AP 01-02-04SOUTH TAHOE PUBLIC UTILITY DISTRICT
"Basic Services for a Complex World"
REGULAR BOARD MEETING AGENDA
Friday, January 2, 2004
2.'00 P.M.
(This regular meeting is being held on Friday, January 2,
since the January 1 regular Board meeting date fell on New Year's holiday)
City Council Chambers
1900 Lake Tahoe Boulevard, South Lake Tahoe, California
Richa~ Solbri!~lI General Mana~ler pau!. SciutoI Assistant Mana~ler
James R. Jones, President BOARD MEMBERS Eric W. Schafer, Vice President
Duane Wallace, Director Mary Lou Mosbacher, Director Tom Comte, Director
Ililllllll ill~l lill/[llll II I · I II IIIII/ IIIIlll IIiil II
CA~.L TO ORDER REGULAR MEETING - PLEDGE OF ALLEGIANCE.
COMMENTS FROM THE AUDIENCE (Short non-agenda items that are within the subject
matter jurisdiction of the District. Five-minute limit. No action will be taken.)
CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR
ADOPTION OF CONSE,NT CALENDAR (Any item can be discussed and considered
separately upon request.)
CONSENT ITEMS BROUGHT FORWARD FOR ACTION I DISCUSSION
ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION
Pg. 31
b
Pg. 33
Election of Board Officers
(Kathy Sharp)
Election of Board Officers
(Kathy Sharp)
Elect a Board President for 2004 Calendar
Year
Elect a Board Vice President for 2004
Calendar Year
' REGULAR BOARD MEETING AGENDA - JANUARY 2, 2004
PAGE- 2
Co
Pg. 35
Highway 50 Waterline Replacement:
VVinnemucca to the Y
(Paul Sciuto)
Approve a Proposal from c2me
Engineering for Design and Construction
Assistance
(Costs will be presented at the Board meeting)
Pg. 45
Bakersfield Well Treatment Project
(John Thiel, Nick Zaninovich)
(1) Adopt Resolution No. 2779-04,
Rescinding Resolution 2777-03, Which
Authorized an Exemption from Competitive
Bidding Procedures to Negotiate Directly
With U.S. Filter; (2) Make a Finding that
Applied Process Technology's Proprietary
Advanced Oxidation Treatment (HiPOx)
System is the Best Treatment for the
Bakersfield Well; and (3) Award Contract to
Applied Process Technology, the Sole
Source Supplier for HiPOx, Including
Treatment Process and Related Services,
in the Amount of $832,600
Pg. 51
Bakersfield Well Treatment Project
(Nick Zaninovich)
Authorize Staff to Enter into an Agreement
with Boyle Engineering for Electrical
Design and Consulting Services for the
HiPOx Treatment System in the Amount of
$31,75O
Pg. 57
Bakersfield Well Treatment Project
(Rick Hydrick, Paul Sciuto)
(1) Determine an Emergency Exists
Pursuant to Section 1102 of the Public
Contract Code; (2) Determine Substantial
Evidence has Been Presented to Authorize
an Exception be Made to Section 22050 of
the Public Contract Code that this
Emergency Will Not Permit a Delay
Resulting from Competitive Solicitation of
for Bids, and that this Action is Necessary
to Respond to the Emergency; and
(3) Delegate Authority to the General
Manager to Order any Action Necessary to
Respond to this Emergency
g. Payment of Claims
Pg. 59
Approve Payment in the Amount of
$629,058.71
BOARD MEMBER STANDING COMMITTEE REPORTS
a. Executive Committee (Jones / Schafer)
b. Finance Committee (Wallace / Schafer)
c. Water & Wastewater Operations Committee (Jones / Comte)
d. Planning Committee (Mosbacher / Schafer)
REGULAR BOARD MEETING AGENDA - JANUARY 2, 2004 PAGE - 3
BOARD MEMBER AD HOC COMMITTEE REPORTS
a. Legislative Ad Hoc Committee (Wallace / Jones)
b. Administration Building Ad Hoc Committee (Jones / Schafer)
c. Water Conservation Ad Hoc Committee (Mosbacher / Comte)
9. EL DORADO COUNTY WATER AGENCY REPRESENTATIVE REPORT
10.
11.
12.
13.
BOARD MEMBER REPORTS
GENERAL MANAGER I STAFF REPORTS
NOTICE OF PAST AND FUTURE MEETINGS I EVENTS
Past Meetings I Events
12/22/03- Finance Committee Meeting
12/23/03 - Christmas Angel Program at Tahoe Manor
12/29/03 - Operations Committee Meeting
Future Meetin.qs I Events
01/08/04- 10:00 a.m. - El Dorado County Water Agency Regular Meeting
01/15/04- 2:00 p.m. - STPUD Regular Board Meeting at City Council Chambers
CLOSED SESSION
a. Pursuant to Government Code Section 54956.95/Conference with Legal Counsel -
Pg. 75 Liability Claim Received from Ed Senior
b. Pursuant to Government Code Section 54956.9(c)/Conference with Legal Counsel-
Pg. 77 Anticipated Litigation: Pioneer Trail Waterline Replacement Near Filter Plant
Pg. 79
Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel-
Existing Litigation: STPUD vs. ARCO et al., San Francisco County Superior Court
Case No. 999128
Pg. 81
Pursuant to Government Code Section 54956.9(a) Conference with Legal Counsel-
Existing Litigation: STPUD vs. F. Heise Land & Live Stock Company, Inc., William
Weaver, Eddie R. Snyder, Crockett Enterprises, Inc., CIV S-02-0238 MLS JFM
United States District Court for the Eastern District of California, Sacramento, Ca.
Pg. 83
Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel-
Existing Litigation re: Meyers Landfill Site: United States of America vs. El Dorado
County and City of South Lake Tahoe and Third Party Defendants, Civil Action No.
S-01-1520 LKK GGH, United States District Court for the Eastern District of Ca.
Pg. 85
Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel-
Existing Litigation: STPUD vs. Lakeside Park Association, et al., County of El
Dorado, Superior Court Case No. SC20010165
REGULAR BOARD MEETING AGENDA - JANUARY 2, 2004 ' PAGE - 4
14. ACTION I REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION
15. ADJOURNMENT (To the next regular meeting, Januar7 15, 2004, 2:00 p.m.)
The South Tahoe Public Utility Distdct Board of Directors regularly meets the first and third Thursday of each month. A complete
agenda packet, including all backup information is available for review at the meeting and at the Distdct office dudng the hours of
8:00 a.m. - 5:00 p.m., Monday through Friday. Items on this agenda are numbered for identification purposes only and will not
necessarily be considered in the order in which they appear on the agenda. Designated times are for particular items only. Public
Hearings will not be called to order pdor to the time specified.
Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda
items are heard; comments should be brief and directed to the specifics of the item being considered. Comments on items not on
the agenda can be heard during "Comments from the Audience;" however, action cannot be taken on items not on the agenda.
Please provide the Clerk of the Board with a copy of all written material presented at the meeting.
The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate
participation of the disabled in all of the District's public meetings. If particular accommodations for the disabled are
needed (i.e., disability-related aids, or other services), please contact the Clerk of the Board at (530) 544-6474,
extension 203, at least 24 hours in advance of the meeting.
ITEMS
CONSENT CALENDAR
JANUARY 2, 2004
REQUESTED ACTION
I I I
Pg. I
Pg. 13
Co
Pg. 21
Pg. 25
Pg. 27
Liability Claim Received from
Ed Senior, APN 26-114-11
(Lisa Coyner)
Plan Review Services
(Lisa Coyner)
Elks Club Well Control Building
(Nick Zaninovich)
Purchase of Tank Truck
(Rick Hydrick)
Side Letter to Managers' Memorandum of
Understanding (MOU)
(Richard Solbrig)
Reject Claim
Authorize Entering into a Contract with
Chris Twomey, Effective January 2, 2004 -
December 31, 2004
Approve Change Order No. 1 in the
Amount of $7,272.56
Authorize Staff to Advertise for Bids for a
Pumper Tank Truck
Approve Side Letter Extending
Compensatory Time Limits for
Engineering Department Due to Assistant
General Manager Position Not Being
Filled
South Tahoe Public Utility Distdct · 1275 Meadow Crest Ddve · South Lake Tahoe, CA 96150
Phone 530.544.6474 · Facsimile 530.541.0614 · www.stpud.us
South Tahoe
PUblic Utility D str Ct
1275 Meadow Crest Drive · South Lake Tahoe', CA 96150-7401
Phone 530 54¢~74 ° Fax 530 541-0614, www. stpud.us
BOARD AGENDA ITEM 4.a
TO:
Board of Directors
FROM:
Lisa Coyner, Manager of Customer Service
MEETING DATE:
ITEM 'PROJECT:
January 2, 2004
Liability Claim received from Ed Senior, APN 26-114-11
REQUESTED BOARD ACTION: Reject claim
DISCUSSION: Ed Senior submitted a letter dated November 17, 2003, and received by
the District on November 20, 2003. In his letter Mr. Senior stated that he was
forwarding a bill for repair to "your" sewer lateral at his property located at 930 Modesto
Avenue. Mr. Senior further stated that "there is no reason I should have to pay for
something off of my property..." In accordance with Administrative Code Section 4.7.2,
sewer laterals shall be maintained by the owner of the property. In his claim submitted
to the District dated December 13, 2003, and received by the District on December 16,
2003, Mr. Senior claims that a District contractor installed the lateral improperly in 1970.
District procedures require that a District inspector verify faulty pipe installation in order
to provide relief under Administrative Code Section 4.7.5. In speaking with the
Inspection Department and the sewer crew ~upervisor, it was found that no inspection
of the alleged faulty installation was requested or performed. Because of this, the
District cannot assume liability for the installation and requests that the Board reject Mr.
Senior's claim.
SCHEDULE:
COSTS':
ACCOUNT NO: 1038-4521
BUDGETED AMOUNT REMAINING:
ATTACHMENTs: Ed Senior letter, claim form, District correspondence
coNCURRENCE WITH 'REQUESTED Ac.TitO/Ni "':''' '. ~ "::
GENERAL MANAGER:'.':: }. :.yEs :'~". :'.No"'.'.' i'"' ' _ ' ' ' "'"
CHIEF FINANCIAL OFFICER: . .YES.
.CATEGORY: seWer
New Construction
Repairs · Backhoe Service
Snow Rcmoval
CA LIc. #232866
NV Lic. #019159
Nuv. & Cali~ J i¢,,en.~eff Plufnbing & Hc,'~tlt~g Cnnlrm~tor
To South l,ake Tahoe Public Utility..Disirict.
2/2/04
Dear Sir
Due to my work load I will not be able to attend the meeting today
In regards to I.isa Coyncr refizsal oi'my claim APN 26114.[ contracted C,B,Ebright
To replace the sewer lateral fi'om the propedy line to the main because of'the failed air
test.
I relied on C. B. Ebright t.o contact the district to resolve thc problem, because they
stated to me that the lateral was in ,excellenl condition and the only way it would fail the
air test. is a improper seal upon installation. 'I also contracted C.B. Ebright to do the work
Because they contract work for the district, and there opinion wold be honored.
The feeling in thc community is that. you should be doing the air test case by case, and
not have a blanket policy on air testing.
1 would urge the district to cnforce the spirit ol'thc law more than the letter of the law.
Thank you
Ed senior·
Post Office Box 575 · South LakeTahoe, CA 95156 - (530) 544-3583
South Tahoe
public Utility District
1275 Meadow Crest Drive, South Lake Tahoe, CA 96150-7401
Phone 530 544-6474, Fax 530 541-0614-www. stpud.us
December 22, 2003
Mr. Ed Senior
Post Office Box 575
South Lake Tahoe, CA 96156
Re:
Claim for 930 Modesto
APN: 26-114-11
Dear Mr. Senior:
I am in receipt of your claim dated December 13, 2003 and received by the District on
December 16, 2003 for the cost of replacement of your sewer lateral. I hai~e discussed
the claim at length with Mike Adams, Underground Repair Sewer Supervisor and District
Inspectors Heather Ross and Cuz Cullen.
It is the determination of the District staffthat your sewer lateral was never inspected for
"improper installation" as required by Administrative Code Section 4.7.5. Only upon
confa'mation of the faulty installation by District staff can you seek relief under this
Section. Furthermore, Administrative Code Section 4.7.2 maintains that the owner of the
property is responsible for their sewer lateral. Sewer lateral is defined by Administrative
Code Section 1.1.113 as "the part of the horizontal sewer piping beginning at the exterior
wall of any building and terminating at the District's main sewer."
The District is willing to take appropriate responsibility for problems caused by our
activities, but will not assume responsibility for problems that are not of our making.
Staffwill recommend that the Board of Directors reject your claim at the January 2, 2004
Board meeting, City Council Chambers, 1900 Lake Tahoe Boulevard, 2:00pm. You are
certainly welcome to attend and express your views directly to the Board at that time, or
communicate with the Board in writing prior to the meeting. Please contact Ms. Kathy
Sharp, Clerk of the Board, at 544-6474, extension 203 if you intend to appear.
-3-
Ed Senior/December 22, 2003
Page two (2)
I am happy to discuss this further with you if you wish.
544-6474, extension 221.
Sincerely,
Please call me at any time at
Lisa M. Coyner
Customer Service Manager
CC:
Mike Adams, Underground Repair Sewer Supervisor
Inspection Department
File
Sout¼ Tahoe
Utility District
1275 Meadow Crest Drive · South Lake Tahoe · CA 96150-7401
Phone 530 54~6474 · Fax 530 541-0614 · www. stpud.us
November 21,2003
Mr. Ed Senior
Post Office Box 575
South Lake Tahoe, CA 96156
Re: 930 Modesto Avenue
Dear Mr. Senior:
I am in receipt of your letter dated November 17, 2003 regarding the ~epair of you~ sewer
lateral at your property located at 930 Modesto Avenue, South Lake Tahoe, CA.
In accordance with Government Code Section 810, you are required to aubmit your al_aim
on a form provided by the District I have enclosed our claim form for you to complete
and remm to us. I have also enclosed inslructions on completing the claim form and a
remm envelope.
Once the completed and signed claim form has been received, the District will investigate
your claim and render a decision.
If you have any questions regarding this matter, please do not hesitate to contact me
directly at 544-6474, extension 221.
Customer Service Manager
cc: File
Enclosures
New Construction
Repairs · Backhoe Service
Snow Removal
Nev. ~ Calif Lic,~nsed Ph:mbincl & Heatino Contr,~cto~
To
South lake Tahoe public utility district
South lake Tahoe Ca
Dear sir
I am forwarding you this bill from C.B. Ebright to repair your sewer
Lateral to my property at 930 Modesto Ave.
There is no reason I should have to pay for something off of my
Property that I had no control over who did the job, and the materials used
And who inspected the job.
If this bill is not paid I will have to seek relief through the court system
Best regards
11/17/03
CA Lic. #233866
NV Lic. #019159
LISA M. CO~~: '%c:
Post '.Office ,_-.,~, ..... ,~ " C-..~.:!",. L.~kc ...... ~ ......... ¢"~ °.~;"~5 ° (9!G) 5+,-3:,8,'.,' ' ~"
FORM: TORT CLAIM FOR MONEY OR DAMAGES
[Gov't Code Title 1, Div. 3.6, §§ 810 et seq.]
~21aim of Ed Senior
Ed Senior
:South Tahoe Public Utility District
TORT CLAIM
FOR MONEY OR DAMAGES
(GOVERNMENT CODE SEC. 810 et seq..)
RECEIVED BY
EISA M. COYNE~
DEC ! 2OO '
See attached Instructions
Section 1: Claimant Information
Name of Claimant
Mailing Address
Telephone Number (include area code)
Ci~ . State Zip Code
Section 2: Claim Information
Is the Claim on Behalf of a Minor? Yes ~ No
If yes, please indicate:
Relationship to Minor:
Date of Birth of Minor:
Incident Date: 5" .5' -]~tTD Dollar Amount of Clairn-~ -~y
Month/Day/Year
If the Amount Exceeds $10,000, Indicate Type of Civil Case: Limited ~ Non-Limited
Explain How The Dollar Amount Claimed Was Computed
(Attach supporting documentation for the amount claimed)
Describe the specific damage or injury incurred as a result of the incident
-?-
Location of incident (if applicable, include street address, city or c{~unty, hlghwa); nUmber, i~ost
mile number and direction of travel).
Explain the circumstances that led to the alleged damage or injury. State all facts that support
your claim against the District and why you believe the District is responsible for the alleged
damage, or injury. If known, provide the name(s) of the District employee(s) who allegedly
caused the injury, damage or loss. (If more space is needed, please attach additional sheets.)
Section 3: Insurance Information (must be completed if claim involves an automobile)
Has the claim for the alleged damage/injury been filed or will it be filed with your insurance
carrier? Yes,
Name of Insurance Carrier
Amount of Deductible
Policy Number
Insurer's Telephone Number (include area code)
Insurer's Mailing Address
City. State
Are you the registered owner?. __ Yes No
Make: Model: Year:
Zip Code
Section 4: Representative Information
(Must be filled out if claim is being filed by an attorney or authorized representative)
Name of Attorney/Representative:
Attorney/Representative's Telephone Number:
Attorney/Representative s Mailing Address:
City State Zip Code '
RECEIVED BY
LISA M ~' ':.'"' ~
Section 5: Notice and Signature
Penal Code Section 72 provides that every person who, with intent to defiaud, presents for allowance or for
payment to any State Board or Officer, or to any county, town, city, district, ward, village, board or officer,
authorized to allow or pay the same if genuine, any false or fraudulent claim, bill, account, voucher or writing is
guilty ora felony.
SignamreofClaimant ~ Dale
Signature of Attomey/Representative (if applicable) Date
RECEIVED BY
,..,,.,,~. M. COYNE~
-9-
.3.~ P, :~[¢RiGHT CO., INC.
,.-.,. Box 7585
South Lake Tahoe, California 96158
Ed Senior
? O Box 575
South Lak',~. Tahoe, Cslifornfa
96', 56
Ed Senior
South Lake Tahoe, Ca!ir'omia
489
9/23/03
1 or"1
8/2,5/2003
1 Daily
Labor, Equipment, Material, Margin
3,046.32
3,046.32
\4. od~.sto ~,"oject. August 28, 2003
3,048.32
JOB: Senior, Ed
DATE:
8t28!2003
LOCATION & DESCRIPTION OF OPERATION; Modesto
!Replac.e exisSng sewer service.
E. Ma ,dJnez-Labor
R, P..aynes-Labor
Mack 10 VYheel Dump
Mack 10 Wheel Dump
~H 2Axle Dbmp Trk
Chevrolet 1Ton Mech
GMC 1 Ton Service
Chevrolet One Ton P~Up
IH Water Truck
GMC Water truck
.Ded~e Diesel CBE
.93 D,odge UT
podia_P/Up Taten
Case 621
926 Loader
Case 580SK
8l 8 I S ,~5.00
8
$ 40.00
TOTALS
126.00
3~0 O0
$ 280.00
$ 280 O0
$ .
$ _
$ 320.00
~0ehdn~ 6620
J.Deere 450Dozer
251 Case Roller
Bitch Pot
Wac?er Compactor
C_opco, Air Compressor
~nterstate EquiD.T,-ailer
"Mobilization" Mack 10/TraDertOper.
Pan Vibrater
A.C Concrete Saw
ADDi rlONPJ.:
0.5
120.00
_
_
.'
.
.
32~D.00
40.00
I $ 90.00
1 $ 15000
$ 2,176.00
3/4 A.-9. from stock 4 tons S 12.00 $ 48.00
Tah~ Asphalt (1.99 tcn 1/2 CiD/Mixi $ 89.64
South Tahoe Refuse $ 42.00
1705821
United Rental Trench Shoring-Jacks
,City cf South Lake Tahoe encroachment permit
106.49
$ 61 .DO
Nevada Suooly
31963556
15.47
Sub-Total $ 2.53_?60
Mar~in L'~% $ 507.72
TOTAL $ 3,046,32
-11-
S'outh Tahoe
Public Utility District
1275 Meadow Crest Drive · South Lake Tahoe, CA 96150-7401
Phone 530 544-6474 · Fax 530 541-0614, www. st?ud.us
BOARD AGENDA ITEM 4.b
TO:
FROM:
MEETING DATE;
ITEM - PROJECT:
Board of Directors
Lisa Coyner, Manager of Customer Service
January 2, 2004
Professional Plan Review Services
REQUESTED BOARD ACTION:' Authorize entering into a contract with Chris Twomey,
effective January 2, 2004 - December 31,2004.
DISCUSSION: The contract with Chris Twomey for professional plan review services
expired on December 31, 2003. Customer Service used his services on as as-need
basis to facilitate timely turn around for commercial plan review. Staff is pleased with
Mr. Twomey's work and requests that a new contract be approved through December
31,2004.
SCHEDULE:
COSTS:
ACCOUNT NO: 1038/2038 - 4405
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:: Contract
Plan review fees paid for by customer.
CONCURRENCE WITH iREQUEsTED AcTION':
'OE.ER^' M "AOER: ' ES
cHIEFFINANClAL OFFICER: YES
CATEGORYi'.sewer & Water
NO '
AGREEMENT FOR SERVICES OF PLAN REVIEWER
This Agreement for Services (Agreement) is made as of January 2, 2004, by and
between the South.Tahoe Public Utility District (District) and Chris Twomey, Engineer and
Plan Reviewer, (Contractor) at South Lake Tahoe, California, with reference to the following
facts and intentions:
Whereas the District desires to benefit its customers by obtaining services for plan review
which requires specific knowledge of the sewer and water requirements under
jurisdiction of the South Tahoe Public Utility District as well as general engineering
practices, knowledge of the Uniform Plumbing Code and District Administrative Code;
Whereas the Contractor has special skills and experience in engineering and previous
District experience which the District desires to retain on an independent contractor
basis;
Now therefore, the parties agree retain Contractor according to the following terms and
conditions:
Services by Contractor. Contractor agrees to perform the following in a professional
manner:
Performs reviews of commercial constmction plans for compliance with District
policies and ordinances.
be
Assists in enfoming District policies and Administrative Codes by adhering to
policy during plan review process.
Co
Meets with or speaks to architects, developer or engineer in clarifying
engineering and plumbing issues during plan review process.
do
Prepares reports of revision requirements for reviewed plans and submits report
with plans for District's response to customer by e-mail and hard copy.
e. Agrees to only accept plans that can be completed within ten (10) working days.
-15-
e
e
District's Obligations. The District shall provide Contractor with access to all necessary
information needed to complete the contracted services above, including providing staff
time as needed for training purposes and document review.
~ Contractor shall keep accurate records of the hours expended for
services performed under this Agreement. The Contractor service fees will be paid by the
District at a rate of $50 per hour. The District will have no obligation to pay Contractor
services fees in excess of 2000 hours per calendar year unless prior v,~tten approval is
obtained from the District's Chief Financial Officer. Contractor shall submit invoices for
payment on a monthly basis.
Methods and Materials. Contractor shall furnish, at Contractor's own expense, all
materials, labor and services necessary for the accomplishment of the Services to be
performed under this Agreement; and shall have the sole and absolute discretion to
determine the methods, details and means of performing the Services to be performed
under this Agreement which shall only be subject to review by the District to the extent
necessary to ensure that the Services contracted for are being provided.
Non Exclusive Contract. Contractor shall have the right to perform services similar to
those provided under this Agreement to any other person or entity Contractor may desire.
Licenses and Insurance... The Contractor shall maintain all licenses and insurance
required by applicable law and state insurance statutes and regulations as they may apply.
Independent Contractor. Said Contractor shall be an independent contractor, and as
such, shall have no authorization, express or implied, to bind the District in any
agreement, settlement, liability, or understanding whatsoever, and shall not perform any
acts as agent for the District except as herein expressly set forth. It is the express
intention of the parties that Contractor is an independent contractor and not a District
employee, that any employees of Contractor are not District employees, and that neither
Contractor nor Contractor's employees are entitled to any of the fights, benefits, or
privileges applicable to District employees.
Term and Termination.. This Agreement shall be effective on January 2, 2004, and nm
through December 31, 2004.
a. Termination Upon Notice. Either party may terminate this contract prior to
expiration of the term for any reason by giving the other party at least ninety days
prior written notice of such termination. Termination by either party shall not
relieve either of them from their responsibilities under this contract until the
termination date. Such termination may take place at a date earlier than ninety
days if mutually agreed upon in writing by the parties.
bo
Termination for Cause. The District may terminate this Agreement, effective
immediately upon written notice of such termination to Contractor, based upon
the occurrence of any of the following events: (1) Material breach of this
Agreement; (2) Failure of Contractor to substantially comply with any
applicable federal, state or local law or regulation; and (3) Filing of a criminal
complaint against Contractor for any crime, other than minor traffic offenses.
Ownership of Work Product. All work product produced as a result of the rendering of
Services pursuant to this Agreement are the property of the District. In the event of
termination or completion of the Services under this Agreement or any Contractor shall,
at District's request, promptly surrender to District all completed work and work in
progress and all materials, records and notes developed, procured, or produced pursuant
to this Agreement. Contractor may retain copies of such work product as a part of its
record of professional activity.
10.
11.
Interests of Contractor. Contractor represents and warrants to District that it presently
has no interests, and covenants that it shall not acquire any interests, direct or indirect,
financial or otherwise, which would conflict with the performance of the Services to be
provided by Contractor under this Agreement. Contractor further covenants that in the
performance of this Agreement, no subcontractor or employee having such an interest
shall be employed by Contractor. Contractor certifies that no one who has or will have
any financial interest under this Agreement or within Contractor is an officer or
employee of District.
General Provisions.
ao
Authori _ty to Contract. The individuals executing this contract represent and
warrant that they have the authority to enter into this contract and to perform all
acts required by this contract, and that the consent, approval or execution of or by
any third party is not required to legally bind either party to the terms and
conditions of this contract.
Construction. The provisions of this contract should be liberally construed to
effectuate its purposes. The language of all parts of this contract shall be
construed simply according to its plain meaning and shall not be construed for or
against either party, as each party has participated in the drafting of this document
and had the oppommity to have their counsel review it. Whenever the context
and construction so requires, all words used in the singular shall be deemed to be
used in the plural, all masculine shall include the feminine and neuter, and vice
versa.
-17-
Co
Notices. All notices, approvals, acceptances, demands, and other
communications required or permitted hereunder, to be effective shall be in
writing and shall be delivered either in person or by mailing the same by United
States mail (postage prepaid, registered or certified, return receipt requested) or
by Federal Express or other similar overnight delivery service to the party to
whom the notice is directed at the address of such party as follows:
TO DISTRICT:
Customer Service Manager
South Tahoe Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
With Copy To:
Inspection Supervisor
South Tahoe Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
-18-
do
eo
go
TO CONTRACTOR: Chris Twomey
2744 Santa Claus Drive
South Lake Tahoe, CA 96150
Any written communication given by mail shall be deemed delivered two (2)
business days after such mailing date and any written communication given by
overnight delivery service shall be deemed delivered one (1) business day after
the dispatch date. Either party may change its address by giving the other party
m'itten notice of its new address as herein provided.
Governing Law. The validity and interpretation of this contract shall be governed
by the laws of the State of California, with venue for all purposes to be proper
only in the County of El Dorado, State of California.
Sevembili _ty. If any term, provision, covenant or condition of this contract is
determined to be unenforceable by a court of competent jurisdiction it is the
parties' intent that the remaining provisions of this contract shall remain in full
force and effect and shall not be affected, impaired or invalidated by such a
determination.
Attorneys' Fees. If any action at law or equity, including an action for
declaratory relief, is brought to enforce or interpret the provisions of this contract,
the prevailing party shall be entitled to recover actual attorneys' fees which may
be determined by the court in the same action or in a separate action brought for
that purpose. The attorneys' fees to be awarded shall be made to fully reimburse
for all attorneys' fees, paralegal fees, costs and expenses actually incurred in good
faith, regardless of the size of the judgment, it being the intention of the parties to
fully compensate for all attorneys' fees, pamlegal fees, costs and expenses paid or
incurred in good faith.
Counterparts. This contract may be executed in any number of counterparts, each
of which shall be an original, but all of which shall constitute one and the same
instrument.
Good Faith. The parties agree to exercise their best efforts and utmost good faith
to effectuate all the terms and conditions of this contract and to execute such
further instruments and documents as are necessary or appropriate to effectuate
all of the terms and conditions of this contract.
Assignment. No party shall have the right to assign its rights or delegate any of
its obligations or duties under this contract without the express written consent of
the other party.
-19-
ko
Waiver. The waiver of any breach of any provision of this contract by any party
~o this contract shall not be deemed to be a waiver of any proceeding or
subsequent breach under the contract, nor shall any waiver constitute a continuing
waiver. No waiver shall be binding unless executed in writing by the party
making the waiver.
Entire Agreement. This contract contains the entire understanding and agreement
0fthe parties and there have been no promises, representations, agreements,
warranties or undertakings by any of the parties, either oral or written, of any
character or nature binding except as stated in this contract. This contract may be
altered, amended or modified only by an instrument in writing, executed by the
parties to this contract and by no other means. Each party waives their future
right to claim, contest or assert that this contract was modified, canceled,
superseded or changed by any omi agreement, course of conduct, waiver or
estoppel.
IN WITNESS WHEREOF, THE PARTIES HAVE EXECUTED THIS contract as of
the date first stated above.
DISTRICT
South Tahoe Public Utility District
Date:
By:
Title:
CONTRACTOR
Chris Twomey
Date:
By:
Title:
-20-
. pUbliC UtilitY DiStrict" .: :.-
1275 Meadow
Crest. Drive · South Lake Tahoe, · CA 96150-7401
Phone 530 544-6474. Fax 530 541-0614
TO:
BOARD AGENDA ITEM 4.c
Board of Directors
FROM: '
NiCk Zaninovich, Senior Engineer
MEETING DATE: January 2, 2004
ITEM - PROJECT: Elks ClUb Well Control Building Project
REQUESTED BOARD ACTION: Approve Ci~ange Order No. 1 in the amount of
$7,272.56.
DISCUSSION: Change Order No. 1. is for temporary asphalt cement paving as required
by Tahoe Regional Planning Agency'to allow snow .removal and wintertime access to
the site.
SCHEDULE: Project completed by June 30, 2004
COSTS: $7,272,56 - -
ACCOUNT NO: 2029-6460/RWELKS
BUDGETED AMOUNT·REMAINING: : ' '
. ATTACHMENTS: Change Order No. % Budget Analysis
CONCURRENCE WITH REQUESTED ACTiONi. " '
· GENERAL MANAGER: YES' ..,'~)t':4~' .- .n ......
CHIEFFINANClAL OFFICER:.. YEs'; ~Y'rh¢---. NO -
~ -21- . '
cATEGORY: Water
CHANGE ORDER NUMBER 1
ProjeCt ELK'S CLUB WELL CONTROL BUILDING PROJECT
Contractor White Rock Construction Inc.
Date January 2, 2003 PO # P14167
The Contract Shall Be Changed As Follows:
A) Labor and materials required for temporary paving of site to allow snowplowing for
winter time access as required by the TRPA, in the lump sum amount of 97,272.56.
Original Contract $588,165.00
Previous Change Order 9-0-
Current Contract $ 588,165.00
THIS CHANGE ORDER $ 7,272.56
New Contract Total $595,437.56
This Change Order constitutes full and mutual accord and satisfaction for' all time and all costs related to this
change. By acceptance of this Change Order the contractor agrees that the Change Order represents an
equitable adjustment to the contract price and time, and further agrees to waive all right to file a claim arising
out of or as a result of this change.
~~ ~rz~sident
Date:~-~'
-2.3-
ELKS CLUB WELL
Account: 2029-8460
BUDG ET REMAINING ANALYSIS:
2003~04 All Years
.Spent to date 257,782 257,844
Outstanding Purchase Orders-
Fast Fabricators Inc. 710 710
White Rock Construction 523,960 523,960
Zim Industries 110,205 110,205
Total Encumbered 634,875 634,875
Total Spent & Encumbered 892,657 892,719
700,000 700,000
Budcjet -192,657 -192,719
Note 1: The amount over budget reduces the Capital Outlay Reserve.
..S'oUth Tahoe
public Utility DistriCt'
1275 Meadow Crest Drive · South lake Tahoe,, CA 96150-7401
' Phone 530 544-6474, lax 530 541-0614
TO:
FROM: -
BOARD AGENDA iTEM 4.d
BOard of Directors '
Rick Hydrick, Manager of Water.Operations
MEETING DATE: January 2, 2004
ITEM - pRoJECT: PurchaSe of Tank Truck
REQUESTED BOARD ACTION: Authorize's{aff to advertise for'bids for a pumper tank
truck.
DISCUSSION: The existing pumper; truck was built by District staff about 10 years ago.
It is .no longer operating satisfactorily;-and it is over the Department of Motor Vehicle's
weight limits when full. The Pump Crew uses the p~Jmper truck to clean septic tanks in
the Fallen Leaf Lake sewage collection system and for cleaning wet wells in the main
collectionI system on a Weekly basis. The truck can also be used by other District
crews.
SCHEDULE: As soon as possible .. ' -
COSTS: $75,000' plus tax (estimated)
ACC'OUNT NO: i002-8489 (Additional monies will be obtained from capital projects
that came in under budget.: The Original budget was created to buy'a new chassis and
use the. existing tank.) - · .
BUDGETED AMOUNT REMAINING:' $26,000 ' ' '.'
CATEGORY: Sewer
CoNcURRENCE wITH REQUESTED ACTIONi.
GENERAL'MANAGER: YES ~ ' "NO
C. E · .O " '
' ' ' ' ' ' -25- ' ' -. . . . : "'
South Tahoe
Public Utility District
1275 Meadow Crest Drive · South Lake Tahoe · CA 96150-7401
Phone 530 54~6474 · Fax 530 541-0614 · www. st?ud.us
BOARD AGENDAITEM4.e
TO:
Board of Directors
FROM:
Richard H. Soibrig, General Manager
MEETING DATE: January 2, 2004
ITEM - PROJECT: Side Letter to Managers' Memorandum of Understanding (MOU)
REQUESTED BOARD ACTION: Approve Side Letter extending compensatory time
limits for Engineering Department due to Assistant General Manager position not being
filled.
DISCUSSION: The position of the Assistant General Manager remained unfilled from
the time I was appointed Interim General Manager until recently when Paul Sciuto was
appointed to that position. The Engineering Department workload did not diminish in.
this time period. To fill the void, the department was required to work additional
compensatory time in excess of the 280 hours allotted by the MOU. This proposed Side
Letter allows the compensation to exceed the 280 hours for the 2003 year, and is
effective as of December 31,2003. Management staff met with the General Manager
· and reached an agreement on.the attached Side Letter.
SCHEDULE:
COSTS: $18,000
ACCOUNT NO: 1020/2029-4102'
BUDGETED AMOUNT REMAINING: <$.12,733>
ATTACHMENTs: Side Letter to Managers Memorandum of Understanding
CO.CURRE"CE W T. ,EOUESTED ACT O.'..
GE,ER^,.M ,AGER: YES i
CHIEFFINANCIAL OFFICER: .YES., ~YY~-
CATEGORY: General
.'NO
-27-
.South Tahoe
Public Utility District.
~gnmral
I~icha~ H. 5olbrl~
Direct:ors
Tom Co~
James ~ Jones
Ma~ ~u Mo~ba~her
Duane Wallace
Eric
1275 Meadow Crest Drive · South Lake Tahoe' CA 96150-7401
PhoneL530 544-6474 · Fax 530 541-0614' www. stpud.us
Side Letter of Agreemen[
Between
South Tahoe Public Utility District
And
Management Staff of South Tahoe Public Utility District
This Side Letter is entered into this day of _, 2003 between the South Tahoe
Public Utility District (District) and the Management Staff of the South Tahoe Public Utility
District (Management Staff).
In Relation to Section i5, Overtime/Compensatory Time, this Side Letter Provides that the
Engineering Department Staff whose positions where effected by the Assistant General
Managers vacancy shall be c. ompensated for the extra comp time in excess of the 280 hours.that
was allotted for in 2003.
Date Adopted by Board:
South Tahoe Public Utility District
James R. Jones
Board President
Richard H. Solbrig
General Manager
Management Staff of the South Tahoe Public Utility District Ivo Bergsohn, Hydro-Geologist
Hal Bird, Land Application Manager
Linda Brown, Purchasing Agent
Dennis Cocking, District Information Officer
Lisa Coyner, Customer Service Manager
Debbie Henderson, Accounting Manager
Jim Hoggatt, Construction Manager/Engineer
-29-
Rick Hydrick, Water Operations Manager
Ross Johnson, Wastewater Operations Manager
Rhonda McFarlane, Chief Financial Officer
Paul Sciuto, Assistant Manager/Engineer
Kenneth Schroeder, Maintenance Manager
Kathy Sharp, Clerk of the Board/Exec. Secty.
Carol Swain, Information Systems Manager
John Thiel, Staff Engineer
Nick Zaninovich, Staff Engineer
Terry Powers, Laboratory Manager
2
1275 Meadow Crest Drive · South Lake Tal~,, CA 96150-7401
Phone 530 544-6474. Fax 530 541-0614
TO:
BOARD AGENDA ITEM 6.a
Board of Directors
FROM: '
Kathy SharP, Clerk of the Board '
MEETING DATE: January 2, 2004
ITEM -. PROJECT: Electi0n'of Board Officers
REQUESTED BOARD ACTION: Elect a Board President for 2004 Calendar Year
DISCUSSION: This election is held in accordance with Board Policy. The Board's
committees shall be appointed and publicly announced by the Board President at the
January 15 Regular Board meeting.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED. AMOUNT· RE
MAINING:
. ATTACHMENTS: None..
cONCuRRENCE WITH REQUESTED ACTION: '.' "'
CHIEF FiNANCIAl.' OFFicER:'...YE~,' 'No ....
CATEGORY: General
South Tahoe
Public Utility District
1275 Meadow Crest Drive · South Lake Tahoe, · CA 96150-7401
Phone 530 544-6474, Fax 530 541-0614
BOARD AGENDA ITEM 6.b
TO:
FROM:
MEETING DATE:
Board of Directo rs
Kathy Sharp, Clerk of the Board
January 2, 2004
ITEM - PROJECT: Election of Board Officers
REQUESTED BOARD ACTION: Elect a Board Vice President for 2004 Calendar Year
DISCUSSION: This election is held in accordance with Board Policy,
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES (f'~,"~ NO
CHIEF Fl NANCIAL OFFICER: yES~ NO
CATEGORY: General
South Tahoe'.-
Public Utility DiStrict. ' :.'
1275 Meadow Crest Drive · South Lake Taka,, CA 96150-7401
- ' ' ' "Phone 530 54~-6474.Fax 530 541-0614
BOARD AGENDA iTEM 6.c ....
TO:
Board of Directors
FROM:
MEETING DATE:
Paul A. SCiuto, Assistant General .Manager/Engineer
January 2, 2004 ..
ITEM - PROJECT.: Highway 50 Waterline Replacement: Winnemucca to the Y
REQUESTED BOARD ACTION' Approve'a proposal from C2ME Engineering for
design and construction assistance (costs will be presented at the Board meeting).
DISCUSSION: There continues to be a bottleneck in the water flow between the east
and the west sides, of the main pressure zone in the Water distribution system.
Therefore, the District cannot utilize Valhalla and Airport Wells to their optimal potential.
There have been numerous waterline improvement .projects on Highway 50 and Lake
Tahoe Boulevard. The completion of the waterline on Highway 50 between
Winnemucca and the .Y will complete' the upsizing of the waterlines in this area thereby
removing.the bottleneck between the east and west sides of the main pressure zone.
Also, theCity is performing intersection and overlay projects in the vicinity of
Winnemucca to the Y and will not allow trenching in this area .after the completion of
their paving project in October of 2005. The combination of these two facts dictates that
the waterline .project be completed during 2004.
SCHEDULE: Design to be completed by March 15, 2004 .and. construction to be
completed byOctober 15, 2004,
COSTS:
ACcoUNT'NO: 2029-8355
.... 'BUDGETED AMOUNT REMAINING: $490,350
ATTACHMENTS: ProPosal
- CONCURRENCE WITH.REQuESTED ACTIoNi ' ' "'..' 'i ." ' ' cATEGORy:' Sewer
CHIEF FINANCIAL OFFICER: YES ~y'y"~c~ ' ' NO
December 2003
Proposal
for
Engineering
Design
Services
South Tahoe Public Utility District
Highway 50- '04
Water Line Replacement Project
Prepared by:
c2me Engineering
2744 Santa Claus Ddve
South Lake Tahoe, CA
Tel: (530) 577-6447
Fax: (530) 577-4003
E-mail: c2me~jps.net
-3?-
STATEMENT OF QUALTF'rCAT~'ON$
c2me Engineering is a sole-proprietor engineering firm staffed by Chds Twomey
P.E. Chds is professionally registered in California and Nevada. Administrative
and technical support and surveying assistance is provided by Lenore Twomey.
A copy of Chris' resume is included as an attachment.
c2 me Engineering has provided engineering services to a growing number of
public and private clients. These projects include the El Dorado Beach Retaining
Wall Replacement Project for the City of South Lake Tahoe, the Pioneer Trail at
Filter Plant Water Line Replacement Project for the South Tahoe Public Utility
District, and a Sewer Capacity and Impact Analysis for the Tahoe- Douglas
District. Having recently successfully performed water line work for the District,
c2me Engineering is qualified and eager to complete this project in a timely
manner.
c2me Engineering would be pleased to perform this work under an existing
Master Agreement for Engineering Services as Task Order No. 2.
PROPOSED PRO3ECT APPROACH
This project involves replacement of approximately 5,000 linear feet of 14-inch
water line in U.S. Highway 50, from adjacent to VVinnemucca Ave. west along
Highway 50 to Dunlap Dr., and possibly around the comer to approximately
McDonalds. There will be one or more bore-and-jack crossings of Highway 50.
This project has a very tight timeline which will require close coordination with
Distdct staff. The project has the benefit of existing base mapping and
conceptual layout work has been accomplished by the District. District standard
details and specifications will form the basis of the design.
Important initial issues to be resolved include additional base mapping if the
project is to be extended, and possible survey augmentation within Highway 50.
There are utility facilities within the traveled way which are not shown on the
base mapping and the utilities that are shown should be checked relative to
purveyor system mapping. USA location will typically not result in identification of
drainage facilities crossings and field location will be necessary. If topographic
contours are desired or required, ground shots will need to be taken along the
Highway 50 crown and contours will need to be generated. This will allow for
profiling along the pipeline centertine. Alternately, it is possible to estimate lhe
centerline profile assuming a 2% roadway cross slope, which would allow for
contour generation and profiling of the pipeline alignment. A method must also
be devised to add roadway stdping to the base map, so that potential pipeline
alignments can be analyzed for their traffic control requirements. Possible
sources of existing aedal survey data should be investigated for the lane stdping
as well as to form expanded base mapping for the traffic control plan, stormwater
pollution prevention plan, identification of staging, and for expanded detail for the
boring-and-jacking site plans.
STPUD Hwy 50 - '04 Water Line Replacement
2 c2me Engineering
-38-
The pipeline design itself is anticipated to require approximately nine, 1"=20' plan
and profile sheets. Detailed site plans for the bore-and-jack crossings and
interties to the existing system will be at a scale of 1"=10'. The design will be
cognizant of District operational and scheduling requirements, public health
requirements related to disinfection, testing and flushing, and common
construction practices.
One or more traffic control plan sheets will be produced at an appropriate scale
to provide legible coverage of the project and adjacent areas. These will be used
to develop a set of plans meeting the requirements of the California Department
of Transportation (CalTrans) using Amedcan Traffic Safety Services Association
(ATSSA) standards.
One or more stormwater pollution prevention plan sheets will be produced at an
appropriate scale and temporary erosion control details will be included with the
project details. These sheets will be used to represent agency requirements and
to fadlitate permitting. Distdct staff will permit the project and I will provide input
in the form of a project description and statistics. It is anticipated that TRPA land
coverage calculations will not be required.
Project specifications will be developed based on District standard specifications,
and input will be provided as necessary for the front end documents, such as
development of the bid form and tailoring of the special conditions. This work is
anticipated to be coordinated as a red-line service with District staff editing the
documents in preparation for bid set production.
An engineers opinion of probable construction cost will be provided at the review
milestones and with the final plans.
The attached preliminary project schedule establishes a 50% and 90% level of
review as well as regular coordination meetings. Work products will be
reproducible plans and technical specifications suitable for public bidding as
more specifically outlined below. I believe that I can meet the ambitious project
schedule in close coordination with District staff, and look forward to assisting
with the successful implementation of this project.
SCOPE OF SERV'rCES
Base Mapping: (Utilizing the base mapping provided by the District and
produced by Turner & Associates, dated 10/2003)
· Investigate sources of additional aerial base mapping or aerial
photography suitable for transfer of lane striping and augmentation of
base mapping for the traffic control plan. Check for sources to augment
the base mapping for possible extension of the pipeline.
· Obtain utility purveyor system maps and compare to utilities on the base
map, noting any discrepancies. Add utility services from purveyor maps
to the base maps as required in areas of possible conflict.
STPUD Hwy 50 - '04 Water Line Replacement
3
c2me Engineering
· Investigate the storm drainage system in the field to check for crossings.
Note that USA location will typically not result in identification of storm
drainage facilities.
· Generate a list of additional survey and data collection requirements, if
any, and coordinate with the Distdct to obtain same. Note that this scope
does not include fees for subcontracting for any additional required
surveying or costs for any data that may be required. The scope includes
time for limited field investigation and measurement.
· It is anticipated that agency requirements will necessitate generation of
topographic contours and they will be required to produce an accurate
pipeline profile. This may involve Distdct crews assisting the surveyor
with traffic control for work in Highway 50. As discussed above, it may
alternately be possible to generate this data based on reasonable
assumptions. This scope anticipates that the Distdct will provide contour
topography through the project surveyor if required.
· Augment base mapping as necessary to include additional alignment
coverage, utilities not present, and lane striping.
Deliverables: There are no specific deliverables identified for this subtask, but
the results will be incorporated into the preliminary design.
Preliminary Design (50% submittal):
· Develop planimetric design of the water line including interties, bore-and-
jack crossings and appurtenances. Limited profiling will be performed as
necessary to identify potential conflicts. All details will be identified.
· A preliminary traffic control plan will be developed to facilitate
coordination with CalTrans on encroachment requirements.
· A preliminary stormwater pollution prevention plan (SWPPP) will be
developed to assist District staff in obtaining permits for the project.
· Technical specifications and related documents such as a bid schedule
will be developed in draft form with all content identified.
· A preliminary engineers opinion of probable construction cost will be
provided utilizing recent District unit cost experience.
Deliverables: 50% plans, specifications and cost estimate as outlined above. It
is proposed that this deliverable milestone be followed by a comprehensive 50%
review meeting to gamer input and set direction for the detailed design phase.
Detailed Design (90% submittal):
Complete the planimetric design of the water line and interties including
profiling and development of all required detailing.
Complete the bore-and-jack site plans and details and update the District
standards for same if desired. If outside expertise is to be retained for
updating the standard bore-and-jack methodology, it is assumed that this
will be subcontracted for directly by the District.
STPUD Hwy 50 - '04 Water Line Replacement
4
-40-
c2me Engineering
· Complete the traffic control plan based on CalTrans and District Staff
review.
· Complete the SWPPP and provide plans for permitting agency submittal.
° Complete the specification documents and provide an engineers opinion
of probable construction cost.
Deliverables: 90% plans, specifications and cost estimate as outlined above. It
is the goal that this submittal be as complete and comprehensive as possible.
Final Design (100% submittal):
Finalize all aspects of the design based on Distdct staff review.
Finalize the specification documents and provide a final engineers opinion
of probable construction cost.
Deliverables: Final plans, specifications, and engineers estimate.
Bid Phase Services:
· Attend the pre-bid meeting, respond to technical questions, and
document pertinent contractor questions related to the design.
· Prepare addenda as necessary.
· In coordination with District Staff, address technical questions raised
during the bid phase.
Deliverables: Addenda as required.
STPUD Hwy 50 - '04 Water Une Replacement
5
-41-
c2me Engineering
,DESI'GN SERV][CES HOUR AND FEE ESTI~MATF
Des~qn Element
Base Mapping:
Preliminary Design:
Detailed Design:
Final Design:
Bid Phase Services:
Total:
Fee schedule:
Engineering design services:
$110 per hour
Hours
45
138
143
44
16
Fee
$4,950
$15,180
$15,730
$4,840
$1,760
$42,460
Thank you for the opportunity to provide this proposal.
STPUD Hwy 50 - ~4 Water Une Replacement
6
-42-
c2me Engineering
Base Maaalnq
Addn'1 Mapping Sources:
Finalize Utilities:
CL Topography:
Roadway Striping:
Update Base Map:
Preliminary Deslan
Kickoff Meeting:
Plan -Profile & Dets:
Traffic Ctrl & SWPPP:
Specifications & EOPC:
50% Submittal:
50% Review Meeting:
petalled Deslan
90% Coordination Mtg:
Plan -Profile & Dets:
Traffic Ctrl & SWPPP:
Specifications & EOPC:
90% Submittal:
90% Review:
Final Deslan
Final Coordination Mtg:
Plan - Profile & Dets:
Spedfications & EOPC:
100% Submittal:
old Phase
Pre -Bid
Addenda
Response to Questions
Lida -ni h
1-Jan
1-Jan
1-Jan
1-Jan
12-Jan
6-Jan
7-Jan
7-Jan
14-Jan
22-Jan
27-Jan
4-Feb
27-Jan
27-Jan
10-Feb
16-Feb
16-Feb
25-Feb
23-Feb
23 -Feb
1-Mar
TBD
TBD
TBD
STPUD Hwy 50 -'04 Water Line Replacement
9-Jan
9-Jan
18-Jan
16-Jan
30Jan
6Jen
22-Jan
22-Jan
22-Jan
22-Jan
27-Jan
4-Feb
16 -Feb
16-Feb
18-Feb
18-Feb
23-Feb
25-Feb
1-Mar -
1-Mar
1 -Mar
TBD
TBD
TBD
rt3
z
m
z
Hwy 50 - '04 Water Line Replacement
Preliminary Design Schedule
m m
m
z
Q
m
tr
c� a
It: to
tr
L'n
co CD
tr tr
tr
tr
tr
■ ■.01■■..■■.■11H■ ■.1111..■■.■.■..■.. ■
..■...■. ■■11■■
11■M11■
11■■■■. 11■........ ..■....■■■... ■..■.■.■■■....■■M.
6' ■.■■■■.■■ ■.....■■■ ■.0101.■..■. ■0101■.■..■■ ■0101■...
■■■■■■■■■. M■■ . ■ ■ ■ ■. ■ ■ ■ ■ ■. ■ ■ ■ ■ ■.. ■ ■. ■ ■ ■ ■ ■ ■ ■E■
■■■■■■■..■■ ?° :,M, is ryl_r t �f, xiflr,, ■ ■ ■ ■ ■ ■ ■. ■ ■ ■ ■■ ■ ■.■■. ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■
■■■■■■■..■■■..■...■■..■ ■. ■..■ ■.■■■■...■■■..■■.... ■ ■.■■ ■■.11.01■
■ } ■■ . ..■.■■■■
.■■■ ■■■.■■■■ 0101■ ■0101■.■■■■■ ■....0101■. ■1101■.■.■.....■. .■..■■... ... ■... ■. ■... ■.... ■.. ■ ■.11■.. ■.. ■..... ■ ■ ■.... .■.V11.■ ■.■t■.. ■ ■ ■■11■ ■..1101■ ■1111. ■0111.■.■ ■... ■..■. ■ .■ 1111.■. a , s - , ■ ■..■......■■..■...■■ 0101■■....■■■■.. .0101.■. ...■... ■.■■■.■.■■■.■ ■■■C■11...■■■.■... .......i.■..`
0101 ■.■■. ■ ■.. ■.■........■... ■.■■...■..■■
■■..0111■■..■.■■■■■.■MM ■■.101■.■■.■E■ ■■■■■■■.■ 11:01. �...■■■..
■■.�....�■...■...MM.. ■■.■■.. ■■ ..■ ■.... ■...■.■...
...... ■ ■..■ ..■ ..■ ■1111..■■.
11. 0101■. 11..■ ■■....11■■■11M■11M1111Wn■.■11...■ ■t ■....■..■>,..■■
0101■■■■■..■..■..■■.11.■11..■. a. t i dkP F 4p � E.. ■ ■ ■. ■ ■ ■.ME■
.010101■01■..01■■■01■01■■01■ ■0101■■■ al T.■ ■.■01■■. ■ ■..■
■. ■.. ■ ■..■■■■■■■ ■.0101■■■■■ ■010101■■■■ ■01.01.01. .■■..■.■■■■..
. .■............ ■ ■.. ■.... ■ ■ ■.. ■ ■. 0111. ■0111. ■ ■ ■ ■...,,. ■ ■. ■ ■. ■ ■ ■ ■..■
■■■■■■■...■.... ■■■■... ■..■...■..■■.■..■.■.■. ■11 ;�y,t 0101■■ ■0101
■■■■■■■■.■.■■■.■■...■■■■■.■.■. ■. ■ ■.. ■.... ■ ■.. ■ ■. ■11■.■.■..■■■.
■ .. ■ ■.■.. ■ ■....... ■...... ■ ■. ■■■■ ■..0101... ■■11■■■■.. ■■.1111■■..■■
.......■■■■■...■■■...■.....■■ .■11C ■. ■.i. ■........ ■.. ■.... ■...
■.. ■. ■ ■.. ■ ■ ■.. ■....... ■. ■. ■.. .11..11..11. ■... ■.C.=. ■ ■■. ■1111... ■■
■■■■....■■.■■..■■..■■■ . ■.■..■■...■ ■ ■■.■.■....■.■.■.■■ a�
■■■■.■■..■.■■■.■.■.■■■■■■ ■ ■. ■.■■■■■■■.■■■.■■■■.01....OIPr s,�5
■ . ■ ■... ■ ■.. ■... ■ ■. ■ ■.... ■.. ■...■ 0111..■.■■■.■■■ ■.0101■..■ ■■01■■01 ■?L-.
■■■■■■■..■.■■.■■■■.■■■■■ M.■■■■ .■■■..■..■.■..■.■■.■....■■.■.■■
.■ ■.01..01■■■■■■■■■■■ ■0111 ■■ ■0101.■ ■.■■■■■.■■■.■■.....■.■.■.■....■
■■■■■■.■...■.■■■■■■....■■..... ..11....■■11..■■■.■.■11.■.11 ■11.■■■■
■11■...■■■11■■...■ 1111. 11■ ■■11■■■11■■11■1111 ■.. ■ ■ ■...... ■ ■. ■.■ ■11.11.11.■■
■■■■.■..■..■11 ■11... ....11.1111 ■.■.11..■■.....■■.■ ■11.■. ■....■1101.■■■
7
c2me Engineering
December 2003
Proposal
for
Engineering
Design
Services
South Tahoe Public Utility District
Highway 50- '04
Water Line Replacement ProjeCt
Prepared by:
c2me Engineering
2744 Santa Claus Drive
South Lake Tahoe, CA
96150
Tel: (530) 577-6447
Fax: (530) 577-4003
E-mail: c2me@jps.net
STATEMENT OF QUALIFICATIONS
c2me Engineering is a sole-proprietor engineering firm staffed by Chris Twomey
P.E. Chris is professionally registered in California and Nevada. Administrative
and technical support and surveying assistance is provided by Lenore Twomey.
A copy of Chris' resume is included as an attachment.
c2me Engineering has provided engineering services to a growing number of
public and private clients. These projects include the El Dorado Beach Retaining
Wall Replacement Project for the City of South Lake Tahoe, the Pioneer Trail at
Filter Plant Water Line Replacement Project for the South Tahoe Public Utility
District, and a Sewer Capacity and Impact Analysis for the Tahoe-Douglas
District. Having recently successfully performed water line work for the District,
c2me Engineering is qualified and eager to complete this project in a timely
manner.
c2me Engineering would be pleased to perform this work under an existing
Master Agreement for Engineering Services as Task Order No. 2.
PROPOSED PROJECT APPROACH
This project involves replacement of approximately 5,000 linear feet of 14-inch
water line in U.S. Highway 50, from adjacent to Winnemucca Ave. west along
Highway 50 to Dunlap Dr., and possibly around the corner to approximately
McDonalds. There will be one or more bore-and-jack crossings of Highway'50.
This project has a very tight timeline which will require close coordination with
District staff. The project has the benefit of existing base mapping and
conceptual layout work has been accomplished by the District. District standard
details and specifications will form the basis of the design.
Important initial issues to be resolved include additional base mapping if the
project is to be extended, and possible survey augmentation within Highway 50.
There are utility facilities within the traveled way which are not shown on the
base mapping and the utilities that are shown should be checked relative to
purveyor system mapping. USA location will typically not result in identification of
drainage facilities crossings and field location will be necessary. If topographic
contours are desired or required, ground shots will need to be taken along the
Highway 50 crown and contours will need to be generated. This will allow for
profiling along the pipeline centerline. Alternately, it is possible to estimate the
centerline profile assuming a 2% roadway cross slope, which would allow for
contour generation and profiling of the pipeline alignment. A method must also
be devised to add roadway striping to the base map, so that potential pipeline
alignments can be analyzed for their traffic control requirements. Possible
sources of existing aerial survey data should be investigated for the lane striping
as well as to form expanded base mapping for the traffic control plan, stormwater
pollution prevention plan, identification of staging, and for expanded detail for the
boring-and-jacking site plans.
STPUD Hwy 50 - '04 Water Line Replacement 2 c2me Engineering
The pipeline design itself is anticipated to require approximately nine, 1"=20' plan
and profile sheets. Detailed site plans for the bore-and-jack crossings and
interties to the existing system will be at a scale of 1"--10'. The design will be
cognizant of District operational and scheduling requirements, public health
requirements related to disinfection, testing and flushing, and common
construction practices.
One or more traffic control plan sheets will be produced at an appropriate scale
to provide legible coverage of the project and adjacent areas. These will be used
to develop a set of plans meeting the requirements of the California Department
of Transportation (CalTrans) using American Traffic Safety Services Association
(ATSSA) standards.
One or more stormwater pollution prevention plan sheets will be produced at an
appropriate scale and temporary erosion control details will be included with the
project details. These sheets will be used to represent agency requirements and
to facilitate permitting. District staff will permit the project and I will provide input
in the form of a project description and statistics. It is anticipated that TRPA land
coverage calculations will not be required.
Project specifications will be developed based on District standard specifications,
and input will be provided as necessary for the front end documents, such as
development of the bid form and tailoring of the special conditions. This work is
anticipated to be coordinated as a red-line service with District staff editing the
documents in preparation for bid set. production.
An engineers opinion of probable construction cost will be provided at the review
milestones and with the final plans.
The attached preliminary project schedule establishes a 50% and 90% level of
review as well as regular coordination meetings. Work products will be
reproducible plans and technical specifications suitable for public bidding as
more specifically outlined below. I believe that I can meet the ambitious project
schedule in close coordination with District staff, and look forward to assisting
with the successful implementation of this project.
SCOPE OF SERVi'CES
Base Mapping: (Utilizing the base mapping provided by the District and
produced by Turner & Associates, dated 10/2003)
· Investigate sources of additional aerial base mapping or aerial
photography suitable for transfer of lane striping and augmentation of
base mapping for the traffic control plan. Check for sources to augment
the base mapping for possible extension of the pipeline.
· Obtain utility purveyor system maps and compare to utilities on the base
map, noting any discrepancies. Add utility services from purveyor maps
to the base maps as required in areas of possible conflict.
STPUD Hwy 50 - '04 Water Line Replacement 3 c2me Engineering
· Investigate the storm drainage system in the field to check for crossings.
Note that USA location will typically not result in identification of storm
drainage facilities.
· Generate a list of additional survey and data collection requirements, if
any, and coordinate with the District to obtain same. Note that this scope
does not include fees for subcontracting for any additional required
surveying or costs for any data that may be required. The scope includes
time for limited field investigation and measurement.
· It is anticipated that agency requirements will necessitate generation of
topographic contours and they will be required to produce an accurate
pipeline profile. This may involve District crews assisting the surveyor
with traffic control for work in Highway 50. As discussed above, it may
alternately be possible to generate this data based on reasonable
assumptions. This scope anticipates that the District will provide contour
topography through the project surveyor if required.
· Augment base mapping as necessary to include additional alignment
coverage, utilities not present, and lane striping.
Deliverables: There are no specific deliverables identified for this subtask, but
the results will be incorporated into the preliminary design.
Preliminary Design (50% submittal):
· Develop planimetric design of the water line including interties, bore-and~
jack crossings and appurtenances. Limited profiling will be performed as
necessary to identify potential conflicts. All details will be identified.
· A preliminary traffic control plan will be developed to facilitate
coordination with CalTrans on encroachment requirements.
· A preliminary stormwater pollution prevention plan (SWPPP) will be
developed to assist District staff in obtaining permits for the project.
· Technical specifications and related documents such as a bid schedule
will be developed in draft form with all content identified.
· A preliminary engineers opinion of probable construction cost will be
provided utilizing recent District unit cost experience.
Deliverables: 50% plans, specifications and cost estimate as outlined above. It
is proposed that this deliverable milestone be followed by a comprehensive 50%
review meeting to garner input and set direction for the detailed design phase.
Detailed Design (90% submittal):
Complete the planimetric design of the water line and interties including
profiling and development of all required detailing.
Complete the bore-and-jack site plans and details and update the District
standards for same if desired. If outside expertise is to be retained for
updating the standard bore-and-jack methodology, it is assumed that this
will be subcontracted for directly by the District.
STPUD Hwy 50 - '04 Water Line Replacement 4 c2me Engineering
· Complete the traffic control plan based on CalTrans and District Staff
review.
· Complete the SWPPP and provide plans for permitting agency submittal.
· Complete the specification documents and provide an engineers opinion
of probable construction cost.
Deliverables: 90% plans, specifications and cost estimate as outlined above. It
is the goal that this submittal be as complete and comprehensive as possible.
Final Design (100% submittal):
· Finalize all aspects of the design based on District staff review.
· Finalize the specification documents and provide a final engineers opinion
of probable construction cost.
Deliverables: Final plans, specifications, and engineers estimate.
Bid Phase Services:
· Attend the pre-bid meeting, respond to technical questions, and
document pertinent contractor questions related to the design.
· Prepare addenda as.necessary.
· In coordination with District Staff, address technical questions raised
during the bid phase.
Deliverables: Addenda as required.
STPUD Hwy 50 - '04 Water Line Replacement 5 c2me Engineering
DESTGN SERVI'CES HOUR AND FEE ESTTHATF
Desi.qn Element En.q'rq Hrs Draft.q Hrs
Base Mapping: 32 12
Preliminary Design: 100 38
Detailed Design: 105 38
Final Design: 32 12
Bid Phase Services: 16
Total:
Fee schedule:
Engineering design services:
Drafting services:
$110 per hour
$55 per hour
Thank you for the opportunity to provide this proposal.
Fee
$4,180
$13,090
$13,640
$4,180
$1,760
$36,850
STPUD Hwy 50 - '04 Water Line Replacement 6 c2me Engineering
December 2003
Proposal
for
Engineering
Design
Services
South Tahoe Public Utility District
Highway 50 - '04
Water Line Replacement ProjeCt
Prepared by:
c2me Engineering
2744 Santa Claus Drive
South Lake Tahoe, CA
96150
Tel: (530) 577-6447
Fax: (530) 577-4003
E-mail: c2me@jps.net
South Tahoe
Public Utility District
1275 Meadow Crest Drive · South Lake Tahoe · CA 96150-7401
Phone 530 54¢6474 · Fax 530 541-0614 ° www. stpud.us
BOARD AGENDA ITEM 6.d
TO:
Board of Directors
FROM:
John Thiel, senior Engineer, Nick Zaninovich, Senior Engineer
MEETING DATE: January 2, 2004
ITEM - PROJECT: Bakersfield Well Treatment Project
REQUESTED BOARD ACTION: (1) Adopt Resolution 2779-04, rescinding
Resolution 2777-03, which authorized an exemption from competitive bidding
procedures to negotiate directly with U.S. Filter;
(2) Make a finding that Applied Process Technology's proprietary advanced oxidation
treatment (HiPOx).system is the best treatment for the Bakersfield Well; and (3) Award
contract to Applied Process Technology, the sole source supplier for HiPOx, including
treatment process and related services, in the amount of $832,600.
DISCUSSION: Engineering staff sent Request for Proposals (RFPs) to the suppliers of
two systems known to be capable of treating drinking water for MTBE. An RFP was
sent to U.S: Filter for their proprietary CC-602 coconut shell carbon system, which was
· selected as the most viable GAC (granular ~ctivated carbon).option for MTBE removal,
per the "Pilot Plant Study Report for MTBE Removal Using GAC Tara Lane Well Water
at Clement Well Treatment Site" prepared by Boyle Engineering~ An RFP was also sent
to Applied Process Technology for advanced oxidation destruction of MTBE, because
they are the only known manufacturer of such a system.
Since Resolution No. 2777-03 was approved; staff has discovered that GAC is
inefficient at removing Tertiary Butyl Alcohol, which has been discoVered at the Sioux
Sentinel Well, approximately 2,000 feet from Bakersfield Well.
Staff evaluated the proposals based on effectiveness and reliability, site constraints,
flow variability, permitting, portability, operations complexity, power consumption, 15
year annualized capital and .operations and maintenance cost for nine different
contamination leVels, and potential for a future arsenic treatment train addition. After
evaluating the GAC and the HiPOx systems, staff recommends the patented HiPOx
system for the Bakersfield Well for the following reasons:
-45-
Total destruction of the MTBE and TBA molecules
· System is not an "accumulator", such as GAC, thereby eliminating concerns
related to radionuclide accumulation, biogrowth, and waste disposal of spent
· carbon (i.e. "cradle-to-grave" issues)
~, Low environment impact (lower profile and less site coverage required than for
(GAC)
~, District operator familiarity and known reliability from Arrowhead Well No. $
treatment
· More versatile than GAC for the variable flow rates that can exist at the Bakers-
field Well
Engineering staff is also recommending that the Board purchase the pressure-switch
adsorption (PSA) system option for on-site generation of oxygen on an as-needed
basis. This will eliminate the requirement to have on-site bulk storage of liquid oxygen
near Meyer's Elementary School. The price of this option is $89,600, and is included in
the total price shown above. While no regulations forbidding placement of a bulk
oxygen storage tank have been found, use of PSA system will help promote a more
positive public perception of the project, and will reduce visual impacts.
This item has been reviewed by the District's purchasing agent.
SCHEDULE: Construction complete June 15, 2004
COSTS: $832,600
ACCOUNT NO: 2029-7046/BKRFLD
BUDGETED AMOUNT REMAINING: Unbudgeted
ATTACHMENTS: , Resolution 2779-04, NPV cost analysis of GAC vs. HiPOx
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES ~-Z _ NO
CHIEF FINANCIAL OFFICER: YES ~'~,~ NO
CATEGORY: Water
-46-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
2O
21
22
23
24
25
26
27
RESOLUTION NO. 2779-04
A Resolution of the South Tahoe Public Utility District
Rescinding Resolution No. 2777-03 Related to Exemption from Competitive Bidding
Procedures for Bakersfield Well MTBE Treatment System Construction and Installation
BE IT RESOLVED by the Board of Directors of the South Tahoe Public Utility District,
County of El Dorado, State of California, as follows:
WHEREAS, the Board of Directors adopted Resolution No. 2777-03 on September 18,
2003, which authorized an exemption from competitive bidding procedures to negotiate
directly with U.S. Filter for an MTBE treatment system utilizing granulated activated carbon
absorption at the Bakersfield Well; and
WHEREAS, due to the discovery of TBA (tediary butyl alcohol) in the groundwater,
U.S. Filter's treatment system is no longer the most efficient, reliable, or economically
preferred treatment system.
NOW, THEREFORE BE IT RESOLVED, AS FOLLOWS: The Board of Directors of the South
Tahoe Public Utility District rescinds Resolution No. 2777-03.
WE, THE UNDERSIGNED, do hereby certify that the above and foregoing Resolution
No. 27794)4 was duly and regularly adopted and passed by the Board of Directors of South
Tahoe Public Utility District at a regular meeting held on January 2, 2004, by the following
vote:
AYES:
NOES:
ABSENT:
JAMES R. JONES, BOARD PRESIDENT
SOUTH TAHOE PUBLIC UTILITY DISTRICT
ATTEST:
KATHY SHARP, CLERK OF THE BOARD
SOUTH TAHOE PUBLIC UTILITY DISTRICT
BAKERSFIELD WELL HiPOx AND GAC TREATMENT ALTERNATIVE COMPARISON TABLE
CATEGORY I HiPOx I GAC
A. Required Infrastructure
Site Coverage Minimal (16'x20')
ILow (12' +/-)
ISelf-contained
ISubstantial additional load
IMore control valves, less piping
Profile
Enclosure
Electrical
Substantial (50'x50' +/-)
ITa~ (25'-30')
IRequires constr, of large enclosure
INegligible additional load
IMore hand valves and piping
Mechanical
B. Reliability
Capacity
Mechanical
Process
Chemical & Biological
C. Operations & Maintenance
1,800gpm maximum
Subject to occasional failure
(automatic shutdown)
More frequent, but short periods of
down time
No negative water quality impact
during preriods of shutdown
Guaranteed destruction of MtBE/TBA
Could create various byproducts
(other oxygenates, bromates, and
unknowns)
No hazardous waste generated
Requires routine testing for
oxygenates
Arsenic synergy (change of valence)
,500gpm maximum
Less prone to failure
(no automatic shutdown)
Less frequent, but longer periods
of down time
Potential for biogmwth during
)eriods of shutdown
Subject to breakthroughs and
sudden release of accumulated
compounds
May become bioreactive
Subject to accumulation of other
compounds, especially radio-
nucleides and degradation
daughters
Potential for hazardous waste
disposal issues
Potential for taste & odor issues
Staff time
Contmls
Materials handling
Waste flows
Substantial (44hrs. +/- per month)
Requires involvement from both
Pumps and Electrical crews
Complex - electronic
Oxidizing chemicals (H202, 03)
On-site generation of oxygen and
ozone (as needed - no bulk storage)
Approximately 3,000gal.
at each startup
Requires on-site waste tank, minimal
operator time
Minimal (15hrs. +/- per month)
Requires only Pumps crew
Basic- manual
Minimal, generally non-hazardous
Approximately 200,000gal.
at each changeout, approximately
11,000gal. per vessel per backwash
(66,000gal. for six vessels)
Requires portable or permanent
settling tank, substantial operator
time at each backwash/changeout
-&8-
GAC
AND HiPOx TREATMENT OPTIONS FOR BAKERSFIELD WELL - ENGINEER'S ESTIMATE
Total 15 year Net Present Value - 3% Net Discount Rate
SCENARIO
MTBE1
(ppb)
TBA2
(ppb)
GAC Option NPV
x(i)
HiPOx Option NPV
x(i)
p(i)3
GAC
x(i)p(i)
HiPOx
x(i)p(i)
1
0.5
0.0
$1,616,286
$2,238,155
0.250
$404,072
$559,539
2
2.0
0.0
$1,735,330
$2,321,601
0.180
$312,359
$417,888
3
5.0
0.0
$1,867,593
$2,363,435
0.160
$298,815
$378,150
4
0.5
2.0
$3,425,381
$2,371,954
0.150
$513,807
$355,793
5
2.0
2.0
$3,647,948
$2,446,922
0.125
$455,994
$305,865
6
5.0
2.0
$3,892,377
$2,497,146
0.075
$291,928
$187,286
7
0.5
6.0
$4,248,959
$2,564,088
0.020
$84,979
$51,282
8
2.0
6.0
$4,480,943
$2,647,596
0.020
$89,619
$52,952
9
5.0
6.0
$4,683,662
$2,699,728
0.020
$93,673
$53,995
TOTALS: 1.000
$2,545,246
$2,362,749
NOTES:
The Net Present Values presented above include $1,201,640 capital cost for GAC, $1,254,283 capital cost for HiPOx,
and annualized estimates for operations, maintenance and carbon /chemical expenses.
1 Assumed MTBE contamination levels
2 Assumed TBA contamination levels
3 Assumed probability of any one scenario occurring
S oUth-Tahoe
public Utility' DiStrict
1275 Meadow Cres'c, Driw, ,Gouth Lake Tahoe, · CA 9(~150-7401
?hone 5,50 54-4-Fo474, Fax 5,50 541-0014
BOARD AGENDAITEM6.e
TO: Board of Directors '
FROM: Nick Zaninovich, Senior Engineer.
MEETING DATE: January 2, 2004
ITEM - PROJECT: Bakersfield Well Treatment Project
REQUESTED BOARD ACTION: Authorize s~aff to enter into an agreement with Boyle
Engineering for electrical design and consulting services for the HiPOx treatment
system, in the amount of $31,750
DISCUSSION: Staff recommends, as· the best Option, using Boyle Engineering for.the
electrical design work, due to the complexity'of the design and their previous experience
with the Arrowhead Well HiPOx project.
SCHEDULE: Construction completed June 15, 2004
COSTS: $31,750
ACCOUNT NO: 2029-7046/BKRFLD
BUDGETED.AMOUNT. REMAINING: Unbudgeted"
ATTACHMENTS:
Boyle Engineering Proposal and Project BUdget
coNCURRENCE WITH REQUESTED ACTION:..
CHIEF. FINANCIAL OFFICER: yEs·
,'NO
NO
CATEGORY: water
South Tahoe Public Utilities District
Bakersfield Well Treatment.
~esign and Construction Services_
December 8~ 2003
The electrical and instrumentation design for the Bakersfield Well treatment system is
based on the previous electrical and instrumentation design performed by Boyle
Engineering Corporation on South Tahoe Public Utilities District's (PUD) well treatment
at Arrowhead Well No. 3. South Tahoe PUD will perform all civil and mechanical
engineering design and construction services.
Electrical.
~he existing electrical system for the Bakersfield Well consists of a 400-ampere service
· -am ere transfer switch, a 250kW emergency generator, a 150-hp well
switchboard, a 400 P ..... ' 15kVA li ting transformer
controlled by a de-rated 250-bp varlabl~ fr~tuency drive, a gh
and a 120/240-volt panelboard. The new well treatment system will require power for
the treatment container, 57.6 kVA, and a new booster pump. The well treatment system
will be similar to Arrowhead Well No. 3. Therefore, it is anticipated that the horsepower
requirements of the well will go down. South Tahoe PUD will be responsible for
determining the revised horsepower requirements for the existing well and designing the
horsepower requirements for the new booster pump. Preliminary calculations show, with
the additional 57.6 kVA load for the treatment process equipment and a slightly larger
overall horsepower requirement for the combined well and booster pump station, that the
existing electrical system should be sufficient. The electrical design is based on reusing
the existing electrical equipment and tapping off the load side of the transfer switch to
feed the new electrical equipment. A new feeder circuit breaker will be provided to feed
the treatment container and a new combination starter will be provided to control the new
booster pump. The combination motor starter will consist of HAND-OFF-AUTO and
motor overloads.
Electrical design consists of a site visit to field verify existing conditions, electrical
drawings, estimate of probable construction costs, specifications, and quality control.
Construction services consist of shop drawing review, responses to RFIs and one site visit
for final punch list and startup.
Instrumentation and Telemetr,v System_
It is our understanding that the STPUD will provide the Motorola MOSCAD RTU
located at the Bakersfield Well site and be responsible for adding the new treatment
process to the existing SCADA computer system.
Boyle will attend a coordination meeting and site visit with the STPUD staff to establish
the SCA_DA system requirements between the Applied Process Technology system and
the STPUD telemetry system. Boyle will provide an I/O list showing the data transfer
requirements between the two systems.
-53-
Boyle will have a coordination meeting with APT to review the electrical and
instrumentation interface requirements. The meeting will be at the Boyle Ontario office.
Boyle will conduct telephone coordination to resolve interface issues with APT and
STPUD.
Boyle will attend a two day site visit for system start-up and debugging.
Project Budget
Bakersfield Well Treatment South Tahoe Public Utility District
Electrical Design and Construction Services Fee
And Instrumentation Coordination
Personnel Hours Budget
Task Description -~ '~ ~ _ '" -~
_ '~ ~ ~ ~ ~ ~
Electrical Design
,it~ Visit 12 12 $ 1,680 $ 594 $ 2,274
$ $ $
~w~s
E-I S~bols, Abb~eviatinns, Si~ PI~, ~d Notes I 2 2 5 $ 514 $ 19 $ 533
E-2 SitePl~ ~dS~le L~e Diag.~. 2 10 10 22 $ 2,150 ~ $ 81 $ 2,231
E-3 Well Build~ Pl~ ~d Valve Vault PI~ 2 12 12 26 $ 2,524 $ 2,524
E~ P~el, L~htln~: ~d Conduit Scb-d-l-a 2 , 10 10 22 $ 2,150 $ 2,150
E-5 S~..,atic Din~ ~d El~l Derails 2 8 8 18 $ 1,776 $ 1,776
Coord~afi~ M~s wi~ Sou~ T~oc PUD (~nference Calls) 4 4 $ 560 $ 560
~d~afion Meet~s wi~ T~a~=at System Provider 6 6 $ 840 $ 840
4 4 $ 428 $ I5 $ ~3
E~;.,,-~e of Probable ~ns~cfioa ~s~ 6 2 8 $ 970 $ 30 $ I,~
S~cifi~dons 4 4 $ 696 $ 15 $ 711
Subto~l 4 37 46 42 2 131 $ 14,288 $ 7~ $ 15,~2
Electrical Construction Se~iceg
Site Visit (F~I Ins~inn) 12 12 $ 1,680 $ 594 $ 2,274
30 $ 952
~vinw shop ~w~s 2 6 8 $ 922 $
Ees~ndto~Is I 4 5 $ 568 $ 19 $ 587
1 3 4 $ 347 $ 15 $ 362
As-buil~
Subto~l 15 I1 3 29 $ 3,517 $ 657 $ 4,174
Instrumentation Coordination
Coor~i-a~aa M~t~ & Site V~it wi~ STPUD Stuff 12 2 14 $ 2,218 $ 550 $ 2,768
C~rdinaHna M~=t~ wi~ ~T - Ele~i~l & I&C Iut=a~a~ 4 2 6 $ 826 $ 1~ $ 926
~one ~ord~ation to Resolv~ Inte~a~ Issues 12 4 16 $ 2,348 $ 150 $ 2,49~
~ -- 4 12 $ 1,652 $ 150 $ 1,802
~ ~a~ Toc~i~l M~m 8 __
Site Visit for Syst~ S~-U~ ~d Deb-EEi-S (2-Days) 2~ -- -- 4 24 $ 3,740 $ 8~ $ 4,540
~ 31,750
lo~l ~o~ ~ho~ ~ f~.
Personnel ~te~o~ S/HR
Principal Engineer $174.00
Senior Engineer $140.00
Associate Engineer $107.00
CADD $80.00
Clerical $65.00
Boyle Engineering Corporation
South Tahoe
Public Utility District
1275 Meadow Crest Drive · South Lake Tahoe, CA 96150-7401
Phone 530 54q-6474, Fax 530 541-0614, www. stpud.us
BOARD AGENDA ITEM 6..j
TO:
Board of Directors
FROM:
Rick Hydrick, Manager of Water Operations,
Paul Sciuto, Assistant General Manager/Engineer
MEETING DATE: January2, 2004
ITEM - PROJECT: Bakersfield Well Treatment Project
REQUESTED BOARD ACTION: Adopt Resolution 2780-04 to: (1) Determine an
emergency exists pursuant to Section 1102 of the Public Contract Code; (2) Determine
substantial evidence has been presented to authorize an exception be made to Section
22050 of the Public Contract Code that this emergenoy will not permit a delay resulting
from competitive solicitation for bids, and that this action is necessary to respond to the
emergency; and (3) Delegate authority to the General Manager to order any action
necessary to respond to this emergency.
DISCUSSION: The Bakersfield Well, rated at 1,500 gallons per minute, is the largest
well' in the Meyers/Tahoe Paradise area. This well must operate, especially during
· periods of high summer-time demand, in or(Jer to provide adequate water supply and
pressure throughout Meyers/Tahoe Paradise. The well is threatened by a MTBE plume
that is several thousands of feet long and wide, and over a hundred feet deep.
Concentrations of MTBE as high as 3.9 parts per billion (ppb) have been found in the
Sioux street Sentinel Well in the past year. Bakersfield Well samples have shown
concentrations of MTBE as high as .47 ppb. 'These MTBE spikes Violate the Board's
policy to prevent all detectable concentrations of MTBE from entering the public drinking
water supply. Data from the SiouX Sentinel Well indicates that higher concentrations of
MTBE may be moving toward the Bakersfield Well. The Bakersfield-Well must be
treated for the removal of MTBE in order to comply With District policy,
Due to the .infrastructure, mechanical, and electrical requirements necessary to have the
treatment process operational by June15, 2004, construction will need to begin by April
1, 2004. With this time constraint and the need for deSign time, suspension of formal
bidding process and the ability to pre-purchase equipment will be necessary. A
minimum of three contractors Shall be asked to provide bids on preliminary design
documents for the site improvements necessary at the Bakersfield well site.
-57-
This item has been reviewed by the District's purchasing agent.
SCHEDULE: Construction complete June 15, 2004
COSTS: $500,000
ACCOUNT NO: 2029-7046/BKRFLD
BUDGETED AMOUNT REMAINING: Unbudgeted
ATTACHMENTS: Resolution to be distributed prior to the Board meeting.
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES ~.,~ NO
CHIEF FINANCIAL OFFICER: YES '('~'C~cZ NO
CATEGORY: Water
-58-
RESOLUTION NO. 2780-04
A Resolution of the South Tahoe Public Utility District
Declaring an Emergency, Authorizing Contracts Without Bids,
And Delegating Authority to Order Emergency Action
For Bakersfield Well Treatment Project
WHEREAS, the Bakersfield Well is the largest well in the Meyers/Tahoe
Paradise area and must operate to provide adequate water supply and pressure
throughout Meyers/Tahoe Paradise; and
WHEREAS, MTBE contaminant plume(s) are present in the drinking water
aquifers used by District wells in the Meyers area; and
WHEREAS, MTBE was detected and confirmed in numerous water samples
collected from the Bakersfield Well during the summer of 2003; and
WHEREAS, it was anticipated that the new Flagpole Well and the new Elks Club
Well could meet the demand for the Meyers/Tahoe Paradise area without pumping
groundwater from MTBE-contaminated aquifers; and
WHEREAS, the Flagpole Well was found to not meet drinking water standards in
reference to iron and arsenic in late summer 2003; and
WHEREAS, the Elks Club Well was found to be below anticipated production in
October 2003 and therefore can not meet the water demands for the Meyers/Tahoe
Paradise area; and
WHEREAS, the Bakersfield Well has shown concentrations of MTBE as high as
0.47 parts per billion (ppb) which violates the Board's policy to prevent all detectable
concentrations of MTBE from entering the public drinking water supply; and
1
WHEREAS, the Bakersfield Well must be treated for the removal of MTBE in
order to comply with the Board's policy; and
WHEREAS, the treatment system must be operational by the middle of June
2004, to meet summer demand; and
WHEREAS, to accommodate setup and testing of the treatment system,
infrastructure, mechanical, and electrical site work must be complete at the Bakersfield
Well site by May 15, 2004; and
WHEREAS, to allow adequate curing time for concrete foundation work which
must precede the infrastructure, mechanical, and electrical site work, construction must
commence by April 1,2004; and
WHEREAS, unless authorization is provided to contract without bids and to pre-
purchase equipment, construction will not begin by April 1,2004; and
WHEREAS, any delay in providing treatment to Bakersfield Well by the middle of
June 2004 poses a substantial risk that adequate water supply and pressure will not be
met in the Meyers/Tahoe Paradise area during summer-time demand; and
WHEREAS, the lack of adequate water supply and pressure in the
Meyers/Tahoe Paradise area poses a clear and imminent danger which could lead to
the loss or impairment of property and/or essential services; and
WHEREAS, substantial evidence has been provided to the District which
demonstrates immediate action is necessary to prevent this loss or impairment and the
District must enter into agreements with contractors and vendors to construct the
infrastructure for the treatment facility at the Bakersfield Well site.
2
NOW, THEREFORE BE IT RESOLVED, AS FOLLOWS:
1. The circumstances concerning the substantial risk that adequate water supply
and pressure will be not be met in the Meyers/Tahoe Paradise area during
summer-time demand, which recently came to the attention of the District,
constitutes an emergency within the meaning of the Public Contract Code
Sections 1102.
2. The emergency will not permit a delay resulting from a competitive solicitation for
bids.
3. Immediate actions directly related to the emergency, including construction of the
infrastructure, mechanical, and electrical work at the Bakersfield Well Site, and
actions to procure the necessary equipment, services and supplies as necessary
to respond to the emergency, shall be made without competitive bidding to let
contracts.
4. The General Manager of the District is authorized and directed to order any
action necessary and appropriate to respond to the emergency.
5. This Resolution shall take effect immediately.
WE, THE UNDERSIGNED, do hereby certify that the above and foregoing
Resolution was duly and regularly adopted and passed by the Board of Directors of
South Tahoe Public Utility District at a regular meeting held on January 2, 2004, by the
following vote:
AYES:
NOES:
ABSENT:
JAMES R. JONES, BOARD PRESIDENT
SOUTH TAHOE PUBLIC UTILITY DISTRICT
ATTEST:
KATHY SHARP, CLERK OF THE BOARD
SOUTH TAHOE PUBLIC UTILITY DISTRICT
4
PAYMENT OF CLAIMS
FOR APPROVAL
Janua~ 2,2004
A~tion Item 6.g
Payroll 12/24/03
Total. Payroll
LaSalle NatiOnal Bank - debt repayment
Cost Containment- health care payments
IGI Resources - natural gas
Hatch & Parent -legal services
Total Vendor EFT
Accounts Payable Checks Sewer Fund
Accounts Payable Checks Water Fund
Accounts Payable Checks Self-funded Ins
Accounts Payable Checks Grant Funds
Total Accounts Payable
299,349.80
299,349.80
0.00
65,001.79
0.00
0.00
65,001.79
141,267.55
75,798.03
16,540.58
31,100.96
264,707.12
629,058.71
Grand Total
Payroll EFTs & Checks
EFT
EFT
EFT
EFT
EFT
EFT
CHK
EFT
EFT
CHK
AFLAC Medical & Dependent Care
CA Employment Taxes & W/H
Federal-Employment Taxes & W/H
CALPERS Contributions
ManuLife Pension Loan Payments
Orchard Trust Deferred Comp
Stationary Engineers Union Dues
United Way Contributions
Employee Direct Deposits
Employee Paychecks
Adjustments
Sub-total
12/24/03
2,088.24
10,579.90
63,664.69
39,852.33
5,100.63
11,548.13
1,512.59
125.00
141,657.46
23,220.83
299,349.80
59
T EEC 23, 2003, 9:51 AM --r DOUGLAS PAYMENT JL - -loc: CNSI1.E A- -job 293529 #J73 9- - -prog 12/19/2003-01/02/2004 091.7 ort id: C�
Default Selecticn: Check Stock ID: AP ; Check Types: Ma,PN,RV,VH
Venclor Natre Account # Department
A C W A SERVICES CRP (ASC)
AFLAC
AT &T
A -1 C;I.ASS SERVICE MU
ALPEN SIERRA COFFEE CE PANY
m
o ALPINE cr NTY
10 -00 -2530 GENERAL & AUFIINISIRATICN
10 -00 -2532 CORAL & AI NIINIS R TICN
10 -02 -6310 PUMPS
10 -28 -6042 ALPINE COUNTY
10 -00 -6520 COAL & ALMINISIRATICN
20 -00 -6520 CNZAL & AlYINNISIRATICN
10 -28 -6651 ALPINE UI0 I'Y
AN1ACKER �NSIRLETTCN & SUPPLY 10 -28 -6042 ALPINE MINTY
AMETEK
ARANARK U\IIFCRNI SERVICES
AVISTA UITLITIES
AVISIY UTILITIES
10 -03 -6021 ELECTRICAL TIC AL SEDP
10 -00 -2518 COAL & ALNIINISIRATICN
10 -00 -6350 COAL & AUV ISIRATICN
20 -00 -6350 GENERAL & AIIMINISIRATICN
20 -29 -8401 IIN3IlNEERI N3
Dascripticn
IIN2LCY VISION INS
Check Total:
INSURANCE SUPPLEMENT C ,k Total :
Check Total:
CR.I\IDS & MA.INIENANCE Total:
SUPPLIES
SUPPLIES
LAND TARS
Check Total:
Check Total:
GRaNDS & MAINIENAKE 'Total:
FINAFtY DTI Total:
UNIFCRM/FLUS/ aPAE.
MURAL CAS
NATURAL CAS
Check Tot al :
C1.ISICMER SERVICE DENIER
Check Total :
Amount Check # Type
2,519.17
2,519.17 00055403 Ma
1,047.10
1,047.10 00055404 MAT
17.62
17.62 00055405 NW
30.00
30.00 00055406 Ma
79.00
79.00
158.00 00055407 Ma
2,032.58
2,032.58 00055408 Ma
300.00
300.00 00055409 MW
481.93
481.93 00055410 NW
1,078.42
1,078.42 00055411 WI
14.56
104.08
118.64 00055412 MV
3,588.68
3,588.68 00055413 Ma
m
S o u t h T a h o e P.U.D. 12/23/03 PAYMENT O F CLAIMS REPORT 12/19/2003-01/02/2004 Page 2
'IUE, DEC 23, 2003, 9:51 AM - -reg: DDS -- -leg: GL 3L- -loc: CNS11E - -- -dab: 293529 #J7389-- -prog: 09 <1.07 >- -report id: GRRECSPC
Eefault Selection: Check Stock ID: AP ; Check Types: MAT, IOW, RV, VH
Verrbr Narre Acoai t # Department
BARBAZO, LANA
BERGSCHN, IVO
BERRY -Y IIURIES
BOYSCN, JCiN
CSDA
10 -22 -6200 HUv N RESOURCES
20 -22 -6200 HL1vAN RESOURCES DIRECTOR
20 -02 -6200 PUN'S
10 -05 -4630 RANT REPAIR
20 -05 -4630 JIAMEIVT REPAIR
10 -00 -0415 GENERAL & ALVDNIS RATICN
10 -03 -6200 ELECTRICAL SHOP
10 -19 -6250 B 7PD OF DDS
20 -19 -6250 B RD OF DIREt IDRS
CALIF DEPI' OF HEALTH SERVICES 20 -02 -6250 PL1`ES
CALIFORNIA OVERNIGHT
10 -00 -4810
20 -00 -4810
10 -07 -4810
20 -07 -4810
20 -29 -7046
10 -29 -8235
10 -29 -8238
COAL & ALMINISTRATICN
GENERAL & SIRATICN
IABCRATOEff
LABORATORY
E=EERILZ
ET
Description
Vencbr Tbtal:
TRA ID II e . /FJXPA ICN
MA DI ID 1 e . /IDUCATICN
Clock Tbta1:
TRAVEL/MEETIMS /E X=CN
Check Tbtal:
OIL & LUBRICANTS
OIL & LLHIC!- NIS
CgsSaL NE INVENICr<ti'
Check Tbta1:
TRAVEL/NEE INGs /ErocK TCN
Check Tbtal:
LUES PS /CEEUTFICATI
DIES PS /CE T:FIC
Check Tbtal:
IxES/NIE1` BPS /CERTTFICATI
Check Tbtal:
M :0- 1 1
M :+D- I
PCS•= ECPENSES
P[.NIP SIN, CARENER MIN
Arrc nt Check # Type
3,707.32
50.08
50.08
100.16 00055414 WI
64.08
64.08 00055415 NW
89.72
89.71
2,579.02
2,758.45 00055416 NW
28.80
28.80 00055417 NW
1,186.50
1,186.50
2,373.00 00055419 144
105.00
105.00 00055420 MAI
15.00
15.00
16.00
38.00
12.00
5.00
2.50
S o u t h T a h o e P.U.D. 12/23/03 PAYMENT O F CLAIMS REPORT 12/19 2003 - 01/02/2004 Pa 3
TUE, DEC 23, 2003, 9:51 AM --leg: 1CI S -- -leg: GL 3L- -loc: CNS1'1E - -- -fob: 293529 #J7389-- -prcg: 09 <1.0 > - -wort id: PC
]fault Selection:
Vencbr Nere
Check Stock ID: AP ; Check hypes: MA1,HW,RV,VH
Aoocxmt # Dot
CANALA LIFE
D EMINEERS
CARRION, PAUL
m
CARSCN PIMP
MCKIM, LENNIS
20 -29 -8438 FI3IlNEER1N3
90 -98 -8828 Ems' PIPELINE GRANT
30 -00 -6744 SELF FUNDED INSURANCE
10 -00 -2512 COAL & AEMINISIRATICN
10 -00 -0301 COAL & AIIVIINISIRATICN
20 -00 -0301 GENERAL & AEN ISIRATICN
90 -98 -8828 EXPORT PIPELINE GRANT
10 -29 -8235 EI GINEE ]N3
10 -29 -2504 ENGINEER1M3
10 -29 -7040 ENGIlNEERIl3
10 -05 -6200
20 -05 -6200
10 -28 -7474
10 -27 -6200
20 -27 -6200
com -t" Y TRA1S 3CN 10 -01 -6052
III AUItM ICN INC. 10 -03 -6051
COST CCNTAINM NT CIS INC 30 -00 -6741
EITIFMENT REPAIR
EXIEMENT REPAIR
ALPINE O NIY
DISIRICT IITICN
DISTRICT INFCRIATTCN
INEER3RCUND REPAIR
ELECIRICAL SDP
SPI F FUSED INSURANCE
Desaripticaz
ESIR SIN CLIAN (REPL)
NINE PIG III LPPS -CAN
Check Tbtal:
EXCESS INS SELF INSURED MED
LIFE INSURANCE
INSURANCE PREPAID
INSURANCE PREPAID Check Total:
SLUDGE IlNG FACILITY
SUSPENSE
YFCCIHICRTIE CCNVERSI
Check Tbtal:
Check Tbtal:
WELL, ALP CD RANCH ME;E
Check 1btal :
VELA /Iav
Check Total:
PIPE, CAS, & WU=
Check Tbtal:
P . P STATI NS
Check Tbtal :
AEMINISIRPATICN rr
Amount Check # Type
2.50
10.00
116.00 00055421 MAT
13,882.00
2,416.24
4,818.24
4,818.24
25,934.72 00055422 M'I
31,090.96
1,065.50
4,137.50
3,046.00
39,339.96 00055423 Ma
25.20
25.20
50.40 00055424 M'
379.25
379.25 00055425 MAI
64.72
64.72
129.44 00055426 Md
507.38
507.38 00055427 MAT
838.74
838.74 00055428 MCI
1,909.08
S o u t h Tahoe P.U.D. 12/23/03 PAYMENT O F CLAIMS REPORT 12/19/2003-01/02/2004
TUE, EEC 23, 2003, 9:51 AM - -req: ECUGEAS -- -leg: GL 3L- -loc: CISSi'iE-- - -jcb: 293529 #J7389-- -prog: 09 <1.07 >- -report id:
Default Selection: Check Stock ID: AP ; Check Types: NW, Hinl, RV, VH
Vencbr Name Account # Departmant
C UTI'IFR, CAL
:ELL NARKETINS L P
DICK'S FULLER. -
DICK O3RP
m
E N S RECCES INC
EL DORADO OZ NTY
FECEK
FISHER SCIENTIFIC
30 -00 -6742 SFr F FENCED INSURANZE
20 -38 -6200 CLb'IQ ' ]ER SERVICE
20 -37 -8434 INFCFNATICN SYSTEMS
10 -37 -4840 INEURVATICN SYSTEMS
20 -37 -4840 Il,TICN SYSTEMS
10 -04 -6041 HEAVY MAINTENANCE
-NCE
10 -07 -6030 LABORATORY
20 -07 -6030 LABi ATLY
10 -27 -4405 DISTRICT INPORAATICN
20 -27 -4405 DISTRICT IITICN
10 -06 -6650 OPERATIQLS
10 -29 -8235
10 -07 -4760 LAEORATCRY
20 -07 -4760 LABORATORY
Description
PBD ]]
Check 'Ibta1:
'IRA /ECUCATICN
Check Tbtal:
C N JTER WORKSIATICN
DISTRICT CCMPUIER SUPPLIES
DISTRICT CSMCCIQ 2R SUPPLIES
BUIIDIN
(heck Tbtal:
SERVICE �S TIC E S Tbtal :
CENIRACIUAL SERVICES
OCNIRACIIAL SERVICES Check Tbtal
OPERAT'INJ PERMITS Tbtal:
Check Check IttAl:
LAB ATOP SUPPLIES
LABCRATORY SUPPLIES
ciierk 'Thta1.:
• 4• Ss.
Arrant Check # TYPe
379.50
2,288.58 00055429 NW
640.00
640.00 00055430 WI
4,437.60
926.00
925.98
6,289.58 00055431 WI
35.14
35.14 00055432 NW
1,814.16
1,814.15
3,628.31 00055433 WI
2,262.00
2,262.00
4,524.00 00055434 NW
1,165.00
1,165.00 00055435 NW
18.24
18.24 00055436 NW
378.97
380.31
759.28 00055437 WI
South Tahoe P.U.D. 12/23/03 PAYMENT OF CLAIMS REPORT 12/19/2003-01/02/2004 Page 5
TUE, DEC 23, 2003, 9:51 AM - -req: DC AS -- -leg: CNSi'i- - -jcb: 293529 #J7389-- -prng: CK509 <1.07 >- -report id: CERECSPC
Default Selecticri: Check Stock ID: AP ; Check Types: Mi', HW, RV, VH
Verrbr Narre Aco mt # Departmant
GRAEZER INC, W. W.
HI-TECH RETAIL INC.
HIGH SIERRA 9aNCS
HILL -DANE 7 Y CORP
10 -03 -6041 ELECTRICAL SEIDP
10 -02 -6075 PONES
20 -01 -6075 u EH U D REPAIR
20 -02 -6075 PUTS
10 -21 -6621 ALMINIS RATION
20 -21 -6621 AUvUNISIRATICN
10 -38 -4830 CUSIQvER SERVICE
20 -38 -4830 CUSIMER SERVICE
IDPKINS TECENIG L CIS INC 20 -02 -6050 REPS
IlNSTY- PRINTS
INIERSLLtE SAFETY & SUPPLY
J &L PRO KLEENINC
10 -38 -4920
10 -22 -4820
20 -22 -4820
10 -00 -0425
10 -39 -6077
CUSICNIER SERVICE
HAW RESaIRCES
H[MAN RESaIRCES DIRICR
GENERAL
FINANCE & ALMENISIPATTCN
10 -39 -6074 FINANCE
20 -39 -6074 FIDE
Descripticn
BJILDIN S
Check Total:
SAFETY ECUIPMENT /PHYSICALS
� II IRNI
SA JI_ IC ALS
Check Total:
INCENTIVE & =CNDTICN PR 3R
INCENTIVE & RECCGNTT CN PRGR
Check Total: :
STRIYI'iCNS EXPENUE
SCESCRIPTICNS EXPENSE
Check Ibtal:
WELLS
Check Total:
PRINTIN s
OrriCE SUPPLIES
Orr'10E SUPPLIES
Check Total:
SAFETY INVENICRY REFIGHT DISCIIIVY
JANITORIAL SERVICES
JANTICRIAL SERVICES Check Total:
Acrcu t deck # Type
222.49
222.49 00055438 MCI
96.51
203.75
96.51
396.77 00055439 Ma
225.00
225.00
450.00 00055440 Ma
69.75
69.75
139.50 00055441 4'I
270.09
270.09 00055442 Md
165.40
263.63
263.62
692.65 00055443 Mn1
412.91
9.52
422.43 00055444 Ma
1,423.50
1,423.50
2,847.00 00055445 Ma
5,647.50
5,647.50 00055446 Ma
South Tahoe P.U.D. 12/23/03 PAYMENT OF CLAIMS REPORT 12/19/2003-01/02/2004
'ILA, DEC 23, 2003, 9:51 AM - -r : DCUMAS- - -leg: GL JL - -loc: CNS1'LE-- - -job: 293529 ##37389-- -prcg: 09 <1.07 >- -report id:
Default Selection: Check Stock ID: AP ; Check Types: MA1, IOW, RV, VH
Vendor Narre Amount # Department
LniNsaT, /AVID P
JC,NE,S, J R
KRLT &K0WLRADIO
K T H 0 RADIO INC
KAISER PERMA,l NIE
(71 KENNEDY /JELLS =ILIA= DE
L A CHEMICAL
20 -38 -6200 CUSIUVER SE VICE
10 -19 -6200 B2ARD OF DIPK I ZS
20 -19 -6200 BYARD OF DI ICES
20 -27 -6660 DISIRICT INE1CFMTICN
10 -27 -6620 DISTRICT INECENATICN
20 -27 -6620 DISTRICT IIICN
20 -27 -6660 DISTRICT IITCN
30 -00 -6745 SELF FLUID E SEANCE
10 -28 -4405 ALPINE COUNTY
10 -28 -7039 ALPINE CUNTY
10 -28 -8429 ALPINE CUIIY
10 -39 -4405 FINANCE
20 -02 -6050
TTTTy'S TIRE SERVICE INC. 10 -05 -6011
20 -05 -6011
ulz, JANICE
10 -21 -6621
20 -21 -6621
EQUIPMENT
PMENT REPAIR
ALNIINISIRATICN
AtNaNISIRATICN
Description
TRAVEL/MEETIN S /E1TATICN
Check Total:
TRA /ECUMTICN
'IRA /EQJCATTCN
Check Total:
WATER CENSERVATICN EXPENSE
RELIC RE ATICNS EKPENSE
RELIC RELATIONS IMPENSE
Check Tbtal:
WRIER CCNSERVATICN EXPENSE
Chedk Ibta1 :
CLAIMS SP,r P INS MEDICAL PLAN
Check Total:
2 0 . e.
2 0 1
ISIS RANCH LAND PURCEASE
ALP PROJECT
C RAACILAL SERVICES IMPLEMENIATTO
Check Total:
WELLS
AUICMDTIVE
PUICMDITIVE
Check Tot-a1
Check 'Ibt -al
INCENTIVE & RB;7JG.VITICN MGR
INCENTIVE & REJCG]ITICN PR Z
Amount Check # 'pipe
60.00
60.00 00055447 NW
22.85
22.85
45.70 00055448 MA]
988.00
129.50
129.50
1,247.00 00055449 MAI
336.00
336.00 00055450 M'
370.00
370.00 00055451 NLJ
105.00
7,137.00
724.00
256.00
00055452 MAT
334.95
334.95 00055453 r4
419.28
225.62
644.90 00055454 NW
25.00
25.00
South EC 23 P.U.D. 12/23/03 PAYMENT l: JL-- OF CNSCLAIMS
l A --job 293529 ##J'7389- - -prcg 12/19/2003-01/02/2004 091.07
�, EEC 23, 2003, 9:51 AM req
Default Selecticn: Check Stock ID: AP ; Check Types: MAT, HW, RV, VH
Vendor Narre Accc nt # Departrrent
LYNN M.D. LTD, EE RD J.
NA,RSHALL, WELLIAM
M3 NASIER CARR SUPPLY CO
M7TTCN INCUSIRIES INC
m
m
MDLNDUN CELIELAR
10 -22 -4405 H.140N REDOURCES
20 -22 -4405 HIIvAN RES URGES DIRECICR
10 -01 -6250 LLB REPAIR
10 -02 -6051 PUMPS
10 -02 -6073 PCNPS
20 -02 -6073 PIMPS
10-04-6024
0 -04 -6023 HEAVY
10 -04 -6024 HEAVY NAINTENANCE
20 -29 -6310 ENCINEER1N3
10 -29 -6310 EI3IlNEEZ
10 -38 -6310 CUSTOMER SERVICE
20 -38 -6310 CLJICI` ER SERVICE
10 -01 -6310 LIPID REPAIR
20 -01 -6310 UNDERGROUND REPAIR
10 -02 -6310 PUMPS
20 -02 -6310 PUMPS
10 -21 -6310 ALNDNISIRAT'ICN
20 -21 -6310 PISIRATICN
10 -07 -6310 LAS
20 -07 -6310 LABORATORY
10 -05 -6310 EQUIPMENT REPAIR
20 -05 -6310 EQUIPMENT REPAIR
10 -03 -6310 ELECTRICAL SAP
Desc r±pticaz
Check Tbtal:
CrNIRACIUAL SERVICES
OCNIRACIZAL SERVICES I%k Total:
DI S/N SHIPSC Tbtal
PCIvIP STATI NS
RENACE.F.WIER HIP ELM C1ecic Ibtal
R3FacE EXIEmENir Total:
TELEPHONE
TEEMCNE
TET F'P tNE
T I F'.PHCNE
TELEPIENE
ZEUEPH:NE
T I FP :NE
TFT FPF E
TFT E:PH:NE
'TE :RIME
TEL
Am:mt Check # 1 'Pe
50.00 00055455 MST
41.50
41.50
83.00 00055456 M
34.00
34.00 00055457 NA
92.65
30.78
30.77
166.72
964.28
1,285.20 00055458 Nei
190.36
190.36 00055459 M'J
43.39
43.40
16.95
16.94
21.81
23.90
21.79
28.00
3.78
3.78
3.86
3.85
2.70
2.69
7.70
south T a h o e P.U.D. 12/23/03 PAYMENT O F CLAIMS REPORT 12/8
- - -1 : GL 3L- -loo: C1�151'1E-- - -jcb: 293529 #J7389- - -png: 09 <1.0 >- -port id: C�C
1912003- 01/02/2004
�, DEC 23, 2003, 9:51 AM -�: DCL�S � �� 7
Default Selection: Check Stock ID: AP ; Cheek Types: W1, , RV, VH
Vendor Na e Ault # Department
20 -03 -6310
10 -28 -6310
10 -27 -6310
20 -27 -6310
NEVADA ENERGY SYSIEN1S INC 10 -05 -6013
NUMIERN CA PACKFLOVI PREV AS9C 20 -38 -6250
Orr10E EEPCr
P D M STEEL
P K SAFETY SUPPLY
PACIFIC BELL
ELELTRI��P
ALPINE DICT SIRICT INECIRNATICN
10 -21 -4820
20 -21 -4820
10 -37 -4820
20 -37 -4820
10 -29 -4820
20 -29 -4820
10 -39 -4820
20 -39 -4820
10 -06 -4820
D UIIM NT REPAIR
CUS'ICNER SERVICE
CNSYSTEMS
INEDWATICN SY5'IIIMS
FINANCE
FINANCE
10 -28 -6042 ALPINE GINIY
10 -02 -6075
20 -02 -6075
10 -00 -6320
20 -00 -6320
REPS
GENERAL GENERAL & AEMINISIRATICN
Desc 'ipticn
TELEPTINE
TELERENE
TELEPHCLE
TELEPHME
GENERMCRS
Check Total:
Check Total:
I /SEIrPS /C 'IFICATI
Check Total:
SUPPLIES
SUPPLIES
SUPPLIES
SUPPLIES
SUPPLIES
SUPPLIES
SUPPLIES
SUPPLIES
SUPPLE
Chk Total:
A i nt Check # T 'pe
ONES & MUNIENANCE , of 1 :
Check SAFETY' k YI�S YJ rNrl/ PiS
Check Total:
SICNp,L C4-12%RC,ES
SICNP,L CI S Check Ibtal:
7.70
13.25
- 21.06
- 21.06
223.37
18.05
18.05
20.00
20.00
12.78
12.78
32.58
32.57
51.74
51.72
16.01
16.00
300.11
526.29
24.37
24.37
163.20
163.20
326.40
249.39
32.09
281.48
00055460 r
00055461 MN
00055462 Ma
00055463 MST
00055464 M'
00055465 M'
00055475 M'
South Tahoe P.U.D. 12/23/03 PAYMENT O F CLAIMS R E P O R T 12/19/2003-01/02/2004
TUE, EEC 23, 2003, 9:51 AM - -req: DCUGLAS -- -leg: GL JL - -loc: CM11E - -- -jab: 293529 ##J7389-- -prog: CK509 <1.07 >- -report ii
Default Selection: Creek Stock ID: AP ; Check Types: NW,Fit,RV,VH
Vexzbr Nare Account # Eepartnent
PACIFIC BELL/WCRLD:CM
PEMSUS SATELLITE TV m:.
PETTY CASEI
10 -02 -6310
10 -05 -6310
20 -05 -6310
10 -39 -6310
20 -39 -6310
10 -21 -6310
20 -21 -6310
PD[EPS_ REPAIR
DUJIM ENT REPAIR
FINANCE
FIDE
AtMENISIRATT N
PLVENISIRATICN
10 -27 -4830 DISIRICr INFCIVATICN
20 -27 -4830 DISIRICT IITCN
10 -00 -6520
10 -01 -6200
20 -01 -6200
20 -01 -6250
20 -02 -6051
10 -02 -6200
20 -02 -6200
20 -02 -6520
10 -04 -6200
10 -05 -6200
20 -05 -6200
10 -06 -6520
10 -07 -6200
20 -07 -6200
10 -19 -4820
20 -19 -4820
10 -21 -4820
20 -21 -4820
10 -21 -6200
20 -21 -6200
10 -21 -6621
GENERAL & AIIMINISIRATTCN
LNEERSTUND REPAIR
LtICIERMaND REPAIR
INEEMRCUND REPAIR
MAPS
PUMPS
PUvIPS
RIPS
HOW
DIUIPMENT REPAIR
EQUIPMENT REPAIR
OPEPATTC1 S
LAB 1 ATC E Y
LABCRATCRY
ECIARD OF DS
BCARD OF
At UMSIRATT S
1
ALMINISTRATTCN
AEM NISIRATICN
ACKI ISIRATICN
tescr-ipticn
TELEPHJNE
TELEFIENE
TELEPHME
TELF'>F
TELEPHONE
TELEPHONE
T•.r EEH NE
Check Ibt•al :
SUBSCRIPITCN5 OCPENSE
SUBSCRIPITCNS EXPENSE
Check Tbtal:
'1-RA
TRA
LUES
PIMP
TRAVEL
TRAVEL
ID.
91 ID 1
2 IV'.F "1 1
IRA
TRA l
TRAVEL
1"
/IDUCATICN
PS FIC ATI
'IRA 1 t.
/TICK
TRAVEL i� 1 Q. /FTICN
Oral SUPPLIES
OM 10E SUPPLIES
OneiCE SUPPLIES
0H 10E SUPPLIES
TRA 1 /Ea3MTICN
!!/ TICK
•
TRAVEL
CN PRGR
Ar .nmt Check # Type
28.94
7.24
7.23
7.11
7.11
7.85
7.84
73.32 00055474 NW
179.50
179.50
359.00 00055466 NW
1.99
17.00
10.00
10.00
20.00
17.00
17.00
2.50
0.71
5.00
5.00
2.50
8.50
8.50
2.95
2.95
14.96
14.96
7.40
7.40
40.81
salth � P.U.D. 12/23/03 PAYMENT CLAIMS 5 12/W003-01/02/2004
23, 2003, 9:51 AM �� -1�' CN B 293529 #l389 -- -per 09 <1.077 > --
id:
Default Selection:
Vendor Name
Check Stock ID: AP ; Check 'Types: NW,PN,RV,VH
Amount # DepartmEnt
20-21-6621 AlYDNISTRATICN
10 -22 -6079 HIM RESOURCES
20 -22 -6079 }IV AN RESOURCES DIREC`IcR
10 -22 -6200 HUVN RESOURCES
20 -22 -6200 RUVVN RESOURCES DIREtIDR
10 -22 -6520 HCNAN RESOURCES
20 -22 -6520 HI1'N RESCIRCES DIRECICR
10 -27 -6200 DISTRICT INKENNTICN
20 -27 -6200 DISIRIC'T INECEMATICN
10 -28 -8285 ALPINE CIY
10 -29 -6075
20 -29 -6075 ENGIIJ
10 -29 -6200 ENSINEEREZ
20 -29 -6200 Ei3IL EERt
10 -37 -4820 II'ATICN SYSTEMS
20 -37 -4820 INECRNATICN SYSIIIv6
10 -37 -6200 INFORATICN SYSTEMS
20 -37 -6200 INECFMTICN SYSTEMS
10 -38 -4820 CUSTOMER SERVICE
20- 38 -482Q CUSICNER SERVICE
10 -38 -6200 CUEICNER SERVICE
20 -38 -6200 CUSICMER SERVICE
10 -38 -6520 CUSICMER SERVICE
20 -38 -6520 COMMIT. SERVICE
10 -39 -4810 FINANCE
20 -39 -6200 FINANCE
10 -39 -6520 FIDE
20 -39 -6520 FIRANCE
10 39 -6200 FINANCE
PRECISION SCIENTIFIC INC
10 -07 -6025 LABS
20 -07 -6025 IAB2RP
Descripticn
'1VE & RE3INIIICN PR3R.
SAFETY PXGRAMS
SAFETY PROGRAMS
i o 1 e.
TRAVEL
TRAVEL
TRA
'IRA
ALP
SAFETY
TRAVEL SAFETY
/t'ICN
D 1 e. /EDUCATICN
i 1 CI�TTY 1 F A_ ICN
R�r PHYSICALS
CN
/F CU:ATICN
OFFIe
OFFICE SUPPLIES
IRA i c./EUCATICN
TRAVEL ID 1 e../EaTATICN
OFFIS SUPPLIES
OAS SUPPLIES
/'ICN
app.,. 012,0 e. /E UMTICN
SUPPLIES
/ATICN
041. ra.
DI ID
��.
TRA
SUPPLIES TR
AVEL / Chedc. Ibtal:
RANI'
LAB:RAMEY EQUIPMENT
Amour-it Check # Ty e
40.81
5.05
5.05
8.50
8.50
8.98
8.98
5.50
5.50
7.51
2.50
2.50
6.19
6.19
6.30
6.30
7.05
7.05
9.75
9.75
25.50
25.50
35.00
35.00
2.31
69.22
17.79
17.79
2.31
69.22
684.73 00055468 144
17.44
8.26
S o u t h T a h e P.U.D. 12/23/03 PAYMENT O F CLAIMS REPORT 12/19 2003 - 01/02/2004
'I[JE, DEC 23, 2003, 9:51 AM - -red: DCULPS- - -leg: GL 3L- -loc: CNSiaE-- - -job: 293529 #77389-- -prog: 09 <1.07 >-- report id:
Default Selection: Check Stock ID: AP ; Check Types: M'T, ITT, RV, VH
Vendor Narre Account # Depart rent
PFO LEISURE
Print -to -Mail
RADIO SHACK
REND DRAIN OIL SERVICE
SIERRA ENVIRCNMENIAL
SIERRA FOOTHILL LABCRATCRY
SIERRA PACIFIC PCWER.
SIERRA SPRING WATER CO
10 -21 -6621 AIIAINISIRATICN
20 -21 -6621 ALNIJIQISIRATICN
10 -37 -4920 INEUMTDaq SYSTEMS
20 -37 -4920 INEU `YATTCN SYSIEIVE
10 -28 -6310 ALPINE OUTIY
10 -03 -6041 ELECTRICAL SEDP
20 -03 -6041 E EC IRTCPL SHOP
10 -05 -4630 EQUIPMENT REPAIR
20 -05 -4630 BWII1MENT REPAIR
10 -07 -6110 LABORATCRY
10 -07 -6110 LAS
10 -00 -6330 COAL & ALMINISIRATICN
20 -00 -6330 COAL & ALMINISIRATTCN
10 -01 -6520 UNEERGROUND REPAIR.
20 -01 -6520 LEDERGRal4D REPAIR
10 -02 -6520 PUMPS
10 -03 -6520 ELECERIM SHOP
20 -03 -6520 ELECIRTCAL SHOP
Description
Check lbtal:
INCENITVE & RHOJCINTITICN PRSR
IN NTIVE & REEM\ITTICN PR,GR
Check Tbtal:
MN=
PRI=
Check Tbtal:
TEL>E
BUILDINGS
HUIIDIl�.a''S
Check Tbtal:
OIL & LIH IG NIS
OIL & LLJE42ICANIS
Check Ibt-a1 :
E EC"III EI=
SUPPLIES
SUPPLIES
SUPPLIES
SUPPLIES
SUPPLIES
Check Tbtal:
Ciack Tbtal:
Check Tbtal:
11
P2
Amumt Check # Type
25.70 00055469 NW
548.06
548.05
1,096.11 00055471 Ma
29.05
29.06
58.11 00055470 WI
66.33
56.30
56.29
178.92 00055472 MAT
15.00
15.00
30.00 00055473 Ma
316.00
316.00 00055477 Ma
150.00
150.00 00055478 Ma
54,441.63
18,048.12
72,489.75 00055479 MAT
24.77
24.80
8.27
8.27
8.27
south Tahoe P.U.D. 12/23/03 PAYMENT OF CLAIMS
REPORT 12/1003- 01L02/20
UE, 12 23, 2003, 9:51 AM - -req: DCt -- -leg: 3L- -loc: CNS1IE - - - -7 �; 293529 PJ738 per: <1.0 >--report
id:
Default Selection: CheCk SW& ID: AP
Check Types: MAT,BW, RV,VH
Va.-ear Narre Amt # Ixsuestffent
10- HEAVY FAINTENANCE
10 -06 -6520 OPERATIC
10 -05 -6520 EQUIPMENT REPAIR
20 -05 -6520 EQUIPMENT REPAIR
10 -28 -6042 ALPINE COUNTY
20 -01 -6052 LLB REPAIR
20 -29 -8401 II3
10 -37 -8448 INFORMATION SYSTEMS
20 -01 -6052 tLEERGROUND REPAIR
SIERRA TAhrE RED MD(
IH L SIGN COUP
SCID BI -IaH INC.
TRPA
EIBEPRINT
CARKN AREA NBNS
INEE FENCE CDINC
TAHOE M3[NTAIM NEWS
20 -02 -4820
20 -29 -8460
10 -29 -8235
10 -22 -4930
20 -22 -4930
10 -28 -7473
10 -28 -6042
PLPIPS
EMINEERILZ
10 -27 -6620
20 -27 -6620
RESOURCES D
DISTRICT DISTRICT �CN
Description
SUPPLIES
SUPPLIES
SUPPLIES
SUPPLIES
GUMS & MINIENPINCE Total:
Check PIPE, OAS, & Check Ibtal:
CUSTOMER VICE Check Total:
SFIWR, IFAS (RED ) _ ,Ibtal :
Ohi lad PIPE, COVERS, & MANECIES
Check dal:
OFFICE SUPPLIES
ELKS cwB WELL REERILL FACILITY
SZLIDCEt 'Ibtal :
ADS/I N2TICES
A1rIS /1IIML NXICES O Ibtal:
FENCE ICR VALVE SIB
GROU S & MINIEMEE TDtal :
PUBLIC RE ATICNS EXPENSE
PUBLIC RELATIONS EXPENSE
pfft.mt Check # Type
33.06
33.06
8.27
8.27
8.27
165.31 00055480 I`'
178.57
178.57 00055481 MAI
23,204.74
23,204.74 00055482 MAI
4,650.00
4,650.00 00055483 MCI
1,500.00
1,500.00 00055484 MAI
19.31
141.57
45.05
205.93 00055485 NW
447.30
447.29
894.59 00055486 WW
2,020.00
1,156.00
3,176.00 00055487 NW
112.50
112.50
Saith T a h o e P.U.D. 12/23/03 PAYMENT O F CLAIMS REPORT 12/19/2003-01/02/2004 CKRD 13
TUE, DEC 23, 2003, 9:51 AM - -req: MUMS—leg: GL JL - -loc: CNSI1E - -- -jab: 293529 #.77389 -- -per: a5.09 <1.07 >- -repot id:
Default Selecticn: Check Stock ID: AP ; Check Types: MA7,111AI,RV,VH
Verrbr Nacre Account # Department
U S A RIDE! HOOK
tNTIED RENTALS
a UNTIED ' EC= INC
VERIZCN
VISIBLE COMPUTER SUPPLY INC
20 -27 -6660 DISIRICT IITCN
10 -04 -6071 HEAVY MDLINIEWNCE
10 -04 -6021 HMVY MUNIENANCE
10 -06 -6042 OPERATIONS
10 -06 -6025 OPERATIONS
10 -04 -6023 HEAVY NAINIEN NCE
10 -04 -6042 HEAVY NAIlNI NCE
10 -00 -0421 GENERAL & ALNIINISIPATION
10 -28 -6310 ALPINE COCNIY
10 -37 -4920 II TICK SYSTEMS
20 -37 -4920 II TICK SYSIH'E
W I P I VEEIERN INDL PARIS INC 10 -05 -6011 IIaU'IAvaiT REPAIR
20 -05 -6011 EQUIFF NT REPAIR
WALLACE, P LJUNE
20 -19 -6200 BOARD OF D]REK IC7RS
WATER EGUCATTCN FUNDATICN 10 -21 -6250 ALNIINISIRATICN
Descripticn
WATER CCNSERVATICN EXPENSE
Check Total:
CRY SUPPLIES
R`9ENT
C1NCS &
P/ELDG EW
Check Total:
C1RaJNDS & IvAINIENANCE Ibtal
SFDP SUPPLY INVENICRY
Check 'Ibt-a1 :
TELL -ENE
Ch-c< Total :
PRINTING
Check Total:
AUIC KITIVE
AUICM7TIVE
Check Total:
TRAVEL/NEE;= /ECU=CN
Check Total:
DUES /AEvEERS HIPS /CERTTFICP,TI
Amount Check # Type
250.00
475.00 00055488 NW
320.29
373.28
275.81
523.76
230.23
1,723.37
237.44
237.44
139.43
139.43
363.43
363.43
16.26
23.17
39.43
14.45
14.45
28.90
50.40
50.40
162.50
00055490 NW
00055491 NW
00055492 NW
00055493 MN
00055494 NW
00055495 NW
00055496 NW
South Tahoe P.U.D. 12/23/03 PAYMENT O F CLAIMS R E P O R T 12/1 2003 - 01/02/2004
id
TUE, L C 23, 2003, 9:51 AM - -x al : DGtJC,[ 5- --1�3: GL JL --loc: 1`i ± - -- -ddb: 293529 #J7389 - - -pr g: 09 <1.0 >--report
Default Selection: Check Stock ID: AP ; Check Types: Mn], HW, RV, VH
verrbr Narre Acaa.mt # DepartmEnt
WEB INC
WESTERN ENVIRaMENIAL
WESIEIN NEVADA SUPPLY
w ZEE MEDICAL SERVICE
ZYIX ENVIROIEIZHWILGY
20 -21 -6250 ALNINISIRATICN
20 -02 -7464 PIMPS
10 -07 -6110 LABORATORY
10 -28 -7474
10 -04 -6023
10 -04 -6042
10 -04 -6071
20 -01 -6071
10 -01 -6075
20 -01 -6075
10 -37 -6075
20 -37 -6075
10 -06 -6075
ALPINE ligiVY HEAVY N�
HEAVY MAINTENMCE
LI1\ID REPAIR
1NDERGRaND REPAIR
IN:ER3RCUND REPAIR
INECHAATICN SYSIElvIS
OPERATICNS INFORMTICN SYSIFNE
10 -07 -6110 LABORATORY
20 -07 -6110 LABORATORY
20 -29 -7046 ENCENEER1N3
Desc ripticn
DUBS/MEMBERSHIPS /C=1T=
Check Total:
SCJ[JJIH UPPER TRUCKEE kk'Ibt a]
IA:N=1R=
Check Total:
WELL ALP OD RANCH LUISE
FJJ TJ t FJ UIP B EG
SHDP mcums
SEDP SUPPLIES
Check Total:
SAFETY EQUIFYIENI' /PHYSICALS
SAFETYEQ7I FMET1 PHYSICALS
SAFETY JTII /�IIESICALS
SAFETY SAFETY DIQJI TrPIvaTT /HIYSICALS
Check. 'Total :
M NTTIt fl
BAKERSFIELD WEN' 1
Grand Tbtal:
•
14
PC
Amount Check # Type
162.50
325.00 00055497 MW
1,668.27
1,668.27 00055498 Ma
280.00
280.00 00055499 MAI
271.47
263.55
75.60
25.33
45.99
681.94 00055500 Ma
20.47
20.46
8.46
8.46
76.58
134.43 00055501 M
742.50
1,660.50
1,106.50
3,509.50 00055502 MCI
264,707.12
' S:OUt.h' Ta"ho. e
PUbliC Ut, litY District
1275 Meadow Crest Drive · South Rake Tahoe, · CA 96150-7401
' ' ' Phone 530 544-6474. Fax 530 541-0614
BOARD AGENDA ITEM'14.a
TO:
FROM: '
B°ard of Directors
Lisa Coyner, Customer Service Manager
MEETING DATE; January 2, 2004
ITEM - PROJECT: LiabilitY Claim Received from Ed Senor, 930 Modesto Avenue
REQUESTED BOARD ACTION: Reject Claim
DISCUSSION: Pursuant to Section 54956.95 of the California Government Code,
Closed Session may be held for conference with legal counsel regarding existing
litigation.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED-ACTION:
GENERALMANAGERi'' . YES
CHIEF FINANclAL oFFICER: YES ~)~
CATEGORY: 'Sewer '
SoUth Ta hoe
Public Utility District
1275 Meadow Crest Drive · South Lake Tal~, · CA 96150-740i
Phone 530 544-6474. Fax 530 541-0614
BOARD AGENDA ITEM 14. b
TO:
Board of Directors
FROM:
MEETING, DATE:
Jim Hoggatt/Construction Manag'edEng~neer,
Gary· Kivstad/Legal Counsel
JanuarY 2; 2004
ITEM- PROJECT: Conference with Legal CoUnsel- Anticipated Litigation: Pioneer
Trail. Waterline Replacement near Filter Plant
REQUESTED BOARD ACTION: Direct legal Counsel.
DISCUSSION' Pursuant to Section 54956.9(c) of the California Government Code,
Closed Session may be held for the conference with legal counsel regarding anticipated
litigation.
SCHEDULE:
COSTS:
AcCouNT NO: ' '
BUDGETED-AMOUNT. REMAINING:
ATTACHMENTS:
CONCURRENCE wITH 'REQUESTED ACTION
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER:'..YEs'
NO
-7?-
CATEGORY:' Water'
-.S'OUth Tahoe
PUbliC UtiliWDiStrict
1275 Meadow Crest Drive · South Lake Tahoe,, CA 96150-7401'
Phone 530 544-~74,1ax 530 541-0614
TO:
BOARD AGENDA ITEM 14.c
Board of Directors '
FROM:
Richard H. Solbrig, General Manager
MEETING DATE: JanUary 2, 2005
ITEM, PROJECT: Confe~'ence with Legal Counsel - Existing Litigation: STPUD vs.
ARCO, et al., San Francisco County Superior. Court Case No. 999128
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION' Pursuant to Section 54956.9(a)of the California Government Code,
Closed Session may be held forconference with legal counsel regarding existing
litigation.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS: ·
CONCURRENCE WITH REQUESTED AcTiON;
GENERAL. MANAGER: YES~(-~.~[ NO
CHIEF. FINANCIAL OFFICER.:...YEs. 'I'~YY~· NO
-?9-
CATEGORY: Water
South Tahoe.....--:';.'"
PUblic Utility District
1275 Meadow Crest Drive · South Lake Tahoe,, CA 96150-7401
Phone 530 544-6474. Fax 530 541-0614
TO:
FROM': '
MEETING DATE:
BOARD AGENDA ITEM'14.d
Board of Directors .
Richard H. Solbrig/General Manager, Gary Kvistad/Legal Counsel
January 2, 2004
ITEM. PROJECT: Conference with Legal Counsel - Existing Litigation: STPUD vs.
F. Heise Land & Livestock Company, Inc,, William Weaver, Eddie R. Snyder, Crockett
Enterprises, Inc., CIV S-02-0238 MLS JFM U~ited States District Court for the Eastern
District' of California, Sacramento, CA
REQUESTED BOARD ACTION' Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code,
Closed Session may be held for conference with legal counsel regardin.g existing
litigation."
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
·ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES' _/f~. NO
CHIEF FINANCIAL OFFICER:.'iYES" ~.~y'y~L~ .... NO ""
CATEGORy: Sewer · '" ·
S'oUth Tahoe
Pukli.c Utility District
1275 Meadow Crest Drive · South Lake Tahoe,. CA 96150-7401
Phone 530 544-6474. Fax 530 541-0614
BOARD AGENDA ITEM 14.e
TO:
FROM: '
BOard of Directors
Richard H. Solbrig, General Manager
MEETING DATE: January 2, 2004
ITEM, PROJECT: Conference with Legal Counsel - Existing Litigation re: Meyers
Landfill Site: United States of America vs. El Dorado County and City of South Lake
Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK GGH, United States
District Court for the Eastern District of California.
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to' Section 54956.9(a) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding existing
litigation.·
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED-AMOUNT-REMAINING:
ATTACHMENTS:
coNCURRENcE WITH ·REQUESTED ACTION:.
~ENERAL. MANAGER:" - ..YEs
CHIEF. FINANCIAL OFFICER:·. YEs'.
.'NO
NO
CATEGORY: General
South Tahoe "'"'; ·:
public Utility' District
1275 Meadow Crest Drive · South Lake Tahoe,, CA 96150-7401
' ' Phone 530 544-6474. Fax 530 541-0614
BOARD AGENDA ITEM' 14.f '
TO:
FROM: '
Board of DirectOrs
Richard H. Solbrig, General Manager
MEETING DATE: January 2, 2004
ITEM - PROJECT: Conference with Legal Counsel - Existing Litigation: STPUD vs.
Lakeside Park Association, et al., County of El Dorado, Superior Court Case No.
SC20010165
REQUESTED BOARD ACTION: Direct staff
DISCUSSION: Pursuant to Section ~4956.9(a) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding existing
litigation.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT-REMAINING:
ATTACHMENTS:
cONCURRENCE WITH REQUESTED ACTION:· -
GE"Er~, M^,AGER: '..YES' i~.~2'_
CHIEF FINANCIAL OFFICER:. YEs ~/~ N0
...... ' CATEGORY: 'Water
.'NO