Loading...
AP 12-15-11SOUTH TAHOE PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING AGENDA Thursday, December 15, 2011 2:00 P.M. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Richard Solbn • , General Mana • er Chris Cefalu, Director BOARD MEMBERS Paul Sciuto, Assistant General Mana • er Eric W. Schafer, Director James R. Jones, Director Randy Vogelkesanq, Director Kelly Sheehan, Director 1. CALL TO ORDER REGULAR MEETING - PLEDGE OF ALLEGIANCE 2. ADMINSTER OATHS OF OFFICE Director Randy Vogelgesang, Seat 3 Director Kelly Sheehan, Seat 4 3. COMMENTS FROM THE AUDIENCE (This is an opportunity for members of the public to address the Board on any short non - agenda items that are within the subject matter jurisdiction of the District. No action can be taken on matters not listed on the agenda. Each member of the public who wishes to comment shall be allotted five minutes, and no more than three individuals shall address the same subject. Time permitting, at the discretion of the Board President, time allotted may be increased or decreased depending on the number of speakers and available time.) 4. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION a. Election of Board Officers Pg. 35 (Kathy Sharp b. Election of Board Officers Pg. 37 (Kathy Sharp) c. Health Insurance Plan Renewal Pg. 39 (Nancy Hussmann) Elect a Board President for 2012 Calendar Year Elect a Board Vice President for 2012 Calendar Year (1) Authorize Renewing Stop Loss Coverage with QBE with an $85,000 Specific Deductible; (2) Approve Funding Level at $1,975 per Employee Per Month; and (3) Establish COBRA Rates at Single Dental $70, Family Dental $200; Single Medical $900 and Family Medical $2,200 REGULAR BOARD MEETING AGENDA - DECEMBER 15, 2011 PAGE - 2 d. California Association of Sanitation Agencies Pg. 41 (CASA) (Dennis Cocking) (1) Make a Determination Whether the District Should Remain a Member of CASA; and (2) If the District Remains a Member, Authorize Payment Of 2012 Dues in the Amount $15,000 e. Payment of Claims Approve Payment in the Amount of Pg. 45 $908,102.72 5. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR 6. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered separately upon request. Comments and questions from members of the public, staff or Board can be taken when the comment does not necessitate separate action.) 7. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION / ACTION 8. PRESENTATION a. Report on the 2011 Fiscal Year Financial Statement Audit (Larry Mace, Partner, Grant Thornton) 9. BOARD MEMBER STANDING COMMITTEE REPORTS (Discussions may take place; however, no action will be taken) a. Water & Wastewater Operations Committee Meeting of 12/12/11 (Jones / Rise) b. Finance Committee Meeting of 12/13/11 (Schafer / Cefalu) 10. BOARD MEMBER AD HOC COMMITTEE REPORTS (Discussions may take place; however, no action will be taken) a. CIP (Capital Improvement Program) Ad Hoc Committee Meeting of 12/12/11 (Schafer /Jones) 11. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken.) 12. EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVES REPORT 13. GENERAL MANAGER REPORT(S) (Discussions may take place; however, no action will be taken.) 14. STAFF / ATTORNEY REPORT(S) (Discussions may take place; however, no action will be taken.) a. Update on Small Claims Court Case from Pasquale Ardolino (Gary Kvistad) 15. NOTICE OF PAST AND FUTURE MEETINGS / EVENTS Past Meetings / Events 12/07/11 - ECC (Employee Communications Committee) Meeting 12/12/11 - CIP (Capital Improvement Program) Ad Hoc Committee Meeting 12/12/11 - Water and Wastewater Operations Committee Meeting 12/13/11 - Finance Committee Meeting 12/15/11 - Board Budget Workshop Future Meetings / Events 12/23/11 & 12/26/11 - District Office Closed {Christmas Holiday) 01/03/11 - 3:30 p.m. - Water and Wastewater Operations Committee Meeting at District 01/05/11 - 2:00 p.m. - STPUD Regular Board Meeting at District REGULAR BOARD MEETING AGENDA - DECEMBER 15, 2011 PAGE - 3 16. CLOSED SESSION (The Board will adjourn to Closed Session to discuss items identified below. Closed Session is not open to the public; however, an opportunity will be provided at this time if members of the public would like to comment on any item listed. Three minute limit.) a. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Counsel Pg. 59 Existing Litigation re: False Claims Act Case: United States, the States of California, Delaware, Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06- 0055 -GW, United States District Court for the Central District of California b. Pursuant to Government Code Section 54956.9(a) /Conference with Legal Pg. 61 Counsel - Existing Litigation re: Los Angeles County Superior Court Case No. BC459943, State of Nevada, et al. v. J -M Manufacturing, et al. 17. ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION 18. ADJOURNMENT (To the next regular meeting, January 5, 2012, at 2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete agenda packet, including all backup information is available for review at the meeting and at the District office during the hours of 8:00 a.m. - 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after minutes of the meeting have been approved. Items on this agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear on the agenda. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified, but may occur slightly later than the specified time. Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the some time the agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Please provide the Clerk of the Board with a copy of all written material presented at the meeting. Comments on items not on the agenda can be heard during "Comments from the Audience;" however, action cannot be taken on items not on the agenda. *Backup materials relating to an open session item on this agenda, which are not included with the Board packet, will be made available for public inspection at the same time they are distributed or made available to the Board, and can be viewed at the District office, at the Board meeting, and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings. If particular accommodations are needed, please contact the Clerk of the Board at (530) 544 -6474, extension 6203. All inquiries must be made at least 48 hours in advance of the meeting. ITEMS CONSENT CALENDAR DECEMBER 15, 2011 REQUESTED ACTION a. Pg. 1 TRPA (Tahoe Regional Planning Agency) Mitigation Payment (Debbie Henderson) b. Temporary Collection Help for Customer Service Pg. 3 (Tim Bledsoe) C. Pg. 7 ERB (Emergency Retention Basin) Replacement Project (Julie Ryan) d. Headworks Replacement Phase 2 Project Pg. 11 (Julie Ryan) e. Diesel Particulate Filters (DPF) Pg. 15 (Randy Curtis) f. Pg.21 Trailer Mounted Air Compressor - Underground Repair Water (Randy Curtis) g. Snowshoe / Millich Slope and Bijou Sewer Pg. 23 Relocates (Pete Lavallee) h. 2011 Grizzly Mountain Booster Station Pg. 27 (John Thiel) Authorize Payment to TRPA for 5% Mitigation Fee on New Sewer Connections (Report to be provided Prior to an at the Board Meeting) Approve an Increase to the Con- tract with Blue Ribbon Personnel Services for the Collections Position, in the Estimated Amount of $4,400 Approve Change Order No. 2 to KG Walters Construction Company, Inc., in the Amount of $26,982.08 Approve Change Order No. 2 to GSE Construction Company, Inc., in the Amount of $14,557.44 (1) Find that Cleaire Diesel Particulate Filter Systems is the only Known Unit Installed on District Vehicles to Provide Compliance with Air Board Regulations; (2) Find that lronman Co. is the Recommended Supplier and Installer; (3) Waive Bidding Procedures, as Outlined in the District's Purchasing Policy, for Sole Brand /Sole Source Supplier; and (4) Authorize Purchases of DPF Units Not to Exceed $75,000 Authorize Staff to Advertise for Bids Approve Change Order No. 6 for White Rock Construction, Inc., in the Credit Amount of <$11,705.88> Approve Change Order No. 4 to Thomas Haen Co. Inc., in the Amount of $28,489 CONSENT CALENDAR - DECEMBER 15, 2011 PAGE - 2 i. Regular Board Meeting Minutes: Pg.31 November 3, 2011 (Kathy Sharp) 1• Pg.33 Regular Board Meeting Minutes: November 17, 2011 (Kathy Sharp) Approve Minutes (To be provided prior to, and at the Board meeting) Approve Minutes (To be provided prior to, and at the Board meeting) South Tahoe Public Utility District • 1274 Meadow Crest Drive • South Lake Tahoe, CA 96150 Phone 530.544.6474 • Facsimile 530.541.0614 • www.stpud.us South Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpuci.us BOARD AGENDA ITEM 6a TO: Board of Directors FROM: Debbie Henderson, Accounting Manager MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: TRPA (Tahoe Regional Planning Agency) Mitigation Payment REQUESTED BOARD ACTION: Authorize Payment to TRPA for 5% mitigation fee on new sewer connections DISCUSSION: Per the 1995 signed MOU between TRPA and numerous agencies, "including South Tahoe Public Utility District, section D ii requires the District to pay 5% of all new connection fees on or before December 31, of the year in which the connections have been made. SCHEDULE: Annual COSTS: ACCOUNT NO: 1000 -6634 BUDGETED AMOUNT REMAINING: $18,056 ATTACHMENTS: TRPA Mitigation Report December 2010 - November 2011 to be provided prior to; and at the iSoor l meeting. CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES "4 : NO CHIEF FINANCIAL OFFICER: YES NO CATEGORY: Sewer (pc, \a-lS —tk rant, TRPA Mitigation Report: Dec. 2010 - Nov. 2011 December -10 January-11 February-11 March -11 April -11 May -11 June -11 July -11 August -11 September -11 October -11 November -11 •0 0 1 0 1 4 4 2 1 2 3 0 0.00 0.00 14,790.00 0.00 12,750.00 84,975.00 79,730.00 29,580.00 19,720.00 39,440.00 54,230.00 0.00 0.00 0.00 739.50 0.00 637.50 4,248.75 3,986.50 1,479.00 986.00 1,972.00 2,711.50 0.00 South Tahoe Public Utility District General Manager Richard H. 5olbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www,stpucLus BOARD AGENDA ITEM 6b TO: Board of Directors FROM: Tim Bledsoe, Manager Customer Service MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: Temporary Collections Help for Customer Service REQUESTED BOARD ACTION: Approve an increase to the contract with Blue Ribbon Personnel Services for the collections position, in the estimated amount of $4,400. DISCUSSION: For fiscal year 2011 -2012, the Board approved Agenda Item 4g on July 7, 2011, with Blue Ribbon Personnel Services for $18,000. Staff is requesting authorization to continue one collections position (Julie Voltl) for an additional 192 hours, not to exceed a total of 999 hours for this fiscal year. Staff would like to have Ms. Voltl continue to work for the Customer Service Department, pursuing residential and commercial delinquent accounts. Staff is recommending that Ms. Volt! continue her work on delinquent accounts for the following reasons: (1) She started on August 19, 2011, with 2,300 commercial and residential delinquent accounts and has worked approximately 700 accounts; and (2) She has collected over $362,000 during her 15 weeks of employment. SCHEDULE: Upon Board approval of contract COSTS: $4,400 (estimated) ACCOUNT NO: 1038/2038 -4405 BUDGETED AMOUNT REMAINING: $1,650 ATTACHMENTS: Agenda Item 4g dated July 7, 2011 CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer & Water GENERAL MANAGER: YES 4141 NO CHIEF FINANCIAL OFFICER: YES -3- NO South Tahoe Public Utility District General Manager Riehar4J H. So'brig .ac .James R.Jones Matt Lou Moebad+er Dyile Rise Eric Sahafia. 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.us BOARD AGENDA ITEM 4g TO: Board of Directors FROM: Paul Hughes, Chief Financial Officer Tim Bledsoe, Manager of Customer Service MEETING DATE: July 7, 2011 ITEM - PROJECT NAME: Temporary Collections Help for Customer Service REQUESTED BOARD ACTION: Approve contract with Substitute Personnel or Blue Ribbon for one temporary employee, in the estimated amount of $18,000. DISCUSSION: Each year the District submits a list of delinquent accounts to the El Dorado County Assessor for inclusion in their property tax roles. The District receives payment of the delinquent balances as the account holder pays their property tax bills, generally in the following year, but quite often can take several years before payment is received. Currently, the District is still owed $194,000, or 35% of the total value of delinquent accounts turned over last year, and $117,000 from the previous year's submissions. This delay in collection has a direct impact on the District's cash flow. Although the District has been reducing its operating budget, it is more important than ever for the District to receive timely payment for services provided so rate increases can be kept at a minimum while other revenue sources remain flat or continue to decline. This year, District staff intends to submit a much shorter list of accounts to the Assessor and actively pursue collection of commercial and residential delinquencies through the methods as described in the Administrative Code. Normal day -to -day activities, including continuous customer contact related to meters , makes it very difficult for the customer service representatives to dedicate the time needed to pursue delinquent accounts. Staff is recommending utilizing a temporary employee from July through November to work exclusively on delinquent commercial and residential accounts allowing the District to collect revenues due for services provided. Hughes and Bledsoe July 7, 2011 Page 2 SCHEDULE: Hire upon Board approval of contract COSTS: $18,000 (estimated) ACCOUNT NO: 1038/2038 -4405 BUDGETED AMOUNT REMAINING: $10,000; $45,000 ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES Rid A p NO CHIEF FINANCIAL OFFICER: YES AYD NO -6- CATEGORY: Sewer & Water South Tahoe Public Utility District General Manager Richard li. 5olbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541-0614• www.etpud.us BOARD AGENDA ITEM 6c TO: Board of Directors FROM: Julie Ryan, Senior Engineer MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: ERB (Emergency Retention Basin) Replacement Project REQUESTED BOARD ACTION: Approve Change Order No. 2 to KG Walters Construction Company, Inc., in the amount $26,982.08. DISCUSSION: Change Order No. 2 addresses seven work items that were beyond the original Contract Amount. 1. The TRPA permit for the ERB Replacement Project was finalized after the bid opening. To comply with that permit, several erosion control features are required that were not included in the contract. KG Walters installed these features on a time and materials basis for an additional cost to the District in the amount $13,652.47. 2. During a project site visit, the Department of Safety of Dams (DSOD) required that the District install a 2" air vent upstream of each of the two inlet /outlet valves on the west side of the ERB. On the South pond, this vent replaced an existing vent. On the North pond the vent is a new feature. KG Walters performed the additional work on a time and materials basis for an additional cost to the District in the amount $2,736.23. 3. During preparation of the subgrade prior to installing the liner system, KG Walters encountered soft and yielding soils in localized areas. At the recommendation of the design engineer, these soils were over - excavated and replaced with stable subgrade materials. KG Walters performed this additional work on a time and materials basis for an additional cost to the District in the amount $3,423.66. 4. During submittal review, the District requested modifications to the hand pumps for two valve actuators. These modifications resulted in an additional cost of $1,573.29 from the supplier. 5. During construction of North and South Pond Inlet /Outlet structures, the DSOD recommended that the District add a second mat of rebar to the concrete slab. Staff also requested that the contractor install a bumper to deflect inflow at the North inlet to protect the edge of liner. The additional cost to fabricate and install these modifications is $1,861.21. 6. One of the contractor's tasks on this project was to abandon all but two of the -7- Julie Ryan December 15, 2011 Page 2 existing wash -down hydrants. Following the completion of this work, the District required that the line be pressure- tested to confirm the integrity of the abandonments. During the pressure test, the hydrant line ruptured at the location of a pre - existing pipe repair. KG Walters fixed the rupture on a time and materials basis for an additional cost to the District in the amount $698.96. 7. During construction, KG Walters encountered unknown underground facilities that required demolition and disposal. KG Walters performed this additional work on a time and materials basis for an additional cost to the District in the amount $3,036.26. Staff recommends that the Board approve Change Order #2 to the District's contract with KG Walters in the amount $26,982.08. With $18,591.50 in Change Orders approved previously, this Change Order #2 brings the contract total to $1,095,173.58. The Engineer's Estimate for construction was $1,149,915.00. SCHEDULE: As soon as possible COSTS: $26,982.08 ACCOUNT NO: 1029 -7581 BUDGETED AMOUNT REMAINING: $738,803 ATTACHMENTS: Change Order No. 2 CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO -8- CATEGORY: Sewer CHANGE ORDER NUMBER 2 Project ERB Replacement Proiect Contractor KG Walters Construction Company. Inc. Date: December 15, 2011 PO # P24125 The Contract Shall Be Changed As Follows: A. Amend Bid Item 11 including all labor, equipment, materials and subcontractor costs necessary to install erosion control features at the site entrance. This item addresses in full the work authorized in Design Construction Memorandum #3, dated July 18, 2011, for a total additional cost to the District in the amount $13,652.47, as detailed in KG Walter's PCO #102 (attached). TOTAL FOR ITEM A IS $13,652.47 TOTAL FOR CHANGE ORDER NUMBER 2 IS A +B +C +D +E +F +G= $26,982.08 Original Contract Previous Change Order Current Contract THIS CHANGE ORDER New Contract Total $1,049,600.00 $18,591.50 $1,068,191.50 $26,982.08 $1,095,173.58 106 Calendar Days 106 Calendar Days 0 Calendar Days 106 Calendar Days Contractor agrees to make the herein - described changes in accordance with the terms hereof. The change in contract price and/or contract time noted is full settlement for costs incurred because of the change(s) described, unless specifically noted in individual description(s). Authorized By STPUD Board President Accepted By Contractor Reviewed By -9- Date: Date: Date: 1 B. Amend Bid Items 5 and 6, including all labor, equipment, materials and subcontractor costs necessary to install a 2" air vent at each of the North and South Pond Inlet/Outlet Structures. This item addresses in full the work authorized in Design Construction Memorandum #4, dated July 18, 2011, for a total additional cost to the District in the amount $2,736.23, as detailed in KG Walter's PCO #103 (attached). The cost shall be charged as follows: $1,280.56 to Bid Item 5 and $1,455.67 to Bid Item 6. TOTAL FOR ITEM B IS $2,736.23 C. Amend Bid Item 7b to include all labor, equipment, materials and subcontractor costs necessary to remove and replace unsuitable subgrade materials including import (if needed), backfill, compaction and fine grading. This item addresses in full the work authorized in Design Construction Memorandum #8, dated November 4, 2011, for a total additional cost to the District in the amount $3,423.66, as detailed in KG Walter's PCO #107 (attached). TOTAL FOR ITEM C IS $3,423.66 D. Amend Bid Items 5 and 6, including all labor, equipment, materials and subcontractor costs necessary to modify the hand actuators for the knife gate valves at the North and South ponds. This item addresses in full the work authorized in the District's Official response to Submittal 18, dated July 18, 2011, for a total additional cost to the District in the amount $1,573.29, as detailed in KG Walter's PCO (attached). The cost shall be charged as follows: $786.65 to Bid Item 5 and $786.64 to Bid Item 6. TOTAL FOR ITEM D IS $1,573.29 E. Amend Bid Items 5 and 6, including all labor, equipment, materials and subcontractor costs necessary to install a second mat of reinforcing bar in the concrete slab at each of the North and South Pond Inlet/Outlet Structures. This item addresses in full the work authorized in Design Construction Memorandum #9, dated November 4, 2011, for a total additional cost to the District in the amount $1,861.21, as detailed in KG Walter's PCO #106 (attached). The cost shall be charged as follows: $1,219.13 to Bid Item 5 and $642.08 to Bid Item 6. TOTAL FOR ITEM E IS $1,861.21 F. Amend Bid Item 3 including all labor, equipment, materials and subcontractor costs necessary to repair a rupture on the existing wash -down hydrant recycled water main. This item addresses in full the work authorized in Design Construction Memorandum #10, dated November 4, 2011, for a total additional cost to the District in the amount $698.96, as detailed in KG Walter's PCO #108 (attached). TOTAL FOR ITEM F IS $698.96 G. Amend Bid Item 3, including all labor, equipment, materials and subcontractor costs necessary to demolish and dispose of unidentified underground facilities. This item addresses in full the work authorized in Design Construction Memorandum #11, dated November 4, 2011, for a total additional cost to the District in the amount $3,036.26, as detailed in KG Walter's PCO #109 (attached). TOTAL FOR ITEM G IS 3,036.26 TOTAL FOR CHANGE ORDER NUMBER 2 IS A +B +C +D +E +F +G= $26,982.08 -10- 2 South Tahoe Pubic Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.u9 BOARD AGENDA ITEM 6d TO: Board of Directors FROM: Julie Ryan, Senior Engineer MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: Headworks Replacement Phase 2 Project REQUESTED BOARD ACTION: Approve Change Order No. 2 to GSE Construction Company, Inc., in the amount $14,557.44. DISCUSSION: Change Order No. 2 addresses 6 work items that are beyond the scope of the contract, 1 credit for work not completed, and 1 cost recovery for District effort on project - related work. 1) Because of relatively high precipitation over the winter season, the Wastewater Treatment Plant experienced high groundwater conditions. During excavation of the Site Waste Pump Station in August 2011, GSE encountered saturated soil conditions, which would keep them from meeting compaction requirements for subgrade soils without a stabilization mat. Staff requested that GSE install a stabilization mat at this location, with a total area of 150 sf. At the bid unit rate of $5.00 per square foot, the total cost to the District for installing the stabilization mat is $750.00. �. 2) During the procurement phase for underground pipe and fittings, it was brought to staff's attention that the specification for plug valves on the influent force mains did not require them to have a rectangular port. GSE had bid and submitted on a round port valve. A rectangular port is recommended for high solids applications, like the force mains, but for a large diameter application is more expensive than a round port. The District directed GSE to install rectangular port valves on the force mains. GSE will provide rectangular port at ALL locations on the project, but only the valves on the five force mains incur additional cost. The additional cost to the District to install rectangular port plugs valves instead of round port plug valves is $7,923.19. 3) During the procurement phase for lighting, it was brought to staff's attention that basic toggle switches had been specified for lighting in the Headworks Building. To conserve energy and to remain consistent with the conversion at the Plant, staff directed GSE to submit on a motion detection switch for installation at non- explosive locations of the Headworks facility. The additional cost to the District for these switches is $661.38. -11- Julie Ryan December 15, 2011 Page 2 4) During layout and excavation of the Backwash Tank, it was discovered that several existing underground utilities encroached on the limits of disturbance, and would have to either be relocated or protected in place in order for the tank to be built as designed. Instead, staff directed GSE to shift the footprint of the tank, which served to avoid these utilities but encroached upon an adjacent propane tank. To protect the tank during excavation, staff directed GSE to design, install, and then remove a temporary shoring system around the tank. The additional lump sum cost to the District for this shoring system is $17,369.00. 5) During submittal review it was brought to staff's attention that the height of the Backwash Tank could be effectively reduced by 2 feet without losing capacity. Staff directed GSE to reduce the height of the tank, which has resulted in a savings to the District in the amount <$1,150.00 >. 6) During construction of the Headworks Building, staff discovered that waterstop at a floor sump on the main level had been installed incorrectly, even though it was installed per the contract drawings. Staff provided a modified detail, and the waterstop was re- installed. The effort to install the waterstop a second time was accounted for on a time - and - materials basis for an additional cost of $1,677.00. 7) During construction it was brought to staff's attention that the contract drawings did not include reinforcing bar for the floor slab of the Hazardous Materials closet. As such, GSE did not include bar for this element in its bid. The bar was added on a lump sum basis for a total cost to the District of $1,610.00. 8) On September 15, 2011, during exploration and excavation for the Influent Force Mains, GSE Construction struck and ruptured the Upper Truckee Force Main, which was in service at the time. The District and GSE put forth a coordinated response to this emergency. District staff kept track of time, materials and equipment furnished to GSE in support of the emergency response. In return, GSE is crediting <$14,283.13> to the District as compensation for these resources. Staff recommends that the Board approve Change Order No. 2 to the District's contract with GSE in the amount $14,557.44. With $19,930.00 in Change Orders approved previously, this Change Order No. 2 brings the contract total to $8,055,347.43. The Engineer's Estimate for construction was $9,198,605.00. SCHEDULE: As soon as possible COSTS: $14,557.44 ACCOUNT NO: 1029 - 8033 /HDWORK BUDGETED AMOUNT REMAINING: $1,374,010 ATTACHMENTS: Change Order No. 2 CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES 1iIC.tI NO CHIEF FINANCIAL OFFICER: YES P1 ► NO -12- CATEGORY: Sewer CHANGE ORDER NUMBER 02 Project: HEADWORKS REPLACEMENT PHASE II PROJECT Contractor: GSE Construction Company, Inc. Date: 12.15.2011 PO #: P23714 The Contract Shall Be Changed As Follows: A) Amend Additive Bid Item A, . including all labor, equipment, materials and subcontractor costs necessary to install a stabilization mat under the Site Waste Pump Station at the Wastewater Treatment Plant at the rate $5.00 per square foot. This item addresses in full the work authorized in Design Construction Memorandum #23 (dated August 24, 2011). The total installed area is 150 square feet, for a total added cost of $750.00. TOTAL FOR ITEM A IS $750.00 TOTAL FOR CHANGE ORDER NO. 2 ISA +B +C +D +E +F +G +H= $14,557.44 Original Contract Previous Change Order Current Contract THIS CHANGE ORDER New Contract Total $8,020,860.29 $19,930.00 $8,040,790.29 $14,557.44 $8,055,347.73 622 Calendar Days 622 Calendar Days 622 Calendar Days Contractor agrees to make the herein - described changes in accordance with the terms hereof. The change in contract price and/or contract time noted is full settlement for costs incurred because of the change(s) described, unless specifically noted in individual description(s). Date: Authorized By STPUD Board President Date: Accepted By Contractor Date: Reviewed By B) Amend Additive Bid Item 20, including all labor, equipment, materials and subcontractor costs necessary to install rectangular port plug valves at all locations on the project, instead of the round port plug valves that were bid. This item addresses in full the work authorized in Design Construction Memorandum #8 (dated June 17, 2011), for an total incremental cost of $7,923.19, as detailed in Contract Change Request #3 and GSE's PC0005 (attached). TOTAL FOR ITEM B IS $7,923.19 C) Amend Additive Bid Item 17, including all labor, equipment, materials and subcontractor costs necessary to install a motion detector switches instead of toggle switches at specified locations of the Headworks facility. This item addresses in full the additional work requested in the Official response to Submittal 29.0 (dated April 28, 2011) for a total incremental cost of $661.38, as detailed in Contract Change Request #4 and GSE's PC0006 (attached). TOTAL FOR ITEM C IS $661.38 D) Amend Additive Bid Item 4, including all labor, equipment, materials and subcontractor costs necessary to install temporary shoring at the Backwash Tank to protect the adjacent existing propane tank during excavation. This item addresses in full the additional work to install shoring, as requested in the Official response to RFI #20 (dated May 25, 2011) for an additional cost of $17,369.00, as detailed in Contract Change Request #6.1 and GSE's PC0008 (attached). TOTAL FOR ITEM D IS $17,369.00 E) Amend Additive Bid Item 14, providing a credit to the District for all labor, equipment, materials and subcontractor costs for reducing the height of the Backwash Tank by 2 ft. This item addresses in full the additional work requested in the Official response to RFI 17 (dated April 28, 2011) for a credit to the District in the amount $1,150.00, as detailed in Contract Change Request #2.1 and GSE's PC0009 (attached). TOTAL FOR ITEM E IS 41,150.00> F) Amend Additive Bid Item 10, including all labor, equipment, materials and subcontractor costs necessary to reinstall water stop at the Headworks main level sump. This item addresses in full the additional work requested in Design Construction Memorandum #12 (dated July 5, 2011) for a total cost of $1,677.00, as detailed in Contract Change Request #8 and GSE's PCO015 (attached). TOTAL FOR ITEM F IS $1,677.00 G) Amend Additive Bid Item 10, including all labor, equipment, materials and subcontractor costs necessary to install reinforcing bar in the floor slab of the Hazardous Materials Storage Closet. This item addresses in full the additional work requested in Design Construction Memorandum #13 (dated July 6, 2011) for a total cost of $1,610.00, as detailed in Contract Change Request #10 and GSE's PC0006 (attached). TOTAL FOR ITEM G IS $1,610.00 H) Amend Additive Bid Item 20, providing a credit to the District for all labor, equipment, and materials furnished by the District in response to GSE's rupture of the Upper Truckee Force Main on September 15, 2011. This item addresses in full the work provided by the District as referenced in Design Construction Memoranda 32 and 32.1 (dated September 16 and October 31, 2011, respectively). The total credit to the District is $14,283.13, as detailed in Contract Change Request #17 (attached). TOTAL FOR ITEM H IS <$14,283.13> -14- TOTALFORCHANGEORDERNO.2 ISA +B +C +D +E +F +G +H= $14,557.44 South Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drivle • South Lake Tahoe • CA 96150 -7401 Phone 530 544-6474 • Fax 530 541 -0614 • www.stpud.us BOARD AGENDA ITEM 6e TO: Board of Directors FROM: Randy Curtis, Manager of Field Operations MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: Diesel Particulate .Filters (DPF) REQUESTED BOARD ACTION: (1) Find that Cleaire Diesel Particulate Filter Systems is the only known unit installed on District vehicles to provide compliance with Air Board regulations; (2) Find that Ironman Co. is the recommended supplier and installer; (3) Waive bidding procedures, as outlined in the District's purchasing policy, for sole brand /sole source supplier; and (4) Authorize purchases of DPF units not to exceed $75,000. DISCUSSION: Diesel Particulate Filters (DPF) units are a mandate from the California Air Resources Control Board to reduce emissions from on road diesel trucks. The District currently has 4 -5 trucks that could be out of compliance. The District went to bid in August of 2009 for the purchase and installation of six DPF units. A -Z Emissions was the low bidder and Ironman was the second low bidder. Six units were installed with three failing within weeks. Replacements could not be provided by A -Z at bid cost. Vehicles were out of compliance at the end of 2010. Purchases will be made over the course of next 16 months. Using Cleaire Filters across the District's fleet simplifies maintenance, and saves on unit re- generation cost which must be done annually or sooner depending on unit back pressure. The District's Purchasing Agenda has reviewed this item. SCHEDULE: As soon as possible COSTS: $14,000- $15,000 each ACCOUNT NO: 1005 -7094; 1005 -7610; 1005 -7613; 1005 -7614 BUDGETED AMOUNT REMAINING: $60,000; $45,000 being transferred from Equipment Repair Capital Line Items ATTACHMENTS: Sole Brand /Source Justification Approval Form CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES pi NO CHIEF FINANCIAL OFFICER: YES NO -15- CATEGORY: Sewer SOUTH TAHOE PUBLIC UTILITY DISTRICT Note: Please do not modify this original form which Is located In the public drive. Either print it out or copy the form to a personal work file to use. Answer questions and utilize as much space as required. Sole Brand/Source Sole Justification/Approval Form EXPLANATION: Complete this form when specifications limit bidding to one brand name (whether or not the item can be purchased from more than one source). 1. The District follows legal requirements to obtain competition whenever possible. Competitive purchases are easy to justify in regards to price and also encourage suppliers to remain competitive in price and service. At times however, it may be necessary or economically preferable to purchase products or services on a sole brand or sole source basis. Since sole brand/sole source purchasing is an exception to the normal procurement function, it must be objectively justified. Completion of this form should facilitate that process and provide a written record of the basis used in sole procurement decisions. 2. Criteria that may be considered in determining sole brand indudes. (but is not limited to): unique features availability size limitations service & support reliability operational familiarity repair ease part interchangeability programming ease 3. The purchase of products or services often requires research of the market and District needs regardless if the purchase will result in a competitive solicitation later. The research is an intemal process. Departments are requested to use discretion in their discussion with vendors so as not to compromise any competitive advantage the buyer may have, regardless of the acceptance or rejection of the sole brand/source justification. Staff is also asked to anticipate future needs and research products/services prior to any substantial investment to avoid being committed to certain products without recognizing and 'comparing all variables. Supplier Name: Ironman Street Address: 2535 Anselmo Drive CRY/ Statel4P: Corona Califomia 92879 Contact, Phone: (951) 735 -3710 General Description of Commodity or Service requested to be Purchased and its function: Provides Diesel Particulate Filters for diesel powered equipment to meet California and Eldorado County Air Board emission requirements. INSTRUCTIONS: Please initial all entries below that apply to the proposed purchase. Attach additional information or support documentation if needed. More than one entry will apply to all sole source justifications. SOLE BRAND JUSTIFICATION ITEM INITIALS JUSTIFICATION 1 A LlsK- • This is the only known product or service that will meet the minimum essential needs of this department or perform the necessary intended function. If this item is initialed, please explain below. Explan necessary): Ironman Board requirements. installation, Ironman vehicles What sourcing The District able to A-Z was These Ironman successful The District performance 09. List the A-Z Emissions This company Each unit removed, some Other Ironman. tion (include • company requirements. Previous which has provided for free. methods sites, has previously provide 3 non- responsive failures caused was the in the has installed results. other vendors Inc. installed was certified leaving as quickly as suppliers were the unique performance features of required functions and why they are has proven to supply Diesel Particulate Filters (DPF) that meets all State and County Air Their filters are guaranteed and warranted upon installation to perform to contracted units that had been installed have failed very early in use or instantly after resulted in the District being non - compliant to Air Board regulations. consultation, vehicle testing, and Air Board regulation assessment concerning District were utilized to find other sources - be specific (e.g. Internet search engines, other users, the competition): requested bids for these components. The low bidder (A Z Emissions) was only functioning units of the 6 they had bid. The other units resulted in removal for failure, and in providing units that could meet Air Board requirements. the District to be in violation for 2010 in three vehicles. second low bidder. Ironman is the distributor for Cleaire units which have proven Districts applications. two units from Ironman to meet regulations for 2011 with excellent installation and The costs for these two units were equal to or less expensive than the previous bids in that were researched. Detail why their product/service was rejected. three Donaldson Diesel Particulate Filters with an extemal regeneration system. to install on the vehicles that were specified. Each unit failed and had to be those vehicles out of compliance. The failure was exhaust plugging at very short intervals 30 minutes of run time. contacted and would have provided the Cleaire units at higher prices than quoted by 2 Product or service has been previously standardized (documentation attached). It is not due for review, and it is not interchangeable with a similar product/service from another manufacturer. Comments: 3 Staff wishes to add the product or service to the standardization list If this item is initialed, describe in detail below. Explanation: 4 — - - - - -- --- - - - - -- Purchase is to be made from the original manufacturer or provider. 5 Pur+chale must be made through the manufacturer - the manufacturer is the exclusive distributor. 6 Purchase must be made through the only area distributor of the product or only authorized service provider. 7 None of the above 6 items apply. A detailed justification for this sole source purchase is _ provided below: Detailed Justification: Ironman Inds_ Has worked with the District to evaluate what emission product would work on the vehide They came to the District and installed data loggers on three of our vehicles at no data and recommend the correct vehicle Diesel Particulate Filter installation. Other used the vehide and engine I.D. to make filter recommendations. that will be using them. charge to compile suppliers had only Describe what you have done to ensure that the product brand or service costs recommended are reasonable: We have used the bids received in our first attempt at compliance installations, and also have talked to other suppliers in the field. The window of opportunity for installers is very short. Most suppliers will not be in the business within a few years. All vehicles must now indude DPF systems from the factory, the Air board has given parameters in time limits for vehicle retirement, retrofit, and to new motor installations which will ultimately make DPF _ instailations a moot point within a few years. Most suppliersfnstallers who only provide DPF supplies and service will no longer exist. Detailed Justification: Ironman k ds. Has worked with the District to evaluate what emission product would work on the vehicle They came to the District and installed data loggers on three of our vehicles at no and recommend the correct vehicle Diesel Particulate Fitter installation. Other the vehicle and engine I.D. to make filter recommendations. that will be using them. charge to compile data suppliers had only used Describe what you have done to ensure that the product brand or service costs recommended are reasonable: We have used the bids received in our first attempt at compliance installations, and also have talked to other suppliers in the field. The window of opportunity for installers is very short Most suppliers will not be in the business within a few years. All vehides must now indude DPF systems from the factory, the Air board has given parameters in time limits for vehide retirement, retrofit, and to new motor installations which will ultimately make DPF installations a moot point within a few years. Most suppliers/installers who only provide DPF supplies and service will no longer exist. Other explanation/justification: (e.g. history of previous like purchases) Suggested review date: (see standardization list for examples) On the basis of the above, 1 recommend that competitive procurement be limited and that the or service indicated be solicited on a sole brand basis. On the basis of the above, I recommend that competitive procurement be waived and that the uct or service indicated be purchased on a sole brand and sole source basis. 1 have made a diligent effort to review comparable products or services. 1 feel confident that the sole brand/sole source purchase is justified and feel confident in explaining the justification to the general public. I also understand that I may be required to provide a detailed cost analysis/estimate since price reasonableness may not be established through the competitive process. EMPLOYEE NAME & DEPARTMENT AUTHORIZED SIGNATURE DATE MANAGER NAME (if different) UTHORIZED SIG TORE DATE 14t1\/`b("j Ca-V5 etall a -'?-1/ Based on the above statements and justification, I hereby agree with the purchase of this product or service on a sole brand/source basis. PURCHASING AGENT SIGNATURE DATE hP-/g/i Other approvals may be required up to and including Board of Director approval. South Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.etpud.us BOARD AGENDA ITEM 6f TO: Board of Directors FROM: Randy Curtis, Manager of Field Operations MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: Trailer Mounted Air Compressor - Underground Repair Water REQUESTED BOARD ACTION: Authorize staff to advertise for bids. DISCUSSION: Compressor is to replace the water crew's 1989 Inger -Solt compressor that no longer meets the State /County Air Boards emission requirements. A Tier 4 engine is now required. The existing old compressor does not have a tier rated engine deeming it non - compliant under current Air Board regulations. All off road portable diesel powered equipment above 50hp must be registered with the California State Air Resources Board's DOORS program (Diesel Off Road On -line Reporting System) SCHEDULE: As soon as possible COSTS: $25,000 ACCOUNT NO: 2005 -8248 BUDGETED AMOUNT REMAINING: $25,000 ATTACHMENTS: None CONCURRENCE WITH REQUESTED ACTION: TI GENERAL MANAGER: YES '1 (�8 NO CHIEF FINANCIAL OFFICER: YES ►: NO —21— CATEGORY: Water Sough Tahoe Public Utility District General Manager Richard H. SoIbrig Directors Chris CefaIu James R. Jones Randy Vogeigesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpuel.us BOARD AGENDA ITEM 6g TO: Board of Directors FROM: Pete Lavallee, Assistant Engineer MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: Snowshoe /Millich Slope and Bijou Sewer Relocates REQUESTED BOARD ACTION: Approve Change Order No. 6 for White Rock Construction, Inc., in the credit amount of <$1 1,705.88>. DISCUSSION: Change Order No. 6 addresses items that increase and decrease the bid due to changes in field conditions. The itemized parts of Change Order No. 6 are as follows: Part A, in the amount of $1,600.00, is for additional costs associated with an increase in length of 80 feet required to install the four -inch perforated SDR 26 Back Drain on the Snowshoe /Millich Slope Repair Project. The additional footage was caused by the necessity to install a drain at the top of the slope on the Snowshoe Thompson Ditch to collect runoff from the slope above and allow for proper drainage. The additional 80 feet will be added to the bid quantities of Bid Item 4 and will be paid at the unit price of $20.00 per lineal foot. The total bid quantity for bid item 4 will increase from 150 lineal feet to 230 lineal feet. Part B, in the amount of $1,725.00, is for additional costs associated with an increase in length of 150 feet required to install the four -inch solid SDR 26 Back Drain on the Snowshoe /Millich Slope Repair Project as well as additional pipe to daylight the slope drain at the existing Millich Ditch. The additional footage was caused by the necessity to install a drain at the top of the slope on the Snowshoe Thompson Ditch to collect runoff from the slope above and allow for proper drainage. The additional 150 feet will be added to the bid quantities of bid item 5 and will be paid at the unit price of $11.50 per lineal foot. The total bid quantity for Bid Item 5 will increase from 150 lineal feet to 300 lineal feet. Part C, in the credit amount of <$2,000.00 >, is for removal of one flush inlet installation from Bid Item 18 of the Bijou Sewer Relocation Project that was not necessary due to the proximity to a new manhole that was installed just upstream of the tie-in location where the flush inlet was to be installed. -23- Peter Lavallee December 15, 2011 Page 2 Part D, in the credit amount of <$9,000.00 >, is for the deletion of Bid Item 21 on the Bijou Sewer Relocation Project from the contract. CalTrans had previously abandoned the traffic loops which were to be replaced as part of this contract in the intersection of Highway 50 and Fairway Ave. Part E, in the credit amount of <$4,030.88 >, is for crack sealing that occurred in Alpine County. The original bid amount was not to exceed $10,697.41, and after a full review of the submitted time and material requests, the total for the crack sealing work only came to a total of $6,666.53 which resulted in a credit to the District. SCHEDULE: As soon as possible COSTS: $3,325.00 ( SNOBLO), <$11,000.00> (ECBIJM), <$4,030.88> (1029 -6042) ACCOUNT NO: 1029 - 7075 /SNOBLO, 1029 - 8287 /ECBIJM, 1029 -6042 BUDGETED AMOUNT REMAINING: <$75,177 >; $326,032; $0 ATTACHMENTS: Change Order No. 6 CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES 4t14.I NO CHIEF FINANCIAL OFFICER: YES to. NO -24- CATEGORY: Sewer CHANGE ORDER NUMBER 6 Project 2011 Snowshoe /Millich Slope and Bijou Sewer Relocations Contractor White Rock Construction Inc. Date: December 15, 2011 PO # P24449 The Contract Shall Be Changed As Follows: A. The contractor shall supply all materials, tools, and labor for the installation of an additional 80 lineal feet of 4 inch perforated SDR 26 pipe for the slope back drain on the Snowshoe /Millich Slope Repair Project. The additional 80 feet will be paid out as a unit cost per bid item 4 and will increase the total bid quantity to 230 lineal feet. Total cost for additional length shall not exceed $1,600.00 and shall be added to bid item 4. TOTAL FOR ITEM A IS $1,600.00 B. The contractor shall supply all materials, tools, and labor for the installation of an additional 150 lineal feet of 4 inch SDR 26 pipe for the slope back drain on the Snowshoe /Millich Slope Repair Project. The additional 150 feet will be paid out as a unit cost per bid item 5 and will increase the total bid quantity to 300 lineal feet. Total cost for additional length shall not exceed $1,725.00 and shall be added to bid item 5. TOTAL FOR ITEM B IS $1,725.00 TOTAL FOR CHANGE ORDER NUMBER 6 IS A + B + C + D = 411,705.88> Original Contract Previous Change Order Current Contract THIS CHANGE ORDER New Contract Total $289,725.00 $90,519.73 $380,244.73 411,705.88> $368,538.85 Contractor agrees to make the herein - described changes in accordance with the terms hereof. The change in contract price and/or contract time noted is full settlement for costs incurred because of the change(s) described, unless specifically noted in individual description(s). Authorized By STPUD Board President Accepted By Contractor Reviewed By -25- Date: Date: Date: 1 C. Delete one flush inlet installation from Bid Item 18 that was not necessary during the final tie in of the twelve inch gravity sewer main. This will reduce the contracted bid quantity on the Bijou Sewer Relocation Project from two flush inlets to one flush inlet. The deletion of one flush inlet installation will result in a credit to the District of $2,000.00. TOTAL FOR ITEM C IS <$2,000.00> D. Delete Bid Item 21 on the Bijou Sewer Relocation Project from the contract which will result in a credit to the District in the amount of $9,000.00 as CalTrans had previously abandoned the traffic loops in the intersection of Highway 50 and Fairway Ave. TOTAL FOR ITEM D IS <$9,000.00> E. Change Order Number 3 Item B included a total price not to exceed of $10,697.41 for crack sealing a concrete lined ditch in Alpine County. After review of the submitted time and material requests the total amount for this item shall be changed to $6,666.53 which will result in a credit to the District in the amount of $4,030.88 from the Alpine County Operation and Maintenance charges on this project. TOTAL FOR ITEM E IS <$4,030.88> -26- 2 South Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Donee any Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544- 6474 • Fax 530 541 -0614 • www.stpud.us BOARD AGENDA ITEM 6h TO: Board of Directors FROM: John Thiel, Principal Engineer MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: 2011 Grizzly Mountain Booster Station REQUESTED BOARD ACTION: Approve Change Order No. 4 to Thomas Haen Co. Inc., in the amount of $28,489. DISCUSSION: This proposed Change Order No. 4 includes additional work as follows: • Part A - Addition of three check valves at the yard hydrant valves to prevent the possibility of high pressure water flowing through to the low pressure side. Flow from high pressure to low pressure zone to be controlled by the PRV stations in the booster station as designed. This work was completed at a cost of $1,159; • Part B - Installation of a 4" area drain outside the southeast corner of the booster station. This will improve site drainage and prevent ice problems near the access door. This work was completed at a cost of $476; • Part C - The project included a sewer connection from the booster station to the existing sewer at the back of the property. Contractor trenched down to the marked location and excavated to a depth of 11 feet in search of the sewer line. This is a very wet area and groundwater became a major problem. The District terminated the effort to locate and tie into the existing sewer due to worker safety concerns and to limit additional environmental disturbance. The area was backfilled and the site was stabilized. The station will now drain to a 500 gallon holding tank near the driveway which will be pumped out annually, or as otherwise necessary. The additional work resulted in an additional cost of $7,795. • Part D - Contractor completed milling and asphalt replacement at the intersection of Grizzly Mountain Drive and North Upper Truckee Road. This work was originally included in the Grizzly Waterline Project completed by Burdick Construction. Burdick had completed the waterline ahead of schedule and was not able to complete this area because it was not yet ready to abandon the old PRV station that was located in the intersection. Therefore, staff moved this work from Burdick to Haen. This work was completed at a cost of $19,059. —27— John Thiel December 15, 2011 Page 2 Note - All costs are on a time and materials basis unless noted otherwise. SCHEDULE: Upon Board approval. COSTS: $28,489 ACCOUNT NO: 2029 -8176 / GRIZBS BUDGETED AMOUNT REMAINING: $7,449 ATTACHMENTS: Change Order No. 4 CONCURRENCE WITH REQUESTED ACTION: J GENERAL MANAGER: YES /IZI/9 NO CHIEF FINANCIAL OFFICER: YES NO -28- CATEGORY: Water CHANGE ORDER NUMBER 4 Project: 2011 Grizzly Mountain Booster Station Contractor: Thomas Haen Company Inc. Date: December 15, 2011 PO # P24124 The Contract Shall Be Changed As Follows: A. Install three check valves at yard hydrant for a cost of $1,159. See Attachment A, THC#16, for a breakdown of all costs. B. Install 4" drain outside southeast corner of pump station for a cost of $476. See Attachment A, THC #18, for a breakdown of all costs. C. Additional work while excavating for the 4" sewer lateral installation for a cost of $7,795. See Attachment A, THC #20, for a breakdown of all costs. D. Additional asphalt paving at the intersection of Grizzly Mountain Drive and North Upper Truckee Road for a cost of $19,059. See Attachment A, THC #21, for a breakdown of all costs. TOTAL FOR CHANGE ORDER NO. 4 IS ITEMS A THROUGH D = $28,489.00 Original Contract $1,076,526.00 Previous Change Orders $ 84,522.00 1 Current Contract $1,161,048.00 THIS CHANGE ORDER $ 28,489.00 New Contract Total $1,189,537.00 Contractor agrees to make the herein - described changes in accordance with the terns hereof. The change in contract price and/or contract time noted is full settlement for costs incurred because of the change(s) described, unless specifically noted in individual description(s). Authorized By STPUD Board President Accepted By Contractor Reviewed By -29- Date: Date: Date: 1 Alit, re South Tahoe Public Utility District Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www stpud.us BOARD AGENDA ITEM 61 TO: Board of Directors FROM: Kathy Sharp, Executive Services Manager MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: Regular Board Meeting Minutes REQUESTED BOARD ACTION: Approve Minutes. DISCUSSION: The regular Board meeting Minutes for November 3, 2011, were not available when this agenda was published. They will be distributed prior to, and at the Board meeting. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: To be distributed prior to, and at the Board meeting CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO -31- CATEGORY: General t�r d n5 T-�_,� SOUTH TAHOE PUBLIC UTILITY DISTRICT Richard Solbri • , General Mana • er Dale Rise, President Chris Cefalu, Director BOARD MEMBERS James R. Jones, Direc pr Paul Sciuto, Assistant General Mana • er Mary Lou Mosbacher, Vice President REGULAR MEETING OF THE RD OF DIRECTORS SOUTH TAHOE PU A ILITY DISTRICT- HOVE ; s 3, 2011 The Board of Directors of the South Tahoe Public U November 3, 2011, 2:00 p.m., at 1275.Meadow Crest Eric W. Schafer, Director met in a regular session, BOARD OF DIRECTORS: President Rise, Directors Jo Director Cefalu was ab STAFF: Solbrig, Sharp, Hoggatt, Ryan, Bird, Hussmann, Curti Attorney He Mosbacher, Schafer. oggatt, C. Stanley, dsoe, Johnson, GUESTS: Kelly SheeharMary Kortge, Ernie Cla Randy Vogelgesang, Hal Bird led the pledge to the flag. Claude Gunsch, Ernie Claudio stated he represents of a group of citizens who have complaints with the water meter rates. He stated his quarterly bill had increased this quarter, and would cost $500 extra. Mr. Claudio then outlined the course of action re: how the group he represents intend to resolve the perceived inequitable situation. When asked to respond to questions, Mr. Claudio stated he would not, and left the room. Director Schafer requested it be noted in these minutes that he questioned if Mr. Claudio had considered four consecutive calendar quarters of water bills when he made the statement that his water bill would increase by $500 in one year. Director ROLL CALL PLEDGE OF ALLEGIANCE COMMENTS FROM THE AUDIENCE REGULAR BOARD MEETING MINUTES - November 3, 2011 PAGE - 2 Schafer noted that if his water bill doubled in the third quarter and if he was adhering to the watering schedule as required by the water conservation program, that he was likely using in the neighborhood of 1,000 gallons of water per day. The Board directed staff to compare Mr. Claudio's third quarter water bill with the first and second, and provide him with that information. The first two quarters should be lower, and the third higher due to water use for outside irrigation. Consent Item d. (Asphalt Patching Services) was remove from the agenda. Moved Schafer / Second Jones / Cefalu Absent /Passed to approve the Consent Calendar as amended: COMMENTS FROM THE AUDIENCE (continued) CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR CONSENT CALENDAR a. Alpine County Annual Impact /Mitigation /Compensation - Authorized payment of District's a ual mitigation fee to Alpine County, in the amount of '' 00; b. ERB (Emergency Retention Basin) R Approved Change Order No. 1 to K Company, Inc., in the amount of $18,59 Project - truction c. Tank Coatings Assessment and Design - A ) ed an increase to Purchase Order No. P23780 for :Ftional cleaning, inspection, at,dassessment of water tanks, in $ amount of $6,600z�: d. Item rernoved; e. Approved P October 20, 2 lar Board Meeting Minutes: ITEM FOR BOARD ACTION Moved Jones / Second Schafer / Cefalu Absent / Passed approve payment in the amount of $2,607,566.16. Director Schafer reported he will attend the January 2012 CASA (California Association of Sanitation Agencies) conference that was budgeted for, and will miss the January 19 regular Board meeting as a result. President Rise commented favorably on the City of Roseville's water meter installation program. PAYMENT OF CLAIMS BOARD MEMBER REPORTS REGULAR BOARD MEETING MINUTES - NOVEMBER 3, 2011 PAGE - 3 Director Schafer complimented District crews who worked on the Golden Bear water meter installation project. The next meeting will be held on November 9. Richard Solbrig reported on two items: 1) He updated the Board on the emergency declared on September 15 re: asphalt patching services: the five remaining patches will be completed next week, approximately $26,080 has been spent to date, and the previous contractor, Harold; Hutson Construction, completed all the fog sealing work t was requested. 2) Representatives from the United States Forest Service toured sites around the lake to see how the moneyfhdtit was earmarked for various water projects was being ipent. They were very pleased with the results (job creatiSeeing workers working on actual projects, etc.) and {edged to continue to support by budgeting money throughjthe Department of the Interior rather than through earriiOrks. BOARD MEMBER REPORTS (continued) EL DORADO COUNTY WATER AGENCY REPORT GENERAL MANAGER REPORTS Manager of Field Operations: Randy the Golden Bear water meter project house crews installed 233 meters, bringin :the homes that are metered,in that area, at $1,500 per meter site. He. gave kudos to the well done. orted that ted. In- 313 f Legal Counsel, Brad Herren :repca .:.on two •1) A motion:hasy 'fmod in Nevada fede ist ,: ourt in Nevada **of to the orapproving a 2010 rary change in the exert* of Diamond DiamonetVpliey water rights, such that fresh- water may betent to Indiariteek Renoir to raise reservoir levels instead 6fing it for irrigation. Opptsitions to the motion are due in Janua m and a heariCtg will be held to consider the motion and any oppc #ions in February. 2) The Yorba Linda water inverse condemnation case trial date has been set for March. 2:35 - 2:55 P.M. STAFF REPORTS ADJOURNMENT TO CLOSED SESSION AND RECONVENED TO OPEN SESSION ACTION / REPORT ON ITEM DISCUSSED DURING CLOSED SESSION Directors Schafer and Cefalu were appointed to an ad hoc committee to assist with selection of a labor negotiations team. Pursuant to Government Code Section 54957 /Consideration of Public Employee Appointment - Labor Negotiator REGULAR BOARD MEETING MINUTES - NOVEMBER 3, 2011 PAGE - 4 2:55 P.M. ADJOURNMENT Board President South Tahoe Public Utility District South Tahoe Public Utility District South Tahoe Public Utility District VG11GrW MArN19Gr Richard H. SoIhrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.us BOARD AGENDA ITEM 6j TO: Board of Directors FROM: Kathy Sharp, Executive Services Manager MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: Regular Board Meeting Minutes REQUESTED BOARD ACTION: Approve Minutes. DISCUSSION: The regular Board meeting Minutes for November 17, 2011, were not available when this agenda was published. They will be distributed prior to, and at the Board meeting. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: To be distributed prior to, and at the Board meeting CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO -33- CATEGORY: General dmss ,-F. nd SOUTH TAHOE PUBLIC UTILITY DISTRICT Richard Solbri • , General Mana • er Dale Rise, President Chris Cefalu, Director Paul Sciuto, Assistant General Mana • er ry Lou Mosbacher, Vice President BOARD MEMBERS James R. Jones, Dire REGULAR MEETING OF TH ®: D OF TORS SOUTH TAHOE PU ILITY DISTRI NOVE 7, 2011 MINUTIO Eric W. Schafer, Director The Board of Directors of the South Tail :Public Utility District met in a regular session, November 17, 2011, 2:00 p.m., at 1275 e ' Crest Drive. BOARD OF DIRECTORS: President Rise, Directors nes, Mo STAFF: Solbrig, Sciuto, Hughes, S Cocking, Attornt ierrema GUESTS: Mike and Ada McFarl Randy Vogelong, Ken C A, iler C. Stanle hnson, , Kelly Sheehan, ROLL CALL Ken Curtzwiler led the pledge tothe flag. PLEDGE OF ALLEGIANCE Moved Schafer / Seco assed Unanimously CONSENT CALENDAR to approve the Consent ix = +r as submitted: a. Engineering Assistant - Approved extension of contract with Substitute Personnel and Business Services for 260 additional hours for an engineering assistant, not to exceed $7,000; b. Snowshoe / Millich Slope and Bijou Sewer Relocates - Approved Change Order No. 4 to White Rock Construction, in the amount of <$10,407 >; c. 2011 Grizzly Mountain Waterline Project - Approved Change Order No. 6 to Burdick Excavating Co. Inc., in the amount of $3,850; REGULAR BOARD MEETING MINUTES - NOVEMBER 17, 2011 PAGE - 2 d. USDA Forest Service Water Special Use Permit - (1) Authorized execution of a Cost Recovery Agreement with the USDA Forest Service for processing the District's Special Use Permit application; and (2) Authorized payment of the estimated processing fee in the amount of $29,292.28 (up to 50% of costs to be reimbursed by the El Dorado County Water Agency); e. Arc Flash Hazard Assessment - Authorized Task Order No. 2 for Lewellyn Technology to furnish the Arc Flash Hazard Assessment on additional water facilities in the amount of $18,041. CONSENT CALENDAR (continued) ITEMS FOR BOARD A T pN This action was declared upon termination of the tractor, Harold Hutson Construction, for substandard o., p.� 'ance and failure to adhere to the contract specifi ns. It was then necessary to take immediate action to r= _,' the non- conforming patches and complete the remainin • tchi prior to the onset of winter weather. Thomas Haen Company, Inc., has completed all patchi services as requested: 30 patches in the county, and 27 in city, plus performed minor totaled $56,042. This is i by Harold Hutson Co ing other than leak repairs, o $58,062 of patch work don h September. Moved Mosbacher / Seco ise ed Unanimously to terminate emergency actio Moved Schafer / Second Cefalu approve payment in the amount o sed Un•° •usly to 06,972.27. ems, Water and Wastewater Operations Commttee: The committee met November 14. Minutes of the Meeting are available upon request. Capital Improvement Program: Ad Hoc Committee: The committee met November 16 to determine the length and scope of the capital projects planning process. Staff provided a list of ideas concerning future projects and potential revenue generation for consideration. The committee decided to cover next 10 years of planning in detail, with a 20 -year horizon that will contain less detail. After that, an even longer -term plan will be considered to cover 50 and 100 years out. Director Cefalu congratulated newly elected Board members, Kelly Sheehan and Randy Vogelgesang. ASPHALT PATCHING SERVICES PAYMENT OF CLAIMS STANDING COMMITTEE REPORT AD HOC COMMITTEE REPORT BOARD MEMBER REPORTS REGULAR BOARD MEETING MINUTES - NOVEMBER 17, 2011 PAGE - 3 Director Jones reported he, along with Dennis Cocking, will BOARD MEMBER REPORTS attend the ACWA (Association of California Water Agencies) (continued) conference November 29 - December 3. Director Jones reported he attended the November 9 County Water Agency board meeting. Board policies concerning travel and employee health were reviewed, a presentation by Blue Solar re: energy collection was made, and discussions are underway concerning funding for hydro systems. Legal Counsel: Brad Herrema reviewed SB 293, which am the Public Contracts Code and restricts the retention for public works contracts. 2:40 P.M. ATTEST: EL DORADO COUNTY WATER AGENCY REPORT ADJOURNMENT rd President hoe Pub Utility District youth Tahoe Public Utility District General Manager Richard H. Sod r .Chris aractors James R. Jones Mary Lou Moebacher Dale Rase Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www stpud.us BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Kathy Sharp, Clerk of the Board MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: Election of Board Officers REQUESTED BOARD ACTION: Elect a Board President for 2012 Calendar Year DISCUSSION: This election is held in accordance with Board Policy 2050 -1. The Board's Committees shall be appointed and publicly announced by the Board President at the January 5, 2012, Regular Board Meeting. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: Policy 2050 -1 CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -35- CATEGORY: General South Tahoe Public Utility District Board Policy Manual 2050.10 The annual organizational meeting shall take place the second meeting in December. At the annual meeting the Board shall elect a President and a Vice - President from among the members of the Board for the next calendar year. 2050.20 The President of the Board shall preside at all meetings of the Board, maintain order, review and approve the Board agenda prior to its publication, enforce the rules of the Board at all meetings, sign all bonds, notes, titles, and leases and other legal instruments ordered to be executed by the Board, appoint all standing committees, ad hoc committees, and all special committees, unless otherwise ordered by a majority of the Board. 2050.30 In case of the resignation, absence, or disability of the President, the Vice - President shall perform the duties of the President. In case of the absence or disability of both the President and Vice - President, the Board shall choose a President pro tempore, who shall perform all of the duties of the President. 2050.31 When the President disqualifies themself from participating in an agenda item or declares partisan in the debate on any item, the Vice President shall perform the duties of the presiding officer. 2050.40 The President shall have all the rights of any member of the Board, including the right to move, second, discuss, and vote on any and all questions before the Board. 2050.50 The President has the power to call Special Meetings and Emergency Meetings of the Board. Adoption Date: 04/01/93 Amended: 05/21/98 -36- South Tahoe Public Utility District General Manager Richard FL Sdbrig Directors .Chris James R. Jones Mary Lou Moebadrer Dab Rise Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544- 6474 • Fax 530 541 -0614 • www.5tpud.u5 BOARD AGENDA ITEM 4b TO: Board of Directors FROM: Kathy Sharp, Clerk of the Board MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: Election of Board Officers REQUESTED BOARD ACTION: Elect a Board Vice President for 2012 Calendar Year. DISCUSSION: This election is held in accordance with Board Policy. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -37- CATEGORY: General South Tahoe Public Utility District General Manager Richard H. 5olbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive* • 5outh Lake Tahoe • CA 96150 -7401 Phone 530 54+6474 • Fax 530 541 -0614 • www.stpud.u5 BOARD AGENDA ITEM 4c TO: Board of Directors FROM: Nancy Hussmann, Human Resources Director MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: Health Insurance Plan Renewal REQUESTED BOARD ACTION: (1) Authorize renewing stop Toss coverage with QBE with an $85,000 specific deductible; (2) 'Approve funding level at $1,975 per employee per month; and (3) Establish COBRA Rates at Single Dental $70, Family Dental $200; Single Medical $900, and Family Medical at $2200. DISCUSSION: BB&H Benefit Designs, Inc. (BB&H) performed an analysis of the Plan and went out for proposal to a number of insurance carriers to determine stop Toss renewal options and to determine the appropriate funding level to fund claims and fixed costs for the self- insured health plan. Claims to date were annualized and then increased by an average trend factor to estimate the 2012 claims. Although claims experience in 2011 was unusually high, the average claims over the past five years indicates that the current funding level of $1,975 per employee per month is sufficient to fund expected claims and fixed costs. This is especially true with the recommendation to increase the specific deductible to $85,000 per individual. It is expected that 2012 claims experience will be lower than 2011. Staff met with the Finance Committee on November 18, 2011, and received their concurrence of the renewal, specific deductible, and funding level of $1,975. COBRA rate recommendations for 2012 were based on 75% of the stop Toss attachment factor, plus fixed costs, in addition to a 4.2% trending for the dental COBRA rates. The composite rate was then rounded off to the nearest whole dollar, for a recommended rate as stated in requested Board action, above. SCHEDULE: December 16, 2011 - Notify BB&H and CDS of renewal action taken COSTS: $2,867,700 ($1,975 per employee per month) ACCOUNT NO: Various BUDGETED AMOUNT REMAINING: Funding level as requested is included in the current budget. ATTACHMENTS: -39- Nancy Hussmann December 15, 2011 Page 2 CONCURRENCE WITH REQUESTED ACTION: ,p GENERAL MANAGER: YES /1`,A NO CHIEF FINANCIAL OFFICER: YES CATEGORY: General NO -40- South Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.us BOARD AGENDA ITEM 4d TO: Board of Directors FROM: Dennis Cocking, District Information Officer MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: California Association of Sanitation Agencies (CASA) Membership Dues REQUESTED BOARD ACTION: (1) Make a determination whether the District should remain a member of CASA; and (2) If the District remains a member, authorize payment of 2012 dues in the amount of $15,000. DISCUSSION: CASA has been recognized as the leading voice on water quality and related environmental wastewater policy issued throughout California and Washington D.C. CASA serves California by providing leadership, advocacy and up- to-date information to promote clean water that protects both public health and the environment. The 2012 membership dues does not include an increase and has remained the same for the last 3 years. SCHEDULE: Upon Board approval COSTS: $15,000 ACCOUNT NO: 1019 -6250 BUDGETED AMOUNT REMAINING: $17,750 ATTACHMENTS: CASA 2012 Agency Membership Dues Statement CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO -41- CATEGORY: Sewer CALIFORNIA ASSOCIATION of SANITATION AGENCIES CASH 1215 K Street, Suite 2290 • Sacramento, CA 95814 • TEL: (916) 446 -0388 — FAX: (916) 231 -2141 • www.casaweb.orq Executive Board President GARY W. DARLING Delta Diablo Sanitation District 1st Vice President JOHN E. HOAGLAND Rancho California Water District 2nd Vice President STEPHEN A. HOGG City of Fresno Secretary- Treasurer TOM SELFRIDGE Truckee Sanitary District TIMOTHY P. BECKER Oro Loma Sanitary District PAUL BUSHEE Leucaia Wastewater District JOSEPH A. LAURIA ARCADIS/Pimie KEVIN M. HARDY En ina Wastewater Authority BARBARA D. HOCKETT Central Contra Costa Sanitary District JEFF M. MOORHOUSE Carpinteria Sanitary District MARGIE L. RICE Midway City Sanitary District DAVID R. WILUAMS East Bay Municipal Utility District RONALD E. YOUNG, P.E., DEE Elsinore Valley Municipal Water District CATHERINE A. SMITH Executive Director MICHAEL F. DILLON State Lobbyist GREG KESTER Biosolids Program Manager ROBERTA L LARSON Director of Legal & Regulatory Affairs ERIC SAPIRSTEId Federal Legislative Advocate November 22, 2011 Richard H. Solbrig, GM South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe CA 96150 Subject: 2012 CASA Membership Dues Renewal On behalf of the California Association of Sanitation Agencies (CASA), I want to personally thank you for your ongoing commitment to our Association. For more than 50 years, CASA has been recognized as the leading voice on water quality and related environmental wastewater policy issues throughout California and Washington, D.C. With your support, CASA can continue to serve California by providing leadership, advocacy, and up -to -date information to promote dean water that protects both public health and the environment. Enclosed you will find your 2012 CASA membership renewal statement based on the calendar year. In August, the Council adopted the rates with no increase in dues for a third year. If you have any questions or need assistance with the renewal process, please contact Debbie Welch at dwelch @casaweb.org or ca(I the office 916 - 446 -0388. Your membership is vital to CASA's ability to successfully fulfill our mission and serve our members. We rely on our members continued involvement as we embark on new challenges in the years ahead. On behalf of our Executive Board, Committees' and staff, thank you for your support and I wish you a Happy Holiday Season and a New Year filled with health and prosperity. Sincerely, Gary W. Darling President Ensuring Clean Water for California -43- California Association of Sanitation Agencies 2012 Agency Membership Dues Statement TAX I.D. 68 - 0018896 Remit to: 1215 K Street Suite 2290, Sacramento, CA 95814 PH: (916)446 -0388 - FX: (916)231 -2141 - Web site: casaweb.org " Please retum a copy of the Dues Statement with your check CONTACT INFORMATION Name: South Tahoe Public Utility District DETERMINE YOUR AGENCY'S ANNUAL DUES AS FOLLOWS: Manager: Richard H. Solbrig, GM �� 2/ Address: 1275 Meadow Crest Drive Agency 2011/2012 Operations and Maintenance Budget for sewerage collection, treatment, disposal and reclamation (including administrative costs, unless your agency is multi- purpose). City: South Lake Tahoe State: CA I Zip: 96150 Phone: (530) 544 -6474 (2) 3. E -mail: ksharp @stpud.dst.ca.us $ Website: www.stpud.us (3) PLEASE 1. DETERMINE YOUR AGENCY'S ANNUAL DUES AS FOLLOWS: $ / �� 2/ (1) Agency 2011/2012 Operations and Maintenance Budget for sewerage collection, treatment, disposal and reclamation (including administrative costs, unless your agency is multi- purpose). 2. For multi- purpose agencies, allocate proportional share of administrative budget for sewage services. $ $ 12,000 (2) 3. Subtract budgeted revenues to be received from other agencies that are members of CASA, if any. $ 8. Budget over $100,000,000 (3) 4. Total for membership dues determination (1 +2 -3). $�� Z.3)/ (4) 5. 2012 Dues Payment insert from chart below the appropriate fee for membership $ /p vl' (5) CHART 1. Minimum rate maximum budget up to $500,000 $ 800 2. Budget between $500,000 up to $1,000,000 $ 1,500 3. Budget between $1,000,000 up to $2,500,000 $ 4,000 4. Budget between $2,500,000 up to $5,000,000 $ 8,000 5. Budget between $5,000,000 up to $10,000,000 $ 12,000 6. Budget between $10,000,000 up to $20,000,000 $ 15,000 7. Budget between $20,000,000 up to $100,000,000 $ 18,000 8. Budget over $100,000,000 $ 25,000 *Please retum a copy of the dues statement with your check. Thank You "Ensuring Clean 44- Water for California" - PAYMENT OF CLAIMS FOR APPROVAL December 15, 2011 Payroll 11/29/2011 Total Payroll 422,075.58 422,075.58 ADP 407.00 American Express 3,347.56 Bank of America 0.00 BNY Mellon Trust Company 0.00 Brownstein /Hyatt/Farber /Schreck legal services 0.00 CDS- health care payments 110,324.41 Union Bank 0.00 Total Vendor EFT 114,078.97 Accounts Payable Checks -Sewer Fund 206,041.85 Accounts Payable Checks -Water Fund 165,906.32 Accounts Payable Checks - Self - funded Insurance 0.00 Accounts Payable Checks - Grants Fund 0.00 Total Accounts Payable 371,948.17 Grand Total 908,102.72 Payroll EFTs & Checks EFT AFLAC Medical & Dependent Care EFT CA Employment Taxes & W/H EFT Federal Employment Taxes & W/H EFT CaIPERS Contributions EFT Great West Deferred Comp EFT Stationary Engineers Union Dues EFT United Way Contributions EFT Employee Direct. Deposits CHK Employee Garnishments CHK Employee Paychecks 11/29/2011 173.13 17,021.73 81,833.48 76,727.53 19,482.20 0.00 134.00 220,461.32 1,256.55 4,985.64 Total 422,075.58 Vendor Name A -1 CHEMICAL INC AECOM TECHNICAL SERVICES INC AECOM TECHNICAL SERVICES INC AFLAC AFLAC AHERN RENTALS ALPEN SIERRA COFFEE AMERIPRIDE UNIFORM SERVICES ARETE SYSTEMS rn I4T &T MOBILITY AT &T MOBILITY AT &T MOBILITY AT &T MOBILITY AT &T MOBILITY AT &T MOBILITY AT &T /CALNET 2 AT &T /CALNET 2 AT &T /CALNET 2 AT &T /CALNET 2 AT &T /CALNET 2 BARR, JAMES PAYMENT OF CLAIMS Department I PrQJ Name GEN &ADMIN ENGINEERING - DVR IRRIG IMPRVS ENGINEERING - GRIZZLY MT BSTR GEN & ADMIN GEN & ADMIN UNDERGROUND REP - METERS, GOLDEN GEN & ADMIN GEN & ADMIN ENGINEERING - GIS SFTWR DEV PUMPS ELECTRICAL SHOP ENGINEERING PUMPS ELECTRICAL SHOP ENGINEERING GEN & ADMIN GEN & ADMIN PUMPS GEN & ADMIN PUMPS Description JANIT /SUPPLY INV DVR IRR IMPRVMNT GRIZ MTN BSTR SUPP INS W/H AFLAC FEE DED METERS,GLDN BEAR OFC SUPPLY ISSUE UNIFORM PAYABLE ARETE, GIS 'TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE SIGNAL CHARGES TELEPHONE TELEPHONE TELEPHONE CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE Acct# / Proj Code 1000 -0422 Check Total: 1029 - 8161 - DVRIIP 2029 - 8176 - GRIZBS Check Total: 1000 - 2532 1000 - 2538 Check Total: 2001 - 7093 - GOLDEN Check Total: Check Total: Check Total: 1000 - 6081 1000 - 2518 2029 - 8120 - GISSFT Check Total: 1002 - 6310 1003 - 6310 1029 - 6310 2002 -6310 2003 - 6310 2029 - 6310 1000 - 6310 1000 - 6320 1002 - 6310 2000 -6310 2002 - 6310 Check Total: Check Total: 2038 - 6660 - WCPROG Check Total: Amount Check Num UPI 585.98 585.98 AP- 00080970 MW 8,242.61 409.00 8.651.61 716.36 110.00 AP- 00080971 MW 826.36 AP- 00080972 MW 341.03 341.03 AP- 00080973 MW 277.40 277.40 AP- 00080974 MW 1,245.08 1.245.08 AP- 00080975 MW 4,75125 4.751.25 AP- 00080976 MW 19.73 4.67 27.94 19.72 4.67 27.94 104.67 AP-00080977 MW 463.04 31.64 166.01 463.03 118.85 1.242.57 AP- 00080978 MW 200.00 200.00 AP- 00080979 MW User: THERESA Report: OH_PMT_CLAIMS_BK Page: 1 Current Date: 12/08/2011 Current Time: 16:51:44 Vendor Name BARTON HEALTHCARE SYSTEM BARTON HEALTHCARE SYSTEM BAVCO BACKFLOW APPARATUS & VLV BAY AREA COATING CONSULTANTS BAY AREA COATING CONSULTANTS BING MATERIALS BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BROWN & CALDWELL CONSULTANTS ,tbALIF DEPT OF PUBLIC HEALTH v CALIF DEPT OF PUBLIC HEALTH CALIFORNIA STEAM INC CASE POWER & EQUIP CASHMAN EQUIPMENT CASHMAN EQUIPMENT CDW -G CORP CDW -G CORP CDW-G CORP CDW -G CORP CHARTER BUSINESS PAYMENT OF CLAIMS Department / ProJ Name HUMAN RESOURCES HUMAN RESOURCES PUMPS ENGINEERING - ANGORA TNK REPL ENGINEERING - TANK COATING UNDERGROUND REP CUSTOMER SERVICE CUSTOMER SERVICE ENGINEERING - FILTER ASSMNT UNDERGROUND REP PUMPS HEAVY MAINT Description SAFETY/EQU I P/PHY SAFETY /EQUIP /PHY PUMP STATIONS TANK, ANGORA TANK COATINGS PIPE /CVRS /MHLS CONTRACT SERVICE CONTRACT SERVICE REHAB FLTR 5&6 TRAVEL/MEETINGS DUES /MEMB /CERT BIOSOL EQUP/BLDG UNDERGROUND REP - METERS, GOLDEN METERS,GLDN BEAR EQUIPMENT REP EQUIPMENT REPAIR INFORMATION SYS INFORMATION SYS INFORMATION SYS INFORMATION SYS GEN & ADMIN AUTOMOTIVE AUTOMOTIVE OFFICE SUPPLIES DIST.COMP SPPLIS OFFICE SUPPLIES DIST.COMP SPPLIS TELEPHONE Acct# / ProJ Coda 1022 - 6075 2022 - 6075 Check Total: 1002-6051 Check Total: 2029 - 7064 - ANGOTK 2029 - 8261 - TKCOAT Check Total: 2001-6052 1038 - 4405 2038 - 4405 Check Total: Check Total: 1029 - 8066 - FILTER Check Total: 2001 - 6200 2002 - 6250 1004-6653 Check Total: Check Total: 2001 - 7093 - GOLDEN Check Total: 1005-6011 2005-6011 1037-4820 1037-4840 2037-4820 2037-4840 1000 - 6310 Check Total: Check Total: Amount Check Num ZKRi 126.71 126.71 253.4Z AP- 00080980 MW 84.93 84.93 AP- 00080981 MW 520.00 8,247.50 8.767.50 AP- 00080982 MW 4,052.37 4.052.37 AP- 00080983 MW 960.96 2,644.00 3.604.96 AP- 00080984 MW 1,813.47 1.813.47 AP- 00080985 MW 70.00 90.00 160.00 AP- 00080986 MW 181.63 181.63 AP- 00080987 MW 3,031.00 3.031.00 AP- 00080988 MW 304.44 143.47 447.91 AP- 00080989 MW 64.65 227.89 64.65 227.90 585.09 AP- 00080990 MW 44.73 User: THERESA Report: OH PMT CLAIMS BK Page: 2 Current Date: 12/08/2011 Current Time: 16:51:44 PAYMENT OF CLAIMS Vendor Name Department / ProJ Name Description Acct# / ProJ Code Amount Check Num IYPQ CHARTER BUSINESS GEN & ADMIN TELEPHONE 2000 - 6310 44.72 Check Total: 89.45 AP- 00080991 MW CONANT, KAREN GEN & ADMIN - T &M UB CASH BRD MISC INCOME 2000 - 3540 - TMCBUB 2,000.00 Check Total: 2.000.00 AP- 00080992 MW CSRMA CUSTOMER SERVICE CSRMA LIAB CLAIM 1038 - 4521 26,346.20 Check Total: 26.34620 AP- 00080993 MW DATCO SERVICES CORP HUMAN RESOURCES SAFETY PROGRAMS 1022 - 6079 159.25 DATCO SERVICES CORP HUMAN RESOURCES SAFETY PROGRAMS 2022 - 6079 159.25 Check Total: 318.50 AP- 00080994 MW DEYERBERG, JR, ROBERT M GEN & ADMIN SUSPENSE 1000 - 2504 5,535.72 Check Total: 5.535.72 AP- 00080969 MW DIY HOME CENTER HEAVY MAINT BUILDINGS 1004 - 6041 8.71 DIY HOME CENTER HEAVY MAINT SMALL TOOLS 1004 - 6073 7.75 DIY HOME CENTER PUMPS WELLS 2002-6050 164.45 DIY HOME CENTER PUMPS PUMP STATIONS 2002-6051 1.73 At. Check Total: 182.64 AP- 00080995 MW co DOUGLAS DISPOSAL GEN & ADMIN REFUSE DISPOSAL 1000 - 6370 564.08 Check Total: 564.08 AP- 00080996 MW E- FILLIATE CORP INFORMATION SYS DIST.COMP SPPLIS 1037 - 4840 88.14 E- FILLIATE CORP INFORMATION SYS DIST.COMP SPPLIS 2037 - 4840 73.28 Check Total: 161.42 AP- 00080997 MW EL DORADO COUNTY CUSTOMER SERVICE SUPPLIES 1038 - 6520 6.50 EL DORADO COUNTY CUSTOMER SERVICE SUPPLIES 2038-6520 6.50 Check Total: 13.00 AP- 00080998 MW ENVIRONMENTAL RESOURCES ASSO LABORATORY LAB SUPPLIES 1007 - 4760 45.34 ENVIRONMENTAL RESOURCES ASSO LABORATORY LAB SUPPLIES 2007 - 4760 45.33 Check Total: 90.67 AP- 00080999 MW FAST FABRICATORS LLC ENGINEERING - ECHO TANK REPL TANK, ECHO 2029 - 8809 - ECHOTK 1,486.95 Check Total: 1.486.95 AP- 00081000 MW FERGUSON ENTERPRISES INC. HEAVY MAINT FILTER EQ /BLDG 1004 - 6023 92.57 FERGUSON ENTERPRISES INC. HEAVY MAINT PUMP STATIONS 1004 - 6051 75.06 User: THERESA Page: 3 Current Date: 12/08/2011 Report: OH_PMT_CLAIMS_BK Current Time: 16:51:44 Vendor Name FERGUSON ENTERPRISES INC. FERGUSON ENTERPRISES INC. FGL ENVIRONMENTAL FINNOFF, JOHNATHAN FLYERS ENGERGY LLC FLYERS ENGERGY LLC FOI-AJTAR, LISA GEO -LOGIC ASSOCIATES INC GEO -LOGIC ASSOCIATES INC GEO -LOGIC ASSOCIATES INC ,la IFS CHEMICAL GFS CHEMICAL GILLIAM, TIMOTHY GILLIAM, TIMOTHY GRACE, JOHN GRAINGER GRAINGER GRAINGER GSE CONSTRUCTION CO INC GSE CONSTRUCTION CO INC Department / Pro) Name UNDERGROUND REP HEAVY MAINTENANC ENGINEERING GEN & ADMIN - GEN & ADMIN GEN 8 ADMIN GEN & ADMIN PAYMENT OF CLAIMS - TANK COATING T&M UB CASH BRD ENGINEERING - ERB LINER REPL ENGINEERING - DEMO RALPH TANK ENGINEERING - DEMO FP,COLD CRK LABORATORY LABORATORY GEN & ADMIN GEN & ADMIN Description PIPE /CVRS/MHLS BUILDINGS TANK COATINGS MISC INCOME GASOLINE INV DIESEL INVENTORY UB SUSPENSE REPLACE ERB LINE RALPH TANK CC FLTR PLANT LAB SUPPLIES LAB SUPPLIES UB SUSPENSE UB SUSPENSE CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE HEAVY MAINT HEAVY MAINT HEAVY MAINT GEN & ADMIN - HEADWORKS ENGINEERING - HEADWORKS PRIMARY EQUIP FILTER EQ/BLDG BIOSOL EQUP/BLDG CONST RETAINAGE HDWKS IMP PROJ Acct# / ProJ Code 2001 - 6052 2004 - 6041 Amount Check Num Iy�e 93.33 8.92 Check Total: 269.88 AP- 00081001 MW 200.00 Check Total: 200.00 AP- 00081002 MW 2,000.00 2.009.00 AP- 00081003 MW 2,861.14 6,455.00 Check Total: 9.316.14 AP- 00081004 MW 2,771.90 2.771.90 AP- 00081005 MW 2029 - 8261 - TKCOAT 2000 - 3540 - TMCBUB Check Total: 1000 - 0415 1000 - 0416 2000 - 2002 Check Total: 1029 - 7581- ERBLNR 2029 - 7090 - DEMORT 2029 - 7091 - DEMOFP Check Total: 1007-4760 2007-4760 1000 - 2002 2000 - 2002 Check Total: Check Total: 2038 - 6660 - WCPROG Check Total: 1004 - 6021 1004 - 6023 1004 - 6653 Check Total: 1000 - 2605 - HDWORK 1029 - 8033 - HDWORK Check Total: 58,434.68 7,695.45 3,980.68 70.110.81 AP- 00081006 MW 102.15 177.15 279.30 AP- 00081007 MW 426.83 229.28 656.11 AP- 00081008 MW 200.00 200.00 AP- 00081009 MW 283.64 2,589.14 5,15 2.877.93 AP- 00081010 MW - 2,778.85 13,176.06 10.397.21 AP -00081011 MW User: THERESA Report: OH PMT_CLAIMS_BK Page: 4 Current Date: 12/08/2011 Current Time: 16:51:44 Vendor Name HAUGE BRUECK ASSOCIATES LLC HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS Home Depot Credit Services HUERTA, JOE HUSSMANN, NANCY HUSSMANN, NANCY to O Incline Village GID INTERSTATE SAFETY & SUPPLY INTERSTATE SAFETY & SUPPLY !ROWAN PARTS & SERVICES IRONMAN PARTS & SERVICES JOHNSON, ROSS V JONES, SARAH KEN'S TIRE CENTER KIMBALL MIDWEST Department / ProJ Name ENGINEERING - GRIZZLY HUMAN RESOURCES CUSTOMER SERVICE FINANCE HUMAN RESOURCES CUSTOMER SERVICE FINANCE DIAMOND VLY RNCH PAYMENT OF CLAIMS Description MT BSTR GRIZ MTN BSTR SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT GROUNDS & MNTC CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE HUMAN RESOURCES HUMAN RESOURCES GEN & ADMIN - USFS GRNT ADMIN UNDERGROUND REP UNDERGROUND REP EQUIPMENT REP EQUIPMENT REPAIR ADMINISTRATION CUSTOMER SERVICE EQUIPMENT REP HEAVY MAINT TRAVEUMEETINGS TRAVEUMEETINGS SUSPENSE SHOP SUPPLIES SAFETY /EQUIP/PHY AUTOMOTIVE AUTOMOTIVE SUPPLIES TRAVEUMEETINGS AUTOMOTIVE SHOP SUPPLIES Acct# / Pro) Code 2029 - 8176 - GRIZBS Check Total: 1022-6030 1038-6030 1039-6030 2022-6030 2038-6030 2039-6030 1028-6042 Check Total: Check Total: 2038 - 6660 - WCPROG Check Total: 1022 - 6200 2022 - 6200 Check Total: 2000 - 2504 - SMOKEY 2001 - 6071 2001 - 6075 1005 - 6011 2005 - 6011 1021-6520 2038-6200 1005-6011 1004-6071 Amount Check Nun IYPQ 180.00 180.00 41.54 7825 119.96 41.53 78.24 119.95 AP- 00081012 MW 479.47 AP- 00081013 MW 95.49 95.49 AP- 00081014 MW 200.00 200.00 169.28 16927 AP -00081015 MW 338.55 AP- 00081016 MW 38,026.55 Check Total: 38.026.55 AP-00081017 MW Check Total: Check Total: Check Total: Check Total: Check Total: 38.79 93.47 132.26 400.00 1,200.00 AP- 00081018 MW 1.600.00 AP- 00081019 MW 49.51 49.51 AP- 00081020 MW 167.61 167.61 AP- 00081021 MW 753.62 753.62 AP- 00081022 MW 223.44 User: THERESA Page: 5 Report: OH PMT_CLAIMS_BK Current Date: 12/08/2011 Current Time: 16:51:44 PAYMENT OF CLAIMS Vender Name Department / Proj Name Description Acct* / Proj Code MIMI Ch ck Num _e� Dan KIMBALL MIDWEST EQUIPMENT REP SHOP SUPPLIES 1005 - 6071 114.72 KIMBALL MIDWEST EQUIPMENT REPAIR SHOP SUPPLIES 2005 - 6071 114.72 Check Total: 45218 AP- 00081023 MW L A PERKS PLUMBING & HEAT INC HEAVY MAINT BUILDINGS 1004 - 6041 570.00 Check Total: 570.00 AP- 00081024 MW LABSCIENCES INC. LABORATORY LAB SUPPLIES 1007 - 4760 122.15 LABSCIENCES INC. LABORATORY LAB SUPPLIES 2007 - 4760 137.53 Check Total: 259.68 AP- 00081025 MW LAKESIDE NAPA UNDERGROUND REP MOBILE EQUIP 1001 - 6012 62.98 LAKESIDE NAPA PUMPS LUTHER PASS 1002 - 6048 55.47 LAKESIDE NAPA PUMPS SHOP SUPPLIES 1002 - 6071 15.12 LAKESIDE NAPA PUMPS SMALL TOOLS 1002 - 6073 50.74 LAKESIDE NAPA HEAVY MAINT MOBILE EQUIP 1004 - 6012 390.80 LAKESIDE NAPA HEAVY MAINT BUILDINGS 1004 - 6041 64.90 LAKESIDE NAPA HEAVY MAINT BIOSOL EQUP/BLDG 1004 - 6653 81.77 LAKESIDE NAPA EQUIPMENT REP AUTOMOTIVE 1005 - 6011 663.77 tn T.AKESIDE NAPA EQUIPMENT REP MOBILE EQUIP 1005 - 6012 7.96 LAKESIDE NAPA EQUIPMENT REP GENERATORS 1005 - 6013 124.06 LAKESIDE NAPA EQUIPMENT REP SHOP SUPPLIES 1005 - 8071 40.41 LAKESIDE NAPA EQUIPMENT REP SMALL TOOLS 1005 - 6073 32.65 LAKESIDE NAPA UNDERGROUND REP OFFICE SUPPLIES 2001 - 4820 5.38 LAKESIDE NAPA PUMPS SHOP SUPPLIES 2002 - 6071 15.12 LAKESIDE NAPA PUMPS SMALL TOOLS 2002 - 6073 50.74 LAKESIDE NAPA EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 522.09 LAKESIDE NAPA EQUIPMENT REPAIR MOBILE EQUIP 2005 - 6012 1.13 LAKESIDE NAPA EQUIPMENT REPAIR SHOP SUPPLIES 2005 - 6071 40.41 LAKESIDE NAPA EQUIPMENT REPAIR SMALL TOOLS 2005 - 8073 32.62 Check Total: 2.258.1Z AP- 00081026 MW LIBERTY ENERGY GEN & ADMIN ELECTRICITY 1000 - 6330 2,339.25 LIBERTY ENERGY GEN & ADMIN ELECTRICITY 2000 - 6330 5,223.56 Check Total: 7.562.81 AP- 00081027 MW LILLY'S TIRE SERVICE INC. EQUIPMENT REP AUTOMOTIVE 1005 - 6011 667.30 User: THERESA Page: 6 Current Date: 12/08/2011 Report: OH PMT CLAIMS_BK . Current Time: 16:51:44 Vendor Name LILLY'S TIRE SERVICE INC. LILLY'S TIRE SERVICE INC. MC CAULOU, KENNETH MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO MCKNIFF, BRIAN a1EEKS BUILDING CENTER /14EEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER Deoartment / Proj Name DIAMOND VLY RNCH EQUIPMENT REPAIR PAYMENT OF CLAIMS Description GROUNDS & MNTC AUTOMOTIVE CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE PUMPS PUMPS HEAVY MAINT PUMPS PUMPS HEAVY MAINTENANC ENGINEERING - ECHO TANK REPL SHOP SUPPLIES SMALL TOOLS FILTER EQ /BLDG SHOP SUPPLIES SMALL TOOLS BUILDINGS TANK, ECHO CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE UNDERGROUND REP PUMPS PUMPS PUMPS ELECTRICAL SHOP HEAVY MAINT LABORATORY DIAMOND VLY RNCH ENGINEERING UNDERGROUND REP UNDERGROUND REP PUMPS PUMPS PUMPS PUMPS LABORATORY ENGINEERING - TANK COATING SMALL TOOLS LUTHER PASS SHOP SUPPLIES SMALL TOOLS BUILDINGS BUILDINGS LAB SUPPLIES GROUNDS & MNTC OFFICE SUPPLIES PIPE /CVRS/MHLS SMALL TOOLS WELLS PUMP STATIONS SHOP SUPPLIES SMALL TOOLS LAB SUPPLIES TANK COATINGS Acct# / Proj Code 1028 - 6042 2005 - 6011 Check Total: 2038 - 6660 - WCPROG Check Total: 1002 - 6071 1002 - 6073 1004 - 6023 2002 - 6071 2002 - 6073 2004 - 6041 2029 - 8809 - ECHOTK Check Total: 2038 - 6660 - WCPROG Check Total: 1001 - 6073 1002 - 6048 1002 - 6071 1002 - 6073 1003 - 6041 1004 - 6041 1007 - 4760 1028 - 6042 1029 - 4820 2001 - 6052 2001 - 6073 2002 - 6050 2002 - 6051 2002 - 6071 2002 - 6073 2007 - 4760 2029 - 8261 - TKCOAT Amount Check Num Ina 12.50 667.28 1.347.08 AP- 00081028 MW 200.00 200.00 AP- 00081029 MW 63.67 68.29 251.34 63.62 68.30 359.39 894.27 1.768.88 AP- 00081030 MW 400.00 400.00 AP- 00081031 MW 5.60 91.69 15.39 4.91 12.27 153.74 7.55 41.00 48.40 7.05 18.21 75.89 109.12 12.84 4.91 7.55 255.90 User: THERESA Report: OH PMT_CLAIMS_BK Page: 7 Current Date: 12/08/2011 Current Time: 16:51:44 PAYMENT, OF CLAMS Vendor Name Department / Pro' Name Description Acct* / Proj Code Amount Cheek Num Ina MEEKS BUILDING CENTER ENGINEERING - IROQUOIS BSTR ST BSTR STN IROQ 2029 - 8967 - IQBSTR 60.02 Check Total: 932.04 AP- 00081032 MW METRO OFFICE SOLUTIONS ADMINISTRATION OFFICE SUPPLIES 1021 - 4820 12.77 METRO OFFICE SOLUTIONS FINANCE OFFICE SUPPLIES 1039 - 4820 10.34 METRO OFFICE SOLUTIONS ADMINISTRATION OFFICE SUPPLIES 2021 - 4820 12.80 METRO OFFICE SOLUTIONS FINANCE OFFICE SUPPLIES 2039 -4820 10.31 Check Total: 46,22 AP- 00081033 MW MOTEL 6 PUMPS STANDBY ACCOMODA 1002 - 6083 176.94 MOTEL 6 PUMPS STANDBY ACCOMODA 2002 - 6083 176.94 Check Total: 353.88 AP- 00081034 MW NASSCO UNDERGROUND REP DUES/MEMB /CERT 1001 - 6250 250.00 Check Total: 250.00 AP- 00081035 MW NELS TAHOE HARDWARE PUMPS SHOP SUPPLIES 1002 -.6071 3.23 NELS TAHOE HARDWARE HEAVY MAINT GROUNDS 8 MNTC 1004 - 6042 5.38 NELS TAHOE HARDWARE HEAVY MAINT BIOSOL EQUP /BLDG 1004 - 6653 5.69 JELS TAHOE HARDWARE EQUIPMENT REP AUTOMOTIVE 1005 - 6011 1.62 1 ELS TAHOE HARDWARE EQUIPMENT REP MOBILE EQUIP 1005 - 6012 131.39 NELS TAHOE HARDWARE PUMPS PUMP STATIONS 2002 - 6051 8.60 NELS TAHOE HARDWARE PUMPS SHOP SUPPLIES 2002 - 6071 3.23 NELS TAHOE HARDWARE EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 1.60 Check Total: 160.74 AP -00081036 MW NEVADA GENERATOR SYSTEMS INC EQUIPMENT REP SFTWR GEN TSTG 1005 - 8150 197.50 Check Total: 197.50 AP- 00081037 MW NEWARK IN ONE ELECTRICAL SHOP BUILDINGS 1003 - 6041 131.39 NEWARK IN ONE ELECTRICAL SHOP SHOP SUPPLIES 1003 - 6071 1,928.69 Check Total: 2,06Q4$ AP- 00081038 MW O I CORP LABORATORY LAB SUPPLIES 1007 - 4760 155.00 O I CORP LABORATORY LAB SUPPLIES 2007 - 4760 139.00 Check Total: J94.00, AP- 00081039 MW OLIN CORPORATION OPERATIONS HYPOCHLORITE 1006 - 4755 3,864.39 Check Total: 3.864.39 AP- 00081040 MW ONTRAC LABORATORY - IND CRK RES MONT POSTAGE EXPENSES 1007 - 4810 - INDIAN 5.35 User: THERESA Page: 8 Current Date: 12/08/2011 Report: OH_PMT CLAIMS_BK Current Time: 16:51:44 Vendor Name ONTRAC ONTRAC POLYDYNE INC PAYMENT OF CLAIMS Department / Proj Name Description Acct# / Proj Code LABORATORY POSTAGE EXPENSES 1007 -4810 LABORATORY POSTAGE EXPENSES 2007 - 4810 OPERATIONS POLYMER 1006 - 4720 Check Total: Amount Check Num 36.35 12.83 54.53 AP- 00081041 MW 16,059.06 Check Total: 16.059.06 AP- 00081042 MW PRAXAIR 174 PUMPS SHOP SUPPLIES 1002 - 6071 60.94 PRAXAIR 174 HEAVY MAINT SHOP SUPPLIES 1004 - 6071 163.85 PRAXAIR 174 EQUIPMENT REP SMALL TOOLS 1005 - 6073 16.97 PRAXAIR 174 LABORATORY LAB SUPPLIES 1007 - 4760 70.03 PRAXAIR 174 DIAMOND VLY RNCH GROUNDS & MNTC 1028 - 6042 908.47 PRAXAIR 174 UNDERGROUND REP SMALL TOOLS 2001 - 6073 71.78 PRAXAIR 174 PUMPS SHOP SUPPLIES 2002 - 6071 60.94 PRAXAIR 174 EQUIPMENT REPAIR SMALL TOOLS 2005 - 6073 16.96 PRAXAIR 174 LABORATORY LAB SUPPLIES 2007 - 4760 70.03 Check Total: 1.439.97 AP- 00081043 MW SURCHASE POWER GEN & ADMIN POSTAGE PPD 1000 - 0304 1,000.00 tURCHASE POWER GEN & ADMIN POSTAGE PPD 2000 - 0304 1,000.00 Check Total: 2.000.00 AP- 00081044 MW RED WING SHOE STORE PUMPS SAFETY /EQUIP /PHY 1002 - 6075 91.59 RED WING SHOE STORE UNDERGROUND REP SAFETY /EQUIP/PHY 2001 - 6075 210.65 RED WING SHOE STORE PUMPS SAFETY /EQUIP /PHY 2002 - 6075 91.59 Check Total: 393.83 AP- 00081045 MW RELIANCE STANDARD GEN & ADMIN LIFE INS UN /BD 1000 - 2512 1,541.77 RELIANCE STANDARD GEN & ADMIN LTD, UNION 1000 - 2539 1,660.68 Check Total: 3.202.45 AP- 00081046 MW RIEGER, TIMOTHY J ENGINEERING DUES /MEMB /CERT 1029 - 6250 196.00 RIEGER, TIMOTHY .1 ENGINEERING DUES /MEMB /CERT 2029 - 6250 196.00 Check Total: 392.00 AP- 00081047 MW Round Hill GID GEN & ADMIN - USFS GRNT ADMIN SUSPENSE 2000 - 2504 - SMOKEY 58,441.58 Check Total: 58.441.58 AP- 00081048 MW SCHLANGE, PAUL DIAMOND VLY RNCH TRAVEUMEETINGS 1028 - 6200 73.26 73.26 AP-00081049 - MW Check Total: User: THERESA Page: 9 Current Date: 12/08/2011 Report: OH_PMT_CLAIMS_BK Current Time: 16:51:44 PAYMENT OF CLAIMS Vendor Name Department / Proj Name Description SCORALLE, LISA CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE SCOTT VALLEY BANK Acct# / Pro) Code 2038 - 6660 - WCPROG Check Total: Amount Check Num IyQi 200.00 200.00 AP- 00081050 MW GEN & ADMIN - HEADWORKS CONST RETAINAGE 1000 - 2605 - HDWORK 1,317.60 Check Total: 1.317.60 AP- 00081051 MW SCOTTYS HARDWARE PUMPS i LUTHER PASS 1002 - 6048 130.13 SCOTTYS HARDWARE PUMPS SHOP SUPPLIES 1002 - 6071 3.84 SCOTTYS HARDWARE PUMPS SMALL TOOLS 1002 - 6073 8.44 SCOTTYS HARDWARE ELECTRICAL SHOP BUILDINGS 1003 - 6041 5.50 SCOTTYS HARDWARE HEAVY MAINT SHOP SUPPLIES 1004 - 6071 3.56 SCOTTYS HARDWARE PUMPS SHOP SUPPLIES 2002 - 6071 3.83 SCOTTYS HARDWARE PUMPS SMALL TOOLS 2002 - 6073 8.44 SCOTTYS HARDWARE HEAVY MAINTENANC BUILDINGS 2004 - 6041 29.08 SCOTTYS HARDWARE LABORATORY LAB SUPPLIES 2007 - 4760 19.84 SCOTTYS HARDWARE CUSTOMER SERVICE SMALL TOOLS 2038 - 6073 29.64 Check Total: 242.30 AP- 00081052 MW EALS, BURLINDA CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00 in Check Total: 200.00 AP- 00081053 MW I SIERRA ENVIRONMENTAL LABORATORY MONITORING 1007 - 6110 961.00 Check Total: 9B1.Q0 AP- 00081054 MW SIERRA FOOTHILL LABORATORY LABORATORY - IND CRK RES MONT MONITORING 1007 - 6110 - INDIAN 195.00 Check Total: 195.00 AP- 00081055 MW SIERRA NEVADA MEDIA GROUP HUMAN RESOURCES ADS/LGL NOTICES 1022 - 4930 162.03 SIERRA NEVADA MEDIA GROUP FINANCE ADS/LGL NOTICES 1039 - 4930 82.46 SIERRA NEVADA MEDIA GROUP HUMAN RESOURCES ADS/LGL NOTICES 2022 - 4930 162.02 Check Total: 406.51 AP- 00081056 MW SOUTH TAHOE REFUSE GEN & ADMIN REFUSE DISPOSAL 1000 - 6370 2,142.40 SOUTH TAHOE REFUSE GEN & ADMIN REFUSE DISPOSAL 2000 - 6370 214.24 Check Total: 2.356.64 AP- 00081057 MW SOUTHWEST GAS GEN & ADMIN NATURAL GAS 1000 - 6350 10,101.77 SOUTHWEST GAS GEN & ADMIN NATURAL GAS 2000 - 6350 584.76 Check Total: 10.686.53 AP- 00081058 MW SUBSTITUTE PERSONNEL & ENGINEERING CONTRACT SERVICE 1029 - 4405 2,805.08 User: THERESA Page: 10 Current Date: 12/08/2011 Report: OH PMT CLAIMS BK Current Time: 16:51:44 Vendor Name SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUBSTITUTE PERSONNEL & SUNGARD PUBLIC SECTOR INC. SUNGARD PUBLIC SECTOR INC. SUNGARD PUBLIC SECTOR INC. SUNGARD PUBLIC SECTOR INC. SUNGARD SUGA MEMBERSHIP SUNGARD SUGA MEMBERSHIP TAHOE BASIN CONTAINER SERVICE 'TAHOE BASIN CONTAINER SERVICE tri o� TAHOE BLUEPRINT TAHOE PRINTING TAHOE PRINTING TAHOE PRINTING TAHOE TRADING POST TAHOE TRADING POST TAHOE TRADING POST TAHOE TRADING POST TAHOE TRADING POST TAHOE TRADING POST TERRELL, GERRICK Department I Proj Name ENGINEERING - CATH P INFORMATION SYS ENGINEERING INFORMATION SYS CUSTOMER SERVICE INFORMATION SYS FINANCE INFORMATION SYS FINANCE INFORMATION SYS INFORMATION SYS GEN &ADMIN OPERATIONS PAYMENT OF CLAIMS ROT-SWR ENGINEERING - Bal BIJOU ER CTL EQUIPMENT REP DIAMOND VLY RNCH EQUIPMENT REPAIR UNDERGROUND REP UNDERGROUND REP HEAVY MAINT HEAVY MAINT HEAVY MAINT OPERATIONS GEN & ADMIN - T &M UB CASH BRD Description CATH PROT CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE TRAVEUMEETINGS TRAVEUMEETINGS TRAVEUMEETINGS TRAVEUMEETINGS DUES /MEMB /CERT DUES /MEMB /CERT REFUSE DISPOSAL SLUDGE DISPOSAL SUPPLIES OFFICE SUPPLIES OFFICE SUPPLIES OFFICE SUPPLIES SMALL TOOLS SAFETY /EQUIP /PHY BUILDINGS SHOP SUPPLIES SAFETY /EQUIP /PHY SAFETY /EQUIP /PHY MISC INCOME Acct# / Proj Code 1029 - 8133 - CATSWR 1037 - 4405 2029 - 4405 2037 - 4405 2038 - 4405 1037 - 6200 1039 - 6200 2037 - 6200 2039 - 6200 1037 - 6250 2037 - 6250 1000 - 6370 1006 - 6652 Check Total: Check Total: Check Total: Check Total: 2029 - 6520 - ECBBWL Check Total: 1005-4820 1028-4820 2005-4820 1001 - 6073 1001 - 6075 1004 - 6041 1004 - 6071 1004 - 6075 1006 - 6075 Check Total: Check Total: 2000 - 3540 - TMCBUB Check Total: Amount Check Num IYRfl 1,219.60 312.96 2,805.08 312.96 899.15 8.354.83 40.00 40.00 40.00 40.00 160.00 97.50 97.50 AP- 00081059 MW AP- 00081060 MW 195.00 AP- 00081061 MW 312.50 9,140.00 9.45250 AP- 00081062 MW 180.11 180.11 10.37 33.18 10.37 AP- 00081063 MW 53.92 AP- 00081064 MW 100.74 201.49 16.27 25.62 109.91 183.16 637.19 AP- 00081065 MW 2,000.00 2.000.00 AP- 00081066 MW User: THERESA Page: 11 Report: OH_PMT_CLAIMS_BK Current Date: 12/08/2011 Current Time: 16:51:44 PAYMENT OF CLAIMS Vendor Name Department / Proj Name Descdpdon Acct# / Proj Code Amount Check Nunn Ulm TERRY'S APOLLO PLUMBING & HTN UNDERGROUND REP PIPE /CVRS /MHLS 1001 - 6052 2,426.88 Check Total: 2A26.88 AP- 00081067 MW THYSSENKRUPP ELEVATOR HEAVY MAINTENANC BUILDINGS 2004 - 6041 149.50 Check Total: 149.50 AP- 00081068 MW USA BLUE BOOK HEAVY MAINT BUILDINGS 1004 - 6041 204.58 Check Total: 204.58 AP- 00081069 MW VIDEO INSIGHT OPERATIONS PLANT SECURITY 1006 - 8250 400.00 Check Total: 400.00 AP- 00081070 MW VOLTL, JULIE CUSTOMER SERVICE TRAVEUMEETINGS 1038 - 6200 52.17 VOLTL, JULIE CUSTOMER SERVICE TRAVEL/MEETINGS 2038 - 6200 52.17 Check Total: 104.34 AP- 00081071 MW WECO INDUSTRIES INC UNDERGROUND REP PIPE /CVRS /MHLS 1001 - 6052 2,193.27 Check Total: 2.193.27 AP- 00081072 MW WEDCO INC ELECTRICAL SHOP SHOP SUPPLIES 2003 - 6071 199.16 Check Total: 199.16 AP- 00081073 MW I WVEHNER, KEITH CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00 v Check Total: 200.00 AP- 00081074 MW WESTERN BOTANICAL SERVICES ENGINEERING,- ERB LINER REPL REPLACE ERB LINE 1029 - 7581 - ERBLNR 2,640.00 Check Total: 2.640.00 AP- 00081075 MW WESTERN ENVIRONMENTAL LABORATORY MONITORING 1007 - 6110 1,120.00 Check Total: 1.120.00 AP- 00081076 MW YANEZ, BENJAMIN CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE 2038 - 6660 - WCPROG 200.00 Check Total: 200.00 AP- 00081077 MW ZEE MEDICAL INC GEN & ADMIN SAFETY /EQUIP /PHY 1000 - 6075 188.57 ZEE MEDICAL INC GEN & ADMIN SAFETY /EQUIP/PHY 2000 - 6075 188.56 Check Total: 377.13 AP- 00081078 MW Grand Total: 371,948.17 User: THERESA Page: 12 Current Date: 12/08/2011 Report: OH_PMT_CLAIMS_BK Current Time: 16:51:44 South Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.u5 BOARD AGENDA ITEM 16a TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: Conference with Legal Counsel - Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government code, Closed Session may be held for conference with legal counsel regarding existing litigation: False Claims Act Case: United States, the States of California, Delaware, Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06- 0055 -GW, United States District Court for the Central District of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO 9- CATEGORY: Water .South Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Chest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614• www.stpud.us BOARD AGENDA ITEM 16b TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: December 15, 2011 ITEM - PROJECT NAME: Conference with Legal Counsel - Existing Litigation REQUESTED BOARD ACTION: Direct Staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Los Angeles County Superior Court, Case No. BC459943, State of Nevada, et al. v. J -M Manufacturing, et al. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO -61- CATEGORY: