Loading...
0892STATE WATER RESOURCES CONTROL BOARD Division of Water Rights Application /8o 3 / Permit / 3 S2? To Water User: Water Code Section 1396 requires an applicant to exercise due diligence in developing a water supply for beneficial use. The State Water Resources Control Board, in considering requests for extension of time for said development, will review the facts presented herein to determine whether there is a showing of good cause upon which to grant a reasonable extension of time to complete the project. Where diligence in completing the project is not fully substantiated, the Board may set the matter for hearing to determine the facts upon which to base formal action relating to the permit. Said formal action may involve:' (1) issuing a license for the amount of water heretofore placed to beneficial use under the terms of the permit (2) granting a reasonable extension of time to complete construction work and/or full beneficial use of water ordering revocation of the permit for failure to proceed with due diligence in completing the project. (3) If the full amount of water allowed by the permit has been used, or•if you consider the project substantially complete, you should,not petition for exten- sion of time, but should request that a license be issued. A license is the final confirmation of the water right. PETITION FOR EXTENSION OF TIME* If start of construction work has been delayed, complete Items 1, 2, and 3. 1. What has been done since permit was issued toward commencing construction? none 2. Estimated date construction work will begin Fait, 1971 3. Reasons why construction work was not begun within the time allowed by the permit Company not successful in acquiringAAland n9 at formerly proposed point of diversion,' 1. There is not enough stream flow -at -time when maximum demand occurs. *A fee of $5 must accompany this petition. WRCB 20C (Rev. 7-69) - 200 £4e P-4-7/ -2 - If construction work and/or use of water is proceeding but is not complete, an extension of time may be petitioned by completing the appropriate items below. Statements must be restricted to construction or use of water under this permit only. 4+. A (1 -year), (2 -year), (3 -year) extension of time is requested to complete construction work and/or beneficial use of water. (Indi- cate period of time required.) 2 -year 5. How much water has been used? none AF/year cfs 6. How many acres have been irrigated? none 7. How many houses or people have been served water? none 8. Extent of past use of water for any other purpose none 9. What construction work has been completed during the last extension? none 10. Estimated date construction work will be completed December 31 1972 11. EhtLmated year in which water will be fully used 1975 12. Reasons why construction and/or use of water was not completed within time previously allowed: As stated in 3 above, Company is unable to acquire sites as proposed under application and the stream flow is too • low to provide full beneficial use when customer demand load is highest. Service area indicates increase of potential customers. The Company now has on file a petition for change in place of use and point of diversion, as shown on the attached map. This point is in Lake Tahoe, thereby eliminating costly storage works and possible algal blooms due to shallow water and nutrient concentrating. The Company further has a letter of intent with Angora Water Co. and Tahoe Keys Water Co. for a cooperative agreement on diversion, place of use, pumping and transmission. T..,,ssos %�i�,P,4isc- vim@ t G,ks moo. Date_ /30/7/ Signature 4% ..ea 02_ Ms,a s e1-- WRCB 20C (Rev. 7-69) - 200