Loading...
1151FILE IN DUPLICATE (For full information concerning the filling out of this form refer to) `Article 4 of Rules and Regulations Pertaining to Appropriation of Water STATE OF CALIFORNIA—STATE WATER RIGHTS BOARD Application No. 18031: Filed`_" ...,.:March 6, 1958, at 4:19 . P. M. . (Applicant mutt not fill in the above blanks) APPLICATION TO -APPROPRIATE UNAPPROPRIATED WATER notice of Assignment Myer) Meyers Water Company Name of applicant or applicants I,. _ of lie_yere Address State of__________Cliforni . County of______ Dor-_ , do hereby make application for a permit to appropriate the following described unappropriated waters of the State of California, SUBJECT TO VESTED RIGHTS: Source, Amount, Use and Location of Diversion Works 1. The source of the proposed appropriation is Upper Truckee River Give name of stream, lake, etc., if named; if unnamed state nature of source and that it it unnamed. located in El Dorado County, tributary to Lake Tahoe 2. The amount of water which applicant desires to appropriate under this application is as follows: (a) For diversion to be directly applied to beneficial use 3:04 - cubic feet per 1 cubic foot per second equals 40 statute miner's inches or 646,317 gallons per day second, to be diverted om_: ______ Jant]ary__1 ` - to, _D e_elb?er_ .3L of each year. Beginning date Closing date • (b) For diversion to be stored and later applied to beneficial use_ _acre-feet aero -foot equals 121,111 gallons per annum, to be collected between and ____—___—_---- ______,____•_---- _--- _ ._______of each season. • Noce. -Answer (a) orJ(b) or both (a) an .(b) as'niay be necessary. If amount under (a) is less than .025 cubic foot per'second, state in gallons per day. Neither the amount nor the season may be increased after application is filed. If underground storage is proposeda special -supplemental form will be supplied by the State Water Rights Board upon request. - ' 3. The use to which the water is to be applied is Domestic • • ' Domestic, irrigation, power, municipal, mining, ind I, recreational purposes. . 4. The point of diversion is to be located S58° 55' W 1320.00 feet .from NE corner of Section 31, State bearing and distance or coordinate'diatancea from section or, quarter section. corner. ; ___2121i,__13,18E _MRA, • being within the___.uu—Qf i • : :: State 40 -acre subdivision of public land survey or projection thereof - of Section____3.1 _____, .T.�l?..l�L ____, R:_�a8$ M•D• .B & M:, in the County, of El Dorado • 5. The main conduit terminates in of Sec: , '-)~ irR State 40 -acre subdivision of U. S. Government survey orprojectioti thereof- Description of Diversion -Works -. .B:&M. NOTE.—An application cannot be approved for an amount grossly in.excess of the estimated capacity of the diversion works. 6. Intake or Headworks (fill only those blanks which apply) t•-+ (a) Diversion will be made by um in from fi Sump, offset well, unobstructed channel, etc. ` (b) -Diversion will be by gravity, the diverting dam being _.__feet in height (stream bed to level of overflow) ;_________,_'_______________feet long on -top; and constructed of • Concrete, earth, brush, etc. . (c) The storage dam will be feet'in height (stream bed to spillway level); feet long on top; have a freeboard of feet, and be constructed of Concrete, earth, etc. 7. Storage Reservoir Name The storage reservoir will flood lands in Indicate section or sections, also 40 -acre subdivisions unless shown upon map It will have a surface area of acres, and a'capacity of acre-feet. In case of insufficient space for answers in form, attach. extra sheets at top of.page 3 and cross reference. FORM 1 ?. Conduit System (describe main conduits only) , None, water will be pumped directly into Mains (a) Canal, ditch, flume: Width on top (at water width at bottom ctoo out taro not used , •-• feet; depth of ____ length_ - feet; grade__ feet per 1,000 feet; materials • • - •-• of consiruCtion_ Earth, rock, timber, etc. • . • (b) _____________ inches; length feet; grade feet per - • 1,000 feet;-toriluft from intake to outlet ' 'feet; kirid ' " • f ' ''''J .- • ' ' . Riveted steel, concrete, wood -stave. etc. ". . • Noiri.-if a:conibinatinn of .differe-nt sizes oi'llindi4c'oiadu lir-is tolhe ised;'attach extra sheets with complete description, also show location -of eacia clearly on map. • ' ' , 9. The ieitimated -Capa.Ciiii:rf-the'clirsiOii-COndiiit or pumping plant proposed is 300.: crs ;Y••, - ; ,,.:-., .• •: • s ' . State cubic feet per second or gallons per minute The 'estirilated' cost -of the diversiiin`WarkS proposed is •$6000 • • • .1- • Give only cost -of intake,or heanworks,-pumps. storage reservoirs and main conduits described herein • . •-• • (.' •••. • • :.! • Y, ''t,Completion. -Schedule 10. Construction work Construction:work: willthe.,completed'on or before • - • June].,. -1:96i ;' • 1 • :The -water :Will be completely applied•to ;the proposed w6 e. 0orjbeforp- ",( 1 9 4 • • • escription of Proposed Use. See Supplement. State 40 -acre subdivisions of the public land suraeyilf area Is unsurveyed,indicate.the location •as if linea of the public land u•• • survey were projected. In the case of irrigation use state the number of acres to be irrigated in each 4O-cr. tract. if space permits. If space does not permit listing of all • 40 -acre tracts, describe -area in a general way and show detail upon map7. • • •:t DO(es) applicant (i) Own the land whereon use of water will be ma`de?- • ' NO Jointly? Yes .- r Yes or Na . Yes oNo -itt1 loini oWnerf-shonlir iticInd click-namesT -as- appliCanti'ansigii application at bottom of third page. / • :,:, ,..,--.. ...: . ; •!.1: .t : ..2:... ,,, .,...... •.;.:' •••, _b!‘4. :. " :. . t , •i • .Y... 7 , •.. • __Igast:s),t the landia_under gptioA to %%hi:we Earadi.se Homes, -the parent compaMrt tlf applicsnt ddes, not: -own Iand whereon use of,water will be mad; 'give name -and address of -owner and ;state what arrangemenu have been made with 'him. .; • 12. Other Rights. Describe all rights except those on file with the State WaterAights Board under which water is served to the'aboye•named-Jands.';' - " 1 ',•:'. . - • - ' '-;--' . ' ••••• - ' . , . , , Nature of Right ' - • " : (riparian, approprisitive, put-el:rased water, etc)1" Year of First Use .. • ,.. , Use made in recent years including-amouni if known , , Season of Use Source of Other Supply . 1 • - . - 2. . 3. :,,, ' 4. • _ . . .... ... • •-i, ::- ...--.., -, :- .-. 7 .: - - i- .. • — • Accach Supplement at top of page 3 if necessary. 13. Irrigationrtse: --Th6 area to -be iiriOted is s- The segre6t1on-of aea cropsIs as follows: ' , . , dt: " State net acreage to be irrigated cies; i1fz1fa '- '.. general crops acres; pasture acres. Nare—tace should be taken that the various statements as to acreage are consistent with each other, with the statement in Paragraph 11, and with 'the Mai,. The irrigation -season Will hegin atioutand end about ' 'fieginning date Closing date - "ICC CI rniaii/n/JUt 14. Power Use. The total fall to be utilized is_ feet. acres. acres; Difference between nozzle or draft tube water level and first free water surface above 'The: ina2rinium\ an-ourit ,Of water' to. beTtietP.:thrchigh.the -Penstock. is / feet per .second. The ma. xinuim.theoretical horsepoWer capable of ;being generated_by_the-works is__. .horsepower. _ . " Second feet X fall + : The use to which the power is to be applied is For distribution and sale or private use, etc. The nature of the works by means. of which power is to be developed is 4 t'7 01: •8477-i."•!'•• So,•, • Lag • • slo. The size of the nozzle to be used is inches. t':' ',.• ! .' • c -s. i+.4.i." r '-....-. .:` '''t., T. ti L'U"'• r" 2, ..-. f, t! ....Y.,:4 1,..,•1" ,......:.:.•:).13:.: I'M ;:.,,1 7.. •,, ‘•;,.7! ',. '. ' • ,;,,C' C•.• ; be redirned o in _ of - Name stream State 40 -acre subdivisir-i 7..,7 : ..:, , s3 Ser---,......_ ___, T. R , , B.'& M. ,..-----_-...„...„ -1.; will Inc water will not u I - 7" RECEIVED MOTILE OF ASSIGNMENT TO ro-`-41-4"A' ""' P Cag Supplement to Parag.raph,11 SW1 of Section 19,• Si of NE-' of Section' 21• SE* of Section 21; 1.y2 of of SWT and S i of NW of Section 22 W of NW- and NW*: of SW--1-of Section 27 • 31*' &'I -4L -and N of .SE* of 'Section 28; ZJ2, SE and S of NE4 of,'Se.ction 29; Section 30;N'2 and. SE*,Of aS.ection 31; and W of Section 32, all in T.12N, R1.8E .:P4.D3Ccbl_; of Section 5; ,NE. and E2 of SE,'—, of Section 6; E2 of NE* and E2 of SE1 of Section 7; W- of Section- 8; •'J2, WI of NrEu` and 113 of SE,, of - Section 17; and N2 of NW* and N'W of NE1 of' 20; all in T11N., . R18E MDE&M; Ez. of Ni?` of Section• 25; NE*, -of Sect'i`on 25:; and the NET of Section 36, all in 'T12N, R1°7E; .1; B&M. ''''CONFORMING • TC') .ORbE'i; O /76 Supplement to Paragraph. 11' A place of use as follows:--S�:�:'—,_of-Section 19; SE* and Si of NE4 of Section 20; WI of SW1 and SW1 of NWof Section 22; Tr+F? of NW,i—, and NW,— of SW* of Section 27; N2i SW* and N1 of SE* of Section 23; W2, SE- and Si of NE* of Section 29; Section 30; N2, and SES—,.of Section 31; and Wa of Section 32, all in T12N, RISE, MDB&M; Wi of Section 5; NE* and E2 of SE* of Section 6; E` of NE -:and EZ of SE* of Section 7; 4 o Section 8; W2, Wz of NE* and x.72 of SET of Section 17; and Ni of NW* and NW* of NE* of Section 20; all in.T11N, R18E, MDB&M; SE* of Section 25 and SE4•of Section 36, both in : T12N, R17E, MDB&M. . CONFORMING TO ORDER OF FORM 6 IMPORTANT [Please Read Carefully] 1. Note the terms and conditions of this permit. Construction; work must be prosecuted, and the water applied to the beneficial uses intended with due diligence. Annual reports of progress will be expected from you upon forms which will be furnished for the purpose. When the water has been fully applied to the beneficial uses intended the Water Code requires that you notify the State Water Rights Board thereof. 2. Neither this application nor the permit is a water right, but if the terms and conditions of the permit are observed a water right can be obtained through beneficial use of the water—the \extent of the right to be determined by a field inspection which will be made by a representative of the State Water Rights Board. 3. No change in point of diversion, or place of use or character of use, can be made under this application and permit without the approval of the State Water Rights Board. 4. If the rights under this permit are assigned immediate notice to that effect with the' name and address of the new owner should be forwarded to the State Water Rights Board, Sacramento, California. 5. Please advise immediately of any change of address. Until otherwise advised communications will be sent to the address used in the letter transmitting this permit. 61979 10-61 2M SPO 3. Actual construction work shall begin on or before July 17/.1962, and shall thereafter be prosecuted'with reasonable diligence;' and' If notJso comin`enced and prosecuted this permit may beJrevoked' 0000607) r,. roc 7�-d'on - '- \ 4: 'Said construction-`wor&`1shallbe coFmpleteor before December 1, 1968. (00D00©ff) S! Complete applicatiori of'• the water�tot the�p'r`oposed'u'sef shall'Ue m`ade•on' or liefor te`" December 1, 1970.(66`69) 6. Progress reports shall be filed promptly by permittee ori forms.; which will be provided annually by the State Water Rights Board until license is issued. -- 00900/6) 7. All rights and privileges under this permit including method of diversion, method of use and quantity of water diverted are subject to the continuing authority of the State Water -Rights Board in accordance with -law and in the interest of the public welfare to prevent waste, unreasonable use, unreasonable method of use or unreasonable method of diversion of said water. `b60-ODJ-2-) 8.. Permittee shall allow representatives of the State Water Rights Board and other parties, as may -be authorized f om- time to time by said Board, reasonable access to project works to determine compliance with the terms of this permit. (0000D 10 9.. _..The total amount of, water. appropriated by direct diversion under this application and Applications 18021, 18030, 18038, and 18039 shall' not exceed 31+5 acre-feet in any calendar month or 2,360 acre-feet. in _any year_. _..... . - (00004/ µ) . 10..,,Permittee.,sha11 bypass the following quantities of water into the natural stream bed gf, the (t!pper7'Trucke, -Aiver-1at `all•etime. ..cc • (a) During the months of April,. May,_and-June,-•75 cubic feet. per. second or the • total'•flow of 1-tlie1fttream,f :4hicheverE:isi.lessw'- ,rc,,; s:.. T: (b)._ During July, a. flo_ w decreasing gradually from 75_ -cubic feet per second or the..total flow of the stream, whichever is less, to 15•cubic feet per second or the total flow of the stream, whicheveris less. The reduction caused by the permittee shall not be'greate'r` than '5`'cutiic feet per second 'in''any one' day: • (c) .During the remainder of the year, 15 tcubic feet per second or the total flow, whichever is less. CO) L 0POO) u`'t c r •ii r.r..J,i:G t.S".••11. i.e. I:1! .fi fu This permit is issued and permittee takes it subject to the following provisions.of, the,Water Code: Section 1390. A permit shall be effective for such time' ai,thelwatei'actualljr appropiiated under it is used for a useful and beneficial purpose incon- formity with this division (of the Water Code), but no longer. Section 1391:.. :Every permit:, shall include the :enumeration' of conditions -therein which in substance shall include all of the provisions of this article and the statement that any appropriator of water to whom a permit is isiued takes it subject to the conditions therein expressed. Serr:nn 1A92_ Every eermittee. if he accents a permit. does so under the conditions precedent that no value whatsoever in excess of the actual amount APPLICANT MUST NOT FILL IN BLANKS BELOW'"" PERMIT No. 13528 - This is to certify that the application of which the foregoing is a true and correct copy has been considered and approved by the State Water Rights Board SUBJECT TO VESTED RIGHTS and the following limitations and conditions: 1. The amount of water appropriated shall be limited to the amount which can be beneficially used, and shall not exceed 3 cubic feet per second to be diverted from January 1 to December 31 of each ye/a�/r./�� - . ;I. �/)`/ ' ! O; lL A .qo. 4i.:. L-_l.L'. <OVWW �/ ,r11 "i;i _,..; 1 ' ", l', .. P!,'. 2. The maximum amount herein stated maybe reduced in the license if investigation so warrants; kt 3. Actual construction work shall begin on or before . July 1, '1962, and shall thereafter be prosecuted with keasonable diligence; and'if not so-comiriericed and prosecn uted this permitnay be reoked(0pp'Q6O7) '''4:rSaid"construetion—VA`shall.be`completed'on or before December 1, 1968. 0000'604 5!'Complete application ofl'the watei'to`thelp'r`oposed'usefshall 'be made,on'dr biefore`'• December 1, 1970.(66d69) 6. Progress reports shall be filed promptly by permittee ori foinisJ which will be provided annually by the State Water Rights Board until license is issued. - (Q0p pp /0 7. All rights and privileges under this permit including method of diversion, method of use and quantity of water diverted ate subject to the continuing authority of the State Water -Rights Board in accordance with -law arid in the interest of 'the public welfare to prevent waste, unreasonable use, unreasonable method of use or unreasonable method of diversion of said 0,60.00[2-) water. _ ._ .:_ . 0000006) :d:1 __.8.. Permittee shallallowrepresentativesof the. State Water Rights Board and otherparties, as may. be authorized f om time to time by said Board, reasonable access to project works to determine compliance with the terms of this permit. (00000 '10 _9_. .. The_ total amount ofwater._ appropriated _by direct diversion under this application and Applications 18021, 18030, 18038, and 18039 shall' not exceed. 311.5 acre-feet in any calendar month or 2,360 acre-feet. in .any year. _.- (5000(11µ) ... 10. Permittee,,, shall bypass the following quantities of water into the natural stream bed of.; the TT��� r Truckee �RiYer at .all 'times.: T F r f;;-, . ._ , CS!Y.Pet.i.,,� .3 , .i L l„ � .: � - - - ,�i1-...Gi.Tb: l.i .I �,:';h.; t; '�' � , �`.C, I,.`," (a) During the months of April,. Mey.,..-`and June,.. 75, cubic feet_ per second or the totalflowlof'the !tatream,":Vihiehever 1 les-PIK; L;_.:.:., r,.;..7 (b) _ During July, a flow decreasing gradually from 75cubicfeet per second or the.?total".flow of the stream, whichever is less, to 15. cubic feet per second or the total flow of the stream, whichever is less. The reduction caused by the permittee shall not be ' greater` than '5 cubic feet per second in "sny one- day:" 2c_ (c).:During the remainder of the year, 15 (cubic feet per second or the total flow, whichever is less. L1;,( U14 I _. I.0;fu.:. '1 CU • "iI .'l.[ ' :If IU n,. . 1C. i; 'y C J7. IIJr- ;.! y,, .,t:'^L4 i(:1. {'J: C :111 ." Cbl: 4d++ro). .. _ .( OJ L",IG; .. This permit is issued and permittee takes it subject to the following provisions.of, thedWater_Code: Section 1390. A permit shall be effective for such tune' ai'tfie`water{actually appropriated under it is used for a useful and beneficial purpose in, con- formity with this division (of the Water Code), but no longer. Section 1391::;;Every' permit shall, include: the.enumeta ion'of conditions -therein which in substance shall include all of the provisions of -this article and the statement that any appropriator of water tb whom a permit is issued takes it subject to the conditions therein expressed. Section 1392. Every permittee, if he accepts a permit, does so under the conditions precedent that no value whatsoever in excess of the actual amount paid to the State therefor shall at'any tinie be aisigned to or claimed.for. any permit -stinted or iisued under the provisions of this -division (of the Water Code), or for any rights granted or acquired under the provisions of thistdiiulon (of the Water Code), in respect to the regulationby any competent public authority of the services or the price of the services to be rendered by, any permittee or by the holder of any rigbu granted or acquired under the provisions of this division (of the Water Code) or in respect to any valuation for pia -poses of sale to of purchase, whether through condemnation pioceed: inga or otherwise, by the State or any city, city and county, municipal water district, irrigation district, lighting district, or any political subdivision of the State, of the rights and property of any permittee, or the possessor of any rights -granted, issued, or acquired under the provisions of this. division (of. the Water Code). APR 2 4 1962 ; _r;_ 4q .17fG'1 't:. .. ., ;i ; STATE WATER RIGHTS BOARD , Executive—Officer..