Loading...
AP 05-19-11SOUTH TAHOE PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING AGENDA Richard Solbri • , General Mana • er Dale Rise, President Chris Cefalu, Director Thursday, May 19, 2011 2:00 P.M. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California BOARD MEMBERS James R. Jones, Director 3. PROPOSITION 218 PUBLIC HEARING TO RECEIVE PROTESTS ON PROPOSED WATER AND SEWER RATE INCREASES Paul Sciuto, Assistant General Mana • er Mary Lou Mosbacher, Vice President 7. PRESENTATION a. Water Rate Presentation Following Direction from May 5 Public Meeting (HDR Consultant) a. Alpine County Monitoring Well Installation Pg.39 Project (Ivo Bergsohn) Eric W. Schafer, Director 1. CALL TO ORDER REGULAR MEETING — PLEDGE OF ALLEGIANCE 2. COMMENTS FROM THE AUDIENCE (This is an opportunity for members of the public to address the Board on short non - agenda items that are within the subject matter jurisdiction of the District. Five minute limit. No action can be taken on matters not listed on the agenda.) a. Report on Customer Notification Pursuant to Proposition 218 Requirements b. Presentation of 2011/12 Proposed Rates for the Sewer and Water Enterprise Funds c. Report on Protests Received 4. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR 5. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered separately upon request. Comments and questions from members of the public, staff or Board can be taken when the comment does not necessitate separate action.) 6. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION / ACTION 8. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION Accept Proposal from the Consultant Recommended to Provide Hydrogeological Services ('A summary of proposals and staff's recommendation will be provided prior to, and at the Board meeting) REGULAR BOARD MEETING AGENDA - MAY 19, 2011 b. Sewer Rate Ordinance Pg. 47 (Paul Hughes) c. Fiscal Year 2011/12 Sewer Enterprise Fund Pg. 53 Budget (Paul Hughes) d. Fiscal Year 2011/12 Water Enterprise Fund Pg. 57 Budget (Paul Hughes) e. Payment of Claims Pg. 61 9. BOARD MEMBER STANDING COMMITTEE REPORTS (Discussions may take place; however, no action will be taken) a. Water & Wastewater Operations Committee (Jones / Rise) b. Finance Committee (Schafer / Cefalu) 14. NOTICE OF PAST AND FUTURE MEETINGS / EVENTS PAGE - 2 Enact Ordinance No. 530 -11, an Amendment to Ordinance No. 464, and Superseding, in Part, Water and Sewer Rate Ordinance No. 523-10 Adopt Resolution No. 2890 -11 Adopting the Budget for the Sewer Enterprise Fund Adopt Resolution 2891 -11 Adopting the Budget for the Water Enterprise Fund Approve Payment in the Amount of $1,990,919.42 10. EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVES REPORT 11. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken.) 12. GENERAL MANAGER REPORT(S) (Discussions may take place; however, no action will be taken.) 13. STAFF / ATTORNEY REPORT(S) (Discussions may take place; however, no action will be taken.) a. Proposed AB 392 re: Website Posting Requirements for Agenda and Staff Generated Reports (Attorney Kvistad) b. Meyers Landfill Budget Update (Paul Hughes) c. Water Meter Pit Discussion (Tim Bledsoe) Past Meetings / Events 05/05/11 - Public Budget Meeting 05/10/11 - 05/13/11 - ACWA (Association of California Water Agencies) Conference in Sac. 05/12/11 - Finance Committee Meeting 05/16/11 - Water and Wastewater Operations Committee Meeting Future Meetings / Events 05/24/11 - 10:00 a.m. - Special Board Meeting re: Water Meter Rates at District 05/25/11 - 8:00 a.m. - ECC (Employee Communications Committee) Meeting Director Mosbacher is Board representative 05/30/11 - Memorial Day Holiday (District Office Closed) 05/31/11 - 3:30 p.m. - Water and Wastewater Operations Committee Meeting 06/01/11 - 10:00 a.m. - El Dorado County Water Agency Board Meeting in Shingle Springs 06/02/11 - 2:00 p.m. - STPUD Regular Board Meeting at District REGULAR BOARD MEETING AGENDA - MAY 19, 2011 PAGE - 3 15. CLOSED SESSION (The Board will adjourn to Closed Session to discuss items identified below. Closed Session is not open to the public; however, an opportunity will be provided at this time if members of the public would like to comment on any item listed. Three minute limit.) a. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel Pg. 75 Existing Litigation re: False Claims Act Case: United States, the States of California, Delaware, Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06- 0055 -GW, United States District Court for the Central District of California b. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Pg. 77 Counsel - Existing Litigation re: Los Angeles County Superior Court Case No. BC459943, State of Nevada, et al. v. J -M Manufacturing, et al. 16. ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION 17. ADJOURNMENT (To the next regular meeting, June 2, 2011, 2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete agenda packet, including all backup information is available for review at the meeting and at the District office during the hours of 8:00 a.m. - 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after minutes of the meeting have been approved. Items on this agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear on the agenda. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified, but may occur slightly later than the specified time. Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Comments on items not on the agenda can be heard during "Comments from the Audience;" however, action cannot be taken on items not on the agenda. Please provide the Clerk of the Board with a copy of all written material presented at the meeting. *Backup to any agenda item(s) not included with the Board packet will be made available when finalized at the District office, at the Board meeting, dnd upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings. If particular accommodations for the disabled are needed (i.e., disability- related aids, or other services), please contact the Clerk of the Board at 530.544.6474, extension 6203, at least 24 hours in advance of the meeting. ITEMS a. Engineering Student Intern Pg. 1 (John Thiel) b. Pg. 3 C. Pg. 7 Luther Pass Pump Station Standby Power Generation Facility (Ivo Bergsohn) d. Consolidated Districts Election to be Held Pg. 13 November 8, 2011 (Kathy Sharp) e. Regular Board Meeting Minutes: Pg. 25 April 21, 2011 (Kathy Sharp) f. Regular Board Meeting Minutes: Pg. 31 May 5, 2011 (Kathy Sharp) g. Public Budget Meeting Minutes: Pg. 37 May 5, 2011 (Kathy Sharp) CONSENT CALENDAR MAY 19, 2011 Diamond Valley Ranch Irrigation Improvements - Environmental Permitting Assistance (Ivo Bergsohn) REQUESTED ACTION Substitute Personnel for One Part- Time Engineering Student Intern Not to Exceed $32,000 Approve Change Order No. 7 to Sierra Nevada Construction, Inc., in the Amount of $15,280 Authorize an Increase to Purchase Order No. P23335 for Additional Environmental Permitting Services, in the Amount of $11,760 Adopt Resolution No. 2892 -11 for El Dorado County Declaring an Election be Held in its Jurisdiction, Consolidation with Other Districts Requesting Election Services Approve Minutes Approve Minutes Approve Minutes South Tahoe Public Utility District • 1274 Meadow Crest Drive • South Lake Tahoe, CA 96150 Phone 530.544.6474 • Facsimile 530.541.0614 • www.stpud.us South Tahoe Public Utility District BOARD AGENDA ITEM 5a 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.us TO: Board of Directors FROM: John Thiel, Principal Engineer MEETING DATE: May 19, 2011 ITEM - PROJECT NAME: Engineering Student Intern REQUESTED BOARD ACTION: Approve extension of contract with Substitute Personnel for one part-time engineering student intern not to exceed $32,000. DISCUSSION: Requesting authorization to continue one engineering intern position (Patrick Wilson) for up to 1,000 hours, through December 2011. Staff would like to have Mr. Wilson continue working for the Engineering Department, approximately 40 hours per week upon Board approval. He will be assisting the engineers on several projects including support for the JM Eagle litigation, inspection assistance on various projects in progress, development of as -built drawings, assistance with the plant coverage mitigation project, collection of GPS points during the Headworks project, and assistance in preparing permits, plans and specifications for upcoming 2012 projects. The special case of having Patrick continue staff believes is warranted for the following reasons: • Patrick has been integral in producing documents for the JM Eagle litigation which is ongoing. • it would be a great benefit to the District to have him available through at least August 2011 in case other discovery requests are made through the litigation. • The continuity of keeping him will make the discovery process much more efficient and effective. In addition Mr. Wilson is graduating with a B.S. in Civil Engineering in May 2011. SCHEDULE: Upon Board approval, through December 2011 COSTS: Not to exceed $32,000 ACCOUNT NO: 1029 -4405; 2029 -4405 BUDGETED AMOUNT REMAINING: $17,565 (2010/11); $60,000 (2011/12) ATTACHMENTS: None -1- General Manager Richard FL sognig Cenwtors .a James R Jones Mary Lou Moabaclur Daile Rise Eric Schafer John Thiel May 19, 2011 Page 2 CONCURRENCE WITH REQUESTED ACTIO CATEGORY: Sewer & Wafer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -2- South Ta Public Utility District 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150-1401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.etpud.u5 BOARD AGENDA ITEM 5b TO: Board of Directors FROM: No Bergsohn, Hydro-Geologist MEETING DATE: May 19, 2011 ITEM - PROJECT NAME: Luther Pass Pump Station (LPPS) Standby Power Generation Facility REQUESTED BOARD ACTION: Approve Change Order No. 7 to Sierra Nevada Construction, Inc., in the amount of $15,280. DISCUSSION: The itemized parts of Change Order No. 7 are as follows: Item 1, in the amount of $810.00, is to extend the crank case vent from the new standby power generator engine. During the load testing of the generator engine, crank case exhaust was found accumulating at the vent discharge near the southeast corner of the new generator building, underneath the connecting roof structure. The crank case vent needs to be extended to entrain the engine exhaust into the air stream of the radiator exhaust. The added labor, materials and specialty hardware required to extend the crank case vent into the radiator exhaust airstream is an extra work item that was not part of the original contract documents. Item 2, in the amount of $10,512.00, is to construct roof dormers above the two exhaust fans located along the north wall of the new generator building. During load testing, ice damaged the exhaust fans as the roof overhang was inadequate. The overhang on the roofline had to be reduced by 18- inches to conform to construction of the drip line, which was constrained by building setback requirements along the north property line. In addition, the sizes of the exhaust fans were increased in order to reduce fan noise levels. The reduced overhang and increased fan sizes, changed during building design, expose the exhaust fans to recurring ice damage. Dormers are needed to protect the exhaust fans and complete the generator building. The added labor, materials and specialty supplies required to make this change is an extra work item that was not part of the original contract documents. General Manager Richard IL SolbHg a James R. Jones Mary Lou Moebadw Dale kW Erb Schafer No Bergsohn May 19, 2011 Page 2 Item 3, in the amount of $3,958.00, is to add a local instrument panel directly on the standby generator as requested by the District's equipment repair supervisor (P. Carrion). The new standby generator has a local instrument panel mounted on the west wall of the building. During construction, P. Carrion expressed a safety need for an emergency stop directly on the standby generator. District staff requested that the emergency stop be mounted on a second instrument panel to include: indicator lights enabling an operator to identify whether the intake and exhaust louvers are in the open position; and a by -pass circuit in case of a control system failure. The 2,500 kW generator has a cooling system air flow of more than 98,000 cfm. The indicator lights and by -pass circuit are needed as a fail -safe to prevent the 2500 kW generator from operating with either the intake and /or exhaust louvers in the closed position. The added labor, materials and specialty supplies required to make this change is an extra work item that was not part of the original contract documents. SCHEDULE: As soon as possible COSTS: $15,280.00 ACCOUNT NO: 1029- 8933 /RGLPPS BUDGETED AMOUNT REMAINING: $523,569 ATTACHMENTS: Change Order No. 7 (May 19, 2011) CONCURRENCE WITH REQUESTED ACTIO GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO - CATEGORY: Sewer CHANGE ORDER NUMBER 7 Project: LPPS STANDBY POWER GENERATOR FACILITY Contractor: Sierra Nevada Construction, Inc. Date: 05.19.2011 PO #: P22641 The Contract Shall Be Changed As Follows: 1) Increase $810.00 to extend the crankcase exhaust vent for the new generator engine in accordance with SNC Letter No. 35 (04/20/2011). The increase includes all additional labor, materials, specialty supplies and contractor mark -up. Total Item 1 Is $810.00 2) Increase $10,512.00 to remove the existing roof splitter and add two roof dormers above the two exhaust fans located on the north wall of the new generator building, complete and in- place, as per Information Bulletin No. 10 (04/20/11). The increase includes all additional labor, materials, specialty supplies and contractor mark -up for this extra work in accordance with SNC Letter No. 36 (04/20/2011). Total Item 2 is $10,512.00 TOTAL FOR CHANGE ORDER NO.7 ITEMS 1— 3 IS: $15,280.00 Original Contract Previous Change Order Current Contract THIS CHANGE ORDER New Contract Total $2,027,007.00 $98,615.79 $2,125,622.79 $15,280.00 $2,140,902.79 263 Calendar Days 127 Calendar Days 390 Calendar Days Contractor agrees to make the herein - described changes In accordance with the terms hereof. The change In contract price andfor contract time noted Is full settlement for costs Incurred because of the change(s) described, unless specifically noted In Individual description(s). Authorized By STPUD Board President Accepted By Cont -5- Date: Date: 5 Date: Reviewed By 1 3) Increase $3,958.00 to install a fully functional 16 light annunciator panel with an emergency stop, intake louver position indicators, exhaust louver position indicators, and emergency by -pass circuit, wired, programmed and tested for the new standby power generator, complete and in place, in accordance with SNC Letter No. 37 (05/09/2011). The increase includes all additional labor, materials, specialty supplies and contractor mark -up. Total Item 3 Is $3,958.00 TOTAL FOR CHANGE ORDER NO.7, ITEMS 1— 3 IS: $15,280.00 -6- 2 South Ta Public Utility District 1275 Meadow Cruet Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.etpud.us BOARD AGENDA ITEM 5c TO: Board of Directors FROM: No Bergsohn, Hydro - Geologist MEETING DATE: May 19, 2011 ITEM - PROJECT NAME: Diamond Valley Ranch Irrigation Improvements - Environmental Permitting Assistance REQUESTED BOARD ACTION: Authorize an increase to Purchase Order No. P23335 for additional environmental permitting services, in the amount of $11,760. DISCUSSION: District staff requested Hauge Brueck Associates (HBA) to perform several tasks that were not within the scope of their present purchase order for the preliminary wetlands delineation and preparation of the supplemental environmental impact report (SEIR). These included: attendance at the January 5, 2011, US Army Corps of Engineers (USACE) project meeting in Sacramento; additional field work to exam geotechnical test pits for wetland indicators on January 18, 2011; added data compilation and evaluation to comply with USACE wetland delineation mapping procedures; and completion of an environmental impact analysis for the Diamond Valley Ranch hydroelectric generation facility project (New Master Plan Project 28) added to the SEIR. Approval of the fee increase shall raise the project contract ceiling to $66,615. SCHEDULE: As soon as possible COSTS: $11,760 ACCOUNT NO: 1029 -8161 BUDGETED AMOUNT REMAINING: Total project estimated at $5.6 million will be funded with a low interest SRF loan ATTACHMENTS: HBA Request for Budget Increase, Task Order 11, P23335 (HBA, 29.04.2011) CONCURRENCE WITH REQUESTED ACTIO GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES CATEGORY: Sewer General Manager Richaml FL Sobrlg Directors Chris Cefalu James R. Jones May Lou Mosbachar Dab Rise Eric Schafer 14AUG5 BRUECK A S S O C I A T E S wwwskaulehruipLeem CAGJPO'Rt1IA P 318 -213 -5006 F 9$11-3t7 -44I1 MS AvsplekEektt 213 s cr.1 : SAMOS NEYA * . P FF5-5 $ F F75- 547114 P.0. tee sa t 310 6011* Itehr‘prIer SOS Zephyr Gent I P.IIMt* Mr. Bergsohn, 29 April 2011 Mr. No Bergsohn South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA I5O SUBJECT: REQUEST FOR FEE INCREASE, HAUGE BRUECK ASSOCIATES TAB- ORDER 11, PURCHASE ORDER NUMBER P23335 A request for fee increase has been prepared for the Diamond Valley Wetland Delineation and Supplemental Environmental Impact Report. This request for fee increase is being submitted for additional work performed for the above stated projects that were not included in the original scope of work approved on 7 October 2010 (original contract value of $54,855.00). The total fee increase request is for $11,760.00. The items that were not included in the original scope of work are as follows and hours and fees are summarized in Table 1 below: 1) Meeting with United States Army Corps of Engineers in Sacramento, CA on January 5, 2011 to discuss the wetland delineation and to determine site details, historical usage, proposed projects, and site visit. Both Amy Parravano and Garth Ailing from HBA attended the meeting in Sacramento. 2) Field data collection and data sheet preparation for January 18, 2011 site visit to Diamond Valley. Amy Parravano performed site visit to inspect holes dug for Geotechnical purposes to observe depth to groundwater, soil types and record vegetation. Additionally time spent on this item was used to prepare datasheets. 3) Per direction from USACE staff all data sheets compiled by Wood Rodgers in 2010 were to be transferred over to an updated Western Mountain Supplement data sheet and cross - referenced with the plant list included in the supplement. Additional map work was necessary to incorporate these points onto the wetland delineation map. 4) Addition of Hydroelectric Generation Station to SEIR. Per the direction of the District the Hydroelectric Generation Station was added to the Draft SEIR. The revision to the proposed project was then reviewed in order to determine impacts in accordance with the analysis in the EIR. The SEIR was then updated accordingly. Table 1 Work Item Description Date Hours Fees 1 USACE Meeting Jan 5, 2011 20 $2,600 2 Field Data Collection and Data Jan 18, 2011 12 $1,360 3 Transfer USACE Data Sheets using Western Mountain Supplement January/February 2011 40 $5,200 4 Addition of Hydroelectric Generation Station to SEIR March 2011 20 $2,600 Total 92 $11,760 Table 2 Task to be Completed Existing Budget Remaining for Tasks to be Completed Anticipated Budget to be Used Budget Savings 2 Migratory Bird Nest Survey $2,235.00 $2,235.00 $0 3 Prep of Tech Memo to USACE $2.135.00 $2,135.00 $0 4.5 Admin Final SEIR $4,365.00 $2,182.50 $2,182.50 4.6 Final SEIR $4,240.00 $2,120.00 $2,120.00 4.7 Board Cert SEW $3,140.00 $1,570.00 $1,570.00 Mr. No Bergsohn 29 April 2011 Page 2 Currently the Draft SEIR is in circulation that leaves Tasks 4.5, 4.6 and 4.7 remaining. Additionally Task 2 Migratory Bird Nest Survey is remaining to be completed this spring. Table 2 below outlines the existing budget remaining for these tasks, the anticipated budget to be used for these tasks and the budget savings after projected completion. The reduction in use of budget by roughly one half is due to the expectation of very few comments being received on the SEIR due to no one showing up at the public meeting, and no comments received to date. It should be noted Task 1 has been completed, however HBA has not received an invoice from Peak Consultants for the cultural work performed onsite. We fully anticipate they will be invoicing in total for the work performed. Mr. No Bergsohn 29 April 2011 Page 3 TOTAL I $16,115.00 I $10,242.50 I $5,872.50 As noted in Table 2 above, a savings of $5,872.50 is anticipated for completion of Tasks 4.5, 4.6, 4.7. The exact savings for these tasks can not be determined at this time due to the uncertainty in the number ad complexity of comments received by the public on the SEIR. As outlined in the last invoice, many of the tasks were over budget totaling $16,865.00. The request for increase totaling $11,760 combined with the savings of $5,872.50 outlined in Table 2, the project should come in at the projected budget of $66,615.00 ($54,855.00 + $11,760). Please feel free to contact me at 775.588.4700 with any questions or if you require any additional information. Kindest Regards, Garth Ailing Senior Planner/Biologist CC: File Sot.ith h e Mosimicbar (aiaCahill' Directors -"�►o �, Jame R. Jones �` Public Utility District May Lou Edo Soludier Pilo Rloo Terms that expire December 2, 2011: Seat 3 - Mary Lou Mosbacher Seat 4 - Dale Rise 1275 Meadow Cnest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544-6474 • Fax 530 541 -0614 • www stpud us BOARD AGENDA ITEM 5d TO: Board of Directors FROM: Kathy Sharp, Executive Services Manager MEETING DATE: May 19, 2011 ITEM - PROJECT NAME: Consolidated Districts Election to be Held November 8, 2011 REQUESTED BOARD ACTION: Adopt Resolution No. 2892 -11 for El Dorado County declaring an election be held in its jurisdiction, consolidation with other Districts, requesting election services. DISCUSSION: This Resolution, to be adopted and returned by July 6, 2011, authorizes El Dorado County Elections Department to provide the necessary election services to fill two four -year terms through December 4, 2015. The fling period begins on July 18, 2011, and ends on August 12, 2011, at 5:00 p.m. If the incumbent for their term fails to file by the last day of the nomination period, the time will be extended for five (5) days (August 17, 2011). (This extension does not apply if there is no eligible incumbent to be elected.) Note: The incumbent may not file after August 12, 2011. SCHEDULE: Return to El Dorado County by July 6. COSTS: Very minimal if incumbents are only candidates. Approx. $25,000+ if election services are needed. ATTACHMENTS: Resolution No. 2892 -11, Correspondence from El Dorado County Registrar of Voters, STPUD Outline of Election Process CONCURRENCE WITH REQUESTED ACTIO i GENERAL MANAGER: YES — NO CHIEF FINANCIAL OFFICER: YES NO -13- CATEGORY: General General Mana eor Mohan! H. SoIrig RESOLUTION NO, 2892-11 SOUTH TAHOE PUBLIC UTILITY DISTRICT Declaring an Election Be Held in its Jurisdiction Consolidation with Other Districts Requesting Election Services WHEREAS, it is the determination of the above -named district that an election be held on November 8, 2011, at which election the issue to be presented to the voters shall be: NOMINATION OF CANDIDATES No. of Members To be Elected Term 2 Full 4 year term to expire 12/4/2015 0 Unexpired 2 year term to expire 12/6/2013 BE IT RESOLVED that the Elections Department of El Dorado County is hereby requested to: AYES: NOES: ABSENT: President 1. Consolidate said election with any other election conducted on the same day. 2. Authorize and direct the Registrar of Voters, at District expense, to provide all necessary services, which shall include, but not be limited to: 3. In the event of a tie vote, the winning candidate shall be decided by lot. PASSED AND ADOPTED on , 2011 at a regular meeting, by the following vote: Date: publications, issue nomination documents, ballots, sample ballots, election officers, polling places and canvass. -15- ATTEST: COUNTY OF EL DORADO RECORDER CLERK - REGISTRAR OF VOTERS - VETERANS AFFAIRS William E. Schultz Recorder -Clerk Commissioner of Civil Marriages 360 Fair Lane Placerville CA 95667 www.edcgov.us/countyciesld Phone: 530.621.5490 JANE KOHLSTEDT Assistant Recorder - Clerk TO: Special District Secretaries Registrar of Voters 2850 Fairlane Court PO Box 678001 Placerville CA 95667 www.edcgov.us/eiections/ Phone: 530.621.7480 Fax 530.628.5514 FROM: William E. Schultz Recorder- Clerk - Registrar of Voters DATE: April 8, 2011 SUBJECT: Consolidated Districts Election to be held November 8, 2011 Enclosed are the necessary forms for the upcoming CONSOLIDATED DISTRICTS ELECTION that will be held on Tuesday, November 8, 2011. Please complete the enclosed forms, make copies for your files and return the originals to my office NQ LATER THAN WEDNESDAY. J14 Y 6, 2011. Veterans Service Office 130 Placerville Drive Placerville CA 95667 httpJ/www.edcgov.us/veterans/ Phone: 530.621.5883 William E. Schultz Veterans Affairs Interim Dept. Head Ed Swanson Veterans Service Officer No k: The enclosed resolution must be passed by your Board of Directors and the original, signed document returned to our office along with other completed documents. I would appreciate a current map of your District boundaries; however, if you complete the enclosed form stating that there have been no annexations of parcels or deletions of parcels from your District boundaries since December 2009 that would be sufficient. It is important that this department be aware of EVERY addition or deletion to your District boundaries. If there have been changes, you may obtain a current map from the Surveyor's office at (530) 621 -5440, ask for Jose Crummett and there is a charge for the map. If appointments to fill vacancies have been made by your Board since the last Consolidated Districts Election (November - 2009), please keep in mind that appointees only hold office until the next Consolidated Districts Election (November 8, 2011). If the term is unexpired, it shall appear on the ballot as such. Therefore, when submitting your NOTICE OF ELECTIVE OFFICES TO BE FILLED AND TRANSMITTAL OF MAP AND BOUNDARIES, please indicate these offices separately from those regularly appearing for election at this time. (Government Code Sec. 1780) The filing period begins on July 18.2011 and ends on August 12.2011 at 5:00 p.m. If the incumbent fails to file for their term by the last day of the filing period, the time will be extended for five (5) days (August 17, 2011). Please be advised that this extension DOES NOT APPLY if there is no eligible incumbent to be elected. Note: The incumbent may not file after August 12, 2011. - 16— Special District Secretaries April 8, 2011 Page Two Declarations of Candidacy papers for all districts are available at the Elections ,• Department in Placerville. Districts in South Lake Tahoe, may also file with the Recorder- Clerk's office located at 3368 Lake Tahoe Boulevard, Suite 108, in South Lake Tahoe. Please note the Recorder-Clerk's office in Tahoe is opened Monday through Friday, however, they are closed from 12:00 noon to 1:00 p.m. Attached is a copy of Elections Code Sec. 13307. This pertains to standards and procedures that may be followed by your Board of Directors with regard to Candidate's Statement of Qualifications. Should your Directors make changes to existing regulations, pursuant to this section, please forward notice of such action to our department promptly. It must be a matter of record BEFORE the filing period opens. If the District wishes to place a measure on the ballot for the Consolidated Districts Election, your Board of Directors must adopt a resolution calling for the MEASURE election and setting forth the measure EXACTLY as it is to appear on the ballot. This resolution must be submitted to the Elections Department NO LATER THAN 5:00 P.M. on July 6. 2011. This will enable publications to take place in a timely manner. For your convenience, we have enclosed a resolution requesting the Board of Supervisors to consolidate your election with any other election conducted on said date. You may use the enclosed resolution or you may draft your own, either one must be filed with Elections. Please address all inquiries and required documents to: Elections Department 2850 Fairlane Court, Building C Placerville, CA 95667 Please complete the areas on the forms marked with the red (X). If you do not agree with what our records show, please contact Diane Guyon at (530) 621 -7490 immediately. Attachments: Resolution Notice of Consolidated Districts Election "Please Post" Elections Code Sec. 13307 Notice of Elective Offices to be filled Please Note: You are required to post the "Notice of Consolidated Districts Election" in three or more conspicuous places within the District to inform the resident voters of the impending election and the number of available positions up for election. Notice of Elective Offices to be Filled and Transmittal of Map and Boundaries (Residential and Landowner Voting Districts) (Elections•Code Sections 10509,10522,10524) South Tahoe Public Utility District (Name of District) To the Registrar of Voters of El Dorado County, Notice hereby is given that the elective offices of the district to be filled at the Election on November 2, 2010 are as follows: Two Full Terms to Expire 12/4/2015 Held by: Mary Lou Mosbcher, Seat #3 and Dale Rise, Seat #4 If there have been changes to the boundaries of the district, please submit a map to the Elections N 4 Department, however, if there have been no changes, please initial " NO CHANGES" The qualifications of a nominee and of an elective officer of the district are as follows: 1 Registered Voter within the District The 2 Candidate's Statement is to be paid for by: (candida) District (lase drde one) There are measures to be voted on: (seal of the District) INSTRUCTION: 2 Yes No (vie dic Dated X (District secretary) The qualifications of a nominee and of an elective officer of a district are determined by the prindpal act of that district. (Elections Code Section 10514) Generally, the qualification for a resident voting district is "resident elector within the district or division thereof, if any," and the qualification for a landowner voting district is "resident and freeholder within the district or division thereof, if any." NOTE: FPPC Regulations Section 18530, effective October 10, 1990, ruled that districts can pay for "production and dissemination of candidates statements" notwithstanding Government Code Section 85300 which forbids use of "public money for promoting candidacies." NOTE: This Notice and Transmittal shall be made at least 125 days before the general district election and shall either be delivered in person or mailed by certified mail in time to reach the Registrar of Voters on the designated date. (Elections Code Sections 10504, 10509, 10522, 10524) * Please return this form to the Elections Dept * -18- Election Code Section 13307. (a) (1) Each candidate for nonpartisan elective office in any local agency,. including any city, county, city and county, or district, may prepare a candidate's statement on an appropriate form provided by the elections official. The statement may include the name, age and occupation of the candidate and a brief description, of no more than 200 words, of the candidate's education and qualifications expressed by the candidate himself or herself. However, the governing body of the local agency may authorize an increase in the limitations on words for the statement from 200 to 400 words. The statement shall not include the party affiliation of the candidate, nor membership or activity in partisan political organizations. (2) The statement authorized by this subdivision shall be filed in the office of the elections official when the candidate's nomination papers are returned for filing, if it is for a primary election, or for an election for offices for which there is no primary. The statement shall be filed in the office of the elections official no later than the 88th day before the election, if it is for an election for which nomination papers are not required to be filed. If a runoff election or general election occurs within 88 days of the primary or first election, the statement shall be filed with the elections official by the third day following the governing body's declaration of the results from the primary or first election. (3) Except as provided in Section 13309, the statement may be withdrawn, but not changed, during the periedfor -filing nomination papers and until 5 p.m. of the next working day after the close of the nomination period. (4) Notwithstanding paragraph (2) of this subdivision, a candidate for a judicial office shall have until 5 p.m. on the 83rd day before the election to file a candidate statement as authorized by this section. This paragraph shall remain in effect only until January 1, 2007, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2007, deletes or extends that date. (b) The elections official shall send to each voter, together with the sample ballot, a voter's pamphlet which contains the written statements of each candidate that is prepared pursuant to this section. The statement of each candidate shall be printed in type of uniform size and darkness, and with uniform spacing. The elections official shall provide a Spanish translation to those candidates who wish to have one, and shall select a person to provide that translation from the list of approved Spanish language translators and interpreters of the superior court of the county or from an institution accredited by the Western Association of Schools and Colleges. Continued on reverse side. (c) The local agency may estimate the total cost of printing, handling, translating, and mailing the candidate's statements filed pursuant to this section, including costs incurred as a result of complying with the federal Voting Rights Act of 1965, as amended. The local agency may require each candidate filing a statement to pay in advance to the local agency his or her estimated pro rata share as a condition of having his or her statement included in the voter's pamphlet. In the event the estimated payment is required, the receipt for the payment shall include a written notice that the estimate is just an approximation of the actual cost that varies from one election to another election and may be significantly more or less than the estimate, depending on the actual number of candidates filing statements. Accordingly, the elections official is not bound by the estimate and may, on a pro rata basis, bill the candidate for additional actual expense or refund any excess paid depending on the final actual cost. In the event of underpayment, the elections official may require the candidate to pay the balance of the cost incurred. In the event of overpayment, the elections official shall prorate the excess amount among the candidates and refund the excess amount paid within 30 days of the election. (d) Nothing in this section shall be deemed to make any statement or the authors thereof free or exempt from any civil or criminal action or penalty because of any false, slanderous, or libelous statements offered for printing or contained in the voter's pamphlet. (e) Before the nominating period opens, the local agency for that election shall determine whether a charge shall be levied against that candidate for the candidate's statement sent to each voter. This decision shall not be revoked or modified after the seventh day prior to the opening of the nominating period. A written statement of the regulations with respect to charges for handling, packaging, and mailing shall be provided to each candidate or his or her representative at the time he or she picks up the nomination papers. (f) For purposes of this section and Section 13310, the board of supervisors shall be deemed the governing body of judicial elections. 13307.5. A candidate for United States Representative may purchase the space to place a statement in the voter information portion of the sample ballot that does not exceed 250 words. The statement may not make reference to any opponent of the candidate. The statement shall be submitted in accordance with the timeframes and procedures set forth in this code for the preparation of the voter information portion of the sample ballot. March —June July — August Election Process and Clerk of Board Duties District Elections Take Place Every Odd - Numbered Year for Director -at- Large, Elected by Seat Election for Seats No. 1, 2, and 5, Alternate with Elections for Seats No. 3 and 4 Receive notice and necessary forms from Registrar of Voters. Put Resolution on agenda for approval and return original document by deadline. Any changes in District boundaries (annexations, deletions, etc.), must be submitted via a current, stamped LAFCO map. If no changes, complete the form stating there were no boundary changes. If Board members were appointed since the fast election, they only hold office until the next election. If the term is unexpired, it shall appear on the ballot as such. If this is the case, these offices need to be indicated separately from those regularly appearing for election at this time. Notice provided from Registrar of Voters must be posted in three or more conspicuous places in the District. It informs the resident voters of the District of the impending election and the number of available positions up for election. Fill out and return an Affidavit of Posting for District records. if changes were made to the existing election regulations, they must be provided ASAP, and before the nomination period begins. If the District wishes to place a measure on the ballot, the Board must adopt a resolution calling for the Measure election and setting forth the measure exactly as it is to appear on the ballot. The resolution must be submitted no later than the deadline, which is within the first few days of July. Registrar of Voters sends notice that this is nomination / filing period. (Typically from the second week of July through early August.) Candidates must file a Declaration of Candidacy with the Registrar of Voters during this time period. These statements can be filed in South Lake Tahoe at the El Dorado County Recorder Clerks Office located at 3368 Lake Tahoe Boulevard. Candidates can also go to the County Registrar of Voters office in Placerville to file at 2850 Fairlane Ct. Building C. El Dorado County Registrar of Voters handles the election process. Questions about the process should be directed to 530.621.7490. Directors are elected at- large, by seat (not by "district" or "territorial unit "). Each person running for a seat must be a registered voter and reside within the District's boundaries. Directors are elected by popular vote of the general public who reside within the District boundaries. When potential candidates go in the Recorder Clerk's office for the first time, they must declare which seat they are filing for. From that point forward, they have "declared their candidacy" or "filed for a seat." There are no filing fees. Their name will appear on the ballot at this point. They do not need a "statement" in order for their name to appear on the ballot. (There are no "nomination" papers, etc.) Candidates have the option to file a "candidates statement" that will appear on their ballot. (Mistakenly referred to as "taking out your papers. ") When the candidate goes in to declare candidacy, they can take this paperwork home to fill out the information needed if they desire to include their statement on the ballot. Must be 200 words or less, and costs approximately $425. The statement can also be printed in Spanish for an additional fee. (Many people think that only when the fee is paid, is when they become official candidates. That is incorrect. They became official candidates when they took the first step declaring the seat they intend to run for.) Candidate's statements are paid for by the candidate (not the District). Candidate statements are kept private during the filing period. After the filing period ends, they will be made available to the public as soon as possible for a 10 day examination period where the statements can be reviewed and purchased for .10 per_ -21- September - October November page from the County Registrar of Voters office. The statements will then be placed on the ballots. If the incumbent for their term fails to file by the last day of the nomination period, the time will be extended five days. This extension does not apply if there is no eligible incumbent to be elected. If a candidate files for a seat, and then decides not to run, they have to notify the Registrar of Voters by the end of the filing period deadline. Any time after that will be too late and the name will appear on the ballot. If a candidate declares candidacy for a particular seat and then decides to switch and run for a different seat, they may resign from the first seat and file for the desired seat. If a candidate who decides not to run did not notify the Registrar of Voters within the filing period, their name will appear on the ballot. The candidate must submit a letter of resignation, a notice of vacancy must be posted 15 days, and the Board will, appoint a director to serve until the next scheduled election. Candidates are prohibited from filing nomination papers for more than one special district office or term of office for the same district in the same election. The Registrar of Voters will publish legal notices of elections in the Tahoe Daily Tribune and other-applicable newspapers. A copy of the notice will be sent to the District for posting. Candidates campaigning process underway. All laws, election rules, local ordinances and codes re: sign placement, distribution of flyers, etc. should be adhered to. Guidelines for communicating with District staff should also be adhered to. Clerk distributes informational memo to customer service and staff, outlining the election procedures, including seats that will expire, dates of nomination period, and the location to declare candidacy. Also puts information outlining process in employee newsletter. Election information may be posted on the District's web site, included in the District's customer newsletter "The District Digest," and on the outside reader board. General Manager sends letters to all candidates acknowledging their intention to run for election. If incumbents are unchallenged, their names will not appear on the election ballot. They are automatically "appointed" to serve their terms. Election costs are greatly reduced. The District has to pay for services received from the Registrar of Voters to this point. Candidates Forums — If incumbents are challenged, the District's ECC sponsors a Candidates Forum to allow employees to interact with candidates. Invitations are sent, questions prepared, and a date is scheduled. Use of District resources is allowed to conduct forums. A neutral format should be provided that ensures the same guidelines, access to information, time allotments, etc. are provided equally to each candidate. Forums should not be used to advocate for or against any candidate, tell employees how to vote, nor ask them to vote for or against particular candidates. Several service organizations in South Lake Tahoe also sponsor candidates. Clerk will provide notification when these are brought to the District's attention. Candidates campaigning process remains underway. Elections are held the first Tuesday after the first Monday in November. Polls close around 8:00 p.m. Absentee ballots are counted around 8:15 p.m. and are updated as precincts turn them in. Tahoe votes are driven to Placerville and processed around 10:30 —11:00 p.m. Final votes are expected to be known by 11:30 p.m. — midnight and are available on their web site: www.edcgov,uslelectionsf -22- New directors must abide by the Brown Act immediately, even before officially assuming office. Email election results to all employees and Board members. Send thank you letters to candidates who were not elected. Registrar of Voters sends a Statement of Vote Cast, Certificates of Election and Oaths Clerk of Board administers Certificates of Appointment and Oaths of Offices. New Directors assume office on the first Friday of December at noon and cannot take any official actions until they have signed the Oath. After Clerk of Board has administered Oath, the original documents are returned to the Registrar of Voters. New Directors are seated at the second Regular Board Meeting in December. A ceremonial oath of office will be held at the beginning of the Board meeting to provide an opportunity for friends and family to watch. Election billing statement is sent by Registrar of Voters, plus a Statement of Vote and Certificate of Result of Official Canvas. Billing statement is received and paid. The amount is approximately $14,000 - $18,000 for election services. Richard Solbri • , General Mana • er Dale Rise, President BOARD OF DIRECTORS: President Rise, Directors Cefalu, Jones, (Note: Director Schafer left the meeting a SOUTH TAHOE PUBLIC UTILITY DISTRICT Chris Cefalu, Director James R. Jones, Direct REGULAR MEETING OF TH D OF ' TORS SOUTH TAHOE PU ILITY DISTRI APR 011 STAFF: Sciuto, Sharp, Hughes, C fi g, Bro Hogga Bergsohn, C. Stanley, P. L • - e, Thie � e, Van en, Curtis, Johnson, Nolan, Bird, `: •h, Ri. s ` r, William Attorney Herrem (Note: Gen = onager, d S • partic : ' in closed sessio teleconfere fro - 4:45 p.m.) GUESTS: Garth Ailling /Hauge . k, Bob D • s /Liberty Energy, Pete Patten /Partnership, . Tuck- >hontan, Kathryn Reed /Lake Tahoe s, r ll Paul, Cathy Martin Lynne Paulson Jimmie Hoggatt led the pledge to the flag. Bob Dodds, Liberty Energy, spoke to convey interest in a public /private partnership to utilize effluent by installing a turbine on the C -line to produce energy to sell back to the grid. Staff will work with Liberty Energy on this concept. Lynne Paulson voiced her concern that approval of Consent Item e. (2011 Grizzly Mountain Waterline) is listed before consideration of Action Item a. (Grizzly Mountain Booster Station). Piping could change depending on Paul Sciuto, Assistant General Mana. er BOARD MEMBERS Lou Mosbacher, Vice President -25- Eric W. Schafer, Director PLEDGE OF ALLEGIANCE COMMENTS FROM THE AUDIENCE CONSENT CALENDAR REGULAR BOARD MEETING MINUTES - APRIL 21, 2011 PAGE - 2 the discussion and action taken once the booster station CONSENT CALENDAR item is considered. President Rise clarified that the water- (continued) line project will still need to be done, however, if the booster station project was changed, the short section of pipe going down Grizzly Mountain could be eliminated from the contract. Moved Schafer / Second Jones / Passed Unanimously to approve the Consent Calendar as submitted: a. Temporary Help for Information Systems Department - Approved contract with Substitute Personnel or Blue Ribbon for a temporary special projects technic' in the estimated amount of $24,000; b. Engineering Temporary Help - Approved ext the contract of a temporary employee throu September 2011, from Substitute Personnel & Business Services, in an amount not t xceed $15,000; c. Organ Transplant Policy - Approved in maximum benefit for organ transplant c an unlimited maximum, f • itional premium of $1,932; d. Diamond Valley Ranch gation Improvements , • .. ted • . :89 -1 regarding t fi /au ion ment /de pprov loan appl ources Control Bo e. 2011 Grizzly Mou bid irregularities; an responsive, responsible Company, Inc., in the a ) Waived minor id to the lowest • ick Excavating 1,110,275; f. Sewer Line Patch Repair - (1) Found minor deviation in the lowest bid to be immaterial and waived deviation as such; and (2) Awarded bid to the lowest responsive, responsible bidder, Hoffman Southwest Corp., in the amount of $62,456; g. Cold Creek Filter Plant SEZ Restoration Project - (1) Found that Eoocrete is the sole manufacturer of porous concrete mixture that has the required durability for the project; and (2) Designated -26- REGULAR BOARD MEETING MINUTES - APRIL 21, 2011 PAGE - 3 Ecocrete admixture as the sole porous concrete CONSENT CALENDAR admixture that may be used in the project, without (consent) alternative; h. Cold Creek Filter Plant and Ralph Tank SEZ - Authorized staff to advertise for bids; i. Hydro Truck Bid - (1) Rejected all bids; and (2) Authorized staff to advertise for bids for a sewer cleaning truck and machine. No Board action. ITEMS FOR BOARD A The District has prepared an Initial Study with a findi GRI OUNTAIN BOOSTER STATION that this project will not result in any significant a environmental effects as a result of implementa Notice of Intent (NOI) was sent to the state for a review period, which expires April 22. The NOI was a provided to property owners within 300 of the prod John Thiel requested the Board receive p on the Initial Study and Negative Declarat Environmental Impact for the - t. He ga PowerPoint presentation t • the p of the project, property s " ion pr s, prop capabilities, funding cons! • ions p ct time comments received /respons - en he pro- ject schedule. T ed th le and extende • me riod to 5. He also sch= d two nei+ ook etings - was held Apri • nd the ne - will pril 23. Lynne Paulson req d the publ omme period be extended by 30 d • • nd read concerns to the Board that include • fficien blic comment period, site selection and • - chase, lack of neighborhood meetings or p olvement, en- vironmental impacts, noise, ligh g, building design, and inadequate mitigation measures. (Ms. Paulson's statement is on file with the Clerk of the Board.) Staff relayed their willingness to work with neighboring property owners to address their concerns and mitigate any impacts the booster station may have. REGULAR BOARD MEETING MINUTES - APRIL 21, 2011 No Bergsohn requested the Board receive public RECYCLED WATER FACILITIES MASTER comments on the Draft Supplemental Environmental PLAN Impact Report (SEIR). The original master plan was adopted December 2009. Since that time, a small project was added, thereby necessitating this supple- ment. Bergsohn and Garth Ailing, Hauge Brueck, gave a PowerPoint presentation that explained the need for this project, and covered the: SEIR and uses, SEIR actions, environmental process, future actions, SEIR summary, project revisions, significant impacts, mitigation monitor- ing plan, and location of project. No public comments were received, and the public comment period was closed. No Board action. Three bids were received for this project at the Ap _' NE COU ROUNDWATER bid opening. Bid results and deviations • ociated wi STALLATION each were summarized. Moved Schafer Second Jones Pass waive the immaterial bid deviations and a to the lowest responsive, re • idder, Engineering Services, in t y ou 71,210. Director Schafer received c fee paid to the U • • *_ ater is necessary to Moved Cefa to approve pa nanimo' "ly 470.67. Legal Service Provi ittee: President Rise reported the committe t, and •resent their recom- mendation at the May 5 " . ar B • meeting. Director Mosbacher reported • =r attendance at the BOARD MEMBER REPORTS the Grizzly Mountain Booster Station neighborhood meeting held April 20. Director Schafer reported he will attend the CASA (California Association of Sanitation Agencies) spring conference in Sacramento. Water and Wastewater Operations Committee: The committee met on April 18. Minutes of the meeting are available upon request. t the an "= i l PAYMENT OF CLAIMS -28- BOARD MEMBER AD HOC COMMITTEE REPORT BOARD MEMBER STANDING COMMITTEE REPORTS PAGE -4 REGULAR BOARD MEETING MINUTES - APRIL 21, 2011 Assistant General Manager / Engineer: Paul Sciuto reported STAFF REPORTS that one of the wells belonging to Tahoe Keys Water Com- pany was severely impacted by PCE. They requested a wholesale water agreement be developed in case they need the District to provide them with additional water this summer. Costs associated with consumptive water use, meter installation, etc. will be discussed. Chief Financial Officer: Paul Hughes reminded the Board that capacity charges are scheduled to increase July 1. Clerk of the Board: Kathy Sharp pointed out that AB 1234 requires only elected officials to receive ethics training two gears - , with the option - to designate certain staff iCd. The Board's policy currently requires that all District • gers receive ethics training every two years. She will . ct a listserve survey to determine industry standard, • ' results differ from current practice, will propose policy am _ ent options for consideration at a future me -; ing. (3:30 P.M. - Director Schafer left the mee 3:30 - 3:50 P.M. 3:50 P.M. No Reportable Board action. 4:45 P.M. -29- point.) ACTION / ' T O S DISC D DURING CLOSED SESSION G BREAK ENT T• L.SED ESSIIN PAGE - 5 Pursuant to Government Code Section 54956.9(aJ /Conference with Legal Counsel - Existing Litigation re: False Claims Act Case: United States, the States of California, Delaware, Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06- 0055 -GW, United States District Court for the Central District of California Pursuant to Government Code Section 54956.9(c) /Conference with Legal Counsel - Anticipated Litigation (One Case) RECONVENED TO OPEN SESSION, REGULAR BOARD MEETING MINUTES - APRIL 21, 2011 Paul Hughes reported notices have been sent to all customers about the Proposition 218 public meeting that will be held May 19 concerning the proposed sewer rate increase. Several public meetings on the budget and rates have been held with no public comment or input. Now that the notices have been sent, there is interest where there was not before. The HDR rate consultants will be at the May 5 public meeting to repeat the water rate study presentation, as well as attend the May 19 Proposition 218 meeting. ATTEST: Kathy Sout STAFF REPORT 4:50 P.M. URNMENT ale Rise, Board P sident uth Tahoe Public Utility District PAGE - 6 Richard Solbri s General Mana • er Dale Rise, President Chris Cefalu, Director STAFF: Solbrig, Sharp, Sciuto, Hug Ryan, Bledsoe, Cullen, J GUESTS: Rob Brueck /Hau Lynne Paulso John Runnel Patricia Handal relay rates and water usage. led her to believe she wo of water. Staff explained the and the consumption rate po SOUTH TAHOE PUBLIC UTILITY DISTRICT Paul Sciuto, Assistant General Mana s er BOARD MEMBERS Lou Mosbacher, Vice President James R. Jones, Direct • Eric W. Schafer, Director REGULAR MEETING OF TH D OF ' TORS SOUTH TAHOE PU ILITY DISTRI M MIN BOARD OF DIRECTORS: OLL CALL President Rise, Directors Cefalu, Jones, Chris Stanley le • •ledge to • g. PLEDGE OF ALLEGIANCE ing of water meter isinformation that for unused portions e portion of the bill, of the bill. a. MXU's and Water Meters - (1) Authorized exception to bidding procedures as outlined in the Purchasing Policy for a sole source purchase of standardized supplies; and (2) Authorized purchase of Sensus MXU's and meters from Western Nevada Supply, in the amount of $120,000 including tax and freight; COMMENTS FROM THE AUDIENCE Moved Mosbacher / Second Schafer/ Passed Unanimously CONSENT CALENDAR to approve the Consent Calendar as submitted: -31- REGULAR BOARD MEETING MINUTES - MAY 5, 2011 b. Secondary Clarifier #1 Drive - (1) Authorized exception CONSENT CALENDAR to bidding procedures as outlined in the Purchasing (continued) Policy for a sole source purchase, and requirement for compatibility with existing equipment; and (2) Approved purchase of one secondary clarifier drive from OVIVO Water Technologies, in the amount of $46,667; c. 2011 Filter Rehabilitation Project - Approved Change Order No. 1 to ERS Industrial Services, in the amount of $13,669.68; d. Headworks Replacement Project Phase 2 - Authorized payment to the Tahoe Regional Planning Agency in amount of $32,019.50 for water quality mitigation f e. BMP and SEZ Restoration Project - Authorize • ent to Liberty Energy in the amount of $30,282 for line extension; f. Headworks Phase 2 Financing - Aut * Chief Financial Officer to execute an enga �` -tter with Bartle Wells Associates, in the amount g. Approved Regular Boar • Minute April 7, 2011. ent in the ed Un 416,29 The agency met M. Topics of • ssion cluded next year's budget a ving ide • he agency will meet w /Bureau of Recla �'on re • . ing Fazio water to obtain additional water � :_ F�� . _. °. Lake. ITEMS FOR BOARD ACTION 2:30 P.M. Public Meeting John Thiel gave a PowerPoint presentation covering the purpose and benefits of the project. Rob Brueck/ Hauge Brueck Engineering, reviewed what was done to satisfy the CEQA process. He also reviewed site selection and the revised site plan, and comments re- ceived on the project including responses for each. PAYMENT OF CLAIMS PAGE - 2 EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVE REPORT GRIZZLY MOUNTAIN BOOSTER STATION REGULAR BOARD MEETING MINUTES - MAY 5, 2011 John Thiel reviewed the schedule, and opened the hear- GRIZZLY MOUNTAIN BOOSTER STATION ing to receive additional public comments. (continued) Lynne Paulson relayed her appreciation for the additional meetings and communications that have occurred since the April 21 Board Meeting. She requested continued com- munications, especially concerning potential operational noise levels. She also recommended policies be reviewed so conflicts encountered can be avoided on future projects. Virginia Mahacek voiced her concerns, which included: - The short notice period and lack of solicitation of public input on the project; - The notice was not postmarked until a week after t official comment period, which made it difficult vide comments; - The neighborhood meeting was noticed the meeting (again, too short of notice); - Her comments were not included or r • onded to the CEQA document, even though s itted the in time (regarding grading and draina Additional meetings will be held with neigh details. Moved Mosbacher / Sec to: (1) Adopt the Mitigated Negative Environ = • • 1 Impa for implement of Determin Dorado Coo President Rise rep the Legal Service Pr explained their recom for Proposals) for legal se relayed concerns with Brow (BHFS) capabilities to meet the assed ously laration thep t utfi e house and dissatisfaction with some performance issues. Attorney Kvistad reviewed BHFS written report with the Board and responded to comments received. He also summarized services provided by BHFS and related experience, competitive rates, history with the District, cost saving measures, and value of services provided. Director Mosbacher indicated her satisfaction that the report prepared by Attorney Kvistad was sufficient and answered all questions. or Ce met as LEGAL SERVICE PROVIDERS mittee and icit RFPs (Request s. President Rise also tt Farber Schreck's ct's changing needs, -33- PAGE -3 REGULAR BOARD MEETING MINUTES - MAY 5, 2011 PAGE - 4 Director Jones and Schafer voiced their opposition to LEGAL SERVICE PROVIDERS soliciting RFPs, and further voiced their satisfaction with (continued) the performance of Attorneys Kvistad, Herrema, and BHFS. The cost comparison survey showed legal fees are within range of others. President Rise wished to relay additional information in connection with Closed Session Item a. (J -M Manufac- turing litigation) and continued the discussion until afterwards. No Board action. Director Schafer reported on his attendance at the (California Association of Sanitation Agencies) co ce held April 27 -29. Topics included: contracts and sible bidders, workers' comp and employment I student education program, biosolids and costs re ;__,• t disposal. The cost to attend the conference totaled YM President Rise reported on his attendan `: SDA (California Special Districts Association Co a eld May 3-4. One highlight was the legal couns Bay MUD. He suggested st. • •ad their use as they relate to the ► T ere als sions on transparency an Brent ods to the public. He reviewed so ang =' the law may be on the ho • . He wi ten r in two weeks. BO MEMBER REPORTS Richard Solb thank - GENERAL MANAGER REPORT staff and the B. � .for their sups':. duri �� is time. President Rise pointe difficulty determining t file a Proposition 218 noti included next time. ere having rs as required to sted they be Assistant General Manager /Engineer: Paul Sciuto reported a few new water meters will be installed as part of the Grizzly Mountain waterline project; however, there were no new water meter projects scheduled for this year. President Rise suggested the District should supply water meters and meter pits for new construction to maintain consistency among customers. The customer would be responsible for installation costs. Staff estimated doing this would result in a $200,000 change order, and will require further definition and direction by the Board. -34- BOARD REPORT STAFF REPORTS REGULAR BOARD MEETING MINUTES - MAY 5, 2011 PAGE - 5 4:05 - 4:50 P.M. ADJOURNMENT TO CLOSED SESSION AND RECONVENE TO OPEN SESSION No reportable Board action. No reportable Board action. After the disc tion Close Item a. (J -M ufacturing • tion sident removed this i rom consi • - on • om the agenda. No Board action. 4:55 P.M. ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION ATTEST: Kathy Sharp, Clerk of the Board South Tahoe Public Utility District FOR BO ACTION -35- Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel- Existing Litigation re: False Claims Act Case: United States, t ; • tes of California, Delaware, a, Nevada, and Tennessee and Commonwealths of Massachusetts irginia ex rel. John Hendrix v. J -M ufacturing Company, Inc., and F. a Plastics Corporation, U.S.A., CI tion ED CV06- 0055 -GW, United Stat trict Court for the tral Distric alifornia ursuant to Government Code ction 54956.9(a) /Conference with I Counsel - Existing Litigation re: eles County Superior Court Case 9943, State of Nevada, et al. nufacturing, et al. LEGAL SERVICE PROVIDERS ADJOURNMENT Dale Rise, Board President South Tahoe Public Utility District Richard Solbri• , General Mane ! er Dale Rise, President James R. Jones, Director The Board of Directors of the South Ta May 5, 2011, 6:00 p.m., District Office, BOARD OF DIRECTORS: President Rise, Directors Mos Schafer STAFF: Bledsoe, Curtis, Frye, fiend Johnson, Mangi Solbrig GUESTS: Shawn Koorn, A Public Meeting w the 2011/12 Sewer an and to gather public inp Ras SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD MEMBERS Eric W. Schafer, Director PUBLIC MEETING OF THE BOA SOUTH TAHOE PUBLIC U MAY MI ES er, Cefal Public Utili adow Cr tt, Hughe ciuto, om public information on se Budgets, es and Paul Sciuto gave a PowerPoint present the 2011/12 Fiscal Year Budgets and long -term i cial plans for the Sewer and Water Enterprise Funds. The sewer fund included a proposed rate increase of 3% and no pro- posed increase for the water fund. Staff and Board members received and responded to several comments from the public pertaining to: water meter installations, conservation, consumption and flat rate billings, and state mandates; Alpine County export processes, infrastructure replacement, and energy costs; and overall District operating expenses with current economic conditions. -37- Paul Sciuto, Assistant General Mena er Mary Lou Mosbacher, Vice President RECTORS CT Chris Cefalu, Director eld a Public ing on ve, South Lake Tahoe, California. NDEES 2011/12 FISCAL YEAR BUDGETS: SEWER ENTERPRISE FUND AND WATER ENTERPRISE FUND PUBLIC MEETING MINUTES - MAY 5, 2011 The Board directed staff to present a budget based on a 3% increase in sewer, and for the Finance Committee to meet to further discuss water consumption thresholds and rates. The final budget is expected to be adopted at the May 19 Board meeting. Shawn Koorn of HDR Engineering gave a PowerPoint presentation on the 2011 water rate study, including revenue requirements, cost of service, and rate design used to formulate the 2011/12 proposed service rates. No Board action. 9:56 P.M. ATTEST: Kathy Sharp, C : oard By: Susan Rasmus Finance Administrative Assistant PAGE - 2 2011/12 FISCAL YEAR BUDGETS: SEWER ENTERPRISE FUND AND WATER ENTERPRISE FUND (continued) 2011 WATER METER SERVICE RATES NMENT Dale : oard President South Tahoe Public Utility District - ..L South Ta Public Utility District 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.us BOARD AGENDA ITEM 8a TO: Board of Directors FROM: No Bergsohn, Hydro - Geologist MEETING DATE: May 19, 2011 ITEM - PROJECT NAME: Alpine County Monitoring Well Installation Project REQUESTED BOARD ACTION: Accept proposal from the consultant recommended to provide hydrogeological services. DISCUSSION: On April 21, 2011, the Board accepted the construction bid from the water well drilling contractor (Technicon Engineering Services, Inc., Fresno, CA) for the Alpine County Monitoring Well Installation Project. This project involves the drilling and sampling of test borings and the construction of shallow groundwater monitoring wells at fourteen (14) sites in Alpine County, CA. Consulting services are needed to assist the Hydro - Geologist: document that all construction services are completed in accordance with District specifications and Alpine County permit conditions; provide on -site direction; collect required soil and groundwater samples; and complete geologic records and project documentation requirements. On April 4, 2011, proposal requests were solicited to potentially interested consultants and were received from four firms. At this time, District staff is reviewing the proposals. A summary of the proposals and staff's recommendation identifying the consultant best qualified to conduct this work will be provided prior to, and at the Board meeting. SCHEDULE: June 2011 - September 2011 COSTS: $65,000 (estimated) ACCOUNT NO: 1029- 8136 /ALPMWS BUDGETED AMOUNT REMAINING: $126,643 ATTACHMENTS: ALPMWS - Hydrogeological Services RFP (04/04/11); Summary of proposals and staff recommendation to be provided prior to, and at the Board meeting. CONCURRENCE WITH REQUESTED ACTIO GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO - CATEGORY: Sewer Goners' Manager Richard H. Soferg Cinvotervs .QaCefaki James R. Jones Mary Lou Mosbacber Di s Rise Eric Schafer South Tc!l'ioe Put l tt%I,%tl� Distract Mevttiora v c u.vu. Date: May 16, 2011 To: Board of Directors, R. Solbrig From: No Bergsohn • 4. Re: Alpine County Monitoring Well Installations — Consultant Recommendation On April 4, 2011, staff solicited a Request for Proposal (RFP) to provide hydrogeological consulting services for the Alpine County Monitoring Well Installation Project (ALPMWS). Submittals were accepted until May 5 2011 and were received from the following firms: 1) AMEC; 2) Construction Materials Engineering (CME); 3) Farr West Engineering (FWE); and 4) Lumos and Associates. Consultant proposals were carefully reviewed and scored by District staff using the four criteria and point values listed on the RFP Evaluation and Selection Criteria worksheet. These criteria included: completeness; qualifications; experience; and efficiency. Following staff evaluation, reviewer scores were compiled and are presented on the RFP Scoring Summary. From the scoring summary, the proposals were re- scored according to each reviewer's rank to provide a total score, provided in the RFP Rankings. On May 13 review team members conferred to discuss the proposals. Review of the scoring summary and RFP rankings shows that the highest scores from the review team were awarded to the proposal submitted by Farr West Engineering. District staff recommends that the Board select Farr West Engineering to provide hydrogeological services for this project and accept the accompanying revised work hour and expense estimate to complete this work in the amount of seventy -seven thousand one hundred ninety -nine dollars ($77,199.00). Attachments cc: P. Scioto F -Le V Richard .soLbri.0, cevverat Mcmcieer oara' Mevkbers Chris aefaLv Jawtes RJouts Mari Lou Mosbacher Dale Rise Eric scha fer South Tahoe Public Utility District • 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Phone 530.544.6474 • Facsimile 530.541.0614 • www.stpud.us SOUTH TAHOE PUBLIC UTILITY DISTRICT ALPINE COUNTY MONITORING WELL INSTALLATION PROJECT PROJECT CODE: 1029 - 8136 /ALPMWS RFP EVALUATION & SELECTION CRITERIA On a scale of 1 to 10 (1 = weak to 10 = strong) rank the proposals using the following criteria and enter your scores on the accompanying scoring sheet. CRITERIA DESCRIPTION WEIGHTING 1 2 3 4 Rank the overall completeness of the submittal. Does it include all components requested in the RFP, including example geologic record and documentation products. Rank the project team in terms of qualifications necessary to complete the work. Does the project team include a California registered professional qualified to do the work. 0.20 0.20 Rank the project team in terms of experience. Does it include relevant project examples and contact information. 0.35 From the estimated schedule and budget, rate your confidence regarding the project teams ability to successfully address the project needs in an efficient manner. 0.25 1.00 ALPMWS_MW_Installations.xlsm 1 5/13/2011 III IAMEC I Reviewer 1111 6 II 7 11 6 11 7 II 26 Reviewer 2 111 8 if 8 0 8 II 6 11 30 Reviewer 3111 7 if 7 if 6 11 7 II 27 AMEC Totals111 21 11 22 if 20 11 20 11 83 Construction Materials Engineering Reviewer 1 111 10 11 8 II 9 1I 9 II 36 Reviewer 2 111 7 if 7 U 7 if 6 11 27 Reviewer 3111 10 11 10 0 9 II 9 U 38 CME Totals111 27 11 25 11 25 11 24 11 101 Farr West Engineering Reviewer 1 111 9 11 8 II 9 II 7 II 33 Reviewer 2 111 8 11 8 11 8 11 7 11 31 1 Reviewer 3 111 10 11 9 11 10 11 9 II 38 FWE Totals111 27 11 25 if 27 11 23 11 102 Lumos & Associates Reviewer 110 5 II 7 II 6 II 7 II 25 Reviewer 2 111 7 11 7 II 7 II 7 II 28 Reviewer 3 111 7 1I 6 11 6 11 6 11 25 L&A Totals!!! 19 11 20 11 19 11 20 11 78 SOUTH TAHOE PUBLIC UTILITY DISTRICT PHASE 1 MONITORING WELL INSTALLATIONS SCORING SUMMARY FIRM 1 CRITERIA 2 3 ALPMWS_MW_Installations.xlsm 1 4 TOTAL SCORE - RAW 5/13/2011 I WEIGHTING) I 0.20 II 0.20 II 0.35 0 0.25 II 1.00 I IAMEC I I I I Reviewer 111 1.20 II 1.40 11 2.10 II 1.75 II 6.45 I Reviewer 211 1.60 II 1.60 II 2.80 II 1.50 II 7.50 I Reviewer 311 1.40 II 1.40 II 2.10 II 1.75 II 6.65 I AMEC Totals) I 4.20 II 4.40 II 7.00 II 5.00 II 20.60 (Construction Materials Engineering I I Reviewer 111 2.00 II 1.60 II 3.15 II 2.25 II 9.00 I Reviewer 211 1.40 9 1.40 II 2.45 9 1.50 2.25 9 I 6.75 9.40 I Reviewer 311 2.00 II 2.00 9 3.15 II I CME Totals! I 5.40 9 5.00 II 8.75 II 6.00 II 25.15 (Farr West Engineering I I I Reviewer 111 1.80 9 1.60 II 3.15 II 1.75 II 8.30 I Reviewer 211 1.60 9 1.60 II 2.80 9 1.75 II 7.75 I I Reviewer 311 2.00 9 1.80 II 3.50 9 2.25 II 9.55 I I FWE Totals) I 5.40 9 5.00 9 9.45 II 5.75 9 25.60 ILumos & Associates I I I I Reviewer 111 1.00 I! 1.40 II 2.10 9 1.75 9 6.25 I Reviewer 211 1.40 9 1.40 9 2.45 9 1.75 9 7.00 I Reviewer 311 I 1.40 3.80 9 9 1.20 4.00 9 II 2.10 6.65 9 II 1.50 5.00 II II 6.20 19.45 I I L&A Totals! SOUTH TAHOE PUBLIC UTILITY DISTRICT PHASE 1 MONITORING WELL INSTALLATIONS SCORING SUMMARY FIRM 1 CRITERIA 2 3 4 TOTAL SCORE - WEIGHTED ALPMWS_MW Installations.xlsm 2 5/13/2011 SOUTH TAHOE PUBLIC UTILITY DISTRICT ALPINE COUNTY MONITORING WELL INSTALLATION PROJECT PROPSAL RANKINGS (1 = Low; 4 = High) Ranking Points 1 4 2 3 3 2 4 1 ALPMWS MW Installations.xlsm 1 5/13/2011 AMEC FIRM Construction Materials Engineering Farr West Engineering Lumos & Associates Reviewer 111 2 3 2 7 II 4 II 1 II 3 II 8 I I I) II �I 3 4 4 11 II �I II II 1 2 1 4 Reviewer 211 Reviewer 311 TOTAL SCORE II SOUTH TAHOE PUBLIC UTILITY DISTRICT ALPINE COUNTY MONITORING WELL INSTALLATION PROJECT PROPSAL RANKINGS (1 = Low; 4 = High) Ranking Points 1 4 2 3 3 2 4 1 ALPMWS MW Installations.xlsm 1 5/13/2011 April 4, 2011 Bret Whitford, P.G. AMEC 780 Vista Boulevard; Ste. 100 Sparks, NV 89434 South Tahoe Public Utility District 1275 hodem 'O r a Chive • Barth Latta Tahoe • CA Fhoita MO 5446474 • Fax 580 5 RE: Alpine County Monitoring Well Installation Project — Hydrogeological Services Request for Proposal (RFP) Dear Mr. Whitford: The South Tahoe Public Utility District (District) is seeking proposals from qualified firms to provide hydrogeological consulting services for the Alpine County Monitoring Well Installation Project. A copy of the contract documents for the monitoring well installation program are enclosed for your review and consideration. The work for this project generally involves providing technical oversight, geologic records and documentation; and construction management services during the drilling and sampling of test borings, monitoring well construction and development for fourteen (14) new shallow groundwater monitoring wells to be installed in south Carson Valley and Diamond Valley, Alpine County, California; and providing groundwater sampling services for these new shallow groundwater monitoring wells. A listing of the proposed well sites is provided in Section 01 10 00. Accompanying locations maps for these sites are presented in the attachments. The scope of work for your estimate should generally include the following work activities; 1. Serve as the owners representative providing technical direction and field documentation of well drilling contractor activities, induding the completion of underground service alert (USA) notification requirements, set -up of approved traffic control measures and the proper containment, storage and disposal of drilling wastes in accordance with the District specifications and Alpine County permit conditions; 1 —41— General Manager Richard H. Solbri,g Directors Chris Ctfalu James R o es Mara Lou Mosbacher Dalt Mist Erie Seha fir RFP- Hydrogeologic Services April 4, 2011 ALPMWS 2. Serve as the owner's representative providing technical direction and document all field activities associated with the drilling program, including: drilling and soil sampling of test holes, monitoring well construction, well cover and surface pad construction, monitoring well development and test hole abandonment and /or monitoring well destruction (if required) in accordance with District specifications and Alpine County Well Construction permit conditions; 3. Collect water quality samples from each new groundwater monitoring well for laboratory analyses in coordination with the District Laboratory; 4. Prepare detailed boring logs, as -built well installation diagrams and well development records for each new monitoring well in general accordance with the attached Geologic Records and Documentation requirements; and 5. Prepare a summary report that includes copies of all well drilling and encroachment permits, field notes, photo - documentation logs, lithologic logs, well material logs, well installation diagrams, well development logs, water -level measurements, water quality results and water well driller reports. All work must be performed under the direction of a California Registered Geologist, Hydro - Geologist or Engineer. The project summary report must be signed and stamped by the registered professional overseeing the work. The monitoring well installations are anticipated to be completed in about twenty working days from June 1 through June 28 2011. Monitoring well development is anticipated to be completed within five (5) working days after the July 4 holiday. Groundwater sampling shall be conducted starting 48 hours following well development. The technical report documenting the well installation program will be due to the District six (6) weeks after groundwater sampling is completed. If interested, please provide a cost proposal from your firm to assist the District in providing hydrogeological services including full -time oversight and documentation of all contractor activities associated with this project. Cost proposals for this work should include the following items: 1. Proiect Team: Include title, office location and contact information for all members of your project team with resumes for those individuals that will be responsible for performing the work. 2. Experience: Describe specific relevant experience of project team members and how that expertise will be utilized for this project. List at least three well installation programs successfully completed by project team members over the past three years, with accompanying client names and contact information. Provide examples of field notes, boring logs, well installation diagrams, and well development records completed by project team members assigned to performing the field work for this project. 3. Work -Hour Requirements: Provide a table showing all consultant tasks and an initial estimate of the work -hour requirements anticipated for this 2 -42- RFP- Hydnogeologic Son/ices ALPMWS project. The initial projection should be an itemized staffing breakdown in spreadsheet form, indicating personnel, title and estimated hours for each project team member on a per task and total project basis. 4. Schedule: Provide a project schedule listing major tasks, deadlines, duration and projected start and finish dates for the project. Interested parties shall submit three (3) copies of their cost proposal to the District by no later than 5:00 p.m., Wednesday, May 4 2011. Please include all required travel time, equipment and expenses required for this project. Cost proposals shall be enclosed in a sealed envelope labeled "Hydrogeological Services for the Alpine County Monitoring Well Installation Project" and addressed as follows: Accepted proposals will be reviewed and evaluated by District staff. Staff will select a proposal for recommendation to the District Board for approval at the May 12, 2011 regular meeting. Should you have any questions regarding this request, please do not hesitate to contact myself by email at iberasohn@tstnud.dat.ca.us. Sincerely, Jo4 South Tahoe Public Utility District Attention: No Bergsohn 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 (530) 544 -6474 No Bergsohn, C. Hg. Hydro- Geologist Attachments cc: J. Hogged P. Saute File 3 -43- N:PProjects\0iamond Valley Ranth 2010NWAGeolopicai SeM esW PMMYs_ GeoSvcs RFP vl.doc ANN 4, 2011 ALPINE COUNTY MONITORING WELL INSTALLATION PROGRAM 1.01 GEOLOGIC RECORDS AND DOCUMENTATION A. Boring Logs 1. Prepare and complete a borehole log for each boring drilled. Provide the log scale at 1 inch equals 10 feet. Keep copies current and complete of all well logs in the field at each well site and make available at all times for inspection by the District. All borehole logs shall be complete and include at a minimum: a. Depth (in feet); b. Sample Interval(s); c. Predominant Grain Size; d. Soil Moisture; e. Sample Interval Photo Log; f. Depth of any observed fractures, weathered zones or any abnormalities; g. USCS Classification; and h. Lithologic Description. 2. Borehole log headers shall include at a minimum the following: a. Project Name and Site Description (Geographic). b. Boring /well identification number. c. Name of drilling firm, make and model of drilling equipment and drilling method used. d. Drilling Dates (Start & Finish) e. Reference Elevation(s) for all depth measurements f. Nominal hole diameter and total depth of boring. g. Depth to water and date /time measured during drilling and prior to well installation. B. Installation Diagram 1. Installation diagrams shall include as a minimum the following: a. Project Name and Site Description (Geographic). b. Well identification number. c. Name of drilling firm, and name and signature of person preparing the diagram. d. Date of well installation e. Description of material from which the well is constructed including well casing and screen, centralizers (if used), diameter and schedule of casing and screen, filter pack brand name and gradation, bentonite seal brand name and size, grout type (including mix ratios) and type of well cover (stand up or flush -to- grade). f. Nominal hole diameter and total depth of well. g. Depth to top and bottom of well screen; filter pack and annular seals. h. Type, slot size and manufacturer of well screen. i. Static water level upon completion of the well prior to and after well development. ALPINE COUNTY MONITORING WELL INSTALLATION PROGRAM C. Well Development Records 1. Prepare and complete a well development record for each monitoring well developed in accordance with Section 3.01 J. 2. Well development records shall include as a minimum the following: a. Name and job title of individual developing well. b. Well identification number, total well depth, and date of development. c. Method used for development, including size, type and make of equipment, bailer and/or pump used during development. d. Volume and physical character of water removed, to include changes during development in clarity, color, sediment and odor. e. Date/Time record of readings of pH, specific conductance and temperature taken, before, during and after development. f. Date/Time record showing total depth of well and static water level from top of casing in the well prior to development, immediately after surging/pumping development and 24 hours after development. D. Well Abandonment Records 1. Prepare and complete a test hole/well abandonment record for each test hole/monitoring well destroyed in accordance with Section 3.01 L. 2. Abandonment records shall include as a minimum the following: a. Name of the project and site. b. Boring/well identification number. c. Well/boring location, depth and diameter. d. Date of destruction/abandonment. e. Description and total quantity of grout used in the well destruction/abandonment procedure and the intervals in which sealing materials were placed. f. Casing and other well construction materials left in the borehole by depth, description and composition. g. Reason for destruction /abandonment of monitoring welVtest hole. N.\Projects\Dlamond Valley Ranch12010 _ALPMWsVILPMWs_Records and Documentation Requirements.doc South Ta Public Utility District 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.us BOARD AGENDA ITEM 8b TO: Board of Directors FROM: Paul Hughes, Chief Financial Officer MEETING DATE: May 19, 2011 ITEM - PROJECT NAME: Sewer Rate Ordinance REQUESTED BOARD ACTION: Enact Ordinance No. 530 -11, an amendment to Ordinance No. 464, and superseding, in part, water and sewer rate Ordinance No. 523 -10. DISCUSSION: During the 2011/12 proposed budget presentation at the March 9, 2011, Board workshop, staff was directed to include a 3% rate increase in the sewer enterprise fund, and no rate increase in the water enterprise fund. Proposition 218 notices were issued to all District account holders illustrating the proposed rates for fiscal year 2011/12, including the restructured metered water rates. Ordinance 530-11 includes only the proposed sewer rates as presented in the Proposition 218 notice. The restructured metered water rates were developed through a water cost of service study prepared by HDR Engineering, Inc. Although the study includes multiple year rate recommendations, the Board instructed staff to issue the Proposition 218 notice with only the first year (2011/12) rate recommendations. During the May 5 public meeting, following comments from the audience, staff was directed to meet with the Finance Committee and rate consultant to discuss some of the customer concerns and possibly make adjustments to the proposed metered water rates. Recommendations will be presented at the May 19 Board meeting for discussion, and Board adoption of the water rates will take place at a subsequent meeting. The 3% sewer rate increase will generate approximately $298,000 in fiscal year 2011/12, and will help offset future debt service payments of the District. The District is preparing to complete two large sewer projects in 2011/12 including the Headworks and Diamond Valley Ranch irrigation projects. The District has budgeted to borrow approximately $11.6 million for these projects creating an annual debt service payment of approximately $847,000. DaVwctora Janus R. Jones Mary Lou Moobachor Drib Rao Eric Schafer Paul Hughes May 19, 2011 Page 2 SCHEDULE: Rates to be effective July 1, 2011 COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: The 3% sewer rate increase will generate approximately $298,000 in Fiscal Year 2011/12. ATTACHMENTS: Ordinance 530-11 CONCURRENCE WITH REQUESTED ACTIO GENERAL MANAGER: YES rte% NO CHIEF FINANCIAL OFFICER: YES '� NO -48- CATEGORY: Sewer ORDINANCE NO. 530-11 AN AMENDMENT TO THE SOUTH TAHOE PUBLIC UTILITY DISTRICT'S ORDINANCE NO. 464 — ADMINISTRATIVE CODE SECTION 4.5.12 SEWER RATE SCHEDULE, AND SUPERSEDING, IN PART, WATER AND SEWER RATE ORDINANCE NO. 523-10 The Board of Directors of the South Tahoe Public Utility District, El Dorado County, State of California, makes the following findings: 1. Public Notice of this Ordinance was duly given, authorized, posted and published, as required by law and specifically, that said Notice fixing the time and place of the hearing on said Ordinance was duly given, posted, and published, as required by Government Code of California. 2. Pursuant to said Public Notice, a public meeting by the Board of Directors of the South Tahoe Public Utility District (District) on this Ordinance took place on May 5, 2011, at 6:00 p.m. at the place specified in said Notice of Public Meeting. 3. The Notice of time and place of said . meeting, including a general explanation of the matters to be considered at said meeting was published in the Tahoe Daily Tribune on April 20, 2011 and April 27, 2011. Time and place of said meeting was also published in the Proposition 218 notice mailed to all District account holders on March 30, 2011. 4. At least ten (10) days prior to said public meeting, the data indicating the amount of the cost or estimated cost required to provide water and sewer services for which service charges are proposed for adoption pursuant to this Ordinance, and the revenue source(s) anticipated to provide such service was available to the public. 5. On March 30, 2011, Proposition 218 notices were mailed to all District account holders, indicating proposed rate increases and protest instructions. 6. Protests were accepted by the District through 2:00 pm on May 19, 2011. Total protests received were of which were valid protests. 7. District rate payers were notified of the proposed rate increase through the Proposition 218 notice, two newspaper publications, radio advertisements and the District website. SEWER RATES 8. The sewer service charges in Schedule No. 6 will be effective July 1, 2011 and are for the following purposes: Ordinance No. 530 -11 Sewer Rate Schedules Page 1 -49- 9. The increases in sewer service charges are necessary to meet the costs and expenses enumerated in Paragraph 8 herein above, and are included in the sewer budget adopted May 19, 2011. Ordinance No. 530 -11 Sewer Rate Schedules Page 2 a. Obtaining funds for capital projects necessary to maintain service for existing customers; b. Meeting debt service requirements; c. Meeting operating expenses; d. Purchasing or leasing equipment, supplies or materials; e. Meeting financial reserve needs and requirements. NOW, THEREFORE, BE IT ENACTED BY THE SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD OF DIRECTORS THAT ORDINANCE NO. 523-10 IS SUPERSEDED IN PART AND THAT SEWER RATE SCHEDULE NUMBER 6 PROVIDED BY ORDINANCE NO. 464 - ADMINISTRATIVE CODE, SECTION 4.5.12 IS HEREBY AMENDED AND REPLACED BY THE FOLLOWING SCHEDULE 6: SEWER RATE SCHEDULE 6 Annual service charges per sewer unit shall be as follows: Type of Connection Annual Service Quarterly Service Minimum Charge Charge per Unit Charge per Unit Per Unit Single Family Dwellings $119.81 $29.95 $9.98 Multi- Family Residences $117.33 $29.33 $9.77 Motels/Hotels/Timeshares $115.86 $28.97 $9.65 Restaurants $124.48 $31.12 $1037 Service Stations $124.48 $31.12 $10.37 Trailer/Mobile Home Parks $110.23 $27.56 $9.19 & Campgrounds Laundromats $124.48 $31.12 $10.37 Automobile Service Garages $124.48 $31.12 $10.37 Taverns without Food $124.48 $31.12 $10.37 Facilities All Other Commercial $124.48 $31.12 $10.37 -50- Establishments 10. Delinquent charges, when recorded as provided in California Government Code Section 54354.5, and the District's Administrative Code, shall constitute a lien upon the real property served. 11. This Ordinance hereby supersedes Ordinance No. 523.10 in part, and amended Ordinance No. 464 — Administrative Code, Section 4.5.12. PASSED AND ENACTED by the Board of Directors of the South Tahoe Public Utility District at its Special Board Meeting on the 19th day of May, 2011, by the following vote: AYES: NOES: ABSENT: DATED: May 19, 2011 ATTEST: Kathy Sharp, Clerk of the Board O>r}itausce No. 530-1 I See Rate Schedules Page 3 Dale Rise, Board President South Tahoe Public Utility District -51-- South Ta Public Utility District 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 - 7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.us BOARD AGENDA ITEM 8c TO: Board of Directors FROM: Paul Hughes, Chief Financial Officer MEETING DATE: May 19, 2011 ITEM - PROJECT NAME: Fiscal Year 2011 /12 Sewer Enterprise Fund Budget REQUESTED BOARD ACTION: Adopt Resolution No. 2890 -11 adopting the budget for the Sewer Enterprise Fund. DISCUSSION: The Fiscal Year 2011/12 proposed budget in the amount of $33,020,104 is fully funded and includes a 3% increase in rates. On May 5, 2011, a budget presentation was delivered to the public followed by comments from the audience and Board discussion. Staff was directed to finalize the budget with the proposed 3% service charge rate increase included. SCHEDULE: Budget must be adopted by July 1, 2011 COSTS: $33,020,104 ACCOUNT NO: Various BUDGETED AMOUNT REMAINING: N/A ATTACHMENTS: Resolution No. 2890 -11, Sewer Budget Summary CONCURRENCE WITH REQUESTED ACTI GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES -53- NO NO CATEGORY: Sewer Gerarel Manstaer Richard FL Silb'g Directors James R.Jaas Mary Loup Drib Rise Eric Schafer 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 WHEREAS, on May 5, 2011, the Board of Directors of the South Tahoe Public Utility District held a public meeting and exhibits of the Sewer Enterprise Fund Budget for the Fiscal Year 2011 -12 were made public. NOW, THEREFORE BE IT RESOLVED, by the Board of Directors of the South Tahoe Public Utility District that: The attached budget in the amount of $33,020,104 is adopted for the Fiscal Year beginning July 1, 2011, and ending June 30, 2012. WE THE UNDERSIGNED, do hereby certify that the above and foregoing resolution was duly and regularly adopted and passed by the Board of Directors of the South Tahoe Public Utility District at a regular meeting duly held on the 19th day of May 2011, by the following vote: AYES: NOES: ABSENT: ATTEST: Kathy Sharp, Clerk of the Board RESOLUTION NO. 2890-11 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT ADOPTING THE BUDGET FOR THE SEWER ENTERPRISE FUND FOR FISCAL YEAR 2011 -12 -55- Dale Rise, Board President South Tahoe Public Utility District NOTES: 2012 Sewer -3% rate increase, reduced borrowing.xls SOUTH TAHOE PUBLIC UTILITY DISTRICT 1. Enterprise Fund revenue is from customer service charges and Capital Outlay Reserve revenue is from capacity fees and grants. Borrowings fund capital improvements. 2. Capital Outlay includes the Engineering Dept expenditures. Enterprise Fund contains all other departments. 3. Interest expense is paid from the Enterprise Fund. Principal is paid from the Capital Outlay Reserve. 4. A cash reserve equal to two months of O&M expenses is maintained for operations. The remaining cash reserve is designated for Capital Outlay projects. 5. The Board established the Rate Stabilization Fund (RSF) on April 15, 2004. In the event of a large and sudden loss of revenue or increase in costs these funds will be used to avoid dramatic changes in sewer service charge rates. The RSF is equal to one years property tax receipts less transfers to other jurisdictions. See the Ten - Year projection pages for more extensive notes. 5/13/2011 SEWER BUDGET SUMMARY 2007/08 2007/08 2008/09 2008/09 2009/10 2009/10 2010/11 2010/11 2011/12 2011/12 ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL ESTIMATED ESTIMATED BUDGET BUDGET ENTERPRISE CAPITAL OUTLAY ENTERPRISE CAPITAL OUTLAY ENTERPRISE CAPITAL OUTLAY ENTERPRISE CAPITAL OUTLAY ENTERPRISE CAPITAL OUTLAY FUND RESERVE FUND RESERVE FUND RESERVE FUND RESERVE FUND RESERVE BEGINNING CASH BALANCES 2,354,079 15,936,243 2,602,064 26,735,546 2,542,002 22,912,364 2,677,267 23,135,793 2,787,229 17,889,921 REVENUES (1) 18,278,615 1,579,486 18,395,088 1,260,684 17,794,878 596,362 17,340,508 525,656 17,585,732 956,000 BORROWINGS 10,000,000 0 0 0 0 0 0 3,535,311 0 13,150,000 AVAILABLE FUNDS 30,632,694 17,515,729 20,997,152 27,996,230 20,336,880 23,508,726 20,017,775 27,196,760 20,372,961 31,995,921 SALARIES (2) 4,726,552 564,597 4,949,254 619,389 4,995,049 680,739 5,186,687 745,291 5,172,825 698,400 BENEFITS (2) 2,538,705 209,827 2,715,689 209,530 2,768,744 219,599 2,771,636 283,220 2,904,850 298,150 OPERATIONS & MAINTENANCE (2) 5,771,650 100,717 4,758,390 99,953 5,437,919 72,325 5,744,568 95,975 6,046,320 114,826 CAPITAL OUTLAY 4,680,978 7,492,752 3,038,260 9,815,619 15,720,733 DEBT SERVICE (3) 943,697 756,639 970,968 928,837 931,223 958,001 903,000 993,000 935,000 1,129,000 TOTAL CASH OUTLAYS 13,980,604 6,312,758 13,394,301 9,350,461 14,132,935 4,968,924 14,605,891 11 933,105 15,058,995 17,961,109 BALANCE BEFORE TRANSFERS 16,652,090 11,202,971 7,602,851 18,645,769 6,203,945 18,539,802 5,411,884 15,263,655 5,313,966 14,034,812 CAPITAL OUTLAY FUND TRANSFERS - 14,050,026 14,050,026 - 5,060,849 5,060,849 - 3,526,678 3,526,678 - 2,624,654 2,624,654 - 2,430,738 2,430,738 ACCRUAL TO CASH ADJUSTMENT 1,482,549 - 794,254 0 1,069,313 1,611 0 7,817 RATE STABILIZATION FUND TRANSFERS - 6,282,487 - 6,494,392 - 6,456,263 - 5,976,420 - 5,959,000 OPERATING AND CAPITAL OUTLAY RESERVES (4) 2,602,064 20,453,059 2,542,002 16,417,972 2,677,267 16,679,530 2,787,229 11,913,501 2,883,229 10,514,367 RATE STABILIZATION FUND (5) 6,282,487 6,494,392 6,456,263 5,976,420 5,959,000 TOTAL RESERVE BALANCES 2,602,064 26,735,546 2,542,002 22,912,364 2,677,267 23,135,793 2,787,229 17,889,921 2,883,229 16,473,367 AMORTIZATION (NON -CASH ITEM) 14,007 14,007 16,639 16,639 16,639 DEPRECIATION (NON -CASH ITEM) 4,496,288 4,127,848 4,281,779 4,367,000 4,454,000 NOTES: 2012 Sewer -3% rate increase, reduced borrowing.xls SOUTH TAHOE PUBLIC UTILITY DISTRICT 1. Enterprise Fund revenue is from customer service charges and Capital Outlay Reserve revenue is from capacity fees and grants. Borrowings fund capital improvements. 2. Capital Outlay includes the Engineering Dept expenditures. Enterprise Fund contains all other departments. 3. Interest expense is paid from the Enterprise Fund. Principal is paid from the Capital Outlay Reserve. 4. A cash reserve equal to two months of O&M expenses is maintained for operations. The remaining cash reserve is designated for Capital Outlay projects. 5. The Board established the Rate Stabilization Fund (RSF) on April 15, 2004. In the event of a large and sudden loss of revenue or increase in costs these funds will be used to avoid dramatic changes in sewer service charge rates. The RSF is equal to one years property tax receipts less transfers to other jurisdictions. See the Ten - Year projection pages for more extensive notes. 5/13/2011 South Tahoe Public Utility District General Manager Rk hard H. 5olbrIg Chris Jame R. Jaffee Mary Lou Moebadhar Dyile Mee Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.us BOARD AGENDA ITEM 8d TO: Board of Directors FROM: Paul Hughes, Chief Financial Officer MEETING DATE: May 19, 2011 ITEM - PROJECT NAME: Fiscal Year 2011/12 Water Enterprise Fund Budget REQUESTED BOARD ACTION: Adopt Resolution No. 2891 -11 adopting the budget for the Water Enterprise Fund. DISCUSSION: The Fiscal Year 2011/12 proposed budget in the amount of $16,160,461 is fully funded and includes service charge revenue which is neutral to the current year. There is no change to the current non - metered rate, but the metered rate is being restructured in an attempt to create equity between metered and non - metered customers. On May 5, 2011, a budget presentation was delivered to the public followed by comments from the audience and Board discussion. Staff was directed to continue working with HDR Engineering and the Finance Committee to adjust the proposed metered rate based on discussion and comments from the public and Board. The final rate structure is expected to remain revenue neutral. SCHEDULE: Budget must be adopted by July 1, 2011 COSTS: $16,160,461 ACCOUNT NO: Various BUDGETED AMOUNT REMAINING: N/A ATTACHMENTS: Resolution No. 2891 -11, Water Budget Summary CONCURRENCE WITH REQUESTED ACTT CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO —57— 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 WHEREAS, on May 5, 2011, the Board of Directors of the South Tahoe Public Utility District held a public meeting and exhibits of the Water Enterprise Fund Budget for the Fiscal Year 2011 -12 were made public. NOW, THEREFORE BE IT RESOLVED, by the Board of Directors of the South Tahoe Public Utility District that: The attached budget in the amount of $16,160,461 is adopted for the Fiscal Year beginning July 1, 2011, and ending June 30, 2012. WE THE UNDERSIGNED, do hereby certify that the above and foregoing resolution was duly and regularly adopted and passed by the Board of Directors of the South Tahoe Public Utility District at a regular meeting duly held on the 19th day of May 2011, by the following vote: AYES: NOES: ABSENT: ATTEST: Kathy Sharp, Clerk of the Board RESOLUTION NO. 2891-11 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT ADOPTING THE BUDGET FOR THE WATER ENTERPRISE FUND FOR FISCAL YEAR 2011 -12 -59- Dale Rise, Board President South Tahoe Public Utility District SOUTH TAHOE PUBLIC UTILITY DISTRICT 2012 Water - Reduced Capital, 0% rate increase.xls NOTES: 1. Enterprise Fund revenue is from service charges. Capital Outlay Reserve revenue is from capacity charges, capital improvement fees, grants and borrowings. 2. Capital Outlay includes the Engineering Dept expenditures. Enterprise Fund accounts for all other depts. 3. Interest expense is paid from the Enterprise Fund. Principle is paid from the Capital Outlay Reserve. 4. A cash reserve equal to two months of O &M expenses is maintained for operations. The remaining reserves are maintained for capital projects, MTBE projects and rate stabilization. 5. The MTBE Fund is exhausted by 2011/12 year end and the Rate Stabilization Fund begins. The Fund is equal to 10% of annual water rate revenue received. See the Ten -Year projection pages for more extensive notes. WATER BUDGET SUMMARY 2007/08 2007/08 2008 /09 2008/09 2009/10 2009 /10 2010/11 2010/11 2011/12 2011/12 ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL ESTIMATED ESTIMATED BUDGET BUDGET ENTERPRISE CAPITAL OUTLAY ENTERPRISE CAPITAL OUTLAY ENTERPRISE CAPITAL OUTLAY ENTERPRISE CAPITAL OUTLAY ENTERPRISE CAPITAL OUTLAY FUND RESERVE FUND RESERVE FUND RESERVE FUND RESERVE FUND RESERVE BEGINNING CASH BALANCES 1,493,256 21,606,129 1,628,894 19,366,619 1,598,420 14,994,784 1,648,540 9,920,794 1,684,877 7,651,192 REVENUES (1) 9,632,877 1,869,540 9,382,552 2,028,585 8,488,319 1,681,565 15,881,692 1,659,000 11,680,000 2,153,000 BORROWINGS 0 0 0 0 0 0 0 0 0 0 AVAILABLE FUNDS 11,126,133 23,475,669 11,011,446 21,395,204 10,086,739 16,676,349 17,530,232 11,579,794 13,364,877 9,804,192 SALARIES (2) 2,814,496 718,228 2,909,385 746,215 2,974,620 903,608 3,075,926 760,501 2,977,550 698,400 BENEFITS (2) 1,531,214 272,434 1,539,491 297,382 1,624,373 342,146 1,643,509 289,000 1,694,050 298,150 OPERATIONS & MAINTENANCE (2) 3,074,578 186,856 2,862,362 155,372 2,582,878 142,147 2,851,556 121,750 3,143,560 154,551 CAPITAL OUTLAY 5,012,307 6,560,714 9,015,152 9,790,468 6,051,200 DEBT SERVICE (2) 347,778 827,779 313,260 767,054 278,289 801,913 311,000 838,000 274,000 869,000 TOTAL CASH OUTLAYS 7,768,066 7,017,604 7,624,498 8,526,737 7,460,160 11,204,966 7,881,991 11,799,719 8,089,160 8,071,301 BALANCE BEFORE TRANSFERS 3,358,067 16,458,065 3,386,948 12,868,467 2,626,579 5,471,383 9,648,241 - 219,925 5,275,717 1,732,891 CAPITAL OUTLAY FUND TRANSFERS - 1,778,647 1,778,647 - 1,838,001 1,838,001 - 1,025,664 1,025,664 - 8,019,918 8,019,918 - 3,647,393 3,647,393 ACCRUAL TO CASH ADJUSTMENT 49,473 1,129,908 49,473 288,316 47,625 3,423,747 56,553 - 148,800 56,553 0 MTBE CONTAMINATION/RATE STABILIZATION FUNDS - 11,332,020 - 10,527,539 0 - 7,355,784 0 - 2,257,506 0 - 914,400 OPERATING AND CAPITAL OUTLAY RESERVES (3) 1,628,894 8,034,599 1,598,420 4,467,245 1,648,540 2,565,010 1,684,877 5,393,686 1,684,877 4,465,884 RESERVED FOR MTBE REMEDIATION (4) 11,332,020 10,527,539 7,355,784 2,257,506 RATE STABILIZATION RESERVE (4) 914,400 TOTAL RESERVE BALANCES 1,628,894 19,366,619 1,598,420 14,994,784 1,648,540 9,920,794 1,684,877 7,651,192 1,684,877 5,380,284 AMORTIZATION (NON -CASH ITEM) 49,473 49,473 49,473 49,473 49,473 DEPRECIATION (NON-CASH ITEM) 1,932,659 1,970,934 2,301,151 2,347,000 2,393,000 SOUTH TAHOE PUBLIC UTILITY DISTRICT 2012 Water - Reduced Capital, 0% rate increase.xls NOTES: 1. Enterprise Fund revenue is from service charges. Capital Outlay Reserve revenue is from capacity charges, capital improvement fees, grants and borrowings. 2. Capital Outlay includes the Engineering Dept expenditures. Enterprise Fund accounts for all other depts. 3. Interest expense is paid from the Enterprise Fund. Principle is paid from the Capital Outlay Reserve. 4. A cash reserve equal to two months of O &M expenses is maintained for operations. The remaining reserves are maintained for capital projects, MTBE projects and rate stabilization. 5. The MTBE Fund is exhausted by 2011/12 year end and the Rate Stabilization Fund begins. The Fund is equal to 10% of annual water rate revenue received. See the Ten -Year projection pages for more extensive notes. PAYMENT OF CLAIMS FOR APPROVAL May 19, 2011 Payroll 5/3/2011 429,433.41 Total Payroll 429,433.41 ADP 416.37 American Express 2,524.17 Bank of America 156,572.80 BNY Mellon Trust Company 890,048.75 Brownstein /Hyatt/Farber /Schreck legal services 9,424.23 CDS- health care payments 198,763.08 Union Bank 0.00 Total Vendor EFT 1,257,749.40 Accounts Payable Checks -Sewer Fund 175,316.86 Accounts Payable Checks -Water Fund 128,419.75 Accounts Payable Checks -Self- funded Insurance 0.00 Accounts Payable Checks - Grants Fund 0.00 Total Accounts Payable 303,736.61 Grand Total 1,990,919.42 Payroll EFTs & Checks 5/3/2011 EFT AFLAC Medical & Dependent Care 573.90 EFT CA Employment Taxes & W/H 18,854.58 EFT Federal Employment Taxes & W/H 90,225.64 EFT CaIPERS Contributions 71,467.39 EFT Great West Deferred Comp 18,719.08 EFT Stationary Engineers Union Dues 2,414.59 EFT United Way Contributions 134.00 EFT Employee Direct Deposits 218,074.16 CHK Employee Garnishments 1,389.22 CHK Employee Paychecks 7,580.85 Total 429,433.41 /endor Name ABC FIRE SERVICE ACCOUNTEMPS ACCOUNTEMPS Department l Proi Name EQUIPMENT REP FINANCE FINANCE AFLAC GEN & ADMIN ALPEN SIERRA COFFEE GEN & ADMIN ALPINE COUNTY BUILDING DEPT GEN & ADMIN AMERIPRIDE UNIFORM SERVICES GEN & ADMIN BARTON HEALTHCARE SYSTEM PUMPS BARTON HEALTHCARE SYSTEM FINANCE BARTON HEALTHCARE SYSTEM PUMPS BARTON HEALTHCARE SYSTEM FINANCE User. THERESA Report: OH PMT CLAIMS BK PAYMENT OF CLAIMS AUTOMOTIVE Acccl# / Prol Code Amount Check Num IYPQ 1005 - 6011 375.19 Check Total: 375 1q AP- 00079146 MW CONTRACT SERVICE . 1039 - 4405 1,037.24 CONTRACT SERVICE 2039 - 4405 1,037.25 Check Total: 9 n74 4q AP- 00079147 MW AFLAC FEE DED 1000 - 2538 110.00 Check Total: _n um on AP- 00079148 MW OFC SUPPLY ISSUE 1000 - 6081 262.90 Check Total: 9R9 go AP- 00079149 MW MISC PREPAIDS 1000 - 0308 1,700.00 Check Total: _Am= AP- 00079145 MW UNIFORM PAYABLE 1000 - 2518 855.26 Check Total: 8552R AP- 00079150 MW ARETE SYSTEMS ENGINEERING - GIS SFTWR DEV CONTRACT SERVICE 1029 - 4405 - GISSFT 367.50 ARETE SYSTEMS ENGINEERING - GIS SFTWR DEV CONTRACT SERVICE 2029 - 4405 - GISSFT 367.50 to Check Total: 735.00 AP- 00079151 MW N 1 AT &T MOBILITY PUMPS TELEPHONE 1002 - 6310 19.80 AT &T MOBILITY PUMPS TELEPHONE 2002 - 6310 19.79 Check Total: o 5q AP- 00079152 MW AT &T /CALNET 2 GEN & ADMIN TELEPHONE 1000 - 6310 328.73 AT &T/CALNET 2 GEN & ADMIN TELEPHONE 2000 - 6310 328.72 Check Total: R57 4,A AP- 00079153 MW AWWA LABORATORY DUES/MEMB/CERT 1007 - 6250 231.00 Check Total: 239.00 AP- 00079154 AXELSON IRON SHOP HEAVY MAINT GROUNDS & MNTC 1004 - 6042 51.12 AXELSON IRON SHOP HEAVY MAINT SHOP SUPPLIES 1004 - 6071 142.14 Check Total: 1q3 7R AP- 00079155 MW SAFETY/EQUIP/PHY 1002 - 6075 SAFETY/EQUIP/PHY 1039 - 6075 SAFETY/EQUIP/PHY 2002 - 6075 SAFETY/EQUIP/PHY 2039 - 6075 Page: 1 Current Date: 05/12/2011 Current Time: 14:53:30 45.00 81.71 45.00 81.71 (Rm�,pLNam BAUGH, HEIDI BAUGH, HEIDI CDW-G CORP CDW-G CORP CDW-G CORP User: THERESA Report: OH PMT CLAIMS BK Department / ProI Name PAYMEjT OF CLAIMS lasagthalign Acct# / Pros Code ENGINEERING TRAVEL/MEETINGS 1029 - 6200 ENGINEERING TRAVEL /MEETINGS 2029 - 6200 Page: 2 Check Total: Animal Check Num liga 95 d9 AP- 00079156 MW 9.18 9.18 Check Total: 18m AP- 00079157 MW BENTLY AGROWDYNAMICS OPERATIONS SLUDGE DISPOSAL 1006 - 6652 2,238.04 Check Total: 293844 AP- 00079158 MW BING MATERIALS UNDERGROUND REP PIPE/CVRS/MHLS 2001 - 6052 156.30 Check Total: i_30 AP 00079159 MW BRICKHOUSE SECURITY HEAVY MAINTENANC BUILDINGS 2004 - 6041 814.45 Check Total: R1 45 AP 00079160 MW BUTLER, SHANN CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00 Check Total: 200 nn AP MW CALIF DEPT OF PUBLIC HEALTH UNDERGROUND REP DUES/MEMB/CERT 1001 - 6250 70.00 CALIF DEPT OF PUBLIC HEALTH UNDERGROUND REP DUES/MEMB/CERT 2001 - 6250 70.00 Check Total: 14000 AP- 00079162 MW 1 CALIFEDIATER RESOURCES CTRL BD OPERATIONS DUES/MEMB/CERT 1006 - 6250 340.00 1 Check Total: __maim AP- 00079163 MW CAPITAL FORD EQUIPMENT REP AUTOMOTIVE 1005 - 6011 472.23 CAPITAL FORD EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 472.23 Check Total: _mug AP- 00079164 MW CAROLLO ENGINEERS ENGINEERING - TWIN PEAKS BS BSTR, TWN PEAKS 2029 - 7070 - TPBSTR 5,458.75 Check Total: 6 4,yR 14 AP- 00079165 MW CARQUEST CARSON VALLEY EQUIPMENT REP SHOP SUPPLIES 1005 - 6071 5128 CARQUEST CARSON VALLEY EQUIPMENT REPAIR SHOP SUPPLIES 2005 - 6071 51.28 Check Total: 1 n2sa AP- 00079166 MW CASHMAN EQUIPMENT EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 301.02 Check Total: nn1 n9 AP- 00079167 MW DIAMOND VLY RNCH OFFICE SUPPLIES 1028 - 4820 136.79 INFORMATION SYS DIST.COMP SPPLIS 1037 - 4840 374.52 INFORMATION SYS DIST.COMP SPPLIS 2037 - 4840 374.52 Check Total: Rut, R AP 00079168 MW Current Date: 05/12/2011 Current Time: 14:53:30 /endor Name CWEA CWEA CWEA CWEA DATCO SERVICES CORP DATCO SERVICES CORP DAVI LABORATORIES DELL MARKETING L P DELL MARKETING L P DELL MARKETING L P DIAMOND DITCH MUTUAL WATER o� DICK'S FULLER - DIVERSIFIED SYSTEMS INTL INC DIVERSIFIED SYSTEMS INTL INC DIVERSIFIED SYSTEMS INTL INC DIY HOME CENTER DOUGLAS DISPOSAL EL DORADO COUNTY ELECTRICAL EQUIPMENT CO INC ENRIQUEZ, JESUS S. User: THERESA Report: OH_PMT CLAIMS BK PS.12213MiaLe121liKOS UNDERGROUND REP OPERATIONS LABORATORY UNDERGROUND REP HUMAN RESOURCES SAFETY PROGRAMS HUMAN RESOURCES SAFETY PROGRAMS ENGINEERING - ARPRT ARSNC EVAL AIRPORT ARSENIC INFORMATION SYS INFORMATION SYS INFORMATION SYS PAYMENT OF CLAIMS QuatintIsta DUES/MEMB /CERT DUES/MEMB/CERT DUES/MEMB/CERT DUES/MEMB/CERT DIST.COMP SPPLIS LAPTOP, URS DIST.COMP SPPLIS DIAMOND VLY RNCH LAND & BUILDINGS PUMPS BUILDINGS ELECTRICAL SHOP ELECTRICAL SHOP ELECTRICAL SHOP HEAVY MAINT GEN &ADMIN ENGINEERING - HEADWORKS ENGINEERING - TWIN PEAKS BS UNDERGROUND REP BUILDINGS BIOSOL EQUP/BLDG BUILDINGS SHOP SUPPLIES REFUSE DISPOSAL HDWKS IMP PROJ BSTR, TWN PEAKS DUES /MEMB/CERT Page: 3 Acct# / Prol Code 1001 - 6250 1006 - 6250 1007 - 6250 2001 - 6250 1022 - 6079 2022 - 6079 2029 - 7089 - AWAEPI 1037 - 4840 1037 - 8139 2037 - 4840 1028 -5010 1002 - 6041 1003 - 6041 1003 - 6653 2003 - 6041 1004 - 6071 1000 - 6370 1029 - 8033 - HDWORK 2029 - 7070 - TPBSTR Check Total: 2001-6250 Amount Check Num 157.00 132.00 294.00 203.00 Check Total: 7RR 0n AP- 00079169 664.30 664.30 1 :12R RQ AP- 00079170 1,404.00 Check Total: _IAN= AP- 00079171 833.00 265.70 922.89 Check Total: 2 n91 59 AP- 00079172 3,085.00 Check Total: a_0Ra_on AP- 00079173 41.12 Check Total: 41 12 AP- 00079174 Check Total: 209.50 448.91 209.50 Check Total: RR7_a1 AP- 00079175 18.09 Check Total: tR [1q AP- 00079176 1,128.66 Check Total: 1.12RRR AP- 00079177 2,044.00 Check Total: 2044 0n AP- 00079144 Current Date: 05/12/2011 Current Time: 14:53:30 9,105.53 q 1 nS .5$ AP- 00079178 120.00 User: THERESA Report: OH PMT CLAIMS BK y.oartm•nt / Prot Name FERGUSON ENTERPRISES INC. PUMPS FERGUSON ENTERPRISES INC. HEAVY MAINT FERGUSON ENTERPRISES INC. PUMPS D Acct# / Prat Coda PUMP STATIONS 1002 - 6051 SECONDARY EQUIP 1004 - 6022 PUMP STATIONS 2002 - 6051 FISHER SCIENTIFIC LABORATORY LAB SUPPLIES 1007 - 4760 FISHER SCIENTIFIC LABORATORY LAB SUPPLIES 2007 - 4760 FRANZ, GAIL GEN & ADMIN UB SUSPENSE 1000 - 2002 FRANZ, GAIL GEN & ADMIN UB SUSPENSE 2000 - 2002 Page: 4 Ammal Chick Num hli2! Check Total: 19nno AP- 00079179 MW 11.34 95.40 11.34 Check Total: _taps AP- 00079180 MW 182.12 218.27 Check Total: mug AP- 00079181 MW 223.45 190.81 Check Total: 41 & 9R AP- 00079182 MW FREGA, PATRICK CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00 Check Total: 9nnnn AP- 00079183 MW GBC. SCIENTIFIC EQUIP INC LABORATORY LAB SUPPLIES 1007 - 4760 737.87 GBC S EQUIP INC LABORATORY LAB SUPPLIES 2007 - 4760 698.17 os to Check Total: 1 dill AP- 00079184 MW kn GRAINGER GEN & ADMIN SHOP SUPPLY INV 1000 - 0421 156.29 GRAINGER GEN & ADMIN SMALL TOOLS INV 1000 - 0423 45.54 GRAINGER HEAVY MAINT GROUNDS & MNTC 1004 - 6042 86.32 Check Total: Inn 1. AP 00079185 MW HIGH SIERRA BUSINESS SYSTEMS CUSTOMER SERVICE SERVICE CONTRACT 1038 - 6030 74.66 HIGH SIERRA BUSINESS SYSTEMS CUSTOMER SERVICE SERVICE CONTRACT 2038 - 6030 74.66 Check Total: i4 /9 AP- 00079186 MW IDEXX DISTRIBUTION CORP. LABORATORY LAB SUPPLIES 1007 - 4760 21.36 IDEXX DISTRIBUTION CORP. LABORATORY LAB SUPPLIES 2007 - 4760 16.31 Check Total: 37 R7 AP- 00079187 MW INFOSEND INC. CUSTOMER SERVICE SERVICE CONTRACT 1038 - 6030 156.46 INFOSEND INC. CUSTOMER SERVICE SERVICE CONTRACT 2038 - 6030 156.46 Check Total: 349 419 AP- 00079188 MW INTEGRITY LOCKSMITH UNDERGROUND REP SHOP SUPPLIES 1001 - 6071 18.76 Check Total: 1g_7B AP- 00079189 MW Current Date: 05/12/2011 Current Time: 14:53:30 lender Name INTERSTATE SAFETY & SUPPLY JDH CORROSION CONSULTANTS JOH CORROSION CONSULTANTS JOHN'S SPRING SERVICE AND KIPLINGER LETTER KIPUNGER LETTER LAB SAFETY SUPPLY LAB SAFETY SUPPLY LAKESIDE NAPA LAKESIDE NAPA LAKEOPE NAPA t LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA User. THERESA Report: OH PMT CLAIMS BK Department / Prol Name GEN & ADMIN ENGINEERING - CATH PROT -SWR ENGINEERING - CATH PROT -WTR EQUIPMENT REP FINANCE FINANCE LABORATORY LABORATORY UNDERGROUND REP UNDERGROUND REP PUMPS PUMPS PUMPS HEAVY MAINT HEAVY MAINT HEAVY MAINT HEAVY MAINT EQUIPMENT REP EQUIPMENT REP EQUIPMENT REP EQUIPMENT REP DIAMOND VLY RNCH UNDERGROUND REP PUMPS PUMPS EQUIPMENT REPAIR EQUIPMENT REPAIR PAYMENT OF CLAIMS DeecHotlon SHOP SUPPLY INV CATH PROT OATH PROT ASSES AUTOMOTIVE SUBSCRIPTIONS SUBSCRIPTIONS LAB SUPPUES LAB SUPPLIES MOBILE EQUIP SHOP SUPPLIES LUTHER PASS SHOP SUPPLIES SMALL TOOLS SECONDARY EQUIP GROUNDS & MNTC SHOP SUPPLIES BIOSOL EQUP /BLDG AUTOMOTIVE GENERATORS SHOP SUPPLIES SMALL TOOLS GROUNDS & MNTC PIPE/CVRS/MHLS SHOP SUPPLIES SMALL TOOLS AUTOMOTIVE SHOP SUPPLIES Page: 5 Acct* I Prot Code 1000 - 0421 Check Total: 1029 - 8133 - CATSWR 2029 - 8113 - CATWTR Check Total: 1005 - 6011 1039 - 4830 2039 - 4830 1007 - 4760 2007 - 4760 1001 - 6012 1001 - 8071 1002 - 6048 1002 - 6071 1002 - 6073 1004 - 6022 1004 - 6042 1004 - 6071 1004 - 6653 1005 -6011 1005 - 6013 1005 - 6071 1005 - 6073 1028 - 6042 2001 - 6052 2002 - 6071 2002 - 6073 2005 - 6011 2005 - 6071 Check Total: Check Total: Current Date: 05/12/2011 Current Time: 14:53:30 Mount Check Num IYQ 197.98 197 e AP- 00079190 MW 7,507.50 7,507.50 _mama) no AP- 00079191 MW 655.72 R5.5 79 AP- 00079192 MW 29.00 29.00 Check Total: MOO AP- 00079193 86.89 86.89 173 711 AP- 00079194 MW 83.64 7.60 49.52 4.72 15.97 6.93 127.22 92.02 16.12 828.11 15.21 37.48 36.43 65.62 4.12 4.72 15.97 741.96 37.48 MW tender Nan» Department / Pnpi Nam. LAKESIDE NAPA EQUIPMENT REPAIR LAWRENCE, EDWIN CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE LIBERTY ENERGY GEN & ADMIN LIBERTY ENERGY GEN & ADMIN LIBERTY ENERGY GEN & ADMIN LILLY'S TIRE SERVICE INC. HEAVY MAINT LILLY'S TIRE SERVICE INC. EQUIPMENT REP LILLY'S TIRE SERVICE INC. EQUIPMENT REPAIR LOOMIS FINANCE LOOMIS FINANCE MC MTER CARR SUPPLY CO PUMPS MC MASTER CARR SUPPLY CO HEAVY MAINT MC MASTER CARR SUPPLY CO PUMPS MC MASTER CARR SUPPLY CO PUMPS MEEKS BUILDING CENTER UNDERGROUND REP MEEKS BUILDING CENTER PUMPS MEEKS BUILDING CENTER PUMPS MEEKS BUILDING CENTER PUMPS MEEKS BUILDING CENTER PUMPS MEEKS BUILDING CENTER PUMPS MEEKS BUILDING CENTER ELECTRICAL SHOP MEEKS BUILDING CENTER HEAVY MAINT MEEKS BUILDING CENTER HEAVY MAINT MEEKS BUILDING CENTER DIAMOND VLY RNCH MEEKS BUILDING CENTER UNDERGROUND REP MEEKS BUILDING CENTER UNDERGROUND REP User: THERESA Report: OH PMT CLAIMS Dmisdiallen A / tiroi Cod. SMALL TOOLS 2005 - 6073 Check Plum jann 36.40 Page: 6 Check Total: 9 227 24 AP- 00079195 MW 2038 - 6660 - WCPROG 200.00 Check Total: _ma= nn AP-00079196 MW ELECTRICITY 1000 - 6330 91,831.54 ST LIGHTING EXP 1000 - 6740 23 ELECTRICITY 2000 - 6330 17,194.44 Check Total: 11l n4A_!:)t AP- 00079197 MW BUILDINGS 1004 - 6041 102.85 AUTOMOTIVE 1005 - 6011 41.25 AUTOMOTIVE 2005 - 6011 8.75 Check Total: 152 aq AP- 00079198 MW CONTRACT SERVICE 1039 - 4405 60.88 CONTRACT SERVICE 2039 - 4405 60.88 Check Total: 121 78 AP- 00079199 MW SMALL TOOLS 1002 - 6073 31.17 MOBILE EQUIP 1004 - 6012 79.40 SMALL TOOLS 2002 - 6073 31.17 BLK BRT BSTR UPG 2002 - 8169 880.24 Check Total: __142:1.2a AP- 00079200 MW SMALL TOOLS 1001 - 6073 19.82 BUILDINGS 1002 - 6041 417.70 LUTHER PASS 1002 - 6048 20.11 PUMP STATIONS 1002 - 6051 55.05 SHOP SUPPLIES 1002 - 6071 62.65 SMALL TOOLS 1002 - 6073 27.93 PUMP STATIONS 1003 - 6051 5.33 GROUNDS & MNTC 1004 - 6042 20.62 SHOP SUPPLIES 1004 - 6071 66.62 GROUNDS & MNTC 1028 - 6042 56.44 PIPE/CVRS/MHLS 2001- 6052 28.67 SMALL TOOLS 2001- 6073 66.47 Current Date: 05/12/2011 Current Time: 14:53:30 ismisiliamg Department I Prol Name MEEKS BUILDING CENTER PUMPS MEEKS BUILDING CENTER PUMPS MEEKS BUILDING CENTER PUMPS MEEKS BUILDING CENTER HEAVY MAINTENANC METRO OFFICE SOLUTIONS ENGINEERING OFFICE SUPPLIES 1029 - 4820 7.89 METRO OFFICE SOLUTIONS INFORMATION SYS OFFICE SUPPLIES 1037 - 4820 8.68 METRO OFFICE SOLUTIONS FINANCE OFFICE SUPPLIES 1039 - 4820 37.51 METRO OFFICE SOLUTIONS ENGINEERING OFFICE SUPPLIES 2029 - 4820 7.87 METRO OFFICE SOLUTIONS INFORMATION SYS OFFICE SUPPLIES 2037 - 4820 8.68 METRO OFFICE SOLUTIONS FINANCE OFFICE SUPPLIES 2039 - 4820 37.56 Check Total: 1()R 1q AP-00079202 MW MID MOUNTAIN COMMUNICATIONS UNDERGROUND REP RADIO - RPRS/RPLCM 1001 - 6056 125.00 MID MOUNTAIN COMMUNICATIONS PUMPS RADIO - RPRS/RPLCM 1002 - 6056 73.84 MID MOUNTAIN COMMUNICATIONS ELECTRICAL SHOP BUILDINGS 1003 - 6041 225.00 MID MOUNTAIN COMMUNICATIONS ELECTRICAL SHOP SMALL TOOLS 1003 - 6073 193.35 co MID MOUNTAIN COMMUNICATIONS PUMPS RADIO - RPRS/RPLCM 2002 - 6056 73.84 Check Total: A91 03 AP- 00079203 MW MORSE, DONIELLE FINANCE TRAVEL/MEETINGS 2039 - 6200 112.00 Check Total: 11200 AP- 00079204 MW MOTEL 6 PUMPS STANDBY ACCOMODA 1002 - 6083 314.56 MOTEL 6 PUMPS STANDBY ACCOMODA 2002 - 6083 314.56 Check Total: R29 19 AP- 00079205 MW MSC INDUSTRIAL SUPPLY CO HEAVY MAINT SHOP SUPPLIES 1004 - 6071 417.77 Check Total: 417.77 AP- 00079206 MW UB SUSPENSE 1000 - 2002 12223.84 INTEREST EXPENSE 1039 - 6710 1,039.03 UB SUSPENSE 2000 - 2002 2,578.92 METER SALE 2000 - 3545 135.00 INTEREST EXPENSE 2039 - 6710 230.68 MUELLER, JAMES MUELLER, JAMES MUELLER, JAMES MUELLER, JAMES MUELLER, JAMES MURRAY, LAURA User THERESA Report: OH PMT CLAIMS BK GEN & ADMIN FINANCE GEN & ADMIN GEN & ADMIN FINANCE PAYMENT OF CLAIMS on PUMP STATIONS SMALL TOOLS BLK BRT BSTR UPG BUILDINGS CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE Page: 7 Acct# / Prol Code 2002 - 6051 2002 - 6073 2002 - 8169 2004 - 6041 Check Total: 1 182 ?;q AP- 00079201 MW Check Total: 18 9(17.47 AP- 00079207 MW 2038 - 6660 - WCPROG 200.00 Current Date: 05/12/2011 Current Time: 14:53:30 Amount 40.00 27.93 19.29 227.76 Check Num jypg MWH LABORATORIES NELS TAHOE HARDWARE NELS TAHOE HARDWARE NELS TAHOE HARDWARE NELS TAHOE HARDWARE NEVADA GENERATOR SYSTEMS INC NIXON'S HEATING NOLAN, LYNN NORTHERN HYDRAULICS INC %.o OGIBA, DAVID P K SAFETY SUPPLY PACIFIC TEK PARSON, FRED PDM STEEL PETERBILT TRUCK PARTS PHILLIPS, WILLIAM P$NKEL,MICHELE User. THERESA Report: OH PMT CLAIMS_BK Deportment / Prol Name pAnztaam RtudiatIgn ENGINEERING - ARPRT ARSNC EVAL AIRPORT ARSENIC EQUIPMENT REP OPERATIONS ELECTRICAL SHOP EQUIPMENT REPAIR ENGINEERING - IROQUOIS BSTR ST ENGINEERING - IROQUOIS BSTR ST FINANCE HEAVY MAINT PUMPS UNDERGROUND REP EQUIPMENT REPAIR EQUIPMENT REP ENGINEERING AUTOMOTIVE GROUNDS & MNTC SHOP SUPPLIES AUTOMOTIVE BSTR STN IROQ BSTR STN IROQ TRAVEUMEETINGS GROUNDS & MNTC CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE SAFETY/EQUIP/PHY VAC TRUCK 61 CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE REPL TRK 61 AUTOMOTIVE CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE TRAVEL/MEETINGS Page: 8 Ac / Pros Cod. 2029 - 7089 - AWAEPI 1005 -6011 1006 - 6042 2003 - 6071 2005 -6011 2029 - 8967 - IQBSTR 2029 - 8967 - IQBSTR Check Total: 2039 - 6200 1004 - 6042 2038 - 6660 - WCPROG 1002-6075 2001 -8191 2038 - 6660 - WCPROG 2005 - 8182 1005 -6011 2038 - 6660 - WCPROG 1029 - 6200 Amssat Oman= IYQ! Check Total: 201m AP- 00079208 MW 1,590.00 Check Total: 1 - AP 00079209 MW 1.68 64.92 16.28 1.68 Check Total: A4 55 AP- 00079210 MW 1,848.51 Check Total: _twit 51 AP- 00079211 513.14 513 AP- 00079212 112.00 Check Total: 112m AP 00079213 247.38 Check Total: 2472R AP- 00079214 200.00 Check Total: _nose AP - 00079215 290.89 Check Total: 22n-Ao AP- 00079216 14,028.75 Check Total: 14 nos; 7A AP 00079217 200.00 Check Total: _mum AP- 00079218 523.60 Check Total: 523an AP- 00079219 211.84 Check Total: ____21 AP- 00079220 200.00 Check Total: 2nn_m AP- 00079221 Current Date: 05/12/2011 Current Time: 14:53:30 17.00 MW MW MW MW MW MW MW MW MW MW Nlitzfigmg PINKEL,MICHELE PRAXAIR 174 PRAXAIR 174 PRAXAIR 174 PRIETO, ANTONIO PROGRESSIVE BUSINESS PROGRESSIVE BUSINESS QUALITY CONTROL SERVICES QUALITY CONTROL SERVICES RENO GAZETTE- JOURNAL RENOTTE- JOURNAL RENO GAZETTE- JOURNAL RISE, DALE RISE, DALE ROVERUD, ERIC SATTLER, MICHELE SCHAFER, ERIC SCOTT'S HARDWARE SCOTT'S HARDWARE SCOTT'S HARDWARE SCOTT'S HARDWARE User: THERESA Report: OH_PMT CLAIMS_BK Department / Prof Name ENGINEERING PUMPS HEAVY MAINT PUMPS UNDERGROUND REP FINANCE FINANCE LABORATORY LABORATORY ENGINEERING - ERB LINER REPL ENGINEERING - DEMO RALPH TANK ENGINEERING - DEMO FP,COLD CRK BOARD OF DIR BOARD OF DIR CUSTOMER SERVICE CUSTOMER SERVICE BOARD OF DIR GEN & ADMIN UNDERGROUND REP PUMPS PUMPS PAYMENT OF CLAIMS - WTR CONS PROG - WTR CONS PROG Page: TRAVEL/MEETINGS SHOP SUPPLIES SHOP SUPPLIES SHOP SUPPLIES DUES/MEMB/CERT SUBSCRIPTIONS SUBSCRIPTIONS SERVICE CONTRACT SERVICE CONTRACT REPLACE ERB LINE RALPH TANK CC FLTR PLANT TRAVEL/MEETINGS TRAVEL/MEETINGS WTR CONS EXPENSE WTR CONS EXPENSE TRAVEL/MEETINGS SHOP SUPPLY INV SHOP SUPPLIES BUILDINGS PUMP STATIONS 9 Aced/ / Proi Code 2029 - 6200 1002 - 6071 1004 - 6071 2002 - 6071 2001 - 6250 1039 - 4830 2039 - 4830 1007 - 6030 2007 - 6030 1029 - 7581 - ERBLNR 2029 - 7090 - DEMORT 2029 - 7091 - DEMOFP Check Total: 1019 - 6200 2019 - 6200 2038 - 6660 - WCPROG 2038 - 6660 - WCPROG 1019-6200 1000 - 0421 1001 - 6071 1002 -6041 1002 - 6051 Check Num bat 17.00 Check Total: 3d_nn AP- 00079222 MW 54.24 54.59 54.24 Check Total: 1R3 n7 AP- 00079223 MW 57.00 Check Total: 57 nn AP- 00079224 MW 149.50 149.50 Check Total: 2910n AP- 00079225 MW 204.00 204.00 Check Total: Check Total: Current Date: 05/12/2011 Current Time: 14:53:30 4nE_nn 262.75 103.03 103.02 619.09 R19_n9 152.29 19.59 8.77 33.04 AP- 00079226 AP- 00079231 MW _BARm AP- 00079227 MW 61.50 61.50 Check Total; 123pn AP-00079228 MW 200.00 Check Total: 2nn_no AP- 00079229 MW 200.00 Check Total: 20000 AP- 00079230 MW MW 0.odor Name SCOTT'S HARDWARE SCOTT'S HARDWARE SCOTT'S HARDWARE SCOTTYS HARDWARE SCOTT'S HARDWARE SIERRA FOOTHILL LABORATORY SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SOUTH TAHOE REFUSE SOUTEST GAS SOUTIiWEST GAS SPRINGBROOKE NATIONAL SPRINGBROOKE NATIONAL STAHL, JIM SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL. & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & User THERESA Report: OH PMT CLAIMS_BK Department / Prot Name PUMPS DIAMOND VLY RNCH PUMPS PUMPS CUSTOMER SERVICE LABORATORY - IND CRK RES MONT MONITORING PUMPS DIAMOND VLY RNCH CUSTOMER SERVICE CUSTOMER SERVICE GEN & ADMIN GEN & ADMIN GEN & ADMIN INFORMATION SYS INFORMATION SYS DIAMOND VLY RNCH ENGINEERING ENGINEERING - HEADWORKS ENGINEERING - FILTER ASSMNT ENGINEERING - REPL GEN, LPPS INFORMATION SYS CUSTOMER SERVICE ENGINEERING ENGINEERING - WT METERING PRJ PAYMENT OF CLAIMS SHOP SUPPLIES GROUNDS & MNTC WELLS SHOP SUPPLIES SMALL TOOLS SUPPLIES SUPPLIES SUPPLIES SUPPLIES REFUSE DISPOSAL NATURAL GAS NATURAL GAS DUES/MEMB/CERT DUES/MEMB/CERT CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE CONTRACT SERVICE CONTRACT SERVICE HDWKS IMP PROJ REHAB FLTR 5&6 REPL GEN LPPS CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE WTR METERING/NEW Page: 10 A / Pros Coda 1002 - 6071 1028 - 6042 2002 - 6050 2002 -6071 2038 - 6073 1007 - 6110 - INDIAN 1002 - 6520 1028 - 6520 1038 - 6520 2038 - 6520 1000 - 6370 1000 - 6350 2000 - 6350 1037 - 6250 2037 - 6250 2038 - 6660 - WCPROG Check Total: 1028 - 4405 1029 - 4405 1029 - 8033 - HDWORK 1029 - 8066 - FILTER 1029 - 8933 - RGLPPS 1037 - 4405 1038 - 4405 2029 - 4405 2029 - 7078 - METERS Check Total: Amount 1.03 26.71 20.99 1.03 9.29 Check Nwm Ix 979 74 AP- 00079232 390.00 MW fm MW 19.67 19.67 10.13 10.14 Check Total: 5Q_A1 AP 00079234 MW 2,811.90 Check Total: 9 Al l sm AP- 00079235 MW 11,805.96 605.14 19 411 14 AP- 00079236 MW 87.50 87.50 Check Total: 175-m AP- 00079237 MW MW Check Total: Check Total: Current Date: 05/12/2011 Current Time: 14:53:30 200.00 _gym - m 907.06 84.03 120.08 25.28 12.64 469.44 469.44 84.02 14.01 AP- 00079233 AP- 00079238 /.Nmms SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUPAN, DONALD TAHOE BASIN CONTAINER SERVICE TAHOE BASIN CONTAINER SERVICE TAHOE BASIN CONTAINER SERVICE TAHOE BLUEPRINT TAHOE BLUEPRINT TAHOE BLUEPRINT TAHOE BLUEPRINT TAHOPARADISE CHEVRON TAHOE TRADING POST TAHOE TRADING POST TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TEPPER, DAN TOPSAFETY TOPSAFETY TRIGGS, CARSON User: THERESA Report: OH_PMT CLAIMS_BK .nt I Proi Name ENGINEERING - IROQUOIS BSTR ST INFORMATION SYS CUSTOMER SERVICE CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE GEN & ADMIN GEN & ADMIN OPERATIONS ENGINEERING - ERB LINER REPL ENGINEERING - HEADWORKS ENGINEERING - DEMO RALPH TANK ENGINEERING - DEMO FP,COLD CRK UNDERGROUND REP PUMPS PUMPS ELECTRICAL SHOP ELECTRICAL SHOP ELECTRICAL SHOP CUSTOMER SERVICE - HUMAN RESOURCES HUMAN RESOURCES CUSTOMER SERVICE PAYMENT OF CLAIMS Description BSTR STN IROQ CONTRACT SERVICE CONTRACT SERVICE SIGNAL CHARGES REFUSE DISPOSAL SLUDGE DISPOSAL REPLACE ERB LINE HDWKS IMP PROJ RALPH TANK CC FLTR PLANT DIESEL SAFETY/EQUIP/PHY SAFETY /EQUIP/PHY BUILDINGS SHOP SUPPLIES BIOSOL EQUPBLDG WTR CONS PROG WTR CONS EXPENSE SUBSCRIPTIONS SUBSCRIPTIONS - WTR CONS PROG WTR CONS EXPENSE Page: 11 Acct# / Prol Code 2029 - 8967 - IQBSTR 2037 - 4405 2038 - 4405 2038 - 6660 - WCPROG 1000 - 6320 1000 - 6370 1006 - 6652 Check Total: 1029 - 7581 - ERBLNR 1029 - 8033 - HDWORK 2029 - 7090 - DEMORT 2029 - 7091 - DEMOFP Check Total: 2001 - 4620 1002 - 6075 2002 - 6075 1003 - 6041 1003 - 6071 1003 - 6653 1022 - 4830 2022.4.830 Check Total: R 179 r,4 AP- 00079239 MW 200.00 Check Total: 2(W On AP- 00079240 MW Check Total: Check Total: Check Total: 2038 - 6660 - WCPROG Check Total: Check Total: 2038 - 6660 - WCPROG Check Total: Current Date: 05/12/2011 Current Time: 14:53:30 Amount Check Num IYR2 54.66 469.44 469.44 52.50 260.00 10,598.00 in 91n Ktt AP- 00079241 MW 1,784.59 186.88 1,802.72, 55.46 R29 RA AP- 00079242 116.30 I IR V1 AP- 00079243 84.58 84.58 I Rg i AP- 00079244 372.91 185.44 132.60 Ago AP- 00079245 200.00 2n0 nn AP- 00079246 90.55 90.54 _inns _n9 AP-00079247 200.00 _ 20000 AP- 00079248 MW MW MW MW MW MW MW PAYMENT OF C IMS larder Nae» Department / Prol Name Nadia Ign Acct# I Proi Code Chia Num DM UPS FREIGHT GEN & ADMIN POSTAGE EXPENSES 1000 - 4810 87.00 Check Total: a7_nn AP- 00079249 MW USA BLUE BOOK OPERATIONS LAB SUPPLIES 1006 - 4760 1,156.92 USA BLUE BOOK OPERATIONS GROUNDS & MNTC 1006 - 6042 488.84 Check Total: I a4.s 7q AP- 00079250 MW V&A CONSULTING ENGINEERS INC ENGINEERING - TANK COATING TANK COATINGS 2029 - 8261 - TKCOAT 21,945.00 Check Total: 21 a45_nn AP- 00079251 MW VAZQUEZ, HERIBERTO CUSTOMER SERVICE - WTR CONS PROD WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00 Check Total: _ma nn AP- 00079252 MW WEDCO INC ELECTRICAL SHOP PUMP STATIONS 1003 - 6051 1,343.19 WEDCO INC ELECTRICAL SHOP RPR/MNTC WTR TKS 2003 - 6054 149.40 Check Total: 1 4a, 5q AP- 00079253 MW WESTERN ENERGETIX INC DIAMOND VLY RNCH GROUNDS & MNTC 1028 - 6042 175.36 Check Total: 175 38 AP- 00079254 MW WESTqRN ENVIRONMENTAL LABORATORY MONITORING 1007 - 6110 240.00 sa w Check Total: _2411012 AP- 00079255 MW 1 WINZLER & KELLY CONSULT ENGRS ENGINEERING - URBAN WATER MGMT URB WTR MGMT PLN 2029 - 8168 - UWMPLN 25,070.50 Check Total: 25.07n 5n AP- 00079256 MW WYSONG, LINDA CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00 Check Totat _mug AP- 00079257 MW XEROX CORP UNDERGROUND REP SERVICE CONTRACT 2001 - 6030 86.73 Check Total: as_73 AP- 00079258 MW ZEE MEDICAL INC GEN & ADMIN SAFETY/EQUIP/PHY 1000 - 6075 401.96 ZEE MEDICAL INC PUMPS SAFETY/EQUIP/PHY 1002 - 6075 77.98 ZEE MEDICAL INC GEN & ADMIN SAFETY/EQUIP/PHY 2000 - 6075 401.95 ZEE MEDICAL INC PUMPS SAFETY/EQUIP/PHY 2002 - 6075 77.97 Check Total: g5q_AR AP- 00079259 MW ZIEGLER, NORTON CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00 Check Total: 2nn_no AP- 00079260 MW Grand Total: 303,736.61 User: THERESA Report: OH PMT_CLAIMS Page: 12 Current Date: 05/12/2011 Current Time: 14:53:30 Ver, dame WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY Deoartment/Prol Name GEN & ADMIN GEN & ADMIN DVR ENGINEERING PUMPS PUMPS PUMPS R:\ACCT\Theresa \Excel\EFT- POC\EFT & POC 5- 19- 11.x1s PAYMENT OF CLAIMS - SUPPLEMENTAL SCHEDULE American Excreta EFT Detail Descrtodon FIRE HYDRANTS BOXES, LIDS, EXTENSION GROUNDS & MAINTENANCE WATER METERING PROJ BLACK BART BOOSTER SHOP SUPPLIES SHOP SUPPLIES Acct #/Prof Code 2000 -0409 2000 -0403 1028 -6042 2029 -7078 2002 -8169 1002 -6071 2002-6071 Total: Amo M 35t>22 9,896.25 EFT 2,200.23 EFT 9.89 EFT - 10,557.05 EFT 940.87 EFT 16.99 EFT 16.99 EFT 2,524.17 South Ta Public Utility District BOARD AGENDA ITEM 15a TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: May 19, 2011 ITEM - PROJECT NAME: Conference with Legal Counsel - Existing Litigation SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government code, Closed Session may be held for conference with legal counsel regarding existing litigation: False Claims Act Case: United States, the States of California, Delaware, Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06- 0055 -GW, United States District Court for the Central District of California. CONCURRENCE WITH REQUESTED ACTIO GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO 5 - CATEGORY: Water General Manager Richard H. Solbdg Dkoctore Chris Coble James K Jones Mary Lou Moeba : er Cale Rise Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150-7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.us South Ta Public Utility District BOARD AGENDA ITEM 15b TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: May 19, 2011 ITEM - PROJECT NAME: Conference with Legal Counsel - Existing Litigation REQUESTED BOARD ACTION: Direct Staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Los Angeles County Superior Court, Case No. BC459943, State of Nevada, et al. v. ..1-M Manufacturing, et al. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION. GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO —77— CATEGORY: General Manager Richard FL Solbrlg Cersetors .Chi James R. Jones May Lou Moebadbr Mile Rlse Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 961504401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.us 5.19.2011 To: STPUD Board of Directors From: JR Long SLT resident What state agency governs water and sewer rates and practices? Who is the head of the state agency or committee that STPUD worked with on the metered water project? Did STPUD identify the large difference in water usage of resident and nonresident in a vacation community when average water use was used to determine CCF per quarter? • If the previous issues was not raised with the state can STPUD re- introduce the issue at this time, after calculating and providing the missing resident /nonresident usage information, and present this to the state agency and request more lenient metered consumption allotments. • Has SPTUD management made any effort to calculate a representation of consumption for resident metered, non metered and nonresident at this time? What specifically are the states mandate(s) with regard to water meter installation, user rates and metered consumption flows and charges? What latitude does STPUD have in setting local water rates, i.e. flat rate expense and metered rate fixed expense and flows per quarter? South Tahoe PUD Alternative Metered Water Rate Desi ns Fa May 19, 2011 Proposed Rate Structure Based on rate study results ✓ Revenue requirement ✓ Cost of service • Developed rate by class of service ✓ Residential ✓ Multi - family ✓ Commercial Developed future rate transition plan options ✓ Increasing meter charges ✓ Decreasing consumption charges ✓ Residential tiered rate structures 3 Timing • Process establishes the maximum rates that ca be charged � • Higher charges require a new Prop. 218 process s Meter or consumption charges Process establishes rates for FY 2012 time period ✓ New Prop. 218 process could revise current proposed rate and rate structures • Prop. 218 notification and protest process completed 5 Number of Gallons Compared to CCF CCF 7,481 10 How Much is One CCF of Water? CCF = Hundred Cubic Feet or 748 gallons 1 CCF = 4,787 Bottles of Water (20 oz.) One Tanker Truck = 5,000 Gallons %WI icJbo G cry c411 c;Jh c Obi fab szah G a t. -o+.. G 1 ► �. 1 G� a a „al, G.b. call cab cab c;;Ph ww1 1 Gab c;;Ilk cab c;;Apo 18,701 37,403 56,104 74,805 93,506 112,208 130,909 25 50 75 100 125 150 Process of Implementing Proposed Rate Design Options Option I. sr Original proposed alternative Option 2 - ✓ Step 10riginal proposed alternative (July - Sept) ✓ Step 2 New Prop 218 - Increased meter charge, decreased consumption charge (Oct 2011 billing period) Option 3 - ✓ Step 10riginal proposed meter charges, decreased consumption charge (July - Sept) ✓ Step 2 New Prop 218 - Increased meter charge, maintain Step I. consumption charge (Oct 2011 billing period) 9 Option 1 -Bill Comparison Consumption Consumption Present (CCF) (Gallons) Metered Rate 0 2 8 14 20 26 32 38 44 50 75 125 0 1,496 5,984 10,473 14,961 19,449 23,938 28,426 32,914 37,403 56,104 93,506 $63.59 68.11 81.67 95.23 108.79 122.35 135.91 149.47 163.03 176.59 233.09 346.09 Option 1 - Original Option $66.00 70.10 82.40 94.70 107.00 119.30 131.60 143.90 156.20 168.50 219.75 322.25 $ Change $2.41 1.99 0.73 (0.53) (1.79) (3.05) (4.31) (5.57) (6.83) (8.09) (13.34) (23.84) % Change 3.8% 2.9% 0.9% - 0.6% - 1.6% - 2.5% - 3.2% - 3.7% - 4.2% -4.6% - 5.7% - 6.9% 1 1 Proposed 2011/12 Water Rates - Option 2 Metered Rate Meter Charge by Size 3/4" $63.59 1" 87.45 1 1/2" 151.53 2" 241.35 Consumption All Customers (per CCF) $2.26 Option 2 - Present Option 1 - Fixed /Variable Rates Original Option 70 a- �° \ \1 $66.00 110.22 219.78 351.78 $2.05 Note: Option 2 would be implemented beginning October 2011, the 2 billing quarter of FY 2012 34 2-19 $85.00 141.95 283.05 453.05 $1.35 13 Option 2 - Review 1st billing quarter in FY 2012 for residential only • 2 billing quarter in FY 2012 for all customers ✓ Requires additional Prop. 218 process • Based on "average" customer consumption r • Minimizes impacts to larger water users • Increases impacts to lower water users • Meets goal of future rate structure L Fixed vs. variable revenues Future rate structure transition plan needs to be developed Meets target revenues 15 Option 3 - Bill Comparison Note: $ and % change are compared to present rate for both options Consumption Consumption Present (CCF) (Gallons) Metered Rate 0 2 8 14 20 26 32 38 44 50 75 125 0 1,496 5,984 10,473 14,961 19,449 23,938 28,426 32,914 37,403 56,104 93, 506 $63.59 68.11 81.67 95.23 108.79 122.35 135.91 149.47 163.03 176.59 233.09 346.09 July Implementation Option 2 - 70/30 Consumption Charge $ Change %Change $66.00 $2.41 3.8% 68.70 0.59 0.9% 76.80 (4.87) -6.0% 84.90 (10.33) - 10.8% 93.00 (15.79) - 14.5% 101.10 (21.25) - 17.4% 109.20 (26.71) - 19.7% 117.30 (32.17) - 21.5% 125.40 (37.63) -23.1% 133.50 (43.09) - 24.4% 167.25 (65.84) - 28.2% 234.75 (111.34) - 32.2% October Implementation Option 2 - 70 %/30% Consumption and Fixed Charges $ Change %Change $85.00 $21.41 33.7% 87.70 19.59 28.8% 95.80 14.13 17.3% 103.90 8.67 9.1 % 112.00 3.21 3.0% 120.10 (2.25) -1.8% 128.20 (7.71) -5.7% 136.30 (13.17) -8.8% 144.40 (18.63) -11.4% 152.50 (24.09) - 13.6% 186.25 (46.84) -20.1% 253.75 (92.34) -26.7% 17 Summary of the Rate Design Rate alternatives provide range of options and customer impacts Option 2 and 3 require additional Prop. 218 process Option 3 results in a one quarter loss of approximately $175,000 Future rate structures can be revised to reflect � final option Board direction is requested to finalize rate study report and future rate structure alternatives 1 9.i