Loading...
2213I„ °ATE OF CALIFORNIA -RESOURCES AGENCY STATE WATER RESOURCES CONTROL BOARD DIVISION OF WATER RIGHTS, 77 Cadillac Drive, Sacramento, CA 95825 (916)•.924-2462 `N1 AY 2 0198x` Tahoe Paradise Water & Gas Company` P. n0. Box,11117 Tahoe Paradise, CA 95708 Gentlemen: PERMIT 1352_413528i 3528, 13529,13530 AND 14335 (APPLICATION 18030, 18031;`'18038, 1.8039 AND �1"96g6YJJPPER TRUCKEE RIVER IN ELDORADO COUNTY Your petitionfor an extension of time•has been received and will be filed in the file for the above permits. A petition for an extension of time was accepted on August 4, 1 The petition was Noticed in February 1976 resulting in three protests including the Pyramid Lake Paiute Tribe. The State Water Resources Control Board has. not acted on the petition because they are waiting on action on the Tahoe Basin Environmental Impact Report. Since we have a petition for an extension of time on file, your latest petition is not necessary and your $5 filing fee will be returned under separate cover. If you have any questions, please contact Rick Miner at (916) 924-2462. Sincerely, Or9g°sar�3 S!g::,ed ays Jim Pankratz, Chief Extension, Change and Compliance Unit State Water Resources Control Board DIVISION OF WATER RIGHTS 77 Cadillac Drive, Sacramento, CA 95825 (916) 920-6151 PVIOGRESS REPORT BY PERMITT OWNER OF RECORD: TAHOE PARADISE WATER & GAS COMPANY P O BOX 11117 TAHOE PARADISE• CALIF manws 95708 IF OWNER'S SOURCE: COYOTE CREEK PURPOSE: DOMESTIC EE FOR 1981 APPLICATION: 01962.9 NAME/ADDRESS/PHONE NO. IS WRONG OR MISSING, PERMIT: 014335 TELEPHONE NUMBER : (916 ) 577 _ 2622 PLEASE CORRECT. COUNTY: EL DORADO DIVERSION/STORAGE SEASON: ACRES/HP: JAN 01 TO DEC 31 /1 OCT 01 TO JUN 01 .0 AC AMOUNT: 2.330 CFS 104.0 AC—FT COMPLETE USE BY: 12/01/70 IMPORTANT! EVERY permit is issued subject to the conditions therein expressed. I have currently reviewed my permit: YES [x ] NO [ ]. I am complying with the conditions under which my permit has been issued: YES [ ] NO [x ]. Identify any noncompliance by permit term number under "Remarks" on reverse side. This report is important in providing the record of use needed in establishing your water right. It should be filled out carefully and returned promptly to the above address. THE PROJECT HAS BEEN ABANDONED AND I REQUEST REVOCATION OF THIS PERMIT: YES [ ] NO [x J. CONSTRUCTION WORK 1. Has construction work commenced? YES ( ] NO [ x]. Is construction completed? YES[ ] NO [ ]. 2. If incomplete, describe briefly the work done, including cost• 3. If not completed, give estimated date of completion • 4. What percent of construction work remains to be done? Explain: �-m T,. > (.S1 2 r^ t„)„ m., z � :c%:n USE OF WATER —4 C, C> z r v —4 Ca c.n 'tti 5. Has use of water commenced? YES [ ] NO PC Check appropriate box(es) below and explain how water was used. (a) [ ] Irrigation (b) [ ] Stockwatering (c) [ ] Industrial (g) [ ] Power generation Nature of use Installeo horsepower capacity sT Total acres irrigated Name of crops served and acreage of each (f) [ ] Recreational ' Number of animals Boating, fishing, water 'contact sports Domestic (h) [ ] Other Number of person% area of garden, lawn, etc. Municipal Approximate population 6. Amount of water used each month under this permit in gallons or acre-feet. (If not known, check months water was used.) Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. Total Annual L 7. Has use of water, both amount and season, been as great as you expect in any future year under this permit? YES [ ] NO [ ]. If "No", explain in "Remarks". 8. Has location of the intake, place of use, or type of use been changed? YES [ ] NO [ ]. Explain in "Remarks". 9. Did the source go dry? YES [ ] NO [ ]. If so, during what months? STORAGE PROJECTS ONLY N/A 10. Did your reservoir spill this year? YES [ ] NO[ ]. If not, how many feet below spillway vertically was the water level at maximum storage? Have you emptied the reservoir? YES [ ] NO [ ]. If not, how many feet below spillway vertically was it drawn down at end of season? WR•15 (8-80) 0128 1981 (REPORT CONTINUES ON REVERSE SIDE) PLEASE ANSWER ONLY THOSE QUESTIONS BELOW WHICH ARE APPLICABLE TO YOUR PROJECT. MUNICIPAL, COMMUNITY, OR SUBDIVISION PROJECTS ONLY CONSERVATION OF WATER 11. How many service connections to date? Total population served by the water system • 12. Estimated number of service connections under full use: 13. Are the connections individually metered; YES [ ] NO [ 1. 14. Do you plan to meter the connections? YES [ ] NO [ ]. When? 15. Sewage generated by those to whom you deliver water is disposed of by: Septic tanks and leach lines [ ]; Seepage pits [ 1; Central treatment plan [ 1 operated by ; Other [ ] (specify under "Remarks"). 16. Is water service provided to an area or subdivision including a recreational reservoir: YES [ 1 NO[ 1. 17. Name of area or subdivision so served: - 18. State surface area at maximum water level in recreational reservoir(s) referred to in 16. Identify surface area(s) by name of dam or reservoir: 19. What measures are you using or planning to reduce water losses in conveyance systems? (1) Seepage or leak detection program 1 1; (2) Lining canals [ 1; (3) Phreatophyte and aquatic vegetation control [ ];. (4) Other (describe in "Remarks") [ ]. 20. What measures are used to encourage consumers to conserve water in' agricultural use? (1) Program to encourage more efficient irrigation systems (sprinkler, drip, etc.), where applicable [ ]; (2) Return flow systems on individual farms [ ]; (3) Return flow system areawide [ ]; (4) Water pricing to encourage reduced use [ ]; (5) Charges for drainage of irrigated lands [ 1; (6) Other (describe in "Remarks") [ 1. 21. What measures are used to encourage municipal and industrial consumers to conserve water? (1) Regulations to control wasteful use [ ]; (2) Public education program on water conservation [ ]; (3) Pricing to encourage reduced use [ ]; (4) Assistance to industry in design of recycle systems [ 1; (5) Other (describe in "Remarks") [ ]. 22. What records are maintained on water use and conservation? (1) Loss rare from conveyance system [ '1; (2) Water use for major crops by each farm [ 1; (3) Other (describe in "Remarks") [ ]. 23. Describe any water conservation eftorts you may have started: 24. If credit toward beneficial use of water under this permit for water not used due to a conservation effort is claimed' under Water Code Section 1011, please show the amounts of water conserved (acre feet or mg.): WATER QUALITY AND WASTEWATER RECLAMATION 25, Describe methods you are using to minimize erosion and to prevent the entry of silt into surface waters: 26. After use; the water is (1) retained in reservoir [ ]; (2) discharged into a stream or lake [ ]; (3) discharged into settling ponds 1 1; (4) other [ ]. Describe 27. Does or will water being discharged contain waste materials? [ ] YES [ ] NO. (1) Domestic [ 1; (2) Municipal [ ]; (3) Industrial [ ]; (4) Agricultural [ ]; (5) Other [ 1. Describe• 28. Does or will water being discharged contain any specific material which is deleterious to fish and wildlife or which would impair the water for beneficial uses? [ ] Yes 1 1 No. Describe• TO THE EXTENT THE FOLLOWING QUESTIONS APPLY TO YOUR PERMIT, PLEASE ANSWER IN REMARKS SECTION BELOW. 29. Are you now or have you been using reclaimed water from a wastewater treatment facility or water polluted by waste to a degree which unreasonably affects such water for other beneficial uses? [ 1 Yes_ -[ X] No. If credit toward use under this water right through substitution of reclaimed or polluted water in lieu of appropriated water is claimed under Section 1010 of the Water Code, please show the amounts of reclaimed water used. 30. Are you now or have you been reclaiming or reusing any of the water appropriated under this right? [ ] Yes [ X] No. If Yes, please describe- - 31. What is present availability or current potential for using reclaimed water from a wastewater treatment plantor polluted water in place of theappropriated water to satisfy all or part of your water needs? 32. What is the current potential for reusing the appropriated water to satisfy part of your water needs? 33. If you produce reclaimed water, or polluted water, is there a potential for others to use it? REMARKS (Identify the item you are explaining. Additional pages may be attached.) See Page 3 9 A 1 declare under penalty of perjury that the information in this report is true to the best of my knowledge and belief. Dated: February 22nd, 1982 at Tahoe ,Paradise, ral i fnrni,9 TAHOE PAWATYMV WATER AND GAS CO. (State) Sign here:��/1.4..e PERMITTEE (OR AGENT OR DESIGNEE) i't! George C. Baron, Pres. PF ESS REPORT BY PERMITTEE - Pfa2 AFOCATION: 019629 PERMIT: 014335 - eA ,.E 3 REMARK L. ' • the Company filed a "Petition for Change i,, en" eho -J,multaa,eeusly filed a "Petition for Change of loc. The e petitions are the result of engineering studies to date and in collaboration with the ether utilities in said petitions. To provide water for domestic use of <•i ,mpams' potential customers based on presently subdivided l h7• ds t h.. total quantity of water in the permit is considered e^ senttiei. _ii' 10v 1971, the Company filed petition for extension of tine stat x Rights Branch had not acted on petitions cite in ,�r aarap one on page one. On June 18, 1973, a hearing was ttA kd h time both DWR Staff and Utility were instructed t' ^ eeheck 04 Fa eubmitted in evidence. A preliminary meeting www hh*ld, however the k aril mee+ r.g between Staff and Utility has not been ;geld. Co Any received letter of August 23, 1974, from State Water Rights °o„ 1 Boaid re: an EIR on subject applications. On or about September 3n, 1(04, Company requested 120 day extension tc prepare EIR, However, on checking Company files it has; been found that an FIR was presented as part of June 18, 1973, hearing. 31. Regulations of the State Department of Health Services prohibit use as potable water. Lahontan Water Quality Control Board prohibits use of reclaimed water for irrigation. 32. No possiblity. After use, water goes into South Tahoe'Public Utility District's sewage system. and cannot be used. See above. 33. After passing through South Tahoe Public Utility District's Reclamation Plant, water could be used for recharge if regulations were relaxed. 41) E -r • 5TATR WA1ir RESOUPOeS OONIROu p)?RQ MAI 13 J 27 Ph 8 OF WATER RIGHTS SACRAMENTO • • • VSTATE OF CALIFORNIA — RESOURCES AGENCY STATE WATER RESOURCES CONTROL BOARD DIVISION OF WATER RIGHTS 77 Cadillac Drive, Sacramento, CA 95825 (916) 920-6151 WATER USERS: Application 019629 Permit 014335 DMUND G. BROWN JR., Governor 'TATE wnrFR RESOU 84YP noN?Dg RGI. 9AR:r. o nrv.o a2 OP I''HTEf; r1Gry�5 S9cRAMENTO Water Code Section 1396 requires an applicant to exercise due diligence in developing a water supply for beneficial use. The State Water Resources Control Board, in considering requests for extension of time, will review the facts presented to determine whether there is good cause for granting an extension of time to complete the project. Where diligence in completing the project isnot fully substantiated, the Board may set the matter for hearing to determine the facts upon which to base formal action relating to the permit. Formal action may involve: 1. Revoking the permit for failure to proceed with due diligence in completing the project. 2. Issuing a license for the amount of water heretofore placed to beneficial use under the terms of the permit. 3. Granting a reasonable extension of time to complete construction work and/or full beneficial use of water. The time previously allowed in your permit within which to.complete construc- tion work and/or use of water has either expired or will expire shortly. Please check below the action you.wish taken on this permit. / / The project has been abandoned and I request revocation of the permit. Signature / / FUZZ use of water has been made, both as to amount and season, andI request license be issued. Signature /xx' The project is not yet complete. I request the Board's consideration of the following petition for an extension of time: PETITION FOR EXTENSION OF TIME If start of construction work has been delayed, complete items 1, 2, and 3. 1. What has been done sincepermit was issued toward commencing construction? NO WORK ACCOMPLISHED. 2. Estimated date construction work will begin UNKNOWN 3. Reasons why construction work was not begun within the time allowed by the permit SEE ATTACHMENT TO "PROGRESS REPORT BY PERMITTEE FOR 1981" If construction work and/or use of water is proceeding but is not complete, an extension of time may be petitioned by completing the appropriate items on reverse side. Statements must be restricted to construction or use of water only under this permit. ecam F.er WR 20C (6/81) 4. A year extension of time is requested to complete construction work and/or beneficial use of water. (Indicate period of time. -- Must be consistent with time frame allowed in "Guidelines for Considering Petitions for Extensions of Time"). 5. How much water has been. used? 6. How many acres'have been irrigated? of/year cfs 7. How many houses or people have been served water? 8. Extent of past use of water for any other purpose 9. What construction work has been completed during the last extension? 10. Approximate amount spent on project during last extension period is 11. Estimated date construction work will be completed 12. Estimated year in which.water.wi11, be fully used 13. Reasons why construction and/or use of water were not completed within time' previously allowed If the use of water is for municipal (including industrial) and irrigation supplies provided or regulated by public agencies and use of the water has • commenced, but additional time is needed to reach full use contempZatea the following information must be provided. 14. What water conservation measures arein effect or feasible within the place of use 15. How much water is being conserved or is it feasible to conserve using these conservation measures? acre-feet per annum. 16. How much water per capita is used during the maximum 30 -day period gpd. 1 dec.ea to unden penaety og pen juny that the above .c4 tAu.e and colvtec t to the best o g my Fznoweedg e and b e.P,i.eg . Dated S�lo , 19 2)._ at TAHOE PARADISE , California. NOTE: A $5 fee must accompany a petition for an extension of -time. TAHOE PARADISE WATER AND GAS CO. WR 20C (6/81) Permittee or Authorized Representative Georg . Baron .gnatUre -�� PRESIDE Title • t 9 l VW U g