Loading...
AP 04-23-10 Special Board MeetingSk r • 1950 • ���` SOUTH TAHOE PUBLIC UTILITY DISTRICT NOTICE OF SPECIAL BOARD MEETING Friday, April 23, 2010 2:00 P.M. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Richard Solbri , General Manager Paul Sciuto, Assistant General Man, Dale Rise, President BOARD MEMBERS Mary Lou Mosbacher, Vice Presic James R. Jones, Director Eric W. Schafer, Director Chris Cefalu, Dire 1. CALL SPECIAL MEETING TO ORDER 2. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION a. Lake Tahoe Boulevard 12 -inch Steel Water- Award Bid to the Lowest Respon- line Replacement Project and Highway 50 sive, Responsible Bidder (Bid results Utility Relocation Project will be distributed prior to, and at the Boar (Jim Hoggatt) meeting) 3. CLOSED SESSION (Closed Sessions are not open to the public) a. Pursuant to Government Code Section 54956.9(b) /Conference with Legal Counse Anticipated Litigation (One Case) .k C-C) C:) \f 4. ADJOURNMENT Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the item is heard. Backup to any agenda item(s) not included with the Board packet will be made available when ft at the District office, at the Board meeting, and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation the disabled in all of the District's public meetings. If particular accommodations for the disabled are needed (i.e., disability- relate aids, or other services), please contact the Clerk of the Board at 530.544.6474, extension 6203, at least 24 hours in advance of tl meeting. South Tahoe Public Utility District ■ 1275 Meadow Crest Drive ■ South Lake Tahoe, CA 96150 Phone 530.544.6474 ■ Facsimile 530.541.0614 ■ www.stpud.us General h Richard H. u Tah Direc {` Chris C James R. J Pu( � t U ni ty P t j _ Mary LouM i�/ U 'f tTf Dale Eric 5of 12'15 Maadow Crest Drive • South Lake Tahoe * CA 9E Phone 5W 544 -6474 + FFrax 5W 541 -C BOARD AGENDA ITEM 2.a TO: Board of Directors FROM: Jim Hoggatt , Construction Manager MEETING DATE: April 23, 2010 ITEM — PROJECT NAME: Lake Tahoe Boulevard 12 -inch Steel Waterline Replacement Project and Highway 50 Utility Relocation Project REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible bidder. DISCUSSION: On April 13, 2010, the District received seven (7) bids for the project named above. Bids ranged from $1,198,153.50 to $1,508,880.00. The engineer's estimate for the project is $1,885,680.00. Staff is currently reviewing the top three bids for compliance with funding requirements for disadvantaged business outreach (DBE) and other contractual requirements (Buy American), and will make a recommendation to the Board for award of the bid, which will be distributed prior to, and at the Special Board Meeting. SCHEDULE: ASAP COSTS: $1,198,153.50 plus ACCOUNT NO: LTBWLR & ECCALT BUDGETED AMOUNT REMAINING: $1,900,000 ATTACHMENTS: None CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES D NO CHIEF FINANCIAL OFFICER: YES NO South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Telephone: (530)544 -6474 Fax: (530)541 -0614 Memorandum Date: April 22, 2010 .SP( - 6 (4 m To: Board Members, Richard Solbrig, and Paul Sciuto From: Jim Hoggatt Engineering Department Manager Subject: Lake Tahoe Blvd 12 -inch Steel Waterline Replacement Project & Highway 50 Utility Relocation Project At 2:00 o'clock on the afternoon of April 13, 2010, we received and opened seven (7) sealed bids for the above - referenced project. Bids ranged from $1,198,153.50 to $1,508,960. The engineer's estimate was $1,885,680. A careful review and analysis of the three lowest bids showed only minor deviations. See Lisa Hamm's attached spreadsheet and list of deviations for full breakdown of each bid. Staff has completed a careful review and approved the Good Faith Effort submitted by Teichert Construction and recommends the Board waive the minor bid deviations and awards the above contract to the lowest responsive responsible bidder Teichert Construction for $1,198,153.50. Cr, Linda Drown South Tahoe Public Utility District . 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Phone 530.544.6474 . Facsimile 530.541.0614 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Telephone: (530)544 -6474 Fax: (530)541 -0614 Memorandum Date: April 14, 2010 To: Board Members, Richard Solbrig, Paul Sciuto From: Lisa Hamm, Asst. Contracts Administrator Subject: Lake Tahoe Blvd 12 -inch Steel Waterline Replacement Project & Highway 50 Utility Relocation Project At 2:00 o'clock on the afternoon of April 13, 2010, we received and opened seven (7) sealed bids for the above - referenced project. Bids ranged from $1,198,153.50 to $1,508,960. The engineer's estimate was $1,885,680. A careful review and analysis of the three lowest bids showed only minor deviations. See attached spreadsheet and list of deviations for full breakdown of each bid. Teichert Construction is the apparent low bidder. Teichert Construction had only a few deviations. I contacted the Contractors License Board and was given the following information: License Number 8 is current and active and expires 04/30/2011. The company is a corporation. Teichert Construction holds a Class A — General Engineering Contractor license. Cc Linda Brown South Tahoe Public Utility District . 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Phone 530.544.6474 . Facsimile 530.541.0614 Lake Tahoe Blvd. 12 -inch Steel Waterline Replacement Project & Highway 50 Utility Relocation Project Bid Opening: 4/13/2010 at 2:00 o'clock p.m. Deviations found in review of three lowest bids: Teichert Construction: • Bid Book, under subcontractor list, contractor listed a supplier due to confusion with the spec wording. • Bid Book, under subcontractor list, contractor did not provide a license number for the trucking company. • Certification by Contractor's Insurance Broker was filled out incorrectly. Only the name of the agent was on the first blank, the brokers name on the second blank and third paragraph; therefore failing to provide the name of the insurance company. Campbell Construction • Bid Book, under subcontractor list, contractor listed a supplier due to confusion with the spec wording. • Certification by Contactor's Insurance Broker was filled out incorrectly with only the name of the agent in the first blank. White Rock Construction Inc. • Bid Book, under subcontractor list, contractor did not provide surveyor license number. • Bidder's General Information, under item 5, contractor failed provide surety company information, only the brokerage information was provided. • Certification by Contractor's Insurance Broker has only an agents name in the first blank. LAKE TAHOE BLVD. 12 -INCH STEEL WATERLINE REPLACEMENT PROJECT & HIGHWAY 50 UTI RELOCATION PROJECT CONTRACTOR'S SUBCONTRACTORS & SUPPLIERS Teichert Construction Description of Work Subcontractors & Address Subcontractors Name & Address Pipe Bursting Pipe Supplier N/A N/A Pipe Supplier N/A 19.3% Western Nevada Supply Sparks, Nevada AC Paving N/A Named E ui mentlMaterial Self Performed Traffic Control N/A Su lier Self Performed Striping 374600 1% Chrisp Co. Woodland, California Sawcutting 817955 1.3% Proffessional Concrete Sawing Merced, California Trucking N/A 10.5% LDL Trucking Assoc. Pinole, California Named EcouiDmen t/Material Supplier List: E ui ment/Material Supplier Aggregate base material Tahoe Asphalt Asphalt mixes for paved areas Tahoe Asphalt Pie Material/Supplier Western Nevada Suppl Fittings and specials Western Nevada Suppl Valves and valve boxes Western Nevada Suppl Pipe bedding material Bing Materials Steel plates TCS Inc. Temporary Water Booster Pump Station Package S setem N/A Campbell Construction Co., Inc. Description of Work Subcontractors & Address Pipe Bursting N/A Pipe Supplier N/A Ferguson — Supplier only no subcontractor AC Paving 20% 721719 Advanced Asphalt Truckee, California Traffic Control N/A Self Named E ui mentlMaterial Supplier List: Equipment/Material Su lier Aggregate base material Bing Materials Asphalt mixes for paved areas Tahoe Asphalt LAKE TAHOE BLVD. 12 -INCH STEEL WATERLINE REPLACEMENT PROJECT & HIGHWAY 50 UTI RELOCATION PROJECT CONTRACTOR'S SUBCONTRACTORS & SUPPLIERS Pie Material/Supplier Ferguson Fittings and specials Ferguson Valves and valve boxes Ferguson Steel plates United Rentals Temporary Water Booster Pump Station Package System None Traffic control si na a Traffic Control Services Traffic control dividers Trench Plate Rental White Rock Construction Inc. Description of Work Subcontractors & Address Pipe Bursting N/A Pipe Supplier N/A AC Paving 16.97% 305618 Don Garcia Excavating & Paving Inc. South Lake Tahoe, California Traffic Control N/A Surveying .23% N/A CFA Planner & Engineers I Reno, Nevada E ui ment/Material Su tier List Equipment/Material Su lier Aggregate base material Bing Material Asphalt mixes for paved areas Don Garcia Excavating & Pavin Pie Material/Supplier U.S. Pipe Fittings andspecials Western Nevada Suppl Valves and valve boxes Western Nevada Suppl Pie bedding material Bing Materials Steel plates United Rentals Temporary Water Booster Pump Station Package System N/A General N Richard H. Direc 150ut-h �r� ,�w� f w� J"•' '� + ((err /i Chris C James R. J Dale Vale Public Utility P1 , ri l of Mary Lou M ooW V Eric Sol 1295 Meadow Crest DrIw • youth Lake Tahoe • CA 9( Phone 530 544-6494 * Fax 5W 541-C BOARD AGENDA ITEM 3.a TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: April 23, 2010 ITEM — PROJECT: Conference with Legal Counsel — Anticipated Litigation (one case) REQUESTED BOARD ACTION: Direct legal counsel. DISCUSSION: Pursuant to Section 54956.9(b) of the California Government Code, Closed Session may be held for conference with legal counsel regarding anticipation of litigation. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: None CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES _AIM NO CHIEF FINANCIAL OFFICER: YES NO