1705• •
STATE WATER RESOURCES CONTROL BOARD
Division of Water Rights
Application I'OSQ Permit /3530
To Water User:
Water Code Section 1396 requires an applicant -to exercise due diligence in
developing a water supply for beneficial use. The State Water Resources Control
Board, in considering requests for extension of time for said development, will
review the facts presented hdrein to determine whether there is a showing of.
good cause upon which to grant a reasonable extension of time to complete the
project. Where diligence in completing the project is not fully substantiated,
the Board may set the matter for hearing to determine the facts upon which to
base formal action relating to the permit.. Said formal action may involve:
(1) issuing a license for the amount of water heretofore placed to
beneficial use under the terms of the permit
(2) granting a reasonable extension of.time to complete construction
work and/or full beneficial use of water
(3)
ordering revocation of the permit for failure to proceed with due
diligence in completing.the project.
If the full amount of water -allowed by the permit has been used, or -if you
consider the project substantially complete, you should. not.petitiori for exten-
sion of time, but should request that a license be issued. A license is the
final confirmation of the water right.
PETITION FOR EXTENSION OF TIME*
If start of construction work has been delayed, complete Items 1, 2, and 3.
1. What has been done since permit was issued toward commencing
• construction?
none
2. Estimated date construction work -will begin Fall,, 1971
3. Reasons why construction work was not begun within the time
allowed by the permit Company not successful in acquiring land
at formerly. proposed point of diversion and storage area. There
is not enough stream flow at time when maximum demand occurs.
*A fee of 5 must accompany this petition.
WRCB 20C (Rev. 7-69) - 200
gze twc
'8y-1'
AUG q 9 46 AM 971
STATE WATER RESOURCES
CONTROL BOARD
SACRAMENTO
c.SJ �_ `tom;
• •
• •
-2-
If construction work and/or use of water is proceeding but is not complete,
an extension of time may be petitioned by completing the appropriate items
below.. Statements must be restricted to construction or use of water under
this permit only.
4. A (1 -year), (2 -year), (3 -year) extension of time is requested to
complete.construction work and/or beneficial use of water. (Indira''
tate period of time required.) 2 -year
5. How much water has been used?
none
6. How many acres have been irrigated? hone
AF/year
cfs
7. How many houses or people have been served water? none
8. Extent of past use of water for any other purpose none
9. What construction work has been completed during the last extension?
none
10. Estimated date construction work will be completed December 31, 1972
11. F Lrnated,year in which water will be fully used 1975
12. Reasons why construction and/or use of water was not completed within
time previously allowed: As stated in 3 above, Company is unable to
acquire siies.as proposed under application and the stream flow is too
low to provide full beneficial use when customer demand load is highest.
Service area indicates increase of potential customers.
The Company now has on file a petition for change in place of use
and point of diversion, as shown on the attached•map. This point is in
Lake Tahoe, thereby eliminating costly storage works and possible algal
blooms due to shallow water and nutrient concentration.
e of any urther has a letter o in en wi ngora a er o. and
Tahoe Keys Water Co. for a cooperative agreement on diversion, place of
use, pumping and transmission.
T.o,#a.E At40/.s 4r 440 me Q' Gas Ce.
Signature B
Kw. osto.e►nrr-
WRCB 20C (Rev. 7-69) - 200