Loading...
Resolution No. 2144U k I ' RESOLUTION NO. 2144 A RESOLUTION APPROVING PROJECTS HIGH LIFT DISCHARGE REPLAC=T PIPELINE AND SURGE PROTECTION PIPELINE SOUTH TAHOE PUBLIC UTILITY DISTRICT BE IT ENACTED, by the Board of Directors of the SOUTH TAHOE PUBLIC UTILITY DISTRICT, El Dorado County, California, as follows: WHEREAS, the Final Environmental Impact Report for South Tahoe Public Utility District High Lift Discharge Replacement Pipeline and Surge Protection Pipeline was presented to and reviewed by the Board of Directors at their meeting of March 1, 1979, and WHEREAS, the Board of Directors of said District found the said Final Environmental Impact Report in compliance with the California Environmental Quality Act and the State C,ui.delines, and % WHEREAS, the Board of Directors of said District found that the projects would not have any significant effects, NOW, THEREFORE, IT IS ORDERED 1. That the projects High Lift Discharge Replacement Pipeline and Surge Protection Pipeline are hereby approved. 2. That the Notice of Determination, copy of which is attached and made a part hereof, be filed with Secretary of Resources and the County Clerk of El Dorado County as ., Lred by the California. Environmental Quality Act. r f ._...__. 1te Neal�bQic TJic P es dent outii ahoeillty i5ist ATTEST: X rd y D.' rose er Clk ooa South hoe Public Utility District I hereby certify that the foregoing is a. full, true and correct copy of a resolution duly and regularly adopted by the BOARD OF DIRECTORS of the SOUTH TAHOE PUBLIC U'T'ILITY DISTRICT, El Dorado County, California, at a meeting thereof duly held on the 15th day of MARCH 1979, by the following vote: AYES: Directors Olson, Cocking, Fieldcamp, Jones NOES: None ABSENT:President Kashuba � r���D se,�Clerk o�'�oard South T e Public Utility District EXHIBIT -i r t • NOTICE OF DETERMINATION 4 TC: [ :iccretary f�)r f2c sc ur .c:5 1 "Pom: r' X 1 1416 Sacramento, . a.1 -c r:.i,� 0- a ( -� County Clerk 1 1 County of El Dorado 360 Fairlane _ _Planeryille, CA 95667 R "p igy South Tahoe Public Util it-y P. 0. Box AU So . Lake Ta C alifornia 95705 SUBJECT: Filing of Notice of Determination in compliance with Section 21108 or 21152 of the Public Resources Code. Fro3ect Title Hi Eh Lift Discharge Replacement Pipeline and Surge Protection Pipeline State Clearinghouse Numbe submitted to State Clearinghouse SCH # 78032 C ontact Person Te ep one Number Jim Cofer, Manager /Di Engineer 1 544 -6474 Project Location Within the right -of -way of State Highway No. 89 between Hwy. Sta. 350 +00 and 4 +00 approx. 5 1/2 miles from its intersection with State Highway No. 50. Project Description Replacement of approx. 4,700 lineal feet of buried 24 diameter P ipe, and installation of approx. 1,300 lineal feet of partially buried 48" diameter L i Re to be connected to th 24" diameter export pipeline. This is to advise that the South Tahoe Public Utility District ( Lead Agency) has approved the above described project and has made the following deter. minations regarding the above described project: 1. The project = will have a significant effect on the environment [= will not 2. U An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA and was certified as re- quired by 14 Cal. Adm. Code Sec. 15085(g). The following mitigation measures were adopted by the Lead Agency to reduce impacts of the approved project: (1)The surge line route now avoids existing drainage swales and accompanying alder and willow vegetation. (2)A Partially buried pipe reduces the amount of spoil to be removed. (3)The shallower trench will greatly reduce the need for blasting. (4)Flagman will be provided 24 hours round the clock at both ends of the project during the construction periods. ?J A Negative Declaration was prepared for this project pursuant to the provisions of CEQA and may be examined at 3. A Statement of Overriding Consideration F-1 was adopted for this project. ~ �a�ece ve �o - x�i� ing was not � s R. Cofer na er /Distric-: � EngL Title March 15. 7.97 9 Date