District Board Agenda Packet May 18, 2017at Nk.—I 1950 SOUTH TAHOE PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING AGENDA Thursday, May 18, 2017 - 2:00 p.m. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Richard Solbrig, General Manager Shannon Cotulla, Assistant General Manager Randy Vogelgesang, President BOARD MEMBERS Kelly Sheehan, Vice President Chris Cefalu, Director James R. Jones, Director Duane Wallace, Director 1. CALL TO ORDER REGULAR MEETING — PLEDGE OF ALLEGIANCE (At this time, please silence phones and other electronic devices so as not to disrupt the business of the meeting.) 2. COMMENTS FROM THE AUDIENCE (This is an opportunity for members of the public to address the Board on any short non -agenda items that are within the subject matter jurisdiction of the District. No discussion or action can be taken on matters not listed on the agenda, per the Brown Act. Each member of the public who wishes to comment shall be allotted five minutes, and no more than three individuals shall address the same subject.) 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR (For purposes of the Brown Act, all Action and Consent items listed give a brief description of each item of business to be transacted or discussed. Recommendations of the staff, as shown, do not prevent the Board from taking other action.) 4. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered separately upon request. Comments and questions from members of the public, staff or Board can be taken when the comment does not necessitate separate action.) 5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION / ACTION 6. ITEMS FOR BOARD ACTION a. Tahoe Keys Sewer Pipe Emergency Repair and Replacement (John Thiel, Engineering Department Manager) Continue emergency action to repair and/or replace 80 linear feet of sewer pipe near the Tahoe Keys Pump Station pursuant to Resolution No. 3054-17. b. 2017 Fire Hydrant Service Expansion/Large Meter Replacement Project (Julie Ryan, Principal Engineer) Award project to the lowest responsive, responsible bidder. C. Water System Monitoring and Supervisory Control and Data Acquisition (SCADA) Communications Upgrade (Julie Ryan, Principal Engineer) Authorize the District to: 1) Approve Proposal from Carollo Engineers for engineering services in the amount not to exceed $439,576 to conduct a Communications Study, perform Alternatives Evaluations and develop Contract Documents and; 2) Approve Proposal from Systems Integrated for engineering services in the amount not to exceed REGULAR BOARD MEETING AGENDA -May 18, 2017 PAGE - 2 $19,920 to conduct a Peer Review of a Communications Study Workplan and Communication Study Technical Memorandum. d. Fiscal Year 2017/18 Water and Sewer Service Charge Rates (Paul Hughes, Chief Financial Officer) Approve Resolution No. 3056-17confirming the water and sewer service charge rates for Fiscal Year 2017/18. e. Fiscal Year 2017/18 Water Enterprise Fund Budget (Paul Hughes, Chief Financial Officer) Authorize the District to : 1)Adopt Resolution No. 3057-17 adopting the Fiscal Year 2017/18 Water Enterprise Fund Budget and; 2) Authorize staff to incorporate any adjustments or changes necessary as a result of Board action. Fiscal Year 2017/18 Sewer Enterprise Fund Budget (Paul Hughes, Chief Financial Officer) Authorize the District to: 1) Adopt Resolution No. 3058-17 adopting the Fiscal Year 2017/18 Sewer Enterprise Fund Budget and; 2) Authorize staff to incorporate any adjustments or changes necessary as a result of Board action. g. Approve Payment of Claims (Debbie Henderson, Accounting Manager) Approve Payment of Claims in the amount of $1,234,671.34 7. STANDING AND AD-HOC COMMITTEE REPORTS (Discussions may take place; however, no action will be taken.) a. City of South Lake Tahoe Ad -Hoc Committee Meeting 8. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken.) 9. EL DORADO COUNTY WATER AGENCY PURVEYOR REPORT 10. GENERAL MANAGER REPORT (Discussion may take place; however, no action will be taken.) a. Water Conservation Program b. Public Outreach Efforts 11. STAFF/ATTORNEY REPORTS (Discussions may take place; however, no action will be taken.) a. Firefighting infrastructure funding in Lake Tahoe Restoration Act (LTRA) Update (Shannon Cotulla, Assistant General Manager) b. Fallen Leaf Lake Vacuum Valve 4 Update (Shannon Cotulla, Assistant General Manager) 12. NOTICE OF PAST AND FUTURE MEETINGS/EVENTS Past Meetings/Events 05/04/17 - 2:00 p.m. Regular Board Meeting at the District 05/04/17 - 6:00 p.m. Budget Workshop Public Meeting at the District 05/15/17 - 2:30 p.m. Operations Committee Meeting at the District 05/16/17 - 1:30 p.m. Alpine County Contract Commission Meeting at the Alpine County Administration Building in Markleeville, CA 05/17/17 - 8:00 a.m. Employee Communications Committee at the District (Sheehan Representing) Future Meetin s Events 05/29/17 - Memorial Day Holiday, District Closed 06101117 - 2:00 p.m. Regular Board Meeting at the District REGULAR BOARD MEETING AGENDA -May 18, 2017 PAGE - 3 13. CLOSED SESSION (The Board will adjourn to Closed Session to discuss items identified below. Closed Session is not open to the public; however, an opportunity will be provided at this time if members of the public would like to comment on any item listed - three minute limit.) a. Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Los Angeles County Superior Court, Case No. BC459943, State of Nevada, et al. v. J -M Manufacturing, et al. b. Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: False Claims Act Case: United States, the States of California, Delaware, Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06-0055-GW, United States District Court for the Central District of California. C. Pursuant to Government Code Section 54957(a)/Conference with Labor Negotiators re: Memorandum of Understanding with Stationary Engineers, Local 39. Present at this Closed Session will be Agency Negotiators: Richard Solbrig/General Manager; Paul Hughes, Chief Financial Officer; and Shannon Cotulla, Assistant General Manager. d. Pursuant to Government Code Section 54957(a)/Conference with Labor Negotiators re: Memorandum of Understanding with the Management Group. Present at this Closed Session will be Agency Negotiators: Richard Solbrig/General Manager; Paul Hughes, Chief Financial Officer; and Shannon Cotulla, Assistant General Manager. ADJOURNMENT (The next Regular Board Meeting is Thursday, June 1, 2017, at 2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete Agenda packet is available for review at the meeting and at the District office during the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after Minutes of the meeting have been approved. Items on the Agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified, but may occur slightly later than the specified time. Public participation is encouraged. Public comments on items appearing on the Agenda will be taken at the some time the Agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Please provide the Clerk of the Board with a copy of all written materials presented at the meeting. Comments on items not on the Agenda can be heard during "Comments from the Audience;" however, action cannot be taken on items not on the Agenda. Backup materials relating to an open session item on this Agenda, which are not included with the Board packet, will be made available for public inspection at the same time they are distributed or made available to the Board, and can be viewed at the District office, at the Board meeting and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings. If particular accommodations are needed, please contact the Clerk of the Board at (530) 544-6474, extension 6203. All inquiries must be made at least 48 hours in advance of the meeting. REGULAR BOARD MEETING AGENDA - May 18, 2017 1950 ' SOUTH TAHOE PUBLIC UTILITY DISTRICT CONSENT CALENDAR May 18, 2017 ITEMS PAGE - 4 a. RESOLUTION TO ACCEPT FUNDING FROM STATE WATER RESOURCES CONTROL BOARD PROPOSITION 1 GROUNDWATER PLANNING GRANT (Lynn Nolan, Grants Coordinator) Adopt Resolution No. 3059-17 to Accept Grant Award for Groundwater Planning. b. REGULAR BOARD MEETING MINUTES: May 4,201 (Melonie Guttry, Executive Services Manager/Clerk of the Board) Approve May 4, 2017, Minutes General Manager Richard H. 5olbrig Directors $der South Chris Taho e James j nco es R. ones v Randy V00elge51110 r u V l 1 G Utility D i �trI ct Kelly Sheehan 1 Duane Wallace 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150-7401 Phone 530 5446474 • Fax 530 541-0614 e www.5tpud.u5 BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Lynn Nolan, Grants Coordinator MEETING DATE: May 18, 2017 ITEM - PROJECT NAME: Resolution to Accept Funding from State Water Resources Control Board Proposition 1 Groundwater Planning Grant REQUESTED BOARD ACTION: Adopt Resolution No. 3059-17 to Accept Grant Award for Groundwater Planning DISCUSSION: The State Water Resources Control Board has approved the application submitted for a Feasibility Study of Remedial Alternatives to Mitigate Tetrachloroethylene (PCE) for approximately $294,270. The attached Resolution No. 3059-17 is a requirement of this funding. SCHEDULE: To Be Determined COSTS: N/A ACCOUNT NO: BUDGETED AMOUNT REMAINING: N/A ATTACHMENTS: Resolution No. 3059-17 CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES 1 NO CHIEF FINANCIAL OFFICER: YES NO -1- CATEGORY: Water 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 RESOLUTION NO. 3059-17 A RESOLUTION BY THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT AUTHORIZING ENTERING INTO A FUNDING AGREEMENT WITH THE STATE WATER RESOURCES CONTROL BOARD AND AUTHORIZING AND DESIGNATING A REPRESENTATIVE FOR THE FEASABILITY STUDY OF REMEDIAL ALTERNATIVES TO MITIGATE TETRACHLOROETHYLENE (PCE) CONTAMINATION PROJECT. WHEREAS, the State Water Resources Control Board has approved a Proposition 1 Groundwater Planning Grant for the project listed above; NOW, THEREFOR BE IT RESOLVED by the Board of Directors of the South Tahoe Public Utility District (The Entity) as follows: The General Manager (Authorized Representative) or his/her designee is hereby authorized and directed to sign and file, for and on behalf of the Entity, a Financial Assistance Application for a funding agreement with the State Water Resources Control Board for the Project. This Authorized Representative, or his/her designee, is designated to provide the assurances, certifications, and commitments required for the financial assistance application, including executing a funding agreement from the State Water Resources Control Board and any amendments or changes thereto. The Authorized Representative, or his/her designee, is designated to represent the Entity in carrying out the Entity's responsibilities under the funding agreement, including certifying disbursement requests on behalf of the Entity and compliance with applicable state and federal laws. WE, THE UNDERSIGNED, do hereby certify that the above and foregoing Resolution No. 3059-17 was duly and regularly adopted and passed by the Board of Directors of the South Tahoe Public Utility District at a regular meeting held on the 18th day of May 2017, by the following vote: AYES: NOES: ABSENT: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 ATTEST: Melonie Guttry, Clerk of the Board South Tahoe Public Utility District Resolution No. 3059-17 Page 2 May 18, 2017 -4- Randy Vogelgesang, Board President South Tahoe Public Utility District 0 D eBr ' 1950 ' SOUTH TAHOE PUBLIC UTILITY DISTRICT Richard Solbrig, General Manager Shannon Cotulla, Assistant General Manager Randy Vogelgesang, President BOARD MEMBERS Kelly Sheehan, Vice President Chris Cefalu, Director James R. Jones, Director Duane Wallace, Director REGULAR MEETING OF THE BOARD OF DIRECTORS SOUTH TAHOE PUBLIC UTILITY DISTRICT May 4, 2017 MINUTES The South Tahoe Public Utility District Board of Directors met in a regular session, 2:02 p.m., at the District Office, located at 1275 Meadow Crest Drive, South Lake Tahoe, California. ROLL CALL: Board of Directors: President Vogelgesang, Directors Jones, Sheehan, Wallace Absent: Director Cefalu Staff: Paul Hughes, Richard Solbrig, Gary Kvistad, Melonie Guttry, Marla Sharp, Brenlyn Hoyle, Nancy Hussmann, John Thiel, Chris Stanley, Chris Skelly, Ivo Bergsohn, Linda Brown, Julie Ryan, Tim Bledsoe, Brent Goligoski CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR: CONSENT CALENDAR: Moved Wallace/Second Sheehan/Voaelgesong Yes/Cefalu AbsentLjones YesLSheehan Yes/Wallace Yes to approve the Consent Calendar as presented. a. TEMPORARY HELP FOR INFORMATION TECHNOLOGY DEPARTMENT (Chris Skelly, Information Technology Manager) Approved renewal of Contract with Blue Ribbon Personnel Services for a temporary special projects technician, in the estimated amount of $28,000. b. LUTHER PASS POWER AND CONTROL PROJECT (Julie Ryan, Principal Engineer) Approved proposal from consultants, GHD, for engineering services for the Luther Pass Power and Control Project in the amount $54,956. C. AMENDMENT TO THE MUTUAL AID AND ASSISTANCE AGREEMENT WITH THE DOUGLAS COUNTY SEWER IMPROVEMENT DISTRICT NO. 1 (Shannon Cotulla, Assistant General Manager) Ratified Amendment to the existing Mutual Aide and Assistance Agreement between South Tahoe Public Utility District and the Douglas County Sewer Improvement District No. 1. -5- ........... . REGULAR BOARD MEETING MINUTES - May 4, 2017 PAGE - 2 d. REGULAR BOARD MEETING MINUTES: April 20, 2017 (Melonie Guttry, Executive Services Manager/Clerk of the Board) Approved April 20, 2017, Minutes ITEMS FOR BOARD ACTION a. Tahoe Keys Sewer Pipe Emergency Repair and Replacement (John Thiel, Engineering Department Manager) -Staff provided an update regarding the Tahoe Keys Emergency Project, indicating May 5 marks three weeks since the sinkhole was discovered. District staff has located the failure in the pipe and has been researching several repair options determining the appropriate option. District crews will be doing much of the repair work although they are working with Thomas Haen Company, utilizing their heavy equipment and staff. There is no permanent damage to the Tahoe Keys Pump Station impellers. Moved Sheehan Jones Second Vo el esan Yes Cefalu Absent Jones Yes Sheehan Yes Wallace Yes to continue emergency action to repair and/or replace 80 linear feet of sewer pipe near the Tahoe Keys Pump Station pursuant to Resolution No. 3054-17. b. Groundwater Sustainability Agency Formation (Ivo Bergsohn, Hydrogeologist) - Staff provided a PowerPoint presentation regarding the Groundwater Sustainability Agency Formation and the reason to enter into a restated Memorandum of Understanding (MOU) with the EI Dorado County Water Agency (EDCWA) requiring the District to develop a Groundwater Sustainability Plan or Alternative Plan for the entire Tahoe Valley South Groundwater Basin. Attorney Kvistad reported the Notice to Withdrawal is not effective until EDCWA is recognized as the Groundwater Sustainability Agency (GSA) for the fringe areas. There are a couple of minor changes to the MOU and Resolution to be considered. Attorney Kvistad requested the Board approve the Resolution, allowing District staff to renegotiate non -substantive modifications. Moved Wallace Second Sheehan Vo el esan Yes Cefatu Absent/Jones Yes Sheehan Yes/Wallace Yes to adopt Resolution No. 3055-17 to: 1) Withdraw the District's 2016 Groundwater Sustainability Agency Formation Notice for the portion of the Tahoe Valley South Groundwater Basin outside the District's service area boundaries; and 2) Enter into an Amended and Restated Memorandum of Understanding with the EI Dorado County Water Agency requiring the District to develop a Groundwater Sustainability Plan or Alternative Plan for the entire Tahoe Valley South Groundwater Basin; 3) Authorize District staff to renegotiate non - substantive modifications additions with the EI Dorado County Water Agency staff. C. Diamond Valley Ranch Irrigation Improvement (Ivo Bergsohn, Hydrogeologist) -Staff provided a report regarding the project including the planning for the first year of crop at Diamond Valley Ranch. Moved Sheehan Second Wallace Va el esan Yes Cefalu Absent Jones Yes Sheehan Yes Wallace Yes to approve Change Order No. 6 to Thomas Haen Company, Inc., in the amount of $136,602.50. d. Approve Payment of Claims (Debbie Henderson, Accounting Manager) Moved Sheeran Second Wallace Vo el esan Yes Cefolu Absent Jones Yes Sheehan Yes/Wallace Yes to approve Payment of Claims in the amount of $1,895,551.19. -6- REGULAR BOARD MEETING MINUTES - May 4, 2017 PAGE - 3 STANDING AND AD-HOC COMMITTEE REPORTS: Director Wallace reported the City of South Lake Tahoe Ad-hoc Committee will meet on May 5, at 9 a.m. at the District. Richard Solbrig will provide a tour at 9 a.m. with the meeting commencing immediately after. Director Jones suggested a site visit of the Tahoe Keys project after the meeting might be appropriate if time allows. Director Wallace reported he arrived for the Tahoe Interagency Executive Steering Committee Meeting scheduled at Tahoe Regional Planning Agency at 1 p.m. today, but he was unable to attend due to the Board meeting starting at 2 p.m. BOARD MEMBER REPORTS: Director Jones reported he will be attending the Association of California Water Agency Conference next week with Shannon Cotulla in Monterey. EL DORADO COUNTY WATER AGENCY PURVEYOR REPORT: Director Wallace reported he is attending the EI Dorado County Water Agency Purveyor meeting on May 17 and the special meeting on May 8 via conference call from the District. GENERAL MANAGER REPORT: Richard Solbrig reported a letter has been coordinated with the fire partnership, and a May 12 meeting is scheduled to come to a consensus of municipal fire infrastructure projects to resubmit for funding. STAFF/ATTORNEY REPORTS: Attorney Kyistad reported two alternatives have been submitted with the Groundwater Sustainability Plan and the comment period is 30 days. Ivo is working on draft comments, which Kvistad will review. Staff reported mandatory harassment prevention training is due by June 30 and there are two options 1) a group live webinar on June 6 from 10 a.m. to noon; or 2) an online, self -paced webinar due by June 30. The Board will let staff know by May 12 which they prefer. ADJOURNMENT TO CLOSED SESSION: 3:07 pm RECONVENED TO OPEN SESSION: 4:18 p.m. ACTION REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION a. Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Los Angeles County Superior Court, Case No. BC459943, State of Nevada, et al. v. J -M Manufacturing, et al. No re odable Board action b. Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: False Claims Act Case: United States, the States of California, Delaware, Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06-0055-GW, United States District Court for the Central District of California. Na reportable Board action -7- REGULAR BOARD MEETING MINUTES - May 4, 2017 PAGE - 4 C. Pursuant to Government Code Section 54957(a)/Conference with Labor Negotiators re: Memorandum of Understanding with Stationary Engineers, Local 39. Present at this Closed Session will be Agency Negotiators: Richard Solbrig/General Manager; Paul Hughes, Chief Financial Officer; and Shannon Cotulla, Assistant General Manager. No rel2ortable Board action d. Pursuant to Government Code Section 54957(a)/Conference with Labor Negotiators re: Memorandum of Understanding with the Management Group. Present at this Closed Session will be Agency Negotiators: Richard Solbrig/General Manager; Paul Hughes, Chief Financial Officer; and Shannon Cotulla, Assistant General Manager. No reportable Board action ADJOURNMENT: 4:18 p.m. Randy Vogelgesang, Board President South Tahoe Public Utility District Melonie Guttry, Clerk of the Board South Tahoe Public Utility District General Manager Richard H. 5olbrig Directors Chris Ccfalu oneo James R. Jones South LRandy Vogelgesang Kelly Sheehan Public Utility District Duane Wallace 1275 Meadow Crest Drive • 5outh Lake Tahoe o CA 96150-7401 Phone 530 544-6474 • Fax 530 541-0614 • www.5tpud.u5 BOARD AGENDA ITEM 6a TO: Board of Directors FROM: John Thiel, Engineering Department Manager MEETING DATE: May 18, 2017 ITEM - PROJECT NAME: Tahoe Keys Sewer Pipe Emergency Repair and Replacement Project REQUESTED BOARD ACTION: Continue emergency action to repair and/or replace 80 linear feet of sewer pipe near the Tahoe Keys Pump Station pursuant to Resolution No. 3054-17. DISCUSSION: The Board declared the Tahoe Keys Sewer Pipe Emergency Repair and Replacement project as an emergency on April 20, 2017. Extensive bypass pumping, dewatering and excavation activities have taken place since that time. The location of the failed pipe section has been located and the remaining pipe is suspected to be in poor condition. After considering a number of repair and replacement alternatives, the District decided to place a new structural pipe section within the existing pipe. New 20 inch PVC schedule 40 pipe was assembled and placed within the existing 24 -inch asbestos cement pipe. Although the maximum carrying capacity of this pipe section will be reduced by the smaller diameter, District sewer model and recent storm data indicates that the smaller pipe diameter will meet future domestic and storm flows without adverse impact. District crews assembled 4.5 foot segments with PVC couplings and inserted the new pipe into the old pipe from the wet well at the Tahoe Keys Pump Station. The 6 foot x 6 foot wet well limited the length of each pipe segment. Eighteen segments were connected with glue -on style couplings to replace 80 feet of old pipe from the wet well to the first upstream manhole Tahoe Keys 1, (TK1). Staff completed the pipe installation on May 10, including grouting the penetrations into the manhole and wet well. Neat cement was then placed in the annular space between the new and old pipes. Backfilling of the excavation, including shoring and dewatering well removal, had begun at the time of the preparation of the Agenda. Q10 Page 2 Thiel May 18, 2017 Public Contract Code Section 22050(c) requires the Board to review the emergency action at every Board meeting thereafter until the action is terminated, to determine by a 4/5 vote, that there is a need to continue the action. District staff is requesting that the Board continue the emergency action for the repair and/or replacement of 80 linear feet of sewer pipe near the Tahoe Keys Pump Station. SCHEDULE: Repairs to be completed as soon as possible COSTS: Not to exceed $100,000 ACCOUNT NO: 1029 BUDGETED AMOUNT AVAILABLE: Funded from Capital Reserves ATTACHMENTS: N/A CONCURRENCE WITH REQUESTED ACTION - GENERAL MANAGER: YES SIC CHIEF FINANCIAL OFFICER: YES NO NO -10- CATEGORY: Sewer 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150-7401 Phone 530 544-6474 - Fax 530 541-0514 • www.5tpud.u5 BOARD AGENDA ITEM 6b TO: Board of Directors FROM: Julie Ryan, Principal Engineer MEETING DATE: May 18, 2017 ITEM - PROJECT NAME: 2017 Fire Hydrant Service Expansion/Large Meter Replacement Project REQUESTED BOARD ACTION: Award project to the lowest responsive, responsible bidder. DISCUSSION: On Thursday, April 6, 2017, five general contractors attended a mandatory pre-bid meeting for the above project. This contract includes the installation of approximately 44 new fire hydrants into the existing water distribution system, installation of approximately 14 mainline valve clusters, installation of 3 commercial water meter vaults to replace 6 existing commercial meter vaults, and appurtenant work including paving, striping, landscape repair, erosion control and traffic control. Bids were opened at the District offices on Tuesday, May 9, 2017, at 2:00 pm. Two bids were received ranging from $1,391,880 to $1,666,287. The Engineer's Estimate for the project is $1,053,389, excluding the cost of the hydrants, purchased separately by the District. A breakdown of the Engineer's Estimate and Bid Tally is attached. White Rock Construction is the apparent low bidder. Staff is in the process of reviewing the bids for conformance with bidding requirements, including Disadvantaged Business Enterprise (DBE) Good -Faith Effort. Staff will provide analysis and recommendation for award prior to and at the Board meeting. SCHEDULE: As soon as possible COSTS: Will be presented prior to and at the Board meeting ACCOUNT NO: 2029-7029/17WO01 (Hydrants/Valves); 2029-8860/17WO02 (Meters) BUDGETED AMOUNT AVAILABLE: $50,329 (2017); 245,477 (2017); $550,000 (2018) ATTACHMENTS: Engineer's Estimate and Bid Tally. Bid Summary and staff recommendation for award will be distributed prior to and at the Board meeting. CONCURRENCE WITH REQUESTED ACTION: CATEGORY. Water GENERAL MANAGER: YES( NO CHIEF FINANCIAL OFFICER: YES NO General Manager Richard H. 5olbrig Directors th Souoe Tah Chris Cefalu James R. Jones I, y /* Public ublic Utility District Randy Vogelgesang Kelly Sheehan Duane Wallace 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150-7401 Phone 530 544-6474 - Fax 530 541-0514 • www.5tpud.u5 BOARD AGENDA ITEM 6b TO: Board of Directors FROM: Julie Ryan, Principal Engineer MEETING DATE: May 18, 2017 ITEM - PROJECT NAME: 2017 Fire Hydrant Service Expansion/Large Meter Replacement Project REQUESTED BOARD ACTION: Award project to the lowest responsive, responsible bidder. DISCUSSION: On Thursday, April 6, 2017, five general contractors attended a mandatory pre-bid meeting for the above project. This contract includes the installation of approximately 44 new fire hydrants into the existing water distribution system, installation of approximately 14 mainline valve clusters, installation of 3 commercial water meter vaults to replace 6 existing commercial meter vaults, and appurtenant work including paving, striping, landscape repair, erosion control and traffic control. Bids were opened at the District offices on Tuesday, May 9, 2017, at 2:00 pm. Two bids were received ranging from $1,391,880 to $1,666,287. The Engineer's Estimate for the project is $1,053,389, excluding the cost of the hydrants, purchased separately by the District. A breakdown of the Engineer's Estimate and Bid Tally is attached. White Rock Construction is the apparent low bidder. Staff is in the process of reviewing the bids for conformance with bidding requirements, including Disadvantaged Business Enterprise (DBE) Good -Faith Effort. Staff will provide analysis and recommendation for award prior to and at the Board meeting. SCHEDULE: As soon as possible COSTS: Will be presented prior to and at the Board meeting ACCOUNT NO: 2029-7029/17WO01 (Hydrants/Valves); 2029-8860/17WO02 (Meters) BUDGETED AMOUNT AVAILABLE: $50,329 (2017); 245,477 (2017); $550,000 (2018) ATTACHMENTS: Engineer's Estimate and Bid Tally. Bid Summary and staff recommendation for award will be distributed prior to and at the Board meeting. CONCURRENCE WITH REQUESTED ACTION: CATEGORY. Water GENERAL MANAGER: YES( NO CHIEF FINANCIAL OFFICER: YES NO 2017 Fire Hydrant Service Expansion/ Large Meter Replacement Proiect Item No. Description Unit Approx. Quantity Unit Price Engineer's Estimate WRC MKD Schedule A: Fire Hydrants 1 Mobilization and Demobilization IS 1 $ 73,508 $ 73,508.40 $ 36,900.00 $ 95,000.00 2 Erosion Control LS 1 $ 16,632 $ 16,632.00 $ 7,500.00 $ 23,600.00 3 Groundwater Dewatering LS 1 $ 8,925 $ 8,925.00 $ 12,000.00 $ 33,000.00 4 Sheeting, Shoring, and Bracing or Equivalent Method LS 1 $ 21,000 $ 21,000.00 $ 14,500.00 $ 30,000.00 5 Traffic Control LS 1 $ 26,090 $ 26,090.40 $ 59,500.00 $ 105,000.00 6 Fire Hydrant, Branch Tee EA 42 $ 8,925 $ 374,850.00 $ 449,400.00 $ 546,000.00 7 Fire Hydrant, Branch Tee Deepened EA 3 $ 12,075 $ 36,225.00 $ 42,600.00 $ 54,000.00 8 Valve (In -Line) EA 9 $ 7,875 $ 70,875.00 $ 71,100.00 $ 79,992.00 9 Valve (with Tee) EA 4 $ 8,400 $ 33,600.00 $ 39,600.00 $ 57,400.00 10 Valve (with Cross) EA 1 $ 10,500 $ 10,500.00 $ 13,600.00 $ 22,800.00 11 Additional Valve EA 3 $ 1,000 $ 3,000.00 $ 12,600.00 $ 29,700.00 12 4" Trench Patch SF 2830 $ 40 $ 112,917.00 $ 93,390.00 $ 32,545.00 13 12" Mill and Overlay SF 2000 1 $ 14 $ 27,300.00 $ 27,500.00 $ 30,000.00 14 Unknown Conditions LS 1 $ 40,000 $ 40,000 $ 40,000.00 $ 40,000.00 Subtotal $ 855,423 $ 920,190.00 1.$ 1,179,037.00 Schedule B: Large Meter Replacement 15 Large Meter Replacement Mobilization and Demobilization LS 1 $ 9,450 $ 9,450 $ 6,200.00 $ 22,000.00 16 Large Meter Replacement Erosion Control LS 1 $ 3,675 $ 3,675 $ 2,300.00 $ 19,500.00 17 Large Meter Replacement Groundwater Dewatering LS 1 $ 2,294 $ 2,294 $ 17,700.00 $ 9,250.00 18 Large Meter Replacement Sheeting, Shoring, and Bracing or Equivalent Method LS 1 $ 3,302 $ 3,302 $ 18,000.00 $ 15,000.00 19 8" Meter in Vault EA 3 $ 44,100 $ 132,300 $ 372,000.00 $ 351,000.00 20 4" Service Lateral EA 1 $ 7,140 $ 7,140 $ 8,400.00 $ 31,400.00 2113 ' " Miscellaneous Patch Paving SF 940 $ 16 $ 14,805 $ 22,090.00 $ 14,100.00 22 nknown Conditions LS 1 $ 25,000 $ 25,000 $ 25,000.00 $ 25,000.00 Subtotal $ 197,967 $ 471,690.00 $ 487,250.00 Total $ 1,053,389 $ 1,391,880 $ 1,666,287 South Tahoe District General Manager Richard H. 5olbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Duane Wallace 1275 Meadow Crest Dave o South Lake Tahoe • CA 96150-7401 Phone 530 544-6474 • Fax 530 541-0614 • www.5tpud.u5 BOARD AGENDA ITEM 6C TO: Board of Directors FROM: Julie Ryan, Principal Engineer MEETING DATE: May 18, 2017 ITEM - PROJECT NAME: Water System Monitoring and Supervisory Control and Data Acquisition (SCADA) Communications Upgrade REQUESTED BOARD ACTION: Authorize the District to: 1) Approve Proposal from Carollo Engineers for engineering services in the amount not to exceed $439,576 to conduct a Communications Study, perform Alternatives Evaluations and develop Contract Documents and; 2) Approve Proposal from Systems Integrated for engineering services in the amount not to exceed $19,920 to conduct a Peer Review of a Communications Study Workplan and Communication Study Technical Memorandum. DISCUSSION: In January 2017, the District advertised a Request for Proposals seeking consultant support for the following: (1) a Communications Study of the District's in -basin facilities, (2) the Evaluation of Alternatives and development of Contract Documents for instrumentation, control and communication improvements at six well sites and one water booster station that are the highest energy consumers in the District's water system, and (3) the Evaluation of Alternatives and development of Contract Documents for instrumentation and communication improvements at one remote pressure reducing valve (PRV) location. In March 2017, the District received proposals from five consulting firms. Following the District's established proposal review process, two firms were selected for interview. Based on the results of the interview, Carollo Engineers (Carollo) was selected to perform the proposed Scope of Work. In addition, based on their demonstrated experience in communications, Systems Integrated (the runner-up firm) was asked by District staff to develop a Scope of Work to provide peer review of two documents that Carollo will prepare for the project: the Communications Study Workplan and the Communications Study Technical Memorandum. -15- Page 2 Ryan May 18, 2017 Carollo's proposed services for the Communications Study include the following primary tasks, which are described more fully in the attached Scope of Work. (1) develop Communications Study Workplan; (2) review existing radio system; (3) develop Desktop Model of existing and alternative radio systems; (4) perform Field Path Studies of powered facilities; (S) evaluate data collection and transmission options for non -powered facilities; and (6) compile study results and recommendations into a Technical Memorandum. The exact level of effort required for the Field Path Study cannot be pinned down until the existing system has been reviewed and the desktop model has been completed. The baselines scope for the Field Path Study includes: (1) confirmation of system capacity of the District's existing radio system at 24 powered facilities, and (2) assessment of the viability of 3 remote locations and 7 locations along the "backbone" as relays on the District's existing radio system. If, however, the preliminary work suggests that the existing radio system capacity is insufficient, Carollo proposes additional scope that would allow the Field Path Study to be expanded up to the following limits: (1) confirmation of system capacity of the District's existing radio system at an additional 48 powered facilities, (2) assessment of alternative wireless communications (ie., Ethernet) at all 72 powered facilities, (3) assessment of alternative wireless communications at 3 remote relay locations. Whereas the baseline Scope of Work makes the assumption that the District's existing radio network remains the backbone of the District's wireless communication system and focuses on improvements to select powered and non -powered field facilities, the expanded Scope of Work is intended to provide the District with a comprehensive evaluation of wireless transmission options for all the powered District facilities within the Tahoe Basin. Carollo's proposed services for both the Water Efficiency Improvements and the PRV Upgrades include the following primary tasks, which are described more fully in the attached scope of work: (1) develop and evaluate alternatives for improvements; (2) prepare and submit Draft and Final Basis of Design Technical Memorandum; and (3) prepare and submit 90% Draft and Final Contract Documents. -16- Page 3 Ryan May 18, 2017 Additional Background Information: In 2014, the District established the Supervisory Control and Data Acquisition (SCADA) Steering and Executive Committees to develop an integrated plan for standardizing and prioritizing upgrades to system instrumentation, remote control, and data collection capabilities across the District's service areas. Communication has been identified as a critical path item for implementing SCADA operational and data collection improvements. As such, the District is interested in evaluating a comprehensive approach to improving its SCADA communication infrastructure with regards to reach, volume, and reliability, including a communication study and recommendations for communications improvements. In addition, the Committees have identified opportunities for improving data collection within the water system, which may be eligible for construction funding, if the project is publically bid. Staff Recommendation: Staff recommends that the Board authorize the maximum anticipated Scope of Work for the project requested by Carollo, in the amount $439,576. The work will be performed as Task Order No. 8 under the existing Master Services Agreement with Carollo. Staff also recommends that the Board authorize the requested Scope of Work for Peer Review Services requested by Systems Integrated, in the amount $19,920. The work will be performed as Task Order No. 1 under a new Master Services Agreement with Systems Integrated. SCHEDULE: COSTS: N/A ACCOUNT NO: 1029-8628; 2029-8763 BUDGETED AMOUNT AVAILABLE: $182,316; $39,723 (2017); $100,000; $100,000 (2018) ATTACHMENTS: Scope of Work and Cost Estimates CONCURRENCE WITH REQUESTED ACTION:. CATEGORY: Sewer/Water GENERAL MANAGER: YES ! L NO CHIEF FINANCIAL OFFICER: YESNO �Y -17- SYSTEMS INTEGRATED 2200 North Glassell Street, Orange, CA 92865 TEL 714/998-0900 FAX 714/998-6059 April 24, 2017 Julie Ryan Principal Engineer SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 92590 Ref: April 13, 2017 letter, Communications study peer review proposal Dear Julie: Though we are disappointed that Systems Integrated was not selected as the project principal, we are happy to accept STPUD's request to act as a peer reviewer of Carollo Engineering's communication work for your project. This letter is in response to your April 13 request and provides, 1) Systems Integrated's proposal for the task work and, 2) SI's reexamination and modifications of the Master Services Agreement in this new reduced role. TASK WORK Given the scope described in your April 13 letter, Systems Integrated will engage in two tasks for work specified in section 3 of the original RFP dated January 13, 2017: Communication Study: Review and provide written comments for Carollo Engineering's communication study work plan. Participate in a conference call with you and your staff to review comments and provide further insight if necessary. 2. Review and provide written comments for Carollo Engineering's communication study report. Participate in a conference call with you and your staff to review comments and provide further insight if necessary. In regards to additional system documentation from the District, we would require a copy of any material provided to Carollo to aid in their own design process. This will give us perspective on what they worked with as they developed their own design. TASK BUDGET & RATE SCHEDULE The not -to -exceed task budget is based on an anticipated number of hours for review and comment generation for the typical work plan and report study. Additional hours are also set aside for reviewing supplemental material that will be provided by the district and for participating in planning and conference calls. The budget is based on work plan and report —19— Julie Ryan SOUTH TAHOE PUBLIC UTILITY DISTRICT April 24, 2017 study not exceeding 300 pages, with supplemental material not exceeding 200 pages. DISCIPLINE HOURS BUDGET Project Manager/Principal Engineer 4 $ 900.00 Sr. Communications Engineer 60 $12,900.00 Sr. Mechanical Engineer Structural Engineer 8 8 $ 1,440.00 $ 1,720.00 Sr. Electrical Engineer 8 $ 1,440.00 Administrative Support 16 $ 1,520.00 TOTAL $19,920.00 The rates shown below are from our 2017 rate schedule. The staff identified will be asked to provide .their input on the different aspects of the final design: the RF, structural, mechanical and electrical supply portions anticipated to be part of the final report. Administrative support is included for documentation formatting and report binding. SYSTEMS INTEGRATED 2017 RATE SCHEDULE Project Manager/Principal Engineer Structural Engineer Sr. Communications Engineer Sr. Mechanical Engineer Sr. Electrical Engineer Admin Support TASKSCHEDULE $225.00 $215.00 $215.00 $180.00 $180.00 $ 95.00 We anticipate that our comments for Task One will be delivered 5 working days after receiving the documentation set from your staff. Comments for Task Two will be delivered in 15 working days after receipt of Carollo's report. MASTER SERVICES AGREEMENT Given Systems Integrated's significantly reduced role in your project, we have reexamined the Master Services Agreement in this new context, and suggest the following modifications (modifications are in red): 21 Page -20- Julie Ryan SOUTH TAHOE PUBLIC UTILITY DISTRICT April 24, 2017 Modify Article III, Section E. 2 to read as follows: CONSULTANT agrees, subject to the terms, conditions and limits of liability contained in its insurance policies required by this Agreement, to defend, indemnify and hold DISTRICT and each of its officers, employees, agents and representatives harmless from any claims, damage, liability or costs (including reasonable attorney's fees and costs of defense) stemming from Services under this Agreement to the extent such claims, damage, liability or costs are caused by CONSULTANT'S negligence, recklessness or willful misconduct or by the negligence, recklessness or willful misconduct of CONSULTANT'S subconsultants, agents, or anyone acting on behalf of or at the direction of CONSULTANT. CONSULTANT'S indemnification is limited to five times the total compensation actually paid to CONSULTANT or $50,000 whichever is greater. Modify Article III, Section F. 3 to read as follows: CONSULTANT shall carry Errors and Omissions Insurance in an amount not less than five (5) times the Agreement value with a deductible of not more than $500,000 for the life of the Agreement which shall include one year beyond completion of Services. Article III, add new Section N to read as follows: N. Notwithstanding all of the above, under no condition shall Systems Integrated's total liability exceed five (5) times the Agreement value. Should you wish to discuss this proposal, please contact either John Holbrook or Greg Conley to discuss the Task Work proposal, and myself to discuss the commercial terms of the Agreement at 714/998-0900. Sincerely, SYSTEMS INTEGRATED Susan Corrales-Diaz President 31 Page Wic SER: 5022-17c Proposal to Provide Engineering Services for the Water System Monitoring and SCADA Communications Upgrade Project for the South Tahoe Public Utility District This proposal includes professional engineering services needed for the completion of preliminary efforts needed to assist the OWNER in obtaining improved supervisory control and data acquisition (SCADA) communication capability across the service area, which includes centralized wastewater treatment and recycled water facilities, 97 water and sewer facilities (20 of which are for in-line water distribution), and 1 stormwater facility. As described herein, efforts provided as part of this initial project phase include the completion of a communications study, select water efficiency improvements, and a pressure reducing valve (PRV) upgrade project. ENGINEER'S SERVICES ENGINEER will perform the following services project administration services throughout the completion of Tasks 1-3, and bill the effort to the related task. TASK 0 - PROJECT MANAGEMENT AND MEETINGS ENGINEER will develop and implement administrative procedures that will be used to plan and monitor the progress of the projects through the duration of the contract. This task will be completed as a joint effort across the three different projects, with fee apportioned between them as appropriate based on perceived overall effort. Task 0.1— Project Administration. ENGINEER will perform the overall management of the three projects defined herein following ENGINEER's typical procedures for resource allocation, scheduling of work, QA/QC, and invoicing. The overall project scope, schedule, budget, and subconsultant coordination will be managed under this task. Task 0.2 — Project Kickoff Meeting. ENGINEER will lead the Project Kickoff Meeting for this overall effort at the OWNER's office, will prepare advance agenda with discussion topics, information needs list, and necessary decisions/feedback to limit project delay. ENGINEER will also prepare minutes summarizing workshop discussion with decisions memorialized in a Decision Log that will be updated through project completion. Task 0.3 — Project Summary Reports. This task includes the preparation of monthly progress reports to keep the OWNER informed about ENGINEER'S project progress, including comparison of baseline scope, budget, and schedule metrics against current activities. Task 0.4 — Meetings. Project progress meetings will be held monthly and following the submittal of major intermediate deliverables. • Project progress meetings: ENGINEER will coordinate monthly conference calls to report project progress by the team, discuss any issues that may arise over the course of the project, and receive OWNER feedback regarding preferred direction. • Design review workshops: ENGINEER will lead the design review workshops with the purpose of communicating design intent to the OWNER's staff and collecting feedback regarding design modifications for the final (bid set) package. Project challenges and issues will be discussed and addressed during these meetings. Task 0 fee is distributed to Task 1 - 3 efforts as follows: 10 Task 1 Project Management and Meeting fee: $19,153 C:\Users\bhann\Desktop\STPUD - Water Systems SCADA Upgrade - Scopgjoc Page 1 of 12 • Task 2 Project Management and Meeting fee: $8,984 • Task 3 Project Management and Meeting fee: $8,617 OWNER Pr v ect Mang ement Resvnsibilrties: • Attend meetings and provide input/feedback Review invoices and project status reports Pry ect Mana ement Assumptions.- Separate ssum tions:Separate efforts will not be required for the completion of subtasks included within Task 0, with the exception of Design Review Workshops (if necessary). The Design Review Workshops will be completed concurrently if allowed by the schedule of completion. Project duration is 24 months. 12 Except where otherwise indicated below, all deliverables will be provided in searchable, portable electronic form (ie. Adobe Acrobat). Where editable electronic documents are called for, they will be provided in a format readable by the District's standardized software. ■ Design review workshops: o At OWNER's office for draft technical memorandum (TM) deliverables (Tasks 1, 2, and 3). o Via conference call for 90% design deliverables (Tasks 2 and 3) Pro ecf Management ENGINEER Deliverables: • Meeting agendas and minutes • Monthly status reports and invoices TASK 1 — COMMUNICATIONS STUDY The goals of this Communications Study is to complete a comprehensive evaluation of the communication needs for the OWNER's water and wastewater system facilities, and provide recommendations for future action aimed at improving the OWNER's SCADA communications infrastructure with regards to reach, volume, and reliability while maintaining the current integrity of status, alarms, and remote control. The initial plan described herein recognizes that the OWNER has already put forth efforts to upgrade some of the sites' communications, having installed new Motorola radios at 48 locations (replaced Motorola Moscad RTUs with Motorola ACE3600 RTUs). Because these radios were just recently installed, we assume the OWNER will want to maintain them if possible. As such, a phased effort is needed to determine whether bandwidth limitations exist at those sites (new equipment are voice radios with serial protocol, so may have limited bandwidth), and if so, whether system upgrades with this same technology, using differing reliability improvements (such as segregation of data and status/alarm/control communication, store and forward, round robin transmission, etc) will allow the functionality that the OWNER desires. As discussed herein, if bandwidth limitations at these sites are significant enough to limit the overall system upgrade, or if reliability improvements cannot be made to overcome identified issues at these sites, then a recommendation to replace some/all of the new radios with alternate technology may provide the most effective long-term solution. This effort will include the following subtasks. C:\Users\bhann\Desktop\STPUD - Water Systems SCADA Upgrade - Scoff.4pP Page 2 of 12 Task 1.1 — Communications Study Workplan. ENGINEER will prepare a Communications Study Workplan for review/approval by the OWNER prior to initiation of remaining subtasks included for this effort. A Draft Communications Study Workplan will be submitted within 2 weeks of the Project Kickoff Meeting for review/approval by OWNER's staff. ENGINEER will incorporate changes requested by the OWNER in a Final Communications Study Workplan that will serve as the road map for successful completion of the overall effort. Task 1.1 fee: $12,815. Task 1.2 — Existing RF Analysis Review. The first step for this task will include the review of any recent path studies, details for the existing radio system, and OWNER's list of additional data collection/transfer desired for each site. Next, ENGINEER will test the preliminary channel capacity using radio diagnostics/scope to document the current loading on the existing radio frequency (RF) links at the 48 sites with new radio systems. As part of this task, ENGINEER will estimate the overall limitation of the radio throughput and the reliability of the received signal strength indicator (RSSI), and ultimately, the appropriate volume of data that can be satisfactorily pushed through the current radio system. The results of this testing will inform next steps as follows: • If enough sites are found to have available bandwidth for OWNER desired communication changes, then ENGINEER will discuss with the OWNER, and move into virtual testing of all 98 sites as discussed in Task 1.3.A. • If too many sites are NOT found to have available bandwidth for OWNER desired communication changes, then ENGINEER will discuss with the OWNER, and if desired, move forward with optional task 1.3.B. Task 1.2 fee: $6,372. Task 1.3.A — Computer RF Modeling (Path A). This task assumes that ENGINEER has determined that adequate channel capacity exists at individual sites for communication upgrades to the overall system without replacing the new radio technology recently installed at up to 48 sites (as determined in Task 1.2). With receipt of these results, and under direction of the OWNER, ENGINEER will then use Pathloss software to conduct a virtual path study to model the system architecture for all of the OWNER's 72 powered sites using the existing Motorola ACE3600 RTU frequency as a baseline. The virtual path study will include up to 3 mountain -top locations that may prove beneficial to the overall layout for system architecture. Task 1.3.A fee: $19,482- Task 19 482. Task 1.3.A.1— Alternative Communication Technologies. During the development of the virtual path modeling, ENGINEER will evaluate viable technology alternatives, for the 24 powered sites where the OWNER has not recently replaced the radio system, to allow for a possible mixed communication media system and/or stand-alone system(s) based on industry standard engineering practices. Based on findings of this evaluation, Engineer will develop a recommendation for the most appropriate technology (or combination of technologies) to best leverage the existing RF system to support the additional data collection desired while extending its reach to connect the currently blind assets with increased reliability. Task 1.3.A.1 fee: $5,657. C:\Users\bhann\Desktop\STPUD - Water Systems SCADA Upgrade - ScopV doc Page 3 of 12 Task 1.3.B — Computer RF Modeling (Optional Path B). This task assumes that ENGINEER has determined that adequate channel capacity does NOT exist at individual sites for upgrades to the system without replacing the new radio technology recently installed at up to 48 sites (as determined in Task 1.2). With receipt of these results, and under direction of the OWNER, ENGINEER will then use Pathloss software to conduct a virtual path study to model the system architecture for all of the OWNER's 72 powered sites using a different platform (meaning that some, or all, of the newly replaced radio systems may be recommended for upgrade/replacement). The virtual path study will include up to 3 mountain -top locations that may prove beneficial to the overall layout for system architecture. There is no additional cost expected with implementing Task 1.3.13 instead of Task 1.3.A. _Task 1.3.8.1— Alternative Communication Technologies. During the development of the virtual path modeling, ENGINEER will evaluate viable technology alternatives for all of the OWNER's 72 powered sites to allow for a possible mixed communication media system and/or stand-alone system(s) based on industry standard engineering practices. Based on the findings of this evaluation, Engineer will develop a recommendation for the most appropriate technology (or combination of technologies) to best leverage the existing RF system to support the additional data collection desired while extending its reach to connect the currently blind assets with increased reliability. There is no additional cost expected with implementing Task 1.3.13.1 instead of Task 1.3.A.1. Task 1.4.A — Field Path Study (Path A). This task follows Task 1.3.A, and includes efforts necessary to field verify the newly modeled system architecture. For this task, ENGINEER will work with hired subconsultant (Applied Technologies, Inc.) to perform RF and/or alternative technology verification of path validity and performance for 49 sites, as follows: e 24 powered stations that the OWNER has not yet converted to voice radio • 3 mountain -top sites 7 7 sites along the path of the developed communication backbone Y 15 of the 26 non -powered sites (see task 1.5 for additional details) The detailed scope of work from Applied Technologies, Inc. is included as attachment 1. Task 1.4.A fee: J44 162. Task_ 1.4.A.1— Additional Field Path Testing (O tiona!). This task includes fee for additional field path testing at up to 48 sites not included in the scope of Task 1.4.A, to be used at the discretion of the OWNER. Task 1.4.A.1 fee: 42,435. Task 1.4.A.2 — Repeat Field Path Stud D tiona! . As an option to the OWNER, ENGINEER will return to up to 15 powered sites (as selected by OWNER and ENGINEER based on modeled and earlier field verified results), to perform secondary testing of path validity and performance. This effort, and associated findings/recommendations, will be summarized in a Communication Study Addendum (included as Task 1.6.1 herein). Task 1.4.A.2 fee: $18,635. C:\Users\bhann\Desktop\STPUD - Water Systems SCADA Upgrade - Scol.Vc Page 4 of 12 Task 1.4.B — Field Path Study (Optional Path B). This task follows Task 1.3.13, and includes efforts necessary to field verify the newly modeled system architecture. For this task, ENGINEER will work with hired subconsultant (Applied Technologies, Inc.) to perform RF and/or alternative technology verification of path validity and performance for 97 sites, as follows: u 72 powered facility sites 9 3 mountain -top sites • 7 sites along the path of the developed communication backbone 15 of the 26 non -powered sites (see task 1.5 for additional details) The cost adder for this task is based on an assumed cost per site, assuming worst-case expected effort as due to the use of new technology at each site, thus requiring new masters, new analytics software, and additional field efforts necessary to establish patterns to follow during completion of the field surveys. Task 1.4.13 fee: $91,375. This fee is an adder to fee included for Task 1.4.A, and will be used on a time and materials (T&M) basis upon initiation of optional task 1.4.13. Task 1.4.B.1-- Repeat Field Path Study Optional. As an option to the OWNER, ENGINEER will return to up to 15 sites (as selected by OWNER and ENGINEER based on modeled and field verified results), to perform secondary testing of path validity and performance. This effort, and associated findings/recommendations, will be summarized in a Communication Study Addendum (included as Task 1.6.1 herein). Task 1.4.13.1 fee: $24,504 Task 1.5 — Non -Powered Data Collection. ENGINEER will evaluate the energy loads and environmental conditions of the 26 off -the -grid (non -powered) sites to determine the best alternatives to bring real time operational data into the OWNER's SCADA system. This task assumes that cellular communication technology will be appropriate for some of the sites, and as such the fee associated with this task (as included in Task 1.4.A and 1.4.13) assumes field surveys at 15 sites. For each of the 26 non -powered sites, ENGINEER will evaluate the battery systems, hardware, and software necessary to bring data back to the OWNER's existing SCADA servers, regardless of final communication technology recommended. Task 1.5 fee: $6,676. This fee does not include field path efforts (see 1.4.A or 1.4.13 for this fee). Task 1.5.1— Additional Field Efforts at Non -Powered Sites Q tional . If early efforts included in Task 1.5 indicate that field efforts will be required at more than 15 of the non -powered sites, ENGINEER will complete additional field path studies (as necessary, and at the option of the OWNER). The fee associated with this task assumes the completion of field path studies at up to an additional 11 sites. Task 1.5.1 fee: $17,480. Task 1.6 — Communications Study TM. Based on the findings of tasks 1.1 through 1.5, ENGINEER will prepare a Communications Study Technical Memorandum (TM) identifying alternatives explored and stating recommendations for: a Hardware improvements to existing radio remote terminal unit (RTU) network Network layout and hardware requirements for alternative data collection network (such as wireless Ethernet), if recommended, and C:\Users\bhann\Desktop\STPUD - Water Systems SCADA Upgrade - ScqP211LC Page 5 of 12 • Non -powered data collection system, including instrumentation, battery systems, and supporting software. ® System reliability improvements (i.e. store and forward, round-robin transmission, etc). The TM will include draft system architecture diagrams, with recommended locations for repeater systems, antenna types, and tower heights for each of the stations studied, as well as a priority list for completion of recommended improvements and estimated cost for each. ENGINEER will present the Recommendations TM at a Communications Study Review Workshop, where OWNER's comments will be collected for incorporation into a final Communications Study TM. Task 1.6 fee: $17,455. Task 1. 6.1 =Comm�mication Study Addendum (Optionai}. As an option to the OWNER, ENGINEER will prepare a Communications Study Addendum summarizing efforts, findings, and next steps for the return field path testing conducted under Tasks 1.4.A.2 or 1.4.B.1. Task 1.6.1 fee: $ 13 065. OWNER Communication Stud Res onsibilities: Provision of the following information/data either before (or at) the project Kickoff Meeting: o Site inventory with GPS coordinates and elevations. o A list of current radio and/or other communication devices by type and model number for each site. o Current heights, type, and ratings for all site antennas. o Previous path studies and test results. o List of additional data collection/transfer desired for each site. o A list of OWNER properties (other than the site list) which could possibly support a future antenna and/or radio repeater site. o Listing of current radio and/or other communication devices by type and model number for each site, with copies of technical manuals for the each model (when possible). o Listing of all Motorola radio support software currently used by OWNER. o All current radio system licenses and call signs. o Listing of all current radio settings. o Listing of any known FCC restrictions within the utilities service boundaries (i. e. airports, military sites, etc). o Respond to ENGINEER's request for additional data/information, as necessary to facilitate completion of efforts. a Participate in workshop and provide comments on draft deliverable ■ Identify (with geographical coordinates) and inventory existing remote site radio, antenna, and miscellaneous communications equipment not currently included in the OWNER's GIS shapefiles. • Assist ENGINEER with site prioritization. C:\Users\bhann\Desktop\STPUD -Water Systems SCADA Upgrade - Scope_g Page 6 of 12 Communication Study Assumptions: • As noted within herein. Communication Study ENGINEER Deliverables: ■ Draft Communications Study Workplan (electronic) Final Communications Study Workplan (10 hardcopies, plus pdf) * Draft Communications Study TM (electronic) Communications Study Review Workshop agenda and minutes (electronic) * Final Communications Study TM (10 hardcopies, plus pdf) o Final deliverable will include field notes from Tasks 1.2 and 1.4 and Pathloss model output files. TASK 2 - WATER EFFICIENCY IMPROVEMENTS ENGINEER will perform an evaluation of select operational efficiency improvements proposed by the OWNER, and prepare bidding documents for construction of improvements as described in the following subtasks. Possible modifications to the seven stations in question include: Possible replacement of old flow meters y Installation of power meters Installation of pressure gauges • Modification or Replacement of radio transmitters Installation of Ethernet antennas (if recommended). Other incidental system reliability improvements resulting from Task 2. Specific details for each of the seven stations are as included in OWNER -provided Table 1.1, included herein as Attachment 2. Task 2.1— Operational Efficiency Review. This task includes a review of existing operational deficiencies and desired improvements with water operations staff. Task 2.1 fee: $7,574. Task 2.2 — Instrumentation Assessment. This task will include the assessment of the capabilities, condition, and/or accuracy of existing power meters, flow meters, and variable frequency drives (VFD) speed meters consistent with Table 1.1, summarized as follows: O Power Meters: At Tahoe and Bayview well stations • Flow Meters: Valhalla, Sunset, and Al Tahoe well stations ■ VFD Speed Meters: Al Tahoe and Bayview well stations ENGINEER will use the information collected during the instrumentation assessment to determine whether the instruments or systems require calibration, need to be taken out of service, have been misapplied for the process application, or will require replacement. ENGINEER will present findings of this assessment, along with recommended manufacturers and model numbers for equipment that will require replacement and/or addition, as part of the deliverable included in Task 2.4. Task 2.2 fee: $12,178. C:\Users\bhann\Desktop\STPUD - Water Systems SCADA Upgrade - Scg2jac Page 7 of 12 Task 2.3 — Distribution Pump Station VFD Assessment. This task will include the assessment of the demand variability issues and determine the proper VFD system design for the David Lane PS. This will include: An evaluation of the existing pump motors to see if the dielectric ratings are compatible with VFDs Verification that the distances between the motor and the proposed VFD locations do not exceed proper design guidelines Analysis of the existing power distribution system and harmonics to ensure they meet IEEE 519 requirements. In addition, ENGINEER will identify any motor protection wiring issues, heat dissipation requirements, and whether HVAC changes will be needed in the building to offset the new heat load produced by the VFDs. Design improvement recommendations will be made as part of task 2.4 Task 2.3 fee: $2,202. Task 2.4 — Field Assessment and Basis of Design TM. This task will include field efforts necessary for the recommendation of additional improvements at the seven well stations, as well as the preparation of a Basis of Design TM. Field efforts will include the review and evaluation of needs associated with the equipment specified for modification or replacement, consistent with Table 1.1, summarized as follows: Power Meters: o Add and wire to RTU: Bakersfield and Sunset well stations, and the David Lane pump station (PS) o Replace and wire to RTU: Valhalla Well o Wire to RTU: SUT well station ■ Submeters: Add at SUT well station and the David Lane PS • Flow Meters - o Move at RTU: SUT, Bakersfield and Bayview well stations, and the David Lane PS Pressure Gauges: Miscellaneous needs at each of the seven well stations • VFD-Speed Meters: Improvements at the SUT, Bakersfield, and Valhalla well stations • Radio: Replace at SUT and Bakersfield well stations • Antenna: Add at each of the seven well stations ENGINEER will prepare a Basis of Design TM that includes findings for each site, along with recommended manufacturers and model numbers for equipment that will require replacement and/or addition for an optimized system. ENGINEER will present the findings and recommendations at a Basis of Design Review Workshop, where OWNER's comments will be collected for incorporation into design documents developed in Task 2.5. Task 2.4 fee: $12.414. C:\Users\bhann\Desktop\STPUD - Water Systems SCADA Upgrade - SC216 9C Page 8 of 12 Task 2.5 — Construction Documents. This task includes the development of construction documents, prepared assuming construction of final design will be accomplished by procurement through a standalone, publically bid contract using select front-end specifications provided by OWNER, ENGINEER's technical specifications, and ENGINEER's standard CAD software, templates, and symbols in the development of contract drawings. ENGINEER will prepare construction cost estimates for each design deliverable. Estimates will be based on available quantity take -offs, manufacturer's quotes, and experience incorporating similar project elements in other projects. Estimates will be prepared to a level of accuracy consistent with the standards of the AACE International. ENGINEER will prepare draft (90%) design documents, which will include the complete set of drawings and specifications necessary for project bidding, and conduct a workshop to present the design details and collect feedback from OWNER's staff. Feedback received on the 90% design documents will be incorporated into a Final Design package, made available to the OWNER for project bidding. Task 2.5 fee: $52,291. OWNER Water Efficiency Improvements Responsibilities: • Provide system drawings and/or data for each site Provide staff to answer questions and allow access to electrical panels (as appropriate) during ENGINEER's site visits Participate in workshops 41 Review draft documents and provide feedback Water Efficiency Improvements Assumptions: The level of detail for design drawings is limited to available construction drawings and/or photos to detail proposed improvements. If as -built drawings are not available as scanned documents, then an amendment to this contract will be needed for effort required to produce drawings with enough detail to bid the project. The engineering fee for Task 3 is intended to support the procurement and installation of the instruments discussed herein for each site, including minor modifications to existing electrical panels and mechanical piping. It is limited in terms of ancillary improvements that might be requiredand excludes: o Major modification to existing electrical panels and/or installation of new panels to support new instrumentation. o Major modification to existing piping for replacement of flow meters o Programming for necessary to connect improvements to SCADA o HVAC improvements o Building modifications Subsurface exploration, geotechnical analysis, nor topographic survey will be necessary for design efforts. • No environmental documentation and/or permit requirements for the implementation of construction improvements will be performed. Water Efficiency Improvements ENGINEER Deliverables: Basis of Design TM (Draft and Final) • Basis of Design Review Workshop agenda and minutes C:\Users\bhann\Desktop\STPUD - Water Systems SCADA Upgrade - Scopic Page 9 of 12 90% Draft Plans and Technical Specifications 90% Design Document Review Workshop agenda and minutes Final Plans and Technical Specifications for Construction (in both editable and portable electronic form) • Engineer's Estimate of Cost for Construction (in both editable and portable electronic form) TASK 3 - PRV UPGRADE ENGINEER will assist the OWNER with the planning, design, and construction of a pressure reducing valve (PRV) station upgrade project, aimed at testing non -powered data collection for future off -grid installations. Task 3.1— PRV Evaluation and Selection of Upgrade Location. ENGINEER will work with OWNER's staff to assess the OWNER's 20 remote PRV sites to determine the optimal location for the PRV upgrade project. This will include a hydraulic evaluation for all 20 sites, and field efforts necessary to verify site conditions and evaluate access and availability of space for construction activities for the site(s) that prove most feasible after desktop analysis. This task assumes that site visits will be required at a maximum of 5 sites to verify site conditions. The OWNER's intent for this effort is that the following will equipment will be installed with this first PRV upgrade: • A new flow meter New suction and discharge pressure gauges • Non -powered transmission device(s) ENGINEER will work with OWNER's staff to evaluate other non -powered solutions that may require less equipment, such as a valve controller that would negate the requirement for separate flow monitoring. If acceptable to OWNER's staff, ENGINEER would implement this as an addition to the other equipment specified for implementation at the selected PRV location, thus providing a secondary means of equipment testing, and more robust results for overall site implementation. Task 3.1 fee: $13,351. Task 3.2 — Field Assessment and Basis of Design TM. ENGINEER will prepare a Basis of Design TM that includes findings of desktop and field evaluations, a recommendation for site selection for the PRV upgrade, and recommended manufacturers and model numbers for the required PRV upgrade equipment. ENGINEER will present the findings and recommendations at a Basis of Design Review Workshop, where OWNER's comments will be collected for incorporation into design documents developed in Task 3.3. Task 3.2 fee: $8.173. Task 3.3 — Construction Documents. This task includes the development of construction documents, prepared assuming construction of final design will be accomplished by C:\Users\bhann\Desktop\STPUD - Water Systems SCADA Upgrade - Scocq.4oc Page 10 of 12 procurement through a standalone, publically bid contract using select front-end specifications provided by OWNER (majority of front-end specifications provided by the OWNER), ENGINEER's technical specifications, and ENGINEER's standard CAD software, templates, and symbols in the development of contract drawings. ENGINEER will prepare construction cost estimates for each design deliverable. Estimates will be based on available quantity take -offs, manufacturer's quotes, and experience incorporating similar project elements in other projects. Estimates will be prepared to a level of accuracy consistent with the standards of the AACE International. ENGINEER will prepare draft (90%) design documents, which will include the complete set of drawings and specifications necessary for project bidding, and conduct a workshop to present the design details and collect feedback from OWNER's staff. Feedback received on the 90% design documents will be incorporated into a Final Design package, made available to the OWNER for project bidding. Task 3.3 fee: $35,598. OWNER PRV Upgrade Res onsibilifies. • Provide record drawings (where available), hydraulic model output, and/or pressure and flow data Provide staff to answer questions and allow access during ENGINEER's site visits Participate in workshops Review draft documents and provide feedback PRV Upgrade Assumptions: • Construction documents will not include provisions to capture and integrate the instrument signals into SCADA. No Subsurface exploration, geotechnical analysis, nor topographic survey will be necessary for design efforts. No environmental documentation and/or permit requirements for the implementation of construction improvements will be provided. PRV Upgrade ENGINEER Deliverables: ■ Basis of Design TM • Basis of Design Review Workshop agenda and minutes a 90% Draft Plans and Technical Specifications ® 90% Design Document Review Workshop agenda and minutes Y Final Plans and Technical Specifications for Construction (in both editable and portable electronic form) 0 Engineer's Estimate of Cost for Construction (in both editable and portable electronic form) C:\Users\bhann\Desktop\STPUD - Water Systems SCADA Upgrade - Scgp3lgc Page 11 of 12 TIME OF PERFORMANCE ENGINEER will manage the following schedule for completion of tasks defined herein. Event Approximate Date Project kickoff meeting Within two weeks of receipt of NTP Communications Stud - Draft Communications Study Workplan - Final Communications Study Workplan - Draft Communications Study TM Within three weeks of receipt of Project Kickoff Meeting Within 2 weeks of receipt of comments Within three months of completion of the Final Communications Study Workplan - Communications Study Workshop2 Within five weeks of submittal of draft TM' - Final Communications Study TM Within four weeks of TM review workshop Water Efficiency Improvements - Submit Basis of Design TM Within 8 weeks of Communications Study Workshop - Basis of Design Review Workshop Within five weeks of submittal of draft TM' - Submit 90% Design Documents Within 8 weeks of TM review workshop - 90% Design Review Workshop Within five weeks of 90% design submittal - Submit Bid Documents Within 6 weeks of 90% submittal review workshop PRV Upgrade Project - Submit Basis of Design TM Within 8 weeks of Project Kickoff Meeting3 - Basis of Design Review Workshop Within five weeks of submittal of draft TM1 - Submit 90% Design Documents Within 8 weeks of TM review workshop - 90% Design Review Workshop Within five weeks of 90% design submittal - Submit Bid Documents _ Within 6 weeks of 90% submittal review workshop Notes,- otes-1. Assumes receipt of OWNER's comments within three weeks of delivery of the draft. 1. 2. Will serve as secondary kickoff meeting for the Water System Efficiency Improvements Project (and PRV Upgrade Project, if necessary). 3. Assumes that selected PRV site can transmit to the existing network. If this is not the case, then schedule for this -task will follow the completion of the Communications Study Workshor7. C:\Users\bhann\Desktop\STPUD - Water Systems SCADA Upgrade - Sc4ps.dw Page 12 of 12 Attachment 1 APPLIED TECHNOLOGY GROUP, INC. SPECIALIZED COMMUNICATIONS SERVICES 4441 Eastm Drive Aakcrsficld, CA 93309 (661) 322-8650 (661) 323-4060 FAX alg nWginlemel.com Lic. iN91598 Applied Technology Group (ATG) - Scope of Work for STPUD Communications Study Proiect: Existing System Description\Proiect Assumptions 1. STPUD has 98 site sites that will require some level of radio frequency (RF) in -field surveying/testing. 2. Of these 98 sites, 26 do not have any power at their locations and thus, have no communications back to the SCADA system. It is assumed that up to 15 of these sites will need in -field surveying. 3. Of the 72 sites that currently have communication capability (98 sites total - 26 non -powered sites), 48 were recently upgraded to Motorola ACE RTU PLCs. It is assumed that these 48 sites communicate back to SCADA and would not need an RF path study, unless; i. The architecture developed by Carollo needs to modify existing links or, ii. The bandwidth analysis above necessitates a modified link needing an in -field RF survey. Carollo will work with STPUD to determine whether the newly replaced radio system is adequate for STPUD's needs or not, and will direct ATG to move forward with either Scope item No. 1 or No. 2 (not both). Scope: ATG will complete Task No. 1 or Task No. 2, as directed by Carollo. 1. In -Field RF Site Surveys _{Path A): a. Carollo is tasked with developing a communication architecture for the overall system, and ATG will assist with in -field RF testing to verify modeled system architecture. Path A assumes that the newly installed radio systems at the 48 sites mentioned above will be maintained, and that the remainder of communication system will use this radio system as the platform for upgrades at the other sites. b. The base fee associated with this scope assumes that ATG will provide in -field RF testing for 49 sites: i. 24 facility sites that currently have communication capability ii. 3 mountain -top sites iii. 7 sites along the path of the developed communication backbone iv. 15 of the 26 non -powered sites. c. Additional (optional) fee is included herein for in -field RF analysis for: L An additional 48 sites. ii. A return visit (during winter) for 15 sites. iii. An additional 11 non -powered sites. d. The overall field effort assumes that 10 sites will get converted to cellular nodes. -35- 2. In -Field RF Site Surveys (Path BY a. Carollo is tasked with developing a communication architecture for the overall system, and ATG will assist with in -field RF testing to verify modeled system architecture. Path B assumes that STPUD chooses to move forward with an entirely new communication architecture (i.e. because the newly replaced radio systems are found to be limited in terms of bandwidth, etc). As such, the entire system will be modeled after the platform that makes the most sense based on the communication needs for each site. b. The base fee associated with this scope item assumes that ATG will provide in -field RF testing for 97 sites: L 72 facility sites ii. 3 mountain -top sites iii. 7 sites along the path of the developed communication backbone iv. 15 of the 26 non -powered sites. c. Additional (optional) fee is included herein for in -field RF analysis for: L A return visit (during winter) for 15 sites. ii. An additional 11 non -powered sites. d. The overall field effort assumes that 20 sites will get converted to cellular nodes. Cost for Task 1 Path A Task Description Hours Hourly Rate Per Diem Total Task Costs Cost 1 In -field path surveys for 49 sites 140 125.00 13,460.00 30,960.00 1.c.i In -field survey for additional 48 sites 138 125.00 13.460.00 30.710.00 1.c.ii Return in -field survey for 15 sites 58 125.00 6,730.00 13,980.00 1.c.iii In -field survey for additional 11 sites 50 125.00 6,730.00 12,980.00 Cost for Task 2 (Path B Task Description Hours Hourly Rate Per Diem Costs .... 40,380.00 10,095.00 s Total Task Cost 2 In -field path surveys for 97 sites 459 125.00 73 125.00 97,755.00 2.6 Return in -field survey for 15 sites 19,220.00 2.c.ii In -field survey for additional 11 sites 61 125.00 6,730.00 14,355.00 -36- Attachment 2 Table I- STPUD Proposed Water Efficiency Improvements 1/12/2017 X:\Staff\lulie\SCADA Steering Comm\BOR Water Energy Grant 2017\BOR-GrantApp2017 Station Power Meter ISubmeters I Flow Meter Suction Pressure Discharge Pressure Radio Antenna Antenna Relay 1VFD VFD Speed Notes: SUT Well Wire to RTU Add 4 Move at RTU For well, use well level- For well, use Aeration Tank Replace (0) Add OK Split at RTU Will need to also upgrade remaining (2-pumps/2-blowers) Move at RTU. Leval. (Same as boomar radios in zone. For booster, use Aeration suctionj Tank Level. Split local signal For booster, split at RFU. and wire to RTU. Bakersfield Well Add and wire to RTU N/A Move at RTU Add well level and wire to Replace and wire to RTU. Sl Replace (x3) Add OK Add and wire to RTU Will need to also upgrade remaining RTU. radios in zone. Valhalla Well Replace and wire to RTU N/A (1) Test and Replace or Use well tevul Move at RTU. Split at RTU OK Add OK Add and wire to RTU l2) Move at RTU Comm Study prior to Sunset Well Add and wire to RTU N A / (1) Test and Replace or Add well level and wire to Split at RTU OK Add None N/A Run 1/2 time. Well replacement on (2) Move at RTU RTU. installation CIP for 2023 AI Tahoe Well (1) Wire to RTU or N/A (1) Test and Replace or Add well level and wire to Split at RTU OK Add OK (1) Wire to RTU or 2) Replace and wire to RTU (2) Move at RTU RTU. (2) Replace and wire to RTU Qayveaw Well (ij Wire to RTU or N/A Move at RTU Use well level. Move at RTU. Split at RTU OK Add OK (1) Wire to RTU or VFD Speed Integral to Power Meter. (21 Ra place a rid wire to R TU (2) Replace and wire to RTU David Lane BS Add and wire to RTU Add with Pump VFDs Move at RTU _ Split at RTU. Add and wire to RTU. Split Add Add 2 VFDs Add with VFDs Split pressure signal at RTU and add signal. JOK high-pressure interlock over radio. 1/12/2017 X:\Staff\lulie\SCADA Steering Comm\BOR Water Energy Grant 2017\BOR-GrantApp2017 Carollo Engineers Confidential 5/10/2017 Page 1 South Tahoe Public Utilities District Water SMom Monitoring and SCADA Communicatfons Upgrades _ LABOR HOURS AND COST May 10 2017 . , . .. _..- STAFF $Ini e$ um Travel, H m 9 E Y e Subsistence, Subcontract Other And Reimbursable Markup Task No. TAS1S OESC#tiPTiOH a o d > 'L^ o u ° 1 labor Cost Labor on Costa Raknburamble Coate Total Task Cost 0 mel�dad in Tasks 1-3 0 11 t.2 Prvfcet rlan4gemanr and Mcctingr---.,�74 Comm,.ncstionp Scud w E:¢Rieq RFAnatyds. 11"kno _ 28 _ _ 13 el 15 15 3 .�. 4 $ 1�� _6 72. ._- -... ... _ $ 2y58 __ _ _ $ ' 3 .. - 19153 S _ 1.3A1g 1.3 A.ttg.t 1.4A _... _ .-.._�. __�__�._-._" ter RF Con!"- -!g .._.. AHdrtlalPre temmJatrJnfat T! _ .. j Fla Pathk .....__ .. __� .—....��— 1J'_ - ^ _._- II f 24 ._ ._ QO _. ..�. -_.. --� -_. ._ _. 70 . _ 12r I 81 12 L2:_ 24 32 .... -:T,S $ $ I 19.48%... 5557 —7,4a4 .. - A-- � _ 6: $ 3gt05fi r$ -- - $ �$ —_- ..._ $ ...... 875 - _.... - _ 1,747 $ _,.... ..�$iT�2 S 10fa62 ... $ .... _ 5,8.57 $ 1.5 Nan.poward Dara Collection �._ _ _1�4 16' $ ?8 S .. . - - $ _ _ ... $ .._ s676 I 16 Communications Stud,, TR4 �&j 4 16 6 16 _ sl' S $ 17,-,455 __.. - - �.....:...._... $...... -�_ $ 17.455 UJ 2 D ... , Pfojert MAnai;Cn.ent and Mcr[wgs _ �- . .. f m- -- I. _ ... I 2.7 _ Operadonal EiFic:ency Rcw�rw 35 -,. _ _ 32 - 14 i `- 7!t 7 8 7 6 6 Oi_ $ _._ 564 .. $ _ 26 $ 22 2.S lrtstnarlan7atlon 4_:....n.; .t , _ ..... ...��_._._._-�.....�_ llisbfburkxl SlaTlan YFD Asssalrneyl7 . _... ._-.....� ... i I - _ t �" --� � 8 .�. 32 4 - 8 .�.-.. -. $..._-11 7,574 - 4 $ $..- 214 $ ...._. ..- $ 7.574 $ 12178 ~ $ .� _ .._-_.-11 525 $- ---26 ... _..,---..5 ` ..._.__......._R+n+4........_..._...__"4lu .._ ...._,.... 2.4 FfllhF A7iW11Mat and NaHf of TM _57 _ 1 4 8 16 20 8 11.863 $ 2_.6 CarlMrtlGlkrl pOIXAmams 2202 $ ----- 12.414 2Ct7 ^_ _1 .- 12 _ ..- ��fi 4 80 80 lfi $- 51739 $ 525 $ 26 S 52,291 0 3.1 Pro)e[t manegasltgtt and AlaWtys ...... ..........._.._._._ .. _. PRY Ev4lcalion and Select-'? ttimd 35' _--1. _ 4-- )_4 _ }: ---�� ... 7 7 .. [I S_ 8.397 $ 219 11 5 0,617 $'8 _____ � $81 ` 87 •_ 2qt �tl.2 $' 9 $ 13,351 7.581 $ $ •. $ - Sfid : $ `- 26 $ 13.351 $ 6173 � � � 40 2q60 16 S 35.006 $ 58q $ 28 $ 35.596 Total 1198 (11 132 .511 48. 198 121 2411 0. 224! 108 56 S 250.777 S 34.058 . S 6,3011$ 2.018 IS 293.152 2017 Rates 295.20 254.70 254.701 29570 21670 21670 254.70 158.70; 179.70. 13770 12270 1 Carollo Engineers Confidential 5/10/2017 Page 1 Carollo Engineers Confidential 5/10/2017 Page 2 C a � N e Z e 9 6 _� o Q o y • . � m LA a g' E FI ! Ii1 Travel, - e m c= - .o E E a -� 6 a 'm to E o� 1� r c Subsistence And Task No. ij m u - ' E 'n ' "o .y o o Subcontract Other Reimbursable Markup on iTASKDESCRIPTION w 5 rc m o a Z A ° C : Labor Cost Labor Costs Relmbursable Costs Total Task Cost EFFORTS 7A9 TIMM Pakh UW-eKpeCtad end adder for�Path a efforts .!> 2a 40 $ - _.__.._-,-_...�._...__._ ..._._ ._.... __.�._�„r Fla_ Id Path Ttlanj A] 1:dAT .Adlt;Q _.�,_ •�. 32 1 B. 28 .... 12 B9 $ 7 47d�a $ 1.750 S 3,761 $ 91,375 _ ... 1_.4A.2 1-1l tt, Al Field Pa[h Yash ipathAl.-.. 7.�- w_.--]r� g 2.304 $ 75.378 r.. 87.5_F 1.733 $ 42a435 �Xapaat .... _ 1.4.8.1 ! Raid Pal}1T iP+eh ISl 1.5.1 [AddlOond Hold Ekortf a[ kaai-Pewared Skes _ -_-- �. _ � _ _32 U 72 ".. _ ,.--� 4 8 :.8 �4 2 oa $ 21,9a2 $ $ $ !$ 70 1,a57 $ 1B,fiO4 s _ 2a.saa _ -.— __........ .. _...�._.�' 1fi.1 !ian"Unkarllm!$URN Addendum g 4 24^-.--1141---^- L--' - j 8 $ 2,304 $ 14.278 $ 175 3 -- 723 $ 17ABO — 12 4. $ 13 6g: S_ $ 13,065 Carollo Engineers Confidential 5/10/2017 Page 2 outh Tahoe Dietrict General Manager Richard H. 5olbrig Directors Chris Cefalu James R. Jones Randy vogelgesang Kelly 5heehan Duane Wallace 1275 Meadow Crest Drive • 5outh Lake Tahoe a CA 96150-7401 Phone 530 5446474 • Fax 530 541-0614 • www.stpuAus BOARD AGENDA ITEM 6d TO: Board of Directors FROM: Paul Hughes, Chief Financial Officer MEETING DATE: May 18, 2017 ITEM - PROJECT NAME: Fiscal Year 2017/18 Water and Sewer Service Charge Rates REQUESTED BOARD ACTION: Approve Resolution No. 3056-17 confirming the water and sewer service charge rates for Fiscal Year 2017/18. DISCUSSION: On June 5, 2014, the Board of Directors passed Ordinance No. 557-14 which included five-year rate schedules for both water and sewer service charge rates. The five-year rate schedule was developed to fund the ten-year Capital Improvement Plan of approximately $103 million. The Ordinance adopted the rates for Fiscal Year 2014/15, but required confirmation from the Board before the rates for years 2015/16, 2016/17, 2017/18 and 2018/19 are effective. Last year on May 19, 2016, the Board confirmed the rates for 2016/17 through approval of Resolution No. 3015-16. Resolution 3056-17 confirms the rates for 2017/18; water increase of 6.5% and sewer increase of 6.0%. The proposed 2017/18 budget has been developed with these rate increases and is scheduled for adoption following Board action on this Agenda Item. If Resolution 3056- 17 is not adopted as prepared, the budget will need to be adopted with Board direction to adjust the revenues and expenditures accordingly. SCHEDULE: Rate changes effective July 1, 2017 COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: Resolution 3056-17, Service Charge Rates CONCURRENCE WITH REQUESTED ACTION: p GENERAL MANAGER: YES .4 NO CHIEF FINANCIAL OFFICER: YES NO -41- CATEGORY: Water 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 j 24 25 26 27 28 29 30 RESOLUTION NO. 3056-17 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT CONFIRMING THE WATER AND SEWER SERVICE CHARGE RATES FOR FISCAL YEAR 2017/18 WHEREAS, on June 5, 2014, the Board of Directors of the South Tahoe Public Utility District held a public hearing on proposed changes in rates and charges which were issued with a Proposition 218 notice that was mailed to all District account holders; 11 and WHEREAS, on June 5, 2014, the Board of Directors of the South Tahoe Public Utility District approved Ordinance 557-14, adopting a five-year water service charge rate schedule and a five-year sewer service charge rate schedule; and WHEREAS, Ordinance 557-14 requires the District's Board of Director's confirmation of the water and sewer service charge rates in Fiscal Years 2015/16, 2016/17, 2017/18 and 2018/19; and WHEREAS, on March 21, 2017, the Board of Directors of the South Tahoe Public Utility District held a public meeting and directed District staff to develop the proposed budget for Fiscal Year 2017/18 with a proposed water service charge rate increase of 6.5% and a sewer service charge rate increase of 6.0% to fund the 2017/18 Capital Improvement Plan and operating budget of the Water and Sewer Enterprise Funds. NOW, THEREFORE BE IT RESOLVED, by the Board of Directors of the South Tahoe Public Utility District that the water and sewer service charge rates for the Fiscal Year 2017/18 included in the attached Water and Sewer Rate Schedules are confirmed, I effective July 1, 2017. WE THE UNDERSIGNED, do hereby certify that the above and foregoing Resolution No. 3056-17 was duly and regularly adopted and passed by the Board of Directors of the South Tahoe Public Utility District at a regular meeting duly held on the 18th day of May 2017, by the following vote: -43- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AYES: NOES: ABSENT: ATTEST: Melonie Guttry, Clerk of the Board South Tahoe Public Utility District Resolution No. 3056-17 Page 2 May 18, 2017 Randy Vogelgesang, Board President South Tahoe Public Utility District SCHEDULE 2 - QUARTERLY FLAT SERVICE SCHEDULE 3 - METERED SERVICE Quarterly Base Rate 2014/15 2015/16 2016/17 2017/18 2018/19 Single Dwelling Unit $130.25 $138.70 $147.70 $157.30 $165.20 Duplex $231.55 $246.60 $262.60 $279.70 $293.70 Triplex $314.59 $335.00 $356.80 $380.00 $399.00 Fourplex $406.96 $433.40 $461.60 $491.60 $516.20 Each additional unit $68.29 $72.70 $77.40 $82.40 $86.50 Business Establishment 3/4 Inch Connection $198.18 $211.10 $224.80 $239.40 $251.40 Business Establishment 1 Inch Connection $299.06 $318.50 $339.20 $361.20 $379.30 SCHEDULE 3 - METERED SERVICE Quarterly Base Rate 2014/15 2015/16 2016/17 2017/18 2018/19 3/4 inch connection $111.06 $118.30 $126.00 $134.20 $140.90 1 inch connection $185.47 $197.50 $210.30 $224.00 $235.20 11/2 inch connection $369.83 $393.90 $419.50 $446.80 $469.10 2 inch connection $591.95 $630.40 $671.40 $715.00 $750.80 3 inch connection $1,110.60 $1,182.80 $1,259.70 $1,341.60 $1,408.70 4 inch connection $1,851.37 $1,971.70 $2,099.90 $2,236.40 $2,348.20 6 inch connection $3,701.63 $3,942.20 $4,189.40 $4,471.30 $4,694.90 8 inch connection $5,922.83 $6,307,80 $6,717.80 $7,154.50 $7,512.20 10 inch connection $8,514.97 $9,068.40 $9,657.80 $10,285.60 $10,799.90 Consumption Rate by Customer Class $34.64 $36.72 $38.92 $41.25 $43.72 Per 100 Cubic Feet (748 Gallons) 2014/15 2015/16 2016/17 2017/18 2018/19 Single Family Tier 1 $0.86 $0.91 $0.97 $1.04 $1.09 Single Family Tier 2 $1.29 $1.37 $1.46 $1.56 $1.64 Multi Family $1.21 $1.29 $1.37 $1.46 $1.53 Commercial $1.20 $1.28 $1.36 $1.45 $1.52 SCHEDULE 6 - SEWER RATES Quarterly Charge Per Sewer Unit By Customer Class 2014/15 2015/16 2016/17 2017/18 2018/19 Single Family Dwelling $33.34 $35.34 $37.46 $39.71 $42.09 Multi Family Residences $32.65 $34.61 $36.69 $38.89 $41.22 Hotels/Motels/Timeshares $32.24 $34.17 $36.22 $38.39 $40.69 Restaurants $34.64 $36.72 $38.92 $41.25 $43.72 Service Stations $34.64 $36.72 $38.92 $41.25 $43.72 Trailer/Mobile Home Parks & Campgrounds $30.68 $32.52 $34.47 $36.54 $38.73 Laundromats $34.64 $36.72 $38.92 $41.25 $43.72 Automobile Service Garage $34.64 $36.72 $38.92 $41.25 $43.72 Taverns without Food Facilities $34.64 $36.72 $38.92 $41.25 $43.72 All other Commercial Establishments $34.64 $36.72 $38.92 $41.25 $43.72 -45- General Manager Richard H. 5olbrig rectors South TahoeT P Jam � � Chris Cefalu V es R. Jones Randy Vogelgesang Public Utility District Kelly5heehan Duane Wallace 1275 Meadow Crest Drive • South Lake Tahoe • CA 961507401 Phone 530 54446474 - Fax 530 541-0614 • www.5T pud.u5 BOARD AGENDA ITEM 6e TO: Board of Directors FROM: Paul Hughes, Chief Financial Officer MEETING DATE: May 18, 2017 ITEM - PROJECT NAME: Fiscal Year 2017/18 Water Enterprise Fund Budget REQUESTED BOARD ACTION: Authorize the District to: 1)Adopt Resolution No. 3057-17 adopting the Fiscal Year 2017/18 Water Enterprise Fund Budget and; 2) Authorize staff to incorporate any adjustments or changes necessary as a result of Board action. DISCUSSION: The Fiscal Year 2017/18 Water Fund proposed budget in the amount of $19,744,175 is fully funded and includes a 6.5% increase in service charge rates. The budget includes $8,604,500 (43%) for capital projects, $901,000 (5%) for debt service, $3,611,375 (18%) for operations and maintenance, and $6,562,300 (34%) for salaries and benefits. If prior Board action is taken to adopt a service charge rate increase less than 6.5%, staff is seeking as part of the requested Board action, approval to adjust the budget and Resolution 3057-17 accordingly. SCHEDULE: Budget must be adopted by July 1, 2017 COSTS: $19,744,175 ACCOUNT NO: Various BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: Resolution 3057-17, Water Fund Budget Summary CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES mo f►L91 -47- CATEGORY: Water 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 RESOLUTION NO. 3057-17 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT ADOPTING THE BUDGET FOR THE WATER ENTERPRISE FUND FOR FISCAL YEAR 2017/18 WHEREAS, on March 21, 2017, the Board of Directors of the South Tahoe Public Utility District held a public meeting and directed District staff to develop the proposed budget for Fiscal Year 2017/18 with a proposed water service charge rate increase of 6.5% to fund the 2017/18 Water Capital Improvement Plan and operating budget of the Water Enterprise Fund. NOW, THEREFORE BE IT RESOLVED, by the Board of Directors of the South Tahoe Public Utility District that: The attached budget in the amount of $19,744,175 is adopted for the Fiscal Year beginning July 1, 2017, and ending June 30, 2018. WE THE UNDERSIGNED, do hereby certify that the above and foregoing Resolution No. 3057-17 was duly and regularly adopted and passed by the Board of Directors of the South Tahoe Public Utility District at a regular meeting duly held on the 18th day of May 2017, by the following vote: AYES: NOES: ABSENT: ATTEST: Melonie Guttry, Clerk of the Board South Tahoe Public Utility District -49- Randy Vogelgesang, Board President South Tahoe Public Utility District WATER FUND FISCAL YEAR 2017/18 BUDGET SUMMARY BEGINNING CASH BALANCES REVENUES BORROWINGS LOAN FROM SEWER FUND AVAILABLE FUNDS cSALARIES BENEFITS OPERATIONS AND MAINTENANCE CAPITAL OUTLAY DEBT SERVICE PAYMENTS TOTAL CASH OUTLAYS BALANCE BEFORE TRANSFERS AVAILABLE TO TRANSFER TO CAPITAL FUND TRANSFER TO RESERVE FUNDS ACCRUAL TO CASH ADJUSTMENT OPERATING AND CAPITAL RESERVES 2017/18 FORECAST 2017/18 FORECAST ENTERPRISE FUND CAPITAL FUND 1,736,281 12,071,500 0 0 $ 13,807,781 3,423,175 1,915,150 3,068,000 0 162,000 8,568,325 5,239,456 —3,391,894 0 9,051 $ 1,856,613 6,602,484 1,801,000 8,370,000 0 $ 16,773,484 860,975 363,000 543,375 8,604,500 804:000 $ 11,'175,$50 5,597,634 3,391,894 —1,179,900 0 $ 7,809,628 RATE STABILIZATION RESERVE $ - I E$- 1,179,900 TOTAL RESERVE(CASH) BALANCES 6/30/17 $ 1,8 F$7 8,989,528 General Manager Richard H. 5olbr1g South Directors f ah Chris Cefalu r r r James K. Jones p 1 ubIIG Utility Di5tl (Vt RandyVogelgesang Kelly Sheehan uatte a ace 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150-7401 Phone 530 544-6474 • Fax 530 541-0614 • www!5tpud.u5 BOARD AGENDA ITEM 61' TO: Board of Directors FROM: Paul Hughes, Chief Financial Officer MEETING DATE: May 18, 2017 ITEM - PROJECT NAME: Fiscal Year 2017/18 Sewer Enterprise Fund Budget REQUESTED BOARD ACTION: Authorize the District to: 1) Adopt Resolution No. 3058-17 adopting the Fiscal Year 2017/18 Sewer Enterprise Fund Budget and; 2) Authorize staff to incorporate any adjustments or changes necessary as a result of Board action. DISCUSSION: The Fiscal Year 2017/18 Sewer Fund proposed budget in the amount of $25,892,275 is fully funded and includes a 6% increase in service charge rates. The budget includes $6,298,000 (24%) for capital projects, $3,045,000 (12%) for debt service, $6,182,375 (24%) for operations and maintenance, and $10,366,900 (40%) for salaries and benefits. If prior Board action is taken to adopt a service charge rate increase less than 6%, staff is seeking as part of the requested Board action, approval to adjust the budget and Resolution 3058-17 accordingly. SCHEDULE: Budget must be adopted by July 1, 2017 COSTS: $25,892,275 ACCOUNT NO: Various BUDGETED AMOUNT AVAILABLE: NA ATTACHMENTS: Resolution No. 3058-17, Sewer Fund Budget Summary CONCURRENCE WITH REQUESTED ACr,�,�rQT�ION: GENERAL MANAGER: YES �9 NO CHIEF FINANCIAL OFFICER: YES NO -53- CATEGORY: Sewer 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 RESOLUTION NO. 3058-17 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT ADOPTING THE BUDGET FOR THE SEWER ENTERPRISE FUND FOR FISCAL YEAR 2017/18 WHEREAS, on March 21, 2017, the Board of Directors of the South Tahoe Public Utility District held a public meeting and directed District staff to develop the proposed budget for Fiscal Year 2017/18 with a proposed sewer service charge rate increase of 6% to fund the 2017/18 Sewer Capital Improvement Plan and operating budget of the Sewer Enterprise Fund. NOW, THEREFORE BE IT RESOLVED, by the Board of Directors of the South Tahoe Public Utility District that: The attached budget in the amount of $25,892,275 is adopted for the Fiscal Year beginning July 1, 2017, and ending June 30, 2018. WE THE UNDERSIGNED, do hereby certify that the above and foregoing Resolution No. 3058-17 was duly and regularly adopted and passed by the Board of Directors of the South Tahoe Public Utility District at a regular meeting duly held on the .18 th day of May 2017, by the following vote: AYES: NOES: ABSENT: IATTEST: Melonie Guttry, Clerk of the Board South Tahoe Public Utility District -55- Randy Vogelgesang, Board President South Tahoe Public Utility District SEWER FUND FISCAL YEAR 2017/18 BUDGET SUMMARY BEGINNING CASH BALANCES REVENUES BORROWINGS AVAILABLE FUNDS SALARIES BENEFITS OPERATIONS AND MAINTENANCE CAPITAL OUTLAY DEBT SERVICE PAYMENTS TOTAL CASH OUTLAYS 2017/18 FORECAST ENTERPRISE FUND 3,685,301 21,896,341 2017/18 FORECAST CAPITAL FUND 18,609,735 384,300 0 2,900,000 _$ 25,581,642 $ 21,894,035 5,851,100 3,291,825 5,491,200 0 811.000 $ 15,445,125 860,975 363,000 691,175 6,298,000 2,234:000 $ 101447,150 BALANCE BEFORE TRANSFERS 10,136,517 11,446,885 AVAILABLE TO TRANSFER TO CAPITAL FUND -6,870,804 6,870,804 TRANSFER TO RESERVE FUNDS 0 -7,008,000 OPERATING AND CAPITAL RESERVES is 3,265,713 1 1 $ 11,309,689 RATE STABILIZATION RESERVE $ 77 - I r—$ 5,979,888 DEBT RESERVE rs - $ 1,028,112 LOAN TO WATER FUND $ TOTAL RESERVE(CASH) BALANCES 6/ 1 $ 3,265,713 $ 18,317,689 PAYMENT OF CLAIMS FOR APPROVAL May 18, 2017 Payroll 5/9/2017 488,138.67 Payroll 5/4/2017 40, 842.86 Total Payroll 528,981.53 ADP & Insight eTools 544.49 AFLAC/WageWorks claims and fees 171.00 BBVA Compass Bank 0.00 BHFS legal services 117,912.82 CalPERS - other 0.00 CDS - health care payments 4,858.31 Total Vendor EFT 123,486.62 Accounts Payable Checks -Sewer Fund 536,784.42 Accounts Payable Checks -Water Fund 45,418.77 Total Accounts Payable 582,203.19 Grand Total 1,234,671,34 Payrolf EFTs & Checks 5/9/2017 5/4/2017 EFT CA Employment Taxes & W/H 21,311.88 365.73 EFT Federal Employment Taxes & W/H 113,353.65 7,142.11 EFT CalPERS Contributions 66,206.44 151.83 EFT Empower Retirement -Deferred Comp 19,327.46 31,250.00 EFT Stationary Engineers Union Dues 2,511.14 28.03 EFT CDHP Health Savings (HSA) 1,253.89 0.00 EFT Retirement Health Savings 12,084.04 100.00 EFT United Way Contributions 181.00 0.00 EFT Employee Direct Deposits 247,757.03 1,805.16 CHK Employee Garnishments 1,104.45 0.00 CHK Employee Paychecks 3,047.69 0.00 Total 488,138.67 40,842.86 -59- PAYMENT OF CLAIMS Vendor Name Department / Pro* Name Description Acct# / Prom Code Amount Check Num Ty -pe A -L SIERRA WELDING PRODUCTS HEAVY MAI NT SHOP SUPPLIES 1004-6071 271.49 A -L SIERRA WELDING PRODUCTS LABORATORY LAB SUPPLIES 1007-4760 44.00 A -L SIERRA WELDING PRODUCTS LABORATORY LAB SUPPLIES 2007-4760 44.00 Check Total: 359.49 AP -00095810 MW ACWA/JPIA GEN & ADMIN ACWA MED INS PAY 1000-2514 234,043.45 ACWA/JPIA GEN & ADMIN VISION INS 1000-2530 2,791.88 Check Total: 236.835.33 AP -00095811 MW ADP SCREENING/SELECTION SERV HUMAN RESOURCES PERSONNEL EXPENS 1022-6670 18.10 ADP SCREENING/SELECTION SERV HUMAN RESOURCES PERSONNEL EXPENS 2022-6670 18.09 Check Total: 36.19 AP -00095812 MW AFLAC GEN & ADMIN SUPP INS W/H 1000-2532 907.90 Check Total: 907.90 AP -00095813 MW AHERN RENTALS "ATER REUSE SHOP SUPPLIES 1028-6071 6.61 Check Total: 6.61 AP -00095814 MW ALPEN SIERRA COFFEE GEN & ADMIN OFC SUPPLY ISSUE 1000-6081 102.15 rn Check Total: 102.15 AP -00095815 MW AMERIPRIDE UNIFORM SERVICES GEN & ADMIN UNIFORM PAYABLE 1000-2518 1,239.66 Check Total: 1.239.66 AP -00095816 MW APPLIED INDUSTRIAL TECH INC HEAVY MAINT SHOP SUPPLIES 1004-6071 2,561.75 Check Total: 2,561.75 AP -00095817 MW AT&T PUMPS TELEPHONE 1002-6310 70.00 Check Total: 70.00 AP -00095818 MW AT&T MOBILITY UNDERGROUND REP TELEPHONE 1001 -6310 136.02 AT&T MOBILITY PUMPS TELEPHONE 1002-6310 66.00 AT&T MOBILITY ELECTRICAL SHOP TELEPHONE 1003-6310 5.25 AT&T MOBILITY ENGINEERING TELEPHONE 1029-6310 29.63 AT&T MOBILITY INFORMATION TECH TELEPHONE 1037-6310 42.00 AT&T MOBILITY CUSTOMER SERVICE TELEPHONE 1038-6310 105.20 AT&T MOBILITY UNDERGROUND REP TELEPHONE 2001-6310 126.80 AT&T MOBILITY PUMPS TELEPHONE 2002-6310 66.00 AT&T MOBILITY ELECTRICAL SHOP TELEPHONE 2003-6310 5.25 User: THERESA - Theresa Sherman Page: 1 Current Date: 05/10/2017 Report: BK: Payment of Claims Report (With RV) V2 <1.03> Current Time: 17:21:44 Vendor Name AT&T MOBILITY AT&T MOBILITY AT&T MOBILITY Department / Pro* Name ENGINEERING INFORMATION TECH CUSTOMER SERVICE PAYMENT OF CLAIMS Description TELEPHONE TELEPHONE TELEPHONE Acct# / Prom Code 2029-6310 2037-6310 2038-6310 AT&T/CALNET 3 GEN & ADMIN TELEPHONE 1000-6310 AT&T/CALNET 3 GEN & ADMIN SIGNAL CHARGES 1000-6320 AT&T/CALNET 3 PUMPS TELEPHONE 1002-6310 AT&T/CALNET 3 CUSTOMER SERVICE TELEPHONE 1038-6310 AT&T/CALNET 3 GEN & ADMIN TELEPHONE 2000-6310 AT&T/CALNET 3 CUSTOMER SERVICE TELEPHONE 2038-6310 BARTON HEALTHCARE SYSTEM BENTLY AGROWDYNAMICS B+ STATE PROPANE rn r I BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BLUE RIBBON TEMP PERSONNEL BRAND, JASON BRAND, JASON OPERATIONS OPERATIONS WATER REUSE OPERATIONS ENGINEERING ENGINEERING - TK SWRLN FAILURE INFORMATION TECH FINANCE ENGINEERING ENGINEERING - WTRLN PONDEROSA ENGINEERING - 2017 METERS PH3 ENGINEERING - 2017 LG WTR MTRS INFORMATION TECH FINANCE ENGINEERING ENGINEERING SAFETY/EQUIP/PHY SLUDGE DISPOSAL PROPANE GROUNDS & MNTC CONTRACT SERVICE TK SWRLN BREAK CONTRACT SERVICE CONTRACT SERVICE CONTRACT SERVICE WTRLN, PONDEROSA METERS PH 3 17 HYD MTR REP CONTRACT SERVICE CONTRACT SERVICE TRAVEUMEETINGS TRAVEUMEETINGS 1006-6075 1006-6652 1028-6360 Amount Check Num 1006-6042 31.84 1029-4405 975.27 42.00 34.22 1037-4405 105.20 1039-4405 Check Total 761.19 AP -00095819 2029 - 7019 - 15WO10 742.41 2029 - 8760 - 16WO03 68.44 33.16 68.44 2037-4405 20.26 2039-4405 37.26 8.93 3,979,86 AP -00095824 1029-6200 742.42 2029-6200 81.15 8.92 162.0 AP -00095825 Check Total 1.556.10 AP -00095820 94.00 Check Total: 94.00 AP -00095821 3,029.88 Check Total: 3.029.88 AP -00095822 10940 Check Total: 109.40 AP -00095823 1006-6042 805.20 1029-4405 975.27 1029 - 7033 - TK1 BRK 34.22 1037-4405 437.92 1039-4405 37.26 2029-4405 1,026.60 2029 - 7019 - 15WO10 51.33 2029 - 8760 - 16WO03 68.44 2029 - 8860 - 17WO02 68.44 2037-4405 437.92 2039-4405 37.26 Check Total: 3,979,86 AP -00095824 1029-6200 81.15 2029-6200 81.15 Check Total: 162.0 AP -00095825 User: THERESA - Theresa Sherman Page: 2 Current Date: 05/10/2017 Report: BK: Payment of Claims Report (With RV) V2 <1.03> Current Time: 17:21:44 Type MW MW MW MW MW MW MW PAYMENT OF CLAIMS Vendor Name Department / Prom Name BUCKMAN,AARON OPERATIONS CALIF DEPT OF WATER RESOURCES OPERATIONS CALIF DEPT OF WATER RESOURCES WATER REUSE CERCEO, CHRIS CHARTER BUSINESS CHARTER BUSINESS CHEMSEARCHINC CHEMSEARCHINC CHEMSEARCHINC CINTAS CORP I rn C'PDALE ELECTRIC SUPPLY COMSTOCK SEED COOLIDGE, TREVOR R CSRMA CSRMA CWEA CWEA DIY HOME CENTER DIY HOME CENTER GEN & ADMIN GEN & ADMIN GEN & ADMIN HEAVY MAINT EQUIPMENT REP EQUIPMENT REPAIR GEN & ADMIN ENGINEERING - I'LL VVS #4 WATER REUSE ENGINEERING CUSTOMER SERVICE CUSTOMER SERVICE HUMAN RESOURCES HUMAN RESOURCES ENGINEERING - TK SWRLN FAILURE HEAVY MAINTENANC Description DUES/MEMB/CERT REGLTRY OP PRMTS REGLTRY OP PRMTS UB SUSPENSE TELEPHONE TELEPHONE OIL & LUBE OIL & LUBE OIL & LUBE SAFETY/EQUIP/PHY I'LL VVS #4 MINE REVEG, DVR TRAVEL/MEETINGS CSRMA LIAB CLAIM CSRMA LIAB CLAIM PERSONNELEXPENS PERSONNELEXPENS TK SWRLN BREAK BUILDINGS User: THERESA - Theresa Sherman Page: 3 Report: BK: Payment of Claims Report (With RV) V2 <1.03> Acct# / Proj Code Amount Check Num Type 1006-6250 340.00 Check Total: 340.00 AP -00095826 MW 1006-6650 4,982.00 1028-6650 23,536.00 Check Total: 28.518.00 AP -00095827 MW 1000-2002 1,151.32 Check Total: 1.151.32 AP -00095828 MW 1000-6310 114.99 2000-6310 114.98 Check Total: 229.97 AP -00095829 MW 1004-4630 660.15 1006-4630 311.29 2005-4630 384.47 Check Total: 1.355.91 AP -00095830 MW 1000-6075 489.07 Check Total: 489.07 AP -00095831 MW 1029 - 7032 - FLVVS4 1,777.88 Check Total: 1.777.88 AP -00095832 MW 1028-8721 704.69 Check Total: 704.69 AP -00095833 MW 1029-6200 257.00 Check Total: 257.00 AP -00095834 MW 1038- 4521 29,530.95 2038-4521 4,113.85 Check Total: 33.644.80 AP -00095835 MW 1022-6670 142.50 2022-6670 142.50 Check Total: 285.00 AP -00095836 MW 1029 - 7033 - TK1 BRK 8.90 2004-6041 9.68 Check Total: 18.58 AP -00095837 MW Current Date: 05/10/2017 Current Time: 17:21:44 Vendor Name DMV RENEWAL DMV RENEWAL DMV RENEWAL DMV RENEWAL DMV RENEWAL DMV RENEWAL DMV RENEWAL DOUGLAS DISPOSAL WNN, PHILIP w I E&M ELECTRIC & MACHINERY INC EUROFINS EATON ANALYTICAL INC Department / Prop Name WATER REUSE WATER REUSE WATER REUSE WATER REUSE PUMPS PUMPS WATER REUSE GEN & ADMIN GEN & ADMIN PAYMENT OF CLAIMS Description SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES REFUSE DISPOSAL UB SUSPENSE ENGINEERING - I'LL VVS #4 I'LL VVS #4 LABORATORY - ARHD3 TRTMT EXP MONITORING EVOQUA WATER TECHNOLOGIES LLC LABORATORY SERVICE CONTRACT EVOQUA WATER TECHNOLOGIES LLC LABORATORY SERVICE CONTRACT FAMILY ENTERPRISES PUBLIC OUTREACH - PR EXP -EXTERNAL PUB RELATIONS FAMILY ENTERPRISES PUBLIC OUTREACH - PR EXP -EXTERNAL PUB RELATIONS FEDEX CUSTOMER SERVICE - GRAND RSDNC LT POSTAGE EXPENSES FERGUSON ENTERPRISES INC HEAVY MAINT GROUNDS & MNTC FERGUSON ENTERPRISES INC HEAVY MAINT SHOP SUPPLIES Acct# / Pro* Code Amount Check Num T"e 1028-6520 25.00 Check Total: 25.00 AP -00095838 MW 1028-6520 25.00 Check Total: 25.00 AP -00095839 MW 1028-6520 25.00 Check Total: 25.00 AP -00095840 MW 1028-6520 5.00 Check Total: 5.00 AP -00095841 MW 1002-6520 2.50 2002-6520 2.50 Check Total: 5.00 AP -00095842 MW 1028-6520 25.00 Check Total: 25.00 AP -00095843 MW 1000-6370 19.52 Check Total: 19.52 AP -00095844 MW 1000-2002 187.30 Check Total: 187.30 AP -00095845 MW 1029 - 7032 - FLVVS4 1,941.39 Check Total: 1.941.39 AP -00095846 MW 2007 - 6110 - AH3EXP 40.00 Check Total: 40-00 AP -00095847 MW 1007-6030 123.77 2007-6030 123.78 Check Total: 247.55 AP -00095848 MW 1027 - 6620 - PREEXT 237.50 2027 - 6620 - PREEXT 237.50 Check Total: 475.00 AP -00095849 MW 1038 - 4810 - GRCLTO 6.54 Check Total: 6.54 AP -00095850 MW 1004-6042 91.63 1004-6071 49.35 User: THERESA - Theresa Sherman Page: 4 Current Date: 05/10/2017 Report: BK: Payment of Claims Report (With RV) V2 <1.03> Current Time: 17:21:44 KTHO AM 590 & 96.1 FM PUBLIC OUTREACH - PR EXP -EXTERNAL PUB RELATIONS KTHO AM 590 & 96.1 FM PUBLIC OUTREACH - PR EXP -EXTERNAL PUB RELATIONS KWA SAFETY & HAZMAT HUMAN RESOURCES SAFETY PROGRAMS User: THERESA - Theresa Sherman Page: 5 Report: BK: Payment of Claims Report (With RV) V2 <1.03> Acct# / Proj Code PAYMENT OF CLAIMS Vendor Name Department / Proj Name Description FERGUSON ENTERPRISES INC UNDERGROUND REP PIPE/CVRS/MHLS FLYERS ENERGY LLC GEN & ADMIN GASOLINE INV FLYERS ENERGY LLC GEN & ADMIN DIESEL INVENTORY FRONTIER COMMUNICATIONS WATER REUSE TELEPHONE GOLIGOSKI, BRENT ENGINEERING TRAVEUMEETINGS GOLIGOSKI, BRENT ENGINEERING TRAVEL/MEETINGS GRAINGER HEAVY MAINT SHOP SUPPLIES HD SUPPLY WHITE CAP ENGINEERING - TK SWRLN FAILURE TK SWRLN BREAK HDR ENGINEERING INC ENGINEERING - AERATION BASIN 2 AB2 REHAB I rn 85.00 FtIDOLPH NORTH AMERICA LLC LABORATORY REPL SM AUTCLV HIGH SIERRA BUSINESS SYSTEMS ADMINISTRATION SERVICE CONTRACT HIGH SIERRA BUSINESS SYSTEMS ENGINEERING SERVICE CONTRACT HIGH SIERRA BUSINESS SYSTEMS FINANCE SERVICE CONTRACT HIGH SIERRA BUSINESS SYSTEMS ADMINISTRATION SERVICE CONTRACT HIGH SIERRA BUSINESS SYSTEMS ENGINEERING SERVICE CONTRACT HIGH SIERRA BUSINESS SYSTEMS FINANCE SERVICE CONTRACT KTHO AM 590 & 96.1 FM PUBLIC OUTREACH - PR EXP -EXTERNAL PUB RELATIONS KTHO AM 590 & 96.1 FM PUBLIC OUTREACH - PR EXP -EXTERNAL PUB RELATIONS KWA SAFETY & HAZMAT HUMAN RESOURCES SAFETY PROGRAMS User: THERESA - Theresa Sherman Page: 5 Report: BK: Payment of Claims Report (With RV) V2 <1.03> Acct# / Proj Code Amount CheQk Num Type 2001 -6052 16.00 Check Total: 156.98 AP -00095851 MW 1000-0415 10,557.93 1000-0416 4,660.42 Check Total: 15.218.35 AP -00095852 MW 1028-6310 667.41 Check Total: 667.41 AP -00095853 MW 1029-6200 85.00 2029-6200 85.00 Check Total: 170.00 AP -00095854 MW 1004-6071 2,017.57 Check Total: 2.017.57 AP -00095855 MW 1029 - 7033 - TK1 BRK 1,124.91 Check Total: 1.124.91 AP -00095856 MW 1029 - 7024 - AB2RHB 2,956.20 Check Total: 2.956.20 AP -00095857 MW 2007-8555 1,070.23 Check Total: 1.070.23 AP -00095858 MW 1021 -6030 6347 1029-6030 80.48 1039-6030 113.93 2021 -6030 63.47 2029-6030 80.47 2039-6030 113.92 Check Total: 515.74 AP -00095859 MW 1027 - 6620 - PREEXT 562.50 2027 - 6620 - PREEXT 562.50 Check Total: 1.125.00 AP -00095860 MW 1022-6079 660.00 Current Date: 05/10/2017 Current Time: 17:21:44 Vendor Name KWA SAFETY & HAZMAT LAKE TAHOE EYE CARE LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA IiKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LAKESIDE NAPA LES SCHWAB TIRE CENTER LIBERTY UTILITIES LIBERTY UTILITIES LIBERTY UTILITIES PAYMENT OF CLAIMS Department / Proj Name HUMAN RESOURCES OPERATIONS GEN & ADMIN PUMPS PUMPS PUMPS HEAVY MAINT HEAVY MAINT HEAVY MAINT HEAVY MAINT EQUIPMENT REP EQUIPMENT REP EQUIPMENT REP EQUIPMENT REP EQUIPMENT REP WATER REUSE ENGINEERING - TK SWRLN FAILURE PUMPS EQUIPMENT REPAIR EQUIPMENT REPAIR EQUIPMENT REPAIR EQUIPMENT REPAIR EQUIPMENT REP GEN & ADMIN GEN & ADMIN GEN & ADMIN LILLY'S TIRE SERVICE INC EQUIPMENT REPAIR User: THERESA - Theresa Sherman Report: BK: Payment of Claims Report (With RV) V2 <1.03> Description Acct# I Proj Code Amount Check Num SAFETY PROGRAMS 2022-6079 660.00 Check Total: _1., 20.0 AP -00095862 SAFETY/EQUIP/PHY 1006-6075 345.00 Check Total: 345.00 AP -00095863 VEH FLTRS EQ RP 1000-0490 69.35 LUTHER PASS 1002-6048 18.06 PUMP STATIONS 1002-6051 138.65 SHOP SUPPLIES 1002-6071 172.81 SECONDARY EQUIP 1004-6022 159.92 GROUNDS & MNTC 1004-6042 12.08 SHOP SUPPLIES 1004-6071 31.81 SMALL TOOLS 1004-6073 43.90 AUTOMOTIVE 1005-6011 902.33 MOBILE EQUIP 1005-6012 199.03 GENERATORS 1005-6013 589.98 SHOP SUPPLIES 1005-6071 322.13 SMALL TOOLS 1005-6073 55.91 SMALL TOOLS 1028-6073 36.33 TK SWRLN BREAK 1029 - 7033 - TKII BRK 160.93 SHOP SUPPLIES 2002-6071 172.79 AUTOMOTIVE 2005-6011 856.43 GENERATORS 2005-6013 -1.37 SHOP SUPPLIES 2005-6071 322.08 SMALL TOOLS 2005-6073 55.90 Check Total: 4.319.05 AP -00095864 AUTOMOTIVE 1005-6011 2,68658 Check Total: 2.686.58 AP -00095865 ELECTRICITY 1000-6330 110,623.70 ST LIGHTING EXP 1000-6740 32.49 ELECTRICITY 2000-6330 17,62347 Check Total: 128.279.66 AP -00095866 AUTOMOTIVE 2005-6011 4,344.13 Page: 6 Current Date: 05/10/2017 Current Time: 17:21:44 TVoe MW MW MW MW MW Vendor Name MALLORY SAFETY & SUPPLY LLC MC MASTER CARR SUPPLY CO MC MASTER CARR SUPPLY CO MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER MEEKS BUILDING CENTER P&EKS BUILDING CENTER i MEEKS BUILDING CENTER MEEKS BUILDING CENTER METRO OFFICE SOLUTIONS METRO OFFICE SOLUTIONS METRO OFFICE SOLUTIONS NELS TAHOE HARDWARE NELS TAHOE HARDWARE NEXLEVEL INFORMATION TECH INC NUROCK, DOUG Department / Prom Name GEN & ADMIN PAYMENT OF CLAIMS Description ENGINEERING - I'LL VVS #4 ENGINEERING - TK SWRLN FAILURE PUMPS PUMPS HEAVY MAINT HEAVY MAINT HEAVY MAINT ENGINEERING - TK SWRLN FAILURE CUSTOMER SERVICE UNDERGROUND REP UNDERGROUND REP PUMPS PUMPS HEAVY MAINTENANC CUSTOMER SERVICE ENGINEERING ENGINEERING FINANCE HEAVY MAINT PUMPS FINANCE - ERP REPL PROJECT OPERATIONS SHOP SUPP INV FLL VVS #4 TK SWRLN BREAK PUMP STATIONS SHOP SUPPLIES PRIMARY EQUIP GROUNDS & MNTC SHOP SUPPLIES TK SWRLN BREAK OFFICE SUPPLIES PIPE/CVRS/MHLS SMALL TOOLS WELLS SHOP SUPPLIES BUILDINGS OFFICE SUPPLIES OFFICE SUPPLIES OFFICE SUPPLIES OFFICE SUPPLIES SECONDARY EQUIP WELLS REPL ERP SYSTEM DUES/MEMB/CERT ONTRAC LABORATORY POSTAGE EXPENSES User: THERESA - Theresa Sherman Page: 7 Report: BK: Payment of Claims Report (With RV) V2 <1.03> Acct# / Prom Code Amoun Check Num Tvoe Check Total: 4,344.13 AP -00095867 MW 1000-0421 584.45 Check Total: 584.45 AP -00095868 MW 1029 - 7032 - FLVVS4 792.21 1029 - 7033 - TK1 BRK 139.58 Check Total: 931.79 AP -00095869 MW 1002-6051 77.12 1002-6071 5.89 1004-6021 135.05 1004-6042 133.38 1004-6071 68.52 1029 - 7033 - TK1 BRK 444.09 1038-4820 3.74 2001 -6052 49.38 2001-6073 46.86 2002-6050 29.25 2002-6071 5.89 2004-6041 200.38 2038-4820 3.72 Check Total: 1.203.27 AP -00095870 MW 1029-4820 197.98 2029-4820 197.98 2039 - 4820 29.31 Check Total: 425.27 AP -00095871 MW 1004-6022 104.32 2002-6050 2.12 Check Total: 106.44 AP -00095872 MW 1039 - 8769 - ERPREP 700.00 Check Total: 700.00 AP -00095873 MW 1006-6250 60.00 Check Total: 60.00 AP -00095874 MW 1007-4810 18.18 Current Date: 05/10/2017 Current Time: 17:21:44 Vendor Name ONTRAC ONTRAC ONTRAC ONTRAC ONTRAC ONTRAC ONTRAC OUTSIDE TELEVISION OUTSIDE TELEVISION PAC MACHINE CO PAYMENT OF CLAIMS Department / Pro* Name PUBLIC OUTREACH ENGINEERING LABORATORY - ARHD3 TRTMT EXP LABORATORY - GLENWD WELL TRT LABORATORY-HERBST LABORATORY ENGINEERING - WTRLN PONDEROSA Description POSTAGE EXPENSES POSTAGE EXPENSES POSTAGE EXPENSES POSTAGE EXPENSES POSTAGE EXPENSES POSTAGE EXPENSES WTRLN, PONDEROSA PUBLIC OUTREACH - PR EXP -EXTERNAL PUB RELATIONS PUBLIC OUTREACH - PR EXP -EXTERNAL PUB RELATIONS HEAVY MAINT PETTY CASH HUMAN RESOURCES PETTY CASH ENGINEERING - TK SWRLN FAILURE PETTY CASH FINANCE TTY CASH UNDERGROUND REP PLTTY CASH HUMAN RESOURCES PETTY CASH FINANCE PRAXAIR 174 PUMPS PRAXAIR 174 HEAVY MAINT PRAXAIR 174 LABORATORY PRAXAIR 174 ENGINEERING - TK SWRLN FAILURE PRAXAIR 174 UNDERGROUND REP PRAXAIR 174 PUMPS PRAXAIR 174 LABORATORY RED WING SHOE STORE UNDERGROUND REP RED WING SHOE STORE UNDERGROUND REP RELIANCE STANDARD GEN & ADMIN User: THERESA - Theresa Sherman Report: BK: Payment of Claims Report (With RV) V2 <1.03> MOBILE EQUIP PERSONNELEXPENS TK SWRLN BREAK OFFICE SUPPLIES TRAVEUMEETINGS PERSONNELEXPENS OFFICE SUPPLIES SHOP SUPPLIES SHOP SUPPLIES LAB SUPPLIES TK SWRLN BREAK EQUIP RENT/LEASE SHOP SUPPLIES LAB SUPPLIES SAFETY/EQUIP/PHY SAFETY/EQUIP/PHY LIFE INS UN/BD Page: 8 Acct# / Prom Code Amount Check Num 1027-4810 2.94 1029-4810 5.35 2007 - 4810 - AH3EXP 8.02 2007 - 4810 - GWMTBE 2.94 2007 - 4810 - HERBST 2.94 2007-4810 28.07 2029 - 7019 - 15WO10 5.34 Check Total: 73.78 AP -00095875 1027 - 6620 - PREEXT 1,005.50 2027 - 6620 - PREEXT 1,005.50 Check Total: 2.011.00 AP -00095876 1004-6012 2,662.50 Check Total: 2.662.50 AP -00095877 1022-6670 36.76 1029 - 7033 - TK1 BRK 102.00 1039-4820 35.02 2001 -6200 48.00 2022-6670 36.75 2039-4820 35.01 Check Total: 293.54 AP -00095878 1002-6071 78.67 1004-6071 70.89 1007-4760 221.63 1029 - 7033 - TK1 BRK 56.60 2001 -5020 68.24 2002-6071 78.66 2007-4760 221.63 Check Total: 796.32 AP -00095879 1001 -6075 178.58 2001 -6075 408.04 Check Total: 586.62 AP -00095880 1000-2512 1,542.42 Current Date: 05/10/2017 Current Time: 17:21:44 Type MW MW MW MW MW MW PAYMENT OF CLAIMS Vendor Name Department / Prow Name Description RELIANCE STANDARD GEN & ADMIN LIFE INS MGMT RELIANCE STANDARD GEN & ADMIN LNG TRM DIS,MGMT RELIANCE STANDARD GEN & ADMIN LTD, UNION RENO CYCLE & GEAR WATER REUSE GROUNDS & MNTC RENO CYCLE & GEAR WATER REUSE VEHICLE 54 REPL RYAN, JULIE ENGINEERING TRAVEUMEETINGS SCOTTYS HARDWARE PUMPS - TK SWRLN FAILURE PUMP STATIONS SCOTTYS HARDWARE EQUIPMENT REP AUTOMOTIVE SCOTTYS HARDWARE EQUIPMENT REP - BLOWER REPAIRS MOBILE EQUIP SCOTTYS HARDWARE ENGINEERING - FLL VVS #4 FLL VVS #4 SCOTTYS HARDWARE ENGINEERING - TK SWRLN FAILURE TK SWRLN BREAK SCOTTYS HARDWARE EQUIPMENT REPAIR AUTOMOTIVE I rn 22.86 3MRED-IT GEN & ADMIN OFC SUPPLY ISSUE SIERRA CHEMICAL CO OPERATIONS HYPOCHLORITE SIERRA CHEMICAL CO PUMPS HYPOCHLORITE SIERRA ECOTONE SOLUTIONS ENGINEERING - PR CLARIF 1 RHB PC1 REHAB SIERRA ECOTONE SOLUTIONS ENGINEERING -AERATION BASIN 2 AB2 REHAB SIERRA NEVADA MEDIA GROUP HUMAN RESOURCES ADS/LGL NOTICES SIERRA NEVADA MEDIA GROUP PUBLIC OUTREACH - PR EXP -EXTERNAL PUB RELATIONS SIERRA NEVADA MEDIA GROUP HUMAN RESOURCES ADS/LGL NOTICES SIERRA NEVADA MEDIA GROUP PUBLIC OUTREACH - PR EXP -EXTERNAL PUB RELATIONS SIERRA NEVADA MEDIA GROUP ENGINEERING - WTRLN PONDEROSA WTRLN, PONDEROSA SIERRA NEVADA MEDIA GROUP CUSTOMER SERVICE ADS/LGL NOTICES SILVERS HR LLC HUMAN RESOURCES STAFF DEVELOPMEN User: THERESA - Theresa Sherman Page: 9 Report: BK: Payment of Claims Report (With RV) V2 <1.03> Acct# / Proi Code Amount Check Num 1000-2525 613.25 1000-2531 1,391.47 1000-2539 1,655.54 Check Total: 5.202.68 AP -00095881 1028-6042 1,023.07 1028-7536 13,905.79 Check Total: 14.928.86 AP -00095882 1029-6200 257.00 Check Total: 257.00 AP -00095883 1002-6051 - TK1 BRK 12.50 1005-6011 8.19 1005 - 6012 - SNWSBF 7.15 1029 - 7032 - FLVVS4 22.86 1029 - 7033 - TK1 BRK 5.47 2005-6011 818 Check Total: 64.35 AP -00095884 1000-6081 64.00 Check Total: 64.00 AP -00095885 1006-4755 3,079.74 2002-4755 2,177.73 Check Total: 5.257.47 AP -00095886 1029 - 7023 - PC RHB 437.50 1029 - 7024 - AB2RHB 437.50 Check Total: 875.00 AP -00095887 1022-4930 720.62 1027 - 6620 - PREEXT 107.50 2022-4930 720.62 2027 - 6620 - PREEXT 107.50 2029 - 7019 - 15WO10 337.63 2038-4930 309.49 Check Total: 2.303.36 AP -00095888 1022-6225 297.37 Current Date: 05/10/2017 Current Time: 17:21:44 Type MW a WIT aW MW MW MW MW MW Vendor Name SILVERS HR LLC SOUNDPROSINC SOUNDPROSINC SOUTH TAHOE REFUSE SOUTH TAHOE REFUSE SOUTH TAHOE REFUSE SOUTHWEST GAS SOUTHWEST GAS SPEC WEST CONCRETE SYSTEMS SPEC WEST CONCRETE SYSTEMS STANLEY, CHRIS M STEEL-TOE-SHOES.COM SVANYUTA, OLEG SWRCB SWRCB TAHBAZOF, SIAVASH TAHBAZOF, SIAVASH PAYMENT OF CLAIMS Department / Prom Name Description HUMAN RESOURCES STAFF DEVELOPMEN PUBLIC OUTREACH - PR EXP -EXTERNAL PUB RELATIONS PUBLIC OUTREACH - PR EXP -EXTERNAL PUB RELATIONS GEN & ADMIN ENGINEERING - TK SWRLN FAILURE GEN & ADMIN GEN & ADMIN GEN & ADMIN GEN & ADMIN UNDERGROUND REP ENGINEERING OPERATIONS GEN & ADMIN UNDERGROUND REP UNDERGROUND REP GEN & ADMIN GEN & ADMIN TAHOE BASIN CONTAINER SERVICE GEN & ADMIN TAHOE BASIN CONTAINER SERVICE UNDERGROUND REP TAHOE BASIN CONTAINER SERVICE OPERATIONS User: THERESA - Theresa Sherman Report: BK: Payment of Claims Report (With RV) V2 <1.03> REFUSE DISPOSAL TK SWRLN BREAK REFUSE DISPOSAL NATURAL GAS NATURAL GAS MH FRM/LIDS&PRTS PIPE/CVRS/MHLS TRAVEL/MEETINGS SAFETY/EQUIP/PHY UB SUSPENSE DUES/MEMB/CERT DUES/MEMB/CERT UB SUSPENSE UB SUSPENSE REFUSE DISPOSAL PIPE/CVRS/MHLS SLUDGE DISPOSAL Page: 10 Acct# / Prow Code Amount Check. Num Tvae 2022-6225 297.37 Check Total: 594.74 AP -00095889 MW 1027 - 6620 - PREEXT 49.00 2027 - 6620 - PREEXT 49.00 Check Total: 98.00 AP -00095890 MW 1000-6370 3,498.66 1029 - 7033 - TK1 BRK 64.75 2000-6370 122.76 Check Total: 3.686.17 AP -00095891 MW 1000-6350 9,169.40 2000-6350 1,798.92 Check Total: 10.968.32 AP -00095892 MW 1000-0410 3,102.42 1001 -6052 227.33 Check Total: 3.329.75 AP -00095893 MW 1029-6200 257.00 Check Total: 257.00 AP -00095894 MW 1006-6075 157.45 Check Total: 157.45 AP -00095895 MW 1000-2002 149.84 Check Total: 149.84 AP -00095896 MW 2001 -6250 70.00 Check Total: 70.00 AP -00095897 MW 2001-6250 95.00 Check Total 95.00 AP -00095898 MW 1000-2002 133.25 2000-2002 133.26 Check Total 266.51 AP -00095899 MW 1000-6370 312.50 1001 -6052 937.50 1006-6652 12,189.12 Current Date: 05/10/2017 Current Time: 17:21:44 Vendor Name TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TAHOE VALLEY ELECTRIC SUPPLY TRUCKEE OVERHEAD DOOR INC WAXIE SANITARY SUPPLY WEDCO INC WEDCO INC WEDCO INC J WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY WESTERN NEVADA SUPPLY Department / Pro* Name ELECTRICAL SHOP ELECTRICAL SHOP ELECTRICAL SHOP ELECTRICAL SHOP ELECTRICAL SHOP ELECTRICAL SHOP WATER REUSE GEN & ADMIN PAYMENT OF CLAIMS Description GEN & ADMIN ENGINEERING - PR CLARIF 1 RHB ENGINEERING - TK SWRLN FAILURE PUMPS HEAVY MAINT HEAVY MAINT ENGINEERING - TK SWRLN FAILURE UNDERGROUND REP PUMPS HEAVY MAINTENANC SECONDARY EQUIP BUILDINGS SUPPLIES BUILDINGS WELLS SHOP SUPPLIES GROUNDS & MNTC OFFICE INVENTORY LIGHT SUPP PARTS PC1 REHAB TK SWRLN BREAK PUMP STATIONS GROUNDS & MNTC SHOP SUPPLIES TK SWRLN BREAK SHOP SUPPLIES PUMP STATIONS BUILDINGS Acct# / Prom Code Check Total: 1003-6022 1003-6041 1003-6520 2003-6041 2003-6050 2003-6071 Check Total: 1028-6042 Check Total: 1000-0428 Check Total: 1000-0483 1029 - 7023 - PC1 RHB 1029 - 7033 - TK1 BRK Check Total: 1002-6051 1004-6042 1004-6071 1029 - 7033 - TK1 BRK 2001 -6071 2002-6051 2004-6041 Check Total: Grand Total: punt Check Num 13.439.12 AP -00095900 435.69 436.79 40.68 1,685.33 28.55 61.54 2.688.58 AP -00095901 1,247.01 1.247.01 AP -00095902 452.55 452.55 AP -00095903 100.25 49.34 102.30 251.89 AP -00095904 292.31 -486.56 96.25 1,012.50 63.02 292.30 390.60 1.660.42 AP -00095905 582,203.19 User: THERESA - Theresa Sherman Page: 11 Current Date: 05/10/2017 Report: BK: Payment of Claims Report (With RV) V2 <1.03> Current Time: 17:21:44 Type MW MW MW MW MW MW General Manager Richard H. 5olbrig D outh Toirectory Chris Cefalu James R. Jones bIic Randy Vogelgesang Utility District Kelly5heehan Duane Wallace 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150-7401 Phone 530 544-6474- Fax 530 541-0614 • www.5tpucW5 BOARD AGENDA ITEM 13a TO: Board of Directors FROM: Richard Solbrig, General Manager MEETING DATE: May 18, 2017 ITEM - PROJECT NAME: Conference with Legal Counsel - Existing Litigation REQUESTED BOARD ACTION: Direct staff DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Los Angeles County Superior Court, Case No. BC459943, State of Nevada, et al. v. J -M Manufacturing, et al. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT AVAILABLE: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES J NO CHIEF FINANCIAL OFFICER: YES _ NO -71- 1 CATEGORY: Water TO: FROM: MEETING DATE: ITEM - PROJECT NAME: General Manager Richard H. 5olbrig 1275 Meadow Crest Drive • South Lake Tahoe o CA 96150-7401 Phone 530 544-6474 • Fax 530 541-0614 • www.5tpud.u5 BOARD AGENDA ITEM 13b Board of Directors Richard Solbrig, General Manager May 18, 2017 Conference with Legal Counsel - Existing Litigation REQUESTED BOARD ACTION: Direct staff DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: False Claims Act Case: United States, the States of California, Delaware, Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06-0055-GW, United States District Court for the Central District of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT AVAILABLE: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YESAU CHIEF FINANCIAL OFFICER: YES — NO NO -73- CATEGORY: Water Director,, irectors Tahoe Chria Cefalu5DUth JamesR.Jones Utility D5trict oario Randy epUblic Kelly Sheehan Duane Wallace 1275 Meadow Crest Drive • South Lake Tahoe o CA 96150-7401 Phone 530 544-6474 • Fax 530 541-0614 • www.5tpud.u5 BOARD AGENDA ITEM 13b Board of Directors Richard Solbrig, General Manager May 18, 2017 Conference with Legal Counsel - Existing Litigation REQUESTED BOARD ACTION: Direct staff DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: False Claims Act Case: United States, the States of California, Delaware, Florida, Nevada, and Tennessee and the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix v. J -M Manufacturing Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06-0055-GW, United States District Court for the Central District of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT AVAILABLE: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YESAU CHIEF FINANCIAL OFFICER: YES — NO NO -73- CATEGORY: Water General Manager Richard H. 5olbrig . . Directors yKgS �I$f� Suth Chris JoncoCefalu O a Ij�/''j o e James R. ones v Randy Vogelgesang +- Kelly Sheehan Public Utility District Duane Wallace 1275 Meadow Crest Drive • 5outh Lake Tahoe • CA 96150-7401 Phone 530 5446474 v Fax 530 541-0614 • www.5tpud.uo BOARD AGENDA ITEM 13C TO: Board of Directors FROM: Richard Solbrig, General Manager Paul Hughes, Chief Financial Officer Shannon Cotulla, Assistant General Manager MEETING DATE: May 18, 2017 ITEM - PROJECT NAME: Closed Session - New Union Memorandum of Understanding Contract Negotiations REQUESTED BOARD ACTION: Direct Staff DISCUSSION: Pursuant to Government Code Section 54957(a)/Conference with Labor Negotiators re: Memorandum of Understanding with Stationary Engineers, Local 39. Present at this Closed Session will be Agency Negotiators: Richard Solbrig/General Manager; Paul Hughes, Chief Financial Officer; and Shannon Cotulla, Assistant General Manager. SCHEDULE: N/A COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: N/A CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES 'F�� NO CHIEF FINANCIAL OFFICER: YES `'^� _ NO -75- CATEGORY: General General Manager Richard H. 5olbrig • i�U • Directors South Chris Cefalu James R. Jones _ Randy Vogelgesang public Utility District Kelly Sheehan Duane Wallace 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150-7401 Phone 530 544-6474 • Fax 530 541-0614 • www.otpud.u5 BOARD AGENDA ITEM 13d TO: Board of Directors FROM: Richard Solbrig, General Manager Paul Hughes, Chief Financial Officer Shannon Cotulla, Assistant General Manager MEETING DATE: May 18, 2017 ITEM - PROJECT NAME: Closed Session - New Management Memorandum of Understanding Contract Negotiations REQUESTED BOARD ACTION: Direct Staff DISCUSSION: Pursuant to Government Code Section 54957(a)/Conference with Labor Negotiators re: Memorandum of Understanding with the Management Group. Present at this Closed Session will be Agency Negotiators: Richard Solbrig/General Manager; Paul Hughes, Chief Financial Officer; and Shannon Cotulla, Assistant General Manager. SCHEDULE: N/A COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: N/A CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO -77- CATEGORY: General