TK604-603South Tahoe Public Utility District
Inspection report
Date :Work Order :Pipe Segment Ref. :Weather :Surveyed By :Certificate Number :
Year laid :Pre-cleaning :Pipe Joint Length :Direction :Total Length :Length Surveyed :
WinCanVX Legacy Data // Page: 1
City :SLT Drainage Area :L29 Upstream MH :TK604
Street :JULIE Media Label :TAHOE KEYS Up Rim to Invert :6.1
Location Code :Easement/Right of way Flow Control :Not Controlled Downstream MH :TK603
Location Details :Sheet Number :Down Rim to Invert :7.6
Pipe shape:Circular Sewer Use:
Pipe size:6 Sewer Category :SEC
Pipe material:Asbestos Cement Purpose:Routine Assessment
Lining Method :Owner :
Additional Info :
1:2605 Distance Code Observation Counter Photo Grade
0.00 AMH Manhole / TK604 00:00:00
0.00 MWL Water Level 00:00:01
9.00 TF Tap Factory Made, at 03 o'clock, 4 inch dim 00:00:05
33.50 TF Tap Factory Made, at 03 o'clock, 4 inch dim 00:00:09
58.80 TB Tap Break-In, at 08 o'clock, 4 inch dim 00:00:13
99.70 TF Tap Factory Made, at 03 o'clock, 4 inch dim 00:00:18
156.20 TF Tap Factory Made, at 03 o'clock, 4 inch dim 00:00:26
199.90 TF Tap Factory Made, at 03 o'clock, 4 inch dim 00:00:32
237.40 TF Tap Factory Made, at 08 o'clock, 4 inch dim 00:00:36
324.40 H Hole, at 12 o'clock / POSSABLE HOLE WITH I&I 00:00:48 S3
324.40 AMH Manhole / TK603 00:01:06
11/5/2008 336403 Dry Francisco Avina U-508-6922 TK604-603
No Pre-Cleaning 0.0Downstream 345.1 345.1
QSR QMR SPR MPR OPR SPRI MPRI OPRI
3100 0000 3.0 0.0 3.0 0.0 3.03.0
TK604
South Tahoe Public Utility District
Page 2
Section Pictures - 11/5/2008 - TK604-603
SLT JULIE 11/5/2008 TK604-603 444
, 00:00:48, 324.40
Hole, at 12 o'clock / POSSABLE HOLE WITH I&I
, 00:00:48, 324.40
Hole, at 12 o'clock / POSSABLE HOLE WITH I&I
City Street Date Pipe Segment Reference Nr.