Loading...
0025•TE WATER RESOURCES CONTROL BOAR Division of Water Rights Application 18021 Permit 13526 To Water User: Water Code Section 1396 requires an applicant to exercise due diligence in de- veloping a water supply for beneficial use. The State Water Resources Control Board, in considering requests for extension of time for said development, will review the facts presented herein to determine whether there is a showing of good cause upon which to grant a reasonable extension of time to complete the project. Where diligence in completing the project is not fully substantiated, the Board may set the matter for hearing to determine the facts upon which to base formal action relating to the permit. Formal action may involve: (1) issuing a license for the amount of water heretofore placed to beneficial use under the terms of the permit. (2) Granting a reasonable extension•of time to complete construction work and/or full beneficial use of water. (3) Revoking the permit for failure to proceed with due diligence in completing the project. The time previously allowed within which to complete construction work and/or use of water has either expired or will expire shortly. Please indicate below the action which you desire taken on this permit: 1. The project has been abandoned and I request revocation of the permit. X Yes No 2. Full use of water has been made, both as to amount and as to season, and I request license be issued. X Yes No 3. The project is not yet complete and I request an extension, of time. X Yes No If an extension is requested, the remainder of this form should be completed in detail. PETITION FOR EXTENSION OF TIME* If start of construction work has been delayed, complete Items 1, 2, and 3. 1. What has been done since permit was issued toward commencing construction? 2. Estimated date construction work will begin 3. Reasons why construction work was not begun within the time allowed by the permit * A fee of zii5 must accompany this petition. WRCB 20C (Rev. 2-70) - 500 Page 1 0/C 1'3; fag E3,4- iv '(13A -2 - If construction work and/or use of water is proceeding but is not complete, an extension of time may be petitioned by completing the appropriate items below. Statements must be restricted to construction or use of water under this permit only. 4. A (1 -year), (2 -year), (3 -year) extension of time is requested to complete construction work and/or beneficial use of water. (Indi- cate period of time required.) 5. How much water has been used?. AF/year .25 cfs 6. How many acres have been irrigated? none 7. How many houses or people have been served water? 8. Extent of past use of water for any other purpose 402 fire hydrants over 575 houses 9. What construction work has been completed during the last extension? none 10. Approximate amount spent on project during last extension period. $ nominal 11. Estimated date construction work will be completed -- 12. Estimated year in which water will be fully used 13. Reasons why construction and/or use of water was not completed within time previously allowed: Date 71.76/7/ TAHOE PARADISE WATER AND GAS CO. Signature i laTiG.triVr - WRCB 20C (Rev. 2-70) - 500 Page 2