AP 06-17-10N
Imo. ��r_• 195O•Y�
SOUTH TAHOE PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING AGENDA
Thursday, June 17, 2010
2:00 P.M.
District Board Room
1275 Meadow Crest Drive, South Lake Tahoe, California
Richard Solbri , General Manager Paul Sciuto, Assistant General Manager
Dale Rise, President BOARD MEMBERS Mary Lou Mosbacher, Vice President
James R. Jones, Director Eric W. Schafer, Director Chris Cefalu, Director
1. CALL TO ORDER REGULAR MEETING — PLEDGE OF ALLEGIANCE
2. COMMENTS FROM THE AUDIENCE (This is an opportunity for members of the public to address the
Board on short non - agenda items that are within the subject matter jurisdiction of the District. Five - minute
limit. No action can be taken on matters not listed on the agenda.)
3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR
4. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered
separately upon request. Comments and questions from members of the public, staff or Board can be taken
when the comment does not necessitate separate action.)
5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION / ACTION
6. ITEMS FOR BOARD ACTION
REQUESTED BOARD ACTION
a. 12" Steel Waterline Replacement and
Approve Teichert Construction's
Pg. 25 Highway 50 Utility Relocation Project
Request to Replace the Approved
(Jim Hoggatt)
Subcontractor with LDL Trucking that
was Listed in the Bid Documents
Unless LDL Trucking Files a Written
Objection to the Substitution. If LDL
Trucking Files a Written Objection,
Hold a Public Hearing During this
Agenda Item to Determine Whether
to Approve the Substitution
REGULAR BOARD MEETING AGENDA: JUNE 17, 2010 PAGE — 2
b. 2010 Water Meter Installation Project -
Pg. 31 Phase 2
(John Thiel)
C. North Apache Booster Station
Pg. 35 (John Thiel)
d. City Redevelopment Agency Project No. 2
Pg. 37 (Richard Solbrig)
e. Payment of Claims
Pg. 39
Approve Change Order No. 1 to
Campbell Construction Company,
Inc., in an Amount Not to Exceed
$452,000
Award Bid to the Lowest Respon-
sive, Responsible Bidder ( " Bid results
will be provided prior to, and at, the Board
meeting)
Receive Update and Direct Staff if
Necessary
Approve Payment in the Amount
of $1,070,729.59
7. BOARD MEMBER STANDING COMMITTEE REPORTS
(Discussions may take place; however, no action will be taken)
a. Water & Wastewater Operations Committee (Jones / Rise)
b. Finance Committee (Schafer / Cefalu)
C. Executive Committee (Rise / Mosbacher)
d. Planning Committee (Mosbacher / Schafer)
8. EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVES REPORT
9. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken)
10. GENERAL MANAGER REPORTS (Discussions may take place; however, no action will be taken)
11. STAFF / ATTORNEY REPORTS (Discussions may take place; however, no action will be taken)
a. Update on Meters Project (Sciuto)
b. Report on the Meta Research Proposal re: Customer Satisfaction Survey (Cocking)
C. State Budget Update (Cocking)
12. NOTICE OF PAST AND FUTURE MEETINGS / EVENTS
Past Meetings / Events
06/10/10 — Union /Management Medical Plan Health Risk Assessment Meeting
06/11110 — City Redevelopment Meeting
06/01A0 — Water and Wastewater Operations Committee Meeting
Future Meetinas / Events
06/22/10 — Noon — Employee Recognition and Longevity Awards Event at District
06/28/10 — 3:30 p.m. — Water and Wastewater Operations Committee Meeting at District
07/01/10 — 2:00 p.m. — STPUD Regular Board Meeting at District
07/05/10 — Independence Day Holiday (District Office Closed)
REGULAR BOARD MEETING AGENDA -- JUNE 17, 2010 PAGE - 3
13. CLOSED SESSION (Closed Sessions are not open to the public)
a. Pursuant to Government Code Section 54956.9(b) /Conference with Legal Counsel -
Pg. 53 Anticipated Litigation (One Case)
b. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel —
Pg. 55 Existing Litigation re: Meyers Landfill Site: United States of America vs. El Dorado
County and City of South Lake Tahoe and Third Party Defendants, Civil Action
No. S -01 -1520 LKK GGH, United States District Court for the Eastern District of CA
C. Pursuant to Section 54956.9(a) of the California Government code, Closed Session
Pg. 57 may be held for conference with legal counsel regarding existing litigation: False
Claims Act Case: United States, the States of California, Delaware, Florida,
Nevada, and Tennessee and the Commonwealths of Massachusetts and Virginia ex
rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics
Corporation, U.S.A., Civil Action No. ED CV06- 0055 -GW, United States District
Court for the Central District of California.
14. ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION
15. ADJOURNMENT (To the next regular meeting, July 1, 2010, 2:00 p.m.)
The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of
each month. A complete agenda packet, including all backup information is available for review at the
meeting and at the District office during the hours of 8:00 a.m. — 5:00 p.m., Monday through Friday. A
recording of the meeting is retained for 30 days after minutes of the meeting have been approved. Items on
this agenda are numbered for identification purposes only and will not necessarily be considered in the
order in which they appear on the agenda. Designated times are for particular items only. Public Hearings
will not be called to order prior to the time specified, but may occur slightly later than the specified time.
Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the
same time the agenda items are heard; comments should be brief and directed to the specifics of the item
being considered. Comments on items not on the agenda can be heard during "Comments from the
Audience;" however, action cannot be taken on items not on the agenda.
Please provide the Clerk of the Board with a copy of all written material presented at the meeting. *Backup
to any agenda item(s) not included with the Board packet will be made available when finalized at the
District office, at the Board meeting, and upon request to the Clerk of the Board.
The meeting location is accessible to people with disabilities. Every reasonable effort will be made to
accommodate participation of the disabled in all of the District's public meetings. If particular
accommodations for the disabled are needed (i.e., disability - related aids, or other services), please contact
the Clerk of the Board at 530.544.6474, extension 6203, at least 24 hours in advance of the meeting.
bra. r • 1
ISO " A
CONSENT CALENDAR
JUNE 17 2010
ITEMS REQUESTED ACTION
a. Annual Software Support Costs for Utility Billing Approve Payment to Springbrook
Pg. 1 Software Software, Inc., for Software Support
(Carol Swain) in the Amount of $19,185.67 Plus
Tax
b. Luther Pass Pump Station Power Generation Facility Approve Change Order No. 1 to
Pg. 5 (Ivo Bergsohn) Sierra Nevada Construction, Inc.,
in the Amount of $37,645
C. 2010 -2011 Sodium Hypochlorite Supply Drums
Pg. 9 (Randy Curtis)
d. 2010 -2011 Sodium Hypochlorite Supply Totes
Pg. 13 (Randy Curtis)
e. Regular Board Meeting Minutes:
Pg. 17 May 20, 2010
(Kathy Sharp)
Award Bid to the Lowest Respon-
sive Bidder, Sierra Chemical Co., in
the Estimated Amount of $11,333.10
Award Bid to the Lowest Respon-
sive Bidder, Sierra Chemical Co.,
in the Estimated Amount of
$17,936.93
Approve Minutes
South Tahoe Public Utility District ■ 1274 Meadow Crest Drive ■ South Lake Tahoe, CA 96150
Phone 530.544.6474 ■ Facsimile 530.541.0614 ■ www.stpud.us
1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401
Phone 530 544 -6474 - Fax 530 541 -0614 - www.stpud.us
BOARD AGENDA ITEM 4a
TO: Board of Directors
FROM: Carol Swain, Information Systems Manager
MEETING DATE: June 17, 2010
ITEM — PROJECT NAME: Annual Software Support Costs for Utility Billing Software
REQUESTED BOARD ACTION: Approve payment to Springbrook Software, Inc., for
software support in the amount of $19,185.67 plus tax.
DISCUSSION: The District's annual software support costs for the Utility Billing
software application and its peripheral components is 20% of the original software
purchase price, plus a 3% CPI factor added each year. The results of this formula is
$19,185.67 for the fiscal year of 7/1/10 — 6/30/11.
These services are needed for daily phone support to resolve issues and for updates to
fix any problems that maybe encountered, as well as minor new releases.
Staff requests that the Board approve renewal of the support contract with Springbrook
Software, Inc. for the upcoming fiscal year 2010 -11.
SCHEDULE: 7/1/10 — 6/30/11
COSTS: $19,185.67 plus $839.37 tax
ACCOUNT NO: 1037 -6030 and 2037 -6030
BUDGETED AMOUNT REMAINING: $113,206 (2010 -11)
ATTACHMENTS: Invoice copy
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer & Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
—1—
General Manager
Rlcharcl H.Solbrlg
hr
South
ChrlsCefalu
James X Jones
Public Utility niotrict
Mary Lou M mlem
Dale Rlse
Frfc Schafer
1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401
Phone 530 544 -6474 - Fax 530 541 -0614 - www.stpud.us
BOARD AGENDA ITEM 4a
TO: Board of Directors
FROM: Carol Swain, Information Systems Manager
MEETING DATE: June 17, 2010
ITEM — PROJECT NAME: Annual Software Support Costs for Utility Billing Software
REQUESTED BOARD ACTION: Approve payment to Springbrook Software, Inc., for
software support in the amount of $19,185.67 plus tax.
DISCUSSION: The District's annual software support costs for the Utility Billing
software application and its peripheral components is 20% of the original software
purchase price, plus a 3% CPI factor added each year. The results of this formula is
$19,185.67 for the fiscal year of 7/1/10 — 6/30/11.
These services are needed for daily phone support to resolve issues and for updates to
fix any problems that maybe encountered, as well as minor new releases.
Staff requests that the Board approve renewal of the support contract with Springbrook
Software, Inc. for the upcoming fiscal year 2010 -11.
SCHEDULE: 7/1/10 — 6/30/11
COSTS: $19,185.67 plus $839.37 tax
ACCOUNT NO: 1037 -6030 and 2037 -6030
BUDGETED AMOUNT REMAINING: $113,206 (2010 -11)
ATTACHMENTS: Invoice copy
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer & Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
—1—
/'O: - Springbrook
DATE INVOICE NO
111 SW Fifth Ave., Suite 2900, Portland, OR 97204
7 0310112010 0014624
South Tahoe PUD
1275 Meadow Crest Drive
South Tahoe, CA 96150
DUE DATE
Annual Maintenance: 712010 - 6/2011:
Custom: Aging Report
118.13
118.13
Custom: Billing Register
118.13
118.13
Custom:UB Billing Export Maint
118.13
118.13
Central Cash Maintenance
2,784.53
2,784.53
GIS Maintenance
7%41
759.41
Progress Maintenance: 5 User
828.26
828.26
Meter Interface Maintenance
759.41
759.41
UB Maintenance /
10,606.49
10,606.49
Custom: CR Enter Window
165.38
165.38
Custom: Past Due Repot
118.13
118.13
Custom: Tokay Interface
472.50
472.50
Custom: Audio-tel Interface
438.62
438.62
App Server Maintenance
1,265.69
1,265.69
BI-Tech Maintenance
632.86
632.86
PLEASE DETACH BOTTOM PORTION & REMIT WITH YOUR PAYMENT
For questions please contact us at 503.820.2200 or billinginquiries @ sprbrk com
Customer Name: South Tahoe PUD
DUE DATE INVOICE N10
Customer No: 002221
Account No: 0002221 07/0112010 1 0014624
Please remit payment by the due date to:
SPRINGBROOK SOFTWARE
111 SW FIFTH AVENUE SUITE 29002
PORTLAND, OR 97264
TOTAL AMOUNT DUE: $19,185.67
AMOUNT RAID
-3-
1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401
Phone 530 544 -6474 - Fax 530 541 -0614 - www.stpud.us
BOARD AGENDA ITEM 4b
TO: Board of Directors
FROM: No Bergsohn, Hydro - Geologist
MEETING DATE: June 17, 2010
ITEM — PROJECT NAME: Luther Pass Pump Station (LPPS) Standby Power
Generation Facility
REQUESTED BOARD ACTION: Approve Change Order No. 1 to Sierra Nevada
Construction, Inc., in the amount of $37,645.
DISCUSSION: The itemized parts of Change Order No. 1 are as follows:
Item 1, in the amount of $3,028, is to extend the underground telephone line re -route
from the pump station building to the power pole nearest the northwest property comer,
as requested by AT &T. The underground telephone line re -route is being performed as
part of new generator building construction at the LPPS. The original utility improvement
plans provided for the utility line re -route to tie -in and splice to the existing underground
telephone line on -site. AT &T requested that the line re -route be extended to install new
conduit all the way to the point of service at the power pole. AT &T also requested that a
new exterior cabinet and pull box be installed for new telephone line installation. The
added labor and equipment required for the change in underground telephone line re-
route is an extra work item that was not part of the original contract documents.
Item 2, in the amount of $34,617, is to change the construction of the fire pump
enclosure from a pre- fabricated metal building to a masonry building. The specifications
require that the fire pump system for the new generator building be housed with an
insulated enclosure /pump house meeting applicable building code requirements. The
accepted bid from Sierra Nevada Construction (SNC) provided for a pre - fabricated
metal building. Following notice to proceed, staff requested that SNC provide a cost
estimate to replace the metal building with a masonry building compatible with the new
generator building in order to increase the robustness of the enclosure, reduce long-
term building maintenance costs and improve the visual appearance of the site. The
proposed cost for masonry building construction were reviewed and found to be
reasonable by the project architect and design engineer. The added cost for change in
building construction for the fire pump skid enclosure is an extra work item that is not
part of the original contract documents.
—5—
General Manager
Richard H. Solbr4
Tahoe
arecrom
out
James R Jones
•
Public. Utility niotrict
Mary Lou Mosbacher
Dale Rise
Eric Schafer
1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401
Phone 530 544 -6474 - Fax 530 541 -0614 - www.stpud.us
BOARD AGENDA ITEM 4b
TO: Board of Directors
FROM: No Bergsohn, Hydro - Geologist
MEETING DATE: June 17, 2010
ITEM — PROJECT NAME: Luther Pass Pump Station (LPPS) Standby Power
Generation Facility
REQUESTED BOARD ACTION: Approve Change Order No. 1 to Sierra Nevada
Construction, Inc., in the amount of $37,645.
DISCUSSION: The itemized parts of Change Order No. 1 are as follows:
Item 1, in the amount of $3,028, is to extend the underground telephone line re -route
from the pump station building to the power pole nearest the northwest property comer,
as requested by AT &T. The underground telephone line re -route is being performed as
part of new generator building construction at the LPPS. The original utility improvement
plans provided for the utility line re -route to tie -in and splice to the existing underground
telephone line on -site. AT &T requested that the line re -route be extended to install new
conduit all the way to the point of service at the power pole. AT &T also requested that a
new exterior cabinet and pull box be installed for new telephone line installation. The
added labor and equipment required for the change in underground telephone line re-
route is an extra work item that was not part of the original contract documents.
Item 2, in the amount of $34,617, is to change the construction of the fire pump
enclosure from a pre- fabricated metal building to a masonry building. The specifications
require that the fire pump system for the new generator building be housed with an
insulated enclosure /pump house meeting applicable building code requirements. The
accepted bid from Sierra Nevada Construction (SNC) provided for a pre - fabricated
metal building. Following notice to proceed, staff requested that SNC provide a cost
estimate to replace the metal building with a masonry building compatible with the new
generator building in order to increase the robustness of the enclosure, reduce long-
term building maintenance costs and improve the visual appearance of the site. The
proposed cost for masonry building construction were reviewed and found to be
reasonable by the project architect and design engineer. The added cost for change in
building construction for the fire pump skid enclosure is an extra work item that is not
part of the original contract documents.
—5—
No Bergsohn
June 17, 2010
Page 2
Item 3 adds ten (10) Calendar Days to the total contract time. Added time is requested
for the proposed change in Fire Pump Building construction. Approval of the time
extension will change the completion date from December 27, 2010 to January 6, 2011.
SCHEDULE: As soon as possible
COSTS: $37,645
ACCOUNT NO: 1029 - 8933 /RGLPPS
BUDGETED AMOUNT REMAINING: $619,722.83
ATTACHMENTS: Change Order No. 1 (June 17, 2010)
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer
GENERAL MANAGER: YES Z91 NO
CHIEF FINANCIAL OFFICER: YES NO
-6-
CHANGE ORDER NUMBER 1
Project: LPPS STANDBY POWER GENERATOR FACILITY
ewe ►��s5o��' to
,�G� Contractor: Sierra Nevada Construction, Inc.
Date: 06.17.2010
The Contract Shall Be Changed As Follows:
PO #: P22641
1) Increase $3,028.00 to extend the relocate for the existing underground telephone utility
line from a new exterior cabinet on the north side of the pump station to the power pole
nearest the northwest property corner as requested by Matt Cochrane, AT &T (04/1612010).
The increase includes all additional labor, equipment and material costs and deducts for the
original AT &T Service work, as per the SNC AT &T Change Proposal (04/26/10).
TOTAL FOR ITEM 1: $3,028.00
2) Increase $34,617.00 to change the construction of the fire pump skid enclosure from a
pre- fabricated metal enclosure to a CMU block enclosure complying with all applicable
building codes and satisfying the fire pump skid manufacturer's installation
recommendations and visually compatible with the new generator building. The increase
includes all additional labor, equipment, material and specialty costs for construction of a
CMU Fire Pump Building and deducts for a Metal Fire Pump Building <$15,000 >, as per the
SNC Building Change Proposal (05/01/10).
TOTAL FOR ITEM 2: $34,617.00
TOTAL FOR CHANGE ORDER NO. 1, ITEMS 1- 3 IS: $37,645.00
Contractor agrees to make the herein - described changes in accordance with the terms hereof. The change
in contract price and/or contract time noted is full settlement for costs incurred because of the change(s)
described, unless specifically noted in individual description(s).
Authorized By STPUD Board President
Date
Date:
Accepted By Contractor
Reviewed By
Date:
-7-
3) Add ten (10) Calendar Days to the total contract time to account for additional time
required for Fire Pump Building Change construction. This no -cost time extension will
change the project completion date from December 27, 2010 to January 6, 2011. It does not
change the October 15, 2010 date required for completion of all excavation or work that
would disturb existing ground.
TOTAL FOR ITEM 3: $0.00
-8-
1275 Meadow Crest Drive -South Lake Tahoe - CA 96150 -7401
Phone 530 5446474 - Fax 530 541 -0614 - www.stpud.u5
BOARD AGENDA ITEM 4c
TO: Board of Directors
FROM: Randy Curtis, Manger of Field Operations
MEETING DATE: June 17, 2010
ITEM — PROJECT NAME: 2010 -2011 Sodium Hypochlorite Supply Drums
REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible
bidder, Sierra Chemical Co., in the estimated amount of $11,333.10 *.
DISCUSSION: Request for bids were sent to fifteen suppliers. Two suppliers
responded and on June 8, 2010, bids were opened, with Siena Chemical Co. being the
low bid.
*The total dollar amount is based upon an estimated quantity that the District will use in
the coming fiscal year. The actual quantity and grand total may vary, but the unit prices
are firm.
SCHEDULE: July 1, 2010 through June 30, 2011
COSTS: $11,333.10 (estimated)
ACCOUNT NO: 2002 -4755
BUDGETED AMOUNT REMAINING: $27,000.00
ATTACHMENTS: Bid Results
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES R Al
CHIEF FINANCIAL OFFICER: YES
NO
NO
CATEGORY: Water
-9-
General Manager
RlchaM H. Solbrlg
Tahoe
out
C�rF
James R Jones
es
Public Utility P Strict
tvlaryLouMNISRiar
Dale Asa
Edc Schafer
1275 Meadow Crest Drive -South Lake Tahoe - CA 96150 -7401
Phone 530 5446474 - Fax 530 541 -0614 - www.stpud.u5
BOARD AGENDA ITEM 4c
TO: Board of Directors
FROM: Randy Curtis, Manger of Field Operations
MEETING DATE: June 17, 2010
ITEM — PROJECT NAME: 2010 -2011 Sodium Hypochlorite Supply Drums
REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible
bidder, Sierra Chemical Co., in the estimated amount of $11,333.10 *.
DISCUSSION: Request for bids were sent to fifteen suppliers. Two suppliers
responded and on June 8, 2010, bids were opened, with Siena Chemical Co. being the
low bid.
*The total dollar amount is based upon an estimated quantity that the District will use in
the coming fiscal year. The actual quantity and grand total may vary, but the unit prices
are firm.
SCHEDULE: July 1, 2010 through June 30, 2011
COSTS: $11,333.10 (estimated)
ACCOUNT NO: 2002 -4755
BUDGETED AMOUNT REMAINING: $27,000.00
ATTACHMENTS: Bid Results
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES R Al
CHIEF FINANCIAL OFFICER: YES
NO
NO
CATEGORY: Water
-9-
SOU-th Tahoe
T>u bL'Lz L'(futt� D'Lstr`Lct
BID RESULTS - 618110 OPENING
SODIUM HYPOCHLORITE DRUMS
Bid # 10 -11-04 term; 711110- 6130/11 es imated 2.00 drums.
$11,333.10 Sierra Chemical Co. (Sparks, NV)
19,260.00 Sierra Chemical Company (W Sacramento, CA)
-11-
1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401
Phone 530 544 -6474 •l=ax 530 541 -0614 • www.stpud.us
BOARD AGENDA ITEM 4d
TO: Board of Directors
FROM: Randy Curtis, Manger of Field Operations
MEETING DATE: June 17, 2010
ITEM - PROJECT NAME: 2010 -2011 Sodium Hypochlorite Supply Totes
REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible
bidder, Sierra Chemical Co., in the estimated amount of $17,936.93 *.
DISCUSSION: Request for bids were sent to fifteen suppliers. Two suppliers responded
and on June 8, 2010, bids were opened, with Sierra Chemical Co. being the low bid.
*The total dollar amount is based upon an estimated quantity that the District will use in
the coming fiscal year. The actual quantity and grand total may vary, but the unit prices
are term.
SCHEDULE: July 1, 2010 through June 30, 2011
COSTS: $17,936.93 (estimate)
ACCOUNT NO: 2002 -4755
BUDGETED AMOUNT REMAINING: $27,000
ATTACHMENTS: Bid Results
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES AV
CHIEF FINANCIAL OFFICER: YES
NO
CATEGORY: Water
-13-
General Manager
fthard H. Solbrig
Tahoe
outh
ChHsCeftfu
,5
James tL Jones
Public Utility niotrict I
Mary Lou Moabacher
DaleR►se
Eric Schafer
1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401
Phone 530 544 -6474 •l=ax 530 541 -0614 • www.stpud.us
BOARD AGENDA ITEM 4d
TO: Board of Directors
FROM: Randy Curtis, Manger of Field Operations
MEETING DATE: June 17, 2010
ITEM - PROJECT NAME: 2010 -2011 Sodium Hypochlorite Supply Totes
REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible
bidder, Sierra Chemical Co., in the estimated amount of $17,936.93 *.
DISCUSSION: Request for bids were sent to fifteen suppliers. Two suppliers responded
and on June 8, 2010, bids were opened, with Sierra Chemical Co. being the low bid.
*The total dollar amount is based upon an estimated quantity that the District will use in
the coming fiscal year. The actual quantity and grand total may vary, but the unit prices
are term.
SCHEDULE: July 1, 2010 through June 30, 2011
COSTS: $17,936.93 (estimate)
ACCOUNT NO: 2002 -4755
BUDGETED AMOUNT REMAINING: $27,000
ATTACHMENTS: Bid Results
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES AV
CHIEF FINANCIAL OFFICER: YES
NO
CATEGORY: Water
-13-
So uth Ta h_oe,
PkUl1r, l tt%I,%t� D%str%ct
$1D RESULTS - 618110 OPENING
SODIUM HYPOCHLORITE DRUMS
Bid # 10 -11 -03 term: 7/1/10 - 6/30/11 estimated 32 totes
$17,936.93 Sierra Chemical Co. (Sparks, NV)
28,800.00 Sierra Chemical Company (W Sacramento, CA)
-15-
5 V1 n I Ay
er •1950•`N
SOUTH TAHOE PUBLIC UTILITY DISTRICT
Richard Solbri , General Manager Paul Sciuto, Assistant Manager
Mary Lou Mosbacher, President BOARD MEMBERS Dale Rise, Vice President
James R. Jones, Director Eric W. Schafer, Director Ernie Claudio, Director
REGULAR MEETING OF THE BOARD OF DIRECTORS
SOUTH TAHOE PUBLIC UTILITY DISTRICT
MAY 20, 2010
MINUTES
The Board of Directors of the South Tahoe Public Utility District met in a regular session,
May 20, 2010, 2:10 P.M., District Office, 1275 Meadow Crest Drive, South Lake Tahoe, CA
BOARD OF DIRECTORS
President Rise, Directors Mosbacher, Cefalu, Jones and
Schafer.
STAFF
Solbrig, Whalen, Sciuto, Hughes, Bledsoe, Curtis,
Rasmussen, Cocking, Barnes, Thiel, Bergsohn, Cullen,
Nolan, Attorney Herrema
GUESTS:
Adam Jensen /Tahoe Daily Tribune, Kathryn Reed /Lake
Tahoe News, Ernie Claudio, John Runnels, Kenneth
Reneer
John Thiel led the pledge to the flag.
Kenneth Reneer stated an extra sewer unit was found
at his home after being discovered by the District when
his home was listed for sale. He maintained the home
has always had the same amount of bedrooms and bath-
rooms since it was built, and nothing has been added.
Mr. Reneer requested relief from being billed for back -
charges, amounting to $342.12. Staff was directed to
look into this situation further, and help develop a
satisfactory solution.
ROLL CALL
PLEDGE OF ALLEGIANCE
COMMENTS FROM THE AUDIENCE
MAJORITY PROTEST HEARING
President Rise opened the Proposition 218 Public
Hearing at 2:11 p.m. to receive protests on proposed
water and sewer rate increases.
-17-
REGULAR BOARD MEETING MINUTES - MAY 20, 2010 PAGE - 2
Pursuant to the requirement of Proposition 218, Paul
Hughes reported that on March 23, 2010, notices were
mailed to all property owners notifying them of the
proposed 4% rate increase. The notice included all
instructions on how to protest the increases.
As of May 20, 2010, the number of protests received
was 122, with 87 being valid, and 35 being invalid. It
would take 8,900 valid protests to prevent the Board
from adopting any rate increase.
On May 6, 2010, the Board directed staff to revise the
budget with a proposed rate increase of 2% instead of
4 %. Documents presented reflect this change.
Staff's recommendation remains unchanged that a 4%
rate increase is justifiable and is the appropriate rate for
the District in the long term.
On May 6, 2010, members of the public agreed the 4%
rate increase was justifiable but just not right for the
current economic climate.
None were received.
The Majority Protest Hearing was closed at 2:17 p.m.
Moved Jones / Second Schafer / Passed Unanimously
to approve the Consent Calendar as submitted:
a. Temporary Help for Inspections — Approved entering
into a contract with Substitute Personnel or Blue
Ribbon for two temporary employees, in the
estimated amount of $35,000;
b. Twin Peaks Booster Station — Approved Change
Order No. 2 to Resource Development Company,
Inc., in the amount of $6,110.96;
c. Temporary Water Educators — Approved contract
with Substitute Personnel for two temporary water
educators, in the estimated amount of $25,000;
d. Approved Regular Board Meeting Minutes:
April 15, 2010;
e. Approved Special Board Meeting Minutes:
April 23, 2010;
Approved Public Meeting Minutes:
May 6, 2010;
g. Approved Regular Board Meeting Minutes:
May 6, 2010.
MAJORITY PROTEST HEARING
(continued)
PUBLIC COMMENTS
CLOSE OF HEARING
CONSENT CALENDAR
-is-
REGULAR BOARD MEETING MINUTES - MAY 20, 2010 PAGE - 3
ITEMS FOR BOARD ACTION
No Bergson reported four bids were opened at the
May 18, 2010, bid opening. The apparent low bidder,
CES (Controlled Environmental Services) had two minor
deviations; (1) did not include hazardous waste
transporter number; and (2) did not provide contact info-
rmation for the landfill proposed for disposal. Staff
contacted CES for this information and was informed
they intended to transport the spent media to a local
transfer station. Staff has determined this does not
constitute the project as outlined in the contract
documents and therefore CES's bid should be declared
non - responsive and should be rejected.
Bergson reported the second lowest bidder, CH (Clean
Harbors) had one deviation they did not include a
hazardous waste transporter number. This deviation is
regarded as a minor irregularity and staff recommended
that it should be waived, and that the bid be awarded to
CH.
Moved Schafer / Second Jones / Passed Unanimously to:
(1) Reject low bid as non - responsive; (2) Waive the minor
irregularities and accept the Clean Harbors bid as the
lowest responsive, responsible bidder, in the amount of
$7,000.
ARROWHEAD WELL NO. 3 MEDIA
CHANGE OUT SERVICES
John Thiel reported five bids were opened at the May 5, MEYERS WATERLINE
2010 bid opening. Campbell Construction was the REPLACEMENT PROJECT
apparent low bidder. Two minor deviations were noted.
This project is grant funded and Campbell has met all the �— ;
DBE and grant requirements. He informed the Board that
the re was a formal pretest filed the Foundation for
Fair Contracting (FFC) had submitted a letter suggesting t
that the contract could not be awarded to against
Campbell. Staff has reviewed the protest issues identified
with District counsel and concluded Campbell cannot be
prohibited from bidding based on-the concerns outlined
in the FFC's letter their rrete nt
Moved Mosbacher / Second Schafer / Passed
Unanimously, to waive the minor bid irregularities and
award bid to the lowest responsive, responsible bidder
Campbell Construction, in the amount of $856,467.50.
tJ/ ALniS Cv✓'rt -f % d✓�
A lengthy discussion ensued ranging from support for ORDINANCE NO. 523 -10:
the original proposed 4% increase in water and sewer RATE AMENDMENT ORDINANCE
rates to secure and maintain capital improvement
projects; to a 0% increase due to the poor current
economic climate.
REGULAR BOARD MEETING MINUTES - MAY 20, 2010 PAGE - 3
ITEMS FOR BOARD ACTION
No Bergson reported four bids were opened at the
May 18, 2010, bid opening. The apparent low bidder,
CES (Controlled Environmental Services) had two minor
deviations; (1) did not include hazardous waste
transporter number; and (2) did not provide contact info-
rmation for the landfill proposed for disposal. Staff
contacted CES for this information and was informed
they intended to transport the spent media to a local
transfer station. Staff has determined this does not
constitute the project as outlined in the contract
documents and therefore CES's bid should be declared
non - responsive and should be rejected.
Bergson reported the second lowest bidder, CH (Clean
Harbors) had one deviation they did not include a
hazardous waste transporter number. This deviation is
regarded as a minor irregularity and staff recommended
that it should be waived, and that the bid be awarded to
CH.
Moved Schafer / Second Jones / Passed Unanimously to:
(1) Reject low bid as non - responsive; (2) Waive the minor
irregularities and accept the Clean Harbors bid as the
lowest responsive, responsible bidder, in the amount of
$7,000.
John Thiel reported five bids were opened at the May 5,
2010 bid opening. Campbell Construction was the
apparent low bidder. Two minor deviations were noted.
This project is grant funded and Campbell has met all the
DBE and grant requirements. He informed the Board that
there was a formal protest filed with the Foundation for
Fair Contracting against Campbell. Staff has reviewed
the protest issues with District counsel and concluded
Campbell cannot be prohibited from bidding based on
their protest.
Moved Mosbacher / Second Schafer / Passed
Unanimously to waive the minor bid irregularities and
award bid to the lowest responsive, responsible bidder
Campbell Construction, in the amount of $856,467.50.
ARROWHEAD WELL NO. 3 MEDIA
CHANGE OUT SERVICES
MEYERS WATERLINE
REPLACEMENT PROJECT
A lengthy discussion ensued ranging from support for ORDINANCE NO. 523 -10:
the original proposed 4% increase in water and sewer RATE AMENDMENT ORDINANCE
rates to secure and maintain capital improvement
projects; to a 0% increase due to the poor current
economic climate.
-19-
REGULAR BOARD MEETING MINUTES - MAY 20, 2010 PAGE - 4
Moved Rise / Second Cefalu / Schafer, Jones and ORDINANCE NO. 523 -10:
Mosbacher Voted No / Motion Failed to enact RATE AMENDMENT ORDINANCE
Ordinance No. 523 -10 amending Ordinance No. 464, (continued)
and superseding Ordinance No. 508 -08 in its entirety
which is a 2% rate increase for both sewer and water.
Moved Schafer / S econd Rise / Jones and Mosbacher
Voted No / Passed to enact Ordinance No. 523 -10
amending Ordinance No. 464 and superseding
Ordinance No. 508 -08 in its entirety including a 2%
increase in sewer rates and a 2.5% increase in water
rates.
Moved Schafer / Second Cefalu / Mosbacher Voted No / RESOLUTION NO. 2881 -10:
Passed to adopt Resolution No. 2881 -10 adopting the FISCAL YEAR 2010/11 WATER
budget for the Water Enterprise Fund and authorizing ENTERPRISE FUND BUDGET
staff to account for the additional .5% increase as
appropriate.
Moved Schafer / Second Rise / Mosbacher Voted No / RESOLUTION NO. 2882 -10:
Passed to adopt Resolution No. 2882 -10 adopting the FISCAL YEAR 2010/11 SEWER
budget for the Sewer Enterprise Fund. ENTERPRISE FUND BUDGET
District representatives attended the City Council meet-
ing on May 18 and spoke to the Council regarding the
District's second proposal of some project level issues
the District has identified that may help to protect future
financial interests of the District. The current ad hoc
committee (Directors Rise and Cefalu) have offered to
work with a City Council ad hoc committee to work
together to identify solutions. A letter from the Board of
Supervisor's was read aloud formally objecting to the
redevelopment and requesting the Council not to
approve it. The Council voted to waive the second
reading of the ordinance and adopt the redevelopment
proposal. A meeting will be held with the City and
District staff. The District has 90 days from the May 18
vote to reach a mutually agreeable position with the City
or file formal objections.
No Board action.
Moved Schafer / Second Cefalu / Passed Unanimously
to approve payment in the amount of $1,038,475.02.
Water and Waste water Operations Committee Meetina:
The committee met on May 17. Minutes of the meeting
are available upon request. The Board directed staff to
look into possible disposition scenarios of the former
Black Bart Post Office building. This item will be on the
agenda for the next scheduled meeting on June 1, 2010.
CITY REDEVELOPMENT AGENCY
PROJECT NO. 2
PAYMENT OF CLAIMS
BOARD MEMBER STANDING
COMMITTEE REPORTS
Management /Union Medical Plan Negotiations Ad Hoc BOARD MEMBER AD HOC
Committee: Staff is continuing to work on details of the COMMITTEE REPORTS
-20-
REGULAR BOARD MEETING MINUTES - MAY 20, 2010 PAGE - 5
risk assessment portion of the wellness program. The BOARD MEMBER AD HOC
Board's ad hoc committee will participate when staff has COMMITTEE REPORT
found a cost effective program to present. (continued)
Director Jones reported on several topics: (1) Job
descriptions were rewritten that combine duties of the
two positions that were eliminated last year. Final
approval is pending; (2) Public Hearing on the proposed
budget; (3) Staff continues to write and submit new
policies and procedures to the Board for approval;
(4) Agency will be moving to less expensive offices; and
(5) Approximately $900,000 which has been held in a
slush fund will be released, now purveyors can apply for
additional project funds. The next Board meeting is
June 2.
General Manager Richard Solbrig reported several staff
members attended the neighborhood meeting for the
Apache Booster Station. Four property owners from
three neighboring properties attended. John Thiel
displayed artists rendering for the building. All seemed
happy with the project and the location. There will be a
neighborhood meeting for the Echo View tanks project
on Tuesday, May 25, 2010.
Chief Financial Officer / Water Conservation Specialist:
Paul Hughes and Shelly Barnes reported on the Metered
Rate Structure (AB 1420) and some confusion regarding
one of the proposed BMP's concerning the percentage of
volumetric structure vs. fixed rate. As more information
becomes available, Board workshops will be scheduled.
Assistant General Manager: Paul Sciuto gave an update
on the several construction projects currently in process.
He reported on the problems and difficulties with the
water meters projects in both the City and the County.
Staff is spending much time in the field with the
contractors to come up with solutions. He also reported
on some complaints by customers.
District Information Officer: Dennis Cocking gave a
legislative update for the State and Federal agencies:
(1) The State will have a $20 billion shortfall; (2) Prop.1 A
borrowing will not be possible this year; (3) Redevelop-
ment funds have been "appropriated" in the amount of
$2 billion; (4) Amendments to AB 1975 (Fong) has been
accepted that ensure water agencies are not responsible
for costs and maintenance of water meters in multi -unit
buildings; (5) USFS "administration costs" have been
reduced to zero; (6) Elimination of the buy American
clause in the FY 10 federal appropriations; (7) Senator
Feinstein submitted the $5 million Lake Tahoe Community
Fire Protection Partnership's project request as part of the
FY11 Interior spending package; and (8) Water Resources
EL DORADO COUNTY WATER
AGENCY PURVEYOR REPORT
GENERAL MANAGER REPORT
STAFF REPORTS
-21-
REGULAR BOARD MEETING MINUTES MAY 20, 2010 PAGE - 6
Development Act request filed with Senator Feinstein STAFF REPORTS
and Boxer's offices for the C -Line Replacement Project. (continued)
This may produce possible future funding via the Bureau
of Reclamation.
4:07 — 4:30 P.M. MEETING BREAK AND ADJOURN-
MENT TO CLOSED SESSION
ACTION / REPORT ON ITEM DISCUSSED DURING CLOSED SESSION
No reportable Board action. Pursuant to Government Code
Section 54956.9(b) /Conference
with Legal Counsel- Anticipated
Litigation (One Case)
No reportable Board action. Pursuant to Government Code
Section 54956.9(a) /Conference
with Legal Counsel — Existing
Litigation re: Meyers Landfill Site:
United States of America vs. El
Dorado County and City of South
Lake Tahoe and Third Party
Defendants, Civil Action No.
S -01 -1520 LKK GGH, U.S. District
Court for the Eastern District of Ca.
No reportable Board action. Pursuant to Government Code
Section 54956.9(a) /Conference
with Legal Counsel — Existing
Litigation re: False Claims Act Case:
United States, the States of
California, Delaware, Florida,
Nevada, and Tennessee and the
Commonwealths of Massachusetts
and Virginia ex rel. John Hendrix v.
J -M Manufacturing Company, Inc.
and Formosa Plastics Corporation,
U.S.A., Civil Action No. ED CV06-
0055-GW, United States District
Court for the Central District of CA
No reportable Board action. Pursuant to Government Code
Section 54956.9(b) /Public
Employee Evaluation
Unrepresented Employee Position:
General Manager
Agency Negotiators: Board of
Directors
-22-
REGULAR BOARD MEETING MINUTES - MAY 20, 2010 PAGE - 7
5:15 P.M.
ATTEST:
By Chris Whalen, Assistant Board Clerk
Kathy Sharp, Clerk of the Board
South Tahoe Public Utility District
ADJOURNMENT
Dale Rise, Board President
South Tahoe Public Utility District
-23-
1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401
Phone 530 544 -6474 - Fax 530 541 -0614 - www.stpud.us
BOARD AGENDA ITEM 6a
TO: Board of Directors
FROM: Jim Hoggatt, Engineering Department Manager
MEETING DATE: June 17, 2010
ITEM — PROJECT NAME: 12" Steel Waterline Replacement and Highway 50 Utility
Relocation Project
REQUESTED BOARD ACTION: Approve Teichert Construction's request to replace
the approved subcontractor LDL Trucking that was listed in the Bid Documents unless
LDL Trucking files a written objection to the substitution. If LDL Trucking files a written
objection, hold a public hearing during this agenda item to determine whether to
approve the substitution.
DISCUSSION: On June 8, 2010, Teichert Construction formally requested they be
allowed to replace the DBE subcontractor they listed in the Bid Documents LDL
Trucking. The DBE subcontractor they listed to furnish the trucking, LDL Trucking,
informed them that they could not furnish the trucking as quoted during the bidding
phase because their quote did not include prevailing wage rates (see attached letter).
Generally, the Subcontractors' Listing Law prohibits a contractor from substituting a
subcontractor listed in the original bid. However, under the Public Contract Code
Section 4107, the District has the discretion to approve substitution of the listed
subcontractor for another subcontractor for certain specified reasons listed in the
statute. One of the circumstances when the awarding authority may consent to
substitution of a subcontractor is where the listed subcontractor fails or refuses to
execute a contract for the scope of work and at the price specified in the subcontractor's
bid. (Pub. Con. Code, § 4107(a)(1).) LDL Trucking has notified Teichert Construction
that it will not provide the trucking services as bid.
On June 9, 2010, the District provided LDL Trucking notice of Teichert Construction's
request to substitute another subcontractor in their place pursuant to Public Contract
Code Section 4107 (See attached letter). LDL trucking has until June 16, 2010 to object
to the substitution. If no objection is filed by that date, LDL Trucking will be deemed to
have consented to the substitution and the District can approve the substitution. If LDL
files an objection, the District must hold a pubic hearing during this agenda item to
determine whether to approve the substitution.
—25—
General Manager
Richard H. 5olbrig
out
hi
James R. Jones
P ublic Utility
niotrict
Mary LouMosbach
Dale RJse
Eric Schafer _
1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401
Phone 530 544 -6474 - Fax 530 541 -0614 - www.stpud.us
BOARD AGENDA ITEM 6a
TO: Board of Directors
FROM: Jim Hoggatt, Engineering Department Manager
MEETING DATE: June 17, 2010
ITEM — PROJECT NAME: 12" Steel Waterline Replacement and Highway 50 Utility
Relocation Project
REQUESTED BOARD ACTION: Approve Teichert Construction's request to replace
the approved subcontractor LDL Trucking that was listed in the Bid Documents unless
LDL Trucking files a written objection to the substitution. If LDL Trucking files a written
objection, hold a public hearing during this agenda item to determine whether to
approve the substitution.
DISCUSSION: On June 8, 2010, Teichert Construction formally requested they be
allowed to replace the DBE subcontractor they listed in the Bid Documents LDL
Trucking. The DBE subcontractor they listed to furnish the trucking, LDL Trucking,
informed them that they could not furnish the trucking as quoted during the bidding
phase because their quote did not include prevailing wage rates (see attached letter).
Generally, the Subcontractors' Listing Law prohibits a contractor from substituting a
subcontractor listed in the original bid. However, under the Public Contract Code
Section 4107, the District has the discretion to approve substitution of the listed
subcontractor for another subcontractor for certain specified reasons listed in the
statute. One of the circumstances when the awarding authority may consent to
substitution of a subcontractor is where the listed subcontractor fails or refuses to
execute a contract for the scope of work and at the price specified in the subcontractor's
bid. (Pub. Con. Code, § 4107(a)(1).) LDL Trucking has notified Teichert Construction
that it will not provide the trucking services as bid.
On June 9, 2010, the District provided LDL Trucking notice of Teichert Construction's
request to substitute another subcontractor in their place pursuant to Public Contract
Code Section 4107 (See attached letter). LDL trucking has until June 16, 2010 to object
to the substitution. If no objection is filed by that date, LDL Trucking will be deemed to
have consented to the substitution and the District can approve the substitution. If LDL
files an objection, the District must hold a pubic hearing during this agenda item to
determine whether to approve the substitution.
—25—
Jim Hoggatt
June 17, 2010
Page 2
The District is waiting for Teichert Construction to provide the information concerning
the subcontractor to be substituted for LDL Trucking so the District can review that
subcontractor's qualifications and determine compliance with the requirements of the
Contract Documents. .
SCHEDULE: As soon as possible
COSTS: None
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS: Teichert letter June 8
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
-26-
Ltd
- 7EICHERr
AS
CONSTRUCTION
Established 1887
Sacramento District
8811 IGefer Blvd
Sacramento, CA 95826
P.O. Box 15144
Sacramento, CA 95851 -0144
(916) 386 -6800 • FAX (916) 386 -2392
June 8, 2010 ` C�
Mr. Jim Hoggatt, Project Manager
South Tahoe Public Utility District
1275 Meadow Crest Dr.
South Lake Tahoe, CA 96150
Re: 12" Steel Waterline Replacement and Highway 50 Utility Relocation Project
LDL Trucking
Dear Mr. Hoggatt,
In Form 4, Selected Disadvantage Business Enterprises List of the DBE Good -Faith
Effort Documentation submitted to the District, Teichert Construction listed LDL Trucking
Associates, Inc., a certified UDBE trucking company, in order to fulfill part of the DBE
participation goals for the above referenced project.
Please see attached letter by LDL Trucking (attachment 1) indicating that they cannot
provide trucks for this project at the hourly prices quoted since said rates are not
prevailing wage rates, even though they sent their original quote (attachment 2) together
with our invitation to bid, which specifically states that the project will require prevailing
wages.
We are trying to find another UDBE trucker to substitute LDL Trucking. in the meantime,
we are using Donovan Trucking so as to not delay the project.
Please call me if you have any questions.
Respectfully,
TEICHERT CONSTRUCTION
Robert Herrera
Engineer / Estimator
(916) 386 -5812
(916) 381 -4949 — FAX
rherrera @teichert.com
Printed on recycled paper. State of Cardomia ConfrqDtor's Ucense No. 8
Received Jun 10 2010 09:10am
Jun 10 10 08:08a Rhonda Lowe 510.245.2865 P.2
,fin ,�raa ^7"" OPT 'f o-v m." f? VITW aa. f+ ?► J::!r' '�^ R "
• i
P.O. Oox 974
Pinale, CA 94564
(510) 734.7849 office /cell
(510) 245.286S fax
June 9, 20x0
UDBE CERTIEICATYUN #36831
Teichert Construction
8811 Kiefer Blvd.
Sacramento, CA 95826
Attn: Project Manager /Adam Storm
RE: Lake Tahoe Blvd, 12" Waterline Replacement & Hwv 50 Utillty Relocation
Pro fee
We submitted a rate on Apri! 6, 2010 on the above project that was non prevailing rates.
Therefore, we could not provide truck(s) prevailing rate for this project.
Please accept our apology in error.
We will be re- submitting quotes for prevailing rates. Thank you again for selecting our
company for Trucking Services.
n a Lowe
rucking
I —28—
Received Apr 6 2010 10:21am
ftpr (16 10 10:20a Rhonda Lowe 510.245.2865 P.1
It.4 y.n, v.„v.nw••w ..... - .- _ -.._._ JJf:I d111E.IW VI. R.�
Mi t ]d eter blvd.
Sacramento, CA 95826
(916) 3866800 - FAX (916) 381-/9
- MICHEM CONMUCTItIN -
A IL
Your company is hereby in ated to bid tho following project: t
i
Project: Lake Tahoe Blvd. 17 Waterline IRteplacezment & lrlighway 50 Utility Relocation project
Owner: South Tahoe Public Utility District
Bid Date_ April 6, 2010 Q 2:00 PM i
i
Quotes are needed for but not limited to: pipe suppliers, aggregate suppliers, swppp, pipe bursting, shoring
and bracing, trench excavation, traffic control, trucking, coneretclac caw - cutting, minor concrete_
Cootacr: Robert Herrera (rherrcm teichert.eom) (916) 386 -5812— (916) 381.4949 (fax)
We are interested and seeking all qualified subcontractors and supplien, particAdO ly qualified
Underutilized Disadvantage Business Entcmviscs (UDBE)-
Plcasc note that this is a =Yailing w e projcCt. All subcontractors will be required to enter our standard
s contraq and must be union or VIJIMg to srgn a one time job agreement. Teicbert is signatory to the
following rations: Carpenters, Cement Masons, iBEW, Labors, Operating Engineers and Teamsters.
Te(chert requires 100% Payment and Performance Bonds from its subcontractors. Tcichcrt will pay bond
prcmium up to 2%. Tcicherfs standard subeontm cc form is available forrcview at: u w�v,teiehC1t.cottvfor !
subcon( rs.cfin . Teichert's insurance requirements are stated in Attachmazt B to the subcontract. I
Plans available at all Builder; Exchanges or may be viewed at our office or portions maybe e- mailed upon
request. Please call to set up a reservation for viewing.
Submission of a sub -bid to Teichert will confirm that you have r'eviewad and accepted TcichW's
subcontract form and that you will meet Tcichces bonding, insurance, union, and safety requirements.
However, certified UDBE's, are encouraged to contact Teichert and request assistance if they are curable
to meet the bonding or insurance requirements and to request technical assistance related to the plans
specifications and requirements for the Rork or to obtain necessary equipment, supplies and materials.
Teichert Construction is an equal opportunity employer, \vmvac of subrogation is required.
Please iAdlcate If you plan on bidding on the project asd fax your response to (916) 3814949
Contractor Lbl- rAXtIA4 eoute L i
Pbone No.: 510 - 7-;' 4 7901 F x fro.: 50 2 294
i
Yes, we will be bid No, not i nterestrd
Prbttad on recycied paper.
Equal Oppodunity Employer
Safe of Calirorrdi CO"mcwe Lcepse No. a
-29-
Received Apr
6 2010 10:21am
Apr 06 10-20a Rhonda Lowe 510.245.2865
p.2
4ice' P 4" f,%. X (T
AVA' effAe OP54. A7-Q' q': Vl%w "as* ep-WI A-VI v per.
17 z.c
P.O. Box 974
Pinole, CA 94564
(510) 734.7849 office/cell
(510) 245,2865 fax
UDBE CERTIFICATION #36831
Attn: Estimator/ prime Contractor
our company Is submitted quotes to your firm for TRUCKIWO
SER for
the above listed project as an UDBE, WMSE, and SRE.
Our hourly rates are
as follow:
TRUCKS Weekday Saturday
Sunday /Holidays
10 -Wheel $73.00 $78.00
$83.00
Super Dump !F89.00 $94.00
$99.00
Semi End $83.00 $88.00
$93.00
Semi Bottom *83.00 $88.00
493.00
Doubles $85.00 $90.00
$95.00
Transfer $81-50 $92.SO
$97.50
Water Truck $77.00 J;85-00
$90.00
High Side $98.00 $103.00
$108.00
All day work will be billed at a 4 hour minimum.
All night work will be billed a 6. hour minimum.
All night work Monday through Friday will be billed at the
Saturday rate,
Contact Edward at 510.385.8594. A Certified UDBE Trucker *36831
-30-
Received Jun 15 2010 06 =26um
Jun 15 10 06:24p Rhonda Lowe 510.245.2965 p.2
P.O. Box 974
Pinole, CA 94564
(510) 734.7849 office /cell
(510) 245.2865 fax
June 15, 2010
UDBE CERTIFICATION #36831
Attn: Robert Herrera /Estimator
Our company is submitted quotes to your firm for TRUCKING SERMES for
the above listed project as an UDBE, WMBE, and SBE. Our hourly rates are
as follow:
TRUCKS_
Weekdays
Saturday
Sunday /Holidays
10 -Wheel
$102.00
$118.00
$123.00
Semi End
$109.00
$125.00
$130.00
Transfer
$114.00
$130.00
$135.00
** All day work will be billed at a 4 hour minimum.
All night work will be billed a 6 hour minimum.
** All night work Monday through Friday will be billed at the
Saturday rate.
HAZMAT RATES UPON REQUEST
Contact Edward at 510.385 -8594. A Certified UDBE Trucker #36831
1275 Meadow Cruet Drive - 5outh Lake Tahoe - CA 96150 -740
Phone530 544 -6474 - Fax 530 541 -0614 - www.stpud.us
BOARD AGENDA ITEM 6b
TO: Board of Directors
FROM: John Thiel, Principal Engineer
MEETING DATE: June 17, 2010
ITEM — PROJECT NAME: 2010 Water Meter Installation Project — Phase 2
REQUESTED BOARD ACTION: Approve Change Order No. 1 to Campbell
Construction Company, Inc., in an amount not to exceed $452,000.
DISCUSSION: Campbell has the contract to install 1,261 meters in the county areas.
During the course of meter installations, they have encountered changed conditions
including deeper excavations, the need for additional fittings, and the occurrence of
groundwater.
The additional depth is necessary to connect to existing curb stops that are deeper than
the 40 inches anticipated and shown on the plans. The additional depth is often
associated with the incidence of groundwater, which must then be pumped.
Additionally, the excavated material is often too wet to use for backfill, which then
requires offsite hauling and the import of suitable backfill material. Additional fittings are
often necessary to adjust for unique horizontal and vertical adjustments for connection
to existing services and to negotiate around utilities and other obstacles.
This Change Order No. 1 includes the following:
Part (1) Additional costs incurred as a result of installing meters on a time and
materials basis due to changed conditions for approximately $102,000;
Part (2) Estimated future costs of installing additional fittings for $120,000;
Part (3) Estimated future costs of additional excavation depth for $230,000.
There will be some additional costs associated with groundwater in the future, but
District staff believes we are mostly out of -the areas with high groundwater.
-31-
General Manager
Richard H. Solbrig
Tahoe
Dfrwtora
,5 outh
James R Jones
I
f
Public Utill
I
(^}'
�Jy Distri
Mary Lou oabacher
Dale Rise
Eric Schafer
1275 Meadow Cruet Drive - 5outh Lake Tahoe - CA 96150 -740
Phone530 544 -6474 - Fax 530 541 -0614 - www.stpud.us
BOARD AGENDA ITEM 6b
TO: Board of Directors
FROM: John Thiel, Principal Engineer
MEETING DATE: June 17, 2010
ITEM — PROJECT NAME: 2010 Water Meter Installation Project — Phase 2
REQUESTED BOARD ACTION: Approve Change Order No. 1 to Campbell
Construction Company, Inc., in an amount not to exceed $452,000.
DISCUSSION: Campbell has the contract to install 1,261 meters in the county areas.
During the course of meter installations, they have encountered changed conditions
including deeper excavations, the need for additional fittings, and the occurrence of
groundwater.
The additional depth is necessary to connect to existing curb stops that are deeper than
the 40 inches anticipated and shown on the plans. The additional depth is often
associated with the incidence of groundwater, which must then be pumped.
Additionally, the excavated material is often too wet to use for backfill, which then
requires offsite hauling and the import of suitable backfill material. Additional fittings are
often necessary to adjust for unique horizontal and vertical adjustments for connection
to existing services and to negotiate around utilities and other obstacles.
This Change Order No. 1 includes the following:
Part (1) Additional costs incurred as a result of installing meters on a time and
materials basis due to changed conditions for approximately $102,000;
Part (2) Estimated future costs of installing additional fittings for $120,000;
Part (3) Estimated future costs of additional excavation depth for $230,000.
There will be some additional costs associated with groundwater in the future, but
District staff believes we are mostly out of -the areas with high groundwater.
-31-
John Thiel
May 20, 2010
Page 2
Staff is currently reviewing the cost information provided by Campbell for Part 1. Staff
expects to complete this review and provide a recommendation to the Operations
Committee meeting on Monday, June 14, 2010, and distribute to the remaining Board
members thereafter. Based on extra unit costs provided by Campbell, estimated costs
of Part 2 and Part 3 are on the attached spreadsheet.
Staff will be tracking the costs of change orders and all other costs not covered by the
grant funding and utilize them as match dollars for the USFS Fire Partnership Grant.
SCHEDULE: Upon Board approval.
COSTS: Not to exceed $452,000
ACCOUNT NO: 2029 -8165 / METERS
BUDGETED AMOUNT REMAINING: $1,800,000 2010/2011
ATTACHMENTS: Estimate of future extra installation costs. Details of the Change
Order No. 1, Part 1, and a staff recommendation will be provided at the Operations
Committee meeting and distributed prior to the Board meeting.
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES 4NA NO
CHIEF FINANCIAL OFFICER: YES NO
-32-
A 5"J' Z " "1 I b
O�tH rn CHANGE ORDER NUMBER 1 (d yw+�
Project 2010 Water M �-e ✓�
� M Installation Phase 2
1950- � Contractor Campbell Construction Co. Inc.
Date June 17, 2010
The Contract Shall Be Changed As Follows:
PO # P22358
A. Installation of meters on a time and materials basis for the period ending June 4,
2010. These meters were not installed under the unit bid cost because they
involved increased depth, additional fittings, and the handling of groundwater.
The total cost submitted by Campbell is $128,982.25 which resulted in the
installation of 67 meters as follows: 20 Type A, 9 Type B, and 28 Type C. The
payment for these meters by the contract bid price totals $81,650, and will be
paid on the next pay request under the appropriate bid item. Therefore, the
difference, and the extra cost incurred for installation of these 67 meters, is
$47,332.25.
TOTAL FOR ITEM A IS $47,332.25
TOTAL FOR CHANGE ORDER NO. 1 IS A through C = $427,332.25
Dollar Amounts Contract Time
Original Contract
$ 1,799,604.00
Previous Change Orders
$ 0
Current Contract
$ 1,799,604.00
THIS CHANGE ORDER
$ 427,332.25
New Contract Total
$ 2,226,936.25
Contractor agrees to make the herein - described changes in accordance with the terms hereof. The
change in contract price and /or contract time noted is full settlement for costs incurred as a result of
the change(s) described, unless specifically noted in individual description(s).
Authorized By STPUD Board President
Date:
Accepted By Contractor
Reviewed By
Date:
Date:
B. Installation of additional fittings for horizontal and /or vertical adjustments from the
new meter to existing curb stops and service connections. Campbell has
provided a detailed breakdown of costs which resulted in an installed cost per
fitting price of $47.29. The total cost for Item B is an estimated amount for extra
fittings for the remaining meters to be installed. See Attachment A for the
estimate of costs.
TOTAL FOR ITEM B IS $120,000
C. Extra depth meter installation. Many existing curb stops are deeper than the 40"
indicated on the plans. Campbell has provided a detailed breakdown of costs for
three extra depth intervals. These are shown on Attachment A along with an
estimate of additional depth costs for the remaining meters to be installed.
TOTAL FOR ITEM C IS $260,000
TOTAL FOR CHANGE ORDER NO. 1 IS A through C = $427,332.25
2
ATTACHMENT A
2010 Meter Installation Project - Phase 2
Change Order No. 1 - Estimate of Future Extra Installation Costs
Meters to be installed: 1261
Meters installed: 87
Meters remaining: 1174
Part 2 - Additional Fittings
Part 3 - Additional Depth
Meters Effected
Campbell's
Estimated
Extra Fittings Required:
%
#
Unit Cost
Cost
0
20%
235
47.29
$0
1
10%
117
47.29
$5,552
2
30%
352
47.29
$33,311
3
15%
176
47.29
$24,983
4
25%
294
47.29
$55,518
Totals
100%
1,174
$119,365
Estimate =
$120,000
Part 3 - Additional Depth
Totals 100% 1,174 $262,410
Estimate = $260,000
Meters Effected
Campbell's
Estimated
Extra Depth Required:
%
#
Unit Cost
Cost
0
20%
235
0
$0
40 to 52
50%
587
197.82
$116,120
53 to 64
20%
235
311.52
$73,145
65 to 76
10%
117
623.04
$73,145
Totals 100% 1,174 $262,410
Estimate = $260,000
2010 Meter Installation Project - Phase 2
Change Order No. 1 - Estimate of Future Extra Installation Costs
Meters to be installed: 1261
Meters installed: 70
Meters remaining: 1191
Part 2 - Additional Fittings
Totals 100% 1,191 $121,093
Estimate = $120,000
Part 3 - Additional Depth
Meters Effected
Campbell's
Estimated
Extra Fittings Required:
%
#
Unit Cost
Cost
0
20%
238
47.29
$0
1
10%
119
47.29
$5,632
2
30%
357
47.29
$33,793
3
15%
179
47.29
$25,345
4
25%
298
47.29
$56,322
Totals 100% 1,191 $121,093
Estimate = $120,000
Part 3 - Additional Depth
Totals 100% 1,191 $234,117
Estimate = $230,000
-33-
Meters Effected
Campbell's
Estimated
Extra Depth Required:
%
#
Unit Cost
Cost
0
20%
238
0
$0
40 to 52
60%
715
197.82
$141,362
53 to 64
15%
179
311.52
$55,653
65 to 76
5%
60
623.04
$37,102
Totals 100% 1,191 $234,117
Estimate = $230,000
-33-
1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401
Phone 530 544 -6474 - Fax 530 541 -0614 - www.stpud.ue
BOARD AGENDA ITEM 6c
TO: Board of Directors
FROM: John Thiel, Principal Engineer
MEETING DATE: June 17, 2010
ITEM — PROJECT NAME: North Apache Booster Station
REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible
bidder.
DISCUSSION: On May 11 ten general contractors attended the mandatory Pre -Bid
meeting. Staff is scheduled to open bids at 2 p.m., Thursday, June 10 After opening
the bids, staff will review the bids in detail for compliance with the specifications
including a review of the DBE Good Faith Efforts as required by the US Forest Service
funding.
A summary of all the bids, along with staff recommendation for award will be distributed
prior to, and at, the Board meeting.
SCHEDULE: Award Bid 6/17/10. Notice to Proceed 7/02/10. Complete by 3/01/11.
COSTS: Engineer's Estimate $1,000,000
ACCOUNT NO: 2029 -8967 / IQBSTR
BUDGETED AMOUNT REMAINING: $1,253,818 2010/2011
ATTACHMENTS: None. A summary of bids and staff recommendation for award will
be distributed prior to, and at the Board meeting.
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
—35—
General Manager
Richard H. Solbrig
Tahoe
Chris Ceftlu
,5 outh
James R. Jones
Public Utility P . Strict
Mary Lou M osbacher
NIS Rise
Eric Schafer
1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401
Phone 530 544 -6474 - Fax 530 541 -0614 - www.stpud.ue
BOARD AGENDA ITEM 6c
TO: Board of Directors
FROM: John Thiel, Principal Engineer
MEETING DATE: June 17, 2010
ITEM — PROJECT NAME: North Apache Booster Station
REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible
bidder.
DISCUSSION: On May 11 ten general contractors attended the mandatory Pre -Bid
meeting. Staff is scheduled to open bids at 2 p.m., Thursday, June 10 After opening
the bids, staff will review the bids in detail for compliance with the specifications
including a review of the DBE Good Faith Efforts as required by the US Forest Service
funding.
A summary of all the bids, along with staff recommendation for award will be distributed
prior to, and at, the Board meeting.
SCHEDULE: Award Bid 6/17/10. Notice to Proceed 7/02/10. Complete by 3/01/11.
COSTS: Engineer's Estimate $1,000,000
ACCOUNT NO: 2029 -8967 / IQBSTR
BUDGETED AMOUNT REMAINING: $1,253,818 2010/2011
ATTACHMENTS: None. A summary of bids and staff recommendation for award will
be distributed prior to, and at the Board meeting.
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
—35—
South Tahoe
Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Telephone: (530)544 -6474
Fax: (530)541 -0614
Memorandum
Date: June 17, 2010
To: Board Members, Richard H. Solbrig, Paul A. Sciuto
From: John Thiel, Principal Engineer
Subject: North Apache Booster Station Project
ri
This project is being funded by the United States Forest Service — Fire Protection
Partnership Funding Program which requires a "Good Faith Effort" outreach to
Disadvantaged Business Enterprises (DBEs). DBE includes Minority Business
Enterprise (MBE), Women's Business Enterprise (WBE), Small Business Enterprise
(SBE), Veteran -owned Business Enterprise, and other entities meeting EPA's DBE Rule
criteria.
Staff has reviewed all documentation provided by Thomas Haen Company, Inc. which
details its Good Faith Efforts for DBE outreach and has concluded that it Thomas Haen
Company, Inc. has complied with the bidding and funding requirements.
Staff recommends that the Board award the project to Thomas Haen Company, Inc. in
the amount of $1,027,749.
cc: Linda Drown
Lynn Nolan
Jim Hoggatt
South Tahoe Public Utility District . 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150
Phone 530.544.6474 9 Facsimile 530.541.0614
A,q ,e,A ,{vvs 1 4c
South Tahoe
Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Telephone: (530)544 -6474
Memorandum
Fax: (530)541 -0614
Date: June 14, 2010
To: Board Members, Richard Solbrig, Paul Sciuto
From: Heidi C. Baugh, Contracts Administrator
Subject: 2010 No. Apache Booster Station Project
(0 -17 -10 M :�
P-( f V-
At 2:00 o'clock on the afternoon of June 10, 2010 we received and opened eight (8)
sealed bids for the above - referenced project. Bids ranged from $1,027,749 to
$1,189,443. The engineer's estimate was $1,000,000. A careful review and analysis of
the three lowest bids showed only minor deviations. See attached spreadsheet and list
of deviations for full breakdown of each bid.
Thomas Haen Company, Inc. is the apparent low bidder. Thomas Haen Company, Inc.
had one minor deviation.
I contacted the Contractors License Board and was given the following information:
License Number 447064 is current and active and expires 10/31/2011.
The company is a corporation.
Thomas Haen Company, Inc. holds a Class A — General Engineering license.
cc: Linda Brown
Jim Hoggatt
South Tahoe Public Utility District . 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150
Phone 530.544.6474 . Facsimile 530.541.0614
South Tahoe
Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Telephone: (530)544 -6474 Fax: (530)541 -0614
Memorandum
Date: June 14, 2010
To: Board Members, Richard Solbrig, Paul Sciuto
From: Heidi C. Baugh, Contracts Administrator
Subject: 2010 No. Apache Booster Station Project
(9 - I) -10 W\1�
At 2:00 o'clock on the afternoon of June 10, 2010 we received and opened eight (8)
sealed bids for the above - referenced project. Bids ranged from $1,027,749 to
$1,189,443. The engineer's estimate was $1,000,000. A careful review and analysis of
the three lowest bids showed only minor deviations. See attached spreadsheet and list
of deviations for full breakdown of each bid.
Thomas Haen Company, Inc. is the apparent low bidder. Thomas Haen Company, Inc.
had one minor deviation.
I contacted the Contractors License Board and was given the following information:
License Number 447064 is current and active and expires 10/31/2011.
The company is a corporation.
Thomas Haen Company, Inc. holds a Class A — General Engineering license.
cc: Linda Brown
Jim Hoggatt
South Tahoe Public Utility District . 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150
Phone 530.544.6474 . Facsimile 530.541.0614
2010 NORTH APACHE BOOSTER STATION PROJECT
Bid Opening: 6/10/2010 at 2:00 o'clock p.m.
Deviations and information gathered during bid analysis of the three lowest
bids
Thomas Haen Company, Inc.
• Subcontractor List: License number for second subcontractor listed was
missing a digit.
K.G. Walters Construction Co.. Inc.
• Subcontractor List: License number for painting subcontractor did not match
the Name of the subcontractor.
Sierra Nevada Construction, Inc.
No irregularities found.
2010 NORTH APACHE BOOSTER STATION PROJECT
CONTRACTORS'SUBCONTRACTORS
Thomas Haen Comnanv. Inc.
Description of Work
Subcontractors Name
& Address
Paving
2%
Ron Fuller Construction, Inc.
2092 Eloise Ave.
South Lake Tahoe, CA 96150
#517412
Painting
2%
EZ Painting Inc.
3130 Fite Circle, #2
Sacramento, CA 95827
#36581
Rebar
2%
Harris Salinas Rebar
70 Linehan Road
Carson City, NV 89706
#695035
Roofing
3%
Blue Sun Metals, Inc.
PO Box 908
Roseville, CA 95678
#501403
Insulation
1%
F.Rogers Insulation Corp.
2777 USA Parkway #101
McCarran, NV 89434
#499755
HVAC - Plumbing
9%
McGee Mechanical
807 Eloise Avenue
South Lake Tahoe, CA 96150
#794412
Instrumentation
Auburn Constructors
Electrical
35%
730 W. Stadium Lane
Sacramento, CA 95834
#606405
Masonry
8%
D &L Masonry
2028 Farnsworth Way
Rancho Cordova, CA 95670
#813162
Named EguipmentlMaterial
Supplier List:
E ui ment/Material
Supplier
Aggregate Base Material
Recycled-Tahoe Asphalt; Water liner - Bing
Asphalt Mixes for paved areas
Tahoe Asphalt
Concrete and grout mixes
Sierra Tahoe Conc
Concrete Masonry Units CMU's
Castle Block
Piping, fittings and specials
Western Nevada Suppl
Valves and valve boxes
Western Nevada Suppl
Trusses
El Dorado Truss, Placerville
Steel
Alpine Welding, South Lake Tahoe
2010 NORTH APACHE BOOSTER STATION PROJECT
CONTRACTORS'SUBCONTRACTORS
Fiber Cement Board Products
Meeks Lumber, South Lake Tahoe
Stone Vaneer
Castle Block
Metal Roof
El Dorado Roofin
Louvers
McGhee
Doors
Diamond Door, South Lake Tahoe
Windows
South Shore Glass
Pumps and Motors
Weir Flowa
MCC, Electrical Meter Panel
George T Hall
Lights, outlets, conduits, switches, other
electrical
Graybar
Electric Heaters
McGhee
Generator
Roofing
Crane
American Equipment Inc., Sparks
Flow Meter
Brandon Instrument Co., West Sacramento
Trees and Shrubs
Earth & Stone, South Lake Tahoe
K.G. Walters Construction Co.. Inc.
Description of Work
Subcontractors & Address
Electrical
22%
Auburn Electric
Sacramento, CA
#606405
Masonry
4%
McNeely Masonry
Gardnerville, NV
#912763
Roofing
2%
Blue Sun Metals
South Lake Tahoe, CA
#501403
Drywall
2%
Independence Drywall
Truckee, CA
#447124
Painting
1%
Lindell's Painting
Sparks, NV
#334811
HVAC
2%
James Long Construction
Sacramento, CA
#821827
Crane
4%
Craneworks
San Leandro, CA
#714581
Named Equipment/
Material Supplier List:
Equipment/Material
Su lier
Aggregate Base Material
Bin
Asphalt Mixes for paved areas
Advanced Asphalt
Concrete and grout mixes
Sierra Tahoe Ready Mix
2010 NORTH APACHE BOOSTER STATION PROJECT
CONTRACTORS' S U BCONTRACTORS
Concrete Masonry Units CMU's
McNeely Masonry
Piping, fittings and specials
HD Suppl
Valves and valve boxes
HD Suppl
Trusses
Intermountain Truss
Steel
Tri -Star
Fiber Cement Board Products
Meeks
Stone Vaneer
McNeely Masonry
Metal Roof
Blue Sun Metals
Louvers
James Lon
Doors
Gary Romero
Windows
Capital Glass
Pumps and Motors
Weir /Floway
MCC, Electrical Meter Panel
Auburn Electric/ GT Hall
Lights, outlets, conduits, switches, other
electrical
Auburn Electric /Graybar
Electric Heaters
James Lon
Generator
"b owner"
Crane
Craneworks
Flow Meter
Seimens
Trees and Shrubs
G &G Landscape
Sierra Nevada Construction. Inc.
Description of Work
Subcontractors & Address
Building 25%
KFC Building Concepts
Reno, Nevada
#900591
Electrical 22%
Creekside Electrical Contractors, Inc.
Carson City, NV
#915754
Landscape 1%
Lovett Landscaping
Reno, NV
#934852
E ui ment/Material Supplier List
Equipment/Material
Su lier
Aggregate Base Material
Cinderlite
Asphalt Mixes for paved areas
Sierra Nevada Construction, Inc.
Concrete and grout mixes
American Ready Mix
Concrete Masonry Units CMU's
Basalite
Piping, fittings and specials
Western Nevada Suppl
Valves and valve boxes
Western Nevada Suppl
Trusses
Capitol Truss
Steel
Deluxe Weldin
Fiber Cement Board Products
Piedmont Lumber
2010 NORTH APACHE BOOSTER STATION PROJECT
CONTRACTORS'SUBCONTRACTORS
Stone Vaneer
Basalite
Metal Roof
Metal Roofing Sales
Louvers
Quality Mechanical
Doors
Romero Doors
Windows
J &L Windows
Pumps and Motors
G3 Engineerin
MCC, Electrical Meter Panel
Pesco
Lights, outlets, conduits, switches, other
electrical
Grove Madsen
Electric Heaters
Quality Mechanical
Generator
Delete per addendum 1
Crane
American Equipment
Flow Meter
Western Nevada Suppl
Trees and Shrubs
Flemming Tree Sales
j �� ||
| 2
| q ! 1
$
r - - - - -- __„ |,
0
$$$$$$ $$$$ $$ ■
3 4V } ? \/ )
•
§ 2` I#)2 §I 2 �|
)k ■ §k§ § |§§k$| 7
k ■s gaga gggggg
$$$?$$ $$$$ @* $
.aiRRRPR P. §1 m§ #
1- !■; of ;}![ ; a
$ $$ ■$ ■
2 `Min § § §§ §§ #
12§ ; ; ;2§ ! }!! A; ;
•
! � ! )§ h;NO| #
kk ■ § §■ ■§§ §§ §- 2
8 8g ggg$ 8g8s
§ §# h Utn ijj
$) 2 §$§ HE M-
8 -
8 88 8888 888888
$$$$$ $$$$ ■$ 8
777(§§$2 $ / }k }\ §
8$$$$$ ■388 $8 $
Standby Power Generates
14 Installation
1
$10,460.00
$10,46000
9,000.00
$9,000.00
$23,000.00
$23,000.00
$10,000.00
$10,000.00
$9,000.00
$9,000.00
$10,000.00
$10,000.00
$5, 000.00
$5,000.00
$8,500.00
$8,500.00
15 Primp Power Service LS
1
$6400.00
$5,400.00
7,000.00
$7,000.00
$7,500.00
$7, 500.00
$4, 000.00
$4,000.00
$8,000.00
$8,000.00
$10000.00
$10,000.00
$5,000.00
$5,000.00
$12,250.00
$12,250.00
spar Disaict Review and Calculation:
$1,027,749.00
$1,051,850.00
$1,079,007.00
$1,083,000.00
$1,107,000.00
$1,164,000.00
$1,189,900.00
$1,189,443.00
TOTAL as written In Bid Received:
same
same
same
same
same
same
$1,193,900.00
same
SOUTH TAHOE PUBLIC UTILITY DISTRICTS
North Aoache Booster Station
BID SUMMARY (06/10/10)
General Manager
Richard H. 5olbrig
• 1950 • /
15outh ChrlsCefalu
James R Jones
Public Utility Diotrict MaryiouMo Vile le Rise
Eric Schafer
1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150-7401
Phone 530 5446474 • Fax 530 541 -0614 • www.stpud.us
BOARD AGENDA ITEM 6d
TO: Board of Directors
FROM: Richard Solbrig, General Manager
MEETING DATE: June 17, 2010
ITEM — PROJECT NAME: City Redevelopment Agency Project No. 2
REQUESTED BOARD ACTION: Receive update and direct staff if necessary.
DISCUSSION: District and City staff met on June 11, 2010, to discuss the District's
proposal. The results of these discussions, and any further communications, will be
presented.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
-37-
If
• From: Richard Solbrig
Page 1 of 4
From: Richard Solbrig
Sent: Tuesday, June 15, 2010 10:20 AM
To: Chris Whalen
Subject: FW: DRAFT - SUMMARY REPORT OF MEETING WITH RICHARD SOLBRIG -
GENERAL MANAGER STPUD - DISTRICT PROPOSAL OF JUNE 4, 2010
From: David Jinkens [mailto:djinkens @cityofslt.us]
Sent: Monday, June 14, 2010 1:29 PM
To: Richard Solbrig
Cc: Tina Shannon
Subject: FW: DRAFT - SUMMARY REPORT OF MEETING WITH RICHARD SOLBRIG - GENERAL MANAGER STPUD
- DISTRICT PROPOSAL OF JUNE 4, 2010
DRAFT FOR REVIEW
Richard - please give me your comment/corrections to be highlighted in this
document if you can do so.
Have I captured our conversation correctly?
David
Monday
1:24 p.m.
June 14, 2010
Mayor and Council:
On Friday of last week I met with STPUD General Manager Richard Solbrig and his
finance Officer. Mr. Palazzo attended the meeting. The City Attorney had other City
appointments and could not attend. The meeting was to discuss the District's June
4, 2010 Proposal.
The following is the District's is in bold lettering and the response in provided
below each issue.
1. Relocation /expansion of water and sewer lines paid by developer.
Comment
With RDA Project Area No. 2 I agree to the extent the City /RDA can require same
under State law.
2. District Capital Improvement Projects (CIP) constructed jointly with
other public improvements — repaving paid by RDA.
Comment:
I agree in concept. If the City RDA within Project Area No. 2 is undertaking capital
improvements (e.g. drainage improvements, curb and gutter, street overlay etc)
in an area and as part of its work with have to repave the street, then the RDA
would be responsible for the cost of paving the street should the District decide to
file: / /C: \Documents and Settings\ksharp \Local Settings \Temporary Internet Files \OLK17\F... 6/17/2010
From: Richard Solbrig Page 2 of 4
upgrade sewer and /or water mains in the street at the same time City RDA work is
underway.
3. For ownership of improvements made to the Lukins System with public
funds, the City would support modifying the CPUC agreement to
have the improvements pass to the District for ownership. If the
agreement could not be modified, the city would agree to sell any
improvements paid by redevelopment funds to the District at a
nominal cost in the event the District were to purchase the Lukins
system in whole or part.
Comment
The District concern here is that the former might have to pay for the Lukins
"twice" under a purchase scenario by somehow being compelled to do so by the
California Public Utilities Commission (CPYC). The District's view of our customers
paying twice is that they would pay for improvements once through the tax
increment transfer, and then the second time to the City for the value of the
publicly funded improvements. What the District is requesting of the City at this
time is to agree to make their best effort to modify the existing agreement with
the CPUC and Lukins to say that the ownership of publicly funded improvements
would pass to the District, not the City. In the event of not being able to modifx
the CPUC agreement, then the City would agree, in the event of a District
purchase of the Lukins system to sell the City owned improved facilities for a
nominal cost. The District is now interested in possible purchase of the Lukins
system at some time in the future under favorable terms since this may be the
most cost effective way to provide fire flows to the community Two existing
Lukins wells are contaminated (Purochloric ethylene Sp ? ?) perch loroethylen e . [If
true, this may make their upgrade or new wells qualified for State Department of
Health funds I previously explored a few years ago ... but only if the domestic
drinking water source is polluted]. Any change in the CPUC order governing the
Lukins System would likely require Lukins, City, and CPUDC approval. The City
became involved and interested in seeing upgrades to the Lukins system after the
Angora Fire and after the District previously decided not to pursue acquisition
because of the cost of making improvements to it. This proposal needs to be
examined and explored further.
4. Dual service agreements between the District and Lukins would be
supported by the city in order to provide fire flows to projects at the
South Y and along Highway 89.
Comment:
City staff supports dual service agreements whereby water from the District could
be provided to Lukins for service to customers. This approach is envisioned in the
PUC order. Lukins officers building a stand -alone system would be much more
expensive to customers than inter connections with the District (approximately $8-
$10 million more). City officials should support and encourage efforts to encourage
Lukins to work with the District on dual service agreements.
file:HC: \Documents and Settings\ksharp \Local Settings \Temporary Internet Files \OLK17\F... 6/17/2010
From: Richard Solbrig
Page 3 of 4
5. The District is willing to bring back for approval and MOU concerning
water supply between the city and District that was drafted last
year, but never ratified. Several items would have to be modified to
reflect changes over the past year. A summary of the terms would be
as follow:
a. The City would receive $48,092 worth of water at no charge;
Comment:
This proposal was unanticipated (the no charge water allotment issue was raised
in your response to our previous proposal, as well as comments from council
members to our staff) and would move the City and District back into a water
agreement. By fixing the dollar amount of "free" water, the actual amount
supplied the City would diminish over time as District water rates go up. It would
be preferable to correlate the dollar amount into a quantity of free water. Although
not discussed at the meeting, a quantity of water at no charge would probably be
a more standard agreement, and certainly more understandable. The District
would be willing to consider this, but only if item d. below was agreed to by the
City.
b. The water conservation item would need to be rewritten to reflect the
termination of the District's turf buy -back program due to the
exhaustion of funds..."
Comment:
I agree that the City should remove ornamental turf at City buildings that are not
needed for recreation and replace same with low water use shrubs etc as the
District has done at its headquarters. Where turf is needed for public or specifically
beautification the City would leave turf in place. The district is not requiring the
City to replace non - essential turf in any agreement but it would over time be a
saving for a reduction in water use even in the event of the City receiving the
allotment of water at no charge.
c. The linear park physical connection is already in place. The district
would simply agree to waive the capacity /connection fee:
Comment
This is a nice offer. I will have City staff evaluate the cost of maintaining City
water well at the old Shell site versus connecting to the
District system and paying monthly water bills. This appears to be a proposal
worthy of immediate evaluation.
d. The City would waive the encroachment fee for all District CIP
construction projects in the city right -of -way.
Comment:
The District believes the 1.5% fee is not related to an actual cost incurred by the
file: //C: \Documents and Settings\ksharp \Local Settings \Temporary Internet Files \OLK17\F... 6/17/2010
From: Richard Solbrig
Page 4 of 4
city and would like it waived. .(Note that we're only talking about the CIP fees, not
the required asphalt repairs /replacement deemed necessary by the City staff to
bring the road back to as good or better condition then before the District project
began, nor the "cut" fees charged by the City on individual leak repairs, or new
individual service line connections) They note that they -mre used williIIg to pay for
time City staff spends reviewing plans and inspecting their projects, but they do
not think it amounts to 1.5 %. The proposed MOU from last year waived this fee in
its entirety in return for the allotment of water at no charge, and that's the
District's proposal. City staff needs to explain the need for this charge in light of
other proposals before us here.
e. Release all past claims
Comment: To my knowledge the city has not filed a claim with the District. The
City did in the past dispute the past charges for sewer allocations paid by the RDA
and City for sewer units not physically connected to the District's sewer system.
Staff did discuss with District staff and questioned the methodology used to
calculate the water connection charges for the Highway 50 Project District staff
indicated that the District has an adoted Water Capacity Charge Study completed
by Municipal Financial Services in September 2006. Copies have been furnished to
City and Caltrans staff at the time the calculations for the capacity /connection fees
were produced. District staff has offered to assist in redesigning the revegetation
plans to conserve water and reduce the connection fees.
. State law provides guides for how agencies
calculate service and connection charges.
file:HC: \Documents and Settings\ksharp \Local Settings \Temporary Internet Files \OLK17\F... 6/17/2010
CSLT RDA #2 OPTIONS MATRIX
SETTLEMENT MOU
PROS
• Will provide well defined project level cost savings to the District
• Will provide an opportunity for RDA projects to move forward sooner with
sufficient fire protection. Early success may stimulate more projects earlier in the
process.
• Provides some protection for District to not have to pay for improvements to
Lukin's Bros. water system
• Enhances working relationship with CSLT Staff and Council
CONS
• Provides limited financial protection from property tax loss for our customers
• Doesn't change the RDA plan at all
FILE LAWSUIT
PROS
• Public support from those opposed to the RDA
• Strongest effort to protect ratepayer's property tax revenues
• Force CSLT to improve plan per California Redevelopment Law (CRL)
requirements.
• Provide opportunity for new City manager to review RDA plan
• Develop mutual support between EDC and District
CONS
• Staff time expenditure very significant (other District lawsuits have demonstrated
this)
• Legal expenses unknown (CNM $15,000 (to file) and BHFS for oversight), but
likely significant
• Damaged working relationship with CSLT Staff and Council
• Lose -Lose proposition with media and general public. Negative perception of
one government agency suing another government agency at taxpayer expense
on one hand and perception of being responsible for stalling or stopping
economic revitalization of community on the other. Little room for positive press.
• Likelihood of success unknown. At best, invalidation of RDA requiring CSLT to
restart the process using a new base year. At worst - loss of lawsuit + legal costs
+ RDA still moves forward.
PAYMENT OF CLAIMS
FOR APPROVAL
June 17, 2010
Payroll 6/1/10
Total Payroll
ADP
Bank of America
BNY Mellon Trust Company
Brownstein /Hyatt/Farber /Schreck legal services
CDS- health care payments
Union Bank
Total Vendor EFT
Accounts Payable Checks -Sewer Fund
Accounts Payable Checks -Water Fund
Accounts Payable Checks - Self - funded Insurance
Accounts Payable Checks - Grants Fund
Total Accounts Payable
Grand Total
Payroll EFTs & Checks
6/1/10
EFT
AFLAC Medical & Dependent Care
0.00
EFT
CA Employment Taxes & W/H
19.,317.70
EFT
Federal Employment Taxes & W/H
94
EFT
CalPERS Contributions
72,492.66
EFT
Great West Deferred Comp
18,766.10
EFT
Stationary Engineers Union Dues
2,390.29
EFT
United Way Contributions
192'.00
EFT
Employee Direct Deposits
209,088.56
CHK
Employee Garnishments
1,383.88
CHK
Employee Paychecks
6,.719.33
Total
424,987.52
424,987.52
424, 987.52
1,002.67
0.00'
0.00
0.00
73, 757.17
0.00
74,759.84
176,668.06
394,314.17
0.00
0.00
570,982.23
9, 070, 729.59
-39-
Vendor Name
AECOM USA INC
PAYJ4ENT OF CLAIMS
tbourtmuntantAmmo Lkomirdon Acct# / Proj Code
ENGINEERING - C-LINE RE -ROUTE CLN REROUTE 1029 - 8097 - CROUTE
Check Total:
AERVOE - PACIFIC UNDERGROUND REP SHOP SUPPLIES 1001 - 6071
AERVOE - PACIFIC UNDERGROUND REP PIPE/CVRS/MHLS 2001 - 6052
Check Total:
AHERN RENTALS UNDERGROUND REP SAFETY/EQUIP/PHY 1001 - 6075
Check Total:
ALPEN SIERRA COFFEE GEN & ADMIN OFC SUPPLY ISSUE 1000 - 6081 274.02
Check Total: 274.02 AP-00076203 MW
ALPINE COUNTY PUBLIC WORKS ENGINEERING - C-LINE RE -ROUTE CLN REROUTE 1029 - 8097 - CROUTE 480.00
Check Total: 480.00 AP- 00076204 MW
ALPINE EYECARE LLC EQUIPMENT REP SAFETY/EQUIP/PHY 1005 - 6075 111.50
ALPINE EYECARE LLC EQIIPMENT REPAIR SAFETY/EQUIP/PHY 2005 - 6075 111.50
Check Total: 223.00 AP-00076205 MW
AMERIPRIDE UNIFORM SERVICES GEN & ADMIN UNIFORM PAYABLE 1000 - 2518 903.74
o Check Total:
903.74 AP 00076206 MW
ARETE SYSTEMS OPERATIONS - MAP UG UTILITIES PLANT GIS 1006 - 8921- GISMAP 210.00
ARETE SYSTEMS ENGINEERING - GIS SFTWR DEV GIS DEVELOPMENT 2029 - 8062 - GISSFT 630.00
ARETE SYSTEMS INFORMATION SYS - GIS SFTWR DEV GIS SURVEYING 2037 - 8446 - GISSFT 2,677.50
Check Total: 3.517.50 AP- 00076207 MW
ARNOLD, NORMA .1 GEN & ADMIN - T&M UB CASH BRD MISC INCOME 2000 - 3540 - TMCBUB 1,347.77
Check Total: 1.347.77 AP-00076208 MW
ASCHENBACH, JARED L ELECTRICAL SHOP TRAVEL/MEETINGS 1003 - 6200 41.00
ASCHENBACH, JARED L ELECTRICAL SHOP TRAVEL/MEETINGS 2003 - 6200 41.00
Check Total: 82.00 AP- 00076209 MW
AT &T MOBILITY LABORATORY TELEPHONE 1007 - 6310 4.71
AT&T MOBILITY LABORATORY TELEPHONE 2007 - 6310 4.70
Check Total: 9.41 AP -00076210 MW
AT&T/CALNET 2 GEN & ADMIN TELEPHONE 1000 - 6310 798.14
AT &T /CALNET 2 GEN & ADMIN SIGNAL CHARGES 1000 - 6320 32.09
AT &T /CALNET 2 PUMPS TELEPHONE 1002 - 6310 104.91
User: THERESA
Page: 1 Current Date: 06/10/2010
Report: OH_PMT Current Time: 14:58:49
Amount chunk Rum jygg
16,646.82
16 AP- 00076200 MW
486.75
642.72
1.129.47 AP- 00076201 MW
32.62
32.62 AP- 00076202 MW
V °dof aame Qe2848I8 t!t / Proi Name
A 631 Code Amount Check Num Mx AT&T / CALNET 2 CUSTOMER SERVICE
TELEPHONE 1038 - 6310 7.25
AT&T / CALNET 2 GEN & ADMIN TELEPHONE 2000 - 6310
798.13
AT&T /CALNET 2 PUMPS TELEPHONE 2002 - 6310
103.47
AT &T /CALNET 2 CUSTOMER SERVICE TELEPHONE 2038 - 6310 7.24
Check Total: 1.851.23 AP-00076211 MW
AWARDS OF TAHOE ADMINISTRATION INCNTV & RCGNTN 1021 - 6621 14.00
AWARDS OF TAHOE ADMINISTRATION INCNTV & RCGNTN 2021 - 6621 14.00
Check Total: 28.00 AP- 00076212 MW
B&L BACKFLOW TESTING OPERATIONS TRAVEL/MEETINGS 1006 - 6200 760.00
Check Total: 760.00 AP- 00076213 MW
BANK OF NEW YORK MELLON, THE FINANCE - COPS FISCAL AGENT FEE 1039 - 6730 - 04DEBT 1,800.00
Check Total: 1.800.00 AP- 00076214 MW
BENTLY AGROWDYNAMICS OPERATIONS SLUDGE DISPOSAL 1006 - 6652 3,252.76
Check Total: 3.252.76 AP -00076215 MW
BIGELOW, JULIANNE ENGINEERING MISC UAB CLAIMS 2029 - 4520 636.98
1—. Check Total:
i 636.98 AP 00076216 MW
BLUE RIBBON TEMP PERSONNEL HUMAN RESOURCES CONTRACT SERVICE 1022 - 4405 741.44
BLUE RIBBON TEMP PERSONNEL HUMAN RESOURCES CONTRACT SERVICE 2022 - 4405 741.44
Check Total: 1 AP- 00076217 MW
CALIF DEPT OF HEALTH SERVICES ENGINEERING DUES/MEMB /CERT 2029 - 6250 80.00
Check Total: 80.00 AP- 00076218 MW
CALIF DEPT OF HEALTH SERVICES ENGINEERING OPERATING PERMIT 1029 - 6650 874.00
CAUF DEPT OF HEALTH SERVICES ENGINEERING OPERATING PERMIT 2029 - 6650 874.00
Check Total: 1.748.00 AP- 00076219 MW
CAUF DEPT OF WATER RESOURCES DIAMOND VLY RNCH OPERATING PERMIT 1028 - 6650 22,586.00
Check Total: 22.586.00 AP- 00076220 MW
CALIF WATER RESOURCES CTRL BD OPERATIONS DUES/MEMB /CERT 1006 - 6250 190.00
Check Total: 190.00 AP- 00076221 MW
CAPITAL FORD EQUIPMENT REP AUTOMOTIVE 1005 - 6011 95.07
Check Total: 95.07 AP- 00076222 MW
CAROLLO ENGINEERS ENGINEERING - TWIN PEAKS BS BSTR, TWN PEAKS 2029 - 7070 - TPBSTR 712.00
User: THERESA Page: 2 Current Date: 06/10/2010
Report: OH_PMT_CLAIMS_BK Current Time: 14:58:49
Vendor Name
pep6rtment / Proj Name
PQYIT OF CLAIMS
Rea4i Acct# / Proj Code
CDW - G CORP INFORMATION SYS DIST.COMP SPPUS 1037 - 4840
CDW - G CORP INFORMATION SYS DIST.COMP SPPUS 2037-4840
User: THERESA
Check Total:
amount Check Num Ts.,
712.00 AP-00076223 MW
Page: 3 Current Date: 06/10/2010
Report: OH_PMT_CLAIMS,BK Current Time: 14:58:49
626.56
920.73
Check Total: 1.547.29 AP- 00076224 MW
CENTAURI LABS LABORATORY - BKRFLD TRTMT EXP MONITORING 2007 - 6110 - BKRFLD 190.00
CENTAURI LABS LABORATORY - HERBST MONITORING 2007 - 6110 - HERBST 190.00
CENTAURI LABS LABORATORY - SOYCON MONITORING 2007.6110 - SOYCON 340.00
CENTAURI LABS LABORATORY - TAHOE TOM CONTAM MONITORING 2007 - 6110 - TOMCON 190.00
Check Total: 910.00 AP- 00076225 MW
CITY OF SOUTH LAKE TAHOE UNDERGROUND REP OPERATING PERMIT 2001 - 6650 600.00
Check Total: 600.00 AP- 00076226 MW
COCHRANE, ROLAND CUSTOMER SERVICE - WTR CONS FROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00
Check Total: 200.00 AP- 00076227 MW
COCKING, DENNIS DIO TRAVEL/MEETINGS 1027 - 6200 366.00
COCKING, DENNIS DIO TRAVEIJMEET1NGS 2027 - 6200 366.00
06 Check Total:
hs
732.00 AP- 00076228 MW
CONSTRUCTION MATERIALS ENG INC ENGINEERING - HEADWORKS -PH 1 HDWKS IMP PROJ 1029 - 8033 - HDWKPI 18,703.50
CONSTRUCTION MATERIALS ENG INC ENGINEERING - C-UNE RE -ROUTE CLN REROUTE 1029 - 8097 - CROUTE 2,850.00
CONSTRUCTION MATERIALS ENG INC ENGINEERING - REPL GEN, LPPS REPL GEN LPPS 1029 - 8933 - RGLPPS 14,388.00
CONSTRUCTION MATERIALS ENG INC ENGINEERING - WT METERING PRJ WTR METERING/NEW 2029 - 7078 - METERS 14,321.00
Check Total: 50.262,50 AP- 00076229 MW
CWEA LABORATORY D.UES/MEMB/CERT 1007 - 6250 74.00
CWEA ENGINEERING DUESIMEMBICERT 1029 - 6250 79.00
Check Total: 153.00 AP- 00076231 MW
CWEA SIERRA SECTION UNDERGROUND REP TRAVEL/MEETINGS 1001 - 6200 180.00
CWEA SIERRA SECTION HEAVY MAINT SAFETY/EQUIP/PHY 1004 - 6075 135.00
Check Total: 315.00 AP- 00076230 MW
CYBER SECURITY SOURCE INFORMATION SYS DIST.COMP SPPUS 1037 - 4840 841.98
CYBER SECURITY SOURCE INFORMATION SYS DIST.COMP SPPUS 2037 - 4840 841.99
Check Total: 1 AP 00076232 MW
DATCO SERVICES CORP HUMAN RESOURCES SAFETY PROGRAMS 1022 - 6079 182.00
Vendor Namp
DATCO SERVICES CORP
DELL MARKETING L P
DELL MARKETING L P
ENVIRONMENTAL EXPRESS
ENVIRONMENTAL EXPRESS
FARO & SON LLC
FEDEX
FEDEX
FEDEX
FEDEX
FERGUSON ENTERPRISES INC.
1 FERGUSON ENTERPRISES INC.
FISHER SCIENTIFIC
FISHER SCIENTIFIC
GERUNGER STEEL
GLOBAL DATA SPECIALISTS
GROVE MADSEN INDUSTRIES INC
HARDY DIAGNOSTICS
HARDY DIAGNOSTICS
HASLER FINANCIAL SERVICES LLC
IJeer: THERESA
Report: OH
Deoerjment IPLoJ Name
HUMAN RESOURCES
INFORMATION SYS
INFORMATION SYS
LABORATORY
LABORATORY
GEN & ADMIN - T&M US CASH BRD MISC INCOME
GEN & ADMIN POSTAGE EXPENSES
LABORATORY POSTAGE EXPENSES
GEN & ADMIN POSTAGE EXPENSES
LABORATORY POSTAGE EXPENSES
HEAVY MAINT SHOP SUPPUES
ENGINEERING - UR SHOPS EVAL UR SHOP BLD EVAL
LABORATORY LAB SUPPUES
LABORATORY LAB SUPPLIES
OPERATIONS
ELECTRICAL SHOP
ELECTRICAL SHOP
LABORATORY
LABORATORY
CUSTOMER SERVICE
Description
SAFETY PROGRAMS
DIST.COMP SPPLIS
DIST.COMP SPPLIS
OTHER SUPPLIES
OTHER SUPPLIES
SECONDARY EQUIP
TRAVEL/MEETINGS
PUMP STATIONS
LAB SUPPLIES
LAB SUPPLIES
EQUIP RENT/LEASE
Acct# / Proj Code,
2022-6079
1037 -4840
2037 -4840
1007 - 4790
2007 - 4790
1000 -4810
1007 -4810
2000 - 4810
2007 - 4810
1007-4760
2007-4760
1006-6022
2003-6200
2003-6051
1007 - 4760
2007 -4760
1038 - 5020
Check Total:
Check Total:
Check Total:
2000 - 3540 - TMCBUB
Check Total:
Check Total:
1004 - 6071
1029 - 7908 - URSHOP
Check Total:
Check Total:
Check Total:
Check Total:
Check Total:
Check Total:
Page. 4 Current Date: 06/10/2010
Current Time: 14:58:49
Amount Check Num jypg
182.00
364.00 AP- 00076233
2,943.77
3,084.63
6 028.40 AP- 00076234
385.00
425.77
810.77 AP- 00076235
1,340.87
1,340.87 AP- 00076236
9.10
81.29
9.10
81.29
180.78 AP- 00076237
170.92
296.76
467.68 6 P- 00076238
378.21
243.62
621.83 AP- 00076239
2,414.25
2,414.25 AP- 00076240
5,200.00
5.200.00 AP-00076241
361.75
361.75 AP 00076242
103.29
115.78
219.07 AP- 00076243
123.70
MW
MW
MW
MW
MW
MW
MW
MW
MW
MW
MW
PAYMENT Of CLAIMS
Vendor Name jAgarbtjnti elSabllit %Winton Acct# / Proj Code mount ghtckhum Lug
HASLER FINANCIAL SERVICES LLC CUSTOMER SERVICE EQUIP RENT/LEASE 2038 - 5020 123.70
Check Total: 247.40 AP- 00076244 MW
HAUGE BRUECK ASSOCIATES LLC ENGINEERING - REPL GEN, LPPS REPL GEN LPPS 1029 - 8933 - RGLPPS 2,860.00
Check Total: 2.860.00 AP- 00076245 MW
HAZLETT, DOUGLAS GEN & ADMIN UB SUSPENSE 2000 - 2002 1,332.00
HAZLETT, DOUGLAS GEN & ADMIN METER SALE 2000 - 3545 336.00
HAZLETT, DOUGLAS FINANCE INTEREST EXPENSE 2039 - 6710 7.81
Check Total: 1.675.81 AP- 00076246 MW
HERTEL, CHRISTOPHER CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00
Check Total: 200.00 AP- 00076247 MW
HYDEC CLA -VAL CO PUMPS REP CTRL VLV SNS 2002 - 8049 5,676.62
Check Total: 5.676.62 AP- 00076248 MW
HYDRONIC SPECIALTIES COMPANY HEAVY MAINTENANC BUILDINGS 2004 - 6041 483.04
Check Total: 483.04 AP- 00076249 MW
1 IDEXX DISTRIBUTION CORP. LABORATORY LAB SUPPLIES 1007 - 4760 305.25
, DISTRIBUTION CORP. LABORATORY LAB SUPPLIES 2007 -4760 289.86
1
Check Total: 595.11 AP- 00076250 MW
Incline Village GID GEN & ADMIN - USFS GRNT ADMIN SUSPENSE 2000 - 2504 - SMOKEY 106,874.84
Check Total: 106.874.84 AP- 00076251 MW
INTEGRITY LOCKSMITH PUMPS PUMP STATIONS 1002 - 6051 48.78
INTEGRITY LOCKSMITH PUMPS PUMP STATIONS 2002 - 6051 48.77
Check Total: 97.55 AP- 00076252 MW
INTERSTATE SAFETY & SUPPLY GEN & ADMIN SHOP SUPPLY INV 1000 - 0421 394.11
INTERSTATE SAFETY & SUPPLY GEN & ADMIN SAFETY INVENTORY 1000 - 0425 432.73
Check Total: 826.84 AP- 00076253 MW
JACKSON -HIRSH INC. GEN & ADMIN OFC SUPPLY ISSUE 1000 - 6081 94.74
Check Total: 94.74 AP- 00076254 MW
JAMES, GREG PUMPS DUES/MEMB/CERT 2002 - 6250 89.25
Check Total: 89.45 AP- 00076255 MW
KEN'S TIRE CENTER EQUIPMENT REP AUTOMOTIVE 1005 - 6011 1,215.31
Check Total: 1.215.31 AP- 00076256 MW
User: THERESA
Report: OH_PMT_CLAIMS_BK
Page: 5 Current Date: 06/10/2010
Current Time: 14:58:49
Vendor Name
KIMBALL MIDWEST
KIMBALL MIDWEST
Dm:ointment / Proj Name
HEAVY MAINT
EQUIPMENT REP
KINGSBURY GENERAL IMPROVEMENT GEN & ADMIN - USFS GRNT ADMIN
KTHO RADIO DIO - PR EXP- EXTERNAL
KTHO RADIO DIO - PR EXP- EXTERNAL
LAKESIDE NAPA
LAKESIDE NAPA
LAKESIDE NAPA
LAKESIDE NAPA
LAKESIDE NAPA
LAKESIDE NAPA
LAKESIDE NAPA
SLAKESIDE NAPA
to
LAKESIDE NAPA
LAKESIDE NAPA
LAKESIDE NAPA
LECOUNT -BECK, DEBRA
LEWIS, MARLENE
LOOMIS
LOOMIS
MC MASTER CARR SUPPLY CO
METRO OFFICE SOLUTIONS
METRO OFFICE SOLUTIONS
METRO OFFICE SOLUTIONS
User: THERESA
Report: OH_PMT_CLAIMS BK
PUMPS
HEAVY MAINT
HEAVY MAINT
EQUIPMENT REP
EQUIPMENT REP
EQUIPMENT REP
EQUIPMENT REP
PUMPS
EQUIPMENT REPAIR
EQUIPMENT REPAIR
EQUIPMENT REPAIR
CUSTOMER SERVICE - WTR CONS PROG
CUSTOMER SERVICE - WTR CONS PROG
FINANCE
FINANCE
ENGINEERING - ECHO TANK REPL
GEN & ADMIN
ADMINISTRATION
ENGINEERING
PAYMENT OF C • IMS
Page:
DescdpIlon
SHOP SUPPLIES
SHOP SUPPLIES
SUSPENSE
PUB RELATIONS
PUB RELATIONS
SMALL TOOLS
GROUNDS & MNTC
SHOP SUPPLIES
AUTOMOTIVE
GENERATORS
SHOP SUPPLIES
SMALL TOOLS
SMALL TOOLS
AUTOMOTIVE
SHOP SUPPLIES
SMALL TOOLS
WTR CONS EXPENSE
WTR CONS EXPENSE
CONTRACT SERVICE
CONTRACT SERVICE
TANK, ECHO
OFFICE INVENTORY
OFFICE SUPPLIES
OFFICE SUPPLIES
6
Acct#(Proj Code
1004 - 6071
1005 -6071
2000 - 2504 - SMOKEY
Check Total:
1027 - 6620 - PREEXT
2027 - 6620 - PREEXT
Check Total:
1002 -6073
1004 -6042
1004 - 6071
1005 -6011
1005 - 6013
1005 -6071
1005 - 6073
2002 - 6073
2005 - 6011
2005 - 6071
2005 - 6073
2038 - 6660 - WCPROG
Check Total:
2038 - 6660 - WCPROG
Check Total:
1039 -4405
2039 - 4405
2029 - 8809 - ECHOTK
Check Total:
1000 - 0428
1021 - 4820
1029 -4820
Check Total:
Check Total:
Check Total:
Current Date: 06 /10/2010
Current Time: 14:58:49
Amount Check Nuns Type
330.32
134.74
465.06 AP- 00076257
24,215.62
24.215.62 AP- 00076258
550.00
550.00
1100.00 AP- 00076259
1.29
142.95
37.02
1,244.33
385.33
7.84
3.14
1.29
642.68
7.83
3.13
2.476.83 AP- 00076260 MW
200.00
200.00 AP- 00076261 MW
200.00
200.00 AP- 00076262 MW
309.27
309.27
618.54 AP- 00076263 MW
151.09
AP- 00076264 MW
151.09
157.69
91.39
106.82
MW
MW
MW
MIDDLEBROOK MEDIA
MIDDLEBROOK MEDIA
01
Vendor Name
METRO OFFICE SOLUTIONS
METRO OFFICE SOLUTIONS
METRO OFFICE SOLUTIONS
METRO OFFICE SOLUTIONS
METRO OFFICE SOLUTIONS
METRO OFFICE SOLUTIONS
MICROCHECK INC
MICROCHECK INC
MID MOUNTAIN COMMUNICATIONS
MID MOUNTAIN COMMUNICATIONS
MID MOUNTAIN COMMUNICATIONS
NELS TAHOE HARDWARE
NELS TAHOE HARDWARE
NELS TAHOE HARDWARE
NELS TAHOE HARDWARE
NELS TAHOE HARDWARE
NELS TAHOE HARDWARE
NELS TAHOE HARDWARE
NELS TAHOE HARDWARE
NELS TAHOE HARDWARE
NEVADA DIVISION OF FORESTRY
NORTHERN TOOL & EQUIPMENT
NUMARA SOFTWARE INC
User: THERESA
Report: QH_PMT CLAIMS_BK
Deoattment / Prof blame
CUSTOMER SERVICE
FINANCE
ADMINISTRATION
ENGINEERING
CUSTOMER SERVICE
FINANCE
LABORATORY
LABORATORY
PUMPS
PUMPS
EQUIPMENT REPAIR
HUMAN RESOURCES
HUMAN RESOURCES
PUMPS
HEAVY MAINT
HEAVY MAINT
HEAVY MAINT
ADMINISTRATION
ENGINEERING - UR SHOPS EVAL
PUMPS '
PUMPS
ADMINISTRATION
DIAMOND VLY RNCH
HEAVY MAINT
INFORMATION SYS
P, ■YMENT OF CL& IMS
Difictiptisa
OFFICE SUPPLIES
OFFICE SUPPUES
OFFICE SUPPUES
OFFICE SUPPLIES
OFFICE SUPPUES
OFFICE SUPPLIES
LAB SUPPLIES
LAB SUPPLIES
RADIO- RPRS/RPLCM
RADIO- RPRS/RPLCM
RADIO- RPRS/RPLCM
SAFETY PROGRAMS
SAFETY PROGRAMS
SHOP SUPPUES
MOBILE EQUIP
GROUNDS & MNTC
SHOP SUPPLIES
SUPPUES
UR SHOP BLD EVAL
GROUNDS & MNTC
SHOP SUPPLIES
SUPPUES
CONTRACT SERVICE
GROUNDS & MNTC
TRAVEL/MEETINGS
Page: 7
Acct# / Proj Code
1038 - 4820
1039 - 4820
2021 -4820
2029 -4820
2038 - 4820
2039 - 4820
1007-4760
2007-4760
1002 - 6056
2002 - 6056
2005 - 6056
1022 - 6079
2022 -6079
1002 - 6071
1004 - 6012
1004 - 6042
1004 - 6071
1021 - 6520
1029 - 7908 - URSHOP
2002 - 6042
2002 - 6071
2021 -6520
1028 -4405
1004 - 6042
1037 - 6200
Check Total:
Check Total:
Check Total:
Check Total:
Check Total:
Check Total:
Check Total:
Current Date: 06/10/2010
Current Time: 14:58:49
Amami Check Num Typo
4.04
41.77
83.70
106.79
4.03
41.77
638.00 AP- 00076266
139.00
261.56
400.56 AP-00076267
59.00
59.00
168.32
286.32 AP-00076268
515.63
515.62
1.031.25 AP- 00076269
1.08
13.02
21.73
40.30
25.00
19.99
8.69
1.08
25.00
MW
MW
MW
MW
155.89 AP- 00076270 MW
6,085.40
6.085.40 AP- 00076271 MW
126.43
126.43 AP- 00076272 MW
1,200.00
Vendor Name
NUMARA SOFTWARE INC
ODELL'S PUMP SERVICE
OFFICE MAX
OFFICE MAX
OFFICE MAX
ONTRAC
ONTRAC
ONTRAC
ONTRAC
ONTRAC
PDM STEEL
1
v
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PETTY CASH
PINKEL,MICHELE
PINKEL,MICHELE
POLYDYNE INC
PRAXAIR 174
PRAXAIR 174
PRAXAIR 174
User: THERESA
Report: OH PMT tS_13K
Department / Proj (Name
INFORMATION SYS
ENGINEERING - LAKE TAHOE BLVD
GEN & ADMIN
ADMINISTRATION
ADMINISTRATION
LABORATORY - IND CRK RES MONT
ENGINEERING - HEAD.INORKS.PH 1
LABORATORY
ENGINEERING - ANGORA TNK REPL
ENGINEERING - ECHO TANK REPL
ENGINEERING - ECHO TANK REPL
ADMINISTRATION
ENGINEERING
ENGINEERING
ADMINISTRATION
ENGINEERING
ENGINEERING
ENGINEERING - ECHO TANK REPL
ENGINEERING
ENGINEERING
OPERATIONS
PUMPS
HEAVY MAINT
HEAVY MAINT
P9YMENT OF CLAIMS
Description
TRAVEL/MEETINGS
WTLN 12" LTB
OFFICE INVENTORY
OFFICE SUPPLIES
OFFICE SUPPUES
POSTAGE EXPENSES
HDWKS IMP PRO./
POSTAGE EXPENSES
TANK, ANGORA
TANK, ECHO
TANK, ECHO
SUPPLIES
OFFICE SUPPLIES
TRAVEL/MEETINGS
SUPPUES
OFFICE SUPPUES
TRAVEL/MEETINGS
TANK, ECHO
TRAVEL/MEETINGS
TRAVEL/MEETINGS
POLYMER
SHOP SUPPUES
SHOP SUPPUES
SAFETY/EQUIP/PHY
Page: 8
Acct# / Proj Code
2037 - 6200
Check Total:
2029 - 8067 - LTBWLR
Check Total:
1000 - 0428
1021 - 4820
2021 -4820
1007 - 4810 - INDIAN
1029 - 8033 - HDWKPI
2007 - 4810
2029 - 7064 - ANGOTK
2029 - 8809 - ECHOTK
Check Total:
2029 - 8809 - ECHOTK
Check Total:
1021 - 6520
1029 - 4820
1029 - 6200
2021 - 6520
2029 - 4820
2029 - 6200
2029 - 8809 - ECHOTK
Check Total:
1029-6200
2029 - 6200
1006 - 4720
1002 - 6071
1004 - 6071
1004 - 6075
Check Total:
Check Total:
Check Total:
Current Date: 06/10/2010
Current Time: 14:58:49
Amount Check Num Type
1,200.00
2.400.00 AP- 00076273 MW
12,900.00
12.900.00 AP -00076274 MW
220.00
54.38
54.37
328.75
34.00
5.50
113.00
5.50
5.50
387.54
17.50
10.87
12.50
17.50
10.87
12.50
7.00
44.35
211.49
16.94
AP-00076275
163.50 AP- 00076276
387.54 AP- 00076277
88.74 AP- 00076278
110.25
110.25
220.50 AP- 00076279
15,007.50
15,007.50 AP- 00076280
MW
MW
MW
MW
MW
MW
Vendor Name
PRAXAIR 174
PRAXAIR 174
PRAXAIR 174
PRIETO, ANTONIO
PRO LEISURE
PRO LEISURE
REDWOOD PRINTING
REDWOOD PRINTING
RICH'S SMALL ENGINE SERVICE
i RYAN, JUUE
,t.
co
SELLERS, JEAN
SELLERS, JEAN
SHERMAN, THERESA
SHERMAN,THERESA
SHRED -IT
SIERRA CHEMICAL CO
SIERRA FOOTHILL LABORATORY
SIERRA NEVADA MEDIA GROUP
SIERRA NEVADA MEDIA GROUP
SIERRA NEVADA MEDIA GROUP
User. THERESA
Report: QH_PMT_CLAIMS_BK
DeparttgntJ Proj Name
LABORATORY
PUMPS
LABORATORY
UNDERGROUND REP
ADMINISTRATION
ADMINISTRATION
ENGINEERING
ENGINEERING
UNDERGROUND REP
ENGINEERING - ECHO TNK SITEWRK
GEN &ADMIN
GEN & ADORN
FINANCE - PAYROLL SYS/ADP
FINANCE - PAYROLL SYS /ADP
GEN & ADMIN
OPERATIONS
LABORATORY - IND CRK RES MONT
HUMAN RESOURCES
UNDERGROUND REP
PUMPS
EMIFA OF CLAIMS
Descriotion
LAB SUPPUES
SHOP SUPPLIES
LAB SUPPLIES
TRAVELIMEETINGS
INCNTV & RCGNTN
INCNTV & RCGNTN
OFFICE SUPPLIES
OFFICE SUPPUES
SMALL TOOLS
TANK, ECHO
UB SUSPENSE
UB SUSPENSE
TRAVEL/MEETINGS
TRAVEL/MEETINGS
OFC SUPPLY ISSUE
HYPOCHLORITE
MONITORING
ADS/LGL NOTICES
PIPE/CVRS/MHLS
HYPOCHLORITE
Page: 9
Acct# I Prof Code
1007 - 4760
2002 -6071
2007 - 4760
2001 - 6200
1021-6621
2021 -6621
1029 - 4820
2029 - 4820
1001-6073
2029 - 8809 - ECHOSW
Check Total:
1000 - 2002
2000 - 2002
Check Total:
1039 - 6200 - PAYADP
2039 - 6200 - PAYADP
Check Total:
Check Total:
Check Total:
1007 - 6110 - INDIAN
1000 -6081
1006-4755
1022 - 4930
2001 - 6052
2002 - 4755
Check Total:
Check Total:
Check Total:
Check Total:
Check Total:
Check Total:
Current Date: 06/10/2010
Current Time: 14:58:49
Amount Check Num bum
58.87
44.35
58.86
434.86 AP- 00076281
140.00
140.00 AP-00076282
63.19
63.18
126.37 AP-00076283
155.78
155.78
311.56 AP- 00076284
107.86
107.86 AP- 00076285
1,833.20
1.833.20 AP- 00076286
309.50
190.50
500.00 AP- 00076287
96.00
96.00
192.00 AP- 00076288
72.00
72.00 AP- 00076289
3,902.86
3 AP- 00076290
390.00
390.00 AP -00076291
183.32
67.11
85.56
MW
MW
MW
MW
MW
MW
MW
MW
MW
MW
MW
Vendor Name
SIERRA NEVADA MEDIA GROUP
SIERRA NEVADA MEDIA GROUP
User: THERESA
Report: OR PICT CLAIMS_BK
Department / Prof Name
HUMAN RESOURCES
PAYMMNT Of CLAIMS
Description Acct# / Proj Code
ADS/LGL NOTICES 2022 - 4930
ENGINEERING - ARSENIC FACILITY ARSNC TRTMNT
Page: 10 Current Date: 06/10/2010
Current Time: 14:58:49
Amount Check Num Type
183.32
2029 - 8864 - ARSNIC 220.40
Check Total: 739.71 AP- 00076292 MW
SIERRA PACIFIC POWER GEN & ADMIN ELECTRICITY 1000 - 6330 209.25
SIERRA PACIFIC POWER GEN & ADMIN ST LIGHTING EXP 1000 - 6740 1,524.74
SIERRA PACIFIC POWER GEN & ADMIN ELECTRICITY 2000 - 6330 11,796.34
Check Total: 13.530.33 AP- 00076293 MW
SIERRA SPRINGS GEN & ADMIN SAFETY INVENTORY 1000 - 0425 482.40
SIERRA SPRINGS UNDERGROUND REP SUPPLIES 1001 - 6520 28.75
SIERRA SPRINGS PUMPS SUPPUES 1002 - 6520 1.92
SIERRA SPRINGS ELECTRICAL SHOP SUPPUES 1003 - 6520 9.58
SIERRA SPRINGS HEAVY MAINT SUPPLIES 1004 - 6520 28.75
SIERRA SPRINGS EQUIPMENT REP SUPPLIES 1005 - 6520 9.58
SIERRA SPRINGS OPERATIONS SUPPLIES 1006 - 6520 28.75
SIERRA SPRINGS DIAMOND VLY RNCH SUPPLIES 1028 - 6520 9.58
I
SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 1038 - 6520 9.58
u,
I SIERRA SPRINGS UNDERGROUND REP SUPPLIES 2001 - 6520 28.75
SIERRA SPRINGS PUMPS SUPPLIES 2002 - 6520 7.67
SIERRA SPRINGS ELECTRICAL SHOP SUPPLIES 2003 - 6520 9.58
SIERRA SPRINGS EQUIPMENT REPAIR SUPPLIES 2005 - 6520 9.58
SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 2038 - 6520 9.58
Check Total: 674.05 AP- 00076294 MW
SIERRA TAHOE READY MIX ENGINEERING - UR SHOPS EVAL UR SHOP BLD EVAL 1029 - 7908 - URSHOP 803.66
Check Total: 803.66 AP- 00076295 MW
SILVER STATE INTERNATIONAL INC EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 496.83
Check Total: 496.83 AP- 00076296 MW
SOUND STRATEGIES /OFC INC. DIO CONTRACT SERVICE 1027 - 4405 49.00
SOUND STRATEGIES /OFC INC. DIO CONTRACT SERVICE 2027 - 4405 49.00
Check Total: 98.00 AP- 00076297 MW
SOUTH TAHOE PUB UTILITY DIST GEN & ADMIN UB SUSPENSE 1000 - 2002 119.01
Check Total: 119.01 AP- 00076298 MW
SOUTH TAHOE REFUSE GEN & ADMIN REFUSE DISPOSAL 1000 - 6370 2,849.04
Vendor Name
SOUTH TAHOE REFUSE
SOUTHWEST GAS
SOUTHWEST GAS
SOUTHWEST VALVE U.0
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
to SUBSTITUTE PERSONNEL &
O
I SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUN2ERI, SALVADOR
User: THERESA
Report OH PMT_CLAIMS_BK
Deoartment / Proj Name
GEN & ADMIN
GEN & ADMIN
GEN & AMON
PUMPS
Deacrintlon
REFUSE DISPOSAL
NATURAL GAS
NATURAL GAS
PUMP STATIONS
UNDERGROUND REP CONTRACT SERVICE
ENGINEERING CONTRACT SERVICE
ENGINEERING - ERB LINER REPL REPLACE ERB LINE
ENGINEERING - SONORA AVE WTRLN WTRLN,SNRA/SK RN
ENGINEERING - HEADINORKS.PH 1 HDWKS IMP PROJ
ENGINEERING - FILTER ASSMNT REHAB FLTR 566
ENGINEERING - REPL GEN, LPPS REPL GEN LPPS
INFORMATION SYS CONTRACT SERVICE
CUSTOMER SERVICE CONTRACT SERVICE
UNDERGROUND REP CONTRACT SERVICE
ENGINEERING - J-M PIPE FAILURE CONTRACT SERVICE
ENGINEERING CONTRACT SERVICE
ENGINEERING - SONORA AVE WTRLN CONTRACT SERVICE
ENGINEERING - ANGORA TNK REPL TANK, ANGORA
ENGINEERING - WT METERING PRJ WTR METERING/NEW
ENGINEERING - SONORA AVE WTRLN WTRLN,SNRA/SK RN
ENGINEERING - CALTRANS EROSION EC TRT CRK -STLN
ENGINEERING - LAKE TAHOE BLVD WTLN 12" LTB
ENGINEERING - ECHO TANK REPL TANK, ECHO
ENGINEERING - ARSENIC FACILITY ARSNC TRTMNT
ENGINEERING - IROQUOIS BSTR ST BSTR STN IROQ
INFORMATION SYS CONTRACT SERVICE
CUSTOMER SERVICE CONTRACT SERVICE
CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE
Acct# / Proj Coda
2000 - 6370
1000 - 6350
2000 - 6350
2002-6061
1001 - 4405
1029 - 4405
1029 - 7581 - ERBLNR
1029 - 7911- SONORA
1029 - 8033 - HDWKPI
1029 - 8066 - FILTER
1029 - 8933 - RGLPPS
1037 - 4405
1038 -4405
2001 - 4405
2029 - 4405 - MANVIL
2029 - 4405
2029 - 4405 - SONORA
2029 - 7064 - ANGOTK
2029 - 7078 - METERS
2029 - 7911 - SONORA
2029 - 8036 - ECCALT
2029 - 8067 - LTBWLR
2029 - 8809 - ECHOTK
2029 - 8864 - ARSNIC
2029 - 8967 - IQBSTR
2037 -4405
2038 - 4405
2038 - 6660 - WCPROG
Check Total:
Check Total:
Check Total:
Check Total:
Page: 11 Current Date: 06/10/2010
Current Time: 14:58:49
Amount Check Num lam
105.52
2,954.56 AP
8,677.14
347.23
9.024.37 AP 00076300
225.10
225.10 AP 00076301
4,261.99
429.03
153.78
111.84
17.97
55.92
115.76
194.72
194.72
2,086.40
602.56
863.30
139.80
127.95
94.07
27.96
121.85
493.49
134.04
219.33
54.83
194.72
194.72
10.890
200.00
75 AP- 00076303
MW
MW
MW
MW
PANT OF CLAIMS
Vendor Name Departn nt / Proj Natpt Description Acct# / Proj Code
Check Total:
Amount Check Num Type
200.00 AP- 0 0076304 MW
TAHOE MOUNTAIN NEWS DIO - PR EXP- EXTERNAL PUB RELATIONS 1027 - 6620 - PREEXT 75.00
TAHOE MOUNTAIN NEWS 010 - PR EXP- EXTERNAL PUB RELATIONS 2027 - 6620 - PREEXT 75.00
Check Total: 150.00 AP- 00076305 MW
TAHOE TRADING POST ENGINEERING SAFETY/EQUIP/PHY 1029 - 6075 69.33
TAHOE TRADING POST ENGINEERING SAFETY/EQUIP/PHY 2029 - 6075 69.32
Check Total:
138.65 AP- 00076306 MW
TAHOE VALLEY ELECTRIC SUPPLY ELECTRICAL SHOP BUILDINGS 1003 - 6041 18.94
TAHOE VALLEY ELECTRIC SUPPLY UNDERGROUND REP PIPE/CVRS/MHLS 2001 - 6052 179.44
TAHOE VALLEY ELECTRIC SUPPLY ELECTRICAL SHOP WELLS 2003 - 6050 287.37
Check Total: 485.75 AP- 00076307 MW
TREMBLAY, AARON CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 143.00
User: THERESA
Report: OH_PMT_CLAIMS_BK
Page: 12 Current Date: 06/10/2010
Current Time: 14:58:49
Check Total: 143.00 AP- 00076308 MW
UNITED PARCEL SERVICE GEN & ADMIN POSTAGE EXPENSES 1000 -4810 1,000.00
UNITED PARCEL SERVICE GEN & ADMIN POSTAGE EXPENSES 2000 - 4810 1,000.00
to
Check Total:
2.000.00 AP 00076304 MW
UNITED RENTALS INC ENGINEERING - C-LINE RE -ROUTE CLN REROUTE 1029 - 8097 - CROUTE 2,762.10
Check Total: 2,762.10 AP- 00076310 MW
USA BLUE BOOK PUMPS WELLS 2002 - 6050 598.33
Check Total: 598.33 AP-00076311 MW
USPS - HASLER GEN & ADMIN POSTAGE PPD 1000 - 0304 1,000.00
USPS - HASLER GEN & ADMIN POSTAGE PPD 2000 - 0304 1,000.00
Check Total: 2.000.00 AP- 00076312 MW
VERIZON CALIFORNIA DIAMOND VLY RNCH TELEPHONE 1028 - 6310 45.95
Check Total: 45.95 AP- 00076313 MW
VWR INTERNATIONAL LABORATORY LAB SUPPLIES 1007 -4760 12.97
VWR INTERNATIONAL LABORATORY LAB SUPPLIES 2007 -4760 29.32
Check Total: 42.29 AP- 00076314 MW
WATER ENVIRONMENT FEDERATION ADMINISTRATION DUES/MEMB/CERT 1021 - 6250 330.00
WATER ENVIRONMENT FEDERATION ADMINISTRATION DUES/MEMB/CERT 2021 - 6250 330.00
Check Total: 660.00 AP- 00076315 MW
Vendor Name
WEDCO INC
WEDCO INC
WEDCO INC
WEDCO INC
WESTERN ENERGETIX INC
WESTERN ENERGETIC INC
WESTERN ENERGETIX INC
WESTERN ENERGETIX INC
WESTERN ENERGETIX INC
WESTERN ENERGETIX INC
WESTERN ENVIRONMENTAL
WESTERN ENVIRONMENTAL
N WESTERN NEVADA SUPPLY
I WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WIRTH, ROB AND SANDY
User: THERESA
Report OH_PMT_CLAIMS_BK
Department / Proi Name
ELECTRICAL SHOP
ELECTRICAL SHOP
ELECTRICAL SHOP
ELECTRICAL SHOP
GEN & ADMIN
GEN & ADMIN
HEAVY MAINT
DIAMOND VLY RNCH
ENGINEERING - REPL GEN, LPPS
PUMPS
Description
PRIMARY EQUIP
PUMP STATIONS
SHOP SUPPLIES
SHOP SUPPLIES
GASOLINE INV
DIESEL INVENTORY
SECONDARY EQUIP
DIESEL
REPL GEN LPPS
OIL & LUKE
LABORATORY - IND CRK RES MONT MONITORING
LABORATORY MONITORING
UNDERGROUND REP PIPE/CVRS/MHLS
PUMPS SHOP SUPPLIES
HEAVY MAINT SECONDARY EQUIP
HEAVY MAINT BUILDINGS
HEAVY MAINT SHOP SUPPLIES
GEN & ADINN VALVES INVENTORY
GEN & ADMIN REPAIR CLMP INV
GEN & ADMIN SADDLES INV
UNDERGROUND REP PIPE/CVRS/MHLS
PUMPS SHOP SUPPLIES
ENGINEERING - WT METERING PRJ WTR METERING/NEW
CUSTOMER SERVICE SHOP SUPPLIES
ENGINEERING - ECHO TANK REPL TANK, ECHO
Acct# / Prpj Code
1003 -6021
1003 - 6051
1003 - 6071
2003 - 6071
1000 - 0415
1000 - 0416
1004 - 6022
1028 - 4620
1029 - 8933 - RGLPPS
2002 -4630
Check Total:
Check Total:
1007 - 6110 - INDIAN
1007 - 6110
1001 -6052
1002 -6071
1004 - 6022
1004 - 6041
1004 - 6071
2000 - 0404
2000 - 0406
2000 - 0407
2001 - 6052
2002 -6071
2029 - 7078 - METERS
2038 -6071
Check Total:
Check Total:
2029 - 8809 - ECHOTK
Check Total:
Grand Total:
Page: 13 Current Date: 06/10/2010
Current Time: 14:58:49
Amount Check Num 11w8
563.49
1,365.96
125.95
125.95
2 AP- 00076316
10,102.66
7,918.66
399.00
2,391.48
- 10,354.02
237.41
10.695.19 AP-00076317
240.00
360.00
600.00 AP- 00076318
940.43
7.18
2,161.42
617.87
127.98
716.67
701.21
1,258.84
149 .40
7.18
164,560.50
97.40
171.346.08 AP- 00076319
4,500.00
4.500.00 AP- 00076320
570,982.23
MW
MW
MW
MW
MW
General Manager
Rkhard H. SolbMg
• 1950 •
out T ahoe Ch��lu
James It Jones
`7 Public Utility district I Mary LouMosbach
Dale Rise
ENo $chafer
1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401
Phone 530 544 -6474 - Fax 530 541 -0614 - www.stpud.us
BOARD AGENDA ITEM 14a
TO: Board of Directors
FROM: Richard Solbrig, General Manager
MEETING DATE: June 17, 2010
ITEM — PROJECT: Conference with Legal Counsel — Anticipated Litigation (one case)
REQUESTED BOARD ACTION: Direct legal counsel.
DISCUSSION: Pursuant to Section 54956.9(b) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding anticipation of
litigation.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
General Manager
Kichard H. 5olbrtg
15 outh T
James K Jones
Mary Lou M
osbacher
Public Utility niotrict Dale Me
Eric Schaffer
1275 Meadow Crest Drive • 5outh lake Tahoe • CA 96150 -7401
Phone f530 544 -6474 • Fax 530 541 -0614 • www.stpud.us
BOARD AGENDA ITEM 14b
TO: Board of Directors
FROM: Richard H. Solbrig, General Manager
MEETING DATE: June 17, 2010
ITEM — PROJECT: Conference with Legal Counsel — Existing Litigation
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code,
Closed Session may be held for conference with legal counsel regarding existing
litigation: Meyers Landfill Site - United States of America vs. El Dorado County and City
of South Lake Tahoe and Third Party Defendants, Civil Action No. S -01 -1520 LKK
GGH, United States District Court for the Eastern District of California.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
NO
NO
CATEGORY: Sewer
-55-
1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401
Phone 530 544 -6474 - Fax 530 541-0014 www.stpud.us
BOARD AGENDA ITEM 14c
TO: Board of Directors
FROM: Richard Solbrig, General Manager
MEETING DATE: June 17, 2010
ITEM — PROJECT NAME: Conference with Legal Counsel — Existing Litigation
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government code,
Closed Session may be held for conference with legal counsel regarding existing
litigation: False Claims Act Case: United States, the States of California, Delaware,
Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and
Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics
Corporation, U.S.A., Civil Action No. ED CV06- 0055 -GW, United States District Court
for the Central District of California.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES IMA NO
CHIEF FINANCIAL OFFICER: YES NO
—57—
General Manger
Richard H. Solbr ig
out
Tahoe
chriscefalu
James K Jones
Public Utility District
Mary Lou Moebacher
Rise
,Nis
1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401
Phone 530 544 -6474 - Fax 530 541-0014 www.stpud.us
BOARD AGENDA ITEM 14c
TO: Board of Directors
FROM: Richard Solbrig, General Manager
MEETING DATE: June 17, 2010
ITEM — PROJECT NAME: Conference with Legal Counsel — Existing Litigation
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government code,
Closed Session may be held for conference with legal counsel regarding existing
litigation: False Claims Act Case: United States, the States of California, Delaware,
Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and
Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics
Corporation, U.S.A., Civil Action No. ED CV06- 0055 -GW, United States District Court
for the Central District of California.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES IMA NO
CHIEF FINANCIAL OFFICER: YES NO
—57—