AP 08-04-11SOUTH TAHOE PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING AGENDA
Thursday, August 4, 2011
2:00 P.M.
District Board Room
1275 Meadow Crest Drive, South. Lake Tahoe, California
Richard Solbn • , General Mana • er Paul Sciuto, Assistant General Mana
Dale Rise, President
Chris Cefalu, Director
BOARD MEMBERS
James R. Jones, Director
er
Mary Lou Mosbacher, Vice President
Eric W. Schafer, Director
1. CALL TO ORDER REGULAR MEETING - PLEDGE OF ALLEGIANCE
2. COMMENTS FROM THE AUDIENCE (This is an opportunity for members of the public to address the
Board on short non - agenda items that are within the subject matter jurisdiction of the District. Five
minute limit. No action can be taken on matters not listed on the agenda.)
3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR
4. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered
separately upon request. Comments and questions from members of the public, staff or Board can
be taken when the comment does not necessitate separate action.)
5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION / ACTION
6. PRESENTATION
a. Award Government Finance Officers Certificate of Achievement for Excellence
in Financial Reporting (President Rise)
7. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION
a. Cathodic Protection Improvement Project
Pg. 71 (John Thiel)
Award Bid to the Lowest Responsive,
Responsible Bidder (*Bid summary and
recommendation will be made available at
the District office, prior to, and at the Board
meeting)
b. Snowshoe /Millich Slope and Bijou Sewer Award Bid to the Lowest Responsive,
Pg. 73 Relocates Responsible Bidder ('Bid summary and
(Peter Lavallee) recommendation will be made available at
the District office, prior to, and at the Board
meeting)
c. Payment of Claims Approve Payment in the Amount of
Pg. 75 $3,015,008.49
REGULAR BOARD MEETING AGENDA - AUGUST 4, 2011 PAGE - 2
8. BOARD MEMBER STANDING COMMITTEE REPORTS
(Discussions may take place; however, no action will be taken)
a. Water & Wastewater Operations Committee (Jones / Rise)
9. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken.)
10. EL DORADO COUNTY WATER AGENCY REPRESENTATIVES REPORT
11. GENERAL MANAGER REPORT(S) (Discussions may take place; however, no action will be taken.)
a. Legal Service Provider for Human Resources (Richard So!brig)
b. CALSTAR Insurance Information (Richard Solbrig)
12. STAFF / ATTORNEY REPORT(S) (Discussions may take place; however, no action will be taken.)
a. Prosperity Project Update (Dennis Cocking)
b. Billing Statement Modification Update (Tim Bledsoe)
c. Board Op /Ed (Dennis Cocking)
13. NOTICE OF PAST AND FUTURE MEETINGS / EVENTS
Past Meetings I Events
07/27/11 - ECC (Employee Communications Committee) Meeting
08/01/11 - El Dorado County Water Agency Special Board Meeting in Shingle Springs
08/01/11 - Water and Wastewater Operations Committee Meeting
Board Election Nomination Period (July 18 - August 12)
Future Meetings / Events
08/08/11 - 08/12/11 - CASA (California Association of Sanitation Agencies) Conference
08/10/11 - 10:00 a.m. - El Dorado County Water Agency Regular Meeting at District
08/12/11 - Board Election Filing Period Ends (Seat 3 Filing Period Extended to 08/17/11)
08/15/11 - 3:30 p.m. - Water and Wastewater Operations Committee Meeting at District
08/16/11 - 9:00 a.m. - Alpine County Supervisors Regular Board Meeting in Markleeville
08/18/11 - 2:00 p.m. - STPUD Regular Board Meeting at District
14. CLOSED SESSION (The Board will adjourn to Closed Session to discuss items identified below.
Closed Session is not open to the public; however, an opportunity will be provided at this time if
members of the public would like to comment on any item listed. Three minute limit.)
a. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel
Pg. 85 Existing Litigation re: False Claims Act Case: United States, the States of California,
Delaware, Florida, Nevada, and Tennessee and the Commonwealths of
Massachusetts and Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc.
and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06- 0055 -GW, United
States District Court for the Central District of California
b. Pursuant to Government Code Section 54956.9(a) /Conference with Legal
Pg. 87 Counsel - Existing Litigation re: Los Angeles County Superior Court Case
No. BC459943, State of Nevada, et al. v. J -M Manufacturing, et al.
15. ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION
16. ADJOURNMENT (To the next regular meeting, August 18, 2011, 2:00 p.m.)
CONSENT CALENDAR
AUGUST 4, 2011
ITEMS REQUESTED ACTION
a. Golden Bear Water Meter Installation Project
Pg. 1 (Chris Stanley)
b. Mobile Reading Unit (MXU) Purchase
Pg.3 (James Cullen)
c. Remote Terminal Unit (RTU) Replacements
Pg. 5 (Ross Johnson, John Boyson)
d. ERB (Emergency Retention Basin) Project
Pg. 11 (Julie Ryan)
e. Water Tank Recoating Project
Pg. 23 (John Thiel)
Approve Contract with Substitute or
Blue Ribbon for Four Temporary
Employees, in the Estimated Amount
of $50,000
(1) Authorize Exception to Bidding
Procedures as Outlined in the
Purchasing Policy for a Sole Source
Purchase of Standardized Supplies;
and (2) Authorize Purchase of Sensus
MXU's from Western Nevada Supply,
in the Amount of $51,384.38,
Including Tax and Freight
(1) Find Purchase of Motorola ACE
3600 Remote Terminal Units to be
Excepted from Bidding, as a
Standardized Item, Matching or
Compatible with the District's
Existing Equipment; and (2) Approve
Purchase of Eight RTUs from Global
Data Specialists, Inc., in the Amount
of $36,338.88
Authorize Staff to Enter into an
Agreement with the City of South
Lake Tahoe to Accept Surplus Liner
Removed from the ERB
Authorize Task Order to Bay Area
Coating Consultants for Coating
Inspection Services, in the Amount
Not to Exceed $37,200
f. LPPS (Luther Pass Pump Station) Standby (1) Approve Change Order No. 8 to
Pg. 37 Power Generation Facility Sierra Nevada Construction Inc., in
(Ivo Bergsohn) the Amount of $4,808; (2) Approve
the Project Closeout Agreement and
Release of Claims; and (3) Authorize
Staff to File a Notice of Completion
with the El Dorado County Clerk
CONSENT CALENDAR - AUGUST 4, 2011
PAGE - 2
g. Alpine County Surveying Services - Alpine County
Pg. 47 Monitoring Well Installation and Diamond Valley
Ranch Irrigation Improvement Projects
h. The Aspens at South Lake Tahoe
Pg.55 (Paul Hughes)
i. Utility Raising Associated with El Dorado County
Pg. 65 Department of Transportation North Upper
Truckee Paving
(Paul Sciuto)
j. Regular Board Meeting Minutes:
Pg. 67 July 21, 2011
(Kathy Sharp)
Accept the Cost Proposal from Tri
State Surveying, LTD, to Complete
Surveying Services, in the Amount of
$6,800
(1) Authorize Board President to
Execute the Fee Deferral Agreement
with SLT Pacific Associates, a
California Limited Partnership; and
(2) Sign the Associated Promissory
Note
(1) Authorize Commitment of Reim-
bursement to El Dorado County for
Raising Manholes, Flushing Inlets,
and Water Valves; and (2) Authorize
Payment to the County for the
Construction in the Estimated
Amount of $33,900
Approve Minutes
The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A
complete agenda packet, including all backup information is available for review at the meeting and at the District
office during the hours of 8:00 a.m. - 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30
days after minutes of the meeting have been approved. Items on this agenda are numbered for identification purposes
only and will not necessarily be considered in the order in which they appear on the agenda. Designated times are for
particular items only. Public Hearings will not be called to order prior to the time specified, but may occur slightly later
than the specified time.
Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time
the agenda items are heard; comments should be brief and directed to the specifics of the item being considered.
Please provide the Clerk of the Board with a copy of all written material presented at the meeting. Comments on items
not on the agenda can be heard during "Comments from the Audience;" however, action cannot be taken on items
not on the agenda.
*Backup materials relating to an open session item on this agenda, which are not included with the Board packet, will
be made available for public inspection at the same time they are distributed or made available to the Board, and
can be viewed at the District office, at the Board meeting, and upon request to the Clerk of the Board.
The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate
participation of the disabled in all of the District's public meetings. If particular accommodations for the disabled are
needed (i.e., disability - related aids, or other services), please contact the Clerk of the Board at 530.544.6474, extension
6203, at least 24 hours in advance of the meeting.
South Tahoe Public Utility District • 1274 Meadow Crest Drive • South Lake Tahoe, CA 96150
Phone 530.544.6474 • Facsimile 530.541.0614 • www.stpud.us
South Tahoe
Public Utility District
General Manager
Riohand K Salbrig
Dlrecters
.O isCetsdu
JamesR. Jaaa
Ma Lou Mookacher
Wefts
mss.
1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401
Phone 530 54A -6474 • Fax 530 541 -0614 • www.etpud.us
BOARD AGENDA ITEM 4a
TO: Board of Directors
FROM: Chris Stanley, Supervisor Underground Repair Water
MEETING DATE: August 4, 2011
ITEM - PROJECT NAME: Golden Bear Meter Installation Project
REQUESTED BOARD ACTION: Approve contract with Substitute Personnel or Blue Ribbon
for four temporary employees, in the estimated amount of $50,000.
DISCUSSION: The District's Underground Repair Water crew will be installing meters in
the Golden Bear area. Staff will be puffing together a four man crew consisting of two
full time permanent employees and two temporary employees for this project. The
remaining two temporary employees will fill the two permanent employee's position on
the District's maintenance and repair crews. The temporary employees will be
employed through October 15, 2011.
SCHEDULE: As soon as possible
COSTS: $50,000
ACCOUNT NO: 2001 -7093
BUDGETED AMOUNT REMAINING: Non - budgeted item. Staff will attempt to absorb the
cost into the department budget.
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES /L . NO
CHIEF FINANCIAL OFFICER: YES NO
-1-
CATEGORY: Water
South Tahoe
Public Utility District
General Manager
Riotm a H. SoWiq
Directors
.aeCAW
Jam sR. Jones
May Lae Moebadmr
li ,
Eric e e
1275 Meadow best Drive • South Lake Tahoe • CA 96150 -7401
Phone 530 544- 6474 • Fax 530 541 -0614 • www.stpud.ue
BOARD AGENDA ITEM 4b
TO: Board of Directors
FROM: James Cullen, Inspections Supervisor
MEETING DATE: August 4, 2011
ITEM - PROJECT NAME: Mobile Reading Unit (MXU) Purchase
REQUESTED BOARD ACTION: (1) Authorize exception to bidding procedures as outlined
in the Purchasing Policy for a sole source purchase of standardized supplies; and (2)
Authorize purchase of Sensus MXU's from Western Nevada Supply, in the amount of
$51,384.38 including tax and freight.
DISCUSSION: Staff needs to purchase a total of 378 MXU's to be installed at the current
in house Golden Bear Meter Installation project.
To ensure that all parts will perform with the District's electronic meter reading system,
the District only purchases MXU's manufactured by Sensus (as authorized by the Board
on May 21, 2009). Western Nevada Supply is the sole source supplier for Sensus in the
area.
SCHEDULE: As soon as possible
COSTS: $51,384.38 (includes tax and freight)
ACCOUNT NO: 2038 -8244
BUDGETED AMOUNT REMAINING: $55,000
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
NO
NO
-3-
CATEGORY: Water
TO:
South Tahoe
Public Utility District
General Mara -er
Richard H. Solids
Cituctas
.Chris Cat*
• Jame* ;Wows
Mary LouMoeba:bar
Dais Rise
Erfc .
1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401
Phone 530 544- 6474 • Fax 530 541 -0614 • www.stpud.us
BOARD AGENDA ITEM 4c
Board of Directors
FROM: Ross Johnson, Manager of Plant Operations
John Boyson, Electrical Supervisor
MEETING DATE: August 4, 2011
ITEM - PROJECT NAME: Remote Terminal Unit (RTU) Replacements
REQUESTED BOARD ACTION: (1) Find purchase of Motorola ACE 3600 Remote Terminal
Units (RTUs) to be excepted from bidding, as a standardized item, matching or
compatible with the District's existing equipment; and (2) Approve purchase of eight
RTUs from Global Data Specialists, Inc., in the amount of $36,338.88.
DISCUSSION: RTUs transmit and receive information from outlying facilities to the
treatment plant Supervisory Control and Data Acquisition, (SCADA) system using the FM
radio band. The Motorola ACE 3600 RTUs replace older Intrac units used in the water
and wastewater systems. The Motorola ACE 3600 RTUs are Motorola's replacement for
the MOSCAD RTU, which the Board of Directors standardized as the replacement for
the Infrac RTUs in 2001.
RTUs must be compatible with existing SCADA equipment used throughout District
facilities. In 2001 and 2007, the Board authorized the purchase of RTUs from Global Data
Specialists, Inc., who has experience with programming RTUs for use with the District's
SCADA system. The maintenance of a consistent supplier for items that will be used in
the District's SCADA system is preferred, as it limits the dissemination of the District's
system codes.
The District's Purchasing Policy exempts from bidding requirements the purchases of
items that have been standardized by the District as well as when it is required or is
economically preferable that an item match or be compatible with equipment
presently on hand and the purchase will be made from the supplier who supplied the
existing equipment.
The first two installations of the RTUs will occur at Gardner Mountain and the Stateline
Zone; others will follow on a to-be- determined basis.
Ross Johnson
August 4, 2011
Page 2
SCHEDULE: Immediate order with all eight installed by January 1, 2012
COSTS: $36,338.88
ACCOUNT NO: 1003 -8207; 2003 -8245
BUDGETED AMOUNT REMAINING: $18,000; $48,000
ATTACHMENTS: Price Quote
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
NO
NO
-6-
CATEGORY: Sewer
GLOBAL
DATA SPECIALISTS
1815 W. First Ave., Suite 110, Mesa, AZ 85202
Phone: 480 -461 -3401 FAX: 480 -461 -3411
QUOTE: MDM04006A
by Duane Moody
480 -461 -3401, Ext. 223, duane @gbl- data.com
Expires 11- Oct -11
Quoted To:
John Boyson
Phone: 261
South Tahoe Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Phone: 530 -544 -6474
FAX: 530 -544 -6359
July 13, 2011
Description
Please find attached the quotation for the ACE3600 RTU equipment as per your request. Please note the following:
1. This quotation includes the equipment for 8 RTU's. Does not include any programming or Engineering Services.
2. Also included are I/O interface kit for the Mixed I/o module that GDSI created with mounting on a panel for wall
mount or installation within a separate housing (delete housing cost from Materials section). This kit was created for the
following issues.
a. The maximum wiring guage for the terminals on the ACE3600 I/O modules is 18 ga.
b. The relays in the DO and Mixed UO modules do not have a high capacity compared to the MOSCAD RTU's. As a
result, interpose relays may need to be required. The interface kit includes 7 -10A relays to provide higher capacity relay s
than those included with the ACE I/O modules.
c. The terminals provided with the interface kit allow for easier installation and up to 12ga wiring.
If you have any questions or need additional information please let me know.
Best Regards,
Duane Moody
Sales Manager
-7-
Page 1 of 3
MATERIALS
RTU's (With AO): $ 16,460.00
QTY Part No Description
0004 F7563 ACE3600 WITH CDM750136 -174 MHZ
0004 V103 ADD: 3 I/O SLOTS FRAME
0004 V228 ADD: 50X50 CM PAINTED METAL HOUSING
Unit Price . Extended
$ 1,800.00 $ 7,200.00
$ 70.00 $ 280.00
$ 300.00 $ 1,200.00
Includes a metal chassis and fits either the 6.5 Ah or the 10Ah battery. It does not include a padlock.
0004 V245 ADD: 16DI 4D0 EE 4AI + / -20MA
0004 V118
0004 V261
0004 V114
0004 V446
0004 V184
0004 FPN1653
$ 430.00 $ 1,720.00
$ 495.00 $ 1,980.00
$ 310.00 $ 1,240.00
$100.00 $ 400.00
$100.00 $ 400.00
$ 100.00 $ 400.00
ADD: 4 AO MODULE
ADD: AC PS 85-264 V WITH BATTERY CHARGER
ADD: 6.5 AH BACKUP BATTERY
ADD: ACE CPU3640
ADD: PLUG -IN RS -232 PORT
ASSEMBLY,POWER SUPPLY,24V PS PLUG IN KIT
$ 75.00 $ 300.00
Provides floating 24V to the module TB. Fits DI, AI, Mixed I/O and Mixed AI/AO modules. The 32 DI module can hold
up to two PS, all other modules just one PS.
0004 GD3572 -Mixed Mixed I/O Interface Kit
$ 335.00 $ 1,340.00
RTU's (Without AO): $ 14,480.00
QTY Part No Description Unit Price Extended
0004 F7563 ACE3600 WITH CDM750 136 -174 MHZ
$1,800.00 $ 7,200.00
0004 V103 ADD: 3 I/O SLOTS FRAME
$ 70.00 $ 280.00
0004 V228 ADD: 50X50 CM PAINTED METAL HOUSING
$ 300.00 $ 1,200.00
Includes a metal chassis and fits either the 6.5 Ah or the 10Ah battery. It does not include a padlock.
0004 V245 ADD: 16DI 4D0 EE 4AI + / -20MA
0004 V261 ADD: AC PS 85 -264 V WITH BATTERY CHARGER
0004 V114 ADD: 6.5 AH BACKUP BATTERY
0004 V446 ADD: ACE CPU3640
0004 V184 ADD: PLUG -IN RS -232 PORT
0004 FPN1653 ASSEMBLY,POWER SUPPLY,24V PS PLUG IN KIT
-8-
$ 430.00 $ 1,720.00
$ 310.00 $ 1,240.00
$ 100.00 $ 400.00
$ 100.00 $ 400.00
$ 100.00 $ 400.00
$ 75.00 $ 300.00
Page 2 of 3
Provides floating 24V to the module TB. Fits DI, AI, Mixed I/O and Mixed AI/AO modules. The 32 DI module can hold
up to two PS, all other modules just one PS.
0004 GD3572 -Mixed Mixed I/O Interface Kit
$ 335.00 $ 1,340.00
Spares: $ 2,190.00
QTY Part No Description Unit Price Extended
0002 F7502 ACE3600 MID TIER CPU 3640
$ 1,000.00 $ 2,000.00
CPU module only with on board RS -232 port , RS- 232/485 port and 10/100 Mbps Ethernet port. Up to two optional plug-
in ports.
0002 FLN3696A PLG IN RAD PORT (GRI)
$ 95.00 $ 190.00
TOTALS
Materials Sub -Total $ 33,130.00
Materials $ 33,130.00
TOTAL $ 33,130.00
TERMS
NOTE 1: All Engineering Services Will Be Quoted A Minimum Of Four (4) Hours Engineering Labor
NOTE 2: Shipping Charges Are Not Included.
Payment 100% Upon Receipt of Invoice, Net 30 Days.
Delivery: TBD Upon Order Placement
Validity: Quotation is valid for 90 days. The above quotation is based upon the information provided at the time of
quotation. Global Data Specialists is not responsible for any information that is missing or incorrect. Any
new information that is received after the quotation has been submitted may result in a revised quotation
being issued to cover the costs of additional equipment or services as Identified.
Shipment. FOB Global Data Specialists, Mesa, AZ.
Warranty: The Motorola equipment is warranted for 1 year upon shipment for parts and labor. Non - Motorola
equipment warranties are vendor specific and will apply. No additional warranties are expressed or
implied. Warranty labor does not include the cost associated with any out of the office related travel or
hourly time expenses and will be billed separately.
Cancellation: 10% Penalty prior to 30 days of shipment, 25% Penalty less than 30 days prior to shipment.
Note: Please reference quotation number on all correspondence.
-9-
Page 3 of 3
South Tahoe
Public Utility District
Generwi Manager
Rlolued K Solbig
.
Ja Directors
ft CA&
me R. Jaw
May Lou Mootadsr
Dids Rise
Eric Schafer
1275 Meadow Crest Drive • South Lake Tahoe • CA 96150-7401
Phone 530 544 -6474 • Fax 530 541- 0614+ www.stpud.us
BOARD AGENDA ITEM 4d
TO: Board of Directors
FROM: Julie Ryan, Senior Engineer
MEETING DATE: August 4, 2011
ITEM - PROJECT NAME: ERB (Emergency Retention Basin) Replacement Project
REQUESTED BOARD ACTION: Authorize staff to enter into an agreement with the City of
South Lake Tahoe to accept surplus liner removed from the ERB.
DISCUSSION: Staff has been working with the City of South Lake Tahoe regarding an
agreement under which the City will receive approximately 90,000 square feet of the
HDPE liner which is currently being removed as part of the District's ERB project. The
agreement, signed by the City, is attached. This agreement provides surplus liner to the
City at no cost to either the District or the City, and relieves the District from any future
responsibility for the surplus liner. The District will be responsible for cutting and stacking
the liner in specified quantities; the City will be responsible for removing the liner from
District property.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS: Agreement
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES , _ NO
CHIEF FINANCIAL OFFICER: YES NO
CATEGORY: Sewer
RECORDING RESTED SY
AND WHEN RECORDED, RETURN TO:
City of South Lake Tahoe
City Clerk's Office
tea
South Laite . Tahoe, CA 96150
11:8111M1
GAT Of TEMPORARY' EASES
APN 026.0111.15
ERB LINER T AN&FER, nwampapreAnoN AND TEMPORARY RK HT 1W
Ate. .MOUIRM
nu ERE LIM TRAMPER, DUVEMPHECATIO19 AND TEMPORARY
RIGHT QF.ArcEss , EEMt ` eAsreammin is matio d+ 2 TT coy of July 2811, by
and between the South Tahoe Public Utility Mania, a Califamittpublin agency, teamed is 1930
Menem to laic Utility DtistrittAet Mgr*" and the OW of South Lake, ("City") (each
individually a "Parte and collectively, the "Parties")„ in Staudt Lac Tahoe, Callibmia, with
r e f e r e n c e to the fallowing facts and i n t e n t i o n s : `
A. The District maintains on amcgamoy retention haaht MB" "} for the entergeng
storage attended and partially trrattad wmarenner mat, prior itt ha =pelt to the Distriers
effluent aloof &Mks in Alpine Ow*, Californkt The BEE kr loaned .**ea'o the
District's trict's vw tat r nettneent plant at do corner of Bieck Bat Ammo mid Pioneer Trail in
unincorporated El Dorados County ( "'pen
L The ERB is lined with
the Diatrk% intends to replace during the 20
competitively bid the Liner removal and
specif`rcatiom for the Project terms that will
high dermitTpolyatItylote liner ("Liner"), which
semen. The Markt has
ant project C'Pr t") and has included in its
it to carry ouj this Agreement
C. City wider to reuse portions of *ilium-, MCC they have been removed from the
ERB ("liner Portione) Pursuant to the teens of thin Agree District agrees to allow City to
utilize the Liner Portions.
D. The Parties agree to bear the costs ofremaval ofthe Liner from the BBB,
preparation of the Liner Portions for City's use, and =oval of the Liner Portions from the
Property as set forth in this Agreement.
B. Pursuant to the terms of this Agreement, District agrees to allow City a temporary
right of access to the Property for the removal of the Liner Portions from the Property.
1
00/627V000100146.4
-13-
P. Pursuant to the terms of this Agreement, City agrees to release, defend, indemnify
and hold the District harmless in connection with its removal of the Liner Portia ft :rm the
Property and its tam of the Liner Portions thereafter.
NOW, THEREFORE, the parties agree as follows:
1. 1.111441L44/11/Lbligilagi The District agrees to transfer ownership and
--raag p t r4re-LinefRosttons t- City, pursuanttathetenueof is Sec
Win.
exasminiof "�......._ that Meat t';%tye Liiawar�. _ ..-._
for its Wed tha Lam' Portions, and 2) the quantity of than that City of S. Lake Tahoe
accept Maxima. Quantity").
1.3 Qturatity of Liner Portions, The District Will make agile, in the liam
of Lunar I. *much of the Liner as the QuitlityStemlerdr, uP to the MOtehnMa
Qu€entity.City. agrees to take as much of the Liner as meets tip. Quality Std ia. the amount
p r o v i d e d , by the let up to the Maximum Quantity, such that no Liner Portions meeting the
Qualky gander* are left by Chy at the Property.
L3 Stackhig of Liner Portions. AS part of dm Project, the District will brass
the peetins of the Limn meeting the Quality Staff eut itnostdps of dimensions of
approximately 25 lbet by 40 feet. The District will lavo these Lio*r Portions stacked.
secured on si. timignated nation of the Property.
' that the total area of the Liner Portkles that will be made aseilable
to City wiN to approximately 90,000 scpaire feet The Dim mime no guarantee astotholinal
area that watt* available to City, as the final total area of the Liner Portions is tadaa * uPon
the portion of the Liner that meet City's Quality Standards.
1+4:3 Removal of Liner Portion front Pt" *,
1.4.1 Cfty will Remove Liner POP01116 Cat, or its repmsentritiaes
contractors, wilt remove the stacked Liner Portions Property.
L.4.2
Removal Period. City and its 'ves and contreettIM
shall, patrsruutto the Temporary Right of Access dew • in section 2, tom, be
allowed woes to the Property tt remove the Liner Portions during the period oUArty 37,
2011, through November 15, 2011 (the "Removal Period"). After the conclusion of ths
Removal Period., City shall have no right to the Liner Portions remaining on the Ply
and the poi may dispose of any Liner Portions remakting on the Property as it wishes.
1.5 Costs. The Parties will bear the costs of the transfer of the Liner Portions
described in section 1.1 -1.3, above, as fellows:
007627t0008L'587186A
2
-14-
1.5.1 Costs Borne ky District. District epees to bear the costs of
preparing the Liner Portions and stoking and securing the Lamer Portions on the
Property. The District's payment of the such costs may be through its payment of
Contractor as part of the Project.
the Lim Portions from the Property, .eluding the costs of any pews:don of the stacked
----tinerftstrontfor removatittat-thigamperty, and-all a ens e - _ ..
..nbielitertrotititialkimilim '. City may - beTr
2.1 Grant of Tompornry Right of Access. District grants to City, its
representatives and contractors, the tbilowfug temporary right of ac es*over, Cass through,
within, and . acme he PrePerty rrempormy light of Access ") for ties following pu lose.:
2.1.1. Preparatitm ettl$er Portions for .
City, its representatives and contactors awl have unrestricted wage along existing
roadways of vehicles and pedestrians within, on, over and manse the P.ropearty , to
carnation with the preparation efts Liner Portions for remenat front the Property',
2.1.2. Trionoportaikto aCUne ► Portion, off Property. ter, its
representatives and use shall have access to the Propesty fi w the gal of the
Lim Portions from the Property.
2.2 Reaseerd Opeerident. City, its representatives rs shall
conduct its opts in ti* boa Liner Portions and retie Liner Patios
nand* Property in a are and workmanlike manner and, upon the emertieticet of any such
openniena, pax swim .a any lama aimed by removal operations, tss Frosided Jo this
ant. The rentmal of the Liner Portions from the Property shill be performed in ao inra:uuir
intenhod to the Property in a naturrd cant ion and free from secumulation of waft
mattetiat or rubbish. City, its representative* i contractors shalt comply with ail icoeptlrentente
of the District Tahoe Ragland mg Age permit for the Prey, ink the condition*
of Attachment Q, Standard Conditions of dyad for Grading Permits.
2.3 Existing 8th The Temporary Right of Access is subject to all
existing structures, Wig, pipelines, math, lanes, highways, elf:coital erasion facilities,
telephone lines; and other existing structuars or improvements on tit Ptopeity.
2.4 Access to Property. Upon three (3) business days' notice of the intent to
enter onto the Property, City, its representatives and contractors shall have the right of lnt
and egress across the Property, as designated by the District for access to and purposes related to
removal of the Liner Portions from the Property. Subject to weather bus on the Property,
District agrees to maintain existing roadways through the Property in a passable condition.
Nothing in this Agreement shall prevent or limit the District's rights to change access to the
00 74171000111587146.4
3
-15-
Property as long as City, its representatives and contractors are provided other reasonably similar
alternative means of access to the Property.
The Parties shall work in good faith with one another, and their respective representatives
and contractors, to determine mutually convenient days and times for entry onto the Property for
-AhxdosksfaeinporarylikightefAesems‘AttiaTemposmOlghts‘Aoman
shall include the Review:04*m &en July 27,-201-1 die miler oftheremovalof all Liner
memeceetsiamitionakent, I Arrys,mitlirrri
• •
above.
3. EgilVlbirldiUklaklitillSUROkElatildliW City oolovalares and *pees, at its
sole and exclusive cost and expense, to release, deltoid, indemnify and hold the District and its
elected officials, &More consultants, contractor*, agents and employees, leurnless from and
against any and all clehas, dementia, actions, mama of action, atteMeys' *es, expert witnesses
*es, and all other costs and expenses of any kind or nature that ssise out of or in any way relate
to City's actions in the removal from the Property, reuse or ulthaete dbposal of the Liner
Portions after their removal from the Pmperty. This release,. indemnification and td harmless
agmement shall apply to all liability arising frail, or related to t nenoval of the Liner Portions
from the Property, bteitelitig, but not limited to, any injury sustained by City tepreamtatives or
contractors on the Prosily during removal atm Liner Portions, except to the extent caused by
dte District's active negligence or willful misconduct.
Further, this mime, indemnification and hold harmless • western shall also apply to
City's use or disposal of the Liner Patens after the removal Ikea tbr Properly. City agrees
that upon removal of the Liner Portions from the Property, the Digest shall be released from any
and all liability arising out of Cky's transportation or reuse of the Liner.
The Parties agree that the above provisions shall be itttmpretod m h.vor of the District,
and that the District shall be afferded the nuethunnt degree of indennrifteation es may be
reasonably inferable front the language used herein that Is available at law.
4. fiSilinalettragns
4.1 Recitals. The recitals sailed at the beginning of this Agreement of any
matters or facts shall be conclusive proof of their truddbinees and the terms and conditions of the
recitals, if any, are ineotporated by this reference and deemed a part of this Agreement
4.2 Cooperatto'n. The Patties shall, whenever and as often as reasonably
requested to do so by the other Party, execute, aelatowledge and deliver or cause to be executed,
acknowledged and delivered any and all downy:WS and instruments as may be reasonably
necessary or proper to carry out the intent and putposes of this Agreement, provided that the
requesting Party shall bear the cost and expense of such further instruments or documents .
43 Authority To Execute. The individuals executing this Agreement
represent and warrant that they have the authority to enter into this Agreement and to perform alt
4
0076271000A587146.4
-16-
acts required by this Agreement, and that the consent, approval or execution of or by any third
party is not required to legally bind either Party to the terms and condition, of this Agreement
that the
44 Remedies:, The Parties agree that irrepsodebs chomp would occur and
would not have an 4 remedy at law In the event that any of the provisions
breached. The Pnrtits shell be entitled to all forms of equine& relief, including restraining
_ -
bond in emootion with obtaining-any equittelski-sedier. No--tosisely. is =elusive but shall,
wherever possible, be deemed cumulative with all other remedies at •low or in equity.
45 Construction. The 'ravish= of this Agreement should be liberally
construed to efforts* he purposes. The blast:age of all parts of this Agreement shall be
construed shmely onsording to its plain musing end shall not be constrited for or against either
Party, u each Patty has participated in tix drafting of this document and hod the opportunity to
'WM their cm NI MOM it. Whenever dto context and constmetios so requires, all words used
is the absepiar shall be deemed to be used in the plural, alt mad= shag include the feartinine
asd neUtert Old vicr * versa.
44 N All notices, approvals, receeprrnees, demands and other
ammemioatione required or peen/Med he, to be effective shell be in writing and shall be
dedivered either in pews= or by mains dna anso by United Slam mil (postage prepaid,
mita= or eertified„ rotorn remeipt requested) or by Federal Eames or other similar overnight
delivery service to the Nifty to whom the notice ie directed at the address of such Party as
follows:
District;
City:
Richard Sari& General Manager
South Taboo Publie Why District
1215 Wars Cost Drive
South Lae TAM CA g6150
City of South Lake Tahoe
1052 Tate Lane
South Lake Tehoe, CA
Any written conumudernion given by mail shall be deemed delivered two (2) business days after
such mailing date and any written communicatke even by overnight delivery service shall be
deemed delivered one (1) business day after the dispatch ate, Either Party may change its
address by giving the other Party written notice of its new address as herein provided.
4.7 Successors and Assigns. This Agreement shall be binding on and shall
inure to the benefit of the parties and their respective heirs, lewd representatives, successors and
assigns.
00762A000111187146.4
5
-17-
411 Governing Law. The validity and intenyetation of this Agreement shall
be governed by the laws of the State of California without giving effect to the principles of
conflict of laws, with venue fbr all purposes to be proper only iu the County of El Dorado, State
of California.
t is dew to ire unenforceable by a court of .cmnpetent jurisdiction, it is the
_ ar i
4.-I0._ ,A rs asp!- Fees. If any: saw- -r_la c_.or. equity, incl. g. _.
aetker for declaratory relief is brought to enforce or hantraret the provisions of this Artesneai,
the prevailing' panty shall be entitled to recover actual attorneys' fees which may be deterntined
by t court in the same aetiott or in a separate brought for that p . The attorneys'
fees to be awarded shell be made to fully rep for all a s1' f . paralegal hes, Costa
and expenses actsally hemmed in good faith, regardless oldie size of the judgment, it leis the
intentlec of the patios to NV compensate fir all Mays` mss, paralegal fen, costs and
expenses paid or armed in good faith.
411 Connterparts. This Agreement mity be executed in any number of
counfirparts, each of which asball be an original, but all of wirkb shall constitute one and the
see Agmement. This Agreement shall not be +skive emit the and &limy
between each of the pastim a at lest one set of caunierpaarts.
413 Amendment. Parties agree that the tonne and maims of the
AgreemeM may be reviewed or oared at any tip. Any modifications to this Agreement
howler, std be abotive only when agreed to in writhag by both Pieties.
413 Garai Faith. The Parties agree to exercise their best efforts and utmost -
good faith to officinal. ell the tennai and conditions of this Agreement and to execute such
Rather instruments and tiemanents as are necoasaay or wpm** to mate all of the tents
mid coadidons of this Arnt.
4.14 'sue. The waiver of any bad of any provision data Agreemoot by
any Party to this AgreeMent shall not be deemed to be a waiver of any proofing or SOI,SeClUtnt
bra under the Armor* or shall any waiver conetitute a eontinuing vat. No waiver
shall be binding unless eXecuted in writing by the Patty making the waiver.
4.15 Entire Agreement and A>andment. This Agreement contains the entire
understanding and agreement of the Parties and there have been no promisoes,
agents, warranties or .undertakings by any of the parties, either oral or written, of any
character or nature binding except as stated in this Agreement. This Agreement may be altered,
amended or modified only by an instrument in writing, executed by the party to this Agreement
and by no other means. Etteh Party waives their fiaturo right to claim, contest or assert that this
Agreement was modified, canceled, superseded or changed by any oral agreement course of
conduct, waivier or estoppel,
62/V300t45137146.4
6
-18-
IN MIMS WHEREOF, the partite have executed this Agreement as of the date first
stated above.
South
trt
By
Kathy Shop, Clerk of the Board/
007462719Q0 $7146A
7
-19-
ALL PURPOSE ACKNOWLEDGMENT
State of Cardbmia )
)
r-courarorrzunntoo)
---21)117:- • 77-77=2#11-utiewirritir=ar.-_
0.4
--tlatmsithio-inatnunent and, acknowtedaglAimethat heccutttI e samek
histfheelbsir authorized capacity*** and that by hiathenfthair signature(o) on the tot the
pason(s), or the entity upon behalf of which the person* slated, executed the hwtrument.
I certify older PENALTY OP PitRSURY underthe htwa dike State of California thwt the
*awing paragraph is true and correct.
WNW my hand and official sett
OC(762OOXOSITI-46:4
(Seal)
- 2 0 -
CifoRTIFICATE OF ACCEPTANCE
FOR GRANT OF TEMPORARY EASEMENT
ant Cam' Boum LAKE TAHOE
OUIZEATILMACCIVIAKA
This is to certify that the interest in real property mimed
Gaunt ofTemparary Ermonent dated JUIy 27, 2011, from the $e Tahoe
Pub lk Utility District At Miyake, to the City of South Lake Tahoe, a
California gemend law ("Grantee"), is hereby aceeptoi by the
uralsaigned caws on behalf of the Civ Council, pursuant too authority
o nf'en d by Resolution of the City 0=4 adopotd on the 1I day of
App 1972, and to meordstion thereof by its duly
cater,
Dated t1 "day of July, 2011.
UM, CITY MANAGER
CITY • ` ' H LAKE TAHOE
ATTEST:
etieve--
youth Tahoe
Public Utility District
General Manager
Richard K ScMnit
Directors
.CMsCeialu
James R.Jones
May Lou Moellacher
Oils Rise
Eric Schafer
1275 Meadow Crest Drive • South Lake Tahoe • CA 96154 -7401
Phone 530 54+6474 • Fax 530 541 -0614 • www.stpud.us
BOARD AGENDA ITEM 4e
TO: Board of Directors
FROM: John Thiel, Principal Engineer
MEETING DATE: August 4, 2011
ITEM - PROJECT NAME: Water Tank Recoating Project
REQUESTED BOARD ACTION: Authorize Task Order to Bay Area Coating Consultants for
coating inspection services, in the amount not to exceed $37,200.
DISCUSSION: The project includes coatings work on the H- Street, Lookout, and Iroquois
No. 2 tanks. Blastco has recently been awarded the contract. Staff is proposing to
have Bay Area Coatings Consultants (BACC) provide the onsite inspection work for the
following reasons:
1) Coatings inspection work is a specialty and staff recommends the use of a
NACE 3 certified inspector (from BACC) that staff expects will result in a
superior coating product;
2) Engineering inspectors are working at full capacity on other projects; and
3) Staff has secured funding from the El Dorado Water Agency to pay for this
outside inspection work - District time is not eligible for payment or
reimbursement under the current agreement.
The inspection work is to be completed from approximately August 8, 2011, to
October 3, 2011, while Blastco is on site. The attached proposal from BACC provides
additional detail.
SCHEDULE: Begin upon Board approval. Completion: October 2011.
COSTS: Not to Exceed $37,200
ACCOUNT NO: 2029 -8261
BUDGETED AMOUNT REMAINING: $591,808 (2011 /12)
ATTACHMENTS: Proposal from Bay Area Coating Consultants
John Thiel
August 4, 2011
Page 2
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES 114 NO
CHIEF FINANCIAL OFFICER: YES NO
-24-
CATEGORY: Water
July 21, 2011
John A. Thiel, P.E., M.B.A.,
Principal Engineer
South Tahoe Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Subject: RFP Coating, Inspection Services for the 2011 Water Tank Recoating Project
Dear Mr. Theil:
We are pleased to present this proposal to perform coating inspection and testing
services for the coating and lining of three water storage reservoirs located in South Lake
Tahoe, California. We have reviewed the available information, and discussed the
requirements with you as a basis for this proposal.
The purpose of our services would be to assist District in completing the contract
requirements established by the District. Bay Area Coating Consultant Services, Inc. will
provide coating and lining inspection services, and client liaison for project. BACC
inspectors are NACE Certified inspectors. BACC is the only totally independent
inspection company working with owners only.
Bay Area Coating Consultants, Inc. (BACC) will provide a National Association of
Corrosion Engineers Level III Certified Coatings Inspector for the coating work. BACC
has extensive knowledge in the application and testing of plural component urethanes and
Enduraflex 1988. BACC has never experienced a coating or lining failure over our
twenty-two year history. We have worked very closely with Mr. Dick Vass
(President/Enduraflex) over the years on numerous projects, and are a preferred
inspection company for Enduraflex. BACC has five Endura flex 1988 projects going on
this month, City of San Leandro, City of Napa, Ora Loma WWTP, Alameda County
Water District, Union Sanitary District and the City of Fairfield. BACC Principal
Consultant Ed Darrimon will assist the District Engineering staff with project consulting,
Corporate: 1- 888 - 3846839 Bakersfield Office: 1-661-836-5799 Fax: 1-661-832-2210
www.bayareacoating.com
Coating and Lining Inspection Services Since 1987
Member: API-AWWA-NACE-SSPC-ASTM
-25-
a
• _ ' J: I J14I 1C • _l' �1
proper product selection, surface preparation, and failure analysis as needed. Our site
inspector will be responsible for the day to day quality assurance and to interface with
District's Engineer's representative. B.A.C.C. will furnish all state of the art inspection
equipment, photographs, and daily reports. Our inspection services cover Cal / Fed
OSHA requirements, disposal requirements, surface condition, abrasive blast cleaning,
and coating application. B.A.C.C.'s extensive experience in the coating and lining of
facilities gives in -depth knowledge to understanding of the Contractor's activities,
allowing us to identify areas of concern or discrepancies on an on -going basis.
B.A.C.C.'S knowledge will aid in identifying key milestones for action required by the
District, and B.A.C.C. Inspection team in the completion of the project.
Bay Area Coating Consultant Services, Inc. will provide independent inspection; and
consulting services, we provide inspection services for Engineering firms and Facility
owners only. BACC was established in 1987. Our philosophy has been, we view each
project as if it was our own structure and spending our own money. We are a small firm
which allows us total involvement and communication with our inspectors. We have
Nextel phones which keep us in daily contact with our inspectors. When our clients, have
used our specifications or input we have never had a cost over run or a change order. We
have never had an OSHA recordable injury. Our inspectors are provided with state of the
art inspection equipment and training classes annually. BACC has completed hundreds
of projects and has total client satisfaction. We send out a survey letter after the
completion of each project, and have never had a complaint.
BACC has completed thousands of Inspection and Consulting projects through out the
United States. Our principle consultant Ed Darrimon was employed by East Bay
Municipal Utility District for eleven years in the Engineering & Maintenance
Departments as Supervising Coating Specialist. Mr. Darrimon designed and developed
the Districts physical coating testing lab and rehabilitation program. Mr. Darrimon was
responsible for overseeing the following projects:
* Coating and lining inspection.
* Coating specifications.
* Design of the physical coating testing lab.
* Established the Districts rehabilitation project of over one - hundred and eighty steel
water storage tanks, and two hydro - electric powerhouses.
Mr. Darrimon also was employed in the coating application field as Vice President of
Field Services and Quality Control for an eight year period. Ed then formed B.A.C.C. in
1987 and has twenty -two years experience in the Coatings & Linings Field
Corporate: 1- 888- 384 -6839 Bakersfield Office: 1-661-836-5799 Fax: 1-661-832-2210
www.bayareacoating,com
Coating and Lining Inspection Services Since 1987
Member: API - AWWA - NACE - SSPC -ASTM
—26—
. 41 JIM'.. .:..• . , B.. _ I. 14 ' 7111:
Accomplishments
STEEL STRUCTURES PAINTING COUNCIL: (S.S.P.C)
* National Board of Directors from 1988 -92. Re- elected in 1992 to serve second four
year term.
* National award 1989 for Outstanding Chairman.
* Past President and Founder of the first S.S.P.C. chapter in the U.S.A
NATIONAL ASSOCIATION OF CORROSION ENGINEERS: (N.A.C.E).
*Past Chairperson / Bay Area Section, Certified Level III Inspector #601
AMERICAN WATER WORKS ASSOCIATION: (A. W. W.A)
* Member National D -100 Standards Committee (20 years)
* Cal/Nev Corrosion Committee. * Cal/Nev past Vice Chairman Maintenance
Committee.
Mr. Darrimon has presented numerous talks to the following Organizations: A.W.W.A.,
N.A.C.E., & S.S.P.C. on the following topics: Tank linings, Tank inspection,
Specifications, Abrasive blasting, & proper use of D.H. equipment.
Mr. Darrimon has received extensive training in the following areas:
1987 National Association of Corrosion Engineers Level III Certified Inspector #601
1988 Estimating Painting and Protection Cost. Baltimore, Maryland
1988 Inspection Instruments. Baltimore, Maryland
1989 Application Techniques. Houston, Texas
1989 Plant Maintenance Surveying. Houston, Texas
1989 Water Storage Tank Design & Construction. L.A., California
1990 Design of Coating & Linings. Oakland, California
1990 Val Spar Paint School. Pomona, California
1990 & 1993 Lead Removal Training. Long Beach & S.F., California
1990 Failure Analysis. Nashville, Tennessee
1991 Industrial Hygiene. Long Beach, California
1992 Construction Project Administration. S.F., California
1993 P.D.C.A. Lead Removal Training. Salt Lake City, Utah
1994 OSHA Lead Instructor. S.F., California
1995/98/2000/2002 /04 BAT Training, Concord, Ca
Corporate: 1- 888 -384 -6839 Bakersfield Office: 1-661-836-5799 Fax: 1- 661 -832 -2210
www.bayareacoatingg,com
Coating and Lining Inspection Services Since 1987
Member: API -AWWA- NACE- SSPC -ASTM
-27-
Page Four Proposal SOUTH TAHOE PUBLIC UTILITY DISTRICT
Bay Area Coating Consultant Services, Inc.
ORGANIZATION CHART
Ed Darrimon
Principal Consultant/President
Danielle Darrimon
Office Manager
Linda Turner
Secretary /Accounting
Full Time Inspectors
All employees are re- certified on a annual basis on Confined Spaces,
Scaffolding, Lead. Fit and Respirator Testing
Ed Darrimon/Principal John Golding/In House Q/A Dale Nicholson/In House Safety
NA. GE. Certified Inspector N.A. C. E. Certified Inspector N.A. C.E. Certified Inspector
BACC Employed 22 years BACC Employed 18 years BACC Employed 6 years
In Industry 30 years In Industry 29 years In Industry 18 years
Paul Andrews
A.S. T. M. /A WS-GWI Inspector
BACC Employed 10 years
In Industry 28 years
Todd Whittenburg
N.A. C.E. Certified Inspector
BACC Employed 7 years
In Industry 25 years
Mark Prestera
NA.C.E. Certified Inspector
BACC Employed 9 years
In Industry 25 years
Javan Cohan
N.A. C.E. Certified Inspector
BACC Employed 6 years
In Industry 20 years
Tom Neeling
N.A. C.E. Certified Inspector
BACC Employed 8 years
In Industry 25 years
Tim Golding
N.A.C.E. Certified Inspector
BACC Employed 10 years
In Industry 20 years.
David Wells
N.A.C.E. Inspector
BACC Employed 5 years
In Industry 15 years
Dave Hobart
N.A.C.E. Inspector
BACC Employed 12 years
In Industry 22 years
Austin Darrimon
NA.C.E. Certified Inspector
BACC Employed 3 years
In Industry 2 years
Bay Area Coating Consultants Inspectors are N.A.C.E. coating inspectors, with an
average of twenty years experience in the corrosion and coating industry.
Corporate: 1- 888 - 384 -6839 Bakersfield Office: 1-661-836-5799 Fax: 1-661-832-2210
www.bayareacoating.com
Coating and Lining Inspection Services Since 1987
Member: API -AWWA- MACE - SSPC -ASTM
-28-
111; _�
EXAMPLE OF PROJECTS IN 2007/2009
Wastewater
City of Hayward: Wastewater (Consulting & Inspection)
City of Fairfield: Wastewater (Consulting & Inspection)
City of Fresno: Wastewater (Failure Analysis, Consulting & Inspection) Annual Contract
City of Tulare: Wastewater (Consulting & Inspection)
City of Visalia: Wastewater (Failure Analysis, Consulting & Inspection) Annual Contract
City of Benicia: Water and Wastewater five tanks (Inspection, Underwater & Consulting)
City of Chico: Wastewater (Failure Analysis, Consulting & Inspection)
County of Sacramento: Wastewater misc. (Consulting, Specifications & Testing)
Union Sanitary District: Wastewater misc. (Inspection Consulting. Inspection)
Shanghai, China: 17 Storage tanks (Inspection, Consulting, Training)
Delta Diablo Sanitary District: Misc. Tanks and piping (Plant Survey, Specifications, Inspection)
Cambria Community Services District. Five steel digesters (Consulting & Inspection)
City of Watsonville: Wastewater misc. (Inspection Consulting. Inspection)
City of Daily City: Wastewater misc. (Inspection Consulting. Inspection)
City of Paso Robles: Wastewater misc. (Inspection Consulting. Inspection)
Truckee Meadows/City of Sparks: Misc. Projects (Lining Inspection & Consulting) Annual Contract
City of Millbrae: Wastewater misc. (Inspection Consulting. Inspection)
City of Modesto: Wastewater misc. (Inspection Consulting. Inspection)
Ora Loma: Wastewater 4 Digesters. (Inspection Consulting. Inspection)
City of Noveto: Wastewater misc. (Inspection Consulting. Inspection)
Reservoirs
Dublin/San Ramon Services District: Eight Tanks (Inspection) Annual Contract
Sacramento Municipal Utility District: Penstocks (Inspection)
City of Foster City: Three 4.0 mg. Tanks (Specifications, Inspection & Underwater)
County of Sacramento: Misc Projects (Specifications, Inspection) Annual Contract
City of Folsom: Two 2.0 mg. Tanks (Specifications, Inspection & Underwater)
County of Napa: One 1.0 mg. Tanks (Specifications, Inspection & Underwater)
Soquel Water District: Eight tanks (Inspection, Specifications, and Failure Analysis)
City of Sacramento: Six 3.0 mg. tanks (Specifications and inspection) Lead Annual Contract
Alameda County Water District: Five water tanks (Inspection, Consulting)
City of Benicia: Five tanks (Inspection, Underwater & Consulting)
City of Fresno: Misc. tanks (Failure Analysis, Consulting & Inspection) Annual Contract
City of Ceres: One water tank (Coating Inspection)
City of Millbrae: Two water tanks (Lead and Coating Inspection)
City of Brisbane: Three water tanks (Coating Inspection)
City of Paterson: Two tanks (Inspection)
Humbolt Community Services District: Three tanks (Underwater & Inspection
Lyons County: Three Tanks (Inspection, Failure Analysis)
City of Hanford: Five Tanks (Consulting & Inspection) Annual Contract
Central Water District: Three tanks (Inspection Lead Class III)
City of Dixon: Two water tanks (Consulting & Inspection)
City of Avenal: Two water tanks (Inspection)
Contra Costa Water District: Three tanks & Pumping Plants (Consulting & Inspection, Failure Analysis)
City of San Francisco: 350,000 Sq./Ft Concrete Coating (Consulting & Inspection) Annual Contract
City of San Francisco: Hetch Hetchy Pipeline (Failure Analysis, Inspection)
Redwood City: Five Tanks (Coating, Underwater, Specifications Inspection)
Corporate: 1- 888 - 384-6839 Bakersfield Office: 1-661-836-5799 Fax: 1-661-832-2210
www.bayareacoating.com
Coating and Lining Inspection Services Since 1987
Member: API -AWWA- NACE - SSPC -ASfM
-29-
Pare Six. Proposal South Tahoe Public Utility District
City of Lodi: Four tanks (Consulting, failure analysis, and inspection)
Cal American Water Company: Six tanks (Consulting, failure analysis, and inspection)
Zone 7: Two Reservoirs and WTP tanks (Consulting, failure analysis, and inspection)
City of Lodi: Four tanks (Consulting, failure analysis, and inspection)
City of Turlock: Two water tanks (Inspection)
Eneineerinr Firms
Jacobs Engineers: Water treatment & 72" Pipelines (Consulting/Inspection)
Parsons Engineers: Water treatment plant (Inspection)
Carollo Engineers: 20 water tanks, Misc. treatment plants (Inspection & Consulting) Annual Contract
Montgomery Watson Engineers: Three 3.0mg Water tanks (Consulting and Inspection)
Kennedy Jenks Engineers: Water tanks (Inspection Consulting)
Camp, Dresser, Mckee Engineers: Three tanks (Coating & Underwater Inspection)
Black & Veatch Engineers: Five water tanks (Inspection & Consulting)
Dames&Moore: Three tanks (Inspection)
V &A Engineers: Five tanks (Inspection) Annual Contract
Psomas: Two tanks (Specifications, Inspection)
West Yoast: Three tanks (Specifications, Consulting, and Inspection)
URS: Pipelines, Wastewater treatment plants (Specifications, Consulting, and Inspection)
HDR: Wastewater treatment plants, Water tanks (Specifications, Consulting, and Inspection)
Petrochemical/ Enemy
ChevronTexaco, U.S.A. Exploration: Misc. Projects (Inspection & Consulting) Annual Contract
ChevronTexaco, U.S.A. Refining: Misc. Projects (Inspection & Consulting) Annual Contract
ChevronTexaco, U.S.A. Marketing: Misc. Projects (Inspection & Consulting) Annual Contract
Valero, Corp,: 34 tanks (Consulting, and Inspection) Annual Contract
Pacific Energy: 400,000 Sq/Ft Structural Steel (Consulting & Inspection
Tosoro, Corp.: 15 tanks (Consulting, and Inspection)
Shell, Corp.: 5 tanks (Consulting, and Inspection)
AREA Energy: 3 tanks (Consulting, and Inspection) Annual Contract
Calpine, Corp.: 8 Energy Facilities (Inspection & Consulting) Annual Contract
Turlock Irrigation District: 1 Cogen Energy Facilities, Penstocks, dam gates (Specifications, Inspection
& Consulting) Annual Contract
Small Business
BACC is certified with the following agencies:
State of California: Micro SBA #61256
Corporate: 1- 888 -384 -6839 Bakersfield Office: 1-661-836-5799 Fax: 1-661-832-2210
www.bayareacoating.com
Coating and Lining inspection Services Since 1987
Member: API - AWWA -MACE- SSPC -ASTM
—30—
REFERENCES
CITY OF SAN FRANCISCO
MONGKOL MARVONGTAKUL, P.E.
875 STEVENS STREET
SAN FRANCISCO CA. 94103 (415) 551 -4890 Fax (415) 551 -4877
PROJECT: NURMEOUS PROJECTS FOR THE PAST 15 YEARS. FAILURE
ANALYSIS, COATING, AND LINING INSPECTION
BACC has completed numerous projects for the City of San Francisco over the past 15
years. BACC has provided coating and lining inspection, failure analysis, coating surveys
and consulting. BACC has completed the following project types for the City, reservoir
linings and coating inspection, pipeline inspection, inspection of penstocks and water and
wastewater treatment plants and failure analysis. Six steel tanks
CITY OF SACRAMENTO
BILL ZENHENDER / ENGINEERING /CONSTRUCTION. MANAGER
1395 35m AVENUE
SACRAMENTO, CA. (916) 808 -1411 FAX (916) 808 -1497
PROJECT: REHAB. SEVEN 3.0 MG WATER TANKS / SPECIFICATIONS,
COATING AND LINING INSPECTION.
BACC has been providing Inspection, Consulting and Specifications for over eight years.
BACC has written the specifications on seven 3.0 MG. Steel Reservoirs. BACC has
provided the inspection on all the Reservoirs. The City has not experienced a change
order or a failure on any of the projects.
SOQUEL CREEK WATER DISTRICT
TAJ DUFOURENGINEERING MANGER
5180 SOQUEL DRIVE
SOQUEL, CA. 95073 (831) 475 -8500 FAX 831 -475 -4291
PROJECT: NINE TANKS/ FAILURE ANALYSIS, COATING, LINING
INSPECTION, AND CONSULTING.
BACC has been providing failure Analysis, Specifications, Inspection and consulting
services on a yearly basis for over eight years. The District has not experienced a cost
overrun or failure since employing BACC. 9 steel tanks
Corporate: 1- 888 -384 -6839 Bakersfield Office: 1-661-836-5799 Fax: 1-661-832-2210
www.bayareacoating.com
Coating and Lining Inspection Services Since 1987
Member: API-AWWA-NACE-SSPC-ASTM
-31-
Pace Eieht Proposal South Tahoe Public Utility District
EL DORRADO IRRIGATION DISTRICT
TIM SULLIVAN, P.E.
2890 MOSIQUITO ROAD
PLACERVILLE, CA. (530) 622 -4513 Fax (530) 622 -8597
PROJECT: NURMEOUS PROJECTS FOR THE PAST EIGHT YEARS.
FAILURE ANALYSIS, COATING, AND LINING INSPECTION
BACC has completed numerous projects for the District over the past eight years Annual
Contract). BACC has provided coating and lining inspection, failure analysis, coating
surveys and consulting. BACC has completed the following project types for the District:
Reservoir linings and coatings, and water and wastewater treatment plants and failure
analysis. Ten steel tanks
RACHEL MARTIN
AIP REESIDENT ENGINEER
CONTRA COSTA WATER DISTRICT
PO Box H2O I CONCORD, CA 1 94524
PHONE: 925 - 626 -3202 FAX: 925 - 626 -3209
BACC has completed numerous projects for the District over the past ten years. BACC
has provided coating and lining inspection, failure analysis, coating surveys and
consulting. BACC has completed the following project types for the District: Reservoir
linings and coatings, and water and water treatment plants and failure analysis. Three
steel tanks
PROJECT APPROACH
BACC is a local firm that has been doing inspection work in Northern California/Nevada
for over twenty -two years. It is very important to have a local firm which has a good
understanding of annual weather conditions as they can change from different areas in the
State. The local firm has a good rapport with local Area Air Management Districts,
having full understanding of local laws and regulations.
Each BACC inspector is equipped with state of the art testing and inspection equipment
and Nextel phones to stay in contact with Ed Darrimon on a daily basis. Our in house
Quality Assurance inspector random selects inspector's sites to audit. The Inspector,
project paper work, work standards, and industry standards are reviewed with the Q/A
inspector to insure the inspector is meeting BACC in house standards. BACC inspectors
receive the specifications prior to the start of work; they are required to highlight the
specification for quick reference. BACC provides the inspector with current Data sheets
and MSDS sheets; every project is reviewed by Ed Darrimon and the site inspector. Our
Inspectors are fully prepared at the start of each project.
Corporate: 1- 888 - 384 -6839 Bakersfield Office: 1-661-836-5799 Fax: 1-661-832-2210
www.bayareacoating.com
Coating and Lining Inspection Services Since 1987
Member: API -AWWA- NACE - SSPC -ASTM
-32-
11 7
!..1f _VA Y
The following are a sample of the key inspection items that are followed and are
documented by the BACC inspector.
1. SCOPE OF WORK: (ASTM 3226)
(a) REVIEW OF SPECIFICATIONS
(b) ATTEND ON -SITE FAMILIARIZATION SESSION
(c) DOCUMENT PRE SITE CONDITIONS
2. SURFACE CONDITION
(a) CONDITION OF EDGES, WELD SPLATTER
(b) GREASE OIL, OR BOTH
(c) PROTECTIVE COVERINGS IN PLACE
(d) AIR TEMPERATURE
(e) SURFACE TEMPERATURE
(f) DEW POINT, R/H
(g) WIND DIRECTION, VELOCITY
(h) VISIBLE MOISTURE
3. BLAST CLEANING
(a) TYPE AND SIZE OF ABRASIVE
(b) SURFACE CONTAMINATION- SULFATES, CHLORIDES
(c) CLEAN AND DRY ABRASIVE
(d) COMPRESSED AIR CHECK / WHITE BLO1 IER
(e) NOM .F. AIR PRESSURE / PRESSURE GAUGE
4. SURFACE PREPARATION
(a) DUST AND ABRASIVE REMOVAL / VISUAL OBSERVATION
(b) DEGREE OF CLEANLINESS / S.S.P.C. /N.A.C.E. STANDARDS
(c) PROFILE MEASUREMENT /TESTEX TAPE
(d) MAGNETIC BASE READING
5. COATINGS AND LINING APPLICATION
(a) TIME FROM SURFACE PREPARATION TO APPLICATION / RECORD
(b) COATING VISCOSITY / DRIP TYPE
(c) COMPRESSED AIR CHECK / WHITE BLOTTER
(d) PROTECTIVE COVERINGS IN PLACE / VISUAL
(e) TIME APPLICATION BEGAN / RECORD
(f) CONTINUE TO MONITOR TEMPERATURE AND HUMIDITY CONDITIONS
(g) RECORD BATCH NUMBERS AND MIXING PROCEDURE
(h) INDUCTION TIME OBSERVED
(I) PROPER THINNING
(j) FILM THICKNESS / WET
(k) RE -COAT TIMES OBSERVED
(1) INER -COAT CLEANLINESS
(m) FILM DEFECTS, RUNS, SAGS, DRY SPRAY, VOIDS ECT.
(n) RATIO AND HARDNESS TESTING
6. FINAL INSPECTION
(a) DRY FILM THICKNESS / READINGS SSPC PA -2
Corporate: 1- 888 - 384 -6839 Bakersfield Office: 1-661-836-5799 Fax: 1-661-832-2210
Coating and Lining Inspection Services Since 1987
Member: API -AWWA- NACE - SSPC -ASTM
-33-
pane Tea Proposal South Tahoe Public Utility District
(b) HOLIDAY INSPECTION / NACE RPO 188.88
(c) SOLVENT TEST / HARDNESS TEST / TOTAL CURE
(d)CLOSING WRITTEN REPORT, PHOTOGRAPHS, CONTRACTOR
SUMMARY.
Experience has shown us much more emphasis has been placed on the details concerning
the start of a project than the completion. As the Site Inspector, B.A.C.C. will work to
establish the procedures for a final project acceptance and close out with both the
District and the Contractor. Each party associated with this project has specific
responsibilities for its successful completion.
Fees and Payment Schedule
BACC will provide daily written reports, photographs, all test equipment, and a closing
reports ccr» We are basing our estimate on 55 days. When we have worked for the
District with past projects we have rented a small cabin to cut cost of use of a hotel.
Ins ection Estimate
440 Hours $30,800.00 Hrs. $0.00 55 $3,000.00 . $0.00 $33,800.00
Total: $33,800.00
Labor Rate: $70.00 Per Hour
Over Eight Hours & Holidays: 97.50 Per Hour
Sub: $0.00 per day
Airfare: Billed @ Cost Estimated $0.00
Hotel: Billed @ $1,200.00 per month
Car Rental: $0.0
Eight Hour Minimum Day.
Please call if you have any questions or, if you want to further discuss the information
contained in this proposal.
Respectfully submitted by,
Bay Area Coating Consultants, Inc.
Ed Darrimon
President/Principal Consultant
Corporate: 1- 888 - 384 -6839 Bakersfield Office: 1 -661- 836 -5799 Fax: 1-661-832-2210
www.bayareacoating.com
Coating and Lining Inspection Services Since 1987
Member: API -AWWA- NACE - SSPC -ASTM
-34-
Corporate: 1- 888 - 384-6839 Bakersfield Office: 1-661-836-5799 Fax: 1-661-832-2210
www.bayareacoating,com
Coating and Lining Inspection Services Since 1987
Member: API-AWWA-NACE-SSPC-ASTM
—35—
South Tahoe
Public Utility District
Richard H. With;
Director*
.Gaisfarshi
James It Jonas
May t eu Mosbadiar
Dill Rbe
4fcsdudar
1275 Meadow Crest Drive • South Lake Tahoe • CA 961504401
Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.ue
BOARD AGENDA ITEM 4f
TO: Board of Directors
FROM: No Bergsohn, Hydro-Geologist
MEETING DATE: August 4, 2011
ITEM - PROJECT NAME: Luther Pass Pump Station (LPPS) Standby Power Generation
Facility
REQUESTED BOARD ACTION: (1) Approve Change Order No. 8 to Sierra Nevada
Construction Inc., in the amount of $4,808; (2) Approve the Project Closeout Agreement
and Release of Claims; and (3) Authorize staff to file a Notice of Completion with the El
Dorado County Clerk.
DISCUSSION: The itemized parts of Change Order No. 8 are as follows:
Item 1, in the amount of $4,808, is for added re- vegetation costs to comply with TRPA
permitting requirements. Re- vegetation of areas disturbed by construction was
completed by the contractor in October 2010, as part of work activities to winterize the
site. Inspection of the re- vegetated areas in June 2011, indicated that the hydro -
seeding completed in 2010 was not adequate and that additional land preparation
work was required for successful re- vegetation to satisfy the TRPA requirements. In order
to provide the best conditions for successful re- vegetation, the District requested that
the contractor perform additional scarifying, grading, and incorporation of wood chips
into the loosened soil surface, prior to hydro- seeding for a second time. The added work
for the land preparation, grading and placement of added materials, and hydro -
seeding performed in June 2011, is extra work not covered in the original contract
documents.
Staff has performed a final inspection of the project and has found that as of July 28,
2011, Sierra Nevada Construction Inc. has met all contract requirements.
SCHEDULE: As soon as possible
COSTS: $4,808
ACCOUNT NO: 1029- 8933 /RGLPPS
BUDGETED AMOUNT REMAINING: $507,002 (2012);
ATTACHMENTS: Change Order No. 8; Closeout Agreement and Release of Claims; and
Notice of Completion.
-37-
No Bergsohn
August 4, 2011
Page 2
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
NO
NO
-38-
CATEGORY: Sewer
CHANGE ORDER NUMBER 8
Project: l..PPS STANDBY POWER GENERATOR FACILITY
Contractor: Sierra Nevada Construction, Inc.
Date: 08.04.2011 PO #: P22641
The Contract Shall Be Changed As Follows:
1) Increase $4,808.00 for land preparation, grading and placement of rock/wood mulch and
hydro-seeding in accordance with the District's request for additional re- vegetation work (I.
Bergsohn email to J. Kolowith, TRPA dated 06/23 /2011). The increase includes all added
labor, equipment, subcontractor costs, materials, supplies and contractor mark-up plus a
credit of $689.85 for 1,050 SF of contractor disturbance. •
Total item 1 is $4,808.00
TOTAL. FOR CHANGE ORDER NO.8, ITEMS 1 IS: $4,808.00
Dollar Amounts . :: Contract Time
Original Contract
Previous Change Order
Current Contract
THIS CHANGE ORDER
New Contract Total
$2,027,007.00
$113,896.79
$2,140,902.79
$4,808.00
$2 146 710.79
263 Calendar Days
127 Calendar Days
390 Calendar Days
Contractor agrees to make the hereln.descrlbed changes In accordance with the terms hereof. The change
in contract price and/or contract time noted is full settlement for costs incurred because of the change(s)
described, unless specifically noted In Individual description(s).
Authorized By STPUD Board President
Accep
Reviewed By
Date:
Date:
Date: VIII I t
TOTAL FOR CHANGE ORDER NO.8, ITEMS 1 IS: $4,808.00
1
-39-
CLOSEOUT AGREEMENT AND RELEASE OF CLAIMS
THIS AGREEMENT AND RELEASE OF CLAIMS is made in South Lake Tahoe, California, this
day of August 2011, by and between South Tahoe Public Utility District, hereinafter
referred to as "DISTRICT", and Sierra Nevada Construction, Inc., hereinafter referred to as
"CONTRACTOR ".
KNOW ALL PERSONS BY THESE PRESENTS:
1. That the undersigned, as the authorized representative of CONTRACTOR, for and in
consideration of Two Million Twenty -Seven Thousand Seven Dollars ($2,027,007),
contract amount, and the amount of One Hundred Eighteen Thousand Seven Hundred
Three Dollars and Seventy -Nine Cents ($118,703.79) for said Contract Change Orders
Nos. 1 through 8, receipt of which is hereby acknowledged, does hereby and for each of
its successors, assigns and partners, release acquit and forever discharge the SOUTH
TAHOE PUBLIC UTILITY DISTRICT OF EL DORADO COUNTY, CALIFORNIA, and
each of its successors, assigns, officers, agents, servants, and employees, from any and
all rights, claims, demands, debts, obligations, liabilities, actions, damages, costs,
expenses and other claims whatsoever, which might have been asserted against
DISTRICT by reason of any matter or thing which was the subject matter of or basis for:
A. The performance of all terms and conditions of that certain agreement dated
March 30, 2010 for Purchase Order No. P22641, DISTRICT project described as
Luther Pass Pump Station Standby Generator Facility Project.
B. Change Orders Nos. 1 through 8 as approved by the parties, pertaining to
Purchase Order No. P22641 and shown in Payment Request No. 16, dated
August 4, 2011.
2. That the undersigned, as the authorized representative of DISTRICT, for and in
consideration of the CONTRACTOR's completion of Purchase Order No. P22641 does
hereby and for each of its successors, and assigns, releases, acquits and forever
discharge Sierra Nevada Construction, Inc., and each of its successors, assigns,
officers, agents, servants, and employees, and sureties from any and all rights, claims,
demands, debts, obligations, liability, actions, costs, expenses whatsoever which might
have been asserted against CONTRACTOR, except for the rights accruing to the
DISTRICT in California Code of Civil Procedure Section 337.15, Entitled "Ten Years -
Action to Recover Damage from Latent Deficiencies in Planning or Construction of
Improvements to Real Property," which rights are specifically not released, and except
for warranties and sureties provided by reason of any matter or thing which was the
subject matter of or basis for:
A. The performance of all terms and conditions of that certain agreement dated
March 30, 2010 for Purchase Order No. P22641, DISTRICT project described as
Luther Pass Pump Station Standby Generator Facility Project.
B. Change Orders Nos. 1 through 8 and as approved by the parties, pertaining to
Purchase . Order No. P22641 and shown in Payment Request No. 16, dated
August 4, 2011.
-40-
1
3. Nothing contained herein shall waive or alter the rights, privileges, and powers of the
DISTRICT or the duties, liabilities and obligations of the CONTRACTOR and its surety in
respect to any portions of the Specifications for Purchase Order No. P22641.
4. The DISTRICT has received no claims from the CONTRACTOR.
5. Upon execution of this agreement, the DISTRICT agrees to immediately file and record
a NOTICE OF COMPLETION with the County Recorder in order to begin the running of
the statutory lien period.
6.
The presently retained amount is $ 107,285.54
Original Contract amount $2,027,007.00
Total Change Order Amount $ 118,703.79
Less: Amount Previously Paid $2,038,425.25
(Request Nos. 1 through 16)
Retainage $ 107,285.54
BALANCE: $ -0-
The retainage will be released to the CONTRACTOR at the expiration of the lien period 35
(thirty -five) calendar days after date of recording a NOTICE OF COMPLETION by El Dorado
County Recorder or when all liens have been released, whichever last occurs. Release
pursuant to this agreement shall not apply to CONTRACTOR's rights to the presently retained
amount until such time as such amounts are received in full by CONTRACTOR.
7. CONTRACTOR and DISTRICT agree that the total adjusted contract price and time of
performance for Purchase Order No. after the execution of change orders shall be as
follows:
Original Contract Price
Original Calendar Days
Total Adjusted Price
Total Adjusted Calendar Days
$2,027,007.00
$2,145,710.79
8. It is understood and agreed by the undersigneds that the facts with respect to which the
foregoing Release is given may hereafter turn out to be other than or different from the
facts in that connection now known to be or believed by said undersigneds to be true,
and the undersigneds hereto expressly assume the risk of the facts turning out to be
different than they now so appear, and agree that the foregoing Release shall be, in all
respects, effective and not subject to termination or recession by any such difference in
facts and undersigneds hereby expressly waive any and all rights the undersigneds have
or may have under California Civil Code Section 1542, which provides as follows:
"A general release does not extend to claims which the creditor does not know or
suspect to exist in his favor at the time of executing the Release which if known
by him must have materially affected his settlement with the debtor."
9. The releases made by the CONTRACTOR and the DISTRICT herein are not to be
construed as an admission or admissions of liability on the part of either party and that
the parties deny liability hereof. The undersigneds agree that they will forever refrain and
-41-
2
RECORDING REQUESTED BY:
South Tahoe Public Utility District
Heidi Baugh
WHEN RECORDED MAIL TO:
South Tahoe Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe
CA 96150
SPACE ABOVE THIS LINE FOR REFS USE
APN: 036- 730 -35 NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN THAT:
1. The undersigned is OWNER or agent of the OWNER of the interest or estate stated below in the property hereinafter described.
2. The FULL NAME of the OWNER is South Tahoe Pubik Utility District
3. The FULL ADDRESS of the OWNER is 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150
4. The NATURE OF THE INTEREST or ESTATE of the undersigned is: In fee.
(If other than fee, strike "in fee" and insert here, for example, "purchaser under contract of purchase," or "lessee."
5. The FULL NAMES and FULL ADDRESSES of ALL PERSONS, if any, WHO HOLD SUCH INTEREST or ESTATE with the undersigned as
JOINT TENANTS or as TENANTS IN COMMON are:
Name & Address
Name & Address
6. The FULL NAMES of FULL ADDRESSES OF THE PREDECESSORS in INTEREST of the undersigned if the property was transferred
subsequent to the commencement of the work of improvement herein referred to:
Name & Address
Name & Address
7. A work of improvement on the property hereinafter desaibed was COMPLETED on 7/31/2011.
8. The work of improvement completed is described as follows: Luther Pass Pump Station Standby Power Generator Facility Project
9. The NAME OF THE ORIGINAL CONTRACTOR, if any, for such work of improvement is Sierra Nevada Construction, Inc.
10. The street address of said property is 3755 Grass Lake Road, South Lake Tahoe, California.
11. The property on which said work of improvement was completed is in the City of Unincorporated Christmas Valley County of El
Dorado, State of California, and Is described as follows: See attached Exhibit A.
As shown in Exhibit "A" attached hereto and made a part hereof
DATE: August 4, 2011
SIGNATURE OF OWNER OR AGENT OF OWNER 'ALL K 15t
VERIFICATION FORINDMDUALOWNER: Board President for So. Tahoe PUD
I, the undersigned, dedare under penalty of perjury under the laws of the State of California that I am the owner of the aforesaid interest or estate in
the property described in the above notice; that I have read said notice, that I know and understand the contents thereof, and the facts stated therein
are true and correct.
DATE AND PLACE SIGNATURE OF OWNER NAMED IN PARAGRAPH 2
VERIFICATION FOR NON-INDIVIDUAL OWNER: South Tahoe Public. I Lt i l i ty li ctri rt
I, the undersigned, declare under penalty of perjury under the laws of the State of California that I am the hoard Pres i dent
of the aforesaid interest or estate in the property described in the above notice; that I have read the said notice, that I know and understand the
contents thereof, and that the facts stated therein are true and correct
August 4, 2011 at South Lake Tahoe, California
DATE AND PLACE SIGNATURE OF PERSON SIGNING ON BEHALF OF OWNER
Dale Rise, Board President
South Tahoe Public Utility District
EXHIBIT "A"
Notice of Completion
Luther Pass Pump Station Standby Power Generator Facility Project
The site of the work is located on District property (APN 036- 370 -35) at 3755 Grass
Lake Road, within the Grass Lake Creek Subdivision Unit #2, a one - family residential
district (TR -1) in Christmas Valley, El Dorado County, California
The work performed consisted of: installation and maintenance of erosion control
measures and other required BMPs; excavation and over excavation including slope
stabilization, dewatering, handling, stockpiling and disposal of excess material;
installation and maintenance of shoring and soil stabilization for worker safety; removal
and relocation of an existing trailer- mounted 1,200 kW generator system for temporary
service, construct temporary electrical and fuel connections, construct temporary pad,
guard posts and spill containment; demolish and dispose of existing trailer and all
facilities contained therein at end of standby power temporary service; demolish and
remove abandoned septic tank and leach field lines; demolish and reconstruct
underground sanitary sewer, industrial waste line and telephone utilities, and demolish
and shutoff gas per utility company requirements; demolish and reconstruct site fencing;
construct new 5,074 square foot (SF) ac pavement, concrete block retaining wall and
footing, gravel -fill trenches, 1,136 SF. CMU generator building and housekeeping pads,
and a 196 SF roof structure connecting the new generator building to the existing pump
station; furnish and install a 2,500 kW generator skid - mounted system and concrete pad,
exhaust silencer and piping, 500 - gallon day tank and control panel; refurbish existing
6,000 - gallon aboveground fuel tank and fill station, reconstruct concrete pad and furnish
and install new fuel supply lines; furnish and install. HVAC equipment, sound attenuation
system, all new electrical facilities, modifications and a clean chemical fire suppression
system.
This project was funded, in part; by the Clean Water State Revolving Fund (CWSRF)
Loan Program.
Notice of Completion
Luther Pass Pump Station Standby Power Generator Facility Project
EXHIBIT "A"
South Tahoe
j Public Utility District
1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401
Phone 530 544 -6474 • Fax 530 541 -0614 • www stpud.us
CERTIFICATION
I hereby certify that the foregoing is a full, true, and correct copy of the
Notice of Completion that was approved by the Board of Directors of the South
Tahoe Public Utility District, County of El Dorado, State of California, and
executed by Board President, Dale Rise.
Date Approved:
Certified by:
Kathy Sharp, Clerk of the Board
South Tahoe
Public Utility District
General Manager
Richard K Solknis
Directors
.(brisWale
James K Jones
May LouMoebaciasr
• Dab We
Eric Schafer
1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401
Phone 530 54+ 6474 • Fax 530 541 -0614 • www stpud.us
BOARD AGENDA ITEM 4g
TO: Board of Directors
FROM: No Bergsohn, Hydro-Geologist
MEETING DATE: August 4, 2011
ITEM - PROJECT NAME: Alpine County Surveying Services - Alpine County Monitoring
Well Installation (ALPMWS) and Diamond Valley Ranch
Irrigation Improvement (DVRIIP) Projects
REQUESTED BOARD ACTION: Accept the cost proposal from Tri State Surveying, LTD.
(TSS) to complete surveying services, in the amount of $6,800.
DISCUSSION: Due to their intimate familiarity with Diamond Valley Ranch, through past
experience and extensive involvement providing surveying services to the District, staff
requested a cost proposal from TSS to perform additional surveying services in Alpine
County. These generally include: (1) Providing topographic survey (California State
Plane, Zone 2, NAVD 88) for fourteen (14) new monitoring wells; (2) Provide plat
mapping services in support of District Grant of Easement Agreements for four (4) new
monitoring wells located on private property for the ALPMWS; and (3) Provide surveying
services for engineering design of the new Millich Ditch channel alignment and Millich
Ditch /Harvey Channel Diversion Structure for the DVRIIP.
District staff believes that TSS is uniquely qualified to provide the surveying services
required for the Alpine County projects. Because of these qualifications and past
experience providing similar services to the District in a fair and reasonable manner,
staff recommends that the Board accept the TSS proposal for professional surveying
services, dated July 21, 2011.
SCHEDULE: As soon as possible
COSTS: ALPMWS ($4,300); DVRIIP ($2,500)
ACCOUNT NO: 1029 - 8136 /ALPMWS; 1029 - 8161 / DVRIIP
BUDGETED AMOUNT REMAINING: $48,727; $5,052,921
ATTACHMENTS: Proposal for Professional Surveying Services (TSS, 07.21.2011)
—47—
No Bergsohn
August 4, 2011
Page 2
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES 1 i_: NO
CHIEF FINANCIAL OFFICER: YES NO
-48-
CATEGORY: Sewer
% T
114°
Land Saftottnation Solution,'
Mr. No Bergsohn, PG, CHg.
South Tahoe Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 -7401
(530) 544 -6474
7/21/2011
Page 1 of 5
TRI STATE SURVEYING, Ltd.
425 E. Long Street, Carson City, Nevada 89706
Telephone (775) 887 -9911 • FAX (775) 887 -9915
Toll Free: 1 -800- 411 -3752
Subject: Proposal for Professional Surveying Services
Alpine County Monitoring Well installations ( ALPMWS); Diamond
Improvements Project (DVRIIP) Project
Via Email
Valley Ranch Irrigation
Dear Mr. Bergsohn:
Tri State Surveying is pleased for the opportunity to submit this proposal to provide Topographic Surveying Services for the
Alpine County Monitoring Well Installations (ALPMWS); Diamond Valley Ranch Irrigation Improvements Project
( DVRIIP) Project, which is referred to herein as the Project After execution of this document and your authorization to proceed,
Tri State will provide the following scope of services based upon our understanding of the Project
300. TOPOGRAPHIC SURVEYING SERVICES
301. Control Survey. Provide horizontal and vertical survey control necessary to accomplish the topographic mapping for
the Project Control wiN be based upon the client provided aerial topographic base map referencing the California
State Plane Coordinate System, Cal Zone 2 and NAV.D. 88.
302. Design Survey. Obtain measurements locating physical features over and adjacent to the Project including:
earthwork related features utility crossings, culverts irrigation ditches and possible construction obstacles.
303. Topographic Mapping. Prepare and provide a Topographic Survey Map art* = 20' scale with a 1 foot contour
interval in accordance with National Map Accuracy Standards.
500. PLAT MAPPING SERVICES
513. Legal Descriptions and Exhibits. Provide legal descriptions and exhibits to accompany legal descriptions as
requested by the Client for 4 well sites.
700. GLOBAL POSITIONING SURVEYING SERVICES
703. Orthometric Heights. Provide orthometric heights (elevation above Mean Sea Level) referenced to the North
American Vertical Datum of 1988 (NAVD'88) and North Geodetic Vertical Datum of 1929 (NGVD29) for the points
induded in the survey for fourteen. (14) well sites.
704. State Plane Conversion Computations. Provide geographic positions and state plane coordinates for the well sites
with conversion coefficients for ground equivalent values for the points included in the survey.
Boundary Surveys • Water Rights • Land Divisions • Construction Surveys ♦ Global Positioning • Aerial Photogrammetry
—49—
7121/2011
Page 2 of 5
Acceptance of Diipital Electronic Flies
In accepting and utilizing computer aided mapping drawings or other data in the form of electronic media prepared by Tri State
Surveying, Ltd., the Client agrees that all such digital drawings and data are instruments of the professional services of Tri State
Surveying, who shall be deemed the author and shall retain all copyrights. The Client agrees that any digital drawings prepared
by Tri State Surveying shall conform to the specifications Digital Mapping Standards of Tri State Surveying. The electronic files
submitted by Tri State Surveying to the Client are submitted for an acceptance period of 90 calendar days. Any defects the
Client discovers during this period shall be reported to Tri State Surveying and will be corrected as part of Tri State Surveying's
scope of services contained in this proposal. The Client further agrees not to use such digital drawings and data, in whole or in
part, for any purpose other than the Project, which is the subject of this proposal. The Client agrees to waive all claims against
Tri State Surveying resulting from any unauthorized changes or reuse of the digital drawings and data. In addition, the Client
agrees, to the fullest extent permitted by law, to indemnify and hold Tri State Surveying harmless for any damage, liability or
cost, including reasonable attorneys' fees, arising from any changes made by anyone other than Tri State Surveying or from any
reuse of the digital drawings and data without the prior written consent of Tri State Surveying.
DELIVERABLES
The deliverables for the TOPOGRAPHIC SURVEYING SERVICES provided to the Project shall include the following:
(1) Design Survey points file with copies of field notes and sketches
(2) Basis of Bearings and Benchmark Notes
(3) Topographic Survey Map with accompanying digital file
The deliverables for the MAPPING SURVEYING SERVICES provided to the Project shall include the following:
(1) Legal Description
(2) Exhibit Map
The deliverables for the GLOBAL POSITIONING SURVEYING SERVICES provided to the Project shall include the following:
(1) Point File per dient specification
(2) Drawing file V =1000'
FEES FOR SERVICES
The fees for the services included in the proposal are as follows:
Alpine County Monitoring Well Installations (ALPMWS) - Task 500 and 700 $ 4,300.00
Diamond Valley Ranch Irrigation Improvements Project (DVRIIP) - Task 300 $ 2,500.00
Total Fees For Services $ 6,800.00
This proposal includes estimated costs for reimbursable expenses such as reproduction of drawings, postage, express
shipping charges, travel, lodging or other out -of- pocket expenses in connection with the project The above fees will not be
exceeded without your prior authorization. This proposal is subject to the terms and conditions attached.
CLIENT SUPPLIED INFORMATION
Boundary Surveys ♦ Water Rights ♦ Land Divisions ♦ Construction Surveys ♦ Global Positioning • Aerial Photogrammetry
—50—
7/21/2011
Page 3of5
Upon notice to proceed from the Client to commence work on the Project the Client shall supply the following necessary
Project information to Tri State Surveying, Ltd.:
For TOPOGRAPHIC SURVEYING SERVICES:
(1) Umits of Topographic Survey
(2) Supporting CAD files for the improvement plans
SCHEDULE OF DELIVERABLES
Deliverables will be completed by August 196 with an August 441 Notice to Proceed.
TERMS AND CONDITIONS
1. This agreement shall be governed by and construed in accordance with the laws of the State of Nevada Services provided
shall be in conformance with local ordinances and the California Professional Land Surveyors Act of Practice for
Professional Land Surveyors. The Client understands and acknowledges that as a professional service provider Tri State
Surveying, Ltd. (Consultant) cannot offer any warranty or guarantee relating to the construction of the Project.
2. The Client shall place on deposit with Consultant a prepayment on the contract of $0.00, which shall be used as payment
against the final billing invoice. Consultant shall perform the services that are contained in the subject proposal promptly,
without delay and that the product of such services will by of customary quality in all respects and consistent with
professional skip and care. Upon written request the Client shall execute and deliver such additional instruments,
documents, governmental fees and charges that are necessary to perform the services for the project.
3. This proposal, once executed will remain in effect until December 31, 2011, at which time Consultant reserves the right to
increase remaining fees for unrendered services described in this proposal 2.5% due to increase in labor and material
costs. Any increase in excess of 2.5% will be negotiated with the Client In the event of a controversy, claim or dispute
between Consultant and the Client arising out of or relating to the Project, the prevailing party shall be entitled to recover
attorney fees, expert witness fees, expenses and costs whether or not litigation is instituted.
4. The Client agrees that periodic billings from Consultant to the Client are correct, condusive, and binding on the Client
unless the Client, within ten days from the date of receipt of such billing, notifies Consultant in writing of a leged
inaccuracies, discrepancies, or errors in the billing. Payment for the services described above will be due within a net 30
days upon receipt of an invoice statement for our work performed during the preceding billing period. Invoices not paid
within 60 days of the date of the invoice are subject to an interest charge of 1% per month until paid in full.
5. in the event that the contract is mutually terminated, any prior work completed shall be billed as services rendered and any
monies received over and above the final bill shall be returned to the Client. Either party may terminate this agreement at
any time without cause upon delivery of written notice to that affect to the other, in which event this agreement shall
terminate twenty -four hours after the delivery of such written notice.
6: It is the Client's responsibility to provide Consultant with wet stamped plan revisions and supporting CAD files for
Construction Surveying Services. Consultant shall not be responsible or liable for errors resulting from construction surveys
based upon plan revisions not received prior to Client survey requests.
7. Should the Client require additional services, other than those detailed in this proposal, such additional services shall be
provided based upon our current hourly rate schedule. Additional services involving field surveying will only be performed
after written authorization of payment from the Client or the Clients onsite representative. At the time of engagement of
Consultant the Client shall provide Consultant, in writing, the names of those individuals authorized to order and approve
Boundary Surveys • Water Rights • Land Divisions • Construction Surveys • Global Positioning • Aerial Photogrammetry
—51—
7/21/2011
Page 4 of 5
payment of restaking and additional requested services. In the event that any staking is destroyed, damaged or disturbed
by an act of God or parties other than Consultant, the cost of restaking shall be paid for by the Client as additional services.
Consultant shall not be responsible for delays or damages incurred from such delays in the project caused by activities or
factors beyond the control of Consultant Unless otherwise stated herein, Consultant shall not be responsible for verifying
or coordinating the services or work of other consultants or subcontractors.
8. When applicable, Client is noticed that at a future date Consultant may claim a lien as provided by law against the property
if not paid in full. Consultant's liability is limited to the negligence, willful misconduct or omissions of its own employees and
subconsultants. In recognition of the relative risks and benefits of the Project to both the Client and Consultant the risks
have been allocated such that the Client agrees, to the fullest extent permitted by law, to limit the liability of Consultant to
the Client for any and all claims expenses from any cause or causes, including attorney's fees, expert witness fees and
costs, so that the total aggregate lablity of Consultant to the Client shall not exceed $25,000.00, or the amount of
Consultant's total fee for services rendered on the Project, whichever is greater. It is intended that this limitation apply to
any and all liability or cause of action however alleged or arising, unless otherwise prohibited by law.
9. Consultant agrees, to the fullest extent permitted by law, to indemnify and hold the Client harmless from damages and
losses arising from the negligent acts, errors or omissions of Consultant in the performance of professional services under
this Agreement to the extent that Consultant is responsible for such damages and losses on a comparative basis of fault
and responsibility between Consultant and the Client Consultant is not obligated to indemnify the Client for the Client's own
negligence.
Additional Terms and Conditions Applicable Only to Condominium Protects
1. The Client acknowledges the risks to the Consultant inherent in condominium projects and the disparity between the
Consultant's fee and the Consultant's potential liability for problems or alleged problems with such condominium projects.
Therefore, the Client agrees, to the fullest extent permitted by law, to defend, indemnify and hold harmless the Consultant its
officers, directors, employees and subconsultants (collectively, Consultant) against all claims, damages, liabilities or costs,
including reasonable attorneys' fees and defense costs, arising out of or in any way connected with the services perfumed
under this agreement except for the Consultant's sole negligence or willful misconduct.
2. In consideration of the substantial risks to the Consultant In rendering professional services in connection with this Project,
the Client agrees to make no claim and hereby waives, to the fullest extent permitted by law, any daim or cause of action of
any nature against Consultant, its officers, directors, employees and subconsultants (collectively, Consultant) which may
arise out of or in connection with this Project or the performance, by any of the parties above named, of the services under
this agreement
3. The Client agrees that the bylaws of the Homeowners' Association established for this Project will require that the
Association will perform, as recommended in the Maintenance Manual, all necessary routine maintenance, maintenance
inspections and any other necessary repairs and maintenance called for as a result of these maintenance inspections. The
bylaws shall also contain an appropriate waiver and indemnity in favor of the Client, the Consultant and his or her
subconsultants and the Contractor if the maintenance recommendations contained in the Maintenance Manual are not
performed. All structures are subject to wear, tear, environmental and manmade exposures. As a result, all structures
require regular and frequent monitoring and maintenance to prevent damage and deterioration. Such monitoring and
maintenance is the sole responsibility of Owner. The Consultant shall have no responsibility for such issues or resulting
damages.
Boundary Surveys • Water Rights • Land Divisions • Construction Surveys • Global Positioning • Aerial Photogrammetry
—52—
7!2112011
Page 5 of 5
We appreciate the opportunity to offer to provide our professional services to this Project, and look forward to working with
you. If this proposal is satisfactory to you, please indicate your agreement by signing and returning one original to us to serve as
our notice to proceed. This proposal is valid for execution fora period of 90 days. If you have any questions, or if l can be of
further service, please don't hesitate to call me. Thank you for your consideration of Tri State Surveying for this project.
Sincerely,
Tr' State Surveying, Ltd.
Charles Ken twamura, P.L.S.
Project Manager
Client Acceptance and Notice to Proceed:
By:
South Tahoe Public Utility District
Date:
Print Name and Title:
Boundary Surveys • Water Rights • Land Divisions ♦ Construction Surveys • Global Positioning ♦ Aerial Photogrammetry
—53—
South Tahoe
Public Utility District
General Manalger
Richard K SolbrIg
Directors
James RJones
Marylou Moebacbar
Deb Rlea
Eric Schafer
1275 Meadow Crest Drive • South Lake Tahoe • CA 96154 -7401
Phone 530 544-6474 • Fax 530 541-0614 • www.stpud.us
BOARD AGENDA ITEM 4h
TO: Board of Directors
FROM: Paul Hughes, Chief Financial Officer
MEETING DATE: August 4, 2011
ITEM - PROJECT NAME: The Aspens at South Lake
REQUESTED BOARD ACTION: (1) Authorize Board President Rise to execute the Fee
Deferral Agreement with SLT Pacific Associates, a California Limited Partnership; and
(2) Sign the associated Promissory Note.
DISCUSSION: At the March 3, 2011 Board meeting, action was taken authorizing the
Board President to sign a commitment letter approving the deferral of water impact
fees for "The Aspens at South Lake" low- income housing project. As part of the agenda
item, staff reported that a fee deferral agreement would be drafted by the developer
for Board consideration.
Attached is the Fee Deferral Agreement and Promissory Note which incorporate the
agreed upon terms as discussed during previous Board meetings, including being first in
line to receive a $10,000 annual primary payment from residual receipts. All other
creditors, including the District, will share any remaining residual receipts. Both
documents have been reviewed by District Counsel accordingly and include
appropriate indemnification language to protect the District in the event that the
deferral was legally challenged.
SCHEDULE: Agreement to be signed following Board authorization
COSTS: Deferred fees of approximately $550,000 paid over 55 years at 3% interest
ACCOUNT NO: N/A
BUDGETED AMOUNT REMAINING: N/A
ATTACHMENTS: Fee Deferral Agreement /Promissory Note
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES Nu NO
CHIEF FINANCIAL OFFICER: YES NO
—55—
FEE DEFERRAL AGREEMENT
THIS FEE DEFERRAL AGREEMENT is entered into as of , 2011 by and
between the South Tahoe Public Utility District ( "STPUD ") and SLT Pacific Associates, a
California Limited Partnership ( "Developer ") with reference to the following facts:
RECITALS
A. Developer intends to construct a 48 -unit affordable housing project to be located at 3521-
3541 Pioneer Avenue, South Lake Tahoe, California and known as The Aspens at South Lake
( "Project ").
B. STPUD's water impact fees for the Project are $550,000 (the "Connection Fees "), which
STPUD has agreed to defer pursuant to the terms of this Agreement.
NOW THEREFORE, in consideration of the promises and covenants set forth
hereinbelow and for good and valuable consideration, the receipt and sufficiency of which is
hereby acknowledged, the parties hereby agree as follows:
AGREEMENT
1. Fee Deferral. The Connection Fees for the Project shall be $550,000. So long as the
Project receives financing commitments from other sources, including a loan from the South
Tahoe Redevelopment Agency or the City of South Lake Tahoe, which are sufficient to permit
Developer to construct the Project, all Connection Fees will be deferred. Pursuant to such
deferral, all Connection Fees will accrue interest at a rate of three percent (3 %) per annum and
be paid by Developer from a portion of the future residual receipts of the Project.
2. Payment. The payment terms for the Connection Fees shall be as set forth in that certain
Promissory Note dated as of even date herewith made by Developer in favor of STPUD
( "Note "). To the extent of any conflict between the terms of this Agreement and the Note, the
Note shall prevail.
3. Execution in Counterparts. This Agreement may be executed in any number of
counterparts, each of which when so executed and delivered shall be deemed to be an original
and all of which taken together shall constitute but one and the same instrument. Delivery of an
executed counterpart of a signature page by facsimile or PDF transmission shall be as effective
as delivery of a manually executed counterpart.
4. Governing Law. This Agreement will be construed and enforced in accordance with, and
the rights of the parties shall be governed by, the laws of the State of California, without regard
to conflicts of laws principles that would require the application of the law of another
jurisdiction, such that to the extent that the provisions of this Agreement are contrary. to
California law or decision of a court of proper jurisdiction in California, such law or court
decision shall govern.
5. Indemnification. Developer shall indemnify and hold harmless STPUD from and against
any and all third party claims, actions, lawsuits, or other causes of action which challenges the
CHI01 50660851v2_339767-00006 7/19/2011 3:27 PM
-57-
validity of this Agreement (collectively, the "Claims "). The foregoing indemnity shall include
without limitation all reasonable attorney fees and other costs and expenses incurred by STPUD
to defend such Claims.
6. Notices. All notices given pursuant to this Agreement shall be sent by personal delivery,
express or courier service, electronic means of transmitting written material (so long as an
original is simultaneously transmitted by the United States Postal Service or express or courier
service) or United States Postal Service. Notices shall be deemed to be delivered the earlier of:
(a) the first (1st) business day after deposited for delivery with FedEx, UPS, or other reputable
delivery company if sent for same day or next day delivery; or (b) three (3) business days after
the date deposited with the United States Postal Service if sent certified mail, return receipt
requested addressed to each party at the following address (or at such other address as such party
may request in writing:
If to STPUD: South Tahoe Public Utility District
275 Meadow Crest Drive
South Lake Tahoe, CA 96150 -7401
If to Developer:
And to:
do Roope, LLC
430 E. State Street, Suite 100
Eagle, ID 83616
Attn: Caleb Roope
Central Valley Coalition for Affordable Housing
3351 M Street, Suite 100
Merced, CA 95348
Attn: Christina Alley
7. Successors and Assigns. The provisions of this Agreement will be binding upon and
inure to the benefit of the parties hereto and their respective successors and assigns.
Notwithstanding the foregoing, Developer may not assign its rights and benefits hereunder
without the prior written consent of the STPUD.
8. Amendment. This Agreement may only be amended, modified, superseded or canceled
and any of the terms, covenants, representations, warranties or conditions hereof may be waived
only by an instrument in writing signed by each of the parties hereto.
CH101 50660851 v2 339767 -00006 7/19/2011 3:27 PM
[Signature page follows]
-58-
IN WITNESS WHEREOF, the undersigned have executed, or have caused to be executed, this
Agreement as of the date first written above
C11101 50660851v2 339767-00006 7/19/2011 3:27 PM
STPUD:
South Tahoe Public Utility District
By:
Name:
Its:
DEVELOPER:
SLT Pacific Associates, a California Limited
Partnership
By: Central Valley Coalition for Affordable
Housing, its managing general partner
By:
Name:
Its:
By: Roope, LLC, its administrative general
partner
-59-
By
Name:
Its:
PROMISSORY NOTE
$550,000 , 201.1
South Lake Tahoe, California
Pursuant to that certain Fee Deferral Agreement (the "Fee Deferral Agreement ")
dated as of even date herewith made by SLT Pacific Associates, A California Limited
Partnership ( "Maker") in favor of the South Tahoe Public Utility District ("Holder"), Maker
hereby promises to pay Holder the sum of Five Hundred Fifty Thousand Dollars
($550,000) on the terms set forth hereinbelow.
Section 1. Purpose. Pursuant to the Fee Deferral Agreement, Holder agreed
to defer payment of $550,000 in water connection fees for that certain 48 -unit affordable
apartment complex (the "Project ") being developed by Maker on certain real property in
the City of South Lake Tahoe, California (the "Property").
Section 2. Interest. The outstanding principal balance of this Note shall bear
simple interest at the rate of three percent (3 %) per annum from the date of this Note
until this Note is paid in full.
Section 3. Term and Repayment Requirements. The term of this Note (the
"Term ") shall commence with the date of this Note and shall expire upon the fifty -fifth
anniversary date of the date of this Note (the "Maturity Date "). The repayment of this
Note shall be nonrecourse to Maker and its partners pursuant to the Loan Agreement,
and subject to the exceptions set forth therein.
Section 4. Repayment. This Note shall be repaid as follows:
a. Annual Payments. Until the original principal amount of this Note and
interest accrued thereon is repaid in full, Maker shall make annual payments from
Residual Receipts to Holder of $10,000 ( "Primary Payment ") plus a sum equal Holder's
Share of Residual Receipts ( "Additional Payment "). Such annual payments shall be
due and payable in arrears no later than May 1st of each year with respect to the
previous calendar year, and shall be accompanied by the Maker's report of Residual
Receipts. Payments made hereunder shall be credited first against accrued interest
and then against outstanding principal. Notwithstanding anything herein to the contrary,
Maker's obligation to make payments hereunder shall be only to the extent of Residual
Receipts from the calendar year preceding such payment such that to the extent any
payment required hereunder exceeds the amount of such Residual Receipts, any
amounts that cannot be paid from Residual Receipts shall accrue and paid from future
year(s) Residual Receipts until paid. Maker shall provide the Holder with any
documentation reasonably requested by the Holder to substantiate the determination of
Residual Receipts.
CHI01 50660088v3 339767 -00006 7/27/2011 10:55 AM
b. Definitions. The following definitions shall apply for purposes of this
Section 4:
(i) "Residual Receipts" means, for a particular calendar year, the
amount by which Gross Revenue (as defined below), less the required payments on the
construction loan or the permanent loan, exceeds Annual Operating Expenses (as
defined below); provided however, when determining the Additional Payment under
Section 4, the amount of the Primary Payment shall also be subtracted from Gross
Revenue in order to determine Residual Receipts.
(ii) "Annual Operating Expenses" with respect to a particular
calendar year shall mean the following costs actually incurred for operation and
maintenance of the Project including without limitation: property and other taxes and
assessments imposed on the Project; premiums for property damage and liability
insurance; utility services not paid for directly by tenants, including but not limited to
water, sewer, trash collection, gas and electricity; maintenance and repair including but
not limited to pest control, landscaping and grounds maintenance, painting and
decorating, cleaning, common systems repairs, general repairs, janitorial, supplies, and
others; any annual license or certificate of occupancy fees required for operation of the
Project; general administrative expenses including but not limited to advertising and
marketing, security services and systems, and professional fees for legal, audit and
accounting; asset management fees; partnership management fees; deferred
development fees; property management fees and reimbursements including on -site
manager expenses pursuant to a management contract; and cash deposited into a
reserve for capital replacements of Project improvements and an operating reserve in
such amounts as are required by the Maker's partnership agreement. "Annual
Operating Expenses" shall not include the following: depreciation, amortization,
depletion or other non -cash expenses or any amount expended from a reserve account.
Notwithstanding the foregoing, when determining Residual Receipts for purposes of the
Primary Payment, the deferred developer fee and asset management fees shall not be
accounted for in calculating Annual Operating Expenses.
(iii) "Gross Revenue" with respect to a particular calendar year
shall mean all revenue, income, receipts and other consideration actually received from
operation and leasing of the Project. "Gross Revenue" shall include, but not be limited
to: all rents, fees and charges paid by tenants; Section 8 payments or other rental
subsidy payments received for the dwelling units; deposits forfeited by tenants; all
cancellation fees, price index adjustments and any other rental adjustments to leases or
rental agreements; proceeds from vending and laundry room machines; the proceeds
of business interruption or similar insurance; the proceeds of casualty insurance to the
extent not utilized to repair or rebuild the Project; and condemnation awards for a taking
of part or all of the Project for a temporary period. "Gross Revenue" shall not include
tenants' security deposits, releases from reserves, loan proceeds, capital contributions,
or similar advances.
(iv) "Holder's Share of Residual Receipts" shall be determined
by multiplying the Residual Receipts by a fraction, the numerator of which is the original
C11101 50660088v3 339767-00006 7/27/2011 10:55 AM
principal sum of the Loan and the denominator is the sum of all loans incurred by Maker
in connection with the Project which are payable from Residual Receipts (including the
Loan).
Section 5. Acceleration. All obligations evidenced by this Note, irrespective of
the maturity dates expressed herein, at the option of Holder thereof and without demand
or notice, shall immediately become due and payable, if at any time during the Term of
this Note, Maker fails to make any payment as required hereunder and such failure
continues for ten (10) days following written notice thereof to Maker from Holder.
Section 6. Attorney's Fees. Maker agrees to pay all costs of collection when
incurred, including without limitation, reasonable attorney's fees and expenses (whether
or not suit is filed hereon) and court costs. Such costs shall be added to the balance of
principal then due.
Section 7. Holder's Rights. Failure of Holder to assert any right under this
Note shall not be deemed a waiver of such right.
Section 8. Prepayment. This Note may be prepaid at any time without
premium or penalty, provided all interest due on the principal being prepaid will be due
at time of prepayment.
Section 9. California Law. This Note and the legality, validity and performance
of the terms hereof shall be governed by, enforced, determined, and construed in
accordance with the laws of the State of California.
Section 10. Waivers. Maker waives presentment, demand for payment, notice
of dishonor, notice of protest, protest, and all other notices or demands in connection
with the delivery, acceptance, performance, default, endorsement, or guaranty of this
Note, and to the extent authorized by law, any and all homestead or other exemption
rights which would apply to the debt evidenced by this Note.
Section 11. Binding Obligation. This Note shall be binding upon Maker and
Maker's heirs, legal representatives, successors, and assigns.
Section 12. Amendment or Modification. The terms of this Note may only be
amended or modified by a written agreement executed by Maker and Holder.
Section 13. Notices. All notices given under this Note shall be made in writing
and shall be deemed received when delivered in accordance with the Fee Deferral
Agreement.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
CH101 50660088v3 339767 - 00006 7/27/2011 10:55 AM
IN WITNESS WHEREOF, Maker has executed this Note as of the date first
written hereinabove.
SLT Pacific Associates, a California Limited Partnership
By: Central Valley Coalition for Affordable Housing, its
managing general partner
By:
Name:
Its:
By: Roope, LLC, its administrative general partner
By:
Name:
Its:
01101 50660088v3_339767-00006 7/27/2011 10:55 AM
South Tahoe
Public Utility District
caner o M�
tachani FL Soibrq
Dirwcters
_Chris Catalu
Jarmo R.Jones
MayL.
Vide Rise
Eric Schafer
1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401
Phone 530 54+6474 • Fax 530 541-0614 • www.etpud.us
BOARD AGENDA ITEM 41
TO: Board of Directors
FROM: Paul A. Sciuto, Assistant General Manager /Engineer
MEETING DATE: August 4, 2011
ITEM - PROJECT NAME: Utility Raising Associated with El Dorado County Department
of Transportation (EDCDOT) North Upper Truckee Paving
REQUESTED BOARD ACTION: (1) Authorize commitment of reimbursement to El Dorado
County for raising manholes, flushing inlets, and water valves; and (2) Authorize
payment to the County for the construction in the estimated amount of $33,900.
DISCUSSION: El Dorado County Department of Transportation (EDCDOT) is paving North
Upper Truckee from Highway 50 to Grizzly Mountain. As part of this project the District is
responsible for raising 24 manholes, one flushing inlet, and 56 water valves. District staff
has been working with the County to have these items raised as part of the County's
bid documents for the project. Staff has agreed to have the bid items include all
materials and labor so as to minimize unnecessary coordination with the County's
contractor.
The District would reimburse the County for the aforementioned items when the
contractor's pay estimate is submitted. Once the bid is received by the County, staff
will inform the Board of the anticipated actual costs.
SCHEDULE: Project anticipated going out to bid on August 5, 2011
COSTS: $ 17,100 (sewer) and $16,800 (water) (estimate)
ACCOUNT NO: 1001 -6052 and 2001 -6052
BUDGETED AMOUNT REMAINING: $71,960, $194,098 (2012)
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
CATEGORY: Sewer & Water
NO
NO
-65-
SOUTH TAHOE PUBLIC UTI
Richard Soibri , , General Mana ' er
DISTRICT
istant General Mana , er
her, Vice President
Dale Rise, President BOARD MEMBE
Chris Cefalu, Director James R. Jones
REGULAR MEETING OF
SOUTH TAHOE PUBL
afer, Director
ARD OF DIR
ITY DIST
ORS
July 21, 201
The Board of Directors of the South Taho
July 21, 2011, 2:00 P.M., Distri t Office, 1275
Iict met
gular session,
e Tahoe, CA
BOARD OF DIRECTO
President Rise, Dire
Director Cefalu
STAFF:
Soibrig, Sci
Huss
osbach
sent.
nes an • • fer
to, Whale
rye,
hiel, Attom
avian /Phillips &
rtzwiler
unsch,
Richar
rig led the ple
to the flag.
Moved Sc
Passed to app
Second
the
acher/ Cefalu Absent /
t Calendar as submitted:
a. Annual Softwa : •orf Costs for Financial /Human
Resource Softwar -- Approved payments to SunGard
Public Sector for annual maintenance costs, in the
amount of $16,828.94, plus tax;
PLEDGE OF ALLEGIANCE
CONSENT CALENDAR
REGULAR BOARD MEETING MINUTES - July 21, 2011
PAGE -2
b. Computer Equipment for Fiscal Year 2011/2012 - CONSENT CALENDAR
Authorized purchase of budgeted computers and (continued)
equipment in the estimated amount of $60,900
(including tax);
c. 2011 Grizzly Mountain Waterline Project - Approved
Change Order No. 3 to Burdick Excavating Co., Inc.,
in the amount of $8,987.80;
d. Angora Sitework - (1) Approved the Project Closeout
Agreement and Release of Claims for K.G. Walters; a
(2) Authorized staff to file a Notice of Completion
the El Dorado County Clerk;
e. Unpaid Assessments - Adopted Resolution 6 -11,
authorizing delinquent accounts be added t
2011/12 El Dorado Tax Assessor's Roll;
f. 2010 North Apache Booster Stati
Change Order No. 2 to Thomas
amount of $19,521;
g.
ect - Approv
c., in the
Approved Special Board Meeting Mi
h. Approved Regula g Minut
MS FOR D ACTION
Seven bids were op
A careful review and
irregu - a staff
an•.
being inc • tial
d Mosbacher /
to find the mino
minor irregulari
nsive, responsi
8,880.
P
d Sc Cefalu Absent /
ulariti • e immaterial;
nd a • the project to the
idder Blastco, Inc., in the
wai
lowes
amount
Nine banks w kite six submitted financing bids.
BBVA Compass • - M ost attractive terms of 3.65%
and a loan term of - . rs. The budget assumed a loan
term of 25 years and ahigher interest rate. With this low
interest rate, the loan can be paid off in 20 years with a
savings to the District of approximately $1.9 million dollars.
Director Schafer congratulated Paul Hughes, Chief
Financial Officer, and in general the staff, for years of
practicing strong fiscal responsibility which has resulted in
-68-
WATER TANK RECOATING PROJECT
BORROWING FOR THE HEADWORKS
REPLACEMENT PROJECT
REGULAR BOARD MEETING MINUTES - July 21, 2011
PAGE - 3
achieving a bond rating as high as the District can go. This BORROWING FOR THE HEADWORKS
has resulted in the attractive terms for the Headworks REPLACEMENT PROJECT
project financing and savings to our customers. (continued)
Moved Schafer / Second Jones / Cefalu Absent / Passed
to approve Resolution No. 2895 -11 authorizing and direct-
ing the execution of an installment sale financing of public
capital improvements with Public Property Financing
Corporation of California and related documents.
Mo - d J • nes
S - cond S h • er Cefalu Absent Passed
to approve payment in the amount of $1,254,816.29.
Water and Wastewater Operations Committee: T
committee met on July 18, 2011. Minutes of the
are available upon request.
BOARD MEMBER ST
COMMITTEE REPORTS
Director Jones reported the agency met on July 13, 2
The next meeting will be in South Lak - • oe at the Distn
on August 10, 2011.
RADO COUNTY WATER AGENCY
RESENTATIVE REPORT
President Rise suggested that staff look i
CALSTAR to the benefit package and to
mation to the next Board •- .• • regardin
information and billin • • olicies
insurance compani
d
BO ' EMBER REPORTS
back
eir pr
nvolv
He also would Ii - Board and s o start thi • of
ideas to generate ative re for the Dist nd to
develop ideas for th ear - - , ted I for
Jones a. torSch •d ho W - •r
thes
orSchaf-rco
r, for his recent a
ssociation Finan
ded
tme
orpor
Dis
Direc
ughes, Chief Financial
e California Special
Board of
District Inf • ' • n Officer r is Cocking reported on his STAFF REPORT
attendance . first m - , of the Tahoe Prosperity
Center Board o c - July 15. A handout listing the
goals of the Center culated and he will provide a
copy to the Board. - layed to the Board that their
concept has merit and may have some future grant
funding opportunities.
2:45 P.M.
ADJOURN ENT TO CLOSED SESSION
REGULAR BOARD MEETING MINUTES - July 21, 2011
PAGE - 4
3:55 P.M.
RECONVENED TO REGULAR
SESSION
ACTION / REPORT ON ITEMS DISCUSSED DURING CL • SSION
No reportable Board action.
No reportable Board a
overnment Code
on 54 a) /Conference with
egal Couns ing Litigation re:
False Claims Ac - : United States,
the States of Calif • Delaware,
Florida, Nevada, an • essee and
the monwealths o
M •:, setts and Virgins • ret.
endrix v. J -M Manufacturing
pany, Inc. and Formosa Plastics
rporation, U.S.A., Civil Action No.
V06- 0055 -GW, United States
ourt for the Central District of
ATTEST:
Kathy Sharp, Clerk of the Board
By Chris Whalen, Assistant Board Clerk
South Tahoe Public Utility District
-70-
t o Government Code
Se 54956.9(a)/Conference with
Legal Counsel - Existing Litigation re:
Los Angeles County Superior Court
Case No. BC459943, State of Nevada,
et al. v. J -M Manufacturing, et al.
Pursuant to Government Code
Section 54957 /Public Employment
Position: Legal Services Provider
ADJOURNMENT
Dale Rise, Board President
South Tahoe Public Utility District
South Tahoe
Public Utility District
Gomm, Marker
Riduad t1. Solbdg
Directors
.Chris
JmeeR.Jonee
Mary Louleioslocber
Chile
Schafer
1275 Meadow Cr st Drive • South Lake Tahoe • CA 96150-7401
Phone 53054+6474. Fax 530 541 -0614 • www.stpud.us
BOARD AGENDA ITEM 7a
TO: Board of Directors
FROM: John Thiel, Principal Engineer
MEETING DATE: August 4, 2011
ITEM - PROJECT NAME: Cathodic Protection Improvement Project
REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible bidder.
DISCUSSION: This project includes the installation of cathodic protection systems at 12
sewer pump stations and 2 tanks as follows: Trout Creek, Pioneer Village, Bellevue,
Beecher, Venice, San Moritz, Pope Beach 1, Pope Beach 2, Camp Richardson, Kiva,
Taylor Creek, Baldwin, H Street Tank, and Luther Pass Tank No. 2.
On July 26, 2011, eight general contractors attended the mandatory pre -bid meeting.
Bids will be opened at 2 p.m., Tuesday, August 2, 2011. After opening the bids, staff will
review the bids in detail for compliance with the specifications.
A summary of all the bids, along with staff recommendation for award will be made
available at the District office, prior to, and at the Board meeting.
SCHEDULE: Open Bids 8/02/11; Award Bid 8/04/11; NTP 8/18/11. Complete 12/15/11.
COSTS: Construction Estimate $260,000
ACCOUNT NO: 1029-81 33 /CATS W R; 2029 - 8113 /CATWTR
BUDGETED AMOUNT REMAINING: $330,904; $82,601 (2011/12)
ATTACHMENTS: A summary of bids and staff recommendation for award will be made
available at the District office, prior to, and at the Board meeting.
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
CATEGORY: Water
South Tahoe
Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Telephone: (530)544 -6474
Memorandum
Fax: (530)541 -4319
Date: August 4, 2011
To: Board Members, Richard So!brig, Paul Sciuto
From: Jim Hoggatt, Engineer Department Manager
Subject: Recommendation for Bid Award
2011 Cathodic Protection Improvements Project
/1-cf( 6/1 1 CL
F-Gi-t (3401+n
As detailed on the bid summary and review information from Heidi Baugh, the apparent
low bid from Exaro Technologies Corporation, contained minor deviations which staff
considers inconsequential and immaterial.
Staff recommends that the Board waive the minor irregularities and award the project to
Exaro Technologies Corporation, in the amount of $285,702.00.
South Tahoe Public Utility District • 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150
Phone 530.544.6474 • Facsimile 530.541.0614
South Tahoe
Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Telephone: (530)544 -6474
Fax: (530)541 -4319
Memorandum
Date: August 3, 2011
To: Board Members, Richard H. Solbrig, Paul A. Sciuto
From: Heidi C. Baugh, Contracts Administrator
Subject: 2011 Cathodic Protection Improvement Project
B -�I-11 ar.k 15
At 2:00 o'clock on the afternoon of August 3, 2011 we received and opened four (4)
sealed bids for the above - referenced project. Bids ranged from $285,702 to $410,995.
The engineer's estimate was $273,300. A careful review and analysis of the three
lowest bids showed a number of deviations, most of them minor. See attached
spreadsheet and list of deviations for full breakdown of each bid.
Exaro Technologies Corporation is the apparent low bidder. Exaro Technologies
Corporation had only minor deviations.
I contacted the Contractors License Board and was given the following information:
License Number 860376 is current and active and expires 06/30/2013.
The company is a corporation.
Exaro Technologies Corporation holds a Class A — General Engineering license.
South Tahoe Public Utility District • 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150
Phone 530.544.6474 • Facsimile 530.541.0614
SOUTH TAHOE PUBLIC UTILITY DISTRICTS
2011 CATHODIC PROTECTION IMPROVEMENT PROJECT
BID SUMMARY (08/03/2011)
Engineers Estimate
Exaro Technologies
Corp.
Thomas Haen Company
Corrpro Companies
Unit Price
Inc.
Amount
Farwest
Control
Unit Price
Corrosion
Company
Amount
Description
Unit
QTY
Unit Price
Amount
Unit Price
Amount
Unit Price
Amount
1
Mob /Demob (10 %)
LS
1
$15,500.00
$15,500.00
$27,880.00
$27,880.00
29,500.00
$29,500.00
$6,000.00
$6,000.00
$2,500.00
$26,050.00
$2,500.00
$26 050.00
2
Baldwin Beach Pump
Station
LS
1
$20,000.00
$20,000.00
$17,029.00
$17,029.00
22,170.00
$22,170.00
$20,835.00
$20,835.00
3
Beecher Pump Station
LS
1
$20,000.00
$20,000.00
$21,517.00
$21,517.00
17,910.00
$17,910.00
$23,157.00
$23,157.00
$34 730.00
$34 730.00
4
Bellevue Pump Station
LS
1
$20,000.00
$20,000.00
$16,663.00
16,663.00
25,085.00
$25,085.00
$22,525.00
$22,525.00
$34,730.00
$34 730.00
5
Camp Richardson Pump
LS
1
$20,000.00
$20,000.00
$15,764.00
15,764.00
23,040.00
$23,040.00
$22,632.00
$22,632.00
$26,050.00
$26 050.00
6
Kiva Pump Station LS
1
$20,000.00
$20,000.00
$20,431.00
$20,431.00
23,720.00
$23,720.00
$25,260.00
$25,260.00
$14,805.00
$34,730.00
$43,115.00
$34,730.00
$43,115.00
7
San Moritz Pump Station
LS
1
$20,000.00
$20,000.00
$25,694.00
$25,694.00
29,750.00
$29,750.00
$14,805.00
8
Taylor Creek Pump Station
LS
1
$20,000.00
$20,000.00
$22,108.00
$22,108.00
28,430.00
$28,430.00
$28,932.00
$28,932.00
$34,730.00
$34 730.00
9
Pioneer Village Pump
Station
LS
1
$20,000.00
$20,000.00
$19,077.00
$19,077.00
26 040.00
$26,040.00
$28,990.00
$28,990.00
$43 115.00
$43 115.00
10
Trout Creek Pump Station LS
1
$10,000.00
$10,000.00
$3,183.00
$3,183.00
3,550.00
$3,550.00
$13,835.00
$13,835.00
$5,500.00
$5,500.00
$43,115.00
11
Venice Pump Station
LS
1
$20,000.00
$20,000.00
$17,393.00
$17,393.00
30,070.00
$30,070.00
$21,090.00
$21,090.00
$43,115.00
12
Pope Beach Pump Sta. No.
1
LS
1
$20,000.00
$20,000.00
$7,985.00
$7,985.00
12,790.00
$12,790.00
$25,305.00
$25,305.00
$17,815.00
$17,815.00
$5,000.00
$10,000.00
$17,815.00
$17,815.00
$5,000.00
$10,000.00
13
Pope Beach Pump Sta. No. LS
2
1
$20,000.00
$20,000.00
$8,171.00
$8,171.00
12,790.00
$12,790.00
$21,225.00
$21,225.00
14
H Street Tank BLS
1
$8,000.00
$8,000.00
$17,854.00
$17,854.00
8,720.00
$8,720.00
$17,595.00
$17,595.00
$33,900.00
15
Luther Pass Tank No. 2 LS
1
$16,000.00
$16,000.00
$43,153.00
$43,153.00
20,960.00
$20,960.00
$33,900.00
16
Site Protection Fencing LF
600
$5.00
$3,000.00
$1.00
$600.00
3.00
$1,800.00
$22.00
$13,200.00
$40.00
$24,000.00
$8,000.00
17
Coir Log Placement LF
400
$2.00
$800.00
$3.00
$1,200.00
6.00
$2,400.00
$13.00
$5,200.00
$20.00
TOTAL per District Review and Calculatio
$273,300.00
$285,702.00
$318,725.00
$344,486.00
$410,995.00
TOTAL as written in Bid Received:
same
same
same
same
e
2011 Cathodic Protection Improvement Project
Bid Opening: 8/3/2011 at 2:00 o'clock p.m.
Deviations and information gathered during bid analysis of the three lowest
bids:
Exaro Technologies Corporation:
• Bidder's General Information Item 5, no address provided for surety.
• Certification by Contractor's Insurance Broker: was filled out incorrectly. I
was able to contact the broker, obtain the names of insurance companies,
and verify that they met specification requirements.
Thomas Haen Company, Inc.
• Bidder's General Information Item 5, no phone number for surety provided.
No address for brokerage firm.
Corrpro Companies, Inc.:
• Certification by Contractor's Insurance Broker form was filled out correctly;
however, Corrpro inserted language stating they would be able to provide the
required insurance `as modified by the attached letter dated August 2, 2011'
The letter identified lower deductibles and different ISO forms they would
need the District to accept. Basically their insurance does not meet our
specifications.
p
2011 CATHODIC PROTECTION IMPROVEMENT PROJECT
CONTRACTOR'S SUBCONTRACTORS
Exaro Technologies Corporatio
Work to be Performed
Subcontractors Name
& Address
Materials 20%
Corrpro
2799 Miller St., San Leandro, CA 94577
#764878
Labor, Equipment, Material 5.3%
Blastco
11905 Regent View, Downey, CA 90241
#767974
Named Equipment/Material Supplier List:
Equipment/Material
Supplier
Rectifier Units
Corrpro
Impressed Current Anodes
Corrpro
Galvanic Anodes for Underground Use
Corrpro
Galvanic Anodes for Underwater Use
Corrpro
Thomas Haen Company, Inc.
Work to be Performed
Subcontractors & Address
Electrical 14%
Innovative Electric, South Lake Tahoe, CA
#689833
Drilling 21 %
Western Strata Exploration
Clarksberg, CA
#552198
Named Equipment/Material Supplier List:
Equipment/Material
Supplier
Rectifier Units
Corrpro
Impressed Current Anodes
Corrpro
Galvanic Anodes for Underground Use
Corrpro
Galvanic Anodes for Underwater Use
Corrpro
Corrpro Companies, Inc.
Work to be Performed
Subcontractors & Address
Bracket Manufacturing & Installation of
Anodes 15%
Blastco Inc.
11905 Regent View, Downey, CA 90241
#767974
Equipment/Material Supplier List
Equipment/Material
Supplier
Rectifier Units
Universal Rectifiers Inc.
Impressed Current Anodes
Corrpro Companies Inc.
Galvanic Anodes for Underground Use
Corrpro Companies Inc.
Galvanic Anodes for Underwater Use
Corrpro Companies Inc.
South Tahoe
Public Utility District
Gi Harmer
Riohml a Solbrlg
Directors
Janne RJones
Mary r.ouMoaba her
Pals Rise
Eric Schafer
1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401
Phone 530 544- 6474 • Fax 530 541 -0614 • www.stpud.us
BOARD AGENDA ITEM 7b
TO: Board of Directors
FROM: Peter Lavallee, Assistant Engineer
MEETING DATE: August 4, 2011
ITEM - PROJECT NAME: Snowshoe /Millich Slope and Bijou Sewer Relocates
REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible bidder.
DISCUSSION: This project includes slope repair and stabilization between the Snowshoe
ditch and the Millich ditch in Alpine County, where heavy winter snowfall and rain
events have caused the existing erosion protection to fail. Work will be done to
re- stabilize the slope as well as to install a short gabion wall to collect future sediment
from the slope. The Bijou portion of the project will relocate approximately 60 feet of
sewer force main, 50 feet of gravity sewer main, and install a new eight -inch sewer
overflow in preparation for the City of South Lake Tahoe's Bijou Erosion Control Project.
On July 26, 2011, seven general contractors attended the mandatory pre -bid meeting.
Bids will be opened at 3 p.m., Tuesday, August 2, 2011. After opening the bids, staff will
review the bids in detail for compliance with the specifications.
A summary of all the bids, along with staff recommendation for award will be made
available at the District office, prior to, and at the Board meeting.
SCHEDULE: Open Bids 8/02/11; Award Bid 8/04/11; NTP 8/22/11. Complete 11/15/11.
COSTS: Construction Estimate $245,000
ACCOUNT NO: 1029- 7075 /SNOBLO; 1029- 8287 /ECBIJM
BUDGETED AMOUNT REMAINING: Unbudgeted; $499,110
ATTACHMENTS: A summary of bids and staff recommendation for award will be made
available at the District office, prior to, and at the Board meeting.
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
CATEGORY: Water
South Tahoe
Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Telephone: (530)544 -6474
Memorandum
Fax: (530)541 -4319
C�1U�1 rib
Date: August 4, 2011
To: Board Members, Richard Solbrig, Paul Sciuto
From: Peter Lavallee, Assistant Engineer
Subject: Recommendation for Bid Award
2011 Snowshoe /Millich Slope and Bijou Sewer Relocation Project
As detailed on the bid summary and review information from Heidi Baugh, the apparent
low bid from White Rock Construction, Inc., contained minor deviations which staff
considers inconsequential and immaterial. In regards to the bid amount, the written
total will govern over the total of the extended amounts for each bid item.
Staff recommends that the Board waive the minor irregularities and award the project to
White Rock Construction, Inc., in the amount of $289,725.00.
South Tahoe Public Utility District • 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150
Phone 530.544.6474 • Facsimile 530.541.0614
South Tahoe
Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Telephone: (530)544 -6474
Fax: (530)541 -4319
Memorandum
Date: August 2, 2011
To: Board Members, Richard H. So!brig, Paul A. Sciuto
From: Heidi C. Baugh, Contracts Administrator
Subject: 2011 Snowshoe /Millich Slope and Bijou Sewer Relocation Project
At 3:00 o'clock on the afternoon of August 2, 2011 we received and opened three (3)
sealed bids for the above - referenced project. Bids ranged from $289,725 to
$439,256.50. The engineer's estimate was $248,153. A careful review and analysis of
the three bids showed only very minor deviations. See attached spreadsheet and list of
deviations for full breakdown of each bid.
White Rock Construction, Inc. is the apparent low bidder. White Rock Construction, Inc.
had two minor deviations.
I contacted the Contractors License Board and was given the following information:
License Number 640958 is current and active and expires 07/31/2012.
The company is a corporation.
White Rock Construction, Inc. holds a Class A — General Engineering license.
South Tahoe Public Utility District • 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150
Phone 530.544.6474 • Facsimile 530.541.0614
SOUTH TAHOE PUBLIC UTILITY DISTRICT'S
2011 Snowshoe/Millich Slope and Bijou Sewer Relocation Project
BID SUMMARY (08/02/2011)
Engineer's Estimate
mm e KOCK
Construction
Thomas Haen Company
n.b. mailers
Construction Co., Inc.
Description
Unit
QTY
Unit Price
Amount
Unit Price
Amount
Unit Price
Amount
Unit Price
Amount
Snowshoe /Millich Slope
Part 1
1
Mob /Demob incldg bonds,
insurance, and cleanup
LS
1
$10,575.00
$10,575.00
3,600.00
$3,600.00
$17,100.00
$17,100.00
$10,000.00
$10,000.00
2
Provide, install and
maintain Erosion Control
and required BMPs
LS
1
$5,000.00
$5,000.00
2,000.00
$2,000.00
$1,000.00
$1,000.00
$2,000.00
$2,000.00
3
Provide & install slope cut
benches, geogrid structural
reinforcement, secondary
reinforcement and all
soilmaterial required to
emet grade
LS
1
$30,000.00
$30,000.00
61,000.00
$61,000.00
$101 000.00
$101 000.00
$48,000.00
$48,000.00
4
Provide & install perforated
4" SDR 26 PVC pipe for
slope drain, inddg
drainrock
LF
150
$75.00
$11,250.00
20.00
$3 000.00
$20.00
$3,000.00
$13.00
$1,950.00
5
Provide & install solid 4"
SDR 26 PVC pipe for slope
drain
LF
150
$70.00
$10,500.00
11.50
$1,725.00
$20.00
$3 000.00
$6.00
$900.00
6
Provide, install 4'x3'x70'
bio retai i a wall. LS
�rowoe,
1
$18,000.00
$18,000.00
14,500.00
$14,500.00
$5,900.00
$5 900.00
$14,000.00
$14,000.00
7
install
containerized plants
LS
1
$2,000.00
$2,000.00
3,500.00
$3,500.00
$3,000.00
$3,000.00
$2,200.00
$2,200.00
8
Provide, install, maintain
irrigation to slope
LS
1
$10,000.00
$10,000.00
16,000.00
$16,000.00
$13,600.00
$13,600.00
$33,000.00
$33,000.00
9
Provide, install reveg LS
Treatment Type 1
1
$10,000.00
$10,000.00
30,000.00
$30,000.00
$31,000.00
$31 000.00
$42,000.00
$42,000.00
10
Provide, install reveg
Treatment Type 2
LS
1
$9,000.00
$9,000.00
11,000.00
$11,000.00
$11,000.00
$11,000.00
$2,000.00
$2,000.00
PART 1 SUBTOTAL:
$116,325.00
$146,325.00
$189,600.00
$156,050.00
Part 2
Biou Sewer Relocation Site
11
Mob /demob, inddg bonds
& insurance and cleanup. LS
1
$11,828.00
$11,828.00
3,600.00
$3,600.00
$20,000.00
$20,000.00
$15,000.00
$15,000.00
12
Provide,install, maintain
erosion control measures & LS
1
$10,000.00
$10,000.00
2,000.00
$2,000.00
$1,000.00
$1 000.00
$2,000.00
$2,000.00
13
Provide, install, maintain
shoring and soil
stabilization for worker
safety per OSHA & District
requirements. LS
1
$7,500.00
$7,500.00
4,000.00
$4,000.00
$10 000.00
$10,000.00
$20,000.00
$20,000.00
14
Provide, install, maintain
traffic control measures. LS
1
$25,000.00
$25,000.00
16,000.00
$16,000.00
$29,400.00
$29,400.00
$22,000.00
$22,000.00
1.4oltracror5Tdn
pipe
oia one type or
material for Item 15A &
15/
Provide, install 12' PVC
C900 (DR18) Sewer Force
Main LF
60
$105.00
$6,300.00
375.00
$22,500.00
$771.70
$46,302.00
$450.00
$27,000.00
151
Provide, install 12" DIP
(Class 350) Sewer Force
Main LF
60
$0.00
$0.00
$0.00
$0.00
16
Provide, install 8' SDR 26
PVC Gravity Sewer Main. LF
70
$100.00
$7,000.00
185.00
$12,950.00
$245.75
$17,202.50
$250.00
$17,500.00
17
Provide,install precast 48"
Eccentric Cone Sewer
Manholes EA
2
$5,000.00
$10,000.00
6,000.00
$12,000.00
$8,000.00
$16,000.00
$6,500.00
$13,000.00
18
Provide, install flush inlets
on existing 8" gravity sewer
main EA
2
$500.00
$1,000.00
2 000.00
$4 000.00
$5,850.00
$11 700.00
$5,500.00
$11,000.00
19
Provide, install 4" SDR 26
sanitary. sewer lateral LF
70
$100.00
$7,000.00
75.00
$5,250.00
$188.60
$13,202.00
$150.00
$10,500.00
20
,
sewer structures and
piping. Install slurry pipe
plugs on all aban -doned LS
1
$7,500.00
$7,500.00
10 000.00
$10 000.00
$25,500.00
$25 500.00
$25,000.00
$25,000.00
21 loops.
Replace damaged traffic
LS
1
$1,000.00
$1,000.00
9,000.00
$9 000.00
$3,000.00
$3 000.00
$10,500.00
$10,500.00
22
Installation of 8" sewer
Overflow LS
1
$10,000.00
$10,000.00
3,500.00
$3,500.00
$11,200.00
$11,200.00
$11,000.00
$11,000.00
Install,
23
maintain, remove all
ground water dewatering
equipment per spec. LS
1
$5,000.00
$5,000.00
4,000.00
$4,000.00
$12 000.00
$12,000.00
$10,000.00
$10,000.00
restoration
24
Provide, install 3" deep mill
and 3" pavement
overlay wfin
City of SLT nght -of -way. SF
1,600
$5.00
$8,000.00
8.50
$13 600.00
$8.25
$13,200.00
$7.00
$11,200.00
restoration
25
Provide, install 4" deep mill
and 4" pavement
overlay w/in
CalTrans right -of -way. SF
2,100
$7.00
$14,700.00
10.00
$21,000.00
$9.50
$19,950.00
$7.00
$14,700.00
Part 2 SUBTOTAL:
$131,828.00
$143,400.00
$249,656.50
$220,400.00
TOTAL per District Review and Calculatiol
$248,153.00
$289,725.00
$439,256.50
$376,450.00
TOTAL as written in Bid Received:
same
same
same
2011 Snowshoe /Millich Slope and Bijou Sewer Relocation Project
Bid Opening: 8/2/2011 at 3:00 o'clock p.m.
Deviations and information gathered during bid analysis of the three bids:
White Rock Construction, Inc.:
• Bidder's General Information Item 5, did not provide surety information, only
broker /brokerage information.
• Certification by Contractor's Insurance Broker form: listed only broker (not
agency) name in 1st blank.
K.G. Walters Construction Co., Inc.
• Bidder's General Information Item 5, contractor listed surety "c /o" brokerage
agency, thus no address or phone provided for surety.
• Certification by Contractor's Insurance Broker form was filled out incorrectly:
in first blank they only listed agent name without the brokerage agency; in the
second blank and 3ta paragraph they inserted brokerage agency instead of
insurance company name(s). I was unable to verify that their proposed
insurance companies met specification as there were none named.
Thomas Haen Company, Inc.:
• Bidder's General Information, Item 5, contractor did not provide phone
number for surety; did not provide address for broker.
2011 SNOWSHOEIMILLICH SLOPE and BIJOU SEWER RELOCATION
CONTRACTOR'S SUBCONTRACTORS
White Rock Construction, Inc.
Work to be Performed
Subcontractors Name
& Address
Revegetation 11.65%
V &C Construction
P.O. Box 1269, Minden, NV 89423
#645708
Asphalt Paving 11.69%
Don Garcia Exc and Paving
Box 7176, South Lake Tahoe, California 96158
#305618
Named Equipment/Material Supplier List:
Equipment/Material
Supplier
Aggregate Base Material
Bing Materials
Asphalt mixes for paved areas
Tahoe Asphalt
Concrete and grout mixes
Sierra Tahoe Ready Mix
Piping, fittings & specials
Western Nevada Supply
Valves and valve boxes
Western Nevada Supply
Pipe bedding material
Bing Materials
Revegetation materials
V &C Construction
K.G. Walters Construction Co., Inc.
Work to be Performed
Subcontractors & Address
Traffic Control 4.5%
TMI, Sacramento, CA
#785804
Traffic Loops 2%
Par Electric, Reno, NV
#687343
SawCutting .5%
Penhall, Reno, NV
#568673
Paving 6%
GB, South Lake Tahoe, CA
#792014
Erosion Control 23%
Sierra Erosion Control, Reno, NV
#807228
Named Equipment/Material Supplier List:
Equipment/Material
Supplier
Aggregate Base material
Bing Materials
Asphalt mixes for paved areas
Tahoe Asphalt
Concrete and grout mixes
Sierra Tahoe Ready Mix
Piping, fittings and specials
Western Nevada Supply
Valves and valve boxes
Western Nevada Supply
Pipe bedding material
Bing Materials
Revegetation materials
Sierra Erosion Control
1
2011 SNOWSHOE/MUCH SLOPE and BIJOU SEWER RELOCATION
CONTRACTOR'S SUBCONTRACTORS
Thomas Haen Company
Work to be Performed
Subcontractors & Address
NC Paving 7%
Fuller Construction Inc.
South Lake Tahoe, CA
#517412
Landscape 12%
V &C Construction
Minden, NV
#645708
Equipment/Material Supplier List
Equipment/Material
Supplier
Aggregate Base material
Bing Materials (non - recycled base)
TAPCO (recycled base)
Asphalt mixes for paved areas
TAPCO
Concrete and grout mixes
Sierra Tahoe Ready Mix
Piping, fittings and specials
Western Nevada Supply
Valves and valve boxes
Western Nevada Supply
Pipe bedding material
Bing Materials
Revegetation materials
V &C Construction
2
PAYMENT OF CLAIMS
FOR APPROVAL
August 4, 2011
Payroll 7/26/2011 437,848.86
Total Payroll 437,848.86
ADP 0.00
American Express 9,237.93
Bank of America 0.00
BNY Mellon Trust Company 724,831.88
Brownstein /Hyatt/Farber /Schreck legal services 0.00
CDS- health care payments 69,391.30
Union Bank 371,425.72
Total Vendor EFT 1,174,886.83
Accounts Payable Checks -Sewer Fund 732,135.96
Accounts Payable Checks -Water Fund 670,136.84
Accounts Payable Checks -Self- funded Insurance 0.00
Accounts Payable Checks - Grants Fund 0.00
Total Accounts Payable 1,402,272.80
Grand Total 3,015,008 49
Payroll EFTs & Checks
EFT AFLAC Medical & Dependent Care
EFT CA Employment Taxes & W/H
EFT Federal Employment Taxes & W/H
EFT CaIPERS Contributions
EFT Great West Deferred Comp
EFT Stationary Engineers Union Dues
EFT United Way Contributions
EFT Employee Direct Deposits
CHK Employee Garnishments
CHK Employee Paychecks
Total
7/26/2011
3,586.19
18,539.53
89,449.53
78,280.73
19,284.08
2,371.16
134.00
217,356.40
1,263.85
7,583.39
437,848.86
Vendor Name
Department / Pro) Name
PAYMENT OF CLAMS
AECOM TECHNICAL SERVICES INC ENGINEERING - REPL GEN, LPPS
Acet# I Prof Code Amourd Check Num IYPft
REPL GEN LPPS 1029 - 8933 - RGLPPS 1,037.34
Check Total: — 1.037.34 AP- 00079902 MW
AFLAC GEN & ADMIN SUPP INS W/H 1000 - 2532
AFLAC GEN & ADMIN AFLAC FEE DED 1000 - 2538
716.36
110.00
Check Total: 826.38 AP- 00079903 MW
AHERN RENTALS HEAVY MAINT GROUNDS & MNTC 1004 - 6042 54.79
Check Total: 54.79 AP- 00079904 MW
AIR PERFECTION INC EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 2,030.17
Check Total: 2.030.17 AP -00079905 MW
ALLTIZER POWDER COATING UNDERGROUND REP PIPEICVRS#MHLS 2001 - 6052 456.75
Check Total: 456.75 AP- 00079906 MW
ALPEN SIERRA COFFEE GEN & ADMIN OFC SUPPLY ISSUE 1000 - 6081 153.08
Check Total: 153.08 AP- 00079907 MW
AMERIPRIDE UNIFORM SERVICES GEN & ADMIN UNIFORM PAYABLE 1000 - 2518 96727
Check Total: 967.27 AP -00079908 MW
1
rn RIZONA INSTRUMENT CORP OPERATIONS SERVICE CONTRACT 1006 - 6030 975.00
i Check Total: 975.00 AP-00079909 MW
AT &T MOBILITY ELECTRICAL SHOP TELEPHONE 1003 - 6310 5.60
AT &T MOBILITY ENGINEERING TELEPHONE 1029 - 6310 19.63
AT &T MOBILITY ELECTRICAL SHOP TELEPHONE 2003 - 6310 5.59
AT &T MOBILITY ENGINEERING TELEPHONE 2029 - 6310 19.63
Check Total: 50.45 AP-00079910 MW
AT &T /CALNET 2 GEN & ADMIN TELEPHONE 1000 - 6310 344.23
AT &T /CALNET 2 PUMPS TELEPHONE 1002 - 6310 66.75
AT &T /CALNET 2 OPERATIONS TELEPHONE 1006 - 6310 31.12
AT &T /CALNET 2 CUSTOMER SERVICE TELEPHONE 1038 - 6310 7.14
AT &T /CALNET 2 GEN & ADMIN TELEPHONE 2000 - 6310 344.22
AT &T/CALNET 2 PUMPS. TELEPHONE 2002 - 6310 51.28
AT &T /CALNET 2 CUSTOMER SERVICE TELEPHONE 2038 - 6310 7.14
Check Total: 851.88 AP- 00079911 MW
BB &H BENEFIT DESIGNS HUMAN RESOURCES CONTRACT SERVICE 1022 - 4405 1,249.00
User: THERESA
Report: OH_PMT_CLAIMS_BK
Page: 1
Current Date: 07/28/2011
Current Time: 10:12:34
Vendor Name
BB&H BENEFIT DESIGNS
BENTLY AGROWDYNAMICS
BLUE RIBBON TEMP PERSONNEL
BLUE RIBBON TEMP PERSONNEL
BLUE RIBBON TEMP PERSONNEL
BURDICK EXCAVATING CO
BURDICK EXCAVATING CO
CALIF DEPT OF CONSUMER AFFAIR
CALIF DEPT OF CONSUMER AFFAIR
DW -G CORP
ICDW -G CORP
CDW-G CORP
CDW-G CORP
CHATHAM, JASON
DIVERSIFIED CONCRETE CUTTING INC
DIY HOME CENTER
DIY HOME CENTER
DIY HOME CENTER
DIY HOME CENTER
DIY HOME CENTER
DIY HOME CENTER
Deparbnent / Proj Name
HUMAN RESOURCES
OPERATIONS
PAYMENT OF CLAIMS
LISSRdidign
CONTRACT SERVICE
SLUDGE DISPOSAL
UNDERGROUND REP CONTRACT SERVICE
UNDERGROUND REP - METERS,GLDN BEARAETERS,GLDN BEAR
CUSTOMER SERVICE CONTRACT SERVICE
GEN & ADMIN - GRIZZLY MT WTRLN
ENGINEERING - GRIZZLY MT WTRLN
ENGINEERING
ENGINEERING
INFORMATION SYS
INFORMATION SYS
INFORMATION SYS
INFORMATION SYS
UNDERGROUND REP
UNDERGROUND REP -
HEAVY MAINT
DIAMOND VLY RNCH
UNDERGROUND REP
UNDERGROUND REP
UNDERGROUND REP
HEAVY MAINTENANC
CONST RETAINAGE
WTRLN,GRIZ MTN
DUES/MEMB/CERT
DUES/MEMB/CERT
OFFICE SUPPLIES
DIST.COMP SPPLIS
OFFICE SUPPLIES
DIST.COMP SPPLIS
TRAVEL/MEETINGS
SIERRA AVE WTRLNWTLN,IN HS UPSIZ
GROUNDS & MNTC
GROUNDS & MNTC
SHOP SUPPLIES
SMALL TOOLS
- METERS,GLDN BEARAETERS,GLDN BEAR
BUILDINGS
AcecB / Rrol Cnde Arnaud rebssIslium URI.
2022 - 4405 1,249.00
Check Total: 2.498.00 AP- 00079912 MW
1006 - 6652 3,211.60
Check Total: 3.211.60 AP-00079913 MW
2001 -4405 1,507.20
2001 - 7093 - GOLDEN 1,919.34
2038 - 4405 1,934.24
Check Total: 5.360.7$ AP-00079914 MW
-52,843.05
528,430.36
2000 - 2605 - GRIZWL
2029 - 8229 - GRIZWL
Check Total:
475.58711 AP- 00079915 MW
2029 - 6250 67.50
Check Total: 67.50 AP-00079916 MW
2029 - 6250 270.00
Check Total: 270.00 AP-00079917 MW
1037 - 4820 51.73
1037 - 4840 15.95
2037 - 4820 51.73
2037 - 4840 15.93
Check Total: 135.34 AP- 00079918 MW
1001 - 6200 50.17
Check Total: 50.17 AP- 00079919 MW
2001 - 8905 - SIERRA 693.00
Check Total: AP- 00079920 MW
a �
1004 - 6042 41.69
1028 - 6042 53.53
2001 - 6071 15.49
2001 - 6073 48.53
2001 - 7093 - GOLDEN 93.38
2004 - 6041 9.69
Check Total: 260.31 AP- 00079921 MW
User: THERESA
Report: OH PMT_CLAIMS_BK
Page: 2
Current Date: 07/28/2011
Current Time: 10:12:34
Vendor Name
ELECTRICAL EQUIPMENT CO INC
ERS INDUSTRIAL SERVICES INC
ERS INDUSTRIAL SERVICES INC
FERGUSON ENTERPRISES INC.
FERGUSON ENTERPRISES INC.
FERGUSON ENTERPRISES INC.
FERGUSON ENTERPRISES INC.
FGL ENVIRONMENTAL
FRONTIER
GLOBAL DATA SPECIALISTS
J
04
'GRAINGER
GRAINGER
GRAINGER
GRAINGER
GRAINGER
GRAINGER
GRAINGER
GRAINGER
GRAINGER
GSE CONSTRUCTION CO INC
GSE CONSTRUCTION CO INC
HACH CO
HACH CO
PAYMENT OF CLAIMS
Department / Proj Name
ENGINEERING - TWIN PEAKS BS
GEN & ADMIN - FILTER ASSMNT
ENGINEERING - FILTER ASSMNT
ENGINEERING - REPL GEN, LPPS
UNDERGROUND REP
PUMPS
PUMPS
LABORATORY
DIAMOND VLY RNCH
ENGINEERING - ECHO TANK REPL
GEN & ADMIN
GEN & ADMIN
GEN & ADMIN
GEN & ADMIN
PUMPS
HEAVY MAINT
HEAVY MAINT
HEAVY MAINT
HEAVY MAINTENANC
GEN & ADMIN - HEADWORKS
ENGINEERING - HEADWORKS
LABORATORY
LABORATORY
Description
BSTR, TWN PEAKS
CONST RETAINAGE
REHAB FLTR 5&6
REPL GEN LPPS
SMALL TOOLS
WELLS
PUMP STATIONS
Acct# / Proj Code
2029 - 7070 - TPBSTR
Check Total:
1000 - 2605 - FILTER
1029 - 8066 - FILTER
Check Total:
1029 - 8933 - RGLPPS
2001 - 6073
2002 - 6050
2002 - 6051
MONITORING 2007 - 6110
TELEPHONE 1028 - 6310
TANK, ECHO
Check Total:
Amount Check Num IxRt
250.43
250.44 AP- 00079922 MW
- 2,530.17
25,302.03
22.771.66
85.54
14.00
89.22
75.77
AP- 00079923 MW
284.53 AP-00079924 MW
100.00
Check Total: 100.00 AP- 00079925
Check Total:
2029 - 8809 - ECHOTK
SHOP SUPPLY INV 1000 - 0421
JANIT/SUPPLY INV 1000 - 0422
SMALL TOOLS INV 1000 - 0423
SAFETY INVENTORY 1000 -0425
PUMP STATIONS 1002 - 6051
FILTER EQ/BLDG 1004.6023
BUILDINGS 1004 - 6041
GROUNDS & MNTC 1004 - 6042
BUILDINGS 2004 - 6041
CONST RETAINAGE
HDWKS IMP PROJ
LAB SUPPLIES
LAB SUPPLIES
Check Total:
Check Total:
1000 - 2605 - HDWORK
1029 - 8033 - HDWORK
Check Total:
1007 - 4760
2007 - 4760
166.47
MW
166.47 AP- 00079926 MW
4,165.00
4.165_(10
504.08
476.47
237.85
119.39
3,161.38
3,029.51
275.67
171.41
306.71
AP -00079927 MW
8.282.47 AP- 00079928 MW
- 56,613.06
566,131.80
509- 8.74 AP-00079929 MW
57.78
57.78
Check Total: 11.56 AP- 00079930 MW
User: THERESA
Report: OH_PMT_CLAIMS_BK
Page: 3
Current Date: 07/28/2011
Current Time: 10:12:34
Vendor Name
HAEN ENGINEERING
HARDY DIAGNOSTICS
HARDY DIAGNOSTICS
HAROLD HUTSON
HAUGE BRUECK ASSOCIATES LLC
HIGH SIERRA BUSINESS SYSTEMS
HIGH SIERRA BUSINESS SYSTEMS
HIGH SIERRA BUSINESS SYSTEMS
HIGH SIERRA BUSINESS SYSTEMS
HIGH SIERRA BUSINESS SYSTEMS
HIGH SIERRA BUSINESS SYSTEMS
;11IGH SIERRA BUSINESS SYSTEMS
t0
!HIGH SIERRA BUSINESS SYSTEMS
Home Depot Credit Services
INTERSTATE SAFETY & SUPPLY
KG WALTERS CONSTRUCTION
KG WALTERS CONSTRUCTION
KINGSBURY GENERAL IMPROVEMENT
LES SCHWAB TIRES
LIBERTY ENERGY
LIBERTY ENERGY
PAYMENT OF CLAIMS
Department / Pro' Name
ENGINEERING - GRIZZLY MT BSTR
aoudad=
GRIZ MTN BSTR
LABORATORY LAB SUPPLIES
LABORATORY LAB SUPPLIES
UNDERGROUND REP PIPE/CVRS/MHLS
ENGINEERING - DVR IRRIG IMPRVS DVR IRR IMPRVMNT
OPERATIONS SERVICE CONTRACT
ADMINISTRATION SERVICE CONTRACT
ENGINEERING SERVICE CONTRACT
FINANCE SERVICE CONTRACT
LABORATORY SERVICE CONTRACT
ADMINISTRATION SERVICE CONTRACT
ENGINEERING SERVICE CONTRACT
FINANCE SERVICE CONTRACT
HEAVY MAINT SMALL TOOLS
GEN & ADMIN
GEN & ADMIN - ERB LINER REPL
ENGINEERING - ERB LINER REPL
GEN & ADMIN - USFS GRNT ADMIN
EQUIPMENT REPAIR
GEN & ADMIN
GEN & ADMIN
SHOP SUPPLY INV
CONST RETAINAGE
REPLACE ERB LINE
SUSPENSE
AUTOMOTIVE
ELECTRICITY
ST LIGHTING EXP
AcctI / Proi Code
2029 - 8176 - GRIZBS
Check Total:
1007-4760
2007-4760
2001-6052
Check Total:
Check Total:
1029 - 8161 - DVRIIP
Check Total:
1006 - 6030
1021 - 8030
1029 - 6030
1039 - 6030
2007 - 6030
2021 - 6030
2029 - 6030
2039 - 6030
1004 - 6073
1000 - 0421
Check Total:
Check Total:
Check Total:
1000 - 2605 - ERBLNR
1029 - 7581 - ERBLNR
Check Total:
2000 - 2504 - SMOKEY
Check Total:
2005 - 6011
1000 - 8330
1000 - 6740
Check Total:
AM2lint Chasktium Tux
875.00
875.00 AP- 00079931 MW
233.32
246.02
479.34 AP -00079932 MW
20,279.95
20279.95 AP- 00079933 MW
12,501.50
12.501.50 AP- 00079934
54.67
249.73
284.37
13.11
54.66
249.73
284.37
13.10
1.203.74 AP-00079935
24627
246.27 AP-00079936
156.26
158,1 AP- 00079937
- 6,538.52
65,385.20
_WAWA
7,802.05
7.802.05
678.09
AP- 00079938
AP- 00079939
678.09 AP -00079940
62,586.86
1,510.83
MW
MW
MW
MW
MW
MW
User: THERESA
Report: OH PMT_CLAIM3 BK
Page: 4
Current Date: 07/28/2011
Current Time: 10:12:34
Vendor Name
LIBERTY ENERGY
PAYMENT OF CLAIMS
Department / Proj Name Deacriotlon Acct# I Proj Code Amount Check Num
IXRe
GEN & ADMIN ELECTRICITY 2000 - 6330 34,340.68
Check Total: 98.41847 AP-00079941 MW
MC MASTER CARR SUPPLY CO PUMPS PUMP STATIONS 1002 - 6051 314.60
MC MASTER CARR SUPPLY CO PUMPS SHOP SUPPLIES 1002 - 6071 13.47
MC MASTER CARR SUPPLY CO PUMPS SMALL TOOLS 1002 - 6073 100.61
MC MASTER CARR SUPPLY CO HEAVY MAINT SECONDARY EQUIP 1004 - 6022 268.64
MC MASTER CARR SUPPLY CO PUMPS WELLS 2002 - 6050 313.98
MC MASTER CARR SUPPLY CO PUMPS PUMP STATIONS 2002 - 6051 314.60
MC MASTER CARR SUPPLY CO PUMPS SHOP SUPPLIES 2002 - 6071 13.47
MC MASTER CARR SUPPLY CO PUMPS SMALL TOOLS 2002 - 6073 100.62
MC MASTER CARR SUPPLY CO PUMPS BLK BRT BSTR UPG 2002 - 8169 388.48
Check Total: 1.828.47 AP -00079942 MW
METRO OFFICE SOLUTIONS GEN & ADMIN OFFICE INVENTORY 1000 - 0428 220.38
METRO OFFICE SOLUTIONS ENGINEERING OFFICE SUPPLIES 1029 - 4820 91.70
METRO OFFICE SOLUTIONS INFORMATION SYS OFFICE SUPPLIES 1037.4820 132.21
c2AETRO OFFICE SOLUTIONS FINANCE OFFICE SUPPLIES. 1039 - 4820 15.05
I�AETRO OFFICE SOLUTIONS ENGINEERING OFFICE SUPPLIES 2029 - 4820 91.68
METRO OFFICE SOLUTIONS INFORMATION SYS OFFICE SUPPLIES 2037 - 4820 132.21
METRO OFFICE SOLUTIONS FINANCE OFFICE SUPPLIES 2039 - 4820 15.05
Check Total: 698,2$ AP-00079943 MW
MWH LABORATORIES LABORATORY MONITORING 1007 - 6110 680.00
MWH LABORATORIES LABORATORY MONITORING 2007 - 6110 180.00
Check Total: 860.00 AP -00079944 MW
OFFICE DEPOT GEN & ADMIN OFFICE INVENTORY 1000 - 0428 245.54
Check Total: 245.54 AP- 00079945 MW
OLIN CORPORATION OPERATIONS HYPOCHLORITE 1006 - 4755 3,845.62
Check Total: 3.845.62 AP-00079946 MW
ONTRAC LABORATORY POSTAGE EXPENSES 1007 - 4810 76.25
ONTRAC LABORATORY POSTAGE EXPENSES 2007 - 4810 45.25
OUTSIDE TELEVISION
DIO - PR EXP- EXTERNAL PUB RELATIONS
Check Total: 121.50 AP- 00079947 MW
1027 - 6620 - PREEXT 1,561.25
Check Total: 1.56125 AP- 00079948 MW
User: THERESA
Report: OH_PMT_CLAIMS_BK
Page: 5
Current Date: 07/28/2011
Current Tine: 10:12:34
Vendor Name
PRAXAIR 174
PRO LEISURE
PRO LEISURE
PUMPWORKS LLC.
REDWOOD PRINTING
REDWOOD PRINTING
REDWOOD PRINTING
RELIANCE STANDARD
RELIANCE STANDARD
RICH'S SMALL ENGINE SERVICE
RICH'S SMALL ENGINE SERVICE
PAYMENT OF CLAIMS
Department / Proj Name
HEAVY MAINT
ADMINISTRATION
ADMINISTRATION
PUMPS
ENGINEERING - SNOWSHOE DITCH R
ENGINEERING - BIJOU MEADOWS ER
ENGINEERING - DEMO FP,COLD CRK
GEN & ADMIN
GEN & ADMIN
PUMPS
PUMPS
SCHAFER, ERIC BOARD OF DIR
SCOTT FRIEDEL OFFICE MACHINES ENGINEERING
SCOTT FRIEDEL OFFICE MACHINES ENGINEERING
SIERRA CHEMICAL CO
SIERRA FOOTHILL LABORATORY
SIERRA NEVADA CONSTRUCTION
SIERRA SPRINGS
SIERRA SPRINGS
SIERRA SPRINGS
PUMPS
LABORATORY
ENGINEERING - REPL GEN, LPPS
PUMPS
DIAMOND VLY RNCH
CUSTOMER SERVICE
n
SHOP SUPPLIES
INCNTV & RCGNTN
INCNTV & RCGNTN
PUMP STATIONS
SNOSHU REPAIR
BIJOU ECP
CC FLTR PLANT
LIFE INS MGMT
LNG TRM DIS,MGMT
SMALL TOOLS
SMALL TOOLS
TRAVEL/MEETINGS
OFFICE SUPPLIES
OFFICE SUPPLIES
HYPOCHLORITE
MONITORING
REPL GEN LPPS
SUPPLIES
SUPPLIES
SUPPLIES
Ate/ Proj Code
1004 - 6071
Check Total:
Amami OWLS= Typg,
141.37
141.37 AP-00079949 MW
1021 - 6621 178.46
2021 - 6621 178.45
Check Total: 358.91 AP- 00079950 MW
2002 - 6051 750.00
Check Total: AP- 00079951 MW
1029 - 7075 - SNOBLO
1029 - 8287 - ECBUM
2029 - 7091 - DEMOFP
Check Total:
1000 - 2525
1000 -2531
1002 - 6073
2002 - 6073
1019-6200
1029 - 4820
2029 - 4820
2002 - 4755
1007-6110
Check Total:
750.00
221.35
221.34
4.53
44721 AP- 00079952 MW
1,023.70
2,538.96
3.582.66 AP- 00079953
16.17
16.16
Check Total: 32.33 AP- 00079954 MW
218.00
Check Total: 21z AP- 00079955 MW
18.75
18.75
Check Total: 37.50 AP- 00079956 MW
3,869.39
Check Total: 3.869:39 AP-00079957 MW
245.00
Check Total:
1029 - 8933 - RGLPPS
Check Total:
1002 - 6520
1028 - 6520
1038 - 6520
245.00
8,089.10
8.089.1.0
24.62
24.62
12.88
AP-00079958 MW
AP- 00079959 MW
User: THERESA
Report: OH_PMT_CLAIMS_BK
Page: 6
Current Date: 07/28/2011
Current Thee: 10:12:34
Vendor Name
SIERRA SPRINGS
SIGNS OF TAHOE
SOUND STRATEGIES /OFC INC.
SOUND STRATEGIES /OFC INC.
SOUTHWEST GAS
SOUTHWEST GAS
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
,SUBSTITUTE PERSONNEL &
I SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
SUBSTITUTE PERSONNEL &
TAHOE BLUEPRINT
TAHOE BLUEPRINT
TAHOE BLUEPRINT
TAHOE MOUNTAIN NEWS
TAHOE MOUNTAIN NEWS
PAYMENT OF CLAIMS
Department / Proj Name
CUSTOMER SERVICE
ENGINEERING - ERB LINER REPL
DIO
DIO
GEN & ADMIN
GEN & ADMIN
UNDERGROUND REP
LABORATORY
ENGINEERING
INFORMATION SYS
UNDERGROUND REP
LABORATORY
ENGINEERING
ENGINEERING - WT METERING PRJ
ENGINEERING - IROQUOIS SUPPLY
ENGINEERING - GRIZZLY MT BSTR
ENGINEERING - IROQUOIS SUPPLY
INFORMATION SYS
CUSTOMER SERVICE
CUSTOMER SERVICE - WTR CONS PROG
ENGINEERING - SNOWSHOE DITCH R
ENGINEERING - CATH PROT -SWR
ENGINEERING - BIJOU MEADOWS ER
DIO - PR EXP- EXTERNAL
DIO - PR EXP- EXTERNAL
Description
SUPPLIES
REPLACE ERB LINE
CONTRACT SERVICE
CONTRACT SERVICE
NATURAL GAS
NATURAL GAS
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
CONTRACT SERVICE
WTR METERING/NEW
WTLN IROQ
GRIZ MTN BSTR
BSTR STN IROQ
CONTRACT SERVICE
CONTRACT SERVICE
WTR CONS EXPENSE
SNOSHU REPAIR
CATH PROT
BIJOU ECP
PUB RELATIONS
PUB RELATIONS
Acct# / Proj Code
2038 - 6520
Check Total:
1029 - 7581 - ERBLNR
Check Total:
1027 - 4405
2027 - 4405
Check Total:
1000 - 6350
2000 - 6350
Check Total:
1001 - 4405
1007 - 4405
1029 - 4405
1037 - 4405
2001 - 4405
2007 - 4405
2029 - 4405
2029 - 7078 - METERS
2029 - 8166 - IQWTRL
2029 - 8176 - GRIZBS
2029 - 8967 - IQWTRL
2037 - 4405
2038 - 4405
2038 - 6660 - WCPROG
Check Total:
1029 - 7075 - SNOBLO
1029 - 8133 - CATSWR
1029 - 8287 - ECBIJM
Check Total:
1027 - 6620 - PREEXT
2027 - 6620 - PREEXT
Check Total:
Amount Check Num ZyPQ
12.69
74.61 AP- 00079960 MW
100.00
100.00
49.00
49.00
98.00
22.00
33.00
55.OD
2,193.60
288.52
274.41
417.28
3,057.34
477.36
243.92
30.49
91.47
335.38
91.47
417.28
1,027.60
1,067.60
9.993.72
19.40
1,697.28
49.39
1.738.07 AP- 00079965 MW
AP-00079961 MW
AP-00079962 MW
AP- 00079963 MW
AP- 00079964 MW
262.50
262.50
525110 AP -00079966 MW
User: THERESA
Report: OH PMT_CLAIMS_BK
Page: 7
Current Date:
Current Time:
07/28/2011
10:12:34
TAHOE PRINTING
TAHOE PRINTING
TECHNICON ENGINEERING SERVICES
TECHNICON ENGINEERING SERVICES
THOMAS HAEN CO INC
THOMAS HAEN CO INC
THOMAS HAEN CO INC
THOMAS HAEN CO INC
THOMAS HAEN CO INC
THOMAS HAEN CO INC
UNDERGROUND SERVICE ALERT
UNDERGROUND SERVICE ALERT
m
i USA BLUE BOOK
WATER ENVIRONMENT FEDERATION
WATER ENVIRONMENT FEDERATION
WEDCO INC
WEDCO INC
WEDCO INC
WESTERN ENVIRONMENTAL
PAYMENT OF CLAIMS
Department / Proj Name
LABORATORY
LABORATORY
GEN & ADMIN - DVR MONIT WELLS
ENGINEERING - DVR MONIT WELLS
GEN & ADMIN - DEMO FP,COLD CRK
GEN & ADMIN - DEMO RALPH TANK
GEN & ADMIN - GRIZZLY MT BSTR
ENGINEERING - DEMO RALPH TANK
ENGINEERING - DEMO FP,COLD CRK
ENGINEERING - GRIZZLY MT BSTR
CUSTOMER SERVICE
CUSTOMER SERVICE
HEAVY MAINT
ADMINISTRATION
ADMINISTRATION
ELECTRICAL SHOP
ELECTRICAL SHOP
ELECTRICAL SHOP
LABORATORY
Dana Iplism
OFFICE SUPPLIES
OFFICE SUPPLIES
CONST RETAINAGE
MON WLS DVR/ALPC
CONST RETAINAGE
CONST RETAINAGE
CONST RETAINAGE
RALPH TANK
CC FLTR PLANT
GRIZ MTN BSTR
DUES/MEMB/CERT
DUES/MEMB/CERT
GROUNDS & MNTC
DUES/MEMB/CERT
DUES/MEMB/CERT
PUMP STATIONS
WELLS
SHOP SUPPLIES
MONITORING
Ago* / Proj Code
1007 - 4820
2007 - 4820
Check Total:
1000 - 2605 - ALPMWS
1029 - 8136 - ALPMWS
Check Total:
2000 - 2605 - DEMOFP
2000 - 2605 - DEMORT
2000 - 2605 - GRIZBS
2029 - 7090 - DEMORT
2029 - 7091 - DEMOFP
2029 - 8176 - GRIZBS
Check Total:
1038 - 6250
2038 - 6250
1004 - 6042
1021 - 6250
2021 - 6250
1003 - 6051
2003 - 6050
2003 - 6071
1007 -6110
Amount Check Nt1tn Um
63.76
63.76
12742 AP- 00079967 MW
- 2,110.45
21,104.50
18.994.05 AP- 00079968 MW
- 1,371.00
- 332.00
- 9,354.69
3,320.00
13,710.00
93,547.30
99.519.81 AP- 00079969 MW
250.00
250.00
Check Total: 500.00 AP- 00079970 MW
Check Total:
Check Total:
Check Total:
189.42
189.42 AP- 00079971 MW
110.00
110.00
220.00 AP- 00079972 MW
24.38
182.72
123.35
330.45 AP- 00079973 MW
240.00
Check Total: 240.00 AP- 00079974 MW
Grand Total: 1,402,272.80
User: THERESA
Report: OH_PMT_CLAIMS BK
Page: 8
Current Date: 07/28/2011
Current Time: 10:12:34
Vendor
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
WESTERN NEVADA SUPPLY
Payment of Claims American Express EFT
GEN & ADMIN - SADDLES INV
GEN & ADMIN - REPAIR CLMP INV
UNDERGROUND REP - METERS,GLDN BEAR
HEAVY MAINTENANC - BUILDINGS
HEAVY MAINTENANC - BUILDINGS
UNDERGROUND REP - METERS,GLDN BEAR
UNDERGROUND REP - PIPE/CVRS/MHLS
HEAVY MAINTENANC - BUILDINGS
PUMPS - PUMP STATIONS
HEAVY MAINT - GROUNDS & MNTC
UNDERGROUND REP - SMALL TOOLS
OH_PAY_CLAIMS_AE - OH Payment of Claims AmerEx <1.00>
THERESA - Theresa Sherman
Acct#/Proj Code Amalint
2000 - 0407 Inv#: . 14977771 4,143.19
2000 - 0406 Inv#: 14977771- 1,857.21
2001- 7093 - GOLDEN Inv#: 34973215 267.71
2004 - 6041 Inv#: 34978734 83.96
2004 - 6041 Inv#: 34979095 240.72
2001 - 7093 - GOLDEN Inv#: 34979929 997.01
2001 - 6052 Inv#: 34983720 288.77
2004 - 6041 Inv#: 34985540 463.76
2002 - 6051 Inv#: 34990519 430.35
1004 - 6042 Inv#: 34990869 364.45
2001 - 6073 Inv#: 34992050 100.80
Report Total:
9,237.93
07/28/2011
10:28:31
South Tahoe
Public Utility District
General Manager
Mehanl Ft Solboig
Gfroctors
.ChtisCehdu
James R. Jones
Mary Lou Mosbadwr
Dale Rise
Eric Schafer
1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401
Phone 530 544- 6474 • Fax 530 541 -0614 • www.stpud.Lls
BOARD AGENDA ITEM 13a
TO: Board of Directors
FROM: Richard So!brig, General Manager
MEETING DATE: August 4, 2011
ITEM - PROJECT NAME: Conference with Legal Counsel - Existing Litigation
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government code,
Closed Session may be held for conference with legal counsel regarding existing
litigation: False Claims Act Case: United States, the States of California, Delaware,
Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and
Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics
Corporation, U.S.A., Civil Action No. ED CV06-0055 -GW, United States District Court for
the Central District of California.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES
CHIEF FINANCIAL OFFICER: YES
CATEGORY: Water
General Manager
Richatti FL Solbrig
South Proctors
James R Jones
Public Utility District Mary Lou Moebsclsor
Digo 1458
Eric Schafer
1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401
Phone 530 544-6474. Fax 530 541 -0614 • www.stpud.us
BOARD AGENDA ITEM 13b
TO: Board of Directors
FROM: Richard Solbrig, General. Manager
MEETING DATE: August 4, 2011
ITEM - PROJECT NAME: Conference with Legal Counsel - Existing Litigation
REQUESTED BOARD ACTION: Direct Staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session
may be held for conference with legal counsel regarding existing litigation: Los Angeles County
Superior Court, Case No. BC459943, State of Nevada, et al. v. J -M Manufacturing, et al.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT REMAINING:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION:
GENERAL MANAGER: YES : ; NO
CHIEF FINANCIAL OFFICER: YES NO
-87-
CATEGORY: