CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE INFORMATION SYS STR PLN IMPL BMP PROJECTS BMP PROJECTS Page: 9 Acct# / Proi Code 2038 - 6660 - WCPROG Check Total: 2038 - 6660 - WCPROG Check Total: 2038 - 6660 - WCPROG Check Total: 1002 - 6071 1002 - 6073 2002 - 6071 2002 - 6073 Check Total: 2038 - 6660 - WCPROG Check Total: 1039 - 6200 2039 - 6200 1002 - 6083 2001 - 6083 2002 - 6083 Check Total: Check Total: 2029 - 4405 - HVNWTR Check Total: 1007 - 6110 - INDIAN 1007 - 6110 1037-8078 Check Total: 2038 - 6660 - WCPROG Check Total: Check Total: 1029 - 8737 - CTCBMP 2029 - 8745 - CTCBMP Current Date: 10/29/2009 Current Time: 09:35:42 Amount Check Num RN 800.00 800.00 AP- 00074149 MW 1,600.00 1,600.00 AP -00074150 MW 889.00 889.00 AP -00074151 383.64 598.68 383.59 2,419.31 3,073.50 MW 3.785.22 AP -00074153 MW 3,073.50 AP- 00074154 MW 70.57 70.56 141.13 AP-00074155 MW 210.60 191.45 210.59 612.64 AP- 00074156 MW 2,880.00 2,880.00 AP- 00074157 MW 113.34 226.66 340.00 AP- 00074158 MW 958.00 958.00 AP -00074159 MW 1,000.00 1,000,00 AP -00074160 MW 4,479.29 4,479.29 PAYMENT OF CLAIMS Vendor Name Department / Proi Name Description Acct# / Proi Code Amount Check Num Tvoe Check Total: 8,958.58 AP -00074161 MW ONTRAC LABORATORY POSTAGE EXPENSES 1007 - 4810 13.50 ONTRAC ENGINEERING - ANGORA TNK REPL TANK, ANGORA 2029 - 7064 - ANGOTK 10.00 ONTRAC ENGINEERING - WT METERING PRJ WTR METERING/NEW 2029 - 7078 - METERS 73.50 Check Total: 97.00 AP -00074162 MW PARTSMASTER DIV OF NCH CORP EQUIPMENT REPAIR SHOP SUPPLIES 2005 - 6071 627.58 Check Total: 627.58 AP -00074163 MW PETERBILT TRUCK PARTS EQUIPMENT REP AUTOMOTIVE 1005 - 6011 555.90 Check Total: 555.90 AP -00074164 MW PETTY CASH ENGINEERING OFFICE SUPPLIES 1029 - 4820 3.26 PETTY CASH ENGINEERING TRAVEL/MEETINGS 1029 - 6200 7.50 PETTY CASH ENGINEERING SUPPLIES 1029 - 6520 2.50 PETTY CASH DIO TRAVEL/MEETINGS 2027 - 6200 20.00 PETTY CASH ENGINEERING OFFICE SUPPLIES 2029 - 4820 3.25 PETTY CASH ENGINEERING TRAVEL/MEETINGS 2029 - 6200 7.50 PET1 CASH ENGINEERING SUPPLIES 2029 - 6520 35.62 I Check Total: 79.63 AP -00074165 MW PETTY, DON UNDERGROUND REP TRAVEL/MEETINGS 1001 - 6200 68.20 Check Total: 68.20 AP -00074166 M W PRAXAIR 174 GEN & ADMIN SAFETY INVENTORY 1000 - 0425 318.16 PRAXAIR 174 HEAVY MAINT BUILDINGS 1004 - 6041 33.54 PRAXAIR 174 HEAVY MAINT SHOP SUPPLIES 1004 - 6071 545.69 PRAXAIR 174 UNDERGROUND REP SAFETY/EQUIP /PHY 2001 - 6075 73.95 Check Total: 971.34 AP -00074167 MW PRO LEISURE ADMINISTRATION INCNTV & RCGNTN 1021 - 6621 54.24 PRO LEISURE ADMINISTRATION INCNTV & RCGNTN 2021 - 6621 54.23 Check Total: 108.47 AP- 00074168 MW PURZE, LISA GEN & ADMIN SERV CHARGE REV 1000 - 3101 - 228.08 PURZE, LISA GEN & ADMIN UB SUSPENSE 2000 - 2002 1,697.00 Check Total: 1,468.92 AP -00074169 MW RADIO SHACK ENGINEERING SUPPLIES 1029 - 6520 -16.31 User: THERESA Page: 10 Current Date: 10/29/2009 Report: OH_PMT CLAIMS_BK Current Time: 09:35:42 Vendor Name RADIO SHACK RADIO SHACK RADIO SHACK Reali, Leon and Susan Reali, Leon and Susan Reali, Leon and Susan RED WING SHOE STORE REDWOOD PRINTING REES, DIANNE RELIANCE STANDARD RELIA10E STANDARD RENO GAZETTE- JOURNAL RESORT SPORTS NETWORK RESOURCE DEVELOPMENT INC RESOURCE DEVELOPMENT INC Schumacher, Roland Schumacher, Roland SHEPPARD MULLIN SHEPPARD MULLIN SHERIDAN, JOHN User: THERESA Report: OH_PMT CLAIMS_BK Department / Proi Name UNDERGROUND REP ELECTRICAL SHOP ENGINEERING GEN & ADMIN GEN & ADMIN GEN & ADMIN DIAMOND VLY RNCH ENGINEERING - DVR ER ENGINEERING - AL TAHOE WTR -09 GEN & ADMIN GEN & ADMIN ENGINEERING - WT METERING PRJ CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE GEN & ADMIN - TWIN PEAKS BS ENGINEERING - TWIN PEAKS BS GEN & ADMIN - T&M UB CASH BRD GEN & ADMIN HUMAN RESOURCES HUMAN RESOURCES OPERATIONS PAYMENT OF CLAIMS P criotion SHOP SUPPLIES SHOP SUPPLIES SUPPLIES UB SUSPENSE UB SUSPENSE METER SALE SAFETY/EQUIP/PHY DIAM VLY MP/EIR WTLN AL TAHOE 09 LIFE INS MGMT LNG TRM DIS,MGMT WTR METERING/NEW CONST RETAINAGE BSTR, TWN PEAKS MISC INCOME METER SALE PERSONNEL LEGAL PERSONNEL LEGAL TRAVEL/MEETINGS Page: 11 Acct# 1 Prot Code 2001 - 6071 2003 - 6071 2029 - 6520 1000 - 2002 2000 - 2002 2000 - 3545 1028 - 6075 1000 - 2525 1000 - 2531 1022 - 4445 2022 - 4445 1006-6200 Check Total: Check Total: Check Total: 1029 - 8725 - DVREIR Check Total: 2029 - 8065 - ATWL09 Check Total: Check Total: 2029 - 7078 - METERS Check Total: 2038 - 6660 - WCPROG Check Total: 2000 - 2605 - TPBSTR 2029 - 7070 - TPBSTR Check Total: 2000 - 3540 - TMCBUB 2000 - 3545 Check Total: Check Total: Current Date: 10/29/2009 Current Time: 09:35:42 Amount Check Num Tvoe 73.90 5.43 -16.31 46.71 AP- 00074170 MW 11,322.12 4,161.88 286.00 15,770.00 AP- 00074171 MW 221.85 221.85 AP -00074172 MW 65.25 AP-00074173 MW 142.50 142.50 AP- 00074174 MW 487.85 1,210.73 65.25 1.698.58 AP -00074175 MW 242.00 242.00 AP- 00074176 1,461.25 1.461.25 AP -00074177 MW - 20,250.55 202,505.51 182,254.96 AP- 00074178 MW 2,000.00 311.00 2,311.00 AP- 00074179 MW 724.50 724.50 1,449.00 AP- 00074180 MW 144.57 Vendor Name SHERMAN, THERESA SHERMAN, THERESA SHERWIN - WILLIAMS SIANO, CHRIS SIERRA CHEMICAL CO SIERRA FOOTHILL LABORATORY SIERRA PACIFIC POWER SIERRA PACIFIC POWER SIERRA PACIFIC POWER SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SINGER, HAROLD User: THERESA Report: OH PMT CLAIMS_BK Department / Proi Name FINANCE - PAYROLL SYS /ADP FINANCE - PAYROLL SYS/ADP HEAVY MAINTENANC OPERATIONS PUMPS LABORATORY GEN & ADMIN GEN & ADMIN GEN & ADMIN GEN & ADMIN UNDERGROUND REP PUMPS ELECTRICAL SHOP HEAVY MAINT EQUIPMENT REP OPERATIONS DIAMOND VLY RNCH CUSTOMER SERVICE UNDERGROUND REP PUMPS ELECTRICAL SHOP EQUIPMENT REPAIR CUSTOMER SERVICE PAYMENT OF CLAIMS Description TRAVEL/MEETINGS TRAVEL/MEETINGS BUILDINGS TRAVEL/MEETINGS HYPOCHLORITE MONITORING ELECTRICITY ST LIGHTING EXP ELECTRICITY SAFETY INVENTORY SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE Acct# / Pro! Code Check Total: 1039 - 6200 - PAYADP 2039.6200 - PAYADP Check Total: 2004 - 6041 1006 - 6200 2002 - 4755 1007 - 6110 1000 - 6330 1000 - 6740 2000 - 6330 1000 - 0425 1001 - 6520 1002 - 6520 1003 - 6520 1004 - 6520 1005 - 6520 1006 -6520 1028 - 6520 1038 - 6520 2001 - 6520 2002 - 6520 2003 - 6520 2005 - 6520 2038 - 6520 Check Total: Check Total: Check Total: Check Total: 2038 - 6660 - WCPROG Page; 12 Current Date: 10/29/2009 Current Time: 09:35:42 Amount Check Num Type 144.57 AP- 00074181 MW 15.13 15.12 30.25 AP- 00074182 MW 76.31 76.31 AP -00074183 MW 70.00 70.00 AP- 00074184 MW 2,713.57 2,713.57 AP -00074185 MW 147.00 Check Total: 147.00 AP -00074186 MW 63,054.88 7.93 42,152.80 Check Total: 105,215.61 AP- 00074187 MW 482.40 27.48 1.83 9.16 27.48 9.16 27.48 9.16 9.16 27.48 7.35 9.16 9.16 9.16 665.62 AP- 00074188 MW 800.00 Vendor Name SMITH, GREG SOUND STRATEGIES/OFC INC. SOUND STRATEGIES /OFC INC. SOUTHWEST GAS SOUTHWEST GAS STANTEC CONSULTING INC STANTEC CONSULTING INC SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & N SUBSJITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & DIO SUTER WALLAUCH CORBETT &ASSOC DIO SUTER WALLAUCH CORBETT &ASSOC 010 TAHOE BLUEPRINT TAHOE MOUNTAIN NEWS TAHOE MOUNTAIN NEWS User: THERESA Report: OH_PMT CLAIMIMS_BK Department / Proi Name PUMPS 010 GEN & ADMIN GEN & ADMIN ENGINEERING - SNOWSHOE DITCH R ENGINEERING - MILLICH REPAIR UNDERGROUND REP DIAMOND VLY RNCH ENGINEERING - ERB LINER REPL CUSTOMER SERVICE UNDERGROUND REP ENGINEERING ENGINEERING - ANGORA TNK REPL ENGINEERING - TWIN PEAKS BS ENGINEERING - SONORA AVE WTRLN ENGINEERING - ARSENIC FACILITY CUSTOMER SERVICE ENGINEERING - REPL GEN, LPPS DIO - PR EXP- EXTERNAL 010 - PR EXP- EXTERNAL PAYMENT OF CLAIMS Description DUES/MEMB/CERT CONTRACT SERVICE CONTRACT SERVICE NATURAL GAS NATURAL GAS SNOSHU REPAIR MILLICH REPAIR CONTRACT SERVICE CONTRACT SERVICE REPLACE ERB LINE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE TANK, ANGORA BSTR, TWN PEAKS WTRLN,SNRA/SK RN ARSNC TRTMNT CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE REPL GEN LPPS PUB RELATIONS PUB RELATIONS Acct / Pro) Code 2002 - 6250 1027 - 4405 2027 - 4405 1000 - 6350 2000 - 6350 1001 - 4405 1028 - 4405 1029 - 7581 - ERBLNR 1038 - 4405 2001 - 4405 2029 - 4405 2029 - 7064 - ANGOTK 2029 - 7070 - TPBSTR 2029 - 7911 - SONORA 2029 - 8864 - ARSNIC 2038 - 4405 1027 - 4405 2027 - 4405 1027 - 6620 - PREEXT 2027 - 6620 - PREEXT Check Total: Check Total: Check Total: Check Total: 1029 - 8933 - RGLPPS Check Total: Page: 13 Current Date: 10/29/2009 Current Time: 09:35:42 6,858.73 1,814.12 27.96 1,791.16 5,725.02 195.72 185.03 144.57 34.70 5.78 4,337.67 Amount Check Num LfR 800.00 AP-00074189 82.00 MW 82.00 AP-00074190 MW 49.00 49.00 98.00 AP- 00074191 MW 3,004.64 143.52 Check Total: 3,148.16 AP -00074192 MW 1029 - 7075 - SNOBLO 27,704.60 1029 - 7076 - MILBLO 21,857.07 Check Total: 49,561.67 AP- 00074193 MW Check Total: 21,120.46 AP -00074195 mw 1,225.00 1,225.00 2,450.00 AP -00074196 MW 645.53 645.53 AP-00074197 MW 162.50 162.50 PAYMENT OF CLAIMS Vendor Name Department / Proi Name Description Acct# / Proi Code Amount Check Num Tvoe Check Total: 325.00 AP- 00074198 MW TAHOE SAND & GRAVEL UNDERGROUND REP PIPE/CVRS /MHLS 2001 - 6052 726.10 Check Total: 726.10 AP- 00074199 MW TAHOE TRADING POST PUMPS SAFETY/EQUIP/PHY 1002 - 6075 70.71 TAHOE TRADING POST ENGINEERING SAFETY/EQUIP/PHY 1029 - 6075 57.75 TAHOE TRADING POST PUMPS SAFETY/EQUIP/PHY 2002 - 6075 70.71 TAHOE TRADING POST ENGINEERING SAFETY /EQUIP/PHY 2029 - 6075 57.75 Check Total: 256.92 AP -00074200 MW TAHOE TRADING POST UNDERGROUND REP SAFETY/EQUIP/PHY 1001 - 6075 387.27 Check Total: 387.27 AP -00074201 MW TAHOE VALLEY ELECTRIC SUPPLY ELECTRICAL SHOP BUILDINGS 1003 - 6041 410.21 Check Total: 410.21 AP -00074202 MW TAMCO LLC UNDERGROUND REP PIPE/CVRS/MHLS 2001 - 6052 3,375.00 Check Total: 3,375.00 AP -00074203 MW TANKNOLOGY INC. HEAVY MAINT GROUNDS & MNTC 1004 - 6042 410.84 0 I Check Total: 410.84 AP- 00074204 MW i TRPA ENGINEERING - ECHO TANK REPL TANK, ECHO 2029 - 8809 - ECHOTK 617.00 Check Total: 617.00 AP -00074205 MW TRPA ENGINEERING - ANGORA TNK REPL TANK, ANGORA 2029 - 7064 - ANGOTK 148.00 Check Total: 148.00 AP- 00074206 MW UNIVERSAL HEALTH NETWORK SELF FUNDED INS PPO FEE 3000 - 6742 672.00 Check Total: 672.00 AP -00074207 MW VERIZON CALIFORNIA DIAMOND VLY RNCH TELEPHONE 1028 - 6310 165.45 Check Total: 165.45 AP -00074208 MW VWR INTERNATIONAL LABORATORY LAB SUPPLIES 1007 - 4760 102.27 Check Total: 102.27 AP- 00074209 MW WECO INDUSTRIES INC UNDERGROUND REP P1PE/CVRS /MHLS 1001 - 6052 1,190.00 Check Total: 1,190.00 AP- 00074210 MW WESTERN ENERGETIX INC GEN & ADMIN GASOLINE INV 1000 - 0415 1,854.47 WESTERN ENERGETIX INC GEN & ADMIN DIESEL INVENTORY 1000 - 0416 520.71 WESTERN ENERGETIX INC DIAMOND VLY RNCH GASOLINE 1028 - 4610 921.53 User: THERESA Page: 14 Current Date: 10/29/2009 Report; OH PMT CLAIMS_BK Current Time: 09:35:42 Vendor Name Department / Proi Name WESTERN ENERGETIX INC DIAMOND VLY RNCH User: THERESA Report: OH PMT CLAIMS_BK PAYMENT OF CLAIMS Description DIESEL Acct# / Proi Code 1028 - 4620 WESTERN ENVIRONMENTAL LABORATORY MONITORING 1007 - 6110 WESTERN NEVADA SUPPLY PUMPS SHOP SUPPLIES 1002 - 6071 WESTERN NEVADA SUPPLY HEAVY MAINT SECONDARY EQUIP 1004 - 6022 WESTERN NEVADA SUPPLY HEAVY MAINT BUILDINGS 1004 - 6041 WESTERN NEVADA SUPPLY GEN & ADMIN BOXES/LIDS /INV 2000 - 0403 WESTERN NEVADA SUPPLY GEN & ADMIN COUPLINGS INV 2000 - 0405 WESTERN NEVADA SUPPLY UNDERGROUND REP PIPE/CVRS/MHLS 2001 - 6052 WESTERN NEVADA SUPPLY PUMPS SHOP SUPPLIES 2002 - 6071 Check Total: Check Total: Check Total: Check Total: Grand Total: Page: 15 Current Date: 10/29/2009 Current Time: 09:35:42 Amount Check Num Type 921.53 4218.24 AP -00074211 MW 600.00 600.00 AP- 00074212 MW 19.41 95.70 77.00 6,595.51 4,756.42 3,810.46 19.41 WHALEN, CHRIS ADMINISTRATION TRAVEL/MEETINGS 1021 - 6200 WHALEN, CHRIS ADMINISTRATION TRAVEL/MEETINGS 2021 - 6200 18.15 i Check Total: 36.30 AP-00074214 MW WINER & KELLY CONSULT ENGRS OPERATIONS - MAP UG UTILITIES PLANT GIS 1006 - 8921 - GISMAP 1,826.59 WINZLER & KELLY CONSULT ENGRS ENGINEERING - EFFLUENT EVAL REP EXP PUMPS 1029 - 8676 - EFFLEV 2,563.59 Check Total: 4.390.18 AP- 00074215 MW XEROX CORP UNDERGROUND REP SERVICE CONTRACT 2001 - 6030 40.16 18.15 1,632,882.38 15,373.91 AP- 00074213 40.16 AP -00074216 MW MW Genwsl Merger RlchsM hl. 5*r4 50"'outh Mum" T a ho e l i % .1Af410� l�`. r�441R1i utlitty, Pletrelc� popw BOARD AGENDA ITEM 14a TO: Board of Directors FROM: Richard H. Solbrig, General Manager MEETING DATE: November 5, 2009 ITEM — PROJECT: Conference with Legal Counsel — Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(x) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Meyers Landfill Site - United States of America vs. El Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S -01 -1520 LKK GGH, United States District Court for the Eastern District of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -103- a, �► Vkwtpro u " Ta h o e. Endo clstwb tC..i+�pee► " Utility Darla ►`° o -i► �r dl 'a ' : t • a ' � it i8 x A BOARD AGENDA ITEM 14b TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: November 5, 2009 ITEM — PROJECT NAME: Conference with Legal Counsel — Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government code, Closed Session may be held for conference with legal counsel regarding existing litigation: Tahoe Asphalt, Inc., and Tahoe Asphalt Materials Company, LLC, vs. South Tahoe Public Utility District, Civil Action No. SC20090104, Superior Court, County of El Dorado, State of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO —105—