Loading...
AP 12-17-15 CPI/WI OVTH TARO CT� er ' 1850 • Ws SOUTH TAHOE PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING AGENDA Thursday, December 17, 2015 - 2:00 P.M. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Richard Solbrig, General Manager Shannon Cotulla,Assistant General Manager Randy Vogelgesang, President BOARD MEMBERS Kelly Sheehan,Vice President Chris Cefalu, Director James R. Jones, Director Duane Wallace, Director 1. CALL TO ORDER REGULAR MEETING-PLEDGE OF ALLEGIANCE(At this time,please silence phones and other electronic devices so as not to disrupt the business of the meeting.) 2. COMMENTS FROM THE AUDIENCE (This is an opportunity for members of the public to address the Board on any short non-agenda items that are within the subject matter jurisdiction of the District.No discussion or action can be taken on matters not listed on the agenda,per the Brown Act. Each member of the public who wishes to comment shall be allotted five minutes, and no more than three individuals shall address the same subject.) 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR (For purposes of the Brown Act,all Action and Consent items listed give a brief description of each item of business to be transacted or discussed. Recommendations of the staff,as shown,do not prevent the Board from taking other action.) 4. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and casidered separately upon request.Comments and questions from members of the public,staff or Board can be taken when the comment does not necessitate separate action.) 5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION /ACTION 6. PRESENTATION Board President Appreciation 2015 7. ITEMS FOR BOARD ACTION a. Election of Board Officers (Melonie Guttry, Executive Services Manager/Clerk of the Board) Pg. 13 Elect a Board President for 2016 Calendar Year. b. Election of Board Officers (Melonie Guttry, Executive Services Manager,Clerk of the Board) Pg. 15 Elect a Board Vice President for 2016 Calendar Year. c. Water System Reliability, Fire Flow and Water Quality Improvement Project (John Thiel, Engineering Department Manager) Pg. 17 Authorize Task Order No. 4 to West Yost Associates in the amount of$96,400, for engineering consulting services. REGULAR BOARD MEETING AGENDA- December 17,2015 PAGE-2 3 d. Keller-Heavenly Water System Improvements Project (Trevor Coolidge,Associate Engineer) Approve Contract for Farr West Engineering to provide engineering services to complete an alternatives evaluation for the Keller-Heavenly Water System Improvements Project for an amount not to exceed $100,000. Pg.23 e. Customer Service Department Staffing (Tim Bledsoe,Manager of Customer Service) Pg.35 Authorize staff to hire one full-time, limited term Meter Technician and one full-time, limited term Customer Service Representative. f. Self-Insured Dental Plan Renewal for 2016 (Nancy Hussmann, Human Resources Director) Pg.39 1) Approve renewal of the Self-Insured 2016 Dental Plan with a funding level of$148.14 per employee per month; and 2) Approve the 2016 COBRA Dental rates at$54.15 Single; $108.30 Employee +1; and $184.10 Family. g. ACWA-JPIA Medical Insurance Renewal Rates (Nancy Hussmann, Human Resources Director) Information Only-No Action Needed Pg.43 h. 2016 Washington, D.C. Legislative Advocacy (Shannon Cotulla,Assistant General Manager) Authorize extension of contract with ENS Resources, Inc., in the amount of$81,794, for the Calendar Year 2016. Pg.45 Approve Payment of Claims (Debbie Henderson,Accounting Manager) Pg.53 Approve Payment of Claims in the amount of$1,314,257.36 j. General Manager Contract Renewal (Nancy Hussmann,Human Resources Director) Pg.67 Approve the three-year contract for General Manager 8. STANDING AND AD-HOC COMMITTEE REPORTS (Discussions may take place;however,no action will be taken.) 9. BOARD MEMBER REPORTS (Discussions may take place;however,no action will be taken.) 10. EL DORADO COUNTY WATER AGENCY PURVEYOR REPORT 11. GENERAL MANAGER REPORT (Discussion may take place;however,no action will be taken.) a. ACWA Annual Membership b. Meters Loan 12. STAFF/ATTORNEY REPORTS (Discussions may take place; however,no action will be taken.) a. Water Conservation Program Update (Donielle Morse,Water Conservation Specialist) b. TVS Basin GWMP SAG Update (Ivo Bergsohn, Hydrogeologist) 13. NOTICE OF PAST AND FUTURE MEETINGS/EVENTS Past Meetings/Events 12/03/2015-2:00 p.m. Regular Board Meeting at the District 12/16/2015-9:00 a.m.Tahoe Valley South Stakeholders Advisory Group Groundwater Management Plan Meeting at the District Future Meetings/Events 12/24/2015 and 12/25/15-Christmas Holidays-District Office Closed 01/01/2016-New Year Holiday-District Office Closed 01/07/2016 2:00 p.m. Regular Board Meeting at the District REGULAR BOARD MEETING AGENDA- December 17,2015 PAGE-3 14. CLOSED SESSION (The Board will adjourn to Closed Session to discuss items identified below.Closed Session is not open to the public;however,an opportunity will be provided at this time if members of the public would like to comment on any item listed-three minute limit.) a. Pursuant to Section 54956.9(a) of the California Government code, Closed Session may be held for conference with legal counsel regarding existing litigation: False Claims Act Case: United States, the States of California, Delaware, Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix v. J-M Manufacturing Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06-0055-GW, United States District Court for the Central District of California. Pg.77 b. Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Los Angeles County Superior Court, Case No. BC459943, State of Nevada, et al.v. J-M Manufacturing, et al. Pg.79 C. Pursuant to Section 54957 of the California Government Code, Closed Session may be held regarding public employee evaluation for unrepresented employee position- General Manager Pg.81 ACTION REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION ADJOURNMENT (The next Regular Board Meeting is Thursday,January 7,2016 at 2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month.A complete Agenda packet is available for review at the meeting and at the District office during the hours of 8:00 a.m.and 5:00 p.m.,Monday through Friday. A recording of the meeting is retained for 30 days after Minutes of the meeting have been approved.Items on the Agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear.Designated times are for particular items only.Public Hearings will not be called to order prior to the time specified,but may occur slightly later than the specified time. Public participation is encouraged.Public comments on items appearing on the Agenda will be taken at the same time the Agenda items are heard;comments should be brief and directed to the specifics of the item being considered.Please provide the Clerk of the Board with a copy of all written materials presented at the meeting.Comments on items not on the Agenda can be heard during"Comments from the Audience;"however,action cannot be taken on items not on the Agenda. Backup materials relating to an open session item on this Agenda,which are not included with the Board packet,will be made available for public inspection at the same time they are distributed or made available to the Board,and can be viewed at the District office,at the Board meeting and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities.Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings.If particular accommodations are needed,please contact the Clerk of the Board at(530) 544-6474,extension 6203.All inquiries must be made at least 48 hours in advance of the meeting. REGULAR BOARD MEETING AGENDA-December 17,2015 PAGE-4 -10 90°1H TAH0I�` mer • 1950 • 44 006 (IC 1� SOUTH TAHOE PUBLIC UTILITY DISTRICT CONSENT CALENDAR December 17, 2015 ITEMS a. TRPA MITIGATION PAYMENT (Debbie Henderson,Accounting Manager) Pg. 1 Authorize Payment to TRPA in the amount of$37,064, for 5%mitigation fee on new sewer connections. b. WATER METER INSTALLATION PROJECTS r 'ria( (Julie Ryan,Principal Engineer) Pg.3 Extend contract with Blue Ribbon Personnel Services in the amount of$15,000, for a temporary Water Meter Installation Coordinator. c. LIABILITY CLAIM AGAINST SOUTH TAHOE PUBLIC UTILITY DISTRICT RECEIVED FROM NORMAN AND BETTY HAGEN (Tim Bledsoe,Manager of Customer Service) Pg.5 Reject claim against the District in the amount of$10,000+ for damages to Norman and Betty Hagen's driveway at 1086 Nottaway Drive. d. PRIMARY CLARIFIER 2/AERATION BASIN 1 REHABILITATION PROJECT (Stephen Caswell,Senior Engineer) Pg.7 Approve Change Order No. 1 to Farr Construction California, dba Resource Development Company in the amount$68,688.94. • 1950 •A+ 7OUtfla hoe Directory Cefalu ►-- _...iii* Jams R.Jones ang Public Utility District Randy ells ShVogelgeehan Kelly Sheehan Duane Wallace I 1275 Meadow Crest prive•South Lake Tahoe•CA 96150-7401 Phone 530 544-6474•Fax 530 541-0614•www etpud.u5 BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Debbie Henderson, Accounting Manager MEETING DATE: December 17, 2015 ITEM- PROJECT NAME: TRPA Mitigation Payment REQUESTED BOARD ACTION: Authorize Payment to TRPA in the amount of$37,064 for 5% mitigation fee on new sewer connections. DISCUSSION: Per the 1995 signed MOU between TRPA and numerous agencies, including South Tahoe Public Utility District, Section D ii requires the District to pay 5%of all new connection fees on or before December 31st of the year in which the connections have been made. SCHEDULE: Annual COSTS: 2015/16$37,064 ACCOUNT NO: 1000-2606/1000-6634 BUDGETED AMOUNT REMAINING: $60,000 ATTACHMENTS: TRPA Mitigation Report December 2014- November 2015 CONCURRENCE WITH REQUESTED ACTION:�� CATEGORY: Sewer !lZ GENERAL MANAGER: YES 74,1 NO CHIEF FINANCIAL OFFICER: YES NO -1- Alk TRPA Mitigation Report: Dec.2014-Nov.2015 � t w �: r x,"# 'i -: ».gym'1 1. av+:¢sr.+7 ,y.,: z N �� December-14 0 0.00 0.00 $0.00 January-15 0 0.00 0.00 $0.00 February-15 0 0.00 0.00 $0.00 March-15 0 0.00 0.00 $0.00 April-15 0 0.00 0.00 $0.00 May-15 11 211,990.00 10,599.50 $10,599.50 June-15 7 119,290.00 5,964.50 $16,564.00 July-15 5 97,180.00 4,859.00 $21,423.00 August-15 5 91,800.00 4,590.00 $26,013.00 September-15 8 125,860.00 6,293.00 $32,306.00 ' October-15 6 95,160.00 4,758.00 $37,064.00 November-15 0 0.00 0.00 $37,064.00 . : —2— • 1960 • Directors ittbor SoutTahoe Chris Cefalu P w-. / James It Jones f Randy Vogelgesang '1` ) public Utility District Kelly Sheehan Duane Wallace 1275 Meadow Greet Drive•South Lake Tahoe•CA 96150-7401 Phone 530 544-6474•Fax 530 541-0614•www.stpud.ue BOARD AGENDA ITEM 4b TO: Board of Directors FROM: Julie Ryan, Principal Engineer MEETING DATE: December 17, 2015 ITEM- PROJECT NAME: Water Meter Installation Projects REQUESTED BOARD ACTION: Extend contract with Blue Ribbon Personnel Services in the amount of$15,000 for a temporary Water Meter Installation Coordinator. DISCUSSION: On March 19, 2015, the Board approved a contract in the amount $30,000,with Blue Ribbon Personnel Services for a temporary Water Meter Installation Coordinator to assist engineering staff with inspection, public outreach, utility location, and coordination functions; that allotment was recently exhausted. Subsequently, on November 19, 2015, the Board approved recruitment of a limited term Water Meter Installation Coordinator, and the Engineering Department is working toward filling that position by April 2016. In the interim, there is additional work to be performed in preparation for the next construction season. To bridge the gap, staff requests that the Board authorize staff to extend the existing purchase order with Blue Ribbon by$15,000 to continue the temporary coordinator until the new position can be filled. SCHEDULE: ASAP COSTS: $15,000 ACCOUNT NO: 2029-8660 BUDGETED AMOUNT AVAILABLE: $151,553 ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES /pi I NO CHIEF FINANCIAL OFFICER: YES NO —3— r rcrnara n.uurvny • Directors � �� ---- Chris Cefalu / South a o e James IZ.is Jones ;, y E Randy Vogelgesang - `�` Public Utility District Kelly Sheehan Duane Wallace 1 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 54+6474•Fax 530 5410614•www.stpud.us BOARD AGENDA ITEM 4c TO: Board of Directors FROM: Tim Bledsoe. Manager of Customer Service MEETING DATE: December 17, 2015 ITEM-PROJECT NAME: Liability Claim against South Tahoe Public Utility District received from Norman and Betty Hagen REQUESTED BOARD ACTION: Reject claim against the District in the amount of$10,000+ for damages to Norman and Betty Hagen's driveway at 1086 Nottaway Drive. DISCUSSION: Norman and Betty Hagen filed a claim against the District in the amount of $10,000+ for damages to their driveway. Carl Warren & Company investigated and discovered that South Tahoe Public Utility District repaired a water leak on the main line in front of 1086 Nottaway Drive, but there was no evidence of any damage to the customer's driveway. It has been recommended from Carl Warren & Company, insurance adjusters, to reject the claim. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT AVAILABLE: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION:TICATEGORY:Water GENERAL MANAGER: YES 4C.711 NO CHIEF FINANCIAL OFFICER: YES NO -5- i Directors _..- -. South Tahoe Chris Cefalu z,,. ...........„., James R Jones , _sr y � -� Randy Vogelgesang ` Public Utility District reliysheehan Duane Wallace 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 544-6474•Fax 530 541-0614•www.5tpud.us BOARD AGENDA ITEM 4d TO: Board of Directors FROM: Stephen Caswell, Senior Engineer MEETING DATE: December 17, 2015 ITEM-PROJECT NAME: Primary Clarifier 2/Aeration Basin 1 Rehabilitation Project REQUESTED BOARD ACTION: Approve Change Order No. 1 to Farr Construction California, dba Resource Development Company in the amount$68,688.94. DISCUSSION: Change Order No. 1 addresses three balancing quantities and eight work items that are beyond the scope of the contract. 1. During construction, it came to staff's attention that Aeration Basin 1 contained six pressure relief valves, instead of three as noted in the contract.The contract calls for all pressure relief valves to be replaced.South Tahoe Public Utility District (District) staff directed the contractor to purchase three additional relief valves. The additional work for purchasing and installing the additional relief valves was performed on a lump sum basis in the amount of$3,310.55. 2. During construction, District staff requested that the outlet baffles in Aeration Basin 1 be removed instead of coated as originally called for in the contract.The original costs for coating the baffles was credited to the District; however, removal required additional labor costs to grind and remove anchor bolts.The additional work was performed on a lump sum basis in the amount of$178.72. 3. It was brought to staff's attention that the Aeration Basin sidewalk was in poor condition and demolition as shown on the contract drawings would not be practical without significant increases in cost.The District worked with the contractor to develop an alternate plan for rehabilitation of the existing sidewalk.The rehabilitation work was done on a time and materials basis and combined with the original costs for the sidewalk repair resulted in a credit to the District in the amount of<$6,001.12>. —7— 4. District staff requested an additional stop plate be added to the Aeration Basin 1 influent channel to isolate out of service portions of the channel.The additional stop plate will eliminate stagnant water in this portion of the channel,which can be a source of odors.The additional work for purchasing and installing the additional stop plate was performed on a lump sum basis in the amount of $6,977.72. 5. During submittal review, it was brought to staff's attention that the pipe support for the new Aeration Basin 1 header was not constructible as shown on the plans. Staff and the design engineer directed the contractor to modify the pipe support.The additional work was performed on a lump sum basis in the amount of$13,357.53. 6. During construction, District staff identified spare wires in existing conduit that could be used to send the signals from the new clarifier drive to the PLC.The contract called for excavation, installation, and backfill for a new conduit for these signals.The District directed the contractor to use the existing wires and conduit resulting in a savings to the District in the amount of <$4,926.00>. 7. During sandblasting of the Primary Clarifier, District staff noticed dust clouds escaping the Primary Clarifier covers.These clouds were not substantial, but did raise concern with staff about potential emissions from sandblasting operations within the Aeration Basin which is not covered.Additionally, the coating that is to be applied to the Aeration Basin walls has specific environmental controls that must be maintained during application and curing.The District requested the contractor address these two concerns by covering the Aeration Basin and agreed to split the cost with the contractor.The additional work was performed on a lump sum basis and the District's portion is$7,077.00. 8. During construction,District staff noticed that the clarifier drive previously purchased by the District did not contain a torque potentiometer or transmitter as previously thought.The District directed the contractor to obtain and install the potentiometer and transmitter for the drive torque signals.The additional work was performed on a lump sum basis in the amount of$3,369.54. 9. The concrete spall repair and crack repair for Primary Clarifier 2 bid items of the contract were bid on a cost per unit price basis. As such, the actual installed quantities for these two bid items varied from the quantities bid. After removal of the existing coating in the Primary Clarifier launder, it was discovered that the underlying concrete required significant repair that could not have been known at bid time. Additionally, the coating manufacturer recommended repairing cracks of a smaller size than the contract required.The change order will adjust the contract quantities for these two items to reflect the installed quantities for a net cost to the District in the amount of$41,880.00. 10.The concrete coating for Primary Clarifier 2 bid item of the contract was bid on a cost per unit price basis. During construction, the District directed the contractor to coat more areas than were originally called for in the contract.The change order will adjust the contract quantity for this item to reflect the installed quantities for a cost to the District in the amount of$3,465.00. -8- Staff recommends that the Board approve Change Order No. 1 to the District's contract with Farr Construction in the amount$68,688.94.This Change Order No. 1 brings the contract total to $1,433,444.94.The engineer's estimate for construction was $2,000,000. SCHEDULE: As soon as possible COSTS: $68,688.94 ACCOUNT NO: 1029-8502/AB1 RHB, 1029-8521/PC2RHB BUDGETED AMOUNT AVAILABLE: $34,696; $39,837 ATTACHMENTS: Change Order No. 1 CONCURRENCE WITH REQUESTED ACTION:� CATEGORY:Sewer GENERAL MANAGER: YES /R /WEE!p NO ____,e __ CHIEF FINANCIAL OFFICER: YES NO -9- CHANGE ORDER NUMBER 01 Project: Primary Clarifier 2/Aeration Basin 1 Rehabilitation T," Project • �eroue. ��� (murf Contractor: Farr Construction California dba Resource Development Company Date: 12.17.2015 PO#: P28818 The Contract Shall Be Changed As Follows: A)Amend Additive Bid Item 14, including all labor, equipment, materials and subcontractor costs necessary to install 3 additional groundwater relief valves in Aeration Basin 1. This item addresses in full the additional work requested in the Official response to RFI 5 (dated August 5, 2015)for a total incremental cost of$3,310.55, as detailed in Contract Change Request#1 (attached). There is no change to the Contract Time related to this change in work. TOTAL FOR ITEM A IS $3,310.55 TOTALFORCHANGEORDERNO. 1 ISA+ B +C + D +E + F+ G + H + I +J + K= $68,688.94 Dollar Amounts Contract Time Original Contract $1,364,756.00 200 Calendar Days Previous Change Order $0.00 0 Calendar Days Current Contract $1,364,756.00 200 Calendar Days THIS CHANGE ORDER68,688.94 0 Calendar Days $ New Contract Total $1,433,444.94 200 Calendar Days Contractor agrees to make the herein-described changes in accordance with the terms hereof. The change in contract price and/or contract time noted is full settlement for costs incurred because of the change(s) described,unless specifically noted in individual description(s). Date: Authorized By STPUD Board President Date: Accepted By Contractor Date: Reviewed By -io- $)Amend Additive Bid Item 14, including all labor, equipment, materials and subcontractor costs necessary to remove instead of coat 4 effluent baffles in Aeration Basin 1. This item addresses in full the additional work authorized in Design Clarification #1 (dated July 22, 2015)for a total incremental cost of$178.72, as detailed in Contract Change Request#2 (attached).There is no change to the Contract Time related to this change in work. TOTAL FOR ITEM B IS $178.72 C)Amend Additive Bid Item 14, providing a credit to the District for all labor, equipment, materials, and subcontractor costs necessary to repair the Aeration Basin sidewalk. This item addresses in full the change in the work authorized in Design Clarification#3 (dated July 23, 2015)for a credit to the District in the amount of$6,001.12 as detailed in Contract Change Request#3 (attached). TOTAL FOR ITEM C IS <$6,001.12> D)Amend Additive Bid Item 14, including all labor, equipment, materials, and subcontractor costs necessary to add an additional stop plate in Aeration Basin 1.This item addresses in full the change in the work authorized in Design Clarification#11 (dated October 15, 2015) for a total incremental cost to the District in the amount of$6,977.72 as detailed in Contract Change Request#4(attached). TOTAL FOR ITEM D IS $6,977.72 E)Amend Additive Bid Item 14, including all labor, equipment, materials, and subcontractor costs necessary to provide the updated pipe supports in Aeration Basin 1. This item addresses in full the change in the work authorized in Design Clarification#12 (dated October 15, 2015)for a total incremental cost to the District in the amount of$13,357.53 as detailed in Contract Change Request#5(attached). TOTAL FOR ITEM E IS $13,357.53 F)Amend Additive Bid Item 12, providing a credit to the District for all labor, equipment, materials, and subcontractor costs necessary to delete the underground conduit installation for Primary Clarifier 2. This item addresses in full the change in the work authorized in Design Clarification#10 (dated October 7, 2015)for a credit to the District in the amount of $4,926.00 as detailed in Contract Change Request#6(attached). TOTAL FOR ITEM F IS <$4,926.00> G)Amend Additive Bid Item 3, including all labor, equipment, materials, and subcontractor costs necessary to provide a containment cover for Aeration Basin 1. This item addresses in full the change in the work authorized in Design Clarification#14(dated October 23, 2015) for a total incremental cost to the District in the amount of$7,077.00 as detailed in Contract Change Request#7 (attached). TOTAL FOR ITEM G IS $7,077.00 H)Amend Additive Bid Item 12, including all labor, equipment, materials, and subcontractor costs necessary to provide a torque potentiometer and transmitter for Primary Clarifier 2. This item addresses in full the change in the work authorized in Design Clarification#15 (dated October 30, 2015)for a total incremental cost to the District in the amount of $3,369.54 as detailed in Contract Change Request#8(attached). TOTAL FOR ITEM H IS $3,369.54 I)Amend Bid Item 8 to reflect an 85 sf increase in the Contract quantity for Repair spalls in Primarcy Clarifier 2 for actual work performed. At the Contract rate of$192.00 per square -11- foot, this increase in the Contract quantity results in a cost to the District in the amount $16,320.00 TOTAL FOR ITEM I IS$16,320.00 J)Amend Bid Item 10 to reflect a 426 if increase in the Contract quantity for Repair cracks in Primary Clarifier 2 for actual work performed. At the Contract rate of$60.00 per linear foot, this increase in the Contract quantity results in a cost to the District in the amount $25,560.00 TOTAL FOR ITEM J IS $25,560.00 K)Amend Bid Item 5 to reflect an 82.5 sf increase in the Contract quantity for Concrete Coatings in Primary Clarifier 2 for actual work performed. At the Contract rate of$42.00 per square foot, this increase in the Contract quantity results in a cost to the District in the amount$3,465.00 TOTAL FOR ITEM K IS $3,465.00 TOTALFORCHANGEORDERNO. 1 ISA+ B +C + D+ E + F+ G + H +I +J +K= $68,688.94 -12- nwnaI u i I.awvl iy — • 1950 • Directors %' �►A So ut o e Chris� Ta James R.Jones ; � sem. � Randy Vogelgesang - Public Utility district Kelly Sheehan Duane Wallace i 1275 Meadow Creat Drive*South Lake Tahoe*CA 96150-7401 Phone 530 544-6474•Fax 530 541-0614•www.stpud.ue BOARD AGENDA ITEM 7a TO: Board of Directors FROM: Melonie Guttry, Executive Services Manager/Board Clerk MEETING DATE: December 17, 2015 ITEM-PROJECT NAME: Election of Board Officers REQUESTED BOARD ACTION: Elect a Board President for 2016 Calendar Year DISCUSSION: This election is held in accordance with Board Policy 2050-1. The Board's Committees shall be appointed and publicly announced by the Board President at the January 7, 2016, regular Board Meeting. SCHEDULE: N/A COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: Policy 2050-1 CONCURRENCE WITH REQUESTED ACTION: CATEGORY:General GENERAL MANAGER: YES /OM NO _ieCHIEF FINANCIAL OFFICER: YES NO —13— South Tahoe Public Utility District 4 Board Policy Manual 2050.10 The annual organizational meeting shall take place the second meeting in December. At the annual meeting the Board shall elect a President and a Vice- President from among the members of the Board for the next calendar year. 2050.20 The President of the Board shall preside at all meetings of the Board, maintain order, review and approve the Board Agenda prior to its publication, enforce the rules of the Board at all meetings, sign all bonds, notes, titles, and leases and other legal instruments ordered to be executed by the Board, appoint all standing committees, ad hoc committees, and all special committees, unless otherwise ordered by a majority of the Board. 2050.30 In case of the resignation, absence, or disability of the President, the Vice- President shall perform the duties of the President. In case of the absence or disability of both the President and Vice-President, the Board shall choose a President pro tempore,who shall perform all of the duties of the President. 2050.31 When the President disqualifies himself from participating in an Agenda item or declares partisan in the debate on any item, the Vice President shall perform the duties of the presiding officer. 2050.40 The President shall have all the rights of any member of the Board, including the right to move,second, discuss, and vote on any and all questions before the Board. 2050.50 The President has the power to call Special Meetings and Emergency Meetings of the Board. -14- Directors • 1860 . South a /ojv)e James R.Jones �;Y ,,.,'.','.yrs a Randy Vogelgesang -`- ` ~'"" i'ublic Utility District Kelly Sheehan Duane Wallace - I 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 544-6474•Fax 530 541-0614•www.stpud.us BOARD AGENDA ITEM 7b TO: Board of Directors FROM: Melonie Guttry, Executive Services Manager/Board Clerk MEETING DATE: December 17, 2015 ITEM-PROJECT NAME: Election of Board Officers REQUESTED BOARD ACTION: Elect a Board Vice President for 2016 Calendar Year DISCUSSION: This election is held in accordance with Board Policy 2050-1. SCHEDULE: N/A COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: N/A CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES /Oa NO CHIEF FINANCIAL OFFICER: YES NO -15- .%lNIa,H I ,y i 1' 0 • Directors South Chris Cefalu mes RJonesa. Vogelgesang Public Utility District Kelly Sheehan Duane Wallace 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 5446474•Fax 530 541-0614•www.etpud.us BOARD AGENDA ITEM 7c TO: Board of Directors FROM: John Thiel, Engineering Department Manager MEETING DATE: December 17, 2015 ITEM-PROJECT NAME: Water System Reliability, Fire Flow, and Water Quality Improvement Project REQUESTED BOARD ACTION: Authorize Task Order No. 4 to West Yost Associates in the amount of$96,400,for engineering consulting services. DISCUSSION: The El Dorado County Water Agency (EDCWA) has approved funding for a number of planning projects,which were submitted by the District earlier this year for potential funding. One of these projects is the referenced project for system-wide reliability with fire flow, redundancy and water quality as major project components (see attached proposal from West Yost). The proposed work will be based on the District's water model,which was completed as part of the Water System Optimization Plan. West Yost will be using the model as a basis for evaluating system deficiencies and vulnerabilities, and also for developing project alternatives for system-wide improvements. At the culmination of the project, the District will have a complete picture of where hydrants,waterlines, and other system improvements are needed throughout our service area in order to provide various levels of service for fire flow. We will also have a plan to reduce systematic risk for large- scale and critical water outages by identifying projects to improve redundancy and limit probability and consequence of failure. West Yost will also use the model to evaluate water age and other water quality parameters throughout the system and provide a specific flushing sequence in selected areas to flush out sand and keep water fresher,while limiting the water loss that results from the flushing process. The total project amount approved by EDCWA is$120,000,which has a 50/50 match requirement. EDCWA requires that its portion of the project budget be utilized by consultants and not District staff time. The District can, and does, use its own staff time towards the match component. —17— 1 SCHEDULE: Upon Board Approval, to be completed by May 1, 2016. COSTS: Not to Exceed $96,400 ACCOUNT NO: 2029-4405 BUDGETED AMOUNT AVAILABLE: $94,773 ATTACHMENTS: Proposed Scope of Services from West Yost Associates CONCURRENCE WITH REQUESTED ACTION: CATEGORY:Water GENERAL MANAGER: YES XV NO CHIEF FINANCIAL OFFICER: YES NO -18- 0 WEST YOST 25 .,dmis YEARS ASSOCIATES 1990-2015 December 9,2015 SENT VIA: EMAIL Mr. John Thiel Engineering Department Manager South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe CA 96150 SUBJECT: Scope of Services — Water System Reliability, Fire Flow, and Water Quality Improvement Project Dear Mr. Thiel: At your request, West Yost Associates (West Yost) is pleased to provide the South Tahoe Public Utility District(District)with this scope of services to perform water system hydraulic modeling and analysis work using the District's existing water system hydraulic model to perform evaluations for system reliability,system redundancy,and water quality.The sections below detail the work requested and effort required to complete these evaluations. BASIC SCOPE OF WORK Below is the basic scope of work and proposed budget to be performed for the hydraulic model evaluations requested. Task 1 —System Fire Flow Evaluation The District has requested a system-wide evaluation of available fire flow including predicted fire flow at all locations for all pipe sizes; identification of customers not currently served by an effective hydrant per the District's Level of Service standards;and identification of where hydrants should be added and where pipeline installations or other system improvements are required. West Yost will use the District's hydraulic model to evaluate various fire flow demands (e.g., 500 gpm, 750 gpm, 1,000 gpm). West Yost will determine locations within the District's system which are currently deficient in hydrant spacing and make recommendations for additional hydrants and locations.The fire flow system evaluation will be used to help prioritize the order for installing the new hydrants.The evaluation will include reviewing locations with deficient hydrant spacing,evaluating available fire flow predicted using the hydraulic model,and determining areas that are a priority to improve public service, health and safety. The fire flow system evaluation will include identifying areas within the District's service area where available fire flow is low. West Yost will make recommendations for improving fire flow service to these areas using the hydraulic model to demonstrate the improved fire flow availability. 2020 Research Park Dave,Suite 100 Davis,CA 95618 _iI ne 530 756-5905 Fax 530 756-5991 westyost.com Mr.John Thiel December 9,2015 Page 2 A complete picture of the system's ability to provide fire flow to all areas will be developed and improvements needed to improve areas with low fire flow availability to meet Level of Service standards will be identified. Recommended improvements will be prioritized and planning level cost estimates will be prepared. Task 1 Deliverables West Yo',,t =:Ill pre"pyrr a is- memorar"drin' 'T',1; dr,,;'.1mso to ] t"c. res lits of the system fire hocevr-ilu1Lo" ,r t,'l v�,llIri�:!:1� reco� I �;;ndatons t �i � ( r ,. : hrydl )nts and other system mprokyct i„nts or(; rcriui 'e t 1 :. ;1'7_;111 assumpiJons Used for rjeterml'lllnn tecorlil iw nj it ans an I Icij );' _);i; iv prioritization for Improvement projects Task 2—Valve Criticality Evaluation The District has requested West Yost use the District's existing hydraulic model to help identify critical valves within the system. The District's service area has been expanded over the years by acquiring several small water companies. The inter-ties between these water companies did not always include a lot of redundancy which increases the risk of the District's customers being out of service should a valve or pipeline fail. West Yost will use the District's hydraulic model to identify additional areas at risk due to lack of redundant supply sources and/or lack of isolation valves.West Yost will work with the District to identify known areas that are at high risk of outage due to a valve or pipeline failure. In addition, West Yost will work with the District to develop a list of risk and consequence of failure factors to use for prioritizing the valve criticality to the system. Examples of the factors that may be considered for determining valve criticality prioritization are number and types of services impacted by an outage,capacity of a valve or pipeline. West Yost will make recommendations to improve the reliability and minimize impacts to the system based on the valve criticality evaluation.The recommendations will be made for the highest priority locations using the hydraulic model to confirm recommended improvements provide a reliable alternative for serving customers. Task 2 Delive abl(s West Yost v ! prep , ' It ar,rnenilnc to o' the .gal, cality evaluatl0 t The Tryl tAtll: ill,Iurl s s: rti)tl t ' Ill deli r illtlil l the ;) i 1',,- �,�rl ,111'; ‘1.1 provide a prioritized recotmnende 7 Pcofer t list Vriltri planning level cost estlrnates Task 3—Christmas Valley Zone Unidirectional Flushing Plan The District requested West Yost to prepare a unidirectional flushing (UDF) sequence for their Christmas Valley Pressure Zone. The District has received several complaints regarding sand in the system in this pressure zone. Over the years, the District has addressed the complaints of sanding by performing a traditional flushing in the area of the complaint.However,the traditional flushing has not solved the sanding issue. The District's hydraulic model has been developed in InfoWater for the WSOP Project and this software has an extension that allows for the development of unidirectional flushing sequences.The program produces individual maps for each sequence which detail which hydrant will be flowed,which valves need to be closed,which valves need to be opened, minimum time for flush, approximate flow expected, and velocity expected. West Yost has previously prepared sequences for approximately half of the Christmas Valley Zone through the WSOP.West Yost will prepare the sequence to flow water from the Christmas Valley WEST Y O S T ASSOCIATES _20— n\m\c\southsahoepud\Ip\102315_1 L • Mr. John Thiel December 9,2015 Page 3 Tank location through the remainder of the Christmas Valley Zone to flush the lines. West Yost will work with the District to confirm the sequences are adequate for their need and make a few alterations to the sequences if requested by the District. Task 3 Deliverables: West Yost will prepare a TM documenting the flushing sequen ;es and provide the District with procedures for performing the UDF sequences. Task 4—GIS Integration and Model Update West Yost recently updated the hydraulic model to reflect system improvements for several areas throughout the District's system. As the District continues to improve and replace pipelines throughout the system, the District wants the hydraulic model results to reflect recent improvements that have been made to the system and be consistent with the District's GIS. The model will be updated to correspond to GIS information.The model and GIS will be improved to include field test data by Lake Valley and the City of South Lake Tahoe fire departments. Task 4 Deliverables West work with the District to prepare procedu es ani ,,h--;:;z:.nF, for integrating the updates mace to e nydlaulic mode: features veto the D.y : o : (1,1".2. standards will include best pIacti';es to transfer information our o the tr,iitituJii noneriudti the vIC and also to add updates to the hydraulic model from the GIS. Task 5—Project Management and Meetings West Yost will provide project management-related activities including general project coordination with the District.Monthly invoices will be prepared that include brief descriptions of services performed under this scope of work, including schedule and budget adherence. West Yost will provide bi-weekly project progress check-ins with the District via conference calls. The conference calls will be used to update the District on the progress of the hydraulic evaluations, including work completed the previous weeks and work anticipated for the next weeks. West Yost will also conduct two in-person meetings with District staff. The first meeting will be used to gather information from District staff on the hydraulic model evaluations being performed, determine the priority of the evaluations, and receive input from District staff, including operations, on the areas of concern. The second meeting will be used to present results and recommendations of the evaluations to District staff. West Yost will also provide in-person training of District Staff and be available to answer questions as needed for model support. COMPENSATION West Yost will provide the above described scope of work for a not-to-exceed total budget of $96,400 billed on a time and materials basis, at the billing rates provided in Exhibit A. Table 1 summarizes estimated hours and budget for each task. WEST YOST ASSOCIATES -21— n\m\c\southtahoepud\Ip\102315_1 I. Mr. John Thiel December 9,2015 Page 4 Table 1. Estimated Level of Effort and Budget Summary Lr of Ffort Bache:. 7a_r �n:rw�rs (cli, rs Task 1 -System Fire Flow Evaluation 208 36,800 Task 2-Valve Criticality Evaluation 92 16,800 Task 3-Christmas Valley Zone Unidirectional Flushing Plan 84 15,000 Task 4-GIS Integration and Model Update 90 17,800 Task 5-Project Management and Meetings 52 10,000 Total 526 $96,400 We anticipate work will begin with the written notice to proceed,and our receipt of all requested information and input from the District.The evaluations have been set up as separate tasks to allow West Yost to prioritize evaluations based on the District's needs and provide TMs for each evaluation.We anticipate that work will be completed by May 2016. We look forward to assisting the District on this project. Please call me at(530)792-3250 if you have any questions or require additional information. Sincerely, WEST YOST ASSOCIATES FtLel Brenda J.Estrada,P.E. Project Manager BJE:lh WEST YOST ASSOCIATES -22- n\m\c\southtahoepud\Ip\102315_1 L 1.9 68 •• Southaoe Directors Chris Cefalu James R Jonesi-,. -44;,..%\...;.r—=e Randy Vogelgesang Public Utility District Kelly Sheehan Duane Wallace 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 544-6474•Fax 530 541-0614•www.stpud.us BOARD AGENDA ITEM 7d TO: Board of Directors FROM: Trevor Coolidge, Associate Engineer MEETING DATE: December 17, 2015 ITEM-PROJECT NAME: Keller-Heavenly Water System Improvements Project REQUESTED BOARD ACTION: Approve Contract for Farr West Engineering (Farr West) to provide engineering services to complete an alternatives evaluation for the Keller- Heavenly Water System Improvements Project for an amount not to exceed $100,000. DISCUSSION: The Keller Zone provides water to the area adjacent to and above the Boulder Lodge at the Heavenly Ski Resort. It is supplied by a high pressure main from the Keller Booster Pump Station that feeds two high elevation water tanks, before gravity feeding back into several subzones through a series of pressure reducing valves (PRV's), with one subzone intertied to the adjacent Heavenly pressure zone. The service area includes both resort and residential properties within an urban-forest interface. The existing tanks serving the Keller Zone were constructed in the 1960's without foundations or footings and are structurally vulnerable to a seismic event,while also subject to catastrophic failure as a result of rock hazards above. The Keller Zone is currently unable to meet the fire flow called for in the area and lacks system redundancy, due to reliance on a single booster pump station that does not have an emergency generator. There are numerous options available to the District to address the concerns over redundancy, reliability, supply, and public safety,so staff has identified the need for an alternatives evaluation prior to commencing with design. The alternatives evaluation will study and provide recommendations on rock fall mitigation measures at the existing tank site, alternative tank sizes and locations, booster pump, intertie(s) to the Heavenly Zone, and PRV options. Due to proximity to the Heavenly ski area as both a major customer and potential tank site alternative, it is also anticipated that the evaluation will take into account potential future water demand for snow making. To aid in the identification and selection of a preferred alternative, staff developed a request for proposal (RFP). On October 19, 2015, the Keller-Heavenly Water Systems Improvements RFP was advertised with a November 16, 2015, proposal deadline. During the advertising period, the District received strong interest in the RFP and was visited by seven different consultants from as far away as Washington State,with each -23- firm ultimately submitting a proposal for engineering services. Proposals covered the proposer's approach to evaluation, design, and construction,with detailed scope and man hour estimates for the evaluation phase. To evaluate the proposals, a review committee was formed with members from Engineering and Field Operations staff. Based on the District's established proposal review process, Farr West was identified as the preferred consultant. Farr West was notified on December 3, 2015, of their ranking as the top rated firm and District staff then reviewed the proposed scope and allocation of hours with the firm to ensure that the District's expectations were clear and could be met within the proposed scope of services and budget, as attached. Farr West's task order includes: • Data collection and review of existing studies and references • Development of evaluation criteria • Development of project alternatives • Hydraulic modeling of project alternatives • Preliminary geotechnical and rock fall analysis of existing and alternative site(s) • Development of alternative analysis technical memo and 10%design drawings • Project management, coordination, and workshops Farr West has an existing Master Services Agreement (MSA) with the District and is available to begin work immediately. Work will be performed on a time and materials basis not to exceed $100,000, as a new task order under the existing MSA.The alternatives evaluation will be completed by June 30, 2016, to meet an El Dorado County Water Agency funding deadline,which is providing a portion of the funding. Upon completion of the proposed scope of work, staff will evaluate the proposed alternatives and recommend a preferred project for design and construction. Staff intends to request an amendment to the Farr West Contract in 2016, for design and permitting of the preferred alternative to upgrade the Keller and Heavenly pressure zones. SCHEDULE: December 18, 2015, through June 30, 2016 COSTS: $100,000 ACCOUNT NO: 2029-7022/15W007 BUDGETED AMOUNT AVAILABLE: ATTACHMENTS: Scope of Work and Fee Estimate CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES 4 7).1 NO CHIEF FINANCIAL OFFICER: YES NO -24- FARR WEST ENGINEERING December 11,2015 Trevor Coolidge,P.E. Associate Engineer South Tahoe PUD 1275 Meadow Crest Drive South Lake Tahoe,CA 96150 RE: SCOPE OF WORK - SOUTH TAHOE PUBLIC UTILITY DISTRICT KELLER-HEAVENLY WATER SYSTEM IMPROVEMENTS PHASE 1 Dear Trevor, Farr West Engineering (Farr West) appreciates the opportunity to continue its efforts to assist the South Tahoe Public Utility District (District) with the District's Keller-Heavenly Water System Improvements Project (Project). The primary purpose of the Project is to evaluate the various water supply and storage alternatives, and identify a preferred water supply project for the District to correct the current public safety, fire flow, system reliability,and redundancy deficiencies. This project includes three distinct phases;however,only Phase I is included in this SOW: • Phase I—Alternatives evaluation(current contract) • Phase II—Design(contract after completion of Phase I) • Phase III—Construction(contract after completion of Phase I) The approach for Phase I—Alternatives Evaluation,will evaluate the feasible water supply options and develop a preferred alternative, project description, and opinion of probable cost. As it is currently written, this phase would include performing a detailed ranking and evaluation of supply and storage alternatives. In the end, a preferred water supply project and its associated components would be recommended, and a detailed project description would be prepared. This would put the District in position to move forward with the environmental permitting process and design. Phase II—Design,will include the focused efforts towards the complete detailed design of the selected project alternative from Phase I, including, but not limited to, survey, design drawings, specifications, permitting assistance,subsurface exploration,opinion of probable cost,and bidding assistance. Phase III—Construction,will include providing assistance to the District with efforts including,but not limited to,pre-construction activities,construction management,and completing record drawings. GOALS AND OBJECTIVES The overall project goals are: • Define water supply and storage alternatives that will identify a sampling of feasible projects to the District addressing the current deficiencies; • Complete preliminary property, environmental, and regulatory assessments necessary for each alternative to understand efforts during design,and 5442 Longley Lane,Suite A•Reno,Nevada 89511 •(775)851-4788 www.farrwestengineering.com —25— December 9,2015 Scope of Work—Keller-Heavenly Water System Improvements,Phase 1 • Develop an evaluation format that encompasses pertinent factors for the District's selection. Farr West will provide continual project management for Phase I that will include coordination with staff and consultants,management of the project scope,budget and schedule,as well as preparing and submitting monthly invoices and project update summaries. These project management tasks will continue throughout the duration of the project. Descriptions of the tacks to be performed as part of Phase 1 are detailed below. TASK 1: DATA COLLECTION AND REVIEW Farr West has collected initial data(during the proposal stage) from the District to gain an understanding of the performance and condition of existing facilities within the project area. Farr West will work with the District to gather additional pertinent data and reporting needed to complete the alternatives evaluation, permitting, and final design. The objective of this task is to obtain a clear understanding of current system conditions. A number of data sources will be used in this effort,including: • 2013 Rockfall Hazard Assessment for Keller Tanks Site(provided by District). • 1991 Heavenly Aerial Topo Survey(provided by District). • Draft 2015 Water System Optimization Plan(provided by District). • 2015 Critical Waterline Evaluation Report(provided by District). • 2012 STPUD Waterline Replacement Planning(provided by District). • Current STPUD Water System Model(to be provided). Further review of data and collaboration with the District during this task may result in additional alternatives to be included in the evaluation. Deliverables/Action Items • None TASK 2: ALTERNATIVES EVALUATION Alternatives Analysis The District has previously identified three alternatives, and Farr West has identified(within the proposal)two additional alternatives that are to be evaluated. This SOW assumes for one additional alternative to be evaluated for a total of six(6)alternatives to be evaluated. If further analyses of alternatives,not identified,are deemed to be feasible, they would be further evaluated in this Phase and incorporated into the overall alternatives evaluation. The scope of Phase I would be modified,as necessary,to accomplish these additional efforts. Evaluation Criteria: Farr West will begin this task by identifying the potential water system improvement alternatives. This will also include recommendations or alternatives that the District would prefer being incorporated. This process includes an interactive decision making workshop with District staff to develop a basis of design criteria for the alternatives. The design criteria will be conformed into a matrix type evaluation table and used to evaluate, rank,and ultimately select the preferred water supply and transmission alternative. This process results in a fair and unbiased assessment of alternatives,and ultimately a well-defined project. Evaluation factors will include the prioritized design criteria as well as other key factors identified during this process. An outline of the recommended evaluation criteria and Farr West's "first cut" at the relative Page 2 of 8 —26— December 9,2015 Scope of Work—Keller-Heavenly Water System Improvements,Phase 1 importance of these criteria will be provided to the District prior to the workshop. Examples of key factors to be considered in the comparison include: • Capital costs • O&M costs • Location of facilities • Complexity and operator attention • Access to facilities for day to day O&M • Constructability • Land acquisition and easements • Timing and implementation • Financing • Integration into existing system • Community acceptance/opposition • Permitting complexity • Consistency with Level of Service(LOS)criteria • Other factors from the District's Optimization Plan will be integrated into the criteria The purpose of this effort is to identify and describe the design criteria that will be used to evaluate,rank, and select the preferred water supply and transmission options. The Farr West team will develop a preliminary list of design criteria,which will then be reviewed in detail with District staff. The design criteria will be broken down into categories based on the type of issues/topics to which they pertain. Examples of this include: • Operations and Maintenance —These criteria address factors that affect the day to day operation and maintenance of the facilities,as well as O&M costs; • Engineering—These criteria address design capacity,production well design,transmission main design and construction constraints and challenges,regulatory compliance,capital costs; • Environmental Permitting—These criteria address and consider issues related to the CEQA permitting process that will need to be addressed as part of the project, and should be considered early in the evaluation and comparison process,and • Public Outreach—These criteria acknowledge and consider the potential sensitivity and concerns of the general public and stakeholders throughout the region which may require outreach and education to communicate the benefits and potential impacts of the project. This task is important to establish the preferences and ultimate objectives for the new facilities with District personnel to ensure that those criteria are incorporated in the final project. Other criteria will be identified as the project moves forward. Feedback from the District is critical in establishing and prioritizing the most important aspects of the project to the District. Modeling: Farr West will collect the District's current water system model, in InfoWater. It is assumed that the model is "turn-key" and no efforts towards loading, calibration, or other preparatory operational measures will be required prior to efforts in this task. Farr West will analyze each project alternative within the model to determine its effects on the system and ensure that all District general water system performance requirements are being met. Fan:West's team will engage in innovative approaches to each model to understand the existing system and zone behaviors,and determine if modifications can be made in efforts to allow for improvements to the current Keller zone deficiencies. Page 3 of 8 —27— i + December 9,2015 Scope of Work—Keller-Heavenly Water System Improvements,Phase 1 Additional Analysis: Per the request of the District,a line item for additional analysis has been incorporated into this SOW. Efforts under this line item include analysis of additional items within the system model that are identified and directed by the District's user group. These efforts will be performed, as directed, on a time and material basis not to exceed$21,960,as identified in the attached fee estimate. Geotechnical and Rockfall Analysis In conjunction with Farr West's efforts, our sub-consultants (CME and Kane Geotech) will be performing preliminary geotechnical evaluations based on existing reports,literature review,and local experience. In depth geotechnical and rockfall analysis for the two tank sites will be perfonned in Phase 2. The Keller booster pump station will receive a literature review. These efforts are further detailed below. Keller Tank Site: The primary design issue is rock fall potential upslope from the tank site. It is also understood that USFS owns the property upslope from the tanks and approval from the USFS including environmental studies could be required prior to the construction of rockfall protection improvements. HDR previously conducted a rockfall potential investigation for the District at the Keller Tank Site. It was concluded that seismically induced rockfall is a significant hazard. Rockfall could significantly damage both existing water tanks and/or impact structures located downslope from the tanks. It was determined from our preliminary review of the existing report that many factors were not investigated, could be considered differently,and resultant information was not presented. Due to the potential of snowpack, difficulties accessing the sites, and per the District's request, a complete rockfall analysis and geotechnical refraction investigation will not be possible to complete within the Phase 1 schedule completion date. Therefore, these efforts will be completed during Phase 2. Consequently, it is recommended to utilize the results from the HDR investigation to determine potential rockfall mitigation construction strategies. As the rockfall mitigation will likely be a primary issue in determining if the tank will be relocated,this investigation will initially be completed early Phase 1. An opinion of probable cost will also be presented to these mitigation strategies. The mitigation options for both geotechnical and rockfall will be presented to the District with a range of costs; however, until a complete investigation is conducted, these estimated costs will (and should) be considered preliminary. Other design/construction issues: • The existing tank pad site likely cannot be widened to accommodate either a one larger tank to replace the existing two water tanks or to build a new tank near the existing tanks. The replacement tanks will likely have to be constructed in the similar footprint as the existing tanks. • The access roadway to the existing water tanks is narrow and,unless widened,may not allow access for construction equipment. • Geologically,the existing tank pad site is located on a combination of in-cut granitic bedrock,classified as a granodiorite of Cretaceous age, and fill soils. Placement history of the existing fill soils is likely unknown. Consequently, if the new tank footprint is placed onto these fill soils, analysis of possible differential settlement will have to be completed. Removal of these fill soils and replacement with structural fill may be required. • To assess the preliminary geotechnical conditions, a site reconnaissance would be performed, which may be limited for Phase 1, depending on snowpack One of the purposes for the site reconnaissance would be to determine approximate cut and fill areas and map the existing bedrock cut slope. The fill Page 4 of 8 —28— • • December 9,2015 Scope of Work—Keller-Heavenly Water System Improvements,Phase 1 soil characterization will be critical. Exploratory test pits and/or exploratory borings would be completed as part of Phase 2. Geophysical studies would also be completed in Phase 2 to assess the existing bedrock for excavation characteristics and seismic site parameters. Heavenly Valley Tank Site: This tank site is located on moderately sloping terrain in a forested area. Grading will include construction of a level tank pad and cut and fill slopes. Design issues include potential rockfall and grading difficulties. A rockfall potential and protection investigation will be completed for this site under Phase 2. Preliminary information gathered in the preliminary review of the Keller Tank Site will be projected for the Heavenly Tank Site. Additional recommendations include the following: • Comparison of rockfall hazards to that of the Keller Tank site to determine relative severity of potential rockfall impact on the tank. At this time, options may include alternatives to a rockfall barrier. For example, stabilizing individual large blocks may reduce the need for slope protection measures. In the case of this site, the relatively flat upslope gradient compared to the Keller site should allow for the reduction in the scope of the rock slope protection measures. These, as well as other options, will be presented in the Report of Findings. • A recommendation to either re-site the tank to the Heavenly Valley site or not. This recommendation will be based on the rockfall hazards at each site relative to each other, cost, constructability, environmental/visual impact, and maintenance requirements in comparison to a recommended mitigative measure at the Keller Tank site. Geologically, it is anticipated that granitic bedrock underlies the site, similar to the Keller Tank site. The primary construction concern is the excavation of the bedrock and the strong possibility of blasting. Blasting will have to be patterned to produce rock particles that can be incorporated into the fill pad. Rockfall potential downslope from the tank pad may have be investigated with possible protection for downslope structures, if located below the tank pad. Booster Pump Station A site reconnaissance will be performed to observe any potential construction issues with any retrofit or expansion of the current station. While subsurface explorations will not be performed at the site with this phase (Phase 1),research of existing geotechnical information will be performed. Geotechnical and Rockfall Summary—Phase 1: • Site reconnaissance for preliminary rockfall analysis and geotechnical site characterization; • Identify areas for further site characterization including subsurface exploration. • Complete rockfall analysis utilizing information from HDR's previous report and providing preliminary potential mitigation alternative measures based on this report. • Provide opinion of probable costs for different rockfall mitigation measures(Keller tank Site)based on HDR's report. This may not be necessary at the Heavenly Site,depending on rockfall potential. • Summarize potential construction and design issues including existing fill soils (Keller Tank Site), grading and filling, bedrock excavation characteristics, slope stability, and seismic issues. This summary will be based on research of existing geotechnical information and should be considered a preliminary level effort. • Present preliminary rockfall analysis and geotechnical site characterize issues to the client for tank location selection. Page 5 of 8 —29— December 9,2015 Scope of Work—Keller-Heavenly Water System Improvements,Phase 1 All Phase 1 geotechnical, rockfall, and water modeling results will be incorporated into the alternatives evaluation and design criteria to rank each alternative. The preferred combination of water supply,storage,and rockfall alternatives will be evaluated thoroughly with the results identifying a preferred project. The identified project will be used as the basis for developing the project description and moving forward with the environmental permitting and design of the project. With the selection of a project alternative, Farr West and team will develop a project description. The preferred project description will be an important document for project planning,for public outreach,and environmental compliance documents and permit applications. Any result alterations from Phase 2 geotechnical and rockfall investigations and testing will be incorporated at the design level. If alterations affect the preferred project,the project alternatives may be reassessed to ensure the District moves forward with the most feasible project. NOTE: Site reconnaissance for preliminary site review of geotechnical and rockfall work may be limited, or prohibited, due to the presence of snow. If access is not obtainable, all preliminary review, results, and recommendations will solely be based on literature review and photographic records. Geotechnical and Rockfall Summary(Phase 2): Based on the review of the existing rockfall report, to properly assess the available rockfall protection options and provide opinion of probably costs, additional site reconnaissance and rockfall analysis is required. The primary element of this investigation will be to identify larger rocks that could cause damage to the tank. It may be more economical to individually anchor rocks in-place,or remove them from the slope,then to design a rock barrier to either deflect the rock or prevent the rock from impacting the tank site. The rockfall investigation will include the following: • Review of existing geotechnical information, reports, and maps provided which are pertinent to the project area. • Evaluation of site conditions,including physical verification of rockfall hazards within the project limits that need mitigation. Parameters to be determined include, but are not limited to, slope surficial characteristics, source area, design boulder(s) size and shape, slope gradient and gradient changes, geology,and slope dimensions. • Analysis of potential rockfall through simulation to determine rockfall energies and bounce heights for the purpose of recommending optimal mitigation locations. Subsequent to the field work, rockfall analyses will be performed on selected slope profiles using the Colorado Rockfall Simulation Program (CRSP)to determine probable bounce heights and energies. • Summary and evaluation of mitigative options. Mitigation can include design and construction of a rockfall barrier and/or tensioned mesh systems, removal of rockfall hazards,protective berms, or other construction options.A Report of Findings will be produced with options and opinion of probable costs. • Recommendation of a single mitigative option based on contributing factors such as constructability, cost,environmental/visual impact,and maintenance requirements. As part of the geotechnical investigation for Phase 2, research and geophysical field measurements using the Refraction Compressional Wave (p-wave)technique will be performed in general accordance with the method described in ASTM D5777. Bedrock compressional velocities measured will be compared to rippability tables produced by Caterpillar. Geophysical field measurements using the Refraction Microtremor(ReMi)will also be performed in general accordance with the method described by Louie (2001). The ReMi method provides an effective and efficient means to obtain basic subsurface profile information on an essentially continuous basis across the explored location. Shear wave velocities measured will be used to determine the Site Soil Classification for detennination of the tank seismic design parameters. Page 6 of 8 -30- December 9,2015 Scope of Work—Keller-Heavenly Water System Improvements,Phase 1 As part of Phase 2,cut and fill slope gradient stability analysis will also be completed to determine design slope gradients. Optimal slope gradients will be determined to minimize grading. Grading recommendations incorporating cut materials from the tank pad will be given. These recommendations will likely include placement requirements for a rock fill material that cannot be tested by conventional density testing methods. Preparation of Technical Memorandum This task includes the preparation of a summary Technical Memorandum (TM) which will summarize the alternatives evaluation process and the selected project. It will include the design criteria, evaluation process results, preferred alternative,project descriptions, and planning level opinion of probable costs. This TM will serve as the basis for moving the project forward into the design phase and potential NEPA and CEQA efforts. Farr West will provide a draft TM to the District for review and comment. Upon review,Farr West will prepare and attend an alternatives workshop with the District to discuss all parameters of the TM. All comments by the District will be reviewed and incorporated into a fmal TM that will be provided to the District. Preparation of 10%Design Drawings Upon completion, Fair West will prepare 10% level drawings to provide the District. These plans will utilize the 1991 Heavenly Aerial Topo Survey provided by the District. Inclusive will be preliminary site layouts and general approach details to visually present the proposed alternative. Not included in this Task Efforts not included in Task 2 of Phase 1: • Survey,permitting,or any design efforts beyond preliminary contact,understanding or 10%plans. • Any/all items presented under the Phase 2 summary of the geotechnical and rockfall section. • Phase 2 would'include a complete geotechnical investigation including design recommendations for grading and filling, excavation difficulties, slope stability, foundation design, settlements, retaining walls,roadway construction,and soil corrosion. Deliverables/Action Items • Attend evaluation and ranking workshop(District office) • Draft Keller-Heavenly Alternatives Evaluation technical memorandum • Attend alternatives workshop(District office) • Final Keller-Heavenly Alternatives Evaluation technical memorandum • 10%design drawings SCHEDULE The proposed schedule for the project is as follows: Task I—Data Collection and Review • Commencing in January and ongoing throughout,as needed Task II—Alternatives Evaluation • Commencing in January and completion by June 30,2016 Page 7 of 8 —31— December 9,2015 Scope of Work—Keller-Heavenly Water System Improvements,Phase 1 BUDGET Farr West proposes to perform the above scope of services for an estimated fee as follows: Task 1—Data Collection and Review • $2,400 Task 2—Alternatives Evaluation • $97,600 The total budget for all phases will not exceed$100,000. The estimated fee will not be exceeded without prior authorization. Attached as Exhibit A is the spreadsheet of our estimated staff hours with costs broken down by Task. The work will be billed on a time and expense basis according to the 2016 Farr West Rate Schedule (Exhibit B). Please contact me at (775) 853-7267 if you have any questions regarding this SOW. We are prepared to commence work immediately upon your authorization. We look forward to working with you on this project. Sincerely, Matt Van Dyne,P.E. Senior Project Manager Attachments: Exhibit A—Fee Estimate Exhibit B—Fan West 2015 Rate Schedule Page 8 of 8 —32— EXHIBIT A • South Tahoe PUD Keller-Heavenly Water System Improvements ' Fee Estimate and Task Breakdown Farr West Engineering Sub-consultants Estimated Fee & 8 p I t I s V ji Id 1' li; 11 .1' 8 - 2 71 $135 $135 $155 0120 $120 $00 $95 $80 $60 Hours 5 $ Hours I $ I Expenses(a)(5) Hous I $ 1 Exses(eI 4) I Horns 1,, $ TAS141•BATA4:OeLECTtGtf AND REVIEW Cotsction of District Data4 4 $ 480 4 $ 480 • Review and Understanding of Data 18 16 S 1,020 18 S 1.020 Deliverables ' None Total Task 1 -0 0 0 20 0 0 0 - 0 0 2b ' - 0 ) - $ 0 $ $ - 20 $ 21400.00 TAS1t2-kt:FE$NA'1WESEvALUAT(ON Alternatives Analysis: Identify water system knprove,mnt ekanalives 4 20 24 $ 2,940 24 S 2,940 Water nixieling 4 _ 32 32 20 88 $ 15,820 • 88 $ 10,020 Evaluation and ranking workshop with District 48 _ 12 $ 1.500 $ 100 12 $ - 1.800 Aneysis of alternatives 4 4 4 _ 48 32 a 100 $ 11,080 100 $ 11,060 Planning Wel opinion of probable exsb 2 1618 34 $ 3,830 34 $ 3,830 Additional analysis-identified by user group 183 J 183 9 21.060 183 $ 21,8600 Geotechnical Analysis: 5 8 $ 960- , 8 $ 9600 Sib rsconnebeance,research and coordination Analysis and pre len nary report praperatb17 n 17 $ 3.324 $ 150 17 $ 2,484 $ 2.884 _ 17 $ 2,984 1 Meetings 8 $ 1,584 8 $ 1,584 E3 Ro66e1 Melysa: 8 8 $ 900 8 $ 960 I bib reconnaissance 20 $ 3,393 $ 200 20 $ 3,593 Review of HDR's report and andoWs 13 $ 1,932 13 $ 1,932 Rockia8 mitigation protection cost estimate - st nate _ 8 $ 1,357 8 $ 1,357 Meetings _ 4 S 679 4 $ 679 Preparation of Draft Technical Memorandum 10 44 4 32 - 8 98 9 10,470 $ 100 98 $ 10,670 Alternatives workshop with District a 4 12 ,$ 1,320 $ 100 12 $ 1,420 Preparation of Final Technical Memorandum 8 24 - 168 58 $ 5.880 $ 200 68 $ 6,080 Preparation of 10%Design Dreeilags: 4 24 32 40 , 4 4 108 $ 10,700 9 100 108 $ 10,800 Deliverables ' Dreg TM Find TM 10%Drawings' total Task 240 4- — 4 423 36 40 — 12 20 7$f $ H 603 42 '0 7072 $ 180' 48 7360 $ 200 018 $ 07,60020 TOTAL(Tasks I a 2) 48 ,_ 4 4 . 443 58 '72 " 40 12 . 20 _ SIH $ $$ $ 000 42 $ 7. r$ 150 40_ 2 1.80 II 200 838 $ 100.000 (a) Expenses include travel,milage,paryaem,lodging,reproduction mats.etc. 121110915 T t FARR WEST ENGINEERING 2015 RATE SCHEDULE Title Hourly Title Hourly Rate Rate Principal Civil Engineer $135 Senior Designer $95 Senior Project Manager $120 GIS Analyst $105 Project Manager $110 GIS Technician $75 Project Engineer I $90 Water Rights Surveyor $125 Project Engineer II $80 Water Rights Specialist $105 Senior Hydrogeologist $135 Water Rights Technician $75 Hydrogeologist $90 Water Rights Technician II $65 Hydrogeologist II $80 Professional Surveyor $120 Principal Electrical Engineer $155 Survey Technician $75 Environmental Scientist $105 Survey Technician II $60 Construction Inspector $90 1 Man Survey Crew $115 Plan Check/Building Inspector $75 2 Man Survey Crew $150 Senior Administrator $70 3 Man Survey Crew $225 Project Assistant $60 Intern $45 Administrator $45 Other Fees and Charges: 1. All direct project expenses, including subconsultants, will be billed at actual cost plus 15%. 2. Vehicles used for travel to meetings, deliveries, etc. will be charged at the current federal reimbursement rate. 3. GPS receivers will be charged at a rate of$10/hr/receiver. 4. Density gauges will be charged at a rate of$100/day. 5. An overtime surcharge of 25% will be applied to the hourly rates of non-salaried employees for authorized overtime work. 6. Different survey and construction inspection labor rates may apply on prevailing wage projects. Rate for prevailing wages projects will be provided on a case by case basis. Revised 8/31/2015 —34- Richard H.5olbrig • 1950 • Directors nvterSouth h o Chris Cefalu Randa eel esans g Public Utility District Kelly Sheehan Duane Wallace J 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 5446474•Fax 530 541-0614•www.stpud.u5 BOARD AGENDA ITEM 7e TO: Board of Directors FROM: Tim Bledsoe, Manager of Customer Service MEETING DATE: December 17, 2015 ITEM-PROJECT NAME: Customer Service Department Staffing REQUESTED BOARD ACTION: Authorize staff to hire one full-time, limited term Meter Technician and one full-time, limited term Customer Service Representative. DISCUSSION: The Customer Service Department has and continues to evolve as the District converts to a metered system. Historically, the Customer Service Department operated with three permanent full-time customer service representatives and three permanent full-time inspectors. When meters began to be installed, three temporary employees were hired annually to help address the additional impact to the department: one assisting customer service representatives and two assisting the , inspectors. Currently, the District intends to install 2,000 meters during the 2016 construction season and the remaining over the following three years. The impact to the department is ongoing, not just during the construction phase. Many of the impacts are listed below: • Customer phone calls have increased due to high bill complaints. • Check reading must be done for high bill complaints which require additional staff time. • The meter replacement program was implemented to replace aging meters that do not read accurately. • Meter readings are required to prorate a customer's bill due to the change of ownership for escrow purposes. • Quarterly meter readings have to be done in order to bill District customers. Once meters are read, maintenance reports are printed to identify errors which must be investigated and corrected. • Coordination with the Engineering Department during meter projects and main line replacements. • Installation of MXU's and programming meters The result of these and other additional impacts is an increase in staff overtime and a scheduling burden during periods of employee absences. Also, the additional time spent on tasks related to meters impacts the time available for collection efforts.The department has improved the number of delinquent accounts, but the delinquency rate is still unacceptable. As mentioned above, the Board has approved seasonal employees for the Customer Service and Inspections Departments to help address the additional workload. But, as Engineering has pointed out,seasonal employees are limited to 1,000 hours per fiscal year under the District's program.Several of those hours are spent training the seasonal employees, leaving less hours available for accomplishing actual tasks that need to be completed in the department. History has proven that several talented individuals employed by the District as seasonal employees in the past, have found-full time benefited employment with other utility companies requiring the hiring and training of new temporary employees. In order to maintain quality, consistent and well trained employees, staff is proposing to convert three temporary positions to two full-time, limited term, four year positions: a Meter Technician and a Customer Service Representative. The approximate additional cost of this proposed conversion is $34,000 per year (see attached cost analysis). Staff recommends the Board approve the hiring of one limited term Meter Technician and one limited term Customer Service Representative,with an estimated hire date of March 1, 2016, through March 1, 2020. -36- J Attachment - Cost Details for Positions Customer Service Representative-This proposed full-time limited term position will be a District union employee with a four-year term.The compensation would follow the existing structure for the Customer Service I, Step A position along with all normal District benefits and in compliance with the existing Union MOU. The costs of this full-time position are estimated on the starting point of the District-Union MOU pay range. The estimated cost for the Customer Service Representative position with benefits is $69,989 per.year. For reference, the cost of a full-time Blue Ribbon seasonal employee is $53,477, resulting in an annual difference of$16,512. This position will perform the duties of a Customer Service Representative. Metering Technician Position-This proposed full-time limited term position will be a District union employee with a four-year term.The compensation would follow the existing pay structure for the Customer Service Inspector I position, along with all normal District benefits and in compliance with the existing Union MOU. The costs of this full-time limited term position are estimated based on the midpoint of the relevant District-Union MOU pay range. The estimated cost for the Metering Technician with benefits is $77,554 per year. For reference, the cost of two part-time Blue Ribbon seasonal employees is $60,403 resulting in an annual difference of$17,151. SCHEDULE: Upon Board Approval COSTS: Approximately$70,000 for a Customer Service Representative and $78,000 for the Meter Technician per year for a four-year term. ACCOUNT NO: 1038-4101 and 2038-4101 BUDGETED AMOUNT AVAILABLE: ATTACHMENTS: Cost Details for Positions CONCURRENCE WITH REQUESTED ACTION: CATEGORY:Wafer&Sewer GENERAL MANAGER: YES /MI NO CHIEF FINANCIAL OFFICER: YES NO -37- Richard H.Solbrig ,4,00 • 1950 • 6R/, Directors ®tSouth Tahoe Chris CeFalu James R.Jones4`-„�r/' .'ARandy Vogelgesang3'" _ Kelly Sheehan oFufi1c Utility District Duane Wallace J 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 544-6474•Fax 530 541-0614•www.stpud.us BOARD AGENDA ITEM 7f TO: Board of Directors FROM: Nancy Hussmann, Human Resources Director MEETING DATE: December 17, 2015 ITEM- PROJECT NAME: Self-Insured Dental Plan Renewal for 2016 REQUESTED BOARD ACTION: 1) Approve renewal of the Self-Insured 2016 Dental Plan with a funding level of$148.14 per employee per month; and 2) Approve the 2016 COBRA Dental rates at $54.15 Single; $108.30 Employee +1; and $184.10 Family. DISCUSSION: With a self-insured plan, the District pays the actual cost of dental claims, and trends indicate that there is a high claim expense year every 4-5 years. The last high claim year was in 2010. In 2015, dental claims increased 10% and an additional increase is attributable to the latest Segal Health Plan Cost Trend Survey, indicating that dental trends are estimated to increase 3.5% in 2016.Therefore, BB&H Benefit Designs recommends a funding level increase of13.35%, from $130.69 to $148.14. This amounts to a $24,081 .00 increase over 2015 funding levels. There is no increase to the dental administration fees charged by CDS Group Health. Because the funding level increases, COBRA rates also need to be reviewed and adjusted accordingly, including offering a three-tier system of COBRA benefits. BB&H Benefit Designs recommends that COBRA rates before the 2% administration fee (which is retained by CDS Group Health) be $54.15 for Single coverage, $108.30 for Employee + 1 coverage, and $184.10 for Family coverage. SCHEDULE: December 18, 2015, notify CDS Group Health of new rates COSTS: $204,433.20 per year ACCOUNT NO: Self-Insured Dental Budget BUDGETED AMOUNT AVAILABLE: ATTACHMENTS: (1) Dental Claims per Member Chart (2) Claims by Member by Dental Category Chart CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES Se7c11 NO Al. .1 CHIEF FINANCIAL OFFICER: YESE7 NO / -39- - ___ __ ----- - - — ______i Dental Claims perMember $520.00 _ — _� —.�.�� �.,.�_„ _ $510.00 T= - $500.00 _.z. . h,._z .... .�."_„9 _ �_.�.a.w�,_ .�w _�, _.�. _ a-T __.,,,. r .__ . $490.00 �- --- -_ -�..Y.._.,._..._.__�..�..�-.T�-�,�___--� _ p.�...,.- _. $480.00 - _-- - . __. _ --- $470.00 -,..� _ _ _ ._�.�..� ��._.�_�r��.y.� za��_. _���, } $460.00 _ —_-_ 2011_/ 2012 2013 2014 2015 L ■ claims/member $513.99 = = r r �� _ L $1____________0_79.69 $484.65 $500.00 $511.79 12/4/15 3 C ;-4 i. I. �_ 7...........7-e.. .=...,........ Claims by Member b Dental Cate or y � y $250.00 _..m.am, ,.« .: . _.. —... _ M.._a.....n.....k.........,..c..., ... M. ...�� $200.00 e . ..___s_, ,�..,. $150.00 ___________ __________ • $100.00 . - $50.00 iii :$000 2011 2012 2013 2014 2015 1 ® preventive basic ' major 12/4/15 4 Richard H.Solbrig a 1950 s pieDirectors • J, ere., South Ta hoe Chris Cefalu James R.Jones Randy Vogelgesang Public I ( ^pf l�a Distr ct Kelly Duane Wallace 1275 Meadow Crest Drive.South Lake Tahoe•CA 96150-7401 Phone 530 514-6474•Fax 530 541-0614•www.etpud.ue BOARD AGENDA ITEM 7g TO: Board of Directors FROM: Nancy Hussmann, Human Resources Director MEETING DATE: December 17, 2015 ITEM-PROJECT NAME: ACWA-JPIA Medical Insurance Renewal Rates REQUESTED BOARD ACTION: Information Only- No Action Needed DISCUSSION: The District received the 2016 medical insurance rates from the ACWA- JPIA, where the District participates in the Anthem Blue Cross PPO Classic Plan. Rates for 2016 will be $776.91 for Single coverage; $1,582.30 for Two-Party coverage; and $2,126.89 for Family coverage. Using the District demographics, this represents a 7.44% increase over 2015 rates. This increase is less than the industry trend, which according to the Segal Group's 2015 Health Plan Cost Trend Survey, finds that medical plans show a 9.2% increase for PPO plans in the west. BB&H Benefit Designs has actually seen an increase in rates for other plans of 11-15%, mainly due to health care reform. The ACWA-JPIA absorbs the costs of various health care reform fees in order to keep premium rate increases to a minimum. ACWA-JPIA has also recently implemented the Castlight price comparison software program, where plan participants can "shop" for medical services, comparing the physicians' quality ratings and cost of specific procedures. This was implemented to educate employees about the differences in costs in medical services with different providers, with the hope that they will select those providers whose services cost less, thereby saving claim costs in the pooled plan. The District has already had some participants using this new feature to shop for medical services. SCHEDULE: Information only COSTS: ACCOUNT NO: BUDGETED AMOUNT AVAILABLE: ATTACHMENTS: None CONCURRENCE WITH REQUESTED ACTION: �J CATEGORY: General GENERAL MANAGER: YES N9 NO CHIEF FINANCIAL OFFICER: YES - ,fib vcncr ar IVIGfI0r CU Richard H.Solbrig 1950 • • / Directors rSouth Ta Chris Cefalu f`�► James R.Jones Public Utility District ric RandyellySheehan ang Kelly Sheehan Duane Wallace 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 544-6474•Fax 530 541-06144•www.stpud.us BOARD AGENDA ITEM 7h TO: Board of Directors FROM: Shannon Cotulla, Assistant General Manager MEETING DATE: December 17, 2015 ITEM-PROJECT NAME: 2016 Washington, D.C. Legislative Advocacy REQUESTED BOARD ACTION: Authorize extension of contract with ENS Resources, Inc., in the amount of$81,794 for the Calendar Year 2016. DISCUSSION: ENS Resources, Inc., (Eric Sapirstein and David French) have effectively and successfully advocated on the District's behalf regarding federal governmental matters since 1997. ENS Resources, Inc. submitted a proposal for ongoing legislative advocacy in Washington, D.C. for the calendar year 2016. SCHEDULE COSTS: $81,794 ACCOUNT NO: 1027/2027-4405 BUDGETED AMOUNT AVAILABLE: $20,138/$20,138 (FY-2015/16) Remaining amount expensed in FY 2016/17 ATTACHMENTS: Proposal for Scope of Work CONCURRENCE WITH REQUESTED ACTION:� CATEGORY: Wafer and Sewer GENERAL MANAGER: YES 1�1a, NO CHIEF FINANCIAL OFFICER: YES Pi. NO -45- r = lg r saw ■Mlieliss. ■ 1 I W!,! .4116.4.L. ®bar RESOURCES December 6,2015 Mr. Shannon Cotulla Assistant General Manager South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Dear Mr. Cotulla: ENS Resources, Inc. (ENS)is pleased to provide you with our proposed extension of the contract between ENS and the South Tahoe Public Utility District(STPUD)as a follow-up to our discussion. The enclosed extension provides a detailed description of specific tasks that we propose to undertake in close coordination with STPUD. These tasks are consistent with our ongoing activities and emerging policy actions that may impact STPUD mission. Our enclosed approach will allow us to leverage opportunities to support STPUD goals and objectives that may arise in the coming year. We submit this extension with no increase in our consulting service fee. We believe that we can provide the identified activities within the current contract agreement's provisions. If you have any questions,please give me a call to discuss. Again, we deeply appreciate the opportunity to work with you and the entire STPUD staff. We look forward to the year ahead. Sincerely yours, , "7"17"4 4 iii 6, 6A.11Sa I irstein III esident 6---- Enclosure ENS Resources,Inc. 1101 14th Street,N.W. ; Suite 350 Washington,D.C. 20005 / Telephone(202)466-3755 • Telefax:(202)466-3787 www.ensresources.com —46— SCOPE OF SERVICES FEDERAL LEGISLATIVE AND REGULATORY SERVICES ON BEHALF OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT ENS understands that the District's federal priorities in 2016 will require ENS involvement. These priorities include,but are not limited to,the identified areas discussed below. We anticipate that additional needs may require our assistance and the accompanying description of our scope of services addresses this potential need. 1. Fiscal Year 2017 Appropriations Requests • Maintain and advance efforts to secure federal funding assistance to achieve the collaborative efforts of the Lake Tahoe Community Fire Protection Partnership (Partnership) to improve water infrastructure capabilities to enhance wildfire responses. Activities would include targeted outreach and educational efforts with the U.S.Forest Service and the congressional delegation,in coordination with the District and members of the Partnership,and key congressional committees with jurisdiction over federal funding of wildfire suppression programs. • Seek opportunities to support and implement federal forest management reforms that enhance watershed management.and/or reduce the threat of catastrophic wildfire. Continue to collaborate with regional,statewide and national entities supportive of similar watershed objectives. • Work closely with the District to identify and respond to appropriate federal grant opportunities.Priorities include funding opportunities for water infrastructure,environmental restoration,educational outreach,technical assistance and energy innovation. • ENS will monitor,evaluate and identify for STPUD follow-up potential federal agency program assistance opportunities to promote STPUD program needs. 2. Infrastructure Assistance • Review and monitor legislative initiatives to provide infrastructure assistance to public agencies,including an emphasis on metering and other conservation-related needs. • Identify for STPUD consideration federal economic development assistance that may support water and wastewater infrastructure priorities within the STPUD service area. • Monitor development of alternative infrastructure financing policy approaches and provide input to STPUD congressional delegation on appropriate elements of such policy options. -47- 3. Alternative Energy Production • Work with STPUD to develop an alternative energy production strategy and pursue public and private sector investments for the potential construction and operation of projects including solar and hydropower as related to Alpine County and in basin needs. • Monitor and identify competitive grant solicitations to support development of alternative energy production projects related to the energy-water nexus. 4. Environmental Permitting • Support STPUD in responding to matters related to U.S.Army Corps of Engineers section 404 permitting and Alpine County water conveyance facilities,as appropriate. 5. Forest Management • Seek opportunities to support and implement federal forest management reforms that improve watershed management • Support policy reforms that will reduce the threat of catastrophic wildfire events.. • Continue to collaborate with regional,statewide and national entities supportive of watershed objectives to reform the management of forests and the health of forest lands. • 6. Tahoe Restoration Act Reauthorization • Continue efforts to further District priorities through the reauthorization of the Lake Tahoe Restoration Act(S. 1451/HR 3382). • Review STPUD policy concerns and develop as necessary recommendations for incorporation into final reauthorization language. • Work with STPUD congressional delegation to preserve utility relocation cost assistance/reimbursement with an emphasis on the authorization of water infrastructure for fire suppression needs. • Monitor,evaluate and provide analyses and recommended actions to stakeholder proposed amendments to existing provisions of the Act to ensure no adverse impacts to STPUD. 7. Water Resources and Drought • Work with STPUD congressional delegation and related committee staff to advance drought relief assistance to benefit the STPUD and retain priority for STPUD water supply infrastructure project needs. • Monitor federal legislative and regulatory initiatives that may impact STPUD management of recycled water. • Develop in consultation with STPUD legislative initiatives to address potential water recycling infrastructure projects. -48 J a • Monitor and advise on proposed water resources development amendments to Water Resources Reform and Development Act of 2016 related to impacts upon STPUD Alpine County initiatives. 8. General Representation and Monitoring • Draft summaries and analyses of legislative and regulatory priorities pending before Congress and the Executive Branch. • Arrange, coordinate and attend meetings between federal and STPUD officials to discuss federal goals and objectives. • Meet with STPUD officials as appropriate to develop and revise federal agenda and implementation strategies. • Provide periodic updates on the status of federal programs of interest to STPUD. I. SCOPE OF SERVICES We propose to maintain our current level of services as provided during the past year. This will include periodic updates by telephone,emails and memoranda on matters identified as policy priorities by STPUD. As part of our activities,we understand that we will provide in person updates to the District and meet with senior management and the Board of Directors,at least twice a year,to review discuss our'activities and if necessary revise STPUD priorities. In the course of conducting our representation of the District's needs,we will work with the General Manager or his designee. The delivery of services will continue to focus on three areas: • Legislative Liaison and Representation • Executive Branch Liaison and Representation • Washington-based Association Liaison A. Legislative Liaison and Representation 1. Work with STPUD officials to identify goals,objectives and priorities for legislative agenda; 2. Develop with STPUD a legislative strategy to achieve and implement priorities; 3. Maintain and expand congressional liaison on behalf of STPUD with an emphasis on natural resources,infrastructure assistance,water quality,energy development and security improvement needs; 4. Monitor status of legislative proposals (authorizations and appropriations) of interest to STPUD and provide appropriate updates; 5. Draft legislative communications,report language,testimony, and other appropriate materials for STPUD's review and approval; 6. Assist STPUD in developing issue papers,briefing materials, and talking points for use in congressional meetings; -49- 7. Arrange and coordinate legislative meetings in Washington and/or California;and 8. Provide periodic written and oral reports detailing matters affecting STPUD's goals and objectives,including an annual presentation to STPUD Board of Directors. B. Executive Branch Liaison and Representation 1. Identify competitive federal grant opportunities that may be of interest to STPUD. Monitoring and advising of potential assistance includes funding opportunities for water infrastructure,environmental restoration,educational outreach,technical assistance and energy innovation. 2. Identify,in coordination with STPUD,regulatory issues of concern pending before the following federal agencies: Environmental Protection Agency,Department of Interior, Department of Energy,and the Department of Agriculture; 3. Work with STPUD to develop a strategy to address program and regulatory priorities with emphasis on water quality; 4. Analyze and prepare reports on agency initiatives,proposed rulemakings,and budgets that impact STPUD's programs and operations; 5. Monitor agency activities and provide updates on actions related to priority issues; 6. Provide support to STPUD in the drafting of appropriate communications to federal agencies related to rulemakings; and 7. Arrange and coordinate meetings between STPUD officials and relevant senior agency officials to address policy issues of concern that affect,directly or indirectly,STPUD's priorities. C. Washington-based Association Liaison ENS will continue to maintain contact with key trade associations based in Washington. This will be supplemented by our working relationships with individual advocates representing water and wastewater agencies. Our liaison will include such groups as the Association of California Water Agencies,the Association of Metropolitan Water Agencies,the National Association of Clean Water Agencies,the California Association of Sanitation Agencies and other organizations as determined to be relevant by STPUD's policy concerns. H. TERMS OF AGREEMENT a. In carrying out the scope of this agreement,ENS and STPUD agree that Eric Sapirstein and David French will serve as points of contact for ENS. STPUD designates as its point of contact Richard Solbrig,General Manager,or his designee. -50- b. In exchange for these services,STPUD agrees to reimburse ENS based on a monthly retainer of$6616.17 and shall not exceed $79,394.04 unless both parties agree to modify the terms of this agreement. Such retainer shall be paid not later than the fifteenth day of the month for which services are provided. ENS will bill for reasonably incurred other direct costs on a monthly basis. These costs are not expected to exceed$200.00 in any given month unless there are extraordinary costs like out of town travel. Should exceptional costs be expected,we shall seek prior approval from STPUD. c. The term of this agreement shall be January 1,2016 through December 31,2016 with an automatic annual extension unless either party to this agreement decides to terminate the agreement with or without cause thirty days prior to the final month of the current contract term. If such termination is elected,written notification shall be provided to the terminated party at its main office of business activity. In such an event, ENS will be compensated for any outstanding costs and services consistent with the provisions of this agreement up to the date of such notice of termination. d. ENS will provide its best efforts,working with STPUD,to attain the identified goals and objectives as agreed to by ENS and STPUD. -51- PAYMENT OF CLAIMS FOR APPROVAL December 17, 2015 Payroll 12/08/2015 589,411.87 Total Payroll 589,411.87 ADP & Insight eTools 526.85 AFLAC/WageWorks claims and fees 1,369.03 BBVA Compass Bank 0.00 BHFS legal services 18,403.50 CaIPERS liability payment 30,582.00 CDS health care payments 7,115.54 Total Vendor EFT 57,996.92 Accounts Payable Checks-Sewer Fund 552,639.74 Accounts Payable Checks-Water Fund 114,208.83 Total Accounts Payable 666,848.57 Grand Total 1,314,257.36 Payroll EFTs & Checks 12/08/2015 EFT CA Employment Taxes & W/H 28,885.16 EFT Federal Employment Taxes & W/H 142,802.40 EFT CaIPERS Contributions 62,279.43 EFT Great West Deferred Comp 27,694.15 EFT Stationary Engineers Union Dues 2,475.27 EFT Retirement Health Savings 12,043.45 EFT United Way Contributions 190.00 EFT Employee Direct Deposits 261,685.43 CHK Employee Garnishments 1,769.69 CHK Employee Paychecks 49,586.89 Total 589,411.87 -53- PAYMENT OF CLAIMS • Vendor Name Department/Proj Name Description Acct#/Proj Code Amount Check Num Type A-L SIERRA WELDING PRODUCTS HEAVY MAINT SHOP SUPPLIES 1004-607181.00 Check Total: 81.00 AP-00092086 •MW ABC FIRE SERVICE CO INC PUMPS PUMP STATIONS 1002-6051 58.10 ABC FIRE SERVICE CO INC PUMPS SAFETY/EQUIP/PHY 1002-6075 • 806.00 ABC FIRE SERVICE CO INC HEAVY MAINT BUILDINGS 1004-6041 2,016.22 ABC FIRE SERVICE CO INC PUMPS PUMP STATIONS 2002-6051 58.11 • ABC FIRE SERVICE CO INC PUMPS SAFETY/EQUIP/PHY 2002-6075 805.99 Check Total: 3.744.42 AP-00092088 MW ACME CONSTRUCTION SUPPLY GEN&ADMIN SMALL TOOLS INV 1000-0423 254.48 Check Total: 254.48 AP-00092089 MW ACWA BOARD OF DIR DUES/MEMB/CERT 2019-6250 21,585.00 Check Total: 21.585.00 AP-00092090 MW ACWA/JPIA GEN&ADMIN ACWA MED INS PAY 1000-2514 193,354.39 ACWA/JPIA GEN&ADMIN VISION INS 1000-2530 2,744.56 I Check Total: 196.098.95 AP-00092091 MW ui ARLAC GEN&ADMIN SUPP INS W/H 1000-2532 611.94 Check Total: 611.94 AP-00092092 MW AHERN RENTALS DIAMOND VLY RNCH GROUNDS&MNTC 1028-6042 83.32 Check Total: 83.32 AP-00092093 MW AIRGAS USA LLC GEN&ADMIN SHOP SUPP INV 1000-0421 • 23.87 AIRGAS USA LLC GEN&ADMIN SMALL TOOLS INV 1000-0423 . 117.42 • AIRGAS USA LLC GEN&ADMIN SAFETY INVENTORY 1000-0425 1,453.54 AIRGAS USA LLC FINANCE INV/FRT/DISCOUNT 1039-6077 2.61 • Check Total: 1.597,44 AP-00092094 MW ALPEN SIERRA COFFEE GEN&ADMIN OFC SUPPLY ISSUE 1000-6081 261.00 Check Total: 261.00 AP-00092095 MW ALSBURY,MARY INFORMATION TECH TRAVEUMEETINGS 1037-6200 135.50 • , ALSBURY,MARY INFORMATION TECH TRAVEUMEETINGS 2037-6200 135.50 Check Total: 271.00 AP-00092096 MW AMERIPRIDE UNIFORM SERVICES GEN&ADMIN UNIFORM PAYABLE 1000-2518 1,263.91 Check Total: 1.263.91 AP-00092.097 MW User: THERESA-Theresa Sherman Page: 1 Current Date: 12/10/2015 Report: BK:Payment of Claims Report(With RV)V2<1.03> Current Time: 09:48:45 PAYMENT OF CLAIMS Vendor Name Department/Proj Name Description Acct#/Proj Code Amount Check Num :Type AT&T MOBILITY PUMPS TELEPHONE 1002-6310 • 41.50 C AT&T MOBILITY ELECTRICAL SHOP TELEPHONE 1003-6310 4.99 . AT&T MOBILITY ENGINEERING TELEPHONE 1029-6310 15.08 AT&T MOBILITY INFORMATION TECH TELEPHONE 1037-6310 20.75 AT&T MOBILITY UNDERGROUND REP TELEPHONE 2001-6310 41.50 AT&T MOBILITY PUMPS TELEPHONE 2002-6310 41.50 . AT&T MOBILITY ELECTRICAL SHOP TELEPHONE 2003-6310 4.98 AT&T MOBILITY ENGINEERING TELEPHONE 2029-6310 16.73 AT&T MOBILITY INFORMATION TECH TELEPHONE 2037-6310 20.75 Check Total: 207.78 AP-00092098 MW AT&T/CALNET 3 GEN&ADMIN TELEPHONE 1000-6310 426.42 AT&T/CALNET 3 GEN&ADMIN SIGNAL CHARGES 1000-6320 33.51 AT&T/CALNET 3 PUMPS TELEPHONE 1002-6310 58.82 AT&T/CALNET 3 GEN&ADMIN TELEPHONE 2000-6310 426.42 Check Total: 945.17 AP-00092099 MW B81B MICROSCOPE SERVICE LABORATORY LABORATORY EQUIP 1007-6025 300.00 BM3 MICROSCOPE SERVICE LABORATORY LABORATORY EQUIP 2007-6025 300.00 I Check Total: 600.00 AP-00092100 MW BAY AREA COATING CONSULTANTS ENGINEERING-AERATION BASIN 1 AER BSN1 REHAB 1029-8502-AB1 RHB . 3,034.00 BAY AREA COATING CONSULTANTS ENGINEERING-PR CLARIF 2 RHB PR CLRF2 REHAB 1029-8521 -PC2RHB 3,034.00 Check Total: 6.068.00 AP-00092101 MW BENTLY AGROWDYNAMICS OPERATIONS SLUDGE DISPOSAL 1006-6652 2,973.88 • Check Total: 2.973.88 AP-00092102 MW BERGSOHN,IVO ENGINEERING TRAVEL/MEETINGS 2029-6200 99.00 Check Total: 99.00 AP-00092103 MW BEST BEST&KRIEGER LLP ENGINEERING-TR PLT GENERATOR LEGAL-SPEC PROJ 1029-4475-13S019 204.40 Check Total: 204.40 AP-00092104 MW BI STATE PROPANE DIAMOND VLY RNCH PROPANE 1028-6360 666.86 Check Total: 666.86 AP-00092105 MW BLUE RIBBON TEMP PERSONNEL UNDERGROUND REP CONTRACT SERVICE 1001-4405 2,054.00 • BLUE RIBBON TEMP PERSONNEL DIAMOND VLY RNCH CONTRACT SERVICE 1028-4405 626.25 BLUE RIBBON TEMP PERSONNEL ENGINEERING CONTRACT SERVICE 1029-4405 95.94 - User: THERESA-Theresa Sherman Page: 2 Current Date: 12/10/2015 Report: BK:Payment of Claims Report(With RV)V2<1.03> Current Time: 09:48:45 PAYMENT OF CLAIMS . • Vendor Name Department/Proj Name Description Acct#/Proj Code Amount Check Num Type BLUE RIBBON TEMP PERSONNEL ENGINEERING-LPPS PWR/CTRLS LPPS PWR/CTR UPG 1029-8330-LPPOWR 3,781.63 BLUE RIBBON TEMP PERSONNEL INFORMATION TECH CONTRACT SERVICE 1037-4405 617.04 BLUE RIBBON TEMP PERSONNEL FINANCE CONTRACT SERVICE 1039-4405 174.83 BLUE RIBBON TEMP PERSONNEL UNDERGROUND REP CONTRACT SERVICE 2001-4405 2,060.37 BLUE RIBBON TEMP PERSONNEL ENGINEERING SUSPENSE 2029-2504 335.79 BLUE RIBBON TEMP PERSONNEL . ENGINEERING CONTRACT SERVICE 2029-4405 431.00 BLUE RIBBON TEMP PERSONNEL ENGINEERING-WTR SYS MSTR PLN CONTRACT SERVICE 2029-4405-WTRSMP 137.07 BLUE RIBBON TEMP PERSONNEL ENGINEERING-2014 METER PRJ METERS 2014 2029-7013-METERS 663.59 ' BLUE RIBBON TEMP PERSONNEL ENGINEERING-FIRE HYDRANTS FR HYD 6"LINES 2029-8560-HYDRNT 2,749.02 BLUE RIBBON TEMP PERSONNEL ENGINEERING-2015 METERS PROJ METERS PHASE II 2029-8660-15W002 2,542.41 BLUE RIBBON TEMP PERSONNEL INFORMATION TECH CONTRACT SERVICE 2037-4405 617.04 BLUE RIBBON TEMP PERSONNEL CUSTOMER SERVICE CONTRACT SERVICE 2038-4405 1,744.40 BLUE RIBBON TEMP PERSONNEL FINANCE CONTRACT SERVICE 2039-4405. 174.82 • Check Total: 18.805.20 AP-00092106 MW BROWN MILBERY INC HEAVY MAINTENANC BUILDINGS2004-6041 612.92 Check Total: 612.92 AP-00092107 MW I CIyl'PBELL SCIENTIFIC INC LABORATORY LABORATORY EQUIP 1007-6025 447.64 I Check Total: 447.64 AP-00092108 MW CDW-G CORP INFORMATION TECH DIST.COMP SPPLIS 1037-4840 951.80 • CDW-G CORP INFORMATION TECH SERVICE CONTRACT 1037-6030 201.97 CDW-G CORP INFORMATION TECH DIST.COMP SPPLIS 2037-4840 2,141.41 CDW-G CORP INFORMATION TECH SERVICE CONTRACT 2037-6030 201.98 Check Total: 3.497.16 AP-00092109 MW • CHARTER BUSINESS GEN&ADMIN TELEPHONE 1000-6310 114.99 CHARTER BUSINESS GEN&ADMIN TELEPHONE 2000-6310 114.98 Check Total: 229.97 AP-00092110 MW CONSTRUCTION MATERIALS ENG INC ENGINEERING-LPPS PWR/CTRLS LPPS PWR/CTR UPG 1029-8330-LPPOWR 1,972.50 . CONSTRUCTION MATERIALS ENG INC ENGINEERING-REP LG WTR MTRS REP LG WT MTRS 2029-8539-14W115 16,936.00 Check Total: 18.908.50 AP-00092111 MW CONTRACTOR COMPLIANCE ENGINEERING-LPPS PWR/CTRLS LPPS PWR/CTR UPG 1029-8330-LPPOWR 340.00 CONTRACTOR COMPLIANCE ENGINEERING-WL,SADDLE WTRLN-SADDLE/KEL 2029-7011 -SADLWL 569.50 • Check Total: 909.50 AP-00092112 MW User: THERESA-Theresa Sherman Page: 3 Current Date: 12/10/2015 ' Report: BK:Payment of Claims Report(With RV)V2<1.03> Current Time: 09:48:45 PAYMENT OF CLAIMS Vendor Name . Department/Proj Name Description Acct#/Proj Code Amount Check Num Tyne CSRMA CUSTOMER SERVICE CSRMA LIAB CLAIM 2038-4521 1,766.30 Check Total: 1.766.30 AP-00092113 MW D&H BROADCASTING LLC PUBLIC OUTREACH-PR EXP-EXTERNAL PUB RELATIONS 1027-6620-PREEXT 2,268.00 D&H BROADCASTING LLC PUBLIC OUTREACH-PR EXP-EXTERNAL PUB RELATIONS 2027-6620-PREEXT 2,268.00 Check Total: 4.536.00 'AP-00092114 MW DAVIS,JENNIFER GEN&ADMIN UB SUSPENSE 1000-2002 106.02 DAVIS,JENNIFER GEN&ADMIN UB SUSPENSE 2000-2002 138.70 Check Total: 244.72 AP-00092115 MW DIY HOME CENTER ELECTRICAL SHOP PUMP STATIONS 1003-6051 17.44 DIY HOME CENTER UNDERGROUND REP PROPANE 2001 -6360 10.09 Check Total: 27.53 AP-00092116 MW DJ SALES LLC PUMPS IMPELLER,SPARE 1002-7519 • 6,404.00 Check Total: 6.404.00 .AP-00092117 MW DOUGLAS DISPOSAL GEN&ADMIN REFUSE DISPOSAL 1000-6370 24.40 Check Total: 24.40 AP-00092118 MW EbInDORADO COUNTY CUSTOMER SERVICE SUPPLIES 1038-6520 8.00 EI DORADO COUNTY CUSTOMER SERVICE SUPPLIES 2038-6520 8.00 Check Total: 16.00 AP-00092119 MW ENVIRONMENTAL SYSTEMS RESEARCH ENGINEERING-GIS SFTWR DEV CONTRACT SERVICE 1029-4405-GISSFT 13,500.00 ENVIRONMENTAL SYSTEMS RESEARCH ENGINEERING-GIS SFTWR DEV CONTRACT SERVICE 2029-4405-GISSFT 13,494.60 Check Total: 26.994.60 AP-00092120 MW EUROFINS EATON ANALYTICAL INC LABORATORY-ARHD3 TRTMT EXP MONITORING 2007-6110-AH3EXP 40.00 Check Total: 40.00 AP-00092121 MW EVOQUA WATER TECHNOLOGIES LLC LABORATORY SERVICE CONTRACT 1007-6030 38.56 EVOQUA WATER TECHNOLOGIES LLC LABORATORY SERVICE CONTRACT 2007-6030 38.57 Check Total: 77.13 AP-00092122 MW FEDEX LABORATORY POSTAGE EXPENSES 1007-4810 50.10 FEDEX HUMAN RESOURCES POSTAGE EXPENSES 1022-4810 21.60 FEDEX LABORATORY POSTAGE EXPENSES 2007-4810 50.09 FEDEX HUMAN RESOURCES POSTAGE EXPENSES 2022-4810 21.59 Check Total: 143.38 AP-00092123 MW User: THERESA-Theresa Sherman Page: 4 Current Date: 12/10/2015 Report: BK:Payment of Claims Report(With RV)V2<1.03> Current Time: 09:48:45 PAYMENT OF CLAIMS Vendor Name Department/Proj Name Description Acct#/Proj Code Amount Check Num Type FERGUSON ENTERPRISES INC HEAVY MAINT SECONDARY EQUIP 1004-6022 441.72 Check Total: 441.72 'AP-00092124 MW FISHER SCIENTIFIC LABORATORY LAB SUPPLIES 1007-4760 389.42 FISHER SCIENTIFIC LABORATORY LAB SUPPLIES 2007-4760 389.43 Check Total: 778.85 AP-00092125 MW FLYERS ENERGY LLC GEN&ADMIN GASOLINE INV 1000-0415 4,018.83 FLYERS ENERGY LLC GEN&ADMIN DIESEL INVENTORY 1000-0416 3,622.43 FLYERS ENERGY LLC EQUIPMENT REP OIL&LUBE 1005-4630 859.20 FLYERS ENERGY LLC DIAMOND VLY RNCH GASOLINE 1028-4610 278.47 FLYERS ENERGY LLC DIAMOND VLY RNCH DIESEL 1028-4620 562.68 FLYERS ENERGY LLC EQUIPMENT REPAIR OIL&LUBE 2005-4630 859.19 Check Total: 10.200.80 AP-00092126 MW FRONTIER COMMUNICATIONS DIAMOND VLY RNCH TELEPHONE 1028-6310 299.00 Check Total: 299.00 AP-00092127 MW GEOTECH ENVIRONMENTAL EQUIP LABORATORY LAB SUPPLIES 1007-4760 1,193.70 GEOTECH ENVIRONMENTAL EQUIP LABORATORY LAB SUPPLIES 2007-4760 1,193.71 u-i co Check Total: 2.387.41 AP-00092128 MW GFOA FINANCE DUES/MEMB/CERT 1039-6250 80.00 GFOA FINANCE DUES/MEMB/CERT 2039-6250 • 80.00 Check Total: 160.00 AP-00092129 MW GFS CHEMICALS INC LABORATORY LAB SUPPLIES 1007-4760 37.31 GFS CHEMICALS INC LABORATORY LAB SUPPLIES 2007-4760 37.32 Check Total: 74.63 AP-00092130 MW GRAINGER GEN&ADMIN SHOP SUPP INV 1000-0421 621.72 GRAINGER ELECTRICAL SHOP BUILDINGS 1003-6041 421.46 GRAINGER GEN&ADMIN HVAC FLTRS/PARTS 2000-0480 836.31 Check Total: 1.879.49 .AP-00092131 MW GRANT THORNTON LLP FINANCE AUDITING 1039-4470 7,618.20 GRANT THORNTON LLP FINANCE AUDITING 2039-4470 7,618.20 Check Total: 15.236.40 AP-00092132 'MW HACH CO ELECTRICAL SHOP SECONDARY EQUIP 1003-6022 417.53 User: THERESA-Theresa Sherman Page: 5 Current Date: 12/10/2015 Report: BK:Payment of Claims Report(With RV)V2<1.03> Current Time: 09:48:45 4` PAYMENT OF CLAIMS Vendor Name Department/Proj Name Description Acct#/Proj Code Amount Check Num type Check Total: 417.53 AP-00092133 a•:MW HANDA,JUDITH CUSTOMER SERVICE-WTR CONS PROG WTR CONS EXPENSE 2038-6660-WCPROG 98.00 Check Total: 98.00 AP-00092134 MW IDEXX DISTRIBUTION CORP LABORATORY LAB SUPPLIES 1007-4760 1,064.93 IDEXX DISTRIBUTION CORP LABORATORY LAB SUPPLIES • 2007-4760 1,064.93 Check Total: . 2.129.86 AP-00092135 MW INFOSEND INC PUBLIC OUTREACH PRINTING 1027-4920 1,590.33 . INFOSEND INC CUSTOMER SERVICE POSTAGE EXPENSES 1038-4810 893.08 INFOSEND INC CUSTOMER SERVICE PRINTING 1038-4920 3,471.55 INFOSEND INC PUBLIC OUTREACH PRINTING 2027-4920 1,590.33 INFOSEND INC CUSTOMER SERVICE POSTAGE EXPENSES 2038-4810 893.08 INFOSEND INC CUSTOMER SERVICE PRINTING - 2038-4920 3,471.56 Check Total: 11.909.93, AP-00092136 MW INSITE LAND SURVEYS ENGINEERING-FLL SWR UPGR FLL SYSTEM UPGR 1029-8331 -FLLSUP 150.00 Check Total: 150.00 AP-00092137 MW JEv SEN PRECAST GEN&ADMIN MH FRM/LIDS&PRTS 1000-0410 294.84 JERSEN PRECAST UNDERGROUND REP PIPE/CVRS/MHLS 1001-6052 274.33 Check Total: 569.17 AP-00092138 MW KIDD,ELDON GEN&ADMIN UB SUSPENSE 1000-2002 118.31 Check Total: 118.31 AP-00092139 MW KTHO AM 590&96.1 FM PUBLIC OUTREACH-PR EXP-EXTERNAL PUB RELATIONS 1027-6620-PREEXT 562.50 KTHO AM 590&96.1 FM PUBLIC OUTREACH-PR EXP-EXTERNAL PUB RELATIONS 2027-6620-PREEXT 562.50 Check Total: • 1.125.00 AP-00092140 MW KTM INC FINANCE ADVISORY 1039-4440 2,567.34 • KTM INC FINANCE ADVISORY 2039-4440 2,567.34 Check Total: 5.134.68 AP-00092141 MW • LAKE TAHOE PLUMBING CUSTOMER SERVICE MISC LIAB CLAIMS 1038-4520 979.25 LAKE TAHOE PLUMBING ENGINEERING-2014 METER PRJ METERS 2014 2029-7013-METERS 490.50 Check Total: 1.469.75 AP-00092142 MW LAKESIDE NAPA UNDERGROUND REP SHOP SUPPLIES 1001 -6071 4.31 LAKESIDE NAPA PUMPS LUTHER PASS 1002-6048 85.15 User: THERESA-Theresa Sherman Page: 6 Current Date: 12/10/2015 Report: BK:Payment of Claims Report(With RV)V2<1.03> Current Time: 09:48:45 PAYMENT OF CLAIMS Vendor Name Department/Proj Name Description Acct#/Proj Code Amount Check Num Type LAKESIDE NAPA PUMPS SHOP SUPPLIES 1002-6071 8.89 LAKESIDE NAPA PUMPS SMALL TOOLS 1002-6073 262.24 LAKESIDE NAPA HEAVY MAINT SECONDARY EQUIP 1004-6022 12.97 LAKESIDE NAPA HEAVY MAINT GROUNDS&MNTC 1004-6042 11.34 LAKESIDE NAPA HEAVY MAINT SHOP SUPPLIES 1004-6071 97.42 LAKESIDE NAPA EQUIPMENT REP AUTOMOTIVE 1005-6011 560.28 • LAKESIDE NAPA EQUIPMENT REP GENERATORS 1005-6013 339.42 LAKESIDE NAPA EQUIPMENT REP SHOP SUPPLIES 1005-6071 212.15 LAKESIDE NAPA EQUIPMENT REP SMALL TOOLS 1005-6073 13.50 LAKESIDE NAPA DIAMOND VLY RNCH GROUNDS&MNTC 1028-6042 55.46 LAKESIDE NAPA DIAMOND VLY RNCH SMALL TOOLS 1028-6073 21.50 LAKESIDE NAPA UNDERGROUND REP - SHOP SUPPLIES 2001-6071 199.84 LAKESIDE NAPA PUMPS SHOP SUPPLIES 2002-6071 8.89 • LAKESIDE NAPA PUMPS SMALL TOOLS 2002-6073 262.24 LAKESIDE NAPA EQUIPMENT REPAIR AUTOMOTIVE 2005-6011 856.29 LAKESIDE NAPA EQUIPMENT REPAIR SHOP SUPPLIES 2005-6071 212.15 L'RESIDE NAPA EQUIPMENT REPAIR SMALL TOOLS 2005-6073 13.48 Check Total: 3.237.52 AP-00092143 MW LIBERTY UTILITIES GEN&ADMIN ELECTRICITY 1000-6330 57,089.81 LIBERTY UTILITIES GEN&ADMIN ST LIGHTING EXP 1000-6740 1,732.18 LIBERTY UTILITIES GEN&ADMIN ELECTRICITY 2000-6330 19,095.40 Check Total: 77.917.39 AP-00092144 MW LILLY'S TIRE SERVICE INC EQUIPMENT REP AUTOMOTIVE 1005-6011 376.16 LILLY'S TIRE SERVICE INC EQUIPMENT REPAIR AUTOMOTIVE 2005-6011 385.16 Check Total: 761.32 AP-00092145 MW LUMOS&ASSOCIATES ENGINEERING-TRUCKEE MARSH TR CRK RESTORE 1029-8426-TMSFPP 4,280.00 LUMOS&ASSOCIATES ENGINEERING CONTRACT SERVICE 2029-4405 13,442.50 Check Total: 17.722.50 AP-00092146 MW MALLORY SAFETY&SUPPLY LLC GEN&ADMIN SHOP SUPP INV 1000-0421 113.50 Check Total: 113.50 .AP-00092147 MW MC MASTER CARR SUPPLY CO HEAVY MAINT PRIMARY EQUIP 1004-6021 367.70 MC MASTER CARR SUPPLY CO PUMPS BUILDINGS 2002-6041 449.59 User: THERESA-Theresa Sherman Page: 7 Current Date: 12/10/2015 Report: BK:Payment of Claims Report(With RV)V2<1.03> Current Time: 09:48:45 fi PAYMENT OF CLAIMS Vendor Name Department/Proj Name Description Acct#/Proj Code . Amount Check Num -Type Check Total: 817.29- AP-00092148 e-MW MCFARLANE,MICHAEL CUSTOMER SERVICE-WTR CONS PROG WTR CONS EXPENSE 2038-6660-WCPROG 99.41 Check Total: 99.41 AP-00092149 MW MEEKS BUILDING CENTER PUMPS PUMP STATIONS 1002-6051 25.16 • MEEKS BUILDING CENTER PUMPS SHOP SUPPLIES 1002-6071 3.24 MEEKS BUILDING CENTER PUMPS SMALL TOOLS 1002-6073 100.76 MEEKS BUILDING CENTER HEAVY MAINT SHOP SUPPLIES 1004-6071 228.67 MEEKS BUILDING CENTER DIAMOND VLY RNCH GROUNDS&MNTC 1028-6042 155.53 MEEKS BUILDING CENTER DIAMOND VLY RNCH SHOP SUPPLIES 1028-6071 30.76 MEEKS BUILDING CENTER DIAMOND VLY RNCH SMALL TOOLS 1028-6073 51.07 • MEEKS BUILDING CENTER ENGINEERING-BIJOU MAINT-CSLT GROUNDS&MNTC 1029-6042-BIJUSW 47.76 MEEKS BUILDING CENTER UNDERGROUND REP SMALL TOOLS 2001 -6073 35.87 MEEKS BUILDING CENTER PUMPS PUMP STATIONS 2002-6051 7.43 MEEKS BUILDING CENTER PUMPS RPR/MNTC WTR TKS 2002-6054 25.60 MEEKS BUILDING CENTER PUMPS SHOP SUPPLIES 2002-6071 3.24 • MFIEKS BUILDING CENTER PUMPS SMALL TOOLS 2002-6073 100.76 MAKS BUILDING CENTER HEAVY MAINTENANC BUILDINGS 2004-6041 232.65 I Check Total: 1.048.50 AP-00092150 MW METRO OFFICE SOLUTIONS CUSTOMER SERVICE OFFICE SUPPLIES 1038-4820 53.96 METRO OFFICE SOLUTIONS FINANCE OFFICE SUPPLIES 1039-4820 43.87 . METRO OFFICE SOLUTIONS CUSTOMER SERVICE OFFICE SUPPLIES 2038-4820 53.95 METRO OFFICE SOLUTIONS FINANCE OFFICE SUPPLIES 2039-4820 43.84 Check Total: 195.62 AP-00092151 MW MINCO COMPONENTS COM ELECTRICAL SHOP PRIMARY EQUIP 1003-6021 1,410.16 - Check Total: 1.410.16 AP-00092152 MW MOFFETT,DEIDRE GEN&ADMIN UB SUSPENSE 1000-2002 2,759.27 MOFFETT,DEIDRE GEN&ADMIN UB SUSPENSE 2000-2002 2,615.73 • Check Total: 5.375.00 AP-00092153 MW MOTEL 6 PUMPS STANDBY ACCOMODA 1002-6083 157.84 MOTEL 6 PUMPS STANDBY ACCOMODA 2002-6083 157.84 Check Total: 315.68 AP-00092154 MW MSC INDUSTRIAL SUPPLY CO HEAVY MAINT SMALL TOOLS 1004-6073 166.24 User: THERESA-Theresa Sherman Page: 8 Current Date: 12/10/2015 Report: BK:Payment of Claims Report(With RV)V2<1.03> Current Time: 09:48:45 PAYMENT OF CLAIMS Vendor Name Department/Proj Name Description Acct#I Proj Code Amount Check Num Tvoe Check Total: 166.24 AP-00092155 MW NELS TAHOE HARDWARE HEAVY MAINT PRIMARY EQUIP 1004-6021 26.20 NELS TAHOE HARDWARE HEAVY MAINT SHOP SUPPLIES 1004-6071 19.41 NELS TAHOE HARDWARE ENGINEERING-BIJOU MAINT-CSLT GROUNDS&MNTC 1029.-6042-BIJUSW 102.48 Check Total: 148.09 AP-00092156 MW NETVAD INFORMATION TECH DIST.COMP SPPLIS 1037-4840 . 1,663.52 NETVAD INFORMATION TECH DIST.COMP SPPLIS 2037-4840 1,663.52 ' Check Total: 3.327.04 AP-00092157 MW NEVADA RURAL WATER ASSOC PUMPS TRAVEL/MEETINGS 2002-6200 35.00 Check Total: 35.00 AP-00092158 MW NEXLEVEL INFORMATION TECH INC INFORMATION TECH CONTRACT SERVICE 1037-4405 1,268.75 NEXLEVEL INFORMATION TECH INC INFORMATION TECH CONTRACT SERVICE 2037-4405 1,268.75 Check Total: 2.537.50 AP-00092159 MW O I CORP LABORATORY LAB SUPPLIES 1007-4760 232.58 O I CORP LABORATORY LAB SUPPLIES 2007-4760 232.58 all Check Total: 465.16 AP-00092160 MW OIIRAC LABORATORY POSTAGE EXPENSES 1007-4810 88.39 ONTRAC LABORATORY POSTAGE EXPENSES 2007-4810 4.54 Check Total: 92.93 AP-00092161 MW PALALA,SUDHAKAR&MADHAVI GEN&ADMIN UB SUSPENSE 1000-2002 160.64 ' Check Total: 160.64 AP-00092162 MW PARK AVENUE DEVELOPMENT CUSTOMER SERVICE-WTR CONS PROG WTR CONS EXPENSE 2038-6660-WCPROG 5,075.00 Check Total: 5.075.00 AP-00092163 MW PC MALL GOV INC INFORMATION TECH REP DOMN CNTRLR 2037-8666 8,749.42 Check Total: 8.749.42 AP-00092164 MW PETERBILT TRUCK PARTS EQUIPMENT REPAIR AUTOMOTIVE 2005-6011 95.14 Check Total: 95.14 AP-00092165 MW PETTY CASH HEAVY MAINT TRAVEUMEETINGS 1004-6200 24.00 PETTY CASH ADMINISTRATION INCNTV&RCGNTN 1021 -6621 10.79 • PETTY CASH DIAMOND VLY RNCH SHOP SUPPLIES 1028-6071 16.99 PETTY CASH ENGINEERING SAFETY/EQUIP/PHY 1029-6075 3.35 • • User: THERESA-Theresa Sherman Page: 9 Current Date: 12/10/2015 r Report: BK:Payment of Claims Report(With RV)V2<1.03> '�' P Ym P Current Time: 09:48:45 PAYMENT OF CLAIMS Vendor Name Department/Proj Name Description Acct#/Proj Code Amount Check Num Type PETTY CASH ENGINEERING TRAVEUMEETINGS 1029-6200 37.50 &: PETTY CASH ENGINEERING SUPPLIES 1029-6520 17.35 PETTY CASH CUSTOMER SERVICE TRAVEUMEETINGS 1038-6200 21.50 PETTY CASH FINANCE TRAVEUMEETINGS 1039-6200 24.30 • PETTY CASH PUMPS •RPR/MNTC WTR TKS 2002-6054 4.85 PETTY CASH ADMINISTRATION INCNTV&RCGNTN 2021 -6621 10.79 PETTY CASH ENGINEERING OFFICE SUPPLIES 2029-4820 36.98 • PETTY CASH ENGINEERING SAFETY/EQUIP/PHY 2029-6075 3.35 PETTY CASH ENGINEERING TRAVEUMEETINGS 2029-6200 37.50 PETTY CASH ENGINEERING SUPPLIES 2029-6520 17.35 PETTY CASH CUSTOMER SERVICE TRAVEL/MEETINGS 2038-6200 21.50 PETTY CASH FINANCE TRAVEUMEETINGS 2039-6200 24.30 Check Total: 312.40 AP-00092166 MW POWERS,TERENCE H LABORATORY TRAVEUMEETINGS 1007-6200 33.93 POWERS,TERENCE H LABORATORY TRAVEUMEETINGS 2007-6200 33.92 Check Total: 67.85 AP-00092167 MW I PF XAIR 174 PUMPS SHOP SUPPLIES 1002-6071 104.16 PRAXAIR 174 HEAVY MAINT SMALL TOOLS 1004-6073 82.07 PRAXAIR 174 EQUIPMENT REP SHOP SUPPLIES 1005-6071 38.75 PRAXAIR 174 LABORATORY LAB SUPPLIES 1007-4760 • 30.19 PRAXAIR 174 PUMPS SHOP SUPPLIES 2002-6071 104.16 PRAXAIR 174 EQUIPMENT REPAIR SHOP SUPPLIES 2005-6071 38.74 PRAXAIR 174 LABORATORY LAB SUPPLIES 2007-4760 30.19 • Check Total: 428.26 AP-00092168 MW RANALLETTE,LORI CUSTOMER SERVICE-WTR CONS PROG WTR CONS EXPENSE 2038-6660-WCPROG 261.56 Check Total: 261.56 AP-00092169 MW RAUCH COMMUNICATION PUBLIC OUTREACH-PR EXP-EXTERNAL PUB RELATIONS 1027-6620-PREEXT 959.38 RAUCH COMMUNICATION PUBLIC OUTREACH-PR EXP-EXTERNAL PUB RELATIONS 2027-6620-PREEXT 959.37 Check Total: 1.918.75 AP-00092170 MW RELIANCE STANDARD GEN&ADMIN LIFE INS UN/BD 1000-2512 1,531.62 RELIANCE STANDARD • GEN&ADMIN LIFE INS MGMT 1000-2525 538.10 RELIANCE STANDARD GEN&ADMIN LNG TRM DIS,MGMT 1000-2531 1,339.43 • User: THERESA-Theresa Sherman Page: 10 Current Date: 12/10/2015 Report: BK:Payment of Claims Report(With RV)V2<1.03> Current Time: 09:48:45 PAYMENT OF CLAIMS Vendor Name Department/Proj Name Description Acct#/Proj Code ' Amount Check Num Type RELIANCE STANDARD GEN&ADMIN j LTD,UNION 1000-2539 1,642.21 • Check Total: 5.051.36 AP-00092171 MW RENO DRAIN OIL SERVICE EQUIPMENT REP SHOP SUPPLIES 1005-6071 15.00 RENO DRAIN OIL SERVICE EQUIPMENT REPAIR SHOP SUPPLIES 2005-6071 15.00 Check Total: 30.00 AP-00092172 MW SCOTTYS HARDWARE GEN&ADMIN SHOP SUPP INV 1000-0421 341.11 SCOTTYS HARDWARE PUMPS SHOP SUPPLIES 1002-6071 15.99 • SCOTTYS HARDWARE PUMPS PUMP STATIONS 2002-6051 45.00 SCOTTYS HARDWARE PUMPS SHOP SUPPLIES 2002-6071 15.98 Check Total: 418.08 AP-00092173 MW SEGAL,HARRY CUSTOMER SERVICE-WTR CONS PROG WTR CONS EXPENSE 2038-6660-WCPROG 200.00 . Check Total: 200.00 AP-00092174 MW SHRED-IT GEN&ADMIN OFC SUPPLY ISSUE 1000-6081 64.00 Check Total: 64.00 AP-00092175 MW SIERRA CHEMICAL CO PUMPS GROUNDS&MNTC 1002-6042 62.57 SIERRA CHEMICAL CO HEAVY MAINT GROUNDS&MNTC 1004-6042 121.46 SI;RA tRA CHEMICAL CO OPERATIONS GROUNDS&MNTC 1006-6042 121.46 SIERRA CHEMICAL CO PUMPS HYPOCHLORITE 2002-4755 610.39 • SIERRA CHEMICAL CO PUMPS GROUNDS&MNTC 2002-6042 62.57 Check Total: 978.45 AP-00092176 MW ' SIERRA FUND,THE ENGINEERING-INT RGNL WTR MGT CONTRACT SERVICE 2029-4405-IRWMPL 5,970.00 Check Total: 5.970.00 AP-00092177 MW SIERRA NEVADA MEDIA GROUP CUSTOMER SERVICE ADS/LGL NOTICES 1038-4930 174.81 • SIERRA NEVADA MEDIA GROUP CUSTOMER SERVICE ADS/LGL NOTICES 2038-4930 174.81 SIERRA NEVADA MEDIA GROUP CUSTOMER SERVICE-WTR CONS PROG WTR CONS EXPENSE 2038-6660-WCPROG 375.00 Check Total: 724.62 AP-00092178 MW SIERRA SPRINGS PUMPS SUPPLIES 1002-6520 15.41 SIERRA SPRINGS DIAMOND VLY RNCH SUPPLIES 1028-6520 15.41 • SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 1038-6520 7.94 SIERRA SPRINGS CUSTOMER SERVICE SUPPLIES 2038-6520 7.94 Check Total: 46.70 AP-00092179 MW SILVER STATE INTERNATIONAL INC EQUIPMENT REP AUTOMOTIVE 1005-6011 555.49 - User: THERESA-Theresa Sherman Page: 11 Current Date: 12/10/2015 Report: BK:Payment of Claims Report(With RV)V2<1.03> Current Time: 09:48:45 _PAYMENT OF CLAIMS Vendor Name Department/Proj Name Description Acct#/Proj Code Amount Check Num T ae Check Total: 555.49 AP-00092180 «MW SILVERS HR LLC HUMAN RESOURCES TRAVEL/MEETINGS 1022-6200 3,560.83 SILVERS HR LLC HUMAN RESOURCES TRAVEL/MEETINGS 2022-6200 3,560.82 Check Total: 7.121.65 AP-00092181 MW SOUNDPROS INC PUBLIC OUTREACH-PR EXP-EXTERNAL PUB RELATIONS 1027-6620-PREEXT 49.00 SOUNDPROS INC PUBLIC OUTREACH-PR EXP-EXTERNAL PUB RELATIONS 2027-6620-PREEXT 49.00 Check Total: 98.00 AP-00092182 MW SOUTH TAHOE REFUSE GEN&ADMIN REFUSE DISPOSAL 1000-6370 2,114.00 SOUTH TAHOE REFUSE GEN&ADMIN REFUSE DISPOSAL 2000-6370 120.80 Check Total: 2.234.80 AP-00092183 MW SOUTHWEST GAS GEN&ADMIN NATURAL GAS 1000-6350 9,119.35 SOUTHWEST GAS GEN&ADMIN NATURAL GAS 2000-6350 1,630.12 . Check Total: 10.749.47 AP-00092184 MW SUNRISE ENGINEERING INC ENGINEERING-DVR IRRIG IMPRVS DVR IRR IMPRVMNT 1029-8161-DVRIIP . 1,245.00 Check Total: 1,245.00 •AP-00092185 MW SWRCB UNDERGROUND REP DUES/MEMB/CERT 2001-6250 70.00 to Check Total: 70.00 AP-00092186 MW SWRCB PUMPS DUES/MEMB/CERT 2002-6250 115.00 Check Total: 115.00 AP-00092187 MW TAHOE BASIN CONTAINER SERVICE GEN&ADMIN REFUSE DISPOSAL 1000-6370 312.50 TAHOE BASIN CONTAINER SERVICE OPERATIONS SLUDGE DISPOSAL 1006-6652 8,930.88 Check Total: . 9.243.38 AP-00092188 MW TAHOE PARADISE CHEVRON UNDERGROUND REP DIESEL 2001 -4620 72.49 . • Check Total: 72.49 AP-00092189 MW TAHOE SAND&GRAVEL PUMPS • GROUNDS&MNTC 1002-6042 35.91 TAHOE SAND&GRAVEL UNDERGROUND REP PIPE/CVRS/MHLS 2001-6052 710.30 TAHOE SAND&GRAVEL PUMPS GROUNDS&MNTC 2002-6042 35.91 Check Total: 782.12 AP-00092190 MW TAHOE VALLEY ELECTRIC SUPPLY ELECTRICAL SHOP BUILDINGS 1003-6041 1,372.94 . TAHOE VALLEY ELECTRIC SUPPLY ELECTRICAL SHOP BUILDINGS 2003-6041 456.84 Check Total: 1,829.78 AP-00092191 MW User: THERESA-Theresa Sherman Page: 12 Current Date: 12/10/2015 Report: BK:Payment of Claims Report(With RV)V2<1.03> Current Time: 09:48:45 PAYMENT OF CLAIMS Vendor Name Department/Proj Name Description Acct#/Proj Code Amount Check Num Type THERMO ELECTRON NO AMER LLC LABORATORY LAB SUPPLIES 1007-4760 728.77 THERMO ELECTRON NO AMER LLC LABORATORY LAB SUPPLIES 2007-4760 728.75 Check Total: 1.457.52 AP-00092192 MW TRPA GEN&ADMIN TRANS MITIGATION 1000-2606 37,064.00 Check Total: 37,064.00 AP-00092193 MW UPS SUPPLY CHAIN INFORMATION TECH POSTAGE EXPENSES 1037-4810 25.37 UPS SUPPLY CHAIN INFORMATION TECH POSTAGE EXPENSES 2037-4810 25.37 Check Total: 50.74 AP-00092194 MW WATER EDUCATION FOUNDATION ADMINISTRATION DUES/MEMB/CERT 1021 -6250 250.00 WATER EDUCATION FOUNDATION ADMINISTRATION DUES/MEMB/CERT 2021-6250 250.00 Check Total: • 500.00 AP-00092195 MW WATERMAN,KEITH&KIMBERLY GEN&ADMIN UB SUSPENSE 1000-2002 50.00 ' WATERMAN,KEITH&KIMBERLY GEN&ADMIN UB SUSPENSE 2000-2002 50.00 Check Total: 100.00 AP-00092196 MW WEDCO INC ELECTRICAL SHOP BUILDINGS 1003-6041 54.90 WBDCO INC ELECTRICAL SHOP SHOP SUPPLIES 1003-6071 105.49 W ybCO INC ELECTRICAL SHOP SMALL TOOLS 1003-6073 31.61 Check Total: 192.00 AP-00092197 MW WHITE ROCK CONSTRUCTION GEN&ADMIN-SWRLN OSGOOD RPL CONST RETAINAGE 1000-2605-15S011 . -6,550.30 WHITE ROCK CONSTRUCTION ENGINEERING-SWRLN OSGOOD RPL SWRLN,OSGOOD 1029-7018-15S011 131,006.07 WHITE ROCK CONSTRUCTION GEN&ADMIN-REP LG WTR MTRS CONST RETAINAGE 2000-2605-14W115 442.97 WHITE ROCK CONSTRUCTION GEN&ADMIN-FIRE HYDRANTS CONST RETAINAGE 2000-2605-HYDRNT 2,362.81 WHITE ROCK CONSTRUCTION ENGINEERING-REP LG WTR MTRS REP LG WT MTRS 2029-8539-14W115 -8,859.34 WHITE ROCK CONSTRUCTION ENGINEERING-FIRE HYDRANTS FR HYD 6"LINES 2029-8560-HYDRNT -47,256.19 Check Total: 71.146.02 AP-00092198 MW Grand Total: 666,848.57 • User: THERESA-Theresa Sherman Page: 13 Current Date: 12/10/2015 Report: BK:Payment of Claims Report(With RV)V2<1.03> Current Time: 09:48:45 r. General Manager Richard H.So!brig ge° 1950 • w Directors E tePSouth Tahoe Chris Cefalu James R.Jones r. ` Randy Vogelgesang Public Utility District Kelly Sheehan Duane Wallace 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 544-0474•Fax 530 541-0614•www.stpucLue BOARD AGENDA ITEM 7j TO: Board of Directors FROM: Nancy Hussmann, Human Resources Director MEETING DATE: December 17, 2015 ITEM ®PROJECT NAME: General Manager Contract Renewal REQUESTED BOARD ACTION: Approve a three year contract for the General Manager DISCUSSION: The Executive Committee met to discuss terms of the contract with Richard Solbrig. It was recommended that the salary be governed by the Management MOU, which includes a 2% increase effective July 1, 2016. Any further increases will be governed by negotiations of the management group resulting in the Management MOU. Finally, for termination without cause, it was recommended that the severance pay be changed from eight to six months. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT AVAILABLE: ATTACHMENTS: General Manager Contract CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES 6/T449 NO CHIEF FINANCIAL OFFICER: YES 14 NO -67- Clo , AGREEMENT FOR PROFESSIONAL SERVICES FOR GENERAL MANAGER This Agreement for Professional Services for General Manager (Agreement) is entered into this 7tli day of January,r294f2016,rby and between the South Tahoe Public Utility District (District), a California public agency formed in 1950 pursuant to the Public Utility District Act and Richard H. Solbrig (Solbrig) at South Lake Tahoe, California, with reference to the following facts and intentions. A. The District is engaged in the collection, treatment, and transportation of sewage and wastewater and the production, storage, transmission and distribution of water within its jurisdictional boundaries; B. The District desires to retain an individual for the position of General Manager who will have full charge and control of the facilities of the District, including construction, maintenance and operation, and who shall be responsible for the efficient administration of all of the affairs of the District; C. Solbrig represents that he is qualified to perform the duties and services of the position of General Manager; and D. The District and Solbrig have negotiated the terms and conditions for Solbrig's employment in the position of General Manager pursuant to the terms and conditions of this Agreement. NOW, THEREFORE, the parties agree as follows: 1. EMPLOYMENT. The District employs Solbrig, and Solbrig accepts employment with the District in the position 9f General Manager, on the terms and conditions and for the compensation as stated below. 2. SCOPE OF DUTIES AND SERVICES. Solbrig shall personally provide all of the services and duties ordinarily performed by the General Manager for the District,including those services and duties as provided by any applicable ordinances,resolutions or regulations of the District,under the general direction of the District's Board of Directors (Board of Directors). As General Manager, Solbrig shall assume full responsibility for the operation and management of the District, including the supervision and control of all of the District's property, administrative activities,personnel,business and operations,subject to the budgetary guidelines and directives of the Board of Directors, and for otherwise carrying out the policies and directives set by the Board of Directors. Solbrig shall perform his obligations and responsibilities diligently within the time parameters indicated by the Board of Directors, applying the highest degree of professionalism and good workmanship to every aspect of his obligations. Solbrig shall have the authority to hire, discipline or discharge such employees as may be necessary to carry out the business of the District, except as provided by law and any -68- I 4)) a applicable ordinances, resolutions and regulations of the District. 3. WARRANTY BY SOLBRIG. Solbrig warrants and represents that he is fully qualified to perform the duties and obligations of the position of General Manager of the District, and that he is fully committed to perform these duties and obligations during the term of this Agreement. 4. TERM. The effective date of this Agreement shall be January 6,2011-7, ( 2016 and shall continue fora three (3) year period through,January 9, 2019 unless otherwise terminated as provided in Section 8 below. This Agreement may, in the Board of Directors' sole and absolute discretion and with the consent of Solbrig,be renewed on or before the expiration of the term of this contract for an additional term or such terms as mutually agreed to by the parties. 5. COMPENSATION. For the services to be provided pursuant to this Agreement, Solbrig shall receive the following compensation: ere Salary. Effective January,b, 2011. 14,.2016, the annual salary range for the position of General Manager shall be $11,801 $15,062 13,856—;17,684 per month_ and Solbrig shall be paid a salary of._$15,06217,684 per month, through January'I, 2012 June 29,- 2016. Effective June. -30, 2016 through June-28, 2017, Solbrig shall be paid salary of $18,038, .per..the MOU negotiations—between the District and the Management Staff employees. Future salary adjustments may will be based upon 1. CASA Survey 1 OO+Employees 2. AWWA 100 199 Employees 3. . .l _ . , , . - . . . , e • ' _ - _ , adjustments made to ether the 'Management_Staff employees of the District, and Board's review of Solbrig's performance, as- well as the health of the overall economy. Solbrig's salary shall be payable at the same time as other Management Staff employees of the District and in accordance with established District procedures. Solbrig, as an executive employee, is exempt from overtime payments and entitlements under State and Federal laws. b. Benefits Except as otherwise provided in this Agreement, all of the rules and regulations of the District relating to vacation, sick leave, retirement, pension system contributions, holidays, and other fringe benefits and working conditions as they now exist or may be amended, shall also apply to Solbrig in the same manner as they apply to other management employees of the District. These benefits include, but are not limited to, District paid vision, health and dental insurance, life insurance, long-term disability, retirement plan, vacation, and sick leave. Solbrig shall receive twenty six (26)twenty-seven_(27)paid vacation days annually. Five (5) days' vacation shall be accrued the first pay period of January of each year of this contract, with the remaining twenty-ones t w o (24.22)vacation days accruing proportionately through each pay period of the year. Administrative Time off of forty (40) hours per contract year shall be earned and which cannot be accumulated from year to year, and must be taken off within the contract year, or lost. c. Expenses. The District shall provide Solbrig with reimbursement for reasonable expenses necessarily incurred by Solbrig in the performance of his duties on behalf of the District. Such reimbursement shall take the form of either cash reimbursement based upon proper expense vouchers,receipts, statements or personal affidavits, or in the alternative,the i fi utilization of a credit card or other similar deferred payment arrangement which sums owing shall be paid by the District, based on substantiation by District. d. Educational Reimbursement. Solbrig may participate in special educational and training programs subject to the reimbursement provisions of this subsection with prior approval by the Board of Directors. Such programs shall be limited to those directly related to District operations which provide knowledge, training and/or ability that cannot reasonably be'provided on the job. All programs conducted outside District facilities, or those programs requiring payment for tuition; registration fees, transportation or other costs, shall be approved in advance by the President of the Board of Directors using District-approved forms, fully completed and executed. All special educational and training programs shall be recorded and/or reported in the manner prescribed by the Board of Directors. The District shall pay the full cost of tuition, examinations, books and certification, provided Solbrig successfully completes the pre-approved course(s) or program(s). The District shall pay the state fee for approved certificates and/or renewals. The District shall allow time off with pay for Solbrig to take certification exams which are within Solbrig's field of work, if approved in advance by the Board of Directors. If Solbrig does not pass the exam, he may take time off without pay for reexaminations. e. Remote Computer Equipment (1) Computer Equipment The District desires to continue assisting Solbrig in performing his General Manager duties and responsibilities during non-business hours by providing Solbrig remote access computer equipment and software at his home, which shall be integrated with the District's computer system. (2) Computer Usage. The District shall be solely responsible for all maintenance and repairs of the computer equipment and all remote set up costs and charges. The District's computer personnel shall be made available for in-house training and assistance. The District shall cover the computer equipment under its insurance policies. 6. VEHICLE USE. a. District Vehicle. The District shall provide to Solbrig a District- owned four-wheel drive vehicle for his use in connection with his District responsibilities. The District-owned vehicle shall be available to Solbrig for Solbrig's use at all times, as the District's General Manager is on call twenty-four (24)hours per day,seven(7)days per week. The District shall pay for the cost of maintenance, repair and gasoline, and provide insurance for this vehicle. Solbrig shall operate the District-provided vehicle in a safe manner, and shall maintain a valid California automobile driver's license during the term of this Agreement. Except as otherwise provided in this Agreement, Solbrig shall operate the District-provided vehicle in accordance with any applicable ordinances, resolutions, regulations or policies of the District regarding District vehicles. b. Personal Vehicle. From time to time, Solbrig may be required to utilize his personal automobile in connection with the performance of his duties under the terms -70- : epi i of this Agreement. Solbrig shall procure and/or maintain in full force and effect during his employment with the District automobile liability insurance covering all personal automobiles which are operated by Solbrig in connection with the services under this Agreement in a reasonable amount, acceptable to the District. Solbrig shall provide the District with a certificate of insurance evidencing the above coverage. Failure to maintain such coverage shall constitute a material breach of this Agreement. 7. CONFLICT OF INTEREST. Solbrig represents and warrants to the District that he presently has no interest, and covenants that he will not acquire any interests, direct or indirect, fmancial or otherwise, which would conflict in any manner or interfere with the performance of services required to be performed under this Agreement. 8. TERMINATION. a. Termination Without Cause. The District may terminate this Agreement and Solbrig's employment with the District in accordance with any applicable ordinances, resolutions or regulations of the District at any time prior to the expiration of the term of this Contract, or any additional terms without cause by giving Solbrig thirty (30) days written notice of such termination. In addition to thirty (30) days written notice, Solbrig will receive eight (8)—six(6)months' severance pay and benefits at the rates and conditions set forth in this Agreement in the event he is terminated without cause under this subsection during the term of this Contract or any subsequent term. In the event Solbrig obtains any other comparable engineering or management employment within the eight (8)six(6) month severance pay period, then the District's obligation set forth in this subsection will cease. Solbrig may terminate this Agreement for any reason by giving the District at least ninety (90) days' prior written notice of termination. Termination by either party shall not relieve either of them from their responsibilities under this Agreement until the.termination date. b. Termination for Cause. The District may terminate this Agreement and Solbrig's employment with the District in accordance with any applicable ordinances, resolutions or regulations of the District, or otherwise discipline Solbrig, for cause upon thirty (30) days prior written notice. If Solbrig's employment is terminated for cause, he shall not be entitled to any severance pay or benefits. The District and Solbrig specifically acknowledge that it is not possible to list every possible form of unacceptable conduct which may subject Solbrig to termination or other disciplinary action for cause. For the purpose of this Agreement, cause for termination shall include, but not be limited to, the following: (1) Poor performance or misconduct; (2) The material breach of this Agreement or Solbrig's obligations under this Agreement; (3) Intentional failure to perform consistent with his obligations under applicable law or with lawful directives issued by the Board of Directors; —71— • (4) Conviction of a felony or any crime involving moral turpitude; (5) Acts of dishonesty, fraud, public intoxication, or any action or • activity that might bring embarrassment or discredit to the District; or (6) Unauthorized absences. 9. DISPUTE RESOLUTION In the event of a dispute in regards to the terms and conditions ofthis Agreement, including termination with or without cause,any such dispute shall be settled through binding arbitration. Within 10 days of the event causing the dispute,the parties shall request through the American Arbitration Association a list of Arbitrators, from which the parties shall select one person to act as the arbitrator in the matter. Both the District and the General Manager shall be represented at said hearing by a representative of their choice,who may be an attorney. The District shall present its case first at the hearing. Each side shall have the right to present witnesses and documentary evidence and to cross-examine the other party's witnesses. At the close of the hearing, the Arbitrator has the right to affirm,deny, or modify the action. The decision of the Arbitrator shall be final and without judicial recourse, except for the enforcement of the Arbitrator's decision. The Parties shall share equally in the costs of the Arbitrator and any court reporters requested by either party. 10. GENERAL PROVISIONS. a. Recitals. The recitals stated at the beginning of this Agreement of any matters or facts shall be conclusive proof of the truthfulness and the terms and conditions of the recitals,,if any,shall be deemed a part of this Agreement. b. Cooperation. The parties shall, whenever and as often as reasonably requested to do so by the other party, execute, acknowledge and deliver, or cause to be executed, acknowledged and delivered, any and all documents and instruments as may be necessary, expedient or proper in the reasonable opinion of the requesting party to carry out the intent and purposes of this Agreement, provided that the requesting party shall bear the cost and expense of such further instruments or documents (except that each party shall bear its own attorney's fees). The term "days" as used in this Agreement shall mean calendar days. c. Authority. The individuals executing this Agreement represent and warrant that they have the authority to enter into this Agreement and to perform all acts required by this Agreement, and that the consent, approval or execution of or by any third party is not required to legally bind either party to the terms and conditions of this Agreement. d. Construction. The provisions of this Agreement should be liberally construed to effectuate its purposes. The language of all parts of this Agreement shall be construed simply according to its plain meaning and shall not be construed for or against either party, as each party has participated in the drafting of this document and had the opportunity to have their counsel review it. Whenever the context and construction so require, all words used in -72- a l I the singular shall be deemed to be used in the plural; all masculine shall include the feminine and neuter, and vice versa. e. Notice. All notices, approvals, acceptances, demands and other communications required or permitted hereunder, to be effective, shall be in writing and shall be delivered either in person or by mailing the same by United States mail (postage prepaid, registered or certified, return receipt requested) or by Federal Express or other similar overnight delivery service to the party to whom the notice is directed at the address of such party as follows: DISTRICT: President,Board of Directors South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, California, 96150 With copy to: Gary M. Kvistad Hatch and Parent Brownstein,Hyatt,. !Farber,.Shrok_ 21 East Carrillo Street Santa Barbara, California 93101 SOLBRIG: Richard H. Solbrig 1581 Estate Court South Lake Tahoe, California 96150 Any written communication given by mail shall be deemed delivered two (2) business days after such mailing date and any written communication given by overnight delivery service shall be deemed delivered one(1)business day after the dispatched date. Either party may change its address by giving the other party written notice of its new address as provided in this Agreement. f. Governing Law. The validity and interpretation of this Agreement shall be governed by the laws of the State of California, with venue for all purposes to be proper only in the County of El Dorado, State of California. g. Severability. If any term,provision; covenant or conditions of this Agreement is determined to be unenforceable by a court of competent jurisdiction, it is the parties' intent that the remaining provisions of this Agreement shall remain in full force and effect and shall not be affected,impaired or invalidated by such a determination. h. Attorney's Fees. If any action, at law or equity, including an action for declaratory relief, is brought to enforce or interpret the provisions of this Agreement, the prevailing party shall be entitled to recover actual attorneys' fees which may be determined by the court in the same action or in a separate action brought for that purpose. The attorneys' fees to be awarded shall be made to fully reimburse for all attorneys' fees,paralegal fees, costs and expenses, actually incurred in good faith,regardless of the size of the judgment, it being the -73- 1 1 i intention of the parties to fully compensate for all attorneys' fees, paralegal fees, costs and expenses paid or incurred in good faith. i. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall be an original, but all of which shall constitute one and the same instrument. j. Interpretation. The provisions and language of this Agreement shall be interpreted in accordance with their plain meaning and shall not be construed for or against any of the parties, as all parties have participated in, and have approved,the drafting of this Agreement. This Agreement may be executed in any number of counterparts, each of which shall be deemed to be an original. k. Good Faith. The parties agree to exercise their best efforts and utmost good faith to effectuate all the terms and conditions of this Agreement and to execute such further instruments and documents as are necessary or appropriate to effectuate all of the terms and conditions of this Agreement. I. Waiver. The waiver of'any of any provision of this Agreement by any party to this Agreement shall not b'e deemed to be a waiver of any other proceeding or subsequent breach under the Agreement,nor shall any waiver constitute a continuing waiver. No waiver shall be binding unless executed in writing by the party making the waiver. m. Successors and Assigns. This Agreement shall be binding on and shall inure to the benefit of the parties and their respective heirs, legal representatives, successors and assigns. n. Headings. The section headings contained in this Agreement are for convenience and reference only and shall not affect the meaning or interpretation ofthis Agreement. o. Entire Agreement and Amendment. This Agreement contains the entire understanding and agreement of the parties and there have been no promises,representations, agreements, warranties or undertakings by any of the parties, either oral or written, of any character or nature binding except as stated in this Agreement. This Agreement may be altered, amended or modified only by an instrument in writing, executed by the parties to this Agreement and by no other means. Each party waives their future right to claim, contest, or assert that this Agreement was modified, canceled, superseded or changed by any oral agreement,course of conduct,waiver, or estoppel. IN WITNESS WHEREOF, the parties have executed this Agreement as of the date and place first written above. -74- SOUTH TAHOE PUBLIC UTILITY DISTRICT RICHARD H.SOLBRIG ,e•; l By: By: Randy Vogelgesang,President Richard H. Solbrig,General Manager ATTEST: By: Melonie Guttry,Clerk of the Board/Executive Serices Manager -75- General Manager Richard H.Solbrig • 1950 :v so • • -- � South Tahoe Directors r Chris Cefalu James R.Jones Randy VogelgesangPubl,c Utility ij, !y Distr,ct Kelly Sheehan Duane Wallace 1275 Meadow Creet Drive+South Lake Tahoe•CA 96150-7401 Phone 530 544-6474•Fax 530 541-0614•www.stpud.u5 BOARD AGENDA ITEM 14a TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: December 17, 2015 ITEM- PROJECT NAME: Conference with Legal Counsel- Existing Litigation REQUESTED BOARD ACTION: Direct Staff DISCUSSION: Pursuant to Section 54956.9(a) of the California Government code, Closed Session may be held for conference with legal counsel regarding existing litigation: False Claims Act Case: United States, the States of California, Delaware, Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix v. J-M Manufacturing Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06-0055-GW, United States District Court for the Central District of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT AVAILABLE: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES /e/-1. NO CHIEF FINANCIAL OFFICER: YES 4'E NO -77- Richard H.So[brig • 1950 MDirectors '' �y10� ��h T /� f� Chris Cefalu _,��� SL./ a! ( J♦�James R.Jones i�'�"i� �/ `/ Randy Vogelgesang '—mt-'` :, f r r r r r Kelly Sheehan /� Public Utility District Duane Wallace f_ // 1 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 544-6474.Fax 530 541-0614•www.5tpud.us BOARD AGENDA ITEM 1 4b TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: December 17, 2015 ITEM- PROJECT NAME: Conference with Legal Counsel- Existing Litigation REQUESTED BOARD ACTION: Direct Staff DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Los Angeles County Superior Court, Case No. BC459943, State of Nevada, et al. v. J-M Manufacturing, et al. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT AVAILABLE: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: t CATEGORY: Water GENERAL MANAGER: YES 4 Al 4 NO CHIEF FINANCIAL OFFICER: YES 14 NO -79- vcnerai ivianager Richard H.So!brig 1950 • wcat Directors .46.• �9r South Chris Cefalu 1►"'ti. James R.Jones Randy Vogelgesang Public Utility District Kelly Sheehan Duane Wallace 1275 Meadow Crest Drive•South Lake Tahoe•CA 96150-7401 Phone 530 544-6474•Fax 530 541-0614•www.stpud.us BOARD AGENDA ITEM 1 4c TO: Board of Directors FROM: Nancy Hussmann, Human Resources Director MEETING DATE: December 17, 2015 ITEM - PROJECT NAME: Public Employee Evaluation -General Manager REQUESTED BOARD ACTION: Conduct Evaluation Process DISCUSSION: Pursuant to Section 54957 of the California Government Code, Closed Session may be held regarding public employee evaluation for unrepresented employee position - General Manager. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT AVAILABLE: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES 7Vra NO CHIEF FINANCIAL OFFICER: YES _8 NO