1214„,Jte Water Resources Control Boal
DIVISION OF WATER RIGHTS
77 Cadillac Drive
Sacramento, Ca. 95825
(916) 920-6151
PROGRESS REPORT BY PERMITTEE FOR 1978
OWNER OF RECORD:
TAHOE PARADISE WATER & GAS COMPANY
P 0 BOX 11117,
TAHOE PARADISE, CALIF 95705
APPLICATION: 18031
916 577-2622
Area Code and Telephone Number
If the owner or address shown above is wrong, please correct.
SOURCE: UPPER TRUCKEE RIVER
COUNTY: EL DORADO
AMOUNT: 3 cu FT/SEC
PURPOSE: DOMESTIC
PERMIT: 13528
r r•, w w m
-1:_ —v c
c r, v
xl
c,
+ ..-.a to
C.0 CP
12-01-70
Time to complete use of
water expires this dote
IMPORTANT! EVERY permit is issued subject to the conditions therein expressed. I have currently reviewed my permit:
YES ® NO ❑ . ,.I am complying with the conditions under which my permit has been issued: YES 0 NO® . Identify any
noncompliance by permit term number under "Remarks” on reverse side. This report is important in providing the record of
use needed in establishing your water right. It should be filled out carefully and returned promptly to the above address.
THE PROJECT HAS BEEN ABANDONED AND I REQUEST REVOCATION OF THIS PERMIT: YES NO®.
CONSTRUCTION WORK
1. Hos construction work commenced? YES ❑ NO L . If YES, is consfruction completed? YES❑ NO ❑ .
2. If incomplete, describe briefly the work done, including cost:
3. If not completed, give estimated date of completion:
4. What percent of construction work remains to be done? Explain:
USE OF WATER
5. Has use of water commenced? YES❑ NOU. Check appropriate box(es) below and explain how water was used.
(a) 0 Irrigation
Total acres. irrigated Name of crops served and acreage of each
(b) 0 Stockwatering (f) 0 Recreational
Number of animals Booting, fishing, water contact sports
(c) 0 Industrial (g) 0 Power generation
Nature of Use Installed horsepower capacity
(d) 0 Domestic (h) 0 Other
Number of persons, oreo of garden, lawn, etc.
(e) 0 Municipal
Approximate population
6. Amount of water used each month under this permit in gallons or acre-feet. (If not known, check months water was used.)
Jan. Feb.
Mar. Apr. May June July Aug. Sept. Oct. Nov.
Dec. Total Annual
7. Has use of water, both amount and season, been as great as you expect in any future year under this permit? YES 0
NO O. If "No", explain,on reverse side under "Remarks".
8. Has location of the intake, place of use, or type,of use been changed? YES 0 NO 0 . Explain on reverse side under
"Remarks".
9. Did the source go dry? YES 0 NO ❑ . If so, during what months?
STORAGE. PROJECTS ONLY N/A
10. Did your reservoir spill this year? YES 0 NO ❑ . If not, how many feet below spillway vertically was the water
level at maximum storage? Have you emptied the reservoir? YES 0 NO 0 . If not, how many feet
below spillway vertically was it drawn down at end of season'
I declare under penalty of perjury that the information in this report is true to the best of my knowledge and belief.
Dated: February 12th, 1979 at Tahoe Paradise, California
(Location) (State)
Sign here:
SWRCB-18 (6.761
Tahoe Paradise Water an Gas Co.
1978
PERMITTEE
George C. Baron Pres.
(REPORT CONTINUES ON REVERSE SIDE)
PROGRESS REPORT BY PERMITTEE - PAGE 2.
PLEASE ANSWER ONLY THOSE QUESTIONS BELOW WHICH ARE APPLICABLE TO YOUR PROJECT:
MUNICIPAL, COMMUNITY, OR SUBDIVISION PROJECTS ONLY
11. How many service connections to date? Total population served by the water system: -
12. Estimated number of service connections under full use:
13. Are the connections individually metered? YES ❑ NO ❑ .
14. Do you plan to meter the connections? YES 0 NO 0 . When?
15. Sewage generated by those to whom you deliver water is disposed of by: Septic tanks and leach lines ❑ ; Seepage
pits ❑ ; Central treatment plan 0 operated by ; Other 0 (specify under "Remarks")
PURVEYORS OF WATER ONLY
16. Water service is provided to an area or subdivision including a recreational reservoir: YES 0 NO ❑ .
17. Name of area or subdivision so served:
18. State surface area of recreational reservoir(s) at maximum water level referred to in 16 and 17. Identify surface
area(s) by name of dam or reservoir:
NOTE: The following questions relate to the Board's continuing responsibility to insure that appropriate water is best
developed, conserved, and utilized in the public interest as required by the Water Code.
CONSERVATION OF WATER
19. What measures are you•using or planning to reduce water losses in conveyance systems? (1) Seepage or leak detection
program 0 ; (2) Lining canals 0 ; (3) Phreatophyte and aquatic vegetation control 0 ;
(4) Other (describe in "Remarks")0.
20. What measures are used to encourage consumers to conserve water in agricultural use? (1) Program to encourage
more efficient irrigation systems (sprinkler, drip, etc.), where applicable 0 ; (2) Return flow systems on individual
farms 0 ; (3) Return flow system areawide 0 ; (4) Water pricing to encourage reduced use 0 ; (5) Charges for
drainage of irrigated lands 0 ; (6) Other (describe in "Remarks") 0.
21. What measures are used to encourage municipal and industrial consumers to conserve water? (1) Regulations to con-
trol wasteful use 0 ; (2) Public education program on water conservation 0 ; (3) Pricing to encourage reduced
,use 0 ; (4) Assistance to industry in design of recycle systems 0 ; (5) Other (describe in "Remarks") 0.
22. What records are maintained on water use and conservation? (1) Loss rate from conveyance system 0 ; (2) Water
use for major crops by each farm 0 ; "(3) Other (describe in "Remarks") 0.
WATER QUALITY AND WASTEWATER RECLAMATION
23. Describe methods you are using to minimize erosion and to prevent the entry of silt into surface waters:
24. After use, the water is (1) retained in reservoir 0 ; (2) discharged into a stream or lake 0 ; (3) discharged into
settling ponds 0 ; (4) other 0. Describe: .
25. Does or will water being discharged contain waste materials? ❑Yes ❑No.
(1) Domestic 0 ; (2) Municipal 0 ; (3) Industrial ❑ ; (4) Agricultural 0 ; (5) Other ❑ . Describe:
26. Does or will water being discharged contain any specific material which is deleterious to fish and wildlife or which
would impair the water for beneficial uses? ❑Yes ❑No. Describe:
27. Describe what steps you are taking, have been taking, or can take to reclaim or indirectly reuse the water being
appropriated.
REMARKS
Please indicate the number of the item you are explaining:
On May 6, 1970, the Company filed a "Petition for Change in Point of Diversion" and
simultaneously filed a "Petition for Change of Place of Use". These petitions are the
result of engineering studies'accomplish.ed to date and in collaboration with the other
utilities mentioned in said petitions. To provide water for domestic use of the.compan-
ies' potential customers based on presently subdivided lands the total quantity of water
in the permit is considered essential. On 30 July 1971. the Comapny filed ppt-ition for
.. . .1 . ... so
. .. • - .
paragraph
one above. On 18 June, 1973, a hearing was held at which time both DWR Staff and Utility
were instructed to recheck data submitted in evidence. A preliminary meeting was held,
however the final meeting between the Staff and Utility has not been held. Company receive
letter of 23 August, 1974, from State Water Rights Control Board re: an EIR on subject
applications. On or about' 30 September, 1974, Company requested 120 day extension to
prepare EIR. However, on checking Company files it has been found that an EIR was
presented as part of June 18, 1973, hearing.
(If adc..; _...jI space is needed for remarks, attach number__ _ Jets.)
SUPPLEMENTAL QUESTIONS CONCERNING
_USE'OF RECLAIMED OR POLLUTED WATER
You should complete and return this supplement if you seek the benefit of Water
Code Section 1010 concerning cessation or reduction of use of water under this
water right through the substitution of reclaimed or polluted water or if any
of the questions concerning the potential use of such water are applicable to
your project or your water supply.
Are you now or have you been using reclaimed water from a wastewater treatment
facility or water polluted by waste to a degree which unreasonably affects such
water for other beneficial uses? /--7 yes jx / no
If credit toward use under.this water right through substitution of reclaimed
or polluted water in lieu of appropriated water is' claimed under Section 1010
of the Water Code, please show such amounts of reduced diversion and amounts -
of reclaimed water used in remarks section below.
171
Are you now or have you been reclaiming or reusing any of the water appropriated
under this :right? / / yes /,-'X/ no
If so, please describe in remarks section below.
(a) What is present availability or current potential for using reclaimed
water from a wastewater treatment plant or polluted water in place of the
appropriated water to satisfy all or part of your water needs?
(b) What is the current potential for reusing the appropriated water to satisfy
part of your water needs?
If you produce reclaimed water, or polluted water, is there a potential for
others to use it?
Please describe in remarks section below.
REMARKS
All water under this permit is for potable water for,the Utility's domestic
customers. Use of reclaimed water, if available, is not allowed at this time
by the. State Department of Health.
.*: .1
ATEOF CALIFORNIA - RESOURCES AGENCY
STATEWATER RESOURCES CONTROL BOARD
DIVISION OF WATER RIGHTS
77 Cadillac Drive, Sacramento, CA' 95825 •
WATER USERS:
Application
, EDMUND G. BROWN JR., Governor
18031'
• PerMit 13528 •
Water Code Section 1396 requires an appliCant te:exercise due dili-
gence in developing a water supply for beneficial use. The State
Water Resources Control Board, in considering. requests for extension
of time, will. review the-factsHpresented to determine whether there
is good cause for'granting an extension oftime'to complete the, .
project. Where diligence in completing the project is not fully
substantiated, the Board may set the matter-fOr hearing to determine
the facts upon which to baseformalaction relating. to the permit.
Formal action may involve:
•
. .
1. Revoking the peimit for. failure to proceed with due diligence
in completing the project.
2. Issuing a license for the amount of Water.heretofore placed to,
beneficial use under the terms of the permit.'
. .
3. Granting a reasonable'extensiOn. f. time to coMplete.construction
work and/or full beneficial: use of Water.•
l'he time previously allowed in your permit within which to complete
construction work and/or use of water has either 'expired or will
'expire shortly.. ...Please check below the action you Wish taken on
.this permit:
0 The project has-been abandoned and.I. request revocation.of the
permi . •
Signature •
0 Full use of waterhasbeen made, both as to amount and season,
and I request' license'be issued.
Signature
•
• . .
. . .
. .
0 The project is not yet complete. I request the...Board's.con-
sideration of the following petition for an extension of time:.
• PETITION FOREXTENSION OFTIME
'If start of Construction work has been delayed, Complete items '1,
2, and 3. • - • -
1. What has been done since permit yasissued.toward commencing
construction? Spe ati-achPri istati=nient . •
SWRCB 20c (1)' -(12/74)
2. Estimated. date construction work will begin ..unknown. .- .. .
3. Reasons why construction work was -not begun. within the. time al-
lowed by the .permit See attached statement.
If construction work and/or use of water is proceeding but is not
complete,.an extension,of time may be petitioned by completing the
appropriate items below. Statements must be restricted to construc-
tion or use of water only under this permit.
4. A (one-year) (two-year) (three-year) extension.of time is re=
quested to'complete construction work and/or beneficial use.of
water. (Indicate period of time.required.)
,How much water has° been ° used? of/year cfs
•
6.; . How many acres have been irrigated?
7... How many houses or people have .been served water?
8. Extent of past use of water for .any other purpose _ .
9.. What construction work has been completed during the last
extension?
10. Approximate amount,spent on project during last extension period
is.$.•
11. Estimated date construction work will be completed
12. Estimated year in which water 'will. be .fully. used
13. Reasons why construction 'and/or use of waterwere not completed
within time previously allowed
I declare under penalty.of.perjury. that the above is true and correct
to the best of my knowledge and ,belief.
Dated February •-12th, . , 19 79
at Tahoe Paradise , California.
TAHOE PARADISE WATER AND GAS CO.'
e_c-L
George C. Baron, Pres.
Note: A $5 fee mus ccompany a petition for t T?xtension of time.
SWRCB 20c (2) (3-74)
Pleo se;indicate':t6e: