Loading...
TK604-603South Tahoe Public Utility District Inspection report Date :Work Order :Pipe Segment Ref. :Weather :Surveyed By :Certificate Number : Year laid :Pre-cleaning :Pipe Joint Length :Direction :Total Length :Length Surveyed : WinCanVX Legacy Data // Page: 1 City :SLT Drainage Area :L29 Upstream MH :TK604 Street :JULIE Media Label :TAHOE KEYS Up Rim to Invert :6.1 Location Code :Easement/Right of way Flow Control :Not Controlled Downstream MH :TK603 Location Details :Sheet Number :Down Rim to Invert :7.6 Pipe shape:Circular Sewer Use: Pipe size:6 Sewer Category :SEC Pipe material:Asbestos Cement Purpose:Routine Assessment Lining Method :Owner : Additional Info : 1:2605 Distance Code Observation Counter Photo Grade 0.00 AMH Manhole / TK604 00:00:00 0.00 MWL Water Level 00:00:01 9.00 TF Tap Factory Made, at 03 o'clock, 4 inch dim 00:00:05 33.50 TF Tap Factory Made, at 03 o'clock, 4 inch dim 00:00:09 58.80 TB Tap Break-In, at 08 o'clock, 4 inch dim 00:00:13 99.70 TF Tap Factory Made, at 03 o'clock, 4 inch dim 00:00:18 156.20 TF Tap Factory Made, at 03 o'clock, 4 inch dim 00:00:26 199.90 TF Tap Factory Made, at 03 o'clock, 4 inch dim 00:00:32 237.40 TF Tap Factory Made, at 08 o'clock, 4 inch dim 00:00:36 324.40 H Hole, at 12 o'clock / POSSABLE HOLE WITH I&I 00:00:48 S3 324.40 AMH Manhole / TK603 00:01:06 11/5/2008 336403 Dry Francisco Avina U-508-6922 TK604-603 No Pre-Cleaning 0.0Downstream 345.1 345.1 QSR QMR SPR MPR OPR SPRI MPRI OPRI 3100 0000 3.0 0.0 3.0 0.0 3.03.0 TK604 South Tahoe Public Utility District Page 2 Section Pictures - 11/5/2008 - TK604-603 SLT JULIE 11/5/2008 TK604-603 444 , 00:00:48, 324.40 Hole, at 12 o'clock / POSSABLE HOLE WITH I&I , 00:00:48, 324.40 Hole, at 12 o'clock / POSSABLE HOLE WITH I&I City Street Date Pipe Segment Reference Nr.