Loading...
AP 04-15-10T 4 ih, • * �, SOUTH TAHOE PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING AGENDA Thursday, April 15, 2010 2:00 P.M. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Richard Solbri , General Manager Paul Sciuto, Assistant General Mana er Dale Rise, President BOARD MEMBERS Mary Lou Mosbacher, Vice President James R. Jones, Director Eric W. Schafer, Director Chris Cefalu, Director 1. CALL TO ORDER REGULAR MEETING — PLEDGE OF ALLEGIANCE 2. COMMENTS FROM THE AUDIENCE (This is an opportunity for members of the public to address the Board on short non - agenda items that are within the subject matter jurisdiction of the District. Five - minute limit. No action can be taken on matters not listed on the agenda.) 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR 4. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered separately upon request. Comments and questions from members of the public, staff or Board can be taken when the comment does not necessitate separate action.) 5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION / ACTION 6. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION a. City Redevelopment Agency Project No. 2 Receive Update and Direct Staff if Pg. 23 (Richard Solbrig) Necessary b. Angora Tank Replacement / Echo View Award Bid to the Lowest Respon- Pg. 25 Tanks Site Work sive Bidder ( `Bid results will be provided (Julie Ryan) prior to, and at the Board meeting) C. Resolution for Bureau of Reclamation Adopt Resolution No. 2879 -10 Pg. 29 Water Grant Approving Grant Funding for Water (Lynn Nolan, Donielle Morse) Meter Installation d. 2010 Inspection and Materials Testing Approve Proposal from Selected Pg. 33 Services During Construction Consultant ( *A staff recommendation will be (Julie Ryan) provided prior to, and at the Board meeting) REGULAR BOARD MEETING AGENDA — APRIL 15, 2010 PAGE — 2 e. Payment of Claims Pg. 41 Approve Payment in the Amount of $965,835.11 7. BOARD MEMBER STANDING COMMITTEE REPORTS (Discussions may take place; however, no action will be taken) a. Water & Wastewater Operations Committee (Jones / Rise) b. Finance Committee (Schafer / Cefalu) C. Executive Committee (Rise / Mosbacher) d. Planning Committee (Mosbacher / Schafer) 8. BOARD MEMBER AD HOC COMMITTEE REPORTS (Discussions may take place; however, no action will be taken) a. Management/Union Medical Plan Negotiations Ad Hoc Committee 9. EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVES REPORT 10. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken) 11. GENERAL MANAGER REPORTS (Discussions may take place; however, no action will be taken) a. LAFCO Consolidation Process 12. STAFF / ATTORNEY REPORTS (Discussions may take place; however, no action will be taken) 13. NOTICE OF PAST AND FUTURE MEETINGS / EVENTS Past Meetings / Events 04/06/10 - City of South Lake Tahoe /Redevelopment Agency Joint Public Hearing on Project No. 2 04/07/10 — Finance Committee Meeting 04/12/10 — Water and Wastewater Operations Committee Meeting 04/14/10 — El Dorado County Water Agency Board Meeting Future Meetings / Events 04/20/10 — 9:00 a.m. — Alpine County Supervisors Regular Meeting in Markleeville 04/22/10 — 9:30 a.m. — Management/Union Medical Plan Negotiations Ad Hoc Committee Meeting at District 04/28/10 — 8:00 a.m. — ECC (Employee Communications Committee) Meeting at District (Director Jones is the Board representative) 04/28/10 — 04/30/10 — CASA (California Association of Sanitation Agencies) Conference 05/03/10 — 05/07/10 — ACWA (Association of California Water Agencies) Conference 05/03/10 — 3:30 p.m. — Water and Wastewater Operations Committee Meeting at District 05/04/10 — 9:00 a.m. — Alpine County Regular Board Meeting in Markleeville 05/06/10 — 2:00 p.m. — STPUD Regular Board Meeting at District 14. CLOSED SESSION (Closed Sessions are not open to the public) a. Pursuant to Government Code Section 54956.9(b) /Conference with Legal Counsel - Pg. 59 Anticipated Litigation (One Case) REGULAR BOARD MEETING AGENDA — APRIL 15, 2010 PAGE — 3 b. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel — Pg. 61 Existing Litigation re: Meyers Landfill Site: United States of America vs. El Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S -01 -1520 LKK GGH, United States District Court for the Eastern District of CA C. Pursuant to Government Code Section 54957(a) /Conference with Labor Negotiators Pg. 63 Agency Negotiators: Richard Solbrig /General Manager, Nancy Hussmann /Human Resources Director, Board of Directors Employee Organization: Stationary Engineers, Local 39 15. ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION 16. ADJOURNMENT (To the next regular meeting, May 6, 2010, 2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete agenda packet, including all backup information is available for review at the meeting and at the District office during the hours of 8:00 a.m. — 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after minutes of the meeting have been approved. Items on this agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear on the agenda. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified, but may occur slightly later than the specified time. Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Comments on items not on the agenda can be heard during "Comments from the Audience;" however, action cannot be taken on items not on the agenda. Please provide the Clerk of the Board with a copy of all written material presented at the meeting. *Backup to any agenda item(s) not included with the Board packet will be made available when finalized at the District office, at the Board meeting, and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings. If particular accommodations for the disabled are needed (i.e., disability - related aids, or other services), please contact the Clerk of the Board at 530.544.6474, extension 6203, at least 24 hours in advance of the meeting. T •ef i! � Id. �� • 7950 •.�� CONSENT CALENDAR APRIL 15, 2010 ITEMS REQUESTED ACTION a. Wastewater Treatment Plant Filter Rehabilitation Approve Proposal from Brown & Pg. 1 (Julie Ryan) Caldwell Consulting Engineers for Design Services, in the Amount of $161,327 b. Engineering Student Interns Pg. 11 (John Thiel) C. Arrowhead Arsenic Treatment System — Media Pg. 13 Change Out Services (Ivo Bergsohn) d. Diamond Valley Ranch (DVR) Pipeline — Phase 1 Pg. 15 (Ivo Bergsohn) e. Regular Board Meeting Minutes: Pg. 17 April 1, 2010 (Kathy Sharp) Approve Contract with Substitute Personnel for Engineering Student Interns through September 2010, in an Amount Not to Exceed $40,000 Authorize Staff to Advertise for Bids for Adsorptive Media Change Out Services Authorize Staff to Advertise for Bids for Construction Approve Minutes South Tahoe Public Utility District ■ 1274 Meadow Crest Drive ■ South Lake Tahoe, CA 96150 Phone 530.544.6474 ■ Facsimile 530.541.0614 ■ www.stpud.us General Manager Richard H. Solbrig youth Tahoe. Pubic Utility District Directors Chris Cefalu James R. Jones Mary Lou Mosbacher Dale Rise Eric Schafer 1275 Meadow Crest Drive a youth Laid Tahoe • CA 96i5Q Phone 550 544 -6474 • Fox 5X7 541 -0614 BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Julie Ryan, Senior Engineer MEETING DATE: April 15, 2010 ITEM — PROJECT NAME: Wastewater Treatment Plant Filter Rehabilitation REQUESTED BOARD ACTION: Approve proposal from Brown & Caldwell Consulting Engineers (B &C) for design services, in the amount $161,327. DISCUSSION: Staff is currently designing the Filters 5 & 6 Rehabilitation Project at the Wastewater Treatment Plant. To support that design, B &C recently prepared a technical memorandum recommending that the District also replace the valves, instrumentation and electrical system for all six filters, including upgrades to the filter backwash system. Staff has requested that B &C prepare a proposal for the following additional task in support of the filter rehabilitation project: 1) Prepare a Basis of Design Memo, 90% Design, Bid Documents and Engineer's Estimate for the valving and instrumentation. 2) Provide as- needed services during the bid period and construction. The design for the rehabilitation of the filter vessels, media and piping is being prepared in -house by staff. The project is scheduled for construction in September 2010. The Scope of Work and Cost Estimate is attached for Board consideration. With Board approval the work will be performed as Task Order 10A under Brown & Caldwell's Master Services Agreement with the District. -1- Julie Ryan April 15, 2010 Page 2 SCHEDULE: April 2010 to June 2011 COSTS: $161,327 ACCOUNT NO: 1029 - 8066 /FILTER BUDGETED AMOUNT REMAINING: $260,357 (2009/10); $1,000,000 (2010/11) ATTACHMENTS: Scope of Work and Cost Estimate CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES :� 0701 -2- CATEGORY: Sewer 201 North Civic Drive, Suite 115 Walnut Creel:, Califorma 94596 Tel: 925- 937 -9010 Fax: 925-937-9026 www.brownandcaldweU.com April 2, 2010 Ms. Julie Ryan South Tahoe PUD 1275 Meadow Crest Drive South Lake Tahoe, California 96150 -7401 136544 -001 Subject: Proposed Amendment for Detailed Design of Effluent Filter Controls Dear Ms. Ryan: In response to the recent request from the South Tahoe Public Utility District (District), Brown and Caldwell is please to forward a proposed scope, budget, and schedule for additional assistance to the District for the effluent filters controls design. The scope addresses expanding the recent draft technical memorandum into a basis of design report and completing 90 percent and final design documents. We proposed to do this work on a time - and - expense basis under the terms of the existing agreement between the District and Brown and Caldwell, for an additional fee of $161,327. The schedule includes submission of the draft Basis of Design Report (BODR) by, May 7, 2010, the 90 percent documents by June 11, 2010, and the final documents by July 8, 2010. We appreciate this opportunity to assist the District. Please call Mr. Tom Birmingham 925.210.2352 or me 925.210.2384 with any questions. Very truly yours, BROWN AND CALDWELL William K. Faisst Vice President WKF:ddt cc: Tom Birmingham, Brown and Caldwell Attachments (2) -3- AMENDMENT A SOUTH TAHOE PUBLIC UTILITY DISTRICT WATER RECLAMATION PLANT SCOPE FOR THE DESIGN OF PRESSURE FILTER VESSEL IMPROVEMENTS BACKGROUND South Tahoe Public Utility District (District) initiated operation of its tertiary water reclamation plant in 1965 at 2.5 million gallons per day (mgd) capacity. Subsequent expansions and upgrades have increased the rated average day capacity to 7.7 mgd. Today, average daily flows are 4 to 5 mgd with peak flows up to 11.2 mgd. Effluent receives tertiary -level treatment that includes pressure filtration. Filtered effluent is exported outside the Tahoe Basin to Harvey Place Reservoir, and from there the effluent is used for agricultural irrigation in the Carson River drainage basin. The District installed the first two of the six dual -media pressure filter vessels in 1964 and the last four by 1966. Each vessel, measuring 10 feet in diameter and 38 feet Iong, originally contained multi- media— anthracite over sand over garnet sand —with rotating surface washes and perforated galvanized pipe underdrains set in gravel. Filter Nos. 1 through 4 were rebuilt in 1984. The District has never rebuilt Filter Nos. 5 and 6, but last added media to these filters around 1990. When secondary effluent quality is sufficiently good, effluent is pumped directly to the filters. When poorer quality effluent occurs, staff adds polyaluminum chloride as its primary coagulant as well as polymer near the filters. District staff backwashes the filters automatically based on time in service, effluent turbidity, or headloss. Backwash typically occurs about every 24 to 48 hours. The backwash rate is about 15 gallons per minute per square foot for about eight minutes. District staff has noticed recent deterioration in filtered effluent turbidity and increased backwash frequency. The District, with Brown and Caldwell's (BC) assistance, inspected the exterior and interior of Filter No. 6 in 2008. Based on this inspection, District staff is designing improvements to Filter Nos. 5 and 6, which include reworking the interior piping, cleaning and recoating the pressure filter vessel interior, and replacing the underdrain piping and filter media and supporting gravel. Currently, the District has adopted Allen - Bradley PLCs and Wonderware software as integral components of its supervisory control and data acquisition system (SCADA). All new construction will use Allen- Bradley programmable logic controllers (PLCs) and Wonderware. The District's Contractor will decommission the existing PLC and install a new PLC for controlling and monitoring all pressure filters. The design will detail the transition from the existing PLC to the new PLC during construction, with process operation continuing through construction except for brief shutdowns coordinated with and approved by District staff. &:vr k -ras0? p{c ecta`:13H 3846' -c 'r UD Hlwrs 5&6 RehaN1 ta§o0Vr po,31 her uMtrds . Scope of Work 4.6.10TA der;. -4- SCOPE OF WORK The District has asked BC to help rework and update the filter control valves, valve actuators, filter controls, and minor miscellaneous equipment. The District will be responsible for: • Providing record drawings for existing facilities and CAD drawing for existing pressure filter front elevation • Providing one set of collated review comments for each submittal • Designing mechanical rehabilitation of existing pressure filters • Providing detailed description of filter sequencing and operation • Preparing the standard terms and conditions (front end) that incorporate technical specifications and minor input, such as construction sequencing, from BC • Releasing the bidding documents to potential bidders, and advertising, receiving and opening bids • Performing construction management and inspections during construction BC will complete the tasks listed below. Table A -1 shows a preliminary list of expected design drawings. Task 1A. Project Management. Our project management includes coordinating all project administration tasks, managing staff, and monitoring the budget and schedule. Specifically, we will prepare a project management plan; monitor job progress, expenditures and performance; and prepare monthly invoices and project progress reports. Task 2. Technical Memorandum on Filter Alternatives. (Not part of current proposal) Task 3. Basis of Design Report (30 Percent Design). Expanding on the draft Technical Memorandum (IN) prepared under previous District authorization, address District comments in the Basis of Design Report. Update the opinion of probable construction cost. Submit a draft Basis of Design Report (BODR) electronically, together with five hard copies (11x17 drawings) to the District for review and approval. Receive one collated set of District review comments. Submit five copies of the final BODR to the District. The report will contain half -size drawings and will include the following information: • Design criteria for the improvements • Most mechanical and process and instrumentation (P &ID) drawings completed to a preliminary completion level • Anticipated construction sequencing • Detailed drawing list (see attached tables for preliminary drawing list) • Technical specifications table of contents • List of proposed equipment suppliers Submission of the updated opinion of probable construction costs will follow the draft BODR by two weeks. brotivn G��ld�vell `:Bran;k ^asu7:.i.: cer.!s ?38 ;x:138467- � Filters 3R6 Rehahiiitalion:Prc,�os;d infam2*�n': ;Iter%csr:5nis - of'Nork 4.6,10M d,y x -5- Task 4. 90 Percent Design. Meet with District's operations and maintenance staff to finalize definition of control and SCADA requirements for filters, including information to reside in the local PLC and alarms, and information to be transmitted to the central control PLC. Document decisions in meeting minutes, submitted electronically. Address the District's review comments on the Basis of Design Report in the 90 percent design package and finalize the following: Valve selection and sizing and valves for replacement Instrumentation improvements Control improvements Submit the 90 percent design package to the District for review and approval. The 90 percent submittal will consist of design drawings and Divisions 2 through 44 of the technical specifications. Conduct one two -hour meeting with District representatives at the District's office to receive comments and answer questions. Task 5. 100 Percent Design. Address the District's review comments on the 90 percent design package in the 100 percent (final) design package and prepare a final design package consisting of plans, technical specifications, and an opinion of probable construction cost (AACE, International Class 1 estimate with 10 percent contingency allowance). Submit the cost opinion two weeks after submittal of the project plans and specifications. BC will give the District one pre - advertising set of the design package that will consist of a hard copy of the full -size drawings, specifications, and a CD containing the CAD and pdf drawings and specifications. Task 6. Bidding Services. Attend one two -hour pre -bid conference, assist District staff in responding to technical questions by prospective bidders, and prepare technical response for inclusion in up to two addenda. Task 7. Engineering Services During Construction. BC's engineering services during construction will be performed in accordance with the following tasks. 7.1— Review Shop Drawing Submittals Review and take action on construction contractor's submittals, in accordance with contract provisions, for materials and pieces of equipment unique to the project. The estimated level of effort is based on 10 submittals and re- submittals. The Contractor will be charged for their labor effort on the second and subsequent re- submittals. It is assumed that the Resident Project Representative will screen, process and track shop drawing submittals. HC's level of effort on this subtask is limited to 40 professional hours. 7.2 — Provide Consultation and Interpretation of Contract Documents Consult with the authorized construction contractor's representative on questions associated with the work. The estimated level of effort is based on 15 formal requests for clarification. It is assumed the Resident Project Representative will screen, process and track Requests for Clarification and Interpretations. BC's level of effort on this subtask is limited to 60 professional hours. &;w . k- nasC -fi T PLJ(i =i;rers U6, Rehatxiifa *Propo sal Informatkm z1 ConTr* - Scope of'Work 4.5.10TB do- -6- 7.3 — Conduct Field Visits Key project team members will conduct field visits to the job site to resolve issues and other matters affecting project completion. District representatives, the District's Resident Project Representative and the Contractor will also attend. The estimated level of effort is based on attending eight two -hour field visits. BC's level of effort on this subtask is limited to 32 professional hours. 7.4 — Prepare Record Drawings On a monthly basis, review and monitor the Contractor's development and maintenance of working record drawings. At approximately 90 percent construction completion, review the Contractor's working record drawings for accuracy, thoroughness and completeness, and advise them of the status. Progress pay estimates beyond the 90 percent completion will be contingent on the acceptability of the Contractor's working record drawings. Based on one consolidated set of marked -up project drawings provided by the Contractor, prepare and submit final record drawings. Record drawings will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the project was finally constructed. BC is not responsible for any errors or omissions in the information from others that are incorporated into the record drawings. BC will provide one set of vellum and electronic files of record drawings on CD for each design package. BC's level of effort on this subtask is limited to 10 professional hours and 48 designer /drafter hours. SCHEDULE The schedule of work for Tasks 1 through S shall be as shown in Table A -1. The District and BC shall negotiate a mutually acceptable schedule for Tasks 6 and 7. Brown; Catdvvell f w k- ras0'r:pre ec!r; ?3�uc` ,138? 7 -STPUO ilte s 585 Reh d ratior:: osa;100(nnoor)"Filter ,or;rol 'k-pe of .N.,rk ,10TB do-n -7- TABLES A -2 THROUGH A -4 SOUTH TAHOE PUBLIC UTILITY DISTRICT WATER RECLAMATION PLANT PRELIMINARY DRAWING LIST FOR FOR THE DESIGN OF IMPROVEMENTS TO THE PRESSURE FILTER VESSELS Table A-2. Mechanical Drawings Abbre Standard Sy and Notes 1 Abbreviations, Standard Symbols and Notes 2 Standard Details 1 Standard Details 2 Building Partial Plan Filter Demolition Schedules Demolition 1— Annotated photographs Demolition 2— Anno p hotogr ap hs Demolition 3— Annotated photog Filte Front Elevation a nd Sections (Based on District drawing) Filter Valve Schedules Filter Details 1— Annotated phot Filter Details 2— Annotated photographs Filter Details 3 Standard Symbols and Notes 1 Standard Symbols and Notes 2 Standard Details Communications Interlink /Block Diagram Filter MID 1 Filter MID 2 Filter MID 3 Filter MID 4 Filter MID 5 Filter MID 6 Filter MID 7 .. l Standard Symbols and Notes 1 Standard Sym and Notes 2 Standard Details 1 Standard Details 2 Single Line Di agram 1 Control Diagrams 1 Demolition Building Partial Plan 1 —8— I'll C ll ?! D sr ICA -- STPUD r $161 60 $86.72 $227.39 $137.59 $109.68 Ay $95.69 $124.13 $191.37 001 Met 40 24 10 0 0 002 88.18.09008190 72 0 24 40 40 19 411 0 003 0I1 M.Dafyn 72 E3 40 49 211 tO 48 4 004' 4 48 0 24 22 20 16 40 8 005 Bid 810106#1 24 16 8 20 0 0 0 D 006 Sonloo8 During Construe&. 24 16 4 116 86 0 12 0 0 O 0 GRAND TOTAL 272 56 110 238 126 48 148 12 Hours and Dollars are rounded to nearest whole number. To display decimals, change the format of the cells. 5166.83 @ 74 1 O xao 34472 1 244, 400441 x, 2243s Imo O 68 9,837 O 208 27,574 Os* 1,000 0 0 0 0 592 11,411 750 2470 37,143 0 0 2,12$ 42577 o 0 1.488 29,327 250 1.90 794 10,631 1 1,400 2484 30,238 32 1,042 150,991 8,336 2,000 2,000 2,000 10,336 161,327 1275 h aaclow Crest Prdve • South fake Tahoe a CA 96150 Phone 530 544-6474 # Fox 530 541 -0614 BOARD AGENDA ITEM 4b TO: Board of Directors FROM: John Thiel, Principal Engineer MEETING DATE: April 15, 2010 ITEM — PROJECT NAME: Engineering Student Interns REQUESTED BOARD ACTION: Approve contract with Substitute Personnel for engineering student interns through September 2010, in an amount not to exceed $40,000. DISCUSSION: Requesting authorization to pay for one engineering intern position through May 21 and for two positions from May 24 to September 30th. The engineering department is currently utilizing one engineering intern, Patrick Wilson, who has been working Fridays and during school breaks since last summer, and will continue to about May 21st. Staff is now advertising for two summer intern positions until April 23 Following the review, interview, and selection process, staff expects the two summer positions to begin on or about May 24 depending on school schedules. The interns will be working as engineering assistants on several tasks including support for the JM Eagle / PVC pipe litigation, development of USFS Special Use Permits, pre - design work for 2011 projects, GPS survey, assistance in preparing permits and AutoCAD drawings for BMPs, details and as- builts, and construction inspection support for some of the following projects: Meter Installations Phase 1 and 2, Meyers Waterline, Lake Tahoe Blvd. /Hwy50 Relocations, Headworks demolition, Tanks sitework, and C- Line Reroute. SCHEDULE: May 2010 through September 2010 COSTS: Not to exceed $40,000 ACCOUNT NO: 1029 -4405; 2029 -4405 BUDGETED AMOUNT REMAINING: $26,896 (2009/10); $106,000 (2010/11) ATTACHMENTS: None -11- General Manager Richard H. 5olbrig Directors 5o o Chris James R. Jones Jonee j�� j `( jjj f�,, 'fit,',/ Fu t is U r+^1, l t r Mary Lou Mosbacher Dale Rise Eric Schafer 1275 h aaclow Crest Prdve • South fake Tahoe a CA 96150 Phone 530 544-6474 # Fox 530 541 -0614 BOARD AGENDA ITEM 4b TO: Board of Directors FROM: John Thiel, Principal Engineer MEETING DATE: April 15, 2010 ITEM — PROJECT NAME: Engineering Student Interns REQUESTED BOARD ACTION: Approve contract with Substitute Personnel for engineering student interns through September 2010, in an amount not to exceed $40,000. DISCUSSION: Requesting authorization to pay for one engineering intern position through May 21 and for two positions from May 24 to September 30th. The engineering department is currently utilizing one engineering intern, Patrick Wilson, who has been working Fridays and during school breaks since last summer, and will continue to about May 21st. Staff is now advertising for two summer intern positions until April 23 Following the review, interview, and selection process, staff expects the two summer positions to begin on or about May 24 depending on school schedules. The interns will be working as engineering assistants on several tasks including support for the JM Eagle / PVC pipe litigation, development of USFS Special Use Permits, pre - design work for 2011 projects, GPS survey, assistance in preparing permits and AutoCAD drawings for BMPs, details and as- builts, and construction inspection support for some of the following projects: Meter Installations Phase 1 and 2, Meyers Waterline, Lake Tahoe Blvd. /Hwy50 Relocations, Headworks demolition, Tanks sitework, and C- Line Reroute. SCHEDULE: May 2010 through September 2010 COSTS: Not to exceed $40,000 ACCOUNT NO: 1029 -4405; 2029 -4405 BUDGETED AMOUNT REMAINING: $26,896 (2009/10); $106,000 (2010/11) ATTACHMENTS: None -11- John Thiel April 15, 2010 Page 2 CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer & Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -12- 1275 MwAow Crest Rrive • South Lake Tahoe • CA 96150 Phone 530 544 -6474 • f�sx 530 541 -C6514 BOARD AGENDA ITEM 4c TO: Board of Directors FROM: No Bergsohn, Hydro - Geologist MEETING DATE: April 15, 2010 ITEM — PROJECT NAME: Arrowhead Arsenic Treatment System — Media Change Out Services REQUESTED BOARD ACTION: Authorize staff to advertise for bids for adsorptive media change out services. DISCUSSION: The Arrowhead Well No. 3 Arsenic Treatment Facility utilizes a granular ferric oxide adsorptive media to remove arsenic from groundwater. Since start-up in October 2009, the arsenic removal system has treated approximately 60 million gallons of groundwater. Performance monitoring shows that the adsorptive media requires replacement, as the arsenic removal system will no longer meet its treatment objective. Change out services for the arsenic removal system will require the removal of the spent media from the treatment system; transport and disposal of the spent media to an approved landfill; and the installation of virgin adsorptive media into the water treatment vessel. Virgin media is needed for continued operation of the Arrowhead Well No. 3 in order to comply with State and Federal arsenic drinking water standards. Staff proposes the following schedule: • Advertise for bids starting April 19, 2010 General Manager May 4, 2010 • Bid Opening Richard H. 5olbrig • Contract Award May 13, 2009 Directors 5ou T aho e Chris James R. Jones JoneF, i Pu H I + Utility P i ot Mary Lou M Pale Ki er Dale Riye Eric Schafer 1275 MwAow Crest Rrive • South Lake Tahoe • CA 96150 Phone 530 544 -6474 • f�sx 530 541 -C6514 BOARD AGENDA ITEM 4c TO: Board of Directors FROM: No Bergsohn, Hydro - Geologist MEETING DATE: April 15, 2010 ITEM — PROJECT NAME: Arrowhead Arsenic Treatment System — Media Change Out Services REQUESTED BOARD ACTION: Authorize staff to advertise for bids for adsorptive media change out services. DISCUSSION: The Arrowhead Well No. 3 Arsenic Treatment Facility utilizes a granular ferric oxide adsorptive media to remove arsenic from groundwater. Since start-up in October 2009, the arsenic removal system has treated approximately 60 million gallons of groundwater. Performance monitoring shows that the adsorptive media requires replacement, as the arsenic removal system will no longer meet its treatment objective. Change out services for the arsenic removal system will require the removal of the spent media from the treatment system; transport and disposal of the spent media to an approved landfill; and the installation of virgin adsorptive media into the water treatment vessel. Virgin media is needed for continued operation of the Arrowhead Well No. 3 in order to comply with State and Federal arsenic drinking water standards. Staff proposes the following schedule: • Advertise for bids starting April 19, 2010 • Mandatory Pre -Bid Conference May 4, 2010 • Bid Opening May 11, 2010 • Contract Award May 13, 2009 • Notice to Proceed May 28, 2010 • Project Completion June 30, 2010 -13- No Bergsohn April 15, 2010 Page 2 SCHEDULE: As noted above COSTS: $100,000 (estimated) ACCOUNT NO: 2029 - 8864 /ARSNIC BUDGETED AMOUNT REMAINING: $354,204 ATTACHMENTS: None CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO =11c General Manager Richard H. 5olbrie youth Tahoe Public Utility District Directors Chris Cefalu James R. Jones Mary Lou Mosbacher Dale Rise Eric Schafer 1275 Maadow Crest Drive • South Lake Tahoe • CA 961150 Phone 550 544 -0474 + Fax 630 541 -0614 BOARD AGENDA ITEM 4d TO: Board of Directors FROM: No Bergsohn, Hydro Geologist MEETING DATE: April 15, 2010 ITEM — PROJECT NAME: Diamond Valley Ranch (DVR) Pipeline — Phase 1 REQUESTED BOARD ACTION: Authorize staff to advertise for bids for construction. DISCUSSION: The project is needed to convey reclaimed wastewater from the District's C -line to District property located north of Diamond Valley Road in the NE1 /4, Section 36, T11 N, R1 9E, MDM. The project will involve the installation of approximately: 7,104 linear feet (LF) of 18 -inch, 300 psi pressure rated pipeline; 3,697 LF of twin 4 -inch electrical conduit; 30 LF of 28" x 20" CMP culvert pipe; electrical pull boxes (38); air - vacuum valve stations (5); pipeline blow -off assemblies (6); fire hydrant assembly (1); pipeline signage (31); asphalt pavement replacement (2,248 ft ); and 7,528 LF of temporary erosion control fencing; including mobilization /demobilization and providing traffic control for work in the California State and Alpine county rights -of -way. New connection to the C -line will be completed using the hot tapping method. A Horizontal Auger Boring (HAB) method will be used to install the pipe under the Millich Diversion Ditch. Funding for this project is anticipated to be provided, in part, by the Clean Water State Revolving Fund (CWSRF) Loan Program. Staff proposes the following schedule: • Advertise for bids starting • Mandatory Pre -Bid Conference • Bid Opening • Bid Evaluation • Contract Award • Notice to Proceed • Start Construction • Project Completion April 20, 2010 May 5, 2010 May 25, 2010 May 25 —June 2, 2010 June 3, 2010 July 7, 2010 July 12, 2010 November 30, 2010 'Start of construction of the DVR Pipeline Project — Phase 1 is contingent upon receiving a Lahontan Regional Water Quality Control Board order permitting the discharge of reclaimed waste water in Diamond Valley, CA. -15- No Bergsohn April 15, 2010 Page 2 SCHEDULE: As noted above COSTS: $1,260,424 (engineer's estimate) ACCOUNT NO: 1029 - 8097 /CROUTE BUDGETED AMOUNT REMAINING: $1,960,461(2009/10);$2,000,000(2010/11) ATTACHMENTS: None CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -16- S %. )j r% , Ay i S -- c IAe • 1950 •�� SOUTH TAHOE PUBLIC UTILITY DISTRICT Richard Solbrig, General Manager Paul S40, Assistant General Man Dale Rise, President BOARD MEMBERS Mosbacher, Vice President James R. Jones, Director Eric W. Schafer, Director Chris Cefalu, Director REGULAR MEETING OF THE BO OF DIRECT( m SOUTH TAHOE PUBLIC U DISTRICT ww:�R The Board of Directors of the South Tahoe Public Utl April 1, 2010, 2:00 P.M., District Offic,, 1;275 Meado California. BOARD OF DIRECTORS Vice President Mosbacher, Directors Cefa�.Jones �:�' °`, -,"., , Schafer. President Rise �����.,. Wit. STAFF Solbrig, Sharp, Sc ocking, Curtis, Hussmann, , Nolan, Attorney Kvistad ' GUESTS• Bill and "Cra d, J David Jens /City der, Att ; )hn, Bledooe, rson, nnels, Ernie Claudio, k Enright /City Bill Crawfd%4, led the pledge to the flag. to approve the "Consent Caldar as submitted: a. Water Meter Outreach Coordinator Temporary Help - Approved contract - budget with the Substitute Personnel or Blue Ribbon for a temporary Water Meter Outreach Coordinator position, in the amount of $35,000; b. Diamond Valley Ranch Pipeline: Phase 2 - Accepted the proposal from C Engineering to provide design services, in the amount of $7,200; ct met in a regular session, Drive, South Lake Tahoe, PLEDGE OF ALLEGIANCE CONSENT CALENDAR -17- REGULAR BOARD MEETING MINUTES - APRIL 1, 2010 PAGE - 2 c. Diamond Valley Ranch Pipeline Project: Phase 1; CONSENT CALENDAR Geotechnical Investigation — Accepted proposal (continued) from Construction Materials Engineers, Inc., to complete a geotechnical investigation, in the amount of $19,000; d. Approved Regular Board Meeting Minutes: March 18, 2010. ITEMS FOR BOARD ACTION The existing synthetic liner for the emergency retention E basin (ERB) was installed in 1989, and is nearing the end of its useful life. The Lahontan Regional Water Quality Control Board has required the District to de- sign a new system by August 2010, and construc by fall of 2011. Three proposals were received from engineerin' ult- ing firms. Staff reviewed and ranked the propose e� on a pre- determined set of criteria, and selected Ve Engineering, Inc., as the preferred co ant to provi design, permitting support, services nstruction, and inspection for the project. to accept the proposal recd. from VectWng Y RETENTION BASIN Y�1r CITY REDEVELOPMENT AGENCY PROJECT NO. 2 encourage eco included: venue could impact ur their attendance at ;ludin April 6 joint community meetings - oposal and goal to the City. Concerns The funding mecharim for improvements to the Lukins water system, including fire protection and asphalt improvements; How public funds could be invested in Lukins, and not for a private water company; If redevelopment funds could be used to help pay for District projects required within the redevelop- ment area for the redevelopment, and not take away from pass- through payments to the District; -ia- REGULAR BOARD MEETING MINUTES -APRIL 1, 2010 PAGE - 3 The size of the redevelopment area; Track record of previous Redevelopment Project No. 1. Bill Crawford spoke about: the background of past city redevelopment projects and associated bankruptcies, annual debt service from RDA No. 1, use of TOT tax/ general fund, no real plan in the current proposal, re- development plan not being put on the ballot for voters to decide on, areas proclaimed to be blighted are ques- tionable, the potential for adding new debt to the City, and problems associated with Lukins. John Runnels purported that Lukins representatives, who could not attend this board meeting, requested he rel their dismay at hearing the City Manager's idea to consolidate City and STPUD services. He also sta : that Lukins objects to any City involvement wit r water system and will testify to their position e April 6 joint public hearing, and if necessary, wi an attorney to prevent it. Mr. Runnels also spoke about the ne s ..our comma to renew itself and rebuild businesses° critical of the City, their policies, track records, a tai `,`b l$nt redevelopment plan. He encouraged the to put: the redevelopment plan on hold, reevaluate t positiQ reduce the project size, a the p' mth the Lukins water syste s om red ' ent. 11 redeve1g,,p0iont pft Boar:'embers comme: : th '' City does not seem to ha ..a, clear plan, Lukiirl :gompl the matter, the District c U1d suffer mone impac and needs to pro- tect ratepys, and that th assumption of 7% growth every year for 45 years is n reliable scenario. It was the consensus of , N ` "Board to direct staff to „� '' contact Lukins to dew b their position prior to the April 6 joint public he hg, and to obtain a copy of an agreement said to exist between RDA, Lukins and the PUC No Board action. CITY REDEVELOPMENT AGENCY PROJECT AREA NO. 2 (continued) -19- REGULAR BOARD MEETING MINUTES - APRIL 1, 2010 PAGE - 4 Moved Schafer / Second Jones / Rise Absent / Passed to approve payment in the amount of $929,509.26. Water and Wastewater Operations Committee: The committee met March 29. Minutes of the meeting are available upon request. Management /Union Medical Plan Negotiations Ad Hoc Committee: The committee met March 25 and heard a presentation from the Principal Group on their program for health risk assessments. A major topic of discussion was to determine the next steps for the wellness pro- gram. Testing guidelines will be modified based on advice received from physicians who reviewed them. Director Mosbacher reported on her tour of the Diamond Valley Ranch, which went a long way towards helping her to understand components the master plan. Y General Manager Richard Solbrig reported a letter received from a customer in the Angor Fire area wh " has not rebuilt but will have to resu ng for ser- vices in April. Staff will respond with s of what can be done under current ordin s ate her burden. District Information Off iggla 0y is Cocki y that the USFS is supposec!`t their gis- tration fee to 3 %. He rop�orted th &11 as request included in ors interior bill is m ovinly. PAYMENT OF CLAIMS BOARD MEMBER STANDING COMMITTEE REPORTS gaNERAL MANAGER REPORT MEETING BREAK AND ADJOURN- MENT TO CLOSED SESSION T ON ITEM DISCUSSED DURING CLOSED SESSION Pursuant to Government Code Section 54957(a) /Conference with Labor Negotiators Agency Negotiators: Richard Solbrig /General Manager, Nancy Hussmann /Human Resources Director, Board of Directors Employee Organization: Stationary Engineers, Local 39 - 20 - BOARD MEMBER AD HOC REGULAR BOARD MEETING MINUTES - APRIL 1, 2010 PAGE - 5 No reportable Board action. No reportable Board action. No reportable Board action. 5:10 P.M. Pursuant to Government Code Section 54957 /Public Employee Appointment Title: Labor Negotiator Pursuant to Government Code Section 54956.9(b) /Conference with Legal Counsel- Anticipated Litigation (One Case) Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel — Existing Litigation re: Meyers Landfill Site: United States of America vs. El Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S -01 -1520 LKK GGH, U.S. District Court for the Eastern District of Ca. ADJOURNMENT Dale Rise, Board President South Tahoe Public Utility District ATTEST: Kathy Sharp, Clerk of the Board South Tahoe Public Utility District 21 1275 Meadow Creel; Drive • South take Tahoe * CAS 66150 Phone 530 544-6474 v Fax 530 541 -0614 BOARD AGENDA ITEM 6a TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: April 15, 2010 ITEM — PROJECT NAME: City Redevelopment Agency Project No. 2 REQUESTED BOARD ACTION: Receive update and direct staff if necessary DISCUSSION: The District filed a letter of objection and outlined concerns regarding the redevelopment plan prior to the City of South Lake Tahoe /Redevelopment Agency joint public hearing held April 6. Concerns included: the loss of property tax increment over the life of the redevelopment project; the funding mechanism for improvements to the Lukins water system, particularly fire protection; use of public funds for improvement to a private water company; District projects within the area and use of pass- through funds; and the overall size of the redevelopment area. The El Dorado County Board of Supervisors also sent a letter of objection to several components of the plan. The City Council voted to delay the decision to adopt the redevelopment plan until May 4, 2010, and directed their staff to make some changes to the redevelopment area, and to work with the District and El Dorado County to address their concerns. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: None CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO Ft -23- General Manager Richard H. 56 rig 5 ou t h Chris Cefalu Jam Directors es R. Jones j � + / ' � ,(, J ] - �(,'/'' Fu t l i c , t i l i t _ P l otri ct er Mary Lou Moale Klee Dale Rise Eric Schafer 1275 Meadow Creel; Drive • South take Tahoe * CAS 66150 Phone 530 544-6474 v Fax 530 541 -0614 BOARD AGENDA ITEM 6a TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: April 15, 2010 ITEM — PROJECT NAME: City Redevelopment Agency Project No. 2 REQUESTED BOARD ACTION: Receive update and direct staff if necessary DISCUSSION: The District filed a letter of objection and outlined concerns regarding the redevelopment plan prior to the City of South Lake Tahoe /Redevelopment Agency joint public hearing held April 6. Concerns included: the loss of property tax increment over the life of the redevelopment project; the funding mechanism for improvements to the Lukins water system, particularly fire protection; use of public funds for improvement to a private water company; District projects within the area and use of pass- through funds; and the overall size of the redevelopment area. The El Dorado County Board of Supervisors also sent a letter of objection to several components of the plan. The City Council voted to delay the decision to adopt the redevelopment plan until May 4, 2010, and directed their staff to make some changes to the redevelopment area, and to work with the District and El Dorado County to address their concerns. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: None CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO Ft -23- 1275 Meadow Crest Pt ive a South take Tahoe • CA 96150 Phone 550 544 -6474 + Fay 530 541 -0614 BOARD AGENDA ITEM 6b TO: Board of Directors FROM: Julie Ryan, Senior Engineer MEETING DATE: April 15, 2010 ITEM — PROJECT NAME: Angora Tank Replacement / Echo View Tanks Site Work REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible bidder. DISCUSSION: On April 7, 2010, at 2 pm, the District received nine (9) bids for the Angora and Echo View Tanks Site Work Project. Bids ranged from $348,443 to $534,820. The engineer's estimate for the project is $503,000. The work included in this contract primarily includes demolition of two existing tanks, replacement of the inlet/outlet pipe at Echo View, construction of a concrete foundation at Echo View, and site improvements at both Angora and Echo View. A summary of all bids is attached. Herback General Engineering is the apparent low bidder. Staff is currently reviewing the top three bids for compliance with funding requirements for disadvantaged business outreach and other contractual requirements. Staff will make a recommendation to the Board for award of the bid to be distributed prior to, and at the Board Meeting. SCHEDULE: As soon as possible COSTS: $58,400.00 (ANGOSW); $290,043 (ECHOSW) ACCOUNT NO: 2029 - 7064 /ANGOSW; 2029 - 8809 /ECHOSW BUDGETED AMOUNT REMAINING: $236,580 (2009/10), $670,000 (2010/11); $53,502 (2009/10), $1,000,000 (2010/11) ATTACHMENTS: Bid summary. Staff recommendation to be distributed prior to, and at the Board meeting. CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO CATEGORY: Water -25- General Manager Richard H. 5olbrig Slou T Chris am Directors es Jones R. ones Pu��iV Utilit Pi triof Mary LouMDaleRier Dale Ri6e Eric 5chafer 1275 Meadow Crest Pt ive a South take Tahoe • CA 96150 Phone 550 544 -6474 + Fay 530 541 -0614 BOARD AGENDA ITEM 6b TO: Board of Directors FROM: Julie Ryan, Senior Engineer MEETING DATE: April 15, 2010 ITEM — PROJECT NAME: Angora Tank Replacement / Echo View Tanks Site Work REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible bidder. DISCUSSION: On April 7, 2010, at 2 pm, the District received nine (9) bids for the Angora and Echo View Tanks Site Work Project. Bids ranged from $348,443 to $534,820. The engineer's estimate for the project is $503,000. The work included in this contract primarily includes demolition of two existing tanks, replacement of the inlet/outlet pipe at Echo View, construction of a concrete foundation at Echo View, and site improvements at both Angora and Echo View. A summary of all bids is attached. Herback General Engineering is the apparent low bidder. Staff is currently reviewing the top three bids for compliance with funding requirements for disadvantaged business outreach and other contractual requirements. Staff will make a recommendation to the Board for award of the bid to be distributed prior to, and at the Board Meeting. SCHEDULE: As soon as possible COSTS: $58,400.00 (ANGOSW); $290,043 (ECHOSW) ACCOUNT NO: 2029 - 7064 /ANGOSW; 2029 - 8809 /ECHOSW BUDGETED AMOUNT REMAINING: $236,580 (2009/10), $670,000 (2010/11); $53,502 (2009/10), $1,000,000 (2010/11) ATTACHMENTS: Bid summary. Staff recommendation to be distributed prior to, and at the Board meeting. CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO CATEGORY: Water -25- SOUTH TAHOE PUBLIC UTILITY DISTRICT'S ECHO VIEW and ANGORA WATER TANKS - SITEWORK PROJECT BID SUMMARY (04/07110) u n m ua uaew wl ame arW .. .. as . S- oy me uumn 1N1t t um and approved tine O by WNER 1 -27- Herback Gen'I K.G. Walters En loser's Estimate I Inearin C nstruction I While Rock Constructio Wunschel b Sons Inc. Item Descript on Unit I OTY I Unit Price I Amount Unit Price Amount I Unit Price I Amount I Unit Price I Amount I Unit Price I Amount 1 Mobilization and demobilization LS 1 $39.400.00 $39.4ft 00 19 943. $19,943 . 00 25.000.00 $25,000. 00 11 800.00 1 800.00 $18,04 40 18 668. 0 2 Provide traffic control b Temp Erosion Control 1 $15,ODO. $8,500. $8 00 8,000. 8 .00 750. $3,750. 894 49 4 .40 3 Clearing b Gnsklm LS 1 $5,000.00 $4,800. $4,800. 00 4 501i. $4,400. 00 4 400.00 Blasting to break up rock for 4 excavation operations to continue in cWng all explosives, drilled e8 b • LS 1 $100.000. 00 100000.00 $100.000.00 S100.000. 00 100 .00 100 1 .00 100000. 1 1 shall Or1 ode:5aor5b: .00 I cull C LF 380 120.00 $45.6W. 00 90.00 $34,200. 00 .00 130.00 9 400.00 97.65 $31,101. 00 Sb P LF 0.00 .00 0.00 .00 0.00: .Of) 6 Provkleandks Pro vo O+ree- quarter kcch (314 waterservice EA 1 $1,800.00 $1,800. 00 7 $4,7W 4,000.00 $4,ODQ. $3,000.00 $3,000.00 *3j47.00 $3,787. Provide and InsMlf 8eeeyuarter inch (314') motor oomptete and in place FA 2 1 .00 200.00 2100.00 200.00 1 3 $1.350.00 $2,700.00 $1.532,4g $3,064. , Provide and Instal fire hydrant, valve and EA 1 6 000. 000 6.00 7000.00 7000.00 5 500.00 $5,900. 5900. $7.037.12 $7.037.12 9 Existing Tank Demo and Removal g 1 $40,000, 00 000. $17,500. 00 17 50000 23 .00 $28.0 $28,000. 00 $33J20, 420. Cut. cap and abandon water f0 mains /services complete and In plac t 1 3 000. $3.000.00 2 200 $2.200.00 9 S3 .00Q00 3 00 3 1 736.80 1 736. 11 Ranfe Bon L9 1 5000.00 445,000 00 2 2500.00 5 .Ofl 53 00 53 7. $45 12 Project sites and wudtv, LS 1 $5500000 $55,000. 00 26 000. $26,000. 00 35,000.00 $-35.0 .00 30400.00 30 400.00 7 .73 37 39.73 Provide and hsfall ftee Inch (3•) 13 he k hot mix asphalt complete nd in piece 3700 110.00 $37,000. 00 5.00 $18.5w. 00 6 $22.2W.00 $5.00 $18,500.00 $4.00 $14 .800.00 EcM V w SUBTOTAL: $396,000.00 $290,043.00 $316 $313A%.00 $310,903.7 ANGORA TANK SITE 14 Mobilization and dwrwdlzatbn 10% of a LS 1 $11'000. $11-000-00 2 200.00 $2,200-001 000.00 6 $9,400. $9,400 00 . .1 348.15 15 Provide traffic CendfEll and T Ems I LS 1 15000.00 15 000. 3100.00 $3.10000 3 000.00 $3,7W. $3.750. 7 .80 16 ead b LS 7 5 . S4.300.0Q $4.30Q. 00 . $4,400.00 - 400.00 ST.M.IQ $7 ,GB2. 17 Existing Tank Dome and R vet L9 1 $25,000. $25,000. $17.5M. 417,M. 20 $20,000. 28000.00 $28 AX $300 00 Exravation and Elver vation 18 for structures and access rd (off - �haks ) CY 300 $70Z0 $2L000.00 $U.00 $9,600.00 3&001 $10.500.00 $7.500.001 .0T $10.221.00 19 Access Rd surfacing and stabilization LS 1 $8,000.00 $8.000.00 .00 $5.500 000.00 $5.000. 11 000. 11 000 $15,790. $15,790.§l Cut, cap and abandon existing 20 wear mans complete and in ace LS 1 $3,000. S3 ,00Q. 700.00 $2,700.00 8 .OQ QW0 3 800.QQ 3 .00 309. .94 21 Project site s and' reslorption 1 20 L .00 00 13 13 500. 14 1 13 13 .00 .00 _ sole U AL: 1 .00 4Q0. 7 7 OTALS r avNw a 44 .00 7 5 1 TOT as N IQ ame ame Sam u n m ua uaew wl ame arW .. .. as . S- oy me uumn 1N1t t um and approved tine O by WNER 1 -27- SOUTH TAHOE PUBLIC UTILITY DISTRICTS ECHO VIEW and ANGORA WATER TANKS - SITEWORK PROJECT BID SUMMARY (04/07110) 'Actual goer amourr to be basso onume and matemw ca by the OWNER. 2 -28- Spiess Construction Co. Inc. Jo En ineeml Gran Constru Ion C.S.Ebri M Marcor Environmental item ve scripu0n 1 Unit I QTY I Unit Prig I Amount I Unit Price I Amount Unit Price I Amount Unit Prke I Amount I Unit Price I ARUM 1 Momizatle bon IS 1 $I 1 $14,000. 1 .110 5 5,060. 37 2 37 240.00 277 7.00 2 Provide tra mnbol d Temp Ero ion Co LS 1 12 000.00 12 12 .00 12 984. 15 15 .00 9,432.00 9 432.00 i 350.00 3 Clearm R Gnibbing LS 1 $13,000.00 $13,MQ, $R,500. $12,000.00 $12,000. 00 7 200. $7,200. 24 292.00 BI•stirg b break up rock for 4 excavation operations b continue Including all •xpbsives, • LS 1 S100.000,00111100=0.00 $100.000.00 51010M. $ $10"00,00 100 .00 100 A00.00. 11100,0Q0,00 $j0Q _00D,00 Contrsctor 3holl bid M one: 9a or : Ideftoot pipe ar P"'I LF 360 $130.00 119 4(a. 1 .00 200. 7 140.00 14 5b IrlleNoUti i 8 01 f o.00 00 Provide and Instal! Brae- quarter 6 inch 3/4" water EA / 800. 4 000.00 500.00 1 80Q .00 $1.4w. $2 Provkle and install threequwter Inch (3/4") motor complete and in utoce FA 21 33.11M.00 $7.600.001 $1,400.00 2 GW�001 S1.300.00 $ SI.M.00 $2.600.00 $1.800.00 $3,600. .7, 20.00 720.00 8 Provide and Install Bra hydrant EA 1 50,00 7 7 00 7 . $9.00000 000.00 5700. 500. $5,43% 54 9 xletirg Tank and MO val LS 1 $30.550.00 $30.5K S26.9D0.00 $26.9W,qg $31 $31,409. 00 45 400.00 $45,400 . 3 32.00 Cut cap and abandon voter 10 mainslseMas complete and in me LS 1 7. 7 $13,665 11165§.99 $2,400 $1,200.00 4 11 Haste undation LS t s $ $ s IMect sH® otabl and 12 socAirity LS 4 $29.000.00 Sn,000Q2 S39 S39 $18,000.00 $1&000.001 31 20.00 $31,320. $45 235 Provide and install ffvw Mch (3') 13 dtick hot mix asphalt complete I SF wid In plage 1701 $2.7 10 $3.1 0 11 470. $33,300. $7,80 $28,860.001 $18,570, Ec o iew 515.00 335 .00 349349.00 3891 185.00 AN A E 14 Mobilization and bliiation 1 of sowtail LS 1 $I.QW.Q0 $1 7 .00 SZ.500.00 S9.000.0Q 9 000.00 10 440.00 8185. 15 Provide traffic control and Tam Erosion COnbol LS 1 13 $3,800. 3 277.00 $9.277.00 a - 00 1 L$ 1. $15'750. 8 7 3 .00 $3,0M. 580. 18942.00 Tank snd r0400.00 17 Rarrovel 1 .00 $10,700. t0I 1 6 41 400. 21586. and Over cavetion 18 for sbuckxes and access rd (otf- CY 300 12 .00 53. 15 .00 7000 21000. 28 68 46704.00 Access d o ur whV amf 19 L 1 16800.00 t � .OQ 06000 8 5 5 .00 $12,57Q. $5 Cut. cep and abandon erleting 20 wafer mains complete and in sea LS 1 5100.00 00 $3,600. . $5200.00 $6,0Q0.22 $6,OQO 00 S4,55Z00 21 she security arol' 1 8397.00 18 9 8000. 15.600.00 1 A Tan 41 72 947. 77 4 1 . TOT ALS • and a0ern ' 408 511 8. TOT ALS a$ I CE Some I Some . $513J02 'Actual goer amourr to be basso onume and matemw ca by the OWNER. 2 -28- South Tahoe Public Utility District Memorandum Date: April 15, 2010 To: Board of Directors Richard H. Solbrig, General Manager Paul A. Sciuto, Assistant General Manager From: Julie Ryan, Senior Engineer Subject: Recommendation for Bid Award Echo View and Angora Tanks Site Work Project '-( 'S- Y0 9,4,rr ) vl'`i_� 1) As indicated in the summary by the Contracts Administrator, the apparent low bid received from Herback General Engineering ( Herback) for the Echo View and Angora Tanks Site Work Project had only minor contractual irregularities. In addition to the standard contractual items, the funding for this project requires that the bidder comply with requirements for outreach to Disadvantaged Business Enterprises (DBEs). Staff has performed a review of review of Herback's "good- faith" effort and has found a major deviation from the requirements of Section 00 74 00, Part 2.10 of the Bid Documents (DBE Requirements). In short, in their Bid Herback named one subcontractor and two suppliers for trades for which it did not advertise and solicit as part of their DBE "good- faith" effort. Staff recommends that the Board find the bid from Herback General Engineering non- responsive for failing to fully comply with the bidding requirements for DBE outreach. 2) The US Forest Service is administrating the grant for this project. Therefore, the project is subject to federal guidelines for contracting, which are clearly stated in the Bid Documents. Any work that is procured using federal funds for construction, equipment, services and supplies is subject to the requirement for outreach to DBEs. Staff recommends that the Board reject the bid from Herback General Engineering for failing to comply with the bid requirements for grant funding. 3) As indicated in the summary by the Contracts Administrator, the bid received from KG Walters Construction Company, Inc. had three contractual irregularities, two of which were minor. The third irregularity, which relates to the naming of subcontractors, is more complex. In accordance with the California Public Contracting Code, all work in excess of Y2% of the total bid amount must either be performed by a subcontractor named in the Bid or must be self - performed by KG Walters. By omitting certain trades from the list of subcontractors, KG Walters is in effect committing to perform all those trades themselves. KG Walters has informed Staff that they intend to self - perform all work not identified on the list of subcontractors. Staff also reviewed the DBE "good- faith" effort documentation provided by KG Walters. Staff has found three minor irregularities, but KG Walters has generally complied with the bidding requirements for DBE outreach. Staff recommends that the Board award the project to KG Walters Construction Company, Inc., in the amount of $388,700.00. South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Telephone: (530)544 -6474 Fax: (530)541 -0614 Memorandum Date: April 15, 2010 To: Board Members, Richard H. Solbrig, Paul A. Sciuto From: Heidi C. Baugh, Contracts Administrator Subject: 2010 Echo View and Angora Water Tanks Sitework Project At 2:00 o'clock on the afternoon of April 7, 2010 we received and opened nine (9) sealed bids for the above - referenced project. Bids ranged from $348,443 to $534,820. The engineer's estimate was $504,000. A careful review and analysis of the three lowest bids showed a few deviations. See attached spreadsheet and list of deviations for full breakdown of each of the three low bids. Herback General Engineering is the apparent low bidder. Herback General Engineering's bid had only one minor deviation. I contacted the Contractors License Board and was given the following information: • License Number 486035 is current and active and expires 12/31/2011. • The company is a Sole Ownership. • Herback General Engineering holds a Class A — General Engineering license. However, because of additional findings by staff of non - compliance with specified dbe "good faith" efforts by Herback General Engineering, I am also providing information regarding the second apparent low bidder: K.G. Walters Construction Co., Inc. K.G. Walters Construction's bid had three deviations. I contacted the Contractors License Board and was given the following information: • License Number 301314 is current and active and expires 6/30/2011. • The company is a corporation. • K.G. Walters Construction Co., Inc. holds a Class A — General Engineering license. cc: Li, da ProwvL South Tahoe Public Utility District . 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Phone 530.544.6474 • Facsimile 530.541.0614 2010 ECHO VIEW and ANGORA WATER TANKS SITEWORK PROJECT Bid Opening: 4/7/2010 at 2:00 o'clock p.m. Deviations found in review of three lowest bids: Herback General Engineering: • Bidder's General Information, under item 5 contractor failed to provide phone number for surety company, and failed to provide the brokerage name and address. K.G. Walters Construction Co.. Inc. • Bidder's General Information, under item 5, contractor failed to provide address and phone number for surety; instead listed the surety company in c/o the brokerage firm. • Certificate by Contractor's Insurance Broker was filled out incorrectly, therefore failing to provide name(s) of insurance company(ies). In turn we were not able to verify that insurance company(ies) met specification requirements. • Bids for paving, erosion control, rebar, trees, and surveyors were all listed as "accepted" in Form 5 of the Good Faith Effort documentation, but were not named in the Bid even though the amount is greater than Y2% of the bid. White Rock Construction Inc.: • Subcontractor List, contractor identified "Work to be Performed" via listing the bid item number that it pertained to, instead of calling out the work using words. Not necessarily incorrect, just irregular. • Bidder's General Information, item 5, contractor failed to provide name, address or phone number of surety. • Certification by Contractor's Insurance Broker failed to name the brokerage name in the first blank. 2010 ECHO VIEW AND ANGORA WATER TANKS SITEWORK PROJECT CONTRACTOR'S SUBCONTRACTORS & SUPPLIERS Herback General Enaineerina Description of Work Subcontractors & Address Subcontractors Name & Address Concrete Foundation 6.4% J. Chisum Concrete Yerin ton, Nevada Site Stabilization / Revegetation 1.2% V &C Construction Gardnerville, Nevada Fencing / Retaining Wall 5.2% Tahoe Fence Co. Mound House, Nevada Tank Demo 6.8% Double B Demolition Folsom, California Asbestos Removal 2.3% Consolidated Western Contractors Sacramento, California Named E ui ment/Material Su lier List: Equipment/Material Site Fencing Supplier Pipe, fittings and specials Bing Materials Western Nevada Suppl Valve and Valve Boxes Western Nevada Suppl Aggregate Base Material Bing Materials Asphalt mixes for paved areas Tahoe Asphalt Concrete Sierra Tahoe Ready Mix Site Fencing Tahoe Fence Co. Pipe Bedding Material Bing Materials Recycled Asphalt Base Tahoe Asphalt K.G. Walters Construct Co., Inc. Description of Work Subcontractors & Address Fence 4% Tholl Fence Sparks, Nevada Tank Demolition 6% Double B Demolition Folsom, California Lead Paint Abatement 5% Consolidated Western Sacramento, California Named E ui mentlMaterial Supplier List: Equipment/Material Supplier Pipe, fittings and specials Ferguson/Fast Fab Valve and Valve Boxes Ferguson Aggregate Base Material Bing Materials Asphalt mixes for paved areas Tahoe AC Concrete Sierra Tahoe Ready Mix Site Fencing Tholl Fence Pipe Bedding Material Bing Materials 2010 ECHO VIEW AND ANGORA WATER TANKS SITEWORK PROJECT CONTRACTOR'S SUBCONTRACTORS & SUPPLIERS White Rock Construction Inc. Description of Work Subcontractors & Address Asphalt Paving 4.15% Don Garcia Excavating & Paving Inc. South Lake Tahoe, California Blasting and drilling 15% Third Generation Drilling & Blasting Placerville, California Fencing and Retaining Wall 4.3% Tahoe Fence Co., Inc. Mount House, Nevada Tank demo and removal 6.15% Double B Demolition Folsom, California Tank demo and removal 2.01% Consolidated Western Contractors, Inc. Sacramento, California Reveg 2.55% Sierra Erosion Control, Inc. Reno, Nevada E ui ment/Material Supplier List Equipment/Material Supplier Pipe, fittings andspecials Western Nevada Suppl Valve and Valve Boxes Western Nevada Suppl Aggregate Base Material Bing Materials Asphalt mixes for paved areas Don Garcia Excavating and Pavin Concrete Sierra Tahoe RediMix Site Fencing Tahoe Fence Co. Pipe Bedding Material Bing Materials SOUTH TAHOE PUB[ ECHO VIEW and ANGORA WAT BID SUM kem Description 6 SRE I Unit 1 Rlization and demobilization LS Provide traffic control & Temp 2 Erosion Control LS 3 lean ng & Grubbing LS Engineer's Estimate QTY I Unit Price T Amount 1 $39,400-00 $39,400.00 1 $15,000.00 $15,000.00 1 $5,000.00 $5,000.00 Herback Gen'[ Engineering Unit Price I Amount $19,943.00 $19,943.00 $8,500.00 $8,500.00 $4,800.00 $4,800.00 K.G. Walters Construction I Unit Price I Amount 25,000.00 $25,000.00 8,000.00 $8,000.00 4,500.00 $4,500.00 White Rock Con tructior I Unit Price I Amount $11,800.Q0 $11,800.00 $375000 $3,750.00 $4 400.00 $4,400.00 Blasting to break up rock for 4 excavation operations to continue including all explosives, drilled holes, equipment & crews' LS 1 $100 . - 100,000.00 100 000.00 $100,000.00 100,000-001 $100,000.00 00 Contractor shall bid on only one: 5a or 5b: .1 , 5a Inlet/outiet 8" PVC LF 380 #120- $45,600.00 #90.00 $34,200.00 100.00 $38,000.00 $110 5b inlet/outlet pipe 8" DIP LF 380 $0.00 $0.00 $0.00 $0.00 $0.00 6 Provide and install three- quarter inch 3/4" double water service EA 1 $1,800,0 $1,800.00 $4,700.00, 4,000.00 $4,000.00. $3,000 -00 $3,000.00 Provide and install three - quarter 7 inch (3/4 ") meter complete and in lace EA 2 $1 $3200.00 $2,100.00 $4,200.00 1,500.00 $3,000.00 $1,3..00 $2.700.00 Provide and install fire hydrant, 8 valve and piping EA 1 $6,000M $6,000.00 $7,000.00 $7,000.00 5,500,00 $5,500.00 $5,900,0 $ 5,900.00 +sting Tank Demo and 9 Removal LS 1 $40,000.00 $40 $17,500.00 $17,500.00 23,000.00 $23,000.00 $28.000.00 $28,000.00 Cut, cap and abandon water 10 mains /services complete and in ce LS 1 $3.000.00 $3.000.00 $2 300.00 2,200.00 3,000.00 $3,000.00 $3 000. S3 11 Reinforced concrete foundation LS 1 000.00 0' $42,500.00 $42,500.00 45,000.00 $45,000.00 $53,000.00 .0M.00 $$3 12 Project site stabilization and security LS 1 $55000.00 $55,000.00 26,000.00 $26,000.00 35,000.00 $35,000.00 $30,400.00 $ 0400.00 Provide and install three inch (3 ") 13 thick hot mix asphalt complete and in lace SF 3700 10.00 0 $5.00 $18,500.00 6.00 $22,20000 $5, $ 4 500.00 Echo View SUBTOTAL: 0: $290,043.00 $316,200. . ANGORA TANK SITE Mobilization and demobilzation 14 10 %of subtotal LS 1 $11000.00 0 $2,200.00 $2,200.00 6,000.00 $6,000.00 $9,400.00 W Provide traffic control and 15 t 00 Tem Erosion Control LS 1 $15,000.00 .0 $3,100.00 $3,100.00 3,000.00 $3,000.00 $3,750,00 16 Cieari & Grubbing LS 1 $5,000.00. $$ 000.00 ,300.00 $4,300.00 6,000.00 $6,000.00 $4,400.00 . 00. Existing Tank Demo and 17 Removal LS 1 $25,000.00. $25,000.00 $17,500.00 $17,500.00 20 000.00 $20,000.00 $28,000.00 $ $.000.00 Excavation and Over- Eavation xc 18 for structures and access rd (off - haul CY 300 $70.00 $21,000.00 $32.00 $9,600.00 35.00 $10,500.00 $25.00 $7 Access Rd surfacing and 19 stabilization LS 1 $8,000.00 $8,000.00 $5,500.00 5,500.00 5,000.00 $5,000.00 $11,000.00 19,000.00 Cut, c and abandon existing 20 water mains complete and in lace LS 1 $3,000.00 $3,000.00 $2,700.00 2,700.00 r$13,500.00 8,000.00 $8,000.00 $3,800.00 $3.800.00 Project site security and 21 restoration LS 1 $20,000.00 $20.000.001 $13.500.00 14,000.00 $14,000.001 $93,900.00 $13.9W.00 An =Tank SUBTOTAL: $108,000,00 $58,400.00 $72,500.00 $81750.00 T OTALS r District Review and Calculation: $504 000.00 $348 443.00 $388,700.00 $39 800.00 TOTALS as WRITTEN IN i REC IVED: "A.. ..1 J..11.. Same Same me by the OWNER. a u vaw v� i an,c a� w �, id�cndi ws db bUUF[MiteU uy ine t vN 1 RAC i VK and approved UTILITY DISTRICT'S R TANKS - SITEWORK PROJECT tY (04/07/10) Spiess Construction Co. Wunschel & Sons Inc. Inc. Jo Enqlnearnig Unit Price I Amount I Unit Price I Amount Unit Price I Amount Granite Construction Unit Price I Amount 2.8.Ebrl ht Unit Price Amount Marcor Environmental Unit Price Amount $18,668.40 $18,668.40 $1,800.00 $1,800.00 $18,000.00 $18000.00 $25,060.00 $25,060.00 $37,240.00 $27,707.00 4,894.40 $2 $4,894.40 $2,990.80 $12,000.00 $13 .00 $12 000.00 $13,000.00 $12,984.00 $2,500.00 $12,984.00 $2,500.00 $15,000.00 $12,000.00 $15,000.00 $12,000. $9,432.00 $7,200.00 j 16,350.00 $24,292.00 ;100,000.00 $ $100000.00 $100.0m. - 1001000.00 $100 000.00.. 100 000.00 $100,000.00 $100. $100000.00 $100.000.001 $100,M0.00 $97.6 $37,107.00 $0.00 $130.00 $49,40b. $0.00 $140.00 3,2110.00 $0.00 200.00 76,000GJ 0.00 $140.40 $53,200.00, $0.00 $37.. 14269.00 $0.00 $3,787.00 $3,787.00 $4,800.00 $4,800.00 $4,000.00 $4,000.00 $4,500.00 $4,500.001 $1,800.00 $1,800.00 $2,850.00 $2,M.00 $1,532.40 $3,064.80 $3,800.00 $7600.00 $1,400.00 $2800.00 $1300.00 $2,600.00 1800.00 $3600.00 $8,720.00 $8,74.00 $7,037.12 $7,037.12 $7,250.00 $7,250.00 $7,600.00 $7 $Q 000.00 $9,000.00 $5,700,00 $5,700.00 $5,430.00 $5 $33,120.00 $33,120.00 $30,550.00 $30,550. 26 900.00 $26,90G.00, $31,489.00 $31,489.00 $45,400.00 $43,232.00 $1,736.80 ;45,937.65 $1,736.80 $45 $4,700.00 $26,300.00 $4,700.00. $26,300.00 $13,655.00 - $42,594.00 $13.055.00 $42,504.00 400.00 $20,006.00 $2,400.00 $20,000.00 $1,200.00, $64,200.00 $4,600.00 $67,990.00 637,839.73 $37,839.731 $29,000.00 $29,000.00 $39652.00 $39652.00 $18,000.00 $18,00o.00l $31,320.00 $45235.00 $4.00 $14,800.00 $2.75 $10,175.00 $3.10 $11,470,,-0-0 $310,983.70 $296,575.2g $335.355.00 $9.00 $33,300.00 $7.80 $349,349. $28,860.00 1 $389,152.00 $1.8,57Q. $3",185.00 $6,348.15 $6,348.15 $1,800.00 $1,800.00 $7,500.00 $7,500. $9,OW. 00 $9,000.00 $10,440.00 $9,185. 00 9,788.8(3 $7,082.80 $9,788.80 $7,082.80 $13,500.00 $15,750.00 $3,860.00 $4,900.00 $3, 800.00 $4,Q. $9.277.00 $3,000.0 $9,277.00 $3,000.00 $2,400.00 $5,280.00 29 080.00 f8 942. .30 682.00 $30,682.00 r$355 $30,550.00 $10,700.00 $10,700.00 $16 000.00 $16,000.00 $41,400.00 $21,566.00 $34.07 $10,221.00 $12,900.00 $53.00 $15,900.00 $70.00 $21,000.00 $96.00 $28,800.00 $55.68 $16 704.00 15,790.61 $15,790.61 $16,800.00 $16,800.00 $8,060.00 $8, 060.0G $5 $5,600.00 $12,570.00 $5,540.00 $2,309.94 $2,309.94 $5,100.00 $5,100.00 $3 $3 $5,200.00 $5,200.00 $6,000.00 $4,552.0 $8,250.00 $8,250.00 $15,250.001 $15,250.00 $18,397.00 $18 3 7. $8 000.00 $8,000.00 $15,600.00 $ 0,062.00 $90,473.30 $401457.00 Same I $111,650.00 $408,225.00 Same $72 917.00 $406 272. Same $77 $426,426.001 Same $122,490.00 $511,642.00 $513,162.00 $135.631.00 $�a34 816.00 $534,820.00 1275 Meadow Creat Drive • Bouth Lake Tahoe • CA 9$150 Thane 530 544 -6474 + Fm 5W 541 -0614 BOARD AGENDA ITEM 6c TO: Board of Directors FROM: Lynn Nolan, Grants Coordinator Donielle Morse, Grant Program Assistant MEETING DATE: April 15, 2010 ITEM — PROJECT NAME: Resolution for Bureau of Reclamation water grant REQUESTED BOARD ACTION: Adopt Resolution No. 2879 -10 approving grant funding for water meter installation DISCUSSION: STPUD staff is requesting approval to submit a water grant to the Bureau of Reclamation WaterSMART grant program for the installation of commercial and residential meters. Costs for this project are approximately $1,000,000 grant funding and an additional $1,000,000 match requirement. This funding would allow STPUD to install approximately 1,200 new meters, 140 of which would be commercial meters. SCHEDULE: Final application will be submitted by May 3, 2010. COSTS: Match costs are associated with this item. ACCOUNT NO: NA BUDGETED AMOUNT REMAINING: NA ATTACHMENTS: Resolution No. 2879 -10 CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES A Il J NO CHIEF FINANCIAL OFFICER: YES NO -29- General Manager Richard H. 541brie Directors 5outh J o Chris ir/'i Jamce R. Jpnes Jorice I 1 111 �I,r/J Pu b I i c Uti (i t'-- 1)" tr i ct er Mary Lou MPale Kl Dale Rise Eric Schafer 1275 Meadow Creat Drive • Bouth Lake Tahoe • CA 9$150 Thane 530 544 -6474 + Fm 5W 541 -0614 BOARD AGENDA ITEM 6c TO: Board of Directors FROM: Lynn Nolan, Grants Coordinator Donielle Morse, Grant Program Assistant MEETING DATE: April 15, 2010 ITEM — PROJECT NAME: Resolution for Bureau of Reclamation water grant REQUESTED BOARD ACTION: Adopt Resolution No. 2879 -10 approving grant funding for water meter installation DISCUSSION: STPUD staff is requesting approval to submit a water grant to the Bureau of Reclamation WaterSMART grant program for the installation of commercial and residential meters. Costs for this project are approximately $1,000,000 grant funding and an additional $1,000,000 match requirement. This funding would allow STPUD to install approximately 1,200 new meters, 140 of which would be commercial meters. SCHEDULE: Final application will be submitted by May 3, 2010. COSTS: Match costs are associated with this item. ACCOUNT NO: NA BUDGETED AMOUNT REMAINING: NA ATTACHMENTS: Resolution No. 2879 -10 CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES A Il J NO CHIEF FINANCIAL OFFICER: YES NO -29- 1 RESOLUTION NO. 2879 -10 2 BUREAU OF RECLAMATION WaterSMART: 3 WATER AND ENERGY EFFICIENCY GRANT 2010 0 5 BE IT RESOLVED by the South Tahoe Public Utility District ( STPUD) Board of 6 Directors that the General Manager, Assistant General Manager and /or the Chief 7 Financial Officer i s hereby authorized and directed to sign and file, for and on behalf of 8 the STPUD a Financial Assistance Application for a financing agreement from the 9 Bureau of Reclamation for the planning, design, and construction of the following 10 11 project: 11 1. Implementation of commercial and residential water meters 12 and 13 14 BE IT FURTHER RESOLVED that the STPUD hereby agrees and further does 15 authorize the aforementioned representative or his /her designee to certify that the 16 Agency has and will comply with all applicable state and federal statutory and regulatory 17 requirements related to any financing or financial assistance received from the Bureau 18 of Reclamation; and 19 20 11 BE IT FURTHER RESOLVED that the STPUD Board of Directors supports the 21 submission of an application under the Bureau of Reclamation WaterSMART Grant 22 Program and certifies that STPUD is capable of the providing the amount of funding and in -kind contributions specified in the funding application; and 23 24 BE IT FURTHER RESOLVED that STPUD will work with Reclamation to meet 25 established deadlines for entering into a cooperative agreement 26 27 28 /// 29 30 -31- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 NOW, THEREFORE, THE AGENCY DOES HEREBY RESOLVE, ORDER AND DETERMINE AS FOLLOWS: WE, THE UNDERSIGNED, do hereby certify that the above and foregoing Resolution was duly adopted and passed by the Board of Directors of the South Tahoe Public Utility District at a regularly scheduled meeting held on the 15th day of April, 2010, by the following vote: AYES: NOES: ABSENT: Dale Rise, Board President South Tahoe Public Utility District ATTEST: Kathy Sharp, Clerk of the Board -32- t275 Meadow Crest Orive • South Lake Tshoe # CA 96150 Phone 550 544 -6474 • Fax 530 541 -CO4 BOARD AGENDA ITEM 6d TO: Board of Directors FROM: Paul A. Sciuto, Assistant General Manager /Engineer MEETING DATE: April 15, 2010 ITEM — PROJECT NAME: 2010 Inspection and Materials Testing Services REQUESTED BOARD ACTION: Approve proposal from selected consultant. DISCUSSION: Due to the increased number of construction projects for the 2010 construction season, there is a need for up to three additional construction inspectors. Staff distributed a Request for Proposal (RFP) to six engineering consulting firms for inspection and laboratory materials testing services. The inspection services will supplement District staff efforts for the inspection of the 11 construction projects anticipated this year. The material testing will consist of testing concrete cylinder, asphalt content and gradation, and compaction curves. The District does not have the capabilities of performing these tests. The District will be receiving proposals on Monday, April 12, 2010, from engineering consulting firms. Staff will review the proposals and give a recommendation to the Board prior to, and at the Board meeting. SCHEDULE: COSTS: ACCOUNT NO: Various BUDGETED AMOUNT REMAINING: Costs will be absorbed into project budgets. ATTACHMENTS: Request for Proposal. Staff recommendation to be distributed prior to, and at the Board meeting. CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer & Water GENERAL MANAGER: YES_,&NJ NO CHIEF FINANCIAL OFFICER: YES NO -33- General Manager Richard H. 5olbrig Director 5outh' h Chrris CPfalu lu James R. JpneS FuHIG Utility Di e r i c ` Mary Lou Vale her pioc Eric 5chafer t275 Meadow Crest Orive • South Lake Tshoe # CA 96150 Phone 550 544 -6474 • Fax 530 541 -CO4 BOARD AGENDA ITEM 6d TO: Board of Directors FROM: Paul A. Sciuto, Assistant General Manager /Engineer MEETING DATE: April 15, 2010 ITEM — PROJECT NAME: 2010 Inspection and Materials Testing Services REQUESTED BOARD ACTION: Approve proposal from selected consultant. DISCUSSION: Due to the increased number of construction projects for the 2010 construction season, there is a need for up to three additional construction inspectors. Staff distributed a Request for Proposal (RFP) to six engineering consulting firms for inspection and laboratory materials testing services. The inspection services will supplement District staff efforts for the inspection of the 11 construction projects anticipated this year. The material testing will consist of testing concrete cylinder, asphalt content and gradation, and compaction curves. The District does not have the capabilities of performing these tests. The District will be receiving proposals on Monday, April 12, 2010, from engineering consulting firms. Staff will review the proposals and give a recommendation to the Board prior to, and at the Board meeting. SCHEDULE: COSTS: ACCOUNT NO: Various BUDGETED AMOUNT REMAINING: Costs will be absorbed into project budgets. ATTACHMENTS: Request for Proposal. Staff recommendation to be distributed prior to, and at the Board meeting. CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer & Water GENERAL MANAGER: YES_,&NJ NO CHIEF FINANCIAL OFFICER: YES NO -33- south Tahoe MGio'ciger T>LC L ttLUti A'str'Lct L '� RLLkprd SolbrLcq, c,ev�eraL nOarnl ment6ers Chris cefaLu Jcm RJOVLes MarU Lou Mosbacher Dale Rise Eric Scha fer Mew-o v O i x wt, Date: April 15, 2010 To: Board From: Jim Hoggatt Re: Request approval for 201 Construction Testing and Inspection Staff requested and received 5 Request for Proposals (RFP) to provide three full time inspectors including material testing for the 2010 Construction Season. The five firms that responded to the RFP were Construction Materials Engineers, Inc. (CME), Lumos & Associates, Geocon, AMEC and Kleinfelder. Staff evaluated the RFP's based on 1) inspection team experience, 2) whether or not they met the Caltrans certified lab requirements, and 3) experience within the basin. Staff is recommending the Board approve CME's proposal for providing the 2010 Construction Inspection and Testing not to exceed $405,000.00. South Tahoe Public Utility District ■ 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Phone 530.544.6474 ■ Facsimile 530.541.0614 ■ www.stpud.us REQUEST FOR PROPOSALS ENGINEERING SERVICES FOR SOUTH TAHOE PUBLIC UTILITY DISTRICT Inspection and Materials Testing Services 1 Introduction The South Tahoe Public Utilities District (District) is seeking proposals from qualified civil engineering consulting firms to provide inspection and materials testing on various projects during the 2010 construction season. The selected Consultant will: • Review and become familiar with construction contract documents. • Provide on -site inspection, nuclear density testing of materials, quality assurance, and quality control of construction projects. • Provide specialty inspection when requested by the District. • Track and document changes to the project and submit a "red -line" markup of the contract documents to the District. • Conduct sampling and testing of concrete, asphalt concrete, and other materials as directed by the District. • Utilize a California Department of Transportation certified testing laboratory. • Document daily inspection reports using a digital voice recorder. 2 Background, The South Tahoe Public Utility District is a special district formed in September 1950, and provides water and wastewater collection, treatment, and recycling for the community of South Lake Tahoe. The District has over 17,000 sewer connections and over 14,000 residential water connections. The District has an aggressive Capital Improvement Program for 2010 and needs resource augmentation for construction inspection and materials testing. 3 Scope of Work and Deliverables The Consultant awarded this contract will have the following general responsibilities: • Review and become familiar with construction contract documents. • Provide on -site inspection, nuclear density testing of materials, quality assurance, and quality control of construction projects. • Provide specialty inspection when requested by the District. • Track and document changes to the project and submit a "red -line" markup of the contract documents to the District. • Conduct sampling and testing of concrete, asphalt concrete, and other materials as directed by the District. • Utilize a California Department of Transportation certified testing laboratory. • Document daily inspection reports using a digital voice recorder. -35- At this point the District anticipates needing construction inspectors for the following projects: Headworks Replacement Project: Phase I Demolition: This project includes the demolition of the existing Incinerator Building, which is a concrete, masonry, and steel -frame structure with aluminum cladding, with three above - ground levels and one below - ground level, including dismantling, removal and proper disposal of all hazardous materials, mechanical equipment in the building. Work also includes demolition of the existing buried lime mud thickener and abandonment and capping of existing process piping, utilities and conduit within work area. After demolition, the area will be backfilled and compacted with structural fill in. Associated work will also include site work, grading, and paving in support of these demolition activities. Luther Pass Pump Station Standby Power Generator Facility: This project includes installation and maintenance of erosion control measures and other required BMPs; excavation and over excavation including slope stabilization, dewatering, handling, stockpiling and disposal of excess material; installation and maintenance of shoring and soil stabilization for worker safety; removal and relocation of an existing trailer- mounted 1,200 kW generator system for temporary service, construct temporary electrical and fuel connections, construct temporary pad, guard posts and spill containment; demolish and dispose of existing trailer and all facilities contained therein at end of standby power temporary service; demolish and remove abandoned septic tank and leach field lines; demolish and reconstruct underground sanitary sewer, industrial waste line and telephone utilities, and demolish and shutoff gas per utility company requirements; demolish and reconstruct site fencing; construct new 5,074 square foot (s.f.) ac pavement, concrete block retaining wall and footing, gravel -fill trenches, 1,136 s.f. CMU generator building and housekeeping pads, and a 196 s.f. roof structure connecting the new generator building to the existing pump station; furnish and install a 2,500 kW generator skid - mounted system and concrete pad, exhaust silencer and piping, 500 - gallon day tank and control panel; refurbish existing 6,000 -gallon aboveground fuel tank and fill station, reconstruct concrete pad and furnish and install new fuel supply lines; furnish and install HVAC equipment, sound attenuation system, all new electrical facilities, modifications and a clean chemical fire suppression system. 2010 Water Meter Installation Project Phase I: This project includes the provision and installation of approximately 1,261 residential water meter installations including meters, meter pits, meter boxes, and related work. Inspection will include compaction testing of backfill. 4 District Project Team Mr. Jim Hoggatt will be the District's principal point of contact for the selected consultant. The Project Manager will have overall responsibility and accountability for the projects. However, each project has its own Project Manager. The District's Project Team will also include: Mr. Paul Sciuto, Asst. General Manager; Ms. Heidi Baugh, Contracts -36- Administrator; Ms. Julie Ryan, Senior Engineer; Mr. No Bergsohn, Hydrogeologist; and Mr. John Thiel, Principal Engineer. 5 Consulting Contract The Project will be performed by the Consultant under the District's Master Agreement for Consulting Services, with an accompanying Task Order for the inspection services and materials testing. To expedite the contracting process, the District asks that the Consultant review the Master Services Agreement and indicate in the Proposal any exceptions they have to the terms of the agreement. A sample agreement is included as Appendix A. 6 Technic Proposal To be considered for Engineering Services., a Technical Proposal and Cost Proposal are required. The Technical Proposal shall be a maximum of six (6) pages, plus resumes for the proposed people. A typical Technical Proposal should follow the format provided below. • Transmittal Letter (no more than 2 pages): Include any information you believe should be highlighted from your proposal or any key considerations for the selection committee to consider that are not covered in the proposal requirements. Consultant will also include in the transmittal, any exceptions taken to the District's Master Services Agreement. • Firm Experience (no more than 1 page): Provide a general overview of your firm and the firm's experience providing engineering inspection and materials testing, giving consideration to projects in areas with climate similar to Tahoe's. List at least three relevant engineering design projects completed by your team members over the past five years. • Project Team (no more than 2 pages): Describe your project team, including title, office location and contact information. Include the names of the individuals proposed for each of the three aforementioned projects will actually be on site for the duration of the project and responsible for conducting the project's technical activities. • Provide a table (1 page) showing estimates of labor costs including but not limited to: • Personnel and hourly rates for each member of the project team; • Travel Rates if different from the hourly rates stated above • Materials Testing rates for all anticipated testing • Other anticipated Direct Costs • Appendix materials may be provided, but is not required other than specifically identified, in addition to the six -page proposal limit. Resumes for the proposed personel are required. 7 Schedule -37- The schedule for the proposal solicitation, project is as follows: • RFP Solicitation • Submittal Review • Notify Successful Firm • Present to Board for Approval review and consultant selection portion of this 04/02/10 to 04/12/10 04/12/10 to 04/14/10 04/14/10 04/15/10 It is anticipated that all three projects will begin on or before May 3, 2010 and continue through the end of October 2010. The exact project duration will change depending on the progress of each contractor. 8 Evaluation Criteria District staff will make a recommendation to the District Board of Directors to select a Consultant to perform Construction Inspection and' Materials Testing at the April 15th, 2010 regular meeting. Staff recommendation will be based on review of the Technical Proposal, relevant project team experience, and costs. Further consideration will be given to example experience and references. 9 Submittals Interested parties shall submit seven (7) copies of their Technical Proposal to the District by no later than 5:00 p.m., Monday, April 12, 2010. The Technical Proposat shall be presented in a sealed Submittal Envelope labeled "2010 Construction Inspection and Materials Testing Proposal" and addressed as follows: South Tahoe Public Utility District Attention: Paul A. Sciuto 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 (530) 543 -6206. Technical Proposals shall not exceed six (6) pages in length (plus appendix material) using minimum 11 -point font. Resumes shall be included in the appendix and will not be counted toward the 6 -page limit. -38- APPENDIX A SAMPLE MASTER SERVICES AGREEMENT -39- PAYMENT OF CLAIMS FOR APPROVAL April 15, 2010 Payroll 4/6/10 Total Payroll ADP Bank of America BNY Mellon Trust Company Brownstein /Hyatt/Farber /Schreck legal services CDS- health care payments Union Bank Total Vendor EFT Accounts Payable Checks -Sewer Fund Accounts Payable Checks -Water Fund Accounts Payable Checks - Self - funded Insurance Accounts Payable Checks - Grants Fund Total Accounts Payable Grand Total Payroll EFTs & Checks 4/6/10 EFT AFLAC Medical & Dependent Care 1,659.72 EFT CA Employment Taxes & W/H 19,324.00 EFT Federal Employment Taxes & W/H 90,498.92 EFT CalPERS Contributions 73,366.37 EFT Great West Deferred Comp 18,735.11 EFT Stationary Engineers Union Dues 2,414.47 EFT United Way Contributions 192.00 EFT Employee Direct Deposits 210,804.49 CHK Employee Garnishments 1,389.22 CHK Employee Paychecks 8,425.41 Total 426,809.71 426,809.71 426,809.71 2,210.81 0.00 0.00 0.00 30,331.70 0.00 32,542.51 149,615.86 356,867.03 0.00 0.00 506,482.89 965, 835.1 1 -41- Vendor Name 3T EQUIPMENT CO Department / Proj Name Ihntaiptign Acct# I Proj Code Amo nt Check Num Tvoe UNDERGROUND REP SMART COVERS 1001 - 8001 8,312.55 Check Total: 8.312.55 AP- 00075630 MW A -1 CHEMICAL INC GEN & ADMIN OFFICE INVENTORY 1000 - 0428 803.42 Check Total: 803.42 AP- 00075631 MW AFLAC GEN & ADMIN SUPP INS WM 1000 - 2532 824.92 Check Total: 824.92 AP- 00075632 MW ALPEN SIERRA COFFEE GEN & ADMIN OFC SUPPLY ISSUE 1000 - 6081 297.50 Check Total: 297.50 AP -00075633 MW ALSBURY, MARY INFORMATION SYS TRAVEL/MEETINGS 1037 - 6200 173.25 ALSBURY, MARY INFORMATION SYS TRAVEL/MEETINGS 2037 - 6200 173.25 Check Total: 346.50 AP- 00075634 MW AMERIPRIDE UNIFORM SERVICES GEN & ADMIN UNIFORM PAYABLE 1000 - 2518 940.66 Check Total: 940.66 AP- 00075635 MW ARCE, DANIEL LABORATORY TRAVEL/MEETINGS 1007 - 6200 141.50 ARCE, DANIEL LABORATORY TRAVEL/MEETINGS 2007 - 6200 141.50 Check Total: 283.00 AP- 00075636 MW ARETE SYSTEMS ENGINEERING - GIS SFTWR DEV GIS DEVELOPMENT 2029 - 8062 - GISSFT 1,233.75 ARETE SYSTEMS INFORMATION SYS - GIS SFTWR DEV GIS SURVEYING 2037 - 8446 - GISSFT 4,777.50 Check Total: 6.011.25 AP- 00075637 MW AT &T GEN & ADMIN TELEPHONE 1000 - 6310 294.50 AT &T GEN & ADMIN TELEPHONE 2000 - 6310 294.50 Check Total: 589.00 AP- 00075639 MW AT &T /CALNET 2 GEN & ADMIN TELEPHONE 1000 - 6310 470.57 AT &T /CALNET 2 GEN & ADMIN SIGNAL CHARGES 1000 - 6320 32.10 AT &T /CALNET 2 PUMPS TELEPHONE 1002 - 6310 166.40 AT &T/CALNET 2 GEN & ADMIN TELEPHONE 2000 - 6310 470.57 AT &TICALNET 2 PUMPS TELEPHONE 2002 - 6310 119.13 Check Total: 1 AP -00075638 MW AW DIRECT EQUIPMENT REP SHOP SUPPUES 1005 - 6071 208.74 AW DIRECT EQUIPMENT REPAIR SHOP SUPPUES 2005 - 6071 263.11 User: THERESA PAYMENT OF CLAIMS Check Total: Page: 1 Current Date: 04/08/2010 Report: OH_PMT_CLAIMS_BK Current Time: 08:53:53 471.85 AP- 00075640 MW Vendor Name BENTLY AGROWDYNAMICS BI STATE PROPANE BLEDSOE, TIM BLEDSOE, TIM BLOM, JEFF BREWSTER, STEVE BUCKMAN, AARON BUTZ, GARTH CALIF BOARD OF EQUALIZATION CAUF BOARD OF EQUALIZATION CAUF BOARD OF EQUALIZATION CAUF BOARD OF EQUAUZATION CALIF BOARD OF EQUALIZATION CAUF BOARD OF EQUAUZATION CALIF BOARD OF EQUAUZATION CAUF BOARD OF EQUAUZATION CAUF BOARD OF EQUALIZATION CAUF BOARD OF EQUALIZATION CALIF BOARD OF EQUALIZATION CAUF BOARD OF EQUALIZATION CAUF BOARD OF EQUALIZATION CAUF BOARD OF EQUALIZATION CAUF BOARD OF EQUALIZATION CAUF BOARD OF EQUALIZATION CALIF BOARD OF EQUALIZATION User: THERESA Report: OH_PMT_CLAIMS BK Department / Proj Name OPERATIONS UNDERGROUND REP CUSTOMER SERVICE CUSTOMER SERVICE CUSTOMER SERVICE - WTR CONS PROG CUSTOMER SERVICE - WTR CONS PROG OPERATIONS UNDERGROUND REP GEN & ADMIN GEN & ADMIN UNDERGROUND REP ELECTRICAL SHOP ELECTRICAL SHOP EQUIPMENT REP OPERATIONS - SCADA IMPRVMTS LABORATORY LABORATORY ADMINISTRATION FINANCE PUMPS PUMPS ELECTRICAL SHOP ELECTRICAL SHOP HEAVY MAINTENANC LABORATORY PAYMENT OF CLAIMS Description SLUDGE DISPOSAL SMALL TOOLS TRAVEL/MEETINGS TRAVEL/MEETINGS WTR CONS EXPENSE WTR CONS EXPENSE TRAVEL/MEETINGS TRAVEL/MEETINGS SHOP SUPPLY INV OFC SUPPLY ISSUE PIPE/CVRS/MHLS LUTHER PASS PUMP STATIONS GENERATORS PLNTSCADA SYSTEM LAB SUPPLIES LABORATORY EQUIP OFFICE SUPPLIES OFFICE SUPPLIES WELLS PUMP,MTN VW WELL RPR/MNTC WTR TKS SHOP SUPPLIES BUILDINGS LAB SUPPUES Page: 2 Acct# / Proj Code 1006 - 6652 2001-6073 1038-6200 2038-6200 2038 - 6660 - WCPROG Check Total: 1006 - 6200 2001 - 6200 1000 - 0421 1000 -6081 1001 - 6052 1003 - 6048 1003 - 6051 1005 -6013 1006 - 8328 - SCADAM 1007 - 4760 1007 - 6025 1021 - 4820 1039 - 4820 2002 -6050 2002 - 7589 2003 - 6054 2003 - 6071 2004 - 6041 2007 - 4760 Check Total: Check Total: Check Total: 2038 - 6660 - WCPROG Check Total: Check Total: Check Total: Current Date: 04 /08/2010 Current Time: 08:53:53 Amount Check Num Tyne 2,521.68 2.521.68 AP- 00075641 MW 20.12 20.12 AP-00075642 MW 50.50 50.50 101.00 AP- 00075643 MW 200.00 200.00 AP- 00075644 MW 200.00 200.00 AP- 00075645 MW 219.00 219.00 AP-00075646 MW 100.50 100.50 AP -00075647 MW 12.24 28.70 161.35 61.65 207.38 15.66 50.66 159.37 46.52 0.17 0.17 8.75 637.00 126.88 29.20 32.32 159.33 PAYMENT OF CLAIMS Vendor Name Department / Proj Name Description Acct# / Proj Cede Amount Check Num ] pg CAUF BOARD OF EQUAUZATION ADMINISTRATION OFFICE SUPPLIES 2021 - 4820 0.17 CAUF BOARD OF EQUAUZATION FINANCE OFFICE SUPPUES 2039 -4820 0.17 Check Total: 1 AP-00075649 MW CALIF BOARD OF EQUAUZATION FINANCE SUPPLIES 1039 - 6520 49.64 CAUF BOARD OF EQUALIZATION FINANCE SUPPLIES 2039 - 6520 49.64 Check Total: 99.28 AP-00075650 MW CAUFORNIA URBAN WATER CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 2,959.14 Check Total: 2 .959.14 AP- 00075651 MW CALPELRA HUMAN RESOURCES DUES/MEMB /CERT 1022 - 6250 175.00 CALPELRA HUMAN RESOURCES DUES/MEMB/CERT 2022 - 6250 175.00 Check Total: 350.00 AP-00075652 MW CAPITAL FORD EQUIPMENT REP AUTOMOTIVE 1005 - 6011 888.75 Check Total: 888.75 AP- 00075653 MW CDW - G CORP INFORMATION SYS OFFICE SUPPUES 1037 - 4820 60.86 CDW - G CORP INFORMATION SYS SERVICE CONTRACT 1037 - 6030 3,725.00 CDW - G CORP INFORMATION SYS OFFICE SUPPUES 2037 - 4820 60.83 CDW - G CORP INFORMATION SYS SERVICE CONTRACT 2037 - 6030 3,725.00 Check Total: 7.571.69 AP- 00075654 MW CENTRAL VALLEY COMP CARE DIAMOND VLY RNCH SAFETY/EQUIP!PHY 1028 - 6075 60.00 Check Total: 60.00 AP- 00075655 MW CFM ELECTRICAL SHOP SECONDARY EQUIP 1003 - 6022 1,307.10 Check Total: 1.307.10 AP- 00075656 MW CHERNAGO, BRIAN LABORATORY TRAVEL/MEETINGS 1007 - 6200 141.50 CHERNAGO, BRIAN LABORATORY TRAVELIMEETINGS 2007 - 6200 141.50 Check Total: 283.00 AP- 00075657 MW CHEW, WARREN GEN & ADMIN UB SUSPENSE 1000 - 2002 12,783.84 CHEW, WARREN GEN & ADMIN UB SUSPENSE 2000 - 2002 2,923.32 CHEW, WARREN GEN & ADMIN METER SALE 2000 - 3545 286.00 Check Total: 15.993.16 AP- 00075658 MW CITY OF SOUTH LAKE TAHOE UNDERGROUND REP OPERATING PERMIT 2001 - 6650 300.00 Check Total: 300.00 AP- 00075659 MW User: THERESA Report: OH_PMT_CLAIMS_BK Page: 3 Current Date: 04/08 /2010 Current Time: 08:53:53 PAYMENT OF CLAIMS Vendor Name Department / Proi Name Description Acct# / Proi Code COCKING, DENNIS DIO TRAVELIMEETINGS 1027 - 6200 Amount Check Num TIM 96.50 COCKING, DENNIS DIO TRAVELIMEETINGS 2027 - 6200 96.50 Check Total: 193.00 AP- 00075660 MW COLE - PARMER INSTRUMENT CO LABORATORY LAB SUPPLIES 1007 - 4760 26.62 COLE - PARMER INSTRUMENT CO LABORATORY LABORATORY EQUIP 2007 - 6025 17.94 Check Total: 44.56 AP- 00075661 MW CREEK ENVIRONMENTAL LABS LABORATORY - ALP CO MTBE CONT MONITORING 1007 - 6110 - ACMTBE 320.00 CREEK ENVIRONMENTAL LABS LABORATORY MONITORING 1007 - 6110 80.00 Check Total: 400.00 AP- 00075662 MW CRENSHAW, PAULA HUMAN RESOURCES CONTRACT SERVICE 1022 - 4405 75.00 CRENSHAW, PAULA HUMAN RESOURCES CONTRACT SERVICE 2022 - 4405 75.00 Check Total: 150.00 AP-00075663 MW CURTIS, RANDY ENGINEERING TRAVEL/MEETINGS 1029 - 6200 100.35 CURTIS, RANDY ENGINEERING TRAVELIMEETINGS 2029 - 6200 100.35 CURTIS, RANDY ENGINEERING DUESIMEMB/CERT 2029 - 6250 60.00 I .4. ln Check Total: 260.70 AP- 00075664 MW I DICK'S FULLER - PUMPS WELLS 2002 - 6050 74.40 Check Total: 74.40 AP- 00075665 MW DIONEX CORP LABORATORY LABORATORY EQUIP 1007 - 6025 1,082.11 DIONEX CORP LABORATORY LABORATORY EQUIP 2007 - 6025 1,033.12 Check Total: 2.115.23 AP- 00075666 MW EIDAM, EILEEN ADMINISTRATION TRAVEL/MEETINGS 1021 - 6200 133.50 Check Total: 133.50 AP -00075667 MW EL DORADO COUNTY PUMPS OPERATING PERMIT 2002 - 6650 250.00 Check Total: 250.00 AP- 00075668 MW EL DORADO COUNTY ENGINEERING - LAKE TAHOE BLVD WTLN 12" LTB 2029 - 8067 - LTBWLR 50.00 Check Total: 50.00 AP- 00075669 MW EL DORADO COUNTY ENGINEERING - CALTRANS EROSION EC PROJECTS 2029 - 8064 - ECCALT 50.00 Check Total: 50.00 AP -00075670 MW EL DORADO ROOFING INC PUMPS Roof,Bijou Gen 1002 - 7592 3,288.00 Check Total: 3.288.00 AP- 00075671 MW User: THERESA Report: OH_PMT_CLAIMS BK Page: 4 Current Date: 04/08/2010 Current Time: 08:53:53 User: THERESA Report: OH_PMT_CLAIMS_BK PAYMENT OF CLAIMS Vendor Name Department / Proi Name Description Acct# / Proj Code Amount Check Num Tyoe ENVIRONMENTAL EXPRESS LABORATORY LAB SUPPUES 1007 - 4760 647.50 ENVIRONMENTAL EXPRESS LABORATORY LAB SUPPUES 2007 - 4760 723.71 Check Total: 1.371.21 AP- 00075672 MW ENVIRONMENTAL RESOURCES ASSO LABORATORY LAB SUPPUES 1007 - 4760 1,299.58 ENVIRONMENTAL RESOURCES ASSO LABORATORY LAB SUPPUES 2007 - 4760 877.63 Check Total: 2.177.21 AP- 00075673 MW EQUIPCO LABORATORY LABORATORY EQUIP 1007 - 6025 304.94 EQUIPCO LABORATORY LABORATORY EQUIP 2007 - 6025 298.74 Check Total: 603.68 AP- 00075674 MW FAST FABRICATORS LLC PUMPS PUMP STATIONS 1002 - 6051 205.68 FAST FABRICATORS LLC PUMPS WELLS 2002 - 6050 527.44 Check Total: 733.12 AP- 00075675 MW FEDEX ENGINEERING POSTAGE EXPENSES 1029 - 4810 29.89 FEDEX ENGINEERING POSTAGE EXPENSES 2029 - 4810 29.88 Check Total: 59.77 AP- 00075676 MW FERGUSON ENTERPRISES INC. HEAVY MAINT BUILDINGS 1004 - 6041 431.60 FERGUSON ENTERPRISES INC. HEAVY MAINT SHOP SUPPUES 1004 - 6071 65.09 FERGUSON ENTERPRISES INC. PUMPS WELLS 2002 - 6050 3.72 Check Total: 500 41 AP- 00075677 MW FISHER SCIENTIFIC LABORATORY LAB SUPPLIES 1007 - 4760 FISHER SCIENTIFIC LABORATORY LAB SUPPUES 2007 - 4760 GFOA FINANCE SUBSCRIPTIONS 1039 - 4830 Check Total: Page: 5 Current Date: 04/08 /2010 Current Time: 08:53:53 437.06 574.21 1.011.27 AP -00075678 MW 27.50 GFOA FINANCE SUBSCRIPTIONS 2039 - 4830 27.50 Check Total: 55.00 AP- 00075679 MW GLOBAL DATA SPECIAUSTS ELECTRICAL SHOP SCADA UPGR FIU 1003 - 8007 6,043.00 Check Total: 6.043.00 AP- 00075680 MW GRAINGER GEN & ADMIN JANIT /SUPPLY INV 1000 - 0422 336.68 GRAINGER HEAVY MAINT BUILDINGS 1004 - 6041 54.04 GRAINGER HEAVY MAINT IN -PLANT AIR CMP 1004 - 8093 5,969.73 GRAINGER EQUIPMENT REPAIR GENERATORS 2005 - 6013 31.67 Vendor Name GREAT IDEAS FOR TAHOE GROVE MADSEN INDUSTRIES INC HARDY DIAGNOSTICS HARDY DIAGNOSTICS HARTFORD, THE HASLER FINANCIAL SERVICES LLC HASLER FINANCIAL SERVICES LLC HAUGE BRUECK ASSOCIATES LLC 1 v HELPING HANDS OUTREACH HENDERSON, DEBBIE HENDERSON, DEBBIE HEWITT INDUSTRIES OF LOS ANGELES HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS User: THERESA Report: OH_PMT_CLAIMS BK Department / Proj Name DIO - PR EXP -EXTERNAL ELECTRICAL SHOP LABORATORY LABORATORY GEN & ADMIN CUSTOMER SERVICE CUSTOMER SERVICE ENGINEERING - REPL GEN, LPPS GEN & ADMIN FINANCE - PAYROLL SYS /ADP FINANCE - PAYROLL SYS/ADP EQUIPMENT REP OPERATIONS LABORATORY ADMINISTRATION HUMAN RESOURCES ENGINEERING CUSTOMER SERVICE LABORATORY ADMINISTRATION HUMAN RESOURCES PAYMENT OF CLAIMS Description PUB RELATIONS PUMP STATIONS LAB SUPPLIES LAB SUPPLIES LTD, UNION EQUIP RENT/LEASE EQUIP RENT/LEASE REPL GEN LPPS H2O PY DED TRAVEL/MEETINGS TRAVEL/MEETINGS GENERATORS SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT Page: 6 Acct# / Proj Code Amount Check Num Dm Check Total: 6 AP- 00075681 MW 2027 - 6620 - PREEXT 1,000.00 Check Total: 1.000.00 AP- 00075682 MW 1003 - 6051 2,450.00 Check Total: 2,450.00 AP- 00075683 MW 1007 - 4760 90.55 2007 - 4760 77.46 Check Total: 168.01 AP- 00075684 MW 1000 - 2539 2,534.73 Check Total: 2,534.73 AP- 00075685 MW 1038 - 5020 123.70 2038 - 5020 123.70 Check Total: 247.40 AP- 00075686 MW 1029 - 8933 - RGLPPS 1,825.00 Check Total: 1,825.00 AP- 00075687 MW 1000 - 2524 105.00 Check Total: 105.00 AP- 00075688 MW 1039 - 6200 - PAYADP 46.00 2039 - 6200 - PAYADP 46.00 Check Total: 92.00 AP- 00075689 MW 1005 - 6013 1,348.41 Check Total: 1 AP-00075690 MW 1006 - 6030 35.00 1007 - 6030 17.50 1021 - 6030 185.58 1022 - 6030 24.46 1029 - 6030 276.12 1038 - 6030 94.07 2007 - 6030 17.49 2021 - 6030 185.58 2022 - 6030 24.45 Current Date: 04 /08/2010 Current Time: 08:53:53 PAYMENT OF CLAIMS Vendor Name Department / Proj Name Description Acct# / Proi Code Amount Check Nun IYRg HIGH SIERRA BUSINESS SYSTEMS ENGINEERING SERVICE CONTRACT 2029 - 6030 276.12 HIGH SIERRA BUSINESS SYSTEMS CUSTOMER SERVICE SERVICE CONTRACT 2038 - 6030 94,07 Check Total: 1. 230.44 AP-00075691 MW HOME DEPOT CREDIT HEAVY MAINT GROUNDS & MNTC 1004 - 6042 427.33 HOME DEPOT CREDIT DIAMOND VLY RNCH GROUNDS & MNTC 1028 - 6042 34.10 Check Total: 461,48 AP- 00075692 MW HUSSMANN, NANCY HUMAN RESOURCES TRAVELIMEETINGS 1022.6200 247.75 HUSSMANN, NANCY HUMAN RESOURCES TRAVELJMEETINGS 2022 - 6200 247.75 Check Total: 495.50 AP- 00075693 MW Incline Village GID GEN & ADMIN - USFS GRNT ADMIN SUSPENSE 2000 - 2504 - SMOKEY 8,833.18 Check Total: 8. 833.18 AP- 00075694 MW INFOSEND INC. CUSTOMER SERVICE SERVICE CONTRACT 1038 - 6030 111.76 INFOSEND INC. CUSTOMER SERVICE SERVICE CONTRACT 2038 - 6030 111.76 Check Total: 223 AP- 00075695 MW INSITE LAND SURVEYS ENGINEERING - IROQUOIS SUPPLY WTLN IROQ 2029 - 8166 - IQWTRL 1,200.00 ' Check Total: CO 1.200.00 AP- 00075696 MW I INTERNATIONAL MAIUNG EQUIP CUSTOMER SERVICE OFFICE SUPPUES 1038 - 4820 23.87 INTERNATIONAL MAIUNG EQUIP CUSTOMER SERVICE OFFICE SUPPUES 2038 - 4820 23.89 Check Total: 47,76 AP- 00075697 MW IPMA -HR HUMAN RESOURCES DUES/MEMBICERT 1022 - 6250 180.00 IPM -HR HUMAN RESOURCES DUES/MEMB/CERT 2022 - 6250 180.00 Check Total: 360.00 AP- 00075698 MW KASPER, DAWN CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00 Check Total: 200.00 AP- 00075699 MW KEN'S TIRE CENTER EQUIPMENT REP AUTOMOTIVE 1005 - 6011 66.89 KEN'S TIRE CENTER EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 66.89 Check Total: 133.78 AP- 00075700 MW KIMBALL MIDWEST EQUIPMENT REP AUTOMOTIVE 1005 - 6011 284.83 Check Total: 284.83 AP- 00075701 MW KINGSBURY GENERAL IMPROVEMENT GEN & ADMIN - USFS GRNT ADMIN SUSPENSE 2000 - 2504 - SMOKEY 1,547.67 Check Total: 1,547,67 AP- 00075702 MW User: THERESA Report: OH_PMT_CLAIMS_BK Page: 7 Current Date: 04 /08/2010 Current Time: 08:53:53 PAYMENT OF CLAIMS Vendor Name Department/ Proj Name Description Acct# / Proj Code Amount Check Num Type KTHO RADIO 010 - PR EXP- EXTERNAL PUB RELATIONS 1027 - 6620 - PREEXT 275.00 KTHO RADIO 010 - PR EXP- EXTERNAL PUB RELATIONS 2027 - 6620 - PREEXT 275.00 Check Total: 550.00 AP- 00075703 MW LADLEY, CARL CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00 Check Total: 200.00 AP- 00075705 MW LAKE TAHOE NEWS DIO - PR EXP -EXTERNAL PUB RELATIONS 1027 - 6620 - PREEXT 1,680.00 LAKE TAHOE NEWS DIO - PR EXP- EXTERNAL PUB RELATIONS 2027 - 6620 - PREEXT 1,680.00 Check Total: 3.360.00 AP- 00075706 MW LAKESIDE NAPA PUMPS PUMP STATIONS 1002 - 6051 4.76 LAKESIDE NAPA PUMPS SHOP SUPPLIES 1002 - 6071 44.17 LAKESIDE NAPA HEAVY MAINT BUILDINGS 1004 - 6041 11.84 LAKESIDE NAPA HEAVY MAINT SHOP SUPPUES 1004 - 6071 38.60 LAKESIDE NAPA EQUIPMENT REP AUTOMOTIVE 1005 - 6011 1,160.22 I . LAKESIDE NAPA EQUIPMENT REP GENERATORS 1005 - 6013 190.01 LAKESIDE NAPA EQUIPMENT REP SHOP SUPPUES 1005 - 6071 100.54 LAKESIDE NAPA DIAMOND VLY RNCH GROUNDS & MNTC 1028 - 6042 59.76 LAKESIDE NAPA PUMPS GROUNDS & MNTC 2002 - 6042 10.85 LAKESIDE NAPA PUMPS WELLS 2002 - 6050 17.38 LAKESIDE NAPA PUMPS SHOP SUPPLIES 2002 - 6071 44.16 LAKESIDE NAPA EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 530.42 LAKESIDE NAPA EQUIPMENT REPAIR GENERATORS 2005 - 6013 166.41 LAKESIDE NAPA EQUIPMENT REPAIR SHOP SUPPLIES 2005 - 6071 100.53 Check Total: 2,479.65 AP- 00075707 MW MC MASTER CARR SUPPLY CO HEAVY MAINT IN -PLANT AIR CMP 1004 - 8093 1,139.54 Check Total: 1,139.54 AP- 00075708 MW MCAFEE INFORMATION SYS CONTRACT SERVICE 1037 - 4405 514.05 MCAFEE INFORMATION SYS CONTRACT SERVICE 2037 - 4405 514.05 Check Total: 1.028.10 AP- 00075709 MW METRO OFFICE SOLUTIONS GEN & ADMIN OFFICE INVENTORY 1000 - 0428 3,602.01 METRO OFFICE SOLUTIONS UNDERGROUND REP OFFICE SUPPUES 1001 - 4820 119.76 User: THERESA Page: 8 Current Date: 04 /08/2010 Current Time: 08:53:53 Report: OH_PMT_CLAIMS_BK Vendor Name METRO OFFICE SOLUTIONS METRO OFFICE SOLUTIONS METRO OFFICE SOLUTIONS METRO OFFICE SOLUTIONS METRO OFFICE SOLUTIONS METRO OFFICE SOLUTIONS METRO OFFICE SOLUTIONS METRO OFFICE SOLUTIONS MID MOUNTAIN COMMUNICATIONS MITTERMAYR, GOTTFRIED MME MUNICIPAL MAINTENANCE C MONDELLO, PHIL MURPHY & ASSOCIATES PC MURPHY & ASSOCIATES PC NELS TAHOE HARDWARE NELS TAHOE HARDWARE NELS TAHOE HARDWARE NELS TAHOE HARDWARE NELS TAHOE HARDWARE NEWSPAPERS IN EDUCATION NEWSPAPERS IN EDUCATION North Tahoe PUD OFFICE DEPOT User: THERESA Report: OH_PMT_CLAIMS_BK Department / Proj Name ADMINISTRATION HUMAN RESOURCES ENGINEERING FINANCE ADMINISTRATION HUMAN RESOURCES ENGINEERING FINANCE UNDERGROUND REP CUSTOMER SERVICE - WTR CONS PROG UNDERGROUND REP CUSTOMER SERVICE - WTR CONS PROG ADMINISTRATION ADMINISTRATION PUMPS PUMPS HEAVY MAINT PUMPS PUMPS DIO - PR EXP- EXTERNAL DIO - PR EXP- EXTERNAL GEN & ADMIN PAYMENT OF CLAIMS Description OFFICE SUPPLIES OFFICE SUPPUES OFFICE SUPPUES OFFICE SUPPUES OFFICE SUPPUES OFFICE SUPPUES OFFICE SUPPUES OFFICE SUPPUES RADIO - RPRS/RPLCM WTR CONS EXPENSE PIPE/CVRS/MHLS WTR CONS EXPENSE LEGAL - REGULAR LEGAL - REGULAR SHOP SUPPUES SMALL TOOLS SHOP SUPPUES SHOP SUPPUES SMALL TOOLS PUB RELATIONS PUB RELATIONS GEN & ADMIN - USFS GRNT ADMIN SUSPENSE OFFICE INVENTORY Page: 9 Acct# / Proj Code 1021 -4820 1022 - 4820 1029 - 4820 1039 - 4820 2021 - 4820 2022 - 4820 2029 - 4820 2039 - 4820 2001 - 6056 Check Total: Check Total: 2038 - 6660 - WCPROG Check Total: 1001 -6052 Check Total: 2038 - 6660 - WCPROG Check Total: 1021 - 4480 2021 -4480 1002 - 6071 1002 - 6073 1004 - 6071 2002 - 6071 2002 - 6073 2000 - 2504 - SMOKEY 1000 - 0428 Check Total: Check Total: 1027 - 6620 - PREEXT 2027 - 6620 - PREEXT Check Total: Check Total: Current Date: 04 /08/2010 Current Time: 08:53:53 Amount Check Num bat 48.91 260.24 145.27 14.84 48.90 260.27 145.28 14.82 4.660.30 AP- 00075711 118.00 118.00 AP- 00075712 200.00 200.00 AP- 00075713 848.58 848.58 AP- 00075714 200.00 200.00 AP- 00075715 1,454.87 1,454.88 2 AP- 00075716 2.25 21.74 50.84 2.25 21.74 98.82 AP- 00075717 125.00 125.00 250.00 AP- 00075718 9,100.95 9.100.95 AP- 000757 476.06 MW MW M W MW MW MW MW MW MW PAYMENT OF CLAIMS Vendor Name Department / Proj Name Description Acct# / Proj Code Amount Check Nunl Tyne Check Total: 476.06 AP 00075720 MW OFFICE MAX GEN & ADMIN OFFICE INVENTORY 1000 - 0428 674.12 OFFICE MAX ENGINEERING OFFICE SUPPLIES 1029 - 4820 190.44 OFFICE MAX CUSTOMER SERVICE OFFICE SUPPLIES 1038 - 4820 38.48 OFFICE MAX FINANCE OFFICE SUPPLIES 1039 - 4820 10.72 OFFICE MAX ENGINEERING OFFICE SUPPLIES 2029 - 4820 190.45 OFFICE MAX CUSTOMER SERVICE OFFICE SUPPLIES 2038 -4820 38.47 OFFICE MAX FINANCE OFFICE SUPPLIES 2039 - 4820 10.73 Check Total: 1.153.41 AP- 00075722 MW ONTRAC GEN & ADMIN TRAVEL/MEETINGS 1000 - 6200 5.00 ONTRAC LABORATORY POSTAGE EXPENSES 1007 - 4810 16.00 ONTRAC ENGINEERING - HEADWORKS HDWKS IMP PROJ 1029 - 8033 - HDWORK 5.00 ONTRAC ENGINEERING - REPL GEN, LPPS REPL GEN LPPS 1029 - 8933 - RGLPPS 5.00 ONTRAC ENGINEERING - ANGORA TNK REPL TANK, ANGORA 2029 - 7064 - ANGOTK 2.50 ONTRAC ENGINEERING - WT METERING PRJ WTR METERING/NEW 2029 - 7078 - METERS 5.50 In ONTRAC ENGINEERING - CALTRANS EROSION EC TRT CRK-STLN 2029 - 8036 - ECCALT 5.75 I ONTRAC ENGINEERING - LAKE TAHOE BLVD WTLN 12" LTB 2029 - 8067 - LTBWLR 5.75 ONTRAC ENGINEERING - ECHO TANK REPL TANK, ECHO 2029 - 8809 - ECHOTK 2.50 Check Total: 53.00 AP- 00075723 MW PACHECO, RICHARD GEN & ADMIN UB SUSPENSE 1000 - 2002 92.88 PACHECO, RICHARD GEN & ADMIN UB SUSPENSE 2000 - 2002 92.89 Check Total: 185.77 AP- 00075724 MW PETTY CASH ADMINISTRATION INCNTV & RCGNTN 1021 - 6621 2.79 PETTY CASH HUMAN RESOURCES OFFICE SUPPLIES 1022 - 4820 9.24 PETTY CASH HUMAN RESOURCES SAFETY PROGRAMS 1022 - 6079 8.48 PETTY CASH ENGINEERING SUPPLIES 1029 - 6520 21.20 PETTY CASH CUSTOMER SERVICE TRAVEL/MEETINGS 1038 - 6200 24.00 PETTY CASH FINANCE TRAVEL/MEETINGS 1039 - 6200 36.00 PETTY CASH ADMINISTRATION INCNTV & RCGNTN 2021 - 6621 2.79 PETTY CASH HUMAN RESOURCES OFFICE SUPPLIES 2022 - 4820 9.24 PETTY CASH HUMAN RESOURCES SAFETY PROGRAMS 2022 - 6079 8.48 PETTY CASH FINANCE TRAVEL/MEETINGS 2039 - 6200 36.00 User: THERESA Page: 10 Current Date: 04 /08/2010 Report: OH_PMT_CLAIMS_BK Current Time: 08:53:53 Vendor Name PETTY CASH PINKEL,MICHELE PIPELINE SYSTEMS INC, PSI POLYDYNE INC POWERS, TERENCE H POWERS, TERENCE H PRAXAIR 174 PRAXAIR 174 PRAXAIR 174 PRAXAIR 174 PRAXAIR 174 PRAXAIR 174 RED WING SHOE STORE RED WING SHOE STORE REDWOOD PRINTING RENO GAZETTE - JOURNAL RESOURCE DEVELOPMENT INC RESOURCE DEVELOPMENT INC SACRAMENTO BEE, THE SACRAMENTO BEE, THE User: THERESA Report: OH_PMT_CLAIMS_BK Department / Proj Name FINANCE UNDERGROUND REP OPERATIONS - PLANT SCADA OPERATIONS LABORATORY LABORATORY PUMPS HEAVY MAINT HEAVY MAINT LABORATORY PUMPS LABORATORY PUMPS PUMPS ENGINEERING - IROQUOIS SUPPLY ENGINEERING - IROQUOIS SUPPLY GEN & ADMIN - TWIN PEAKS BS ENGINEERING - TWIN PEAKS BS PAYMENT OF CLAIMS Description SUPPUES SUPPUES PLNTSCADA SYSTEM POLYMER TRAVEL MEETINGS TRAVELIMEETINGS SHOP SUPPUES SECONDARY EQUIP SHOP SUPPUES LAB SUPPLIES SHOP SUPPUES LAB SUPPUES SAFETY/EQUIP/PHY SAFETY/EQUIP/PHY WTLN IROQ WTLN IROQ CONST RETAINAGE BSTR, TWN PEAKS ENGINEERING - LAKE TAHOE BLVD WTLN 12" LTB ENGINEERING - IROQUOIS SUPPLY WTLN IROQ Page: 11 Acct# / Proj Code 2039 - 6520 1001-6520 1006 - 8328 - PSCADA Check Total: 1006 - 4720 1007 - 6200 2007 - 6200 1002 -6071 1004 - 6022 1004 - 6071 1007-4760 2002 -6071 2007-4760 1002-6075 2002-6075 2029 - 8166 - IQWTRL Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: 2029 - 8166 - IQWTRL Check Total: 2000 - 2605 - TPBSTR - 25,509.10 2029 - 7070 - TPBSTR 255,091.00 Check Total: 2029 - 8067 - LTBWLR 2029 - 8166 - IQWTRL Check Total: Current Date: 04 /08/2010 Current Time: 08:53:53 Amount Check Num Type 21.20 179.42 AP- 00075725 200.00 200.00 AP- 00075726 10,901.60 10.901.60 AP- 00075727 15,007.50 15.007.50 AP- 00075728 133.50 133.50 267.00 AP- 00075729 41.40 84.65 227.67 55.54 41.39 55.53 506.18 AP- 00075730 182.11 182.10 364.21 AP- 00075731 1,024.73 1.024.73 AP- 00075732 160.69 160.69 AP- 00075733 229.581.90 AP- 00075734 1,338.20 938.36 2.276.56 AP 00075735 MW MW MW MW MW MW MW MW MW MW MW Vendor Name SCIUTO, PAUL SCOTTYS HARDWARE SCOTTYS HARDWARE SCOTTYS HARDWARE SCOTTYS HARDWARE SCOTTYS HARDWARE SHANAHAN MD, KELLY SHANAHAN MD, KELLY SIERRA CHEMICAL CO SIERRA CHEMICAL CO SIERRA FOOTHILL LABORATORY SIERRA NEVADA MEDIA GROUP SIERRA NEVADA MEDIA GROUP SIERRA NEVADA MEDIA GROUP SIERRA NEVADA MEDIA GROUP SIERRA NEVADA MEDIA GROUP SIERRA NEVADA MEDIA GROUP SIERRA OFFICE SUPPLY SIERRA OFFICE SUPPLY SIERRA PACIFIC POWER SIERRA PACIFIC POWER SIERRA PACIFIC POWER SIGNS OF TAHOE User: THERESA Report: OH_PMT_CLAIMS_BK Department / PrQj Name ENGINEERING PUMPS OPERATIONS DIAMOND VLY RNCH PUMPS PUMPS HUMAN RESOURCES HUMAN RESOURCES OPERATIONS PUMPS LABORATORY - IND CRK RES MONT HUMAN RESOURCES CUSTOMER SERVICE HUMAN RESOURCES ENGINEERING - IROQUOIS SUPPLY CUSTOMER SERVICE CUSTOMER SERVICE - WTR CONS PROG FINANCE FINANCE GEN & ADMIN GEN & ADMIN GEN & ADMIN CUSTOMER SERVICE PAYMENT OF CLAIMS Description TRAVEL/MEETINGS PUMP STATIONS SMALL TOOLS GROUNDS & MNTC WELLS PUMP STATIONS CONTRACT SERVICE CONTRACT SERVICE HYPOCHLORITE HYPOCHLORITE MONITORING ADS/LGL NOTICES ADS/LGL NOTICES ADS/LGL NOTICES WTLN IROQ ADS/LGL NOTICES WTR CONS EXPENSE PRINTING PRINTING ELECTRICITY ST LIGHTING EXP ELECTRICITY SHOP SUPPLIES Acct# / Proj Code 1029 -6200 1002-6051 1006 -6073 1028 -6042 2002-6050 2002-6051 1022 -4405 2022 - 4405 1006-4755 2002 - 4755 1007 - 6110 - INDIAN Check Total: 1022 - 4930 1038 - 4930 2022 - 4930 2029 - 8166 - IQWTRL 2038 - 4930 2038 - 6660 - WCPROG Check Total: 1039 - 4920 2039 - 4920 1000 - 6330 1000 - 6740 2000 -6330 2038-6071 Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Page: 12 Current Date: 04 /08/2010 Current Time: 08:53:53 Amount Check Num Type 188.00 188.00 AP- 00075736 53.65 49.58 103.42 15.46 7.33 229.44 AP- 00075737 75.00 75.00 150.00 AP- 00075738 3,980.41 3,197.14 7.177.55 AP-00075739 390.00 390.00 AP- 00075740 173.00 274.05 172.99 224.49 658.68 737.10 2 240.31 AP -00075741 1,489.87 1,489.88 2.979.75 AP- 00075742 1,392.62 1,516.53 12,064.23 14.973.38 AP- 00075743 27.19 27.19 AP- 00075744 MW MW MW MW MW MW MW MW MW Vendor Name SKELLY, CHRIS SKELLY, CHRIS SMITH, JANES SNEED, CHRIS SOUND STRATEGIES/OFC INC. SOUND STRATEGIES /OFC INC. SOUTHWEST GAS SOUTHWEST GAS SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & TAHOE BLUEPRINT TAHOE BLUEPRINT TAHOE BLUEPRINT TAHOE BLUEPRINT TAHOE BLUEPRINT User: THERESA Report: OH_PMT_CLAIMS_BK Department / Proj Name INFORMATION SYS INFORMATION SYS DIAMOND VLY RNCH UNDERGROUND REP DIO DIO GEN & ADMIN GEN & ADMIN ENGINEERING ENGINEERING - ERB LINER REPL INFORMATION SYS CUSTOMER SERVICE ENGINEERING ENGINEERING - TWIN PEAKS BS ENGINEERING - WT METERING PRJ ENGINEERING - LAKE TAHOE BLVD ENGINEERING - IROQUOIS SUPPLY ENGINEERING - ARSENIC FACILITY INFORMATION SYS CUSTOMER SERVICE ENGINEERING - BIJOU MEADOWS ER ENGINEERING ENGINEERING - BIJOU MEADOWS ER ENGINEERING ENGINEERING - IROQUOIS SUPPLY PAYMENT OF CLAIMS Description TRAVEL/MEETINGS TRAVEL/MEETINGS TRAVEL/MEETINGS TRAVEL/MEETINGS CONTRACT SERVICE CONTRACT SERVICE NATURAL GAS NATURAL GAS CONTRACT SERVICE REPLACE ERB UNE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE BSTR, TWN PEAKS WTR METERING/NEW WTLN 12" LTB WTLN IROQ ARSNC TRTMNT CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE MAPPING CONTRACT SERVICE MAPPING WTLN IROQ Acct# / Proi Code 1037 - 6200 2037 - 6200 1028-6200 2001-6200 1027 - 4405 2027 - 4405 1000 - 6350 2000 - 6350 1029 -4405 1029 - 7581 - ERBLNR 1037 - 4405 1038 -4405 2029 - 4405 2029 - 7070 - TPBSTR 2029 - 7078 - METERS 2029 - 8067 - LTBWLR 2029 - 8166 - IQWTRL 2029 - 8864 - ARSNIC 2037 -4405 2038 -4405 Cheek Total: Check Total: Cheek Total: Check Total: Check Total: Check Total: 1029 - 4405 - ECBIJM 1029 -4420 2029 - 4405 - ECBIJM 2029 - 4420 2029 - 8166 - IQWTRL Check Total: Page: 13 Current Date: 04 /08/2010 Current Time: 08:53:53 Amount Check Num IBM 226.38 226.38 452.76 AP -00075745 25.00 25.00 AP -00075746 210.57 210.57 AP-00075747 49.00 49.00 98.00 AP -00075748 13,955.58 745.67 14.701.25 AP-00075749 176.68 97.48 194.72 194.72 176.68 12.19 201.05 73.11 170.59 12.19 194.72 194.72 1 AP- 00075750 34.63 38.07 34.62 38.06 1,871.04 2.016.42 AP- 00075751 MW MW MW MW MW MW MW Vendor Name TAHOE PARADISE CHEVRON TAHOE PRINTING TAHOE PRINTING TAHOE TRADING POST TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TECHPRO SALES & SERVICE INC TEICHERT CONSTRUCTION TEICHERT CONSTRUCTION TORNEY, PHILL TRPA USDA FOREST SERVICE VERIZON CAUFORNIA VWR INTERNATIONAL VWR INTERNATIONAL User: THERESA Report: OH_PMT_CLAIMS_BK Department / Proj Name UNDERGROUND REP CUSTOMER SERVICE CUSTOMER SERVICE UNDERGROUND REP ELECTRICAL SHOP ELECTRICAL SHOP ELECTRICAL SHOP ELECTRICAL SHOP ELECTRICAL SHOP ELECTRICAL SHOP ELECTRICAL SHOP ELECTRICAL SHOP PUMPS GEN & ADMIN - WT METERING PRJ ENGINEERING - WT METERING PRJ PUMPS ENGINEERING - REPL GEN, LPPS PUMPS DIAMOND VLY RNCH PAYMENT OF CLAIMS Description DIESEL PRINTING PRINTING SAFETY/EQUIP/PHY SECONDARY EQUIP BUILDINGS PUMP STATIONS SHOP SUPPLIES SMALL TOOLS BUILDINGS PUMP STATIONS SHOP SUPPUES PUMP STATIONS CONST RETAINAGE WTR METERING/NEW TRAVELJMEETINGS REPL GEN LPPS LAND & BUILDINGS TELEPHONE LABORATORY LAB SUPPLIES LABORATORY LAB SUPPUES Acct# / Proj Code 2001 - 4620 1038-4920 2038 -4920 2001-6075 1003 - 6022 1003 - 6041 1003 -6051 1003 - 6071 1003 - 6073 2003 - 6041 2003 - 6051 2003 -6071 1002-6051 Check Total: 2000 - 2605 - METERS 2029 - 7078 - METERS 1002-6200 1029 - 8933 - RGLPPS Check Total: 2002 - 5010 Check Total: Check Total: 1028-6310 1007-4760 2007-4760 Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Page: 14 Current Date: 04 /08/2010 Current Time: 08:53:53 Amount Check Num Tvce 72.20 72.20 AP- 00075752 10.20 10.19 20.39 AP- 00075753 277.30 277.30 AP- 00075754 666.06 588.96 76.43 394.44 35.60 48.92 115.49 394.44 2.320.34 AP- 00075755 720.73 720.73 AP- 00075756 - 981.00 9,810.00 8 829.00 AP- 00075757 158.00 158.00 AP- 00075758 160.00 160.00 AP- 00075759 21,409.89 21.409.89 AP- 00075760 • 40.77 40.77 AP- 00075761 311.37 154.91 MW MW MW MW MW MW MW MW MW MW Vendor Name WECO INDUSTRIES INC UNDERGROUND REP INFILTRTN/1NFLOW 1001 - 6055 2,864.34 Check Total: 2.864.34 AP- 00075763 MW WEDCO INC ELECTRICAL SHOP PUMP STATIONS 1003 - 6051 240.13 WEDCO INC ELECTRICAL SHOP SHOP SUPPUES 2003 - 6071 429.85 Check Total: 669.98 AP- 00075764 MW WESTERN ENERGETIX INC GEN & ADMIN GASOUNE INV 1000 - 0415 4,085.89 WESTERN ENERGETIX INC GEN & ADMIN DIESEL INVENTORY 1000 - 0416 5,077.44 WESTERN ENERGETIX INC DIAMOND VLY RNCH OIL & LUBE 1028 - 4630 603.71 Check Total: 9.767.04 AP- 00075765 MW WESTERN NEVADA SUPPLY GEN & ADMIN VALVES INVENTORY 2000 - 0404 8,336.55 WESTERN NEVADA SUPPLY GEN & ADMIN REPAIR CLMP INV 2000 - 0406 8,186.57 WESTERN NEVADA SUPPLY PUMPS GROUNDS & MNTC 2002 - 6042 101.17 WESTERN NEVADA SUPPLY CUSTOMER SERVICE WATER METERS 2038 - 6045 1,631.25 Check Total: 18.255.54 AP- 00075766 MW 1 to WETENKAMP, SHARCHEWA CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00 rn Check Total: 200.00 AP- 00075767 MW WHALEN, CHRIS ADMINISTRATION TRAVEL/MEETINGS 1021 - 6200 13.50 WHALEN, CHRIS ADMINISTRATION TRAVEL/MEETINGS 2021 - 6200 13.50 Check Total: 27.00 AP- 00075768 MW WOLVERTON, NANCY CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00 Check Total: 200.00 AP- 00075769 MW ZEE MEDICAL INC GEN & ADMIN SAFETY/EQUIPIPHY 1000 - 6075 ZEE MEDICAL INC GEN & ADMIN SAFETY/EQUIP/PHY 2000 - 6075 User: THERESA Report: OH_PMT_CLAIMS_BK Department / Proj Name PAYMENT OF CLAIMS Description Acct# / Proi Code Check Total: Check Total: Grand Total: Page: 15 Current Date: 04/08 /2010 Current Time: 08:53:53 Amount Check Num Tvoe 466.28 AP- 00075762 MW 254.03 254.03 508.06 AP- 00075770 MW 510,103.42 0 South Tahoe P.U.D. TLS, NM 30, 2010, 4 Check Payee ID. AP00074802 V48233 elOMMIONNOIM111.1a 03/30 VOID & A/P CHECK RE tSIER :07 AEI - -req: - -leg: G L JL - - i 'am oc: C STIE - -- -job: 454325 #J523 - - -- pmg: 8(200 c1.30 > - -zepart id: Payee Name tats Check Pnrunt Type Stabs Ref Tb Note C ?AFAR SIC CIINPA GRAND TOTALS: Tbtal Void Machine Written Tbtal Void Hand Written Tbtal Machire Written Tbtal Hamel Written Tbtal Reversals Tbtal Cancelled GRAND TOTAL 01/21/10 3,620.53 RV TR Reversed D 0.00 0.00 0.00 0.00 3,620.53 0.00 3,620.53 Nutr of Checks Processed: 0 Nutter of Checks Processed: 0 NJ± Z of (necks Processed: 0 Nutter of Checks Processed: 0 Niter of Checks Posed: 1 Number of Checks Processed: 0 • 4•4a General Manager Richard H. 5olbrig 15outh Directors Tah oe, Chris Cefalu James R. Jones r� Mary Lou Mo5bacher FubliG Utility Piotri�t ot PaleRire Eric Schafer 1275 Meadow Cr e4 Dr Iw • South Lake Tahoe # CA 96150 Phone 550 544 -6474 + Fax 530541 -0614 BOARD AGENDA ITEM 14a TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: April 15, 2010 ITEM — PROJECT: Conference with Legal Counsel — Anticipated Litigation (one case) REQUESTED BOARD ACTION: Direct legal counsel. DISCUSSION: Pursuant to Section 54956.9(b) of the California Government Code, Closed Session may be held for conference with legal counsel regarding anticipation of litigation. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -59 General Manager Richard H. 5olbrig Ta , 15outh Cee '� /rw�j' Chris Cefalu Jamee R. Jones FuWc Utility 01 otrI t Mary Lou Eric 50h her Dale Klee Eric Schafer 1275 Meadow Crept; Drive. » 9out✓h Lake Tahoe # CA 96150 Phone 530 544 -6474 • Fax 530 541.0614 BOARD AGENDA ITEM 14b TO: Board of Directors FROM: Richard H. Solbrig, General Manager MEETING DATE: April 15, 2010 ITEM — PROJECT: Conference with Legal Counsel — Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Meyers Landfill Site - United States of America vs. El Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S -01 -1520 LKK GGH, United States District Court for the Eastern District of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -61- General Manager Richard H. 5oWrig 5outh Tahoe f ublic Utility District Directors Chris Cefalu James R. Jones Mary Lou Mosbacher Dale Rise Eric 5chafer 1275 Meadow Crest Rrive • 5outh Lake Tahoe + CA 96150 Mone 550 544 -6474 • Fa< 530 541 -0614 BOARD AGENDA ITEM 14c TO: Board of Directors FROM: Richard Solbrig, General Manager Nancy Hussmann, Human Resources Director MEETING DATE: April 15, 2010 ITEM — PROJECT NAME: Conference with Labor Negotiators REQUESTED BOARD ACTION: Direct negotiators DISCUSSION: Pursuant to Section 54957.6(a) of the California Government Code, Closed Session may be held regarding contract negotiations. Agency Negotiators: Richard Solbrig /General Manager, Nancy Hussmann /Human Resources Director /Board of Directors Employee Organization: Stationary Engineers, Local 39 SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -63-