Loading...
District Board Agenda Packet 02-01-18 SOUTH TAHOE PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING AGENDA Thursday, February 1, 2018 - 2:00 p.m. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Richard Solbrig, General Manager Shannon Cotulla, Assistant General Manager Randy Vogelgesang, President BOARD MEMBERS Kelly Sheehan, Vice President Chris Cefalu, Director James R. Jones, Director Duane Wallace, Director 1. CALL TO ORDER REGULAR MEETING – PLEDGE OF ALLEGIANCE (At this time, please silence phones and other electronic devices so as not to disrupt the business of the meeting.) 2. COMMENTS FROM THE AUDIENCE (This is an opportunity for members of the public to address the Board on any short non-agenda items that are within the subject matter jurisdiction of the District. No discussion or action can be taken on matters not listed on the agenda, per the Brown Act. Each member of the public who wishes to comment shall be allotted five minutes, and no more than three individuals shall address the same subject.) 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR (For purposes of the Brown Act, all Action and Consent items listed give a brief description of each item of business to be transacted or discussed. Recommendations of the staff, as shown, do not prevent the Board from taking other action.) 4. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered separately upon request. Comments and questions from members of the public, staff or Board can be taken when the comment does not necessitate separate action.) 5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION / ACTION 6. ITEMS FOR BOARD ACTION a. Al Tahoe Sewer Pump Emergency Pump Repair/Replacement (Chris Stanley, Manager of Field Operations) Continue or terminate the emergency action to repair Al Tahoe Sewer Pump #2, pursuant to Resolution No. 3075-17, depending on the status of the repair work. b. Approve Payment of Claims (Debbie Henderson, Accounting Manager) Approve Payment of Claims in the amount of $1,242,946.82 7. STANDING AND AD-HOC COMMITTEE REPORTS (Discussions may take place; however, no action will be taken.) 8. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken.) 9. EL DORADO COUNTY WATER AGENCY PURVEYOR REPORT REGULAR BOARD MEETING AGENDA – February 1, 2018 PAGE – 2 10. GENERAL MANAGER REPORT (Discussion may take place; however, no action will be taken.) 11. STAFF/ATTORNEY REPORTS (Discussions may take place; however, no action will be taken.) 12. NOTICE OF PAST AND FUTURE MEETINGS/EVENTS Past Meetings/Events 01/18/18 - 2:00 p.m. Regular Board Meeting at the District Future Meetings/Events 02/07/18 - 6:00 p.m. Groundwater Contamination Study Public Outreach Meeting at the Tahoe Valley Elementary School 02/09/18 - 9:00 a.m. Ad-Hoc City Council at the District 02/12/18 - 3:30 p.m. Operations Committee Meeting at the District 02/14/18 - 10:00 a.m. El Dorado County Water Agency Meeting in Placerville 02/15/18 - 2:00 p.m. Regular Board Meeting at the District ADJOURNMENT (The next Regular Board Meeting is Thursday, February 15, 2018, at 2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete Agenda packet is available for review at the meeting and at the District office during the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after Minutes of the meeting have been approved. Items on the Agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified, but may occur slightly later than the specified time. Public participation is encouraged. Public comments on items appearing on the Agenda will be taken at the same time the Agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Please provide the Clerk of the Board with a copy of all written materials presented at the meeting. Comments on items not on the Agenda can be heard during “Comments from the Audience;” however, action cannot be taken on items not on the Agenda. Backup materials relating to an open session item on this Agenda, which are not included with the Board packet, will be made available for public inspection at the same time they are distributed or made available to the Board, and can be viewed at the District office, at the Board meeting and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District’s public meetings. If particular accommodations are needed, please contact the Clerk of the Board at (530) 544-6474, extension 6203. All inquiries must be made at least 48 hours in advance of the meeting. REGULAR BOARD MEETING AGENDA – February 1, 2018 PAGE – 3 SOUTH TAHOE PUBLIC UTILITY DISTRICT CONSENT CALENDAR February 1, 2018 ITEMS a. BIG 5 PUMP STATIONS CONDITION ASSESSMENT PROJECT SEISMIC EVALUATION (Stephen Caswell, Senior Engineer) Authorize Amendment B to Task Order No. 9 to Carollo Engineers, Inc., in the amount of $39,791 for the Big 5 Pump Stations Condition Assessment. b. TEMPORARY HELP FOR CUSTOMER SERVICE DEPARTMENT (Tim Bledsoe, Manager of Customer Service) Approve contract with Blue Ribbon Personnel Services for a temporary Customer Service Representative in the estimated amount of $27,000. c. WATER METER INSTALLATION PROJECT – PHASE III (Trevor Coolidge, Associate Engineer) Approve the Final Balancing Change Order for a credit of $596,078.81and the Closeout Agreement and Release of Claims for the 2017 Water Meter Installation Project - Phase III. d. LIBERTY UTILITIES RATE INTERVENTION (Paul Hughes, Chief Financial Officer) Authorize staff to execute a Contract with Kinect Energy Group, previously named KTM, to provide professional consulting services to support the intervention in a general rate case filed by Liberty Utilities, in an amount not to exceed $32,645. e. 2018 WASHINGTON, D.C. LEGISLATIVE ADVOCACY (Shannon Cotulla, Assistant General Manager) Authorize extension of the Contract with ENS Resources, Inc., for two years for lobbying and consulting services in the amount of $84,000 per year. f. 2015 LUTHER PASS POWER AND CONTROL PROJECT (Julie Ryan, Principal Engineer) Approve Change Order No. 8 to Thomas Haen Company in the amount $88,257.93. g. REGULAR BOARD MEETING MINUTES: January 18, 2018 (Melonie Guttry, Executive Services Manager/Clerk of the Board) Approve January 18, 2018, Minutes Stephen Caswell February 1, 2018 Page 2 BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Stephen Caswell, Senior Engineer MEETING DATE: February 1, 2018 ITEM – PROJECT NAME: Big 5 Pump Stations Condition Assessment Project Seismic Evaluation REQUESTED BOARD ACTION: Authorize Amendment B to Task Order No. 9 to Carollo Engineers, Inc., in the amount of $39,791 for the Big 5 Pump Stations Condition Assessment. DISCUSSION: District staff has been working with Carollo Engineers, Inc., (Carollo), since July of 2017 on the Big 5 Pump Station Condition Assessment. To date, the condition assessment work has been completed and the Draft Report is currently under review by the District. The next steps of the project will be done in conjunction with the sewer flow monitoring effort to identify potential improvement projects for each pump station, evaluate the projects to determine the right solution for each pump station, and prioritize the projects to provide the District with a comprehensive improvement plan for these critical assets. The original Scope of the project did not include a seismic evaluation of each pump station as the condition of the concrete in the wet wells was unknown at the time. The results of the preliminary testing of the concrete in the wet wells showed the concrete was in good condition with only minor deterioration. If the concrete was not in good condition, evaluating the rest of the structural elements would not be needed. Since it appears that the concrete has remaining useful life, the next step would be to complete a seismic evaluation of both the below- and above-ground components of the pump station. The results of this evaluation will help to inform District staff as to the potential improvement projects and their prioritization. SCHEDULE: Assessment complete by June 2018 COSTS: $39,971 ACCOUNT NO: 1029-4405/BIG5PS BUDGETED AMOUNT AVAILABLE: <$84,852> ATTACHMENTS: Scope of Work _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Duane Wallace 1 pw:\\PHX-POP-PW.Carollo.local:Carollo\Documents\Client\CA\STPUD\10793A00\Project Mgmt\Contracts\TO 2 - Seismic Evaluation - 10793A00 Page 1 of 3 TASK ORDER NO. 2 South Tahoe Public Utility District DISTRICT AND CAROLLO ENGINEERS, INC. This Task Order is issued by the DISTRICT and accepted by CONSULTANT pursuant to the mutual promises, covenants and conditions contained in the Agreement between the above named parties dated the 4th day of May, 2017, in connection with: Big 5 Pump Station Condition Assessment__________________________________________. (Project) PURPOSE The purpose of this Task Order is to add seismic evaluation of the Big 5 Pump Station structures to the Project. CONSULTANT'S SERVICES The seismic assessment of STPUD's Big 5 Pump Stations buildings, i.e. Al Tahoe, Tahoe Keys, Bijou, Johnson, and Upper Truckee, will be performed using the American Society of Civil Engineers Standard: Seismic Evaluation and Retrofit of Existing Buildings (ASCE 41-13) Tier 1 screening, and Tier 2 evaluation procedures. This standard is commonly used as a way to evaluate anticipated seismic performance of existing buildings and the Tier 1 phase is the initial screening step. The purpose of Tier 1 step is to efficiently identify potential deficiencies or identify the need for additional investigation. Tier 2 is a follow-up step to further evaluate potential deficiencies identified in Tier 1. The purpose of Tier 2 evaluation is to perform a seismic evaluation and determine required retrofits. The additional analysis of Tier 2 is sufficient to either confirm the identified deficiency or demonstrate the adequacy of the structure. The seismic evaluation of the below grade concrete dry well and the wet well will be performed in accordance with American Concrete Institute: Seismic Design of Liquid-Containing Concrete Structures and Commentary (ACI 350.3-06). During a seismic event, these below grade structures will experience soil loads, and in the wet wells hydrostatic and hydrodynamic loads. The performance level of a structure can be described in terms of: · Safety of the building occupants during and after a seismic event · Cost of restoring the building to its pre-event condition · Length of time the building is removed from service, i.e. not occupiable The seismic evaluation process will follow the guidelines of the ASCE 41-13 Standard. A flow chart of the ASCE 41-13 decision making process is provided as Attachment 2 of this task order. 2 pw:\\PHX-POP-PW.Carollo.local:Carollo\Documents\Client\CA\STPUD\10793A00\Project Mgmt\Contracts\TO 2 - Seismic Evaluation - 10793A00 Page 2 of 3 TASK 5 - SEISMIC EVALUATION 5.01 Site Visit An additional site visit is necessary to investigate structural and non-structural connections, specifically, the connections of the roof diaphragms to the walls. This is especially important for masonry block buildings where grout may or may not have been used to fill each block's cell. This condition was observed at the Tahoe Keys Pump Station during the original condition assessment, but not examined for other pump stations. Additional time is included in this task for supplemental pump performance testing to confirm if flow meter measurements are reasonable. Pump draw down tests from the original condition assessment yielded results that did not make sense when compared to flow meter readings and design flows. If this supplemental testing is not desired, then 8 hours of Project Manager's time may be removed from the proposed fee. 5.02 Establishing Performance Objective and Structural Level The first step of the seismic assessment will be to establish the performance objectives, structural and nonstructural performance levels, and the earthquake hazard level of the existing pump stations. The decision will be based on the criticality of the facilities within the collection system. To facilitate the decision making process, CONSULTANT will conduct a workshop or a conference call with STPUD to go over the different performance objectives and describe the expected damage level for each performance objective. 5.03 Tier 1 Screening Checklists For the Tier 1 Screening phase, CONSULTANT will use the information gathered during the condition assessment to fill out all the structural and nonstructural checklist forms. To fill out the foundation and geologic site hazard checklist, CONSULTANT will need previous geotechnical investigations reports to assess fault rupture, liquefaction potential, differential settlement, compaction, land sliding, and earthquake induced flooding. If there are no geotechnical investigation reports available CONSULTANT will provide a proposal for a subconsultant to perform a desktop investigation to obtain the needed information. 5.04 Tier 2 Evaluation For the Tier 2 Evaluation phase, CONSULTANT will use existing record drawings for performing required calculations. Stamped calculations will be performed and included in the appendix of an Evaluation Report as described in Task 5.05 below. 5.05 Prepare Evaluation Report DRAFT and FINAL versions of an evaluation report will be prepared summarizing the findings of the site visit, Tier 1, and Tier 2 evaluations. Specifically, the following will be included in the Evaluation Report: · General building/structure description · Structural system description · Nonstructural systems descriptions · Common building type · Performance level · Level of seismicity 3 pw:\\PHX-POP-PW.Carollo.local:Carollo\Documents\Client\CA\STPUD\10793A00\Project Mgmt\Contracts\TO 2 - Seismic Evaluation - 10793A00 Page 3 of 3 · Soil type · List of assumptions: material properties, site soil conditions · Findings: a list of seismic deficiencies identified · Recommendations: Mitigation schemes and cost estimate for implementing mitigation measures · Appendix: references, preliminary calculations, photographs, all necessary checklists, summary data sheets, and analysis procedures TIME OF PERFORMANCE A DRAFT Evaluation Report will be prepared within 30 days of the site visit. A FINAL Evaluation Report will be prepared within two weeks of receiving District comments to the DRAFT report. PAYMENT Payment to CONSULTANT for services performed under Task Order No. 2 shall be $39,791 and paid as provided in Article IV of the May 4, 2017, Master Agreement for Consulting Services. The Not to Exceed limit of the contract is increased to $439,689 by the execution of Task Order No. 2. EFFECTIVE DATE This Task Order No. 2 is effective as of the _____ day of ____________________, 20__. IN WITNESS WHEREOF, duly authorized representatives of the OWNER and of the ENGINEER have executed this Task Order No. 2 evidencing its issuance by OWNER and acceptance by ENGINEER. CAROLLO ENGINEERS, INC. OWNER Accepted this _____ day of __________, 20___ By: By: Ryan A. Hook, P.E. Associate Vice President Officer By: Scott E. Parker, P.E. Vice President 4 ESTIMATED ENGINEERING HOURS AND COSTSSouth Tahoe Public Utility DistrictEngineering Services for Big 5 Pump Station Condition AssessmentParker / Taylor Hook Fisher Inoue Quiroz Post KairouzDeslauriersProject Staff Struct EI&CPECETravelAdvisorManagerEngineerProfEngrEngrControlChangeJDH Caltrol$/miQA/QC PICAnalyst2017 Fee Schedule $284 $205 $168 $168 $262 $262 $262 $205 $176 $111 Hours Budget$11.7010.0%$0.535 Column 12345678910111213141516171819202122TASK 1 - PROJECT MANAGEMENT1.01Project Administration425 16 0 0 0 000 8 53$9,837 $620$0 $0$0$0 $0$60 $395$1,075$10,9121.02Conduct Project Status Updates443 24 0 0 0 000 4 75$14,427 $878$0 $0$0$0 $0$0 $0$878$15,3051.03QC & Technical Review Program400 0 0 0 0 000 8 48$12,248 $562$0 $0$0$0 $0$0 $0$562$12,810Task 1 Total Hours 4868 40 0 0 0 000 20 176Task 1 Total Budget $13,632 $13,940 $6,720 $0 $0 $0 $0$0$0 $2,220$36,512 $2,060 $0 $0$0 $0 $0 $60 $395 $2,515 $39,027TASK 2 - DATA COLLECTION AND REVIEW2.01Collect and review facility-specific data22 8 20 0 0 004 0 36$6,386 $421$0 $0$0$0 $0$0 $0$421$6,8072.02Perform preliminary investigations at pump stations414 24 0 0 0 000 2 44$8,260 $515$0 $0$0$0 $0$240 $395$1,150$9,4102.03612 20 8 0 0 000 0 46$8,868 $538$0 $0$0$0 $0$0 $0$538$9,4062.04Perform comprehensive Condition Assessments030 56 64 31 28 000 0 209 $41,768 $2,445$27,570 $15,690 $0$43,260 $4,326$3,356 $480$53,867$95,6352.05Compile results of Condition Assessments04 8 16 4 4 000 4 40$7,392 $468$0 $0$0$0 $0$0 $0$468$7,8602.06Develop Condition Assessment TM - DRAFT 216 32 16 4 8 4016 28 126 $22,028 $1,474$0 $0$0$0 $0$0 $0$1,474$23,5022.07Develop Condition Assessment TM - FINAL 28 16 16 0 4 004 16 66$11,112 $772$0 $0$0$0 $0$200 $0$972$12,084Task 2 Total Hours 1686 164 140 39 44 4024 50 567Task 2 Total Budget $4,544 $17,630 $27,552 $23,520 $10,218 $11,528 $1,048 $0 $4,224 $5,550$105,814 $6,633 $27,570 $15,690 $0 $43,260 $4,326 $3,796 $875 $58,890 $164,704TASK 3 - ALTERNATIVES EVALUATION3.01 Develop specific design criteria for each pump station412 16 8 0 0 000 0 40$7,628 $468$0 $0$0$0 $0$0 $0$468$8,0963.02 Develop recommendations for improvements412 16 24 0 0 0016 0 72$13,132 $842$2,000 $0$0$2,000 $200$0 $0$3,042$16,1743.03 Develop planning level costs for the alternatives04 12 32 0 0 000 0 48$8,212 $562$0 $0$0$0 $0$0 $0$562$8,7743.04 Assess environmental and/or permitting considerations02 2 4 0 0 080 0 16$3,058 $187$0 $0 $7,500$7,500 $750$0 $0$8,437$11,4953.05 Develop alternatives ranking criteria24 8 4 0 0 000 0 18$3,404 $211$0 $0$0$0 $0$0 $0$211$3,6153.06216 24 16 4 16 400 0 82$16,856 $959$0 $0$0$0 $0$0 $0$959$17,8153.07 Collaborate with District regarding funding strategies44 2 0 0 0 000 0 10$2,292 $117$0 $0$0$0 $0$0 $0$117$2,4093.08 Prioritize each of the preferred alternatives416 16 8 0 0 000 0 44$8,448 $515$0 $0$0$0 $0$0 $0$515$8,9633.09 Prepare 10% plans216 48 64 8 32 00120 4 294 $54,708 $3,440$0 $0$0$0 $0$0 $0$3,440$58,1483.10 Identify construction sequencing28 16 24 0 8 000 0 58$11,024 $679$0 $0$0$0 $0$0 $0$679$11,7033.11 Existing utility coordination02 8 16 0 0 000 0 26$4,442 $304$0 $0$0$0 $0$0 $0$304$4,7463.12 Develop Alternatives Analysis TM - DRAFT016 32 16 4 8 4416 24 124 $21,836 $1,451$0 $0$0$0 $0$0 $0$1,451$23,2873.13 Alternatives Evaluation Workshop88 16 8 0 8 000 0 48$10,040 $562$0 $0$0$0 $0$100 $480$1,142$11,1823.14 Develop Alternatives Analysis TM - FINAL08 16 16 0 4 000 8 52$8,952 $608$0 $0$0$0 $0$200 $0$808$9,760Task 3 Total Hours 32128 232 240 16 76 812 152 36 932Task 3 Total Budget $9,088 $26,240 $38,976 $40,320 $4,192 $19,912 $2,096 $2,460 $26,752 $3,996$174,032 $10,905 $2,000 $0 $7,500 $9,500 $950 $300 $480 $22,135 $196,167Tasks 1-3 Total Hours962824363805512012121761061675Tasks 1-3 Total Budget27,264$ 57,810$ 73,248$ 63,840$ 14,410$ 31,440$ 3,144$ 2,460$ 30,976$ 11,766$ 316,358$ 19,598$ 29,570$ 15,690$ 7,500$ 52,760$ 5,276$ 4,156$ 1,750$ 83,540$ 399,898$ Additional TasksTASK 4 - CONCRETE TESTING4.01Manned Entry into Wet Wells (Tahoe Keys, Upper Truckee, Johnson, Bijou)02 0 24 0 0 000 0 26$4,442 $304$32,480 $0$0$32,480 $1,624$522 $193$35,123$39,5654.02-4-36.5 -36 20 0 -8 00-120 -2 -186.5 -$34,745 -$2,182 $0 $0$0 $0 -$2,638 $0 $0 -$4,820 -$39,565Task 4 Total Hours -4-34.5 -36 44 0 -8 00-120 -2 -160.5Task 4 Total Budget -$1,136 -$7,073 -$6,048 $7,392 $0 -$2,096 $0$0 -$21,120 -$222-$30,303 -$1,878 $32,480 $0$0 $32,480 -$1,014 $522 $193 $30,303 $0TASK 5 - SEISMIC EVALUATION5.01 Site Visit08 0 0 8 0 000 0 16$3,736 $187$0 $0$0$0 $0$250 $154$591$4,3275.02 Establishing Performance Objective and Structural Level04 0 0 8 0 000 0 12$2,916 $140$0 $0$0$0 $0$250 $154$544$3,4605.03 Tier 1 Screening Checklists00 0 0 24 0 000 0 24$6,288 $281$0 $0$0$0 $0$0 $193$474$6,7625.04 Tier 2 Evaluation00 0 0 40 0 000 0 40$10,480 $468$0 $0$0$0 $0$0 $193$661$11,1415.0548 0 0 30 0 008 12 62$13,376 $725 $0 $0$0 $0 $0 $0 $0 $725 $14,101Task 5 Total Hours 420 0 0 110 0 008 12 154Task 5 Total Budget $1,136 $4,100 $0 $0 $28,820 $0 $0$0 $1,408 $1,332$36,796 $1,801 $0 $0$0 $0 $0 $500 $692 $2,993 $39,791Tasks 1-5 Total Hours96267.54004241651121212641161668.5Tasks 1-5 Total Budget27,264$ 54,837$ 67,200$ 71,232$ 43,230$ 29,344$ 3,144$ 2,460$ 11,264$ 12,876$ 322,851$ 19,521$ 62,050$ 15,690$ 7,500$ 85,240$ 4,262$ 5,178$ 2,635$ 116,836$ 439,689$ TASKTechnical ProjectOdorPerform alternatives evaluations and recommend preferred alternatives for each pump stationDevelop LOS objectives, performance indicators, and metricsDeductive Credit: 5% Sub Markup; Tasks 1.02, 3.09, 3.10, & 3.11Prepare Evaluation ReportCOST SUMMARYClerical SupportSubtotalsSierra Ecotone SolutionsTotal ODCs Total CostSubtotalsOTHER DIRECT COSTSCAD TechClimateSub-consultantMisc. Costs and Printingc:\pw_working\projectwise\rhook\d0649350\STPUD Big 5 Fee Estimate v4.0.xlsxBudgetATTACHMENT 15 ATTACHMENT 2 - ASCE 41-13 FLOW CHART 6 BOARD AGENDA ITEM 4b TO: Board of Directors FROM: Tim Bledsoe, Manager of Customer Service MEETING DATE: February 1, 2018 ITEM – PROJECT NAME: Temporary Help for Customer Service Department REQUESTED BOARD ACTION: Approve contract with Blue Ribbon Personnel Services for a temporary Customer Service Representative in the estimated amount of $27,000. DISCUSSION: Staff requests that the Board authorize payment to Blue Ribbon Personnel Services for a temporary employee in the Customer Service Department from approximately March 1, 2018, through September 30, 2018. As part of the District’s Staff Development and Succession Planning Programs, one of the current Customer Service Representatives will be working/training with the Contracts Administrator in the Engineering Department. As a result, there is a need to backfill the position in the Customer Service Department. This temporary employee will assist the Customer Service Department by answering telephone calls, taking payments and responding to routine questions from the public. Additionally, this temporary employee will be working on technical projects such as updating records in the billing software database, scanning the necessary customer information and other special projects as required. This employee will work 40 hours per week, not to exceed 999 hours. SCHEDULE: March 1, 2018 – September 30, 2018 COSTS: Estimated cost of $27,000 ACCOUNT NO: 50/50 29-4405 BUDGETED AMOUNT AVAILABLE: <$84,852>; $277,292 ATTACHMENTS: Justification Memo _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water & Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Eric Schafer 7 8 Trevor Coolidge February 1, 2018 Page 2 BOARD AGENDA ITEM 4c TO: Board of Directors FROM: Trevor Coolidge, Associate Engineer MEETING DATE: February 1, 2018 ITEM – PROJECT NAME: Water Meter Installation Project - Phase III REQUESTED BOARD ACTION: Approve the Final Balancing Change Order for a credit of $596,078.81 and the Closeout Agreement and Release of Claims for the 2017 Water Meter Installation Project - Phase III. DISCUSSION: The Water Meter Installation Project – Phase III completed a total of 1,258 new water meter installations and 163 water service valve replacements during the 2017 construction season in the Al Tahoe, Glenwood, Herbert, Keller, Park, Rocky Point, Ski Run, and Springwood neighborhoods of the District’s service area. The contractor, Vinciguerra Construction (Vinciguerra), achieved substantial completion on October 27, 2017, after starting work on July 6, 2017. Vinciguerra worked closely with District staff to minimize force account (time and materials) work to $1,657.68 or 0.05% of the original Contract amount. The proposed Final Balancing Change Order reduces the original Contract amount by $596,078.81 and brings the final Contract cost to $2,649,921.19. Staff recommends approval of both the Final Balancing Change Order and the Closeout Agreement and Release of Claims for the Water Meter Installation Project – Phase III. SCHEDULE: As soon as possible. COSTS: <$596,078.81> ACCOUNT NO: 2029-8760 16W003 BUDGETED AMOUNT AVAILABLE: $266,289 ATTACHMENTS: Final Balancing Change Order, Closeout Agreement and Release of Claims _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Duane Wallace 9 2 A. Amend Bid Item 4A to reflect a 25 unit decrease in the number of 3/4" water meter installations on single water services, for work not performed. At the contract rate of $1,600.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $40,000.00. TOTAL FOR ITEM A IS <$40,000.00> B. Amend Bid Item 5A to reflect a 19 unit decrease in the number of 3/4" water meter installations on double water services, for work not performed. At the contract rate of $1,700.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $32,300.00. TOTAL FOR ITEM B IS <$32,300.00> C. Amend Bid Item 6A to reflect an 8 unit decrease in the number of 1" water meter installations on single water services, for work not performed. At the contract rate of $1,850.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $14,800.00. TOTAL FOR ITEM C IS <$14,800.00> D. Amend Bid Item 7A to reflect a 2 unit decrease in the number of 1" water meter installations on double water services, for work not performed. At the contract rate of $2,100.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $4,200.00. TOTAL FOR ITEM D IS <$4,200.00> E. Amend Bid Item 8A to reflect a 13 unit decrease in the number of locations requiring traffic-rated installations on 3/4" meters, for work not performed. At the contract rate of $250.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $3,250.00. TOTAL FOR ITEM E IS <$3,250.00> F. Amend Bid Item 9A to reflect a 6 unit decrease in the number of locations requiring traffic-rated installations on 1" meters, for work not performed. At the contract rate of $275.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $1,650.00. TOTAL FOR ITEM F IS <$1,650.00> G. Amend Bid Item 10A to reflect a 91 square foot increase in the area of 3" asphalt patch paving. At the contract rate of $5.00 per square foot, the additional cost to the District is $455.00. TOTAL FOR ITEM G IS $455.00 H. Amend Bid Item 11A to reflect a 14 unit decrease in the number of locations requiring groundwater dewatering, for work not performed. At the contract rate of $150.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $2,100.00. TOTAL FOR ITEM H IS <$2,100.00> I. Amend Bid Item 12A to reflect a 40 unit increase in the number of additional depth non-traffic excavations completed between 61” and 76” deep. At the contract rate of $100.00 each, the additional cost to the District is $4,000.00. TOTAL FOR ITEM I IS $4,000.00 10 3 J. Amend Bid Item 13A to reflect a 4 unit increase in the number of additional depth traffic-rated excavations completed between 61” and 76” deep. At the contract rate of $100.00 each, the additional cost to the District is $400.00. TOTAL FOR ITEM J IS $400.00 K. Amend Bid Item 14A to reflect a 4 unit decrease in the number of ¾” single water service valve replacements, for work not performed. At the contract rate of $250.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $1,000.00. TOTAL FOR ITEM K IS <$1,000.00> L. Amend Bid Item 15A to reflect a 1 unit decrease in the number of 1” single water service valve replacements, for work not performed. At the contract rate of $500.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $500.00. TOTAL FOR ITEM L IS <$500.00> M. Amend Bid Item 16A to reflect a 2 unit decrease in the number of ¾" water service valve replacements on double services, for work not performed. At the contract rate of $350.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $700.00. TOTAL FOR ITEM M IS <$700.00> N. Amend Bid Item 17A to reflect a 9 unit decrease in the number of 3/4” single in-line water service valve replacements, for work not performed. At the contract rate of $250.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $2,250.00. TOTAL FOR ITEM N IS <$2,250.00> O. Amend Bid Item 18A to reflect a 2 unit decrease in the number of 1” single in-line water service valve replacements, for work not performed. At the contract rate of $500.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $1,000.00. TOTAL FOR ITEM O IS <$1,000.00> P. Amend Bid Item 20A to reflect a 1 unit increase in the number of drainage inlets protected. At the contract rate of $250.00 each, the additional cost to the District is $250.00. TOTAL FOR ITEM P IS $250.00 Q. Amend Bid Item 22A to reflect a decrease in the unknown conditions item for bid Schedule A, for work not performed. The reduction in the Contract amount for this item results in a credit to the District in the amount of $40,000.00. TOTAL FOR ITEM Q IS <$40,000.00> R. Amend Bid Item 4B to reflect a 26 unit decrease in the number of 3/4" water meter installations on single water services, for work not performed. At the contract rate of $1600.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $41,600.00. TOTAL FOR ITEM R IS <$41,600.00> 11 4 S. Amend Bid Item 5B to reflect a 13 unit decrease in the number of 3/4" water meter installations on double water services, for work not performed. At the contract rate of $1,850.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $24,050.00. TOTAL FOR ITEM S IS <$24,050.00> T. Amend Bid Item 6B to reflect a 3 unit increase in the number of 1" water meter installations on single water services. At the contract rate of $2,100.00 each, the additional cost to the District is $6,300.00. TOTAL FOR ITEM T IS $6,300.00 U. Amend Bid Item 7B to reflect a 2 unit increase in the number of 1" water meter installations on double water services. At the contract rate of $2,100.00 each, the additional cost to the District is $4,200.00. TOTAL FOR ITEM U IS $4,200.00 V. Amend Bid Item 8B to reflect a 28 unit decrease in the number of locations requiring traffic-rated installations on 3/4" meters, for work not performed. At the contract rate of $250.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $7,000.00. TOTAL FOR ITEM V IS <$7,000.00> W. Amend Bid Item 9B to reflect a 2 unit increase in the number of locations requiring traffic-rated installations on 1" meters. At the contract rate of $275.00 each, the additional cost to the District is $550.00. TOTAL FOR ITEM W IS $550.00 X. Amend Bid Item 10B to reflect a 407 square foot decrease in the area of 3" asphalt patch paving, for work not performed. At the contract rate of $5.00 per square foot, the reduction in the Contract quantity results in a credit to the District in the amount of $2,035.00. TOTAL FOR ITEM X IS <$2,035.00> Y. Amend Bid Item 11B to reflect a 114 unit decrease in the number of locations requiring groundwater dewatering, for work not performed. At the contract rate of $150.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $17,100.00. TOTAL FOR ITEM Y IS <$17,100.00> Z. Amend Bid Item 12B to reflect a 2 unit increase in the number of additional depth non-traffic excavations completed between 61” and 76” deep. At the contract rate of $100.00 each, the additional cost to the District is $200.00. TOTAL FOR ITEM Z IS $200.00 12 5 AA. Amend Bid Item 13B to reflect a 5 unit decrease in the number of additional depth traffic-rated excavations completed between 61” and 76” deep, for work not performed. At the contract rate of $100.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $500.00. TOTAL FOR ITEM AA IS <$500.00> BB. Amend Bid Item 14B to reflect a 38 unit increase in the number of ¾” single water service valve replacements. At the contract rate of $250.00 each, the additional cost to the District is $9,500.00. TOTAL FOR ITEM BB IS $9,500.00 CC. Amend Bid Item 15B to reflect a 6 unit increase in the number of 1” single water service valve replacements. At the contract rate of $500.00 each, the additional cost to the District is $3,000.00. TOTAL FOR ITEM CC IS $3,000.00 DD. Amend Bid Item 16B to reflect a 3 unit increase in the number of ¾" water service valve replacements on double services. At the contract rate of $350.00 each, the additional cost to the District is $1,050.00. TOTAL FOR ITEM DD IS $1,050.00 EE. Amend Bid Item 17B to reflect a 19 unit decrease in the number of 3/4” single in-line water service valve replacements, for work not performed. At the contract rate of $250.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $4,750.00. TOTAL FOR ITEM EE IS <$4,750.00> FF. Amend Bid Item 18B to reflect a 2 unit increase in the number of 1” single in-line water service valve replacements. At the contract rate of $500.00 each, the additional cost to the District is $1,000.00. TOTAL FOR ITEM FF IS $1,000.00 GG. Amend Bid Item 19B to reflect a 6 unit decrease in the number of locations requiring service line freezing for water service valve replacement, for work not performed. At the contract rate of $500.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $3,000.00. TOTAL FOR ITEM GG IS <$3,000.00> HH. Amend Bid Item 20B to reflect a 13 unit decrease in the number of drainage inlets protected, for work not performed. At the contract rate of $250.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $3,250.00. TOTAL FOR ITEM HH IS <$3,250.00> II. Amend Bid Item 22B to reflect a decrease in the unknown conditions item for bid Schedule B, for work not performed. The reduction in the Contract amount for this item results in a credit to the District in the amount of $70,000.00. TOTAL FOR ITEM II IS <$70,000.00> 13 6 JJ. Amend Bid Item 4C to reflect an 84 unit decrease in the number of 3/4" water meter installations on single water services, for work not performed. At the contract rate of $1,600.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $134,400.00. TOTAL FOR ITEM JJ IS <$134,400.00> KK. Amend Bid Item 5C to reflect a 15 unit increase in the number of 3/4" water meter installations on double water services. At the contract rate of $1,700.00 each, the additional cost to the District is $25,500.00. TOTAL FOR ITEM KK IS $25,500.00 LL. Amend Bid Item 6C to reflect a 21 unit decrease in the number of 1" water meter installations on single water services, for work not performed. At the contract rate of $1850.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $38,850.00. TOTAL FOR ITEM LL IS <$38,850.00> MM. Amend Bid Item 7C to reflect a 2 unit increase in the number of 1" water meter installations on double water services. At the contract rate of $2,100.00 each, the additional cost to the District is $4,200.00. TOTAL FOR ITEM MM IS $4,200.00 NN. Amend Bid Item 8C to reflect a 46 unit decrease in the number of locations requiring traffic-rated installations on 3/4" meters, for work not performed. At the contract rate of $250.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $11,500.00. TOTAL FOR ITEM NN IS <$11,500.00> OO. Amend Bid Item 9C to reflect a 16 unit decrease in the number of locations requiring traffic-rated installations on 1" meters, for work not performed. At the contract rate of $275.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $4400.00. TOTAL FOR ITEM OO IS <$4,400.00> PP. Amend Bid Item 10C to reflect a 1485 square foot decrease to the area of 3" asphalt patch paving, for work not performed. At the contract rate of $5.00 per square foot, the reduction in the Contract quantity results in a credit to the District in the amount of $7,425.00. TOTAL FOR ITEM PP IS <$7,425.00> QQ. Amend Bid Item 11C to reflect a 67 unit decrease in the number of locations requiring groundwater dewatering, for work not performed. At the contract rate of $150.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $10,050.00. TOTAL FOR ITEM QQ IS <$10,050.00> RR. Amend Bid Item 12C to reflect an 8 unit increase in the number of additional depth non-traffic excavations completed between 61” and 76” deep. At the contract rate of $100.00 each, the additional cost to the District is $800.00. TOTAL FOR ITEM RR IS $800.00 14 7 SS. Amend Bid Item 13C to reflect a 10 unit decrease in the number of additional depth traffic-rated excavations completed between 61” and 76” deep, for work not performed. At the contract rate of $100.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $1,000.00. TOTAL FOR ITEM SS IS <$1,000.00> TT. Amend Bid Item 14C to reflect a 2 unit decrease in the number of ¾” single water service valve replacements, for work not performed. At the contract rate of $250.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $500.00. TOTAL FOR ITEM TT IS <$500.00> UU. Amend Bid Item 15C to reflect a 2 unit decrease in the number of 1” single water service valve replacements, for work not performed. At the contract rate of $500.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $1,000.00. TOTAL FOR ITEM UU IS <$1,000.00> VV. Amend Bid Item 16C to reflect a 1 unit decrease in the number of ¾" water service valve replacements on double services, for work not performed. At the contract rate of $350.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $350.00. TOTAL FOR ITEM VV IS <$350.00> WW. Amend Bid Item 17C to reflect a 23 unit decrease in the number of 3/4” single in-line water service valve replacements, for work not performed. At the contract rate of $250.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $5,750.00. TOTAL FOR ITEM WW IS <$5,750.00> XX. Amend Bid Item 18C to reflect a 6 unit decrease in the number of 1” single in-line water service valve replacements, for work not performed. At the contract rate of $500.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $3,000.00. TOTAL FOR ITEM XX IS <$3,000.00> YY. Amend Bid Item 20C to reflect a 31 unit decrease in the number of drainage inlets protected, for work not performed. At the contract rate of $250.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $7,750.00. TOTAL FOR ITEM ZZ IS <$7,750.00> ZZ. Amend Bid Item 22C to reflect a decrease in the unknown conditions pay item for Bid Schedule C for work not performed. Work performed on a time and materials basis totaled $1,657.68. Additional materials for the project (valve boxes), supplied by the Contractor, and remaining non- returnable items provided to the District totaled $64,203.51. Bid Schedule C included $90,000.00 for unknown conditions; the reduction in the Contract amount results in a credit to the District in the amount of $24,138.81. TOTAL FOR ITEM ZZ IS <$24,138.81> 15 8 AAA. Amend Bid Item 4D to reflect a 28 unit decrease in the number of 3/4" water meter installations on single water services, for work not performed. At the contract rate of $1,600.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $44800.00. TOTAL FOR ITEM AAA IS <$44,800.00> BBB. Amend Bid Item 5D to reflect a 6 unit increase in the number of 3/4" water meter installations on double water services. At the contract rate of $1,700.00 each, the additional cost to the District is $10,200.00. TOTAL FOR ITEM BBB IS $10,200.00 CCC. Amend Bid Item 6D to reflect a 3 unit decrease in the number of 1" water meter installations on single water services, for work not performed. At the contract rate of $1,850.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $5,550.00. TOTAL FOR ITEM CCC IS <$5,550.00> DDD. Amend Bid Item 7D to reflect a 2 unit decrease in the number of 1" water meter installations on double water services, for work not performed. At the contract rate of $2,100.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $4,200.00. TOTAL FOR ITEM DDD IS <$4,200.00> EEE. Amend Bid Item 8D to reflect an 8 unit decrease in the number of locations requiring traffic-rated installations on 3/4" meters, for work not performed. At the contract rate of $250.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $2,000.00. TOTAL FOR ITEM EEE IS <$2,000.00> FFF. Amend Bid Item 9D to reflect a 1 unit decrease in the number of locations requiring traffic-rated installations on 1" meters, for work not performed. At the contract rate of $275.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $275.00. TOTAL FOR ITEM FFF IS <$275.00> GGG. Amend Bid Item 10D to reflect an 82 square foot decrease in the area of 3" asphalt patch paving, for work not performed. At the contract rate of $5.00 per square foot, the reduction in the Contract quantity results in a credit to the District in the amount of $410.00. TOTAL FOR ITEM GGG IS <$410.00> HHH. Amend Bid Item 11D to reflect an 11 unit increase in the number of locations requiring groundwater dewatering. At the contract rate of $150.00 each, the additional cost to the District is $1,650.00. TOTAL FOR ITEM HHH IS $1,650.00 16 9 III. Amend Bid Item 12D to reflect a 12 unit decrease in the number of additional depth non-traffic excavations completed between 61” and 76” deep, for work not performed. At the contract rate of $100.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $1,200.00. TOTAL FOR ITEM III IS <$1,200.00> JJJ. Amend Bid Item 14D to reflect a 5 unit increase in the number of ¾” single water service valve replacements. At the contract rate of $250.00 each, the additional cost to the District is $1,250.00. TOTAL FOR ITEM JJJ IS $1,250.00 KKK. Amend Bid Item 15D to reflect a 1 unit decrease in the number of 1” single water service valve replacements, for work not performed. At the contract rate of $500.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $500.00. TOTAL FOR ITEM KKK IS <$500.00> LLL. Amend Bid Item 16D to reflect a 5 unit increase in the number of ¾" water service valve replacements on double services. At the contract rate of $350.00 each, the additional cost to the District is $1,750.00. TOTAL FOR ITEM LLL IS $1,750.00 MMM. Amend Bid Item 17D to reflect an 11 unit decrease in the number of 3/4” single in-line water service valve replacements, for work not performed. At the contract rate of $250.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $2750.00. TOTAL FOR ITEM MMM IS <$2,750.00> NNN. Amend Bid Item 18D to reflect a 1 unit decrease in the number of 1” single in-line water service valve replacements, for work not performed. At the contract rate of $500.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $500.00. TOTAL FOR ITEM NNN IS <$500.00> OOO. Amend Bid Item 19D to reflect a 4 unit decrease in the number of locations requiring service line freezing for water service valve replacement, for work not performed. At the contract rate of $500.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $2,000.00. TOTAL FOR ITEM OOO IS <$2,000.00> PPP. Amend Bid Item 20D to reflect a 4 unit decrease in the number of drainage inlets protected, for work not performed. At the contract rate of $250.00 each, the reduction in the Contract quantity results in a credit to the District in the amount of $1000.00. TOTAL FOR ITEM PPP IS <$1,000.00> 17 10 QQQ. Amend Bid Item 22D to reflect a decrease in the unknown conditions item for bid Schedule D, for work not performed. The reduction in the Contract amount for this item results in a credit to the District in the amount of $40,000.00. TOTAL FOR ITEM QQQ IS <$40,000.00> RRR. Change the Contract Time, identified in Section 007200, Part 2.04 of the Contract Specifications, from one-hundred-seven (107) calendar days to one-hundred-thirteen (113) calendar days, to account for additions to the Scope of Work. This item addresses in full additional time required to complete extra work and the procurement of materials requested by the District. No compensation is awarded due to the time extension. All additional costs for the extra work related to this item are addressed separately. TOTAL FOR ITEM RRR IS $0.00 TOTAL FOR CHANGE ORDER NUMBER 1 IS A+B+C+D+E+F+G+H+I+J+K+L+M+N+O+P+Q+R+S+T+U+V+W+X+Y+Z+AA+BB+CC+D D+EE+FF+GG+HH+II+JJ+KK+LL+MM+NN+OO+PP+QQ+RR+SS+TT+UU+VV+WW+XX +YY+ZZ+AAA+BBB+CCC+DDD+EEE+FFF+GGG+HHH+III+JJJ+KKK+LLL+MMM+NNN +OOO+PPP+QQQ+RRR = <$596,078.81> 18 1 CLOSEOUT AGREEMENT AND RELEASE OF CLAIMS THIS AGREEMENT AND RELEASE OF CLAIMS is made in South Lake Tahoe, California, this 1st day of February 2018, by and between South Tahoe Public Utility DISTRICT, hereinafter referred to as "DISTRICT", and Vinciguerra Construction, hereinafter referred to as "CONTRACTOR". KNOW ALL PERSONS BY THESE PRESENTS: 1. That the undersigned, as the authorized representative of CONTRACTOR, for and in consideration of Three Million Two Hundred Forty-Six Thousand Dollars and Zero Cents ($3,246,000.00), contract amount, and the credit sum of Five Hundred Ninety-Six Thousand Seventy-eight Dollars and Eighty-One Cents (-$596,078.81) for said Contract Change Orders No. 1, which is hereby acknowledged, has submitted waivers from all subcontractors and suppliers in the form required by Civil Code §8132 - 8138, and does hereby and for each of its successors, assigns and partners, release acquit and forever discharge the SOUTH TAHOE PUBLIC UTILITY DISTRICT OF EL DORADO COUNTY, CALIFORNIA, and each of its successors, assigns, officers, agents, servants, and employees, from any and all rights, claims, demands, debts, obligations, liabilities, actions, damages, costs, expenses and other claims whatsoever, which might have been asserted against DISTRICT by reason of any matter or thing which was the subject matter of or basis for: A. The performance of all terms and conditions of that certain agreement dated June 9, 2017 for Purchase Order No. P31087 DISTRICT project described as Water Meter Installation Project – Phase 3. B. Change Order No. 1 as approved by the parties, pertaining to Purchase Order No. P31087 and shown in Payment Request No. 5, dated February 1, 2018. 2. That the undersigned, as the authorized representative of DISTRICT, for and in consideration of the CONTRACTOR’s completion of Purchase Order No. P31087 does hereby and for each of its successors, and assigns, releases, acquits and forever discharge Vinciguerra Construction and each of its successors, assigns, officers, agents, servants, and employees, and sureties from any and all rights, claims, demands, debts, obligations, liability, actions, costs, expenses whatsoever which might have been asserted against CONTRACTOR, except for the rights accruing to the DISTRICT in California Code of Civil Procedure Section 337.15, Entitled "Ten Years - Action to Recover Damage from Latent Deficiencies in Planning or Construction of Improvements to Real Property," which rights are specifically not released, and except for warranties and sureties provided by reason of any matter or thing which was the subject matter of or basis for: A. The performance of all terms and conditions of that certain agreement dated June 9, 2017 for Purchase Order No. P31087, DISTRICT project described as Water Meter Installation Project – Phase 3. B. Change Order No. 1 as approved by the parties, pertaining to Purchase Order No. P31087 and shown in FINAL Payment Request No. 5 dated February 1, 2018. 19 2 3. Nothing contained herein shall waive or alter the rights, privileges, and powers of the DISTRICT or the duties, liabilities and obligations of the CONTRACTOR and its surety in respect to any portions of the Specifications for Purchase Order No. P31087. 4. The DISTRICT has received no claims from the CONTRACTOR. 5. Upon execution of this agreement, the DISTRICT agrees to immediately file and record a NOTICE OF COMPLETION with the County Recorder in order to begin the running of the statutory lien period. 6. The presently retained amount is $121,708.56 Original Contract amount $3,246,000.00 Total Change Order Amount -$596,078.81 Less: Amount Previously Paid (Request Nos. 1 through 4) $2,528,212.63 Retainage $121,708.56 BALANCE: $ 0 The retainage will be released to the CONTRACTOR at the expiration of the lien period 35 (thirty-five) calendar days after date of recording a NOTICE OF COMPLETION by El Dorado County Recorder or when all liens have been released, whichever last occurs. Release pursuant to this agreement shall not apply to CONTRACTOR’s rights to the presently retained amount until such time as such amounts are received in full by CONTRACTOR. 7. CONTRACTOR and DISTRICT agree that the total adjusted contract price and time of performance for Purchase Order No. after the execution of change orders shall be as follows: Original Contract Price $3,246,000.00 Original Calendar Days 107 Total Adjusted Price $2,649,921.19 Total Adjusted Calendar Days 113 8. It is understood and agreed by the undersigneds that the facts with respect to which the foregoing Release is given may hereafter turn out to be other than or different from the facts in that connection now known to be or believed by said undersigneds to be true, and the undersigneds hereto expressly assume the risk of the facts turning out to be different than they now so appear, and agree that the foregoing Release shall be, in all respects, effective and not subject to termination or recession by any such difference in facts and undersigneds hereby expressly waive any and all rights the undersigneds have or may have under California Civil Code Section 1542, which provides as follows: "A general release does not extend to claims which the creditor does not know or suspect to exist in his favor at the time of executing the Release which if known by him must have materially affected his settlement with the debtor." 9. The releases made by the CONTRACTOR and the DISTRICT herein are not to be construed as an admission or admissions of liability on the part of either party and that the parties deny liability hereof. The undersigneds agree that they will forever refrain and forebear from commencing, instituting or prosecuting any lawsuit, action or other 20 3 proceeding against the other party based on, arising out of, or in any way connected with the subject matter of this Release. 10. The CONTRACTOR hereby releases the DISTRICT from all claims, including those of its Subcontractors for all delay and impact costs, if any. 11. The CONTRACTOR represents and warrants to the DISTRICT that the CONTRACTOR has not heretofore assigned or transferred or purported to assign or transfer to any person, firm, corporation, association or entity any of the rights, claims, warranties, demands, debts, obligations, liabilities, actions, damages, costs, expenses and other claims whatsoever and the CONTRACTOR agrees to indemnify and hold harmless the DISTRICT against, without limitation, any and all rights, claims, warranties, demands, debts, obligations, liabilities, actions, damages, costs, expenses and other claims, including attorney's fees, arising out of or connected with any such assignment or transfer or purported assignment or transfer. 12. The undersigned acknowledge that they have been represented by counsel of their own choice in connection with the preparation and execution of this Closeout Agreement and Release of Claims. The undersigned acknowledge and represent that they understand and voluntarily consent and agree to each and every provision contained herein. 13. The undersigned further declare and represent that no promise, inducement or agreement, not herein expressed, have been made to the undersigned and that this Release contains the entire agreement among the parties hereto and that the terms of the Release are contractual and not a mere recital. 14. The persons executing this Closeout Agreement and Release of Claims represent and warrant to the other party that the execution and performance of the terms of this Release have been duly authorized by all requisite corporate, partnership, individual, or other entity requirements and that said persons have the right, power, legal capacity and authority to execute and enter in the Closeout Agreement and Release of Claims. RICHARD SOLBRIG, GENERAL MANAGER DATED ATTEST: MELONIE GUTTRY, CLERK OF BOARD DATED VINCIGUERRA CONSTRUCTION By: WAYNE VINCIGUERRA, OWNER DATED 21 Paul Hughes, Chief Financial Officer February 1, 2018 Page 2 BOARD AGENDA ITEM 4d TO: Board of Directors FROM: Paul Hughes, Chief Financial Officer MEETING DATE: February 1, 2018 ITEM – PROJECT NAME: Liberty Utilities Rate Intervention REQUESTED BOARD ACTION: Authorize staff to execute a Contract with Kinect Energy Group, previously named KTM, to provide professional consulting services to support the intervention in a general rate case filed by Liberty Utilities, in an amount not to exceed $32,645. DISCUSSION: In June 2012, the District Board of Directors approved an initial Contract with KTM to intervene on behalf of the District and five other large customers (the A-3 Customer Coalition) in a general rate case filing by Liberty Utilities. The intervention resulted in a significant reduction to the A-3 customer class rate increase. The District’s participating investment created a savings of thousands of dollars annually for the rate payers. In 2017, Kinect Energy Group (KEG) reviewed a proposed rate increase from Liberty Utilities, and by questioning their calculations, Liberty agreed to lower the proposed rate, saving the District’s customers $28,325. Liberty Utilities is filling for a rate increase in 2018 which will have a significant impact to the A-3 customer class if approved. KEG believes there to be cost of service and cost allocation issues with Liberty’s proposed rate structure that should be challenged, discussed, negotiated and hopefully settled prior to the December hearing date. Due to the potential ongoing cost impact to the District and other A-3 Customer Coalition members, staff believes that participating in the intervention is the right thing to do. The District’s cost share of the 2018 intervention is between a low of $16,849 and up to a maximum of $32,645. This one-time expenditure could save the District tens of thousands of dollars annually in electric utility charges. SCHEDULE: Filing, review, negotiations, and hearings throughout 2018 COSTS: Not to exceed $32,645 ACCOUNT NO: 1000-6750; 2000-6750 BUDGETED AMOUNT AVAILABLE: $131,840; $131,840 ATTACHMENTS: KEG Memorandum __________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water and Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Duane Wallace 22 777 29th Street, Suite 200, Boulder, CO 80303 +1 303.442.2719 kinectenergy.com MEMORANDUM       To:   A‐3 Customer Coalition     From:  Geoffrey B. Inge              Director, Regulatory Services  Date:  January 17, 2018  Subject:  A‐3CC 2018 Anticipated Regulatory Activities and Proposed Budget    This memo will report the results of recent A‐3CC activity, identify known 2018 regulatory events impacting the  NNIEU, recommend NNIEU active participation in four known events, and request budget approval.    Recent A‐3CC Regulatory Activities    Advice Letter 72‐E, GRCMA Protest Resolution  We finally received a ruling on our year old protest of Liberty’s General Rate Case Memorandum Account (GRCMA)  Advice Letter.  The CPUC approved the Energy Division’s resolution denying our protest of Liberty’s GRCMA  surcharge.      Recall that the CPUC’s failure to approve our settlement in the 2015 rate case in time for a January 1, 2016 effective  date forced Liberty to collect eight months of 2016 revenue at the old 2015 rates.  Liberty argued that it should be  allowed to recover the difference between its 2015 approved base rate revenue requirement and the 2016  approved base rate revenue requirement for the 8 months in 2016.  At the time, Liberty’s forecast for 2016 system  sales indicated that they would over collect their 2016 base rate revenue even at the 2015 rates.  Therefore we  argued that Liberty should only be able to recover the actual difference between the revenue it collected for the  first 8 months of 2016 and the revenue it would have collected if charging the 2016 approved rates.    As it turned out, Liberty’s forecast of 2016 revenue was significantly over stated and therefore its proposed GRCMA  calculation proved to be favorable for the A‐3CC members.  So, losing the argument did not have a negative impact  on group members.    Base Rate Revenue Balancing Account (BRRBA), Advice Letter 83‐E    On October 30, 2017 Liberty filed a BRRBA Advice Letter requesting permission to recover a $9 million revenue  shortfall in its Base Revenue Balancing Account.  The portion allocated to the A‐3 customer class was $3.9 million.   According to Liberty, the primary driver for the revenue shortfall was the 2016‐2017 snow pack, which forced ski  area closure, correspondingly reducing their electric consumption.    The tariff allows Liberty to collect this shortfall as a surcharge during the 12 months of the following calendar year.   Because of the significant amount, Liberty requested permission to spread the surcharge over a 24 month period.    Kinect reviewed Liberty’s BRRBA calculations and discovered that in addition to the base rate revenue shortfall,  Liberty had added an increase in the vegetation management charge.  You will recall that as part of the settlement  the A‐3CC negotiated a fixed vegetation management annual amount collected as a customer charge.  Therefore  Liberty’s application of a vegetation management charge increase to A‐3 customers is inappropriate. We alerted  Liberty to this mistake and they agreed.  Consequently the $.0144/kWh A‐3 customer BRRBA surcharge proposed  by Liberty will be reduced to $.01346/kWh.  The total 24 month savings for the A‐3CC members is $125,744.  The  chart below shows the savings for each member.  GBI 23 A‐3CC 2018 Activities and Budget January 17, 2018  Page 2      Anticipated 2018 Regulatory Activity and Budget    The attached Exhibit 1 shows four 2018 anticipated A‐3CC regulatory activities and the related estimated budget.  The budget range reflects the significant unknowns inherent in regulatory activity. The budget is allocated among  the members based on our past methodology which assigns 25% pro rata and 75% based on relative annual electric  usage.    The largest single and most important activity item is Liberty’s 2018 rate case.  This case will set base revenue  electric rates for three years beginning January 1, 2019.  The A‐3CC has participated in all of these triennial general  rate case for the past 15 years and has been successful in reducing Liberty’s proposed rate for A‐3CC members.  As  we have done in past general rate cases, we will attempt to achieve our participation goals through settlement and  avoid the cost of a litigated case. The low budget estimate reflects this strategy.    The CPUC is will require all utilities to adjust rates to reflect the 2018 federal income tax changes. It is unclear at  this point if Liberty’s rate will be adjusted in a standalone proceeding or as part of the 2018 rate case.  We have  assumed the latter for the purpose of this budget estimate.    Expanding A‐3CC Membership    Kinect intends to make a concerted effort this spring to expand the A‐3CC membership.  We have been able to  identify 32 A‐3 customers who are not yet members of the A‐3CC.  We will provide their names and a recruitment  plan in a subsequent memo. We will solicit your help in the recruiting effort. Needless to say a successful recruiting  effort will lower individual member allocated cost.    Request for Response    Please respond to this memo with an email indicating your intention to participate in A‐3CC 2018 regulatory  activities and estimated budget.    Please don’t hesitate to contact me if you have questions regarding anything in this memo.  Thank you.    Two Year BRRBA A‐3 CC Member Surcharge  Savings Lake Tahoe Resort Hotel 8,593$                         Marriott 13,224                         Heavenly Valley 21,817                         Northstar 23,100                         SLTPUD 28,325                         Squaw 30,685                         125,744$                    24 Exhibit 1Total Group Estimated 2018 Regulatory Activities BudgetLegalConsultingTotalA3CC Regulatory ActivitiesLowHighLowHighLowHigh(a)(b)(c)(d)(e)(f)(g)1 CEMA A.17‐10‐018 intervention3,000$                 ‐5,000$           5,000$            ‐10,000$         8,000$            ‐15,000$              2 Liberty Rate Case Intervention (May ‐ December 2018)30,000                 ‐60,000           30,000            ‐60,000           60,000            ‐120,000              3 Annual Adjustment Filings Review and Report (Fall 2018)3,000                   ‐5,000              3,000               ‐5,000              6,000               ‐10,000                4 General Monitoring & Reporting5,000                   ‐5,000              3,500               ‐5,000              8,500               ‐10,000                Total41,000$              ‐75,000$        41,500$         ‐80,000$        82,500$         ‐155,000$           * Excluding any authorized travel costAllocation5Lake Tahoe Resort3,810$                 ‐6,969$           3,856$            ‐7,434$           7,666$            ‐14,402$              6 Marriott4,942                   ‐9,041              5,002               ‐9,643              9,945               ‐18,684                7 Heavenly Valley7,044                   ‐12,885           7,129               ‐13,744           14,173            ‐26,628                8 Northstar7,357                   ‐13,459           7,447               ‐14,356           14,804            ‐27,814                9 SLTPUD 8,635                   ‐15,796           8,740               ‐16,849           17,375            ‐32,645                10 Squaw9,212                   ‐16,852           9,325               ‐17,975           18,537            ‐34,827                Total 41,000$              ‐75,000$        41,500$         ‐80,000$        82,500$         ‐155,000$           25 BOARD AGENDA ITEM 4e TO: Board of Directors FROM: Shannon Cotulla, Assistant General Manager MEETING DATE: February 1, 2018 ITEM – PROJECT NAME: 2018 Washington, D.C. Legislative Advocacy REQUESTED BOARD ACTION: Authorize extension of the Contract with ENS Resources, Inc., for two years for lobbying and consulting services in the amount of $84,000 per year. DISCUSSION: ENS Resources, Inc., (Eric Sapirstein and David French) have effectively and successfully advocated on the District’s behalf regarding federal governmental matters since 1997. ENS Resources, Inc., submitted a proposal for ongoing legislative advocacy in Washington, D.C. for the calendar years 2018 and 2019. The proposed fee of $84,000 per year maintains the same fees as the previous year. Staff requests that the Board authorize extension of Contract with ENS Resources, Inc., for lobbying and consulting services through December 2019 for an amount not to exceed $84,000 per year. SCHEDULE: N/A COSTS: $84,000 ACCOUNT NO: 1027/2027-4405 BUDGETED AMOUNT AVAILABLE: $38,303; $30,304 ATTACHMENTS: Proposal for Scope of Work - Federal Policy Initiatives 2018 _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water and Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Duane Wallace 26 27 28 29 30 31 Julie Ryan February 1, 2018 Page 3 BOARD AGENDA ITEM 4f TO: Board of Directors FROM: Julie Ryan, Principal Engineer MEETING DATE: February 1, 2018 ITEM – PROJECT NAME: 2015 Luther Pass Power and Control Project REQUESTED BOARD ACTION: Approve Change Order No. 8 to Thomas Haen Company in the amount $88,257.93. DISCUSSION: Change Order No. 8 addresses seven work items that are beyond the scope of the Contract, and three reductions for work not performed. This is the final Change Order for the project. A) With addition of the catwalk between the Pump Station Building and the Electrical Building, the configuration of the front overhang at the Electrical Building changed, such that the exterior light fixture would no longer fit. Also, during construction, the District received numerous complaints from the neighbors that the newly installed light was disruptive. Staff directed the contractor to rewire the exterior light and add a motion detector. The additional cost to the District for modifications to installed exterior lighting is $2,699.85. B) On August 10, 2017, Pump #3, which had been rebuilt by the contractor as Change Order No. 7B to the Contract in the amount $97,849.72, was reinstalled at the Pump Station and assigned the lead position. The pump ran for approximately 11 days before the rotary element, which had been supplied to the contractor by the District, failed catastrophically. Staff directed the contractor to rebuild the rotary element and repair the damage to the interior of the pump casing. The pump was returned to service on December 1, 2017. The cost to repair Pump #3 is $73,052.77. C) After demolition of the exterior electrical equipment at the south wall of the Pump Station, it was brought to staff’s attention that the plans failed to call for painting the now bare block. Staff directed the contractor to repaint the south wall of the Pump Station at an additional cost to the District of $2,079.30. General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Duane Wallace 32 Julie Ryan February 1, 2018 Page 2 D) During testing of the pump interlocks, it became apparent that, as designed, the control system had an inherent weakness. Rather than a dedicated pressure switch, restricting a pump from running at a specific pressure, the interlock is integral to a digital pressure transducer. If the transducer fails, the pump would be inoperable. Staff directed the contractor to install a separate pressure switch for each side (suction and discharge) of each pump, to add indicator lights at the control panel to show if a switch has failed, and to wire the switches to the motor controller. The additional cost to the District for this added functionality is $17,891.26. E) In April 2017, the Board authorized payment for additional expenses in the amount $54,548 incurred by the Contract as a result of the ten month Contract overrun. This authorization did not account for additional expense incurred by the electrical subcontractor, who has played a significant role in the final commissioning and documentation for the project. The subcontractor has requested compensation for his additional administrative expenses for the 10-month extenions. The additional cost to the District for this effort is $4,656. F) During construction, staff directed the contractor to relocate a portion of the site access road, improving safety for large vehicles but substantially changing the effort required for pavement restoration. As a result, pavement restoration was paid on a time and materials basis as an unanticipated condition, and Bid Item #16 – Pavement Restoration was not used. As a result the amount of the Contract is reduced by $7,475. G) The Contract includes a $100,000 line item for addressing unanticipated conditions encountered during the project on a time and materials basis. Based on receipts provided by the contractor, the work performed to address unanticipated conditions cost $92,949.25. As such, the District is due a credit in the amount $7,050.75 for work not performed under the Contract. H) During construction the contractor raised the concern that the existing conduit for the 75kwa transformer would not accommodate the new cable for the new transformer. Staff directed the contractor to install a new conduit from the transformer to Panel A inside the Pumps Station. The work was performed on a combination of time and materials and lump sum for an additional cost to the District of $3,739. I) During the course of the project, staff identified several safety-related control features that had been omitted from the design, included a flashing beacon to indicate when an alarm had been triggered, a switch for the Pump Station intrusion alarm located near the front and side doors, and emergency stop button located near the front door of the Pump Station, and an interlock that shuts down any running pumps upon discharge of the chemical fire suppression system. Staff directed the contractor to install the additional four features on a lump sum basis for an additional cost to the District of $23,665.50. 33 Julie Ryan February 1, 2018 Page 3 J) The contractor failed to complete final submittals and redlines in time for the funding deadline. Rather than hold the contract open and risk reimbursement, the contractor has agreed to credit the District $25,000 for work not performed to date, and will complete the remaining submittals, redlines, punchlist items and spare parts under a separate Contract. Staff recommends that the Board approve Change Order No.8 to the District’s Contract with Thomas Haen Company in the amount $88,257.93, bringing the Contract total to $4,356,414.33. The Engineer’s Estimate for construction was $3,875,000. SCHEDULE: As soon as possible COSTS: $88,257.93 ACCOUNT NO: 1029-8330 (LPPOWR) BUDGETED AMOUNT AVAILABLE: $1,241,881 ATTACHMENTS: Change Order No. 8 _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO 34 1 CHANGE ORDER NUMBER 08 Project: 2015 LUTHER PASS PS POWER AND CONTROL PROJECT Contractor: Thomas Haen Company Date: 02.01.2018 PO #: P28991 The Contract Shall Be Changed As Follows: A) Increase Bid Item 7 – Electrical Building- including all labor, equipment, materials and subcontractor costs necessary for the Contractor to procure alternative lights and motion sensors for the front entry, as directed by the District in its Supplemental Response to RFI 8.1, dated July 27, 2017 (attached).This item addresses in full the additional costs associated with the modifications to exterior lighting, as detailed in Contract Change Request #36, dated August 8, 2017 (attached). There is no change to the Contract Time associated with this item. TOTAL FOR ITEM A IS $2,699.85 TOTAL FOR CHANGE ORDER NO. 8 IS A + B + C + D + E + F + G + H + I + J = $$88,257.93 Dollar Amounts Contract Time Original Contract $3,881,334.00 426 Calendar Days Previous Change Order $386,822.40 404 Calendar Days Current Contract $4,268,156.40 830 Calendar Days THIS CHANGE ORDER $88,257.93 000 Calendar Days New Contract Total $4,356,414.33 830 Calendar Days Contractor agrees to make the herein-described changes in accordance with the terms hereof. The change in contract price and/or contract time noted is full settlement for costs incurred because of the change(s) described, unless specifically noted in individual description(s). Date: ____________ Authorized By STPUD Board President Date: _____________ Accepted By Contractor Date: _____________ Reviewed By 35 2 B) Increase Bid Item 26 – Pump #3 Rehabilitation - including all labor, equipment, materials and subcontractor costs necessary for a second round of rehabilitation of Pump #3 as directed by the District in its Design Construction Memorandum #23.1, dated November 17, 2017 (attached).This item addresses in full the additional costs to rehabilitate Pump 3, as detailed in Contract Change Request #42, dated December 18, 2017 (attached). Additional Contract Time associated with this item was addressed in Item B of Change Order #5. TOTAL FOR ITEM B IS $73,052.77 C) Increase Bid Item 6 – Pump Station Mechanical/Structural Modifications- including all labor, equipment, materials and subcontractor costs necessary for the Contractor to paint the south exterior wall of the Pump Station Building where electrical equipment was demolished, as directed by the District in its Response to RFI #89, dated August 26, 2017 (attached). This item addresses in full the additional work for painting, as detailed in Contract Change Request #40, dated November 21, 2017. There is no change to the Contract Time associated with this extra work. TOTAL FOR ITEM C IS $2,079.30 D) Increase Bid Item 9 – Instrumentation and Control Systems- including all labor, equipment, materials and subcontractor costs necessary for the Contractor to procure and install 8 additional pressure switches at the suction and discharge piping of the four pumps, and to wire them to indicators at the control panel and to relays at the motor starters, as directed by the District in its Design Construction Memorandum #26, dated July 28, 2017 (attached). This item addresses in full the additional work for additional pressure switches, as detailed in Contract Change Request #41, dated December 18, 2017. There is no change to the Contract Time associated with this extra work. TOTAL FOR ITEM D IS $17,891.26 E) Increase Bid Item 1 – Mobilization and Demobilization- including all overhead, labor and insurance costs incurred by the electrical subcontractor associated with a 10-month extension to the Contract Time, for the reasons detailed in Design Construction Memorandum #17.11, dated February 12, 2017 (attached). The basis for the charges is detailed in Contract Change Request #43, dated December 20, 2017 (attached). The associated change to the Contract Time is addressed in Item B of Change Order #5. TOTAL FOR ITEM E IS $4,656.00 F) Delete Bid Item 16 – Pavement Restoration- to omit all labor, equipment, materials and subcontractor costs associated with pavement restoration. Pavement restoration has been paid based on subcontractor costs under Bid 14 – Unknown Underground Conditions. TOTAL FOR ITEM F IS <$7,475.00> G) Decrease Bid Item 14 – Unknown Underground Conditions- by $7,050.75 to reflect actual work performed in response to unanticipated conditions, including, but not limited to work directed by the District in Design Construction Memoranda #9, dated October 1, 2015, #6, dated August 18, 2015, and #6.1, dated August 28, 2015. The additional work was performed on force account for $92,949.25, as detailed in the attached list of Daily Work Reports and accompanying receipts. TOTAL FOR ITEM G IS <$7,050.75> 36 3 H) Increase Bid Item 8 – Electrical Systems - including all labor, equipment, materials and subcontractor costs necessary for to reroute the conduit connections for the new 75kva transformer, as directed by the District in its Response to RFI 56, dated February 12, 2016 (attached).This item addresses in full the additional costs to reroute the conduit, as detailed in Contract Change Request #45, dated January 22, 2018 (attached). There is no change to the Contract Time associated with this extra work. TOTAL FOR ITEM H IS $3,739.00 I) Increase Bid Item 9 – Instrumentation and Control Systems - including all labor, equipment, materials and subcontractor costs necessary for to install additional emergency features, as directed by the District in its Design Construction Memorandum #15, dated May 2, 2016 (attached).This item addresses in full the additional costs to install the four features identified, as detailed in Contract Change Request #44, dated January 22, 2018 (attached). There is no change to the Contract Time associated with this extra work. TOTAL FOR ITEM I IS $23,665.50 J) Decrease Bid Item 1– Mobilization and Demobilization- to reflect a $25,000.00 reduction in the Contract Amount for work not performed by the Contractor under this Contract to complete the punchlist and to produce spare parts, redline markups, and other final submittals as directed by the District in Design Construction Memorandum 27.2, dated January 23, 2018. TOTAL FOR ITEM J IS <$25,000.00> TOTAL FOR CHANGE ORDER NO. 8 IS A + B + C + D + E + F + G + H + I + J = $88,257.93 37 SOUTH TAHOE PUBLIC UTILITY DISTRICT Richard Solbrig, General Manager Shannon Cotulla, Assistant General Manager Randy Vogelgesang, President BOARD MEMBERS Kelly Sheehan, Vice President Chris Cefalu, Director James R. Jones, Director Duane Wallace, Director REGULAR MEETING OF THE BOARD OF DIRECTORS SOUTH TAHOE PUBLIC UTILITY DISTRICT January 18, 2018 MINUTES The South Tahoe Public Utility District Board of Directors met in a regular session, 2:15 p.m., at the District Office, located at 1275 Meadow Crest Drive, South Lake Tahoe, California. ROLL CALL: Board of Directors: President Vogelgesang, Directors Jones, Cefalu, Wallace Absent: Director Sheehan Staff: Paul Hughes, Richard Solbrig, Shannon Cotulla, Gary Kvistad, Melonie Guttry, Shelly Thomsen, Brenlyn Hoyle, Mike Chieffo, Brian Bartlett, Heidi Baugh, Raina Blasser, Nancy Hussmann, Ivo Bergsohn, Linda Brown, Tim Bledsoe, Trevor Coolidge, John Thiel CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR: None CONSENT CALENDAR: Moved Cefalu/Second Wallace/Vogelgesang Yes/Cefalu Yes/Jones Yes/Sheehan Absent/Wallace Yes to approve the Consent Calendar as presented. a. RESOLUTIONS FOR STATE WATER RESOURCES CONTROL BOARD DRINKING WATER STATE REVOLVING FUND APPLICATION (Lynn Nolan, Grants Coordinator) Adopt Resolution Nos. 3076-18, 3077-18 and 3078-18 required for application for funding from the State Water Resources Control Board Drinking Water State Revolving Fund for the Keller Heavenly Water System Improvements Project. b. RESOLUTION FOR BUREAU OF RECLAMATION DROUGHT FUNDING (Lynn Nolan, Grants Coordinator) Adopt Resolution No. 3079-18 approving grant funding for Pressure Reducing Valve/Supervisory Control and Data Acquisition Upgrades. 38 REGULAR BOARD MEETING MINUTES – January 18, 2018 PAGE – 2 c. WATER METER INSTALLATION PROJECT PHASE IV (Trevor Coolidge, Associate Engineer) Authorize staff to advertise for bids for water meter valve boxes and lids for Phase IV of the Water Meter Installation Project. d. WATER METER INSTALLATION PROJECT PHASE IV (Trevor Coolidge, Associate Engineer) Authorize staff to advertise for bids for Phase IV of the Water Meter Installation Project. e. KELLER-HEAVENLY WATER SYSTEM IMPROVEMENTS PROJECT (Trevor Coolidge, Associate Engineer) Approve Task Order No. 10 for Sierra Ecotone Solutions to provide environmental consulting services for the Keller-Heavenly Water System Improvements Project for an amount not to exceed $24,500. f. REGULAR BOARD MEETING MINUTES: January 4, 2018 (Melonie Guttry, Executive Services Manager/Clerk of the Board) Approved January 4, 2018, Minutes ITEMS FOR BOARD ACTION a. Al Tahoe Sewer Pump Emergency Repair/Replacement (Chris Stanley, Manager of Field Operations) – Staff provided an overview of the project. Moved Vogelgesang/Second Wallace/Vogelgesang Yes/Cefalu Yes/Jones Yes/Sheehan Absent/Wallace Yes to continue emergency action to repair Al Tahoe Sewer Pump #2, and purchase an additional pump, pursuant to Resolution No. 3075-17. b. Liability Claim against South Tahoe Public Utility District received from the Harrison Family (Tim Bledsoe, Manager of Customer Service) – Staff provided an overview of the liability claim received from the Harrison Family. Moved Wallace/Second Cefalu/Vogelgesang Yes/Cefalu Yes/Jones Yes/Sheehan Absent/Wallace Yes to reject Claim against the District in the amount of $6,000,000 for the death of Charles Harrison. c. South Y Feasibility Study of Remedial Alternatives (Ivo Bergsohn, Hydrogeologist) – Staff provided a PowerPoint Presentation outlining the South Y Feasibility Study of Remedial Alternatives and the funding. Moved Vogelgesang/Second Jones/Vogelgesang Yes/Cefalu Yes/Jones Yes/Sheehan Absent/Wallace Yes to accept the proposed cost Amendment Request #1 in the amount of $284,000 from Kennedy/Jenks Consultants for out of scope professional and engineering design services for the South Y Feasibility Study of Remedial Alternatives. d. Approve Payment of Claims (Debbie Henderson, Accounting Manager) Moved Cefalu/Second Wallace/Vogelgesang Yes/Cefalu Yes/Jones Yes/Sheehan Absent/Wallace Yes to approve Payment of Claims in the amount of $2,027,697.29. 39 REGULAR BOARD MEETING MINUTES – January 18, 2018 PAGE – 3 ANNOUNCEMENT OF 2018 BOARD APPOINTMENTS President Vogelgesang reported the 2018 committee appointments as follows: STANDING COMMITTEES 1) Executive Committee Vogelgesang/Sheehan 2) Finance Committee – Wallace/Cefalu 3) Water and Wastewater Operations Committee – Jones/Sheehan AD HOC COMMITTEES 1) Lakeside Park Associates – Jones/Sheehan 2) Metering and Development – Cefalu/Wallace 3) City Council Committee – Vogelgesang/Wallace LIAISONS 1) Alpine County – Wallace 2) ACWA (Association of California Water Agencies) – Jones 3) CASA (California Association of Sanitation Agencies) – Vogelgesang 4) City of South Lake Tahoe – Vogelgesang/Hughes Alternate 5) City and County Fire Departments – Cefalu 6) El Dorado County – Jones 7) El Dorado County Water Agency – Sheehan/Jones Alternate STANDING AND AD-HOC COMMITTEE REPORTS: President Vogelgesang reported there was an Ad-Hoc Committee meeting at 9 a.m. on Friday, January 12, at the City of South Lake Tahoe. The main topic of discussion was the PCE Contamination and the overall approach to this contamination. Attorney Kvistad reported the water purveyors submitted comments to Lahontan and the Responsible Party submitted a response to Lahontan last week. The District is anticipating some direction from the State Water Resources Control Board to the Responsible Party. The committee also debriefed on Snow Globe and the District expressed appreciation for the expanded support this year with the idea of moving forward in future years with this same model of support. Affordable housing was discussed and the City prepared a memo regarding affordable housing that was distributed to the Board. The final topic of discussion was drainage issues within the City limits. The next meeting is scheduled for Friday, February 9, at the District. BOARD MEMBER REPORTS: Director Wallace reported he represented the Board at the Employee Communication Committee Meeting on Wednesday, January 17, and provided an overview of his report. Director Jones reported he will be attending the California Association of Sanitation Agencies Conference next week in Palm Springs with President Vogelgesang and Jeff Lee, Manager of Plant Operations. EL DORADO COUNTY WATER AGENCY PURVEYOR REPORT: Director Jones reported he attended the meeting on Wednesday, January 10, along with Richard Solbrig and provided an overview of the meeting. 40 REGULAR BOARD MEETING MINUTES – January 18, 2018 PAGE – 4 GENERAL MANAGER REPORT: Richard Solbrig reported on several items: • Mayor Wendy David is initiating informal meetings with the public. Richard Solbrig is planning to attend the first meeting on Wednesday, January 24, located at Peet’s Coffee at the Y. Shannon Cotulla will attend the February meeting and Board Members are welcome to attend. STAFF/ATTORNEY REPORTS: Staff provided a detailed report regarding Luther Pass Pump Station 700 Horsepower Pump purchase. Director Jones reported the Operations Committee had a lengthy discussion on Tuesday, January 16, regarding this issue. Attorney Kvistad reported the Stephenson hearing tentatively scheduled for Friday, January 19, has been continued to Friday, February 9, at 1:30 p.m. ADJOURNMENT TO CLOSED SESSION: 3:15 p.m. RECONVENED TO OPEN SESSION: 4:07 p.m. ACTION REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION a. 54956.9(b)/Conference with Legal Counsel Potential Litigation (one case). No reportable Board action b. Pursuant to Section 54957 of the California Government Code, Closed Session may be held regarding public employee evaluation for unrepresented employee position – General Manager. No reportable Board action ADJOURNMENT: 4:08 p.m. _______________________________________ Randy Vogelgesang, Board President South Tahoe Public Utility District ________________________________________ Melonie Guttry, Clerk of the Board South Tahoe Public Utility District 41 BOARD AGENDA 6a TO: Board of Directors FROM: Chris Stanley, Manager of Field Operations MEETING DATE: February 1, 2018 ITEM – PROJECT NAME: Al Tahoe Sewer Pump Emergency Pump Repair/Replacement. REQUESTED BOARD ACTION: Continue or terminate the emergency action to repair Al Tahoe Sewer Pump #2, pursuant to Resolution No. 3075-17, depending on the status of the repair work. DISCUSSION: The Board declared the Al Tahoe Sewer Station Emergency Repair and additional pump purchase project as an emergency on December 21, 2017, and has continued the emergency since then. Public Contract Code Section 22050(c) requires the Board to review the emergency action at every Board meeting thereafter until the action is terminated, to determine by a 4/5 vote, that there is a need to continue the action. District staff will present a report to the Board to request that the Board either continue or terminate the emergency action for the repair/replacement of Al Tahoe Sewer Pump #2 depending on the status of the repair work. SCHEDULE: Repairs to be completed as soon as possible COSTS: ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: Funded with Reserves ATTACHMENTS: N/A _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager Richard H. Solbrig Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Duane Wallace 42 PAYMENT OF CLAIMS Payroll 1/16/2018 568,025.98 Total Payroll 568,025.98 ADP & Insight eTools 4,247.11 AFLAC/WageWorks claims and fees 3,665.84 BBVA Compass Bank 0.00 BHFS legal services 0.00 CalPERS - other 0.00 Cal Bank & Trust Fiscal Agent Fees 0.00 CDS - health care payments 14,820.31 Total Vendor EFT 22,733.26 Accounts Payable Checks-Sewer Fund 384,326.60 Accounts Payable Checks-Water Fund 267,860.98 Total Accounts Payable 652,187.58 Grand Total 1,242,946.82 Payroll EFTs & Checks 1/16/2018 mmddy EFT CA Employment Taxes & W/H 26,919.56 0.00 EFT Federal Employment Taxes & W/H 147,193.67 0.00 EFT CalPERS Contributions 66,181.62 0.00 EFT Empower Retirement-Deferred Comp 18,934.59 100.00 EFT Stationary Engineers Union Dues 2,715.29 0.00 EFT CDHP Health Savings (HSA)2,533.32 20.00 EFT Retirement Health Savings 0.00 0.00 EFT United Way Contributions 160.00 0.00 EFT Employee Direct Deposits 241,769.74 0.00 CHK Employee Garnishments 1,104.45 0.00 CHK Employee Paychecks 60,513.74 0.00 Total 568,025.98 FOR APPROVAL February 1, 2018 43 Description Acct# / Proj CodeDepartment / Proj Name TypeAmountVendor Name PAYMENT OF CLAIMS Check Num SHOP SUPPLIESHEAVY MAINT 1004 - 6071 202.00A-L SIERRA WELDING PRODUCTS Check Total:MWAP-00097820202.00 SW FLWMTRS (21)ENGINEERING - SW FLWMTR PROJ 1029 - 7039 - SWRFLO 132,983.02ADS CORP Check Total:MWAP-00097821132,983.02 SUPP INS W/HGEN & ADMIN 1000 - 2532 907.90AFLAC Check Total:MWAP-00097822907.90 EQUIP RENT/LEASEWATER REUSE 1028 - 5020 2,306.67AHERN RENTALS FLL VVS #3ENGINEERING - FLL VVS #3 1029 - 7036 - FLVVS3 47.68AHERN RENTALS Check Total:MWAP-000978232,354.35 OFC SUPPLY ISSUEGEN & ADMIN 1000 - 6081 262.50ALPEN SIERRA COFFEE Check Total:MWAP-00097824262.50 UNIFORM PAYABLEGEN & ADMIN 1000 - 2518 1,336.41AMERIPRIDE UNIFORM SERVICES Check Total:MWAP-000978251,336.41 TELEPHONEGEN & ADMIN 1000 - 6310 20.28AT&T/CALNET 3 TELEPHONEPUMPS 1002 - 6310 63.27AT&T/CALNET 3 TELEPHONEOPERATIONS 1006 - 6310 26.40AT&T/CALNET 3 TELEPHONEGEN & ADMIN 2000 - 6310 20.28AT&T/CALNET 3 TELEPHONEPUMPS 2002 - 6310 24.24AT&T/CALNET 3 Check Total:MWAP-00097826154.47 PRIMARY EQUIPELECTRICAL SHOP 1003 - 6021 418.00AUTOMATION DIRECT PUMP STATIONSELECTRICAL SHOP 1003 - 6051 137.25AUTOMATION DIRECT Check Total:MWAP-00097827555.25 SAFETY/EQUIP/PHYUNDERGROUND REP 2001 - 6075 192.93AW DIRECT Check Total:MWAP-00097828192.93 DUES/MEMB/CERTBOARD OF DIR 2019 - 6250 3,868.00AWWA Check Total:MWAP-000978293,868.00 SHOP SUPPLIESHEAVY MAINT 1004 - 6071 67.40AXELSON IRON SHOP Check Total:MWAP-0009783067.40 SAFETY/EQUIP/PHYUNDERGROUND REP 1001 - 6075 378.00BARTON HEALTHCARE SYSTEM SAFETY/EQUIP/PHYPUMPS 1002 - 6075 162.50BARTON HEALTHCARE SYSTEM SAFETY/EQUIP/PHYHEAVY MAINT 1004 - 6075 253.00BARTON HEALTHCARE SYSTEM THERESA - Theresa Sherman BK: Payment of Claims Report (With RV) V2 <1.03> Current Date:01/24/2018 Current Time: Page:1 18:25:08 User: Report:44 Description Acct# / Proj CodeDepartment / Proj Name TypeAmountVendor Name PAYMENT OF CLAIMS Check Num SAFETY/EQUIP/PHYEQUIPMENT REP 1005 - 6075 141.00BARTON HEALTHCARE SYSTEM SAFETY/EQUIP/PHYOPERATIONS 1006 - 6075 420.00BARTON HEALTHCARE SYSTEM SAFETY/EQUIP/PHYWATER REUSE 1028 - 6075 65.00BARTON HEALTHCARE SYSTEM SAFETY/EQUIP/PHYENGINEERING 1029 - 6075 37.50BARTON HEALTHCARE SYSTEM SAFETY/EQUIP/PHYUNDERGROUND REP 2001 - 6075 282.00BARTON HEALTHCARE SYSTEM SAFETY/EQUIP/PHYPUMPS 2002 - 6075 162.50BARTON HEALTHCARE SYSTEM SAFETY/EQUIP/PHYEQUIPMENT REPAIR 2005 - 6075 141.00BARTON HEALTHCARE SYSTEM SAFETY/EQUIP/PHYENGINEERING 2029 - 6075 37.50BARTON HEALTHCARE SYSTEM Check Total:MWAP-000978312,080.00 SLUDGE DISPOSALOPERATIONS 1006 - 6652 2,672.74BENTLY AGROWDYNAMICS Check Total:MWAP-000978322,672.74 PIPE/CVRS/MHLSUNDERGROUND REP 1001 - 6052 93.31BING MATERIALS Check Total:MWAP-0009783393.31 CONTRACT SERVICEFINANCE 1039 - 4405 164.03BLUE RIBBON TEMP PERSONNEL CONTRACT SERVICEFINANCE 2039 - 4405 164.02BLUE RIBBON TEMP PERSONNEL CONTRACT SERVICEFINANCE - TAH SIERRA IRWMP 2039 - 4405 - TSIRWM 508.08BLUE RIBBON TEMP PERSONNEL Check Total:MWAP-00097834836.13 MONITORINGLABORATORY 1007 - 6110 17.50BSK ASSOCIATES MONITORINGLABORATORY 2007 - 6110 17.50BSK ASSOCIATES Check Total:MWAP-0009783535.00 TRAVEL/MEETINGSENGINEERING 1029 - 6200 414.32BUTZ, GARTH TRAVEL/MEETINGSENGINEERING 2029 - 6200 414.31BUTZ, GARTH Check Total:MWAP-00097836828.63 TRAVEL/MEETINGSENGINEERING 2029 - 6200 128.00BUTZ, GARTH Check Total:MWAP-00097837128.00 DUES/MEMB/CERTENGINEERING 1029 - 6250 65.00CAPPO INC DUES/MEMB/CERTFINANCE 1039 - 6250 65.00CAPPO INC DUES/MEMB/CERTENGINEERING 2029 - 6250 65.00CAPPO INC DUES/MEMB/CERTFINANCE 2039 - 6250 65.00CAPPO INC Check Total:MWAP-00097838260.00 CONTRACT SERVICEENGINEERING 1029 - 4405 10,575.29CAROLLO ENGINEERS CONTRACT SERVICEENGINEERING - COMM STUDY - SEW 1029 - 4405 - SCDS01 7,729.50CAROLLO ENGINEERS THERESA - Theresa Sherman BK: Payment of Claims Report (With RV) V2 <1.03> Current Date:01/24/2018 Current Time: Page:2 18:25:08 User: Report:45 Description Acct# / Proj CodeDepartment / Proj Name TypeAmountVendor Name PAYMENT OF CLAIMS Check Num CONTRACT SERVICEENGINEERING - COMM STUDY - WAT 2029 - 4405 - SCDW01 7,729.50CAROLLO ENGINEERS PRVs SCDW03ENGINEERING - PRV INSTRUMENTAT 2029 - 7038 - SCDW03 3,665.23CAROLLO ENGINEERS SCADA UPGRENGINEERING - WATER STATION EN 2029 - 8763 - SCDW02 3,056.40CAROLLO ENGINEERS Check Total:MWAP-0009783932,755.92 AUTOMOTIVEEQUIPMENT REP 1005 - 6011 298.00CARSON DODGE Check Total:MWAP-00097840298.00 CMPTR PURCHASESINFORMATION TECH 1037 - 4845 72.71CDW-G CORP CMPTR PURCHASESINFORMATION TECH 2037 - 4845 72.72CDW-G CORP Check Total:MWAP-00097841145.43 SPR PLC CENTFGELECTRICAL SHOP 1003 - 8808 14,198.30CODALE ELECTRIC SUPPLY Check Total:MWAP-0009784214,198.30 OFFICE SUPPLIESHUMAN RESOURCES 1022 - 4820 87.43COMPLIANCE POSTER COMPANY OFFICE SUPPLIESHUMAN RESOURCES 2022 - 4820 87.43COMPLIANCE POSTER COMPANY Check Total:MWAP-00097843174.86 MONITORINGLABORATORY 1007 - 6110 182.50DAVI LABORATORIES MONITORINGLABORATORY 2007 - 6110 182.50DAVI LABORATORIES Check Total:MWAP-00097844365.00 PUMP STATIONSPUMPS 1002 - 6051 49.84DIY HOME CENTER SMALL TOOLSPUMPS 1002 - 6073 43.64DIY HOME CENTER SHOP SUPPLIESHEAVY MAINT 1004 - 6071 12.21DIY HOME CENTER SMALL TOOLSUNDERGROUND REP 2001 - 6073 124.34DIY HOME CENTER PUMP STATIONSPUMPS 2002 - 6051 53.33DIY HOME CENTER SMALL TOOLSPUMPS 2002 - 6073 43.63DIY HOME CENTER SHOP SUPPLIESELECTRICAL SHOP 2003 - 6071 55.73DIY HOME CENTER Check Total:MWAP-00097845382.72 REFUSE DISPOSALGEN & ADMIN 1000 - 6370 622.07DOUGLAS DISPOSAL Check Total:MWAP-00097846622.07 STAFF DEVELOPMENHUMAN RESOURCES 1022 - 6225 2,287.82EDUCATION & TRAINING SVS LLC STAFF DEVELOPMENHUMAN RESOURCES 2022 - 6225 2,287.81EDUCATION & TRAINING SVS LLC Check Total:MWAP-000978474,575.63 SAFETY INVENTORYGEN & ADMIN 1000 - 0425 384.02EMPIRE SAFETY & SUPPLY INV/FRT/DISCOUNTFINANCE 1039 - 6077 31.89EMPIRE SAFETY & SUPPLY THERESA - Theresa Sherman BK: Payment of Claims Report (With RV) V2 <1.03> Current Date:01/24/2018 Current Time: Page:3 18:25:08 User: Report:46 Description Acct# / Proj CodeDepartment / Proj Name TypeAmountVendor Name PAYMENT OF CLAIMS Check Num Check Total:MWAP-00097848415.91 MONITORINGLABORATORY 1007 - 6110 850.50ETS Check Total:MWAP-00097849850.50 MONITORINGLABORATORY 1007 - 6110 90.00EUROFINS EATON ANALYTICAL INC MONITORINGLABORATORY - ARHD3 TRTMT EXP 2007 - 6110 - AH3EXP 40.00EUROFINS EATON ANALYTICAL INC MONITORINGLABORATORY 2007 - 6110 50.00EUROFINS EATON ANALYTICAL INC Check Total:MWAP-00097850180.00 KELLER-HVNLY IMPENGINEERING - KELLER/HVNLY IMP 2029 - 7022 - 15W007 240.00FARR WEST ENGINEERING INC Check Total:MWAP-00097851240.00 POSTAGE EXPENSESLABORATORY 1007 - 4810 25.39FEDEX POSTAGE EXPENSESLABORATORY - SO Y GRNDWATER 2007 - 4810 - 15W009 33.21FEDEX POSTAGE EXPENSESLABORATORY 2007 - 4810 87.38FEDEX Check Total:MWAP-00097852145.98 PRIMARY EQUIPHEAVY MAINT 1004 - 6021 187.72FEDEX FREIGHT Check Total:MWAP-00097853187.72 MONITORINGLABORATORY - ALP CO MTBE CONT 1007 - 6110 - ACMTBE 100.00FGL ENVIRONMENTAL MONITORINGLABORATORY 1007 - 6110 72.00FGL ENVIRONMENTAL Check Total:MWAP-00097854172.00 LAB SUPPLIESLABORATORY 1007 - 4760 43.83FISHER SCIENTIFIC LAB SUPPLIESLABORATORY 2007 - 4760 43.80FISHER SCIENTIFIC Check Total:MWAP-0009785587.63 TRAVEL/MEETINGSCUSTOMER SERVICE 1038 - 6200 34.07FRANCO, ERIKA TRAVEL/MEETINGSCUSTOMER SERVICE 2038 - 6200 34.06FRANCO, ERIKA Check Total:MWAP-0009785668.13 GROUNDS & MNTCWATER REUSE 1028 - 6042 101.91GEMPLER'S Check Total:MWAP-00097857101.91 LAB SUPPLIESLABORATORY 1007 - 4760 65.70GFS CHEMICALS INC LAB SUPPLIESLABORATORY 2007 - 4760 65.70GFS CHEMICALS INC Check Total:MWAP-00097858131.40 DUES/MEMB/CERTPUMPS 2002 - 6250 50.00GORALSKI, RONALD R Check Total:MWAP-0009785950.00 THERESA - Theresa Sherman BK: Payment of Claims Report (With RV) V2 <1.03> Current Date:01/24/2018 Current Time: Page:4 18:25:08 User: Report:47 Description Acct# / Proj CodeDepartment / Proj Name TypeAmountVendor Name PAYMENT OF CLAIMS Check Num PIPE/CVRS/MHLSUNDERGROUND REP 1001 - 6052 1,623.74GRANITE CONSTRUCTION CO Check Total:MWAP-000978601,623.74 DO PROBEELECTRICAL SHOP 1003 - 7544 5,048.17HACH CO Check Total:MWAP-000978615,048.17 WTR CONS EXPENSECUSTOMER SERVICE - WTR CONS PROG 2038 - 6660 - WCPROG 200.00HEILMAN, KIMBERLY Check Total:MWAP-00097862200.00 WTR CONS EXPENSECUSTOMER SERVICE - WTR CONS PROG 2038 - 6660 - WCPROG 200.00HOEFER, ANJANETTE Check Total:MWAP-00097863200.00 STANDBY ACCOMODAPUMPS 1002 - 6083 394.92HOTEL BECKET STANDBY ACCOMODAPUMPS 2002 - 6083 394.91HOTEL BECKET Check Total:MWAP-00097864789.83 SERVICE CONTRACTCUSTOMER SERVICE 1038 - 6030 260.17INFOSEND INC SERVICE CONTRACTCUSTOMER SERVICE 2038 - 6030 260.17INFOSEND INC Check Total:MWAP-00097865520.34 TRAVEL/MEETINGSENGINEERING 2029 - 6200 1,600.00INNOVYZE INC Check Total:MWAP-000978661,600.00 DUES/MEMB/CERTENGINEERING 1029 - 6250 9,000.00ISLE INC DUES/MEMB/CERTENGINEERING 2029 - 6250 9,000.00ISLE INC Check Total:MWAP-0009786718,000.00 JANITORIAL SERVFINANCE 1039 - 6074 1,603.50J&L PRO KLEEN INC JANITORIAL SERVFINANCE 2039 - 6074 1,603.50J&L PRO KLEEN INC Check Total:MWAP-000978683,207.00 MH FRM/LIDS&PRTSGEN & ADMIN 1000 - 0410 1,737.66JENSEN PRECAST Check Total:MWAP-000978691,737.66 AUTOMOTIVEEQUIPMENT REP 1005 - 6011 68.93JONES WEST FORD AUTOMOTIVEEQUIPMENT REPAIR 2005 - 6011 69.60JONES WEST FORD Check Total:MWAP-00097870138.53 WELLSENGINEERING - SO Y FEASIBILITY 2029 - 6050 - 17W006 13,233.75KENNEDY/JENKS CONSULTANTS INC Check Total:MWAP-0009787113,233.75 ELECTRICITYGEN & ADMIN 1000 - 6330 75,366.17LIBERTY UTILITIES ELECTRICITYGEN & ADMIN 2000 - 6330 26,695.00LIBERTY UTILITIES THERESA - Theresa Sherman BK: Payment of Claims Report (With RV) V2 <1.03> Current Date:01/24/2018 Current Time: Page:5 18:25:08 User: Report:48 Description Acct# / Proj CodeDepartment / Proj Name TypeAmountVendor Name PAYMENT OF CLAIMS Check Num Check Total:MWAP-00097872102,061.17 AUTOMOTIVEEQUIPMENT REP 1005 - 6011 323.79LILLY'S TIRE SERVICE INC AUTOMOTIVEEQUIPMENT REPAIR 2005 - 6011 296.28LILLY'S TIRE SERVICE INC Check Total:MWAP-00097873620.07 SAFETY PROGRAMSHUMAN RESOURCES 1022 - 6079 200.00MANAGED HEALTH NETWORK SAFETY PROGRAMSHUMAN RESOURCES 2022 - 6079 200.00MANAGED HEALTH NETWORK Check Total:MWAP-00097874400.00 BOBCATEQUIPMENT REP 1005 - 7538 20,709.00MATTRACKS INC Check Total:MWAP-0009787520,709.00 TRAVEL/MEETINGSENGINEERING 2029 - 6200 128.00MENDOZA, MATTHEW Check Total:MWAP-00097876128.00 OFFICE SUPPLIESHUMAN RESOURCES 1022 - 4820 31.99METRO OFFICE SOLUTIONS OFFICE SUPPLIESFINANCE 1039 - 4820 23.27METRO OFFICE SOLUTIONS OFFICE SUPPLIESHUMAN RESOURCES 2022 - 4820 31.98METRO OFFICE SOLUTIONS OFFICE SUPPLIESFINANCE 2039 - 4820 23.26METRO OFFICE SOLUTIONS Check Total:MWAP-00097877110.50 SHOP SUPPLIESELECTRICAL SHOP 1003 - 6071 129.68MITCHELL INSTRUMENT CO SHOP SUPPLIESELECTRICAL SHOP 2003 - 6071 116.78MITCHELL INSTRUMENT CO Check Total:MWAP-00097878246.46 PUMP STATIONSPUMPS 1002 - 6051 20.12MOTION INDUSTRIES INC PUMP STATIONSPUMPS 2002 - 6051 148.93MOTION INDUSTRIES INC Check Total:MWAP-00097879169.05 SAFETY PROGRAMSHUMAN RESOURCES 1022 - 6079 1,199.00MSDSonline SAFETY PROGRAMSHUMAN RESOURCES 2022 - 6079 1,200.00MSDSonline Check Total:MWAP-000978802,399.00 WTR CONS EXPENSECUSTOMER SERVICE - WTR CONS PROG 2038 - 6660 - WCPROG 100.00NACU, GOERGE Check Total:MWAP-00097881100.00 PUMP STATIONSELECTRICAL SHOP 1003 - 6051 199.32NEWARK IN ONE Check Total:MWAP-00097882199.32 TAL CRK SW CRSNGENGINEERING - TALLAC SWR XNG 1029 - 7014 - TLCXNG 7,442.65NORTHWEST HYD CONSULT INC Check Total:MWAP-000978837,442.65 THERESA - Theresa Sherman BK: Payment of Claims Report (With RV) V2 <1.03> Current Date:01/24/2018 Current Time: Page:6 18:25:08 User: Report:49 Description Acct# / Proj CodeDepartment / Proj Name TypeAmountVendor Name PAYMENT OF CLAIMS Check Num HYPOCHLORITEOPERATIONS 1006 - 4755 3,276.22OLIN CORPORATION Check Total:MWAP-000978843,276.22 TRAVEL/MEETINGSOPERATIONS 1006 - 6200 364.55PHILLIPS, JUSTIN DUES/MEMB/CERTOPERATIONS 1006 - 6250 295.00PHILLIPS, JUSTIN Check Total:MWAP-00097885659.55 POLYMEROPERATIONS 1006 - 4720 5,576.07POLYDYNE INC Check Total:MWAP-000978865,576.07 SHOP SUPPLIESHEAVY MAINT 1004 - 6071 359.00PRAXAIR 174 Check Total:MWAP-00097887359.00 SAFETY/EQUIP/PHYUNDERGROUND REP 1001 - 6075 203.63RED WING SHOE STORE SAFETY/EQUIP/PHYELECTRICAL SHOP 1003 - 6075 87.27RED WING SHOE STORE SAFETY/EQUIP/PHYOPERATIONS 1006 - 6075 193.94RED WING SHOE STORE SAFETY/EQUIP/PHYELECTRICAL SHOP 2003 - 6075 87.27RED WING SHOE STORE Check Total:MWAP-00097888572.11 REP TR PLT GENENGINEERING - TR PLT GENERATOR 1029 - 8629 - 13S019 1,625.99REDWOOD PRINTING Check Total:MWAP-000978891,625.99 REP UTIL VEHHEAVY MAINT 1004 - 8809 14,018.22RENO CYCLE & GEAR Check Total:MWAP-0009789014,018.22 WTR CONS EXPENSECUSTOMER SERVICE - WTR CONS PROG 2038 - 6660 - WCPROG 337.50RHA RICHARD HEATH &ASSOC INC Check Total:MWAP-00097891337.50 TRAVEL/MEETINGSOPERATIONS 1006 - 6200 245.00RUIZ, JOSE Check Total:MWAP-00097892245.00 TRAVEL/MEETINGSPUMPS 1002 - 6200 435.60SAFETY COMPLIANCE MANAGEMENT TRAVEL/MEETINGSELECTRICAL SHOP 1003 - 6200 158.40SAFETY COMPLIANCE MANAGEMENT TRAVEL/MEETINGSHEAVY MAINT 1004 - 6200 554.40SAFETY COMPLIANCE MANAGEMENT TRAVEL/MEETINGSEQUIPMENT REP 1005 - 6200 118.80SAFETY COMPLIANCE MANAGEMENT TRAVEL/MEETINGSOPERATIONS 1006 - 6200 1,346.40SAFETY COMPLIANCE MANAGEMENT TRAVEL/MEETINGSPUMPS 2002 - 6200 435.60SAFETY COMPLIANCE MANAGEMENT TRAVEL/MEETINGSELECTRICAL SHOP 2003 - 6200 158.40SAFETY COMPLIANCE MANAGEMENT TRAVEL/MEETINGSEQUIPMENT REPAIR 2005 - 6200 118.80SAFETY COMPLIANCE MANAGEMENT Check Total:MWAP-000978933,326.40 THERESA - Theresa Sherman BK: Payment of Claims Report (With RV) V2 <1.03> Current Date:01/24/2018 Current Time: Page:7 18:25:08 User: Report:50 Description Acct# / Proj CodeDepartment / Proj Name TypeAmountVendor Name PAYMENT OF CLAIMS Check Num UB SUSPENSEGEN & ADMIN 1000 - 2002 852.00SAFFARIAN, TAUBEH Check Total:MWAP-00097894852.00 KELLER-HVNLY IMPENGINEERING - TANK, KELLER 2029 - 7022 - KELTNK 1,250.00SIERRA ECOTONE SOLUTIONS Check Total:MWAP-000978951,250.00 AUTOMOTIVEEQUIPMENT REP 1005 - 6011 616.15SIERRA ELECTRONICS AUTOMOTIVEEQUIPMENT REPAIR 2005 - 6011 24.24SIERRA ELECTRONICS Check Total:MWAP-00097896640.39 AUTOMOTIVEEQUIPMENT REP 1005 - 6011 779.45SIERRA FREIGHTLINER STERLING Check Total:MWAP-00097897779.45 AUTOMOTIVEEQUIPMENT REP 1005 - 6011 199.03SILVER STATE INT'L INC Check Total:MWAP-00097898199.03 TRAVEL/MEETINGSUNDERGROUND REP 2001 - 6200 133.00SMITH, TOMMY Check Total:MWAP-00097899133.00 TRAVEL/MEETINGSADMINISTRATION 1021 - 6200 170.00SOLBRIG, RICHARD TRAVEL/MEETINGSADMINISTRATION 2021 - 6200 170.00SOLBRIG, RICHARD Check Total:MWAP-00097900340.00 DUES/MEMB/CERTADMINISTRATION 1021 - 6250 12.50SOUTH TAHOE CHAMBER DUES/MEMB/CERTADMINISTRATION 2021 - 6250 12.50SOUTH TAHOE CHAMBER Check Total:MWAP-0009790125.00 GROUNDS & MNTCPUMPS 1002 - 6042 37.18SOUTH TAHOE REFUSE PRIMARY EQUIPHEAVY MAINT 1004 - 6021 42.00SOUTH TAHOE REFUSE PIPE/CVRS/MHLSUNDERGROUND REP 2001 - 6052 64.35SOUTH TAHOE REFUSE GROUNDS & MNTCPUMPS 2002 - 6042 21.07SOUTH TAHOE REFUSE Check Total:MWAP-00097902164.60 NATURAL GASGEN & ADMIN 1000 - 6350 194.79SOUTHWEST GAS NATURAL GASGEN & ADMIN 2000 - 6350 404.68SOUTHWEST GAS Check Total:MWAP-00097903599.47 MH FRM/LIDS&PRTSGEN & ADMIN 1000 - 0410 3,169.14SPEC WEST CONCRETE SYSTEMS Check Total:MWAP-000979043,169.14 DUES/MEMB/CERTUNDERGROUND REP 2001 - 6250 65.00STANLEY, CHRIS Check Total:MWAP-0009790565.00 THERESA - Theresa Sherman BK: Payment of Claims Report (With RV) V2 <1.03> Current Date:01/24/2018 Current Time: Page:8 18:25:08 User: Report:51 Description Acct# / Proj CodeDepartment / Proj Name TypeAmountVendor Name PAYMENT OF CLAIMS Check Num SAFETY/EQUIP/PHYOPERATIONS 1006 - 6075 98.99STEEL-TOE-SHOES.COM SAFETY/EQUIP/PHYUNDERGROUND REP 2001 - 6075 274.49STEEL-TOE-SHOES.COM Check Total:MWAP-00097906373.48 REFUSE DISPOSALGEN & ADMIN 1000 - 6370 20.00TAHOE BASIN CONTAINER SERVICE Check Total:MWAP-0009790720.00 REP TR PLT GENENGINEERING - TR PLT GENERATOR 1029 - 8629 - 13S019 2,215.68TAHOE BLUEPRINT MTRS PHS IVENGINEERING - METERS PHASE 4 2029 - 8859 - METER4 158.26TAHOE BLUEPRINT Check Total:MWAP-000979082,373.94 POSTAGE EXPENSESCUSTOMER SERVICE 1038 - 4810 35.71TECHNIQUE DATA SYSTEMS POSTAGE EXPENSESCUSTOMER SERVICE 2038 - 4810 35.70TECHNIQUE DATA SYSTEMS Check Total:MWAP-0009790971.41 WTR CONS EXPENSECUSTOMER SERVICE - WTR CONS PROG 2038 - 6660 - WCPROG 200.00TEXAS TAHOE CHALET, LTD Check Total:MWAP-00097910200.00 PUMP STATIONSELECTRICAL SHOP 1003 - 6051 215.97THUNDERBIRD COMMUNICATIONS REPL SCADA RTUELECTRICAL SHOP 1003 - 8722 1,825.29THUNDERBIRD COMMUNICATIONS PUMP STATIONSELECTRICAL SHOP 2003 - 6051 215.98THUNDERBIRD COMMUNICATIONS Check Total:MWAP-000979112,257.24 PIPE/CVRS/MHLSUNDERGROUND REP 1001 - 6052 10.00U S BANK CORPORATE DUES/MEMB/CERTUNDERGROUND REP 1001 - 6250 1,425.00U S BANK CORPORATE STANDBY ACCOMODAPUMPS 1002 - 6083 94.34U S BANK CORPORATE SUPPLIESPUMPS 1002 - 6520 10.77U S BANK CORPORATE BUILDINGSELECTRICAL SHOP 1003 - 6041 61.41U S BANK CORPORATE PUMP STATIONSELECTRICAL SHOP 1003 - 6051 1,889.68U S BANK CORPORATE SHOP SUPPLIESELECTRICAL SHOP 1003 - 6071 201.13U S BANK CORPORATE TRAVEL/MEETINGSELECTRICAL SHOP 1003 - 6200 37.18U S BANK CORPORATE SMALL TOOLSHEAVY MAINT 1004 - 6073 595.09U S BANK CORPORATE AUTOMOTIVEEQUIPMENT REP 1005 - 6011 142.50U S BANK CORPORATE GROUNDS & MNTCOPERATIONS 1006 - 6042 220.68U S BANK CORPORATE SMALL TOOLSOPERATIONS 1006 - 6073 105.58U S BANK CORPORATE SAFETY/EQUIP/PHYOPERATIONS 1006 - 6075 61.23U S BANK CORPORATE TRAVEL/MEETINGSOPERATIONS 1006 - 6200 174.78U S BANK CORPORATE DUES/MEMB/CERTOPERATIONS 1006 - 6250 139.00U S BANK CORPORATE THERESA - Theresa Sherman BK: Payment of Claims Report (With RV) V2 <1.03> Current Date:01/24/2018 Current Time: Page:9 18:25:08 User: Report:52 Description Acct# / Proj CodeDepartment / Proj Name TypeAmountVendor Name PAYMENT OF CLAIMS Check Num SUPPLIESOPERATIONS 1006 - 6520 13.98U S BANK CORPORATE LAB SUPPLIESLABORATORY 1007 - 4760 -93.50U S BANK CORPORATE OFFICE SUPPLIESLABORATORY 1007 - 4820 2.38U S BANK CORPORATE SAFETY/EQUIP/PHYLABORATORY 1007 - 6075 61.81U S BANK CORPORATE SUPPLIESBOARD OF DIR 1019 - 6520 25.00U S BANK CORPORATE TRAVEL/MEETINGSADMINISTRATION 1021 - 6200 504.88U S BANK CORPORATE INCNTV & RCGNTNADMINISTRATION 1021 - 6621 1,972.11U S BANK CORPORATE SUBSCRIPTIONSHUMAN RESOURCES 1022 - 4830 30.00U S BANK CORPORATE SAFETY PROGRAMSHUMAN RESOURCES 1022 - 6079 409.36U S BANK CORPORATE TRAVEL/MEETINGSHUMAN RESOURCES 1022 - 6200 493.29U S BANK CORPORATE DUES/MEMB/CERTHUMAN RESOURCES 1022 - 6250 196.50U S BANK CORPORATE PERSONNEL EXPENSHUMAN RESOURCES 1022 - 6670 18.53U S BANK CORPORATE TRAVEL/MEETINGSPUBLIC OUTREACH 1027 - 6200 1,467.79U S BANK CORPORATE OFFICE SUPPLIESWATER REUSE 1028 - 4820 26.89U S BANK CORPORATE GROUNDS & MNTCWATER REUSE 1028 - 6042 1,028.53U S BANK CORPORATE TRAVEL/MEETINGSWATER REUSE 1028 - 6200 694.35U S BANK CORPORATE OFFICE SUPPLIESENGINEERING 1029 - 4820 143.57U S BANK CORPORATE TRAVEL/MEETINGSENGINEERING 1029 - 6200 384.91U S BANK CORPORATE DUES/MEMB/CERTENGINEERING 1029 - 6250 283.00U S BANK CORPORATE SUPPLIESENGINEERING 1029 - 6520 15.00U S BANK CORPORATE LPPS PWR/CTR UPGENGINEERING - LPPS PWR/CTRLS 1029 - 8330 - LPPOWR 148.53U S BANK CORPORATE DIST.COMP SPPLISINFORMATION TECH 1037 - 4840 393.37U S BANK CORPORATE SERVICE CONTRACTINFORMATION TECH 1037 - 6030 234.00U S BANK CORPORATE TRAVEL/MEETINGSINFORMATION TECH 1037 - 6200 740.01U S BANK CORPORATE OFFICE SUPPLIESCUSTOMER SERVICE 1038 - 4820 41.85U S BANK CORPORATE TRAVEL/MEETINGSCUSTOMER SERVICE 1038 - 6200 205.39U S BANK CORPORATE TRAVEL/MEETINGSFINANCE 1039 - 6200 484.00U S BANK CORPORATE SUPPLIESFINANCE 1039 - 6520 9.50U S BANK CORPORATE REPL ERP SYSTEMFINANCE - ERP REPL PROJECT 1039 - 8769 - ERPREP 388.32U S BANK CORPORATE OFFICE SUPPLIESUNDERGROUND REP 2001 - 4820 -118.03U S BANK CORPORATE TRAVEL/MEETINGSUNDERGROUND REP 2001 - 6200 164.53U S BANK CORPORATE STANDBY ACCOMODAPUMPS 2002 - 6083 94.33U S BANK CORPORATE THERESA - Theresa Sherman BK: Payment of Claims Report (With RV) V2 <1.03> Current Date:01/24/2018 Current Time: Page:10 18:25:08 User: Report:53 Description Acct# / Proj CodeDepartment / Proj Name TypeAmountVendor Name PAYMENT OF CLAIMS Check Num SUPPLIESPUMPS 2002 - 6520 10.77U S BANK CORPORATE BUILDINGSELECTRICAL SHOP 2003 - 6041 61.41U S BANK CORPORATE PUMP STATIONSELECTRICAL SHOP 2003 - 6051 260.14U S BANK CORPORATE SHOP SUPPLIESELECTRICAL SHOP 2003 - 6071 117.69U S BANK CORPORATE TRAVEL/MEETINGSELECTRICAL SHOP 2003 - 6200 37.17U S BANK CORPORATE AUTOMOTIVEEQUIPMENT REPAIR 2005 - 6011 142.50U S BANK CORPORATE LAB SUPPLIESLABORATORY 2007 - 4760 21.45U S BANK CORPORATE OFFICE SUPPLIESLABORATORY 2007 - 4820 2.37U S BANK CORPORATE SAFETY/EQUIP/PHYLABORATORY 2007 - 6075 61.80U S BANK CORPORATE TRAVEL/MEETINGSBOARD OF DIR 2019 - 6200 155.00U S BANK CORPORATE SUPPLIESBOARD OF DIR 2019 - 6520 25.00U S BANK CORPORATE TRAVEL/MEETINGSADMINISTRATION 2021 - 6200 504.88U S BANK CORPORATE INCNTV & RCGNTNADMINISTRATION 2021 - 6621 1,972.10U S BANK CORPORATE SUBSCRIPTIONSHUMAN RESOURCES 2022 - 4830 30.00U S BANK CORPORATE SAFETY PROGRAMSHUMAN RESOURCES 2022 - 6079 409.34U S BANK CORPORATE TRAVEL/MEETINGSHUMAN RESOURCES 2022 - 6200 493.29U S BANK CORPORATE DUES/MEMB/CERTHUMAN RESOURCES 2022 - 6250 196.50U S BANK CORPORATE PERSONNEL EXPENSHUMAN RESOURCES 2022 - 6670 18.53U S BANK CORPORATE TRAVEL/MEETINGSPUBLIC OUTREACH 2027 - 6200 552.23U S BANK CORPORATE OFFICE SUPPLIESENGINEERING 2029 - 4820 143.57U S BANK CORPORATE TRAVEL/MEETINGSENGINEERING - GRDWTR AGENCY 2029 - 6200 - 15W005 41.91U S BANK CORPORATE TRAVEL/MEETINGSENGINEERING 2029 - 6200 789.10U S BANK CORPORATE DUES/MEMB/CERTENGINEERING 2029 - 6250 283.00U S BANK CORPORATE SUPPLIESENGINEERING 2029 - 6520 15.00U S BANK CORPORATE SCADA UPGRENGINEERING - WATER STATION EN 2029 - 8763 - SCDW02 1,344.42U S BANK CORPORATE DIST.COMP SPPLISINFORMATION TECH - AMI SFTWR/HDWE 2037 - 4840 - 16W004 94.97U S BANK CORPORATE DIST.COMP SPPLISINFORMATION TECH 2037 - 4840 393.37U S BANK CORPORATE SERVICE CONTRACTINFORMATION TECH 2037 - 6030 234.00U S BANK CORPORATE TRAVEL/MEETINGSINFORMATION TECH 2037 - 6200 740.01U S BANK CORPORATE OFFICE SUPPLIESCUSTOMER SERVICE 2038 - 4820 41.84U S BANK CORPORATE TRAVEL/MEETINGSCUSTOMER SERVICE 2038 - 6200 320.39U S BANK CORPORATE TRAVEL/MEETINGSFINANCE 2039 - 6200 484.00U S BANK CORPORATE THERESA - Theresa Sherman BK: Payment of Claims Report (With RV) V2 <1.03> Current Date:01/24/2018 Current Time: Page:11 18:25:08 User: Report:54 Description Acct# / Proj CodeDepartment / Proj Name TypeAmountVendor Name PAYMENT OF CLAIMS Check Num TRAVEL/MEETINGSFINANCE - FIRE 18 GR ADMN 2039 - 6200 - SMOK10 62.43U S BANK CORPORATE SUPPLIESFINANCE 2039 - 6520 9.50U S BANK CORPORATE Check Total:MWAP-0009791525,702.23 REBLD BLWR AB2OPERATIONS 1006 - 7540 21,558.53UNICO MECHANICAL CORP Check Total:MWAP-0009791621,558.53 WTR CONS EXPENSECUSTOMER SERVICE - WTR CONS PROG 2038 - 6660 - WCPROG 500.00VAN GORDEN, DOUG Check Total:MWAP-00097917500.00 UB SUSPENSEGEN & ADMIN 1000 - 2002 123.40VANO, DONNA UB SUSPENSEGEN & ADMIN 2000 - 2002 121.00VANO, DONNA Check Total:MWAP-00097918244.40 CONST RETAINAGEGEN & ADMIN - 2017 METERS PH3 2000 - 2605 - 16W003 133,063.82VINCIGUERRA CONSTRUCTION METERS PH 3ENGINEERING - 2017 METERS PH3 2029 - 8760 - 16W003 -11,355.26VINCIGUERRA CONSTRUCTION Check Total:MWAP-00097919121,708.56 PRIMARY EQUIPELECTRICAL SHOP 1003 - 6021 54.25WEDCO INC BUILDINGSELECTRICAL SHOP 1003 - 6041 18.37WEDCO INC SMALL TOOLSELECTRICAL SHOP 1003 - 6073 42.84WEDCO INC FLL VVS #3ENGINEERING - FLL VVS #3 1029 - 7036 - FLVVS3 267.59WEDCO INC Check Total:MWAP-00097920383.05 PUMP STATIONSPUMPS 1002 - 6051 46.87WESTERN NEVADA SUPPLY SECONDARY EQUIPHEAVY MAINT 1004 - 6022 178.61WESTERN NEVADA SUPPLY BOXES/LIDS/INVGEN & ADMIN 2000 - 0403 10,958.33WESTERN NEVADA SUPPLY VLVS ELB Ts FLNGGEN & ADMIN 2000 - 0404 3,532.30WESTERN NEVADA SUPPLY SADDLES FTNG INVGEN & ADMIN 2000 - 0407 1,019.32WESTERN NEVADA SUPPLY SM BRASS URWGEN & ADMIN 2000 - 0471 194.60WESTERN NEVADA SUPPLY PUMP STATIONSPUMPS 2002 - 6051 46.87WESTERN NEVADA SUPPLY BUILDINGSHEAVY MAINTENANC 2004 - 6041 355.58WESTERN NEVADA SUPPLY SERVICE CONTRACTCUSTOMER SERVICE 2038 - 6030 404.06WESTERN NEVADA SUPPLY Check Total:MWAP-0009792116,736.54 CONST RETAINAGEGEN & ADMIN - 2017 HYDRNT-SIER 2000 - 2605 - 17W001 -1,848.83WHITE ROCK CONSTRUCTION 2017 HYDRANTSENGINEERING - 2017 HYDRNT-SIER 2029 - 8860 - 17W001 36,976.55WHITE ROCK CONSTRUCTION Check Total:MWAP-0009792235,127.72 AUTOMOTIVEEQUIPMENT REP 1005 - 6011 243.95WINDSHIELD PROS OF TAHOE THERESA - Theresa Sherman BK: Payment of Claims Report (With RV) V2 <1.03> Current Date:01/24/2018 Current Time: Page:12 18:25:08 User: Report:55 Description Acct# / Proj CodeDepartment / Proj Name TypeAmountVendor Name PAYMENT OF CLAIMS Check Num Check Total:MWAP-00097923243.95 652,187.58Grand Total: THERESA - Theresa Sherman BK: Payment of Claims Report (With RV) V2 <1.03> Current Date:01/24/2018 Current Time: Page:13 18:25:08 User: Report: Less: reversed checks -378.00 Total: 652,565.58 56