Resolution No. 2144U
k
I
' RESOLUTION NO. 2144
A RESOLUTION APPROVING PROJECTS
HIGH LIFT DISCHARGE REPLAC=T PIPELINE
AND SURGE PROTECTION PIPELINE
SOUTH TAHOE PUBLIC UTILITY DISTRICT
BE IT ENACTED, by the Board of Directors of the SOUTH TAHOE
PUBLIC UTILITY DISTRICT, El Dorado County, California, as follows:
WHEREAS, the Final Environmental Impact Report for South
Tahoe Public Utility District High Lift Discharge Replacement Pipeline
and Surge Protection Pipeline was presented to and reviewed by the Board
of Directors at their meeting of March 1, 1979, and
WHEREAS, the Board of Directors of said District found the
said Final Environmental Impact Report in compliance with the California
Environmental Quality Act and the State C,ui.delines, and
% WHEREAS, the Board of Directors of said District found that
the projects would not have any significant effects,
NOW, THEREFORE, IT IS ORDERED
1. That the projects High Lift Discharge Replacement Pipeline
and Surge Protection Pipeline are hereby approved.
2. That the Notice of Determination, copy of which is attached
and made a part hereof, be filed with Secretary of Resources and the
County Clerk of El Dorado County as ., Lred by the California. Environmental
Quality Act.
r f
._...__. 1te Neal�bQic TJic P es dent
outii ahoeillty i5ist
ATTEST:
X rd y D.' rose er Clk ooa
South hoe Public Utility District
I hereby certify that the foregoing is a. full, true and correct
copy of a resolution duly and regularly adopted by the BOARD OF DIRECTORS
of the SOUTH TAHOE PUBLIC U'T'ILITY DISTRICT, El Dorado County, California,
at a meeting thereof duly held on the 15th day of MARCH 1979, by
the following vote:
AYES: Directors Olson, Cocking, Fieldcamp, Jones
NOES: None
ABSENT:President Kashuba
� r���D se,�Clerk o�'�oard
South T e Public Utility District
EXHIBIT -i r t
• NOTICE OF DETERMINATION
4
TC: [ :iccretary f�)r f2c sc ur .c:5 1 "Pom:
r' X 1 1416
Sacramento, . a.1 -c r:.i,� 0- a
( -� County Clerk
1 1 County of El Dorado
360 Fairlane
_ _Planeryille, CA 95667
R
"p igy
South Tahoe Public
Util it-y
P. 0. Box AU
So . Lake Ta
C alifornia 95705
SUBJECT: Filing of Notice of Determination in compliance with
Section 21108 or 21152 of the Public Resources Code.
Fro3ect Title
Hi Eh Lift Discharge Replacement Pipeline and Surge Protection Pipeline
State Clearinghouse Numbe submitted to State Clearinghouse
SCH # 78032
C ontact Person Te ep one Number
Jim Cofer, Manager /Di Engineer 1 544 -6474
Project Location Within the right -of -way of State Highway No. 89 between Hwy. Sta.
350 +00 and 4 +00 approx. 5 1/2 miles from its intersection with State Highway No. 50.
Project Description Replacement of approx. 4,700 lineal feet of buried 24 diameter
P ipe, and installation of approx. 1,300 lineal feet of partially buried 48" diameter
L i Re to be connected to th 24" diameter export pipeline.
This is to advise that the South Tahoe Public Utility District
( Lead Agency) has approved the above described project and has made the following deter.
minations regarding the above described project:
1. The project = will have a significant effect on the environment
[= will not
2. U An Environmental Impact Report was prepared for this project
pursuant to the provisions of CEQA and was certified as re-
quired by 14 Cal. Adm. Code Sec. 15085(g). The following
mitigation measures were adopted by the Lead Agency to reduce
impacts of the approved project:
(1)The surge line route now avoids existing drainage swales and
accompanying alder and willow vegetation.
(2)A Partially buried pipe reduces the amount of spoil to be
removed.
(3)The shallower trench will greatly reduce the need for blasting.
(4)Flagman will be provided 24 hours round the clock at both ends
of the project during the construction periods.
?J A Negative Declaration was prepared for this project pursuant to
the provisions of CEQA and may be examined at
3. A Statement of Overriding Consideration F-1 was adopted for
this project.
~ �a�ece ve �o - x�i� ing
was not
� s R. Cofer
na er /Distric-: � EngL
Title
March 15. 7.97 9
Date