Loading...
1105Retum completed Report to: STATE WATER RESOURCES CONTROL BOARD DIVISION OF WATER RIGHTS P.O. Box 2000 SACRAMENTO, CA 95812-2000 For assistance completing this Report, call: (916) 341-5300 FAX (916) 341-5400 _ u 111111 PROGRESS REPORT BY PERMITTEE FOR 2007 OWNER(S) OF RECORD: If the owner information below is wrong or missing, please correct. SOUTH TAHOE PUBLIC UTILITY DISTRICT PRIMARY CONTACT OR AGENT FOR MAIL & REPORTING: SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 MEADOW CREST DR SOUTH LAKE TAHOE, CA 96150 PERMIT SUMMARY NAME(S) OF SOURCES OF WATER (Up to first 4 sources listed) PARCEL NO UPPER TRUCKEE RIVER APPLICATION NO:A018031 PERMIT NO:013528 CONTACT PHONE NO:530-544-6474 r�1 COUNTY LOCATRN "4 ?: El Dore'dd? O SrV cD CID .72 w I III 0 11 MAX DIRECT DIVERSION RATE: 3 Cubic Feet per Second MAX COLLECTION TO STORAGE AMOUNT: 0 AC -FT WATER RIGHT FACE VALUE: 2,171.9 AC -FT PERMITTED USE(S) OF WATER ACRES DIRECT DIVERSION SEASON COLLECTION TO STORAGE SEASON• (First 4 uses displayed below) (AC) (month/day to month/day) (month/day to month/day) Domestic , 0.0 1/1 to 12/31 DATE BY WHICH PERMITEE SHALL COMPLETE THE AUTHORIZED PROJECT, INCLUDING COMPLIANCE WITH ALL PERMIT TERMS AND CONDITIONS, AND MAKE FULL BENEFICIAL USE OF WATER: 12/01/1970 COMPLIANCE WITH PERMIT TERMS AND CONDITIONS: This Report is important since it provides a record of your actual water use necessary to establish your water right as well as your compliance with the terms and conditions of your water right permit. The information requested below should be filled out carefully. This Report should be promptly retumed to the above address. 1. p4 YES [ ] NO I have currently reviewed my water right permit. 2. [ ]YES [ ] NO I am complying with all terms and conditions listed in the permit. Identify any noncompliance under "Remarks" on the reverse side. 3. [ 1 YES [ J NO I have changed the intake location, type(s) of use, and/or place of use authorized by the permit. If YES, explain under "Remarks" on reverse side. Note: A Change Petition & associated fees may be required for any significant changes to the permitted project. PERMITTED PROJECT STATUS: Califomia Water Code sections 1396 and 1397 requires a permittee(s) to exercise due diligence in developing an appropriative water right project so that the project is completed within the time period specified in the permit. CHECK ONE OF THE FOLLOWING CONCERNING YOUR WATER RIGHT PROJECT STATUS: 4. [ ] REVOCATION — The project has been abandoned and I request revocation of the permit. 5. [. ] PROJECT COMPLETE — The project has been completed. I have made full beneficial use of water as to the diversion rate, amount, and season specified in the permit and have complied with all terms and conditions. I am ready for (or have had) a licensing inspection by Division of Water Rights staff and request that a water right license be issued. 6. [f3ROJECT HAS NOT BEEN COMPLETED If the project has not been completed, please answer the following: a. [ ] YESNO Has construction work commenced? b. [ ] YES , d NO Is construction completed? c. [ 1 YES K NO Have the permitted beneficial uses of water commenced? d. [ 1 YES ())\ O Will the project be completed within the time period specified in the permit? e. f. Explain what work remains to be done: Give the estimated date of completion of the project, including maximizing beneficial use of water: Note: A time extension petition and associated fees may be required if the project is not completed within the time period specified in the permit. (Continues on reverse) PROGRESS REPORT BY PERMITTEE — PAGE 1 BENEFICIAL USE(S) OF WATER: (Note: See reverse side for a summary of the beneficial uses of water authorized under your permit) 7. If your use of water has commenced, check the appropriate boxes below and explain how the water was used: a.. [ ] Irrigation b. [ ] Frost Protection c. [ ] Heat Control d. [ ] Industrial e. [ ] Stockwatering Acres Acres Acres Specify f. [ J Municipal g. [ J Domestic Approximate population No. of persons, lawn/garden area, etc. h. [ ] Power Generation i. [ ] Recreational j. [ ] Other Installed capacity in kW, MW, or hp Boating, fishing, water contact sports No. & type of animals AMOUNT OF WATER USED: Please report only the amounts diverted and beneficially used under this permit. 8. Amount of water used each month under this permit in [ ] gallons or ( 1 acre-feet: Specify Jan Feb Mar Apr May • Jun Jul Aug Sep Oct Nov Dec Total Annual STORAGE PROJECTS ONLY: (Note: Up to 5 reservoirs may be covered under a single permit. Refer to your permit for the actual number covered.) 9. Complete for long-term storage projects only: a. [ ] YES [ ] NO Did your reservoir(s) spill this year? If No, how many feet below the spillway vertically was the water level(s) at maximum storage? b. [ ] YES [ ] NO Have you emptied the reservoir(s)? If No, how many feet below the spillway vertically was the water level (s) at minimum storage? PLEASE ANSWER ONLY THOSE QUESTIONS BELOW WHICH ARE APPLICABLE TO YOUR WATER RIGHT PROJECT. (Please note that future amendments to the claims below will not be accepted.) An appropriative water right can be reduced or revoked through five continuous years of nonuse. However, the Califomia Water Code specifies that under certain conditions no reduction or loss of the appropriative water right shall occur due to: (a) water conservation efforts; (b) use of recycled, desalinated, or polluted water; and/or (c) conjunctive use of groundwater and surface water. You must report the extent and amount of water claimed for credit below. Failure to report the amounts will deprive you of the benefits allowed under the Water Code sections. CONSERVATION OF WATER: (Water Code section 1011) 10. [ ] YES [ ] NO During the period covered by this Report, were you implementing any water conservation efforts? If YES, please describe: 11. If YES and you want to claim credit for the amount of water conserved towards the water use authorized under your permit as allowed under Water Code section 1011, please show the amount of water conserved below: (specify the amount in acre-feet or million gallons) Future amendments to this claim will not be accepted. WATER QUALITY AND WASTEWATER RECLAMATION: (Water Code section 1010) 12. [ ] YES [ ] NO During the period covered by this Report, did you use reclaimed water from a wastewater treatment facility, water from a desalination facility, or water polluted by waste to a degree which unreasonably affects the water for other beneficial uses? 13. If YES and you want to claim credit for the substitution of this reclaimed, desalinated, or polluted water in lieu of the surface water authorized under your permit as allowed by Water Code section 1010, please show the amount of reclaimed, desalinated, or polluted water used below: (specify the amount in acre-feet or million gallons) Future amendments to this claim will not be accepted. CONJUNCTIVE USE OF GROUNDWATER AND SURFACE WATER: (Water Code section 1011.5) 14. YES [ ] NO During the period covered by this Report, were you using groundwater in lieu of the surface water authorized under your permit? 15. If YES and you want to claim credit for the groundwater used in lieu of the surface water authorized under your permit as allowed under Water Code section 1011.5, please show the amount of groundwater used below: (specify the amount in acre-feet or million gallons) Future amendments to this claim will not be accepted. REMARKS: (Identify the item you are explaining; additional pages may be attached.) I declare under enalty of perjury that th information in this report is true to the best of my knowledge and belief: Signature: Date: (/! Phone No: lc -0 ) S j! �— -6o.57 MI EE (OR AGEN / DESIGNEE) • 4/2008 PROGRESS REPORT BY PERMITTEE – PAGE 2 A018031