1117Retum completed Report to: E WATER RESOURCES CONTROL BOARD
o' DIVISION OF WATER RIGHTS
P.O. Box 2000
SACRAMENTO, CA 95812-2000
For assistance completing this Report, call: (916) 341-5300 FAX (916) 341-5400
PROGRESS REPORT BY PERMITTEE FOR
OWNER(S) OF RECORD: If the owner information below is wrong or missing, please correct
SOUTH TAHOE PUBLIC UTILITY DISTRICT;
1,111111111,11111,12 (
PRIMARY CONTACT OR AGENT FOR MNL 8 REPORTING:
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 MEADOW CREST DR
SOUTH LAKE TAHOE, CA 96150
PERMIT SUMMARY
NAME(S) OF SOURCES OF WATER (Up to first 4 sources listed) PARCEL NO
UPPER TRUCKEE RIVER
MAX DIRECT DIVERSION RATE: 3 CFS
[Cubic feet per second (CFS) or Gallons per day(GPD)]
PERMITTED USE(S) OF WATER
(First 4 uses displayed below)
Domestic
ACRES
(AC)
0 AC
2004
APPLICATION NO.: A018031
PERMIT NO.: 013528
. CONTACT PHONE NO.: (530)544-6474
v;r ;
COUNTY LOCATION
- r ,
El Dorado __1
(JD
ry
CD
110
ra
MAX COLLECTION TO STORAGE AMOUNT: AC -FT
[Total reservoir(s) storage volume in acre-feet (AC -FT)]
DIRECT DIVERSION SEASON
(month/day to month/day)
01/01 - 12/31
COLLECTION TO STORAGE SEASON
(month/day to month/day)
DATE BY WHICH PERMITTEE SHALL COMPLETE THE AUTHORIZED PROJECT, INCLUDING
COMPLIANCE WITH ALL PERMIT TERMS AND CONDITIONS, AND MAKE FULL BENEFICIAL USE OF WATER:
12/01/1970
COMPLIANCE WITH PERMIT TERMS AND CONDITIONS: This Report is important since it provides a record of your actual water use necessary to
establish your water right as well as your compliance with the terms and conditions of your water right permit. The information requested below should
be filled out carefully. This Report should be promptly returned to the above address.
1. [XI YES [ ] NO I have currently reviewed my water right permit.
2. [)[ YES [ ] NO I am complying with all terms and conditions listed in the permit. Identify any noncompliance under "Remarks" on the reverse side.
3. [ ] YES [)-4: NO I have changed the intake location, type(s) of use, and/or place of use authorized by the permit. If YES, explain under "Remarks"
on reverse side. Note: A Change Petition & associated fees may be required for any significant changes to the permitted project.
PERMITTED PROJECT STATUS: California Water Code sections 1396 and 1397 requires a permittee(s) to exercise due diligence in developing an
appropriative water right project so that the project is completed within the time period specified in the permit. Time extensions may be authorized for
good cause.
CHECK ONE OF THE FOLLOWING CONCERNING YOUR WATER RIGHT PROJECT STATUS:
4. [ ] REVOCATION — The project has been abandoned and I request revocation of the permit.
5. [ ] PROJECT COMPLETE — The project has been completed. I have made full beneficial use of water as to the diversion rate, amount, and
season specified in the permit and have complied with all terms and conditions. I am ready for (or have had) a licensing inspection by Division
of Water Rights staff and request that a water right license be issued.
6. [A
a.
b.
c.
d.
e.
PROJECT HAS NOT BEEN COMPLETED
If the project has not been completed, please answer the following:
[ ] YES [X NO Has construction work commenced?
[ ] YES [g NO Is construction completed?
[ ] YES [X NO Have the permitted beneficial uses of water commenced?
[ ] YES [>1 NO Will the project be completed within the time period specified in the permit?
Explain what work remains to be done: Al 1 work
11
f. Give the estimated date of completion of the project, including maximizing beneficial use of water:[/ben the Truckee River Operating
Note: A time extension petition and associated fees may be required if the project is not completed within the time period specified in the
permit.
Agreement is signed
(Continues on reverse) PROGRESS REPORT BY PERMITTEE — PAGE 1
Z BOVd — 3311IW213d A81210d32i SS321J02 v gOZ/Z
(33N0193a /1N30 33111W213d
1iL179 • tits ( o s ) :oN auogdSOOZ '81 qOae.Walea �,vw :amleu6ls
yayaq pue a5palmowl,iw jo ;say ay; oj ani; s/ podaj sly; u/ uolethJOJu! a[l;;ey;]Anpa jo uad Japun &Jell&
p l
squautppq.a.u. aas
(•paLoe)le aq Aew sa6ed Ieuoglppe :6ululeldxa ale no)( wa)l a4) A;lluapl) :SNHVW321
•paldaooe aq lou gum wlep s141 o; sluawpuawe &mind (suolle6 uollllw JO )ea; -aloe u1)unowe a4) pads)
:Molaq pasn Ja)empunoJ6;o )unowe a43 Moos aseald 'g 1 1.01 uogoas apo0
JaleM Japun paMolle se 11wJ&d Jno/( Japun pazuo4Ine JaleM aoepns a43;o nag ul pasn JalempunoJ6 ayl Jo; pan pep of lueM no, pue S3A;I •si,
awiad Jno/( Japun pazuo43ne Ja)em aoepns a43;O nag ul JalempunoJ6 6ulsn nog( aJaM 'podad s14; Aq paJanoo pouad a43 6uuna ON [ 1 S3A : [X] 171.
(s•1101 uolloes apo& JeleM) 2131VM 30VdanS aNV 2131VMaNl02IO 30 3Sn 3AI10NnfNO3
•pa)daooe aq jou g!M wlep sly) of sluewpuawe einlnd (suolle6 uollllw JO )aa; -&Joe LI! )unowe ayl Aloads)
:Molaq pasn JaleM palnllod JO 'pa)eullesep 'pawlepej;o lunowe a43 Moos aseald '0101 uogoas apo& Ja)ew Aq paMolle se 11wjad JnoA
Japun pazuo43ne Ja;eM aoe}jns a4);0 nag ul Ja)eM palnllod Jo 'paleullesap 'pawleloaJ slyljo uognp sgns NT Jo; pan wlelo of IueM noi( pue S3A 11 E L
;,sesn lepgauaq Jaylo Jo; JaleM ay; sloalle blgeuoseaJun 4o14M aaJ6ap e of alseM Aq paingod JaleM J0 '/p!I!oe; uogeugesep
e w0J; JaleM 'AuIIoe; luawleaJl JaleMalseM a WOJJ Ja)eM pawlepaJ asn nog( pip '1Joda23 sly) Aq piano° pouad a43 6uuna ON [ ] s3A 1C] 'Z l
(0L0L uogoes opo Je1eM) :NOIIVWV1332I 2131VM31SVM aNV JllliVnb 2131VM
•paldaooe aq lou IIIM wlelo sly) 0l s1uawpuawe aJn)nd (suolle6 uogllw JO )ea;-eJOe ul )unowe ay) /1pads)
V/N
:MOIeq panJaS000 Ja1eM;O 1unowe ay) Mo4S aseald ' I 1 n 1 uo' arnn i�•r. r ,
Japun.paMolle se Huuad moi( Japun pazuo4)ne asn JaleM ayl spJeMo) panJasuoo Ja)eM;o )unowe ay) Jo; pan wlelo o) 11J8M nolo pue 531 11 •11.
:aquosap aseald 'S3A111 gspoja uogeAJasuoo Ja12M Aue 6uguawaidwl nog( aJaM 'poda21 sly) i(q paJanoo po!Jed eqj 6uunCI ON I. 1 Sax 141 •01
(L 1.01. uolloas apo0 Jelem) :2131VM 30 NOI1VA213SN00
•suopoas apo0 Ja;enn ay; Japun pamoge spjauaq ay; jo nog' anudap !gm s;unowe ay; podai o; aJnlled xMol°q;lpaJo
Joj pawlep JaleM jo;unowe pue;ua;xa ay; padaJ;snw no, •JeleM aoeppns pue Ja;empun0J5 jo asn angounfuoo (o) Jo/pue :Ja;eM pa;npod Jo 'pa;euyes ep
'pepfoai jo asn (q) 'spoil° uopenJasuoo Ja;eM (e) :01 enp Jn000 I/eys;q&u Ja;eM angeudcudde ay; jo sso/ Jo uogonpej ou suoglpuoo ulepao Japun
ley; sayloeds apo& Ja1enn elwojlle0 ay; 'JenaMoH •asnuou /o siea t snonuguoo any y5nojy; pa4onei JO paonpai eq ueo;y6u JO eM engeudoJdde uv
(pa;deooe aq ;ou ;pm mo/eq swlelo ay; o; spuewpuewe amity ley; a;ou aseald)
•103rodd 1HJI21 2131VM 21nOA 01 318V3IlddV 321V HOIHM M0138 SNOIIS3n0 3SOH1 AlN0 2I3MSNV 3SV31d
ta6eJo1s wnwlulw le (s) lana) J91eM aqi sem i(IleogJan i(eMlnds eqj Moleq )aa; Auew Moo 'oN 11
L(s)JlonMasaJ a43 pagdwa no C aneH ON [ ] s3J( [ 1 •q
6a6eJo1s wnwlxew 12 (s)Ianal Ja)eM eqi sem AIleo!pan Aemlllds ay) Molaq 1aa; i(uew Moo 'oN 11
ZJea�( s141 Inds (s)Jlo&JaseJ Jnol( P!a ON 11 S3A 11 'e
:�fluo s;oafojd e5eJo;s wja;-6uol Joj a;aldwo0 •6
(•paianoo Jagwnu lenge ay; Jo{;lwJed Jnoit o; Japel 'pulled al5uls e Japun paianoo eq I(ew sJlotuasai g o; do :010N) :Al NO S1031 -021d 30Vu018
IenuuV IelO1 .
oaa'
A0N
100.
des
BnV
1n(
unr
J(eLeg
JdV .
JEW
qad
)(pads
sijods l0e)uo0 Ja1eM '6ulysg '6ugeo8
uer
aaa; &Joe [ ] Jo suolle6 [ ] ul )IUJJad sly) Japun U3uow goee pasn 191eM;o IunowV •g
:03Sn 2131VM 3O 1Nn0WV
18 410 [ ] • [
IeuogeeJoa23 [ ] .l
dq Jo 'MW 'Am U! Alloedeo paIIelsui
uogeJauaO JaMod [ ] y
•o)a 'ewe uap1e6/uMel 'suosJad;o •ON
Ogsawoa [ 1 '6
uogelndod alewlxoJddV
IedplunW [ ] •1
SIewIUe;o ad/CI g •°N
)loads
sant(
soJOV
saJoV
6uualeMmools
Ieuisnpul
lOJIuoa;r•i;
uogoa)oJd ISOJd
uoge6!JJl
[ 1 •a
[ 1 •p
:pasn sem JaleM a41 Moy uleldxa pue Mo1eq saxoq ale!JdoJdde ay) )loa10 'paouawwoo sey JaleM;o asn Jnoi(11 L
(7lwJad _molt Japun pazuoy;ne Ja;eM;o sasn lepyauaq ay; JO i(Jewwns a J0J apls assanaJ eaS :aloN) :2131VM 40 (s)3Sn 1VI0133N38
ATTACHMENT A
This is one of five related water rights applications:
A 18030 P 13527
A 18031 - P 13528
A 18038 P 13529
A 18039 P 13530
A 19629 P 14335
These permits are now held by the South Tahoe Public Utility District. Its predecessor,
Tahoe -Paradise Water Company, Inc., filed various petitions in 1970 and 1971 for
extensions of time to put water to beneficial use and for changes in place and purpose
of use for these permits. Those petitions are still pending.
South Tahoe Public Utility District anticipates that these pending petitions will eventually
be acted upon by the State Water Resources Control Board. South Tahoe Public Utility
District intends to made reasonable and beneficial use of water pursuant to these
permits at such time as these pending petitions are granted.
ATTACHMENT B
This project has not been completed because water rights applications have
been frozen until the Truckee River Operating Agreement is completed and
signed.