0024FILE
Application /0c, a/ , Permit (352_6,
Mr. 8. 2,
, an engineer from this office, will
make an inspection of the construction work and use of water under your
project to take water from Uvl ✓iciri•7 Pd' eree_Ic.
It is important that you be present at the time of the inspec-
tion or have a representative present who is familiar with the project
and who can supply all necessary information relative to your use of
water.
Mr.
will be at jou i2
on oTu e 4 7/ to make the inspection.
(Month)(Day)(Year)
STATE WATER RIGHTS BOARD
Original Form 18B (Postal Card) sent to://
75-44e �dr4dise G(%/z%r (C Com,
X 47 7
Ta -t oe
?4..c•& .cse (�� 9_573/
Date sent:
Mailed from:
Returned to:
SWRB
18B (4-66)