Loading...
2399STATE OF CALIFORNIA THE RESOURCES AGENCY STATE WATER RESOURCES CONTROL BOARD APPLICATION TO APPROPRIATE WATER Application No. 23t93 Filed November 7, '1969 - (Applicant must not fill in the above blanks.) (This application must be typewritten or legibly written in ink.) City of South Lake Tahoe Name of applicant at_3 _16 Nov l 3 16 PM '69 .3lATE WATER RESOURCES PM COWL/L. BOARD SAORAMEr4TO Post Office Box 1210 South Lake Tahoe California Address City or Town State do hereby make application for a permit to appropriate the following described unappropriated waters California, SUBJECT TO VESTED RIGHTS: 1. The name of the source at the point.of diversion: is__Lake `Tahoe If unnamed, state nature of source and that it is unnamed. tributary to_ Truckee River 95705 Zip Code of the State of 2. The amount of water which applicant desires to appropriate under this application is as follows: cubic feet per second (a) To be diverted directly to beneficial use 52.5 4011basipkgtday 16,000 gallons per day is approximately 0,027 cubic foot per second. Ute gallons: perday if leu, than 0.026 cd.a. to be diverted from Jannuary_l to December 31 of each year. Be ipniag dice . Closing date Total annual diversion of 19,000 acre-feet (b) To be stored and later applied to beneficial use acre-feet per, annum, to be collected between and_ of each season. Closing data • Beginning date If offstream storage is proposed, maximum rate of diversion to storage will NOTE.—Neither the amount nor the season may be increased after the application is filed. -If underground storage is proposed a special supple- mental form will be supplied by the State Water Resources Control Board upon request. 3. The use to which the water is to be applied is municipal purposes. - - —Domestic, irrigation, power, municipe mining, industrial. recreational, stockwatering, Bab culture, etc.. Describe more fully in paragraphs 11. 14. 11. 16 end/or 17. _ ® 4. The points of diversion or rediversion are to be located as follows: �. List all points giving coordinate distances or bearing and 1 distance from section corner or quarter section corner 40 -acre subdivision ofBase public land survey or projection thereof Section Town - ship Range and Meridian 4,000 feet west and 1,600 feet south of northeast corner, Sec. 27, T13N, R18E SW1 of NW y4 27 13N 18E MDB&l\ 2,000 feet north and 2,300 feet west southeast Berner Se -c_ 32_ T13N, RISE NW % of SE y4 32 13N 18E MDB&IN 468 feet northeast Lot3w4i 5 12N 18E MDB&P v.1, caot of corner, Sec. 5, T12N, R18E 1100 feet- Souk elPO39so -Feer Wes+ The points of diversion are located in El Dorado. County. 5. The main conduit will terminate in_ of Sec. ___, T.___________, R.__ State 40 -acre subdivision of public land survey or projection thereof. All three diversions by pumps directly to the distribution system. Description of Diversion Works Nora.—An application cannot be.approved for an amount grossly in excess of the estimated capacity of the diversion works. 6. Intake or headworks (complete only those blanks which apply) Complete (a) and/or (b) for direct diversion or diversion to offstream storage. (a) Diversion will be made by pumping from Lake Tahoe - + Sump, offset well, unobstructed channel. ate. (b) Diversion will be by gravity, the diverting dam being of overflow), ____ _—_______—______Meet 'long on top, and constructed of (c) Complete for storage reservoirs only _B. & M. feet in height (stream bed to level Concrete, earth, brush, etc. Height of dam, ft. (streambed to spillway level) Crest length of dam, ft. Freeboard above spillway level, ft. - Material of_ construction WRCB 1 (3.6 8) \ l: 1 1 7. Storage -Reservoirs Name, if any Sections flooded by reservoir. Also name 40 -acre subdivisions unliss shown on map Surface area, acres Capacity acre-feet Grade, feet per • 1,000 feet " Construction Materials: . earth, rock, concrete, plastic, etc. Unknown Approx.- 200' N/A Steel 24 Unknown Approx. 200' N/A Steel SHEETS.) For any reservoir having a capacity of 25 acre-feet or more, complete the following: e Diameter of outlet pipe, inches Length of outlet pipe, feet Difference in elevation, spillway level to top of outlet pipe in reservoir, feet Fall in outlet pipe, feet Grade, feet per • 1,000 feet " Construction Materials: . earth, rock, concrete, plastic, etc. Unknown Approx.- 200' N/A Steel 24 Unknown Approx. 200' N/A Steel SHEETS.) 8. Conduit system (describe diversion conduits and main distribution conduits only) (a) Open channel ; ditch ; flume ; canal (check type to be used) Width of top at -water line, feet • Width it bottom, feet Depth of water, feet Length, ng feet ' Grade, feet per • 1,000 feet " Construction Materials: . earth, rock, concrete, plastic, etc. Unknown Approx.- 200' N/A Steel 24 Unknown Approx. 200' N/A Steel SHEETS.) b Pipeline ( ) Pi p ; sprinkler system -a • ; tunnel r< (check type to be used) Diameter, - inches • - - Length,, feet - a � -Pump lift, feet - Gravity fall intake to outlet, feet . , Construction Materials: steel, concrete, wood, etc. 24 ' - Unknown Approx.- 200' N/A Steel 24 Unknown Approx. 200' N/A Steel 24 Unknown Approx. 200' 9. (a) Estimated capacities of the pumping plants are °(b)-Eseiiriated capacities -of i:iie diversion conduits are (c) Estimated total cost of the diversion works proposed is Give only cost of intake, or headworks, pumps, storage reservoirs and main conduits. Completion Schedule 10. Construction work will begin on or before December 1 , 1972. N/A 17.5 c. f. s. __; uiuiown a $30Q,_009-00 Steel (a) (b) Construction work will be completed on or before December la 1973. (c) Water will becompletely applied to the proposed use on or before December 1� 1990. (d) If complete, state year of completion _- Description of. Proposed Use 11. Place of use Does applicant own the land where the water will be used? No Jointly? All joint owners should include their names as applicants and sign the application at bottom of page 4. If applicant does riot own land ;where the water will be used, give name and address of owner and state what arrangements have been made with him. Land owned by water users within City of South Lake Tahoe proposed service area. If area is unsurveyed state the location as if lines of the public land survey were projected. If space does'not permit listing all 40 -acre tracts, state sections, townships, and ranges and show detail on map. 40 -acre tract Section Township Range Base and Meridian If irrigation, state number of acres (SEE ATTACHED SHEETS.) y. -R a :9r1 k -,,y ,,, 2. 6l ATTACH EXTRA SHEETS HERE 12. Other rights. Describe all rights except other applications on file with the State Water Resources Control Board under which water is served to the above-named lands. Nature of Rights (riparian, appropriative, purchased water, etc.) Year of first use Use made in recent years including amount, if known Season of use Source of other supply -,p 13. Irrigation use. The total area to be irrigated is acres. Acreage of crops is as follows: Net acreage Rice acres; alfalfa acres; orchard acres; general crops acres; pasture acres. Care should be taken that the various statements of acreage are consistent with each other, with the statement in Paragraph 11 and with the map. The irrigation season will begin about___—__ ___________________________and end about Beginning date Closing date 14. Power use. The total fall to be utilized is feet. The maximum amount of water to be used through Difference between nozzle or draft tube water level end first free water surface above. the penstock is _______________cubic feet per second. The maximum theoretical horsepower capable of being generated by the works is . The use to which the power is to be applied is Second feet X fell _ 8.6 Por distribution and sale or private use, etc. The nature of the works by means of which power is to be developed is _____. The size Turbine, Pelton wheel, etc. of the nozzle to be used is inches. After use, the water will be discharged into in of Name of stream State 40 -acre subdivision 15. Municipal use. The name of the city or town to be served is South Lake Tahoe and environs having a present population of - IQ0,_0Q0 The estimated water requirement per capita per day during the month of maximum use is The estimated average daily consumption during the month of maximum use at the end of each five-year period until the full amount ipplied for is put to beneficial use is as follows: 1975 38.8 c. f, s. 1980 44.8 c.f. s . 1990 61.0cef.s. 16. Mining use. The name of the mining property to be served is Name of claim and the nature of the mine is Mineral to be extracted is The method of utilizing the Placer, lode, etc. water is______ The estimated ultimate water requirement for this project is__ will Cubic feet per second, gallon' per minute. State basis of estimate. ° The water will not be polluted by chemicals or otherwise. Explain nature of pollution, if any. After use the water will be discharged into in_, of Name of stream State 40 -acre subdivision Sec ,T ,R B.&M. 17. Uses other than those described in Paragraphs 13 through 16. The nature of the use proposed is Industrial, recreational, domestic, stockwatering, etc. State basis of determination of amount needed Number of persons, residences, area of domestic lawns and gardens, number and kind of stock, type of industrial use, and unit requirements. 3. s - 18. If the required maps are not filed with the application, state the reasons for not filing them Our engineers will require 60 days in which to prepare the filing_ map. I will need ___________6Q__________________ (days) (rtakttits9 within which to file the maps. 19. Does the applicant own the land at the proposed point of diversion?_______NO______. If not, give name and address of owner and state what steps have been taken to secure right of access. 20. What is the name of the post, office most used by those living near the proposed point of diversion? South Lk Tah_Q 21. What are the names and addresses of diverters of water from the source of supply downstream from the proposed point of diversion? 22. (a) Have you investigated the effect of the proposed appropriation on fish and wildlife? No (b) Have you consulted with' the'State Department of Fish and Game concerning this proposed appropriation) No (c) Will your proposed diversion or impoundment of water beneficially or adversely affect fish and wildlife? (d) State all data and information reasonably available to you or that can be obtained from the California Department of Fish and Game concerning the extent, if any, to which fish and wildlife would be affected by the appropriation. e (e) Describe any measures you propose to take for the protection of fish and wildlife in connection with the appropriation. Intakes will be adequately screened to prevent fish from entering pumps. Name of person filing application if other than applicant Correspondence about this application should be sent to: Name_ Address Signature of applicant(s) (Refer to Section 671 of the Board's regulations) Mr. mss. Mr. Mrs. Miss Telephone ohn Williams, City Manager The complete information needed for preparation of this application may be found in the Regulations and Information Pertaining to Appropriation of Water. If there is insufficient space for answers in the form, attach extra sheets at top of page 3 and cross reference. Send application in duplicate to the State Water Resources Control Board, Room 1140, Resources Building, 1416 Ninth Street, Sacramento, California 95814, and retain one copy for your files. 4. „di 21520-983 8-68 SM 0 OSP ATTACH EXTRA SHEETS HERE 12. Other rights. Describe all rights except other applications on file with the State Water Resources Control Board under which water is served to the above-named lands. Nature of Rights (riparian, appropriative, purchased water, etc.) Year of first use Use made in recent years including amount, if known Season of use Source of other supply 4 ' 13. Irrigation use. The total area to be irrigated is acres. Acreage of crops isas follows: Net acreage Rice acres; alfalfa acres; orchard acres; general crops acres; pasture acres. Care should be taken that the various statements of acreage are consistent with each other, with the statement in Paragraph 11 and with the map. The irrigation season will begin about__---_—_________ ___—_____ ________and end about_--- Beginning date. Closing date 14. Power use. The total fall to be utilized is feet. The maximum amount of water to be used through Difference between nozzle or draft tube water leveland first free water surface above. the penstock is _ cubic feet per second. The maximum theoretical horsepower capable of being generated by the works is _____ —__ —�__. The use to which the power is to be applied is Second feet X fall _ 1.1 For d 'bution and rale or private use, etc. The nature of the works by means of which power is fo be developed The size Turbine, Pelton wheel, etc. of the nozzle to be used is After use, the water will be discharged into .in of Name of stream State 40 -acre subdivision & M. 15. Municipal use. The name of the city or town to be served is South Lake Tahoe and environs having a present population of _100,_000 The estimated water requirement per capita per day during the month of maximum use is The estimated average daily consumption during the month of maximum use at the end of each five-year period until the full amount applied for is put to beneficial use is as follows: 1975 38.8 c. f. s. 1980 44.8 c. f, s. 1985________ 52.5 c. f. s. 1990 61.0 c. f. s, 16. Mining use. The name of the mining property to be served is Name of claim and the nature of the mine is Mineral to be extracted is The method of utilizing the Placer, lode, etc. water is – — The estimated ultimate water requirement for this project is Cubic feet per second, gallons per minute. State basis of estimate. will The water will not be polluted by chemicals or otherwise. Explain nature of pollution, if any. After use the water will be discharged into in of Name of stream Stam 40 -acro subdivision Sec ,T ,R , B.&M. 17. Uses other than those described in Paragraphs 13 through 16. The nature of the use proposed is Industrial, recreational, domestic, stockwatering, etc. State basis of determination of amount needed Number of persons, residences, area of domestic lawns and gardens, number and kind of stock, type of industrial use, and unit requirements. .- ,.sem•- f_1:� ._�°` f 18. If the required maps are not filed with the application, state the reasons for not filing them Our engineers will require 60 clays in which to prepare the filing map.. I will need 60 (days) (thith1tili) within which to file the maps. 19. Does the applicant own the land at the proposed point of diversion) No__. If not, give name and address of owner and state what steps have been taken to secure right of access. 20. What is the name of the post office most used by those living near the proposed point of diversion? South Lake Tahoe 21. What are the names and addresses of diverters of water from the source of supply downstream from the proposed point of diversion? 22. (a) Have you investigated the effect of the proposed appropriation on fish and wildlife) NO (b) 'Have you consulted wiih the `State Department of Fish and Game concerning this proposed appropriation? NO (c) Will your proposed diversion or impoundment of water beneficially or adversely affect fish and wildlife? (d) State all data arid information reasonably available to you or that can be obtained from the California Department of Fish and Game concerning the extent, if any, to which fish and wildlife would be affected by the appropriation. (e) Describe any measures you propose to take for the protection of fish and wildlife in connection with the appropriation. Intakes. will be adequately screened to_prevent fish from entering pumps. Name of person filing application if other than applicant Correspondence about this application should be sent to: Name Address Telephone Signature of applicant(s) (Refer to Section 671`of the Board's regulations) Mr. Mrs Miss John T. Williams, City Manager The complete information needed for preparation of this application may be found in the Regulations and Information Pertaining to Appropriation of Water. If there is insufficient space for answers in the form, _attach extra sheets at top of page 3 and cross reference. Send application in duplicate to the State Water Resources Control Board, Room 1140, Resources Building, 1416 Ninth Street, Sacramento, California 95814, and retain one copy for your files. 21520-969 9-69 9M Q OSP 4. 11. PLACE OF. .USE' Section Portion of 26. Partial 28 31 32 Portion of 34 35�r Portion of 1 23 Partial - 8 10, Por` tion ' of 12 _ ; 13,. -14 , 15 16 '17 18 19, 201 '-�_ 'Portion of 22 23 26` 27 28 29 30t Portion of 31 32` Portion of 33' 46 Portion of 9 Mount Diablo Base &. Township Range Meridian , (MDB & M) ) T13N R1 -8E _TV 11 TT t, 11 11 Il T11N b „ ,:t R18E t, a 71 ,1 1, 17 I1 ,1 ,1 r. n 1.1 ,1 '7 R18'E ,1 IT 17 • :7, '7 11 - 11 ,,1 f Zl Section Portion of 14 15 -16 17 Portion of 18 20 21- -22 23', Portion of 28 29 Partial- ,4 25 Mount Diablo, Base '& Range Meridian (MDB & M) Portion of 27 34 35 36' Partial 1 2 -Portion of 3 10 Partial 11. Partial 12. 13 14 Portion' of 15 Portion 'Of thisurVeYed.-- Section of 22 Portion of Unsurveyed Section of 23 Portion ot 24' 25 26 36