Resolution No. 1781 A WJML:SSW :ar:3 /26/73:10c
RESOLUTION NO. /745
A RESOLUTION DIRECTING THE PREPARATION OF A DRAFT
ENVIRONMENTAL IMPACT REPORT
ASSESSMENT DISTRICT 1971 -1
RESOLVED, by the Board of Directors of the South Tahoe Public
Utility District, El Dorado County, California, that
WHEREAS, on the 6th day of April, 1972, this Board did duly
adopt its Resolution No. 1672, being a resolution of intention to
undertake a Project more particularly described in Exhibit "A"
attached hereto and by reference incorporated herein; and
WHEREAS, an initial study of the environmental effects of
said Project has been undertaken and completed and the results
thereof have been reviewed by this Board;
NOW, THEREFORE, IT IS FOUND, DETERMINED AND ORDERED as
follows:
1. That said Project could have a significant effect upon
the environment.
2. That, pursuant to Section 21151 of the Public Resources
Code, the District Engineer should be and is hereby authorized and
instructed to prepare for this Board a draft environmental impact
report for said Project which report shall include a detailed
statement setting forth the items contained in Section 21100 of
said Public Resources Code.
President
South Tahoe Public Utility District
ATTEST:
1 Z
erk and Ex officio ecretary
4
•
I hereby certify that the foregoing is a full, true and correct copy of
Resolution No. 1781 duly and regularly adopted by the Board of Directors of
the SOUTH TAHOE PUBLIC UTILITY DISTRICT, El Dorado County, California,
at a meeting thereof duly held on the 29 day of March, 1973, by the following
vote:
AYES, Directors: Fesler, Wakeman, Hegarty, Kortes and Ream
NOES, None
ABSENT, None
10 dip - /
David W. Callahan, Clerk and Ex- officio
Secretary of the Board
SOUTH TAHOE PUBLIC UTILITY DISTRICT
4 1000 ,) The installation and construction of sanitary sewer systems, including
trunk sewers, collection sewers, necessary pumping stations and force
mains, manholes, flushing devices, rodholes, wye branches, laterals
and appurtenances on streets and roads and in easements to be acquired
therefor, to serve each of the separate parcels of land within the
boundaries of the proposed assessment district, as hereinafter de-
scribed, which parcels of land are along and adjacent to the west,
south and east shores of Fallen Leaf Lake, and which facilities in-
clude the following: (1) a main sewer commencing at the southwesterly
corner of the parcel of land identified as No. 1 on the boundary map
hereinafter referred to (being the most northerly parcel on the west
shore of Fallen Leaf Lake within said assessment district) and extend-
ing southerly to the north boundary of the parcel identified as No. 46
on said map; (2) a main sewer commencing at said north boundary of
said parcel No. 46 and extending southeasterly approximately 650 feet
to Fallen Leaf Road; (3) a pump station located at the point where
said main sewer described at "2" above terminates with a force main ex-
tending southerly therefrom along said Road to a point just north of
the intersection of said Road and Glen Alpine Creek; ( a main sewer
commencing at the pump station described at "3" above and extending
southerly in and along said Fallen Leaf Road to a point near the north-
easterly boundary of the parcel of land identified as No. 53 on said
boundary map; (5) a main sewer commencing at the termination of said
force main described at "3" above and extending southerly and easterly.
in and along said Fallen Leaf Road to a point approximately 600 feet
easterly of the east boundary of the parcel identified as No. 61 on
said boundary map; (6) a main sewer commencing at the pump station de-
scribed at "7" below and extending easterly in and along said Fallen
Leaf Road approximately 350 feet; (7) a pump station located
at the point where said main sewer described at "5" above ter;
minates with a force main extending easterly therefrom along
said Fallen Leaf Road to a point on said Road near the easterly bound-
ary of the parcel identified as No. 65 on said boundary map; (8) ) a
main sewer commencing at the termination of said force main described
at "7" above and extending northeasterly and northerly in and along
said Fallen Leaf Road to a point near the southerly boundary of the
parcel identified as No. 87 on said boundary map; (9) a pump station
located at the point where said main sewer described at '8" above ter-
minates with a force main extending northerly therefrom along said
Fallen Leaf Road to a point near the northerly boundary of the parcel
identified as No. 93 on said boundary map; (10) a main sewer commenc-
ing at the pump station described at "9" above and extending northerly
in and along said Fallen Leaf Road to a point near the south boundary
of the parcel identified as No. 92 on said boundary map; (11) a main
sewer commencing at the termination of said force main described at "9"
above and extending northeasterly in and along said Fallen Leaf Road
to a point near the north boundary of the parcel identified as No. 121
on said boundary map; (12) a pump station located at the termination of
said main sewer described at '11' above, with a force main extending
northerly therefrom along said Fallen Leaf Road to a point near the
northeast corner of the parcel identified as No. 194 on said boundary
map ; (13) a main sewer commencing at the pump station described at
"12' above and extending northerly therefrom to a point near the south-
west corner of the parcel identified as No. 169 on said boundary map;
(14) a main sewer commencing at the termination of said force main de-
scribed at "12" above and extending northerly in and along said Fallen
Leaf Road to a point near the north boundary of the parcel identified
as No. 163 on said boundary map, thence extending northerly (leaving
said Road) and northeasterly through parcels identified as Nos. 196 to
202, inclusive, on said boundary map; (15) a main sewer commencing at
the point where said main sewer described at "14" above terminates and
EXHIBIT A
kor
d.
extending northeasterly (outside the boundaries of said assessment dis-
trict) to a point approximately 200 feet east of Fallen Leaf Lake and
200 feet south of the south boundary of the parcel identified as No.
203 on said boundary map; (16) a pump station located at the termina-
tion of the main sewer described at '15" above, with a force main
extending east therefrom to a point near said Fallen Leaf Road, thence
northerly along said Road to a point approximately 25 feet north of
the south boundary of said parcel No. 203; (17) a trunk sewer line
commencing at the termination of the force main described at "16"
above and extending northerly through said parcel No. 203, land out-
side the boundaries of said assessment district and the parcel identi-
fied as No. 204 on said boundary map and thence continuing northerly
approximately 3000 feet to connect to an existing Forest Service Trunk
Sewer at the Forest Service Fallen Leaf Campground; (18) a main sewer
extending westerly from the main sewer described at '4" above through
the parcel identified as No. 51 on said boundary map to a point near
the southwest corner of the parcel identified as No. 50 on said map;
(19) a main sewer extending westerly from the main sewer described at
'5" above in and along Glen Alpine Road to a point near the southeast
corner of the parcel identified as No. 27 on said boundary map, thence
westerly to the northeast corner of the parcel identified as No. 26 on
said boundary map; (20) sewer lines extending westerly from the west-
erly end of the main sewer described at "18" above to the parcel iden=
tified as No. 211 on said boundary map, together with branch sewers
extending northerly therefrom and a pump station located near the
northwest corner of the parcel identified as No. 24 on said boundary
map, with a force main extending northeasterly therefrom to a point
near the northwest corner of the parcel identified as No. 42 on said
map all to serve Forest Service lands subject to private permits;
(21, sewer lines extending northwesterly from the main sewer described
at '5" above, to serve parcels identified as Nos. 58 and 59 on said
boundary map; (22) a sewer line commencing at the pump station de-
scribed at '7" above and extending easterly therefrom to a point near
the northwest corner of the parcel identified as No. 64 on said bound-
ary map; (23) a sewer line commencing in the parcel identified as No.
106 on said map, at the main sewer described at "11" above, and ex-
tending easterly and southerly to the northwest corner of the parcel
identified as No. 103 on said boundary map (24) a main sewer com-
mencing in the parcel identified as No. 198 on said boundary map, at
the main sewer described at "14" above, and extending easterly to and
in and along said Fallen Leaf Road to a point near the northwest
corner of the parcel identified as No. 152 on said map, thence south to
a point near the northwest corner of the parcel identified as No. 151
on said boundary map; and (25) a main sewer commencing at the termina-
tion of said main sewer described at "24" above and extending south to
a point near the southeast corner of the parcel identified as No. 162
on said boundary map, thence west to the northwest corner of the par-
cel identified as No. 143 on said map, thence southerly along parcel
boundary lines to a point near the southeast corner of the parcel
identified as No. 120 on said map, and thence southerly through the
easterly end of the parcel identified as No. 117 on said map and ter-
minating in the parcel identified as No. 106 on said map;
b) The acquisition within said boundaries of a right of service and use
in the existing sanitary sewerage and sewage treatment and disposal
facilities of said Utility District, other than the facilities de-
scribed in clause (c) hereof, which help provide service to and which
are of benefit to the properties within said area;
EXHIBIT A
. ii
.
c) The acquisition within said boundaries of a right of service and use
in the sanitary sewerage facilities constructed by said Utility Dis-
trict for the Pope Baldwin Recreation Area, El Dorado National Forest,
pursuant to and as described in Contract No. GS- 00T- 1708(TP) between
said Utility District and the United States of America, dated
June 20/25, 1968, which help provide service to and which are of bene-
fit to the properties within said area for those parcels of land only
the sewage from which will constitute 'non Government loads" as such
term is used in said Contract No. GS- 00T- 1708(TP) and amendments
thereto.
d) The acquisition of all facilities, lands and easements and the con-
struction of all work auxiliary to any of the above as necessary to
complete the same.
4
1
EXHIBIT A
South Tahoe Public Utility District
Assessment District 1971 -1
iii