AP 03-15-12SOUTH TAHOE PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING AGENDA Thursday, March 15, 2012 2:00 P.M. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Richard Solbn • , General Mona • er Eric W. Schafer, President Chris Cefalu, Director BOARD MEMBERS Rand Vo • el • esan • , Director Paul Sciuto, Assistant General Mana•er James R. Jones, Vice President Kell Sheehan, Director 1. CALL TO ORDER REGULAR MEETING - PLEDGE OF ALLEGIANCE 2. COMMENTS FROM THE AUDIENCE (This is an opportunity for members of the public to address the Board on any short non - agenda items that are within the subject matter jurisdiction of the District. No action can be taken on matters not listed on the agenda. Each member of the public who wishes to comment shall be allotted five minutes, and no more than three individuals shall address the same subject.) 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR 4. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered separately upon request. Comments and questions from members of the public, staff or Board can be taken when the comment does not necessitate separate action.) 5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION / ACTION 6. ITEMS FOR BOARD ACTION REQUESTED BOARD ACTION a. Request to Appear Before the Board: Public Pg. 55 Records Request for Mailing Address for the District's Ratepayers (Tim Bledsoe) b. Upper Truckee River Sewer Line Protection Pg. 59 Project (Paul Sciuto) c. Upper Truckee River Sewer Line Protection Pg.61 Project (Ivo Bergsohn) Consider Request Received from John Runnels, Citizens Alliance for Responsible Government, to Furnish Customer Mailing Address and if Available, E -mail Addresses Continue Emergency Action (An up -to -date verbal report will be given at the Board meeting) Authorize an Increase in the Amount of $20,162 to Purchase Order P24808 for Added Environmental Permitting Services; Biological Monitoring; Revegetation Inspection; and Post - Construction Monitoring REGULAR BOARD MEETING AGENDA - MARCH 15, 2012 PAGE - 2 d. C -Line Hydraulic Power Generation Pg. 69 Feasibility Analysis (Paul Sciuto) e. District Methyl Tertiary Butyl Ether (MtBE) Pg. 71 Policy (Paul Sciuto) f. Appointment to the Oversight Board in Pg. 75 Accordance with Assembly Bill 1X 26 (Paul Hughes) Approve Proposal from Selected Consultant for Engineering Planning and Design Services ('A summary of proposals and recom- mendation will be made available prior to, and at the Board meeting.) (1) Discuss Updating the District's MtBE Policy; and (2) Authorize Staff to Revise the Current MtBE Policy by Allowing the Detectable Limit to be Raised from 0.2 Parts per Billion or Micrograms per Liter to 0.5 Appoint a Member of the Board or Senior Staff to the Oversight Board of the Successor Agency to the Former South Tahoe Redevelopment Agencies g. Payment of Claims Approve Payment in the Amount of Pg. 101 $1,188,190.76 7. BOARD MEMBER STANDING COMMITTEE REPORTS (Discussions may take place; however, no action will be taken) a. Water & Wastewater Operations Committee Meeting of 03/12/12 (Jones /Vogelgesang ) 8. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken.) 9. EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVES REPORT 10. GENERAL MANAGER REPORT (Discussions may take place; however, no action will be taken.) a. Outreach Presentation to Service Club Update 11. STAFF / ATTORNEY REPORT (Discussions may take place; however, no action will be taken.) a. ACWA Legislative Symposium Update (Dennis Cocking) 12. NOTICE OF PAST AND FUTURE MEETINGS / EVENTS Past Meetings / Events 03/12/12 - Water and Wastewater Operations Committee Meeting 03/13/12 - Board Budget Workshop 03/14/12 - ECC (Employee Communications Committee) Meeting Future Meetings / Events 04/02/12 - 3:30 p.m. - Water and Wastewater Operations Committee Meeting 04/04/12 - 1:30 p.m. - Technical Advisory Committee Meeting at District 04/05/12 - 2:00 p.m. - STPUD Regular Board Meeting at District 04/11/12 - 10:00 a.m. - El Dorado County Water Agency Board Meeting in Shingle Springs 04/16/12 - 3:30 p.m. - Water and Wastewater Operations Committee Meeting at District REGULAR BOARD MEETING AGENDA - MARCH 15, 2012 PAGE - 3 13. CLOSED SESSION (The Board will adjourn to Closed Session to discuss items identified below. Closed Session is not open to the public; however, an opportunity will be provided at this time if members of the public would like to comment on any item listed. Three minute limit.) a. Pursuant to Section 54956.9(b) of the California Government Code /Liability Pg. 115 Claim Against STPUD Received from Theodore and Janice Ornellas b. Pursuant to Government Code Section 54957(a) /Conference with Labor Pg. 117 Negotiators - Present During This Closed Session Will Be: Agency Negotiators: Austris Rungis /IEDA, Richard Solbrig /General Manager, Nancy Hussmann /Human Resources Director, Paul Hughes /Chief Financial Officer Employee Organization: Management Unit c. Pursuant to Government Code Section 54957(a) /Conference with Labor Pg. 119 Negotiators - Present During This Closed Session Will Be: Agency Negotiators: Austris Rungis /IEDA, Richard Solbrig /General Manager, Nancy Hussmann /Human Resources Director, Paul Hughes /Chief Financial Officer, Employee Organization: Stationary Engineers, Local 39 d. Pursuant to Government Code Section 54957 /Public Employee Evaluation Pg. 121 Unrepresented Employee Position: General Manager 14. ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION 15. ADJOURNMENT (To the next regular meeting, April 5, 2012, at 2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete agenda packet, including all backup information is available for review at the meeting and at the District office during the hours of 8:00 a.m. - 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after minutes of the meeting have been approved. Items on this agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear on the agenda. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified, but may occur slightly later than the specified time. Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Please provide the Clerk of the Board with a copy of all written material presented at the meeting. Comments on items not on the agenda can be heard during "Comments from the Audience;" however, action cannot be taken on items not on the agenda. *Backup materials relating to an open session item on this agenda, which are not included with the Board packet, will be made available for public inspection at the same time they are distributed or made available to the Board, and can be viewed at the District office, at the Board meeting, and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings. If particular accommodations are needed, please contact the Clerk of the Board at (530) 544 -6474, extension 6203. All inquiries must be made at least 48 hours in advance of the meeting. ITEMS a. Pg. 1 b. Pg. 5 CONSENT CALENDAR MARCH 15, 2012 Alpine County's Summer 2012 Fish Purchases (Hal Bird, Linda Brown) Liability Claim Against STPUD Received from Theodore and Janice Ornellas (Tim Bledsoe) c. GPS Units and Reporting /Monitoring Services Pg. 11 (Randy Curtis) d. Cold Creek Filter Plant and Ralph Tank SEZ Pg. 33 Restoration Projects (Julie Ryan) e. Department of Water Resources Grant Pg. 37 Application (Lynn Nolan) f. Tahoe Regional Planning Agency (TRPA) Pg. 41 Memorandum of Understanding (MOU) (Paul Sciuto) g. Contract for Audit Services Pg. 51 (Paul Hughes) REQUESTED ACTION Authorize Payment to Alpine County in the Amount of $51,000 Reject Claim (1) Approve Purchase of 35 GPS Units; and (2) Approve One (1) Year Monitoring Service Contract from RMJ Technologies, in the Total Amount of $27,243.51 Extend Northwest Hydraulic Consultants, Inc., Contract for Consulting Services, in the Amount of $5,682.04 Adopt Resolution No. 2906 -12 to the Department of Water Resources for the Integrated Regional Water Management Funding for Tahoe Sierra Integrated Regional Water Management Plan Revision Authorize Execution of a New MOU between TRPA and the District Authorize Execution of a Three Year Contract for Audit Services with Grant Thornton LLP in the Amount of $157,000 plus $3,000 per Year for Each Required Program under the Single Audit South Tahoe Public Utility District • 1274 Meadow Crest Drive • South Lake Tahoe, CA 96150 Phone 530.544.6474 • Facsimile 530.541.0614 • www.stpud.us youth Tahoe Public Utility District General Manager Richard H. Sollnig Directors Chris Cefalu James R. Jones Randy ¥ogelgesang Kelly Sheehan Eric Schafer J 1275 Meadow Crest Pnive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.us BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Hal Bird, Land Application Manager Linda Brown, Purchasing Agent MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: Alpine County's Summer 2012 Fish Purchases REQUESTED BOARD ACTION: Authorize payment to Alpine County in the amount of $51,000. DISCUSSION: Alpine County received one quote from American Trout & Salmon Company for the 2012 fish planting season with a price increase of 6.25%. Their last price increase was four years ago. The District has paid for Alpine County fish plants since 1988 as required in our contract with them. Staff believes the quote from American Trout & Salmon is reasonable and recommends payment to Alpine County. Staff audited Summer 2011 fish purchases and all funds were spent. SCHEDULE: Payment before April 15, 2012 COSTS: $51,000 ACCOUNT NO: 1028 -6649 BUDGETED AMOUNT REMAINING: $50,000 ATTACHMENTS: Letter from Alpine County CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES 4911 CHIEF FINANCIAL OFFICER: YES NO NO -1- )l(pine County F'isFi Game Commission California Chairman: Dave Zellmer PO Box 3 Markleeville, CA 96120 530 694 -2114 Commissioners: Bruce Huff, Markleeville Buck McLelland, Woodfords John Jackson, Markleeville Stefan Krayk, Bear Valley Earl O'Neal, Woodfords Todd Sodaro, Markleeville NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN NNNNNNNNNNNNNNNNNN4►4► February 16, 2012 Hal Bird, Land Application Manager Diamond Valley Ranch, Alpine County, CA South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Dear Hal: Alpine County Fish and Game Commission has received one bid for fish for the 2012 fishing season. American Trout and Salmon from Susanville, California, our supplier for the past several years has supplied this bid. The bid came in at $3.40 per pound for 15,000 pounds of fish for a total of $51,000.00. This bid is for catchable fish delivered to Alpine County streams and lakes for the 2012 fish planting program. We are very happy with the fish that he has provided. We are once again please to partner with South Tahoe Public Utility District in this joint program. Thank you again for your help with this project. If you have any questions, please feel free to call me at (530) 694 -2114. David 0. Zellmer, Chairman South Tahoe Public Utility District General Manager Richard H. 5olbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer J 1275 Meadcw Cross Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541-0614-* www stpud.us BOARD AGENDA ITEM 4b TO: Board of Directors FROM: Tim Bledsoe, Customer Service Manager MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: Liability Claim against STPUD received from Theodore and Janice Ornellas REQUESTED BOARD ACTION: Reject Claim DISCUSSION: It has been recommended from Carl Warren & Company, Insurance Adjusters for the District, to reject the claim from Theodore and Janice Ornellas. Carl Warren & Company investigated and discovered that the County of El Dorado obtained an easement over the Ornellas property in 1991 for the purpose of constructing a drainage ditch running the length of the property. This has allegedly caused the Ornellas private water line to freeze during snow and /or cold weather conditions. The District does not have any ownership interest in, maintenance responsibility, or any manner of responsibility for private property service lines. This responsibility rests with the property owner. A closed session item has been included on this agenda if the Board wishes to discuss the merits of this claim. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: Claim, Recommendation from Carl Warren & Co. CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES 4A -8 CHIEF FINANCIAL OFFICER: YES NO NO -5- Falco & McGrath ATTORNEYS AT LAW 1940A Tice Valley Blvd., Walnut Creek, California 94595 Tel. (925) 938-6107 Fax (925) 932 -7423 email: falcomcgrath @aol.com John P. McGrath, Esq. Carol A. Williams, Paralegal February 21, 2012 Tim Bledsoe South Tahoe Public Utility District 1275 Meadow Crest Dr: South Lake Tahoe, CA 96150 Re: 2514 Del Norte St., So. Lake Tahoe, CA Dear Mr. Bledsoe: Robert A. Falco, Retired Received By Tian Bledsoe FEB 2 3 2012 Customer Service Manager , This office represents Theodore and Janice. Ornefl s, the owners of 2514 Del Norte So.; Lake Tahoe, CA, (hereafter the `Property"). We Kaye been advised by Carl Warren & Co ,..(claims managers /adjusters) to send this claim to your attention. I understand the facts as follows: 1. The residence on the Property was constructed sometime before 1970. 2. In 1991,the County of El Dorado obtained an easement over the Property for the purpose of constructing a drainage ditch running the length of the Property. The easement was granted to the County by the parents of Janice Ornellas. 3. Sometime after 1991, the County of El Dorado constructed the above - mentioned drainage ditch which required removal of 2 to 3 feet of soil. The drainage ditch runs perpendicular to the water supply line to the. residence. 4. Shortly after the January 1, 2012, the Ornellas experienced problems with the water supply pipe to their home freezing due to the fact that it has been quite cold .and the lack of snow on the ground. It was discovered that the likely cause of the freezing is due to the fact that the distance between the bottom of tile drainage ditch and the top of the water supply line is less than the required depth that a water supply' line should be below the surface of the ground in an environment where freezing temperatures regularly occur. It February 21, 2012 Page 2 appears that the water pipe was not sufficiently lowered when the drainage ditch was constructed. We are also informed that the water supply line cannot be unfrozen vis -a -vis an electrical charge due to the fact the adjoining property owner's water supply is teed off of the water supply to the Ornellas Property. We are also informed that the appropriate repair is to make sure that the water supply line to the Ornellas Property is uniformly placed at the appropriate depth per the plumbing code and to place the neighbor's water supply on their own line to allow for future use of the electrical charge defrosting method. We are informed that the cost to the above- mentioned repair will likely be between $5,000 and $10,000. This estimate was provided by a contractor in the So. Lake Tahoe area. His name is Steve Kenney, ph. no. (530) 314 -1153. You may contact him directly. You may also contact Bruce Person at El Dorado County DOT about this matter, ph. no. (530) 621 -5964. The Ornellas' grant permission to your agency to do the above - mentioned repair work and also request that the repair work be done as quickly as possible. If a plan of action is not put into place in the next thirty (30) days, the Ornellas' will have no choice but to commence the repair process through a licensed contractor and once completed will file a claim in court for reimbursement of their costs and expenses. Please do not hesitate to contact me if you have any questions regarding the above. Very Truly Yours, John P. McGrath cc: client cc: Janice C. Yardley, Claims Analyst at Carl Warren & Co. via facsimile transmission to (925) 825 -5964 .47./ Falco & McGrath Attorneys At Law 1940A Tice Valley Blvd. Walnut Creek, CA 94595 Attention: John P. McGrath February 21, 2012 Re: Our Principal: South Tahoe Public Utility District / CSRMA Your Clients: Theodore and Janice Ornellas Loss Location: 2514 Del Norte Suet, South Lake Tahoe, CA Date of Loss: Circa 01/01/2012 Our File No.: 1615442 Dear Mr. McGrath: Please recall we are the third party claims administrators for the South Tahoe Public Utility District / CSRMA handling the above captioned matter on their behalf. The undersigned is in receipt of the carbon copy of the amended claim submitted in response to the Notice of Insufficiency. You may recall that when we spoke on March 15, 2012 I did advise you that, based on our investigation, it appears that responsibility for the alleged damages to your client's property rests with the County of El Dorado and not with the South Tahoe Public Utility District (the "District "). At the time we spoke I advised you that "the District" was not involved in any manner whatsoever with the construction of the drainage ditch installed by the County of El Dorado. In addition to not having any involvement whatsoever with the installation of the drainage ditch, the water pipe allegedly freezing as a result of snow and issues with the installation of the drainage ditch is located on private property, presumably owned by your clients. The District does not have any ownership interest in, maintenance responsibility, or any manner of responsibility for, private property service lines. This responsibility rests with the property owner. As such, we regret we must deny your client's claim in its' entirety as responsibility for this incident and your client's damages appears to rest with the County of El Dorado `in toto'. Based on the results of our investigation wherein we find liability or responsibility on behalf of CARL WARREN & Co. CLAIMS MANAGEMENT • CLAIMS ADJUSTERS P.O. Box 3975 • Walnut Creek, CA 94598 Phone: (925) 674 -4860 • (800)98 -4763 • Fax: (925) 825 -5964 John P. McGrath Claimants: Theodore & Janice Omellas D/L: Circa 01 /01/2012 Claim No.: 1615442 February 21, 2012 our principal we have recommended to our principal that a Notice of Rejection pursuant to California Government Code be issued which would be sent to you by the District under separate cover. Should you have any questions please do not hesitate to contact the undersigned at (707)732- 6728 Very Truly Yours, CARL WARREN & COMPANY Janice C. Yardley Claims Analyst South Tahoe Public Utility District General Manager Richard H. Sollxrg Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive* South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614• wwwstpud.us BOARD AGENDA ITEM 4c TO: Board of Directors FROM: Randy Curtis, Manager of Field Operations MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: GPS Units and Reporting /Monitoring Services REQUESTED BOARD ACTION: (1) Approve Purchase of 35 GPS unit; and (2) Approve One (1) year monitoring Service Contract from RMJ Technologies, in the total amount of $27,243.51. DISCUSSION: GPS Units are to provide vehicle monitoring services to the District to reduce and track District vehicle mileage, reduce fuel consumption, give advance warning of vehicle condition through on board computer monitoring, and to overall optimize fleet use and service requirements. RMJ Technologies was chosen by the Association of California Water Agencies (ACWA) through a competitive request for proposal process and allows for ACWA members to receive preferred contract terms. The District's Purchasing Policy considers participation in other government or purchasing coalition contracts, which have recently been competitively awarded, as meeting the formal public competitive requirement. This item has been reviewed by the District's Purchasing Agent. SCHEDULE: As soon as possible COSTS: $13,125.00 + 7.75% tax for 35 GPS units; $12,159.00 + 7.75% tax Annual Monitoring. Monitoring costs equate to $28.95 per month, per GPS Unit ACCOUNT NO: BUDGETED AMOUNT REMAINING: Unbudgeted Item ATTACHMENTS: ACWA Preferred Provider Protocol; RMJ Technologies Quote; ACWA Preferred Provider Program; Fleet Optimization CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES CATEGORY: Sewer & Water NO NO I i\PPRO V"E D Providers APP Preferred Provider Procedure, Evaluation and Acquisition Protocol • A vendor will come to us as a potential candidate for the ACWA Preferred Provider Program or a member will approach us with a product or service they'd like to see on the APP roster. • These offers cannot be duplicative of what is found among the "Friend of ACWA associates" at the time of application. • We save these requests throughout the year and the first part of January of the following year, we survey our membership, giving them the list of the various offerings. • We choose the three or four offerings that receive the highest votes. • We write RFPs for those offerings. The RFPs are approved by the appropriate ACWA committee (this committee approval at this stage is a recent addition to the protocol) • We advertise the RFP on the ACWA website and with two online bid distribution services, BidNet and AEC Leads or whatever bid service is appropriate for the service we are looking at adding. • We evaluate the responses and call all of their references. If they are glowing, we go forward. If they are not, we halt the process for that applicant. • If, however, everything checks out, we submit the bid packages with our recommendation to appropriate ACWA staff and /or leadership for their evaluation • If it is found to meet the program criteria, is it submitted to the appropriate ACWA committee or panel of experts made up of ACWA members, for review, discussion and approval. • If it passes committee or expert panel approval, we present it to the ACWA Board of Directors for final approval. • A contract is drawn up by ACWA Legal Counsel and signed by both parties. Since I've been in this position, this procedure has been followed. RMJ Technologies do Accounting Value P.O. Box 4470 Oceanside, CA 92052 Name / Address South Tahoe Public Utility District Randy Curtis, Mgr. Field Operations 1275 Meadow Crest Dr. South Lake Tahoe, CA 96150 Quote Date Quote # 2/9/2012 115 Ship To -14- Rep Project Item Description Qty U/M Cost Total 5500 5500 - Diagnostic Vehicle Unit "Monitoring Service $28.95 per month per unit* 7.75% • 35 ea 375.00 7.75% 13,125.00T 1,017.19 Total $14,142.19 -14- ASSOCIATION OF CALIFORNIA WATER AGENCIES PREFERRED PROVIDER PROGRAM REQUEST FOR QUALIFICATIONS FOR CONSIDERATION AS AN ACWA PREFERRED PROVIDER FOR A FLEET OPTIMIZATION SYSTEM ON AN INDEFINITE DELIVERY /INDEFINITE QUANTITY BASIS FOR THE YEARS 2010 - 2015 MO -IOW Mims for Oal mow Water Agenda 910 K Street Saramento, CA 95814 Contact Linda Anderson Iindaa @acwa.com Closes 4/21/2010 @ 4:00 pm PDT ASSOCIATION OF CALIFORNIA WATER AGENCIES PREFERRED PROVIDER PROGRAM REQUEST FOR QUALIFICATIONS TO PROVIDE A FLEET OPTIMIZATION SYSTEM ON AN INDEFINITE DELIVERY /INDEFINITE QUANTITY (IDIQ) BASIS PURPOSE The Association of California Water Agencies (ACWA) Preferred Provider Program (APP) is looking to augment its current group of APPs with a Fleet Optimization system provider that can assist its water agency members in managing their fleets through a variety of management and monitoring systems that can be found in Section 7, the Requirement Section of this IDIQ Request for Qualifications. OVERVIEW ACWA's membership which consists of more than 450 public water agencies, has a need for a fleet optimization system to offer to its members at a reduced rate. ACWA anticipates the fleet optimization system will: (1) provide a baseline assessment of the efficiency of field operations routes, scheduling and travel time; (2) identify and track areas that need improvement; (3) conduct a scheduling and route assessment based on historical performance; (4) track the vehicle with a global positioning system or tracking device. Responses to this RFQ will be scored in accordance with the criteria set forth in the following pages. In order to meet the target date for selection, ACWA is adhering to the following time schedule for the selection process. The successful bidder, if any, shall assist the ACWA in meeting this schedule. The schedule is as follows: 3/26/2010 Issuance of RFQ 4/21/2010 Deadline for Submission of Statements of Qualifications (4:00 p.m. CST) via PDF or MS Word email submission to Iindaa @acwa.com The above dates are subject to change. Notices of changes to items directly impacting the original RFQ or qualifications submittal process will be posted electronically on the ACWA website: htto://www.acwa.com. If you wish to be notified of changes to this RFQ, send a "notification of intent to submit" to Linda Anderson at lindaa @acwa.com 1 -16- DESIRED OUTCOMES ACWA is seeking for its agency members the delivery of a comprehensive Fleet Optimization System, which will result in increased productivity, reduced costs (including fuel, maintenance and mileage) and a decrease in the number of inspections and field visits. The services provided by the selected individual or organization must: 1 Interface with existing services which are commonly in place among Association of California Water Agencies member organizations. 2 Establish and document current fleet and route strengths and weaknesses. 3 Provide a plan to increase employee productivity and efficiency by more effectively utilizing our current fleet at a reduced cost to the agency. SOQ REQUIREMENTS / LAYOUT ACWA requests that you keep the various components of the proposal within the page limits set for them. All page requirements are double sided (one page = one page printed on both sides). 1. Introductory Statement /Project Understanding - State how your firm's technology will be able to assist our members in increasing their fleet's optimization and a brief overview of how you will accomplish this. 2. Company Profile a. Company and manufacturer Information b. Company certifications c. Proven customer benefits (give examples) d. Experience with provided fleet optimization services to water agencies 3. References /Demonstrated Experience that has occurred in the last five years. Please provide at least three, preferably five, examples of experience with this type of work, including references. Format should be: Company name, contact, title of contact, address, phone and the Scope of Services for the Project and the dates of the project. 4. Application Software and Hardware Solution including description of how it works a. Software key features and benefits for: i. Location Information /GPS ii. Remote diagnostics iii. Reports provided (e.g., speed violation report, activity detail report; Odd Hours report, drive time summary report; stop detail and idle time reports; geo -fence violation; landmark report by both landmark and vehicle; remote emissions report; fuel efficiency report of MPG for all vehicles; begin /end of day report; fleet performance report. b. Manufacturer URL 5. Integration Capabilities -17- 2 6. ACWA Specific Requirements - The table below represents our requirements. Please put a check in the Full, Partial, or None box as appropriate. If you have only a Partial or None response, please provide an explanation. (Replicate this table and fill in as appropriate) ACWA Requirement Compliance Level Explanation Full Partial None GPS Service Collect diagnostic and location information from a motor vehicle using a wireless internet device installed in the vehicle Analyze, deliver and post the information to a web page within the provider's web site and notify the owner and a designated 3rd party by email of certain events or information Provide and install in designated agency member vehicles GPS hardware, integrating odometer and engine diagnostics data Provide training to District staff on the use of the hardware and website Scope of Support Service Provide the support services, consultation, and technical assistance during regular working hours which are M -F 7:00 — 5:00 PT GPS Tracking Automatic Vehicle Location to be accurate to +/ -9 meters 90% of the time Roadside assistance and Stolen Vehicle Recover To include solution for trailer tanker fleet without 12v power supply on same system Remote Diagnostics Receive diagnostic trouble code alerts from OBD II via e-mail Speed Data Track current real speed, speed history and maximum speed Remote Smog Check 3 —18— ACWA Requirement Compliance Level Explanation Full Partial None The Automatic Vehicle Locator must be accurate to +/ -9 meters at a minimum of 90% of the time The system must be able to accommodate MWD's trailer tanker fleet which has a 12 Volt power supply The system must be able to receive diagnostic trouble code alerts from OBD II via emails The system must track current real speed, speed history and maximum speed on all included vehicles System shall be web based with no hardware or software other than a mapping program required to be installed on Agency computers System must transmit location information for all equipment and must be able to transmit information for a subset of that equipment. The system must include the ability to isolate a facility and identify all vehicles that have used that facility and store that information on hard disk or other media and upload as needed. The system must transmit additional information provided by electronic sensor such as on /off or pressure switch, OBD-II or 11708 data connections as well as 12 -volt only for non - computer controlled equipment. The system must be expandable from an initial 100 units to 200, 400 or 600 in 20 unit blocks. The system must include the ability to be installed as hardened equipment in open environments such as backhoes and loaders. 4 —19— ACWA Requirement Compliance Level Explanation Full Partial Full The system must include all the hardware necessary to transmit the location information from a vehicle to one or more District command centers. The system must provide routing information and interface with routing software. The system must include the ability to isolate single vehicles on its website. The system must include the ability to show all vehicles at once. The system must include the ability to isolate a sub -group of vehicles The system must include the ability to display multiple map screens simultaneously. The system must include software to give District the ability to customize vehicle icons and color -code vehicles. The system must include a continuous display of vehicle speed, direction, and status. The system must include the ability for agency members to add its own landmarks. The system must include graphic route playback with a broad range of reports. The system must provide the ability to define geographic boundaries with audible alarms and report when those boundaries have been violated. The system must monitor inputs such as door open, engine idle, temperature, remote door unlock, vehicle starter disabled. The system must include the ability to send preset alarms to a list of user configurable e-mails and /or as a Short Message Service (SMS) to cell phones. The system must include the ability to expand to full two way messaging and GPS. 5 —20— ACWA Requirement Compliance Level Explanation Full Partial Full The system must include the ability to export any report in all major formats including Excel, and PDF The system must include an internal temperature sensor for auto protection if the unit temperature exceeds 80°F. The system must have a built in motion switch for security alarm. The system must include an auto switch which goes to sleep mode when car battery is low to prevent battery discharge. Reports — Where they are and where they were. Every stop; driving speed, mileage by state, stop duration, start and finish time and unauthorized or after hours use. Delay Reportts, showing the actual arriving time vs. planned time per preset daily route. Search by driver or search the entire fleet by setting the date /time range that you are looking for. Management Information Requirements ACWA Agency members will require a report that includes the following information its fleet - t Where the vehicles are and were. Every stop, driving speed, mileage by state, stop duration. Start and finish times for each vehicle and any unauthorized /after hours use. Delay Reprots, showing the actual arriving time vs. planned time per preset daily route. A report that allows a search by driver or search the entire fleet by setting a date /time range. 6 —21— ACWA Requirement Compliance Level Explanation Full Partial Full Need the ability to create and store history be vehicle by day on disk or other hard medium and upload as needed. There will be a storage requirement of a minimum of one month on- line and up to one year on demand for all standard reports. Require the ability to provide dispatch history in a format compatible with Microsoft Access or Excel. Require a report which allows dispatch personnel to assign a unique identifying number to each dispatch. Installation Service Support The vendor selected will perform: • Onsite installation • Ongoing maintenance • Ongoing programming, and • Ongoing upgrades to current software releases. • Hardware upgrades required by technology changes or cellular communications systems. Onsite support within 24 hours or next working day 24/7 toll -free support during life of system. The installation of software for problem tracking and error recording software which the vendor shell also be responsible for maintaining. The identification of its dedicated support personnel. _ The maintenance of an off -site backup of all software and modifications, delivery of backups will be guaranteed within 24- hours. Software recovery unless it can be shown that the loss of data was as a result of agency member's negligence. 7 -22- ACWA Requirement Compliance Level Explanation Full Partial Full Onsite installation of bug fixes and upgrades. Onsite training and refresher classes Demonstrate that all components of the system, with the exception of in- vehicle units are recoverable within 24 hours after a natural disaster. Open cab equipment too is hardened to environmental elements or vandalism, and that the equipment will be installed in secured locations and that all wiring will be protected. Maximum average power consumption will not exceed 100 mA when vehicle is running and 35mA when vehicle is turned off. 8 —23— 7. Pricing = Please define pricing in two separate schedules as defined below: Schedule 1- Unprotected Units Year Est. Quantity Unit Price (AVL) United Price /Month (Services) Unit Price (Installation) $ $ Schedule 2 - Protected Units Year Est. Quantity Unit Price (AVL) United Price /Month (Services) Unit Price (Installation) $ $ Indicate the one -time cost for each of the items listed below: Training $ Other (please itemize and add lines as necessary $ $ $ 8. Explain how your company will be able to expand airtime as needed and indicate as to how the company will prevent our agency members' messages from being crowded out as usage increases or the cost of each transmission increases dramatically after agency members become captive through proprietary hardware purchase. 9. Include Screen Shots demonstrating the software's key components such as those described in Item 4.a on page two of this RFQ. 10. See attached ACWA Preferred Provider Agreement. Please state any exceptions you have to this agreement and why. 11. Appendix - you may add any additional collateral materials, resumes of key staff or other items that you feel would make a compelling case for choosing your firm for this service, however, we request that you keep this section limited to 20 pages. 9 -24- MASTER AGREEMENT [Insert Name of Company and Type of Service here] For Members and Supporters of the Association of California Water Agencies This Agreement is entered into by and between _ Company, a California corporation, and the Association of California Water Agencies (ACWA), a California non - profit corporation. RECITALS A. [Insert company name here], (hereinafter referred to as the "Provider") is in the business of providing [insert type of service here] and related management products and services. Provider is legally authorized to do business in California. B. ACWA is an association comprised of public agency members with interests in promoting the development, management and reasonable beneficial use of water in an environmentally balanced manner (generally referred to as "members "); mutual water companies (generally referred to as "affiliates "); and other agencies, businesses and associations that have similar interests or provide products or services to public agency members (generally referred to as "associates "). For the purposes of this Agreement, all public agency members will be referred to as "Members ", and affiliates and associates will be referred to collectively as "Supporters." C. For purposes of this Agreement, Provider and ACWA may be referred to individually as "Party" and collectively as "Parties." D. Provider and ACWA are entering into this Program Agreement ( "Agreement ") to implement a program (hereinafter referred to as the "Program ") to assist Members and Supporters in retaining the services of Provider under preferred terms and conditions as described in Section 1. A. of the Agreement, E. Any Member or Supporter of ACWA in good standing is eligible to secure the services of, and enter into an agreement with, the Provider for [insert type of service here] on preferred terms as described in this Agreement. F. Members and Supporters that elect to enter into an agreement with Provider pursuant to this Agreement may be referred to as "Participants." NOW THEREFORE, Provider and ACWA agree as follows: I. SERVICES: PROVIDER -25- 10 A. The Provider will provide the following services to Participants: 1. [insert specific description of products and /or services here] B. In addition, Provider will be responsible for the following: 1. Customer Service — Provider will provide Members, Supporters and Participants with information and required support in a timely manner. Provider will respond to each inquiry within three (3) working days of receiving the inquiry, but preferably on the day received. If appropriate, Provider will work cooperatively with ACWA to expeditiously resolve any customer service problem or issue. 2. Information for Members and Supporters— Provider will assist ACWA in providing information about the Program to Members and Supporters and potential members and supporters. Provider will develop and disseminate, or provide to ACWA to disseminate, informational materials, including printed materials that promote participation in the Program. Such activities may include direct mail and other uses of printed materials, participation in programs and exhibits at conferences, seminars, workshops, region events and other appropriate and reasonable activities that Provider and /or ACWA determines is available. 3. Reporting requirements — Provider will provide ACWA with a quarterly report, in a format agreed to by Provider and ACWA. The report will list Participants that received services from Provider during the quarter pursuant to Section I. A. of this Agreement. Provider will supply ACWA with the report by the 10th working day of the first month of the following quarter. If a customer service issue or other issue concerning a Member, Supporter or Participant occurs and is not immediately resolved, Provider will notify ACWA without delay. C. Billing— Provider will be responsible for billing Participants for the services provided pursuant to this Agreement according to the pricing established for Participants pursuant to Section IV. 1. Provider will provide ACWA with an accounting of billings submitted to, and fees collected from, Participants by the 10th day of the month following each quarter in which Participants are billed. If the 10th day falls on a Saturday, Sunday or holiday, the accounting will be due on the following business day. 2. By the end of the month, following a month in which Provider receives payment from a Participant(s), Provider will make a payment, as determined pursuant to section VI, to ACWA as compensation for Provider's services. II. SERVICES: ACWA -26- 11 A. Information dissemination to Members and Supporters —ACWA will announce the program to Members and Supporters as an ACWA Preferred Provider Program through one or more mailings (either by direct mail or e-mail) to ACWA Members and Supporters; include information on the ACWA Web site; compose articles for ACWA publications and promote this program during ACWA conferences and other appropriate events. B. Additional information for Members and Supporters —ACWA shall assist Provider in providing information about the Program to Members and Supporters and potential members and supporters. Informational activities may include: direct mail, e-mail and other uses of printed materials supplied by Provider, conferences, seminars, workshops, region events and other appropriate and reasonable activities. C. Member and Supporter information —ACWA agrees to supply Provider with a list of Members and Supporters. ACWA will also provide appropriate information to Provider concerning any Member or Supporter customer service issues or similar issues and will work cooperatively with Provider to expeditiously resolve any such issue or problem. III. CONFIDENTIALITY Provider and ACWA agree to keep the terms of this Agreement confidential to the extent permitted by law. Access to agreement terms will be limited to each Party's officers, employees and legal counsel. Each Party will take all reasonable measures to assure that officers, employees and legal counsel who have such access maintain the confidentiality required by this provision. IV. PRICING A. Provider will give Participants preferred pricing as follows: 1. Provider will provide preferred pricing to all Members and Supporters that become Participants. 2. Provider agrees that it will match or beat any bona fide offer received by a Participant or Participants collectively, or by ACWA if it is an offer to all eligible Members and Supporters, for a comparable program and services within 30 days of written notification of the offer. If Provider is unable to match or beat the offer, the Participant or Participants (or ACWA if an offer is available to all eligible Members and Supporters) may select the alternative vendor and terminate any and all agreements with Provider. V. TERM A. This Agreement will commence on [insert date], and shall be automatically renewed annually thereafter unless a Party notifies the other Party in writing thirty (30) days in advance that the Agreement will be terminated on the anniversary date then in effect; and provided, however, that this Agreement, and any subsequent renewal thereof, may be terminated by either Party upon one hundred and twenty (120) days written notice. 12 -27- B. This Agreement also may be terminated upon written notice from one Party for material breach or default by the other Party in the performance of its obligations under this Agreement if such breach or default is not cured or corrected within 15 days following receipt of notice by the offending Party of such breach or default. C. If Provider elects to terminate this Agreement, it shall also provide written notice of its election to do so to all Participants. D. Provider will become and remain an Associate of ACWA throughout the term of this Agreement and any renewal thereof. Provider will exhibit at one of the two ACWA semi- annual conferences, but preferably at both. VI. COMPENSATION A. As consideration for the services provided by ACWA under this Agreement, Provider shall pay ACWA (5%) of all payments Provider receives from any Participant for services described herein and as required pursuant to Section I. C. 2. of this Agreement. Payments shall be made to ACWA on a quarterly basis within thirty (30) days after the end of each quarter. B. Provider will pay ACWA compensation pursuant to this Agreement for any Participant for which a contract is signed with that Participant while this Agreement is in force, even if the Agreement has terminated by the time payment is to be made. VII. EXCLUSIVITY During the term of this Agreement, ACWA agrees not to endorse any other provider of comparable services, and Provider agrees to offer services described in Section II to Members and Supporters and potential members and supporters, pursuant to this Agreement. Nothing in this Agreement will restrict a Member's or Supporter's ability to obtain services offered by Provider from another provider. VIII. LIABILITY AND INDEMNIFICATION Provider will indemnify, defend and hold ACWA harmless from all claims, causes of action and liabilities, of any nature whatsoever, including reasonable attorney's fees, which may be asserted by third parties against ACWA except those that are caused by negligence or willful misconduct on the part of ACWA, or any employee or agent of ACWA, in connection with this Agreement. Provider also agrees that any and all obligations and liabilities incurred by any Participant will be the obligations and liabilities only of that Participant and shall not in any manner be an obligation or liability of any other Participant, ACWA, or ACWA Member or Supporter. 13 -28- IX. INSURANCE During the term of this Agreement and any agreement entered into with a Member or Supporter pursuant to section I A, Provider will secure and maintain at Provider's own expense the following insurance coverages and provisions: A. General liability insurance with minimum limits of $1,000,000 each occurrence; personal and advertising injury of $1,000,000; and general aggregate of $2,000,000. B. Business automobile liability insurance applicable to all owned, non -owned and hired vehicles with bodily injury and property damage limits of not less than $1,000,000 per occurrence. C. Workers' Compensation insurance as required under California State Law. X. REPRESENTATIONS AND WARRANTIES A. Each Party is, and shall at all times remain, in compliance with all federal, state and local laws, ordinances, rulings, regulations, decisions and directives in connection with the performance of obligations pursuant to this Agreement. B. Each Party warrants that this Agreement, and any instrument or agreement required dr contemplated hereunder, are within the Party's respective powers, have been duly authorized, and do not conflict with the organizational purpose of that Party or any law, agreement or obligation by which that Party is bound. XI. INDEPENDENT CONTRACTOR Each Party is and shall perform its services under this Agreement as an independent contractor. Neither Party has authority to assume or create any commitment or obligation on behalf of, or to bind the other Party, absent prior written approval of the other Party. XII. GOVERNING LAW The validity, performance and construction of this Agreement will be governed and interpreted in accordance with the laws of the State of California applicable to contracts made and to be performed herein. XIII. ENTIRE AGREEMENT This Agreement embodies the entire agreement of the Parties relating to the subject matter hereof and supersedes all prior and contemporaneous agreements, representations and commitments between the Parties, whether written or oral. No supplement, modification or amendment of this Agreement will be binding unless made in writing and duly executed by both Parties. 14 -29- XIV. ASSIGNABILITY Neither Party shall assign this Agreement without the prior written consent of the other party, which consent will not be unreasonably withheld. This Agreement will be binding not only upon the Parties but also upon all assigns and interests. XV. COMMUNICATIONS All notices, requests, demands and other communications hereunder shall be in writing and shall be deemed given when received. Notices will be personally delivered or mailed, certified mail, return - receipt requested, or sent by overnight carrier to the following addresses: If to Provider: If to ACWA: Association of California Water Agencies 910 K Street, Suite 100 Sacramento, CA 95814 Attention: Linda Anderson IN WITNESS WHEREOF, each Party has caused this Agreement to be executed by its authorized representative. NAME OF PREFERRED PROVIDER, ASSOCIATION OF CALIFORNIA WATER AGENCIES Signed. Title Signed, Timothy Quinn Executive Director Date Date 15 -30- Fleet Optimization Company: RMJ Technologies Product: Network Fleet's Fleet Optimization Device fits into a vehicle's engine and tracks engine information Description: Fleet Optimization focuses on reducing the overall operating expense of the fleet, resulting in an increase in the cost savings component of the fleet. If properly managed, most agencies experience a ROI in as few as four to six months. Overall Product Benefits: • Fuel savings as a result of reduced idle time and reduced fleet speeds as well as eliminating unauthorized after hours usage of fleet vehicles. • . Liability reduction as a result of eliminating after hours usage of fleet vehicles. • Fuel and wage savings by tracking vehicle usage during business hours (enhanced dispatch). • Fuel and wage savings as a result of fewer vehicle miles traveled (enhanced dispatch). • Reduced fuel and maintenance savings as a result of continually monitoring engine health. • Increased revenues as a result of being able to perform more jobs per day /per week (enhanced dispatch). • Reduced towing costs as a result of Networkfleet Roadside Assistance. • Wage savings as a result of having wireless odometer values and a decrease in overtime • Time and money savings due to the exemption from California smog check (Bureau of Automotive Repair). • Insurance savings from having a stolen vehicle recovery and safety device installed. • Reduced GHG emissions from pollutants such as carbon dioxide, carbon monoxide, nitrous oxides, PM10, methane, and hydrocarbons primarily as a result of fewer miles driven and reduced idle. • A reduced fleet size as a result of understanding vehicle utilization rates. • A reduction in new vehicle purchase as a result of longer vehicle life with a reduction in idle. References (Water Agencies they've worked with /their success): Project: Implementation and Servicing of 300 GPS Vehicle Tracking Units Throughout A Fleet. San Diego County Water Authority (June 2009 - Present) Al Garza, System Maintenance Supervisor in Fleet Services, noted the key environmental benefits of using this system. "It helps decrease greenhouse gases in several ways: by alerting the mechanics via email of maintenance needs (properly maintained vehicles operate more efficiently) and monitoring the vehicles constantly, instead of during smog checks every two years. In addition, we can manage idle time and vehicle speeds, since low speeds create fewer pollutants, and the GPS system helps drivers select the best routes." Furthermore, "With an estimated 10% reduction in fuel use fleet wide, the Water Authority can expect to save $25,000 a year in fuel costs. The exemption of the bi- annual smog check saves $7,000 a year, and the included 24/7 roadside assistance saves $3,000 a year. On top of this, there are savings realized by catching problems early and eliminating costly repairs with the preventative Diagnostic Trouble Code (DTC) Reporting System. Overall the system will pay for itself in less than six months the first year, and in less than three months for each following year. This will be a huge cost savings for the Water Authority over time, which is a big plus to our budget." Project: implementation and Servicing of 100 GPS Vehicle Tracking Devices Primarily to Monitor Emergency Response Vehicles and Equipment Metropolitan Water District of Southern California (July 2008- Present) Implementation and servicing of 100 GPS Vehicle Tracking Devices primarily to monitor emergency response vehicles and equipment. These devices provide location information in real time reporting every two minutes. The solution is web -based with no software. Therefore, the assets can be managed from anywhere in the world where you can gain internet access. Project: Implementation and Servicing of 300 GPS Vehicle Tracking Units Throughout A Fleet. Eastern Municipal Water District (April 2009 — Present) These are actual numbers from Eastern (300 vehicles) over 11 months (April 1, 2009 through February 28, 2010) • Reduction in miles driven 325,000 • Reduction in fuel usage 52,000 gallons • Reduction in fuel cost $130,000 • Labor Efficiency (cost reduction) $700,000 • (reduction in miles /average vehicle speed x average labor rate) • Accumulative Labor and Fuel Savings $830,000 • Miles /Gallon Performance Increase Gas: 8% • Miles /Gallon Performance Increase Diesel: 5% • Class A &B Vehicle Speed Violations Per week >55mph 460 to 42 • (460 in the first week of April down to 42 in the last week of February) • Class C Vehicles Speed Violations Per week > 70 mph 2000 to 62 • (2000 in the first week of April down to 62 in the last week of February) • Reduction in Nox 840 pounds • Reduction in Sox 3.8 pounds • Reduction in CO 3400 pounds • Reduction in CO2 400,000 pounds • Reduction in PM10 48 pounds • Reduction in CH$ 30 pounds *Note, the results above do not yet include savings In maintenance, insurance, towing, liability, etc. Eastern is in the process of calculating total savings over its first full year of usage. This data should be available in May. What they are offering ACWA members through the Preferred Provider Program: ACWA is getting a 12 to 14% discount for their agency members on the fleet optimization devices that are added to the vehicles. The range is tied to the vehicle wholesale price which fluctuates. South Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541.0614 • wwws us BOARD AGENDA ITEM 4d TO: Board of Directors FROM: Julie Ryan, Senior Engineer MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: Cold Creek Filter Plant and Ralph Tank SEZ Restoration Projects REQUESTED BOARD ACTION: Extend Northwest Hydraulic Consultants, Inc. (NHC) contract for consulting services, in the amount of $5,682.04 DISCUSSION: This summer, the District completed SEZ Restoration projects, which also included facility demolition and site improvements, at Cold Creek Filter Plant and Ralph Tank sites. To support permitting, final construction documents, and service during bidding and construction for these projects, the Board had previously authorized $73,741 for NHC. During construction, a number of unanticipated work items required additional attention by NHC, and their budget has been fully expended. To allow NHC to complete as -built drawings and perform final site inspections for these projects, staff recommends that the Board authorize an additional $5,682.04 for NHC. Staff will be requesting reimbursement of these costs from the USFS under the District's existing grant for this project. SCHEDULE: March 2012 to June 2012 COSTS: $5,682.04 ACCOUNT NO: 2029 - 8745 /DEMOFP; 2029 - 8745 /DEMORT BUDGETED AMOUNT REMAINING: $139,682 ATTACHMENTS: Amendment No. 3, Scope of Work and Budget CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES CATEGORY: Water NO NO -33- South Tahoe Public Utility District Memorandum Date: March 14, 2012 To: Board of Directors, R. Solbrig From: Paul Sciuto, P.E. Re: C -Line Hydraulic Power Generation Evaluation - Consultant Recommendation T 4ei (at arcA Richard Solbrig, General Manager— Board Members Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer On February 14, 2012, staff solicited a Request for Proposal (RFP) to provide engineering design services to complete: a condition assessment of the Districts C -Line; a feasibility analysis of its hydraulic power generation potential; and an engineering design and specifications for permitting and construction of the recommended hydraulic power facility. Responses to the RFP were received from 1) HDR Inc.; 2) Carollo Engineers /Sunrise Engineering; 3) Kennedy Jenks Consultants /Rentricity; and 4) Domenichelli and Associates. Submitted proposals were carefully reviewed and scored by District staff using the five criteria and point values listed on the RFP Evaluation and Selection Criteria worksheet. These criteria included: completeness; specialized design /technical competence; approach; capacity /capability; and familiarity with the project conditions. Following staff evaluation, reviewer scores were compiled and are presented on the RFP Scoring Summary. From the scoring summary, the proposals were rescored according to each reviewer's rank to provide a total score, provided in the RFP Rankings. On March 14th, review team members conferred to discuss the proposals. Review of the scoring summary and RFP rankings shows that the highest scores from the review team for all evaluation and selection criteria were awarded to the technical proposal submitted by Carollo Engineers (CE). District staff recommends that the Board approve the selection of CE for this project and allow staff to enter into an agreement with CE to complete this work up to a total contract amount not exceeding two hundred thousand dollars ($200,000). Attachments Cc: I. Dergeohn File South Tahoe Public Utility District • 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Phone 530.544.6474 • Facsimile 530.541.0614 • www.stpud.us SOUTH TAHOE PUBLIC UTILITY DISTRICT C -LINE HYDRAULIC POWER GENERATION EVALUATION ENGINEERING SERVICES PROJECT :1029- 7915/##x## RFP EVALUATION & SELECTION CRITERIA Rank the technical proposals using the following criteria and enter your scores on the accompanying scoring sheet. CRITERIA DESCRIPTION POINTS 1 COMPLETENESS: Rank the overall completeness of the technical proposal. Does it include all components requested in the RFP, including transmittal letter, three (3) relevant project descriptions, project approach, project team description, organization chart, % time availability matrix; project work -hour requirenments; and project schedule. SPECIALIZED DESIGN/TECHNICAL COMPETENCE: Rank the project team in terms of professional qualifications /experience necessary to complete the project. Does the proposal provide specific examples of relevant experience showing proficiency in hydraulic power generation 2 feasibility analysis and engineering design appropriate for the project. Does the project team have the relevent professional credentials (e.g. PE in appropriate discipline) and desired level of experience required to perform the work? 10 30 APPROACH: Rank the proposal in terms of offering unique approaches or key considerations to completing the project. Does the proposal show that 3 the project team has a full understanding of the project scope. Does the 35 proposal provide a clear plan to complete the project in a complete and cost effective manner. CAPACITY /CAPABILITY: Rank the the project team on its qualifications 4 and ability to provide specialized services needed to complete the project 20 as presented in the proposal. FAMILIARITY: Rank the project team in terms of its work experience and 5 familiarity in working withy the District. 5 TOTAL 100 CLINE HydroGen_Eval.xlsCriteria SOUTH TAHOE PUBLIC UTILITY DISTRICT C -LINE HYDRAULIC POWER GENERATION EVALUATION RFP SCORING SUMMARY FIRM 1 CRITERIA 2 3 4 5 TOTAL SCORE (HDR Reviewer 1 9 25 32 I 18 II 5 89 Reviewer 20 10 I 23 25 15 5 78 Reviewer 3 7 24 24.5 16 3 74.5 Reviewer 40 8 1 I 27 28 I 16 IL 16 I' �I 3.5 3.5 II 82.5 87 Reviewer 5 9 27 31.5 Reviewer 60 0 I Reviewer 71 8 10 18 10 4 50 HDR Totals 51 136 159 91 24 461 Caro llo Engineers/Sunrise Engineering Reviewer 18 10 30 27 20 5 92 Reviewer 211 10 28 31 17 5 91 I Reviewer 30 8 I 27 24.5 14 4.5 78 Reviewer 4 9 27 24.5 16 4.5 81 Reviewer 5I1 9 I 27 31.5 18 4 89.5 Reviewer 6 0 Reviewer 7I 10 25 30 20 5 CE/SE Totals I 56 164 168.5 105 28 KJC/Rentricity II Reviewer 1 10 27 30 19 5 91 Reviewer 21 8 24 I 28 15 I 5 II 80 I Reviewer-31I 9 18 I 28 12 I 4 71 Reviewer 40 10 I 24 24.5 16 4.5 1 79 Reviewer 5II 9 I 24 24.5 18 4 79.5 . Reviewer 60 f J I 0 I Reviewer 7I 10 26 25 20 5 KJC/RENT Totals( 56 143 160 100 27.5 CLINE HydroGen_Eval.xis 1 3/14/2012 SOUTH TAHOE PUBLIC UTILITY DISTRICT C -LINE HYDRAULIC POWER GENERATION EVALUATION RFP SCORING SUMMARY Fl 1 CRITERIA 2 3 4 5 TOTAL SCORE Domenichelli and Associates Reviewer 1 10 25 33 15 5 88 Reviewer 2 9.5 26 32 17 5 89.5 I Reviewer 3 8 24 24.5 14 5 75.5 I Reviewer 4 9 21 24.5 14 4.5 73 I Reviewer 51 9 18 31.5 16 4 78.5 IReviewer 61 0 Reviewer 7 9 24 30 20 5 88 DMA Totals 54.5 138 175.5 96 28.5 492.5 Engineering Reviewer 1 0 Reviewer 2 0 Reviewer 3 I 0 Reviewer 4 0 Reviewer 5 0 Reviewer 6 0 Reviewer 7 0 MI Totals 0 0 0 0 0 0 CLINE HydroGen_Eval.xls 2 3/14/2012 SOUTH TAHOE PUBLIC UTILITY DISTRICT C -LINE HYDRAULIC POWER GENERATION EVALUATION PROPSAL RANKINGS (1 =High; 4 = Low) HDR, Inc. FIRM Caroilo Engineers /Sunrise Domenichelli and Engineering KJC /Rentricity Associates Reviewer 1 3 1 2 ( 4 1 Reviewer 21I 4 1 1 3 2 3 1 4 2 3 4 Reviewer 51 2 1 3 1 4 Reviewer 61 2 Reviewer 7 4 1 3 2 TOTAL SCORE 17 7 18 20 CLINE HydroGen_Eval.xls 1 3/14/2012 • nhc Ea, northwest hydraulic consultants 07 March 2012 Julie Ryan Senior Engineer South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, California 96150 Subject: STPUD Purchase Order #23307 and #23306 Augmentation Request Dear Ms. Ryan: NHC is providing engineering design, permitting, and construction support services to the South Tahoe Public Utility District (District) to complete construction of improvements associated with the Cold Creek Filter Plant and Ralph Tank BMP and Stream Zone Restoration Project (Project). Amendment #2 (08 September 2010) of the Scope of Work between NHC and the District for the Project defined activities NHC would perform to obtain environmental permits, complete engineering design, and provide construction support. District Purchase Order #23307 authorizes NHC to perform work defined in Amendment #2 for the Ralph Tank site. District Purchase Order #23306 authorizes NHC to perform work defined in Amendment #2 for the Cold Creek Filter Plant site. The scope of work for Amendment #2 assumed NHC and its subcontractors would provide limited construction support to the District through periodic site visits. At the District's request, NHC and its subcontractors provided additional construction support services above what was originally anticipated in the scope of work to lead construction observation tasks associated with revegetation activities at both sites, and the placement of pervious concrete at the Cold Creek Filter Plant site (including observing a test pour conducted by the Contractor off - site). To cover the cost of the additional work, NHC is requesting a budget augmentation to District PO #23307 in the amount of $682.04 and a budget augmentation to District PO #23306 of $5,000. These augmentations would increase the total budget under District PO #23307 from $34,700 to $35,382.04 and District PO # 23306 from $44,050 to $49,550. No other revisions to the contract or scope of work, Amendment #1, or Amendment #2 are requested. Thank you for considering this item and please contact me with any questions. northwest hydraulic consultants inc. Brent C. Wolfe, P.E. Senior Engineer —35— South Tahoe Public Utility District General Manager Richard H. So!brig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Cruet Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.us BOARD AGENDA ITEM 4e TO: Board of Directors FROM: Lynn Nolan, Grants Coordinator MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: Department of Water Resources Grant Application REQUESTED BOARD ACTION: Adopt Resolution No. 2906 -12 to apply to the Department of Water Resources for Integrated Regional Water Management (IRWM) funding for the Tahoe Sierra Integrated Regional Water Management Plan revision. DISCUSSION: The District, acting as the lead agency for the Tahoe Sierra Integrated Regional Wafer Management partnership, submitted an application to the Department of Water Resources for planning grant funding to update /revise the current IRWM plan. This is the last round of Proposition 84 IRWM Planning grant funding and the Tahoe Sierra partnership wishes to pursue funds to allow the firm of Kennedy Jenks to complete the plan update. This resolution is a part of that application process (and may be submitted after the grant submission date). The IRWM process is a state -wide effort to identify partnerships that share watersheds and water issues within an identified region. These partnerships work toward integrating resources and information to identify priority projects within their region. The District has been involved in this partnership since 2003 and has been successful in receiving funding from a variety of sources through the IRWM process. The Water Conservation Program and several waterlines have been implemented under the IRWM and future grant opportunities require an IRWM plan update. SCHEDULE: N/A COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT REMAINING: Unbudgeted ATTACHMENTS: Resolution 2906 -12 CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES 4WI NO CHIEF FINANCIAL OFFICER: YES NO -37- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 RESOLUTION NO. 2906-12 A RESOLUTION BY THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT TO APPLY TO THE DEPARTMENT OF WATER RESOURCES FOR INTEGRATED REGIONAL WATER MANAGEMENT FUNDING FOR THE TAHOE SIERRA INTEGRATED REGIONAL WATER MANAGEMENT PLAN REVISIONS BE IT RESOLVED by the Board of Directors of the South Tahoe Public Utility District that application be made to the California Department of Water Resources to obtain an Integrated Regional Water Management Planning Grant pursuant to the Safe Drinking Water, Water Quality and Supply, Flood Control, River and Coastal Protection Bond Act of 2006 (Public Resource Code (PRC) Section 75001 et seq.), and to enter into an agreement to receive a grant for the: Tahoe Sierra Integrated Regional Water Management Plan Update. BE IF FURTHER RESOLVED that the General Manager, Assistant General Manager and /or the Chief Financial Officer, or their designees, of the South Tahoe Public Utility District are hereby authorized and directed to prepare the necessary data, conduct investigations, file such application, and execute a grant agreement with California Department of Water Resources. WE, THE UNDERSIGNED, do hereby certify that the above and foregoing resolution was duly and regularly adopted and passed by the Board of Directors of the South Tahoe Public Utility District at a regular meeting duly held on the 15th day of March, 2012, by the following vote: AYES: NOES: ABSENT: ATTEST: Kathy Sharp, Clerk of the Board -39- Eric Schafer, Board President youth Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drfie • South Lake Tahoe • CA 96150 -7401 Phone 530 544- 6474 • Fax 530 541 -0614 • www.stpud.us BOARD AGENDA ITEM 4f TO: Board of Directors FROM: Paul A. Sciuto, Assistant General Manager /Engineer MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: Tahoe Regional Planning Agency (TRPA) Memorandum of Understanding (MOU) REQUESTED BOARD ACTION: Authorize execution of a new MOU between TRPA and the District. DISCUSSION: The District has been working with the member agencies of the Lake Tahoe Wastewater Infrastructure Partnership to negotiate a common MOU with all public utility districts around Lake Tahoe. In the past, each agency has had an individual MOU with inconsistent requirements between them. The attached MOU is the culmination of many months of work to compile an MOU defining Exempt and Qualified Exempt work that each agency can undertake. The MOU can be terminated by either party following a 60 -day notice in writing. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: TRPA MOU CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES 4 7/1 NO CHIEF FINANCIAL OFFICER: YES NO -41- CATEGORY: Sewer & Water • ' C � AF � S eg tk>" ffi 1, � '✓ i �' Nf A& �`f yxpF4%�� 4, � • �' � M Y �'•. ' .l pi 3 2 he Mw. i' �, k,. (' Y � '4'.< �•. d '\'� � k'+ AY # i M4 „ k l Z '.F.:: .fib k,. ,"3 x x.. ,ea.t.V1%'4'Sr. @4 '$'3�+•.. ,.. ¢M $ai 5. T. °ervj y..xry { • • �" ,e 8"4 'N" ^i,F A+ 4.., 'C .^, 'R 4 y. i8y Si f k, j x v .. 3 ,'. •:, . .. .. , ., f • — , s . a tl , .. Note: The activities described in this table expand upon the Exempt (E) and Qualified Exempt (QE) activities otherwise allowed in 2.3 and Subparagraph 2.3.7 of the TRPA Code of Ordinances, provided the activities are consistent with Part 1 and Part 2 (Performance Standards) of this Memorandum of Understanding. Subsection (General Provisions) I-' a Line No. Activity Level E Activity Roadways, Trails, Sidewalks & Parking Facilities Routine non - structural maintenance provided the activities do not modify the shape or location of the facility, create or relocate land coverage, add new structural appurtenances or modify existing drainage. 2 E Structural maintenance, repair and replacement of existing facilities (such as pavement, curb and gutter, compacted shoulders, culverts, pipes, vaults, and similar structures), provided no new land coverage is created and any relocated land coverage and /or permanent land disturbance is limited to 120 square feet in low capability land (Classes la, 1b, 1c, 2, and 3) and 500 square feet in high capability land (Classes 4, 5, 6 and 7). 3 E Installation of vehicle barriers (such as bollards, fencing and boulders) along travel ways provided the barriers conform to applicable highway standards and boulders are placed partially in the ground to prevent rolling and to give a natural appearance. 4 QE Modifications to existing facilities to improve public safety and /or environmental protection provided any new or relocated land coverage or permanent land disturbance is limited to 240 square feet in low capability land (Classes la, 1b, 1c, 2, and 3) and 1,000 square feet in high capability land (Classes 4, 5, 6 and 7). Attachment B - Public Utility Districts MOU Table of Delegated Activities 5 I E Erosion Control & Water Quality Protection Facilities Routine non - structural maintenance of existing storm water treatment facilities (such as dry wells, infiltration trenches, drop inlets, and vaults), including removal of sediment, vegetative overgrowth and organic material, without limit on material volume or land capability, provided remov terials are deposited outside of the Tahoe Basin or at a TRPA - approved disposal site. - ` 6 E S ' ' ' - I - • - • I - - . cilities, provided no new land coverage is created and relocated land coverage or permanent land dis n 4 � ited to 120 square feet in low capability land (Classes la, 1b, 1c, 2, and 3jand 500 square feet in Ito h pabili ' � (Classes 4, 5, 6 and 7). 7 QE Modifications to existing facilities to improve effective, meet new re: • ry standards, or correct system inefficiencies, provided new structures such as rock scope protection and ret -walls are not visible from any TRPA - designated scenic roadway or shorezone travel unit, Class I bicycle paths, reation areas designated in the TRPA Scenic Quality Improvement Pro: ram (SQIP). Water Distribution and Wastewater Collection & Treatment Facilities 8 E Testing, locating, and maintenance of e" facilities (such as mechanical and electrical equipment, piping and plumbing, pumps and similar devices). 9 E Structural maintenance, repair, in -kind re • e ` "- ilities, provided excavation is limited to areas under existing pavement, road shoulder, or compact oil; no d cover is created, and relocated land coverage or permanent land disturla� is Rinited to 120 . re f pability land (Classes la, 1b, 1c, 2, and 3) and 500 square feet in hi h r • ility land asses 4, ,;,, 10 QE Modifications to existing cities proved the mo ions do not result in any increases in water or sewer treatment capacity or growth ktclucing activity, and a w or relocated land coverage or permanent land disturbance is o 240 square feet in low capabili d (Classes la, 1b, 1c, 2 or 3) and 1,000 square feet in high cepa •' "° �+: �:�; 4, 5, 6 ' °7). Public Service /Recreation Buildings and Facilities 11 E Interior re ling of existin -z ' dings in accordance with Subparagraph 2.3.2.A of the TRPA Code, except that the allowable str • I cost of the r- . el all. is increased to $80,000. 12 E Demolition of st es, improve is or fa "`' ies less than 50 years of age in accordance with Subparagraph 2.3.2.G of the TRPA ;: except th ,r, e excavation and backfill limits are increased to the grading limits in this MOU. 13 QE Demolition of structures, s or facilities greater than 50 years of age that are not designated, or pending designation, on the storic Resource Map in accordance with Subparagraph 2.3.7.A.6 of the TRPA Code if the MOU Partner deter nes that the structure does not qualify for historic protection in accordance with Chapter 67 based on a report prepared by a qualified professional acceptable to the appropriate State Historic Preservation Officer (SHPO). Attachment B - Public Utility Districts MOU Table of Delegated Activities 14 QE Public Service /Recreation Buildings and Facilities (continued) Structural repair to existing structures in accordance with Subparagraph 2.3.7.A.1 of the TRPA Code, except that the structural repair cost in 2.3.7.A.1 is increased to $42,000 per year and excavation and backfilling limits in 2.3.7.A.1.a are increased to the : radin: limits in this MOU. 15 QE Structural modifications to existing structures in accordance with r,m = ragraph 2.3.7.A.2 of the TRPA Code, except that the :radin: limits in 2.3.7.A.2.c (i) are increased to the gr.. ; ; knits of this MOU. 16 QE Structural remodeling or additions to existing structures in aria • ance with Subparagraph 2.3.7.A.3 of the TRPA Code, except that the grading limits in 2.3.7.A.3.a (i) are • eased to the limits of this MOU, and the BMP retrofit plan required in 2.3.7.A.a (b) is consistent with the re• ents of this Vegetation Management and Soil Preparation for Vegetation Planting 17 E Pruning of vegetation, including hazardous tree lim ,•oval, beyond the limits " allOwed in Subparagraph 2.3.2.H of the TRPA Code to maintain adequate si _ ht distance alo dwa other travet f , es. 18 QE Scarification of disturbed high capability sails (Classes 4, .,, rt; :'s preparation for vegetation with native plant species in accordance with Subparagraph 2.3.2.H of the Code provided the scarification is less than one acre in area and does not exceed six inches in depth. 19 QE Hazardous tree removal around MOU Partner facilities in accordan ':1'h Subparagraph 61.1.7.A of the TRPA Code, except that TRPA approval is • . . - quired unless the tree was planted cenic mitigation measure pursuant to a TRPA permit includin ` •y local g• ;-4;.nme - °" -;• ance "�" h Section 2.5). Grading (Including Grading in Combination with Other Activities) 20 E Excavations under exist! • land rage to an amount that can be backfilled, stabilized and swept clean within a 24 -hour period. 21 E Excavations of Inee4se allow • . .3.2.6 of the TRPA Code, except that the volume limit of the excavation > ipereased .> .15 cubic - "' bit ; districts. 22 QE Excavation °Otherwise allowed in Su . , : raph 2. of the TRPA Code, except that the volume limit of the excavation' reased to 50 ards. MEMORANDUM OF UNDERSTANDING for PUBLIC UTILITY DISTRICTS This Memorandum of Understanding (MOU) is entered between th (TRPA) and the public utility district(s) fisted in Attachment "A," TRPA's authority to enter into this MOU with local governme TRPA Compact (Public Law 96 -551) and Section 2.6 of the T authority of the MOU Partner to enter into this MOU is become part of the TRPA Code under Section 2.6 up hoe Regional Planning Agency eferred to as "MOU Partner." orities rests in Article VI (m) of the f Ordinances ( "Code "). The hment "A." This MOU shall P " °`E<:Y =;;the MOU Partner. ed in ing by TR PART 1— GENE ROVIS!QNS COMMON OBJECTIVES TRPA and wisely use a and enhance t implementation Orhe T Partner (they _ es) have a common objective to the wate resources in the Lake Tahoe Region, ss of gov ' ent through the efficient onal Plan. TERM OF AGREEMENT This Mis effectiv shalt re in effect ice in writing. ttachment "A" by the Parties and minated kither party following a 60 -day Termsituthis MOUs1 be ed in accordance with the TRPA Code. INTER TION rovisfrior of this MO l are subject to the interpretation and AND SEV ITY DISTRIBUTION FUNCTIONS se • ility pions of Section 1.6 of the TRPA Code. Activi uthorized by TRPA under this MOU are described in Attachment B (Tab Exempt (E) and Qualified Exempt (QE) Activities). These ctivr re designated as either "Exempt" or "Qualified Exempt." ent B modifies the scope of Exempt and Qualified Exempt activities ise allowed in Section 2.3 of the TRPA Code. Activities that are not Exempt or Qualified Exempt are subject to the project review requirements of Section 2.2 of the Code and are subject to TRPA review and approval. LOSS OF EXEMPTION Any "exempt" or "qualified exempt" activity set forth herein shall be considered a "project" outside the scope and authorities granted under this MOU if the TRPA Executive Director determines that the activity may have a substantial effect on natural resources in the TRPA Region as defined in the TRPA Code. Page 1 of 5 -46- COMMUNICATION TRAINING EXAMINATION OF RECORDS PROCEDURES FOR RESOLVING DISPUTES EMERGENCIES The Parties shall each designate a liaison for direct communication of matters related to this MOU. Liaisons for the Parties shall meet at least once per year to review this MOU and to establish policy directives, training needs, and renew communications. TRPA shall provide initial training to the MOU Partner regarding the provisions of this MOU. Subsequent training shall be provided for matters affecting this MOU, including but not limited to: changes to the TRPA Code or other provisions of the Regional Plan; policy or procedural changes; and training needed for corrective actions or clarify MOU provisions. Every record of activity under this `` all be open for examination in accordance with Article VI (o) of Compact. In the event of a dispute, difference of inte decision regarding the terns or conditions of first be pursued by the MOU liaisons, and if the ation, or appeal of a OU, settlement shall s are unable to resolve the dispute then by the executive officers o : ' arties. If the executive officers are unable to resolvea dispute, the Executive Director m minate the MOU or recommend that the Metter be heard by the TRP g Board. The TRPA Exec . '. Diredermay issue an emergency permit for a situation or circumstance h poses late dander to life, property or the e .. nt and nds ction to order to comply with the Coma p Cgegional P and/or of Procedure. Emergency permit requests may bOAflede by letter, if time allows, or by telephone or in pion, i does not . Requests shall include a description of the natigeoWifikscatfor of the rgency and the work to be performed. Upon the EisuAtive Director's:.deteination that an emergency does exist, initial mit apteuval may be given orally. In the event an emergency exists and PA o are closed, or a means of communication is not readily ava , the Partner may proceed to take necessary action while dilige `; continuing to contact the TRPA Executive Director. ENVIRONMENTAL DOCUMENTATION RECORD KEEPING AND REPORTING The M ' artner shall certify that a Qualified Exempt Activity allowed d MOU shall not have a negative impact on the environment by ing a TRPA Initial Environmental Checklist (IEC) for the activity. A "`'``ities requiring a TRPA Environmental Assessment (EA) or Environmental Impact Statement (EIS) are not covered by this MOU. The MOU Partner shall keep records of Exempt activities commenced pursuant to this MOU for a period of thirteen months following the cessation of the activity. The MOU Partner shall also report Qualified Exempt (QE) activities to the TRPA liaison on a TRPA reporting form at least three business days prior to commencement of the activity. Activities allowed under this MOU may be subject to an annual audit by TRPA. -47- Page 2 of 5 AMENDMENT ASSIGNMENT This MOU may be amended from time to time by mutual agreement of the Parties in writing. Proposed amendments shall be presented to the liaisons (for approval by their respective agencies) as soon as possible to facilitate timely consideration of proposed amendments. None of the authorities, duties or responsibilities set forth in this MOU shall be assigned, transferred or subcontracted to a party other than that named in Attachment A, without written consent by TRPA. Part 2 — PERFORMANCE ST . ARDS The following standards shall apply to activities authori -;, tinder thL MOU. The Parties shall consult with each other regarding any uncertainties about t . ndards. Alttive standards may be approved by the TRPA liaison when the results ar mined to be equal or superior to these E; standards. GENERAL STANDARDS 1. Project Area Project area shall be calculated for Quaid ExenVtoctivities i 30.4.1.C.2 of the TRP M: 1 ` , $ oject areas shall not OVEOlapexcep land coverage or I rdance with Subparagraph activities that do not involve 2. Land Coverage The fol covera i. e m for Qualified Exempt activities subject to the landt0Verage props of C �� r 30 of t -. Code: • PtOkct Area • AlloWeble land coverage bi probe' : a and land capability district • Existing lend coverage byject area and land capability district • Existing excess land coverage by project area and land capability district • Relocated land coverage by project area and land capability district • New land coverage by project area and land capability district • Transferred land coverage by project area and land capability district 3. Findings The MOU Partner shall keep, as part of their Exempt Activity records, all written findings required in the TRPA Code for the activities allowed under this MOU. Page 3 of 5 -48- CONSTRUCTION AND GRADING STANDARDS 1. Sediment and Erosion Control Appropriate measures shall be taken to control sediment and prevent erosion from graded or unstable ground. Erosion control structures shall be installed and maintained in an operable condition for ground disturbing activities. Sediment and erosion control measures shall, at minimum, conform to the following provisions of the TRPA Code of Ordinances: • Chapter 33, Grading and Construction • Section 60.1, Water Quality Control • Section 60.3, Source Water Protection • Section 60.4 , Best Management Practice Requ Erosion control structures shall be installed beforeavities comm until disturbed sites are stabilized or winterized Subparagraph 3 winterization requirements). Erosion controtmeasures shall include rev approved plant species and soil mulching with composted organic materials increase soil moisture holding capacity of soils. Revagstatedereas shall be pro disturbance and irrigated as nece , :• ensure plant groratthduring the first gro and shall remain in place of the TRPA Code for tion with TRPA necessary to d from future g season. 2. Vegetation Protection Vegetation within, or adjacent to, constr 61 and other applicable of the or adjacent to a construction site shall be fe provisions of the TRPA Regional Ptbn, including equipment shall enter into, and no materials sha n ar eat xx' tz�•e protected in accordance with Chapter d native vegetation to remain on rotecti ccordance with all applicable not limited to Section 33.8 of the TRPA Code. No placed within, areas protected by fencing. 3. Dus Appr disturbi but not lim activities co measures s ivities in acco • Subsection T and shall taken .to prevent the transport of fugitive dust from ground ce with an applicable provisions of the TRPA Regional Plan, including .3 of the TRPA Code. These measures shall be employed when tinue until disturbed sites are stabilized. 4. Noise and Hours of Construction, maintenance, and demolition activities creating noise in excess of the TRPA single event noise or community noise level standards in Section 68.9 of the TRPA Code shall be considered exempt provided that such work is conducted between the hours of 8:00 a.m. and 6:30 p.m. Emergency work to protect life or property is also exempt from the TRPA noise standards. Page 4 of 5 -49- MEMORANDUM OF UNDERSTANDING for PUBLIC UTILITY DISTRICTS ATTACHMENT "A. Between Tahoe Regional Planning Agen TRPA's authority to enter into this Memorandum of Under, ' _ " °'° ,.a OU) with local governmental authorities rests in Article VI (m) of the TRPA Compact (Pu taw 9 • and Section 2.6 of the TRPA Code of Ordinances. The authority of the MOU Part tenter into th • U rests in This MOU shall become effective when signed by th ies listecelow. TAHOE REGIONAL PLANNING AGENCY Date Date: -50- tive Director Page 5 of 5 South Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 54+6474 • Fax 5330 541 -0614 • www.stpud.us BOARD AGENDA ITEM 4g TO: Board of Directors FROM: Paul Hughes, Chief Financial Officer MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: Contract for Audit Services REQUESTED BOARD ACTION: Authorize execution of a three year contract for audit services with Grant Thornton LLP, in the amount of $157,500 plus $3,000 per year for each required program under the single audit. DISCUSSION: The District issued a request for proposals for audit services on January 19, 2012, due no later than February 17, 2012. The District received four proposals, two of which scored very similar and much higher than the other two. The two highest scoring and equally qualified proposers were Grant Thornton and Crowe Horwath (formerly Perry- Smith). The cost proposals from the two firms were evaluated by staff and the Finance Committee. The three year cost proposed by Crowe Horwath was $206,250 plus $3,000 per year for each required program under the single audit, or $48,750 greater than the cost proposed by Grant Thornton. SCHEDULE: The contract is for audit services for fiscal years 2012, 2013, and 2014 COSTS: $157,500 plus $3,000 per year for each required program under the single audit. ACCOUNT NO: 1039/2039 -4470 BUDGETED AMOUNT REMAINING: The appropriate amount will be budgeted each fiscal year to cover the audit expenditures ATTACHMENTS: Costs Proposal CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer & Water GENERAL MANAGER: YES 4 1J NO CHIEF FINANCIAL OFFICER: YES NO -51- QGrantThornton Cost proposal Professional fees and billing information Audk • Tax • Advisory Grant Thornton LLP 100 W Lite* street Sole 770 Reno, NV 89501 -1965 T 775.786.1520 F 775.7861091 www.GranfThombo.com Assurance Partner Assurance Manager Supervisors Staff Total Proposed not -to- exceed audit fee for the years ended June 30: 2011 2012 2013 $425 250 175 135 50 $ 21,250 100 25,000 100 17,500 100 13,500 350 $ 77,250 $ 47,000 49,000 51,000 Total $147,000 Our fees are directly related to the time required to complete the assignment. We devote considerable effort to controlling the time expended while maintaining consistency with our professional responsibilities and our desire to provide outstanding services to our clients. In addition, we estimate and agree not to exceed out -of- pocket costs of $3,500 per year. In committing to a discounted not -to- exceed fee, we have anticipated that support will be provided by the District's staff to locate records for review, prepare various account analyses as may be needed, and prepare the financial statements. Our fee quote includes our estimate of the time necessary to audit the South Tahoe Public Utility District. Our quote assumes that there are no other significant changes in size or level of operations and that there are no significant audit or financial reporting issues. South Tahoe Public Utility District may be required to have a single audit, and if that were to occur, we agree to an additional fee of $135/hour due to the varying nature of grant compliance testing. -53- Gan ThsnsnUP U.& nwibrlYmd Graft Th,,nbi hMnfwrlLW South Tahoe Public Utility District General Manager Richard H. Soil: rig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe. CA 96150 -7401 Phone 530 544-6474 • Fax 530 541 -0614 • www.stpuci.us BOARD AGENDA ITEM 6a TO: Board of Directors FROM: Tim Bledsoe, Customer Service Manager MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: Request to Appear Before the Board re: Public Records Request for Mailing Addresses for the District's Ratepayers REQUESTED BOARD ACTION: Consider request received from John Runnels, Citizens Alliance for Responsible Government, to furnish customer mailing addresses and if available, E -mail addresses. DISCUSSION: During the January 19th Board meeting, the Board discussed in detail the pros and cons of releasing confidential information. It was the consensus of the Board to postpone making a decision on this request until the next time the full Board was seated. Staff Comments: By letter of December 19, 2011, John Runnels submitted a Public Records Request for the mailing addresses for District ratepayers, including email addresses. On December 22, 2011, his request was denied pursuant to Government Code Section 6254:16, discussed below. Mr. Runnels relayed, under the Comments from the Audience portion of the January 5, 2012 Board meeting, that he thought the public interest in disclosure of the information clearly outweighs the public interest in nondisclosure, and requested this issue be decided upon by a vote of the Board. The California Public Records Act ( "Act "), was enacted by the California Legislature to ensure that the public has access to information concerning the conduct of the public's business. This is achieved by allowing the public to inspect and /or obtain copies of identifiable public records. The Act defines "public records" as "any writing containing information relating to the conduct of the public's business prepared, owned, used, or retained by any state or local agency regardless of physical form or characteristics." The Act was designed to allow for greater governmental transparency by making information more readily available. -55- Tim Bledsoe March 15, 2012 Page 2 At the same time, the Legislature recognized the need to exempt certain types of government records from disclosure. There are numerous statutory exemptions as well as a general balancing test which allows an agency to withhold records if the public interest in non - disclosure clearly outweighs the public interest in disclosure. The interests that justify these exemptions are primarily related to the recognition of an individual's right to privacy (e.g. privacy in certain personnel, medical or similar records) and the need for a government agency to perform its assigned function in a reasonably efficient manner (e.g. maintaining confidentiality of attorney - client privileged records, records related to pending litigation and preliminary notes or memoranda). Government Code section 6254.16 provides that nothing in the Act shall be construed to require disclosure of the name, home address or telephone numbers of utility customers of local agencies, except in certain circumstances. However, the disclosure of the name, utility usage data and home address of certain utility customers is authorized in six specified instances. The only applicable exception in this case is where the local agency determines that the public interest in disclosure of the information clearly outweighs the public interest in nondisclosure. (Gov. Code, § 6254.16(f).) As described above, pursuant to the Act, customers' personal contact information is not disclosable. In considering the Act, California courts have consistently ruled that individuals have a substantial privacy interest in their personal contact information. Because Mr. Runnels, at the time of his December 19, 2011 request, presented no information demonstrating a public interest in disclosure of customer contact information, his request was denied by staff. In order to disclose records containing the requested information, the Board must find that the public interest in the disclosure of customers' contact information clearly outweighs the public interest in nondisclosure. Comments from Reauestor, John Runnels: Mailing addresses will be used to engage the 70% of out of town ratepayers who have no access to daily local media coverage of STPUD activities. Providing an unbiased report of STPUD policies and operations, a heads up to Proposition 218 notifications, and site information for local Internet blogs to provide information, interaction, and involvement for out of area ratepayers. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: Government Code Section 6254:16 CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -56- CATEGORY: General From the Government Code, section 6254.16: 6254.16. Nothing in this chapter shall be construed to-require the disclosure of the name, credit history, utility usage data, home address, or telephone number of utility customers of local agencies, except that disclosure of name, utility usage data, and the home address of utility customers of local agencies shall be made available upon request as follows: (a) To an agent or authorized family member of the person to whom the information pertains. (b) To an officer or employee of another governmental agency when necessary for the performance of its official duties. (c) Upon court order or the request of a law enforcement agency relative to an ongoing investigation. (d) Upon determination by the local agency that the utility customer who is the subject of the request has used utility services in a manner inconsistent with applicable local utility usage policies. (e) Upon determination by the local agency that the utility customer who is the subject of the request is an elected or appointed official with authority to determine the utility usage policies of the local agency, provided that the home address of an appointed official shall not be disclosed without his or her consent. (f) Upon determination by the local agency that the public interest in disclosure of the information clearly outweighs the public interest in nondisclosure. South Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer J 1275 Meadow Chest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www stpud.us BOARD AGENDA ITEM 6b TO: Board of Directors FROM: Paul Sciuto, Assistant General Manager MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: Upper Truckee River Sewer Line Protection Project' REQUESTED BOARD ACTION: Continue Emergency Action DISCUSSION: The Board declared this an emergency on January 5, 2012. Repairs to the facilities are still underway. Public Contract Code Section 22050(c) requires the Board to review the emergency action at every scheduled Board meeting thereafter until the action is terminated, to determine by a 4/5 vote, that there is a need to continue the action. An update will be given at the Board meeting. SCHEDULE: Repairs to be completed as soon as possible. COSTS: $250,000 (estimated) ACCOUNT NO: BUDGETED AMOUNT REMAINING: Unbudgeted ATTACHMENTS: None CONCURRENCE WITH REQUESTED ACTION: p GENERAL MANAGER: YES 4� .A NO CHIEF FINANCIAL OFFICER: YES /6%1 NO -59- CATEGORY: Sewer South Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www stpud.us BOARD AGENDA ITEM 6c TO: Board of Directors FROM: No Bergsohn, Project Manager MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: Upper Truckee River Sewer Line Protection Project REQUESTED BOARD ACTION: Authorize an increase in the amount of $20,162 to Purchase Order P24808 for added environmental permitting services; biological monitoring; revegetation inspection; and post - construction monitoring. DISCUSSION: The effort required to satisfy regulatory agency comments have exceeded the level of permitting assistance in the original engineering services scope of work (Northwest Hydraulic Consultants NHC, December 16, 2011). In addition, unanticipated regulatory agency requirements have been imposed on the project that were not recognized in the original scope of work. NHC is requesting an increase of $3,640 for additional permitting assistance required to satisfy regulatory agency comments and finalize the Lahontan Regional Water Quality Control Board (LRWQCB) 401 Water Quality Certification and Tahoe Regional Planning Agency (TRPA) Grading Permit required for this project. The California Department of Fish and Game is requesting that a biologist be on -site to monitor potential biological impacts while dewatering and watering of stream channels during stream bed stabilization. NHC is requesting an increase of $4,400 to provide a biologist to satisfy this requirement. In response to concerns regarding the level of experience of the landscaping sub- contractor, staff requested that NHC provide additional construction oversight during revegetation. The added cost for these inspection services is estimated at $2,700. Staff requested that NHC prepare a monitoring plan and associated budget estimate to satisfy Special Conditions 21 and 2J of the project TRPA Grading Permit # ERSP 2012- 0219. The conditional permit items require the District to conduct 3 years of post - construction stream restoration monitoring to confirm that the installed grade control structures for the Upper Truckee River bed are stable and function as intended (Condition 21); and to conduct 2 years of post - construction revegetation monitoring to confirm that the installed vegetation is successful (Condition 2J). The District has requested that the TRPA approve stream restoration monitoring for a 2 year period to —61— No Bergsohn March 15, 2012 Page 2 be consistent with the required revegetation monitoring period. The added cost for these monitoring services is estimated at $9,422. As added engineering services are needed to respond to regulatory agency requirements that were not anticipated as part of the original scope of work, District staff recommends that the Board approve the requested cost increase for additional engineering services, as presented in the Proposal for Monitoring Plan (NHC, March 5, 2012) and the March 7, 2012, email from Ed Wallace to No Bergsohn. Approval of the requested increase will raise the contract ceiling to a total amount of sixty five thousand five hundred ninety seven dollars ($65,597). SCHEDULE: As soon as possible COSTS: $20,162 ACCOUNT NO: 1029 -7096 BUDGETED AMOUNT REMAINING: <$50,282> ATTACHMENTS: Proposal for Monitoring Plan, Northwest Hydraulics Consultant, March 2012; Costs email from Ed Wallace to Ivo Bergsohn (March 7, 2012) CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES A" _ NO CHIEF FINANCIAL OFFICER: YES '" NO -62- CATEGORY: Sewer Upper Truckee River Emergency Sewer Pipeline Protection Proposal for Photo Monitoring Plan Stream Bed /Bank Stability and Revegetation Monitoring March 2012 The following proposal for a Photo Monitoring Plan was prepared by Northwest Hydraulic Consultants (NHC) for the South Tahoe Public Utility District (District) Upper Truckee River Emergency Sewer Pipeline Protection Project (Project). Background The plan was prepared to satisfy Condition 2I and Condition 2J of the TRPA Grading Permit (File # ERSP 2012 -0219) for the Project, which state: Condition 21: The permittee shall provide to TRPA for review and approval a monitoring plan that includes post- construction photographs and evaluation to confirm that the grade control structures are stabilized and have been successful. This plan may include, but is not limited to, annual reporting for a minimum of 3 years indicating that no adverse upstream or downstream impacts have occurred (e.g. stream bed down- cutting, stream bank erosion), success criteria, etc. Condition 2J: The permittee shall provide to TRPA for review and approval a revegetation success criteria and monitoring plan ;hat includes post- construction photographs and evaluation to confirm that the revegetation has been successful. This plan may include, but is not limited to, annual reporting up to 2 years indicating that soil compaction in disturbed areas is similar to undisturbed, native species growth and cover, no/limited invasive species, etc. Stream Stability Photo Monitoring Locations Seven photo monitoring points are proposed as shown in Figure 1 to assess the stability of the constructed grade control structures and the stream bank stabilization. • Photo point P -1 will be located on the existing bar between the primary and secondary channel upstream from the existing sewer line. The picture will be taken looking in a north easterly direction focused on the stream bank stabilization. • Photo point P -2 will be located on the existing bar between the primary and secondary channel immediately across from the existing manhole. The picture will be taken looking in an easterly direction towards the existing manhole and stream bank stabilization. UTR Emergency Sewer Pipeline Protection Photo Monitoring Plan 1 -63- March 2012 • Photo point P -3 will be located on the existing bar between the primary and secondary channel downstream from the existing sewer line. The picture will be taken looking in a north easterly direction towards grade control #3. • Photo point P -4 will be located on the existing bar between the primary and secondary channel downstream from the existing sewer line. The picture will be taken looking in a south easterly direction towards grade control #1 and the stream bank stabilization. • Photo point P -5 will be located on the right bank of the main channel downstream from the existing sewer line. The picture will be taken looking in a south westerly direction towards grade control #3. • Photo point P -6 will be located on the left bank of the existing bar between the primary and secondary channel downstream from the existing sewer line. The picture will be taken looking in a south westerly direction towards grade control #2. • Photo point P -7 will be located on the existing bar between the primary and secondary channel downstream from the existing sewer line. The picture will be taken looking in a north easterly direction towards grade control #2. Figure 1. Photo Monitoring Locations to Assess Stream Stability UTR Emergency Sewer Pipeline Protection Photo Monitoring Plan 2 -64- March 2012 Revegetation Photo Monitoring Locations Four photo monitoring points (seven total pictures) are proposed as shown in Figure 2 to assess revegetation success. • Photo point P -8 will be just east of the existing manhole. Three pictures will be taken looking towards the north, east, and south. • Photo point P -9 will be located roughly 250 feet east of P -8 along the access road. The picture will be taken looking east. • Photo point P -10 will be located roughly 250 feet east of P -9 along the access road. The picture will be taken looking east. • Photo point P -11 will be located roughly 250 feet east of P -10 at the intersection of Country Club Drive and Bakersfield Street. The picture will be taken looking west towards the existing State Parks gate. Figure 2. Photo Monitoring Locations to Assess Revegetation Success UTR Emergency Sewer Pipeline Protection Photo Monitoring Plan 3 March 2012 -65- Schedule for Observations The duration and timing of observations and photos shall be as follows: • One set of post- construction photos in the summer of 2012 to document the beginning of the monitoring period after snow cover is gone. • One set of photos taken annually for the monitoring period. Photos shall occur during the following periods: o Spring/Summer of 2013 o Spring/Summer of 2014 • During the monitoring period, optional photos may be taken after major runoff events to capture any impacts to the Project. Major runoff events will be defined as flows exceeded 1,000 cfs in the Upper Truckee River. Optional event -based photos may be taken at different locations relative to the established photo points to document any impacts to the Project. Evaluation and Reporting In addition to documenting the condition of the Project site through photo- monitoring, the following assessments will be conducted during each site visit and summarized in the submitted reports. Stream Bed and Bank Stability Observations During each photo monitoring site visit, a reconnaissance will be conducted to note any significant changes related to the: 1) amount of cover over the sewer pipeline in the Upper Truckee River; 2) stability of the stream bed at the constructed grade control structures; and 3) stability of the banks in -the vicinity of the grade control structures; 4) stability of the vegetated rock toe protection along the bank adjacent to the existing manhole; and 5) stability of the banks upstream of the vegetated rock toe protection. Project success will be judged based on the observed stability of the stream bank and bed stabilization measures and the avoidance of any excessive erosion or tendency for flanking of the structures. Revegetation Observations The revegetation observations will be made at approximately the same time as the bed and bank stability observations and will focus on qualitative evaluation of revegetation success in terms of 1) survival of sufficient willow pole cuttings to increase woody vegetative cover compared to pre - project conditions; 2) adequate survival of salvaged sod to stabilize the upper bank; 3) adequate seed germination and growth to provide cover in disturbed areas, with no significant areas of areas of bare or exposed soil outside of trails defined by human use; 4) normal health and vigor in revegetation plantings comparable to the SEZ in the areas adjacent to the work area; and 5) absence of noxious weeds and invasive exotic species. UTR Emergency Sewer Pipeline Protection Photo Monitoring Plan 4 March 2012 -66- Reporting Photo monitoring reports will include the photos taken, photo annotations indicating the time and date of each photo, and field observations regarding bank stability, bed stability, and revegetation success. Photo monitoring reports will be submitted to STPUD for review and for STPUD transmittal to TRPA. Photo monitoring report submittals will occur on the following schedule: • Post Construction Report — Summer 2012 • Year 1 Report - Summer 2013 • Year 2 Report - Summer 2014 Cost Estimate The anticipated budget for the total photo monitoring effort is $9,422. UTR Emergency Sewer Pipeline Protection Photo Monitoring Plan 5 March 2012 -67- No Bergsohn From: EWallace @nhcweb.com Sent: Wednesday, March 07, 2012 12:14 PM To: No Bergsohn Cc: bwolfe@nhcweb.com Subject: Costs Ivo - These may be somewhat conservative but if we don't need the whole amount we won't use it. With respect to Item 3, we are anticipating another round of comments with TRPA and more interaction with Lahontan and have already exceeded our original permit coordination budget by a fair amount. So we are requesting that you consider an augmentation to our contract for permit coordination as well as the two items you called about. Please call with any questions Thanks Ed 1. Biologist on site for dewatering and rewatering - 4 days at $1100 - $4400 2. Additional revegetation inspection - 3 days at $900 - $2700 3. Additional permit coordination - 20 hours SE at $182 - $3640 Total - $10740 Ed Wallace 1 Principal nhc northwest hydraulic consultants 80 S Lake Avenue I Pasadena, CA 91101 Tel: 626 440 -0080 1 626 940 -8347 I Fax: 626 440 -1881 Web: www.nhcweb.com This email and any attached files are confidential and intended for the use of the addressee. {fyou believe you have received this email in error, please not j+ the sender, delete it, and destroy any copies. Check this email and attachments for viruses; NHC accepts no liability for virus damage caused by email. This email message has been delivered safely and archived online by Mimecast. youth Tahoe Public Utility District General Manager Richard H. 5olbrig Directors Chris Cefalu James R. Jones any Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530541-0614. www.stpud.us BOARD AGENDA ITEM 6d TO: Board of Directors FROM: Paul A. Sciuto, Assistant General Manager /Engineer MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: C -Line Hydraulic Power Generation Feasibility Analysis REQUESTED BOARD ACTION: Approve proposal from selected consultant for engineering planning and design services. DISCUSSION: District staff sent a Request for Proposal (RFP) to seven engineering consulting firms and posted the RFP on the District web page to provide the planning and design for the C -Line Hydraulic Power Generation Feasibility Analysis. The last C -Line hydro feasibility study was completed in June of 2001. Several factors have changed in the interim: power costs have increased, generation technology has improved, and power utilities are under increased pressure to produce renewal energy. Diamond Valley Ranch improvements are expected to alter the C -Line terminus as well cis create new power requirements in the application area via pivot rigs. The first phase of the project will perform a condition assessment of the C -Line to determine the remaining useful life and will look at the feasibility of hydro power generation on the C -Line. Based on the outcome of the feasibility study the contract may move on to design. The District received four proposals from engineering consulting firms. Five District staff will review the proposals and select the most qualified and competent consultant. Staff will select a consultant, negotiate the terms of the agreement and give a recommendation to the Board prior to, and at the Board meeting. El Dorado County Water Agency is providing $50,000 funding for the Condition Assessment and $50,000 for the design phase of the project. Paul Scluto March 15, 2012 Page 2 SCHEDULE: April 2012 to October 2012 COSTS: To be determined ACCOUNT NO: 1029 -7915 and 1029 -8028 BUDGETED AMOUNT REMAINING: $50,000; $83,893 ATTACHMENTS: A summary of proposals and recommendation will be made available prior to, and at the Board meeting CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO -70- South Tahoe Public Utility District Memorandum Date: March 14, 2012 To: Board of Directors, R. Solbrig From: Paul Sciuto, P.E. —J-Jeiv, GoA 3-1.5-1 64A 144 t9 Richard Solbrig, General Manager Board Members Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer Re: C -Line Hydraulic Power Generation Evaluation - Consultant Recommendation On February 14, 2012, staff solicited a Request for Proposal (RFP) to provide engineering design services to complete: a condition assessment of the Districts C -Line; a feasibility analysis of its hydraulic power generation potential; and an engineering design and specifications for permitting and construction of the recommended hydraulic power facility. Responses to the RFP were received from 1) HDR Inc.; 2) Carollo Engineers /Sunrise Engineering; 3) Kennedy Jenks Consultants /Rentricity; and 4) Domenichelli and Associates. Submitted proposals were carefully reviewed and scored by District staff using the five criteria and point values listed on the RFP Evaluation and Selection Criteria worksheet. These criteria included: completeness; specialized design /technical competence; approach; capacity /capability; and familiarity with the project conditions. Following staff evaluation, reviewer scores were compiled and are presented on the RFP Scoring Summary. From the scoring summary, the proposals were rescored according to each reviewer's rank to provide a total score, provided in the RFP Rankings. On March 14th, review team members conferred to discuss the proposals. Review of the scoring summary and RFP rankings shows that the highest scores from the review team for all evaluation and selection criteria were awarded to the technical proposal submitted by Carollo Engineers (CE). District staff recommends that the Board approve the selection of CE for this project and allow staff to enter into an agreement with CE to complete this work up to a total contract amount not exceeding two hundred thousand dollars ($200,000). Attachments Cc: I. Dergeohn File South Tahoe Public Utility District • 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Phone 530.544.6474 • Facsimile 530.541.0614 • www.stpud.us SOUTH TAHOE PUBLIC UTILITY DISTRICT C -LINE HYDRAULIC POWER GENERATION EVALUATION ENGINEERING SERVICES PROJECT : 1029 - 7915 /NNW RFP EVALUATION & SELECTION CRITERIA Rank the technical proposals using the following criteria and enter your scores on the accompanying scoring sheet. CRITERIA DESCRIPTION POINTS 1 COMPLETENESS: Rank the overall completeness of the technical proposal. Does it include all components requested in the RFP, including transmittal letter, three (3) relevant project descriptions, project approach, project team description, organization chart, % time availability matrix; project work -hour requirenments; and project schedule. 10 SPECIALIZED DESIGN/TECHNICAL COMPETENCE: Rank the project team in terms of professional qualifications /experience necessary to complete the project. Does the proposal provide specific examples of relevant experience showing proficiency in hydraulic power generation 2 feasibility analysis and engineering design appropriate for the project. 30 Does the project team have the relevent professional credentials (e.g. PE in appropriate discipline) and desired level of experience required to perform the work? APPROACH: Rank the proposal in terms of offering unique approaches or key considerations to completing the project. Does the proposal show that 3 the project team has a full understanding of the project scope. Does the 35 proposal provide a clear plan to complete the project in a complete and cost effective manner. CAPACITY /CAPABILITY: Rank the the project team on its qualifications 4 and ability to provide specialized services needed to complete the project 20 as presented in the proposal. FAMILIARITY: Rank the project team in terms of its work experience and 5 familiarity in working withy the District. 5 TOTAL 100 CLINE HydroGen_Eval.xlsCriteria SOUTH TAHOE PUBLIC UTILITY DISTRICT C -LINE HYDRAULIC POWER GENERATION EVALUATION RFP SCORING SUMMARY FIRM 1 CRITERIA 2 3 4 5 TOTAL SCORE HDR Reviewer 1 9 25 32 18 5 89 Reviewer 2 10 23 25 15 5 78 Reviewer 3 7 24 24.5 16 3 74.5 Reviewer 4 8 27 28 16 3.5 82.5 Reviewer 5 9 27 31.5 16 3.5 87 Reviewer 6 0 Reviewer 7 8 10 18 10 4 50 HDR Totals 51 136 159 91 24 461 Carollo Engineers /Sunrise Engineering Reviewer 1 10 30 27 20 5 92 Reviewer 2 10 28 31 17 5 91 Reviewer 3 8 27 24.5 14 4.5 78 Reviewer 4 9 27 24.5 16 4.5 81 Reviewer 5 9 27 31.5 18 4 89.5 Reviewer 6 0 Reviewer 7 10 25 30 20 5 90 CE/SE Totals 56 164 168.5 105 28 521.5 KJC /Rentricity Reviewer 1 10 27 30 19 5 91 Reviewer 2 8 24 28 15 5 80 Reviewer 3 9 18 28 12 4 71 Reviewer 4 10 24 24.5 16 4.5 79 Reviewer 5 9 24 24.5 18 4 79.5 Reviewer 6 0 Reviewer 7 10 26 25 20 5 86 KJC /RENT Totals 56 143 160 100 27.5 486.5 CLINE HydroGen_Eval.xls 1 3/14/2012 SOUTH TAHOE PUBLIC UTILITY DISTRICT C -LINE HYDRAULIC POWER GENERATION EVALUATION RFP SCORING SUMMARY FIRM 1 CRITERIA 2 3 4 5 TOTAL SCORE Domenichelli and Associates 1 Reviewer 1 10 25 33 15 5 88 Reviewer 2 9.5 26 32 17 5 89.5 Reviewer 3 8 24 24.5 14 5 75.5 Reviewer 4 9 21 24.5 14 4.5 73 Reviewer 5 9 18 31.5 16 4 78.5 Reviewer 6 0 Reviewer 7 9 24 30 20 5 88 D &A Totals 54.5 138 175.5 96 28.5 492.5 ##### Engineering Reviewer 1 0 Reviewer 2 0 Reviewer 3 0 Reviewer 4 0 Reviewer 5 0 Reviewer 6 0 Reviewer 7 0 ### Totals 0 0 0 0 0 0 CLINE HydroGen_Eval.xls 2 3/14/2012 SOUTH TAHOE PUBLIC UTILITY DISTRICT C -LINE HYDRAULIC POWER GENERATION EVALUATION PROPSAL RANKINGS (1 =High; 4 = Low) FIRM Carollo Engineers /Sunrise Domenichelli and HDR, Inc. Engineering KJC /Rentricity Associates Reviewer 1 3 1 2 4 Reviewer 2 4 1 3 2 Reviewer 3 3 1 4 2 Reviewer 4 1 2 3 4 Reviewer 5 2 1 3 4 Reviewer 6 2 Reviewer 7 4 1 3 2 TOTAL SCORE 17 7 18 20 CLINE HydroGen_Eval.xls 1 3/14/2012 • youth Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544- 6474 • Fax 530 541 -0614 • wwwstpud.ue BOARD AGENDA ITEM be TO: Board of Directors FROM: Paul A. Sciuto, Assistant General Manager /Engineer MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: District Methyl Tertiary Butyl Ether (MtBE) Policy REQUESTED BOARD ACTION: (1) Discuss updating the District's MtBE Policy; and (2) Authorize staff to revise the current MtBE policy by allowing the detectable level to be raised from 0.2 parts per billion (ppb) or micrograms per liter(pg /L) to 0.5 pg/L DISCUSSION: The District's current policy on MtBE is the only criteria where the District policy is more restrictive than EPA and California Department of Public Health (CDPH) standards for drinking wafer. The current MtBE policy was adopted by the Board in November 2003. It states that if a concentration of 0.2 parts per billion (ppb) is detected at a District well, the well will be placed on increased observation and testing and ultimately shut down if detections at that concentration continue. Staff believes that raising the detectable level to 0.5 pg /L will substantially reduce added laboratory costs required to maintain the MtBE policy and increase operational flexibility of the water system. Increase of the detectable level to 0.5 pg/L will maintain water quality at a level that is at least 10 times lower than the State and Federal Maximum Contaminant Levels (MCL's). The following are current California Drinking Water Standards for MTBE concentrations MtBE pg/L (ppb) Primary MCL 13 Secondary MCL (Taste and Odor) 5 CDPH DLR(Detection Reporting Limit) 3 EPA Methods 524.2 and 8260 0.5 Another factor that should be considered is that most laboratories do not report MtBE concentrations down to 0.2 ppb. The District has had difficulty finding laboratories that test to 0.2 ppb and it is at an increased cost per test. The laboratories used for MtBE analysis all use EPA Methods 524.2 and 8260. They do not make any major changes to the test method to report to 0.2 pg /L. Most laboratories have never tried to run minimum detection limit (MDL) studies to 0.2 pg /L, since the state requirement is to report MtBE down to 3 pg /L. -71- Paul Sciuto March 15, 2012 Page 2 The District has been monitoring the progress of MtBE groundwater contamination assessment and remediation activities at many of the Leaking Underground Storage Tank (LUST) sites within the District's service area since 1998. The Lahontan Regional Water Quality Control Board (LRWCB) and El Dorado County Environmental Management Department (EDCEMD) are responsible for regulating the site investigation and clean -up activities at these sites. There has been significant pressure from the State Water Resources Control Board (SWRCB) and UST Clean -Up Fund on these agencies to attain closure. This has led to a growing number of LUST sites that have been closed with low levels of groundwater contamination (less than the secondary MCL of 5 pg /L) remaining in place. This trend is continuing and risk -based clean -up levels are currently being considered by the SWRCB that under certain conditions would permit closure of LUST sites with much higher MtBE concentrations on the order of 100s of pg /L. Because of these relatively high concentration clean up levels compared to the District's allowable MtBE concentrations, there is the potential for future water supply impacts. Staff believes it is in the best interest of the District to stay more restrictive than State and Federal standards, but to increase the allowable concentration of MtBE in our drinking water supply to 0.5 pg /I while maintaining the delivery of safe, high quality drinking water in a cost effective manner. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: Revised MtBE Policy CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES ifoll NO CHIEF FINANCIAL OFFICER: YES NO -72- South Tahoe Public Utility District Policy Regarding Methyl Tertiary Butyl Ether (MTBE) It is the policy of the South Tahoe Public Utility District not to supply drinking water containing detectable concentrations of MTBE to its customers, if reasonable alternatives exist. To achieve this goal, the following actions will be taken: a) When MTBE is detected in any District well at a level of O720_5 parts per billion (ppb), the well will be placed on increased observation and testing to determine if the initial measurement is an anomaly. If the concentration of MTBE in the well continues to increase or averages greater than O 2O_5 ppb after a minimum of five (5) tests the Board will be notified and action will be determined. b) The staff shall identify and utilize all reasonably available alternatives to the use of any well in which MTBE has been detected. c) If the staff determines that the continued operation of any District well is likely to cause a nearby plume of MTBE to contaminate any District well, it will notify the Board and place that well on an increased observation and testing status. d) In the event that a water shortage is imminent, and that voluntary and mandatory conservation measures are inadequate, standby wells will be utilized, in accordance with the contingency plan, to the extent and for the time period necessary to provide for customer water demand. Appropriate notice wilI be provided to the public. e) Staff will prepare a contingency plan and submit it to the Board for its review to establish the priority for the utilization of wells placed on increased observation and testing status because of MTBE concentrations found in the well. The contingency plan shall ensure that only wells with the lowest concentrations, if any, of MTBE are activated to meet emergency needs. f) In an effort to determine the ongoing status of a well that has been shut down due to detectable levels of MTBE, that well will be sampled on a monthly basis. If it is found that concentrations of MTBE have decreased below detectable concentrations, the well may be returned to full -time operation. Adopted by Board 11/06/03 South Tahoe Public Utility District General Manager Richard H. 5oflnig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544$474 • Fax 530 541 -0614 • www.stpudt.us BOARD AGENDA ITEM 6f TO: Board of Directors FROM: Paul Hughes, Chief Financial Officer MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: Appointment to the Oversight Board in accordance with Assembly Bill 1X 26 REQUESTED BOARD ACTION: Appoint a member of the Board or senior staff to the Oversight Board of the Successor Agency to the former South Tahoe Redevelopment Agencies. DISCUSSION: As part of the dissolution process of redevelopment agencies in California, successor agencies are designated to administer the remaining debts and obligations of the former redevelopment agencies. Each successor agency will have an Oversight Board in place by May 1, 2012. The Oversight Board has a fiduciary responsibility to holders of enforceable obligations and the taxing entities that benefit from the distribution of property tax and other revenue. The Oversight Board is required to direct the successor agency to take certain actions to wind down the affairs of the redevelopment agency. The Oversight Board is composed of seven members; two appointed by the City, two appointed by the County, one appointed by the largest Special District (STPUD), one appointed by the County Superintendent of Schools, and one appointed by the Chancellor of the Community College. SCHEDULE: Oversight Board must be active by May 1, 2012 COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: Redevelopment Agency Minutes of January 30, 2012 and Dissolution Resolution CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer & Water GENERAL MANAGER: YES AllAt yy NO CHIEF FINANCIAL OFFICER: YES [� NO -75- tak 'making a positiva difference *ow." STAFF REPORT FOR SOUTH LAKE TAHOE CITY COUNCIL AND SOUTH LAKE TAHOE REDEVELOPMENT AGENCY AND SOUTH LAKE TAHOE CITY COUNCIL ACTING ON BEHALF OF GOVERNING BOARD OF THE SOUTH TAHOE REDEVELOPMENT SUCCESSOR AGENCY MEETING OF JANUARY 30, 2012 TO: Honorable Mayor and City Council Members, STRA Board of Directors and Council Members Acting on Behalf of South Tahoe Redevelopment Successor Agency Governing Board Members FROM: Nancy Kerry, Public Affairs/Communications Manager Christine Vuletich, Finance Director and Patrick Enright, City Attorney RE: Resolutions to Dissolve South Tahoe Redevelopment Agency and Establish the City of South Lake Tahoe Housing Agency as Required or Authorized by State Assembly Bill 'IX 26 RECOMMENDATION: Adopt the following resolutions, which are explained in detail in this report: On behalf of the City Of South Lake Tahoe, to adopt the following resolutions: 1. A Resolution of the City Council of the City of South Lake Tahoe Reestablishing the City of South Lake Tahoe Housing Authority and Makin} an Election in Connection with Housing Assets and Functions Under Part 1.85 of Division 24 of the California Health and Safety Code and Taking Certain Actions in Connection Therewith 2. A Resolution of the City Council of the City Of South Lake Tahoe Making Certain Determinations Regarding the Administration of the Transient Occupancy Tax Levied Pursuant to Ordinance No. 868 Adopted by the South Tahoe Redevelopment Agency and Taking Certain Related Actions A Series of Resolutions to Dissolve the South Lake Tahoe Redevelopment Agency, and take actions on behalf of the STRSA (uooessor Agency) -- 18lry 30.2012 Page 2 3. A Resolution of the City Council of the City Of South Lake Tahoe Appointing a City Council Member to the Oversight Board in Accordance with Califomia Assembly Bill 1 x 26. On behalf of the South Lake Tahoe Redevelopment Aeencv, to adopt the following resolutions: 4. A Resolution of the South Tahoe Redevelopment Agency Pursuant to Health and Safety Code Section 34163 Finding That No Loans of the Agency Have Been Forgiven or Amended Since the Enactment of AB X1 26. The South Lake Tahoe City Council Acting on Behalf of the Governing Board of the South Tahoe Redevelopment Successor Apencv, to adopt the following resolutions: 5. A Resolution of the Board of Directors of the Successor Agency to the South Tahoe Redevelopment Agency Amending an Enforceable Obligation Payment Schedule Pursuant To Health And Safety Code Section 34177 and Taking Certain Actions In Connection Therewith 6. A Resolution of the Board of Directors of the Successor Agency to the South Tahoe Redevelopment Agency Creating a Redevelopment Obligation Retirement Fund Pursuant To Health And Safety Code Section 34170.5 And Taking Certain Actions In Connection Therewith BACKGROUND: The complex process dissolving the South Tahoe Redevelopment Agency as required by the passage of State Assembly Bill 1X 26 ( "AB 26) and affirmed by the California Supreme Court has been discussed with the City Council at several public meetings throughout 2011. At the time of the signing of this staff report (January 26, 2012), the following pending court and legislative actions could change some or all of the actions to be taken at the scheduled January 30, 2012 meeting of the City Council, STRA Board of Directors, and South Tahoe Redevelopment Successor Agency (STRSA): • The City of Cerritos, its redevelopment agency and several other Southern Califomia cities have filed a lawsuit in Sacramento Superior Court to invalidate AB 26. The Plaintiffs' hearing on their motion for Stay Order /Preliminary Injunction is scheduled for January 27, 2012. If the "Cerritos" case is granted an injunction, the meeting of the actions stated herein scheduled for January 30, 2012 may be pobtponed pending further direction of a court. - A Soles of Resolutions take Tahoe - Redevelopment A and take actions on behalf of the STRSA (Successor Agency). January 30, 2012 Page 3 • California Senator Padiilla's bill (SB 659) would delay implementation of AB 26 until April 15, 2012 has not received support and is currently stuck in committee and is extremely unlikely to be passed. In addition, Governor Brown as already indicated he would not sign the bill. • California Senator Steinberg's bill (SB 654) is continuing to proceed through the legislature, moving quickly through the Senate, and then to the Assembly and is expected to pass. The bill will allow the transfer of the Low to Moderate Income Housing Fund Balance to a new Successor Housing Agency. The bill is expected to pass both houses and be signed by the Governor but not before February 1, 2012, which means the action authorized (transfer of funds), if signed into law, would take place after dissolution of the agency. Therefore, with these bilis and actions in mind, the dissolution of the South Tahoe Redevelopment Agency is expected to occur on February 1, 2012. ISSUE AND DISCUSSION: As a result of the dissolution of the South Tahoe Redevelopment Agency (STRA), and the City Council's direction to staff at the January 17, 2012 meeting to establish a Successor Housing Authority, the following actions are required or authorized by AB 26 and explained in detail below: Actions to be taken by the City Council of the City of South Lake Tahoe: 1. Reestablishing the City of South Lake Tahoe Hous.ina Authority (Attachment 1) As directed by the City Council at the January 17, 2012 City Council meeting, the first resolution to be adopted will Reestablish the City of South Lake Tahoe Housing Authority. On November 17, 1998, the City and the South Tahoe Redevelopment Agency entered into a Memorandum of Understanding (Attachment 1A) whereby the City would provide staffing and the Agency would providing funding (from Low to Moderate Income Housing Fund / which represents 20% of property taxes collected via redevelopment tax increment) to operate and manage the City's Housing Authority. Also on November 17, 1998, the City and the South Tahoe Housing Authority (aka City Council) entered into a Memorandum of Understanding (Attachment 1 B) clarifying roles and responsibilities of housing staff. A Series of Resolutions to Dissolve the South Lake Tahoe Redevelopment Agency_, and take actions on behalf of the STRSA (Successor Agency) January 30, 2012 Page 4 • The attached resolution reestablishes the City as the Housing Authority, renaming it the City of South Lake Tahoe Housing Authority, and transfers all housing rights, powers, duties, assets and obligations as allowed by law, and functions previously performed by the Redevelopment Agency to the City of South Lake Tahoe Housing Authority. The resolution also authorizes the Authority to accept such transfer of all rights, powers, duties, assets and obligations. Should SB 654 (Steinberg) pass through both houses in the state legislature and be signed into law as expected, staff will bring a resolution back to the City Council and /or SLT Redevelopment Successor Agency to authorize the transfer of the balance in the Low to Moderate Income Housing Fund as of January 30, 2012 ($1.6 million) to the CSLT Housing Authority. The City's Housing Authority will manage the following housing programs: • First time Homebuyer Program • Housing Rehabilitation Program • Multi- family Inspection Program (all MFD over 8-units are inspected) • Development of Multi- family Affordable Housing Projects • Illegal Housing Unit Conversion Program • Lead Based Paint Program • Housing Hotline Note: Regarding the City's U.S. Housing and Urban Development (HUD) funded Lead Based Paint Program: At the January 17, 2012 City Council meeting, staff informed the Council that the 2011 Lead Based Paint $2,000,000 grant received by the City (second funding round), included a $200,000 contribution from RDA's future /annual housing fund set - aside and since those funds are eliminated under AB 26, staff presumed HUD would require a retum of the $2M grant. However, in subsequent conversations with HUD, they have authorized the City to recalculate the program budget removing the $200,000 housing contribution. HUD Secretary will need to approve the decision, but it appears the community will continue to benefit from this program, which removes lead hazards from homes, helps keeps children safe and provides local contractors an opportunity to work. N.o. 868 (Attachment 2) The investors holding the 1999, 2003, 2004, 2005 and 2007 Series A Tax Allocation Revenue Bonds for the South Tahoe Redevelopment Project Area No. 1 (collectively, the "Remaining Refunding Revenue Bonds ") have been guaranteed payment from redevelopment property tax increment (Agency Tax Increment) as the primary revenue. source, which is the most secure tax revenue available. To the extent that revenues from Agency Tax Increment are insufficient for debt service for -80- 3. _ A ewes_ of Re.soletiositto Dissolve the Solittazike Tahoe and take actions on behalf of the STRSA (Successor Agency) January 30, 2012 Page 5 these bonds only, revenues from transient occupancy tax collected in the project area were pledged as a secondary revenue source for the payment of and security to the `Remaining Refunding Revenue Bonds" (Tax Allocation Bonds). The attached resolution reaffirms the City Council's commitment to. the Trust Agreement, the Tax Allocation Loan Agreement and the Transient Occupancy Tax Loan Agreement, to continue payments to the bond holders from the primary revenue source of Agency Tax Increment and if and when revenues are insufficient, the use of agency transient occupancy tax as a secondary source of revenue. J'.1=Lili' aC C • 1 ber to the ers ht C • mtttee (Attachment 3) The attached resolution allows the Mayor and City Council to appoint one member of the City Council to the Oversight Committee as required by AB 26. The Oversight Committee will consist of the following members: o One member appointed by Mayor /City Council of the City that formed the redevelopment agency (City of South Lake Tahoe), o One member appointed by El Dorado County Board of Supervisors, o One member of the public appointed by the County Board of Supervisors, o One member appointed by the County Superintendent of Education (see *note) o One member appointed by the Chancellor of California Community Colleges representing community college districts in county, o One member appointed by the largest special district taxing entity (STPUD), o One former employee of the redevelopment agency (the City is seeking clarification of this appointment since all employees who worked in the former redevelopment agency were employees "of the City," not the STRA). *Note, the City has received notice that El Dorado County Superintendent Vicky Barber has appointed herself to the Oversight Committee (see Attachment 3A). One Action to be taken by the South Tahoe Redevel•Dment Agency Board: 4. Findin • .Th; t N • L ns f •: c li v Been Fo en or Ince the Enactment of AB X1 26 (AB 26) (Attachment 4) AB 26 requires a finding from the South Tahoe Redevelopment Agency board as to whether or not the Agency has forgiven any debts since the enactment of AB 26. There have been no loans or debts forgiven by the Agency. Therefore, adoption of the attached resolution makes that finding. A Series of Resolutions to Dissolve the South Lake Tahoe Redevelopment Agency, and take actions on behalf of the STRSA (Staxassor Agenc97 January 30, 2012 Page 6 Azns to be taken by the South Lake Tahoe City Council Acting on Behalf of the Successor Agency Goveming Board of Directors: 5. Amending an Enforceable Obligation Payment Schedule (Attachment 5) The attached resolution is the Amended Enforceable Obligation Payment Schedule (EOPS) which indicates the current amount of Outstanding Debt or Obligations total $199,502,413, plus on -going expenses. The Amended EOPS must be fled with State Department of Finance (DOF), State Controller's Office, County Auditor's Office, and posted on the Agency's website. The Successor Agency may not take any payment actions until three days after the EOPS has been received by the DOF. The Enforceable Obligations of the (former) South Tahoe Redevelopment Agency include the following: • Pass - through Payments (Tax Sharing Section 33401) to Lake Tahoe Unified School District, Lake Tahoe Community College). o Outstanding debt or obligation: $ 9,584,556 • El Dorado County Annual Administration Fee o Outstanding debt or obligation: $ 6,791,000 • Pass - through Payments (Section 33676), County General Fund, County ACO Fund, County Water Agency, County Service Area #3, South Tahoe Public Utility District, County School Superintendent. o Outstanding debt or obligation: $ 17,119,000 • Other Statutory Payments (Section 33607), that are obligations under AB 1290 but for which annual payments are not made until assessed valued is greater than the base year (2007 -08) value of $788,990,383. These future payments would be made to those listed above (Section 33676) along with the City, Tahoe Joint RCD and Happy Homestead Cemetery. o Outstanding debt or obligation: $ 10,230,000 • The 1999, 2003, 2004, 2005 and 2007 Series A Tax Allocation Revenue Bonds for the South Tahoe Redevelopment Project Area No. 1 (collectively, the "Remaining Refunding Revenue Bonds ") as described in #2 above. The primary revenue source for these bonds is (and will remain for the life of the bonds) Tax Increment collected in Project Area No. 1. o Outstanding debt or obligation: $ 155,201,647 • Contracted Financial Services (includes, but not limited to, trustee services, arbitrage rebate calculations, continuing disclosure reports, pass through calculations). o Historical Annual expense: $ 74.000 A Series of Resolutions to Dissolve the South Lake Tahoe Redevelopment Agency, and take actions on behalf of the STRSA (Successor Agency) January 30, 2012 Page 7 • Lawsuit Settlement/ Project Area No. 1 (Tricia Kennedy). o Outstanding debt or obligation: $ 150,000 • 2010 -2011 SERAF Low to Moderate Income Housing Fund Loan Repayment (AB 26 requires repayment of this loan). o Outstanding debt or obligation: $ 426,210 • Insurance (PARSAC) o Outstanding debt or obligation: $ 8,000 /per year • Administration Costs to the City of South Lake Tahoe (costs to administer Successor Agency debt, financial reporting, legal and banking fees)." o Outstanding debt or obligation: $ 265,000 /per year • Contracted Legal Services (Tonon & Associates; Richards/Watson /Gershon and Boutin Jones) for legal services provided in regards to Convention Center bankruptcy and pending resolution of lawsuit. o Outstanding debt or obligation: $ 50,000 /per year The $7 million loan from the City of South Lake Tahoe to the South Tahoe Redevelopment Agency, of which approximately $3,500,000 has been repaid, is a legal obligation of the RDA. However, the loan was invalidated by AB 26, which states that loans between sponsoring agencies (the City) and RDAs are invalid except for loans entered into within two years of adoption of a project area (Project Area No. 1 was adopted in 1988 and the loan agreement was executed in 2004). There is currently legislation pending that could validate the loan agreement, which may provide an opportunity to amend the EOPS in the future to include the City /RDA Loan Agreement should the City Council wish to do so (the Loan Agreement is included as Attachment 5B). 6. Creating a Redevelopment Obliaation Retirement Fund (RORF) (Attachment 6) AB 26 requires the Successor Agency (not the City or STRA), to adopt a resolution establishing a RORF to receive Tax Increment revenues from the County Auditor. The RORF will have a bank account separate from the City's bank account and will be used to collect revenues and pay the debts and obligations of the Successor Agency. RORF will be funded by 100% of the Tax Increment and will follow a payment priority set forth by AB 26. The attached resolution authorizes the Executive Director of the Successor Agency (City Manager) and Finance Officer (Finance Director) to create and administer the RORF and authorizes the Successor Agency Secretary (City Clerk) to file a copy with the County Auditor - Controller. A Series of Resolutions to Dissolve the South Lake Tahoe Redevelopment Agency, and take actions on half of the STRSA (Sucossor Agency) January 30,, 2012 Page 8 RO S AND R SP • NSIBI GOVERNING BOARD I H . S CC S AG N Y ND ITS As a reminder, the South Tahoe Redevelopment Successor Agency (RSA) will have the following responsibilities: • The Successor Agency will become effective February 1, 2012 and all South Tahoe Redevelopment Agency assets, contracts, leases, books and records, buildings, and the existing Low/Moderate Income Housing fund balance1 are required to be transferred to the Successor Agency. • Make payments and perform other enforceable obligations of the former RDA for bonded indebtedness, loans borrowed, employee pension obligations, judgments /settlements and legally enforceable agreements and contracts. • By March 1, 2012, adopt a Recognized Obligation Payment Schedule (ROPS), which is a permanent schedule of obligations (replaces the EOPS) and includes a listing of any revenues pledged to debt service. • By April 1, 2012, report to the County Auditor whether the total amount of property tax increment available to the Successor Agency will be sufficient to funds ROPS obligations. • By April 15, 2012, send the adopted ROPS to the State Controller and State Department of Finance for approval. Both of these agencies, along with the Oversight Board, oversee and must approve all actions of the Successor Agency. • Starting May 1, 2012, the Successor Agency may pay only the obligations on the approved ROPS. • Dispose of the former RDA's assets or properties expeditiously while maximizing value. • Wind down all affairs of the former RDA. • Prepare administrative budgets for Oversight Board approval. • Participate in Oversight Board meetings. • Act at the direction of, or upon approval of, the Oversight Board. 1 California Senator Steinberg's bill (SB 654) would amend AB1X 26 by authorizing the Low - Moderate Income Housing Fund Balance to transfer to the agency overseeing the Housing Activities of the former redevelopment agencies. Should SB 654 become law, the estimated $ 1.6 million in the LMIH fund balance would transfer to what will be the City's newly formed Successor Housing Authority. -84- A Series of Resolutions to Dissolve the South Lake Tahoe Redevelopment Agency, and take actions on behalf of the STRSA (Successor Agency) January 30, 2012 Page 9 FINANCIAL IMPACT: As described in Item #5 "Enforceable Obligation Schedule' and fisted in the Exhibit attached to the resolution (Attachment 5) the total outstanding debt or obligation estimated at this time is $199,502,413 (all Enforceable Obligations). The first calendar year of obligation payments and debt service (January 2012 through December 2012) total approximately $7,273,383, but that amount will be reduced in subsequent years as a one -time repayment of the SERAF loan is eliminated and the Kennedy settlement, which has three years remaining is eliminated. The table below illustrates how the Successor Agency will collect revenue and administer debt and obbgation payments for the period January to June 2012. As noted on the table, the Successor Agency will have two small one -time fund balances and sufficient tax increment to cover the Highest Priority Payment Obligations (Pass through payments and Tax Allocation bond payments) during the first period. AB 26 requires revenues, debts and obligations to be accounted for in two six month periods each calendar year, which will result in uneven revenue and payment cycles. TABLE 1: SUCCESSOR AGENCY, FINANCIAL OBLIGATIONS FIRST PERIOD (January - June 2012) Successor Agency Resources RDA Fund Balance $ 760,280 Tax Increment Revenue (Project Area No. 1) $ 5,175,735 RDA Convention Center Project Fund Balance (fax Increment collected from those parcels) (one -time fund balance transfer) $ 337,528 Project Area No. 2 Fund Balance (one -time fund balance transfer) $ 153,844 Low to Moderate Income Housing Fund Balance (LMIHF) $ 1,600,000 LMIHF balance expected to transfer to Housing Authority (projecting Steinberg bill passing) $ (1,600,000) Total Resources I $ 6,427,387 Successor Agency Obligations Pass Thru and Debt Payment Obligations Repay SERAF Loan (AB 26 requirement) $ 426,210 Et Dorado County Admin Fee $ 148,902 Pass Through Payments (Section 33676) $ 313,252 Pass Through Negotiated (LTUSD & LTCC) $ 150,000 Tax Allocation Bonds (next period payment is $3,656,092) $ 2,090,779 Subtotal Pass Thru and Debt Payment Obligations $ 3,129,143 Other Payment Obbaatiions Contracted Financial Services $ 37,500 Kennedy Settlement $ 50,000 Administration Costs (City of South Lake Tahoe) $ 132,500 Contracted Legal Costs $ 50,000 Subtotal Other Payment Obligations $ 270,000 TotalObligatfons l $ $3,407,141 Available Cony Forward Fund Balance for Required Debt and Obligations In next period (July 2012 to Dec 2012) $ 3,020,244 A Series of Resolutions to Dissolve the South Lake Tahoe Redevelopment Agency, and take actions on behalf of the STRSA (Successor Agency) January 30, 2012 Page 10 FINANCIAL IMPACT (Continued): As shown on the previous page, the South Tahoe Redevelopment Successor Agency (RSA) is responsible to continue to pay the obligations of the (former) redevelopment agency as listed and approved on the Enforceable Obligation Payment Schedule (EOPS) and later the Recognized Obligation Payment Schedule (ROPS). There is sufficient tax increment and fund balances available (as shown on Table 1) to cover the debts and obligations through the first period (through June 30, 2012). Non - "Enforceable" Obligations As noted earlier, the loan between the City and RDA (Attachment 7) was invalidated by AB26. However, there is pending legislation and lawsuits that could reverse the invalidation, which may provide an opportunity to amend the EOPS /ROPS to include this, loan. If that opportunity arises, igLd agency tax increment increases to provide sufficient revenue to pay the debt, the City might realize the actual repayment of funds. However, there has not been sufficient tax increment revenue to cover that debt since the loan agreement was signed in 2004; there will be no net negative impact on the General Fund resulting from this debt being excluded from the EOPS/ROPS. The following is a list of obligations previously accounted for in the redevelopment agency budgets, but are not "enforceable obligations" as defined by AB 26. They have been and will continue to be paid through transient occupancy tax (there is no net negative financial impact for the change in how these obligations will be funded and budgeted). • 2006 Lease Revenue Bonds o Annual payment obligation: $ 1,811,544 • State Water Resources Loan (for Stateline Erosion Control Project). The City took out this loan on behalf of' the redevelopment agency. o Annual payment obligation: $ 209,926 • Parks and Recreation Scholarship Fund (per bond covenants). • Annual payment obligation: $ 5,200 Employees previously funded through the redevelopment agency via a transfer of transient occupancy tax into the agency will now be funded directly from the transient occupancy tax received directly into the general fund. Employees previously funded through the housing set aside funds (Low to Moderate Income Housing Fund ( LMIHF)) will now be funded through the CSLT Housing Agency, which will receive one -time revenues in the form of a repayment of $426,000 loan (SERAF listed on EOPS), grants and any remaining LMIHF balances available. However, the annual set -aside of 20% of property tax for low to moderate income housing utilized to fund the majority of housing activities will cease as a result of AB 26. A Series of Resolutions to Dissolve the South Lake Tahoe Redevelopment Agency, and take actions on behalf of the STRSA (Successor Agency) Januarys 2012 Page 11 Satitinaft While the signatories below prepared the information in this report and attached rissiolutions, we appreciate and recognize the dedication and hard work of other teen ffiehiberS Who have invested time, thought, care and preparation into these and other diktuttlents relative to dissolving the South Tahoe Redevelopment Agency, which is a x and complicated process_. The agency has been in place since 1981 and has coated and expended more than 00,000,000 in tax increment revenue in the dikrokoment of various projects in and around Park Avenue, Heavenly Village, Mr Vie, Sill Run and elsewhere and provided hundreds of affordable housing units for the COtmmuniy. The professional attention to detail and care that has been invested by those involved to dissolve the agency and comply with AB26 is acknowledged. Christine Vuletich Finance Director A Amts: 1. Resolution of the City Council Reestablishing the City of South Lake Tahoe Housing Authority 1A 1998 MOU between the City and RDA regarding Housing Activities 1E. 1998 MOO &Mee& Cfty d Cltys Housing Author*, for Housing Responsibilities 2. Resolution of the City Council of the City Of South Lake Tahoe Making Certain Determinates Regarding the Administration of the Transient Occupancy Tax Levied Pursuant to Ordinance No. 868 a A Resolution Of the City Council of the City Of South Lake Tahoe Appointing a Cfty Council Member to the Oversight Board in Accofdancce With California Assembly Biti ix 26 3A Letter hem W d Barber, EbC Superintendent of Schools appointing herself fro Oversight Board 4. A Resolution of the South Tahoe Redevelopment Agency Finding That No Loans of the Agency Have Been Forgiven or Amended since AB 26 was Enacted 5. A Resolution of the Board of Directors of the Successor Agency to the South Tahoe Redevelopment Agency Amending an Enforceable Obligation Payment Schedule 5.8. 2004 Loan Agreement between City and RDA for repayment of $7.5M 6. A Resolution of -the Board of Directors of the Successor Agency to the South Tahoe Redevelopment Agency Creating a Redevelopment Obligation Retirement Fund Pursuant To Health And Safety Code Section 34170:5 And Taking Certain Actions In Connection Therewith 7. City Council Resolution 2011 -54 adopted September 27, 20911 electing to serve as the STRA Successor Agency (attached to keep the public record on resolutions related to AB 1X 26 complete) 8. AB 26 Acronym list -87- Attachment 2 City Council Resolution Making Certain Determinations Regarding the Administration of the Transient Occupancy Tax Levied Pursuant to Ordinance No. 868 RESOLUTION NO. 2012-11 A RIWOLITITON OP 'ilk crry COUNCIL OF THE CITY OF SOUTH LAKE TAHOE i G CERTAIN DEITERMINATIONS IMARDiNG THE ADMINEZRATION OF THE TRANSIENT OCCUPANY TAX IVIED PURSUANT TO ORDINANCE NO 868 ADOPTED BY THE SOU111 TAHOE REDE'VELOPMENT AGENCY AND TAKING CEitTAIN RELATED ACTIONS RECITALS A. The South Tahoe Redevelopment Agency (the "Agency") was formed in 1981 pursuant to the Community Redevelopment Law (the "CRL"), set forth in Section 33000 et seq. of the California Health and Safety Code ("H&S Code"). B. The City Council of the City of South Lake Tahoe (the "City") adopted Ordinance No. 746 on June 28, 1988, approving and adopting the redevelopment plan for the South Tahoe Redevelopment Project Area No. 1 (the "Project Area"). The redevelopment plan was amended from time to time. The redevelopment plan, as amended, is referred to herein as the "RedevelopMent-Phm, C. Pursuant to the CRL and the Redevelopment Plan, the Agency undertook a program to redevelop the Project Area. D. Pursuant to the. CRL and the Redevelopment Plan, the Agency receives •a portion of the revenues from the property tax levied upon the taxable property within the Project Area each year (the "Tax Increment"). E. The CRL and the Redevelopment Plan authorized the Agency to incur bonded indebtedness from time to time to fmance redevelopment projects within the Project Are& F. In 1995, the Agency desired to incur bonded indebtedness to accomplish the followkig (together, the "1995 Rowing Objectives"): (a) cause -the re of Wain. bonds (4Pnor Agency Debt") that were issued by the South Tahoe loirt Powers Financing Authority (the "Authority') to assist the Agency in financing improvements and betterments within the Project Mea, and (b) finance additional redevelopment projects. G. Based on analysis available to the Agency in 1995, the Agency determined that it was not in a financial position to issue bonds that would yield sufficient bond proceeds to accomplish the 1995 Financing Objectives, if the bonds were -secured only by Ta_x increment H. As further described below, the City provided assistance to the Agency to accomplish the 1995 Financing Objectives by (a) entering into an Amended and Restated Project Lease, dated as of November 1, 1995 (the "1995A Bond Lease"), by and between the City and the Authority in connection with the issuance of the Authority's Refunding Lease Revenue Bonds, 1995 Series A ("1995A Bonds"), and (b) implementing Ordinance No. 867, as City Council Resolution Making Certain Determinations Regarding Ordinance No. 868 Adopted January 30, 2012 adopted by the City Council on October 17, 1995 the "1995 City TOT Amendment"), which redirected certain revenue from the levy of transient Occupancy tax ("TOT") within the Project Area from flit City to the Agency. I. The Authority issued the 1995A Bonds, in the aggregate principal amount of $27,150,000, to assist the Agency in accomplishing- a part of the 1995 Twanging Objectives by rising the proteeds from the sale of the 1995A Bonds to refund a portion •of the Prior Agency Debt and finance redevelopment projects. J. Pursuant to the 1995A Bond Lease, the City made appropriations from the City's General Fund for rental payments to the Authority With respect to certain properties. Debt service on the Authority's 1995A Bonds was payable from and seemed by a pledge of the Authority's revenues from the City's rental payments under the 1995A Bond Lease. K. Since the enactment of Ordinance No. 292, adopted by the City Council on June 15, 1971, the City has levied a TOT within the City (the "City TOT"). Following the adoption of Ordinance No. 292, the City TOT became a significant source of revenue for the City's General Fund. • L. Pursuant-na-Section 7280.5-afthe California-Revenue and Taxation-eode-("MT Code Section 7280.5"), the Agency is authorized to levy, by ordinance, a TOT within the Project Area (the "Agency TOT") but only if the City amended its City TOT ordinance to provide that any person subject to the City TOT would be entitled to a credit in the amount of Agency TOT levied pursuant to RAU Code Section 7280.5. M. The Agency desired to levy an Agency TOT under MT Code Section 7280.5 as • a means to accomplithing the 1995 Financing Objectives. To that end, the City Council adopted the 1995 City TOT Amendment pursuant to RAT Code Section 7280.5 and the Agency adopted Ordinance No. 868, on Ogibber 17, 1995 the "Agency TOT (minima") to levy the Ageney TOT. N. In addition to the 1995A Bon*, the AntholitY also jaded RefundiliS Revenue Bonds (South Tahoe RedeVelopment Ptopet Area NO; 1), 1995 Series B (Ae '199511 Bonds"), in Or* aggregate principal =aunt of $28,555,000; to provide additional moneys to refund Prior Iwney Debt and finance redevelopment projects. 0. The 1995B Bonds were issued purStiant to a Trust Agreement, dated as of November 1, 1995 (the "Master Trust Agreement"), by and between the Authority and First Interstate Bank of California, as inistee. P. In connection with the issuance of the 1995B Bonds, the Agency entered into a Master Tax Allocation Loan Agreement, dated as of November 1, 1995 (the "Matter TA Loan Agreement") and a Master Transient Occupancy Tax Loan Agreement, dated as of November 1, 1995 (the "Master TOT Loan Agreement"), each by and between the Agency and the trustee for the 1995B Bonds. -2- -90- City Council Resolution Making Certain Determinations Regarding Ordinance No. 868 Adopted January 30, 2012 Q. Debt service on the 199513 Bonds was payable from and secured by revenues from the Agency's Tax Inert as the primary source. To the extent that des from Tax Increment were insufficient for such debt service, revenues from the Agcy T'OT were pledged as a nary source for the payment of and security for the 1995B Bonds. R. In connection with the adoption of the Agency TOT 4ranee and the issuance of the 1995B Bonds, the City and the Agency entered into a Transient Occtpncy Tax Adtiisation Agreement, dated as of November 1, 1995 (the "TOT Administration Agreement"). S. Pursuant to the TOT Administration Agreement, the City agreed to perform all fiu►clions incidental to the administration and collection of the Agency TOT, irieluding . the transfer of Agency TOT revenues to the trustee for the 199513 Bonds in the amount required by the Master TOT Loan Agreement for debt service. T. Together, the Master . TOT Loan Agreement and the TOT Administration Agreement, provide that any amount of Agency TOT revenues not required for debt service is paid to the City in consideration for (a) the collection and administrative services performed by the City in connection with the Agency TOT, (b) the City's prior advances made to the Agency fedevelopnient purposes, and (c)--o d [ m itt the-TOT Administration Agreement: U. Since 1995, the Master Trust Agreement, the Master TA Loan Agreement and the Master TOT Loan Agreement have been amended from time to time in correction with the is- trance of additional bonds to provide for the financing and refinancing of redevelopment projects of the Agency (es so amended, the "Trust Agreement," the "TA Loan Agreement" and the "TOT Loan Agreement," respectively). V. As of February 1, 2012, the following bonds remain outstanding under the Trust Agent (collectively, the "Remaining Refunding Revenue Bonds"): (a) the Authority's Refunding Reve to Bonds (South Tahoe Red®velopm+nt Project Area No. 1) 1999 des A, in the remainingprincipal, aineimt of $8,090,000, (b) the Autarky's Rel dirng .Revneue Bow (South Tahoe Redeveloteuent Project Area No. 1) 2003 Series A, in the remaining pfineipal amount of $10.,6103000, (c) the Authr ty's Refunding Revenue Bonds (South Tahoe Redevelopment Project Area No 1) 2004 Series A, in the r a ng principal amount of $11.270,000, (d) the Authority's Refunding Revenue Bonds. (South Tahoe Redevelopment Project Area No 1) 2005 Series A, in the remaining principal amount of $13.,350,100, and (e) the Authority's Refunding Revenue Bonds (South Tahoe Redevelopment Project Area No. 1) 2007 Series A, in the remaining principal amount of $19,630,000. W. Pursuant to the Trust Agreement, the TA Loan Agreement, the TOT Loan. Agreement, debt service on the Remaining Refunding Revenue Bonds is payable from and secured by revenues from the Agency's Tax Increment as the primary source. To the extent that revenues from Tax Increment are insufficient for such debt service, revenues from the Agency -3- -91- City Council Resolution Making Certain Determinations Regarding Ordinance No. 868 Adopted January 30, 2012 TOT are pledged as a seCondary source for the payinent of and security for the Remaining Refunding Revenue Bonds. X In 2006, the Authority issued its Refimding Lease Revenue Bonds, Series 2006A (the "2006A Bonds," and together with the Remaining Refunding Revenue Bonds, the "Existing Bonds"), in the aggregate principal amount of $23,245,000, the proceeds of which were used to refund the 1995A Skids. In such connection, the Qty and the Authority entered into a Sublease Agreement, dated as of April 1, 2006 (the "2006A Bond Lease"). Y. Pursuant to the 20G6A Bond Lease, the City makes appropriations from the City's General Fund for rental payments to the Authority with respect to certain properties. Debt service on the Authority's 2006A Bonds is payable from and secured by a pledge of the Authority's revenues froin the City's rental payments wider the 2006A Bond Lease. Z. The TOT Administration Agreement was amended in 2006 to reflect certain updates. As amended, the TOT Administrarion Agreement recognizes the following as third party beneficiaries to the TOT Administration Agreement: (a) the holder of any obligation issued under the TOT Loan Agreement (b) The Bank of New York Mellon Trust Company, NA, as the successor trustee Under the Trust A.greenient relating to the Remaining Refunding -Revenue Bonds, lid TOTNWMFPul5lic -FMM130fantee Corp (formerly -191BIA— - Insurance Corporation), the bond insurer for the 2006A Bonds. AA. The City has continued to collect the Agency TOT and make transfers to The Bank of New York Mellon Trust Company, N.A., the successor trustee under the Trust Agreement, as contemplated by the TOT Adrninistration Agreement. BB. AB X1 26 and AB X1 27 were signed by the Governor of California on June 29, 2011, malcitlg significant changes to the CRL, in/Aiding adding Part 1.8 (=mewing with Section 34161) and Part 1.85 (commencing with Section 34170) ("Part 1.8 ) to Division 24 of the H S Code. CC. The Calitbrnia Redevelopment liNOtigi9n and League of California Cities filed a lawsuit in the Supreme Ccititt of Calilbrnla (Callfionia Redevelopment Association, et al Matosantos, et al (Case No S194861)) alleging that AB X1 26 and AB X1 27 were unconstitutional. On DeeeMber 29, 2011, the Supreme Court issued its opinion in the Matbsantos case (the "Matpsantos Opinion") largely upholding AB X1 26 and invalidating AB X1 27. DD. Pursuant to AB X1 26, a redevelop:ient agency may not impose a new TOT pursuant to R&T Code Section 7280.5, cos. cing on the effective date of AB X1 26. AB X1 26 does not address the effect of the Agency's dissolution on the existing Agency TOT which is pledged as a secondary source of revenues for the repayment of the Remaining Refunding Revenue Bonds. EE. Subsection (d) a R&T Code Section 7280.5 states: "Any pledge pursuant to Section 33641 of the Health and Safety Code made with respect to taxes imposed under this -4- -92-- City Council Resolution Making Certain Determinations Regarding Ordinance No. 868 Adopted January 30, 2012 section for the payment of principal and interest on bonds of a redevelopment agency shall constinrte the obligation of a cpntract between the redevelopment agency and the holder of the bonds and shall be pmteeted from impairment by the United States and California Constitutions. The provisions of this section which authorize the imposition of the taxes may not be repealed during the time that any of the bonds remain outstanding. FF. H&S Code Section 34175(a), added by AB X1 26, states: "It is the intent of this part that pledges of revenues associated with ejifo ale obligations of the former redevelopment agencies are to be honored.. It is intended that the cessation of any redevelopment agency shall not affect either the pledge, the legal existence of that pledge, or the stream of revenues available to meet the requirements of the pledge." GG. The Trust Agreement, the TA Loan Agreement, the TOT Loan Agreement and the TOT Administration tion Agreement (including the original agreements and each amendment thereto) (collectively, the `Bond Documents ").are all duly authorized written agreements executed at the time of and integral to the issuance of bonds, which were issued to finance or refinance redevelopment projects of the Agency and many of which remain outstanding as of the date of this Resolution. The Bond Documents provide for the security and repayment of such bonds. Pursuant to R&T Code Section 7280.5 and 14&S Code Section 33641, the Bond Documents caolieet vely alittitligatibianingntParrtrstifil HH, Pursuant to AB X1 26, as modified by the Matosantos Opinion, the Agency will be dissolved as of February 1, 2012, and all authority, rights, powers, duties and obligations vested with the Agency under the CRI,, except for those provisions of the CRL that are repealed, restricted, or revised pursuant to AB. X1 26, will be vested in a successor entity (the "Successor Agency"). II. The City Council of the City adopted Resolution No.. 2011 -54 on September 27, 2011, pursuant to Part 1.85 of AB Xl 26 and .made an election for the City to serve as the Successor Agency, a distinct and separate legal entity from the City. JJ. A disruption or cessation of the achifilligtration and collection of the Agency TOT pursuant to the TOT Administration Agent, as a whole, would materially impair the rights and benefits of the holder of the Existing Bonds. NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF SOUTH LAKE TAHOE HEREBY FINDS, DETERMINES, RESOLVES AND ORDERS AS FOLLOWS: .1119,L__11. The above recitals are true and correct and are a substantive part of this Resolution. Section 2. To ensure that the contractual obligations owed to the bondholders of the Existing Bonds are met and no default in the payment of an enforceable obligation occurs, upon the dissolution of the Agency, the City will recognize the Successor Agency as the successor to the Agency under the Agency TOT Ordinance, the TOT Loan Agreement and the TOT Administration Agreement. The City shall continue to do so and shall continue to administer and collect the Agency TOT pursuant to the TOT Administration Agreement in the same manner that -5- -93- City Council Resolution Making Certain Determinations Regarding Ordinance No. 868 Adopted January 30, 2012 the City hone prior to the Agency's dissolution, so long as each of the 'following remains true under the California State C,013StitUtiOti, RAT Cede Section 72$o.5 ar4 B Xi 26: (a) the Agency TOT -Ordinance has not been repealed (by operation of law or 0th:0*e) or held itivand pursuant to a judgment of court (b) the TOT Loan Agreement and the TOT Administration Agreement, as a whole, remain as enforceable obligations; and (e) the TOT levied pursuant to the Agency TOT Ordinance remains pledged as a secondary some of remment revenues for the Reinainlng Refunding Revenue Bonds if the property taxes allocated to the Successor Agency pursuant to AB X1 26 to pay the Magnin' g Refunding Revenue Rends are insuffieient therefor. Section3. If at any time the TOT Loan Agreement and the TOT Administration Agreement are no longer operative as a whole, whether by operation of law or as the result of the retirement of the Remaining Refunding Revenue Bonds (by payment at maturity, redemption prior to maturity, defeasance or otherwise), the collection of the Agency TOT under the Agency TOT Ordintmee shall cease and, pursuant to the 1995 City TOT Amendment, all TOT collected within the Project Area shall be part of the City TOT. Section 4. The officers and staff of the City are herby authorized and directed, jointly and severalty, to do any and all things which they may deem necessary or advisable to effectuate ____this-Resolution,and_any_such_aetions4xevionsly taken bysuch_officeraarelereb_y_ratified and confrmted. PASSED AND ADOPTED by the City Council of the City of South Lake Tahoe on January *2012, by tite folinvving vote. AYES: Councilmember(s) FORTIER, DAVIS, COTE & GREGO NOES: Councilmember(s) ABSENT: Cotmcilmembet(s) SWANSON ABSTAIN: Councihnember(s) -94- Attachment 5 Board of Directors of the South Tahoe Redevelopment Successor Agency Amen-ding an Enforceable Obligation Payment Schedule Attathment 2004 Loan Agreement between City and RDA —RF.SOLUTIMI-NO. 201?-3 A RESOLUTION OF THE BOARD OF . DIRECTORS OF THE SUCCESSOR AGENCY TO Tiff SOUTH TAMA REDEVELOPMENT AGENCY AMENDING AN ENFORCEABLE OBLIGATION PAYMENT SCHEDULE PURSUANT TO HE/writ op SAFETY COD SECTION 341'17 AND TAKING CERTAIN ACTIONS IN CONNECTION THEREWITH RECITALS: A. AB X1 26 and AB X1 27 were signed by the Governor of California on June 29, 2011, making certain changes to the Community Redevelopment Law (Part I (commencing with Section 33000) of Division 24 of the California Health and Safety Code) the "Redevelopment Law"), including adding Part 1.8 (commencing with Section 34161) ("Part 1.8") and Part 1.85 (commencing with Section 34170) ("Part 1.85"). B. The California Redevelopment Association and League of California Cities filed a lawsuit in the Supreme Court of California (California liedevelopment Association, et al. v. Matosantos, et al. (Case No. S194861)) alleging that AB X1 26 and AB X1 27 are unconstitutional. On December 29, 2011, the Supreme Court issued its opinion in the Ivlatosantos case largely upholding AB X1 26, invalidating AB XI 27, and holding that AB X1 26 may be severed from AB X1 27 and enforced independently. C. The Supreme Court generally revised the effective dates and deadlines for perf, ce of obligations in Part 1.85 arising before May 1, 2012, to take effect four months later. D. As a result of the Supreme Court's decision, the South Tahoe Redevelopment Agency (the "Redevelopment Agency"), a redevelopment agency in the City of South Lake Tahoe (the "Chy"), created pursuant to the Redevelopment Law, was dissolved pursuant to Part 1.85 on February 1,2012. B. By its Resolution. No 2011-54, adopted on September 27, 2011, the City Council of the City made an election to stole as the successor agency fot the RedeVe/opment Agency under Part 1.85 (the `Successor Agency"). F. By its Resolution No, 2011-7, the Redevelopment Agency approved an Enforceable Obligation Payment Schedule on August 23, 2011, which the Successor Agency desires to amend. G. Health and Safety Code Section 34177(a) provides that successor agencies are required to continue to make payments due for enforceable obligations. Health and Safety Code Section 3417700(4 as modified by the Supreme Court, provides that on and after February 1, 2012, and moil a Recognized Obligation Payment Schedule becomes operative, only payments required pursuant to an enforceable obligation payment schedule shall be made The enforceable obligation schedule may be amended by the successor agency at any public meeting and shall be subject to the approval of the oversight board as soon as the board has sufficient members to form a quorum. H. Acton WY, the Board desires to idpt this-Resolution adopting an enforceable ----- - obligation schedule. NOW, THEIIEFORE, TOE BOARD OF DIRECTORS OF THE SUCCESSOR AGENCY TO THE SOUTH TAHOE REDEVELOPMENT AGENCY, HEREBY FINDS, DETERMINES, RESOLVES, AND ORDERS AS FOLLOWS: Section 1. The above recitals are true and correct and are a substantive part of this Resolution. Section 2. This Resolution is adopted pursuant to Health and Safety Code Section 34177. Section 3. The Board hereby adopts the enforceable obligation payment schedule attached as Exhibit A to this Resolution and incorporated herein by reference (the "Enforceable Obligation Payment Schedule"). Section 4. The Secretary is hereby authorized and directed to post the Enforceable Obligation Payment Schedule on the City's web site. Section 5. The Enforceable Obligation Payment Schedule may be amended from time to tune at any public meeting of the Boatd. Section 6. The Secretary is hereby authorized and directed to transmit a copy of the Enforceable Obligation Payment Schedule by mail or electronic mew to the County A. uditor- Controller, the State. Controller, and the California Department of Finance (the “Department of Finance"). A notification providing the Internet Web site location shall suffice. Section 7. The officers. and staff of the Successor Agency are hereby authorized and directed, jointly and severally, to do any and all things which they may deem necessary or advisable to effectuate this Resolution, including Providing dOonnients asstaciated with the Enforceable Obligation Payment Schedule to the Department of Finance and the State Controller m the manner of their choosing, and any guch actions previously taken by such °Mors Are hereby ratified and coutnned. The Board hereby designates the City of South Lake TOW Director of Finance as the official to whom the Department of Finance may make requests for review in conneotion with the geforceable Obligation Payment Schedule. PASSED AND ADOPTED this 30th day of January, 2012. AYES: Agcy members PCfErrIXR, DAVIS' CCU 8' GBEGO Agency members MSENT: Agency members SWANSoN APSTAtN Agency members Claire Fortier, Chair - 92= VOMIT A FORCEABLE OBLIGATION PAYMENT SCHEDULE 81000-01 72 \ 1420207v2.dde Exhibit A -98- wma of Rsdavabpmsnt Agency >$OUth Taboo etopf0@4Pm.nt AMOY Proleat Ares(a) 'PrOI.ct Mill' 1 :ENFORCEABLE OBLIGATION PAYMENT SCHEDULE Per AS 211- ,SeatIon•34i67 and 34469 (') Page 1 of _1 Project Name ! Debt ObHg . Payee Dgscriptlan Total Outstanding Debt or Obligation Total Due During Fiscal- Year , Payments by month Jan Feb Mar A. M Ju Total 1999 Refunding Revenue Bonds - Series A Bank of New York a • • . !.J., , -,�, iii004 - nding Revenue -.., .. - Series, . Bank of New York • Issues fo. tund. nqn -house lg, .:_ ,' 21! 041: , ' • 746 48 MEI Mel, Er200 Refunding Revenue Bonds - Series A Bank of New York * ^'• >, •:: • , I 0 • : -1l- "_ - Bank of New Yak 321 kaye ta: fiirdrlercslg ' 29 1`.,2•2 _ 672 'J.' 833 750 -« 750 1111 CI 61 2007 Bonds - Series f�pyeR "to fund necr.hvkisNb 40 5 : 574 1 .161 578 Contracted Financial Serolces Bank•ofNYMslion, Widen, Fraser & Associates Trustetsefvices.•a t*Se calculations, canllnuing,dYldosute �.i• "• th .- ,. as =. lotion • 75,000 $ 8,250 $ 6.250 $ 6250 $ 6250 $ 6250 8 6,250 $ 37„500 7 Pro)ect Area 1 (Park Avenue Tricia Kenned t e., - t 150 0 �0 000 50 0 r r 50.0,0 piIncome NIInsurance 10 Housing. Fund for ' 2010 -11 SERAF Payment :Lo VMod'Inccme Housing Fuhd Per AB X126 $ 428.210 J 428.210 $ 428,210 $ 428210•, c s c Administration. Costs PAR AC Y .r - n,�: L, . a r ,, I 9 010 8 000 City ofGauttvLake. Tahoe Apartay, Ontarnardabi admlNetrattell aasurefrl9, 8tianetpl'tegorang,• legal; and banking fees) $ 265,000 $ 22;083 $ 22,083 $ 22,083 $ 22;083 $ 22,083 ' $ 22,083 . $ 1,32;498 11) Contracted Legal Services Tenon & Assoc,, Riehardt:Watson Gershon, and Be•tln Jones Conventktn'Center'Pa t ban tuttotoyeri9 fli e$4Fb . ng.resollatt 'Qf 1B sUF* ! $ 50:000 $ 8.333 ' $ 8333 $ 8.333 $ 8,333 $ 8 ;333 ' $ 6,333 $ 50.000 12) $ - 13 $ - 14 IIMOMMIIIIIIIIIIMI •$ - '$ - $ - - Totals •This Page Totals. Page 2 Totals - Page -3 Tows • Page 4 Totals - Other Obligations Grand total - All - .. - s $chsduls.(EOPajwas etighneliy edaptadb, ms teeleVerepthent I MMO* MPS): which ogee bs adopbA Me Me iltweeeeor Amy $ 155,777,857 $ 6.621.0.81 $ 36,666 '$ 462,876 I S 36,666 $ 2. 185,445' $ 38.666 '$ 36,688 2..794,987 , $1t 4.t:3 E iULIC A'k) NL B" si$INIMINIIIIIIIIIIIIIIMIE -E: 1.111E:Elallgt111111NIEEEA Ell. .1 G 46 78 agency IN August, 201$..ThIs amsndnNgt Is vaed through June 30, 1y Mtty 1.2012. 88 :"A E l86 445' 2012 and will be the baste for the [WM Fail 36'888• E IINEGliall • This Enforceable Obligaaon'Paymsnt Roenpuaed'O beMasn'Peymsnt Name of Redevelopment Agency. h. T , • L.. pr000t Ares(s) 0114}Eft OBUGATION PAYMENT SCHEDULE Per AS 26 -Seation,34167 and; UM r) Pagel Of_1 POOPS ProJectName / Debt Obligati Payee , DescriptIOn ' Total Outstan 5ing • Debtor Obligator Total Due During Fiscal Year PaYniertti-bY Jan; Feb Mar Apr May Jun Total • . 1) Tax Sharing Section 33401 Lake Tahoe Unified School .District Tax.Sharing Agreement 4,792,27f. 75,000 75.400 75,001 75,00( 148 90: 2) Tax Sharing Section 33401 Lake Tahoe COnimunity College Tax SharInct Agreement 4,792,278 75090, L 75,000 3) Property Tax Adrnin Fee Er Dorado Comity Spunly-Yearly.Administrative Fee. 6,791,001, 144,9.02 148,902 L 4) Section 33676 Payments County' General 'Fund Section '33670.PaYments 10,970109 201,000 100,500 i00,500 201,001 3.97( 5). Section' 33676 Payments County A,C,O.Pund '..$0010.n 3365 Pawments 228,000 3,975 1,988 1.988 6) Section 33678 Payments County.WaterAciencY Sat8on33675,Parytnerna 359,000/. 8,275 3;138 3138 6,27( 7) Section.33676 Payments Couriti-Seniice Area 33 SeQ9on 3364telPsYments 2521_000 5,0,40 2,500 2,500 5,001 8), Section 33676 Payments South-ratios PUblic Utility District . Section '33676,13810ents 4.253,000 78.000 39.000 39;000 78.001 9) Section 33676 Payments County School Suatrintandent ' Section ;33076 Payments 1,051,000 19,000. 9,500 9,500 19,00( 10) 'Statutory Payments County Senora! Pund; ,§aation;33607.5Payents 5206.000 _.0 0 .1 11) Statutory Payment. County &OD:Fund Section 336075 PaYmento 11'0,000 • 0 0 .( 12) Statutory Payments 00061Y Water-Money Siod0013110.74 Paarnents 174.000 ; 0 0 ' ( 13) Statutory Payments County SetYlowArla 113 Attel)011.311607,.5 PeYments 122,000 : 0 0 (, 14) StabatOryPaYments 'City Of SLT - Seation331307.5 PsYrnests 2S$6,000 ; 0 0 15) Statutory Payments . South TahoiaPubile.Utifity'Distkit _ Sesiert33607,5 Romanis 2,052.000 0 0 16) Statutory Payments Tahoe Jciat FteD, .Uctom-- ' ' , 7.5 Pmessths -ir` 1,7.400 . 0 0 17, ; 1. ' ,-.11....!...6 Pa • - ,•-• • . -.2 7.5 ft . • •-0�Oi 0. 0 S . El DOW* CiauM10400100 . 0 0 ( .... .... 6l • ( 0 ____....._ _._ .. . ( 211 . . • ( . 221.s. ( 23) ( 24) 25) : ( 26) ( 27), 28) I— I 1 . Totals - Other 0814103*ns 1 43172-099 1 612,152 305428 1 0 0 0 f 30(40201 T 61z15 .. . i NOTE: Statutory Payments (a/3-1200) ars currently. sato Ainttlartesssed Wituelare &eater, thin the baseyear value (2007.08) 0,5788,990,383. ., PAYMENT OF CLAIMS FOR APPROVAL March 15, 2012 Payroll 3/6/2012 347,427.29 Total Payroll 347,427.29 ADP 407.00 American Express 23,784.38 Bank of America 0.00 BBVA Compass Bank 0.00 BNY Mellon Trust Company 0.00 Brownstein/Hyatt/Farber /Schreck legal services 14,354.71 CaIPERS actuary services 0.00 CDS- health care payments 171, 055.01 Union Bank 0.00 Total Vendor EFT 209,601.10 Accounts Payable Checks -Sewer Fund 484,215.51 Accounts Payable Checks -Water Fund 108,338.36 Accounts Payable Checks-Self-funded Insurance 38,608.50 Accounts Payable Checks - Grants Fund 0.00 Total Accounts Payable 631,162.37 Grand Total 1,188,190.76 Payroll EFTs & Checks EFT AFLAC Medical & Dependent Care EFT CA Employment Taxes & W/H EFT Federal Employment Taxes & W/H EFT CaIPERS Contributions EFT Great West Deferred Comp EFT Stationary Engineers Union Dues EFT United Way Contributions EFT Employee Direct Deposits CHK Employee Garnishments CHK Employee Paychecks Total -101- 3/6/2012 2,886.39 17,397.05 86,041.08 0.00 20,106.08 2,343.29 115.00 213,298.19 1,273.83 3,966.38 347,427.29 PAYMENT OF CLAIMS Vendor Name Department / ProJ Name Description Acct# / Proj Code Amount Check Num Int ACWA HEALTH BENEFITS AUTHORITY GEN & ADMIN VISION INS 1000 - 2530 2,598.40 Check Total: 2.598,40 AP-00081696 MW ADMINISTRATIVE PROFESSIONAL ADMINISTRATION SUBSCRIPTIONS 1021 - 4830 44.50 ADMINISTRATIVE PROFESSIONAL ADMINISTRATION SUBSCRIPTIONS 2021 - 4830 44.50 Check Total: 89.90 AP- 00081697 MW AECOM TECHNICAL SERVICES INC ENGINEERING - DVR IRRIG IMPRVS DVR IRR IMPRVMNT 1029 - 8161 - DVRIIP 152.55 Check Total: 152.55 AP- 00081698 MW AFLAC GEN & ADMIN SUPP INS W/H 1000 - 2532 1,540.00 AFLAC GEN & ADMIN AFLAC FEE DED 1000 - 2538 121.00 Check Total: 1.661.00 AP- 00081699 MW ALPEN SIERRA COFFEE GEN & ADMIN OFC SUPPLY ISSUE 1000 - 6081 268.45 Check Total: 268.45 AP-00081700 MW ALPINE COUNTY DIAMOND VLY RNCH FISH 1028 - 6649 51,000.00 Check Total: 51.000.00 AP- 00081701 MW ALPINE METALS HEAVY MAINT BUILDINGS 1004 - 6041 30.71 I o Check Total: 30.71 AP- 00081702 MW AME ICAN BANKERS INS CO GEN & ADMIN INSURANCE PPD 1000 - 0301 8,324.50 AMERICAN BANKERS INS CO GEN & ADMIN INSURANCE PPD 2000 - 0301 8,324.50 Check Total: 16.649.00 AP- 00081703 MW AMERIGAS DIAMOND VLY RNCH PROPANE 1028 - 6360 99.74 Check Total: 99.74 AP- 00081704 MW AMERIPRIDE UNIFORM SERVICES GEN & ADMIN UNIFORM PAYABLE 1000 - 2518 2,153.13 Check Total: 2.153.13 AP-00081705 MW ANETA FLORES OPERATIONS TRAVEL/MEETINGS 1006 - 6200 65.49 Check Total: 85.49 AP-00081706 MW ARETE SYSTEMS ENGINEERING CONTRACT SERVICE 1029 - 4405 91.87 ARETE SYSTEMS ENGINEERING CONTRACT SERVICE 2029 - 4405 91.88 ARETE SYSTEMS ENGINEERING - GIS SFTWR DEV ARETE, GIS 2029 - 8120 - GISSFT 1,706.25 Check Total: 1.890.09 AP-00081707 MW AT &T /CALNET 2 GEN & ADMIN TELEPHONE 1000 - 6310 437.25 AT &T /CALNET 2 GEN & ADMIN SIGNAL CHARGES 1000 - 6320 31.64 User: LAVERNE Report: OH_PMT_CLAIMS_BK Page: 1 Current Date: 03/08/2012 Current Time: 10:07:08 AT &T /CALNET 2 AT &T /CALNET 2 AT &T /CALNET 2 BAY TOOL & SUPPLY INC BAY TOOL & SUPPLY INC BAY TOOL & SUPPLY INC BENTLY AGROWDYNAMICS BI STATE PROPANE BLR COMM'L REAL ESTATE INC BLR COMM'L REAL ESTATE INC BLU I- RIBBON TEMP PERSONNEL BLUES'ttj IBBON TEMP PERSONNEL BMI SYSTEMS GROUP BMI SYSTEMS GROUP BROWN & CALDWELL CONSULTANTS CALIF DEPT OF PUBLIC HEALTH CALIF WATER RESOURCES CTRL BD CAROLLO ENGINEERS CDS GROUP HEALTH PAYMENT OF CLAIMS PUMPS GEN & ADMIN PUMPS GEN & ADMIN GEN &ADMIN FINANCE OPERATIONS GEN & ADMIN GEN & ADMIN GEN & ADMIN CUSTOMER SERVICE CUSTOMER SERVICE INFORMATION SYS INFORMATION SYS ENGINEERING - FILTER ASSMNT PUMPS ENGINEERING - DEMO RALPH TANK ENGINEERING - HEADWORKS SELF FUNDED INS 12299 on TELEPHONE TELEPHONE TELEPHONE SHOP SUPPLY INV SMALL TOOLS INV INV /FRT /DISCOUNT SLUDGE DISPOSAL PROPANE UB SUSPENSE UB SUSPENSE CONTRACT SERVICE CONTRACT SERVICE SERVICE CONTRACT SERVICE CONTRACT REHAB FLTR 5&6 DUES /MEMB /CERT RALPH TANK HDWKS IMP PROJ ADMIN FEE Acct# / Proj Code 1002 - 6310 2000 - 6310 2002 - 6310 1000 -0421 1000 - 0423 1039 - 6077 1006 - 6652 1000 - 6360 1000 - 2002 2000 - 2002 1038 - 4405 2038 - 4405 1037 - 6030 2037 - 6030 Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: 1029 - 8066 - FILTER Check Total: 2002-6250 Check Total: 2029 - 7090 - DEMORT Check Total: 1029 - 8033 - HDWORK Check Total: 3000 - 6741 Check Total: Amount 167.40 437.24 119.15 1.192.68 122.68 584.89 29.33 Check Num 1.01 AP- 00081708 MW 736.90 AP-00081709 2,302.58 2.30238 AP-00081710 258.94 258.94 AP- 00081711 48.48 48.49 96.97 AP-00081712 234.52 234.52 469& AP- 00081713 124.50 124.50 249.00 AP-00081714 4,690.43 4.690.43 AP-00081715 90.00 O00 127.00 MW MW MW MW MW MW MW AP- 00081716 MW 127.00 AP- 00081717 30,819.13 30.819.13 AP-00081718 3,591.43 3.591.44 AP- 00081719 MW MW MW User. LAVERNE Page: 2 Report: OH_PMT_CLAIMS_BK Current Date: 03/08/2012 Current Time: 10:07:08 PAYMENT OF CLAIMS Vendor Name Department / Proj Name Description Acct# / Proj Code Amount Check Num Ina CDW -G CORP INFORMATION SYS DIST.COMP SPPLIS 1037 - 4840 130.07 CDW -G CORP INFORMATION SYS STR PLN IMPL 1037 - 8078 2,223.57 CDW -G CORP INFORMATION SYS BCKUP PWR SRVR R 1037 - 8236 2,565.78 CDW-G CORP INFORMATION SYS DIST.COMP SPPLIS 2037 - 4840 130.09 Check Total: 5.049.51 AP- 00081720 MW COCKING, DENNIS DIO TRAVEL/MEETINGS 2027 - 6200 211.64 Check Total: 211.64 AP- 00081721 MW CUEVAS, SIMON A UNDERGROUND REP TRAVEUMEETINGS 2001 - 6200 158.00 Check Total: 1456.00 AP- 00081722 MW CWEA PUMPS DUES/MEMB /CERT 1002 - 6250 132.00 CWEA OPERATIONS DUES /MEMB /CERT 1006 - 6250 132.00 Check Total: 264.00 AP- 00081723 MW DATCO SERVICES CORP HUMAN RESOURCES SAFETY PROGRAMS 1022 - 6079 159.25 DATCO SERVICES CORP HUMAN RESOURCES SAFETY PROGRAMS 2022 - 6079 159.25 Check Total: 318.50 AP- 00081724 MW DIY }4$ ME CENTER UNDERGROUND REP PIPE/CVRS/MHLS 1001 - 6052 349.03 o DIY I'�)ME CENTER UNDERGROUND REP SHOP SUPPLIES 1001 - 6071 37.79 DIY HOME CENTER UNDERGROUND REP SMALL TOOLS 1001 - 6073 10.66 DIY HOME CENTER HEAVY MAINT BUILDINGS 1004 - 6041 31.64 DIY HOME CENTER PUMPS WELLS 2002 - 6050 79.23 Check Total: 508.35 AP- 00081725 MW DOUGLAS DISPOSAL GEN & ADMIN REFUSE DISPOSAL 1000 - 6370 572.91 Check Total: 572.91 AP- 00081726 MW EADOC LLC ENGINEERING - HEADWORKS HDWKS IMP PROJ 1029 - 8033 - HDWORK 5,550.00 Check Total: 5.550.00 AP- 00081727 MW EL DORADO COUNTY CUSTOMER SERVICE SUPPLIES 1038 - 6520 6.50 EL DORADO COUNTY CUSTOMER SERVICE SUPPLIES 2038 - 6520 6.50 Check Total: 13.Q0 AP- 00081728 MW EL DORADO COUNTY CUSTOMER SERVICE SUPPLIES 1038 - 6520 6.50 EL DORADO COUNTY CUSTOMER SERVICE SUPPLIES 2038.6520 6.50 Check Total: 13.00 AP-00081729 MW User: LAVERNE Page: 3 Current Date: 03/08/2012 Report: OH_PMT_CLAIMS_13K Current Time: 10:07:08 V.ndor Nems EL DORADO COUNTY EL DORADO COUNTY EL DORADO COUNTY EL DORADO COUNTY EL DORADO COUNTY EL DORADO COUNTY EL DORADO HILLS CAPITAL FUND LLC EL DORADO HILLS CAPITAL FUND LLC EMPIRE SAFETY & SUPPLY EMPIRE SAFETY & SUPPLY EMPIRE SAFETY & SUPPLY ERI4Q ISMAN FAST FABRICATORS LLC FERGUSON ENTERPRISES INC. FISHER SCIENTIFIC FISHER SCIENTIFIC FLYERS ENERGY LLC GEO -LOGIC ASSOCIATES INC GRAINGER GRAINGER Wpat tMOnti Pro] Name CUSTOMER SERVICE CUSTOMER SERVICE CUSTOMER SERVICE CUSTOMER SERVICE CUSTOMER SERVICE CUSTOMER SERVICE GEN & ADMIN GEN & ADMIN GEN & ADMIN GEN & ADMIN FINANCE PAYMENT OF CLAIMS SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES UB SUSPENSE UB SUSPENSE SHOP SUPPLY INV SAFETY INVENTORY INV /FRT /DISCOUNT CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE PUMPS HEAVY MAINT LABORATORY LABORATORY HEAVY MAINT ENGINEERING - ERB LINER REPL ELECTRICAL SHOP HEAVY MAINTENANC WELLS BUILDINGS LAB SUPPLIES LAB SUPPLIES SECONDARY EQUIP REPLACE ERB LINE WELLS BUILDINGS Acct# / Pro' Code 1038 - 6520 2038 - 6520 1038 - 6520 2038 - 6520 1038 - 6520 2038 - 6520 1000 - 2002 2000 - 2002 1000 - 0421 1000 - 0425 1039 - 6077 Check Total: Check Total: Check Total: Check Total: Check Total: 2038 - 6660 - WCPROG Check Total: 2002 - 6050 Check Total: 1004 -6041 Amount Check Num Iyp 6.50 6.50 13.00 AP-00081730 MW 6.50 6.50 13.00 AP-00081731 MW 8.50 6.50 13.Q0 AP- 00081732 MW 52.87 69.58 122.45 AP -00081733 MW 252.91 542.34 15.38 810.63 AP-00081734 MW 200.00 200.00 AP- 00081735 MW 1,252.05 1.252.0§ AP-110081736 MW 17.77 Check Total: 17.77 AP- 00081737 MW 1007 - 4760 184.22 2007 - 4760 425.72 Check Total: 609,94 AP- 00081738 MW 1004 - 6022 145.14 Check Total: 145.14 AP- 00081739 MW 1029 - 7581 - ERBLNR Check Total: 2003 - 6050 2004 - 6041 7,402.50 7.402.50 AP- 00081740 MW 346.44 72.15 User: LAVERNE Page: 4 Current Date: 03/08/2012 Report OH_PMT_CLAIMS_BK Current Time: 10:07:08 Vendor Name HARDY DIAGNOSTICS HARDY DIAGNOSTICS HERNANDEZ, LAZARO HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS HIGH SIERRA BUSINESS SYSTEMS Home Depot Credit Services IDEXX DISTRIBUTION CORP. IDEXX DISTRIBUTION CORP. 0 INSTOTEK INC. INTERSTATE SAFETY & SUPPLY INTERSTATE SAFETY & SUPPLY INTERSTATE SAFETY & SUPPLY INTERSTATE SAFETY & SUPPLY JACK DOHENY $UPPLIES INC JDH CORROSION CONSULTANTS JDH CORROSION CONSULTANTS JOHN MARENGO KAREN BURT PAYMENT OF CLAIMS Department / Proj Name LABORATORY LABORATORY UNDERGROUND REP HUMAN RESOURCES CUSTOMER SERVICE HUMAN RESOURCES CUSTOMER SERVICE DIAMOND VLY RNCH LABORATORY LABORATORY ENGINEERING GEN & ADMIN GEN & ADMIN OPERATIONS OPERATIONS EQUIPMENT REP ENGINEERING - CATH PROT -SWR ENGINEERING - CATH PROT -WTR Description Acct# / ProJ Coda LAB SUPPLIES 1007 - 4760 LAB SUPPLIES 2007 - 4760 TRAVEUMEETINGS 2001 - 6200 SERVICE CONTRACT 1022 - 6030 SERVICE CONTRACT 1038 - 6030 SERVICE CONTRACT 2022 - 6030 SERVICE CONTRACT 2038 - 6030 GROUNDS & MNTC 1028 - 6042 LAB SUPPLIES 1007 - 4760 LAB SUPPLIES 2007 - 4760 OFC EQUIP/REPAIR 1029 - 6027 SHOP SUPPLY INV 1000 - 0421 SAFETY INVENTORY 1000 -0425 LAB SUPPLIES 1006 - 4760 SAFETY /EQUIP /PHY 1006 - 6075 REPL TRK 53 1005 - 8106 CATH PROT CATH PROT ASSES CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE CUSTOMER SERVICE Amount Check Num IyPQ Check Total: 418.59 AP- 00081741 MW 51.98 64.67 Check Total: 116.65 AP- 00081742 MW 158.00 Check Total: 158.00 AP- 00081743 MW 89.22 111.28 89.22 111.27 Check Total: 400.99 AP- 00081744 MW 80.63 Check Total: 80,63 AP- 00081745 MW 16.16 21.46 Check Total: 37.6 AP-00081746 MW 540.03 Check Total: 540 .93 AP- 00081747 MW 209.58 306.96 67.84 52.53 Check Total: 636.91 AP- 00081748 MW 172,196.00 Check Total: 172.19Q.00 AP- 00081749 MW 7,335.00 7,335.00 14.670.00 AP-00081750 MW 199.00 Check Total: 199.00 AP- 00081751 MW 147.00 1029 - 8133 - CATSWR 2029 - 8113 - CATWTR Check Total: 2038 - 6660 - WCPROG MISC LIAB CLAIMS 2038 - 4520 User: LAVERNE Report: OH_PMT_CLAIMS_BK Page: 5 Current Date: 03/08/2012 Current Time: 10:07:08 PAYMENT OF CLAIMS Vendor Name Plandmont.LETRUIRMR Dambation Accts ! Proj Code Al1lStslnI Chad /him LIM Check Total: 147.00 AP- 00081752 MW KELLY MOORE PAINTS PUMPS PUMP STATIONS 1002 - 6051 42.73 Check Total: 42,73 AP- 00081753 MW KENNEDY /JENKS CONSULTANTS INC ENGINEERING - WILDWOOD WATERLN WTRLNS WILDWOOD 2029 - 8263 - WILDWD 29,198.69 Check Total: 29.198.69 AP-00081754 MW KOFF & ASSOCIATES INC HUMAN RESOURCES CONTRACT SERVICE 1022 - 4405 3,875.00 KOFF & ASSOCIATES INC HUMAN RESOURCES CONTRACT SERVICE 2022 - 4405 3,875.00 Check Total: 7.750.00 AP -00081755 MW LAKE TAHOE PLUMBING PUMPS PUMP STATIONS 2002 - 6051 1,292.00 Check Total: 1.292.00 AP- 00081756 MW LAKE VALLEY FIRE DISTRICT PUMPS LAND & BUILDINGS 2002 - 5010 5,549.31 Check Total: 5.549.31 AP- 00081757 MW LAKESIDE NAPA ELECTRICAL SHOP PUMP STATIONS 1003 - 6051 4.29 LAKESIDE NAPA EQUIPMENT REP AUTOMOTIVE 1005 - 6011 852.81 LAKESIDE NAPA EQUIPMENT REP GENERATORS 1005 - 6013 181.32 LAKEIDE NAPA DIAMOND VLY RNCH GROUNDS & MNTC 1028 - 6042 124.67 LAKESIDE NAPA EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 1,692.33 Check Total: 2.855.42 AP- 00081758 MW LES SCHWAB TIRES EQUIPMENT REP AUTOMOTIVE 1005 - 6011 1,139.38 LES SCHWAB TIRES EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 428.41 LIBERTY ENERGY LIBERTY ENERGY LIBERTY ENERGY MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO GEN & ADMIN GEN & AMAIN GEN & ADMIN PUMPS PUMPS PUMPS PUMPS PUMPS PUMPS Check Total: 1.567.79 AP- 00081759 MW ELECTRICITY 1000 - 6330 53,763.53 ST UGHTING EXP 1000 - 6740 1,510.74 ELECTRICITY 2000 - 6330 24,847.75 Check Total: 80.122.02 AP- 00081760 MW PUMP STATIONS 1002 - 6051 411.26 SHOP SUPPLIES 1002 - 6071 68.79 SMALL TOOLS 1002 - 6073 34.54 PUMP STATIONS 2002 - 6051 280.21 SHOP SUPPLIES 2002 - 6071 68.77 SMALL TOOLS 2002 - 6073 34.53 User: LAVERNE Page: 6 Current Date: 03/08/2012 Report: OH_PMT_CLAIMS_BK Current Time: 10:07:08 PAYMENT OF CLAIMS Vendor Name Department / Proj Name Description Acct# / Proj Code AI oust Check Num IIR! Check Total: 898.10 AP-00081761 MW MEEKS BUILDING CENTER UNDERGROUND REP SHOP SUPPLIES 1001 - 6071 352.35 MEEKS BUILDING CENTER PUMPS LUTHER PASS 1002 - 6048 147.73 MEEKS BUILDING CENTER PUMPS SHOP SUPPLIES 1002 - 6071 64.35 MEEKS BUILDING CENTER PUMPS SMALL TOOLS 1002 - 6073 16.40 MEEKS BUILDING CENTER ELECTRICAL SHOP BUILDINGS 1003 - 6041 4.08 MEEKS BUILDING CENTER HEAVY MAINT BUILDINGS 1004 - 6041 68.87 MEEKS BUILDING CENTER DIAMOND VLY RNCH GROUNDS & MNTC 1028 - 6042 239.26 MEEKS BUILDING CENTER INFORMATION SYS OFFICE SUPPLIES 1037 - 4820 17.91 MEEKS BUILDING CENTER • UNDERGROUND REP PIPE/CVRS /MHLS 2001 - 6052 92.97 MEEKS BUILDING CENTER PUMPS WELLS 2002 - 6050 478.44 MEEKS BUILDING CENTER PUMPS SHOP SUPPLIES 2002 - 6071 64.34 MEEKS BUILDING CENTER PUMPS SMALL TOOLS 2002 - 6073 16.39 MEEKS BUILDING CENTER INFORMATION SYS OFFICE SUPPLIES 2037 - 4820 17.91 Check Total: 1.581.00 AP-00081762 MW MIRAIDA SOLUTIONS ADMINISTRATION SUPPLIES 1021 - 6520 562.50 0 MIRANDA SOLUTIONS ADMINISTRATION SUPPLIES 2021 - 6520 562.50 Check Total: 1.125,00 AP- 00081763 MW MONTGOMERY, SEAN GEN & ADMIN UB SUSPENSE 1000 - 2002 13,198.40 MONTGOMERY, SEAN FINANCE INTEREST EXPENSE 1039 - 6710 560.93 MONTGOMERY, SEAN GEN & ADMIN UB SUSPENSE 2000 - 2002 3,911.60 MONTGOMERY, SEAN GEN & ADMIN METER SALE 2000 - 3545 286.00 MONTGOMERY, SEAN FINANCE INTEREST EXPENSE 2039 - 6710 178.41 Check Total: 18.135.34 AP-00081764 MW MOTEL 6 PUMPS STANDBY ACCOMODA 1002 - 6083 58.98 MOTEL 6 PUMPS STANDBY ACCOMODA 2002 - 6083 58.98 Check Total: 117.96 AP- 00081765 MW MSC INDUSTRIAL SUPPLY CO PUMPS PUMP STATIONS 1002 - 6051 60.48 Check Total: 60.48 AP- 00081766 MW NELS TAHOE HARDWARE PUMPS PUMP STATIONS 1002 - 6051 2.76 NELS TAHOE HARDWARE HEAVY MAINT SECONDARY EQUIP 1004 - 6022 2.97 NELS TAHOE HARDWARE EQUIPMENT REP AUTOMOTIVE 1005 - 6011 7.00 User: LAVERNE Report: OH_PMT_CLAIMS_BK Page: 7 Current Date: 03/08/2012 Current Time: 10:07:08 PAYMgNT OF CLAIMS Vendor Name Department / Proj j1ame Description Acet# 1 Proj Code NELS TAHOE HARDWARE EQUIPMENT REPAIR AUTOMOTIVE 2005 - 6011 A1nourtt Check Num IYPQ 7.00 Check Total: 19.73 AP-00081767 MW NEVADA GENERATOR SYSTEMS INC EQUIPMENT REP SFTWR GEN TSTG 1005 - 8150 197.50 Check Total: 197.50 AP- 00081768 MW OLIN CORPORATION OPERATIONS HYPOCHLORITE 1006 - 4755 3,831.54 Check Total: 3.831.54 AP- 00081769 MW ONTRAC LABORATORY POSTAGE EXPENSES 1007 - 4810 24.05 ONTRAC LABORATORY POSTAGE EXPENSES 2007 - 4810 14.97 ONTRAC ENGINEERING - WILDWOOD WATERLN WTRLNS WILDWOOD 2029 - 8263 - WILDWD 18.71 Check Total: 57.73 AP-00081770 MW PDM STEEL PUMPS PUMP STATIONS 1002 - 6051 437.34 PDM STEEL PUMPS WELLS 2002 - 6050 138.80 Check Total: 576.14 AP-00081771 MW POLYDYNE INC OPERATIONS POLYMER 1006 - 4720 16,059.06 Check Total: 16.059.06 AP- 00081772 MW 1 PRAIR 174 PUMPS SHOP SUPPLIES 1002 - 6071 115.65 ko PRAXAIR 174 LABORATORY LAB SUPPLIES 1007 - 4760 82.75 PRAXAIR 174 PUMPS SHOP SUPPLIES 2002 - 6071 115.64 PRAXAIR 174 LABORATORY LAB SUPPLIES 2007 - 4760 82.75 Check Total: 396.79 AP -00081773 MW PRIETO, ANTONIO UNDERGROUND REP TRAVEL/MEETINGS 2001 - 6200 31.08 Check Total: 31.08 AP- 00081774 MW PURCHASE POWER GEN & ADMIN POSTAGE PPD 1000 - 0304 1,000.00 PURCHASE POWER GEN & ADMIN POSTAGE PPD 2000 - 0304 1,000.00 Check Total: 2.000.00 AP- 00081775 MW RADIO SHACK HEAVY MAINT SHOP SUPPLIES 1004 - 6071 23.67 RED WING SHOE STORE RED WING SHOE STORE RED WING SHOE STORE RED WING SHOE STORE OPERATIONS ENGINEERING CUSTOMER SERVICE UNDERGROUND REP Check Total: 2187 AP- 00081776 MW SAFETY /EQUIP /PHY 1006 - 6075 540.37 SAFETY/EQUIP /PHY 1029 - 6075 109.91 SAFETY /EQUIP /PHY 1038 - 6075 96.17 SAFETY /EQUIP/PHY 2001 - 6075 320.55 User: LAVERNE Page: 8 Current Dote: 03/08/2012 Report: OH_PMT_CLAIMS_BK Current Time: 10:07:08 Vendor Name RED WING SHOE STORE RED WING SHOE STORE REDWOOD PRINTING REDWOOD PRINTING REDWOOD PRINTING REDWOOD PRINTING RENO GAZETTE - JOURNAL RENO GAZETTE- JOURNAL RODERICK, GLENN SACRAMENTO BEE, THE SACRAMENTO BEE, THE SIERWA ENVIRONMENTAL SIERRA FOOTHILL LABORATORY SIERRA FOOTHILL LABORATORY SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SIERRA SPRINGS SIGNS OF TAHOE SNAP ON TOOLS SOUNDSTRATEGIES Department ( ProJ Names ENGINEERING CUSTOMER SERVICE PAYMENT OF CLAIMS Quorbatlen SAFETY/EQUIP /PHY SAFETY/EQUIP/PHY CUSTOMER SERVICE PRINTING ENGINEERING - WL, BAL BIJOU WL,BAL BIJOU ENGINEERING - WILDWOOD WATERLN WTRLNS WILDWOOD CUSTOMER SERVICE PRINTING ENGINEERING - WL, BAL BIJOU WL,BAL BIJOU ENGINEERING - WILDWOOD WATERLN WTRLNS WILDWOOD PUMPS DUES /MEMB /CERT ENGINEERING - WL, BAL BIJOU WL,BAL BIJOU ENGINEERING - WILDWOOD WATERLN WTRLNS WILDWOOD LABORATORY MONITORING LABORATORY - IND CRK RES MONT MONITORING LABORATORY MONITORING PUMPS DIAMOND VLY RNCH CUSTOMER SERVICE CUSTOMER SERVICE CUSTOMER SERVICE EQUIPMENT REP DIO SUPPLIES SUPPLIES SUPPLIES SUPPLIES SHOP SUPPLIES SFTW UPGR EQ REP CONTRACT SERVICE Acct# / ProJ Code 2029 - 6075 2038 - 6075 Check Total: 1038 - 4920 2029 - 7098 - ECBBWL 2029 - 8263 - WILDWD 2038 - 4920 Check Total: 2029 - 7098 - ECBBWL 2029 - 8263 - WILDWD Check Total: 2002-6250 Check Total: 2029 - 7098 - ECBBWL 2029 - 8263 - WILDWD Check Total: 1007 - 6110 Check Total: 1007 - 6110 - INDIAN 1007 - 6110 1002 - 6520 1028 - 6520 1038 - 6520 2038 - 6520 2038 - 6071 1005 -8152 1027 - 4405 Check Total: Check Total: Check Total: Check Total: Amount Check Num Imo 109.90 96.17 1.273.07 AP- 00081777 MW 128.46 639.91 639.91 128.45 1.536.73 AP -00081778 MW 94.93 94.92 189.85 AP- 00081779 MW 90.00 90.00 AP- 00081780 MW 569.64 569.64 1.139.28 • P- 00081781 MW 372.00 37200 AP- 00081782 MW 195.00 49.00 244.00 AP-00081783 MW 5.66 5.66 2.91 2.91 17.14 AP-00081784 MW 26.94 26.94 AP- 00081785 MW 3,112.90 3.112.90 AP- 00081786 MW 49.00 User: LAVERNE Report: OH_PMT_CLAIMS_BK Page: 9 Current Date: 03/08/2012 Current Time: 10:07:08 Vendor Name SOUNDSTRATEGIES SOUTH TAHOE REFUSE SOUTH TAHOE REFUSE SOUTH TAHOE REFUSE SOUTHWEST GAS SOUTHWEST GAS STATE DEPT OF CONSERVATION STOP LOSS INSURANCE SERVICES SUNGARD PUBLIC SECTOR INC. SUNGARD PUBLIC SECTOR INC. TAHOE BASIN CONTAINER SERVICE TAHOE BLUEPRINT TAHOE BLUEPRINT TAHOE MOUNTAIN NEWS TAHOE MOUNTAIN NEWS TAHOE PARADISE CHEVRON TAHOE TRADING POST TAHOE TRADING POST TAHOE TRADING POST TAHOE TRADING POST TAHOE TRADING POST PAYMENT OF CLAIMS QuadnisniamIliamt DIO GEN & ADMIN GEN & ADMIN PUMPS GEN & ADMIN GEN & ADMIN DIAMOND VLY RNCH SELF FUNDED INS INFORMATION SYS INFORMATION SYS GEN & ADMIN ENGINEERING - WL, BAL BIJOU ENGINEERING - WILDWOOD WATERLN DIO - PR EXP- EXTERNAL DIO - PR EXP- EXTERNAL UNDERGROUND REP UNDERGROUND REP HEAVY MAINT EQUIPMENT REP UNDERGROUND REP EQUIPMENT REPAIR flualitian CONTRACT SERVICE REFUSE DISPOSAL REFUSE DISPOSAL PUMP STATIONS NATURAL GAS NATURAL GAS REGLTRY OP PRMTS EXCESS INSURANCE TRAVEL/MEETINGS TRAVEL/MEETINGS REFUSE DISPOSAL WL,BAL BIJOU WTRLNS WILDWOOD PUB RELATIONS PUB RELATIONS DIESEL SAFETY /EQUIP /PHY SAFETY /EQUIP /PHY SAFETY /EQUIP /PHY SAFETY /EQUIP /PHY SAFETY /EQUIP /PHY Acct# / Pro,/ Code 2027 - 4405 1000 - 6370 2000 - 6370 2002 - 6051 1000 - 6350 2000 - 6350 1028 - 6650 3000 - 6744 1037 - 6200 2037 - 6200 Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: Amount Check Num Iy t 49.00 96.00 AP- 00081787 MW 2,678.00 107.12 24.60 _2i9222 AP- 00081788 MW 10,387.48 730.56 11,118.04 AP- 00081789 MW 2,590.00 2,590.00 AP- 00081790 MW 34,613.42 34.613.42 AP- 00081791 MW 60.00 60.00 120.00 AP-00081792 MW 1000 - 6370 10,823.50 Check Total: 10.823,50 AP- 00081793 MW 2029 - 7098 - ECBBWL 1,754.13 2029 - 8263 - WILDWD 3,062.26 Check Total: 4.816.39 AP -00081794 MW 162.50 162.50 1027 - 6620 - PREEXT 2027 - 6620 - PREEXT Check Total: 2001-4620 1001 - 6075 1004 - 6075 1005 - 6075 2001 - 6075 2005 - 6075 Check Total: 325.00 AP- 00081795 MW 87.95 87.95 AP- 00081796 MW 311.40 109.91 54.96 109.91 54.95 User: LAVERNE Page: 10 Report: OH_PMT CLAIMS_BK Current Date: 03/08/2012 Current Time: 10:07:08 Vendor Name TAHOE VALLEY ELECTRIC SUPPLY THOMAS HAEN CO INC TREBOTICH, DELORES L TRPA TRUE CAPACITY LLC TRUE CAPACITY LLC U S FOREST SERVICE UNITyD MICRO DATA INC UNIT MICRO DATA INC UNIVERSAL HEALTH NETWORK WAXIE SANITARY SUPPLY WEDCO INC WEDCO INC WEDCO INC WEDCO INC WISE CONSULTING & TRAINING WOODFORDS INN Department / Proj Name ELECTRICAL SHOP PAYMENT OF CLAIMS Description BUILDINGS DIAMOND VLY RNCH - DVR HOUSE RENOV1RANCH HS REMOD CUSTOMER SERVICE - WTR CONS PROG WTR CONS EXPENSE ENGINEERING - CC/BK SWR REPAIR SWR REP CC/BKFLD HUMAN RESOURCES CONTRACT SERVICE HUMAN RESOURCES CONTRACT SERVICE GEN & ADMIN UB SUSPENSE INFORMATION SYS SERVICE CONTRACT INFORMATION SYS SERVICE CONTRACT SELF FUNDED INS PPO FEE GEN & ADMIN JANIT /SUPPLY INV ELECTRICAL SHOP BUILDINGS ELECTRICAL SHOP SHOP SUPPLIES ELECTRICAL SHOP WELLS ELECTRICAL SHOP PUMP STATIONS ENGINEERING - FILTER ASSMNT REHAB FLTR 5 &6 GEN & ADMIN LAB MONITORING Acct# / Proj Code 1003 -6041 Check Total: Check Total: 1028 - 8130 - DVRENO Check Total: 2038 - 6660 - WCPROG Check Total: 1029 - 7096 - CCBKRP Check Total: 1022 - 4405 2022 - 4405 1000 - 2002 1037 - 6030 2037 - 6030 3000 - 6742 1000 - 0422 1003 -6041 1003 - 6071 2003 - 8050 2003 - 6051 Check Total: Check Total: Check Total: Check Total: Check Total: Check Total: 1029 - 8066 - FILTER Check Total: 2000 - 3541 Check Total: Amount Check Num Ina 641.13 AP-00081797 MW 2.88 2.88 AP- 00081798 MW 14,780.00 14.780.00 AP- 00081799 MW 200.00 200.00 AP- 00081800 MW 135.00 135.00 AP-00081695 MW 492.50 492.50 985.00 AP- 00081801 MW 26,931.40 26.93149 AP- 00081802 MW 110.00 110.00 220,00 AP- 00081803 MW 403.65 403.65 AP- 00081804 MW 239.72 239.72 AP-00081805 MW 209.40 240.58 176.04 794.18 1.420.20 AP-00081806 MW 2,144.00 2.144.00 AP-00081807 MW 25.00 25.00 AP- 00081808 MW User: LAVERNE Page: 11 Report: OH_PMT_CLAIMS_BK Current Date: 03/08/2012 Current Time: 10:07:08 Vendor None PAl(M4NT OF CLAIMS Department / ProJ Name De5criptioR Acct# / ProJ Code Amount Check Num Iyp Grand Total: 631,162.37 1 User: LAVERNE Report: OH_PMT_CLAIMS_BK Page: 12 Current Date: 03/08/2012 Current Time: 10:07:08 Vendor WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY Payment of Claims Aii can Express EFT GEN & ADMIN - BOXES/LIDS/INV GEN & ADMIN - METERS,ETC INV GEN & ADMIN - METERS,ETC INV GEN & ADMIN - METERS,ETC INV CUSTOMER SERVICE - WATER METERS/PAR GEN & ADMIN - REPAIR CLMP INV GEN & ADMIN - REPAIR CLMP INV GEN & ADMIN - SADDLES INV UNDERGROUND REP - PIPE /CVRS/MHLS HEAVY MAINT - SHOP SUPPLIES HEAVY MAINT - SECONDARY EQUIP OH_PAY CLAIMS_AE - OH Payment of Claims AmerEx <1.00> LAVERNE - LaVerne Eddy Acct#/Proj Code 2000 - 0403 2000 - 0402 2000 - 0402 2000 - 0402 2038 - 6045 2000 - 0406 2000 - 0406 2000 - 0407 2001 - 6052 1004 - 6071 1004 - 6022 Report Total: Amount Inv#: 15132260- 505.02 Inv#: 15137005 4,363.88 Inv#: 15137005- 1,810.20 Inv#: 15142337 2,296.84 Inv#: 15142337- 2,137.49 Inv#: 15145544 4,717.62 Inv#: 15153231 2,337.80 Inv#: 15155176 4,445.98 Inv#: 35099361 1,004.29 Inv#: 35142721 21.12 Inv#: 35155023 144.14 23,784.38 03/08/2012 11:14:23 South Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Civet Drive • South Lake Tahoe. CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www stpud us BOARD AGENDA ITEM 13a TO: Board of Directors FROM: Tim Bledsoe, Customer Service Manager MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: Liability Claim against STPUD received from Theodore and Janice Omellas REQUESTED BOARD ACTION: Reject Claim DISCUSSION: Pursuant to Section 54956.9(b) of the California Government Code, Closed Session may be held for a conference with legal counsel. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES ,2U NO CHIEF FINANCIAL OFFICER: YES NO -115- South Tahoe Public Utility District General Manager, Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150 -7401 Phone 530 544-6474 • Fax 530 541 -0614 • www.stpud.us BOARD AGENDA ITEM 13b TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: Conference with Labor Negotiators REQUESTED BOARD ACTION: Direct negotiators DISCUSSION: Pursuant to Section 54957(a) of the California Government Code/ Conference with Labor Negotiators - Present During This Closed Session Will Be: Agency Negotiators: Austris Rungis /IEDA, Richard Solbrig /General Manager, Nancy Hussmann /Human Resources Director, Paul Hughes /Chief Financial Officer Employee Organization: Management Unit SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: p CATEGORY: General GENERAL MANAGER: YES RV NO CHIEF FINANCIAL OFFICER: YES (2 NO -117- South Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150-7401 Phone 530 544 -6474 • Fax 530 541 -0614 • www.stpud.us BOARD AGENDA ITEM 13c TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: Conference with Labor Negotiators REQUESTED BOARD ACTION: Direct negotiators DISCUSSION: Pursuant to Section 54957(a) of the California Government Code/ Conference with Labor Negotiators - Present During This Closed Session Will Be: Agency Negotiators: Austris Rungis /IEDA, Richard Solbrig /General Manager, Nancy Hussmann /Human Resources Director, Paul Hughes /Chief Financial Officer, Employee Organization: Stationary Engineers, Local 39 SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES I NO CHIEF FINANCIAL OFFICER: YES NO -119- CATEGORY: General South Tahoe Public Utility District General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 1275 Meadow Cast Dries • South Lake Tahoe • CA 96150 -7401 Phone 530 544 -6474 • Fax 530 541-0614 • www.stpud.us BOARD AGENDA ITEM 13d TO: Board of Directors FROM: Nancy Hussmann, Human Resources Director MEETING DATE: March 15, 2012 ITEM - PROJECT NAME: Public Employee Evaluation - General Manager REQUESTED BOARD ACTION: Begin Evaluation Process DISCUSSION: Pursuant to Section 54957 of the California Government Code, Closed Session may be held regarding public employee evaluation for unrepresented employee position. Unrepresented Employee Position: General Manager SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES k l NO CHIEF FINANCIAL OFFICER: YES NO -121-