Loading...
AP 11-04-10%3 't t I1d� • 1950 SOUTH TAHOE PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING AGENDA Thursday, November 4, 2010 2:00 P.M. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Richard Solbri , General Manager Paul Sciuto, Assistant General Mana er Dale Rise, President BOARD MEMBERS Mary Lou Mosbacher, Vice President James R. Jones, Director Eric W. Schafer, Director Chris Cefalu, Director 1. CALL TO ORDER REGULAR MEETING - PLEDGE OF ALLEGIANCE 2. COMMENTS FROM THE AUDIENCE (This is an opportunity for members of the public to address the Board on short non - agenda items that are within the subject matter jurisdiction of the District. Five minute limit. No action can be taken on matters not listed on the agenda.) 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR 4. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered separately upon request. Comments and questions from members of the public, staff or Board can be taken when the comment does not necessitate separate action.) 5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION / ACTION 6. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION i - a. Request to Appear Before the Board Consider Request to Eliminate Three Zj Pg. 77 Received from Larry Singleton re: Years Back Charges for Current 1989 Marconi Way Sewer Service Fees for Unreported (Tim Bledsoe) Connection b. Black Bart Post Office Discuss Future Status of the Post P9.79 (Paul Sciuto) Office Building on Black Bart, and Direct Staff Accordingly 0 c. Legal Service Provider Discuss if Comparison of Legal Pg. 81 (President Rise) Service Providers is Needed at this Time, and Direct Staff Accordingly d. Payment of Claims Approve Payment in the Amount of Pg. 83 $1,736,993.35 REGULAR BOARD MEETING AGENDA - NOVEMBER 4, 2010 PAGE - 2 7. BOARD MEMBER STANDING COMMITTEE REPORTS (Discussions may take place; however, no action will be taken) a. Water & Wastewater Operations Committee (Jones / Rise) b. Finance Committee (Schafer / Cefalu) C. Executive Committee (Rise / Mosbacher) d. Planning Committee (Mosbacher / Schafer) 8. EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVES REPORT 9. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken) 10. GENERAL MANAGER REPORT(S) (Discussions may take place; however, no action will be taken) 11. STAFF / ATTORNEY REPORT(S) (Discussions may take place; however, no action will be taken) 12. NOTICE OF PAST AND FUTURE MEETINGS / EVENTS Past Meetings / Events 10/27/10- ECC (Employee Communication Committee) Meeting 10/29/10 - Finance Committee Meeting 11 /01 /10 - Water and Wastewater Operations Committee Meeting Future Meetings / Events 11 /10/10 - 10:00 a.m. - El Dorado County Water Agency Meeting in Shingle Springs 11 /15/10 - 9:00 a.m. - Finance Committee Meeting at District 11 / 15/10 - 3:30 p.m. - Water and Wastewater Operations Committee Meeting at District 11 /18/10 - 2:00 p.m. - STPUD Regular Board Meeting at District 13. CLOSED SESSION (The Board will adjourn to Closed Session to discuss items listed below. Closed Session is not open to the public; however, an opportunity will be provided at this time if members of the public would like to comment on any item listed. Three minute limit.) a. Pursuant to Government Code Section 54956.9(b) /Conference with Pg. 99 Legal Counsel re: Liability Claim against STPUD received from Park Tahoe, LP b. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel Pg. 101 Existing Litigation re: False Claims Act Case: United States, the States of California, Delaware, Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06- 0055 -GW, United States District Court for the Central District of California 14. ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION 15. ADJOURNMENT (To the next regular meeting, November 18, 2010, 2:00 p.m.) South Tahoe Public Utility District ■ 1274 Meadow Crest Drive - South Lake Tahoe, CA 96150 Phone 530.544.6474 ■ Facsimile 530.541.0614 - www.stpud.us t In��� 1950 • � CONSENT CALENDAR NOVEMBER 4, 2010 ITEMS REQUESTED ACTION a. Alpine County Annual Impact /Mitigation/ Pg.l Compensation (Debbie Henderson) b. Liability Claim Against STPUD Received from Pg. 5 Park Tahoe, LP (Tim Bledsoe) C. 2010 -2011 Water Rate Study Pg.21 (Paul Hughes) d. Headworks Replacement Project Pg.45 (Julie Ryan) e. Diamond Valley Ranch Permitting Assistance Pg.51 (Ivo Bergsohn) f. 2010 Water Meter Installation Project - Phase 2 Pg.55 (John Thiel) g. 2010 Asphalt Patching / Repair Contract Pg.59 (Randy Curtis) h. Purchase 1 Ton Service Truck - Electrical Pg.61 Department (Randy Curtis) Authorize Payment of District's Annual Mitigation Fee to Alpine County in the Amount of $112,100 Reject Claim Approve Proposal and Authorize Execution of a Contract with HDR Engineering, in the Amount of $49,275 Approve Proposal from Carollo Engineers for Design Services, in the Amount Not to Exceed $296,534 Authorize an Increase to Purchase Order P22728 for Additional Engineering Work for Permitting Assistance, in the Amount of $7,000 Approve Change Order No. 2 to Campbell Construction Company, Inc., in the Amount of $45,874.29 Authorize an Increase to Purchase Order P22979 for Additional Required Patch Repairs, in the Amount of $40,000 Award Bid to the Lowest Responsive, Responsible Bidder, San Francisco Ford, Lincoln, Mercury, in the Amount of $24,803.75 CONSENT CALENDAR — NOVEMBER 4, 2010 PAGE — 2 i. Purchase / Ton Pickup Truck - Pumps Department Award Bid to the Lowest Responsive, Pg. 65 (Randy Curtis) Responsible Bidder, San Francisco Ford, Lincoln, Mercury, in the Amount of $20,992.06 j. Purchase Mid -Size Truck - Lab Department Pg. 69 (Randy Curtis) (1) Reject Three Lowest Bids as Non- responsive to Bid Specifications; (2) Find Minor Deviation from Specification in the Fourth Lowest Bid to Be Immaterial and Waive Deviation as Such; (3) Award Bid to the Lowest Responsive, Responsible Bidder, San Francisco Ford, Lincoln, Mercury, in the Amount of $21,949.06 k. Regular Board Meeting Minutes: Pg 73 October 21, 2010 (Kathy Sharp) Approve Minutes The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete agenda packet, including all backup information is available for review at the meeting and at the District office during the hours of 8:00 a.m. - 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after minutes of the meeting have been approved. Items on this agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear on the agenda. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified, but may occur slightly later than the specified time. Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Comments on items not on the agenda can be heard during "Comments from the Audience;" however, action cannot be taken on items not on the agenda. Please provide the Clerk of the Board with a copy of all written material presented at the meeting. Backup to any agenda item(s) not included with the Board packet will be made available when finalized at the District office, at the Board meeting, and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings. If particular accommodations for the disabled are needed (i.e., disability - related aids, or other services), please contact the Clerk of the Board at 530.544.6474, extension 6203, at least 24 hours in advance of the meeting. SOUTH TAHOE PUBLIC UTILITY DISTRICT "Basic Services for a Complex World" ADDENDUM NO. 1 Note: This item, posted 11- 01 -10, met all noticing requirements. It will be added to the Action Calendar for approval. REGULAR BOARD MEETING AGENDA ACTION CALENDAR Thursday, November 4, 2010 2:00 P.M. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California ITEM FOR BOARD ACTION REQUESTED BOARD ACTION e. Water Supplier Fire Liability / Inverse Condemnation Authorize Sending Letter to the (Richard Solbrig, Brad Herrema) California Supreme Court in Support of Yorba Linda Water District's Petition for Review South Tahoe Public Utility District ■ 1274 Meadow Crest Drive ■ South Lake Tahoe, CA 96150 Phone 530.544.6474 ■ Facsimile 530.541.0614 ■ www.stpud.us 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.ue BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Debbie Henderson, Accounting Manager MEETING DATE: November 4, 2010 ITEM - PROJECT: Alpine County Annual Impact /Mitigation /Compensation REQUESTED BOARD ACTION: Authorize payment of District's annual mitigation fee to Alpine County in the amount of $112,100 DISCUSSION: The second amendment to the agreement between the District and the County of Alpine, dated June 2, 1983, provides for an annual payment to compensate for and mitigate the impacts of Harvey Place Dam Project. The current year obligation is $112,100. This represents the $115,200 paid in fiscal year 2009/2010 decreased by the percentage decrease in the District's sewer system connections from October 1, 2009 to September 30, 2010. SCHEDULE: Amount due is indicated on this meeting's payment of claims COSTS: $1 12,100 ACCOUNT NO: 1028 -6650 BUDGETED AMOUNT REMAINING: $54,835 ATTACHMENTS: Alpine County Mitigation Fee Report CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES -1- NO M,, * CATEGORY: Sewer General Manager Rkhard H. Solbrlg Tahoe arMtors ,9 outh ChrisCefsfu James R Jones Public Utility district '��'`°��le� Eric Schafer 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.ue BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Debbie Henderson, Accounting Manager MEETING DATE: November 4, 2010 ITEM - PROJECT: Alpine County Annual Impact /Mitigation /Compensation REQUESTED BOARD ACTION: Authorize payment of District's annual mitigation fee to Alpine County in the amount of $112,100 DISCUSSION: The second amendment to the agreement between the District and the County of Alpine, dated June 2, 1983, provides for an annual payment to compensate for and mitigate the impacts of Harvey Place Dam Project. The current year obligation is $112,100. This represents the $115,200 paid in fiscal year 2009/2010 decreased by the percentage decrease in the District's sewer system connections from October 1, 2009 to September 30, 2010. SCHEDULE: Amount due is indicated on this meeting's payment of claims COSTS: $1 12,100 ACCOUNT NO: 1028 -6650 BUDGETED AMOUNT REMAINING: $54,835 ATTACHMENTS: Alpine County Mitigation Fee Report CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES -1- NO M,, * CATEGORY: Sewer DATE SEWER UT MITIGATION ROUNDED in sewer units in dollars 11 -1 -89 74,855 100,000 100,000 11 -1 -90 75,722 101,158 101,200 867 $1,200 11 -1 -91 76,451 102,132 102,100 729 $942 10 -26 -92 76,976 102,833 102,800 525 $668 10 -31 -93 77,495 103,527 103,500 519 $667 10 -31 -94 78,808 105,281 105,300 1,313 $1,773 11 -1 -95 78,231 104,510 104,500 -577 ($781) 11 -1 -96 78,777 105,239 105,200 546 $690 11 -1 -97 79,235 105,851 105,900 458 $661 11 -1 -98 79,906 106,748 106,700 671 $849 10 -06 -99 80,367 107,364 107,400 461 $652 10 -19 -00 80,890 108,062 108,000 523 $636 10 -18 -01 81,268 108,567 108,600 378 $538 12 -5 -02 81,948 109,476 109,500 680 $933 10/16/03 83,699 111,815 111,800 1,751 $2,324 10/21/04 84,423 112,782 112,800 724 $985 10/20/05 85,038 113,604 113,600 615 $818 10/19/06 85,962 114,838 114,800 924 $1,196 10/18/07 86,658 115,768 115,800 696 $962 10/16/08 86,602 115,693 115,700 -56 ($68) 10/15/09 86,246 115,217 115,200 -356 ($493) 11/04/10 83,921 112,111 112,100 -2,325 ($3,117) Please issue a check to Alpine County in the amount of $112,100 for their annual impact/mitigation /compensation fee. Based on 83,921 sewer units. This is provided for in the Second Amendment to Agreement between STPUD and the County of Alpine and the Alpine County Water Agency dated June 2, 1983 (Ref 1 D(5)). Account 1028 -6650 ALPINE COUNTY MITIGATION FEE 1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401 Phone 530 544 -6474 - Fax 530 541 -0614 - www.stpud.us BOARD AGENDA ITEM 4b TO: Board of Directors FROM: Tim Bledsoe, Manager of Customer Service MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Liability Claim Against STPUD Received from Park Tahoe, LP REQUESTED BOARD ACTION: Reject Claim DISCUSSION: Randal Plummer with Park Tahoe, LP filed a claim for damages against the District in the amount of $8,154.54 for allegations that a problem in the District's main caused a backup of approximately 300 feet up to the second floor of his hotel. There was no problem found in the District's main line per Doug Van Gordon, Underground Sewer Supervisor, when responding to the service call received the day after the alleged incident. At the advice of Carl Warren and Company, the District's insurance adjusters, staff recommends denial of this claim. A closed session item has been included on this agenda if the Board wishes to discuss the merits of this claim. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: Claim, Insurance Company Recommendation CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO —5— CATEGORY: Sewer General Manager RlahaM H. Solbr4 Tahoe out ��� James R Jonea ii F 1 u Ni c Utility Diotrict Mary LouM Dale Rlse Erio Schafer 1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401 Phone 530 544 -6474 - Fax 530 541 -0614 - www.stpud.us BOARD AGENDA ITEM 4b TO: Board of Directors FROM: Tim Bledsoe, Manager of Customer Service MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Liability Claim Against STPUD Received from Park Tahoe, LP REQUESTED BOARD ACTION: Reject Claim DISCUSSION: Randal Plummer with Park Tahoe, LP filed a claim for damages against the District in the amount of $8,154.54 for allegations that a problem in the District's main caused a backup of approximately 300 feet up to the second floor of his hotel. There was no problem found in the District's main line per Doug Van Gordon, Underground Sewer Supervisor, when responding to the service call received the day after the alleged incident. At the advice of Carl Warren and Company, the District's insurance adjusters, staff recommends denial of this claim. A closed session item has been included on this agenda if the Board wishes to discuss the merits of this claim. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: Claim, Insurance Company Recommendation CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO —5— CATEGORY: Sewer SOUTH LAKE TAHOE PUBLIC UTILITY DISTRICT CLAIM FORM: TORT CLAIM FOR MONEY OR DAMAGES [Gov't Code Title 1, Div. 3.6, §§ 810 et seq.) "This form must be completed and returned to: South Lake Tahoe Public Utility District, 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Claim of. Vs. South Tahoe Public Utility District No. TORT CLAIM FOR MONEY OR DAMAGES (GOVERNMENT CODE SEC. 810 et seq..) See attached Instructions Section l: Claimant Information Name of Claimant Mailing 1 elephone Number (include area code) L City State Zip Code Section 2: Claim Information Is the Claim on Behalf of a Minor? Yes IeO No If yes, please indicate: Relationship to Minor: _ - .- Date of Birth of Minor: Incident Date: 1d__ Wonthay /Year Dollar Amount of Claim: ,_ If the Amount Exceeds $10,000_ Indicate Type of Civil Case: -.___ Limited Non- Limited Explain Ilow The Dollar Amount Claimed Vas Computed (Attach supporting documentation for the amount claimed) Describe the specific damage or injury incurred as a result of the incident R e2 mow. A ' ' L. a QTr�[*� .. Z Loca ion of incident (if applicable. include street address. city or county highway number, post mile number and direction of travel). Explain the circumstances that led to the alleged damage or injury. State all facts that support your claim against the District and why you believe the District is responsible for the alleged damage. or injury. If known, provide the name(s) of the District employee(s) who allegedly caused the injury, damage or loss. (If more space is needed, please attach additional sheets.) Section 3: Insurance Information (must be completed if claim involves an automobile) Has the claim for the alleged damage /injury been filed or will it be tiled with your insurance carrier? Yes No Name of Insurance Carrier Amount of Deductible Policy Number Insurer's Telephone Number (include area code) Insurer's Mailing Address City State Zip Code Are you the registered owner? Yes No Make: Model: Year: Section 4• Representative Information (Must be filled out if claim is bung filed by an attorney or authorized representative) Name of Attorney /Representative: Attorney /Representative's Telephone Number: Attorney /Representative s Mailing Address:_ C_ City State Zip Code Section 5: Notice and Signature Penal Code Section 72 provides that every person who, with intent to defraud, presents for allowance or for payment to any State Board or Officer, or to any county, town, city, district, ward, village, board or officer, authorized to allow or pay the same if genuine, any false or fraudulent claim, bill, account, voucher or writing is guilty of a felony. Signature of Claimant Signature of Attorney/ Representative (if applicable) Date /!� /jam // U Date -9- #1 HOW DOLLAR AMOUNT WAS COMPUTED: 1. Hourly rate per employee for extraction of water and removal of material from ceiling and walls. 2. Estimate to repair damage to room 123. 3. Replacement cost of 40" Flat Screen Emerson HDTV. 4. Refrigerator. S. Phone. 6. Coffee Maker. 7. Estimated lost revenue for room 123. Computed at 45 days at 40% occupancy. TOTAL DOLLAR AMOUNT FROM ABOVE: 1. $761.80 2. $4250.00 3. $535.80 4. $911.61 5. $62.68 6. $30.65 7. $1602.00 TOTAL DOLLAR AMOUNT OF CLAIM = $8154.54 -10- OCT -7 -2010 11:15 FROM:CATTAIEO 530 -541 -1644 TO:5446869 P.2 „ 2 DAVID CATTANEO General Contractor -Home Improvement Certified CA. ,Lic. # 785576 2700 Muir Lane So. Lake Tahoe, CA. 96150 (530) 541 -1073 October 7, 2010 Estimate /contract to repair water damages to room #123 Park Tahoe Inn 4011 Lake Tahoe Blvd. So. Lake Tuhge Cu. 961..50 I . Install new R - insulation. 2. Install new sound board on ceiling. 3. Install sheet rock on ceiling & walls, tape, texture & paint 4. 'Install new Ma,” carpet padding & re- install existing carpet. 5. Install new baseboards. 6. Clean up and disposal. ALL LABOR & MATERIALS OVERHEAD & PROFIT INCLUDED TOTAL ESTIMATE: $4250.00 TERMS: Payment to be made as follows: Payment in fuA due upon completion Work to begin 3 working days after contract sigWn&. Wo* to be completed depending upon weather. delivery of materials and access to property and providing payment terms are met. *nv- above is an estimate based on our inspection and does not Dover permits, drawings or additional labor or materials +vluch may be required alter work his been Wood up, OoeaaionaUy, after work has boom start4 worn or d. -tmaged materials are discovemd which are not evident upon first inspection. because of this, prices are not guatantood. Extm► charges for any extra work requested and parforned that are not included is this estimate shall be paid upon oompWan of the extra work performed. Comm not valid unkas signed by all parties. As required by law notice is lureby given: Under tlto Mechanic's Lien Law (Calif Civil Code, Soc. 1181 ct seq.1, any contr=ar. r.+d=n1ractor, labonwr, supplicr or other person wbo hakw improve your property, bud is not paid for his work or supplies, has the ri;& to enforce a claim against your property. This means that. after a conit hearing, your property could be sold by a court officer and the proceods of the sale usod to satisfy the indebtedness. This can happen even if you have paid your own contractor in full if the subconuacto ,1 / o � r supplier wmains unpaid. / EST ,� P Cie" '' G�y v DATE David Cattaneo, Contractor TERMS ACCEPTED BY: DATE Property Owncr or Agent (s) signatures Mailing Address Ph.# -11- Page 1 of - 12 - httns:// webmail. onalcanita1. com/ exchan�,,e/ rvlummer/ Inbox /tJpdates %2Oon %20Rooms %... 10/ 13 /2010 Page l of 1 -13- httas : / /webmail.oi)alcar)ital.com /exchange /rplummcr )nbox t pdate� "02Oon %20Rooms %... 10/1 );?010 Page \ o| { ~ ' A ll to -l4- hnn+ 'm`�nnxUonn\coni\d-cnnn/cxchunuc/n)\uinoler/lubox/\I3]�K8l/}2'1Y/�200U3.'np/('5— )0/11{2010 A £ .. e F I II X``MM r \ Y t 3 II` •4 , t . c' t r +M of r TI z- I Y + x F, 4. 1 5 _ + x , r` xs i k, r f { { t }� i u a t. oe ° , yr`" ,.�i�:�t,MY^�d'J�" t r"T ' i # i y t , Nor n , A A r` b .. - I t t w.r. x w t L W t. oe ° , yr`" ,.�i�:�t,MY^�d'J�" t r"T ' i # i Nor n , A A r` b .. - I t t w t t. '1Fic f t +k e l' w k � • f� •4'sW� �'A IIZ�IA'S �. � yh .. ..... h� 1� .. l » k •�n'1t �v 1 { ,,{ is R 1 t. � urn L l R 2 �r u •{�. rO UAW. V OW �'- , � ' 1 3 y �, y - � n ,,•, 'r ah �+e• . . � S - .- "� a t »w . � k F3Y�W.a..r. 1M�Y.>7�, a x.• a.x , .E4°u;A' . r k • „e t Vi .kg #2 Circumstances and Facts that led to damage: On Thursday September 2010 at 4:50pm, around 80 -90 gallons of water came up through the Toilet and Shower in room 122, for a period of 3 to 4 minutes flooding room 122 and room 123. Park Tahoe Inn does not have the amount of water it takes to fill up our 4" sewer line fast enough to create the pressure it took to come up through the Toilet and Shower as fast as it did. We only had 9 guests in house that day on this side of our property. I believe the city is responsible as the city's sewer mains can and do handle the volume and pressure it took to travel up our 4" sewer line, over 300 feet, and push that much water up through our Toilet and Shower. -18- rage Tim Bledsoe From: Yardley, Janice [JYardley @carlwarren.com] Sent: Wednesday, October 20, 2010 2:41 PM To: Tim Bledsoe Subject: Park Tahoe / 4011 Lake Tahoe Blvd. Hi Tim: I spoke with Doug today. Based on my discussion with Doug, in conjunction with the information provided in the claim for relative to allegations that a problem in the District's main caused a backup of some sort 300 feet UP to the second floor of the hotel, we are recommending that the District reject this claim. Doug also advised me that the Park Tahoe had called out a plumber. It's interesting that there is no claim being made for plumber expense or any plumber's invoice provided. I believe if it were it would reveal this incident occurred as a result of a problem in the private lateral line(s) versus any problem in the District's main line. Doug advised me that no maintenance had been performed in the area and that this location is on a winter maintenance schedule. No problem was found in the District's main line per Doug when responding to the service call received the day after the alleged incident. Please let me know if you concur with rejection of this claim and if you would like me to prepare the Notice of Rejection and Proof of Service? Thanks Tim. Janice / (707)732 -6728 Janice Yardley Claims Analyst Carl Warren & Company An Employee -Owned Company - Where Quality is Assured P. O. Box 3975 Walnut Creek, CA 94598 Office (925) 674 -4660 ext. 234 Please visit our website at www.carlwarren.com to learn more about our Gold Level Claim Service. This e-mail and any files transmitted with it are intended solely for the use of the individual or entity to which they are addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you have received this e-mail in error, please contact the sender and delete the material from your computer. Please note that any view or opinions presented in this e-mail are solely those of the author and do not necessarily represent those of Carl Warren & Company (CWC) and/or its subsidiaries. Finally, the recipient should check this e-mail and any attachments for the presence of viruses. CWC accepts no liability for any damage caused by any virus transmitted by this e-mail. -19- 10/20/2010 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401 Phone 530 54445474 • Fax 530 541 -0614 • www.stpud.u5 BOARD AGENDA ITEM 4C TO: Board of Directors FROM: Paul Hughes, Chief Financial Officer MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: 2010 -11 Water Rate Study REQUESTED BOARD ACTION: Approve proposal and authorize execution of a contract with HDR Engineering in the amount of $49,275. DISCUSSION: In an effort to meet the 2025 state mandate requiring a completely metered system, the District has been installing meters on budgeted waterline replacement projects, as well as other waterlines due to the receipt of grant funds. The District is required to begin billing metered connections based on consumption beginning January 2011. A water rate study is necessary, and budgeted, to ensure the metered connections are charged appropriate and equitable rates, encouraging efficient water use while maintaining an adequate revenue stream to support the District water system. The new metered rates are anticipated to be effective July 1, 2011. The District submitted a Request for Proposal on September 23, 2010, to ten consulting firms. On October 19, 2010, the District received proposals from nine consultants. Five District staff reviewed and scored the proposals based on five primary criteria and selected HDR Engineering. HDR understands the unique aspects and challenges of the local area having provided rate and financial planning studies to local entities such as Tahoe City PUD, Truckee Donner PUD, Squaw Valley Public Service District, and Alpine Springs County Water District. They have recently established metered rates for Tahoe City PUD, Truckee Donner PUD and the Cities of Woodland and Folsom. HDR's cost proposal in the amount of $49,275 is well below the budgeted and grant funded amount of $60,000, allowing for additional services or scope expansion, if necessary. Staff would like to execute a Master Services Agreement with HDR and begin the water rate study process with an initial kick off meeting scheduled in the near future. —21— General Manager Word H. Solbrig Tahoe hr �� out �I,�scefa� James K Jones Public Utility District MaryiouMosbacher , Dale Rise Eric Schafer 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401 Phone 530 54445474 • Fax 530 541 -0614 • www.stpud.u5 BOARD AGENDA ITEM 4C TO: Board of Directors FROM: Paul Hughes, Chief Financial Officer MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: 2010 -11 Water Rate Study REQUESTED BOARD ACTION: Approve proposal and authorize execution of a contract with HDR Engineering in the amount of $49,275. DISCUSSION: In an effort to meet the 2025 state mandate requiring a completely metered system, the District has been installing meters on budgeted waterline replacement projects, as well as other waterlines due to the receipt of grant funds. The District is required to begin billing metered connections based on consumption beginning January 2011. A water rate study is necessary, and budgeted, to ensure the metered connections are charged appropriate and equitable rates, encouraging efficient water use while maintaining an adequate revenue stream to support the District water system. The new metered rates are anticipated to be effective July 1, 2011. The District submitted a Request for Proposal on September 23, 2010, to ten consulting firms. On October 19, 2010, the District received proposals from nine consultants. Five District staff reviewed and scored the proposals based on five primary criteria and selected HDR Engineering. HDR understands the unique aspects and challenges of the local area having provided rate and financial planning studies to local entities such as Tahoe City PUD, Truckee Donner PUD, Squaw Valley Public Service District, and Alpine Springs County Water District. They have recently established metered rates for Tahoe City PUD, Truckee Donner PUD and the Cities of Woodland and Folsom. HDR's cost proposal in the amount of $49,275 is well below the budgeted and grant funded amount of $60,000, allowing for additional services or scope expansion, if necessary. Staff would like to execute a Master Services Agreement with HDR and begin the water rate study process with an initial kick off meeting scheduled in the near future. —21— Paul Hughes November 4, 2010 Page 2 SCHEDULE: New metered water rates to be effective July 1, 2011. COSTS: $49,275 ACCOUNT NO: 2039 -4440 BUDGETED AMOUNT REMAINING: $65,115 ATTACHMENTS: Request for Proposal, Evaluation and Selection Criteria, Scoring Results, HDR Cost Proposal CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES I If- NO NO CATEGORY: Water -22- SOUTH TAHOE PUBLIC UTILITY DISTRICT Request for Proposals For Water Rate Study /Model September 2010 Respond to: Paul Hughes, Chief Financial Officer South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 phughes _stpud.dst.ca.us Due No Later than 4:30 p.m., October 19, 2010 -23- REQUEST FOR PROPOSALS FOR PROFESSIONAL SERVICES FOR PREPARATION OF SOUTH TAHOE PUBLIC UTILITY DISTRICT "WATER RATE STUDY/ MODEL" The South Tahoe Public Utility District (District) is seeking proposals from qualified firms /consultants to conduct and prepare a water rate study and model. The goal of the study is to propose a metered conservation rate structure to encourage efficient water use while maintaining an adequate revenue stream to ensure the sustainability of the District - owned water system. BACKGROUND The District, a public agency chartered in 1950, operates at the south shore of Lake Tahoe in El Dorado County. The District supplies drinking water and provides wastewater collection and treatment. Lake Tahoe's seasonal tourism, large number of part-time residents, and a true four - season environment cause wide fluctuations in both daily water production and wastewater flows. The District supplies water service to approximately 14,000 homes and businesses of which approximately 30% are metered. Annual water production is nearly 2.5 billion gallons. Seventeen active wells, 22 water tanks, 15 booster stations, 24 pressure- reducing valves, and 253 miles of water mainline make up the District's water system. The District currently has a flat water rate structure for the majority of residential connections. Customers will convert over time to a consumptive -based rate structure as meters are installed at connections. Metered connection rate structures include a fixed service charge based on meter size and a variable consumption rate consistent among all customer types. Customers are billed quarterly. The new rate structures must provide reliably predictable sources of revenue for ongoing operations and maintenance, existing debt service, possible additional debt service or other financing for future capital improvements, and reserves according to the District reserve policy. The new rate structures also shall encourage water conservation. Optional rate structures may be proposed. To comply with California law, the District is installing meters and intends to be 100% compliant by 2025. The current District policy is to install meters on all scheduled waterline replacement projects and more if grant funds are obtained. This summer, the District installed approximately 2,500 residential meters financed with a $4.4 million grant. A broad representation of residential historic consumption data is not available, since only a small minority of residential customers have been metered in the past. It is anticipated that the new water rate structures will be implemented in July 2011. All Proposition 218 requirements and schedules must be met. -1- -24- REQUIREMENTS 1. The proposed rate structures must be compatible with legal requirements and be equitable among customer classes. 2. The proposed rates should be easy to understand and easy to administer. 3. The proposed rates should promote conservation for all meter sizes. 4. The proposed rates should be stable and predictable in their ability to provide adequate revenues to meet the District's financial, operating, capital, and regulatory requirements. 5. The proposed rate structures should capture fixed costs through a fixed service charge. SCOPE OF WORK The following items are the expected scope of work. The Consultant is encouraged to recommend expanding or editing the scope as it deems necessary to provide a complete work product. The schedule of specific meetings and deliverables will be developed in conjunction with the Consultant to meet the July 2011 implementation date. 1. Conduct detailed review and analysis of existing water rates and related financial factors and become familiar with the District's billing system. 2. Consider the District's water billing system's ability to implement the proposed rate structure. 3. Obtain all necessary records, data, and statistics for the District. 4. Confer with District staff, as needed, through the Chief Financial Officer. 5. Attend and facilitate sufficient meetings with appropriate District staff and elected officials at beginning of engagement, during engagement, and at conclusion of fieldwork to discuss assumptions, methodology, findings, and recommendations. 6. Attend and facilitate at least one workshop with the Board of Directors and staff to discuss the proposed rate structures and alternatives. 7. Develop a user -rate model that will be used to adjust rates. This model must be user - friendly and in a software program currently utilized by District staff (preferably Excel). This model will become the property of South Tahoe Public Utility District. 8. Prepare a report encompassing all project work and present the results of the analysis to District officials. Make such observations or recommendations as may be prudent, desirable or necessary to adequately address all concerns of District staff, elected officials, and customer classes as they pertain to the setting of rates. Document all recommendations, assumptions and methodology, including a recommendation of the Consultant's opinion as to the most prudent course for the District to pursue. 9. The Consultant shall present the report at a Public Hearing, including a PowerPoint presentation. -2- -25- PROPOSAL SUBMITTAL Technical Proposal The following information is to be submitted as part of the proposal. The proposal is not to be more than ten single -sided pages in length including single page resumes of persons to be assigned to the project. Five copies of the proposal are to be provided. Other material may be attached, as deemed appropriate, including a copy of a rate study performed by the applicant that most closely fits the scope of work outlined above. The ten -page portion of the proposal is to be organized as follows: 1. Approach to the project: Describe your approach to this project and any special ideas, techniques, or suggestions that you think might make the project proceed smoothly. 2. Experience: Describe the experience of the firm and the individuals assigned with related projects of a similar nature. 3. Qualifications: Describe your staffs unique qualifications and training for this type of work. Describe the similar assignments the firm and the proposed staff have completed. 4. References: List contact information for references of similar projects completed within the last three years. Provide at least three references. 5. Schedule: Describe your plan /schedule for completing the work. A shorter timeline is preferred and will be given added value in the evaluation of the proposals. Cost Proposal A separate envelop shall be provided containing the Cost Proposal for the study. The cost proposal shall include an estimate of hours and costs to complete the services as described in this Request for Proposal. The estimate should be an itemized staffing breakdown in spreadsheet form indicating personnel classification, hours and costs for each Consultant team member, and indicating the hourly rate for each personnel category used. CURRENT RATES A copy of the current rate structure is included as Attachment A. DISTRICT'S STANDARD CONSULTING AGREEMENT The selected firm will be required to enter into a Master Agreement for Consulting Services with the District. The District's Master Agreement for Consulting Services is included as Attachment B. The consultant should comment on any issues that may be of concern with the District's standard agreement. -3- -26- DEADLINE FOR SUBMISSION OF PROPOSALS Please deliver five (5) copies of both the Technical Proposal and the Cost Proposal in separate, sealed envelopes plainly marked "Technical Proposal" and "Cost Proposal" in the format prescribed by the RFP. 1. Proposals must be received by the District by 4:30 P.M. October 19, 2010, addressed to: Paul Hughes, Chief Financial Officer South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Postmarks shall not be acceptable in lieu of receipt by the date and time shown above. 2. Technical Proposals should be sealed and marked: "Technical Proposal — Water Rate Study — STPUD" 3. Cost Proposals should be sealed and marked: "Cost Proposal — Water Rate Study — STPUD" SELECTION OF CONSULTANT A team of District employees will evaluate proposals. Proposals will be evaluated on the basis of experience, qualifications, approach to the project, degree of District staff time required to complete the project, and any innovative ideas for making the project go quickly and smoothly, as well as: 1. Experience and qualifications of key project staff; availability and previous experience and qualifications related to the proposed function they will perform. 2. Approach to work; how the Consultant intends to meet the desired schedule and project goals and the impression of the Consultant's ability to work with a varied project team, including elected officials and other consultants if necessary. 3. Performance on other water rate studies /models; particularly quality of work, budget, schedule control, cooperativeness, and responsiveness. 4. General impression of Consultant's ability to successfully complete the work. Final selection will be based on the evaluation of proposals unless it is deemed necessary by the team to conduct interviews of closely- scored consultants. The Consultant determined best qualified to perform this project will be recommended to the District's Board of Directors for contract award. -4- -27- The following selection schedule is anticipated: October 19, 2010 - Deadline for submitting RFP October 22, 2010 - Selection made unless interviews are required October 25, 2010 - Conduct interviews if required October 29, 2010 - Finalize scope and budget November 4, 2010 - District Board of Directors awards Consultant contract The South Tahoe Public Utility District reserves the right to reject any and all proposals for any reason deemed appropriate by the District. -5- -28- Attachment A SOUTH TAHOE PUBLIC UTILITY DISTRICT 2010/11 WATER RATES EFFECTIVE: 07/01/2010 CODE CONNECTION SIZE ANNUAL SERVICE CHARGE QUARTERLY SERVICE CHARGE SF SINGLE FAMILY DWELLING $479.58 $119.89 DU DUPLEX $852.64 $213.16 TR TRIPLEX $1,158.41 $289.60 MU FOUR -PLEX $1,498.51 $374.63 EACH ADDITIONAL UNIT $251.45 $62.86 R75 SFD Y<" METERED $254.36 $63.59 R1 SFD 1" METERED $349.81 $87.45 R15 SFD 1 Y2" METERED $606.10 $151.53 R2 SFD 2" METERED $965.39 $241.35 M75 MFD'/." METERED $254.36 $63.59 M1 MFD 1" METERED $349.81 $87.45 M15 MFD 1 Y2" METERED $606.10 $151.53 M2 MFD 2" METERED $965.39 $241.35 M3 MFD 3" METERED $1,922.49 $480.62 M4 MFD 4" METERED $2,999.36 $749.84 B75 Y4" BUSINESS FLAT $729.72 $182.43 B1 1" BUSINESS FLAT $1,101.18 $275.29 C75 Y4" COMMERCIAL METER $254.36 $63.59 C1 1" COMMERCIAL METER $349.81 $87.45 C15 1Y2" COMMERCIAL METER $606.10 $151.53 C2 2" COMMERCIAL METER $965.39 $241.35 C3 3" COMMERCIAL METER $1,922.49 $480.62 C4 4" COMMERCIAL METER $2,999.36 $749.84 C6 6" COMMERCIAL METER $5,878.09 $1,469.52 C8 8" COMMERCIAL METER $9,399.91 $2,349.98 C10 10" COMMERCIAL METER $13,509.62 $3,377.41 IF1 1" INTERTIE FLAT $1,101.18 $275.29 IF75 Y." INTERTIE FLAT $729.72 $182.43 IM15 1.5" INTERDEPARTMENTAL $588.43 $147.11 S2 1" RESALE METER $349.81 $87.45 1) Metered Consumption Rate: $2.26 per 100 cubic feet 2) Residential Capacity Charge: $6,833.00 + $150 Admin. Fee (Sec. 3.1.48) effective 7/01/2010 3) Commercial Connection Fee subject to use projections /residential equivalency per Administrative Code Sec. 3.1.23 et seq. -29- Attachment B MASTER AGREEMENT FOR CONSULTING SERVICES ANSERTNAME OF FIRM) THIS AGREEMENT is made and entered into as of the _ day of by and between South j — 1'` Tahoe Public Utility District, hereinafter referred to as "DISTRICT" and NAME OF.FIRM hereinafter referred to as "CONSULTANT ". RECITALS A. DISTRICT periodically makes improvements to its water, wastewater and ancillary facilities, for which it may require the services of a consultant. B. DISTRICT proposes to provide a MASTER AGREEMENT for consulting services which will be required by DISTRICT in general support of projects under separate titles (Task Orders). The general scope of services outlined in this MASTER AGREEMENT will be further defined by a series of Task Orders which will set forth the services to be performed (detailed scope), costs, and time for completion. C. DISTRICT desires to secure professional consulting services for said projects and CONSULTANT represents that CONSULTANT possesses the professional qualifications to provide such consulting services. D. DISTRICT and CONSULTANT agree to enter into this MASTER AGREEMENT for the performance of consulting services on the terms and conditions stated in this MASTER AGREEMENT. NOW THEREFORE, for and in consideration of their mutual promises and subject to the terms, provisions and conditions hereinafter set forth, the parties hereto do hereby agree as follows: ARTICLE I. - CONSULTING SERVICES A. Upon execution of this agreement and subsequent Task Orders by both parties, and upon receipt of written authorization from DISTRICT, CONSULTANT at CONSULTANT's sole cost and expense (to be reimbursed as outlined in ARTICLE IV) and to the satisfaction of DISTRICT, shall perform the services (Services) set forth in each Task Order and represented by a separate proposal for each Task Order. The Services shall be assigned to CONSULTANT by DISTRICT for the various projects as planned and developed by DISTRICT. Each Task Order shall specify the Services to be performed, the time schedules for completion of the Task Order and for completion of all tasks (Tasks) within the Task Order, and the cost (Cost Ceiling) including all fees, costs and expenses, both direct and indirect, of the Task Order, but shall otherwise be governed by the terms and conditions of this Agreement, as modified by the individual Task Orders. Task Orders shall be in -30- writing, signed by both parties in advance, and shall be attached to this Agreement as consecutive exhibits beginning with Task Order 1. B. CONSULTANT agrees to comply with the schedule as set forth in each Task Order, and to provide Services in a timely manner to allow DISTRICT's project(s) to be constructed as planned by DISTRICT. In the event CONSULTANT is not able to comply with the project schedule, a written statement from CONSULTANT will be required showing CONSULTANT's plan to bring schedule back into compliance to meet completion date. In the event of delays due to causes beyond the control of CONSULTANT, an extension to the schedule for performance shall be negotiated. C. CONSULTANT shall provide DISTRICT with a review of the budget amount when 75% of the Cost Ceiling of each Task Order has been expended. CONSULTANT shall be entitled to reallocate costs among subtasks within a Task. DISTRICT shall have the right to transfer Tasks and costs within the same or other Task Order(s). CONSULTANT may request a revision in the Cost Ceiling for performance of the Task Order, and will relate the rationale for the revision to the specific basis of estimate. Such notification will be submitted to DISTRICT at the earliest possible date. The Cost Ceiling will not be exceeded without approval by DISTRICT and written amendment to the Task Order. D. In the case of changes affecting project scope resulting from new findings, unanticipated conditions, or other conflicts or discrepancies, CONSULTANT shall promptly notify the DISTRICT of the identified changes and advise the DISTRICT of a recommended solution. Additional Services shall not be performed without prior written authorization of DISTRICT. DISTRICT may order, via a written amendment signed by each party's authorized representative, changes in scope or character of Services, either decreasing or increasing the amount of CONSULTANT'S services associated with a given Task Order. An order for additional services constitutes a change to the Task Order and shall be made in writing, dated, and appended to that Task Order. Compensation for Additional Services shall be on the basis of Time and Materials or Lump Sum, to be agreed upon at the time of request for Additional Services. The estimated amount of compensation for Additional Services will be determined at the time the Additional Services are requested. ARTICLE II. - RESPONSIBILITIES OF DISTRICT A. DISTRICT shall furnish to or make available for examination by CONSULTANT, as it may request, all data and information which DISTRICT may have available, and CONSULTANT may rely upon such data and information developed exclusively by DISTRICT in the performance of CONSULTANT' services. 2 -31- B. DISTRICT shall secure and pay for all permits and licenses (other than permits and licenses under any patent or invention) and furnish all deposits and bonds necessary in connection with the Projects, except licenses required to permit CONSULTANT to do business at the place where its services are to be performed. CONSULTANT will assist DISTRICT in procuring necessary licenses or permits if required by DISTRICT to do so. C. In order that DISTRICT may meet its obligations with respect to the technical quality of the services to be performed under this Master Agreement, the services performed by CONSULTANT under this Agreement shall be under the general supervision and direction of the DISTRICT's General Manager /Engineer (DISTRICT REPRESENTATIVE), who shall be Mr. Richard H. Solbrig. CONSULTANT and its officers, employees, agents, affiliates, and subcontractors shall act in complete harmony and coordination with the DISTRICT REPRESENTATIVE. The DISTRICT REPRESENTATIVE shall keep in touch with the CONSULTANT during the duration of the Task Orders and shall be the authorized medium of communication for and with District matters pertaining thereto. DISTRICT REPRESENTATIVE may from time to time delegate any or all of his supervisory responsibility to appropriate staff members, and the DISTRICT shall so inform CONSULTANT before the effective date of each such delegation. ARTICLE III. - RESPONSIBILITIES OF CONSULTANT A. In rendering the professional services, CONSULTANT is an independent contractor, the DISTRICT being interested only in the result obtained, and the manner and means of conducting such professional services will be under the sole control of CONSULTANT, except that nothing herein shall be deemed to negate DISTRICT's right to direct the nature of the Services requested and to direct the work in terms of timing and coordination with the Projects. B. CONSULTANT shall secure approval of DISTRICT prior to executing contracts with subcontractors and prior to retaining subcontractors for any portion of services for DISTRICT. C. CONSULTANT shall be as fully responsible to DISTRICT for the negligent acts, errors, and/or omissions of its subcontractors, as it is for the negligent acts, errors and /or omissions of persons directly employed by it. CONSULTANT will be responsible for review and billing accuracy and for the direct payment for Services completed or equipment/materials supplied by all of its subcontractors. D. Nothing contained in the Agreement shall create any contractual relationship between any subcontractor and DISTRICT. E. Indemnification CONSULTANT shall perform Services in a manner commensurate with prevailing professional standards of qualified and experienced personnel in CONSULTANT'S field. 3 -32- 2. CONSULTANT agrees to defend, indemnify and hold DISTRICT and each of its officers, employees, agents and representatives harmless from any claims, damage, liability or costs (including reasonable attorney's fees and costs of defense) stemming from Services under this Agreement to the extent such claims, damage, liability or costs are caused by CONSULTANT'S negligence, recklessness or willful misconduct or by the negligence, recklessness or willful misconduct of CONSULTANT'S subconsultants, agents, or anyone acting on behalf of or at the direction of CONSULTANT. DISTRICT agrees to defend, indemnify and hold CONSULTANT and each of its officers, employees, agents and representatives harmless from any claims, damage, liability or costs (including reasonable attorney's fees and costs of defense) stemming from Services under this Agreement to the extent such claims, damage, liability or costs are caused by DISTRICT'S negligence, recklessness or willful misconduct or by the negligence, recklessness or willful misconduct of the DISTRICT'S subconsultants, agents, or anyone acting on behalf of or at the direction of the DISTRICT. The provisions of this section survive the completion of services under or the termination of this Agreement. F. Insurance: The following are the basic requirements that CONSULTANT shall be responsible for at CONSULTANT' sole cost and expense, and for the full term of this Agreement and before commencement of services hereunder: CONSULTANT shall carry or require that there be carried Worker's Compensation Insurance for all of its employees and those of its subcontractors in accordance with the laws of the State of California. 2. CONSULTANT shall carry or require that there be carried Commercial Liability Insurance including Automobile Coverage in an amount not less than $5,000,000 for each person, in an amount not less than $5,000,000 on account of one accident, and Property Damage Insurance in an amount not less than $5,000,000 single limit Bodily Injury and Property Damage Insurance per occurrence. 3. CONSULTANT shall carry Errors and Omissions Insurance in an amount not less than $ 5,000,000 with a deductible of not more than $500,000 for the life of the Agreement which shall include one year beyond completion of Services. 4. Before commencing services, CONSULTANT shall submit evidence of the coverage required above to DISTRICT for review and approval. All such coverage shall be subject to approval by DISTRICT; approval of which shall not be unreasonably withheld. Such insurance shall be carried with financially responsible insurance companies, licensed in the State of California, and approved by DISTRICT; approval of which shall not be unreasonably withheld. Evidence of coverage shall insure that such policies will not be canceled without 30 days prior written notice to DISTRICT. Commercial Liability policies, 4 -33- including Automobile Coverage and Property Damage Insurance, shall name DISTRICT, its officers, and employees as Additional Insured and as such persons, shall be Primary coverage. 5. It is the responsibility of the CONSULTANT to provide to the DISTRICT updated insurance certificates within 30 days after renewal or changes to insurance policies. G. CONSULTANT shall comply with all applicable laws, ordinances and codes of the Federal, State of California, and local governments. CONSULTANT shall hold DISTRICT harmless with respect to any damages to the extent arising from any tort committed in the performance of any of the services embraced by this AGREEMENT due to CONSULTANT's negligence. H. CONSULTANT is responsible for the health and safety of its employees, subconsultants, agents or anyone working on behalf or direction of Consultant in the course of Services. CONSULTANT shall ensure that its employees, subconsultants, agents or anyone working on behalf of or under the direction of Consultant shall have experience and knowledge of Federal, State and local Health and Safety regulations and requirements. CONSULTANT and its associates and employees involved in projects covered under this Master Agreement covenant that they presently have no interest and that they will not acquire any interest, direct or indirect, during the term of this Agreement which would conflict in any manner or degree with the performance of services required under this Agreement. CONSULTANT will name the supervisory and staffing levels in the performance of CONSULTANT's services for each Task Order. CONSULTANT shall not replace supervisory or staffing levels without the prior written consent of DISTRICT. In the event a change is required by reason of resignation or similar circumstance, DISTRICT shall not deny consent to a change, but shall have the right to review and approve or disapprove the particular person proposed as a replacement. Any proposed replacement shall have substantially the same experience and qualifications as the person being replaced. K. CONSULTANT shall furnish, at its own expense, all labor, materials, equipment, tools, transportation and services necessary for the successful completion of the services to be performed under this Agreement. CONSULTANT shall give its full attention and supervision to the fulfillment of the provisions of this Agreement and each Task Order by its employees and subcontractors and shall be responsible for the timely performance of the Services required by this Agreement. L. CONSULTANT shall furnish DISTRICT with reasonable opportunities from time to time to ascertain whether the Services of CONSULTANT are being performed in accordance with this Agreement. All work done and materials furnished shall be subject to final review and approval by DISTRICT. DISTRICT's review and approval of the Services shall not, however, relieve CONSULTANT of any of its obligations under this Agreement. 5 -34- ARTICLE IV. - CONSULTANT'S FEES A. CONSULTANT is employed to render professional services only, and any payments made to it are compensation only for such Services as it may render and recommendations it may make in carrying out the Services. CONSULTANT shall submit to DISTRICT an estimate of costs for the authorized Task Order. Said estimate shall include a breakdown of estimated job classification with corresponding man hours, hourly rate, and estimated fee, together with estimated expenses. Upon approval by DISTRICT, said total estimate shall become a Cost Ceiling, and total compensation for said Services shall not exceed said amount without further authorization by DISTRICT. DISTRICT shall be obligated to pay only such hourly rates and expenses as are actually incurred by CONSULTANT subject to the Cost Ceiling. The rates of compensation in the Task Order are agreed to in anticipation of the orderly and continuous progress of the Project through completion of the Services contained therein. CONSULTANT'S obligation to render services thereunder will extend for the period set forth in the associated schedule, and required extensions thereto. If such dates are exceeded through no fault of CONSULTANT, then all rates, measures and amounts of compensation provided in the Task Order shall be subject to equitable, negotiated adjustment, but not otherwise. B. DISTRICT agrees to pay CONSULTANT for and in consideration of the faithful performance of all services and duties set forth in this Master Agreement and subsequent Task Orders, and agreed to be performed by CONSULTANT. CONSULTANT agrees to accept payment from DISTRICT as and for full compensation for the faithful performance of all said services and duties as the amount set forth for consulting services for each Task Order. C. The DISTRICT will not approve any additional compensation unless a change in the scope of the Services has occurred due to conditions that the parties could not have reasonably anticipated at the time entering into this Agreement. CONSULTANT shall notify DISTRICT immediately if the scope of services under the lump sum Task Order is changed substantially, as required in Article I, Paragraph D. D. CONSULTANT shall submit to DISTRICT a monthly, itemized invoice for services completed during the preceding month. The invoice should also include the purchase order number and task order number for each Task Order. Payment by DISTRICT to CONSULTANT shall be made within 45 days after receipt and approval by DISTRICT of CONSULTANT' hereinabove described invoice. E. Should the DISTRICT dispute any portion of any bill, the DISTRICT shall pay the undisputed portion within the time frame stated above and, at the same time, advise the CONSULTANT in writing of the disputed portion. The DISTRICT shall promptly notify CONSULTANT of the dispute and request clarification and /or remedial action. After any dispute has been settled, CONSULTANT shall provide a special invoice that accounts for the resolution of the disputed item. 6 -35- The costs for professional services and direct expenses shall be in accordance with the rates and amounts set forth in the applicable Task Order. In addition, the DISTRICT reserves the right to request from the CONSULTANT a breakdown of costs associated with the rates for professional services, including but not limited to direct salary, total overhead, and profit. G. CONSULTANT shall be solely responsible for the payment of all federal, state or local income tax, social security tax, worker's compensation insurance, state disability insurance and any other taxes or insurance which CONSULTANT is responsible for paying as an independent contractor under federal, state or local law. CONSULTANT shall procure and maintain all licenses necessary for the performance of the Services, all at the sole cost of CONSULTANT. All of the above shall not be reimbursable under the Agreement. ARTICLE V. - MISCELLANEOUS PROVISIONS A. Any Services subcontracted hereunder shall be specified by written contract or agreement and shall be subject to each provision of this Agreement. B. Notice to Proceed - CONSULTANT will not begin services on any Task Order until DISTRICT directs it in writing to proceed. C. Submittal of Work Product and Written Notice - All reports and documents which CONSULTANT is required to furnish to DISTRICT (Work Product) and any other writing which CONSULTANT desires to give DISTRICT shall be delivered to DISTRICT or by depositing same in the United States mail, postage prepaid, addressed to: Richard H. Solbrig, General Manager South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Any legally operative documents shall be copied to: Brownstein Hyatt Farber Schreck, LLC 21 East Carrillo Street Santa Barbara, CA 93101 -2782 Any notices or other writing which DISTRICT desires or is required to give or furnish to CONSULTANT shall be delivered to CONSULTANT by delivering in person or by depositing same in the United States mail, postage prepaid, addressed to: INSERT NAME AND ADDRESS OF FIRM. The effective date of such written notice shall be the date of personal delivery of such notice or the 7 -36- receipt of same in the United States mail. The address to which any notice or other writing may be delivered may be changed upon written notice by such party as above provided. D. Ownership of Documents - All documents prepared by CONSULTANT and required to be furnished to DISTRICT in electronic and hard copy format, shall be the property of DISTRICT after payment to CONSULTANT. All electronic documents shall be provided to the District in an editable format. Any use of Work Product for other projects and /or any use of uncompleted documents without specific written authorization from CONSULTANT will be at DISTRICT's sole risk and without liability or legal exposure to CONSULTANT and DISTRICT shall indemnify and hold harmless CONSULTANT from all claims, damages, losses and expenses, including attorney's fees arising out of or resulting therefrom. E. Audit of CONSULTANT's Records - The books, papers, records, and accounts of CONSULTANT or any other consultants retained by CONSULTANT insofar as they relate to charges for services, or are in any way connected with the work herein contemplated, shall be open at all reasonable times to inspection and audit by the agents and authorized representatives of DISTRICT. Said records shall be retained for a minimum of five (5) years after completion of services on the individual Task Orders. F. Discrimination - During the term of this Agreement, CONSULTANT agrees in accordance with Section 1735 of the Labor Code of the State of California not to discriminate against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical handicap, medical condition, sex, or marital status. CONSULTANT will take affirmative action to the limits prescribed by law to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, religious creed, color, national origin, ancestry, physical handicap, medical condition, sex, or marital status. G. Assignment - Neither party shall assign any interest in this Agreement, nor transfer any interest in the same (whether by assignment or novation), without the prior written consent of the other party; provided, however, that claims for money due or to become due CONSULTANT from DISTRICT under this Agreement may be assigned to a bank, trust company or other financial institution without such approval. Notice of any such assignment or transfer shall be furnished promptly to DISTRICT. H. Attorney's Fees - If any legal proceeding is brought to enforce or interpret the provisions of the Agreement, the prevailing party shall be entitled to recover actual attorneys' fees and costs, which may be determined by the court in the same action or in a separate action brought for that purpose. The attorneys' fees award shall be made as to fully reimburse for all attorneys', paralegal and experts' fees, costs and expenses actually incurred in good faith, regardless of the size of the judgment, it being the intention of the parties to fully compensate for all attorneys', paralegal and experts' fees, costs and expenses paid or incurred in good faith. Confidential Information - During and after the term of this Agreement, CONSULTANT shall not, directly or indirectly, use, exploit, disclose or divulge to anyone, except appropriate representatives 8 -37- of DISTRICT, any of CONSULTANT'S engineering Work Product, except as otherwise authorized with DISTRICT's express consent. J. Authorization - All officers and individuals executing this and other documents on behalf of the respective parties certify and warrant that they have the capacity and have been duly authorized to execute said documents on behalf of the entities indicated. K. Time of the Essence Time is of the essence in the performance of this Agreement and each Task Order. Any breach of any time deadline or schedule by CONSULTANT is agreed by the parties to be a material breach of this Agreement, providing DISTRICT with termination rights under this Agreement, in addition to its rights to recover damages, regular, consequential or otherwise. The failure on the part of CONSULTANT to perform the Services within such time deadline or schedule when such failure is caused by acts beyond the control of CONSULTANT shall not be considered a breach of this Agreement and CONSULTANT shall be entitled to an extension of such time deadline or schedule accordingly. ARTICLE VI. - CANCELLATION OF AGREEMENT OR SUSPENSION OF WORK A. This Master Agreement and /or subsequent Task Orders may be terminated in whole or in part in writing by either party for any reason, providing that no such termination may be effected unless the other party is given not less than thirty (30) calendar days written notice (delivered by certified mail, return receipt requested) of intent to terminate. B. This Master Agreement and /or subsequent Task Orders may be terminated in whole or in part in writing by DISTRICT for cause, effective immediately upon written notice of such termination to CONSULTANT, based upon the occurrence of any of the following events: 1) Material breach of this Agreement, Task Order or Task by CONSULTANT; 2) Cessation of CONSULTANT to be licensed, as required by law; 3) Failure of CONSULTANT to substantially comply with any applicable federal, state or local law or regulation; 4) Filing by or against CONSULTANT of any petition under any law for the relief of debtors; and, 5) Conviction of CONSULTANT's principal representative or personnel of any crime other than minor traffic offenses. C. In the event the Master Agreement or subsequent Task Order(s) are terminated in whole or in part, CONSULTANT is to be fairly compensated for all approved Services performed under the terminated Task Order as of the termination date, provided that the total amount of compensation paid to CONSULTANT does not exceed the Cost Ceiling set forth in the Task Order, and provided 9 -38- that the CONSULTANT delivers to the District all Work Product due for the Services completed through the termination date. D. Upon receipt of a Termination Notice by CONSULTANT from DISTRICT, an equitable adjustment shall be negotiated to provide payment to CONSULTANT for termination settlement costs reasonably incurred by CONSULTANT relating to obligations and commitments as a result of entering into this Master Agreement and the affected Task Order. E. Upon receipt of a Termination Notice, CONSULTANT shall (1) promptly discontinue all services affected (unless the Notice directs otherwise), and (2) deliver or otherwise make available to DISTRICT, copies of data, design calculations, drawings, specifications, reports, estimates, summaries, and such other information and materials as may have been accumulated by CONSULTANT in performing the services under the affected Task Order. ARTICLE VII. — DISPUTES A. All disputes arising out of or relating to this Agreement or subsequent Task Orders, or the professional services rendered hereunder, shall be determined by arbitration in El Dorado County, California, before a sole arbitrator, in accordance with the laws of the State of California. B. The arbitration shall be administered by JAMS@ pursuant to its Comprehensive Arbitration Rules and Procedures. Judgment on the Award may be entered in any court having jurisdiction. C. Costs and attorneys fees in said arbitration shall be borne in accordance with the terms set forth in Article V.H., above. ARTICLE VIII. — SEVERABILITY AND WAIVER A. If any provision of this Agreement is held to be invalid and unenforceable, the remainder of this Agreement shall be valid and binding upon the parties, provided that the remainder of the Agreement can be interpreted to give effect to the intentions of the parties. B. Any waiver at any time by either party hereto of its rights with respect to a breach or default, or any other matter arising in connection with this Agreement, shall not invalidate this Agreement or be deemed to be a waiver with respect to any subsequent breach, default or matter. ARTICLE IX. - ENTIRE AGREEMENT A. This Master Agreement and the subsequent Task Orders contain the entire understanding between the parties with respect to the subject matter herein. This Agreement may not be amended except pursuant to a written instrument signed by all parties. B. This Master Agreement is to be binding on the heirs, successors, and assigns of the parties hereto and is not to be assigned by either party without first obtaining the written consent of the other 10 -39- party, subject to the terms of Article V.G. C. The term of this Agreement shall commence upon the date first written above and shall continue in full force and effect for a period no longer than 10 years, unless sooner terminated as provided herein. Any subsequent Task Orders that are scheduled to exceed the aforementioned duration shall require that this Agreement be renegotiated and executed prior to adoption of the Task Order. ARTICLE X. — EXECUTION OF AGREEMENT. IN WITNESS WHEREOF, the parties hereto each herewith subscribe the same in duplicate on the effective date of Richard H. Solbrig, General Manager /Engineer South Tahoe Public Utility District ATTEST: Clerk of Board INSERT F fEM M INSERT NAME AND TITLE OF INDIVIDUAL 11 -40- SOUTH TAHOE PUBLIC UTILITY DISTRICT 2010 WATER RATE STUDY /MODEL RFP Consultant: PROPOSAL EVALUATION & SELECTION CRITERIA On a scale of 1 to 10 (1 = weak to 10 = strong) rate the proposals using the following criteria and enter your scores on the accompanying scoring sheet. CRITERIA DESCRIPTION Score Rate the overall completeness of the proposal. Does it include all components 1 requested in the RFP, including project schedule, approach to the project, experience and qualifications of project staff, and performance on other water rate studies /models. Rate the project team in terms of relevant experience in water rate studies and rate 2 structuring. Highest marks should be given to consultants that have experience with related projects of a similar nature. Rate the consultant's approach with regard to thoroughness, uniqueness, 3 familiarity with the project, and ability to efficiently and effectively manage and complete the project while working with a varied project team, including elected officials and other consultants if necessary. 4 Rate the schedule in terms of reasonableness and efficiency. Rate the Project Manager and project staff in terms of professional qualifications 5 necessary to complete the water rate study /model as outlined in the RFP. TOTALS -41- BWA 3 4 3 4 3 17 CDM 3 1 4 1 2 11 HDR 1 3 1 2 1 8 IGS 6 8 7 8 6 35 MFS 2 2 2 2 3 11 NBS 4 5 6 5 N/A 20 RFC 2 1 2 3 5 13 DTA 6 6 5 7 N/A 24 GAC 5 7 6 6 7 31 2010 -11 WATER RATE STUDY CONSULTANT RANKINGS Low Rank Wins Task Description Total Labor Task 1: Initial Project Meeting $1,530 Task 2: Data Collection 1,365 Task 3: Revenue Requirement Analysis 7,685 Task 4: Cost of Service Analysis 9,835 Task 5: Rate Design Analysis 6,235 Task 6: Public Meetings/ Presentations 6,495 Task 7: Written Report 4,370 Task 8: Model - User Manual and Training 4.690 Grand Total Labor $42,205 Expenses: Total Expenses $7,070 Grand Total Water Rate Study $42 The above fee estimate is based upon the technical proposal developed by HDR. HDR Engineering, Inc. is willing to negotiate a final fee based upon a final scope of services. Should the District request any additional services under this contract, the services will be provided at the hourly billing rates stated above. All portions of this cost proposal can be expanded or reduced as mutually agreed upon in writing by District and HDR. The above quoted fees will remain in effect until December 1, 2010. A summary of the detailed fee estimate is provided below in Figure 1. Cost Proposal - Water Rate Study /Model 2 - ` South Tahoe Public Utility District -43- 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.5tpud.uS BOARD AGENDA ITEM 4d TO: Board of Directors FROM: Julie Ryan, Senior Engineer MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Headworks Replacement Project REQUESTED BOARD ACTION: Approve proposal from Carollo Engineers for design services in the amount not to exceed $296,534.00. DISCUSSION: On July 16, 2009, the Board approved Carollo Engineers as the design engineer for the Headworks Replacement Project. Carollo's budget for this project is currently $1,558,942.56, for design and services during bidding and construction. The Headworks Phase 1 project was constructed this summer, and the Headworks Phase 2 design is nearing completion. Staff is on schedule to advertise bidding for the project beginning November 22, 2010. The Bid Price for Headworks Phase 1 was $545,379.50. The Engineer's Estimate for Headworks Phase 2 (based on the 90% design) is $8,725,000.00. In preparation for the next phase of work, staff has worked with Carollo to reassess the status of their budget, and has identified a number of efficiencies and overruns during the design phase. Staff recommends that the Board approve an extension to Carollo's budget to address the following items. 1) To date, Carollo has underutilized the funds budgeted for project management, field investigations, permitting assistance, and Phase 1 programming services, for a total project savings of $66, 228.00. Staff proposes that this savings be used to offset budget overages due to the following items. 2) Due to the complexity of underground piping, Carollo faced challenges during the design of both Phases 1 and 2, identifying and locating existing utilities, as well as designing tie -ins and demolition instructions for piping. 3) Likewise, during Phase 1, staff directed Carollo to make extensive revisions to the demolition plans, to provide more information to the demolition contractor, resulting in lower bid prices. 4) During Preliminary Design for the new Headworks Facility, several facilities for handling plant return flows were ady-d to the Scope of Work. These ancillary General Manager Richard H. Solbrig Tahoe arwtors chriscefallu ,5outh James R. Jones Public Utility D5trict MarylouMoseRJsa Hale Rlsa Eric Schafer 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.5tpud.uS BOARD AGENDA ITEM 4d TO: Board of Directors FROM: Julie Ryan, Senior Engineer MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Headworks Replacement Project REQUESTED BOARD ACTION: Approve proposal from Carollo Engineers for design services in the amount not to exceed $296,534.00. DISCUSSION: On July 16, 2009, the Board approved Carollo Engineers as the design engineer for the Headworks Replacement Project. Carollo's budget for this project is currently $1,558,942.56, for design and services during bidding and construction. The Headworks Phase 1 project was constructed this summer, and the Headworks Phase 2 design is nearing completion. Staff is on schedule to advertise bidding for the project beginning November 22, 2010. The Bid Price for Headworks Phase 1 was $545,379.50. The Engineer's Estimate for Headworks Phase 2 (based on the 90% design) is $8,725,000.00. In preparation for the next phase of work, staff has worked with Carollo to reassess the status of their budget, and has identified a number of efficiencies and overruns during the design phase. Staff recommends that the Board approve an extension to Carollo's budget to address the following items. 1) To date, Carollo has underutilized the funds budgeted for project management, field investigations, permitting assistance, and Phase 1 programming services, for a total project savings of $66, 228.00. Staff proposes that this savings be used to offset budget overages due to the following items. 2) Due to the complexity of underground piping, Carollo faced challenges during the design of both Phases 1 and 2, identifying and locating existing utilities, as well as designing tie -ins and demolition instructions for piping. 3) Likewise, during Phase 1, staff directed Carollo to make extensive revisions to the demolition plans, to provide more information to the demolition contractor, resulting in lower bid prices. 4) During Preliminary Design for the new Headworks Facility, several facilities for handling plant return flows were ady-d to the Scope of Work. These ancillary Julie Ryan November 4, 2010 Page 2 facilities are necessary for a fully functioning Headworks, but the cost to design them could not be accounted for in the original budget because the type of facility had not been selected. These facilities include: a filter backwash equalization tank and pump station, a site waste pump station, and a waste activated sludge pump station. 5) During preliminary design, it came to staff's attention that Carollo had assumed in their original proposal that the new facility would mimic the architecture of the Solid Waste Handling Facility, such that they did not feel a need to employ the services of an architect. For a number of reasons, including maintenance considerations, staff directed Carollo to design the facility to mimic the Customer Service Facility. As such, Carollo employed the services of an architect. 6) To fully comply with funding requirements, staff was forced to throw out all bids for Phase 1 and rebid the project. As such, Carollo incurred costs for bidding the Phase 1 project in excess of their original budgeted amount. 7) During construction of Phase 1, staff identified a means for substantial savings in construction cost (on the order of $36,000) by modifying the Phase 1 grading plans. However, these modifications required additional support from Carollo that was not accounted for in their original budget. 8) In addition, the Phase 1 contractor's proposed means for excavating with laybacks instead of shoring reduced the construction cost (as reflected in their low bid), but required Carollo to reconsider slope stability and utility abandonment locations. The total cost for the additional scope items and task overruns is $362,762.00 as detailed in Exhibit A to the Services Proposal (attached). These costs are offset by the $66,228.00 budget savings, for a total proposed budget increase of $296,534.00. Staff requests that the Board accept the proposal from Carollo Engineers in the amount $296,534.00, which will be performed as an Amendment to Task Order 4, which is being performed under their current Master Services Agreement with the District. SCHEDULE: As soon as possible COSTS: Not to exceed $296,534.00 ACCOUNT NO: 1029 -8033 BUDGETED AMOUNT REMAINING: $1,780,507 ATTACHMENTS: Services Proposal CONCURRENCE WITH REQUESTED ACTION: p CATEGORY: Sewer GENERAL MANAGER: YES �A NO CHIEF FINANCIAL OFFICER: YES NO -46- qw.-Carollo EngiI79BiB... KtA tg Wonders WA Water* October 27, 2010 8324A.10 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Attention: Ms. Julie Ryan, P.E., Senior Civil Engineer Subject: Headworks Replacement Project - Scope of Services, Task Order 4C Dear Julie: As we have discussed and Carollo has indicated in our monthly project management updates, we have been tracking a number of project challenges during the Phase 1 and 2 projects that have required effort not originally anticipated in our Project scope and budget. In addition, we have added several project elements that were not considered in the drawing list prepared for the project. These efforts on Carollo's part have contributed to our exceedance of the planned budget for several of our proposed tasks. While we have remained below our overall project ceiling to date, we do foresee at this point that our goal of delivering the project within the contractually established not -to- exceed is likely not achievable given the scope of work remaining. As part of Carollo's proposal for the project, we provided our best estimate of cost to complete the project, based largely on what we anticipated for the project scope. In our estimate, many of the specific improvements now in the project, such as the location of the headworks, the need for a new backwash equalization tank in lieu of using the emergency solids storage, the site waste pump station, and the WAS pumping improvements were not included, as they represent decisions that were made collaboratively between the District staff and Carollo during the completion of the preliminary design. When the Project was scoped, the proposed location of the headworks improvements had not yet been confirmed. Our original thinking was that the headworks structure would mimic the appearance of the biosolids building, and thus the necessity of architectural design services to conform the facility's appearance to the buildings surrounding its current location were not specifically identified as requiring external expertise. We notified the District in February 2010 of our intent to add the services of Alan Tolhurst, A.I.A. to Carollo's team to assist with the architectural and permitting issues for the proposed building location. To that end, we have not yet adjusted the Project scope or budget in order to include Alan's services. The decision to locate the headworks at the site of the demolished incineration building was made knowing that existing buried infrastructure in the vicinity would present challenges to the headworks process design. The footprint of the headworks building, while maintained as small as possible, could not fit within the space previously occupied by the incineration building. The expanded footprint, and connecting utilities, meant that the identification and avoidance of existing buried utilities would be critical to the success of both the Phase 1 project (incineration building demo) as well as the Phase 2 project. We also had several Ms. Julie Ryan, P.E. South Tahoe Public Utility District October 27, 2010 Page 2 project communication missteps, including the incorrect "as built" information provided by the Phase 1 Contractor. Although the project team has encountered a significant unexpected expense and effort related to the existing underground infrastructure, we believe the efforts of the entire team - the District operations staff, engineering staff, and Carollo - will provide a deliverable that, as accurately as possible, reflects the proper identification and location of the extensive underground infrastructure that exists in the vicinity of the project. These efforts will also serve the District well into the future, as the information on these drawings can serve as a more complete record of the buried assets the District currently maintains within the plant site. Carollo recognizes there have been certain inefficiencies we have experienced through the use of 3D CADD Modeling and more specifically the transition into 2D CADD Drawings. While these inefficiencies are to be expected along the "learning curve" for new applications, we do not believe it is the responsibility of the District to fund those experiences. Through our analysis, we have determined that approximately 120 hours of CADD time we would consider not of direct benefit to the District, and we offer to credit that time against services rendered moving forward in our completion of the Project. Further, in our efforts to meet our schedule for our 90% design deliverable, we augmented our project staff substantially to complete our work. This augmentation required coordination and oversight that might not have been necessary under a more conventional schedule. To compensate, we have identified the time spent on the project by our CADD department manager during the months of July and August 2010. While he completed drawings assigned to him for the project, he also spent a significant amount of time during those two months coordinating the activities of the large pool of other CADD technicians that were being used on the project. We have proposed to credit his time spent of 138.5 hours in the months of July and August 2010 to the District, in addition to the 120 hours previously credited for the "learning curve" issues. Table 1 presents a breakdown of both the unanticipated project elements and their respective expenditures, as well as, a "credit" available for unutilized portions of other tasks that were part of our original contract. Using these offsets, plus the offered CADD time credits, the net adjustment to the scope is $296,534. Also attached please find an Amendment 4C scope and fee for the aforementioned efforts. Please let me know if you have any questions or comments. As always, we greatly appreciate the opportunity to be of service to the District. Sincerely, CAROLLO ENGINEERS, INC. // Scott E. Parker, P.E., BCEE SEP:djg Enclosures: Table 1 - Additional Project Elements Summary Task Order 4C, Exhibit A to Task Order 4C cc: File, Steve Caswell Page 1 of 1 EXHIBIT A TASK ORDER 4C ESTIMATED ENGINEERING HOURS AND COSTS South Tahoe Public Utility District Headworks Replacement Project TASK TASK SA • ADDITIONAL SERVICES - CONSTRUCTION DOCUMENTS (PHASE 1) 5.1 Compile Piping Information from Multiple Sources 5.2 Provide Ongoing Assistance to Track Underground Piping Changes 5.3 Augment Contract Does with Photos and other Demo Details TASK 6A - ADDITIONAL SERVICES - CONSTRUCTION DOCUMENTS (PHASE 2) 6.1 Backwash EC) Tank/PS Design 6.2 Site Waste PS 6.3 WAS Pumping 6.4 Architectural 6.5 Yard Piping TASK TA - ADDITIONAL SERVICES - BID PHASE SERVICES (PHASE 1) 7.1 Project Rebid - Answer Bidder Questions/Provide Addendums 7.2 Re-Conform Drawing Set TASK 8A - ADDITIONAL SERVICES - ENGINEERING SERVICES DURING CONSTRUCTION (PHASE 1) 8.1 Submittal Review - Adjustments for Deleting Shoring 8,2 Prepare Design Clarifications - Piping Changes 8.3 Review Proposed Change Orders - Deletion of Structural Backfill TASK 10A - ADDITIONAL SERVICES - ENGINEERING SERVICES DURING CONSTRUCTION (PHASE 2) 10.1 Architectural ESDC Assistance Task SA Total Hours Task 5A Total Budget Task 6A Total Hours Task 6A Total Budget Task 7A Total Hours Task 7A Total Budget Task 8A Total Hours Task 8A Total Budget Task 10A Total Hours Task 10A Total Budget TOTALS Hours Costs CREDITED TASKS AMENDMENT 4C, NOT TO EXCEED COST SUMMARY TasklSubtask Total $36.159 531.453 522,297 589,909 $54 592 518,956 53 577,854 559.858 3243,453 $5,156 $2,056 57,212 $589 55,834 35,117 511,540 510,648 510,648 362,762 $ (66,228) 296,534 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 54445474 • Fax 530 541 -0614 • www.stpud.ue BOARD AGENDA ITEM 4e TO: Board of Directors FROM: No Bergsohn, Hydro - Geologist MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Diamond Valley Ranch Permitting Assistance REQUESTED BOARD ACTION: Authorize an increase to Purchase Order P22728 for additional engineering work for permitting assistance, in the amount of $7,000. DISCUSSION: An Application /Report of Waste Discharge (ROWD) is being prepared to request regulatory approval from the Lahontan Regional Water Quality Control Board (LRWQCB) for use of reclaimed wastewater in Diamond Valley. During preparation of the ROWD, added engineering time was required to integrate work products produced by other consultants and District staff into the application including: engineering design of the reclaimed water mainline (aka CROUTE); pre - planning designs for irrigation improvements and piping layouts; and delineated wetland boundaries. Additional effort was also expended to attend an added May 19 +h review meeting with District staff in order to present the draft ROWD. The added effort required for work product integration and project review meeting were not considered in the original fee estimate, resulting in the request for fee increase. The requested fee increase is expected to be sufficient to complete all remaining tasks required for this project. Approval of the fee increase will raise the project contract ceiling to $54,272. SCHEDULE: As soon as possible COSTS: $7,000 ACCOUNT NO: 1029 -8097 BUDGETED AMOUNT REMAINING: ($37,088) ATTACHMENTS: Request for Fee Increase from AECOM dated 10.18.2010 for District Purchase Order P22728 CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO 4 1' - 1- General Manager RlchaM H. Solbrig 90 t , ora U O hrlsC ChrlsCefalu James R. Jones Public Utility D15trict Mary Lou Mosbacher Dale Rise Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 54445474 • Fax 530 541 -0614 • www.stpud.ue BOARD AGENDA ITEM 4e TO: Board of Directors FROM: No Bergsohn, Hydro - Geologist MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Diamond Valley Ranch Permitting Assistance REQUESTED BOARD ACTION: Authorize an increase to Purchase Order P22728 for additional engineering work for permitting assistance, in the amount of $7,000. DISCUSSION: An Application /Report of Waste Discharge (ROWD) is being prepared to request regulatory approval from the Lahontan Regional Water Quality Control Board (LRWQCB) for use of reclaimed wastewater in Diamond Valley. During preparation of the ROWD, added engineering time was required to integrate work products produced by other consultants and District staff into the application including: engineering design of the reclaimed water mainline (aka CROUTE); pre - planning designs for irrigation improvements and piping layouts; and delineated wetland boundaries. Additional effort was also expended to attend an added May 19 +h review meeting with District staff in order to present the draft ROWD. The added effort required for work product integration and project review meeting were not considered in the original fee estimate, resulting in the request for fee increase. The requested fee increase is expected to be sufficient to complete all remaining tasks required for this project. Approval of the fee increase will raise the project contract ceiling to $54,272. SCHEDULE: As soon as possible COSTS: $7,000 ACCOUNT NO: 1029 -8097 BUDGETED AMOUNT REMAINING: ($37,088) ATTACHMENTS: Request for Fee Increase from AECOM dated 10.18.2010 for District Purchase Order P22728 CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO 4 1' - 1- /� ,COM AECOM 559 448 8222 tel /�+�� 1360 E. Spruce Avenue 559 448 8233 fax Suite 101 Fresno, CA 93720 www.aecom.com October 18, 2010 No Bergsohn, PG, CHG South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Subject: Diamond Valley Ranch Permitting Assistance Project Report of Waste Discharge Request for Fee Increase (District Purchase Order P22728) Dear Ivo, As you are aware, we have almost reached the not -to- exceed fee contained in the original scope of work and there are still two work tasks that need to be completed. The purpose of this letter is to describe the additional work performed (and not considered in the original scope of work) that justifies the additional fee spent to date and to provide an estimate to complete the remaining Task 104 - Address LRWQCB Review Comments and Task 105 - Prepare Final RWD. The additional time spent on this project was related to a number of reasons that could not be anticipated at the time the scope was prepared. The following is a list of work tasks and fee spent on each work task that justifies the additional services performed: 1. Eight (8) hours of additional project management time required to coordinate with other consultants and due to the extended duration of the project. The fee spent on this task is $1,400. 2. Ten (10) hours of project management time included in Task 106 and mistakenly left out of in the sum of the total fee. The fee spent on this task is $1,750. 3. Twelve (12) hours of additional engineering time related to preparing a power point presentation of the Draft Report of Waste Discharge (RWD) and attending a meeting at the District's office for a presentation to District staff. The fee spent on this task is$2,500. 4. Sixteen (16) hours of additional CADD designer time for formatting and handling some of the GIS information received from the other consultants. Some of this time was included in Tasks 300 and 400 in the original scope of work. However, Tasks 300 and 400 were later removed from the scope and the fee for this work was inadvertently left out of the remaining tasks in the scope. The fee spent on this task is $1,700. The total fee amount spent on these additional services sum up to $7,350. After having reviewed the LRWQCB comments to the RWD, our fee required to address those comments and to prepare a final RWD incorporating irrigation improvement layout changes being developed during predesign for the Diamond Valley Ranch is estimated at $7,000. For the reasons stated above, we respectfully request that the District consider reimbursing AECOM for the additional time required to complete this project. Approval of the requested budget increase for permitting assistance will raise the contract ceiling for Task Order Number 3 to $54,272.00. -53- ASCOM Page 2 We appreciate your understanding and we look forward to completing these work tasks to your satisfaction. If you have any questions or requests for additional information, do not hesitate to contact me at (559) 448 -8222. Sincerely, Alfonso Manrique, PE Senior Sanitary Engineer -54- 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150-7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.5tpud.u5 BOARD AGENDA ITEM 4f TO: Board of Directors FROM: John Thiel, Principal Engineer MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: 2010 Water Meter Installation Project - Phase 2 REQUESTED BOARD ACTION: Approve Change Order No. 2 to Campbell Construction Company, Inc., in the amount of $45,874.29. DISCUSSION: During the course of completing the contract work for meter installations, Campbell provided additional work on a time and materials basis. These additional costs were incurred from 5/20/10 through 8/30/10 and include the handling of groundwater, export of saturated soil, import of backfill material, additional piping and excavation, and other labor and material required to install the meters in situations with expanded conflicts with utilities, landscaping, fences, and other obstacles. All or most of this change order cost will be paid by grant funds due to the reduction in the total number of meter installations. Staff is tracking all costs so that if the grant funds are exceeded, the District funds can be utilized as match dollars for the USFS Fire Partnership Grant. SCHEDULE: Upon Board approval. COSTS: $ 45,874.29 ACCOUNT NO: 2029 -7078 /METERS BUDGETED AMOUNT REMAINING: $575,757 (2010/2011) ATTACHMENTS: Change Order No. 2 CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO - 55 - CATEGORY: Water General Manager Richard H. SolWq A South Chris WS W W James R. Jones Public Utility District Mary Lou MosWcher D5ch� 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150-7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.5tpud.u5 BOARD AGENDA ITEM 4f TO: Board of Directors FROM: John Thiel, Principal Engineer MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: 2010 Water Meter Installation Project - Phase 2 REQUESTED BOARD ACTION: Approve Change Order No. 2 to Campbell Construction Company, Inc., in the amount of $45,874.29. DISCUSSION: During the course of completing the contract work for meter installations, Campbell provided additional work on a time and materials basis. These additional costs were incurred from 5/20/10 through 8/30/10 and include the handling of groundwater, export of saturated soil, import of backfill material, additional piping and excavation, and other labor and material required to install the meters in situations with expanded conflicts with utilities, landscaping, fences, and other obstacles. All or most of this change order cost will be paid by grant funds due to the reduction in the total number of meter installations. Staff is tracking all costs so that if the grant funds are exceeded, the District funds can be utilized as match dollars for the USFS Fire Partnership Grant. SCHEDULE: Upon Board approval. COSTS: $ 45,874.29 ACCOUNT NO: 2029 -7078 /METERS BUDGETED AMOUNT REMAINING: $575,757 (2010/2011) ATTACHMENTS: Change Order No. 2 CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO - 55 - CATEGORY: Water 7e a CHANGE ORDER NUMBER 2 Project 2010 Water Meter Installation Phase 2 °�� Contractor Campbell Construction Co. Inc. Date November 4.2010 PO # P22385 The Contract Shall Be Changed As Follows: A. Additional time and material cost to complete approximately 880 meter installations paid for under the contract bid price from 5/20/10 through 8/30/10. The additional costs include the handling of groundwater, export of saturated soil, import of backfill material, additional piping and excavation, and other labor and material required to install the meters in situations with expanded conflicts with utilities, landscaping, fences, and other obstacles. TOTAL FOR ITEM A IS $45,874.29 TOTAL FOR CHANGE ORDER NO.2 IS ITEM A = $45,874.29 Dollar-Amounts Contract Time Original Contract $ 1,799,604.00 Previous Change Orders $ 427,332.25 Current Contract $ 2,226,936.25 THIS CHANGE ORDER $ 45,874.29 New Contract Total $ 2 Contractor agrees to make the herein - described changes in accordance with the terms hereof. The change in contract price and /or contract time noted is full settlement for costs incurred as a result of the change(s) described, unless specifically noted in individual description(s). Authorized By STPUD Board President Date: Date: Accepted By Contractor Reviewed By Date: -57- General Manager Richard H. Solbrig 5outh Tahoe Public Utility District Pirmtons Chris Cefalu James R Jones Mary Lou Mosbacher Dale Rlse Eric Schafer 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.5tpud.ue BOARD AGENDA ITEM 4g TO: Board of Directors FROM: Randy Curtis, Manager of Field Operations MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: 2010 Asphalt Patching /Repair Contract REQUESTED BOARD ACTION: Authorize an increase to Purchase Order No. P22979 for additional required patch repairs, in the amount of $40,000. DISCUSSION: This past summer and fall have seen an increase in water main breaks, and the size of excavations have been larger than past trends have shown. The temporary patches installed by District crews need to be permanently repaired before the asphalt plant closes for the season, inclement weather, and the winter plowing season begins. SCHEDULE: As soon as possible COSTS: $40,000 ACCOUNT NO: 2001 -6052 BUDGETED AMOUNT REMAINING: $202,974 ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -59- General Manager Richard H. Solbrig W' �- South Tahoe Public Utility District oy=tors Chris Cefalu James K Jones May Lou Mosbacher Dale Rise Eric Schafer 1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401 Phone 530 544 -6474 - Fax 530 541 -0614 - www.5tpud.ue BOARD AGENDA ITEM 4h TO: Board of Directors FROM: Randy Curtis, Manager of Field Operations MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Purchase 1 Ton Service Truck - Electrical Department REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible bidder, San Francisco Ford, Lincoln, Mercury, in the amount of $24,803.75. DISCUSSION: The Board authorized advertising for bids at the October 7, 2010, Board meeting. Five (5) bids were received and opened, with an additional three (3) refused for delivery after deadline. Staff believes the bid price to be fair and recommends award. This item was reviewed by the District's Purchasing Agent. SCHEDULE: As soon as possible COSTS: $24,803.75 ACCOUNT NO: 1005 -8180 BUDGETED AMOUNT REMAINING: $30,000 ATTACHMENTS: Bid Results CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES ?5L NO -61- CATEGORY: Sewer SOUTH TAHOE PUBLIC UTILITY P15TKICT BID RESULTS - 2011 —1 TON PLOW & SERVICE TRUCK (CAB & CHASSIS BID) BID #: 10 -11 -11 OPENING DATE: OCTOBER 26, 2010 1:31p7_\ y[�I�P►�Ir SAN FRANCISCO FORD, LINCOLN, MERCURY $ 24,803.75 Ford F350 Delivery 90 -120 days ARO, Net 15 HANSEL FORD LINCOLN 24,939.69 Ford F350 Delivery 90 days ARO, Net 30 FALLON AUTO MALL 26,721.60 Ford F350 Cab, Chassis SRW XL trim Delivery 120 days, Net15 days Minor Deviation: Axle is E -Lock not Limited Slip Enhancements: Transmission is 6 speed (vs. 5 spec'd) 10,200 GVWR (vs. 9700) HARROLD FORD Ford F350 27,020.65 Delivery 70 days ARO, Net 20 WINNER CHEVROLET INC 27,120.75 Chevrolet Silverado Delivery Estimate 8 -10 weeks ARO, Net 30 Exception: Eaton G80 locking rear end BIDS REJECTED — RECEIVED AFTER DEADLINE Chevrolet of Watsonville Downtown Ford Sales Theodore Robins Ford -63- General Manager Richard H. Solbrig 1950 - '0 oe� War out h T ahoe `7 Public Utility District Diroctors Chris Cefalu James. R. Jones Mary Lou Mosbacher Dale Rise Eric Schafer 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.6tpud.u5 BOARD AGENDA ITEM 41 TO: Board of Directors FROM: Randy Curtis, Manager of Field Operations MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Purchase '/2 Ton Pickup Truck - Pumps Department REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible bidder, San Francisco Ford, Lincoln, Mercury, in the amount of $20,992.06. DISCUSSION: The Board authorized advertising for bids at the October 7, 2010, Board meeting. Six (6) bids were received and opened, with an additional three (3) refused for delivery after deadline. Staff believes the bid to be fair and recommends award. This item was reviewed by the District's Purchasing Agent. SCHEDULE: As soon as possible COSTS: $20,992.06 ACCOUNT NO: 1005 -8179 BUDGETED AMOUNT REMAINING: $23,000 ATTACHMENTS: Bid Results CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -65- 5OUTH TAHOE PUBLIC UTILITY DISTRICT BID RESULTS - 2011 - % TON 2 DOOR PICKUP TRUCK BID #: 10 -11 -09 OPENING DATE: OCTOBER 26, 2010 BID AMOUNT SAN FRANCISCO FORD, LINCOLN, MERC. $ 20,992.06 Ford F150 Delivery 90 -120 days ARO, Net 15 HANSEL FORD LINCOLN 21,394.44 Ford F150 Delivery 90 days ARO, Net 30 HARROLD FORD Ford F150 21,684.29 Delivery 70 days ARO, Net 20 FALLON AUTO MALL 23,053.46 Ford F150, XL trim Delivery 120 days, Net 15 days WINNER CHEVROLET INC 24,049.65 Chevrolet Silverado Delivery Estimate 8 -10 weeks ARO, Net 30 Exceptions: No rear sliding window available Eaton G80 locking rear end CARSON CITY TOYOTA SCION 29,906.25 Toyota Tundra 8324 Delivery 120 days, Net 30 Exception: No locking front wheel hubs — push button Factory rebates will be passed on at time of delivery BIDS REJECTED — RECEIVED AFTER DEADLINE Chevrolet of Watsonville Downtown Ford Sales Theodore Robins Ford -67- 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.ue BOARD AGENDA ITEM 4j TO: Board of Directors FROM: Randy Curtis, Manager of Field Operations MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Purchase Mid -Size Truck - Lab Department REQUESTED BOARD ACTION: (1) Reject three lowest bids as non - responsive to bid specifications; (2) Find minor deviation from specification in the fourth lowest bid to be immaterial and waive deviation as such; (3) Award bid to the lowest responsive, responsible bidder, San Francisco Ford, Lincoln, Mercury, in the amount of $21,949.06. DISCUSSION: The Board authorized advertising for bids at the October 7, 2010, Board meeting. Six (6) bids were received and opened, with an additional three (3) refused for delivery after deadline. The three (3) lowest bidders proposed vehicles without rear sliding windows which was specified in the bid. The fourth lowest bidder proposed a vehicle which met all material specifications. The proposed vehicle deviated from the specifications by including cloth seats instead of vinyl seats. Under California public contract law, it is within the District's discretion to waive minor irregularities in submitted bids. Irregularities are considered to be minor, such that they may be waived, if they are not material, meaning that waiver of the irregularity would not constitute favoritism and would not give an advantage to the "irregular" bidder. Staff recommends that the Board waive this as an immaterial minor deviation from the specs' requirements. Staff believes the bid price to be fair and recommends award. This item was reviewed by the District's Purchasing Agent. SCHEDULE: As soon as possible COSTS: $21,949.06 ACCOUNT NO: 1005 -8181 BUDGETED AMOUNT REMAINING: $30,000 ATTACHMENTS: Bid Results, Specifications -69- General Manager RlchaM H. Solb iq Tah lrnx� out Chri9 l,CfAhl James K Jones FUblic Utility district Mary Lou Mosbacher ValeRlse Eric Schafer 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.ue BOARD AGENDA ITEM 4j TO: Board of Directors FROM: Randy Curtis, Manager of Field Operations MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Purchase Mid -Size Truck - Lab Department REQUESTED BOARD ACTION: (1) Reject three lowest bids as non - responsive to bid specifications; (2) Find minor deviation from specification in the fourth lowest bid to be immaterial and waive deviation as such; (3) Award bid to the lowest responsive, responsible bidder, San Francisco Ford, Lincoln, Mercury, in the amount of $21,949.06. DISCUSSION: The Board authorized advertising for bids at the October 7, 2010, Board meeting. Six (6) bids were received and opened, with an additional three (3) refused for delivery after deadline. The three (3) lowest bidders proposed vehicles without rear sliding windows which was specified in the bid. The fourth lowest bidder proposed a vehicle which met all material specifications. The proposed vehicle deviated from the specifications by including cloth seats instead of vinyl seats. Under California public contract law, it is within the District's discretion to waive minor irregularities in submitted bids. Irregularities are considered to be minor, such that they may be waived, if they are not material, meaning that waiver of the irregularity would not constitute favoritism and would not give an advantage to the "irregular" bidder. Staff recommends that the Board waive this as an immaterial minor deviation from the specs' requirements. Staff believes the bid price to be fair and recommends award. This item was reviewed by the District's Purchasing Agent. SCHEDULE: As soon as possible COSTS: $21,949.06 ACCOUNT NO: 1005 -8181 BUDGETED AMOUNT REMAINING: $30,000 ATTACHMENTS: Bid Results, Specifications -69- SOUTH TAHOE PUBLIC UTILITY P15TKICT BID RESULTS - 2011 — MIDSIZE EXTENDED CAB PICKUP TRUCK BID #: 10 -11 -10 OPENING DATE: OCTOBER 26, 2010 BID AMOUNT HANSEL FORD LINCOLN $ 20,039.41 Ford Ranger Delivery 90 days ARO, Net 30 Exception: Rear sliding window unavailable Minor deviation: Cloth seat (vinyl unavailable) HARROLD FORD Ford Ranger 20,569.60 Delivery 70 days ARO, Net 20 Exception: Rear sliding window unavailable Minor deviation: Cloth seat (vinyl unavailable) FALLON AUTO MALL 21,123.15 Ford Ranger, XL trim Delivery 120 days, Net 15 days Exceptions: Rear sliding window unavailable Rear seats are jump seats Enhancement: Transmission is 5 speed (vs. 4 spec'd) SAN FRANCISCO FORD, LINCOLN, MERCURY 21,949.06 Ford Ranger Supercab Sport Delivery 90 -120 days ARO, Net 15 Minor deviation: Cloth seat (vinyl unavailable) WINNER CHEVROLET INC 24,250.84 Chevrolet Colorado Delivery Estimate 8 -10 weeks ARO, Net 30 Exceptions: 5 cylinder vs V6 spec'd No specific under seat storage Enhancement: Eaton G80 locking rear end CARSON CITY TOYOTA SCION 28,275.00 Toyota Tacoma 7554 Delivery 120 days, Net 30 Exceptions: Rear sliding window unavailable (unless upgrade) No locking front wheel hubs Enhancement: Transmission is 5 speed (vs. 4 spec'd) BIDS REJECTED — RECEIVED AFTER DEADLINE Chevrolet of Watsonville Downtown Ford Sales Theodore Robins Ford 60�7N r Q F :�. MINIMUM SPECIFICATIONS 44 MIDSIZE EXTENDED CAB PICKUP TRUCK Truck 49 Lab 1. 44 Extended Cab Midsize Truck 2. Model year 2011 3. 4 -wheel drive 4. V -6 engine — gas 5. Locking front wheel hubs 6. Limited slip differential 7. Automatic 4 -speed transmission with overdrive 8. Trailer tow group and rear step bumper 9. Skid plate group 10. AM /FM radio 11. Standard front seating vinyl 12. Rear seating and under -seat storage 13. Air Conditioning 14. Sliding rear window 15. Standard size bed for mini midsize truck 16. Emissions approved by the State of California 17. Single tone white exterior 18. All season tires with full size spare tire 19. Driving lights and turn signals shall be approved by the State of California 20. The engine shall be fully prepared and set -up to operate smoothly and efficiently at an altitude of 6300 feet above sea level 21. Shop repair manual or CD (not operator manual) -72- Is we r 195 0 • Yd SOUTH TAHOE PUBLIC UTILITY DISTRICT Richard Solbri , General Manager Paul Sciuto, Assistant General Manager Dale Rise, President BOARD MEMBERS Mary Lou Mosbacher, Vice President James R. Jones, Director Eric W. Schafer, Director Chris Cefalu, Director REGULAR MEETING OF THE BOARD OF DIRECTORS SOUTH TAHOE PUBLIC UTILITY DISTRICT OCTOBER 21, 2010 MINUTES The Board of Directors of the South Tahoe Public Utility District met in a regular session, October 21, 2010, 2:00 P.M., District Office, 1275 Meadow Crest Drive, South Lake Tahoe, CA BOARD OF DIRECTORS ROLL CALL President Rise, Directors Cefalu, Jones, Mosbacher, Schafer STAFF Sciuto, Sharp, Cocking, Bledsoe, Thiel, Bledsoe, Brown, Bird, Curtis, Whalen, Johnson, Swain, Morse, Attorney Herrema GUESTS: David French and Eric Sapirstein /ENS Resources, Inc., Dave Galicia /G. B. General, John Runnels John Runnels led the pledge to the flag. PLEDGE OF ALLEGIANCE Moved Mosbacher/ Second Schafer / Passed Unanimouslx CONSENT CALENDAR to approve the Consent Calendar as submitted: a. Server Virtualization - Authorized staff to purchase virtualization software and contract with Systems Technology Associates for implementation services for server virtualization project, in the amount of $35,848; b. Headworks Replacement Phase II - Approved finding that special circumstances exist to warrant that Duperon Flexrake screens be the sole brand of screens for the headworks facilities; -73- REGULAR BOARD MEETING MINUTES - OCTOBER 21, 2010 PAGE - 2 c. Headworks Replacement Phase II - Approved finding CONSENT CALENDAR that to match or be compatible with the already (continued) existing study, revision of the Arc Flash analysis must be by SKM Power Tools Software; d. 45 Degree Slope Mower - Rejected all bids; e. 2010 Water Meter Installation Project: Phase 1 - Approved Change Order No. 2 to Teichert Construction in the amount of $198,363.34; f. Approved Regular Board Meeting Minutes: October 7, 2010. ITEMS FOR BOARD ACTION The Department of Dam Safety requires that vegetation 45 DEGREE SLOPE MOWER on dams be short in nature to observe burrowing animal activity, and to ensure thorough inspections can be readily performed. A 45 degree slope mower is necessary to safely perform mowing of the four dam faces at the District's facilities in Alpine County. The mower will be capable of performing other tasks and will include a ditch witch attachment and a broom. There are up to 30 attachments that can be purchased individually, if desired. Power Trac is the only company willing to provide a mower that is consistent with the District's requirements and does not include other costly features that are not necessary. Pursuant to the District's Purchasing Policy, when a particular item is available from only one source, the policy allows an exemption to the competitive bidding process. Hal Bird responded to several questions from the Board and the public, and explained all other options that were investigated prior to making this recommendation. Moved Schafer / Second Mosbacher / Passed Unanimously to: (1) Find that a slope mower meeting the District's require- ments is available only from Power Trac; and (2) Authorize staff to negotiate purchase in an amount not to exceed $47,317.20, plus freight and tax. Moved Schafer / Second Cefalu / Passed Unanimously PAYMENT OF CLAIMS to approve payment in the amount of $958,152.44. -74- REGULAR BOARD MEETING MINUTES - OCTOBER 21, 2010 PAGE - 3 Eric Sapirstein and David French gave a presentation PRESENTATION: FEDERAL LEGISLATIVE covering recent achievements that benefitted the ADVOCACY UPDATE FOR 2010/2011 District, and the expected outlook related to continued efforts in Washington D.C. Water and Wastewater Operations Committee: The committee met on October 18. Minutes of the meeting are available upon request. The October 13 meeting of the water agency focused on the need to maintain membership with CABI. The decision was made not to provide funding in the future unless the group could provide a compelling reason to do so. The general manager recruitment process is underway and interviews will be held November 10. BOARD MEMBER STANDING COMMITTEE REPORTS EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVE REPORT Director Schafer reported he attended the tour of Alpine BOARD MEMBER REPORTS County facilities and appreciated the information pre- sented to ENS Resources, which will help obtain grants in the future. President Rise reported he attended the City of South Lake Tahoe council meeting where he met the new executive director of CalPECO. (CaIPECO will replace Sierra Pacific Power Company.) The council tabled the new marijuana ordinance until after November 2 elections are held in order to involve the newly elected council members. The District will advise of any effects to the collection or distribution systems. Assistant General Manager / En _ iq neer: Paul Sciuto report- ed Teichert Construction installed 1,509 water meters (in the city) at an average cost of $1,563 each. Problems with leaking brass fittings are being addressed. Campbell Construction installed a total of 946 water meters (in the county) out of 1,261, at an average cost of $1,800 each. While the District still received the full grant amount, the state allowed for the reduction in meters installed due to the difficult circumstances of construction. There are 315 meters left and staff will determine whether to pay a restocking fee or to purchase them and have District crews do the installations. Accounting Technician: Donielle Morse gave an update on changes made to the employee travel policy. STAFF REPORTS -75- REGULAR BOARD MEETING MINUTES - OCTOBER 21, 2010 PAGE - 4 The Board did not enter into closed session to discuss items ADJOURNMENT listed on the agenda. The meeting was adjourned at 3:10 p.m. Dale Rise, Board President South Tahoe Public Utility District ATTEST: Kathy Sharp, Clerk of the Board South Tahoe Public Utility District -76- SOUTH TAHOE PUBLIC UTILITY DISTRICT • 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 • Phone 530.544.6474 • Facsimile 530.541.0614 Agenda Item 6a NOTE: COMPLETION OF THE ABOVE INFORMATION IS VOLUNTARY AND NOT A PRECONDITION FOR ATTENDANCE. REQUEST TO APPEAR BEFORE THE BOARD (Use Separate Sheet if Necessary) Name: Larry Singleton 2. Street Address: 1989 Marconi Way 3. Mailing Address: 8333 Shilling Court, Granite Bay, CA 95746 4. Phone No: Date: 10/19/10 5. Date I wish to appear: Before committee: Before full Board 11/04/10 6. 1 have discussed this matter with a member of District staff: Yes X No If "Yes ": Name /Department of District contact: Tim Bledsoe, Richard Solbrig 7. Staff Introduction: On May 20, 2010, a sewer unit count was done for Larry Singleton at 1989 Marconi Way. Rex Marshall, Customer Service Representative, completed the sewer unit count and found one (1) unreported sewer unit. Mr. Singleton provided documentation that the sewer unit was there when he purchased his property: therefore, a connection fee of $4,930 was not applied to his account. When Rex returned to the office, he modified Mr. Singleton's account to reflect the one unreported sewer unit, and Tim Bledsoe, Customer Service Manager, approved. A notice was sent to Mr. Singleton to show that $342.12 three years in back charges would be assessed to his account according to Administrative Code 4.6.7 (attached). 8. Customer Comments: I would like to address the fraudulent practice of penalizing current homeowners for obsolete records or actions taken by the original owner /builder. Details to be given in person. 9. Action I am requesting Board take: Eliminate this unconscionable fee and practice. 10. Staff Comments / Recommendation: Staff recommends that the Administrative Code 4.6.7 be followed and direct Mr. Singleton to pay the three years in back charges for the unreported sewer unit. By waiving Mr. Singleton's charges would set a precedence for future customers who have unreported sewer units. -77- 4.6.7 Unreported Connections and Discharges. Upon discovery of the unreported connections and discharges to the District sewer system, the District shall charge all current charges and fees, including all current connection charges, plus a ten percent (10 %) basic penalty, up to three (3) years back charges for current sewer service fees, a ten percent (10 %) penalty on such back charges, and the current administrative fee for unreported connections and discharges. (Refer to Schedule No. 2, Section 4.5.8.) The owner of said property may, at his option, abate the unreported connection(s) immediately or pay all of the above charges and fees. If the owner elects to abate the unreported connection(s) or can demonstrate sufficient proof to the District Customer Service Manager or authorized representative that the unreported sewer connection(s) existed prior to the purchase of such property by owner, then the District may only charge up to three (3) years back charge for current sewer service fees. If the owner fails to complete any of the above options, all charges and fees shall be deemed charges for the purposes of collection and enforcement, and the property shall be subject to disconnection procedures for delinquent charges as provided in Section 6.6. -78- 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.ue BOARD AGENDA ITEM bb TO: Board of Directors FROM: Paul A. Sciuto, Assistant General Manager /Engineer MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Black Bart Post Office REQUESTED BOARD ACTION: Discuss future status of the post office building on Black Bart, and direct staff accordingly. DISCUSSION: The District owns the land where the old post office is on Black Bart and Pioneer Trail. The building has been vacant except for storage of old items for 5 years. There is no sewer service or water service to the building and to get utility service to the building would cost approximately $30,000 to $50,000 at prevailing wage rates. Furthermore, the uses for the lot are limited by the TRPA Plan Area Statement. The land is part of the parcel that the Emergency Retention Basins are on so therefore the District can not segment and sell just the area where the building sits. Also, there is no ability to bank or sell the coverage if the improved area is restored. Planning level estimate for demolition of the structure, concrete slab, and paving is approximately $30,000. Revegetation of the area would cost about $10,000. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES CATEGORY: Sewer & Water I:I:01 NO -79- General Manager Rlchard H. SolbHg Tahoe hr� out �hrEs�a� James R. Jones Public Utility Di5trlct Mary Lou Mosbacher Vale PUB Eric Schafer 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.ue BOARD AGENDA ITEM bb TO: Board of Directors FROM: Paul A. Sciuto, Assistant General Manager /Engineer MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Black Bart Post Office REQUESTED BOARD ACTION: Discuss future status of the post office building on Black Bart, and direct staff accordingly. DISCUSSION: The District owns the land where the old post office is on Black Bart and Pioneer Trail. The building has been vacant except for storage of old items for 5 years. There is no sewer service or water service to the building and to get utility service to the building would cost approximately $30,000 to $50,000 at prevailing wage rates. Furthermore, the uses for the lot are limited by the TRPA Plan Area Statement. The land is part of the parcel that the Emergency Retention Basins are on so therefore the District can not segment and sell just the area where the building sits. Also, there is no ability to bank or sell the coverage if the improved area is restored. Planning level estimate for demolition of the structure, concrete slab, and paving is approximately $30,000. Revegetation of the area would cost about $10,000. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES CATEGORY: Sewer & Water I:I:01 NO -79- General Manager Richard H. Solbrlg South Tahoe Public Utility District Vinactors Chris Cefalu James X Jones Mary Lou Mosbacher Dale Rlse Eric Schafer 1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401 Phone 530 544 -6474 - Fax 530 541 -0614 - www.5tpud.ue BOARD AGENDA ITEM 6c TO: Board of Directors FROM: Dale Rise, Board President MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Legal Service Provider REQUESTED BOARD ACTION: Discuss if comparison of legal service providers is needed at this time, and direct staff accordingly. DISCUSSION: The Board has retained its current general legal services provider since 1996. Since that time, the District has been involved in several legal challenges that required consistency in legal representation. Now that the large cases have been resolved, the Board should consider if it is prudent to compare legal service providers at this time. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: None CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES CATEGORY: General NO NO -81- PAYMENT OF CLAIMS FOR APPROVAL November 4, 2010 Payroll 10/19/10 Total Payroll ADP Bank of America BNY Mellon Trust Company Brownstein /Hyatt/Farber /Schreck legal services CDS- health care payments Union Bank Total Vendor EFT Accounts Payable Checks -Sewer Fund Accounts Payable Checks -Water Fund Accounts Payable Checks -Self- funded Insurance Accounts Payable Checks - Grants Fund Total Accounts Payable Grand Total Payroll EFTS & Checks 10/19/10 EFT AFLAC Medical & Dependent Care 428.96 EFT CA Employment Taxes & W/H 18,961.62 EFT Federal Employment Taxes & W/H 91 EFT CalPERS Contributions 69,612.01 EFT Great West Deferred Comp 18,356.54 EFT Stationary Engineers Union Dues 2,390.84 EFT United Way Contributions 187.00 EFT Employee Direct Deposits 214,576.83 EFT Employee Garnishments 1,524.30 CHK Employee Paychecks 6,382.43 Total 423, 891.70 423, 891.70 423,891.70 0.00 0.00 0.00 21, 764.08 19,891.84 0.00 41,655.92 608,321.68 632,482.57 30,641.48 0.00 1,271,445.73 1, 736,993.35 -83- PAYMENT OF CLAIMS Vendor Name Department 1 Proj Name Description Acct# / Proi Code Amount Check Num Typos ACWA HEALTH BENEFITS AUTHORITY GEN & ADMIN VISION INS 1000 - 2530 2,604.26 Check Total: 2.604.26 AP- 00077389 MW ADVANTEL INC INFORMATION SYS CONTRACT SERVICE 1037 - 4405 336.25 ADVANTEL INC INFORMATION SYS CONTRACT SERVICE 2037 - 4405 336.25 Check Total: 672.50 AP- 00077390 MW AECOM USA INC ENGINEERING - REPL GEN, LPPS REPL GEN LPPS 1029 - 8933 - RGLPPS 2,708.37 Check Total: 2.708.37 AP- 00077391 MW AERVOE - PACIFIC UNDERGROUND REP PIPE/CVRS /MHLS 2001 - 6052 593.28 Check Total: 593 AP- 00077392 MW AFLAC GEN & ADMIN SUPP INS W/H 1000 - 2532 744.70 AFLAC GEN & ADMIN AFLAC FEE DED 1000 - 2538 105.00 Check Total: 849.70 AP- 00077393 MW ALEXANDER HAMILTON INSTITUTE HUMAN RESOURCES SUBSCRIPTIONS 1022 - 4830 36.00 ALEXANDER HAMILTON INSTITUTE HUMAN RESOURCES SUBSCRIPTIONS 2022 - 4830 36.00 Check Total: 72.00 AP- 00077394 MW ap ALEXANDER, RICK CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00 I Check Total: 200.00 AP- 00077395 MW ALPEN SIERRA COFFEE GEN & ADMIN OFC SUPPLY ISSUE 1000 - 6081 199.00 Check Total: 199.00 AP- 00077396 MW ALPINE COUNTY ADMIN OFFICE DIAMOND VLY RNCH OPERATING PERMIT 1028 - 6650 112,100.00 Check Total: 112.100.00 AP- 00077397 MW ALPINE METALS HEAVY MAINT SHOP SUPPUES 1004 - 6071 23.60 Check Total: 23.60 AP- 00077398 MW ALSBURY, JAY HEAVY MAINT TRAVEL/MEETINGS 1004 - 6200 136.00 Check Total: 136.00 AP- 00077399 MW AMERIPRIDE UNIFORM SERVICES GEN & ADMIN UNIFORM PAYABLE 1000 - 2518 951.26 Check Total: 951.26 AP -00077400 MW AT &T MOBIUTY UNDERGROUND REP TELEPHONE 1001 - 6310 8.57 AT &T MOBIUTY ELECTRICAL SHOP TELEPHONE 1003 - 6310 4.34 AT &T MOBILITY ENGINEERING TELEPHONE 1029 - 6310 9.18 AT &T MOBILITY UNDERGROUND REP TELEPHONE 2001 - 6310 8.57 User: CAROLYN Page: 1 Current Dote: 10/27/2010 Report: OH_PMT_CLAIMS_BK Current Time: 17:02:17 Vendor Name AT&T MOBILITY AT&T MOBILITY AT&T / CALNET 2 AT&T /CALNET 2 AT&T/CALNET 2 AT&T/CALNET 2 AT&T / CALNET 2 AT&T/CALNET 2 AT&T / CALNET 2 AWWA AWWA CAL -NEV SECTION 4ANK OF THE WEST tr 1 BB&H BENEFIT DESIGNS BB&H BENEFIT DESIGNS BENTLY AGROWDYNAMICS BI STATE PROPANE BING MATERIALS BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BRANDSGARD, ANGEL User: CAROLYN Report: OH_PMT_CLAIMS_BK Department / Proj Name ELECTRICAL. SHOP ENGINEERING GEN & ADMIN PUMPS OPERATIONS CUSTOMER SERVICE GEN & ADMIN PUMPS CUSTOMER SERVICE CUSTOMER SERVICE ENGINEERING GEN & ADMIN - WT METERING PRJ HUMAN RESOURCES HUMAN RESOURCES OPERATIONS UNDERGROUND REP UNDERGROUND REP UNDERGROUND REP ENGINEERING - WT METERING PRJ CUSTOMER SERVICE - WTR CONS PROG CUSTOMER SERVICE - WTR CONS PROG PAYMENT OF CLAIMS Page: Description TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE DUES/MEMB /CERT DUES/MEMB /CERT CONST RETAINAGE CONTRACT SERVICE CONTRACT SERVICE SLUDGE DISPOSAL PIPE/CVRS /MHLS PIPE/CVRS/MHLS CONTRACT SERVICE WTR METERING/NEW CONTRACT SERVICE WTR CONS EXPENSE 2 Accd/ / Proj Code 2003 - 6310 2029 - 6310 1000 - 6310 1002 -6310 1006 - 6310 1038 - 6310 2000 - 6310 2002 - 6310 2038 - 6310 2038-6250 2029-6250 Check Total: Check Total: Check Total: Check Total: 2000 - 2605 - METERS Check Total: 1022 - 4405 2022 - 4405 1006 -6652 1001 -6052 2001 -6052 2038 - 6660 - WCPROG Check Total: Check Total: Check Total: Check Total: 2001 - 4405 2029 - 7078 - METERS 2038 - 4405 - WCPROG Check Total: Current Date: 10/27/2010 Current Time: 17:02:17 Amount chnt Num I e 28.52 63.52 AP- 00077401 MW 4.34 344.47 82.30 30.93 7.20 344.47 35.48 7.19 852.04 AP- 00077402 MW 198.00 198 AP- 00077404 MW 80.00 80.00 AP- 00077403 MW 9,918.17 9 AP- 00077405 MW 624.50 624.50 1.249.00 AP -00077406 MW 2,191.00 2.191.00 AP -00077407 MW 25.38 25.38 AP -00077408 MW 11,551.53 11.551.53 AP-00077409 MW 3,893.60 2,009.60 503.48 6.406.88 AP -00077410 200.00 MW Vendor Name BROWN & CALDWELL CONSULTANTS CAUF DEPT OF MOTOR VEHICLES CAUF DEPT OF MOTOR VEHICLES CAMPBELL CONSTRUCTION CO INC CAMPBELL. CONSTRUCTION CO INC CAPITAL FORD CAPITAL FORD CAPITAL RUBBER CO LTD CAROLLO ENGINEERS a On CARSON PUMP CASHMAN EQUIPMENT CDS GROUP HEALTH COW - G CORP CDW - G CORP CDW - G CORP CDW - G CORP CDW - G CORP CDW - G CORP CITY OF SOUTH LAKE TAHOE User: CAROLYN Report: OH_PMT_CLAIMS_BK Department / Proj Name ENGINEERING - FILTER ASSMNT OPERATIONS DIAMOND VLY RNCH GEN & ADMIN - IROQUOIS SUPPLY ENGINEERING - IROQUOIS SUPPLY EQUIPMENT REP EQUIPMENT REPAIR HEAVY MAINT ENGINEERING - TWIN PEAKS BS PUMPS EQUIPMENT REPAIR SELF FUNDED INS LABORATORY INFORMATION SYS INFORMATION SYS LABORATORY INFORMATION SYS INFORMATION SYS UNDERGROUND REP PAYMENT OF CLAIMS Description REHAB FLTR 5&6 OPERATING PERMIT OPERATING PERMIT CONST RETAINAGE WTLN IROQ AUTOMOTIVE AUTOMOTIVE MOBILE EQUIP BSTR, TWN PEAKS PUMP #2, HELEN W AUTOMOTIVE ADMIN FEE OFFICE SUPPUES OFFICE SUPPLIES DIST.COMP SPPUS OFFICE SUPPUES OFFICE SUPPUES DIST.COMP SPPLIS OPERATING PERMIT Page: 3 Acct# I Proj Code 1029 - 8066 - FILTER Check Total: 10.529.88 AP- 00077412 MW 1006 - 6650 23.00 1028 - 6650 46.00 Check Total: 69.00 AP- 00077413 MW 2000 - 2605 - IQWTRL - 11,469.95 2029 - 8166 - IQWTRL 114,699.45 Check Total: 1005 -6011 2005 -6011 1004 - 6012 2029 - 7070 - TPBSTR 2002 - 7598 2005 - 6011 3000 -6741 1007 -4820 1037 -4820 1037 -4840 2007 - 4820 2037 - 4820 2037 - 4840 2001 - 6650 Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Current Date: 10/27/2010 Current Time: 17:02:17 Amount Check Num Tvoe 200.00 AP- 00077411 MW 10,529.88 10229 ,50 AP-00077414 649.49 - 235.52 413.97 AP- 00077415 685.69 685.69 AP -00077416 1,326.75 1. 326.75 AP- 00077417 2,497.00 2.497.00 AP- 00077418 432.25 432.25 AP-00077419 2,600.15 2.600.15 AP- 00077420 247.00 667.36 95.45 247.01 667.32 94.07 2.018.21 AP- 00077421 2,772.00 2.772.00 AP -00077422 MW MW MW MW MW MW MW MW MW PAYMENT OF CLAIMS Vendor Name Department/ Proj Name Description AccUt / Proj Code Amount Check Num Iyp CLARK PLUMBING HEATING & A/C ENGINEERING - IROQUOIS SUPPLY WTLN IROQ 2029 - 8166 - IQWTRL 171.00 Check Total: 171.00 AP- 00077423 MW COASTLINE EQUIPMENT EQUIPMENT REP AUTOMOTIVE 1005 - 6011 728.99 Check Total: 728.99 AP- 00077424 MW COOK CONCRETE PRODUCTS INC GEN & ADMIN FRAMEJCOVERS INV 1000 - 0410 1,211 .47 COOK CONCRETE PRODUCTS INC UNDERGROUND REP PIPE/CVRS/MHLS 1001 - 6052 554.63 Check Total: 1,766,10 AP- 00077425 MW CPI INTERNATIONAL LABORATORY LAB SUPPUES 1007 -4760 102.23 CPI INTERNATIONAL LABORATORY LAB SUPPUES 2007 - 4760 102.22 Check Total: 204.45 AP- 00077426 MW CWEA HEAVY MAINT DUES/MEMB/CERT 1004 - 6250 132.00 Check Total: 132.00 AP- 00077427 MW DIY HOME CENTER UNDERGROUND REP SMALL TOOLS 2001 - 6073 6.84 Check Total: 6.84 AP- 00077428 MW DOHERTY LANDSCAPING ENGINEERING - WT METERING PRJ WTR METERING/NEW 2029 - 7078 - METERS 60.00 1 co Check Total: 60.00 AP- 00077429 MW bOUGLAS DISPOSAL GEN & ADMIN REFUSE DISPOSAL 1000 - 6370 21.12 Check Total: 21.12 AP- 00077430 MW E- FILUATE CORP INFORMATION SYS DIST.COMP SPPLIS 1037 - 4840 54.72 E- F1LUATE CORP INFORMATION SYS DIST.COMP SPPUS 2037 - 4840 EL DORADO COUNTY CUSTOMER SERVICE SUPPUES 1038 - 6520 6.50 EL DORADO COUNTY CUSTOMER SERVICE SUPPLIES 2038 - 6520 6.50 Check Total: 13.00 AP- 00077432 MW EL DORADO COUNTY CUSTOMER SERVICE SUPPUES 1038 - 6520 6.50 EL DORADO COUNTY CUSTOMER SERVICE SUPPUES 2038 - 6520 6.50 Check Total: 13.00 AP- 00077433 MW EL DORADO COUNTY CUSTOMER SERVICE SUPPUES 1038 - 6520 6.50 EL DORADO COUNTY CUSTOMER SERVICE SUPPUES 2038 - 6520 6.50 Check Total: 13.00 AP- 00077434 MW EL DORADO COUNTY CUSTOMER SERVICE SUPPLIES 1038 - 6520 8.00 User: CAROLYN Check Total: 109.48 Page: 4 Current Date: 10/27/2010 Report: OH_PMT_CLAIMS_BK Current Time: 17:02:17 54.76 AP -00077431 MW Vendor Name EL DORADO COUNTY EL DORADO COUNTY EL DORADO COUNTY HACH CO User: CAROLYN Department / Proj Name CUSTOMER SERVICE CUSTOMER SERVICE CUSTOMER SERVICE PAYMENT OF CLAIMS Description SUPPUES Aced, / Proj Code Amount Check Nuns IyRtt 2038 - 6520 8.00 Check Total: 16.00 AP- 00077435 MW SUPPUES 1038 - 6520 8.00 SUPPLIES 2038 - 6520 8.00 Check Total: 16 AP- 00077436 MW ELECTRICAL EQUIPMENT CO INC ELECTRICAL SHOP PUMP STATIONS 1003 - 6051 4,382.69 Check Total: 4.382.69 AP- 00077437 MW ETS LABORATORY MONITORING 1007 - 6110 992.25 Check Total: 992.25 AP -00077438 MW EVANS BROTHERS INC GEN & ADMIN - HEADWORKS -PH 1 CONST RETAINAGE 1000 - 2605 - HDWKPI - 19,133.30 EVANS BROTHERS INC ENGINEERING - HEADWORKS -PH 1 HDWKS IMP PROJ 1029 - 8033 - HDWKPI 191,333.00 Check Total: 172,199.70 AP- 00077439 MW FEDEX FINANCE POSTAGE EXPENSES 1039 - 4810 3.13 FEDEX FINANCE POSTAGE EXPENSES 2039 - 4810 3.13 Check Total: 6.26 AP- 00077440 MW co FERGUSON ENTERPRISES INC. HEAVY MAINT BUILDINGS 1004 - 6041 42.68 co 1 FERGUSON ENTERPRISES INC. HEAVY MAINT GROUNDS & MNTC 1004 - 8042 101.49 FERGUSON ENTERPRISES INC. ENGINEERING - UR SHOPS EVAL UR SHOP BLD EVAL 1029 - 7908 - URSHOP 1,216.37 Check Total: 1.360.54 AP- 00077441 MW FRONTIER DIAMOND VLY RNCH TELEPHONE 1028 - 6310 221.82 Check Total: 221.82 AP -00077442 MW GB GENERAL ENG CONTRACTOR INC UNDERGROUND REP PIPE/CVRS/MHLS 2001 - 6052 32,276.00 Check Total: 32.27100 AP -00077443 MW GENEAU ENTERPRISES ENGINEERING - IROQUOIS SUPPLY WTLN IROQ 2029 - 8166 - IQWTRL 900.00 Check Total: 900.00 AP- 00077444 MW GRAINGER GEN & ADMIN SHOP SUPPLY INV 1000 - 0421 164.43 GRAINGER GEN & ADMIN JANIT /SUPPLY INV 1000 - 0422 68.62 Check Total: 233.05 AP- 00077445 MW GURARINO, JEFF LABORATORY TRAVEUMEETINGS 1007 - 6200 65.00 Check Total: 65.00 AP- 00077446 MW LABORATORY LABORATORY EQUIP 1007 - 8025 142.62 Page: 5 Current Date: 10/27/2010 Report: OH_PMT_CLAIMS_BK Current Time: 17:02:17 PAYMENT OF CLAIMS Vendor Name Department / Proj Name Description HACH CO LABORATORY LABORATORY EQUIP VCRs User: CAROLYN Acct# / Proj Code Amount Check Num 2007 - 6025 149.05 Check Total: 291.67 AP- 00077447 MW HADRONEX INC UNDERGROUND REP PIPE/CVRS /MHLS 1001 - 6052 1,625.00 Check Total: 1.625.00 AP- 00077448 MW HAMMOND, JIM UNDERGROUND REP DUES/MEMB /CERT 1001 - 6250 57.00 Check Total: 57.00 AP- 00077449 MW HARKINS, GAYLE CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00 Check Total: 200.00 AP- 00077450 MW HARTFORD, THE GEN & ADMIN UFE INS 1000 - 2512 2,037.56 HARTFORD, THE GEN & ADMIN LTD, UNION 1000 - 2539 2,471.95 Check Total: 4.509.51 AP- 00077451 MW HOME DEPOT CREDIT ENGINEERING - UR SHOPS EVAL UR SHOP BLD EVAL 1029 - 7908 - URSHOP 150.64 Check Total: 150.64 AP- 00077452 MW HUBER PLUMBING ENGINEERING - WT METERING PRJ WTR METERING/NEW 2029 - 7078 - METERS 500.00 Check Total: 500.00 AP- 00077453 MW c UGHES, PAUL FINANCE TRAVEUMEETINGS 1039 - 6200 51.50 IkUGHES, PAUL FINANCE TRAVEL/MEETINGS 2039 - 6200 51.50 Check Total: 103.00 AP -00077454 MW HUSSMANN, NANCY HUMAN RESOURCES TRAVEL/MEETINGS 1022 - 6200 133.00 HUSSMANN,`NANCY HUMAN RESOURCES TRAVEUMEETINGS 2022 - 6200 133.00 Check Total: 266.00 AP -00077455 MW IDEXX DISTRIBUTION CORP. LABORATORY LAB SUPPLIES 1007 - 4760 138.81 IDEXX DISTRIBUTION CORP. LABORATORY LAB SUPPLIES 2007 - 4760 129.62 Check Total: 468.43 AP- 00077456 MW INTERSTATE SAFETY & SUPPLY GEN & ADMIN SHOP SUPPLY INV 1000 - 0421 196.85 INTERSTATE SAFETY & SUPPLY GEN & ADMIN SAFETY INVENTORY 1000 - 0425 68.28 Check Total: 265.13 AP -00077457 MW J&L PRO KLEEN INC FINANCE JANITORIAL SERV 1039 - 6074 1,603.50 J&L PRO KLEEN INC FINANCE JANITORIAL SERV 2039 - 6074 1,603.50 Check Total: 3.207.00 AP- 00077458 MW JDH CORROSION CONSULTANTS ENGINEERING - CATHODIC ALL SYS CATH PROT 1029 - 8133 - RUSTOP 23,961.50 Page: 6 Current Date: 10/27/2010 Report: OH_PMT_CLAIMS_BK Current Time: 17:02:17 Vendor Name JDH CORROSION CONSULTANTS KELLEY EROSION CONTROL INC KELLEY EROSION CONTROL INC KG WALTERS CONSTRUCTION KG WALTERS CONSTRUCTION KIMBALL MIDWEST KUCHENBECKER, KATRINA L A PERKS PLUMBING & HEAT INC LAKE TAHOE PLUMBING INC LAKE TAHOE PLUMBING INC LAWRENCE, LYNDA LES SCHWAB TIRES LILLY'S TIRE SERVICE INC. LILLY'S TIRE SERVICE INC. LINCOLN, CHARLES LOOMIS LOOMIS MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO User: CAROLYN Report: OH_PMT_CLAIMS_BK Department! Proj Name ENGINEERING - CATHODIC ALL SYS ENGINEERING - REPL GEN, LPPS ENGINEERING - IROQUOIS SUPPLY GEN & ADMIN - ECHO TNK SITEWRK CONST RETAINAGE ENGINEERING - ECHO TNK SITEWRK TANK, ECHO HEAVY MAINT ENGINEERING - IROQUOIS SUPPLY HEAVY MAINT ENGINEERING - WT METERING PRJ ENGINEERING - IROQUOIS SUPPLY CUSTOMER SERVICE - WTR CONS PROG EQUIPMENT REP EQUIPMENT REP EQUIPMENT REPAIR ENGINEERING - IROQUOIS SUPPLY FINANCE FINANCE PUMPS PUMPS PAYMENT OF CLAIMS Description CAIN PROT ASSES REPL GEN LPPS WTLN IROQ SHOP SUPPUES WTLN IROQ GROUNDS & MNTC WTR METERING/NEW WTLN IROQ WTR CONS EXPENSE AUTOMOTIVE AUTOMOTIVE AUTOMOTIVE WTLN IROQ CONTRACT SERVICE CONTRACT SERVICE SHOP SUPPUES SHOP SUPPUES Acct# / Proj Code 2029 - 8113 - RUSTOP Check Total: 1029 - 8933 - RGLPPS 2029 - 8166 - IQWTRL Check Total: 2000 - 2605 - ECHOSW 2029 - 8809 - ECHOSW Check Total: 1004 -6071 2029 - 8166 - IQWTRL Check Total: 1004 -6042 1005-6011 1005 - 6011 2005 -6011 1039 - 4405 2039 - 4405 1002-6071 2002-6071 Check Total: Check Total: 2029 - 7078 - METERS 2029 - 8166 - IQWTRL Check Total: 2038 - 6660 - WCPROG Check Total: Check Total: Check Total: 2029 - 8166 - IQWTRL Check Total: Check Total: Page: 7 Current Date: 10/27/2010 Current Time: 17:02:17 Amount Check Num bill 23,961.50 47.923.00 AP 00077459 2,630.00 12,000.00 14.630.00 AP-00077460 - 745.38 7,453.72 6,705.34 AP- 00077461 522.09 522.09 AP- 00077462 47.50 47.50 AP-00077463 430.00 430.00 AP-00077464 128.50 658.00 786.50 AP- 00077465 200.00 200.00 AP-00077466 349.10 349.10 864.61 2,371.72 3,236.33 AP- 00077468 225.03 225.03 307.96 307.95 302.21 302.68 AP- 00077467 AP-00077469 615.91 AP 00077470 MW MW MW MW MW MW MW MW MW MW MW MW PAYMENT OF CLAIMS Vendor Name Department / Proj Name Description MCGEE MECHANICAL ENGINEERING - WT METERING PRJ WTR METERING/NEW METRO OFFICE SOLUTIONS GEN & ADMIN OFFICE INVENTORY MID MOUNTAIN COMMUNICATIONS HEAVY MAINT RADIO- RPRS/RPLCM User: CAROLYN Aced / Proj Code 2029 - 7078 - METERS 142.50 Check Total: 1000 - 0428 Check Total: Check Total: 1004 - 6056 340.16 Check Total: S40.16 AP- 00077474 MW MOTEL 6 PUMPS _ STANDBY ACCOMODA 1002 - 6083 196.60 MOTEL 6 PUMPS STANDBY ACCOMODA 2002 - 6083 196.60 Check Total: 393.20 AP- 00077475 MW NATIONAL GEOGRAPHIC SOCIETY INFORMATION SYS OFFICE SUPPLIES 1037 - 4820 11.59 NATIONAL GEOGRAPHIC SOCIETY FINANCE OFFICE SUPPLIES 1039 - 4820 5.79 NATIONAL GEOGRAPHIC SOCIETY INFORMATION SYS OFFICE SUPPUES 2037 - 4820 11.59 NATIONAL GEOGRAPHIC SOCIETY FINANCE OFFICE SUPPLIES 2039 - 4820 5.78 I Check Total: 34.75 AP- 00077476 MW 1IXON'S HEATING ENGINEERING - WT METERING PRJ WTR METERING/NEW 2029 - 7078 - METERS 1,817.75 I Check Total: 1 AP- 00077477 MW O'REILLY AUTO PARTS EQUIPMENT REP AUTOMOTIVE 1005 - 6011 38.05 Check Total: 38.05 AP -00077478 MW ONTRAC LABORATORY POSTAGE EXPENSES 1007 - 4810 86.50 Check Total: 86.50 AP- 00077479 MW ORATECH CONTROLS INC DIAMOND VLY RNCH PUMP STATIONS 1028 - 6051 983.02 Check Total: 983.02 AP- 00077480 MW PRAXAIR 174 LABORATORY LAB SUPPUES 1007 - 4760 217.51 PRAXAIR 174 LABORATORY LAB SUPPUES 2007 - 4760 217.50 Check Total: 435.01 AP- 00077481 MW PRO LEISURE ADMINISTRATION INCNW & RCGNTN 1021 - 6621 59.69 PRO LEISURE ADMINISTRATION INCNW & RCGNTN 2021 - 6621 59.68 Check Total: 11937 AP- 00077482 MW RELIANCE STANDARD GEN & ADMIN LIFE INS MGMT 1000 - 2525 508.70 RELIANCE STANDARD GEN & ADMIN LNG TRM DIS,MGMT 1000 - 2531 1,261.09 Page: 8 Current Date: 10/27/2010 Report: OH_PMT_CLAIMS_BK Current Time: 17:02:17 Amount Check Num ?YDS 604.89 AP- 00077471 MW 142.50 AP- 00077472 MW 554.28 554.28 AP -00077473 MW 1 Vendor Name RENO DRAIN OIL SERVICE RENO DRAIN OIL SERVICE RESOURCE DEVELOPMENT INC RESOURCE DEVELOPMENT INC RESOURCE DEVELOPMENT INC RESOURCE DEVELOPMENT INC RESOURCE DEVELOPMENT INC RICH'S SMALL ENGINE SERVICE RUDY'S PLUMBING & HEATING INC SCIUTO, PAUL ko SCIUTO, PAUL SHARP, KATHY SHARP, KATHY SHERIDAN, JOHN SIERRA CHEMICAL CO SIERRA CHEMICAL CO SIERRA CRANE AND HOIST INC SIERRA ENVIRONMENTAL SIERRA FOOTHILL LABORATORY Department / Proj Name EQUIPMENT REP EQUIPMENT REPAIR GEN & ADMIN - ANGORA TNK REPL GEN & ADMIN - ECHO TANK REPL GEN & ADMIN - TWIN PEAKS BS ENGINEERING - ANGORA TNK REPL ENGINEERING - ECHO TANK REPL DIAMOND VLY RNCH ENGINEERING - WT METERING PRJ ENGINEERING ENGINEERING ADMINISTRATION ADMINISTRATION OPERATIONS OPERATIONS PUMPS HEAVY MAtNT LABORATORY LABORATORY - IND CRK RES MONT PAYMENT OF CLAIMS Description OIL & LUBE OIL & LURE User: CAROLYN Page: 9 Report: OH_PMT_CLAIMS_BK CONST RETAINAGE CONST RETAINAGE CONST RETAINAGE TANK, ANGORA TANK, ECHO GROUNDS & MNTC WTR METERING/NEW TRAVEL/MEETINGS TRAVEL/MEETINGS TRAVELAMEETINGS TRAVELJMEETINGS TRAVELIMEETINGS HYPOCHLORITE HYPOCHLORITE BUILDINGS MONITORING MONITORING Acct# / Proj Code 1005 - 4630 2005 -4630 Check Total: 2000 - 2605 - ANGOTK 2000 - 2605 - ECHOTK 2000 - 2605 - TPBSTR 2029 - 7064 - ANGOTK 2029 - 8809 - ECHOTK Check Total: 1028 -6042 1029 -6200 2029 - 6200 1021-6200 2021-6200 1006 -6200 1006-4755 2002-4755 1004 -6041 2007 -6110 1007 - 6110 - INDIAN Check Total: Check Total: 2029 - 7078 - METERS Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Current Date: 10/27/2010 Current Time: 17:02:17 Amount Check Num 1 2PR 1 769.79 AP- 00077483 MW 75.00 75.00 150.00 AP- 00077484 - 1,007.83 - 2,783.52 6,602.38 20,156.64 55,670.40 78.638.07 AP- 00077485 35.00 35,00 AP- 00077486 102.50 _Aug AP- 00077487 127.00 127.00 254.00 AP- 00077488 73.00 73.00 146.00 AP- 00077489 102.00 102.00 AP- 00077490 10,336.20 2,933.65 13.269.85 AP- 00077491 5,489.06 5.489.06 AP- 00077492 114.00 114.00 AP- 00077493 780.00 780.00 AP-00077494 MW MW MW MW MW MW MW MW MW MW MW PAYMENT OF CLAIMS Vendor Name Department 1 Proj Name Deacription Acct# / Proj Code Amount Check Num DPI SIERRA NEVADA CONSTRUCTION GEN & ADMIN - REPL GEN, LPPS CONST RETAINAGE 1000 - 2605 - RGLPPS - 14,921.21 SIERRA NEVADA CONSTRUCTION ENGINEERING - REPL GEN, LPPS REPL GEN LPPS 1029 - 8933 - RGLPPS 149,212.05 Check Total: 134.290.84 AP 00077495 MW SIERRA PACIFIC POWER GEN & ADMIN ELECTRICITY 1000 - 6330 61,492.23 SIERRA PACIFIC POWER GEN & ADMIN ELECTRICITY 2000 - 6330 29,036.75 Check Total: 90,528.98 AP 00077496 MW SIERRA SPRINGS PUMPS SUPPUES 1002 - 6520 11.44 SIERRA SPRINGS DIAMOND VLY RNCH SUPPUES 1028 - 6520 11.43 SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 1038 - 6520 5.89 SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 2038 - 6520 5.89 Check Total: 34.65 AP- 00077497 MW SKELLY, ROBERT CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00 Check Total: 200.00 AP -00077498 MW SOUTH SIDE AUTO BODY EQUIPMENT REP AUTOMOTIVE 1005 - 6011 1,902.01 Check Total: 1.902.01 AP -00077499 MW ■6OUTH TAHOE REFUSE GEN & ADMIN REFUSE DISPOSAL 1000 - 6370 2,374.20 w SOUTH TAHOE REFUSE GEN & ADMIN REFUSE DISPOSAL 2000 - 6370 369.32 SOUTH TAHOE REFUSE PUMPS GROUNDS & MNTC 2002 - 6042 7.80 Check Total: 2.751.32 AP -00077500 MW SOUTHWEST GAS GEN & ADMIN NATURAL GAS 1000 - 6350 44.00 SOUTHWEST GAS GEN & ADMIN NATURAL GAS 2000 - 6350 93.17 Check Total: 137.17 AP -00077501 MW SPINARDI, ROBERT & DEBRA GEN & ADMIN - T&M UB CASH BRD INTEREST INCOME 2000 - 3510 - TMCBUB 451.52 Check Total: 451.52 AP- 00077502 MW STOP LOSS INSURANCE SERVICES SELF FUNDED INS EXCESS INSURANCE 3000 - 6744 27,630.78 Check Total: 27.630.78 AP- 00077503 MW SUBSTITUTE PERSONNEL & GEN & ADMIN SUSPENSE 1000 - 2504 415.62 SUBSTITUTE PERSONNEL & UNDERGROUND REP CONTRACT SERVICE 1001 - 4405 4,400.56 SUBSTITUTE PERSONNEL & DIAMOND VLY RNCH CONTRACT SERVICE 1028 - 4405 840.84 SUBSTITUTE PERSONNEL & INFORMATION SYS CONTRACT SERVICE 1037 - 4405 182.56 SUBSTITUTE PERSONNEL & CUSTOMER SERVICE CONTRACT SERVICE 1038 - 4405 182.56 SUBSTITUTE PERSONNEL & ENGINEERING - WT METERING PRJ WTR METERING/NEW 2029 - 7078 - METERS 2,141.25 User: CAROLYN Page: 10 Current Date: 10/27/2010 Report: OH_PMT_CLAIMS_BK Current Time: 17:02:17 Vendor Name SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUNGARD PUBUC SECTOR INC. SUNGARD PUBUC SECTOR INC. SYSTEMS TECHNOLOGY ASSOCIATES INC SYSTEMS TECHNOLOGY ASSOCIATES INC TAHOE BASIN CONTAINER SERVICE TAHOE BASIN CONTAINER SERVICE TAHOE BASIN CONTAINER SERVICE TAHOE SAND & GRAVEL 0 TAHOE TRADING POST 1 TAHOE TRADING POST TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TEICHERT CONSTRUCTION TEICHERT CONSTRUCTION TERRY'S APOLLO PLUMBING & HTN TERRY'S APOLLO PLUMBING & HTN THOMAS HAEN CO INC THOMAS HAEN CO INC User: CAROLYN Report: OH_PMT_CLAIMS_BK Department / Proj Name INFORMATION SYS CUSTOMER SERVICE INFORMATION SYS INFORMATION SYS , INFORMATION SYS , INFORMATION SYS GEN & ADMIN OPERATIONS GEN 8. ADMIN UNDERGROUND REP HEAVY MAINT HEAVY MAINT ELECTRICAL SHOP UNDERGROUND REP ELECTRICAL SHOP GEN & ADMIN - WT METERING PRJ ENGINEERING - WT METERING PRJ ENGINEERING - WT METERING PRJ ENGINEERING - IROQUOIS SUPPLY GEN & ADMIN - IROQUOIS BSTR ST ENGINEERING - IROQUOIS BSTR ST PAYMENT OF CLAIMS Description CONTRACT SERVICE CONTRACT SERVICE TRAVEUMEETINGS TRAVEL/MEETINGS CONTRACT SERVICE CONTRACT SERVICE REFUSE DISPOSAL SLUDGE DISPOSAL REFUSE DISPOSAL PIPE/CVRS/MHLS SHOP SUPPUES SAFETY/EQUIP/PHY BUILDINGS SMALL TOOLS SHOP SUPPUES CONST RETAINAGE WTR METERING/NEW WTR METERING/NEW WTLN IROQ CONST RETAINAGE BSTR STN IROQ Acct# / Proj Code Amount Check Nuts 2037 - 4405 182.56 2038 - 4405 182.56 Check Total: 7,497.27 AP- 00077504 1037 - 6200 195.00 2037 - 6200 195.00 Check Total: 1037 - 4405 2037 -4405 1000 - 6370 1006 - 6652 2000 - 6370 1001 - 6052 1004 - 6071 1004 - 6075 1003-6041 2001-6073 2003 -6071 2000 - 2605 - IQBSTR 2029 - 8967 - IQBSTR Check Total: Check Total: Check Total: Check Total: 2029 - 7078 - METERS 2029 - 8166 - IQWTRL Check Total: Page: 11 Current Date: 10/27/2010 Current Thne: 17:02:17 390.00 AP-00077505 450.00 450.00 900.00 AP- 00077506 286.25 14,208.00 26.25 14.520.50 AP- 00077507 501.02 501.02 AP- 00077508 12.08 128.60 140.68 AP- 00077509 6.80 16.93 41.21 Check Total: 64.94 AP-00077510 MW 2000 - 2605 - METERS - 9,918.17 2029 - 7078 - METERS 198,363.34 Check Total: 188 AP- 00 MW 349.92 295.00 644.92 AP -00077512 - 9,289.51 92,895.05 Check Total: 83,605.54 AP -00077513 M W MW MW MW MW MW MW MW Vendor Name TREGLOWN, LACIE TRPA TRPA TRPA TRPA TRPA U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE AI 8 BANK CORPORATE I U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U 8 BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE U S BANK CORPORATE User: CAROLYN Report: OH_PMT_CLAIMS_BK Department / Proj Name CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE ENGINEERING - GRIZZLY MT BSTR ENGINEERING - GRIZZLY MT BSTR ENGINEERING - GRIZZLY MT BSTR ENGINEERING - GRIZZLY MT BSTR ENGINEERING - GRIZZLY MT WTRLN UNDERGROUND REP UNDERGROUND REP ELECTRICAL SHOP EQUIPMENT REP OPERATIONS LABORATORY LABORATORY LABORATORY ADMINISTRATION ADMINISTRATION HUMAN RESOURCES HUMAN RESOURCES HUMAN RESOURCES HUMAN RESOURCES DIAMOND VLY RNCH DIAMOND VLY RNCH ENGINEERING ENGINEERING ENGINEERING - ERB UNER REPL ENGINEERING - HEADWORKS -PH 1 PAYMENT OF CLAIMS Description GRIZ MTN BSTR GRIZ MTN BSTR GRIZ MTN BSTR GRIZ MTN BSTR GRIZ MTN BSTR INFILTRTNANFLOW TRAVELIMEETINGS BUILDINGS TRAVEL/MEETINGS TRAVEUMEETINGS LAB SUPPUES OFFICE SUPPUES TRAVEL/MEETINGS TRAVELIMEETINGS INCNTV & RCGNTN OFFICE SUPPLIES TRAVEL/MEETINGS DUES/MEMB /CERT PERSONNEL EXPENS GROUNDS & MNTC TELEPHONE OFFICE SUPPUES TRAVELIMEETINGS REPLACE ERB UNE HDWKS IMP PROJ Acct# / Proj Code 2038 - 6660 - WCPROG Check Total: 2029 - 8176 - GRIZBS Check Total: 2029 - 8176 - GRIZBS Check Total: 2029 - 8176 - GRIZBS Check Total: 2029 - 8176 - GRIZBS Check Total: 2029 -8176 - GRIZWL Check Total: 1001 - 6055 1001 -6200 1003 -6041 1005 - 6200 1006 - 6200 1007 - 4760 1007 - 4820 1007 - 6200 1021 - 6200 1021 - 6621 1022 - 4820 1022 - 6200 1022 - 6250 1022 - 6670 1028 - 6042 1028 - 6310 1029 - 4820 1029 -6200 1029 - 7581 - ERBLNR 1029 - 8033 - HDWKPI Page: 12 Current Date: 10/27/2010 Current Time: 17:02:17 Amount Check Num ing 200.00 200.00 AP- 00077514 602.00 602.00 AP -00077515 602.00 602.00 AP- 00077516 575.00 575.00 AP- 00077517 1,008.00 1.008.00 AP- 00077518 575.00 575.00 721.79 594.48 1,065.81 54.07 - 1,139.29 9.33 58.06 91.82 16.58 109.77 133.30 97.00 499.50 28.68 1,277.00 59.99 55.44 584.56 102.46 102.47 AP- 00077519 MW MW MW MW MW MW Vendor Name Department 1 Proj Name Description Acct# 1 Proj Code Amount Check Num Tvoe U S BANK CORPORATE ENGINEERING - HEADWORKS HDWKS IMP PROJ 1029 - 8033 - HDWORK 163.35 U S BANK CORPORATE ENGINEERING - REPL GEN, LPPS REPL GEN LPPS 1029 - 8933 - RGLPPS 102.47 U S BANK CORPORATE INFORMATION SYS OFFICE SUPPUES 1037 - 4820 19.35 U S BANK CORPORATE INFORMATION SYS TRAVEL/MEETINGS 1037 - 6200 2,219.68 U S BANK CORPORATE CUSTOMER SERVICE OFFICE SUPPUES 1038 - 4820 117.42 U S BANK CORPORATE CUSTOMER SERVICE TRAVEL/MEETINGS 1038 - 6200 107.05 U S BANK CORPORATE FINANCE SUBSCRIPTIONS 1039 - 4830 225.00 U S BANK CORPORATE FINANCE TRAVEUMEETINGS 1039 - 6200 488.46 U S BANK CORPORATE FINANCE SUPPUES 1039 - 6520 16.31 U S BANK CORPORATE UNDERGROUND REP OFFICE SUPPUES 2001 - 4820 10.85 U S BANK CORPORATE UNDERGROUND REP TRAVEUMEETINGS 2001 - 6200 370.00 U S BANK CORPORATE HEAVY MAINTENANC BUILDINGS 2004-6041 118.16 U S BANK CORPORATE EQUIPMENT REPAIR TRAVEUMEETINGS 2005 - 6200 45.07 U S BANK CORPORATE LABORATORY LAB SUPPLIES 2007 - 4760 9.33 U S BANK CORPORATE LABORATORY OFFICE SUPPUES 2007 -4820 58.06 1 U S BANK CORPORATE LABORATORY TRAVEUMEETINGS 2007 - 6200 42.65 all/ S BANK CORPORATE ADMINISTRATION TRAVEUMEETINGS 2021 - 6200 16.57 1 U S BANK CORPORATE ADMINISTRATION INCNTV & RCGNTN 2021 - 6621 109.77 U S BANK CORPORATE HUMAN RESOURCES OFFICE SUPPUES 2022 - 4820 133.30 U S BANK CORPORATE HUMAN RESOURCES TRAVEL/MEETINGS 2022 - 6200 97.00 U S BANK CORPORATE HUMAN RESOURCES DUES/MEMB/CERT 2022 - 6250 499.50 U S BANK CORPORATE HUMAN RESOURCES PERSONNEL EXPENS 2022 - 6670 28.67 U 5 BANK CORPORATE ENGINEERING OFFICE SUPPUES 2029 - 4820 55.43 U 5 BANK CORPORATE ENGINEERING TRAVEL/MEETINGS 2029 - 6200 556.42 U S BANK CORPORATE ENGINEERING - WT METERING PRJ WTR METERING/NEW 2029 - 7078 - METERS 1,251.13 U S BANK CORPORATE INFORMATION SYS OFFICE SUPPUES 2037 - 4820 19.35 U 5 BANK CORPORATE INFORMATION SYS TRAVEL/MEETINGS 2037 - 6200 2,219.68 U S BANK CORPORATE CUSTOMER SERVICE OFFICE SUPPUES 2038 - 4820 117.41 U S BANK CORPORATE CUSTOMER SERVICE TRAVEL/MEETINGS 2038 - 6200 107.06 U S BANK CORPORATE CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 229.08 U 5 BANK CORPORATE FINANCE SUBSCRIPTIONS 2039 - 4830 225.00 U S BANK CORPORATE FINANCE TRAVEL/MEETINGS 2039 - 6200 488.45 User: CAROLYN PAYMENT OF CLAIMS Page: 13 Current Date: 10/27/2010 Report: OH_PMT_CLAIMS_BK Current Time: 17:02:17 Vendor Name U S BANK CORPORATE UNIVERSAL HEALTH NETWORK VHG LABS VHG LABS WATER ENVIRONMENT FEDERATION WEDCO INC WESTERN BOTANICAL SERVICES WESTERN ENVIRONMENTAL WESTERN ENVIRONMENTAL V) v 4VESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY YSI INCORPORATED YSI INCORPORATED User: CAROLYN Report: OH_PMT_CLAIMS_BK Department / Proj Name FINANCE SELF FUNDED INS LABORATORY LABORATORY ELECTRICAL SHOP ELECTRICAL SHOP ENGINEERING - IROQUOIS SUPPLY LABORATORY - IND CRK RES MONT LABORATORY GEN & ADMIN GEN & ADMIN GEN & ADMIN UNDERGROUND REP UNDERGROUND REP ENGINEERING • WT METERING PRJ CUSTOMER SERVICE CUSTOMER SERVICE LABORATORY LABORATORY PAYMENT OF CLAIMS Description SUPPUES PPO FEE LAB SUPPLIES LAB SUPPLIES DUES/MEMB/CERT BUILDINGS WTLN IROQ MONITORING MONITORING METERS,ETC INV REPAIR CLMP INV SADDLES INV PIPE/CVRS /MHLS SMALL TOOLS WTR METERING/NEW SHOP SUPPUES SMALL TOOLS LAB SUPPLIES LAB SUPPLIES Acct# / Proj Code 2039-6520 3000 - 6742 1007 -4760 2007-4760 1003-6250 1003 -6041 2029 - 8166 - IQWTRL Check Total: 1007 - 6110 - INDIAN 1007 - 6110 2000 -0402 2000 - 0406 2000 - 0407 2001 - 6052 2001 -6073 2029 - 7078 - METERS 2038 -6071 2038 - 6073 1007-4760 2007-4760 Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Page: 14 Current Date: 10/27/2010 Current Time: 17:02:17 Amount Check Num Iypg 16.30 14.806.15 AP- 00077522 410.55 410.55 AP- 00077523 24.00 36.85 Grand Total: 1,271,622.73 Grand Total: 1,271,445.73 60.85 AP- 00077524 220.00 220.00 AP- 00077525 67.14 67.14 AP- 00077526 1,100.00 1,100.00 AP -00077527 480.00 760.00 1.240.00 AP- 00077528 3,262.50 - 1,576.88 601.21 2,898.68 52.57 175.83 - 529.92 543.75 5.427.74 AP -00077529 127.00 119.08 246.08 AP- 00077530 Reversals - 177.00 Ck #77032 MW MW MW MW MW MW MW MW MW General Manager RkhaM H. Solbrlg r • 7950 • WBtg� arectors ,9 outh Tahoe Chris James R Jones public Utility district "a"L°u oba Kiss Eric Schafer 1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150-7401 Phone 530 544 -6474 - Fax 530 541 -0614 - www.5tpud.ue BOARD AGENDA ITEM 13a TO: Board of Directors FROM: Tim Bledsoe, Customer Service Manager MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Liability Claim against STPUD received from Park Tahoe, LP REQUESTED BOARD ACTION: Reject Claim DISCUSSION: Pursuant to Section 54956.9(b) of the California Government Code, Closed Session may be held for a conference with legal counsel. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES k tj4 NO CHIEF FINANCIAL OFFICER: YES NO —99— 1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401 Phone 530 544 -6474 - Fax 530 541 -0614 - www etpucW6 BOARD AGENDA ITEM 13b TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Conference with Legal Counsel - Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government code, Closed Session may be held for conference with legal counsel regarding existing litigation: False Claims Act Case: United States, the States of California, Delaware, Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06- 0055 -GW, United States District Court for the Central District of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: ES A , NO CHIEF FINANCIAL OFFICER: YES NO - 101 - CATEGORY: Water General Manager Richard H. Solbrig a� S outh James K Jones Public Utility/ Diotrict f "'�'�L°�"'°sba�r Dale Rise Eric Schafer 1275 Meadow Crest Drive - 5outh Lake Tahoe - CA 96150 -7401 Phone 530 544 -6474 - Fax 530 541 -0614 - www etpucW6 BOARD AGENDA ITEM 13b TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: November 4, 2010 ITEM - PROJECT NAME: Conference with Legal Counsel - Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government code, Closed Session may be held for conference with legal counsel regarding existing litigation: False Claims Act Case: United States, the States of California, Delaware, Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06- 0055 -GW, United States District Court for the Central District of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: ES A , NO CHIEF FINANCIAL OFFICER: YES NO - 101 - CATEGORY: Water