Loading...
07-09-15 Special Meeting =OVTH TqhOF � - -- :�-=" '- = e� A(�e<�r ' 1950 ' �9� �j UTILITY DI'�� SOUTH TAHOE PUBLIC UTILITY DISTRICT NOTICE OF SPECIAL BOARD MEETING Thursday, July 9, 2015 - 9:00 A.M. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Richard Solbrig, General Manager Shannon Cotulla, Assistant General Manager Randy Vogelgesang, President BOARD MEMBERS Kelly Sheehan, Vice President Chris Cefalu, Director James R. Jones, Director Duane Wallace, Director 1. CALL SPECIAL MEETING TO ORDER �At this time, please silence phones and other electronic devices so as not to disrupt the business of the meeting.) 2. PUBLIC COMMENTS (An opportunity will be provided at this time if inembers of the public would like to comment on any item listed below.Three minute limit.) 3. ITEMS FOR BOARD ACTION a. 2015 Luther Pass Pump Station Power and Control Project ��uiie Ryan, Principal Engineer) Award contract for the project to the lowest responsive, responsible bidder. 3. ADJOURNMENT (The next Regular eoard Meeting is July 16,2015,at 2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and ihird Thursday of each month.A complete Agenda packet is available for review at the meeting and at the District office during the hours of 8:00 a.m.and 5:00 p.m., Monday through Friday.A recording of the meeting is retained for 30 days after Minutes of the meeting have been approved. Items on the Agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear.Designated times are for particular items only.Public Hearings will not be called to order prior to the time specified, but may occur slightly later than the specified time. Public participation is encouraged.Public comments on items appearing on the Agenda will be taken at the same time the Agenda items are heard;comments should be brief and directed to the specifics of the item being considered.Please provide the Clerk of the Board with a copy of all written materials presented at the meeting.Comments on items not on the Agenda can be heard during"Comments from the Audience;"however,action cannot be taken on items not on the Agenda. Backup materials relating to an open session item on this Agenda,which are not included with the Board packet,will be made available for public inspection at the same time they are distributed or made available to the Board,and can be viewed at the District office,at the Board meeting and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities.Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings.If particular accommodations are needed,please contact the Clerk of the Board at(530) 544-6474,extension 6203.All inquiries must be made at least 48 hours in advance of the meeting. 6eneral Manager Richard H.5olbrig � • 1950 • w Directore 8� O �� a o e GhriS Cefalu Jamee R.JoneS �, �` Randy Vogelgeeang I'u b 1 i c U ti I ity D i 5tri�t Kelly 5heehan Duane Wallace 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 54�4-6474•Fax 530 541-06i4•WWw.StpUG#.U5 BOARD AGENDA ITEM TO: Board of Directors FROM: Julie Ryan, Principal Engineer MEETING DATE: July 9, 2015 ITEM- PROJECT NAME: 2015 Luther Pass Pump Station Power and Control Project REQUESTED BOARD ACTION: Award contract for the project to the lowest responsive, responsible bidder. DISCUSSION: On Wednesday, June 17, 2015, three general contractors attended the mandatory pre-bid meeting for the above project. The work included in this project primarily includes replacement and upgrade of existing electrical, instrumentation and control systems at the Luther Pass Pump Station. (1) The District held a p�blic opening of electronic bids at the District office on Wednesday, July 1, 2015, at 4:00 p.m.Three bids were received, ranging from $3,749,250 to $4,752,900, as detailed in the attached summary. The Engineer's estimate for this project is $3,875,000. After subtracting the value of the alternative bid items (not considered in the award of the bid), Vinciguerra Construction is the apparent low bidder. Staff is in the process of reviewing the three lowest bids for conformance with bidding requirements, including Disadvantaged Business Enterprise (DBE) Good-Faith Effort. Staff will provide analysis and recommendation for bid award at the Board Meeting. SCHEDULE: As soon as possible COSTS: $3,749,250 ACCOUNT NO: 1029-8330/LPPOWR ($3,641,750); 1029-8626 ($107,500) BUDGETED AMOUNT AVAIIABIE: Project funded with a SWRCB SRF Loan ATTACHMENTS: Bid Results CONCURRENCE WITH REQUESTED ACTION: CATEGORY:Sewer GENERAL MANAGER: YES . NO CHIEF FINANCIAL OFFICER: YES NO BID RESULTS FOR REBID 2015 LUTHER PA55 PUMP STATION POWER AND CONTROLS PROJECT Bid Due on July 1,2015 4:00 o'clock PM Exported on 07/02/2015 Vinciguerra Construction Thomas Haen Company,Inc. Koch&Koch Unit of Item No. Description Measure Qnty Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total SCHEDULE A:LUTHER PASS PUMP STATION Mobilization and Demobilization(NOTE: Lump sum figure cannot exceed 10 percent of the total cost of the total bid,excluding 1 this item.) LS 1 $250,000.00 $250,000.00 $155,840.00 $155,840.00 $300,000.00 $300,000.00 2 Temporary BMP's LS 1 $10,000.00 $10,000.00 $11,350.00 $11,350.00 $8,500.00 $8,500.00 3 Shoringand WorkerSafety LS 1 $2,500.00 $2,500.00 $2,000.00 $2,000.00 $27,000.00 $27,000.00 4 Dewatering LS 1 $10,000.00 $10,000.00 $500.00 $500.00 $20,000.00 $20,000.00 5 Sitework and improvements site grading LS 1 $159,000.00 $159,000.00 $89,075.00 $89,075.00 $388,000.00 $388,000.00 Pump Station Mechanical Structural 6 modifications LS 1 $515,000.00 $515,000.00 $522,300.00 $522,300.00 $800,000.00 $800,000.00 7 Electrical Building LS 1 $400,000.00 $400,000.00 $418,240.00 $418,240.00 $642,000.00 $642,000.00 8 Electrical Systems LS 1 $1,300,000.00 51,300,000.00 $1,196,000.00 $1,196,000.00 $1,392,000.00 $1,392,000.00 9 Instrumentation and Control Systems LS 1 $620,000.00 $620,000.00 $747,800.00 $747,800.00 5790,000.00 $790,000.00 10 Electrical and Instrumentation Trenches LS 1 $104,000.00 $104,000.00 $252,340.00 $252,340.00 $40,000.00 $40,000.00 Hazardous Materials Abatement--"Lead 11 Paint Material" LS 1 $5,000.00 $5,000.00 $500.00 $500.00 $18,000.00 $18,000.00 Hazardous Materials Abatement-"PCB and 12 Mercury Material" LS 1 $2,500.00 $2,500.00 $100.00 5100.00 $13,500.00 $13,500.00 13 Electrical Demolition l5 1 $35,000.00 $35,000.00 $97,810.00 $97,810.00 $35,000.00 $35,000.00 14 Unknown Underground Conditions LS 1 $100,000.00 $100,000.00 $100,000.00 $500,000.00 5100,000.00 $100,000.00 15 Landscape Revegetation LS 1 $10,000.00 $10,000.00 $4,000.00 $4,000.00 $13,500.00 $13,500.00 16 Pavement Restoration SF 650 $15.00 $9,750.00 $11.50 $7,475.00 $26.00 $16,900.00 Subtotal $3,532,750.00 $3,605,330.00 $4,604,400.00 SCHEDULE B:WASTEWATER TREATMENT PLANT 17 Mobilization and Demobilization(NOTE:Lum LS 1 $10,000.00 $10,000.00 $400.00 $400.00 $2,900.00 $2,900.00 18 Temporary BMP's LS 1 $7,500.00 $7,500.00 $200.00 $200.00 $1,300.00 $1,300.00 19 Shoringand WorkerSafety LS 1 $5,000.00 $5,000.00 $10.00 $10.00 $1,000.00 $1,000.00 20 Transformer Replacement LS 1 $85,000.00 $85,000.00 $109,285.00 $109,285.00 $63,000.00 $63,000.00 Subtotal $107,500.00 $109,895.00 $68,200.00 SUBTOTAL FOR BID AWARD: $3,640,250.00 $3,715,225.00 $4,672,600.00 ALTERNATE BID ITEMS:SCHEDULE A 21 8"Full-Port Ball Valves EA 2 $7,500.00 $15,000.00 $11,050.00 $22,100.00 $4,500.00 $9,000.00 22 10"Full-Port Ball Valves EA 2 $10,000.00 $20,000.00 $22,950.00 $45,900.00 $8,500.00 $17,000.00 23 8"Nozzle-Type Non-Slam Check Valves EA 2 $15,000.00 $30,000.00 $20,744.00 $41,488.00 $11,500.00 $23,000.00 24 10"Nozzle-Type Non-Slam Check Valves EA 2 $20,000.00 $40,000.00 525,710.50 $51,421.00 $14,500.00 $29,000.00 25 3"Full-Port Ball Valves EA 2 $2,000.00 $4,000.00 $2,600.00 $5,200.00 $1,150.00 $2,300.00 Subtotal $109,000.00 $166,309.00 $80,300.00 CONTRACT TOTAL $3,749,250.00 $3,881,334.00 $4,752,900.00