Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
TK823-822
South Tahoe Public Utility District Inspection report Date :Work Order :Pipe Segment Ref. :Weather :Surveyed By :Certificate Number : Year laid :Pre-cleaning :Pipe Joint Length :Direction :Total Length :Length Surveyed : WinCanVX Legacy Data // Page: 1 City :SLT Drainage Area :K-29 Upstream MH :TK823 Street :D ST Media Label :SPECIAL PROJECTS Up Rim to Invert :0.0 Location Code :Light highway Flow Control :Not Controlled Downstream MH :TK822 Location Details :Sheet Number :Down Rim to Invert :0.0 Pipe shape:Circular Sewer Use: Pipe size:6 Sewer Category :SEC Pipe material:Polypropylene Purpose:Maintenance Related Lining Method :Owner : Additional Info : 1:1049 Distance Code Observation Counter Photo Grade 0.00 AMH Manhole / TK823 00:00:00 0.00 MWL Water Level 00:00:00 138.90 AMH Manhole / TK822 00:00:15 12/22/2014 01 Dry IV U-213-13107 TK823-822 Not Known 0.0Downstream 138.9 138.9 QSR QMR SPR MPR OPR SPRI MPRI OPRI 0000 0000 0.0 0.0 0.0 0.0 0.00.0 TK823