AP 04-23-10 Special Board MeetingSk r • 1950 • ���`
SOUTH TAHOE PUBLIC UTILITY DISTRICT
NOTICE OF SPECIAL BOARD MEETING
Friday, April 23, 2010
2:00 P.M.
District Board Room
1275 Meadow Crest Drive, South Lake Tahoe, California
Richard Solbri , General Manager Paul Sciuto, Assistant General Man,
Dale Rise, President BOARD MEMBERS Mary Lou Mosbacher, Vice Presic
James R. Jones, Director Eric W. Schafer, Director Chris Cefalu, Dire
1. CALL SPECIAL MEETING TO ORDER
2. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION
a. Lake Tahoe Boulevard 12 -inch Steel Water- Award Bid to the Lowest Respon-
line Replacement Project and Highway 50 sive, Responsible Bidder (Bid results
Utility Relocation Project will be distributed prior to, and at the Boar
(Jim Hoggatt) meeting)
3. CLOSED SESSION (Closed Sessions are not open to the public)
a. Pursuant to Government Code Section 54956.9(b) /Conference with Legal Counse
Anticipated Litigation (One Case) .k C-C) C:) \f
4. ADJOURNMENT
Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the
item is heard. Backup to any agenda item(s) not included with the Board packet will be made available when ft
at the District office, at the Board meeting, and upon request to the Clerk of the Board.
The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation
the disabled in all of the District's public meetings. If particular accommodations for the disabled are needed (i.e., disability- relate
aids, or other services), please contact the Clerk of the Board at 530.544.6474, extension 6203, at least 24 hours in advance of tl
meeting.
South Tahoe Public Utility District ■ 1275 Meadow Crest Drive ■ South Lake Tahoe, CA 96150
Phone 530.544.6474 ■ Facsimile 530.541.0614 ■ www.stpud.us
General h
Richard H.
u Tah Direc
{` Chris C
James R. J
Pu( � t U ni ty P t j _ Mary LouM
i�/ U 'f tTf Dale
Eric 5of
12'15 Maadow Crest Drive • South Lake Tahoe * CA 9E
Phone 5W 544 -6474 + FFrax 5W 541 -C
BOARD AGENDA ITEM 2.a
TO: Board of Directors
FROM: Jim Hoggatt , Construction Manager
MEETING DATE: April 23, 2010
ITEM — PROJECT NAME: Lake Tahoe Boulevard 12 -inch Steel Waterline
Replacement Project and Highway 50 Utility Relocation Project
REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible
bidder.
DISCUSSION: On April 13, 2010, the District received seven (7) bids for the project
named above. Bids ranged from $1,198,153.50 to $1,508,880.00. The engineer's
estimate for the project is $1,885,680.00.
Staff is currently reviewing the top three bids for compliance with funding requirements
for disadvantaged business outreach (DBE) and other contractual requirements (Buy
American), and will make a recommendation to the Board for award of the bid, which
will be distributed prior to, and at the Special Board Meeting.
SCHEDULE: ASAP
COSTS: $1,198,153.50 plus
ACCOUNT NO: LTBWLR & ECCALT
BUDGETED AMOUNT REMAINING: $1,900,000
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES D NO
CHIEF FINANCIAL OFFICER: YES NO
South Tahoe
Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Telephone: (530)544 -6474 Fax: (530)541 -0614
Memorandum
Date: April 22, 2010
.SP( - 6 (4 m
To: Board Members, Richard Solbrig, and Paul Sciuto
From: Jim Hoggatt Engineering Department Manager
Subject: Lake Tahoe Blvd 12 -inch Steel Waterline Replacement Project & Highway
50 Utility Relocation Project
At 2:00 o'clock on the afternoon of April 13, 2010, we received and opened seven (7)
sealed bids for the above - referenced project. Bids ranged from $1,198,153.50 to
$1,508,960. The engineer's estimate was $1,885,680. A careful review and analysis of
the three lowest bids showed only minor deviations. See Lisa Hamm's attached
spreadsheet and list of deviations for full breakdown of each bid.
Staff has completed a careful review and approved the Good Faith Effort submitted by
Teichert Construction and recommends the Board waive the minor bid deviations and
awards the above contract to the lowest responsive responsible bidder Teichert
Construction for $1,198,153.50.
Cr, Linda Drown
South Tahoe Public Utility District . 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150
Phone 530.544.6474 . Facsimile 530.541.0614
South Tahoe
Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Telephone: (530)544 -6474 Fax: (530)541 -0614
Memorandum
Date: April 14, 2010
To: Board Members, Richard Solbrig, Paul Sciuto
From: Lisa Hamm, Asst. Contracts Administrator
Subject: Lake Tahoe Blvd 12 -inch Steel Waterline Replacement Project & Highway
50 Utility Relocation Project
At 2:00 o'clock on the afternoon of April 13, 2010, we received and opened seven (7)
sealed bids for the above - referenced project. Bids ranged from $1,198,153.50 to
$1,508,960. The engineer's estimate was $1,885,680. A careful review and analysis of
the three lowest bids showed only minor deviations. See attached spreadsheet and list
of deviations for full breakdown of each bid.
Teichert Construction is the apparent low bidder. Teichert Construction had only a few
deviations.
I contacted the Contractors License Board and was given the following information:
License Number 8 is current and active and expires 04/30/2011.
The company is a corporation.
Teichert Construction holds a Class A — General Engineering Contractor license.
Cc Linda Brown
South Tahoe Public Utility District . 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150
Phone 530.544.6474 . Facsimile 530.541.0614
Lake Tahoe Blvd. 12 -inch Steel Waterline Replacement Project & Highway 50
Utility Relocation Project
Bid Opening: 4/13/2010 at 2:00 o'clock p.m.
Deviations found in review of three lowest bids:
Teichert Construction:
• Bid Book, under subcontractor list, contractor listed a supplier due to
confusion with the spec wording.
• Bid Book, under subcontractor list, contractor did not provide a license
number for the trucking company.
• Certification by Contractor's Insurance Broker was filled out incorrectly. Only
the name of the agent was on the first blank, the brokers name on the second
blank and third paragraph; therefore failing to provide the name of the
insurance company.
Campbell Construction
• Bid Book, under subcontractor list, contractor listed a supplier due to
confusion with the spec wording.
• Certification by Contactor's Insurance Broker was filled out incorrectly with
only the name of the agent in the first blank.
White Rock Construction Inc.
• Bid Book, under subcontractor list, contractor did not provide surveyor license
number.
• Bidder's General Information, under item 5, contractor failed provide surety
company information, only the brokerage information was provided.
• Certification by Contractor's Insurance Broker has only an agents name in the
first blank.
LAKE TAHOE BLVD. 12 -INCH STEEL WATERLINE REPLACEMENT PROJECT & HIGHWAY 50 UTI
RELOCATION PROJECT
CONTRACTOR'S SUBCONTRACTORS & SUPPLIERS
Teichert Construction
Description of Work
Subcontractors & Address
Subcontractors Name
& Address
Pipe Bursting
Pipe Supplier
N/A
N/A
Pipe Supplier
N/A
19.3%
Western Nevada Supply
Sparks, Nevada
AC Paving
N/A
Named E ui mentlMaterial
Self Performed
Traffic Control
N/A
Su lier
Self Performed
Striping
374600
1%
Chrisp Co.
Woodland, California
Sawcutting
817955
1.3%
Proffessional Concrete Sawing
Merced, California
Trucking
N/A
10.5%
LDL Trucking Assoc.
Pinole, California
Named EcouiDmen t/Material
Supplier List:
E ui ment/Material
Supplier
Aggregate base material
Tahoe Asphalt
Asphalt mixes for paved areas
Tahoe Asphalt
Pie Material/Supplier
Western Nevada Suppl
Fittings and specials
Western Nevada Suppl
Valves and valve boxes
Western Nevada Suppl
Pipe bedding material
Bing Materials
Steel plates
TCS Inc.
Temporary Water Booster Pump Station
Package S setem
N/A
Campbell Construction Co., Inc.
Description of Work
Subcontractors & Address
Pipe Bursting
N/A
Pipe Supplier
N/A
Ferguson — Supplier only no subcontractor
AC Paving 20%
721719
Advanced Asphalt
Truckee, California
Traffic Control
N/A
Self
Named E ui mentlMaterial
Supplier List:
Equipment/Material
Su lier
Aggregate base material
Bing Materials
Asphalt mixes for paved areas
Tahoe Asphalt
LAKE TAHOE BLVD. 12 -INCH STEEL WATERLINE REPLACEMENT PROJECT & HIGHWAY 50 UTI
RELOCATION PROJECT
CONTRACTOR'S SUBCONTRACTORS & SUPPLIERS
Pie Material/Supplier
Ferguson
Fittings and specials
Ferguson
Valves and valve boxes
Ferguson
Steel plates
United Rentals
Temporary Water Booster Pump Station
Package System
None
Traffic control si na a
Traffic Control Services
Traffic control dividers
Trench Plate Rental
White Rock Construction Inc.
Description of Work
Subcontractors & Address
Pipe Bursting
N/A
Pipe Supplier
N/A
AC Paving 16.97%
305618
Don Garcia Excavating & Paving Inc.
South Lake Tahoe, California
Traffic Control
N/A
Surveying .23%
N/A
CFA Planner & Engineers
I Reno, Nevada
E ui ment/Material Su tier List
Equipment/Material
Su lier
Aggregate base material
Bing Material
Asphalt mixes for paved areas
Don Garcia Excavating & Pavin
Pie Material/Supplier
U.S. Pipe
Fittings andspecials
Western Nevada Suppl
Valves and valve boxes
Western Nevada Suppl
Pie bedding material
Bing Materials
Steel plates
United Rentals
Temporary Water Booster Pump Station
Package System
N/A
General N
Richard H.
Direc
150ut-h �r� ,�w�
f w� J"•' '� + ((err /i Chris C
James R. J
Dale Vale Public Utility P1 , ri l of Mary Lou M ooW
V
Eric Sol
1295 Meadow Crest DrIw • youth Lake Tahoe • CA 9(
Phone 530 544-6494 * Fax 5W 541-C
BOARD AGENDA ITEM 3.a
TO: Board of Directors
FROM: Richard Solbrig, General Manager
MEETING DATE: April 23, 2010
ITEM — PROJECT: Conference with Legal Counsel — Anticipated Litigation (one case)
REQUESTED BOARD ACTION: Direct legal counsel.
DISCUSSION: Pursuant to Section 54956.9(b) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding anticipation of
litigation.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General
GENERAL MANAGER: YES _AIM NO
CHIEF FINANCIAL OFFICER: YES NO