Loading...
1200• STATE OF4 ALIFORNIA - RESOURCES AGENCY `STATE WATER RESOURCES CONTROL BOARD. DIVISION DE WATER WATER 'RIGHTS • .:777 77 Cadillac Drive, Sacramento, CA 95825 (916) -924-2462.. '-EDMUND G: BROWN JR., Goveinor Reply Refer: ` .. 342:RJM:18030, Tahoe Paradise .. Water. & . Gas Company:. P. O. Box 11117 Tahoe Paradise, CA 95708 Gentlemen: PERMIT 13527, `x13528 13529, .:13530 AND ".14335: (APPLICATION 18030, 18039 AND 19625). UPPER TRUCKEE RIVER IN EL DORADO COUNTY.. 18031; Your petitionfor an extension of time has been receivedand will the file for the above permits. A petition for an extensionof time was accepted on August 4, 1981., a The petition was Noticed in February 1976 resulting in three protests including the Pyramid Lake Paiute Tribe,The State Water Resources Control Board has not acted on the petition because they are waiting on action on the Tahoe Basin Environmental Impact Report. Since we have a petition foran extension of time on file, your latest petition, is not necessary and your. $5 filing fee will be returned under separate cover.. If you haveany questions, please contact Rick Miner at (916) 924-2462. 1.8038, be filed in :Sincerely Original i yli . . Jim Pankratz, Chief Extension, Change and ,Compliance Unit Trate vvaier iiesources l.oniroi tsoar^ DIVISION OF WATER RIGHTS 7 Cadillac Drive, Sacramento, CA 95825 (916) 920-6151 PROGRESS REPORT BY PERMITTEE FOR 1981 OWNER OF RECORD: APPLICATION: 018031 TAHOE PARADISE WATER & GAS COMPANY P 0 BOX 11117 TAHOE PARADISE, CALIF 58 95708 PERMI T:' 01.352.8 TELEPHONE NUMBER : (916 )577 -2622 IF OWNER'S NAME/ADDRESS/PHONE NO. IS WRONG OR. MISSING, PLEASE CO2RECT. SOURCE: , COUNTY: U' ?PER TRUCKEE RIVER EL DORADO PURPOSE: DOMESTIC DIVERSION/STORAGE SEASON: ACRES/HP: JAN OI TO DEC 31 .0 AC AMOUNT: 3.000 CFS 0.0 AC -FT COMPLETE USE BY: 12/01/70 IMPORTANT! EVERY permit is issued subject to the conditions therein expressed. I have currently reviewed my permit: YES [x ] NO [ j. I am complying with the conditions under which my permit has been issued: YES [ ] NO [x ]. Identify any noncompliance by permit term number under "Remarks" on reverse side. This report is important in providing the record of use needed inestablishing your water right. It should be filled out carefully and returned promptlyo the above address. not THE PROJECT HAS BEEN ABANDONED AND I REQUEST REVOCATION OF THIS PERMIT: YES [ ] NQ- ]. CONSTRUCTION WORK 1 3 fiy :n cp,�-a 1. Has construction work commenced? YES [ 1 NO [ X]. Is construction completed? YES[ ] NO [ 1 r7193 .a' 2. If incomplete, describe briefly the work done, including cost: �c • a re% 3. If not completed, give estimated date of completion• 4. What percent of construction work remains to be done? Explain: USE OF WATER 5. Has use of water commenced? YES [ ] NO [X]. Check appropriate box(es) below and explain how water was used. (a) [ 1 Irrigation Total acres irrigated Name of crops served and acreage of each (b) [ 1 Stockwatering (f) [ ] Recreational Number of animals Boating, fishing, water contact sports (c) [ ] Industrial (g) [ ] Power generation Nature of use Installeo horsepower capacity (d) [ 1 Domestic (h) [ ] Other Number of person; area of garden, lawn, etc. - (e) [ ] Municipal Approximate population 6. Amount of water used each month under this permit in gallons or acre-feet. (If not known, check months water was used.) _. Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. Total Annual 7. Has use of water, both amount and season, been as great as you expect in any future year under this permit? YES [ ] NO [ ]. If "No", explain in "Remarks". 8. Has location of the intake, place of use, or type of use been changed? YES [ 1 NO [ 1. Explain in "Remarks". 9. Did the source go dry? YES [ 1 NO [ J. If so, during what months? STORAGE PROJECTS ONLY N/arb 10. Did your reservoir spill this year? YES [ ] NO[ ]. If not, how many feet below spillway vertically was the water level at maximum storage? Have you emptied the reservoir? YES [ 1 NO [ 1. If not, how many feet below spillway vertically was it drawn down at end of season? WR -15 (8-801 0103 1981 (REPORT CONTINUES ON REVERSE SIDE) PLEASE ANSWER ONLY THOSE QUESTIONS BELOW WHICH ARE APPLICABLE TO YOUR PROJECT. MUNICIPAL, COMMUNITY, OR SUBDIVISION PROJECTS ONLY CONSERVATION OF WATER 11. How many service connections to date? Total population served by the water system 12. Estimated number of service connections under full use: 13. Are the connections individually metered; YES [ ] NO 1 1. 14. Do you plan to meter the connections? YES [ ] NO [ 1. When? 15. Sewage generated by those to whom you deliver water is disposed of by: Septic tanks and leach lines [ ]; Seepage pits [ ]; Central treatment plan [ ] operated by ; Other [ . ] (specify under "Remarks"). 16. Is water service provided to an area or subdivision including a recreational reservoir: YES [ ] NO( 1. 17. Name of area or subdivision so served • 18. State surface area at maximum water level in recreational reservoirs) referred to in 16. Identify surface area(s) by name of dam or reservoir: 19. What measures are you .using or planning to reduce water losses in conveyance systems? (1) Seepage or leak detection program [ 1; (2) Lining canals [ 1; (3) Phreatophyte and aquatic vegetation control [ ]; (4) Other, (describe in "Remarks") [ J. 20. What -measures are used to encourage consumers to conserve water in agricultural use? (1) Program to encourage more efficient irrigation - systems (sprinkler, drip, etc.), where applicable [ 1; (2) Return flow systems on individual farms [ ]; (3) Return flow system areawide [ ]; (4) Water pricing to encourage reduced use [ ]; (5) Charges for drainage.of irrigated lands [ 1; (6) Other (describe in "Remarks") [ ]. 21. What measures are used to encourage municipal and industrial consumers to conserve water? (1) Regulations to control wasteful use [ . 1; (2) Public education program on water conservation [ 1; (3) Pricing to encourage reduced use [ 1; (4) Assistance to industry in design of recycle systems [ 1; (5) Other (describe in "Remarks") [ J. 22. What records are maintained on water use and conservation? (1) Loss rate from conveyance system [ ' ]; (2) Water use for major crops by each farm [ 1; (3) Other (describe in "Remarks") [ ]. 23. Describe any water conservation eftorts you may have started 24. If credit toward beneficial use of water under this permit for water not used due to a conservation effort is claimed under Water Code Section 1011, please show the amounts of water conserved (acre feet or mg.): WATER QUALITY AND WASTEWATER RECLAMATION 25. Describe methods you are using to minimize erosion and to prevent the entry of silt into surface waters 26. After use, the water is (1) retained in reservoir [ ]; (2) discharged into a stream or lake 1 .1; (3) discharged into settling ponds [ 1; (4) other [ ]. Describe: 27. Does or will water being discharged contain waste materials? [ ] YES [ ] NO. (1) Domestic [ ]; (2) Municipal [ 1; (3) Industrial [ 1; (4) Agricultural [ 1; (5) Other [ J. Describe• 28. Does or will water being discharged contain any specific material which is deleterious to fish and wildlife or which would impair the water for beneficial uses? [ 1 Yes [ ] No. Describe• TO THE EXTENT THE FOLLOWING QUESTIONS APPLY TO YOUR PERMIT, PLEASE ANSWER IN REMARKS SECTION BELOW. 29. Are you now or have you been using reclaimed water from a wastewater treatment facility or water polluted by waste to a degree which unreasonably affects such water for other beneficial uses? [ • ] Yes_ -1x] No. . If credit toward use under this water right through substitution of reclaimed or polluted water in lieu of appropriated water is claimed under Section 1010 of the Water Code, (please show the amounts of reclaimed water used. 30. Are you now or have you been reclaiming or reusing any of the water appropriated under this right? [ ] Yes If Yes, please describe: t '31. What is present availability or current potential for using reclaimed water from a wastewater treatment plantor polluted water in place of the appropriated water to satisfy all or part of your water needs? 32. What is thecurrent potential for reusing the appropriated water to satisfy part of your water needs? 33. If you produce reclaimed water, or polluted water, is there a potential for others to use it? REMARKS (Identify the item you are explaining. Additional pages may be attached.) [X ] No. See Page 3 1 declare under penalty of perjury that the information in this report is true to the best of my knowledge and belief. California Dated: February 22nd, 1982 at Tal3oe Paradise, Sign here: TAHOE PAI HTSE^)WATER AND GAS CO. George . Bar TEE (OR AGENT OR DESIGNEE) FESS REPORT BY PERMITTEE — P12 (State) _A] CATION: 018031 PERMIT: 131528 i: ')r)t h'i ?(;R?',':' %:,E: - PAGE 3 REMARKS +y b, l70, the Company filed a "Petition for Change )int: Df and simultaneously filed a "Petition for Change of Place These petitions are the result of engineering studie'' i-cmp'_ . -,•led to date and in collaboration with the other utilities mtn'_ioned in said petitions. To provide water for domestic use .of the-:u=mpanies' potential customers based on presently subdivided lands the total quantity of water in the permit is considered essential. (m :lv 30, 1971, the Company filed petition for extension of time as the Water Rights Branch had not acted on petitions cited in paragraph one on page one. On June 18, 1973, a hearing was held at wLich time both DWR Staff and Utility were instructed to recheck data submitted in evidence. A preliminary meeting was held, however the final meeting between Staff and Utility has not been held. Company received letter of August 23, 1974, from State Water Rights Control Board re: an EIR on subject applications. On or about September 30, 1974, Company requested 120 day extension to prepare EIR. However, on checking Company files it has been found that an EIR was presented as part of June 18, 1973, hearing. 31. Regulations of the State Department of Health Services prohibit use as potable water. Lahontan Water Quality Control Board prohibits use of reclaimed water for irrigation. 32. No possiblity. After use, water goes into South Tahoe Public Utility District's sewage system and cannot be used. See above. 33. After passing through South Tahoe Public Utility District's Reclamation Plant, water could be used for recharge if regulations were relaxed. 9 OINAthibV§ .40 'Ma lit Wti " 0 IN MOWILAWNIIVI§ •STATE OF CALIFORNIA —RESOURCES AGENCY STATE WATER RESOURCES CONTROL BOARD DIVISION OF WATER RIGHTS 77 Cadillac Drive, Sacramento, CA 95825 (916) 920-6151 WATER USERS: Application 018031 Permit 013528 EDMUNb' j'ra 1�1• SO�F 26 "j{y THvnor CRAHEN0 Water Code Section 1396 requires an applicant to exercise due diligence in developing a water supply for beneficia_j.use. The State Water Resources Control Board, in considering requests for:extension' of time, will review the facts presented to determine whether there is good cause for granting an _extension of time to complete the project. Where diligence in completing the project is not fully substantiated, the Board may set the matter for hearing to determine the facts upon which to base formal action relating to the permit. Formal action may involve: 1. Revoking the permit for failure to proceed with due diligence in completing the project. 2. Issuing a license for the amount of water heretofore placed to beneficial use under the terms of the permit. 3. Granting a reasonable extension of time to complete construction work and/or full beneficial use of water. . The time previously allowed in your permit within which to complete construc- tion work and/or use of water has either expired.or will expire shortly. Please check below the action you wish taken on this permit. / / The project has been abandoned and I request revocation of the permit Signature FUZZ use of water has been made, both_as_;to.amount and season,_and I request lieense be issued. • Signature / x/ The project is not yet complete. I request the Board's consideration of the following petition for an extension of time: PETITION FOR EXTENSION OF TIME If start of construction work has been delayed, complete items 1, 2, and 3. 1. What has been done sincepermit was issued toward commencing construction? NO WORK ACCOMPLISHED. 2. Estimated date construction work will begin UNKNOWN 3. Reasons why construction work was not begun within the time allowed by the permit SEE ATTACHMENT TO "PROGRESS REPORT BY PERMITTEE FOR 1981" If construction work and/or use of water is proceeding but is not complete, an , extension of time may be petitioned by _completing the appropriate items on -reverse 'side. Statements must be restricted to construction or use �f water only under this permit. WR 20C (6/81) .4: A year extension of time is requested to complete construction work and/or beneficial use of water. (Indicate period of 'time. -- Must be consistent with time frame allowed in "Guidelines for Considering Petitions for Extensions of Time"). 5. How much water has been used? of/year • cfs 6. How many acres have been irrigated? 7. How many houses or people have been served water? 8. Extent of past use of water for any other purpose 9. What construction work has been completed during the last extension? • 10. Approximate amount spent on project during last extension period is 11. Estimated date construction. work will be completed 12.. Estimated year in which water will be fully used 13. Reasons why construction and/or use of water were not completed within time previously allowed .If the use of water is for municipal (including industrial) and irrigation supplies provided or regulated by public agencies and use of the water has commenced,, but additional time is neededto reach full use contemplatea the following information must be provided. 14. What water conservation measures are. in effect or feasible within the place of use 15. How much water is being conserved or is'itfeasible to conserve using these conservation.measures? acre-feet per annum. 16. How much Water per capita is used during the.maximum 30 -day period gpd: 1 dee!a., andet penaR.ty of penjutcy that the. above i4 time and coktect to the best ob my kn.oul!edge and be -Uzi. Dated s/I ° , 19 rZ at TAHOE PARADISE ,California. NOTE: A $5 fee must accompany a petition for an extension of time. TAHOE PARADISE WATER AND GAS CO. "4( .Grt. Permitter' or Au 'orized:'epresentative George C. Baron.Signature PRESIDENT Title WR 29C (6/81)