AP 06-19-14 g�uTH , TAHOtc
�(°
- _ _ —�_ ---�,,,,...:�
�
'0(�e<N'er . 1950 • �s��j
�U77LITY D1�
SOUTH TAHOE PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING AGENDA
Thursday, June 19, 2014 - 2:00 P.nn.
District Board Room
1275 Meadow Crest Drive, South Lake Tahoe, California
Richard Solbrig, General Manager Paul Sciuto, Assistant General Manager
Eric W. Schafer, President BOARD MEMBERS Randy Vogelgesang, Vice President
Chris Cefalu, Director James R. Jones, Director Kelly Sheehan Director
1. CALL TO ORDER REGULAR MEETING— PLEDGE OF ALLEGIANCE(At this time, please silence phones and
other electronic devices so as not to disrupt the business of the meeting.)
2. COMMENTS FROM THE AUDIENCE (This is an opporfunity for members of the public to address the Board on
any shorf non-agenda items that are within the subject matter jurisdiction of the District. No discussion or action can
be taken on matters not listed on the agenda, per the Brown Act. Each member of the public who wishes to
comment shall be allotted five minutes, and no more than three individuals shall address the same subject.)
3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR (For purposes of the Brown Act, all Action and
Consent items listed give a brief description of each item of business to be transacted or discussed.
Recommendations of the staff, as shown, do not prevent the Board from taking other action.)
4. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered separately
upon request. Comments and questions from members of the public, staff or Board can be taken when the
comment does not neCessitate separate action.)
5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION / ACTION
6. ITEMS FOR BOARD ACTION
a. Truckee Marsh Sewer Facilities Protection Project (i�o Bergsor,n, Hydrogeologist) Pg 43
(1) Hold a Public Hearing to receive comments on the designation of the Upper Truckee
Marsh Sewer Facilities Adaptive Management Plan as "substantially complex" under
Public Contract Code section 7201; (2) Pursuant to the facts, find the Project is
substantially complex and requires a 10% retention limit; and (3) Authorize staff to
advertise for construction bids
b. Luther Pass Power and Control Project (�uiie Ryan,Senior Engineer� Pg 47
Approve proposal from GHD for engineering services in the amount of $325,826.
C. PCIy►'Y12nt Of CIC11►715 (Debbie Henderson, Accounting Manager) Pg 59
Approve Payment of Claims in the amount of $2,912,703.93
8. STANDING AND AD-HOC COMMITTEE REPORTS (Discussions may take place; however, no action will be
taken.)
REGULAR BOARD MEETING AGENDA-June 19, 2014 PAGE-2
9. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken.)
10. EL DORADO COUNTY WATER AGENCY PURVEYOR REPORT
1 1. GENERAL MANAGER REPORT (Discussion may take place; however, no action wiil be taken.)
Public Outreach
12. STAFF/ATTORNEY REPORTS (Discussions may take place; however, no action will be taken.)
13. NOTICE OF PAST AND FUTURE MEETINGS/EVENTS
Past Meetings Events
06/11/14-9:00 a.m. EDCWA Meeting
O6/16/14-3:30 P.M. Water and Wastewater Operations Committee Meeting
O6/19/14-2:00 p.m. Regular Board Meeting at District
Future Meetings/Events
07/03/14-2:00 p.m. Regular Board Meeting at District
14. CLOSED SESSION �The Board will adjourn to Closed Session to discuss items identified below. Closed Session is not
open to the pubiic;however,an opportunity will be provided at this time if inembers of the public would like to
comment on any item listed-three minute limit.)
a. Pursuant to Government Code Section 54956.9(a)/Conference with Legal
Counsel Existing Litigation re: EI Dorado County Superior Court Case
SC20120227 GRCLT Condominium vs. South Tahoe Public Utility District
(Filed 10/22/12) Pg 75
b. Pursuant to Government Code Section 5456.9(b)/Conference with Legal
Counsel Anticipated Litigation (one potentiai case�. Pg ��
c. Pursuant to Section 54956.9(a) of the California Government code, Closed Session may
be held for conference with legal counsel regarding existing litigation: False Claims Act
Case: United States, the States of California, Delaware, Florida, Nevada, and
Tennessee and the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix
v. J-M Manufacturing Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil
Action No. ED CV06-0055-GW, United States District Court for the Central District of
California. Pg 79
d. Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may
be held for conference with legal counsel regarding existing litigation: Los Angeles
County Superior Court, Case No. BC459943, State of Nevada, et al. v. J-M
Manufacturing, et al. Pg 8�
e. Pursuant to Government Code Section 54957�a)/Conference with Labor Negotiators
re: Memorandum of Understanding with Stationary Engineers, Local 39. Present at this
Closed Session will be Agency Negotiators: Richard Solbrig/General Manager, Nancy
Hussmann/Human Resources Director, Paul Hughes/Chief Financiai Officer. Pg ss
ACTION REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION
ADJOURNMENT (The next Regular Board Meeting is July 3, 2014, at 2:00 p.m.)
REGULAR BOARD MEETING AGENDA-June 19, 2014 PAGE-3
The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each monih.A complete Agenda
packet is available for review at the meeting and at the District office during the hours of 8:00 a.m.and 5:00 p.m.,Monday through Friday.
A recording of the meeting is retained for 30 days after Minutes of the meeting have been approved.Items on the Agenda are numbered
for identification purposes only and will not necessarily be considered in the order in which they appear.Designated times are for particular
items only.Public Hearings will not be calied to order prior to the time specified,but may occur slightly later than the specified time.
Public participation is encouraged.Public comments on items appearing on the Agenda will be taken at the same time the Agenda items
are heard;comments should be brief and directed to the specifics of the item being considered. Please provide the Clerk of the Board with
a copy of all written materials presented at the meeting.Comments on items not on the Agenda can be heard during"Comments from
the Audience;"however,action cannot be taken on items not on the Agenda.
Backup materials relating to an open session item on this Agenda,which are not included with the Board packet,will be made available
for public inspection at the same time they are distributed or made available to the Board,and can be viewed at the District office,at the
Board meeting and upon request to the Clerk of the Board.
The meeting location is accessible to people with disabilities.Every reasonable effort will be made to accommodate participation of the
disabled in all of the District's public meetings.If particular accommodations are needed,please contact the Cierk of the Board at(530)
544-6474,extension 6203.Ali inquiries must be made at least 48 hours in advance of the meeting.
REGULAR BOARD MEETING AGENDA-June 19, 2014 PAGE-4
S�V�' TaH�
���A F
- _ --,..�..= ��-
�e`wer ' 1950 • w t��G"
�UT7LITY 015
SOUTH TAHOE PUBLIC UTILITY DISTRICT
CONSENT CALENDAR
June 19, 2014
ITEMS
a. RESOLUTION NOS. 2950-14 2951-14 2952-14 AND 2953-14 IN SUPPORT OF METER PROJECT
APPLICATIONS TO THE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH, Pg 1
(Lynn Nolan, Grant Coordinator)
Adopt Resolution Nos. 2950-14, 2951-14, 2952-14 and 2953-14 to CDPH for the submission of four
meter applications through the Safe Drinking Water State Revolving Fund program.
b. ANNUAL ADOPTION OF STATEMENT OF INVESTMENT POLICY Pg 7
(Debbie Henderson, Accounting Manager)
Adopt Resolution No. 2954-14 (superseding Resolution No. 2935-13).
c. SEWER ENTERPRISE 2014-15 APPROPRIATIONS SUBJECT TO LIMITATION Pg 21
(Debbie Henderson, Accounting Manager)
Adopt Resolution No. 2955-14 setting the limitation on appropriations for fiscal year 2014-15.
d. POLYMER CONTRACT RENEWAL Pg 27
(Ross Johnson, Manager of Plant Operations)
Authorize one year renewal option of polymer contract with Polydyne, Inc., in the estimated
amount of $128,304.00
e. 2014-2015 BULK SODIUM HYPOCHLORITE SUPPLIES Pg 29
(Ross Johnson, Manager of Plant Operations and Linda Brown, Purchasing Manager)
Award bid to the lowest responsive, responsible bidder, Sierra Chemical Company, in the
estimated amount of $68,472.00
f. 2014-2015 SODIUM HYPOCHLORITE SUPPLY TOTES Pg 31
(Randy Curtis, Manager of Field Operations and Linda Brown, Purchasing Manager)
Award bid to the lowest responsive, responsible bidder, Sierra Chemical Company, in the
estimated amount of $13,770.00.
g. 2014-2015 SODIUM HYPOCHLORITE SUPPLY DRUMS Pg 33
(Randy Curtis, Manager of Fieid Operations and Linda Brown, Purchasing Manager)
Award bid to the lowest responsive, responsible bidder, Sierra Chemical Company, in the
estimated amount of $10,971 .40.
REGULAR BOARD MEETING AGENDA-June 19, 2014 PAGE-5
h. SURPLUS VEHICLES Pg 35
(Linda Brown, Purchasing Agent)
Authorize Baxtin Management Group to auction District vehicles.
i. REGULAR BOARD MEETING MINUTES: JUNE 5, 2014 Pg 37
(Melonie Guttry, Executive Services Manager/Clerk of the Board)
Approve June 5, 2014 Minutes
General Manager
Richard H.Solbrig
� . t9�i�`o . '`W,..
� �/` /'� � t'"� �/'� /�� Directore
r � r , �i i � Chris Cefalu
�""� � �� v JameS R.Jonee
~�` "�'" � � � � � Randy Vogelgesang
�'ubl�c Ut��ity D�Strict KellySheehan
Eric Schafer
1275 Meadow CreSt Drive•5outh Lake Tahoe•CA 9615D-740i
F'hone 53D 54�4-6474•Fax 530 541-0614•www.�tpud.u5
BOARD AGENDA ITEM 4a
TO: Board of Directors
FROM: Lynn Nolan, Grant Coordinator
MEETING DATE: June 19, 2014
ITEM - PROJECT NAME: Resolution Nos. 2950-14, 2951-14, 2952-14 and 2953-14 in
support of Meter Project Applications to the California Department of Public Health
(CDPH)
REQUESTED BOARD ACTION: Adopt Resolution Nos. 2950-14, 2951-14, 2952-14 and
2953-14 to CDPH for the submission of four meter applications through the Safe Drinking
Water State Revolving Fund program.
DISCUSSION: The CDPH has chosen the South Tahoe Public Utility District's (District) four
phases of ineter installation projects for funding for FY 2014. These four projects consist
of the installation of approximately 6,265 residential water meters on existing service
connections located throughout the District's service area. The total cost of all four
phases of ineter installations is approximately $17,137,815. The CDPH will evaluate the
applications for approval of four loans, one for each phase of ineter installation, that
will have a proposed zero interest rate payback. The District is eligible for this zero
interest rate payback loan based on the income status of the community. The District
has the right to accept or reject the loan proposal from CDPH when it is offered.
SCHEDULE: Applications must be submitted by June 23, 2014
COSTS: See each attached Resolution for each project phase cost
ACCOUNT NO: N/A
BUDGETED AMOUNT AVAILABLE: N/A
ATTACHMENTS: Resolution Nos. 2950-14, 2951-14, 2952-14 and 2953-14 in support of four
applications to CDPH
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES 'I,I�� NO
CHIEF FINANCIAL OFFICER: YES r NO
-1-
� RESOLUTION NO. 2950-14
2
3 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
SOUTH TAHOE PUBLIC UTILITY DISTRICT FOR WATER METER INSTALLATION PHASE 2
4
5 WHEREAS, the South Tahoe Public Utility District has the authority to construct,
6 operate, and maintain the STPUD water system; and
7 WHEREAS, the South Tahoe Public Utility District desires to enhance the provision
$ and protection of the drinking water supplied to customers of STPUD;
9
NOW, THEREFORE BE IT RESOLVED by the South Tahoe Public Utility District that,
10 pursuant and subject to all of the terms and provisions of the Safe Drinking Water State
11 Revolving Fund (SDWSRF) program, application will be made to the State of California
�2 Department of Public Health for funding of Water Meter Installation Phase 2 project with
13 the total project cost being $3,973,345; and,
14
BE IT FURTHER RESOLVED that the General Manager, Assistant General Manager
15 and/or Chief Financial Officer of said South Tahoe Public Utility District are hereby
16 Quthorized and directed to cause the necessary data to be prepared and application
17 to be signed and filed with the State of California Department of Public Health.
18
WE, THE UNDERSIGNED, do hereby certify that the above and foregoing
19
Resolution No. 2950-14 was duly adopted and passed by the Board of Directors of the
20 South Tahoe Public Utility District at a regularly scheduled meeting held on the 19th day
2� of June, 2014, by the following vote:
22
23 AYES:
24 NOES:
25 ABSENT:
26
Eric Schafer, Board President
27 South Tahoe Public Utility District
28 ATTEST:
29
30 Melonie Guttry, Clerk of the Bocug�
� RESOLUTION NO. 2951-14
2
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
3 SOUTH TAHOE PUBLIC UTILITY DISTRICT FOR WATER METER INSTALLATION PHASE 3
4
5 WHEREAS, the South Tahoe Public Utility District has the authority to construct,
6 operate, and maintain the STPUD water system; and,
7 WHEREAS, the South Tahoe Public Utility District desires to enhance the provision
g and protection of the drinking water supplied to customers of STPUD;
9 NOW, THEREFORE BE IT RESOLVED by the South Tahoe Public Utility District that,
10 pursuant and subject to all of the terms and provisions of the Safe Drinking Water State
11 Revolving Fund (SDWSRF) program, application will be made to the State of California
12 Department of Public Health for funding of Water Meter Installation Phase 3 project with
13 the total project cost being $4,267,318; and,
14 gE IT FURTHER RESOLVED that the General Manager, Assistant General Manager
15 and/or Chief Financial Officer of said South Tahoe Public Utility District are hereby
16 authorized and directed to cause the necessary data to be prepared and application
17 to be signed and filed with the State of California Department of Public Health.
18
WE, THE UNDERSIGNED, do hereby certify that the above and foregoing
19
Resolution No. 2951-14 was duly adopted and passed by the Board of Directors of the
20 South Tahoe Public Utility District at a regularly scheduled meeting held on the 19th day
,
2� of June, 2014, by the following vote:
� 22
�
} 23 AYES:
�
�
24 NOES:
�
; 25 ABSENT: ,
�
3
� 26 Eric Schafer, Board President
; 27 South Tahoe Public Utility District
$ 28
ATTEST:
{
29
P
30 Melonie Guttry, Clerk of the Boaf�-
1 RESOLUTION NO. 2952-14
2 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
3 SOUTH TAHOE PUBLIC UTILITY DISTRICT FOR WATER METER INSTALLATION PHASE 4
4 WHEREAS, the South Tahoe Public Utility District has the authority to construct,
5 operate, and maintain the STPUD water system; and,
6
WHEREAS, the South Tahoe Public Utility District desires to enhance the provision
7
and protection of the drinking water supplied to customers of STPUD;
8
g NOW, THEREFORE BE IT RESOLVED by the South Tahoe Public Utility District that,
10 Pursuant and subject to all of the terms and provisions of the Safe Drinking Water State
11 Revolving Fund (SDWSRF) program, application will be made to the State of California
12 Department of Public Health for funding of the Water Meter Installation Phase 4 project
with a total project cost being $3,797,021; and,
13
14 BE IT FURTHER RESOLVED that the General Manager, Assistant General Manager
15 and/or Chief Financial Officer of said South Tahoe Public Utility District are hereby
16 authorized and directed to cause the necessary data to be prepared and application
�7 to be signed and filed with the State of California Department of Pubiic Health.
�$ WE, THE UNDERSIGNED, do hereby certify that the above and foregoing
19 Resolution No. 2952-14 was duly adopted and passed by the Board of Directors of the
20 South Tahoe Public Utility District at a regularly scheduled meeting held on the 19th day
21 of June, 2014, by the following vote:
22
23 AYES:
24 NOES:
25 ABSENT:
26
27 Eric Schafer, Board President
South Tahoe Public Utility District
28
29 ATTEST:
30 _5_
Melonie Guttry, Clerk of the Board
� RESOLUTION NO. 2953-14
2
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
3 SOUTH TAHOE PUBLIC UTILITY DISTRICT FOR WATER METER INSTALLATION PHASE 5 '
4
5 WHEREAS, the South Tahoe Public Utility District has the authority to construct,
6 operate, and maintain the STPUD water system; and
7 WHEREAS, the South Tahoe Public Utility District desires to enhance the provision `
g and protection of the drinking water supplied to consumers of STPUD;
9 NOW, THEREFORE BE IT RESOLVED by the South Tahoe Public Utility District that, .
10 pursuant and subject to all of the terms and provisions of the Safe Drinking Water State
11 Revolving Fund (SDWSRF) program, application will be made to the State of California :
12 Department of Public Health for funding of the Water Meter Installation Phase 5 project
13 with the total project cost being $5,100,131; and,
, 14
� BE IT FURTHER RESOLVED that the General Manager, Assistant General Manager
; 15 and/or Chief Financial Officer of said South Tahoe Public Utility District are hereby
;
� 16
authorized and directed to cause the necessary data to be prepared and application
�
� 17 to be signed and filed with the State of California Department of Pubiic Health.
�
{ 18
19 WE,THE UNDERSIGNED, do hereby certify that the above and foregoing
, 20 Resolution No. 2950-14 was duly adopted and passed by the Board of Directors of the
2� South Tahoe Public Utility District at a regularly scheduled meeting held on the 19t" day
22 of June, 2014, by the following vote:
23
AYES:
24
NOES:
25 ABSENT:
26
27 Eric Schafer, Board President
South Tahoe Public Utility District
28
: 29 ATTEST:
30 -6-
Melonie Guttry, Clerk of the Board
General Manager
Richard H.5olbrig
V� �`1��
� "- w� � f '� � �� Director5
U Chris Cefalu
JameS R.JoneS
�y� � �u b[�c u t��ity �i�tri ct Randy Vogelge5ang
Kelly Sheehan
Eric 5chafer
1275 Meadow CreSt Drive•5ou�th Lake Tahoe•CA 96150-7401
Phone 534 544-F474�Fax 530 541-0614•www.stpud.u5
BOARD AGENDA ITEM 4b
TO: Board of Directors
FROM: Debbie Henderson, Accounting Manager
MEETING DATE: June 19, 2014
ITEM - PROJECT NAME: Annual Adoption of Statement of Investment Policy
REQUESTED BOARD ACTION: Adopt Resolution No. 2954-14, (superseding Resolution
N o. 2935-13).
DISCUSSION: The present investment policy was adopted July 18, 2013. The policy
requires annual review and adoption by the Board of Directors. The PFM Group has
recommended changes for 2014 that are summarized in the attached memorandum.
Details of the changes are provided in the attached redline/strikeout version of the
investment policy.
SCHEDULE: Adopt Resolution June 19, 2014
COSTS: None
ACCOUNT NO: N/A
BUDGETED AMOUNT REMAINING: N/A
ATTACHMENTS: Resolution No. 2954-14, PFM Memorandum, Statement of Investment
Policy
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: N/A
GENERAL MANAGER: YES__/'�� NO
CHIEF FINANCIAL OFFICER: YES NO
-7-
� RESOLUTION NO. 2954-14
2 A RESOLUTION OF THE BOARD OF DIRECTORS
OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT
3 ADOPTING A STATEMENT OF INVESTMENT POLICY AND
SUPERSEDING RESOLUTION NO. 2935-12
4
5
6 BE IT RESOLVED, by the Board of Directors of the South Tahoe Public Utility
7 District, County of EI Dorado, State of California, as foilows:
WHEREAS, the South Tahoe Public Utility District enters into various investments
8
from time to time on behalf of the District as permitted by the California Government
9
Code and the District's investment policy; and
10 WHEREAS, the South Tahoe Public Utility District staff wish to update the
11 Statement of Investment Policy to enhance the South Tahoe Public Utility District's
12 opportunities for prudent and systematic investments, to delegate the Chief Financial
13 Officer as the investment officer of the District, and to update certain language
14 according to the California Government Code; and
15 NOW, THEREFORE BE IT RESOLVED, by the Board of Directors of the South Tahoe
16 Public Utility District that:
17 The attached Statement of Investment Policy is hereby adopted and becomes
a part of this Resolution by reference herein.
18
WE, THE UNDERSIGNED, do hereby certify that the above and foregoing
19 resolution was duly and regularly adopted and passed by the Board of Directors of the
20 South Tahoe Public Utility District at a regular meeting duly held on the
21 19th day of June, 2014, by the following vote:
22 AYES:
23 NOES:
24
ABSENT:
25
26 Eric Schafer, Board President
27 South Tahoe Public Utility District
28 ATTEST:
29
30 Melonie Guttry, Clerk of the Board_9_
50 Califomia Street 415 982-5544
� Suite 2300 415 982-4513 fax
�����'=�,� San Francisco,CA 94111 www.pfm.com
The PFM Group
Publ�c�ir:ancial'vtanagement.�nc.
PFM Asset Management�LC
P�M Advisors
May 2,2014
Memorandum
To: Paul Hughes,Chief Financial Officer
Debbie Henderson,Accounting Manager
South Tahoe Public Utility District
From: Nancy Jones,Managing Director
Sarah Meacham,Director
PFM A.r.cet Management LLC
Re: Annual Review of Investrnent Policy
We have completed our annual review of the District's Investment Policy (the "Policy"). The District's
Policy is comprehensive and remains in compliance with all applicable California Government Code
(the"Code") statutes regulating the investment of public funds.
We have made some recommendations to better align the Policy with the Code. We have made other
recommendations to improve the District's investment opportunities, while maintaining the District's
top investment objectives of safety and liquidity,in light of diminishing supply and value in the Federal
Agenry sector. The conservatorship and wind down of FNMA and FHI.MC has caused these issuers to
cut their previously frequent debt issuance significandy. Since 2008, the market of Federal Agency debt
has fallen by$1.2 trillion (1/3 of the previously$3 trillion market).
II Scope of Policy
• We added that funds held in a trust for retiree pension or medical benefits are not within
the Scope of the District's Investrnent Policy.
VIII Permitted Investments
• We added that sector and issuer percentage limits and credit requirements apply at the rime
of purchase;this is consistent with Code Section 53601.
• We also recommended the addition of municipal obligations issued by the State of
California, the other 49 states, and California local agencies as allowed by Code Sections
53601 (c), (d), and (e). We have included credit criteria though the Code does not require it.
T'he credit criteria we have recommended is consistent with that the "A"or better rating for
corparate notes and the short-term"A-1" or better rating for commercial paper.
• The District's current Policy limits U.S. corporate debt to a maxirnum of three years
maturiry. We recommend extending the maxirrium maturity permitted for U.S. corporate
debt to five years consistent with the Code. We also changed the reference to rating
-11-
3
��
� South Tahoe Public Utility District
�PFM �tay 2,2ot4
� Page 2
��
�
agencies to the acronym, NRSRO, as previously defined acronym in the Permitted
Investment subsecrion C, State of California Municipal Obligarions. �
• We added short-term credit criteria for negotiable CDs. This is consistent with the way
NRSROs rate fixed-income securities with maturities less than once year.
• For commercial paper, we changed the reference to rating agencies to the acronym,
NRSRO.
We look forwarding to discussing our recommendarions with you.
f
�
�
i
,
r
�
� -12- �
SOUTH TAHOE PUBLIC UTILITY DISTRICT
STATEMENT OF INVESTMENT POLICY
I Statement of Intent
This statement of investment policy is adopted to establish an overall policy and
procedures for the management and investment South Tahoe Public Utility District's
funds available for investment. This policy is effective as of its adoption by the Board
of Directors. It will be reviewed by the Board and readopted at least once each year.
II Scope of Policy
This policy covers all funds and investment activities under the direct authority of the
I District. It does not cover funds related to funds held in a trust for retiree pension or
medical benefits or District borrowing,—. The investments for debt issues�} are
controlled by documents related to each debt issue.
III Objectives
The investment program shall be designed and managed with a degree of
professionalism worthy of the public trust. The District's primary investment
objectives, in order of priority, shall be:
A Safety
Safety of principal is the foremost objective of the District. Investments shall be
made in a manner that first seeks to ensure the preservation of capital in the
overall portfolio. And, second seeks to ensure that capital losses are avoided,
whether they be from securities defaults or erosion of market value.
B Liquidity
The investment portfolio shall be structured to provide sufficient liquidity to
enable the District to meet its cash flow requirements. An adequate percentage of
the portfolio should be maintained in liquid short-term securities, which can be
converted to cash if necessary to meet disbursement requirements. Since all cash
requirements cannot be anticipated, investments in securities with active
secondary or retail markets are highly recommended. Emphasis is on marketable
securities with low sensitivity to market risk.
C Yield
The investment program shall be designed with the objective of attaining a market
rate of return on its investments consistent with the constraints imposed by its
safety objective and cash flow considerations. Yield should become a
consideration only after the basic requirements of safety and liquidity have been
met.
IV Prudence
The District adheres to the guidance provided by the "prudent investor rule," which
states that when investing, reinvesting, purchasing, acquiring, exchanging, selling, or
managing public funds, a trustee shall act with care, skill, prudence, and diligence
under the circumstances then prevailing, including, but not limited to, the general
C:�ocuments and SMtings�debbie�Local Settings�Temporary[nternet Files�Conteut.0u,[Iook��C6AMJS4B'�Investmrnt PoGcy 2013_PFM Recommendations Marked Up_May
2014.docx —l,j—
1
� ,
economic conditions and the anticipated needs of the agency, that a prudent person
acting in a like capacity and familiarity with those matters would use in the conduct of
funds of a like character and with like aims, to safeguard the principal and maintain
° the liquidity needs of the agency.
. Authorized individuals acting in accordance with this Policy and written procedures
; and exercising due diligence shall be relieved of personal responsibility for an
individual security's credit risk or market price changes, provided deviations from
� expectations are reported in a timely fashion.
i
; V Delegation of Authority
� The Board of Directors has delegated management responsibility for the investment
; program to the Chief Financial Officer, who is designated as the Investment Officer of
� the District. This delegation is for a one-year period. Subject to review, the Board
� may renew the delegation of authority each year. In the Chief Financial Officer's
; absence, the Accounting Manager shall act as the Investment Officer. The Chief
' Financial Officer shall develop and maintain administrative procedures for the '
' operation of the investment program, consistent with this investment policy.
} All participants in the investment process shall act as custodians of the public trust.
' Investment officials shall recognize that the investment portfolio is subject to public
{ review and evaluation. The overall program shall be designed and managed with a
degree of professionalism that is worthy of the public trust.
� VI Internal Controls
The Chief Financial Of�icer shall establish a system of internal controls, which shall
be reviewed annually by the independent auditor. The controls shall be designed to
� prevent loss of public funds arising from fraud, error, misrepresentation,unanticipated
market changes or imprudent actions. Controls deemed most important include:
minimization of opportunities for collusion, separation of duties, separating
transaction authority from accounting and record keeping, custodial safekeeping,
� avoidance of bearer-form securities, specific limitation regarding securities losses and
, remedial actions, written confirmation of all transactions, minimizing the number of
authorized investment officials, documentation of transactions and strategies, and
proper review and approval of brokerage accounts and investment transactions.
; VII Reporting
The Investment Officer, or her designee, shall submit a monthly investment report to
the Board of Directors. The monthly reports shall include all investments held by the
" District, and/or under the management of any outside party and shall include: a list of
security transactions; the type of investment; issuer; date of maturity; par and dollar
amount invested on all securities; current market value on all securities(including the
� source of this valuation); a statement that the portfolio is in compliance with this
Policy or the manner in which it is not in compliance; and, a statement that the
District has the ability to meet its expenditure requirements for the next 6 months or
an explanation as to why sufficient money may not be available.
j C:�Documrnts and Settings�debbie\Local Settings\Temporazy Intemet Files�Contem.0u look�C6AMJS46�lnvestmert Policy 2013_PFM Recommendations Marked Up_May
2014.docx —1�—
7 ^
's
L
VIII Permitted Investments
Sections 53600 et. seq. of the California Government Code provide basic investment
limits and guidelines for government entities. Within the investments permitted by the
Government Code, the District seeks to further restrict eligible investments as
provided below. In the event an apparent discrepancy is found between this Policy
and the Government Code, the more restrictive parameters shall take precedence. The
Investment Officer shall invest District moneys as directed by this Policy and only in
the investments specifically authorized in this section. Where this Policy�ecifies a
percenta�e limitation for a particular security type or issuer that percentage is
a�plicable at the time the security is purchased Credit criteria listed in this section
refers to the credit rating at the time the security is purchased
A U.S. Treasury Instruments
United States Treasury notes, bonds, bills or certificates of indebtedness, or
those for which the full faith and credit of the United States is pledged for
payrnent of principal and interest.
B Federal Agency and Instrumentality Securities
Federal agency or United States government-sponsored enterprise obligations,
participations, or other instruments, including those issued by or fully
guaranteed as to principal and interest by federal agencies or United States
government-sponsored enterprises.
The District should target a maximum allocation of 25% to callable Federal
agency securities.
Investments in Federal agency mortgage-backed pass-through securities or
collateralized mortgage obligations may not exceed 20% of the District's
portfolio.
C State of California Municinal Obligations
Re�istered state warrants or treasury notes or bonds of this state includin�
bonds navable solelv out of the revenues from a revenue-producing property
owned, controlled, or operated by the state or by a department board agenc�
or authoritv of the state. Eli�ible investments shall be rated "A" for long-term
"A-1" for short-term, their equivalent or better by one or more nationally
reco�nized statistical-rating organization(NRSROZ
D Other 49 States Municinal Obligations
Re�istered treasury notes or bonds of any of the other 49 states in addition to
California, including bonds payable solely out of the revenues from a revenue-
producin�property owned controlled or operated by a state or by a denartment
board, a�ency, or authori of any of the other 49 states in addition to
California. Eli�ible investments shall be rated "A" for lon�-term "A-1" for
short-term, their equivalent, or better by one or more NRSRO
E California Local AEencv Municipal Obligations
_ Bonds, notes, warrants, or other evidences of indebtedness of a local a ency
within this state, includin� bonds payable solely out of the revenues from a
C:�Documents and Settings�debbie��Local Settiugs'Temporary Intemet Files�Contenti�tlook�C6AMJS4B',Investment Policy 2013_PFM Recommrndatioas Marked Up_May
2014.docx
3
revenue-producin�nro�erty owned controlled or operated by the local a�encv,
or by a department board agency or authority of the local ag�ency. Eli i�,�ble
investments shall be rated "A" for long term, "A-1" far short-term, their ;,
eauivalent, or better by one or more NRSRO.
F U.S. Corporate Debt �
Medium-term notes, defined as all corporate and depository institution
� securities with a maximum remaining maturity of t�ee-five (�5) years or less,
issued by corporations organized and operating within the United States or
depository institutions licensed by the United States or any state and operating
within the United States. Eligible investments shall be rated "A" or better by
� one or more NRSRO. A maximum of 30% ;
of the District's portfolio may be invested in this category.
I �G Negotiable Certificates of Deposit i
Negotiable certificates of deposit CDs issued by a nationally or state-
chartered bank or a state or federal association or by a federally- or state-
licensed branch of a foreign bank. Eligible investments shall be rated "A" for
long-term "A-1" for short-term their equivalent, or better by one or more
NRSRO.D '���.,.� ...., '.....*.,a *., ..,.,»..... ..'�.,.,_ .,'�..-* �_""a ,.,- ____*_a A 1�
, -� A maximum of 30% of the District's portfolio may be invested in this
' category. �
>
� �H Commercial Paper
' Commercial paper of"prime" quality of the highest ranking or of the highest
; letter and number rating as provided for by a
� I SR03. The entity that issues the commercial paper
;
shall meet all of the following conditions in either paragraph (1) or paragraph ,
; �2)�
} (1)The entity meets the following criteria: i Is organized and operating
I within the United States as a general corporation. ii Has total assets in excess
of five hundred million dollars ($500,000,000). (iii) Has debt other than
commercial paper, if any, that is rated "A" or higher, or the equivalent, by a
� NRSRO .
� (2)The entity meets the following criteria: (i) Is organized within the United
States as a special purpose corporation, trust, or limited liability company. (ii)
Has program wide credit enhancements including, but not limited to, over
collateralization, letters of credit, or surety bond. (iii) Has commercial paper
that is rated "A-1" or higher, or the equivalent, by a NRSRO�a�ie�a�}
- I •
Eligible commercial paper shall have a maximum of 270 days or less and not
represent more than 10% of the outstanding paper of an issuing corporation. A
maximum of 25% of the District's portfolio may be invested in this category.
_ C:�Docummts and Settings',debbie�Local Settings�Temporary Iatemet Files\Conteat.4u�]ook�C6AM1S4B'�Investment Policy 2013_PFM Recommendations Marked Up_May
2014.docx 1 6
4
� �I Bank Deposits
FDIC insured or fully collateralized demand deposit accounts,
savings accounts, market rate accounts, time certificates of deposits in state or
national banks located in California. As required by Government Code §53649,
the District shall have a signed contract with each financial institution with the
District's funds on deposit. Any financial institution accepting the District's funds
for deposit must comply with the requirements of Government Code §53630 et
seq., including collateralization of deposits. The District may waive the
collateralization requirements for any portion of the deposit that is covered by
Federal deposit insurance. To be eligible to receive District deposits, the financial
institution must have received a minimum overall rating "satisfactory" in its most
recent evaluation of its record of ineeting the credit needs of California
communities, as required by Govemment Code §53635 et. seq. A maximum of
20%of the District's portfolio may be invested in time certificates of deposit.
� GJ Bankers' Acceptances
Bankers' acceptances which are otherwise known as bills of exchange or time
draf�s that are drawn on and accepted by a domestic commercial bank.
Purchases are limited to issuers whose short-term debt is rated A-1/P-1.
Bankers' acceptances cannot exceed a maturity of 180 days. A maximum of
40% of the District's portfolio may be invested in this category.
� �K State of California's Local Agency Investment Fund (LAIF)
If the District has funds invested in LAIF, the District shall maintain on file
LAIF's current investment policy and its requirements for participation,
including limitations on deposits and withdrawals. In addition, the District's
shall review annually investment policies of LAIF to ascertain that its funds are
invested in accordance with the District's investment objectives. Furthermore,
the District shall review the provisions of these investment policies requiring
internal controls on the investment process to ascertain that there is a division
of responsibility in the investment procedures.
� �L California Asset Management Trust
A California common law trust established pursuant to Title 1, Division 7,
Chapter 5 of the Government Code of the State of California. CAMP must be
rated"AAAm"to be eligible for investment of District funds.
� dM Money Market Funds
Shares of beneficial interest issued by diversified management companies that
are money market funds registered with the Securities and Exchange
Commission under the Investment Company Act of 1940 (15 U.S.C. Sec. 80a-1
and following). The company shall have met either of the following criteria:
(a) attained the highest ranking or the highest letter and numerical rating
provided by not less than two nationally recognized statistical rating
organizations and (b) retained an investment adviser registered or exempt from
registration with the SEC with not less than five (5) years' experience
managing money market mutual funds with assets under management in excess
of five hundred million dollars ($500,000,000). A maximum of 20% of the
District's portfolio may be invested in this category.
C:�Documents and Settings�debbie�Local Settings�Temporary[ntemet Files�Contrnt.0utlook�C6AMJS4B�investment Policy 2013_PFM Recommendations Marked Up_May
2014.docx —1�]—
5
�
�
t
f
� � �N EI Dorado County Pool
;;
; The District shall review at least annually the El Dorado County investrnent
pool to ascertain that its funds in these pools are invested in accordance with
the District's investment objectives. The District shall also review the
provisions of these investment policies requiring internal controls on the
investment process to ascertain that there is a division of responsibility in the
investment procedures.
IX Prohibited Investments:
Investments by the District in securities permitted by the California Government
� Code, but not specifically approved by this investment policy are prohibited without
the prior approval of the Board. The District is prohibited from buying on margin or
from speculative buying. Furthermore, the District is prohibited from investing in
equity-linked securities or from entering into fmancial futures contracts, options, or
swaps. However, the District may purchase U.S. government securities which are
discount or securities bearing interest.
. In accordance with California Government Code §53601.6, the District shall not
invest in inverse floaters, range notes, mortgage derived interest-only strips, or any
security that could result in zero interest accrual if held to maturity.
X Term of Investments
The term of any investment may not exceed five years without express authority from
Board of Directors received at least 90 days preceding the investment purchase.
�
- C:�Documents and Settings�debbie`.Local Settings\Temporary IntemM Files\Contrnt.0u Iook�C6AMJS4B\Investment PoGcy 2013_PFM Recommendations Marked Up_May
2014.docx —1�—
6
XI Diversification
The investment portfolio shall be diversified to avoid incurring unreasonable and
avoidable risks regarding specific security types or individual financial institutions.
The portfolio shall also be diversified with respect to the term of individual
investments purchased by the District. In addition to the percentage limitations
specified in Section VIII Permitted Investments, the maximum amount of the
portfolio the District may invest with any one issuer is 10%, excluding U.S.
Treasuries, Federal Agencies, and pooled investments.
XII Credit Rating Changes
In the event a security held by the District is subject to a rating change that brings it
below the minimum credit ratings specified in this Policy, the Investment Officer
should disclose such information in the monthly investrnent report.
XIII Safekeeping
All cash and securities in the District's portfolio, including those that are being
managed by the Investment Officer, shall be held in safekeeping in the District's
name by a third party bank trust department, acting as agent for the District under the
terms of a custody agreement executed by the bank and the District.
All securities will be received and delivered using standard delivery versus payment
(DVP) procedures, the District's safekeeping agent will only release payment for a
security after the security has been properly delivered. The only exception to the
foregoing shall be depository accounts and securities purchases made with: (i) local
government investment pools; and, (ii) money market mutual funds, since the
purchased securities are not deliverable.
XIV Securities Dealers
The District has authorized the Investment Advisor to use broker/dealers, which the
Investment Advisor has selected in accordance with its written selection policy. The
Investment Officer may also use broker/dealers meeting credit worthiness standards
established by the Investment Officer.
XV Ethics and Conflicts of Interest
Officers and employees involved in the investment process shall refrain from personal
business activity that could conflict with proper execution of the investment program,
or which could impair their ability to make impartial investment decisions. Such
employees and investment officials shall disclose to the District Board and the General
Manager any material financial interests in financial institutions that conduct business
within the District, and they shall further disclose any large personal
financiaUinvestment positions that could be related to the performance of the District's
portfolio.
C:�,Documrnts and Settings�debbie�Local Settings,Temporary Internet Fites��Contrnt.0utlook�,C6AMJS4B�.lnvestment PoGcy 2013_PFM Recommendations Mazked Up_May
2014.docx —19—
7
6eneral Manager
Richard H.5olbrig
r 1950��~`
�.�1� W$j�r ^ �� � �� Directors
U Chris Cefalu
James R.Jonee
`"=""—=' �.� � e • � � Randy Vogelgesang
f ublEc Utiiity D�Str�ct KellySheehan
Eric 5chafer
1275 Meadow CreSt Drive�5outh 1�ke Tahoe•CA 9�15D-7401
F'hone 53Q 544-6474•Fax 534 541-0614•www.s�pud.u5
BOARD AGENDA ITEM 4c
TO: Board of Directors
FROM: Debbie Henderson, Accounting Manager
MEETING DATE: June 19, 2014
ITEM- PROJECT NAME: Sewer Enterprise 2014-15 Appropriations Subject to Limitation
REQUESTED BOARD ACTION: Adopt Resolution No. 2955-14 setting the limitation on
appropriations for fiscal year 2014-15.
DISCUSSION: This is the District's annual Resolution called for by Constitutional
Amendment XIIIB. The limitation on Appropriations for fiscal year 2014-15 is $62,831,985.
The Sewer Enterprise fund budget for fiscal year 2014-15 appropriates $28,652,582. As
such, the District is $34,179,403 below the state mandated spending limit.
SCHEDULE: Adopt Resolution No. 2955-14
COSTS: None
ACCOUNT NO: N/A
BUDGETED AMOUNT REMAINING: N/A
ATTACHMENTS: Resolution No. 2955-14 and a calculation of the permitted
appropriation growth rate.
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer
GENERAL MANAGER: YES C. NO
CHIEF FINANCIAL OFFICER: YES NO
-21-
� RESOLUTION NO. 2955-14
2 A RESOLUTION OF THE BOARD OF DIRECTORS OF
THE SOUTH TAHOE PUBLIC UTILITY DISTRICT
3 ADOPTING THE SEWER ENTERPRISE FUND APPROPRIATIONS
4 SUBJECT TO LIMITATION AND PROCEEDS OF TAXES FOR
FISCAL YEAR 2014-15
5
WHEREAS, the people of the State of California have elected to approve
6
Constit�tional Amendment XIIIB, and the Legislat�re of the State of California has voted
7 to adopt Senate Bill No. 1352, which implements Constitutional Amendment XIIIB, setting
$ the method of com utin annual a
p g ppropriations subject to limitation of local non-
9 residentia� construction and population; and
10 WHEREAS, the Directors selected the change in per capita personal income; and
11 WHEREAS, such �egislation sets the base year for this computation as Fiscal Year
�2 1978-79; and
13 WHEREAS, such legislation required documentation setting such appropriation
14 ��mitations shall be available to the public fifteen days prior to the adoption of this
15 resolution; and
WHEREAS, on June 4, 2014, such documentation was made public:
16
NOW, THEREFORE, BE IT RESOLVED, that the Board of Directors of the South Tahoe
�7 Public Utilit District does find and declare that the a
Y ppropriations subject to limitation
�$ for Fiscal Year 2014-15 are: $28,652,582; and that for Fiscal Year 2014-15, the proceeds
�9 of taxes as defined in the enabling statutes are: $6,857,001; and that the increase in
20 proceeds of taxes over the appropriations subject to limitations is: $-0.
21 PASSED AND ADOPTED at a duly held regular meeting of the Board of Directors of
22 the South Tahoe Public Utility District on the 19t" day of June, 2013, by the following vote:
23
24 AYES:
NOES:
25
ABSENT:
26
27 Eric Schafer, Board President
28 South Tahoe Public Utility District
ATTEST:
29
30 Melonie Guttry, Clerk of the Board
SOUTH TAHOE PUBLIC UTILITY DISTRICT
Permitted Growth Rate in Appropriations for 2014-15
Appropriation Limitation 2013-14 $62,850,840
Increase In CA Per Capita Personal Income
-.23 + 100 = 0.9977
100
Increase In Population
El Dorado County
.21 + 100 = 1.0021
100
Change Ratio .9977 x 1.0021 x 0.9997
Appropriations Limitation for 2014-15 $62,831,985
Actual Appropriations 2014-15 $28,652,582
Limitation Exceeding Actual Appropriations 2014-15 $34,179,403
Historical Appropriations Limitations & Proceeds Of Taxes
�I --�-Appropriation Limitation -f-Actuaf Appropriations'
' $70 -
$60 ��
�
$50 -,
o$40 -
�$30 -' �a �H
�$20 - �rt--�
$10 �,
'� �O 1996-97 1998-99 2000-01 2002-03 2004-05 '�� 20D6-07 �I 2008-09 �, 2010-11 , 2072•13 �� 2014-15 �
!1995-96 �1997-98 �1999-00 �2001-02 '200304 200506 �2007-08 2009-10 �'R011-12 p01314 ��
Fiscal Year
201415 Actual Appropriations:
Cash Expenditures $23,890,699
Depreciation 4 761 883
Total Ex enditures 28,652,582
-25-
General Manager
Richard H.5olbrig
• 1950 i""�
�.�1� w$j�„ /� �� � �� Director5
� � Chriy Cefalu
`'� JameS R.JoneS
"'!�^-�.� ;�,.; ► . � ♦ � Randy Vogelge5ang
- 1�ubl�c Ut�[ity D�5-Gr�ct KellySheehan
Eric Schafer
1275 Meadow CreSt Drive�South llake Tahoe•CA 96150-7401
Phone 534 54�4-6474•Fax 530 541-0614•www.5tpud.u�
BOARD AGENDA ITEM 4d
TO: Board of Directors
FROM: Ross Johnson, Manager of Plant Operations
MEETING DATE: June 19, 2014
ITEM - PROJECT NAME: Polymer Contract Renewal
REQUESTED BOARD ACTION: Authorize one year renewal option of polymer contract
with Polydyne, Inc., in the estimated amount of $128,304.*
DISCUSSION: Polymer is used as a dewatering aid in the biosolids handling process. Full-
scale treatment plant testing of the three manufactured polymer products was
completed in 2011 . Due to the time-consuming and disruptive nature of the process,
bids were solicited for a one-year contract with three one-year renewal options.
Polydyne, Inc. has offered this third renewal term with no price increase over last year
($1.08/Ib.).
*The total dollar amount is based upon an estimated usage quantity (110,000 Ibs.) for
the period of July 1, 2014, through June 30, 2015. The actual quantity may vary but unit
prices remain firm.
SCHEDULE:
COSTS: Estimated amount of $128,304
ACCOUNT NO: 1006-4720
BUDGETED AMOUNT AVAILABLE: $120,000 (2014/15)
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer
GENERAL MANAGER: YES rll� NO
CHIEF FINANCIAL OFFICER: YES NO
General Manager
Richard H.Solbrig
♦ 195b •
�+N��" w�t�qr, /� �� � �� Director5
� � ChriS Cefaiu
�"'"� James R.Jonee
w��M �F 1 t,�1�l(V U t�[�ty D i 5tri ct Randy Vogelge5ang
Kelly 5heehan
Eric 5chafer
1275 Meadow Crest Drive•South Lake Tahoe•Ca 96150-7401
Phone 530 544�-6474•Fax 534 541-0614•www.stpud.u5
BOARD AGENDA ITEM 4e
TO: Board of Directors
FROM: Ross Johnson, Manager of Plant Operations
Linda Brown, Purchasing Agent
MEETING DATE: June 19, 2014
ITEM -PROJECT NAME: 2014- 2015 Bulk Sodium Hypochlorite Supplies
REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible bidder,
Sierra Chemical Company, in the estimated amount of$68,472.00.*
DISCUSSION: Bids were opened on June 9, 2014, with three bidders responding:
$ 68,472.00 Sierra Chemical Co
$ 68,580.00 Olin Corp dba Olin Chlor-Alkali Products
$ 108,151.20 Univar USA, Inc
*The price is increasing approximately 2.6% from last year, and estimated usage is
expected to remain the same. The actual quantity and grand total may vary, but unit
prices are firm.
SCHEDULE: July 1, 2014 through June 30, 2015
COSTS: estimated $68,472.00
ACCOUNT NO: 1006-4755
BUDGETED AMOUNT AVAILABLE: $75,000.00
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer
GENERAL MANAGER: YES L � NO
CHIEF FINANCIAL OFFICER: YES NO
- 9-
General Manager
Richard H.5olbrig
• 1950 •
��8t w��r � �� � �� Directors
ChriS Cefalu
JamcS R.JoneS
'�"!�-��.:. ,�,� � � � � � Randy Vogelgesang
�'u b(�c U t���ty D�5tri ct Kelly 5heehan
Eric 5chafer
1275 Meadow CreSt Drive�Sauth Lake Tahoe•Cf196150-7401
Phone 530 544-6474•Fax 530 541-0614•www.stpud.u5
BOARD AGENDA ITEM 4f
TO: Board of Directors
FROM: Randy Curtis, Manager of Fieid Operations
Linda Brown, Purchasing Agent
MEETING DATE: June 19, 2014
ITEM - PROJECT NAME: 2014-2015 Sodium Hypochlorite Supply Totes
REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible bidder,
Sierra Chemical Company, in the estimated amo�nt of$13,770.00*
DISCUSSION: Bids were opened on June 9, 2014, with only one bidder responding from
the RFBs advertised and mailed to 16 potential bidders.
Sodium Hypochlorite is added to drinking water to ensure compliance with California
State standards. This contract is for hypochlorite which is off-loaded from 330 gallon
totes to three large-producing District wells (Bakersfield, Bayview, and South Upper
Truckee). Delivery in small bulk for these wells reduces handling of the chemical
thereby increasing safety, and results in a small price savings. Prices are � 2.1% lower
than last year and estimated usage is expected to remain the same.
*The total dollar amount is based upon an estimated quantity that the District will use in
the coming fiscal year. The actual quantity and grand total may vary, but unit prices
are firm.
SCHEDULE: July 1, 2014 through June 30, 2015
COSTS: $13,770.00 estimated
ACCOUNT NO: 2002-4755
BUDGETED AMOUNT REMAINING: $28,000.00
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES �H
CHIEF FINANCIAL OFFICER: YES NO
-31-
General Manager
Richard H.5olbrig
�.� �.�--��--,..8t
N/ �r w �� � �� Directors
t j Chria CeFalu
w James R.JoneS
—.w....�;, �r � � � � � Randy Vogelgesang
�u b 1�c u-�11�ty d�5tr�c-� Kelly 5heehan
Eric Schafer
1275 Meadow CreSt Drive•5o uth Lake Tahoe•CA 96150-7401
Phone 534 54-4-6474•Fax 53U 541-0694•www.S�Cpud.u�
BOARD AGENDA ITEM 4g
TO: Board of Direc#ors
FROM: Randy Curtis, Manager of Field Operations
Linda Brown, Purchasing Agent
MEETING DATE: June 19, 2014
ITEM- PROJECT NAME: 2014-2015 Sodium Hypochlorite Supply Drums
REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible bidder,
Sierra Chemical Company, in the estimated amount of $10,971 .40.*
DISCUSSION: Bids were opened on June 9, 2014, with two bidders responding:
$ 10,971.40 Sierra Chemical Co.
$ 13,640.00 Brenntag Pacific, Inc.
Sodium Hypochlorite is added to drinking water to ensure compliance with California
State standards. This contract is for hypochlorite which is delivered in 30 gallon drums to
the plant; staff distributes the drums to various wells as needed. Prices are -7% lower
than last year and estimated usage is expected to remain the same.
*The total dollar amount is based upon an estimated quantity that the District will use in
the coming fiscal year. The actual quantity and grand total may vary, but unit prices
are firm.
SCHEDULE: July 1, 2014, through June 30, 2015
COSTS: $10,971.40 estimated
ACCOUNT NO: 2002-4755
BUDGETED AMOUNT REMAINING: �28,000.00
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES��_ NO
CHIEF FINANCIAL OFFICER: YES NO
-33-
General Manager
Richard H.5olbrig
• �� • w Director5
�� �'�' � �� � �� ChriS Cefalu
James K.JoneS
,r,�,,,� �` � � � � � P.andy Vogelge5ang
�'ublEc Ut�Ifty D�Stri�t KellySheehan
Eric 5chafer
1275 Meadow Cr�t Drive�South Lake Tahoe•CA 96150-7401
Phone 53�544-6474•Fax 530 541-0614•www.�tpud.u5
BOARD AGENDA ITEM4h
TO: Board of Directors
FROM: Linda Brown, Purchasing Agent
MEETING DATE: June 19, 2014
ITEM - PROJECT NAME: Surplus Vehicles
REQUESTED BOARD ACTION: Authorize Baxtin Management Group to auction District
vehicles.
DISCUSSION: The following vehicles are surplus equipment and have been replaced by
new vehicles:
Truck 49- 1997 Dodge Dakota, VIN 7795, mileage 102,865
Equip O6- 1990 Kawasaki ATV, VIN 2435, not running
Baxtin Management Group is located in Reno, Nevada. They will pick up the vehicles
and complete any required vehicle smog testing at no charge.
SCHEDULE: ASAP
COSTS: 7.5% of gross sales price
ACCOUNT NO: Income
BUDGETED AMOUNT REMAINING: N/A
ATTACHMENTS: None
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: S8�W
GENERAL MANAGER: YES H NO
CHIEF FINANCIAL OFFICER: YES NO
- 5-
�OVtH TqHOF
8,
—�.�
.
�jsewe� • 7950 •Ws��
e��UT'ILITY���
SOUTH TAHOE PUBLIC UTILITY DISTRICT
Richard Solbrig, General Manager Paul Sciuto, Assistant General Manager
Eric W.Schafer, President BOARD MEMBERS Randy Vogelgesang, Vice President
Chris Cefalu, Director James R. Jones, Director Kelly Sheehan, Director
REGULAR MEETING OF THE BOARD OF DIRECTORS
SOUTH TAHOE PUBLIC UTILITY DISTRICT
June 5, 2014
MINUTES
The South Tahoe Public Utility District Board of Directors met in a regular session, June 5, 2014,
2:00 p.m., at the District Office, located at 1275 Meadow Crest Drive, South Lake Tahoe, CA.
ROLL CALL:
Board of Directors: President Schafer, Directors Cefalu, Jones, Sheehan, Vogelgesang
Staff: Stanley, C., Cuevas, Hussmann, Rasmussen, Cotulla, Hughes, Sciuto, Solbrig, Butz, Curtis,
Alves, Ryan, Bartlett, Henderson, Guttry, Eidam and Attorney Herrema.
Guests: Shawn Koorn, HDR Engineering, Wayne Vinciguerra, Vinciguerra Construction,
Avery Hussmann, Ferg�son Waterworks, Carlos Ledon, Ferguson Waterworks,
Alex Nevarez, Herback General Engineering, Marty Herman, Tom Moulie, Rob Brent
and Kathi Lishman
PROPOSITION 218 MAJORITY PROTEST HEARING
The Majority Protest Hearing was opened at 2:05 pm. Pursuant to the requirements of Proposition 218,
Paul Hughes reported that notices were mailed to all property owners on April 1 1, 2014. The notices
included potential increases over 5 years as follows: a proposed sewer rate increase of 6% this year
and an additional 6%each year over the next 4 years; for flat rate water customers, a proposed rate
increase of 6.5% this year and the next 3 years and a 5% increase the fifth year; and a proposed
restructured metered water rate to increase the base charge to 80% and decrease the consumptive
charge to 20%. Although these proposed increases are over a 5 year period, they must still go before
the Board each year and passed.
In response to the Proposition 218 mailer, the District received 305 valid protests for the water rate
changes �2.17%), 342 valid protests for the sewer rate changes (1.88%) and 260 valid protests for the
meterratechanges (1.85%).
The Majority Protest Hearing was the final opportunity to receive protests and was open to public
comment at 2:20 pm. A few customers came forward with concerns regarding the increases. After
-37-
!
i
; REGULAR BOARD MEETING MINUTES-June 19, 2014 PAGE-2
_ listening to all comments and concerns, the Hearing was closed at 2:30 p.m.
;
CONSENT CALENDAR:
` Moved Vogelc�esang / Second Cefalu / Schafer Yes / Cefalu Yes /Jones Yes /Sheehan Yes /
: Voaelgesang Yes to approve the Consent Calendar as submitted.
a. ASPHALT PATCH PAVING-Award bid to the lowest responsive, responsible bidder, Thomas
�� Haen Company, Inc., in the estimated amount of $116,135 for asphalt patching services;
b. TAGGART EASEMENT ACCEPTANCE- Approved Resolution No. 2949-14 approving a new
recorded Easement for the Fallen Leaf main sewer force main located on the property of the
Beatrice Taggart Trust;
c. REGULAR BOARD MEETING MINUTES- May 15, 2014- Approved Minutes
ITEMS FOR BOARD ACTION:
a. Water and Sewer Rate Ordinance- Each Director presented their final thoughts on the
proposed water and sewer increases. Directors' Jones and Schafer stated that while they
intended to vote for the increase, they preferred a more significant increase as they deemed
it necessary to maintain infrastructure, fire protection services and general operations,
maintenance and facility improvements. Director Sheehan stated her intent to vote for the
increase, however would have preferred smaller, more frequent increases over the last several
years. Lastly, Directors Cefalu and Vogelgesang stated their intent to vote for the increase,
however, would have preferred the smaller increase proposed due to the potential hardships
placed on customers.
Moved Sheehan/Second Cefalu/ Passed Unanimously / Schafer Yes / Jones Yes/ Sheehan Yes /
Vogelgesang Yes to enact Ordinance No. 557-14, an amendment to the South Tahoe Public
Utility District's Ordinance No. 464, and superseding Water and Sewer Rate Ordinance No. 540-12.
b. Fiscal Year 2014/15 Water Enterprise Fund Budget-Adopt Resolution No. 2947-14 adopting the
Fiscal Year 2014/15 Water Enterprise Fund Budget.
Moved Schafer/Second Sheehan/ Passed Unanimouslv / Cefalu Yes / Jones Yes / Vocaelqesana Yes�
to adopt Resolution No. 2947-14 adopting the Fiscal Year 2014/15 Water Enterprise Fund Budget.
c. Fiscal Year 2014/15 Sewer Enterprise Fund Budget- Adopt Resolution No. 2948-14 adopting the
Fiscal Year 2014/15 Sewer Enterprise Fund Budget.
Moved Schafer/ Second Sheehan/ Passed Unanimouslv / Cefalu Yes / Jones Yes / Vo4elaesan4 Yes/
. to adopt Resolution No. 2948-14 adopting the Fiscal Year 2014/15 Sewer Enterprise Fund Budget.
d. Sunset Well Evaluation - Continue emergency action to install a replacement submersible
: pump and motor at Sunset Well.
Staff reported the newly, refurbished motor will be instdlled on June 19, 2014.
-38-
REGULAR BOARD MEETING MINUTES-June 19, 2014 PAGE -3
Moved Vogelaesanq/ Second Cefalu/ Passed Unanimously/ Schafer Yes Jones Yes/ Sheehan Yes/
to contin�e emergency action to install a replacement submersible pump and motor at Sunset Well.
e. Liability Ciaim Against South Tahoe Public Utility District -Staff reported a claim was filed for
driveway damages due to repair of a water leak on the main line. Upon inspection by the
insurance company, there is no evidence of any lifting or undermining of the asphalt,
therefore, it was recommended the claim be rejected.
Moved Jones/ Second Voaelctesang/ Passed Unanimously/ Schafer Yes/ Jones Yes/ Sheehan Yes/
to reject claim against the District in the amount of $5,000+ for damages to Martha Cooper's
driveway.
f. Saddle Keller Waterline Replacement Project-Staff reported that last year the District and the
City of South Lake Tahoe (City) entered into an agreement by which the District, due to
unforeseen circumstances between the City and Contractor, would perform patch repairs on
Pioneer Trail. Most recently, staff reported that as part of the Saddle Keller Waterfine
Replacement Project the District's contractor will make improvements to asphalt pavement
which was damaged by the District's 2013 Pioneer Trail Water Services Relocation Project. For
consistency, the City has requested the District make improvements to the pavement beyond
the limits of the area damaged by the District's work, at the City's cost. Staff and the City have
produced a Reimbursement Agreement to take effect immediately.
Moved Jones/ Second Vogelgesana/ Passed Unanimously/ Schafer Yes/ Jones Yes/ Sheehan Yes/
to authorize staff to terminate existing Reimbursement with the City of South Lake Tahoe, dated
September 17, 2013; (2) Authorize staff to enter into a Reimbursement Agreement with the City
Of South Lake Tahoe to provide improvements to pavement on Pioneer Trail, with potential minor
Modifications to be made by staff.
g. Saddle Keller Waterline Replacement Project- Herbeck General Engineering (Herbeck)
requested to substitute the approved materials supplier listed in the Bid Documents, Ferguson,
with Western Nevada Supply Company (WNS). A representative from Ferguson attended the
meeting and stated they would agree to relinquish the Bid to WNS, however, specifically
requested the Board read their submitted letter taking exception to reasons given by Herbeck.
The Board acknowledged receipt of the letter.
Moved Voqelgesang/ Second Sheehan/ Passed Unanimously/ Schafer Yes/ Jones Yes/ Cefalu Yes/
to approve Change Order No. 1 to substitute the approved materials supplier, Ferguson, which was
listed in the Bid Documents, with Western Nevada Supply Company, at no cost to the District.
h. Payment of Claims
Moved Cefalu/ Second Shafer/ Sheehan Yes/ Jones Yes / Sheehan Yes / Voaelaesan4 Yes to
approve the Payment of Claims in the amount of $1,207,766.64.
STANDING AND AD-HOC COMMITTEE REPORTS:
Richard Solbria stated he attended a preliminary meeting with Lakeside Park District staff (along with
Directors Cefalu and Jones and others) to discuss provision of water service for the convention center
site.
-39-
�
�
REGULAR BOARD MEETING MINUTES-June 19, 2014 PAGE-4
BOARD MEMBER REPORTS:
Director Jones reporfed the next EI Dorado County Water Agency meeting wiil be Wednesday,
June 1 1 t".
EL DORADO COUNTY WATER AGENCY PURVEYOR REPORT:
Nothing to Report
GENERAL MANAGER REPORT:
Solbria stated he was a guest on KRLT radio on Tuesday morning and will be making an appearance
on Lake Tahoe TV Friday, June 13'n. ?
{
STAFF/ATTORNEY REPORTS:
Attorney Herrema briefly discussed the ACWA proposal regarding California groundwater and the
importance of updating the District's Groundwater Management Plan, paying close attention to �
state legislation. He also discussed the Army Corp of Engineers permitting scrutiny and stated there
will be a conference call on June 10, 2014, to further discuss the Clean Water Act Rule and �
encouraged input from all involved. �
;
BREAK AND ADJOURNMENT TO CLOSED SESSION: 3:40 p.m. .
;
RECONVENED TO OPEN SESSION: 3:50 p.m.
ACTION / REPORT ON ITEM DISCUSSED DURING CLOSED SESSION: �
a. Pursuant to Government code Section 54956.9(a)/Conference with Legal Counsel Existing Litigation
re: EI Dorado County Superior Court Case SC20120227 GRCLT Condominium vs. South Tahoe Public
Utility District (filed 10/22/12).
No reportable Board action.
b. Pursuant to Government Code Section 54956.9(b)/Conference with Legal Counsel Anticipated
Litigation (two potential cases).
No reportable Board action.
c. Pursuant to Government Code Section 54957(a)/Conference with Labor Negotiators
re: Memorandum of Understanding with Stationary Engineers, Local 39. Present at this Closed Session ;
will be Agency Negotiators: Richard Solbrig/General Manager, Nancy Hussmann/Human Resources
Director, Paul Hughes/Chief Financial Officer.
No reportable Board action.
-40-
REGULAR BOARD MEETING MINUTES -June 19, 2014 PAGE-5
ADJOURNMENT: 4:30 p.m.
Eric Schafer, Board Member
South Tahoe Public Utility District
Eileen Eidam, Assistant Clerk of the Board
South Tahoe Public Utility District
General Managcr
Richard H.Solbrig
�� + � Director5
�*�� �'' � �� � �� Chris Cefalu
James R.JoneS
�-� � f�ublic U�Gility Di�tri�t RandyVogelge5ang
Kelly 5heehan
Eric 5chafer
1275 Meadow Crest Drive•�outh Lake Tahoe•CA 96150-7401
Phone 530 54�4-6474•Fax 530 54-1-0614•www.��Gpud.u�
BOARD AGENDA ITEM 6a
TO: Board of Directors
FROM: Ivo Bergsohn, Hydrogeologist
MEETING DATE: June 19, 2014
ITEM- PROJECT NAME: Truckee Marsh Sewer Facilities Protection Project
REQUESTED BOARD ACTION: (1) Hold a Public Hearing to receive comments on the
designation of the Upper Truckee Marsh Sewer Facilities Adaptive Management Plan as
"substantially complex" under Public Contract Code section 7201; (2) Pursuant to the
facts, find the Project is substantially complex and requires a 10% retention limit; and (3)
Authorize staff to advertise for construction bids.
DISCUSSION: The proposed sewer facilities protection project requires implementing
measures from the Adaptive Management Plan (AMP), employing low-impact
construction measures over a two to five year period, to encourage the reestablish-
ment of Trout Creek flows away from the District's Bellevue Pump Station and adjoining
utility easement along the northeast margin of the Upper Truckee Marsh. As the project
is an Adaptive Management Plan, management measures will be defined in later years
based on the success of initial measures constructed in Year 1 towards meeting project
goals. The project for bid includes plans and specifications for Year 1 improvements
and allowances representing the present value of future work anticipated to be
completed during Year 2 and Year 3. The allowances will be negotiated annually prior
to Year 2 and Year 3 work using the unit costs for Year 1 work, adjusted by applying the
change in the Engineering News-Record Construction Cost Index (ENR CCI) and the
quantities of work actually needed. Adjustments to work quantities wili be determined
by monitoring the effectiveness of constructed measures towards meeting specified
success criteria. The District will require the bidder to possess a valid Class A General
Engineering contractor license and a Class C-27 specialty contractor license for the
Vegetation subcontractor at the time of bid opening, Contract award and for the
duration of the contract.
Work to implement the AMP shall include: mobilization/demobilization of all equipment,
material and personnel required to complete the work; provision of all safety measures
for excavation; development and maintenance of site access routes and staging areas
and provision of traffic control on public�t-of-way; installation and maintenance of
Ivo Bergsohn
June 19,2014
Page 2
erosion control measures, silt fencing and required BMPs; construction of pilot channels;
excavation of stream bank overflow paths; planting of willow fences and clusters;
excavation and removal of fill from Trout Creek; planting of owner-furnished pre-grown
marsh mats and pre-planted coir logs; placement of fill; installation of overbank flow
plugs; removal of abandoned road fill; placement of fill plugs; and restoration of
disturbed areas following construction. All work shall be performed within the Upper
Truckee Marsh (UTM). The UTM is a broad meadow/marsh complex [classified as a
Stream Environment Zone (SEZ)], recognized for providing regionally important
ecological, water quality, aesthetic and recreational values.
Plans, specifications and estimates of probable costs are being prepared by District
staff with assistance from the Project Design Engineer, Northwest Hydraulic Consultants
(NHC). The proposed schedule is as follows:
Advertise for Bids - June 24, 2014
Mandatory Pre- Bid Conference - July 8, 2014
Bid Opening -July 22, 2014
Contract Award-July 24, 2014
Notice to Proceed/Procurement- August 1, 2014
Notice to Proceed/Construction -September 2, 2014
Complete Year 1 Improvements -October 15, 2014
Legislative amendments to the Public Contract Code, effective January 1, 2012, limit
the amount of retention the District can withhold from a contractor for a capital project
to 5% of the total contract amount. However, the retention amount may exceed 5% if
the Board, at a properly noticed and normally scheduled public hearing, finds that the
project is "substantially complex," and that the nature of the project merits a higher
retention amount.
On February 2, 2012, the Board adopted Resolution No. 2904-12, whereby the Board
resolved that when bidding capital projects, the criteria identified therein will be used
to determine whether a project is substantially complex such that it justifies a retention
amount higher than 5%.
District staff recommends that the Board designate the Project as substantially complex
and meriting a retention amount of 10%, based on the following:
• The Project is subject to the conditions described in criteria (a)(d)(e)(f)and (g) in that
the construction measures to implement the AMP cannot be tested until the project is
substantially complete; construction within the Upper Truckee Marsh is subject to special
regulatory requirements and permit conditions; the work site is located within an
environmentally sensitive area; and timing of construction is a significant concern due
to potential damage from winter storm flows, difficulty in performing repairs during high
flows and significant consequences associated with flood damage.
-44-
Ivo Bergsohn
June 19,2014
Page 3
SCHEDULE: See DISCUSSION (above)
COSTS: $648,140 (estimated)
ACCOUNT NO: 1029-8426/TMSFPP
BUDGETED AMOUNT AVAILABLE: $734,000
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
-45-
General Manager
Richard H.5olbrig
� • 1950 • �r� tt ��__
^-r- ►vj�t /�r �� � ir�r /� Director5
/ i I—�'
(•— � ChriS Cefalu
r,r 1r�'�� James R.JoneS
""'�"^-� ,�,,, {���(�� j (��[�y,� D��y�)�� IZandy Vogelgesang
1~' t l� i ii V Kelly Sheehan
Eric 5chafer
1275 Meadow CreSt Drive•South Lake�'ahoe•CA 96150-74-D�
Phar�e 534 544-6474�Fax 534 541-0614•www.s�pud.u5
BOARD AGENDA ITEM 6b
TO: Board of Directors
FROM: Julie Ryan, Senior Engineer
MEETING DATE: June 19, 2014
ITEM- PROJECT NAME: Luther Pass Power and Control Project
REQUESTED BOARD ACTION: Approve proposal from GHD for engineering services in the
amount $325,826.
DISCUSSION: Since 2012, GHD has been working on an Alternatives Analysis and Basis
of Design Report for upgrades to the power and control systems at the Luther Pass
Pump Station (LPPS). GHD was selected for this work based on their response to a 2012
Request for Proposal from the District.
The preferred alternative for LPPS upgrades includes the following primary tasks:
convert the power source from 2.4kV to 4.1 bkV; replace motors, motor controllers and
motor instrumentation; replace programmable logic controllers (PLCs); upgrade
SCADA, instrumentation and communication; and replace pump discharge and
control valves. The preliminary estimate of cost for construction of the proposed project
is approximately $4 million.
At Staff's request, GHD has prepared a proposal to develop the Bid Documents (Plans
and Specifications) for the proposed project. GHD's proposal includes the following
services, described in more detail in the attached Scope of Work:
• Prepare a workplan for completion of the project;
• Conduct site survey, potholing and geotechnical and hazardous materials
assessments;
• Provide as-needed permit support, including relevant drawings and schematics;
• Coordinate project requirements with other utilities, especially Liberty Energy;
• Prepare 50%, 90% and Final Bid Documents.
-47-
�
t
f
Julie Ryan
June 19, 2014
Page 2
GHD proposes to provide these services on a Time and Materials basis not to exceed
; $325,826, as shown on the attached Cost Estimate. The proposed scope does not
include service during bidding or construction, which will be scoped following
completion of the design.
The design phase is expected to be complete by the end of January, 2015. The District
plans to bid the project in February, 2015, and start construction in July, 2015. Based on
. initial projections, Staff expects that construction will be complete by December, 2016.
With Board approval the work will be performed as an Amendment to Task Order #2
under GHD's existing Master Services Agreement with the District.
r
�.
SCHEDULE: July 8, 2014-January 31, 2015
COSTS $325,826
; ACCOUNT NO: 1029-8330/LPPOWR
�
; BUDGETED AMOUNT AVAILABLE: $1,030,000
ATTACHMENTS: GHD Scope of Work and Cost Estimate
j CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer
GENERAL MANAGER: YES NO
i
CHIEF FINANCIAL OFFICER: YES NO
-48-
;
5outh Tahoe Public Utility District
Luther Pass Pump Station Power and Controls Design
Task Order Scope of Work
Five years has passed since the Luther Pass Pump Station (LPPS) condition assessment and
alternatives analysis evaluation was completed. Recently the District and GHD completed the
next two milestones in the LPPS asset management plan by (a) examining the alternatives to the
power and control systems with the LPPS Power and Control Evaluation (PCE) and (b)
completing the LPPS Power and Control Basis of Design Report(BODR).
With the BODR complete GHD proposes the following Scope of Work for designing the power
and control improvements at the Luther Pass Pump Station. Upon completion of the work
detailed in this Scope the District will possess a set of bid ready construction documents for
power and control improvements at the pump station.
Originally identified during the PCE project and confirmed through the Final BODR, the
following is the agreed upon extent of the design improvements at LPPS:
1. Change LPPS primary power service from 2,400 volts to 4,160 volts.
a. Replace existing motors with new high efficiency motors.
b. Replace existing pump motor controllers with soft start motor controllers.
c. Replace existing medium voltage switchgear with new 5-kV switchgear.
d. Replace existing utility substation equipment including the single phase transformers
and overhead structure with new 14.4-kV to 4,160 volt secondary rated, pad
mounted, 3-phase, liquid filled transformer with primary metering.
2. Construct a new electrical building to house the new electrical equipment. The new building
will be constructed of CMU on a concrete perimeter footing with interior slab on grade
foundation. The building will have a shed roof and will aesthetically match the existing
structures on the site.
3. Replace existing PLC, enclosure, and HMI with similar configuration to match existing
system.
4. Provide a SCADA system capable of monitoring,controlling, storing and forwarding data
locally and remotely to the central facility.
5. Add a redundant secondary hard-wired SCADA netwark connection to reduce radio based
network traffic, improve data transmission speed, and retain integrity of the operational data.
6. Replace motor protection elements and instrumentation.
7. Add pump controls and instrumentation for recording and trending pump performance and
efficiency.
8. Replace globe-style discharge valves with full-port ball valves and manual gear operators.
9. Replace Bailey control valves with nozzle-style silent check valves.
10. Insta114-inch bypass with v-port valve on two pumps for B-Line fill operation.
Additional and specific details of the design improvements can be found in the Final BODR dated
May 2014. A site plan of the improvements taken from the BODR is included in Attachment.
The tasks of LPPS Power and Controls Design Services are broken down as follows:
LPPS P&C Design Scope of Work _491- Rev. 1 06-09-14
Task 1 -Project Management
Task 2,3 &4-BODR(COMPLETE)
. Task 5-Surveying and Base Mapping
Task 6-Geotechnical Investigations
Task 7-Hazardous Materials Survey and Abatement Documents
Task 8-Permitting Support
, Task 9-50%Plans and Specifications with Review Meeting
Task 10-90%Plans and Specifications with Review Meeting
Task 11 -Construction Bid Documents
Task 12-Design Level Estimates of Cost
Task 1- Project Management
: As part of the project management phase, GHD will prepare a design services workplan
identifying all major tasks and milestones. Staff assignments, task prerequisites, and detailed
schedule breakdowns will be developed under this task. The workplan communicates to all
project stakeholders what is being done, who is responsible, and when tasks start and stop. Major
schedule milestones include:
• Task 1 -Project Workplan 2 Weeks from NTP*
• Task 5-Survey and Base Mapping 2 Weeks from NTP
• Task 6-Geotechnical Investigation 6 Weeks from NTP
• Task 7-Hazmat Survey and Abatement Docs 14 Weeks from NTP
• Task 8-Permit Support Ongoing Throughout
• Task 9-Utility Coordination 14 Weeks from NTP
• Task 9-Pothole Schedule and Survey 14 Weeks from NTP
• Task 10-50%Submittal 10 Weeks from NTP
• Task 11 -90%Submittal 22 Weeks from NTP
� Task 12-Construction Bid Documents 28 Weeks from NTP
*Project assumes a Notice to Proceed no later than July 7`�'.
A detailed schedule and staff assignments are included in Attachment.
GHD will regularly evaluate project staffing requirements and assign staff as needed to meet
_ project quality and schedule requirements. Using the work plan developed at the beginning of the
project GHD will track the budget and schedule for each task. GHD will submit invoices each
. month summarizing the work accomplished and budget status.
GHD will provide ongoing quality assurance and quality control(QA/QC)activities for the
. project. Our QA/QC process will ensure that the work products are completed to the District's,
GHD's and industry standards.
Task 2,3 and 4-Basis of Design Effort and Activities
The LPPS Power and Control Improvements Basis of Design tasks are complete. No further
scope proposed.
Task 5-Surveying and Base Mapping
GHD has teamed with Andregg Geomatics to perform a site survey and prepare an electronic
topogaphic map and digital terrain model tied to the California State Plane Coordinate System,
Zone 2. Since coverage calculation and analysis in support of Tahoe Regional Planning Agency
(TRPA) permits is necessary GHD proposes that the entire parcel be ground surveyed as part of
- this task. Conversely, only the immediate project area may be surveyed at the District's
LPPS P&C Design Scope of Work -2- Rev. 1 06-09-14
-50-
discretion. No legal boundary surveys, property acquisition or Record of Survey work is
anticipated for this project and is excluded. No potholing is anticipated for this task and is
therefore not included in the Scope.
• Task 5 Deliverable: LPPS topographic survey in AutoCAD 2014 format
Task 6—Geotechnical Investigation
GHD has teamed with Fugro West Inc.to provide geotechnical engineering and related LPPS site
soils investigations for the project. The geotechnical effort will investigate soil and ground water
conditions at the proposed electrical building site. The Scope includes one(1) shallow(15-ft)
boring, geotechnical recommendations and a short letter report signed by a PE.The purpose of
the boring is to confirm the possibility of potentially high groundwater at the building site and to
confirm the possible presence of any large boulders that may affect foundation or utility
excavations. This building footprint-specific information combined with the previous AMEC
borings and geotechnical report conducted in 2009 in support of the emergency generator project
will serve as the geotechnical design basis for the new electrical building.
• Task 6 Deliverable: Project Site-Specific Geotechnical Report
Task 7—Hazardous Materials Survey and Abatement Documents
GHD has teamed with Wise Consulting and Training (Wise) to conduct a hazardous materials
survey of portions of the existing LPPS Pump Station Building, specifically the interior on the
south wall. The survey will consist of collecting building material samples in locations where
equipment and interior finish removal, alteration, or renovation is expected in support of the
design project and will focus on those areas where the existing electrical equipment will be
moved, removed or altered. Also included in the survey is pump discharge piping paint and
flange gaskets. No building structural modification is expected so no exterior sampling is
included.
To accurately sample locations while simultaneously minimizing the number of samples needed
to characterize the abatement requirements GHD proposes that this survey be conducted after the
50% submittal and subsequent design review meeting and before the 90% submittal. This
sequencing will allow for clearer direction for areas of sample and survey. Hazardous materials
survey methods will include use of x-ray fluorescence (XRF) spectrometer for lead-based paint
identification and the sampling of wall finishes, mastics, joint compounds, etc. for possible
asbestos containing material. Products or equipment containing polychlorinated biphenyls
(PCB's),mercury, or other universal waste will also be identified.
GHD and Wise will then prepare the required plans and specifications for the removal and
disposal of any hazardous building materials identified during the survey by a qualified
abatement Contractor. The abatement documents will be incarporated in the overall set of plans
and specifications. It is expected that a maximum of one abatement drawing would be required
along with specification section(s).
• Task 7 Deliverable: Project-Specific Hazmat Report and Abatement Documents
Task 8—Permit Support and Utility Coordination
As discussed with the District, GHD will provide permit support services to assist the District
with permits and agency authorizations required for implementation of the project including:
1. GHD will develop and design site-specific storm water mitigation measures (aka best
management practices or BMP's) for inclusion into the construction documents and as
part of the District's efforts to secure permits from TRPA and El Dorado County. GHD
will employ State qualified storm water designer staff for development of the BMP's and
subsequent Erosion Control Plan drawing which will also be used in the design
documents for Tasks 10, 11 and 12. Based on the area of disturbance expected, filing a
LPPS P&C Design Scope of Work _513- Rev. 1 06-09-14
�
permit and subsequent formal Storm Water Pollution Prevention Plan (S WPPP)
preparation for coverage under the Statewide Stormwater Permit for Construction
Activities is not expected. Therefore SWPPP preparation and permit support services for
a State Stormwater Permit are not included. One plan sheet,the Erosion Control Plan, is
included in this scope item.
2. GHD will provide supporting documentation and calculations including site plans, ;
facility elevations, coverage calculations, BMP calculations and excavation cut/fill
calculations in support of the District's TRPA permit filing through permit acquisition.
In addition GHD will assist with information necessary for the District to file grading
season extensions or exemptions as appropriate. Plans included in this scope item are
one to two sheets and will also be included in the design submittals for Tasks 10, 11 and
12.
3. Per discussions with the District, GHD is excluding for this Scope of Work any effort and
services associated with environmental permitting and compliance, with specific
reference to all California environmental Quality Act (CEQA) and National
Environmental Protection Act (NEPA) related requirements. Permit support items
related to storm water mitigations are only included to the extent detailed in item 1 above
for this task. Should the District request environmental permitting and compliance
support in the future GHD will submit a separate scope and fee.
4. GHD will provide permit support documentation to the District for the new electrical
building in the form of plans and code analysis information. Based on discussions with
the District and as identified in the BODR, a building permit from El Dorado County,
including review and approval by the local Fire Marshal, will likely be required. To
facilitate final approval at the conclusion of design it is proposed that the District and
GHD engage the Fire Marshal shortly following the 50% design submittal once the site
plan and building floor plans have been sufficiently,though not fully, developed. Permit
support documents will include a civil site plan and electrical building floor plans for
architectural, mechanical, and electrical disciplines. The architectural floor plan will .
include a code analysis summary table. An architectural rendering of the proposed
building and improvements as viewed from the street is also included for use during
permitting and neighborhood meetings.
5. Time for one trip and meeting by one GHD staff inember with the local Fire Marshal is
included and is assumed to be joint meeting with the District,GHD,and the Fire Marshal.
Attendance by GHD for building permit,TRPA permit, or neighborhood meetings are not
included. Design, review, and permitting services and activities related to the American
with Disabilities Act(ADA)are excluded from this Scope. •
6. GHD will continue to support the District in coordination with the local Utility provider. �
For this scope item GHD proposes to allot time for an in-person meeting with Liberty
Utilities. GHD is planning for one trip-meeting by two GHD staff inembers with the
Utility to be conducted after the 50% CD submittal to gain final buy-in for the design
improvements. This meeting is assumed to also be attended by the District. Phone calls
with the Utility for design related questions or inquiries are expected to occur
interspersed throughout the project and are accounted for in Tasks 10, 11, 12,and 13.
Task 9-Pothole Schedule and Survey
To verify the location of existing underground utilities to facilitate accurate point-of-connections
between new and existing utilities, utility relocation, and utility conflict avoidance, GHD
proposes utility pothole and survey activities be conducted as part of this design project. A
proposed pothole plan and schedule will be submitted as part of the 50%Plans and Specifications
(Task 10)once sufficient design detail has been developed to pinpoint where the project-specific
utility tie-ins,crossings, and relocations will be located. To develop this pothole plan GHD will
use previously obtained record drawings of the LPPS site as well as request any new record ,
drawings be provided for recently completed project(s)at LPPS. At the conclusion of Task 10
LPPS P&C Design Scope of Work -4- Rev. 1 06-09-14
-52-
and with an agreed-upon pothole plan and schedule, GHD and the District will excavate and
survey the utilities identified in the pothole schedule. From discussions with the District, GHD
has identified that the District will provide hydro-excavation services in in-house equipment and
staff. The survey portion will be conducted by GHD using the same sub-consultant used for Task
5.
Task 10—50% Plans and Speci�cations
For the 50% level for completion of the plans and specifications, GHD will prepare and submit
design documents for Power and Control improvements at the LPPS. A preliminary list of
drawings is attached to this Scope of Work. A plan and specification review meeting will be held
with the District at the 50% level of design completion. The 50% submittal shall include one set
of full-size drawings hard copy, full-size drawings is pdf format, and a specification outline, and
supporting documents in pdf format. Three to five draft specifications of key equipment (to be
identified by the District)will also be submitted in pdf format.
• Task 10 Deliverable: 50%Plans and Specifications
Task 11—90% Plans and Specifications
For the 90% level for completion of the plans and specifications, GHD will prepare and submit
plans and specifications for the aforementioned facilities. Similar to the F/SEPS project
completed by the District and GHD in 2009, GHD will utilize the District's boilerplate front-end
contract documents and make project-specific modifications as necessary and as allowed under
the District's direction. A plan and specification review meeting will be held with the District at
the 90% level of design completion. The 90% submittal shall include one set of full-size
drawings hard copy, one copy of full-size drawings in pdf format, and complete specifications in
both pdf and Word format.
• Task 11 Deliverable: 90%Plans and Specifications
Task 12—Construction Bid Documents
For the construction bid documents, GHD will prepare and submit final plans and specifications
for the aforementioned facilities. The construction bid documents shall include electronic
submittal of drawings in pdf and AutoCAD format and specifications in pdf and Word format.No
hard copy of plans or specs will be provided.
• Task 12 Deliverable: Construction Bid Documents
Task 13—Design-Level Cost Estimates
GHD will prepare design-level estimates of cost to construct the project, at each of the design
submittal milestones: 50%, 90%, and the construction bid document estimate. Estimate will be
submitted in pdf format.
• Task 13 Deliverables:Estimates of Cost(submitted with plans and specifications)
Attachments:
Site Plan from BODR
Fee Table
Detailed Schedule
Staff Assignments
Drawing List
LPPS P&C Design Scope of Work -5- Rev. 1 06-09-14
—53—
' E
a
� o t
O N
, N M �
� a o N 3
L m
N � d � �
,. a N 0 �
Q � j � Z Z � �
����p w� � °'
���xZ� O� UO o "
W3�Noo g� � s
�n �U r
� w
�?v�W� c�f-�a �
o>zvw �Z a "
Z~���nW ZUp�� K LL w
07?�W� Owpwrw V m O Q
= c�7�OCWio� ��a�Z� V F-w � �n Z � �
�V-QZ> �pQp_p � z� �Z �
W HLL Q W lL ILHLL � � � � m
` Z�1Z�x=� ZZ�ZXZ ?Um �� �Q� � � q
�Oq��mQ� ��.r-.q�Wq� � om �r� LU � E
?a�w�arn zr-zF-w� w ¢az �cno �- V, P
z� ��a � Z "
* Ja� J 0 �
a¢� V � e
aF � m y
,, W�Z � �
;, ¢_� W Q y
? F�¢ W U—�. m
i � � � �
� U _
�
wZ WZ a J Y
' �
a � F� W Z
i O~¢V 2 I���� .
m Z�
± �� UO
i
� W� � �
� �F
1 aQ
� ❑ai
_�
��
� oW Q
i Z W� �
O `"." N S �CJ
tn W
�Z �J ��
Q F
; Wp m �� Oa� :
1 jF �ZW �o ww
Z� �Um ��,t1
Q� j Va�W W QZ> _
, �Z RU' U.�..�V O ��7�Q .
U� U �Z�d 7 $V� �
UV- I}_- �a2� � �ZH
�a _' �w�w � �p�
� > OZ W �Uql
=d ' v�NO Z �jja�H
� OQZQ � Q''�� F J
�O � WWZm �W l�a� ZWSLL �
>O � .�OWQ �J Qf7lA
�_� > �a W�z
�N pZ .aF- Smo
j >Q }a ���
Y� ~ J
W� 'Z F w Q�� ,
2x �>� �WO
W Yvj �WZ � .,
�V ZZZ
�;� ?V ��0
H
�HN
y��
H~
W y
•.•Z
O
U
W �
J �
Y O
a
a�
�
za J N �
U N u `s
� �
-�-Z-�
O
a
s
SOUTH TAHOE PUBLIC UTILITY DISTRICT-LPPS P8C Design
GHD-TASK ORDER FEE
LABOR 3 OTMER OIRECT CO3T9
O
LABOR CATEGORY PM Senior Sta}f Ell Tech PS Teeh CAD Project 70TAL Other TOTAL
Civil PE CWiI Eng Mech Eng Elee E�g Struet Eng Arch Advisor Advisor Admin GHD SUB Direet
RATE 5220 5175 5740 5750 5160 S'170 5730 5205 t210 f120 S90 HOURS COST Costs FEE
Task/kem /Hr Air Mr IHr IHr /Hr M� /Hr Mr Mr Ihlr
iASK - C
Pro'ecl Mana emem 8 48 20 76
TOTALFORTASKI 51,760 58,400 SO SO 50 EO SO SO SO EO E1.800 76 SO E456 512,416
BaseMa in SubeonsultaM-Andro Geomatics 0 E4,370
• Re�riew and vertfication of baae ma to o fiks 2 4 6 2 14
TOTAL FOR TASK 5 SO 5350 ;560 SO SO EO SO EO EO E720 5180 14 54,370 E84 f6,264
T - 0 E13,650
Geotech Invesf ations•Fu ro ConsuRards
Review and verificalion ot eotech findin s 1 4 4 < 2 �5
� TOTAL FOR TASK 6 5220 5700 E560 SO SO 5680 SO 50 SO SO 5180 15 513,650 S90 576,080
� 7- ►M o as,soo
� Hazmat Abatemerrt Surve -TBD
� Review end venfication of findin s 4 4 4 4 4 Z ZZ
Develo meM of abatemenl tlrawin s and s ecs 7 2 4 8 15
TOTALFORTASK7 5220 E1,050 51,120 5600 5640 EO E520 EO SO 5960 5780 37 55,600 E222 S'11��12
,�ce- ftr
BMP end E�osion CoMrol Plan for Permit Su ort 7 6 18 20 45
TRPAPermeSu ort � �Z �8 28 59
EI Dorado Buildin and Flre Marshal Permd Su ort 2 24 72 2 4 16 16 76
Ulil CoorCinffiion 8 12 20
TOTAL FOR TASK 8 5880 57,350 $6,720 5300 E1,920 EO E2,080 52.460 SD E7.680 EO 200 EO E1.200 f30,590
T - s 1 27
Pothole Schedule a�d Surve Z 76 2
TOTAL FOR TASK 9 SO 5350 52,240 SO 5320 EO SO SO SO E720 E90 27 51,640 5712 56,072
TAEK1o. SPE '
50%Plans and S acs 12 46 96 24 144 24 60 24 8 180 24 642
TOTAL FOR TASK 10 E2.640 E8,050 573,440 E3,600 E23,M0 54,080 E7,800 54,920 51,680 521,600 52.160 642 EO 54,402 f97,d12
K11-
90%Plans antl S ece 8 38 74 16 112 16 40 24 8 760 12 508
TOTAL FOR TASK 11 51.760 E6,650 E70,380 E2,400 517.920 E2,720 E5,200 E4,920 E1.680 519.200 $1.080 508 SO E3,598 577,488
A8 3-CON
Construdion Bid Docs Plans anG S ecs 8 28 64 12 72 16 20 16 i6 80 12 344
TOTAIFORTASKI2 51,760 54,900 58.960 51,800 577.520 52,720 E2.600 E3,280 53,360 E9,600 E1,080 344 50 52,064 553,644
TA$K 19- M E!!T 8T
Desi n Level Eatimales of Cosl 6 14 78 4 22 4 10 6 2 Z 88
TOTALFORTASKI3 1,320 2.450 2.520 00 53.520 5680 1,300 1,230 $420 0 180 88 50 5528 14,748
• • � .� � � �.
� ..� � � .� �� � :� �� :� � ::� �� � �� .� �:� � .i
12-3-12
ID � �Task ask Name Duretion Start iFinish iJun 22_'14 Jul 13�'14 _;Aug 3,'14__r Au�24',14 15ep 14,_'14 �Oc[_5,'14 I Oct 26'14 ;Noy 16,'14 �Dec 7�'14_ Dec_28'14 i!T 18 15 �Feb
: . --- - - I - 1 . ._
- �--�--- --- ---- --`- ------- -F_LS. I 5�� M LT 1 W i_T—F_i_5_S �M_L_T___LW LT_L F 1.5_i S_ i M '`T �_W l T 1 F : S �_5_i-.M '.�T_1_W i T 7_F J S
----�'-8 iMode ------ ----------- --- --
1 � ;�' Project Management 150 days Mon 7/7/14 Fri 1/30/15 -
i
_ i
2 �' Permitting Support 140 days Mon 7/7/14 Fri 1/16/15 - - - -
3 ; �" Survey and Base Mapping 14 days Mon 7/7/14 Thu 7/24/14
--i
4 : �" Deliver Topo Base Map for Design 0 days Fri 7/25/14 Fri 7/25/14 �/25
i
--�
5 I l�' Geotechnical Investigations 20 days Mon 7/28/14 Fri 8/22/14
I
6 j y;}� Draft Geotechnical Report 0 days Mon 8/25/14 Mon 8/25/14 8/ZS
I
7 ; � 50%Plans and Specifications 50 days Mon 7/7/14 Fri 9/12/14
i
- a
8 ; � 50%Design Review Period 10 days Mon 9/15/14 Fri 9/26/14
9 i y�* 50%Design Review Meeting 0 days Mon 9/29/14 Mon 9/29/14 9�29
SO� ?� Final Geotech Report 0 days Fri 10/3/14 Fri 10/3/14 O 30/3
i
11 ; p� Hazardous Materials Survey and Report 19 days Tue 9/30/14 Fri 30/24/14
1 �
�j r`�' Potholing and Survey 19 days Tue 9/30/14 Fri 10/24/14
I �
13 ; ;-� Plan Review with Fire Marshal 0 days Wed 10/8/14 Wed 10/8/14 0 10/S
i
la � g� Utility Coordination Meeting 0 days Wed 10/15/14 Wed 10/15/14 ♦ 10/i5
15 i � 90%Plans as Specifications 49 days Tue 9/30/14 Fri 12/5/14
i
- �
16 i f' 90%Design Review Period 10 days Mon 12/8/14 Fri 12/19/14
i
17 ; ;�' 90Y Design Review Meeting 0 days Mon 12/22/14 Mon 12/22/14 12�ZZ
- -'
1a � ;� Bid Set Plans and Specifications 20 days Mon 12/22/14 Fri 1/16/15 �
i
- �i-- -- - -- - - � -- - - ---- - - . _ _ -. _.. ... „ - - - ' - - . .
Task � Project Summary �� Inactive Milestone . Manual Summary Rollup� Deadline �
Projed:LPPSP&CDesign5chedul Split �����„��„�������������� ExtemalTasks i�Yiiifii�Y�Yiiiiiri Inactive5ummary �f------�� ManualSummary ��� Progress �
Date:Wed 6/11/14 Milestone ♦ Ettternal Milesto�e ♦ Manual Task �i Start-only C
Summary �7 InactiveTask C. � Duration-only ...._»a,_.�_,.,�a, Finish-only ]
Page 1
South Tahoe Public Utility District
Luther Pass Pump Station Power and Controls Design
Attachment—Staff Assignments
Project Manager Dave Lindow, PE
Senior Civil Engineer Aaron Sullivan, PE
Staff Civil Engineer Ed Hohlt
Mechanical Engineer Ernie Osborne, PE
Electrical Engineer Mike Tocher
Structural Engineer Cody Cruz, PE
Architect Sue Brady
E/I Technical Advisor Shishir poctor, PE
Pump Station Technical Advisor Ted Whiton, PE
CAD Designer Rich Fuglewicz
Project Administration/Support Arlene Paulino
LPPS P&C Design Scope of Work -1- Rev. 1 06-09-14
—57—
J
South Tahce Public Utility District
Luther Pass Pump Station Power and Controls Improvement Design
Drawing List
Status Date 6/9/2014
Sheet No. Drawing No. Drawing Title
50% CD 90% CD Bid
1 G-001 Title Sheet,Vicini Ma ,and Location Ma X X X
2 G-002 Index of Drawin s,Drawin Desi ation,and S bols X X X
3 G-003 Ke Ma ,Surve Control Dia am,and General Notes X X X
` 4 G-004 Erosion Control Plan and TRPA Covera e X X X
5 G-005 Pothole Schedule X* X X
,:
6 C-001 Civil Abbreviations and Le end X X X
7 C-101 Site Demolition Plan X X X
8 C-102 Buildin Abatement and Demolition Plan X X
9 C-103 Civil Site Plan X X X
� 10 C-104 Civil Utili Plan X X X
11 C-105 Site Civil Profiles-Pi in and Retainin Walls X X
12 C-501 Civil Details- 1 X X
� 13 C-502 Civil Details-2 X X
14 G503 Civil Details-3 X X
� 15 A-001 Architectural Abbreviations and L.e end X X X
3 16 A-101 Electrical Buildin Floor and Roof Plan X X X
� 17 A-102 Electrical Buildin Sections X X
� 18 A-201 Electrical Buildin Elevations X X X
� 19 A-501 Electrical Buildin Details and Schedules X X
� 20 S-001 Structural Abbreviations,Le ends,and General Notes X X X
't
� 21 5-101 LPPS Electrical Buildin Foundation and Roof Framin Plan X X X
� 22 S-102 Electrical Buildin Sections X X
�
� 23 S-501 Electrical Buildin Details-1 X X
� 24 S-502 Electrical Buildin Details-2 X X
; 25 M-001 Mechanical and HVAC Abbreviations and Le end X X X
� 26 M-101 Electrical Buildin Mechanical and HVAC Plan X X X
a
27 M-102 Pum Valve and Pi in Mechanical Plan X X X
i 28 M-501 Mechanical Pi in and HVAC Details and Schedules X X
� 29 E-001 Electrical S bols,Le end and Abbreviation X X X
� 30 E-101 Electrical Site Plan X X X
� 31 E-102 Electrical Site Demolition Plan X X X
i 32 E-103 Electrical Buildin Site Plan Detail X X X
� 33 E-104 Substation Site Plan Detail X X X
° 34 E-105 Pum Station Buildin Demolition Floor Plan X X X '
; 35 E-106 Electrical Buildin Floor Plan- 1 X X X
� 36 E-107 Electrical Buildin Floor Plan-2 X X X
� 37 E-108 LPPS Station Buildin Floor Plan X X X
38 E-201 Electrical Buildin E ui ment Elevations X X
� 39 E-501 Electrical Details-1 X X
� 40 E-502 Electrical Details-2 X X
; 41 E-503 Electrical Details-3 X X
� 42 E-601 Sin le Line Dia am X X X
i
43 E-602 Power Conduit&Cable Schedules X X
� 44 I-001 Instrumentation Abbreviations and L.e end X X X
45 I-601 P&ID-LPPS Pum Station- 1 X X X
46 I-602 P&ID-LPPS Pum Station-2 X X X +
47 I-603 SCADA Riser Dia am X X
48 I-604 Instrumentation Details- 1 X X
49 I-605 Instrumentation Details-2 X X '
-58-
PAYMENT OF CLAIMS
FOR APPROVAL
June 19, 2014
Payroll 6/10/2014 459,218.96
Payroll 5/27/2014 439,651.63
Total Payroll 898,870.59
ADP & Insight eTools 2,440.56
AFLAC/WageWorks-claim payments and fees 602.26
BHFS legal services 0.00
CaIPERS prepayment for 2014/15 1,492,913.00
CDS-health care payments 5,846.99
Union Bank 0.00
Total Vendor EFT 1,501,802.81
Accounts Payable Checks-NonCrew Fund 0.00
Accounts Payable Checks-Sewer Fund 412,437.26
Accounts Payable Checks-Water Fund 99,593.27
Accounts Payable Checks-Self-funded Insurance 0.00
Accounts Payable Checks-Grants Fund 0.00
Total Accounts Payable 512,030.53
Grand Tota/ 2,912,703.93
Pavroll EFTs & Checks 6/10/2014 5/27/2014
EFT CA Employment Taxes & W/H 18,868.70 17,720.71
EFT Federal Employment Taxes & W/H 98,561.03 94,842.89
EFT CaIPERS Contributions 81,124.68 82,700.64
EFT Great West Deferred Comp 20,869.78 20,734.64
EFT Stationary Engineers Union Dues 2,418.30 2,416.54
EFT Retirement Heafth Savings 11,928.04 0.00
EFT United Way Contributions 170.00 170.00
EFT Employee Direct Deposits 220,467.01 216,336.56
CHK Employee Garnishments 1,263.22 1,260.94
CHK Employee Paychecks 3,548.20 3,468.71
Total 459,218.96 439,651.63
-59-
QAYMENT OF CLAIMS
Vendor Name Department/ProJ Name Descriptlon Acct#/Proj Code Amount Check Num Tvoe
ACWA/JPIA GEN 8 ADMIN ACWA MED INS PAY 1000-2514 194,727.90
ACWA/JPIA GEN 8 ADMIN VISION INS 1000-2530 2,720.90
Check Total: 197.448.80 AP-00087882 MW
AHERN RENTALS UNDERGROUND REP SMALL TOOLS 1001-6073 62.10
Check Total: 62.10 AP-00087883 MW
ALPEN SIERRA COFFEE GEN 8 ADMIN OFC SUPPLY ISSUE 1000-6081 144.94
Check Total: �44.94 AP-00087884 MW
AMERIPRIDE UNIFORM SERVICES GEN&ADMIN UNIFORM PAYABLE 1000-2518 1,739.47
Check Total: 1.739.47 AP-OOOR7885 MW
ARETE SYSTEMS ENGINEERING-GIS SFTWR DEV ARETE,GIS 2029-8120-GISSFT 6,457.50
Check Total: 6.457.50 AP-00087886 MW
AT&T MOBILITY PUMPS TELEPHONE 1002-6310 18.gg
ATBT MOBILITY ELECTRICAL SHOP TELEPHONE 1003-6310 4.25
ATBT MOBILITY ENGINEERING TELEPHONE 1029-6310 6.55
Ai&T MOBILITY INFORMATION TECH TELEPHONE 1037-6310 20.23
�8T MOBILITY PUMPS TELEPHONE 2002-6310 18.97
A�fB�T MOBILITY ELECTRICAL SHOP TELEPHONE 2003-6310 4.24
AT&T MOBILITY ENGINEERING TELEPHONE 2029-6310 6.55
AT&T MOBILITY INFORMATION TECH TELEPHONE 2037-6310 20.22
Check Totai: gg.gg AP-00087887 MW
ATBT/CALNET 2 GEN 8 ADMIN TELEPHONE 1000-6310 329.29
ATBT/CALNET 2 CUSTOMER SERVICE TELEPHONE 1038-6310 7.45
ATBTlCALNET 2 GEN 8 ADMIN TELEPHONE 2000-6310 329.28
ATBT/CALNET 2 CUSTOMER SERVICE TELEPHONE 2038-6310 7.44
Check Totai: 673.46 AP-00087888 MW
BARGETTO,SUE CUSTOMER SERVICE-WTR CONS PROG WTR CONS EXPENSE 2038-6660-WCPROG 100.00
Check Total: 100.00 AP-00087889 MW
BARSAMIAN,BETTY PUBLIC OUTREACH PRINTING 2027-4920 250.00
Check Total: 250.00 AP-00087890 MW j
BARTLETT,BRIAN INFORMATION TECH TRAVEL/MEETINGS 1037-6200 184.83 I
BARTLETT,BRIAN INFORMATION TECH TRAVEUMEETINGS 2037-6200 184.84
User:THERESA Page: 1 Current Date: 06/11/2014
Report:OH_PMT_CLAIMS_BK Current Time: 11:18:35
PAYMENT OF CLAIMS
Vendor Name Department I Proj Name Qescriptfon Acct#!ProJ Code A�+n Check Num Tvue
Check Total: 369.67 AP-00o87891 MW
BAUGH,HEIDI ENGINEERING TRAVEL/MEETINGS 1029-6200 10.95
BAUGH,HEIDI ENGINEERING TRAVEL/MEETINGS 2029-6200 10.95
Check Total: 21.g0 AP-00087892 MW
BAY TOOL 8 SUPPLY INC GEN&ADMIN SMALL TOOLS INV 1000-0423 285.09
BAY TOOL&SUPPLY INC FINANCE INV/FRT/DISCOUNT 1039-6077 64.39
Check Total: 349.48 AP-00087893 MW
BENTLY AGROWDYNAMICS OPERATIONS SLUDGE DISPOSAL 1006-6652 2,216.48
Check Total: 2.216.48 AP-00087894 MW
BLUE RIBBON TEMP PERSONNEL UNDERGROUND REP CONTRACT SERVICE 1001 -4405 3,912.00
BLUE RIBBON TEMP PERSONNEL INFORMATION TECH CONTRACT SERVICE 1037-4405 549.12
BLUE RIBBON TEMP PERSONNEL CUSTOMER SERVICE CONTRACT SERVICE 1038-4405 537.49
BLUE RIBBON TEMP PERSONNEL UNDERGROUND REP CONTRACT SERVICE 2001-4405 4,042.40
BLUE RIBBON TEMP PERSONNEL ENGINEERING-2014 METER PRJ METERS 2014 2029-7013-METERS 3,468.64
BLUE RIBBON TEMP PERSONNEL INFORMATION TECH CONTRACT SERVICE 2037-4405 549.12
�LUE RIBBON TEMP PERSONNEL CUSTOMER SERVICE CONTRACT SERVICE 2038-4405 537.49
r
�LUE RIBBON TEMP PERSONNEL CUSTOMER SERVICE-WTR CONS PROG WTR CONS EXPENSE 2038-6660-WCPROG 4,848.46
Check TataL 18.444.72 AP-00087895 MW
BULL COMPANY,CH HEAW MAINT SHOP SUPPLIES 1004-6071 1,351.00
BULL COMPANY,CH UNDERGROUND REP SHOP SUPPLIES 2001-6071 343.40
Check Total: 1.694.40 AP-00087896 MW
CALIF DEPT OF HEALTH SERVICES ENGINEERING REGLTRY OP PRMTS 1029-6650 1,049.00
CALIF DEPT OF HEALTH SERVICES ENGINEERING REGLTRY OP PRMTS 2029-6650 1,049.00
Check Total: 2.098.00 AP-00087897 MW
CALIF DEPT OF PUBLIC HEALTH PUMPS DUES/MEMBICERT 2002-6250 105.00
Check Total: 105.00 AP-OOOR7A98 MW
CALIF DEPT OF PUBLIC HEALTH PUMPS DUES/MEMB/CERT 2002-6250 90.00
Check Tatal: 90.00 AP-00087899 MW
CASHMAN EQUIPMENT EQUIPMENT REPAIR AUTOMOTIVE 2005-6011 227.97
Check Total: 227.g7 AP-OOOR7900 MW
CCR LAKE TAHOE III LlC PUBLIC OUTREACH-PR EXP-EXTERNAL PUB RELATIONS 1027-6620-PREEXT 576.00
User: THERESA Page: 2 Current Date: 06/1 U2014
Report:OH_PMT_CLAIMS_BK Current Time: 11:1835
PAYMENT OF CLAIMS
Vendor Name Deoartment/ProJ Name Descri tp ion Acct#/Proj Code Amount Check Num Tvoe
CCR LAKE TAHOE III LLC PUBLIC OUTREACH-PR EXP-EXTERNAL PUB RELATIONS 2027-6620-PREEXT 576.00
Check Total: 1,152.00 AP-00087901 MW
CDS GROUP HEAITH GEN 8 ADMIN DENTAL SLF INS 1000-2536 747.50
Check Total: 747.50 AP-00087902 MW
CHARTER BUSINESS GEN 8 ADMIN TELEPHONE 1000-6310 90.27
CHARTER BUSINESS GEN&ADMIN TELEPHONE 2000-6310 90.26
Check Total: 180.53 AP-00087903 MW
CONSTRUCTION MATERIALS ENG INC ENGINEERING-BIJOU SWR ER BIJOU ECP 1029-8287-ECSBJM 4,363.00
Check Total: 4.363.00 AP-OOOR7904 MW
CWEA SIERRA SECTION UNDERGROUND REP TRAVEUMEETINGS 1001-6200 249.00
CWEA SIERRA SECTION ELECTRICAL SHOP TRAVEL/MEETINGS 1003-6200 47.00
CWEA SIERRA SECTION HEAVY MAINT TRAVEUMEETINGS 1004-6200 141.00
CWEA SIERRA SECTION OPERATIONS TRAVEUMEETINGS 1006-6200 230.00
CWEA SIERRA SECTION UNDERGROUND REP TRAVEL/MEETINGS 2001-6200 183.00
Check Total: 850.00 AP-0008'7905 MW
I
�ATCO SERVICES CORP HUMAN RESOURCES SAFETY PROGRAMS 1022-6079 168.35
�ATCO SERVICES CORP HUMAN RESOURCES SAFETY PROGRAMS 2022-6079 168.35
Check Total: 336.70 AP-00087906 MW
DIY HOME CENTER PUMPS PUMP STATIONS 1002-6051 14.55
DIY HOME CENTER HEAVY MAINT BUILDINGS 1004-6041 12.63
DIY HOME CENTER HEAW MAINT GROUNDS 8 MNTC 1004-6042 29.13
Check Total: 56.31 AP-00087907 MW
DOUGLAS DISPOSAL GEN&ADMIN REFUSE DISPOSAL 1000-6370 19.08
Check Total: 19.08 AP-00087908 MW
EIDAM,EILEEN ADMINISTRATION TRAVEL/MEETINGS 1021-6200 24.92
EIDAM,EILEEN ADMINISTRATION TRAVEL/MEETINGS 2021-6200 24.92
Check Total: 49,gq AP-00087909 MW
EL DORADO COUNTY ENGINEERING-2014 METER PRJ METERS 2014 2029-7013-METERS 50.00
Check Total: 50.00 AP-00087877 MW
EL DORADO COUNTY ENGINEERING-2014 METER PRJ METERS 2014 2029-7013-METERS 50.00
Check Total: 50.00 AP-00087878 MW
Uaer:THERESA Page: 3 Curreat Date: 06/11/2014
Report:OH_PMT_CLAIMS_BK Current Time: 11:18:35
PAYMENT OF CLAIMS
Vendor Name Qgpartment/ProJ Name Description Acct#/Proj Code A�4��S Check Num Tvoe
EL DORADO COUNTY ENGINEERING-2014 METER PRJ METERS 2014 2029-7013-METERS 50.00
Check Total: 50.00 AP-00087R79 MW
El DORADO COUNTY ENGINEERING-2014 METER PRJ METERS 2014 2029-7013-METERS 50.00 '
Check Total: 50.00 AP-00087880 MW
EL DORADO COUNTY CUSTOMER SERVICE SUPPLIES 1038-6520 24.00
EL DORADO COUNTY CUSTOMER SERVICE SUPPLIES 2038-6520 24.00
Check Total: 48.00 AP-00087910 MW
EL DORADO COUNTY CUSTOMER SERVICE SUPPLIES 1038-6520 8.00
EL DORADO COUNTY CUSTOMER SERVICE SUPPLIES 2038-6520 8.00
Check Total: 16.00 AP-00087911 MW
EMBREY,ROBYN CUSTOMER SERVICE-WTR CONS PROG WTR CONS EXPENSE 2038-6660-WCPROG 227•92
Check Total: Y27,g2 AP-00087912 MW
ENS RESOURCES INC PUBLIC OUTREACH CONTRACT SERVICE 1027-4405 3,324.34
ENS RESOURCES INC PUBLIC OUTREACH CONTRACT SERVICE 2027-4405 3,324.33
Check Total: 6.648.67 AP-00087913 MW
I
�VIRONMENTAL RESOURCES ASSO LABORATORY LAB SUPPLIES 1007-4760 73.44
ENVIRONMENTAL RESOURCES ASSO LABORATORY LAB SUPPLIES 2007-4760 95.35
Check TotaL• �gg,7g AP-00087914 MW
EVOQUA WATER TECHNOLOGIES LLC LABORATORY SERVICE CONTRACT 1007-6030 36.00
EVOQUA WATER TECHNOLOGIES LLC LABORATORY SERVICE CONTRACT 2007-6030 36.00
Check Total: 72.00 AP-00087915 MW
FARMER,NANCY CUSTOMER SERVICE-WTR CONS PROG WTR CONS EXPENSE 2038-6660-WCPROG 169.53
Check Total: 169.53 AP-00087916 MW
FEDEX HEAVY MAINT PRIMARY EQUIP 1004-6021 274.99
Check Total: 274.99 AP-00087917 MW
FERGUSON ENTERPRISES INC HEAVY MAINT PRIMARY EQUIP 1004-6021 43.55
FERGUSON ENTERPRISES INC HEAVY MAINT GROUNDS 8 MNTC 1004-6042 70.50
Check Total: 114.05 AP-00087918 MW
FGL ENVIRONMENTAL LABORATORY-ALP CO MTBE CONT MONITORING 1007-6110-ACMTBE 100.00
FGL ENVIRONMENTAL LABORATORY-HERBST MONITORING 2007-6110-HERBST 100.00
FGL ENVIRONMENTAL LABORATORY-SOYCON MONITORING 2007-6110-SOYCON 100.00
User: THERESA Page: 4 Current Date: 06/11/2014
RepoM:OH_PMT_CLAIMS_BK Current Time: 11:18:35
PAYMENT OF CLAIMS
Vendor Name Department/Proj Name Description Acct#/P�qJ Code Amount Check Num Tvoe
FGL ENVIRONMENTAL ENGINEERING-GLENWD WELL TRT WEIL TR-GLENWOOD 2029-7012-GWMTBE 100.00
Check Total: 400.00 AP-OOOR7919 MW
FISHER SCIENTIFIC LABORATORY LAB SUPPLIES 1007-4760 43.20
FISHER SCIENTIFIC LABORATORY LAB SUPPLIES 2007-4760 43.22
Check Total: 86.42 AP-00087920 MW
FLYERS ENERGY LLC GEN&ADMIN GASOLINE INV 1000-0415 6,638.61
FLYERS ENERGY LLC GEN 8 ADMIN DIESEL INVENTORY 1000-0416 4,969.72
FLYERS ENERGY LLC DIAMOND VLY RNCH GASOLINE 1028-4610 832.46
FLYERS ENERGY LLC DIAMOND VLY RNCH DIESEL 1028-4620 1,500.48
Check Total: 13.941.27 AP-00087921 MW
FRANK OLSEN COMPANY PUMPS PUMP STATIONS 1002-6051 66.26
FRANK OLSEN COMPANY ENGINEERING-TKEYS FM BYPASS FRCMN BYPS KEYS 1029-8288-TKFMBP 1,707.49
Check Total: 1.773.75 AP-00087922 MW
FRONTIER COMMUNICATIONS DIAMOND VLY RNCH TELEPHONE 1028-6310 261.75
� Check Total: 261.75 AP-00087923 MW
�HD INC ENGINEERING-�PPS PWR/CTRLS LPPS PWR/CTR UPG 1029-8330-LPPOWR 9,420.98
I Check Total: 9.420.98 AP-00087924 MW
GLOBAL DATA SPECIALISTS ELECTRICAL SHOP PUMP STATIONS 2003-6051 2,160.00
Check TotaL• 2.160.00 AP-00087925 MW
GRAINGER HEAW MAINT SECONDARY EQUIP 1004-6022 56.31
GRAINGER HEAVY MAINT GROUNDS 8�MNTC 1004-6042 401.19
Check Total: 457.50 AP-00087926 MW
GRANITE RANCH OPP LLC GEN 8 ADMIN UB SUSPENSE 1000-2002 108.52
GRANITE RANCH OPP LLC GEN 8�ADMIN UB SUSPENSE 2000-2002 108.53
Check Totai: 217.05 AP-o0087927 MW
HDR ENGINEERING INC FINANCE ADVISORY 2039-4440 4,065.26
Check Total: 4.065.26 AP-00087928 MW
HENDERSON,DEBBIE ADMINISTRATION INCNN 8 RCGNTN 1021-6621 121.59
HENDERSON,DEBBIE ADMINISTRATION INCNN&RCGNTN 2021-6621 121.59
Check Total: 243.18 AP-00087929 MW
HESSION,SHAELYN CUSTOMER SERVICE-WTR CONS PROG WTR CONS EXPENSE 2038-6660-WCPROG 170.80
User:THERESA Page: 5 Current Date: 06/11/2014
Report:OH_PMT_CLAIMS_BK Current Time: 11:18:35
PAYMENT OF CLAIMS
Vendor Name Depardnent/Proj Name Description Acct#/Pro)Code � Check Num IYRg
Check Total: 170.80 AP-00087930 MW
HIGH SIERRA BUSINESS SYSTEMS HUMAN RESOURCES SERVICE CONTRACT 1022-6030 58.98 �
HIGH SIERRA BUSINESS SYSTEMS CUSTOMER SERVICE SERVICE CONTRACT 1038-6030 9.47
HIGH SIERRA BUSINESS SYSTEMS FINANCE SERVICE CONTRACT 1039-6030 110.97
HIGH SIERRA BUSINESS SYSTEMS HUMAN RESOURCES SERVICE CONTRACT 2022-6030 58.97
HIGH SIERRA BUSINESS SYSTEMS CUSTOMER SERVICE SERVICE CONTRACT 2038-6030 9.46
HIGH SIERRA BUSINESS SYSTEMS CUSTOMER SERVICE-WTR CONS PROG WTR CONS EXPENSE 2038-6660-WCPROG 117.95
HIGH SIERRA BUSINESS SYSTEMS FINANCE SERVICE CONTRACT 2039-6030 110.96
Check Total: 476.76 AP-00087931 MW
INFOSEND INC PUBLIC OUTREACH PRINTING 1027-4920 1,836.00
INFOSEND INC PUBLIC OUTREACH PRINTING 2027-4920 1,836.00
Check Total: 3,672.00 AP-00087932 MW
INTERSTATE SAFETY 8 SUPPLY GEN 8 ADMIN SHOP SUPP INV 1000-0421 937.56
Check Total: 931.56 AP-00087933 MW
JACK HENRY&ASSOC.INC INFORMATION TECH SERVICE CONTRACT 1037-6030 1,465.00
dACK HENRY 8�ASSOC.INC INFORMATION TECH SERVICE CONTRACT 2037-6030 1,464.50
�
i Check Total:
2.929.50 AP-00087934 MW
KAUFFMAN,ELIZABETH HUMAN RESOURCES TRAVEI/MEETINGS 1022-6200 58.29
KAUFFMAN,ELIZABETH HUMAN RESOURCES TRAVEUMEETINGS 2022-6200 58.29
Check Total: 116.58 AP-00087935 MW
KIMBALL MIDWEST EQUIPMENT REP AUTOMOTIVE 1005-6011 284.90
KIMBALL MIDWEST EQUIPMENT REPAIR AUTOMOTIVE 2005-6011 419.62
Check Total: 704.52 AP-00087938 MW
KTHO AM 590&96.1 FM PUBLIC OUTREACH-PR EXP-EXTERNAL PUB RELATIONS 1027-6620-PREEXT 562.50
KTHO AM 590 8 96.1 FM PUBLIC OUTREACH-PR EXP-EXTERNAL PUB RELATIONS 2027-6620-PREEXT 562.50
Check Total: 1.125.00 AP-OOOR7939 MW
LAKESIDE NAPA PUMPS LUTHER PASS 1002-6048 17.43
LAKESIDE NAPA PUMPS PUMP STATIONS 1002-6051 7.43
LAKESIDE NAPA PUMPS SMALL TOOLS 1002-6073 93.85
LAKESIDE NAPA HEAVY MAINT SECONDARY EQUIP 1004-6022 30.94
LAKESIDE NAPA HEAVY MAINT GROUNDS 8 MNTC 1004-6042 71.14
LAKE5IDE NAPA EQUIPMENT REP AUTOMOTIVE 1005-6011 290.89
User: THERESA Page: 6 Current Date: 06/11/2014
Report:OH_PMT_CLAIMS_BK Current Time: 11:18:35
PAYMENT OF CLAIMS
Vendor Name Department/Proj Name Descrlptlon Acct#/ProJ Code ALri4sl.OS Check Num Tvoe
LAKESIDE NAPA EQUIPMENT REP GENERATORS 1005-6013 123.36
LAKESIDE NAPA DIAMOND VLY RNCH GROUNDS 8 MNTC 1028-6042 160.69
LAKESIDE NAPA UNDERGROUND REP SHOP SUPPLIES 2001-6071 118.17
LAKESIDE NAPA UNDERGROUND REP SMALL TOOLS 2001-6073 33.39
LAKESIDE NAPA PUMPS SMALL TOOLS 2002-6073 93.84
LAKESIDE NAPA EQUIPMENT REPAIR AUTOMOTIVE 2005-6011 488.75
Check Total: �.52g_gg pp-00087940 MW
LANG FAMILY TRUST GEN 8 ADMIN UB SUSPENSE 2000-2002 4,556.00
Check Total: 4.556.00 AP-00087941 MW
LEE,JEFF OPERATIONS DUES/MEMB/CERT 1006-6250 80.00
Check Total: 80.00 AP-00087942 MW
LES SCHWAB TIRE CENTER EQUIPMENT REP AUTOMOTIVE 1005-6011 739.57
Check Total: 739.57 AP-00087943 MW
LIBERTY UTILITIES GEN 8 AOMIN ELECTRICITY 1000-6330 64,872.74
LIBERTY UTILITIES GEN&ADMIN ST LIGHTING EXP 1000-6740 9.74
i
I�ERTY UTILITIES GEN 8�ADMIN ELECTRICITY 2000-6330 22,757.08 ,
I
Check Total: 87.639.56 AP-00087944 MW
LILLY'S TIRE SERVICE INC EQUIPMENT REP AUTOMOTIVE 1005-6011 221.64
LILLY'S TIRE SERVICE INC EQUIPMENT REP GENERATORS 1005-6013 116.36
LILLY'S TIRE SERVICE INC EQUIPMENT REPAfR GENERATORS 2005-6013 116.35
Check Total: 454.35 AP-00087945 MW
MC MASTER CARR SUPPLY CO PUMPS PUMP STATIONS 1002-6051 146.13
Check Total: 146.13 AP-00087946 MW
MCALICE,ARTHUR CUSTOMER SERVICE-WfR CONS PROG WTR CONS EXPENSE 2038-6660-WCPROG 300.00
Check Total: 300.00 AP-00087947 MW
MEEKS BUILDING CENTER UNDERGROUND REP SHOP SUPPLIES 1001-6071 38.59
MEEKS BUILDING CENTER PUMPS LUTHER PASS 1002-6048 114.73
MEEKS BUILDING CENTER PUMPS PUMP STATIONS 1002-6051 59.37
MEEKS BUILDING CENTER PUMPS SHOP SUPPLIES 1002-6071 7.66 '
MEEKS BUILDING CENTER PUMPS SMALL TOOLS 1002-6073 5.89
MEEKS BUILDING CENTER ELECTRICAL SHOP BUILDINGS 1003-6041 27.29
MEEKS BUILDING CENTER ELECTRICAL SHOP SMALL TOOLS 1003-6073 55.39
Uaer: THERESA Page: 7 Current Date: 06/11/2014
Report:OH_PMT_CLAIMS_BK Current Time: ll:18:35
PAYMENT OF CLAIMS '
Vendor Name p�Rrtment/Proj Name Description Acct#/Praj Code ��S Check Num Tv�e
MEEKS BUILDING CENTER HEAVY MAINT PRIMARY EQUIP 1004-6021 17.95
MEEKS BUILDING CENTER HEAVY MAINT BUILDINGS 1004-6041 83�99
MEEKS BUILDING CENTER HEAW MAINT GROUNDS 8 MNTC 1004-6042 30.76
MEEKS BUILDING CENTER HEAVY MAINT SHOP SUPPLIES 1004-6071 13.33
MEEKS BUILDING CENTER DIAMOND VLY RNCH GROUNDS&MNTC 1028-6042 384.85
MEEKS BUILDING CENTER CUSTOMER SERVICE SHOP SUPPLIES 1038-6071 1026
MEEKS BUILDING CENTER UNDERGROUND REP PIPE/CVRS/MHLS 2001-6052 1�•32
MEEKS BUILDING CENTER UNDERGROUND REP SMALL TOOLS 2001 -6073 21.50
MEEKS BUILDING CENTER PUMPS WELLS 2002-6050 381.04
MEEKS BUILDING CENTER PUMPS PUMP STATIONS 2002-6051 43.45
MEEKS BUILDING CENTER PUMPS SHOP SUPPLIES 2002-6071 7.65
MEEKS BUI�DING CENTER PUMPS SMALL TbOLS 2002-6073 5.89
MEEKS BUILDING CENTER CUSTOMER SERVICE SHOP SUPPLIES 2038-6071 10.25
CheCk Total: 1.337.16 AP-00087948 MW
METRO OFFICE 50LUTIONS HUMAN RESOURCES OFFICE SUPPLIES 1022-4820 39.99
�TRO OFFICE SOLUTIONS HUMAN RESOURCES OFFICE SUPPLIES 2022-4820 39•98
� Check Total: 7g.97 AP-00087949 MW
I
MOTEL 6 PUMPS STANDBY ACCOMODA 1002-6083 78.64
MOTEL 6 PUMPS STANDBY ACCOMODA 2002-6083 78.64
CheckTotal: 157,2g AP-00087950 MW
MOUNTAIN COUNTIES WATER BOARD OF DIR DUES/MEMBlCERT 2019-6250 8,750.00
Check Total: 8.750.00 AP-00087951 MW
NELS TAHOE HARDWARE HEAW MAINT BUILDINGS 1004-6041 10.50
Check Total: 10.50 AP-00087952 MW
NEVADA GENERATOR SYSTEMS INC EQUIPMENT REP GENERATORS 1005-6013 197.50
NEVADA GENERATOR SYSTEMS INC EQUIPMENT REPAIR GENERATORS 2005-6013 475.00
Check Total: 672.50 AP-OOOR7953 MW
NEWARK IN ONE ELECTRICAL SHOP BUILDINGS 1003-6041 43.90
Check Total: 43.90 AP-OOOR7954 MW
NIXON'S HEATING/AIR CONDITION CUSTOMER SERVICE MISC LIAB CLAIMS 2038-4520 1,145.33
Check Total: 1.145.33 AP-00087955 MW
NORTHERN SAFETY 8 INDUSTRIAL HEAVY MAINT SHOP SUPPLIES 1004-6071 492.12
User. THERESA Page: R CurrentDate: 06/11/2014
Report:OH_PMT_CLAIMS_BK Current Time: ll:1 A:35
PAYMENT OF CLAIMS
Vendor Name Qepartment I ProJ Name Deacrintion Acct#/P�ol Code Amount Check Num Tvoe
Check Total: 492.12 AP-00087956 MW
NORTHERN TOOL&EQUIP OPERATIONS SMALL TOOLS 1006-6073 211.04
Check Total: 211.04 AP-00087957 MW
NUROCK,DOUG OPERATIONS DUES/MEMB/CERT 1006-6250 219.00
Check Tatal: 21g.00 AP-00087958 MW
OLIN CORPORATION OPERATIONS ITYPOCHLORITE 1006-4755 3,269.12
Check Total: 3.269.12 AP-00087959 MW
ONTRAC LABORATORY POSTAGE EXPENSES 1007-4810 13.35
ONTRAC ENGINEERING-WL,SADDLE WTRLN-SADDLE/KEL 2029-7011-SADLWL 20.91
ONTRAC ENGINEERING-2014 METER PRJ METERS 2014 2029-7013-METERS 5.88
Check Total: 40.14 AP-00087960 MW
PC MALL GOV INC DIAMOND VLY RNCH GROUNDS&MNTC 1028-6042 3,790.54
Check Total: 3.790.54 AP-00087961 MW
PETTY CASH GEN 8�ADMIN OFC SUPPLY ISSUE 1000-6081 13.99
PETTY CASH OPERATIONS TRAVEL/MEETINGS 1006-6200 45.92
I
�ETTY CASH BOARD OF DIR TRAVEUMEETINGS 1019-6200 9.00
�ETTY CASH ADMINISTRATION SUPPLIES 1021-6520 2.43
PETTY CASH ADMINISTRATION INCNN&RCGNTN 1021-6621 22.13
PETTY CASH ENGINEERING-RENEWABLE ENERGY TRAVEL/MEETINGS 1029-6200-PIER13 27.06
PETTY CASH ENGINEERING SUPPLIES 1029-6520 z,7p
PETTY CASH ENGINEERING-FLL SWR UPGR FLL SYSTEM UPGR 1029-8331-FLLSUP 3.50
PETTY CASH FINANCE TRAVEL/MEETINGS 1039-6200 32.03
PETTY CASH BOARD OF DIR TRAVEL/MEETINGS 2019-6200 9.00
PETTY CASH ADMINISTRATION SUPPLIES 2021-6520 2.42
PETTY CASH ADMINISTRATION INCNN&RCGNTN 2021-6621 22.12
PETTY CASH ENGINEERING SUPPLIES 2029-6520 2.69
PETTY CASH FINANCE-FIRE GRNT ADMIN TRAVEL/MEETINGS 2039-6200-SMOKY4 104.02
Check Total: 2gg.01 AP-00087962 MW
PITNEY BOWES GLOBAL FINANCIAL CUSTOMER SERVICE EQUIP RENT/LEASE 1038-5020 35.18
PITNEY BOWES GLOBAL FINANCIAL CUSTOMER SERVICE EQUIP RENT/LEASE 2038-5020 35.17 '
Check Total: 70.35 AP-00087963 MW
PRAXAIR 174 HEAVY MAINT SHOP SUPPLIES 1004-6071 67.61
Uaer: THERESA page: 9 Current Date: 06/11/2014
Report:OH_PMT_CLAIMS_BK Current Time: 11:18:35
PAYMENT OF CLAIMS
Vendor Name Qg{�rtment I Proj Name Descr�ption Acct#/ProJ Code A�Qld01 Check Num Tvoe
PRAXAIR 174 LABORATORY LAB SUPPLIES 1007-4760 945.38
PRAXAIR 174 LABORATORY LAB SUPPLIES 2007-4760 945.37
Check Total: 1.958.36 AP-00087964 MW
PRO LEISURE ADMINISTRATION INCNN 8 RCGNTN 1021-6621 416.84 ,
PRO LEISURE ADMINISTRATION INCNTV&RCGNTN 2021-6621 416.83
Check Total: 833.67 AP-00087965 MW
RAUCH COMMUNICATION PUBLIC OUTREACH CONTRACT SERVICE 1027-4405 592.50
RAUCH COMMUNICATION PUBLIC OUTREACH CONTRACT SERVICE 2027-4405 592.50
Check Total: 1.185.00 AP-00087966 MW
REDWOOD PRINTING UNDERGROUND REP SHOP SUPPLIES 1001-6071 313.82
REDWOOD PRINTING PUMPS OFFICE SUPPLIES 1002-4820 104.60
REDWOOD PRINTING ADMINISTRATION OFFICE SUPPLIES 1021-4820 52.30
REDWOOD PRINTING ENGINEERING MAPPING 1029-4420 156.92
REDWOOD PRINTING CUSTOMER SERVICE OFFICE SUPPLIES 1038-4820 2�9•22
REDWOOD PRINTING UNDERGROUND REP SHOP SUPPLIES 2001-6071 406.00
�DWO00 PRINTING PUMPS OFFICE SUPPLIES 2002-4820 9�•22
�
f�EDWOOD PRINTING ADMINISTRATION OFFICE SUPPLIES 2021-4820 45.
REDWOOD PRINTING ENGINEERING MAPPING 2029-4420 135.34
REDWOOD PRINTING CUSTOMER SERVICE OFFICE SUPPLIES 2038-4820 171.57
Check Total: 1.685.10 AP-00087967 MW
RELIANCE STANDARD GEN 8 ADMIN LIFE INS UN/BD 1000-2512 1,537.81
RELIANCE STANDARD GEN 8 ADMIN LIFE INS MGMT 1000-2525 505.25
RELIANCE STANDARD GEN 8 ADMIN LNG TRM DIS,MGMT 1000-2531 1,249.37
RELIANCE STANDARD GEN 8 ADMIN LTD,UNION 1000-2539 1,628.01
Check Total: q,g2p.qq AP-00087968 MW
RUIZ,JOSE OPERATIONS DUES/MEMB/CERT 1006-6250 110.00
Check Total: 110.00 AP-OOOR7969 MW
SCOTTYS HARDWARE GEN 8 ADMIN SHOP SUPP INV 1000-0421 155.13
SCOTTYS HARDWARE PUMPS LUTHER PASS 1002-6048 19•4�
SCOTTYS HARDWARE PUMPS SMALL TOOLS 1002-6073 3.85
SCOTTYS HARDWARE PUMPS REP PMP/MTR1 VEN 1002-8305 35.83
SCOTTYS HARDWARE PUMPS WELLS 2002-6050 6.15
User:THERESA Page: 10 Current Date: 06/11/2014
Report:OH_PMT_CLAIMS_BK Current Time: ll:18:35
PAYMENT OF CLAIMS
Vendor Name Deeartment I ProJ Name Description Acct#/ProJ Code Amount Check Num SyRg
SCOTTYS HARDWARE PUMPS SMALL TOOLS 2002-6073 3.84
Check Total: 2Y4.27 pp_00087970 MW
SENSUS METERING SYSTEMS INFORMATION TECH SERVICE CONTRACT 2037-6030 1,801.80
Check Total: 1.801.80 AP-00087971 MW
SHRED-IT GEN 8 ADMIN OFC SUPPLY ISSUE 1000-6081 64.00
Check Total: 64.00 AP-00087972 MW
SIERRA CHEMICAL CO OPERATIONS SODIUM HYDROXIDE 1006-4770 5,780.00
Check Total: 5.780.00 AP-00087973 MW
SIERRA ENVIRONMENTAL LABORATORY MONITORING 1007-6110 372.00
Check Total: 372.00 AP-00087974 MW
SIERRA FOOTHILL LABORATORY LABORATORY-IND CRK RES MONT MONITORING 1007-6110-INDIAN 390.00
Check Total: 390.00 AP-00087975 MW
SIERRA NEVADA MEDIA GROUP OPERATIONS ITYPOCHLORITE 1006-4755 59.06
SIERRA NEVADA MEDIA GROUP HUMAN RESOURCES ADS/LGL NOTICES 1022-4930 213.44
S�ERRA NEVADA MEDIA GROUP PUMPS ITYPOCHLORITE 2002-4755 59.05
�RRA NEVADA MEDIA GROUP HUMAN RESOURCES ADS/LGL NOTICES 2022-4930 213.44
I
Check Total: 544.99 AP-00087976 MW
SKELLY,CHRIS INFORMATION TECH TRAVEUMEETINGS 1037-6200 12.15
SKELLY,CHRIS INFORMATION TECH TRAVEL/MEETINGS 2037-6200 12.15
Check Total: 24.30 AP-00087977 MW
SOUTH TAHOE REFUSE GEN 8 ADMIN REFUSE DISPOSAL 1000-6370 2,172.78
SOUTH TAHOE REFUSE GEN 8 ADMIN REFUSE DISPOSAL 2000-6370 234.80
Check Total: 2.407.58 AP-00087978 MW
SOUTHWEST GAS GEN 8�ADMIN NATURAL GAS 1000-6350 5,668.41
SOUTHWEST GAS GEN 8 ADMIN NATURAL GAS 2000-6350 345.45
Check Total: 6.013.86 AP-00087979 MW
SPRINGBROOK SOFTWARE INC CUSTOMER SERVICE CONTRACT SERVICE 1038-4405 g7,5p
SPRINGBROOK SOFTWARE INC CUSTOMER SERVICE CONTRACT SERVICE 2038-4405 87.50
Check Total: 175.00 AP-00087980 MW
SWRCB OPERATIONS DUES/MEMB/CERT 1006-6250 300.00
Check Total: 300.00 AP-00087876 MW
User: THERESA page: 11 CurrentDate: 06/I1/2014
RepoM:OH_PMT_CLAIMS_BK Current Time: ]1:18:35
PAYMENT OF CLAIMS
Vendor Name �partment I ProJ Name Descriptfon Acct#/ProJ Code ARl4��S Check Num Tvoe
TAHOE BASIN CONTAINER SERVICE GEN 8 ADMIN REFUSE DISPOSAL 1000-6370 313.00
TAHOE BASIN CONTAINER SERVICE OPERATIONS SLUDGE DISPOSAL 1006-6652 10,185.00
Check Total: 10.498.00 AP-00087981 MW
TAHOE BLUEPRINT ENGINEERING-WL,SADDLE VYTRLN-SADDLElKEL 2029-7011-SADLWL 239•72
Check Total: 239.72 AP-OOOR7982 MW
TAHOE POOL SERVICE PUMPS WELLS 2002-6050 �•OS
Check Total: 84.08 Ap-�0087983 MW
TAHOE PRINTING CUSTOMER SERV�CE OFFICE SUPPLIES 1038-4820 22•4�
TAHOE PRINTING CUSTOMER SERVICE OFFICE SUPPLIES 2038-4820 22•4�
TAHOE PRINTING CUSTOMER SERVICE-WTR CONS PROG WTR CONS EXPENSE 2038-6660-WCPROG z2•4�
Check Total: 67.23 AP-�0087984 MW
TAHOE SAND 8 GRAVEL UNDERGROUND REP PIPE/CVRSIMHLS 2001-6052 488.00
Check Total: 488.00 AP-00087985 MW
TAHOE VALLEY ELECTRIC SUPPLY ELECTRICAL SHOP BUILDINGS 1003-6041 1,118.40
TAHOE VALLEY ELECTRIC SUPPLY ELECTRICAL SHOP SMALL TOOLS 2003-6073 86.23
� Check Total: 1.204.63 AP-00087986 MW
�
r
TORQUE TOOLS CALIFORNIA PUMPS LUTHER PASS 1002-6048 1,370.90
Check Total: 1.370.90 AP-00087987 MW
TRPA ENGINEERING-TRUCKEE MARSH TR CRK RESTORE 1029-8426-TMSFPP 1,588.00
Check Total: 1.588.00 AP-o0o87881 MW
UNITED PARCEL SERVICE GEN 8�ADMIN POSTAGE EXPENSES 1000-4810 150.00
UNITED PARCEL SERVICE GEN 8 ADMIN POSTAGE EXPENSES 2000-4810 150.00
Check Total: 300.00 AP-00087988 MW
UNITED RENTALS INC ENGINEERING TRAVEUMEETINGS 1029-6200 128.09
Check Total: 128.09 AP-000879R9 MW
USC Foundation Office CUSTOMER SERVICE DUES/MEMB/CERT 2038-6250 695.00
Check Total: 695.00 AP-00087990 MW
USDA FOREST SERVICE ENGINEERING REGLTRY OP PRMTS 1029-6650 42,046.71
Check Total: 42.046.71 AP-OOOR7991 MW
WALSH,DANIEL CUSTOMER SERVICE-WTR CONS PROG WTR CONS EXPENSE 2038-6660-WCPROG 100.00
Check Total: 100.00 AP-00087992 MW
User: THERESA Page: 12 Current Date: 06/11/2014
Report:OH_PMT_CLAIMS_BK Current Time: 11:18:35
PAYMENT OF CLAIMS
Vendor Name Department I Proj Name Descri tion Acct#I Proj Code Amount Check Num IyR�
WAXIE SANITARY SUPPLY GEN&ADMIN JANIT/SUPPLY INV 1000-0422 245.81
WAXIE SANITARY SUPPLY GEN&ADMIN OFFICE INVENTORY 1000-0428 3gg,7�
Check Total: 644.52 AP-00087993 MW
WEDCO INC ELECTRICAL SHOP SHOP SUPPLIES 1003-6071 549.21
Check Total: 549.21 AP-00087994 MW
WESTERN NEVADA SUPPLY HEAVY MAINT FILTER EQ/BLDG 1004-6023 4,409.77
WESTERN NEVADA SUPPLY GEN 8 ADMIN BOXES/LIDS/INV 2000-0403 7,481.20
WESTERN NEVADA SUPPLY GEN 8 ADMIN VLVS ELB Ts FLNG 2000-0404 2,507.80
WESTERN NEVADA SUPPLY GEN&ADMIN SADDLES FTNG INV 2000-0407 1,385.10
WESTERN NEVADA SUPPLY UNDERGROUND REP PIPE/CVRS/MHLS 2001-6052 1,735.58
Check Total: 17.519.45 AP-00087995 MW
Grand Total: 513,790.03
�
N
.. . : ;t .
'� , , il i i � ; ..
� ) : �� _
— l) (i �
�. , ;-� , {', . - . . .
Uaer:THERESA Page: 13 Current Date: 06/1 I/2014
Report:OH_PMT_CLAIMS_BK Current Time: 11:1835
� . ��,�� �,� .
Sout�h Tahoe P.U.D. 06/05 14 WID TYPID & REUFR.Sm A�P �� �� 1
UR
___ �'200 <1.35>-- id: --
gIH7, J[N 05, 2014, 8:26 AM --req: - ].er3: C�.� JU-Zoc: Q�TTE----�ab: 550671 #�Tl].5�4---�og: �t
�ec1c Payee ID. Payee Natte Date C1�c'k Pitn�mt 'I�pe Sub� I�e1 'Ib NoGe
AP00087510 V40114 '1RP'A 04 7/14 1,500.00 RV 'Il2 �r�
GRAND TOTALS: ��la ��
'Ibtal �loid Nb�hir�e Writt�en �I 0.00 N�xnber af CYr�c]ts Piooesse�d: 0
'Ibtal Void �Ta��cl Writt�en 0.00 l�n�beY' of C�ecks Praoe.s.�ed: 0
'Ibt.al N�chir�e Writt� 0.00 1�znbPr af CY�ecks Ptroo�sed.: 0
'lbtal Hand Writtez 0.00 I�anber af CY�ec}cs Ptrooessed: 0
�,� R� 1,500.00 1�=�er' of C��ecks Proo�.sed: 1
�1 �� 0.00 N�ni�er of C1�ec)ts Prooes-9ed: 0
Zbtal E�'i� 0.00 I�irbex of E�'IS P�oes.9ec1: 0
'Ibtal EPAYs 0.00 l�bes of EPAYs Prooe.s�.�d: 0
GRAND TOTAL 1,500.00
J
W
..��. �, I I'1 � I t��
�
9outh Tahoe P.U.D. 05/30 14 ZAID 'IYPID & 1�VII�.� A/P �m:K RFCTr�R p� 1
FRI, M4Y 30, 2014, 11:48 AM --zeq: ----1,�: Ca, JL--�oc: Q�b'TIE----�ob: 550469 #J2073---p�t�g: ffiC200 <1.35>--repart id: Q�EG---
Q']ecic Paye�e ID. Payee l�aCte L13te CY]ec',k Pmo�u7t 'I�pe S�.�a6 lael Tb N�t,e
AP00087826 V40124 �T TOCg, & D�T� 06/ /14 259.50 RV TR l�evPrsed
GRAND TOTALS: � �Il,y �`1
�. v�.a r�� v�.t� � 0 9 0.0o r�� of a�ks �: o
T b t a l v o i a x a a�d writtei � o.oo l�mber of cl�era�s Prooes.qed,: o
'Ib�.al N�chine Writtaz 0.00 DTi,mb�x of CY�eds Prooes.�ed: 0
'Ib�tal Har�d Written 0.00 1�inibPr of Cl�ec�]s Prooessed: 0
'�'� �S 259.50 l�Tut�ber � �erks Prooes,yed: 1
'Ib�.a]. C�nelled 0.00 1Jimber of Ci�eck's P.roc�es..9ed: 0
Tbtal EETS 0.00 1V�mbe�r of F�'!5 Prooas.sed: 0
Tbtal EPAYs 0.00 Nunber of �,Ys P.rooessed: 0
GRAND TOTAL 259.50
�
�
6eneral Manager
Richard H.5olbrig
� � ��(j � � �� � � ` Director5
t� w�" � ChriS Cefalu
�i JameS R.Jones
Randy Vogelge5ang
�" �` pub(ic Utiiity Di5-Grict KellySheehan
Eric 5chafer
1275 Meadow CreSt Drive•5auth Lake Tahoe•CA 96150-7401
Phone 530 54-4-6474•Fax 530 541-0614•www.�tpud.u5
BOARD AGENDA ITEM
TO: Board of Directors
FROM: Tim Bledsoe, Customer Service Manager
Debbie Henderson, Accounting Manager
MEETING DATE: June 19, 2014
ITEM - PROJECT NAME: Conference with Legal Counsel - Existing Litigation
REQUESTED BOARD ACTION: Direct legal counsel
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government code,
Closed Session may be held for conference with legal counsel regarding existing
litigation: EI Dorado County Superior Court Case SC20120227 GRCLT Condominium vs.
South Tahoe Public Utility District.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT AVAILABLE:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer
GENERAL MANAGER: YES � ,--- NO
CHIEF FINANCIAL OFFICER: YES NO
-75-
General Manager
Richard H.5olbrig
.�-�-^�-r.,,
Directors
� • 1'�iQ • w Chris Cefalu
�� � �� � ��
JameS R.JoneS
Randy Vogelge5ang
�� �' C'ublic Utili-�y Di�tric-G KellySheehan
Eric Schafer
1275 Meadow Crest Drive•5outh E.ake Tahae•CA 96150-74-Oi
!'hone 530 544-6474•Fax 53�541-06��•www.5tpud.u�
BOARD AGENDA ITEM
TO: Board of Directors
FROM: Paul Sciuto, Assistant General Manager/Engineer
MEETING DATE: June 19, 2014
ITEM - PROJECT NAME: Conference with Legal Counsel- Potential Litigation
REQUESTED BOARD ACTION: Direct Staff
DISCUSSION: Pursuant to Government Code Section 54956.9(b)/Conference with Legal
Counsel Anticipated Litigation (one potential case).
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT AVAILABLE:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES � NO
CHIEF PINANCIAL OFPICER: YES NO
-77-
General Manager
Richard H.5olbrig
r—
����t� � w h ///��� Director5
� � � / �� Chrie Cefalu
\� l,/�� �,,,� James R.Jones
�
Randy Vogelgesang
�- �� �u b[i c U ti[i ty D i�tri c-� Kelly 5heehan
Eric 5chafer
1275 Meadow Crest Drive•South Lake Tahoe•CA 96154-74D1
Phone 530 544-6474•Fax 530 541-0614•www.a�tpud.u5
BOARD AGENDA ITEM
TO: Board of Directors
FROM: Paul Sciuto, Assistant General Manager/Engineer
MEETING DATE: June 19, 2014
ITEM - PROJECT NAME: Conference with Legal Counsel - Existing Litigation
REQUESTED BOARD ACTION: Direct staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government code,
Closed Session may be held for conference with legal counsel regarding existing
litigation: False Claims Act Case: United States, the States of California, Delaware,
Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and
Virginia ex rel. John Hendrix v. J-M Manufacturing Company, Inc. and Formosa Plastics
Corporation, U.S.A., Civil Action No. ED CVO6-0055-GW, United States District Court for
the Central District of California.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT AVAILABLE:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES -79 NO
General Manager
Richard H.5olbrig
Director5
��950 • w� � Chris Cefalu
�� n �l � P Jamee R.Jones
h a o L, Rand Vo el esan
V � v Y 9 9 9
�- �� �u b[�� l�t�i�ty D i 5-tr;c-� Kelly 5heehan
Eric 5chafer
1275 Meadaw CreSt Drive•5outh Lake tahae•CA 9�15U-7401
Phone 530 54�4-�474•�ax 530 541-0634•www.5tpud.u5
BOARD AGENDA ITEM
TO: Board of Directors
FROM: Paul Sciuto, Assistant General Manager/Engineer
MEETING DATE: June 19, 2014
ITEM - PROJECT NAME: Conference with Legal Counsel- Existing Litigation
REQUESTED BOARD ACTION: Direct Staff.
DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session
may be held for conference with legal counsel regarding existing litigation: Los Angeles County
Superior Court, Case No. BC459943, State of Nevada, et al. v. J-M Manufacturing, et al.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT AVAILABLE:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
-81-
General Manager
Richard H.Solbrig
• 195C1 • w /''''� Directors
C�`� �"'`��' n � /� ( f� ChriS Cefalu
V ;�< <��� James R.Jones
� �' � � r r Randy Vogelge5ang
�� �'u b!i c U�t�i i�Gy D i 5tri ct Kelly Sheehan
Eric 5chafer
1275 Meadow Crest Drive•South Lake Tahoe�CA 9615�-7401
f'hane 530 544--6474•�ax 530 541-0614*www.5tpud.u5
BOARD AGENDA ITEM
TO: Board of Directors
FROM: Richard Solbrig, General Manager
Paul Hughes, Chief Financial Officer
Nancy Hussmann, Human Resources Director
MEETING DATE: June 19, 2014
ITEM - PROJECT NAME: Closed Session- New Union MOU Contract Negotiations
REQUESTED BOARD ACTION: Direct Staff
DISCUSSION: Pursuant to Government Code Section 54957(a)/Conference with Labor
Negotiators re: Memorandum of Understanding with Stationary Engineers, Local 39.
Present at this Closed Session will be Agency Negotiators: Richard Solbrig/General
Manager, Nancy Hussmann/Human Resources Director, Pau� Hughes, Chief Financial
Officer.
SCHEDULE:
COSTS:
ACCOUNT NO:
BUDGETED AMOUNT AVAILABLE:
ATTACHMENTS:
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General
GENERAL MANAGER: YES �/L� _ _NO
CHIEF PINANCIAL OFFICER: YES NO