AP 04-01-10 o rq $1Q
.rar
- -ZoZ -
4 v. p t
aN•t • 1950. $
SOUTH TAHOE PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING AGENDA
Thursday, April 1, 2010
2:00 P.M.
District Board Room
1275 Meadow Crest Drive, South Lake Tahoe, California
Richard Solbrig, General Manager Paul Sciuto, Assistant General Manager
Dale Rise, President BOARD MEMBERS Mary Lou Mosbacher, Vice President
James R. Jones, Director Eric W. Schafer, Director Chris Cefalu, Director
1. CALL TO ORDER REGULAR MEETING — PLEDGE OF ALLEGIANCE
2. COMMENTS FROM THE AUDIENCE (This is an opportunity for members of the public to address the
Board on short non - agenda items that are within the subject matter jurisdiction of the District. Five - minute
limit. No action can be taken on matters not listed on the agenda.)
3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR
4. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered
separately upon request. Comments and questions from members of the public, staff or Board can be taken
when the comment does not necessitate separate action.)
5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION / ACTION
6. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION
a. Emergency Retention Basin Replacement Approve Proposal from Selected
Pg. 21 (Julie Ryan) Consultant for Design and Services
During Construction
(A staff recommendation will be provided
prior to, and at the Board meeting)
b. City Redevelopment Agency Project No. 2 Receive Update and Direct Staff
Pg. 23 (Richard Solbrig) if Necessary
REGULAR BOARD MEETING AGENDA — APRIL 1, 2010 PAGE — 2
c. Payment of Claims Approve Payment in the Amount
Pg. 25 of $929,509.26
7. BOARD MEMBER STANDING COMMITTEE REPORTS
(Discussions may take place; however, no action will be taken)
a. Water & Wastewater Operations Committee (Jones / Rise)
b. Finance Committee (Schafer / Cefalu)
c. Executive Committee (Rise / Mosbacher)
d. Planning Committee (Mosbacher / Schafer)
8. BOARD MEMBER AD HOC COMMITTEE REPORTS
(Discussions may take place; however, no action will be taken)
a. Management/Union Medical Plan Negotiations Ad Hoc Committee
9. EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVES REPORT
10. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken)
11. GENERAL MANAGER REPORTS (Discussions may take place; however, no action will be taken)
12. STAFF / ATTORNEY REPORTS (Discussions may take place; however, no action will be taken)
13. NOTICE OF PAST AND FUTURE MEETINGS / EVENTS
Past Meetings / Events
03/24/10 — Redevelopment Agency Project No. 2 Community Meetings
03/25/10 — Management/Union Medical Plan Negotiations Ad Hoc Committee Meeting
03/27/10 — Congressman Tom McClintock Town Hall Meeting
03/29/10 — Water and Wastewater Operations Committee Meeting
03/30/10 — Assemblyman Ted Gaines Town Hall Meeting
03/31/10 — Technical Review Committee Public Meeting
Future Meetings / Events
04/06/10 — 9:00 a.m. — City of South Lake Tahoe /Redevelopment Agency Joint Public
Hearing on Project No. 2 at City Offices at the Airport
04/12/10 — 3:30 p.m. — Water and Wastewater Operations Committee Meeting at District
04/14/10 — 9:00 a.m. — El Dorado County Water Agency Meeting in Shingle Springs
04/15/10 — 2:00 p.m. — STPUD Regular Board Meeting at District
04/20/10 — 9:00 a.m. — Alpine County Supervisors Regular Meeting in Markleeville
14. CLOSED SESSION (Closed Sessions are not open to the public)
a. Pursuant to Government Code Section 54956.9(b) /Conference with Legal Counsel -
Pg. 41 Anticipated Litigation (One Case)
b. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel —
Pg. 43 Existing Litigation re: Meyers Landfill Site: United States of America vs. El Dorado
County and City of South Lake Tahoe and Third Party Defendants, Civil Action
No. S -01 -1520 LKK GGH, United States District Court for the Eastern District of CA
REGULAR BOARD MEETING AGENDA — APRIL 1, 2010 PAGE — 3
c. Pursuant to Government Code Section 54957(a) /Conference with Labor Negotiators
Pg. 45 Agency Negotiators: Richard Solbrig /General Manager, Nancy Hussmann /Human
Resources Director, Board of Directors
Employee Organization: Stationary Engineers, Local 39
d. Pursuant to Govemment Code Section 54957 /Public Employee Appointment
Pg. 47 Title: Labor Negotiator
15. ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION
16. ADJOURNMENT (To the next regular meeting, April 15, 2010, 2:00 p.m.)
The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month.
A complete agenda packet, including all backup information is available for review at the meeting and at the District
office during the hours of 8:00 a.m. — 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30
days after minutes of the meeting have been approved. Items on this agenda are numbered for identification purposes
only and will not necessarily be considered in the order in which they appear on the agenda. Designated times are for
particular items only. Public Hearings will not be called to order prior to the time specified, but may occur slightly later
than the specified time.
Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time
the agenda items are heard; comments should be brief and directed to the specifics of the item being considered.
Comments on items not on the agenda can be heard during "Comments from the Audience;" however, action cannot
be taken on items not on the agenda.
Please provide the Clerk of the Board with a copy of all written material presented at the meeting. *Backup to any
agenda item(s) not included with the Board packet will be made available when finalized at the District office, at the
Board meeting, and upon request to the Clerk of the Board.
The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate
participation of the disabled in all of the District's public meetings. If particular accommodations for the disabled are
needed (i.e., disability - related aids, or other services), please contact the Clerk of the Board at 530.544.6474,
extension 6203, at least 24 hours in advance of the meeting.
tyt
* •19 50."1 43 ' o
CONSENT CALENDAR
APRIL 1, 2010
ITEMS REQUESTED ACTION
a. Water Meter Outreach Coordinator Temporary Approve Contract Budget with the
Pg. 1 Help Substitute Personnel or Blue Ribbon
(Paul Sciuto) for a Temporary Water Meter Out-
reach Coordinator Position, in the
Amount of $35,000
b. Diamond Valley Ranch (DVR) Pipeline — Phase 2 Accept the Proposal from C2Me
Pg. 3 (Ivo Bergsohn) Engineering to Provide Design
Services, in the Amount of $7,200
c. Diamond Valley Ranch (DVR) Pipeline Project - Accept Proposal from Construction
Pg. 7 Phase 1; Geotechnical Investigation Materials Engineers, Inc. to Com-
(Ivo Bergsohn) plete a Geotechnical Investigation, in
the Amount of $19,000
d. Regular Board Meeting Minutes: Approve Minutes
Pg. 15 March 18, 2010
(Kathy Sharp)
South Tahoe Public Utility District • 1274 Meadow Crest Drive • South Lake Tahoe, CA 96150
Phone 530.544.6474 • Facsimile 530.541.0614 • www.stpud.us
General Manager
Richard H. Solbrig
- ` Directors
o u a o e Chris Cefalu
James R. Jones
t/"! UtUit District
Ma Lou Mer
G Erio Schafer
1275 Maadow Cwt Drive • South Lake Tahoe • CA 96150
Phone 530 544 -6474 • Fax 530 541 -0614
BOARD AGENDA ITEM 4a
TO: Board of Directors
FROM: Paul A. Sciuto, Assistant General Manager /Engineer
MEETING DATE: April 1, 2010
ITEM — PROJECT NAME: Water Meter Outreach Coordinator Temporary Help
REQUESTED BOARD ACTION: Approve contract budget with the Substitute
Personnel or Blue Ribbon for a temporary Water Meter Outreach Coordinator position,
in the amount of $ 35,000.
DISCUSSION: The District will be installing approximately 2800 water meters in the
City and County this construction season. A Water Meter Outreach Coordinator is
needed to facilitate the public outreach and answer questions from the public. This will
include attending public meetings, sending out letters prior to construction, distributing
door hangers within 72 hours of construction and water shutoffs, and answering the
multitude of questions staff is anticipating. The position will work closely with the
construction inspectors to coordinate the construction schedule and public outreach.
It is anticipated that this temporary employee will be full time /temporary, from
April 12, 2010, through October 15, 2010.
SCHEDULE: April - October 2010
COSTS: $35,000
ACCOUNT NO: 2029 - 7078 /METERS
BUDGETED AMOUNT REMAINING: $3,800,000 2010/11
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES / NO
CHIEF FINANCIAL OFFICER: YES ea NO
—1—
General Manager
Richard H. Solbrig
�, Directors
0tirt
.+I►
f +err' ',''� �.
Jam es Ch R. ris Jones Cefalu
.Xi "=k
Pu 1t i c Mary Lou Mosbacher
U t il ity ,�� Dale Rise
Eric Schafer
1275 Meadow Civet Nye • South Lake Tahoe • CA
Phone 550 -6474 • Fax 530 541-0614
BOARD AGENDA ITEM 4b
TO: Board of Directors
FROM: No Bergsohn, Hydro - Geologist
OMEETING DATE: April 1, 2010
ITEM — PROJECT NAME: Diamond Valley Ranch (DVR) Pipeline - Phase 2
REQUESTED BOARD ACTION: Accept the proposal from C2Me Engineering (C2Me)
to provide engineering design services, in the amount of $7,200.
DISCUSSION: Upon Board approval (October 15, 2009), C2Me has developed
engineering plans, specifications, and estimate of probable construction costs (PS &E)
for the DVR Pipeline Project — Phase 1. This portion of the project entails the installation
of approximately 7,100 lineal feet of new 18 -inch pipeline to convey reclaimed
wastewater from the District's C -line to District property located north of Diamond Valley
Road in the NE1 /4, Section 36, T11N, R19E, MDM. The PS &E for Phase 1 is presently
at the 90% stage of completion.
The District is seeking funding through the State Water Resources Control Board Clean
Water State Revolving Fund (CWSRF) program for this project. With the favorable
bidding climate for public works projects, District staff has requested that C2Me continue
the engineering design and submit a proposal for development of a preliminary (50 %)
plan and estimate of probable construction costs for Phase 2 of the project. The Phase
2 pipeline alignment will extend the pipeline approximately 8,000 lineal feet from the end
of Phase 1 back to the existing C -line in the N' /2 of Section 5, T 10 N, R 20 E, MDM.
This portion of the pipeline is planned to serve the Diamond Valley Irrigation Fields.
Construction of the Irrigation Fields is presented as Project Component 11 of Master
Plan Project 1 in the Recycled Water Facilities Master Plan (HBA, 2009).
District staff believes that there is a reasonable chance that accepted bids for
construction of the DVR Pipeline Project — Phase 1 will be below engineer's estimate.
Should that occur, it would be advantageous to apply any available remaining grant
funding towards completion of the DVR Pipeline Project. Completion of the preliminary
alignment for Phase 2 will better enable the District to use any remaining available
funds towards that objective.
-3-
No Bergsohn
April 1, 2010
Page 2
C2Me has met all staff expectations and has completed the Phase 1 engineering design
work in a cost - effective and timely manner. Therefore, staff recommends approval of the
DVR Pipeline - Phase 2 Engineering Services Proposal dated March 23, 2010 as
submitted.
SCHEDULE: April 2010 — May 2010 (anticipated)
COSTS: $7,200
ACCOUNT NO: 1029 - 8097 /CROUTE
BUDGETED AMOUNT REMAINING: $1,960,461 (2009/10); $2,000,000 (2010/11)
ATTACHMENTS: DVR Phase 2 Pipeline Preliminary Plan Proposal (C2Me, March 23,
2010).
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer
GENERAL MANAGER: YES do NO
CHIEF FINANCIAL OFFICER: YES NO
—4—
CZME ENGINEERING
SCOPE OF SERVICES
HOUR AND FEE ESTIMATE
This Scope of Services is for development of a Preliminary (50 %) Plan and Estimate of Probable
Construction Cost for installation of approximately 8,000 linear feet of 18 -inch Ductile Iron or
Steel pipe for the DVR Phase 2 Pipeline Project. An initial meeting and site walk with District
Staff resulted in the following observations:
1) The phase 2 pipeline alignment will complete a loop from the terminus of the initial
DVR Pipeline Project back to the existing export pipeline (C -Line) on District
property.
2) The phase 2 pipeline will need to serve planned storage ponds and irrigation facilities
(pivot rigs and subsurface irrigation) in terms of location and by providing turnout
plumbing.
3) There appears to be a favorable pipeline alignment location based on field
reconnaissance. This alignment will necessarily cross Diamond Valley Road and the
Millich Ditch.
4) The District desires preliminary (50 %) plans, consisting of a horizontal alignment, to
begin evaluating the Phase 2 project.
Based on the above, the following work products and tasks are suggested.
50% PLAN PREPARATION:
The conceptual horizontal alignment for the 18 -inch pipeline will be constructed geometrically on
the existing 1 " =40' aerial survey base map. Design will be consistent with phase 1 horizontal
alignment criteria (e.g. suitable for installation of DIP or Steel pipe).
Planned storage pond, pivot rig and subsurface irrigation facility locations will be superimposed
on the base map to assist in alignment definition. Turnout plumbing consisting of 18 -inch tees
and valves will be provided to serve planned facilities. Areas under various forms of irrigation
will be quantified.
Preliminary sending and receiving pit locations for the Diamond Valley Road bore and jack
crossing will be identified, and a preliminary detail will be provided for crossing of the Millich
Ditch.
The alignment will be divided into logical construction segments based on District standard
pressure testing and acceptance criteria. These segments will be quantified in terms of pipeline
length and a simplified construction cost estimate will be formulated by pipeline segment. This
will allow District staff to plan for future construction.
1 " =20' plan view sheet window rectangles and match lines will be superimposed on the
horizontal alignment, enabling a sheet count, and facilitating possible future production of
construction plans for subphases.
DVR Phase 2 Pipeline
Preliminary Plan Proposal Page 1 of 2 3/23/2010
-5-
The Preliminary Plan will be an overview map produced at 1" =300' showing the above. The Plan
will be produced in 22x34 format using District plan production standards. One full -size plan
sheet will be provided in hardcopy along with a copy in electronic (.doc, .pdf, and AutoCAD
v2007 .dwg) format.
SCHEDULE:
The anticipated schedule is to complete the 50% plan within 4 - weeks of authorization to proceed.
FEE ESTIMATE:
Task Hours Dollars
Prepare Base Map: 6 $720
Layout Alignment: 6 $720
Field Check Alignment: 4 $480
Ditch Crossing Detail: 4 $480
Cost Estimate: 4 $480
Sheet Layout: 4 $480
50% Plan Production: 32 $3840
TOTAL: 60 $7200
DVR Phase 2 Pipeline
Preliminary Plan Proposal Page 2 of 2 3/23/2010
-6-
General Manager
Richard H. SoIbrig
Directors
Tah
. Chris Cefalu
Jam •
. r , ,,,� _ es R. Jones
3, • e MaLou M er Fu o Ut Di trio e Eric SchafRier
1275 Meadow Crest Chive • Sow Lake Tahoe • CA 96150
Phone 530 545 74 • Fax 530 541 -0614
BOARD AGENDA ITEM 4c
TO: Board of Directors
FROM: No Bergsohn, Hydro - Geologist
MEETING DATE: April 1, 2010
ITEM — PROJECT NAME: Diamond Valley Ranch (DVR) Pipeline Project - Phase 1;
Geotechnical Investigation
REQUESTED BOARD ACTION: Accept proposal from Construction Materials
Engineers, Inc. (CME) to complete a geotechnical investigation, in the amount of
$19,000.
DISCUSSION: The DVR Pipeline Project -Phase 1 entails the installation of
approximately 7,100 lineal feet of new 18 -inch diameter pipeline from a new inter -tie at
the intersection of Ca -89S and Diamond Valley Road to the District property (APN 01-
080 -060) located north of Diamond Valley Road in the NE'/, Section 36, Township
11N, R19E. Reaches of this pipeline alignment require that a geotechnical investigation
be completed to satisfy due diligence and finalize the engineering design. The
geotechnical investigation will provide recommendations for construction techniques
and geotechnical design required along the pipeline alignment including construction
within the paved section of Diamond Valley Road; crossing through the trace of an
active fault(s); and crossing under the Millich Diversion Ditch using the horizontal auger
boring method.
District staff believes that CME has the necessary experience and qualifications to
complete this work in a cost - effective and timely manner. Therefore, staff recommends
approval of the DVR Pipeline — Phase 1 Geotechnical Investigation proposal (CME,
March 25, 2010), as submitted.
-7-
No Bergsohn
April 1, 2010
Page 2
SCHEDULE: March —May, 2010 (anticipated)
COSTS:
ACCOUNT NO: 1029 -8097
BUDGETED AMOUNT REMAINING: $1,960,461 (2009/10); $2,000,000 (2010/11)
ATTACHMENTS: Proposal for Engineering Services, DVR Pipeline Project — Phase 1
Geotechnical Investigation (CME, March 25, 21010)
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES !V& NO
-8-
ME
6980 Sierra Center Parkway, Suite 90
Reno, NV 89511
March 25, 2010
Ivo Bergsohn, P.G., C. Hg.
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 -7401
RE: Geotechnical Investigation Proposal
Diamond Valley Ranch Pipeline
Woodsford, California
Dear Ivo:
Construction Materials Engineers Inc. is pleased to submit the following proposal to provide a
Geotechnical Investigation for the Diamond Valley Ranch Pipeline in Woodsford, California.
1.0 PROJECT DESCRIPTION
The project consists of the construction of a 7,100 lineal foot pipeline extending from a new inter-
tie at the intersection of Ca-89S and Diamond Valley Road to the District property (APN 01 -080-
060). The pipeline will consist of a 18 -inch diameter ductile iron or welded steel distribution line
with a depth of about 6 to 8 feet below the existing ground surface.
Starting at the tie-in for a length of about 614 feet, the pipeline route will be constructed within
Diamond Valley Road. The remainder of the pipeline alignment will be within unpaved sections of
the road on district property. Approximately 30 lineal feet of the pipeline will cross under the
Millich Diversion Ditch using horizontal boring methodology.
2.0 SCOPE OF WORK
2.1 Field Exploration
Field Exploration will be completed for both the pipeline route and performing a fault investigation.
2.1.1 Pipeline Route
Field exploration will consist of excavating 15 exploratory test pits along the pipeline route
to depths of 8 to 10 feet, or refusal on bedrock or other hard impenetrable surface. The
exploratory test pits would be spaced approximately every 500 feet with a test pit
excavated on either side of Millich Ditch. Additional test pits may be required if unusual
soil conditions are encountered. It is understood that STPUD will provide the trackhoe and
operator.
Our geotechnical personnel will log material encountered during exploration in the field.
The ground water surface will be measured, if encountered. Representative samples will
be returned to our Reno laboratory for testing.
office 775-851-82051 fax 775-851-85931 www.cme - corp.com 0
-9-
No Bergsohn, P.G., C. Hg.
SOUTH TAHOE PUBLIC UTILITY DISTRICT
March 25, 2010
Page 2
Due to the anticipated coarse soil conditions, one of the more important aspects of this
project is to provide estimates of the percentage of plus 6 inch particles in the native soils.
The spoils from the trench excavation will likely have to be screened prior to use as trench
backfill. Therefore, visual approximate estimates of large cobbles and boulders will be
made during our field investigation to determine the amount of material that cannot be re-
used as trench backfill.
We will also core the pavement in a couple of locations on Diamond Valley Road to
determine the existing pavement thickness.
All test pits will be backfilled upon completion of the field portion of our study. The backfill
will be compacted to the extent possible with the equipment on hand; however, the
backfill cannot be considered a structural fill. If structures, concrete flatwork, pavement,
utilities or other improvements are to be located in the vicinity of any of the test pits, the
backfill should be removed and replaced with structural fill.
We have budgeted to mark the site for USA Dig Clearance to locate existing utilities. CME
will take every precaution to lower the risk of damaging underground structures; however,
underground exploration is inherently risky as it is not possible to predsely locate all
underground structures. Our fee is not substantial to compensate for damage or
disruption of service and repair costs. If insufficient or incorrect data results in damage to
underground structures, the cost for repair will be the responsibility of the client.
2.1.2 Fault Investigation
Based on our preliminary review of mapped faults in the area, it appears that 2 fault
traces may cross the pipeline alignment with possibly a third fault trace near the west side
of the proposed alignment. Exploration trenches will be excavated perpendicular to fault
traces in order to verify the existence and location of the faults.
Based on preliminary geologic information, the project area contains very bouldery alluvial
and glacial - outwash deposits. Such deposits would not only make excavating trenches
difficult, but may limit our ability to adequately characterize fault activity.
CME will subconsult with Piedmont GeoSciences to complete the fault investigation. The
resume of the Principal Geologist to complete the investigation will be included with our
final proposal. The fault investigation will be completed in three phases:
1) Surface Investigation:
a) Stereoscopic analysis of available aerial photography;
b) Research existing fault information;
c) A site visit to verify or revise existing mapping and stereoscopic information;.
d) Determination of where the fault trenches should be located; i
2) Sub - surface Investigation:
The sub - surface investigation depends on the findings of the surface investigation.
The Investigation would consist of excavating a trench perpendicular to the fault trace.
Each trench would be flagged, graphically logged, and photographed. One trench
-10-
No Bergsohn, P.G., C. Hg.
SOUTH TAHOE PUBLIC UTILITY DISTRICT
March 25, 2010
Page 3
would be excavated across each of the two active fault traces previously mapped as
crossing the proposed pipeline alignment. A third trench may be needed to locate the
active fault trace mapped parallel to and west of Hwy 89 in the area, to verify the
location of the fault trace relative to where the proposed pipeline would connect to the
existing pipeline.
3) Report Preparation
The report would summarize our field findings and provide conclusions on the
existence of the fault and impact to the project.
2.2 Laboratory Testing
Representative samples of each significant soil type will be tested In the laboratory as to index
properties, such as moisture content, grain size distribution, and plasticity. These index properties
are indicative of mechanical behavior of the soils.
Density testing, where appropriate by soil type, will be performed on in -situ soils to determine dry
density and moisture content. Moisture /density relationship testing will be completed to determine
maximum dry density and optimum moisture.
Corrosion testing on representative near surface soils will also be performed to determine
corrosion potential to steel and concrete. Soils will be tested for resistivity, redox potential, soluble
sulfates, chlorides, sulfides, and pH.
2.3 Report Preparation
Upon completion of our field, laboratory, and office studies, a geotechnical investigation report will
be completed for the project and include the following:
• Description of the project site with the approximate locations of our explorations, shown on a
Site Plan;
• Descriptive Togs of the explorations performed for this study;
• General summary of the site soils and geology;
• Results of laboratory tests and a description of test methods;
• Soil corrosion potential to concrete and underground piping.
• Seismic hazards including site seismicity and parameters for design based on the 2007
Califomia Building Code;
• Earthquake fault Investigation;
• Surface and ground water conditions;
> Site preparation and grading including excavation difficulties in bedrock or coarse grained
soils;
• Suitability of site soils for use as structural fill and trench backfill;
- 11-
No Bergsohn, P.G., C. Hg.
SOUTH TAHOE PUBLIC UTILITY DISTRICT
March 25, 2010
Page 4
• Construction dewatering recommendations, If required;
• Pipe Trenching recommendations, including:
• OSHA recommendations for open trench excavations;
• Suitable materials for backfill and bedding;
• Compaction recommendations;
• Construction recommendations to prevent bedding from acting as a conduit for
groundwater drainage;
• Construction recommendations to minimize pipe settlement;
• Use of geotextiles for backfill soil retention when considering open graded aggregate
bedding.
• Backfill soil loading on pipe;
• Structural section design recommendations for Diamond Valley Road;
D Anticipated construction difficulties.
3.0 SCHEDULE
•
It is our understanding that the notice to proceed may be given on April 6 Our subconsultant is
scheduled to complete field week on another project the week of April 12 to 16 but will be available to
begin field work on this project the following week. We can begin the USA dig clearance and preliminary
field work on April 6th.
Verbal geotechnical recommendations can be provided within one week following the completion of field
exploration. A draft of the written report will be available in about 3 weeks after the completion of the field
work. The final report will be submitted after receipt of review comments from the district.
4.0 FEES
We will provide our services on a time and materials basis for an estimated fee of $17,500 to $19,000. A
breakdown of the fees is presented on Table 1 on the following page.
1
- 1
1
-12-
No Bergsohn, P.G., C. Hg.
SOUTH TAHOE PUBLIC UTILITY DISTRICT
March 25, 2010
Page 5
Es?1MATED FEN BY PROJECT TASK
Project task Estimated Fees
Fault Investigation 5,900 to 6,900
Laboratory Testing 2,000
Field Exploration 4,600 to 5,100
Analysis, Report Preparation, Consultation and
Meetings (includes 3 hours of consultation and 5,000
meeting time)
Notes:
1) Includes 7 hours for the Senior Geotechnical Engineer and subconsultant fees.
2) Includes testing 5 soil samples for index properties and corrosion testing. A moisture -
density curve will be completed on one soil sample.
3) Includes 30 hours for the Field Geologist and 7 hours for the Senior Geotechnical Engineer.
4) Includes 26 hours for the Senior Geotechnical Engineer.
I
We thank you for the opportunity to submit this proposal, and look forward to its favorable consideration.
If you have an questions, please call.
Sincev6ly, !�
CONS R ION MATER ENGINE RS, INC.
• andel A. • eynold
Project : nager
D t: 775.7.7 -7576
• lrect Fax: 775 - 737 -7607
RAR:rar:Jwl
w nr.mo12OIWO a,n d airy ranch wpa..b.o.pom.
t .[ L
-13-
s oul" T4N
s
N"e • 1950•`Nst Y
` ic vnury `
SOUTH TAHOE PUBLIC UTILITY DISTRICT
Richard Solbri , General Mena er Paul Sc' . ssistant General Mana er
Dale Rise, President BOARD MEMBERS ou Mosbacher, Vice President
James R. Jones, Director Eric W. Schafer, Director Chris Cefalu, Director
REGULAR MEETING OF THE BO A . OF DIRECTORS
SOUTH TAHOE PUBLIC U DISTRICT
MARCH '110
.r .i
MINU
The Board of Directors of the South T oe Public Uti rict met in a regular session,
March 18, 2010, 2:00 P.M., District 1275 Mee]. rest Drive, South Lake Tahoe,
California.
BOARD OF DIRECTORS: ROB LL
President Rise, Directors Cefalu, Jones, `4 .fer.
Director Mosbacher was
STAFF:
Solbrig, Sharp, Sc `Hughes, C h nley, B ,i" hn,
Brown, Bird, Cocki t Ryan, Att • Herrema
Hal Bird led the pledge , _ F.° ; ~� ° ° x s PLEDGE OF ALLEGIANCE
J
Moved , W A afer f Jo Mosbacher Absent / CONSENT CALENDAR
Pass010 approve the Consen : . endar as submitted
a. Re` v ted liability claim against `= D received from
Sona Havel;
b. Sewer System Master Plan - Approved the District's
Sewer System Manag nt Plan;
c. Engineering Temporary Help - Approved contract
budget with Substte Personnel for temporary
Engineering department helper, in the amount of
$32,000;
d. MXUs (Radio Read) for Water Meters - (1) Authorized
exception to bidding procedures as outlined in the
Purchasing Policy for a sole source purchase of
standardized supplies; and (2) Authorized purchase of
Sensus MXUs from Western Nevada Supply in the
amount of $193,792.50;
-15-
REGULAR BOARD MEETING MINUTES - MARCH 18, 2010 PAGE - 2
e. Alpine County's Summer 2010 Fish Purchases — CONSENT CALENDAR
Authorized payment in the amount of $48,000; (continued)
f. Board Policy Section 2010: Election of Directors —
Approved amendments clarifying that directors
at large need not designate a numbered office,
adding information related to term limits, offering
special district training to directors, and deleting
a section pertaining to directors of geographic
divisions;
g. Approved Regular Board Meeting Minutes:
March 4, 2010.
` ¢',,y
ITEMS FOR BOARD ;�� ON
This ordinance would require any meter that is t ALLOCATION Off" PONSIBILITY
inches or larger to be the responsibility of the • ° " FOR MAINTENAN 1.. WATER
tomer for the first year after connection, and ori'
pertains to property owners, or his or her contrac
who obtain and install the meters themselves. The
District will maintain responsibility a e first year
of connection. Staff determined that s to
repair or replace such a meter are disp `� :Iy `
greater than the costs of repairing for r: sing
meter smaller than two inches in size. 0 arily, i ''
such costs arise within the f' ear that h a
, air x • s::
meter is in service, the need or • nt is a result of improper.,installatio :.freeze riouttion
of the meter. :u
Moved Schafer / Se - Jones T ,•.- her Ab ., , /
Passed to enact Ordin N • , _ � endin •
Section 3. se Adm ��� . ve Code mpg
the mai .ter . ` s and superseding
Ordina �� ' 0 51 its evigiety.
The 'ct is in the proCefts of daveibping engineer- DIAMOND VALLEY RANCH
ing pla install a new 1 dry: ch dieter pipeline PERMITTING ASSISTANCE
to conve waste 9 ._: er to District property
in Diamon • Staff id:' , ied environmental per -
mitting requir is that to be satisfied in order
to construct an• .: this line. These include
preparation of per .-: `ation document to attain
a general construct,. mit for installation of the
pipeline; preparation o a Report of Waste Discharge
to permit the discharge of reclaimed wastewater; and
completion of wetlands delineation and biological
resource assessments for design of the irrigation fields.
Two proposals were received. Staff ranked each
according to specific criteria. Submittals from both
consultants showed varying strengths and areas of
-16-
REGULAR BOARD MEETING MINUTES - MARCH 18, 2010 PAGE - 3
expertise. Staff recommended that the project scope DIAMOND VALLEY RANCH
be split between the two in order to take advantage PERMITTING ASSISTANCE
of the strengths from both consultants as follows: (continued)
AECOM to complete tasks related to the permitting
process, and HBA to complete tasks related to the
environmental assessments. Both were agreeable to
the reduced scopes as identified.
Moved Schafer / Second Cefalu / Mosbacher Absent /
Passed to: (1) Approve proposal received from AECOM
in the amount of $47,272 to complete Tasks 1.1 and
and (2) Approve proposal received from HBA in
the amount of $49,600 to complete Tasks 2.2 and 2.3.
Seven bids were received for this project to construct L THER P 'UMP STATION
the power generation facility. The lowest bid, receiv0 STANDBY P• <.,° ' GENERATOR
from Sierra Nevada Construction, had minor irregublek FACILITY
ities that did not impact the bid advantage: omiegaert of
the phone number for the surety company, and° t add-
ress for the bonding company (which were receives j '
soon thereafter). In addition, the funding for this p t
(State Water Resources Control Board State Revolving
Loan Fund) requires the bidder to co < '.f . ith require-
ments for outreach to Disadvantage . nterprises
(DBEs). Staff detected minor deviation ;, t ° � er
that the DBE was reported (the DBE for x as n �.
completed, but the necessary informatio s me i
in the supporting docume kt 1-!,. The gra ,:,-d t ra
verified this was acceptable.
Moved Jones / Se Schafer / bacher ••nt
Passed to waive the ue'R or irregul es as des -d
above, and award the to reaponsi
responsible bidder, Sierr : : Co � ' k k , r e
amount o .. •07.
The Ail this cone frimiOy includes demolition HEADWORKS REPLACEMENT
of t fisting incinera .A, uildir, yard piping and PHASE 1
earth'' , „ to prepare the = for the new Headworks,
which ` .•.a eduled to be . Z in 201 1.
Five bids wAlY . received for . project at the March 12
bid opening. Tht :' west
-ceived from Evans
Brothers, Inc., iations that did not impact
bidding advantages`. >'tion funding for this project
requires the bidder t•` ply with requirements for
outreach to DBEs. Sta f detected minor deviations, but
found the bid complied with the bidding requirements
for DBE outreach.
Moved Jones / Second Schafer / Mosbacher Absent /
Passed to waive the minor irregularities as described
above, and award the bid to the lowest responsive,
responsible bidder, Evans Brothers, Inc., in the
amount of $545,380.
-17-
REGULAR BOARD MEETING MINUTES - MARCH 18, 2010 PAGE - 4
The work included in this contact includes erection, ANGORA TANK REPLACEMENT/
coating, disinfection and testing of two welded ECHO VIEW TANK REPLACEMENT
steel water storage tanks, including appurtenances,
on existing concrete foundations.
Four bids were received at the March 9 bid opening.
The lowest bid, received from Resource Development
Company, had minor deviations that did not impact
bidding advantages. In addition, funding for this project
requires the bidder to comply with requirements for
to DBEs. Staff detected minor deviations, but
found the bid complied with the bidding requirements
for DBE outreach.
Moved Schafer / Second Jones / Mosbacher Absen
Passed to waive the minor irregularities as descri •, "
above, and award the bid to the lowest respon
bidder, Resource Development Co ti y,
(RDC) in the amount of $466,700.
Moved Jones / Second Cefalu / MosbeEher Absent / MENT OF CLAIMS
Passed to approve payment in the a H of
$956,769.81. *i
Water and Wastewater Operations Com ee: Ti =. ,, BO •` EMBER STANDING
committee met March 15. Minutes of th eting -M EE REPORTS
are available upon reques
Management /Union al Plan otiation "n eAd Hoc BOARD MEMBER AD HOC
Committee: The c' ttee met h 11 to °atinue COMMITTEE REPORTS
to work on stream the well program. Several
physicians gave their 'ons •, • guidelines
for the committee to c. - r. • will
attend the •aa ting t, : ss wellnes , rams
that inch de u ' b ' ealt assessments /coaching.
Sta ry Engineers, L. 39, r s : letter requesting
the lJn contract be op and :-gin negotiations.
They arse included an exte ^ e req st for information.
Staff will p -. ide all records that are available. The idea
of hiring a I . `, was also discussed.
Director Jones a `' "x'.,.•e•,te March 10 agency board EL DORADO COUNTY WATER
meeting. The next €F . is April 15. On March 26, AGENCY PURVEYOR
Jones met w Sup = =or Sweeney to discuss ideas REPRESENTATIVE REPORT
to reorganize the agency, including structure, staffing,
and tasks to be completed. They also discussed the
potential for hiring a new general manager, whether to
initiate an outside audit, and the possibility of relocating
their office space. Significant reductions in costs are
expected, which will leave more funding for projects.
-18-
REGULAR BOARD MEETING MINUTES — MARCH 18, 2010 PAGE — 5
Director Schafer reported on the CASA (California BOARD MEMBER REPORT
Association of Sanitation Agencies) Conference held
in Washington D.C. He attended various congressional
panels. Topics included chemical security, compliance
and oversight; pharmaceuticals in water supplies, climate
change and renewable energy sources, Department of
Energy programs and funding, and the Clean Water Act.
He made a pitch to several congressional offices to
allow the use of reclaimed water in Nevada. µ.
Director Schafer also reported that Senator McClintok
would be in Tahoe for a town hall meeting, so he :-
invited him to tour the District's facilities. „,,
District Information Officer: Dennis Cocking reported S AFF RE s ,':.
he attended an ACWA Joint Federal Affairs Legislative s .
”,
Committee meeting. The main topic of discussion was ;. ,
about the waters of the U.S. ACWA is currentl u , . king ;
approximately 90 of the 1,600 bills that were ` „ N` ,, ,
before the March 1 deadline.
He also reported the USFS reduced th - fee they were
going to charge for grant administrat ` , •m 10%
down to 3 %, which will save the gra ,, hip
around $300,000. ��.
4
3:25 — 3:35 P.M.
.�c ���,) E BREAK AND ADJOUR-
. �, ‘ TO CLOSED SESSION
ACTION J ORT O M DIS *` ' _SED DURING CLOSED SESSION
k *
No reportable Board ;_'• n. : Pursuant to Government Code
`: , ” Section 54956.9(b) /Conference Counsel
,�� • „ _,'. Cla m Against STPUD
,
from Sonia Havel
No r able Board acts, Pursuant to Government Code
a „ Section 54956.8 /Conference re:
4 ¢ , Real Property Negotiations
� Agency Negotiators: District Staff
'''F 4. s (Curtis)
. ;, zt `, Under Negotiations: Acquisition of
:= , Easement
', ., ;„ Property Identification: Lot 55 Echo
View Estates, APN 33- 623 -12
No reportable Board action. Pursuant to Government Code
Section 54956.9(b) /Conference
with Legal Counsel- Anticipated
Litigation (Three Cases)
-19-
s
REGULAR BOARD MEETING MINUTES — MARCH 18, 2010 PAGE — 6
No reportable Board action. Pursuant to Government Code
Section 54956.9(a) /Conference
with Legal Counsel- Existing
Litigation re: False Claims Act Case:
United States, the States of
California, Delaware, Florida,
Nevada, and Tennessee and the
Commonwealths of Massachusetts
and Virgi E' ex rel. John Hendrix v.
J -M M. turing Company, Inc.,
and F .sa Plastics Corporation,
U. ' "t' it , . ivil Action No. ED CV06-
•, United States District
rt fo =;,Central District of CA
No reportable Board action. Pursuant to c - :- nment Code
Section 54956. - r Conference
-` with Legal Couns x
;; ,g Liti • , 'on re: Meyer i dfill Site:
y
U States of Ame , vs. El
E ' • do County and City of South
e Tahoe and Third Party
�� . :fondants, Civil Action No.
" ' r .:, 1 -1520 LKK GGH, U.S. District
k ` y r 3 . �. for the Eastern District of Ca.
-� N � ,
No reportable Board action. " -,- n • .rsu to Government Code
'" l it ' + n 54956.9(b) /Public
°' � + E -ogee Evaluation
'" ;; Unrepresented Employee Position:
.' General Manager
,,, Agency Negotiators: Board of
'e Directors
4
"
4:40 P.M. , :i " ADJOURNMENT
k t �ie_
= R . . Dale Rise, Board President
South Tahoe Public Utility District
ATTEST:
Kathy Sharp, Clerk of the Board
South Tahoe Public Utility District
-20-
General Manager
Richard H. 5olbrig
Directors
So uth Thh s C /"� Utility (/"`� JamR. J FuE'Iic t" (D istriet Mary Lou M osbacher
Dale Rise
Eric Schafer
1275 Meadow Chest Chive • South Lake Tahoe • CA 96150
Phone 530 544 -6474. Fax 530 541 -0614
BOARD AGENDA ITEM 6a
TO: Board of Directors
FROM: Julie Ryan, Senior Engineer
MEETING DATE: April 1, 2010
ITEM — PROJECT NAME: Emergency Retention Basin (ERB) Replacement Project
REQUESTED BOARD ACTION: Approve proposal from selected consultant for design
and services during construction.
DISCUSSION: The existing synthetic liner system for the Wastewater Treatment Plant
ERB was installed in 1989, and is nearing the end of its useful life. The Lahontan
Regional Water Quality Control Board (RWQCB) is requiring that the District design the
new system by August 2010, and construct it by Fall 2011. Liner system design is an
engineering specialty, and staff has sought engineering support from qualified
engineering firms. The selected consultant will design the new system (including
improvements to appurtenances), assist with permitting, and support District compliance
with RWQCB requirements for Construction Quality Assurance (including inspection
and reporting).
The District received three proposals from engineering consulting firms. Staff will review
the proposals and give a recommendation to the Board prior to, and at the Board
meeting.
SCHEDULE: April 2010 to December 2011
COSTS: To be determined
ACCOUNT NO: 1029 - 7581 /ERBLNR
BUDGETED AMOUNT REMAINING: <$1,089> (2009/10); $500,000 (2010/11)
ATTACHMENTS: To be distributed prior to, and at the Board meeting.
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer
GENERAL MANAGER: YES 4111 _ NO
CHIEF FINANCIAL OFFICER: YES NO
-21-
South T& hoe 1-10 60A<�
Ricl�avd solbric+, c,eweral MawaUev 0
fvv-
�ubl,�c l�tt%I,%tl� �%str%Gt n�q�d mekubers
Chris Cefalu
Javu.es R.Jowes
Mari Lou Mosbacker
pace RLSe
Er c, Schafer
Meik.ora viol l/cm
Date: March 31, 2010
To: STPUD Board Members
Cc: Richard Solbrig, General Manager
Paul Sciuto, Assistant General Manager
From: Julie Ryan, Senior Engineer
Re: Recommendation of Design Consultant
ERB Replacement Project
The District received three proposals for consulting services in support of the ERB Replacement
Project. Staff reviewed the proposals from the three consultants based on a pre- determined set of
criteria (attached). The Staffs preferred consultant is Vector Engineering, Inc. (Vector), selected
based on their scores with respect to these criteria. A project schedule and breakdown of costs is
attached. The work will be performed under a Master Services Agreement with the Consultant, the
terms of which are being negotiated.
Staff recommends that the Board accept the proposal from Vector to provide design, permitting
support, services during construction, and Construction Quality Assurance (ie., inspection) for the
ERB Replacement Project in an amount not to exceed $254,442.65, contingent upon execution of a
mutually agreeable Master Services Agreement.
South Tahoe Public Utility District • 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150
Phone 530.544.6474 • Facsimile 530.541.0614 • www.stpud.us
SOUTH TAHOE PUBLIC UTILITY DISTRICT
ERB REPLACMENT 2010
PROJECT CODE: ERBLNR
PROPOSAL EVALUATION & SELECTION CRITERIA
On a scale of 1 to 10 (1 = weak to 10 = strong) rank the proposals using the following criteria
and enter your scores on the accompanying scoring sheet.
CRITERIA DESCRIPTION
Rank the overall completeness of the proposal. Does it provide for the
components requested in the RFP, including draft designs, plans, specs,
1 and construction support for the ERB and appurtenances? Does it address
all the requirements of the RFP? Does it meet the requirements placed on
the submittal (ie., page limitation)?
2 Rank the project team in terms of relevant experience planning, designing
and inspecting liner systems.
Rank the proposal in terms of the consultant's overall grasp of the issues
3 that need to be addressed for this project (ie., instrumentation, liner
penetrations, sun exposure, regulations and permit requirements, etc).
Does the proposal meet the scheduling constraints outlined int the RFP? If
not, is the consultant's proposed alternate schedule seem achievable and
4 appropriate for RWQCB constraints and grading season constraints?
Rank the project team in terms of experience working within the unique
5 regulatory climate in Lake Tahoe. Does the proposal acknowledge and
address the anticipated difficulties?
Using the proposal, the manpower loading matrix, and your previous project
6 experience with the consultant as guides (if any), rate your confidence in
the project team with respect to responsiveness, availability, and ability to
communicate technical issues.
Rank the proposal in terms of offering unique approaches or key
7 considerations to completing the project.
Consultant_review-ERB.xls 1 3/22/2010
South Tahoe Public Utility Distnct -ERB Replacement Project
ID Task Name Start Finish eb'10 Mar '10 Apr '10 May' 10 Jun' 10 Jul '10 Aug '10 Sep '10 Oct ' 10 Nov '10 Dec '10 Jan '11 Feb ' 11 Mar'11 Apr '11 May '11 - Jun' 11 Jul '11 Aug ' 11 Sep '11 Oct '11 Nov'11 Dec '11
2/7 2/28 3/21 4/11 5/2 5/23 6/13 7/4 7/25 8/15 9/5 9/26 ,10/17 11/7 ,11/28,12/19 1/9 1/30 2/20 3/13 4/3 4/24 5/15. 6/5 6/26 7/17 8/7 8/28 9/18 10/9 10/30 11/20 12/11
1
3 STPUD ERB Liner Replacement Project Mon 3/29/10 Mon 11/28/11 (a
4 Select Consultant Mon 3/29/10 Mon 3/29/10 •
5 Kickoff Meeting Fri 4/16/10 Fn 4/16/10
6 Data Review Mon 4/12/10 Fn 4/16/10 �+
7 Limited Field Investigation Mon 5/3/10 Fri 5/7/10
8 Deliver Altemabves Evakiation Memo Mon 5/10/10 Mon 5/17/10 �y
9 Meet with Drstnct to Discuss AE Mena Mon 5/24/10 Mon 5/24/10
10 'Design Basis Memo Mon 5/24/10 Mon 5/31/10
11 Pond Design Mon 6/14/10 Fri 8/6/10
12 90% Plans and Final CQA Plan to District Review Mon 8/9/10 Tue 8/24/10 f�
13 Edits to Plans and Final CQA Plan; Send to RWQCB Tue 8/24/10 Tue 8/24/10
14 Regulatory Review Wed 9 /1/10 Mon 1/3/11 -- - .- ___.._..____.-.
15 Make Edits and Final Design Mon 1/3/11 Mon 1/17/11 Gail
16 Finalize Construction Documents Mon 1/17/11 Mon 1/31/11 la
17 Engineer's Cost Estimate Mon 1/24/11 Mon 1/31/11
18 Contractor Bidding (6 weeks plus 2 weeks float) Tue 3/1/11 Thu 4/28/11
19 Contract Signing (6 weeks) Thu 4/28/11 Tue 8/7/11
20 Construction Window Tue 6/7/11 Sat 10/15/11
21 Construct First Half of Pond (8 weeks) Tue 7/5/11 Tue 8/30/11
22 Construct Second Half of Pond Tue 8/30/11 Sat 10/15/11
23 Final CQA Report (2 weeks after completion) Mon 10/17/11 Mon 10/31/11 Y__1
24 Distnct review of CQA Report (2 weeks) Tue 11/1/11 Tue 11/15/11
25 Revise CQA Report Wed 11/16/11 Wed 11/23/11
26 Submit CQA Report to RWQCB Mon 11/28/11 Mon 11/28/11
Prepared by: Vector Engineering, Inc.
Page 1
COST ESTIMATE - South Tahoe Public Utilities District VECTOR
EMERGENCY RETENTION BASIN r. ctvr'exf -vu, iNr
DESIGN and CQA SERVICES An Aussnco group company
TASK 1: DOCUMENT REVIEW AND KICKOFF MEETING
Personnel Number of Units Unit Rate per Unit Subtotal Cost
Principal Professional II - Thiel 4 hour $175.00 $700.00
Senior Professional II - Christie 16 hour $155.00 $2,480.00 .
Senior Engineer - JWA 12 hour $154.00 $1,848.00
Clerical 2 hour $55.00 $110.00
Comp. and Comm. fee - 5% of labor " ° ' e ' 5% % labor $256.90
Vehicle to kickoff meeting 1 each $150.00 $150.00
Total Costs - Task 1 $5,544.90 '
Note 1 - Rather than provide a fixed cost to reimbursables. Vector proposes to charge a percentage of labor for this task
TASK 2: LIMITED FIELD INVESTIGATION
Personnel Number of Units Unit Rate per Unit Subtotal Cost
I Senior Professional 11- Christie (1 day in field) 12 hour $155.00 $1,860.00
!Senior Engineer - JWA 4 hour $154.00 $616.00
Staff Professional II (1 day in field) 12 hour $90.00 $1.080.00
Clerical 3 hour $55.00 $165.00
Vacuum box testing and 3 holes repair 1 each $1,500.00 $1,500.00
Comp. and Comm. fee - 5% of labor " ° ' e ' 5% % labor $261.05
Travel Expenses 1 each $150.00 $150.00
Geomembrane testing 3 each $300.00 $900.00
Soils testing 3 each $1,000.00 $3,000 00
Laboratory Testing /Sample Shipping 3 each $100.00 $300.00
Total Costs - Task 2
;9,832.05 1
TASK 3: LINER DESIGN
Personnel Number of Units Unit Rate per Unit Subtotal Cost
'Principal Professional 11- Thiel 8 hour $175.00 $1.400.00
Senior Professional II - Christie 80 hour $155.00 $12,400.00
Senior Professional II - Russell 40 hour $155.00 $6,200.00
Senior Professional - PSI 40 hour $120.00 $4,800.00
Project Professional II 100 hour $125.00 $12,500.00
Project Professional 100 hour $110.00 $11,000.00
Staff Engineer II 100 hour $90.00 $9,000 00
Land Surveyor 1 Lump sum $4,680.00 $4,680.00
. Clerical 8 hour $55.00 $440.00
Comp. and Comm. fee - 5% of labor " ° ' e ' 5% % labor $3,121.00
!TOTAL COSTS TASK 3 $85,541.00
TASK 4: CONSTRUCTION QUALITY ASSURANCE SERVICES
6 weeks at 50 hrs/week; 10 weeks at 40 hrs/week
Actual schedule depends on Contractor's schedule 16 weeks - estimate
Personnel Number of Units Unit Rate per Unit Subtotal Cost
Senior Professional 11- Christie (8 hours/week) 128 hour $155.00 $19,840.00
'Sr Engineering Tech. (regular time) - prevailing wage 640 hour $85.00 $54,400.00
Sr Engineering Tech. (overtime) - prevailing wage 60 hour $127.50 $7,650.00
Clerical 24 hour $55.00 $1,320.00
Comp. and Comm. fee - 5% of labor " °" ' 5% % labor $4,160.50
Total Personnel Costs - Task 4 $87,370.50
ESTIMATE OF EQUIPMENT AND DIRECT EXPENSES - Task 4
Description Number of Units Units Rate per Unit Subtotal Cost
Personnel Mob /Demob 1 each $500 $500.00
EquipmentMob /Demob 1 each $500 $500.00
Project Manager Site Visits (1 per 2 weeks) 8 each $150 $1,200.00 .
'On-site Vehicle - Senior Eng. Tech (weekly) 16 week $250 $4,000.00
Per Diem - Senior Eng. Tech (weekly) 16 week $750 $12,000.00 ,
Field Computer (weekly) 16 week $25 $400.00
Communications (phone) (weekly) 16 week $100 $1,600.00
Final Report Preparation 1 lump sum $8,000 $8,000.00
Geomembrane Conformance (1 per 100,000 ft 8 each $300 $2,400 00
Shipping Geosynthetics (each) 8 each $100 $800.00
Total for Equipment and Direct Expenses - Task 4 $31,400.00
TOTAL COSTS TASK 4 $118,770.50 I
Note 1 Unit rates for Senior Engineering Technician and Engineering Technician are based on the current prevailing wage rate schedule Vector reserves the right
0 modify these unit rates based on changes to the prescribed prevailing wage rate
TASK 5: AS- NEEDED CONSTRUCTION P ERIOD DESIGN SERVICES
Personnel ' Number of Units .. Lind' '' bale per Unit Subtotal Cost
Principal Professional 11 - Thiel 8 hour $175.00 $1,400.00
Senior Professional 11- Christie 40 hour $155.00 $6,200.00
Senior Professional II - Russell 100 hour $155.00 $15,500.00
Senior Professional - PSI 16 hour $120.00 $1,920.00
Project Professional II 100 hour $120.00 $12,000 00
Clerical 4 hour $55.00 $220.00
Comp. and Comm. fee - 5% of labor " "'- ' 5% % labor $1,862.00
,TOTAL COSTS TASK 5 $39,102.00 [
TASK 6: AS- NEEDED PERMITTING SUPPORT
bPersonnel Number of Units Unit Rate per Unit Subtotal Cost
]Principal Professional 11 -Thiel 1 hour $175.00 $175.00
Senior Professional II - Christie (1 meeting in S.T.) 8 hour $155.00 $1,240.00
Principal- JWA 3 hour $175.00 5525.00
Senior Engineer- JWA 30 hour $154.00 $4,620.00
Engineer- JWA 48 hour $108.00 55,184 00
Senior Drafter- JWA 20 hour $103.00 $2,060.00
Clerical -JWA 16 hour $60.00 $960.00 .
Comp. and Comm. fee - 5% of labor "°' °' 5% % labor $738.20
Travel Expenses 1 each $150.00 $150.00
TOTAL COSTS TASK 6 $15,652.20 I
Total = $254,442.65
General Manager
Richard H. Solbrig
'��� .V1- .:r .. Directors
y ;, Y ,. r , 1 I . S out h o e
James R. Jones
vf t "� i Ma Lou M osbacher
""", I public Utility District Dale Rise
Eric Schafer
a.
1275 Meadow Crest Drive • South Lake Tahoe • CA 96150
Phone 530 54+6474 • Fax 530 541 -0614
BOARD AGENDA ITEM 6b
TO: Board of Directors
FROM: Richard Solbrig, General Manager
MEETING DATE: April 1, 2010
ITEM — PROJECT NAME: City Redevelopment Agency Project No. 2
REQUESTED BOARD ACTION: Receive update and direct staff if necessary
DISCUSSION: Staff will relay further discussions held with the City, and seek direction
regarding desired course of action in relation to public outreach, community meetings,
etc.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General
GENERAL MANAGER: YES Li_: NO
CHIEF FINANCIAL OFFICER: YES 11 NO
-23-
PAYMENT OF CLAIMS
FOR APPROVAL
April 1, 2010
Payroll 3/23/10 425,580.50
Total Payroll 425,580.50
ADP 0.00
Bank of America 0.00
BNY Mellon Trust Company 0.00
Brownstein /Hyatt/Farber /Schreck legal services 25,032.22
CDS- health care payments 136,100.05
Union Bank 0.00
Total Vendor EFT 161,132.27
Accounts Payable Checks -Sewer Fund 239,611.65
Accounts Payable Checks -Water Fund 72,802.61
Accounts Payable Checks -Self- funded Insurance 30,382.23
Accounts Payable Checks - Grants Fund 0.00
Total Accounts Payable 342,796.49
Grand Total 929,509.26
Payroll EFTs & Checks 3/23/10
EFT AFLAC Medical & Dependent Care 1,512.42
EFT CA Employment Taxes & W/H 18,609.35
EFT Federal Employment Taxes & W/H 92,420.89
EFT CaIPERS Contributions 73,183.44
EFT Great West Deferred Comp 18,735.11
EFT Stationary Engineers Union Dues 2,395.87
EFT United Way Contributions 192.00
EFT Employee Direct Deposits 209,278.55
CHK Employee Garnishments 1,434.20
CHK Employee Paychecks 7,818.67
Total 425,580.50
-25-
PAYMENT OF CLAIMS
Department / PrQj Name Description Acct# / Proj Code Amount Check Num ]p g
ACE HARDWARE OF SO LAKE TAHOE GEN & ADMIN SHOP SUPPLY INV 1000 - 0421 131.44
Check Total: 131.44 AP- 00075518 MW
ACWA HEALTH BENEFITS AUTHORITY GEN & ADMIN VISION INS 1000 - 2530 2,626.33
Check Total: 2.626.33 AP- 00075519 MW
AERVOE - PACIFIC GEN & ADMIN SHOP SUPPLY INV 1000 - 0421 153.74
Vendor Name
Check Total: 153.74 AP- 00075520 MW
AFLAC GEN & ADMIN AFLAC FEE DED 1000 - 2538 110.00
Check Total: 110.00 AP- 00075521 MW
AHERN RENTALS HEAVY MAINT BUILDINGS 1004 - 6041 28.28
Check Total: Y8.28 AP- 00075522 MW
ALL ELECTRIC MOTORS INC PUMPS PUMP STATIONS 1002 - 6051 890.93
Check Total: 890.93 AP- 00075523 MW
ALPEN SIERRA COFFEE GEN & ADMIN OFC SUPPLY ISSUE 1000 - 6081 223.75
Check Total: 223.75 AP- 00075524 MW
I ALPINE COUNTY DIAMOND VLY RNCH LAND TAXES 1028 - 6651 30,373.61
N
of Check Total: 30.373.61 AP- 00075525 MW
I
ALPINE EYECARE LLC FINANCE SAFETYIEQUIP/PHY 1039 - 6075 99.00
ALPINE EYECARE LLC FINANCE SAFETYIEQUIP/PHY 2039 - 6075 99.00
Check Total: 198.00 AP-00075526 MW
ALPINE, COUNTY OF DIAMOND VLY RNCH FISH 1028 - 6649 48,000.00
Check Total: 48.000.00 AP- 00075527 MW
AMERIGAS DIAMOND VLY RNCH PROPANE 1028 - 6360 511.00
Check Total: 511.00 AP- 00075528 MW
AMERIPRIDE UNIFORM SERVICES GEN & ADMIN UNIFORM PAYABLE 1000 - 2518 915.50
Check Total: 915.50 AP- 00075529 MW
AP TECHNOLOGY FINANCE SERVICE CONTRACT 1039 - 6030 106.03
AP TECHNOLOGY FINANCE SERVICE CONTRACT 2039 - 6030 106.03
Check Total: 212.06 AP- 00075530 MW
APPLIED INDUSTRIAL TECH INC HEAVY MAINT REHAB ODOR SCRBR 1004 - 8011 183.23
Cheek Total: 183.23 AP- 00075531 MW
ASPEN PUBLISHERS INC. FINANCE OFFICE SUPPLIES 1039 - 4820 135.65
User: THERESA
Page: 1 Current Date: 03/25/2010
Report: OH_PMT_CLAIMS_BK Current Time: 09:57:55
PAYMENT OF CLAIMS
Vendor Name Denatiment / Proj Name Desscrjptign Acct# / Proj Code
Amount Check NUM Tyne
ASPEN PUBUSHERS INC.
FINANCE OFFICE SUPPLIES 2039 -4820 135.64
Check Total: 271.29 AP- 00075532 MW
AT&T MOBIUTY UNDERGROUND REP TELEPHONE 1001 - 6310
5.93
AT&T MOBIUTY ELECTRICAL SHOP TELEPHONE 1003 - 6310
3.32
AT&T MOBILITY LABORATORY TELEPHONE 1007 - 6310
2.97
AT&T MOBIUTY ENGINEERING TELEPHONE 1029 - 6310
3.14
AT&T MOBILITY UNDERGROUND REP TELEPHONE 2001 - 6310
5.93
AT&T MOBILITY ELECTRICAL SHOP TELEPHONE 2003 - 6310 3.31
AT&T MOBILITY LABORATORY TELEPHONE 2007 - 6310 2.96
AT&T MOBIUTY ENGINEERING TELEPHONE 2029 - 6310 3.13
Check Total: 30.69 AP- 00075533 MW
AT&T /CALNET 2 GEN & ADMIN TELEPHONE 1000 - 6310 336.68
AT&T /CALNET 2 PUMPS TELEPHONE 1002 - 6310 20.19
AT&T /CALNET 2 OPERATIONS TELEPHONE 1006 - 6310 30.46
AT&T /CALNET 2 CUSTOMER SERVICE TELEPHONE 1038 - 6310 7.21
v AT&T /CALNET 2 GEN & ADMIN TELEPHONE 2000 - 6310 336.67
1 AT&T/CALNET 2 PUMPS
TELEPHONE , 2002 - 6310 20.19
AT&T/CALNET 2 CUSTOMER SERVICE TELEPHONE 2038 - 6310 7.21
Check Total: 758.61 AP- 00075534 MW
AUERBACH ENGINEERING CORP ENGINEERING - TWIN PEAKS BS BSTR, TWN PEAKS 2029 - 7070 - TPBSTR 22.50
Check Total: 22.50 AP- 00075535 MW
AVINA, FRANCISCO
BARTON HEALTHCARE SYSTEM DIAMOND VLY RNCH SAFETY/EQUIP/PHY 1028 - 6075 53.42
BARTON HEALTHCARE SYSTEM CUSTOMER SERVICE SAFETY/EQUIP/PHY 1038 - 6075 132.35
BARTON HEALTHCARE SYSTEM CUSTOMER SERVICE SAFETY/EQUIP/PHY 2038 - 6075 132.35
UNDERGROUND REP TRAVELIMEETINGS 1001 - 6200 110.00
Check Total: 110.00 AP- 00075536 MW
Check Total: 318.12 AP- 00075537 MW
BB&H BENEFIT DESIGNS HUMAN RESOURCES CONTRACT SERVICE 1022 - 4405 624.50
BB&H BENEFIT DESIGNS HUMAN RESOURCES CONTRACT SERVICE 2022 - 4405 624.50
Check Total: 1.249.00 AP- 00075538 MW
BENTLY AGROWDYNAMICS OPERATIONS SLUDGE DISPOSAL 1006 - 6652 2,537.78
Check Total: 2.537.78 AP- 00075539 MW
User: THERESA
Page: 2 Current Date: 03/25/2010
Report: OH_PMT_CLAIMS_BK Current Time: 09:57:55
PAYMENT OF CLAIMS
Vendor Name Pepartment / Proj Name Description Acct# / Proi Code
Amount Cheek Num Tvoe
BI STATE PROPANE UNDERGROUND REP PROPANE 2001 - 6360 31.17
Check Total: 31.17 AP- 00075540 MW
BING MATERIALS UNDERGROUND REP PIPE/CVRS/MHLS 2001 -6052 334.01
Check Total: 334.01 AP- 00075541 MW
BORGES & MAHONEY INC LABORATORY LABORATORY EQUIP 1007 - 6025 105.27
BORGES & MAHONEY INC LABORATORY LABORATORY EQUIP 2007 - 6025 120.26
Check Total: 225.53 AP- 00075542 MW
BROWN & CALDWELL CONSULTANTS ENGINEERING - FILTER ASSMNT REHAB FLTR 5 &6 1029 - 8066 - FILTER 9,502.05
BROWN & CALDWELL CONSULTANTS ENGINEERING - ANGORA TNK REPL TANK, ANGORA 2029 - 7064 - ANGOTK 5,286.40
BROWN & CALDWELL CONSULTANTS ENGINEERING - ECHO TANK REPL TANK, ECHO 2029 - 8809 - ECHOTK 7,929.59
Check Total: 22 718,04 AP- 00075543 MW
BROWN MILBERY INC HEAVY MAINTENANC BUILDINGS 2004 - 6041 376.56
Check Total: 376.56 AP-00075544 MW
BUTZ, GARTH UNDERGROUND REP TRAVEL/MEETINGS 2001 - 6200 61.00
I
co CALIF REG WATER QUAL CONTR BD DIAMOND VLY RNCH OPERATING PERMIT 1028 - 6650 165.12
I
Check Total: 165.12 AP-00075546 MW
CAUF WATER RESOURCES CTRL BD ENGINEERING OPERATING PERMIT 1029 - 6650 1,595.00
Check Total: 1.595.00 AP-00075547 MW
CAPITAL FORD EQUIPMENT REP AUTOMOTIVE 1005 - 6011 57.99
Check Total: 57.99 AP- 00075548 MW
CDS GROUP HEALTH SELF FUNDED INS ADMIN FEE 3000 - 6741 2,622.00
Check Total: 2.622.00 AP- 00075549 MW
CDW - G CORP ENGINEERING OFFICE SUPPUES 1029 - 4820 108.47
CDW - G CORP INFORMATION SYS OFFICE SUPPUES 1037 - 4820 332.49
CDW - G CORP INFORMATION SYS DIST.COMP SPPUS 1037 - 4840 694.79
CDW - G CORP ENGINEERING OFFICE SUPPUES 2029 - 4820 108.47
CDW - G CORP INFORMATION SYS OFFICE SUPPUES 2037 - 4820 332.51
CDW - G CORP INFORMATION SYS DIST.COMP SPPUS 2037 - 4840 694.79
Check Total: 2.271.52 AP- 00075550 MW
CREEK ENVIRONMENTAL LABS LABORATORY - BEACON CONTAM MONITORING 2007 - 6110 - BEACON 190.00
User: THERESA
Page: 3 Current Date: 03/25/2010
Report: OH_PMT_CLAIMS_BK Current Time: 09:57:55
Check Total: 61.00 AP- 00075545 MW
PAYMENT OF CLAIMS
Vendor Name Department / Proi Name Description Acct# / Proj Code
CREEK ENVIRONMENTAL LABS 9 430 tt Check Num Jypg
LABORATORY - BKRFLD TRTMT EXP MONITORING 2007 - 6110 - BKRFLD 430.00
CREEK ENVIRONMENTAL LABS LABORATORY - SOYCON MONITORING 2007 - 6110 - SOYCON
240.00
CREEK ENVIRONMENTAL LABS LABORATORY - TAHOE TOM CONTAM MONITORING 2007 - 6110 - TOMCON
240.00
Check Total: 1.100. AP- 00075551 MW
CRWA PUMPS TRAVEUMEETINGS 1002 - 6200
262.50
CRWA PUMPS TRAVEL/MEETINGS 2002 - 6200
262.50
CWEA UNDERGROUND REP DUES/MEMB /CERT 1001 - 6250
CWEA LABORATORY DUES/MEMB/CERT 1007 - 6250
EMPIRE SAFETY & SUPPLY ELECTRICAL SHOP SAFETY/EQUIP/PHY 1003 - 6075
EMPIRE SAFETY & SUPPLY ELECTRICAL SHOP SAFETY/EQUIP/PHY 2003 - 6075
User: THERESA
Report: OH PMT CLAIMS BK
Check Total:
Check Total:
Check Total:
Page: 4 Current Date: 03/25/2010
Current Time: 09:57:55
525.00 AP- 00075552 MW
264.00
132.00
396.00 AP- 00075553 MW
DATCO SERVICES CORP HUMAN RESOURCES SAFETY PROGRAMS 1022 - 6079 182.00
DATCO SERVICES CORP HUMAN RESOURCES SAFETY PROGRAMS 2022 - 6079 182.00
Check Total: 364.00 AP- 00075554 MW
DE MAIORI, ANTHONY T. CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00
i Check Total: 200.00 AP- 00075555 MW
NJ
DELL MARKETING L P FINANCE OFFICE SUPPLIES 1039 - 4820 34.40
DELL MARKETING L P FINANCE
OFFICE SUPPLIES 2039 -4820 34.37
Check Total: 68.77 AP- 00075556 MW
E- FILLIATE CORP INFORMATION SYS DIST.COMP SPPLIS 1037 - 4840 65.19
E- FILLIATE CORP FINANCE OFFICE SUPPLIES 1039 - 4820 32.55
E- FILLIATE CORP INFORMATION SYS DIST.COMP SPPLIS 2037 - 4840 65.16
E- FILUATE CORP FINANCE OFFICE SUPPLIES 2039 -4820 32.54
Check Total: 195.44 AP- 00075557 MW
ECS IMAGING INC INFORMATION SYS SERVICE CONTRACT 1037 - 6030 3,23110
ECS IMAGING INC INFORMATION SYS SERVICE CONTRACT 2037 - 6030 3,231.19
Check Total: 6.462.39 AP- 00075558 MW
EL DORADO ROOFING INC PUMPS BUILDINGS 1002 - 6041 430.00
EL DORADO ROOFING INC PUMPS BUILDINGS 2002 - 6041 430.00
860.00 AP- 00075559 MW
350.12
331.41
Vendor Name Department / Proj Name Description Acct# / Proj Code Amount Check Num
7Yeg
Check Total: 681.53 AP- 00075560 MW
ENCO MFG CO. HEAVY MAINT SHOP SUPPUES 1004 - 6071 211.39
Check Total: 211.39 AP- 00075561 MW
ENVIRONMENTAL RESOURCES ASSO LABORATORY LAB SUPPUES 1007 - 4760 46.90
ENVIRONMENTAL RESOURCES ASSO LABORATORY LAB SUPPUES 2007 - 4760 41.00
Check Total: 87.90 AP- 00075562 MW
FAMILY ENTERPRISES 010 - PR EXP -EXTERNAL PUB RELATIONS 1027 - 6620 - PREEXT 237.50
FAMILY ENTERPRISES 010 - PR EXP- EXTERNAL PUB RELATIONS 2027 - 6620 - PREEXT 237.50
Check Total: 475.00 AP- 00075563 MW
FERGUSON ENTERPRISES INC. PUMPS PUMP STATIONS 1002 - 6051 142.52
FERGUSON ENTERPRISES INC. HEAVY MAINT SHOP SUPPUES 1004 - 6071 26.22
FERGUSON ENTERPRISES INC. DIAMOND VLY RNCH GROUNDS & MNTC 1028 - 6042 683.41
FERGUSON ENTERPRISES INC. GEN & ADMIN BOXES/LIDS/INV 2000 - 0403 326.25
FERGUSON ENTERPRISES INC. HEAVY MAINTENANC BUILDINGS 2004 - 6041 641.54
Check Total: 1 AP- 00075564 MW
I
w o FISHER SCIENTIFIC LABORATORY LAB SUPPUES 1007 - 4760 216.97
I FISHER SCIENTIFIC LABORATORY LAB SUPPUES 2007 - 4760 162.66
Check Total: 379.63 AP- 00075565 MW
GADDIS INC HEAVY MAINT SECONDARY EQUIP 1004 - 6022 619.30
Check Total: 619.30 AP- 00075566 MW
GLOBAL DATA SPECIAUSTS ELECTRICAL SHOP RPR/MNTC WTR TICS 2003 - 6054 1,505.00
Check Total: 1.505.00 AP- 00075567 MW
GRAINGER GEN & ADMIN JANIT /SUPPLY INV 1000 - 0422 359.49
GRAINGER GEN & ADMIN SMALL TOOLS INV 1000 - 0423 609.51
GRAINGER HEAVY MAINT SHOP SUPPLIES 1004 - 6071 78.55
GRAINGER HEAVY MAINT SAFETY/EQUIP/PHY 1004 - 6075 553.01
GRAINGER HEAVY MAINT IN -PLANT AIR CMP 1004 - 8093 1,914.57
Check Total: 3.515.13 AP-000 MW
HARDY DIAGNOSTICS LABORATORY LAB SUPPUES 1007 - 4760 74.42
HARDY DIAGNOSTICS LABORATORY LAB SUPPUES 2007 - 4760 61.89
Check Total: 136.31 AP- 00075569 MW
User: THERESA
Report: OH_PMT_CLAIMS_BK
PAYMENT OF CLAIMS
Page: 5 Current Date: 03/25/2010
Current Time: 09:57:55
Vendor Name
HARTFORD, THE
Description Acct# / Proj Code Amount Check Num Tyne
LIFE INS 1000 - 2512 2,014.99
Check Total: 2.014.99 AP- 00075570 MW
HIGH SIERRA BUSINESS SYSTEMS HUMAN RESOURCES SERVICE CONTRACT 1022 - 6030
0.37
HIGH SIERRA BUSINESS SYSTEMS ENGINEERING OFFICE SUPPUES 1029 - 4820
37.13
HIGH SIERRA BUSINESS SYSTEMS CUSTOMER SERVICE SERVICE CONTRACT 1038 - 6030
76.90
HIGH SIERRA BUSINESS SYSTEMS HUMAN RESOURCES SERVICE CONTRACT 2022 - 6030
0.36
HIGH SIERRA BUSINESS SYSTEMS ENGINEERING OFFICE SUPPLIES 2029 - 4820
37.12
HIGH SIERRA BUSINESS SYSTEMS CUSTOMER SERVICE SERVICE CONTRACT 2038 - 6030
76.89
Check Total: 228.77 AP- 00075571 MW
HUSSMANN, NANCY HUMAN RESOURCES TRAVEL/MEETINGS 1022 - 6200 25.00
HUSSMANN, NANCY HUMAN RESOURCES TRAVEIJMEETINGS 2022 - 6200 25.00
Check Total: 50.00 AP- 00075572 MW
INDUSTRIAL SAFETY UNDERGROUND REP SAFETY/EQUIP/PHY 1001 -6075 315.25
Check Total: 315.25 AP- 00075573 MW
INDUSTRIAL SCIENTIFIC UNDERGROUND REP SAFETY/EQUIP/PHY 1001 - 6075 130.39
w INDUSTRIAL SCIENTIFIC HEAVY MAINT SAFETY/EQUIP/PHY 1004 - 6075 65.17
Check Total: 195.56 AP- 00075574 MW
INSTROTEK INC. ENGINEERING OFC EQUIP/REPAIR 1029 - 6027 444.19
Check Total: 444.19 AP- 00075575 MW
INTERSTATE SAFETY & SUPPLY GEN & ADMIN SHOP SUPPLY INV 1000 - 0421 867.56
Check Total: 867.56 AP- 00075576 MW
J &L PRO KLEEN INC FINANCE JANITORIAL SERV 1039 - 6074 1,603.50
J &L PRO KLEEN INC FINANCE JANITORIAL SERV 2039 - 6074 1,603.50
Check Total: 3.207.00 AP- 00075577 MW
KIMBALL MIDWEST HEAVY MAINT SHOP SUPPLIES 1004 - 6071
KIMBALL MIDWEST EQUIPMENT REP SHOP SUPPLIES 1005 - 6071
KRLT FM/KOWL AM CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE
LOOMIS FINANCE CONTRACT SERVICE 1039 - 4405
LOOMIS FINANCE CONTRACT SERVICE 2039 - 4405
User: THERESA
Report: OH_PMT_CLAJMS_BK
Department / Proj Name
GEN & ADMIN
PAYMENT OF CLAIMS
Check Total:
Page: 6 Current Date: 03/25/2010
Current Time: 09:57:55
259.43
486.13
745.56 AP- 00075578 MW
2038 - 6660 - WCPROG 648.00
Check Total: 648.00 AP- 00075579 MW
305.33
305.32
Vendor Name
MANNA CONSULTING
MANNA CONSULTING
MANNA CONSULTING
MOUNTAIN DEMOCRAT
MUSCAT M.D., MARISSA R.
MUSCAT M.D., MARISSA R.
FINANCE
FINANCE
FINANCE
NIGP - NORTHERN CALIF CHAPTER FINANCE
NIGP - NORTHERN CAUF CHAPTER FINANCE
User: THERESA
PAYMENT OF CLAIMS
Peoartment / Proj Name Description Acct# / Proj Code Amount Check Num Tvne
Check Total: 610.65 AP- 00075580 MW
CONTRACT SERVICE 1039 - 4405 250.00
ADP HR INTFC 1039 - 7582 100.00
CONTRACT SERVICE 2039 - 4405 250.00
Check Total: 600.00 AP- 00075581 MW
MC MASTER CARR SUPPLY CO PUMPS SHOP SUPPUES 1002 - 6071 100.95
MC MASTER CARR SUPPLY CO HEAVY MAINT BUILDINGS 1004 - 6041 2,073.46
MC MASTER CARR SUPPLY CO HEAVY MAINT IN -PLANT AIR CMP 1004 - 8093 211.37
MC MASTER CARR SUPPLY CO PUMPS WELLS 2002 - 6050 946.20
MC MASTER CARR SUPPLY CO PUMPS SHOP SUPPUES 2002 - 6071 101.09
Check Total: 3.433.07 AP- 00075584 MW
MICROCHECK INC LABORATORY LAB SUPPUES 1007 - 4760 255.00
MICROCHECK INC LABORATORY LAB SUPPUES 2007 - 4760 438.06
MOTEL 6 PUMPS STANDBY ACCOMODA 1002 - 6083 271.57
I
Lo MOTEL 6 PUMPS STANDBY ACCOMODA 2002 - 6083 271.56
N
I
ADMINISTRATION SUBSCRIPTIONS 2021 - 4830 104.00
Check Total: 104.00 AP- 00075587 MW
HUMAN RESOURCES CONTRACT SERVICE 1022 - 4405 75.00
HUMAN RESOURCES CONTRACT SERVICE 2022 - 4405 75.00
Check Total: 150.00 AP- 00075588 MW
MWH LABORATORIES LABORATORY MONITORING 1007 - 6110 50.00
MWH LABORATORIES LABORATORY MONITORING 2007 - 6110 10.00
MWH LABORATORIES - ENGINEERING - ARSENIC FACILITY ARSNC TRTMNT 2029 - 8864 - ARSNIC 50.00
Check Total: 110.00 AP- 00075589 MW
NEWARK IN ONE ELECTRICAL SHOP PUMP STATIONS 1003 - 6051 354.60
Check Total: 354.60 AP- 000 MW
DUES/MEMB /CERT
DUES/MEMB /CERT
Check Total:
1039 - 6250 12.50
2039 - 6250 12.50
Check Total: 25.00 AP- 00075591 MW
Page: 7 Current Date: 03/25/2010
Report: OH_PMT_CLAIMS_BK Current Time: 09:57:55
Check Total: 693.06 AP- 00075585 MW
543.13 AP- 00075586 MW
Vendor Name
NORTHWEST HYD. CONSULT INC
NORTHWEST HYD. CONSULT INC
NUG
NUG
NUMARA SOFTWARE INC
NUMARA SOFTWARE INC
O'CONNELL, PATRICK
O'CONNELL, PATRICK
OFFICE MAX
OFFICE MAX
ONTRAC
ONTRAC
ONTRAC
ONTRAC
ONTRAC
ONTRAC
ONTRAC
ONTRAC
ONTRAC
PERKINELMER INC
PERKINELMER INC
PERKINELMER INC
PETTY CASH
PETTY CASH
PETTY CASH
User: THERESA
Report OH_PMT_CLAIMS_BK
Department / Proj Name
ENGINEERING - CTC GRNT -BMPs
ENGINEERING - CTC GRNT -BMPs
INFORMATION SYS
INFORMATION SYS
INFORMATION SYS
INFORMATION SYS
GEN & ADMIN
GEN & ADMIN
FINANCE
FINANCE
LABORATORY
ENGINEERING
ENGINEERING
LABORATORY
ENGINEERING -
ENGINEERING -
ENGINEERING -
ENGINEERING -
ENGINEERING -
LABORATORY
LABORATORY
LABORATORY
PUMPS
ADMINISTRATION
ENGINEERING
- C-LINE RE -ROUTE
- DVR EIR
ANGORA TNK REPL
TWIN PEAKS BS
CALTRANS EROSION
LAKE TAHOE BLVD
ECHO TANK REPL
PAYMENT OF CLAIMS
Page: 8
Description
BMP PROJECTS
BMP PROJECTS
DUES/MEMB/CERT
DUES/MEMB/CERT
SERVICE CONTRACT
SERVICE CONTRACT
UB SUSPENSE
UB SUSPENSE
OFFICE SUPPUES
OFFICE SUPPUES
POSTAGE EXPENSES
CLN REROUTE
DIAM VLY MP/EIR
POSTAGE EXPENSES
TANK, ANGORA
BSTR, TWN PEAKS
EC TRT CRK -STLN
WTLN 12" LTB
TANK, ECHO
TRAVELIMEETINGS
TRAVELIMEETINGS
SFTWR, UMS
PUMP STATIONS
INCNTV & RCGNTN
OFFICE SUPPUES
Acct# / Proj Code
1029 - 8737 - CTCBMP
2029 - 8745 - CTCBMP
Check Total:
1037-6250
2037-6250
1037-6030
2037 -6030
1000 - 2002
2000 - 2002
1039 - 4820
2039 -4820
Check Total:
Check Total:
Check Total:
Check Total:
1007 -4810
1029 - 8097 - CROUTE
1029 - 8725 - DVREIR
2007 -4810
2029 - 7064 - ANGOTK
2029 - 7070 - TPBSTR
2029 - 8036 - ECCALT
2029 - 8067 - LTBWLR
2029 - 8809 - ECHOTK
Check Total:
1007-6200
2007-6200
2007-8622
1002-6051
1021-6621
1029 -4820
Check Total:
Current Date: 03/25/2010
Current Time: 09:57:55
Amount Check Num Tvoe
3,642.23
3,642.23
7 284.46 AP- 00075592
25.00
25.00
50.00 AP- 00075593
275.00
275.00
550.00 AP- 00075594
300.00
300.00
600.00 AP- 00075517
31.99
32.00
63.99 AP- 00075595
7.50
15.00
5.00
14.50
65.00
5.00
33.50
33.50
65.00
244.00 AP- 00075596
1,487.50
1,487.50
8,191.57
11 AP- 00075597
11.00
11.96
12.27
MW
MW
MW
MW
MW
MW
MW
Vendor Name
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
User: THERESA
Department / Proj Name
INFORMATION SYS
CUSTOMER SERVICE
FINANCE
PUMPS
ADMINISTRATION
ENGINEERING
ENGINEERING - IROQUOIS SUPPLY
INFORMATION SYS
CUSTOMER SERVICE
FINANCE
PAYMENT OF CLAIMS
Description Acct# / Proj Code Amount Check Num lug
TRAVEL/MEETINGS 1037 - 6200 11.67
OFFICE SUPPUES 1038 - 4820 11.41
TRAVEL/MEETINGS 1039 - 6200 15.25
TRAVEUMEETINGS 2002 - 6200 45.00
INCNTV & RCGNTN 2021 - 6621 11.95
OFFICE SUPPUES 2029 -4820 12.26
WTLN IROQ 2029 - 8166 - IQWTRL 8.80
TRAVEL/MEETINGS 2037 - 6200 11.66
OFFICE SUPPUES 2038 - 4820 11.41
TRAVEL/MEETINGS 2039 - 6200 15.25
Check Total: 189.89 AP- 00075598 MW
PRAXAIR 174 HEAVY MAINT SHOP SUPPUES 1004 - 6071 228.73
Check Total: 228.73 AP- 00075599 MW
PRO LEISURE ADMINISTRATION INCNTV & RCGNTN 1021 - 6621 57.18
PRO LEISURE ADMINISTRATION INCNTV & RCGNTN 2021 - 6621 57.18
L.) Check Total: 114.36 AP-00075600 MW
PURVIS, JOHN E. GEN & ADMIN UB SUSPENSE 1000 - 2002 16,498.00
PURVIS, JOHN E. GEN & ADMIN UB SUSPENSE 2000 - 2002 3,911.60
PURVIS, JOHN E. GEN & ADMIN METER SALE 2000 - 3545 286.00
Check Total: 20,695.60 AP- 00075601 MW
RELIANCE STANDARD GEN & ADMIN UFE INS MGMT 1000 - 2525 508.70
RELIANCE STANDARD GEN & ADMIN LNG TRM DIS,MGMT 1000 - 2531 1,261.09
Check Total: 1.769.79 AP- 00075602 mw
RESORT SPORTS NETWORK CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 1,461.25
Check Total: 1.461.25 AP- 00075603 MW
RICH'S SMALL ENGINE SERVICE PUMPS SMALL TOOLS 1002 - 6073 6.50
RICH'S SMALL ENGINE SERVICE PUMPS SMALL TOOLS 2002 - 6073 6.50
Check Total: 13.00 AP- 00075604 MW
SACRAMENTO BEE, THE ENGINEERING - HEADWORKS HDWKS IMP PROJ 1029 - 8033 - HDWORK 1,230.72
SACRAMENTO BEE, THE ENGINEERING - ANGORA TNK REPL TANK, ANGORA 2029 - 7064 - ANGOTK 574.98
SACRAMENTO BEE, THE ENGINEERING - ECHO TANK REPL TANK, ECHO 2029 - 8809 - ECHOTK 574.98
Page: 9 Current Date: 03/25/2010
Report: OH_PMT_CLAIMS_BK Current Time: 09:57:55
Check Total: 23B= AP- 00075605 MW
Vendor Name
SHERIDAN, JOHN
SHERMAN, THERESA
SHERMAN, THERESA
SIEMENS WATER TECHNOLOGIES
SIEMENS WATER TECHNOLOGIES
SIERRA CHEMICAL CO
SIERRA CHEMICAL CO
SIERRA PACIFIC POWER
SIERRA PACIFIC POWER
SIERRA PACIFIC POWER
(4 SOUTH TAHOE PUB UTIUTY DIST
SOUTHWEST GAS
SOUTHWEST GAS
STOP LOSS INSURANCE SERVICES
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
User: THERESA
Report OH_PMT_CLAIMS BK
Department / Proj Name
OPERATIONS
FINANCE - PAYROLL SYS/ADP
FINANCE - PAYROLL SYS /ADP
LABORATORY
LABORATORY
OPERATIONS
PUMPS
GEN & ADMIN
GEN & ADMIN
GEN & ADMIN
GEN & ADMIN
GEN & ADMIN
GEN & ADMIN
SELF FUNDED INS
DIAMOND VLY RNCH
ENGINEERING
INFORMATION SYS
CUSTOMER SERVICE
ENGINEERING - J-M PIPE FAILURE
ENGINEERING
ENGINEERING - TWIN PEAKS BS
INFORMATION SYS
CUSTOMER SERVICE
PAYMENT OF CLAIMS
D03criptioq
TRAVEL/MEETINGS
TRAVEUMEETINGS
TRAVEUMEETINGS
LAB SUPPUES
LAB SUPPUES
HYPOCHLORITE
HYPOCHLORITE
ELECTRICITY
ST UGHTING EXP
ELECTRICITY
UB SUSPENSE
NATURAL GAS
NATURAL GAS
EXCESS INSURANCE
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
BSTR, TWN PEAKS
CONTRACT SERVICE
CONTRACT SERVICE
Acct# / Proj Code
1006 - 6200
Check Total:
1039 - 6200 - PAYADP
2039 - 6200 - PAYADP
Check Total:
1007-4760
2007-4760
1006-4755
2002-4755
1000 - 6330
1000 - 6740
2000 - 6330
1000 - 2002
1000 - 6350
2000 -6350
3000 - 6744
1028 - 4405
1029 -4405
1037 - 4405
1038 - 4405
2029 - 4405 - MANVIL
2029 - 4405
2029 - 7070 - TPBSTR
2037.4405
2038 -4405
Check Total:
Check Total:
Check Total:
Cheek Total:
Check Total:
Cheek Total:
Check Total:
Page: 10 Current Date: 03/25/2010
Current Time: 09:57:55
Amount Check Num Type
198.34
198.34 AP- 00075606
179.38
179.37
358.75 AP- 00075607
140.00
140.00
280.00 AP- 00075608
3,876.49
1,262.57
5,139.06 AP- 00075609
66,449.07
8.21
14,903.04
81 360.32 AP- 00075610
1,800.00
1.800.00 AP- 00075611
118.11
221.32
339.43 AP- 00075612
27,346.23
27.346.23 AP- 00075613
497.42
27.96
133.87
133.87
419.40
223.68
208.17
133.87
133.87
1.912.11 AP- 00075614
M W
MW
MW
MW
MW
MW
MW
MW
MW
Vendor Name
Department / Proj Name
TAHOE PARADISE CHEVRON UNDERGROUND REP
TAHOE PRINTING
TAHOE PRINTING
User: THERESA
FINANCE
FINANCE
PAYMENT OF CLAIMS
Description Accl# / Proj Code
DIESEL 2001 -4620
Amount Check Num ljrpg
71.31
Check Total: 71.31 AP- 00075615 MW
OFFICE SUPPUES 1039 - 4820 7.75
OFFICE SUPPUES 2039 - 4820 7.74
Check Total: 15.49 AP- 00075616 MW
TAHOE SAND & GRAVEL UNDERGROUND REP PIPE/CVRS/MHLS 2001 - 6052 117.45
Check Total: 117 AP- 00075617 MW
TAHOE VALLEY ELECTRIC SUPPLY ELECTRICAL SHOP PUMP STATIONS 2003 - 6051 119.63
Check Total: 119.63 AP- 00075618 MW
UNIVERSAL HEALTH NETWORK SELF FUNDED INS PPO FEE 3000 - 6742 414.00
Check Total: 414.00 AP-00075619 MW
VANTON PUMP & EQUIP HEAVY MAINT REHAB ODOR SCRBR 1004 - 8011 282.67
Check Total: 282.67 AP- 00075620 MW
VERIZON CALIFORNIA DIAMOND VLY RNCH TELEPHONE 1028 - 6310 135.92
1 Check Total: 135.92 AP- 00075621 MW
rn TRAVEL/MEETINGS WATER ENVIRONMENT FEDERATION OPERATIONS 1006 - 6200 217.00
1
WATER ENVIRONMENT FEDERATION LABORATORY DUES/MEMB/CERT 1007 - 6250 42.50
WATER ENVIRONMENT FEDERATION LABORATORY DUES/MEMB/CERT 2007 - 6250 42.50
Check Total: 302.00 AP- 00075622 MW
WESTERN ENERGETIX INC GEN & ADMIN GASOUNE INV 1000 - 0415 5,287.04
WESTERN ENERGETIX INC GEN & ADMIN DIESEL INVENTORY 1000 - 0416 8,179.77
WESTERN ENERGETIX INC DIAMOND VLY RNCH GASOUNE 1028 - 4610 1,086.92
WESTERN ENERGET1X INC DIAMOND VLY RNCH DIESEL 1028 - 4620 1,419.32
Check Total: 15.973.05 AP-000756 MW
WESTERN ENVIRONMENTAL LABORATORY MONITORING 1007 - 6110 40.00
Check Total: 40,00 AP- 00075624 MW
WESTERN NEVADA SUPPLY PUMPS SHOP SUPPUES 1002 - 6071 7.57
WESTERN NEVADA SUPPLY GEN & ADMIN REPAIR CLMP INV 2000 - 0406 1,110.28
WESTERN NEVADA SUPPLY GEN & ADMIN SADDLES INV 2000 - 0407 959.09
WESTERN NEVADA SUPPLY UNDERGROUND REP PIPE/CVRS/MHLS 2001 - 6052 520.81
WESTERN NEVADA SUPPLY PUMPS WELLS 2002 - 6050 22.30
Page: 11 Current Date: 03/25/2010
Report: OH_PMT_CLAIMS_BK Current Time: 09:57:55
Vendor Name
WESTERN NEVADA SUPPLY
WILLIAM A DOWNEY OD INC
WILLIAM A DOWNEY OD INC
WINZLER & KELLY CONSULT ENGRS
WINZLER & KELLY CONSULT ENGRS
WISE CONSULTING & TRAINING
User: THERESA
Report: OH PMT CLAIMS BK
Department / Proj Name
PUMPS
PUMPS
PUMPS
OPERATIONS - MAP UG UTILITIES
ENGINEERING - EFFLUENT EVAL
ENGINEERING - ECHO TANK REPL
PAYMENT OF CLAIMS
Description
SHOP SUPPLIES
SAFETY /EQUIP/PHY
SAFETY/EQUIP/PHY
PLANT GIS
REP EXP PUMPS
TANK, ECHO
Aect# / Proj Code
2002 - 6071
1002 -6075
2002-6075
Check Total:
Check Total:
1006 - 8921 - GISMAP
1029 - 8676 - EFFLEV
Check Total:
2029 - 8809 - ECHOTK
Check Total:
Grand Total:
MIROMMII
10.61,0* MOWS
Page: 12 Current Date: 03/25/2010
Current Time: 09:57:55
Amount Check Num Type
7.57
2,627.62 AP- 00075625
86.23
86.23
172.46 AP- 00075626
712.10
2,531.62
3 AP- 00075627
700.00
700.00 AP- 00075628
345,018.80
MW
MW
MW
MW
Swath Tahoe P.U.D. 03/17 /10 WID =ED & REVERSED A/1 CHECK RE SIER p 1
WED, MAR 17, 2010, 9:29 PM - -rag: DQ�IE - -1eg: GL JL- -hoc: CESTIE - -- -scab: 453486 #J097 - -- p og: BK <1.30 > - -repart id: Q REt - --
Criedt Payee ID. Payee rate Check Arount
Type Sups Rel Tb Note
AP00073554 V45190
TOSHIBA INIERNATICNAL 08/12/09
GRAND TOTALS:
Ibtal Void Mine Written
'Thal Void Hand Written
Tbta1 Machine Written
Total Hard Written
Tbtal Reversals
Tbtal CErrelled
GRAND TOTAL
0
1,537.19 RV TR Reveraad
0.00
o.00
?V) o.00
1,537.19
0.00
1,537.19
Unbar of Cracks Processed:
Ninber of Checks Processed:
Natter of checks Processed:
Mincer of Checks Processed:
Nurber of Checks Processed:
Nimber of Checks Processed:
0
0
0
0
1
0
le,
South Tie P.U.D.
TtE, MR 23, 2010,
Check Payee ID.
AP00072067 V12642
AP00077111 V19450
AP00072420 V13001
9:33 AM -- 03/23 10 -- WID TYPED & Aip Cf . REGISTER 1
req: leg: GL JL - -loc: CISTIE - -- -jab: 453843 4J231 - -- -prDq: BK200 Q.30 > - -rt cart id
. CIQE--
P lee Mire Date (lack Atnaait 'I pe Subs Rel To Note
CAL►g' MER A
NaZIBERN CA BACXEB W P
CALEREG WATER CIALC
GRAND TOTALS:
Tbtal. Void Machine Written
Ibtal void Hand Written
Tbtal Machine Written
Tbtal Hand Written
Total Reveiesals
Tbtal CEncelled
GRAND TOTAL
002
03/05/09
03/05/09
04/16/09
{ '^ 3
500.00 RV TR
20.00 RV TR
165.12 RV 'IR
0.00
0.00
0.00
0.00
685.12
0.00
685.12
1.537 -i9-
685 • 1 2
2 * 2 22 • 3 i . +
Reversed
Reversed
Reversed
Nutter of Checks Pte
Natter of Checks Processed:
Nurber of Checks Processed:
Niter of Checks Processed:
Natter of Checks Processed:
Limber of Checks Processed:
0
0
0
0
3
0
General Manager
Richard H. 5olbrig
f Directory
/► . ✓ �, ` Chris Cefalu
,, : :' 142;!; . + Sout Jones
James R. ones
7 7:4; i'57°:;'' s Mary Lou Mosbacher
PuH UtiIity is riot e
Eric Schafer
1276 Meadow Crest Drive • South Lake Tahoe • CA 96150
Phone 530 544-6474 • Fax 530 541-0614
BOARD AGENDA ITEM 14a
TO: Board of Directors
FROM: Richard Solbrig, General Manager,
MEETING DATE: April 1, 2010
ITEM — PROJECT: Conference with Legal Counsel — Anticipated Litigation (one case)
REQUESTED BOARD ACTION: Direct legal counsel.
DISCUSSION: Pursuant to Section 54956.9(b) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding anticipation of
litigation.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General
GENERAL MANAGER: YES it . NO
CHIEF FINANCIAL OFFICER: YES .ii.'■ NO
- -,
General Manager
Richard H. Solbrig
<<l
�r Directors
Chris Cefalu
w , tiw Tahoe James R. Jones
. Ma Lou M* L Util District Dale Rise
Eric Schafer
1275 Me&low Crest Nye • South Lake Tahoe • CA 96150
Phone 550 54+6474 + Fax 550 541 -0614
BOARD AGENDA ITEM 14b
TO: Board of Directors
FROM: Richard H. Solbrig, General Manager
MEETING DATE: April 1, 2010
ITEM — PROJECT: Conference with Legal Counsel — Existing Litigation
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding existing
litigation: Meyers Landfill Site - United States of America vs. El Dorado County and City
of South Lake Tahoe and Third Party Defendants, Civil Action No. S -01 -1520 LKK
GGH, United States District Court for the Eastern District of California.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer
GENERAL MANAGER: YES • NO
CHIEF FINANCIAL OFFICER: YES :!il NO
-43-
General Manager
Richard H. So!brig
`' ;.; Directors
�, " w °` ,.„ 3 T a Chris Cefalu
t► am 1. V James R. J0t1C5
Y �,�. r ♦ ♦ ♦ ♦ ♦ Mary Lou Mosbacher
Public Utility District Dale Rise
Eric Schafer
1275 Meadow Crest Drive • South Lake Tahoe it CA 96150
Phone 530 544 -6474 • Fax 530 541 -0614
BOARD AGENDA ITEM 14c
TO: Board of Directors
FROM: Richard Solbrig, General Manager
Nancy Hussmann, Human Resources Director
MEETING DATE: April 1, 2010
ITEM — PROJECT NAME: Conference with Labor Negotiators
REQUESTED BOARD ACTION: Direct negotiators
DISCUSSION:
Pursuant to Section 54957.6(a) of the California Government Code, Closed Session
may be held regarding contract negotiations.
Agency Negotiators: Richard Solbrig /General Manager, Nancy
Hussmann /Human Resources Director /Board of Directors
Employee Organization: Stationary Engineers, Local 39
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
-45-
General Manager
Richard H. Solbrig
f?. V Directors
S o ut h
:7, � James R. Jones
a'*; :> a Mary Lou Mosbacher
1 a Dale Rise
\. f lR V UtitityDistrict Eric Schaffer
1275 Meadow Crest Drive • South Lake Tahoe • CA 96150
Phone 330 544-6474 • Fax 330 541-0614
BOARD AGENDA ITEM 14_ d
TO: Board of Directors
FROM: Richard Solbrig, General Manager
MEETING DATE: April 1, 2010
ITEM — PROJECT NAME: Labor Negotiator
REQUESTED BOARD ACTION: Direct staff
DISCUSSION: Pursuant to Section 54957 of the California Government Code, Closed
Session may be held for consideration of whether to appoint a negotiator.
Title: Labor Negotiator
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General
n
GENERAL MANAGER: YES a NO
CHIEF FINANCIAL OFFICER: YES NO
-47-