Loading...
1288STATE WATER RESOURCES CONTROL BOAR' Division of Water Rights: Application / .3q5 'Permit /3S2,..? To Water User: Water Code Section 1396 requires'.an applicant to exercise due diligence in developing a water supply for,beneficial use. The State Water Resources Control Board, in considering requests` for extension of time for said development, will review. the facts presented herein to determine whether there is a showing of good cause upon; which to grant .a reasonable extension of time to complete the project. Where diligence in:completing the project is not fully substantiated, the. Board may set the matter for hearing to determine the facts upon which to base formal action relating to the permit. Said formal action may involve:' (1) issuing a'license.for the amount of water heretofore placed to beneficial use under the terms of the permit (2) granting a reasonable extension of tine to complete construction • work and/or ,full beneficial use of water; (3).ordering revocation of the permit for failure to proceed with due diligence in completing.the project. If the full amount of water allowed. by the permit has been used, or if you consider the project substantially complete, you should.notpetition for exten- sion of time, but should request that a license be issued. A license is the final confirmation of the water right. • . PETITION FOR. EXTENSION. OF TIME* If start of constructionwork has been delayed, complete Items 1, 2, and 3. 1. What has been done since.permit was issued toward commencing , construction? none 2. Estimated date construction work will begin Fall, 1971 3. • Reasons why construction work was not:begun within the time allowed by the permit Company not successful in acquiring'land • . at formerly proposed point of diversion and storage area. There is not enough stream flow at time when maximum demand occurs. *A fee of $5 must accompany this petition. WRCB 20C (Rev. 7-69) - 200 �72A IOL 89-9-Y-71 lin LI 9.46 AM '7! • STATE WATER RESOURCES CONTROL BOARD 4. SACRAMENTO .41 , • -2 - If construction work and/or use of water is proceeding but, is not complete, an extension of time may be petitioned by completing the appropriate items below. Statements must be restricted to construction or use of water under this permit only. 4. A.(1 -year), (2-year),:(3-year),extensionof-tine is:requested'to complete construction work'and/or beneficial use of water.' (Indi- cate period of time required.) 2 -year .5. How much water has been used? none. AF/year cfs 6. How many acres have been irrigated? none 7. How many houses or people have been served water? none. 8. Extent of past use of water.for any other purpose none 9. What construction work has been completed during the last extension? none 10. Estimated date construction work will be _completed December 31, 1972 11. Edimated.year in which water will be fully used 1975 12. Reasons .why construction and/or.use of water was not completed within time -previously allowed•.As stated in 3 above, Company is.unable to acquire sites as proposed under application and the stream flow is toolow to, provide full beneficial use when customer demand load is highest. Service. area indicates increase of potential customers. The Company now has on file a petition for change in place.o use and point of diversion, as shown on the attached map. This point is in Lake Tahoe, thereby eliminating costly storage works and possible algal blooms due to shallow water and nutrient concentration. The Company Tahoe Keys Water use, pumping and Date 7/.30,'7 f further has a letter of intent with Angora Water Co. and Co. for a cooperative agreement on diversion, place of transmission. . WRCB 20C (Rev. 7-69). - 200 Signature 77i/A06- rE,e f GA, ce !� 2, ps, APAPV