1200•
STATE OF4 ALIFORNIA - RESOURCES AGENCY
`STATE WATER RESOURCES CONTROL BOARD.
DIVISION DE WATER WATER 'RIGHTS •
.:777 77 Cadillac Drive, Sacramento, CA 95825
(916) -924-2462..
'-EDMUND G: BROWN JR., Goveinor
Reply Refer: ` ..
342:RJM:18030,
Tahoe Paradise .. Water. & . Gas Company:.
P. O. Box 11117
Tahoe Paradise, CA 95708
Gentlemen:
PERMIT 13527, `x13528 13529, .:13530 AND ".14335: (APPLICATION 18030,
18039 AND 19625). UPPER TRUCKEE RIVER IN EL DORADO COUNTY..
18031;
Your petitionfor an extension of time has been receivedand will
the file for the above permits.
A petition for an extensionof time was accepted on August 4, 1981., a The
petition was Noticed in February 1976 resulting in three protests including
the Pyramid Lake Paiute Tribe,The State Water Resources Control Board has
not acted on the petition because they are waiting on action on the Tahoe
Basin Environmental Impact Report.
Since we have a petition foran extension of time on file, your latest petition,
is not necessary and your. $5 filing fee will be returned under separate cover..
If you haveany questions, please contact Rick Miner at (916) 924-2462.
1.8038,
be filed in
:Sincerely
Original i yli . .
Jim Pankratz, Chief
Extension, Change and
,Compliance Unit
Trate vvaier iiesources l.oniroi tsoar^
DIVISION OF WATER RIGHTS
7 Cadillac Drive, Sacramento, CA 95825
(916) 920-6151
PROGRESS REPORT BY PERMITTEE FOR
1981
OWNER OF RECORD: APPLICATION: 018031
TAHOE PARADISE WATER & GAS COMPANY
P 0 BOX 11117
TAHOE PARADISE, CALIF 58 95708
PERMI T:' 01.352.8
TELEPHONE NUMBER :
(916 )577 -2622
IF OWNER'S NAME/ADDRESS/PHONE NO. IS WRONG OR. MISSING, PLEASE CO2RECT.
SOURCE: , COUNTY:
U' ?PER TRUCKEE RIVER EL DORADO
PURPOSE:
DOMESTIC
DIVERSION/STORAGE SEASON: ACRES/HP:
JAN OI TO DEC 31 .0 AC
AMOUNT: 3.000 CFS 0.0 AC -FT COMPLETE USE BY: 12/01/70
IMPORTANT! EVERY permit is issued subject to the conditions therein expressed. I have currently reviewed my permit:
YES [x ] NO [ j. I am complying with the conditions under which my permit has been issued: YES [ ] NO [x ].
Identify any noncompliance by permit term number under "Remarks" on reverse side. This report is important in providing
the record of use needed inestablishing your water right. It should be filled out carefully and returned promptlyo the above
address.
not
THE PROJECT HAS BEEN ABANDONED AND I REQUEST REVOCATION OF THIS PERMIT: YES [ ] NQ- ].
CONSTRUCTION WORK
1 3 fiy :n cp,�-a
1. Has construction work commenced? YES [ 1 NO [ X]. Is construction completed? YES[ ] NO [ 1 r7193 .a'
2. If incomplete, describe briefly the work done, including cost: �c
• a
re%
3. If not completed, give estimated date of completion•
4. What percent of construction work remains to be done? Explain:
USE OF WATER
5. Has use of water commenced? YES [ ] NO [X]. Check appropriate box(es) below and explain how water was used.
(a) [ 1 Irrigation
Total acres irrigated Name of crops served and acreage of each
(b) [ 1 Stockwatering (f) [ ] Recreational
Number of animals Boating, fishing, water contact sports
(c) [ ] Industrial (g) [ ] Power generation
Nature of use Installeo horsepower capacity
(d) [ 1 Domestic (h) [ ] Other
Number of person; area of garden, lawn, etc. -
(e) [ ] Municipal
Approximate population
6. Amount of water used each month under this permit in gallons or acre-feet. (If not known, check months water was used.) _.
Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. Total Annual
7. Has use of water, both amount and season, been as great as you expect in any future year under this permit? YES [ ] NO [ ]. If
"No", explain in "Remarks".
8. Has location of the intake, place of use, or type of use been changed? YES [ 1 NO [ 1. Explain in "Remarks".
9. Did the source go dry? YES [ 1 NO [ J. If so, during what months?
STORAGE PROJECTS ONLY N/arb
10. Did your reservoir spill this year? YES [ ] NO[ ]. If not, how many feet below spillway vertically was the water level at maximum
storage? Have you emptied the reservoir? YES [ 1 NO [ 1. If not, how many feet below spillway vertically was it
drawn down at end of season?
WR -15 (8-801
0103
1981
(REPORT CONTINUES ON REVERSE SIDE)
PLEASE ANSWER ONLY THOSE QUESTIONS BELOW WHICH ARE APPLICABLE TO YOUR PROJECT.
MUNICIPAL, COMMUNITY, OR SUBDIVISION PROJECTS ONLY
CONSERVATION OF WATER
11. How many service connections to date? Total population served by the water system
12. Estimated number of service connections under full use:
13. Are the connections individually metered; YES [ ] NO 1 1.
14. Do you plan to meter the connections? YES [ ] NO [ 1. When?
15. Sewage generated by those to whom you deliver water is disposed of by: Septic tanks and leach lines [ ]; Seepage pits [ ]; Central
treatment plan [ ] operated by ; Other [ . ] (specify under "Remarks").
16. Is water service provided to an area or subdivision including a recreational reservoir: YES [ ] NO( 1.
17. Name of area or subdivision so served •
18. State surface area at maximum water level in recreational reservoirs) referred to in 16. Identify surface area(s) by name of dam or reservoir:
19. What measures are you .using or planning to reduce water losses in conveyance systems? (1) Seepage or leak detection program [ 1;
(2) Lining canals [ 1; (3) Phreatophyte and aquatic vegetation control [ ]; (4) Other, (describe in "Remarks") [ J.
20. What -measures are used to encourage consumers to conserve water in agricultural use? (1) Program to encourage more efficient irrigation -
systems (sprinkler, drip, etc.), where applicable [ 1; (2) Return flow systems on individual farms [ ]; (3) Return flow system areawide [ ];
(4) Water pricing to encourage reduced use [ ]; (5) Charges for drainage.of irrigated lands [ 1; (6) Other (describe in "Remarks") [ ].
21. What measures are used to encourage municipal and industrial consumers to conserve water? (1) Regulations to control wasteful use [ . 1;
(2) Public education program on water conservation [ 1; (3) Pricing to encourage reduced use [ 1; (4) Assistance to industry in design
of recycle systems [ 1; (5) Other (describe in "Remarks") [ J.
22. What records are maintained on water use and conservation? (1) Loss rate from conveyance system [ ' ]; (2) Water use for major crops by
each farm [ 1; (3) Other (describe in "Remarks") [ ].
23. Describe any water conservation eftorts you may have started
24. If credit toward beneficial use of water under this permit for water not used due to a conservation effort is claimed under Water Code
Section 1011, please show the amounts of water conserved (acre feet or mg.):
WATER QUALITY AND WASTEWATER RECLAMATION
25. Describe methods you are using to minimize erosion and to prevent the entry of silt into surface waters
26. After use, the water is (1) retained in reservoir [ ]; (2) discharged into a stream or lake 1 .1; (3) discharged into settling ponds [ 1;
(4) other [ ]. Describe:
27. Does or will water being discharged contain waste materials? [ ] YES [ ] NO.
(1) Domestic [ ]; (2) Municipal [ 1; (3) Industrial [ 1; (4) Agricultural [ 1; (5) Other [ J. Describe•
28. Does or will water being discharged contain any specific material which is deleterious to fish and wildlife or which would impair the water
for beneficial uses? [ 1 Yes [ ] No. Describe•
TO THE EXTENT THE FOLLOWING QUESTIONS APPLY TO YOUR PERMIT, PLEASE ANSWER IN REMARKS SECTION BELOW.
29. Are you now or have you been using reclaimed water from a wastewater treatment facility or water polluted by waste to a degree which
unreasonably affects such water for other beneficial uses? [ • ] Yes_ -1x] No. .
If credit toward use under this water right through substitution of reclaimed or polluted water in lieu of appropriated water is claimed
under Section 1010 of the Water Code, (please show the amounts of reclaimed water used.
30. Are you now or have you been reclaiming or reusing any of the water appropriated under this right? [ ] Yes
If Yes, please describe: t
'31. What is present availability or current potential for using reclaimed water from a wastewater treatment plantor polluted water in place of
the appropriated water to satisfy all or part of your water needs?
32. What is thecurrent potential for reusing the appropriated water to satisfy part of your water needs?
33. If you produce reclaimed water, or polluted water, is there a potential for others to use it?
REMARKS (Identify the item you are explaining. Additional pages may be attached.)
[X ] No.
See Page 3
1 declare under penalty of perjury that the information in this report is true to the best of my knowledge and belief.
California
Dated: February 22nd, 1982
at
Tal3oe Paradise,
Sign here:
TAHOE PAI HTSE^)WATER AND GAS CO.
George . Bar
TEE (OR AGENT OR DESIGNEE)
FESS REPORT BY PERMITTEE — P12
(State)
_A] CATION: 018031
PERMIT: 131528
i: ')r)t h'i ?(;R?',':' %:,E: - PAGE 3
REMARKS
+y b, l70, the Company filed a "Petition for Change )int: Df
and simultaneously filed a "Petition for Change of Place
These petitions are the result of engineering studie''
i-cmp'_ . -,•led to date and in collaboration with the other utilities
mtn'_ioned in said petitions. To provide water for domestic use .of
the-:u=mpanies' potential customers based on presently subdivided
lands the total quantity of water in the permit is considered essential.
(m :lv 30, 1971, the Company filed petition for extension of time
as the Water Rights Branch had not acted on petitions cited in
paragraph one on page one. On June 18, 1973, a hearing was held
at wLich time both DWR Staff and Utility were instructed to recheck
data submitted in evidence. A preliminary meeting was held, however
the final meeting between Staff and Utility has not been held.
Company received letter of August 23, 1974, from State Water Rights
Control Board re: an EIR on subject applications. On or about
September 30, 1974, Company requested 120 day extension to prepare
EIR. However, on checking Company files it has been found that an
EIR was presented as part of June 18, 1973, hearing.
31. Regulations of the State Department of Health Services prohibit
use as potable water. Lahontan Water Quality Control Board
prohibits use of reclaimed water for irrigation.
32. No possiblity. After use, water goes into South Tahoe Public
Utility District's sewage system and cannot be used. See above.
33. After passing through South Tahoe Public Utility District's
Reclamation Plant, water could be used for recharge if regulations
were relaxed.
9
OINAthibV§
.40 'Ma
lit Wti " 0 IN
MOWILAWNIIVI§
•STATE OF CALIFORNIA —RESOURCES AGENCY
STATE WATER RESOURCES CONTROL BOARD
DIVISION OF WATER RIGHTS
77 Cadillac Drive, Sacramento, CA 95825
(916) 920-6151
WATER USERS:
Application 018031 Permit
013528
EDMUNb' j'ra
1�1• SO�F 26 "j{y
THvnor
CRAHEN0
Water Code Section 1396 requires an applicant to exercise due diligence in
developing a water supply for beneficia_j.use. The State Water Resources
Control Board, in considering requests for:extension' of time, will review the
facts presented to determine whether there is good cause for granting an
_extension of time to complete the project. Where diligence in completing the
project is not fully substantiated, the Board may set the matter for hearing
to determine the facts upon which to base formal action relating to the permit.
Formal action may involve:
1. Revoking the permit for failure to proceed with due diligence in
completing the project.
2. Issuing a license for the amount of water heretofore placed to beneficial
use under the terms of the permit.
3. Granting a reasonable extension of time to complete construction work
and/or full beneficial use of water. .
The time previously allowed in your permit within which to complete construc-
tion work and/or use of water has either expired.or will expire shortly.
Please check below the action you wish taken on this permit.
/ / The project has been abandoned and I request revocation of the permit
Signature
FUZZ use of water has been made, both_as_;to.amount and season,_and I
request lieense be issued.
•
Signature
/ x/ The project is not yet complete. I request the Board's consideration of
the following petition for an extension of time:
PETITION FOR EXTENSION OF TIME
If start of construction work has been delayed, complete items 1, 2, and 3.
1. What has been done sincepermit was issued toward commencing construction?
NO WORK ACCOMPLISHED.
2. Estimated date construction work will begin UNKNOWN
3. Reasons why construction work was not begun within the time allowed by the
permit SEE ATTACHMENT TO "PROGRESS REPORT BY PERMITTEE FOR 1981"
If construction work and/or use of water is proceeding but is not complete, an ,
extension of time may be petitioned by _completing the appropriate items on
-reverse 'side. Statements must be restricted to construction or use �f water
only under this permit.
WR 20C (6/81)
.4: A year extension of time is requested to complete construction
work and/or beneficial use of water. (Indicate period of 'time. -- Must be
consistent with time frame allowed in "Guidelines for Considering Petitions
for Extensions of Time").
5. How much water has been used? of/year • cfs
6. How many acres have been irrigated?
7. How many houses or people have been served water?
8. Extent of past use of water for any other purpose
9. What construction work has been completed during the last extension?
• 10. Approximate amount spent on project during last extension period is
11. Estimated date construction. work will be completed
12.. Estimated year in which water will be fully used
13. Reasons why construction and/or use of water were not completed within time
previously allowed
.If the use of water is for municipal (including industrial) and irrigation
supplies provided or regulated by public agencies and use of the water has
commenced,, but additional time is neededto reach full use contemplatea the
following information must be provided.
14. What water conservation measures are. in effect or feasible within the
place of use
15. How much water is being conserved or is'itfeasible to conserve using these
conservation.measures? acre-feet per annum.
16. How much Water per capita is used during the.maximum 30 -day period gpd:
1 dee!a., andet penaR.ty of penjutcy that the. above i4 time and coktect to the best
ob my kn.oul!edge and be -Uzi.
Dated
s/I ° , 19 rZ at TAHOE PARADISE
,California.
NOTE: A $5 fee must accompany a petition for an extension of time.
TAHOE PARADISE WATER AND GAS CO.
"4( .Grt.
Permitter' or Au 'orized:'epresentative
George C. Baron.Signature
PRESIDENT
Title
WR 29C (6/81)