Loading...
AP 06-06-02SOUTH TAHOE PUBLIC UTILITY DISTRICT "Basic Services for a Complex World" REGULAR BOARD MEETING AGENDA Thursday, June 6, 2002 2:00 P.M. City Council Chambers 1900 Lake Tahoe Boulevard, South Lake Tahoe, California Robert G. Baer General Duane Wallace, President BOARD MEMBERS James R. Jones, Vice President CALL TO ORDER REGULAR MEETING - PLEDGE OF ALLEGIANCE COMMENTS FROM THE AUDIENCE (Short non-agenda items that are within the subject matter jurisdiction of the District. Five minute limit. No action will be taken.) CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR ADOPTION OF CONSENT CALENDAR (Any item can be discussed and considered separately upon request.) CONSENT ITEMS BROUGHT FORWARD FOR ACTION I DISCUSSION ITEMS FOR BOARD ACTION Purchase of 480 Volt Switchgear for Main Plant (Ken Schroeder) Sludge Handling and Odor Control Facilities Project (Jim Hoggatt) REQUESTED BOARDACTION Approve Purchase of 480 Switchgear (Bid results to be presented at Board Meeting) Increase Task Order No. 56-A to Carollo Engineers in the Amount of $124,000 REGULAR BOARD MEETING AGENDA - JUNE 6, 2002 Construction Inspection and Testing Services for 2002 Construction Season (Jim Hoggatt) Export B-Line: Phase 3 (Richard Solbrig) Utility Billing Software Replacement (Carol Swain, Lisa Coyner) f. Payment of Claims PAGE-2 Approve Task Order No. 40 to AMEC Earth & Environmental, Inc. in an Amount Not to Exceed $118,000 Authorize Execution of Collection Agreement with the United States Forest Service, in the Amount of $10,620, Subject to Review/Approval by Legal Counsel Authorize Staff to Negotiate Contract with Selected Utility Billing Software Vendor for Software Purchase and Installation, Conversion, and Training Services in an Amount Not to Exceed $157,000 Approve Payment BOARD MEMBER COMMITTEE REPORTS a, Executive Committee (Wallace / Jones) b. Finance Committee (Wallace / Schafer) c. Water & Wastewater Operations Committee (Jones / Becker) d Planning Committee (Mosbacher / Schafer) BOARD MEMBER AD HOC COMMITTEE REPORTS a, Federal Legislative Ad Hoc Committee (Wallace / Jones) b. Park Avenue Redevelopment Ad Hoc Committee (Jones / Schafer) c. Lakeside Park Ad Hoc Committee (Jones / Becker) d. Special Litigation Ad Hoc Committee (Jones / Wallace) EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVES REPORT 10. 11. 12. BOARD MEMBER REPORTS GENERAL MANAGER I STAFF REPORTS NOTICE OF PAST AND FUTURE MEETINGS I EVENTS Past Meet/ntis / Events 05/29/02 - Meeting w/Washoe Tribe re: Comments on Alpine Co. Master Plan Environmental Report 05/31/02 - Congressman Doug Ose Alpine County Tour 06/03/02 - Operations Committee Meeting 06105/02 - National Groundwater Association Conference 06/05/02 - Meeting w/Dennis Crabb re: Comments on Alpine Co. Master Plan Environmental Report REGULAR BOARD MEETING AGENDA - JUNE 6~ 2002 PAGE-3 Future Meetings / Events 06/10/02 - 1:00 p.m. - Heise vs. STPUD CEQA Hearing (Heise) 06/12/02 - 10:00 a.m. - El Dorado County Water Agency Board Meeting in Placerville 06112/02 - 4:00 p.m. - Lahontan Regular Board Meeting in Bishop 06117102- 2:00 p.m. - Operations Committee Meeting at District Office 06/18/02 - 9:00 a~m - Alpine County Board of Supervisors Regular Meeting in Markleeville 06/18/02 - 6:00 p.m. - City of SLT Council Meeting at City Council Meeting in Placerville 06/19/02 - 8:00 a.m. - Employee Communications Committee Meeting at District Office (Director Becker is Board Representative) 06/19/02 - 7:00 p.m. - Meyers Roundtable Meeting 06/20/02 - 2:00 p.m. - STPUD Regular Board Meeting at City Council Chambers 06/26102 - 12:00 p.m. - Employee Recognition Picnic at District Office 13. CLOSED SESSION (Please note Closed Sessions are not open to the public) Pursuant to Govemment Code Section 54957.6(a)/Conference with Labor Neqotia- tors - Agency Negotiators: Robert BaerlGeneral Manager, Management Committee; Employee Or.qanization: Intemational Union of Operating Engi- neers, Stationary Local 39 Pursuant to Government Code Section 54956.8/Conference with Real Property Negotiators Negotiating Parties: Board of Directors, Robert Baer / General Manager Under Negotiation: Consideration of Property Purchase Property Identification: APN 01-080-80, APN 01-080-81, APN 01-080-82, APN 01-080-56, APN 01-080-60, APN 01-200-01, APN 01-200-10, APN 01-200-11 Pursuant to Government Code Section 54956.9(a)lConference with Legal Counsel- Existing Litigation: F. Heise Land & Live Stock Company vs. STPUD and Does 1 through 10, Inclusive; Alpine County Superior Court Case No. C18644 Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel- Existing Litigation: F. Heise Land & Live Stock Company vs. STPUD and Does 1 through 10, Inclusive; Alpine County Superior Court Case No. C18733 Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel- Existing Litigation: STPUD vs. F. Heise Land & Live Stock Company Inc., William Weaver, Eddie R. Snyder, Crockett Enterprises, Inc. CiV. S-02-0238 MLS JFM United States District Court for the Eastern District of California, Sacramento, CA Pursuant to Government Code Section 54956.9(c)/Conference with Legal Counsel- Anticipated. Litigation (one case) Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel- Existing Litigation: STPUD vs. ARCO, et al, San Francisco County Superior Court Case No. 999128 REGULAR BOARD MEETING AGENDA - JUNE 6, 2002 PAGE - 4 14. 15. Pursuant to Government Code Section 54956.9(a)/Conference with Leqal Counsel- Existing Litigation re: Meyers Landfill Site: United States of America vs. El Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK GGH, United States District Court for the Eastern District of California Pursuant to Government Code Section 54956.9(a)/Conference with Le.qal Counsel- Existin.q Litigation: STPUD vs. Lakeside Park Association, et al, County of El Dorado, Superior Court Case No. SC20010165 ACTION / REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION ADJOURNMENT (To the next regular meeting, June 20, 2002, 2:00 p.m.) The South Tahoe Public Utility Distdct Board of Directors regularly meets the first and third Thursday of each month. A complete agenda packet, including all backup information is available for review at the Distdct office dudng the hours of 8:00 a.m. - 5:00 p.m. Monday through Fdday. items on this agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear on the agenda. Designated times are for particular items only. Public hearings will not be called to order pdor to the time specified. Participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda items are heard; comments should be brief and directed to specifics of the item being considered. Comments on items not on the agenda can be heard dudng "Comments from the Audience;" however, action cannot be taken on items not included on agenda. Please provide the Clerk of the Board with a copy of all whiten matedal presented at the meeting. Tape recordings are made of each Board meeting and these tapes are retained in the Board Clerk's office for two years. South Tahoe Public Utility District · 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 - Phone 530.544.6474 · Facsirni{e 530.541.0614 SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Ken Schroederl Manager of Maintenance RE: BOARD MEETING June 6, 2002 AGENDA ITEM: ACTION ITEM NO: 6.a CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: PURCHASE OF 480 VOLT SWITCHGEAR FOR MAIN PLANT REQUESTED BOARD ACTION: Approve purchase of 480 volt switchgear DISCUSSION: The District held a mandatory pre-bid on May 23, 2002, for the purchase of new switchgear to replace the old existing equipment. Two bidders, WEDCO, Inc., representing Square D Equipment, and Grove Madsen representinq Cutler-Hammer Equipment were present for the pre-bid meeting. Bids received at the June 4, 2002, are evaluated on cost, delivery date, overall design, and the ease of installation by District personnel. The equipment must be compatible with the existing equipments footprint and wire lenqths. Asummaryofthe bid results and recommendation will be distributed prior to the Board Meeting, and also presented at the Board Meeting. It is the District's intent to purchase the equipment and install it in-house prier to the up- coming winter weather. SCHEDULE: Deliver,/and installation prior to winter weather COSTS: ACCOUNT NO: 1003-8281 BUDGETED AMOUNT REMAINING: $175,000 ATTACHMENTS: Bid results and recommendation to be presented at the Board Meeting CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES~ NO CATEGORY: GENERAL WATER SEWER X TO: FR: RE: SOUTH TAHOEPUBLIC UTILITY DISTRICT BOARD AGENDAITEM BOARD OFDIRECTORS Jim Hoggatt, Construction ManagedEngineer June 6, 2002 BOARD MEETING AGENDA ITEM: ACTION ITEM NO: 6.b CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: SLUDGE HANDLING AND ODOR CONTROL FACILITIES PROJECT REQUESTED BOARD ACTION: Increase Task Order No. 56-A to Carollo Engineers in the amount of $124,000 DISCUSSION: Carollo Engineers had originally estimated that it would take only 52 plan sheets to desiqn the Sludge Handling Facilities and Odor Control Project, but because of the complexity of the project, it took 80 plan sheets. The bid schedule could not be delayed due to environmental agencies requirements which forced Carollo Engineers to add a siqnificant amount of additional personnel to the project to stay on schedule. Task Order No. 55, which was to write specifications for prepurchasing centrifuqe equipment, has $61,000 remaining. That amount will be transferred to Task Order No. 56-A to partially cover the increase. The entire budget for this project's net effect is an increase of $63,000. SCHEDULE: As soon as possible COSTS: $124,000 ACCOUNT NO: 1029/8235 SHFOCP BUDGETED AMOUNT REMAINING: <$1,315,333> A I I ACHMENTS: Task Order 56-A, Carollo's request for increase CONCURHr~NCr= WITH M£QUESTED ACTION: GENERAL MANAGER: YES~Q. NO CHIEF FINANCIAL OFFICER' YES~- ' NO CATEGORY: GENERAL WATER SEWER X CAROLLO ENGINEERS, A PROFESSIONAL CORPORATION TASK ORDER NO. 56-A ENGINEERING SERVICFS This Agreement is made and entered into as of the 6th day of June, 2002 by and between South Tahoe Public Utility District, hereinafter referred to as "DISTRICT" and Carollo Engineers, hereinafter referred to as "ENGINEER". In consideration of the mutual promises, covenants, and conditions as addressed in the Master Agreement dated April 21, 1988 and as specifically hereinafter set forth, the parties do hereby agree as follows: PURPOSE The purpose of this Task Order Amendment is to provide for additional labor and personnel to in order to keep project on schedule and finalize design work for the dewatering building, sludge storage tank, and primary clarifier covers. 2. SCOPE OF WORK The scope of work for these additional Engineering services is contained in the ENGINEER's letter proposal of May 29, 2002 as outlined in Exhibit "A" as Tasks 1 through 7 which include preliminary siting, site visits, influent box analysis, darifier cover analysis, design, bidding assistance, and construction assistance. This proposal becomes a part of this Task Order by reference herein. 3. STAFFING Staffing will consist of Robert Gillette, Principal-in-Charge, Jack I~urnam, Proiect Manager, Scott Parker, Project Engineerand ScottJoslyn, Project Engineer. ENGINEER shall not change staffing without approval by DISTRICT. Any changes shall provide for equivalent qualifications as far as possible and practical. 4. DISTRICT RESPONSIBILITIE~ DISTRICT agrees that its officers and employees will cooperate with ENGINEER in the performance of services under this Task Order and will provide existing drawings and specifications for the incinerator building, structural calculations on the incinerator (if available) and data on existing feed sludge, cake and centrate quantity and quality. ge TIME OF PERFORMANCF Tasks will commence with approval of Board on June 6,2002 and end with the completion of the construction (approximately March 31, 2003). PAYMENT Payment to E NGIN EE R for services performed under th is Task Order Amend ment shall be as provided in Article IV of the 4/21/88 Master Non-Grant Agreement and shall not exceed the amount of One Hundred Twenty-four Thousand Dollars ($124,000.00) un[ess the scope of work is changed and an increase is authorized by DISTRICT. 7. INSURANCE COVERAGF ENGINEER's Errors & Omissions coverage shall be $5,000,000 aggregate with a deductible of not more than $500,000 for the duration of this Task Order. 8. LABOR CODE REOUIREMENTS All State of California prevailing wage laws must be complied with in the performance of work related to this Task Order. These include, but are not limited to, Labor Code Sections 1720 through 1860. 9. EFFECTIVE DATE This Task Order No. 56-A will become effective upon execution by both parties and shall serve as a Notice to Proceed upon execution by District. IN WITNESS WHEREOF, this Agreement is executed by the General Manager and Clerk of the Board of the South Tahoe Public Utility District, and ENGINEER has caused this Agreement to be executed the day and year first above written. Robert G. Baer, General Manager/Engineer Attest Kathy Sharp, Clerk of Board June 6, 2002 Board Approval Date Gary C. Deis, Principal License No. 27809 Expiration Date 3-31-06 Robert A. Gillette License No. 25218 Expiration Date 12-31-05 May29,2002 6249A.00 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Attention: Mr. Richard Solbrig, Assistant Manager/Engineer Subject: Amendment #1 to the Sludge Handling and Odor Control Facilities Project Dear Richard: The purpose of this letter is to: 1 ) Present our request for an amendment to the original contract for the design of the Sludge Handling and Odor Control Facilities Project and, 2) Request that our project number 6249A.00 (your P.O. # 10530) - Replacement of Sludge Dewatering Centrifuges be closed. Unfortunately, hours that should have been charged to the previous centrifuge replacement study were inadvertently charged to the final design project. We would like to close out the centrifuge replacement study to prevent this from occurring in the future. There is approximately $61,000 left in this project. As discussed with District staff, this "fast track" project has required the dedication of significantly more personnel than originally scheduled to meet the desired bid date. More time was spent in the initial phase of the project completing technical memorandums needed to delineate design components and requirements than originally anticipated. In order to maintain the original schedule for bidding the project the lost time had to be made up during the design phase. This was accomplished by increasing the project staffing level to accelerate the completion of the plans and specifications. In addition, the sheet count for this project went up from the originally anticipated 52 sheets to 80 sheets provided by Carollo. This is discussed in detail in the Scope of Work (Exhibit A, attached). Our Amendment #1 to the Sludge Handling and Odor Control Facilities Project, Scope of Work (Exhibit A, attached) includes just the additional tasks that have been competed and are included in this amendment. The amended engineering cost for the completion of the tasks contained in the Scope is $124,000. The development of this cost is detailed in the attached Labor Hour and Cost Estimate (Exhibit B). Engineering fees will be based on the current fee schedule. The project team for the completion of this project will remain unchanged. Please review our Scope and Level of Effort and, if acceptable, submit them to the Board of Directors for approval. Please contact us with any questions. Sincerely, CAROLLO ENGINEERS, P.C. Robert A. Gillette, Principal JLB:jnl Attached: Scope of Work %SEA/DATA\DATA\Client\Stpud_SEA\6249A 10 Dewatenng Fa¢ities/Solbrig L-352902 doc 1218 THIRD AVENUE, SUITE 1600 · SEATTLE, WASHINGTON 98101-3032 · (206) 684-6532 · FAX (206) 903-0419 EXHIBIT A SOUTH TAHOE PUBLIC UTILITY DISTRICT AMENDMENT #1 TO THE SLUDGE HANDLING AND ODOR CONTROL FACILITIES PROJECT Scope Of Work The following describes the additional work required to complete the development of plans and specifications for the Sludge Handling and Odor Control Facilities Project. Bidding and construction services associated with the construction of the new facilities will be completed as part of the original contract. The completion of this project has required the dedication of significantly more personnel than originally scheduled to meet the desired bid date. Time was lost during the initial phase of the project where the design technical memorandums were developed and reviewed with District Staff. We included in our original estimate the time for three small technical memorandums covering the design of the dewatering building, siting and dealing with the "ugly box." As the project was discussed with District staff, it became apparent that more detailed memorandums were required to clarify aspects of the project important to the District. An additional memorandum was added to discuss the clarifier covers. Four Technical Memorandums were finally developed and reviewed. The four memorandums were TM #1 - Centrifuge Building/Sludge Storage Tank Siting; TM #2 - Solids Holding Tank Evaluation; TM #3 - Building Layout and Components and; TM #4 - Clarifier Cover Evaluation. Each of these memorandums served to clarify different aspects of the total design in the minds of District Staff and helped Carollo identify and confirm District preferences for design components. Each was important in this aspect, however, each also reduced the time originally available to complete the design work. Once the TM's were submitted and District comments were thoroughly reviewed with staff, the design began almost 6 weeks later than originally scheduled. The process also increased the anticipated drawing sheet count from the original 52 sheets to the final 80 sheets supplied by Carollo. An additional 11 sheets were completed by District Staff and added into the project bringing the overall sheet total to 91. The limited building season in the Tahoe Basin does not allow time to be made up at the other end of the project. Carollo had to significantly accelerate the completion of the plans and specifications in order to meet the original bid dates required to begin underground construction this year in the Tahoe Basin. Since additional time was not an option, Carollo increased the project staffing. While not the most efficient means to completing the design of a project, it was the only means available to meet the schedule. Task 1 - Preliminary Siting - to be completed as indicated under the original design contract. Task 2 - Site Visits - to be completed as indicated under the original design contract. Task 3 - Influent Box Analysis - to be completed as indicated under the original design contract. Task 4 - Clarifier Cover Analysis - to be completed as indicated under the original design contract. Task 5 - Design - This is the only categ?ry effected by the requested contract amendment. As stated above, additional personnel were assigned to the project to maintain the schedule. The cost for the additional personnel assigned is reflected in Exhibit B (attached). The scope of work being completed changed only in the total personnel hours required to complete the work and the extra 28 sheets to fully develop it and show it for contractors bidding. Task 6 - Bidding Assistance - to be completed as indicated under the original design contract. Task 7 - Construction Assistance - to be completed as indicated under the original design contract. PROJECT SCHEDULE - No Change H:\Client\Stpud_SEA\6249A.10 Dewatering Facilities\300.80 Addendum #1 for Additional Funds.doc 2 TO: FR: RE: ACTION ITEM NO: SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM BOARD OF DIRECTORS Jim Hoqgatt, Construction Manager/Engineer BOARD MEETING June 6, 2002 6.c AGENDA ITEM: CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: CONSTRUCTION INSPECTION AND TESTING SERVICES FOR 2002 CONSTRUCTION SEASON REQUESTED BOARD ACTION: Approve Task Order No. 40 to AMEC Earth & Environmental, Inc., in an amount not to exceed $118,000 DISCUSSION: The Board approved a new staff position to provide inspection and testing service for the 2002-2003 bud(jet. Staff advertised and received seven applications, none of which met the minium requirements needed for this position. Instead of hiring someone who did not meet the District requirements and needs at this time, staff is requesting the Board approve Task Order No. 40 to AMEC Earth & Environmental, Inc., to provide the inspection and testing services for the 2002 construction season. Staff will re-advertise for this position again in the fall, and hopefully attract qualified applicants at that time. Staff recommends the Board approve Task Order No. 40. SCHEDULE: As soon as possible COSTS: $118,000 ACCOUNT NO: 2029-8157GMTNK1, 2029-8273 LONGWT,9098-8829 BLINII, 1029-8235 SHFOCP BUDGETED AMOUNT REMAINING: <$49,186>, <$677,228>, $346,702, <$1,135,333> ATFACHMENTS: Task Order No. 40, AMEC Earth & Environmental, Inc., proposal CONCURRENCE WITH REQUESTED A/~TION: GENERAL MANAGER: YES .//,~,.~ NO CHIEF FINANCIAL OFFICER: YES/ NO CATEGORY: GENERAL WATER X SEWER X AMEC EARTH & ENVIRONMENTAL, INC TASK ORDER NO. 40 ENVIRONMENTAL SERVICES This Agreement is made and entered into as of the 6th day of June, 2002 by and between South Tahoe Public Uti]ity District, hereinafter referred to as "DISTRICT" and AMEC Earth & Environmental, Inc. (formerly known as AGRA Earth and Environmental, Inc.) hereinafter referred to as "CONSULTANT". In consideration of the mutual promises, covenants, and conditions as addressed in the Master Agreement dated September 19, 1990 and as specifically hereinafter set forth, the parties do hereby agree as follows: I. PURPOSE Materials testing and inspection services for the 2002 construction season. 2. SCOPE OF WORK Tasks will include services of Materials Technician, Laboratory Testing, Project Management and possible Clerical Assistance as described in CONSULTANT's proposal dated May 21, 2002 which becomes a part of this Task Order by reference herein. 3. STAFFING Services will be provided by Arthur C. Legg, Field Services Supervisor, Robert B. Valceschini, P.E., Materials Department Manager and Michael Magee, Materials Technician. CONSULTANT shall not change staffing without approval by DISTRICT. A.n_y changes shall provide for equivalent qualifications as far as possible and practical. TIME OF PERFORMANCE CONSULTANT anticipates field work will begin on June 10, 2002 and be completed by October 30, 2002. 5. PAYMENT Payment to CONSULTANT for services performed under this Task Order shall be in accordance with CONSULTANT'S unit fee schedule for the persons assigned to the project task. The cost ceiling for this Task Order shall not exceed One Hundred Eighteen Thousand Dollars ($118,000.00), and will not exceed same except as provided in Article IV of the Master Agreement. 6. LABOR CODE REOUIREMENTS All State of California prevailing wage laws must be complied with in the performance of work related to this Task Order. These include, but are not limited to, Labor Code Sections 1720 through 1860. 7. EFFECTIVE DATE This Task Order No. 40 will become effective upon execution by both parties and shall serve as a Notice to Proceed upon execution by District. IN WITNESS WHEREOF, this Agreement is executed by the General Manager and Clerk of the Board of the South Tahoe Public Utility District, and CONSULTANT has caused this Agreement to be executed the day and year first above written. ROBERT G. BAER, GENERAL MANAGER/ENGINEER lune 6, 2002 Board Approval Date ATTEST: KATHY SHARP, CLERK OF BOARD SOUTH TAHOE PUBLIC UTILITY DISTRICT PAUL KAPLAN, ENGINEERING SERVICES MANAGER AMEC EARTH & ENVIRONMENTAL DATE 2 May 21,2002 AMEC Proposal No. 2-41Q-000274 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 AMEC Earth & Environmental, Inc. 780 Vista Boulevard, Suite 100 Sparks, Nevada USA 89434-6656 Tel + 1 (775) 331-2375 Fax + 1 (775) 331-4153 www.amac.com Attention: Mr. Jim Hoggatt Construction Manager/Engineer Re: 2002 MATERIALS TESTING AND INSPECTION SERVICES Sludge Handling and Odor Control Facilities and Various Other Projects South Lake Tahoe, California Dear Mr. Hoggatt: AMEC Earth & Environmental, Inc. (AMEC), is pleased to present our proposal to provide materials and testing services for the referenced projects. Our cost estimates are based on the plans and specifications for the Sludge Building, conversations between Rob Valceschini, P.E., Michael Magee (AMEC), and you, and our experience with similar, past projects for the South Tahoe Public Utility District (STPUD). It is our understanding that the STPUD is requesting that AMEC provide Mr. Magee to perform materials testing and inspection services for the Sludge Building and various other projects for the 2002 construction season. The STPUD has requested that Mr. Magee be available from June 10 to October 30, 2002, and work an average of 50 hours per week. The technician will be responsible for the sampling and testing of native soils, import backfill, and aggregate base during earthworks operations and the sampling, testing, and placement inspection of structural masonry, concrete and asphalt concrete during building construction and paving operations. South Tahoe Public Utility District AM EC Proposal No. 2-41Q-000274 2002 Materials Testing and Inspection Services Sludge Handling and Odor Control Facilities and Various Other Projects South Lake Tahoe, California May 21,2002 COST ESTIMATE June 10 to October 30, 2002 (102 days, Monday through Friday) Senior Materials Technician - Mike Magee 102 days at 8 hours RT at $80.00/hour ............................. $65,280.00 102 days at 3 hours CT at $100.00/hour ............................ $30,600.00 102 days at 190 miles at $0.50/mile ................................ $9,690.00 Total for Senior Materials Technician ........................... $105,570.00 Laboratory Testing Soils 12 moisture/density curves at $150.00 each .......................... $1,800.00 Concrete 30 sets of 4 PCC cylinders at $68.00/set ............................. $2,040.00 Masonry The specifications did not specifically state which method of testing is required for structural masonry. It appears that the intent of the specifications is to use the unit strength method. We have provided a cost for testing prisms should they be required. Unit Strength Option; 8 sets of 3 grout cylinders at $51.00/set .............................. $408.00 6 sets of 3 mortar cylinders at $51.00/set ............................. $408.00 9 masonry block compression at $65.00 each .......................... $585.00 Total for Masonry Unit Strength Option ........................... $1,401.00 Masonry Prism Option; 9, 12-inch prism at $100.00 each ................................... $900.00 9. 8-inch prism at $100 each ...................................... $900.00 Sample trimming, 1.5 hours at $53.50/hr ............................... $80.25 Total for Masonry Prism Option .................................. $1,880.25 Page 2 South Tahoe Public Utility District AMEC Proposal No. 2~41Q-000274 2002 Materials Testing and Inspection Services Sludge Handling and Odor Control Facilities and Various Other Proiects South Lake Tahoe, California May 21,2002 Asphalt Concrete 6 samples for full Marshall series at $490.00/sample ................... $2,940.00 Total for Laboratory Testing, Masonry Unit Strength Option .......... $8,181.00 Total for Laboratory Testing, Masonry Prism Option .................. 8,660.25 Project Management 22 weeks at 1 hour per week at $73.00/hour .......................... $1,606.00 Total for Project Management ................................... $1,606.00 Clerical 22 weeks at 2 hours per week at $40.00/hour ......................... $1,760.00 Total for Clerical .............................................. $1,760.00 Total Cost Estimate for 2002 Materials Testing and Inspection Services, Masonry Unit Strength Option .............. $117,117,00 Total Cost Estimate for 2002 Materials Testing and Inspection Services, Masonry Prism Option ..................... $117,596,00 Overtime rates will be charged for services performed in excess of 8 hours per day, Monday through Friday; and on Saturdays. AMEC assumes no work will be performed on Sundays or holidays. · AMEC assumes no work will be performed on the following dates: July 4, 2002 (Independence Day) September 2, 2002 (Labor Day) We also assume that we will not be required to participate on the apprenticeship program. If it is determined that we will need to, we will provide you with the cost to comply with the program. Page 3 South Tahoe Public Utility District AMEC Proposal No. 2-41Q-000274 2002 Materials Testing and Inspection Services Sludge Handling and Odor Control Facilities and Various Other Projects South Lake Tahoe, California May 21,2002 We trust this information suits your current needs. If you have any questions or require additional information, please do not hesitate to contact either of the undersigned at (775) 331-2375. Respectfully submitted, AMEC Earth & Environmental, Inc. Robert B. Valceschini, P.E. Materials Department Manager Reviewed by, Steven L. Vineis Laboratory Manager RBV/SLV/mm J:\Marketing\pro-O2-1ab',241 QOOO274~oro.wpd Page 4 SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Richard Solbriq, Assistant ManagedEnqineer RE: BOARD MEETING June 6, 2002 AGENDA ITEM: ACTION ITEM NO: 6. d CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: EXPORT B-LINE: PHASE 3 REQUESTED BOARD ACTION: Authorize execution of Collection Agreement with the United States Forest Service, in the amount of $10,620, subiect to review/approval by legal counsel DISCUSSION: The United States Forest Service (USFS) staff has been workinq on the permitting and environmental documentation for the B-Line Phase 3 project for the NEPA process. They are actually the lead agency. The USFS standard practice for the last seven years is tn require the project proponents pay for the USFS staff time to accomplish the environmental and permitting working in a timely fashion. Collection agreements similar to the one currently proposed were signed by the District and the USFS in 1996 for B-Line Phase 1, and in 1998 for B-Line Phase 2. SCHEDULE: Certifications and permits to be obtained by October, 2002 COSTS: $10,620 ACCOUNT NO: 9098-8828-BLNIII-PRMT BUDGETED AMOUNT REMAINING: $1,760,497 ATTACHMENTS: Collection Aqreement CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES~/ NO CATEGORY: GENERAL WATER SEWER X 02-CO-110519 00- COLLECTION AGREEMENT BETWEEN SOUTH TAHOE PUBLIC UTILITY DISTRICTAND USDA FOREST SERVICE LAKE TAHOE BASIN 1VLaA'gAGEMENT UNIT THIS COLLECTION AGREEMENT is entered into by and between South Tahoe Public LTtiS~_District, hereinatier referred to as STPUD; and the U.S. Department of A=_~icutture, Forest Serv/ce, Lake Tahoe Basin Management Un/r, hereinafter referred to as FOREST SERVICE; under the provisions of the Cooperative Funds Act of June 30, 1914 (16 U.S.C. 498). i. PURPOSE: To provide a mechanism for STPLq) to pay thek share of costs for environmental documentation of their proposed projects. The Forest Ser~4ce administers National Forest System lands on ~vhich STPLrD is under special use permit for waste water and drinking water facilities. STPUD currently proposes the following projects to construct and maintain waste water and drinking water fac~ties: Luther Pass B line Phase III Export Sewerline, Gardner Mountain Tank #2 Replacement, Iroquois Infiltration Gallery. Additionally, the development and completion cf a new Master Waste Water Special Use Permit has been proposed. The FOREST SERVICE requires an environmental analysis (in compliance with the National Environmental Policy Act) in order to evaluate these proposals, but is unable to schedule and finance the process of obtalnin_q this information wSthin the STPUD's desired planning schedule. STPUD desires to ~:ontribute financial assistance and/or facilkate the obtaining of the needed information from mutually a~eed upon consultants to allow the FOREST SERVICE to obtain the needed information to make a decision on an envircnmental analysis. In consideration of the above premises, the parties hereto a~ee as follows: H. S~f'UD SHALL: I. ADVANCE PAYMENT BY COOPERATOR TO FOREST SERVICE. Upon presemation of a Bill for Collection, make an advance deposit in the amount of TEN THOUSAND SIX HUNDRED TWENTY dollars and NO cents ($10,620.00) for the purpose of paying costs associated with project field reviews, environmental compliance (NTPA), resource specialist studies and or reviews of project applications and plans, GIS survey and mapping where appl/cable and monitoring where necessary and agreed upon by both parties. This amount includes required 18% overhead assessment. Exhibit A attached hereto, and by this reference incorporated herein, displays the breakdown of these costs. 1~ THE~ FOREST SERVICE SHALL: 1. ADVANCE BILLING. Bill the cooperator prior to commencement of work for deposits sufficient to cover the estimated costs (including overhead) for the specific payment period. Overhead will be assessed at the rate of 18 %. Billings shall he sent to: South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, California 96150-7401 2. Deposk the payments received fi.om the Cooperator into a Forest Service cooperative work fund. 3. Provide project office and field review by resource specialists, review and comment on contractor supplied environmental documentation or preparation of environmental compliance documents (NEPA), resource specialist(s) contact with STPLrD environmental consultant(s) and federal and state agencies, GIS support for survey and mapping where needed, and project monitoring where necessary and a~eed upon. 4. If additional funds are required to complete the documents, the FOREST SERVICE w~ bill the STPUD for additional money, in advance of continuing work on said projects. All funds used to finance the project must be collected in advance of expenditures on project. Additionally, a written modification to this instrument documenting the additional estimated costs will be executed by both parties as provided in IV.2. below-. Ff. IT IS bIUTUALLY UNDERSTOOD A/ND AGREED U-PON BY AND BETWEEN THE~ PARTIIES THAT: 1. For those projects involving an amendment or issuance of a special use permit, this instrument is accepted solely to expedke decisions on environmental documents (which may include the preparation of the documents), which appropriately discloses the effects of the proposed projects. Nothing herein shall be construed as obligating the FOREST SERVICE to approve STPUD's application to issue or amend a special use pemnit for the proposed uses. 2. MODIFICATION. Modifications within the scope of the instrument shall be made by mutual consent of the parties, by the issuance ora written modification, signed and dated by all parties, prior to any changes being performed. 3. PARTICH?ATION IN SIMtLAR ACTMTIES. This instrument in no way restricts the Forest Service or the Cooperator(s) fi-om participating in similar activities with other public or private agencies, organizations, and individuals. 4. PR/NC[PAL CONTACTS. The principal contacts for tiffs instrument are: Gary R. Weigel USDA Forest Service Special Uses Adrrfinistrator 870 Emerald Bay Road Suite 1 South Lake Tahoe, CA 96150 530 573-2672 530 573-2693 Email: gweigelOfs.fed.us Richard Solbrig South Tahoe Public Utility District Assistant General Manager 1275 Meadow Crest Drive South Lake Tahoe, CA 96150-7401 530 544-6474 Ext: 202 530 542-7073 Emall: rsolbrig~stpud.dst.ca.us 5. TEKMINATION. Any of the parties, in writing, may terminate the instrument in whole, or in part, at any time before the date of expiration. No parties shall incur any new obligations for the terminated portion of the instrument after the effective date and shall cancel as many obligations as possible. Full credit shall be allowed for each Partv's expenses and all non-cancelable obligations properly incurred up to the effective'date of te,wnination. 6. ENDORSEMENT Any cooperator contributions made under this instrument do not by direct reference or implication convey Forest Service endorsement of the cooperator's products or activities. 7. COM2VI~NCEMENT/EXPIRATION DATE. This instrument is executed as of the date of last signature and is effective through Dezember 3 I. 200Z, at which time it will expire unless extend 8. TAXPAYER DENTIFICATION NUMBER. The cooperator shall furnish their t,~x identification number upon execution of this instrument. 9. FREEDOM OF INFORMATION ACT (FOIA). Any information furnished to the Forest Service under this instrument is subject to the Freedom of Information Act (5 U.S.C. 552). 10. REFUNDS. Contributions authorized for use by the Forest Service, which are not spent or obligated for the project(s) approved under this instrument, will be refunded to the cooperator or authorized for use for new projects by the cooperator. 1 I. LEGAL AUTHORITY. The cooperator has the legal authority to enter into this instrument, ahd the institutional, managerial and financial capability (including funds sufficient to pay nonfederal share of project costs) to ensure proper planning, management, and completion of the project. IN' WITNESS WHEREOF, the parties hereto have executed this instrument as of the last date written below. BOB BAER, General Manager South Tahoe Public Utilky District Date Taxpayer Identification Number: Date NLARD3ETH GUSTAFSON, Forest Supervisor USDA Forest Service La~.:e Tahoe Basin Management Unit The authority and format for this instrument have been reviewed and approved for si=onamre by: KARINE WAGNER A~eements Coordinator USFS - IBET Province Date EXHIBIT A To COLLECTION AGREEMENT Between South Tahoe Public Utility District and USDA - Forest Service Lake Tahoe Basin Management Unit Description of Work: Field Suvey(s) connected with Bline Phase Review and report on ADEIS for Bline Phase HI. Consultation and meetings with STPL'D, TRPA and LRWQB. Plan review, NTPA documentation, consultation, and inspections for Iroquois Infiltration Gallery. Wildlife coordination for Gardner Mountain Water Tank. GIS map exhibits for Master Wastewater Special Use Permit. Resource surveys and inspections for NqEPA preparation. NEPA documentation for permit issuance. Resource(s):Wildlife Botany Landscape Watershed Heritage Resources En~wineefing Lands Special Uses Subtotal = $9,000.00 Administrative Costs (18%) = $1,620.00 Total to be Collected = $10,620.00 Job Code for Default to CWFS: SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Carol Swain/Information Systems Manaqer, Lisa Coyner/Customer Service Manager RE: BOARD MEETING June 6, 2002 AGENDA ITEM: ACTION ITEM NO: 6. e CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: UTILITY BILLING SOFTWARE REPLACEMENT REQUESTED BOARD ACTION: Authorize staff to negotiate contract with selected Utility Billing software vendor for software purchase and installation, conversion, and traininq services in an amount not to exceed $157,000 DISCUSSION: After the February 7, 2002 Board Meeting, when staff was authorized to proceed with the Request For Proposal (RFP) process for replacement of the District's Utility Billing software, RFPs to twelve software vendors were sent out. Of the seven vendors who responded, four were considered by staff to meet District requirements. These four vendors were invited to demonstrate the features of their software to District staff for evaluation. Staff also held telephone interviews with their current clients to determine user satisfaction with the product and with vendor responsiveness to user needs. Upon com- pletion of the preliminary evaluation process, staff narrowed the field to two vendors: Advanced Utility Systems and Springbrook Software. Upon completion of final evaluation of the remaining two vendors' proposals, staff is requesting authorization to award the contract to the selected vendor for utility billing software and professional services for installation, conversion, training, and maintenance services and to proceed with details of contract negotiation with input and approval from District counsel. SCHEDULE: Complete evaluation by 6/13; Negotiation of contract by June 30; Implementation & training: 7/22 - 11/30/02 COSTS: In an amount not to exceed $157,000 ACCOUNT NO: 1037-8361 BUDGETED AMOUNT REMAINING: $157,000 in 2003 fiscal budget ATTACHMENTS: Vendor Proposals and Preliminary Cost Comparison available upon request to the Clerk of the Board CONCURRENCE WITH REQUESTED ~r.~.l'l~ON: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES/ NO CATEGORY: GENERAL X WATER SEWER ! N F I N ! T Y South Tahoe Public Utility District Request for Proposal Utility Billing & Customer ~[nformation Software System Presented by ADVANCED UTILITY SYSTEMS March 15, 2002 ADVANCED UTILITY SYSTEMS Section 1: Executive Summary Advanced Utility Systems Corporation is proud to offer the South Tahoe Public Utility District a proposal that defines and distinguishes the key factors that will provide the foundation for a successful conversion to a new Customer Information System. We appreciate the opportunity to highlight some of the strengths of CIS Infinity, our Customer Information and Billing so,yarc application. After review of our proposal, we hope that the District will see that Advanced represents a safe and practical choice for a complete CIS solution. After reviewing this Executive Summary, we are confident that the South Tahoe Public Utility District will have a broad understanding of why so many public sector entities have chosen Advanced Utility Systems Corporation to provide the most functional, innovative, and progressive solutions available for CIS today. Company Strengths Advanced Utility Systems Corporation has a deep understanding of the water industry and its needs: the majority of the company's management installation, sales and support personnel have worked for utilities and public sector water providers themselves, and it is this experience and expertise upon which we draw to deliver powerful solutions. One of the key reasons behind Advanced Utility Systems Corporation's success is our proven track record. In 1997 the company began with a single client. In five short years we now have in excess of 45 clients. In 1999 growth topped 100%. In Year 2000 growth continued to be strong. In 2001 sales more than doubled those of the entire Year 2000, as word of the functionality and implementation successes of Advanced Utility Systems spreads. Product Functionality CIS Infinity has been developed so that the business objectives and needs identified in your RFP can be achieved. Following are a few of the unique features of the CIS Infinity product offering: Easy access to utility bills, reciepts, and CIS information - Easily handles customer inquiries from a single, easy-to-use window. Provide "real time" information - CIS Infinity is an easy to use, fully flexible application that will allow your Customer Service Representatives (CSRs) to focus on meeting customer needs. It also inlcudes rich functionality letting CSR's complete activities in real time. South Tahoe Public Utility District March 15, 2002 Page 1 of 4~3 ADVANCED Eliminate duplicate entry of information into the ne,v system - The fully integrated architecture of CIS Infinty ensures that the District will not have to duplicate the entry of data into thc system. Eliminate redundant paper production - Real time, with imegrated modular development the system reduces the need for printing copies of documents. · Enhance current system procedures by automating certain tasks - Soon to be released scheduler module allows users to schedule billing and other functions in the optimal manner for the District. · Support "ad hoc" report writing capabilities - CIS Infinity has an easy- to-use report writer for custom reports and extensive query capabilities. · Assist with conversion process for current system information - Data conversion experts from Advanced Utility Systems provide assistance in the conversion from the Districts existing CIS system. · Provide a user-friendly, easy to learn system - CIS Infinity is easy-to- use, and because it was built from the ground up as a windows product, therby using point-and-click display, numerous icons, and intuitive drop- down boxes it is easy to train new employees. · Provide the agency with state of the art 32-bit GUI software - CIS Infinity has been developed using true 32-bit graphical development tools. · Utilization of conventional hardware, operating system, & database software - Utilizes database independent technologyTM to allow the use of Microsoft SQL or Oracle database. The application runs on Microsoft NT Servers. Ensure ongoing, responsive, reliable technical software support - Advanced provides a comprehensive support system as part of the chosen annual support and maintenance package. Provide refinements through responsiveness to enhancement requests - Regular product releases ensure that CIS Infnity continues to as a market leader in functionality while taking advantage of the latest technological developments. Implementation Methodology A thorough understanding of our streamlined implementation process is key to assessing the value of choosing CIS Infinity as your billing and customer information solution. Our previous work with more than 45 implementations for utilities has been instrumental in the development of our conversion, installation, set-up and training solutions. We know from experience that thorough preparation and effective scheduling increases the confidence of your staff while keeping overtime and costs to a minimum - and that's as important to us as it is to you. South Tahoe Public Utility District March 15, 2002 Page 2 of 4~; ADVANCED UTILITY SYST E H$ On-Going Support Structure During and after the implementation, the on-going support structure of Advanced Utility Systems Corporation will provide that added value to make the successful conversion to CIS Infinity. There are several elements to our service package that are provided with on- going support and maintenance. Some of these services include: Help Desk Support - Advanced offers a variety of support services including the "Gold" 7-day a week 24 hour a day technical and user support, and the "Silver" "Business Hours" service. PC Anywhere 9.0 is used for dial-in support, or Citrix Metaframe or Terminal Server are used for support provided with intemet access, and site visits are made when necessary. Enhancements - No matter which support package is selected for the CIS Infinity system the South Tahoe Public Utility District, will be entitled to all ongoing enhancements to the system. These enhancements are included as part of the base support agreement and will be provided at no additional cost. Version Upgrades - New versions of CIS Infinity are included as part of the core support package. Historically new versions are issued annually. Continued Compatibility - Separating the back-end database from new versions of CIS Infinity means the South Tahoe Public Utility District can receive a new version and not be forced to upgrade your database. Or if you elect to upgrade your database to a new release of SQL or Oracle, Advanced is constantly testing in-house ail new database releases to ensure CIS Infinity is fully compatible with the latest database technology. This gives you the power to decide when it is time to upgrade database soft:ware, and not be dictated by the CIS application. Price Advanced Utility Systems prides itself on providing mission-critical software to Public Sector organizations for a reasonable price. CIS Infinity provides robust software, comprehensive support and cost effective solutions to the North American Utility marketplace. South Tahoe Public Utility DislaSct March 15, 2002 Page 3 of ADVANCED Future Versions Advanced Utility Systems is committed to keeping both our clients and our customers up-to-date with the latest technology and processes. Our policy of armual releases has allowed us to keep on top of the latest changes in both the utility industry and the software industry. Version 2.0, which is currently shipping, provides our clients with the advantages of Database Independent TechnologyTM and our Rate InfinityTM rate management system. We have also completed interfaces for automatic payment firms, 12 different meter-reading devices, and, most recently, Bill Presentment technology that allows our customers to offer bills and bill payments over the web. In CIS Infinity, Version 2, we have a product that is robust yet flexible but we are committed to go farther. Our next version will take full advantage of not only the web but of mobile and palm computing. We are fully focused on taking advantage of com/dcom technology and are striving to provide tools for our clients that will allow them to take advantage of technological change. As we commit to strengthen our product, we commit to ensure that our customers can take advantage of the latest technology and techniques to provide state-of-the-art responsive customer care and billing services. Benefits · Strong Company Stability and Mission · Innovative Product Functionality Realistic and Progressive Technology Structure/Future · Proven "Best Practices" Implementation Methodology · Consistent and Reliable On-Going Support Structure Competitive Price South Tahoe Public Utility District March 15, 2002 Page 4 of ADVANCED UTILITY SYSTEMS Section 3: Vendor Profile Advanced Utility Systems Corporation was formed in 1997 to provide Customer Information and Billing services exclusively for the utility industry. Our services include providing the application software, software installation, product implementation, and complete acceptance testing. The implementation involves training, conversion, and complete documentation. It also involves working with your technical experts in specifying hardware and communications technology and ensuring the interfaces to the software application selected by the South Tahoe Public Utility District are operating seamlessly. CIS Infinity taps the potential of SQL development and object-oriented Windows technology in order to deliver a flexible and dynamic utility billing software system. Within five years of releasing CIS Infinity, billing and customer information software, Advanced Utility Systems Corporation has established itself as one of the leading suppliers of customer information system solutions in the North American utility marketplace. The Advanced Utility Systems management team has proven experience in three key areas: innovative development of billing and customer service software for municipal utilities, a thorough understanding of the role of information technology in the utility business and a comprehensive understanding of the changing utility industry. That expertise has resulted in the creation of robust software, cost effective solutions and comprehensive client support. Over forty-five utilities in North America, and many with similar operating characteristics to the South Tahoe Public Utility District, have already chosen CIS Infinity as their software solution. Their search for an experienced company, with comprehensive, affordable, and easy-to-use billing and customer information software has led them to Advanced Utility Systems Corporation. It is our hope your search will result in the selection of an Advanced Utility Systems' solution, as we demonstrate the fit between your needs and our Solution. Advanced Utility Systems is a privately owned, independent company. Advanced Utility Systems is owner operated, dedicated to developing and implementing Customer Information and Utility Billing software solutions for the utility industry. The company has a single main office located in Toronto. Utilizing a single office allows the company to concentrate expertise in areas such as development and support, and to promote synergies fi:om working together. Visits to client sites are common, and sales efforts also generate a great deal of travel. The company has a single focus, and relies exclusively on a single product - CIS Infinity. Other services are in place to support this product - Data Conversion, Implementation Services, and Training. CIS Infinity has been developed in a modular format with modules activated/not-activated depending on your needs. South Tahoe Public Utility District March 15, 2002 Page 6 of 4U ADVANCED At present the company has 41 clients using CIS Infinity, with a further 8 implementations underway, slated for completion throughout 2002. Over half of our clients have migrated to Version 2, with the remainder scheduled to upgrade in the coming months. All new implementations are installing Version 2 of CIS Infinity. Advanced Utility Systems is a private company and bound by shareholder agreements not to divulge certain company financial information including Sales and Net Income data. If we were selected as the vendor of choice we would discuss how to provide the information you require. We can say that the company has experienced extremely strong growth in the past few years, that sales for 2001 more than doubled those from 2000, and that we are committed to serving the utility sector for many years. Advanced Utility Systems currently projects employment levels in 2002 to exceed 86 people. A break down by responsibility area is shown below. Total Employees 86 Senior Management 8 General & Administration 9 Sales and Marketing 6 Analysts/Developers 28 Implementation/Support Professionals 35 Advanced is proud of the team approach that it takes into every project. Advanced believes that this approach and rewarding our employees accordingly has led to very low turnover of staff. This low turnover has meant increased productivity, stability and has been the key to the rapid and successful growth of Advanced Utility Systems. Advanced Utility Systems is exclusively a CIS vendor. From formation several years ago, to the company's current position as a leader in supplying CIS solutions to the public sector, success has come because ora dedicated focus on the development and implementation of CIS Infinity in a manner that ensures innovation, flexibility and superior customer service. Choosing Advanced Utility Systems, and CIS Infinity is not a one-time action. The South Tahoe Public Utility District is selecting a long-term partner. This phrase is often used loosely, but with Advanced we back-it-up. CIS In£mity is updated every month with small features. They arise from activity with other clients - perhaps a new client has requested a customization that is being made available to everyone, or from technological changes, or fi:om improvements our development team has identified. New Versions of CIS Infinity are released every 18 to 24 months, incorporating new features and technology to meet market changes. When you select Advanced you join this ever-moving evolution, as all our customers, through their support arrangements, are entitled to all new releases. As the company South Tahoe Public Utility District March 15, 2002 Page 7 of 48 ADVANCED focuses exclusively on the utility sector we are able to devote our development expertise to building solutions for the future as well as today's market. Unlike vendors for whom CIS is a division of a larger entity who, depending on the whims of the parent firm, may or may not stay in the CIS business, Advanced is dedicated to the CIS sector. South Tahoe Public Utility District March 15, 2002 Page 8 of 48 ADVANCED Section 4: Application Software (i) Account Management The user interface is designed to provide access from the account inquiry screen to all customer information with the click of a mouse. CIS Infinity retains all customer history including calling history, correspondence notes, comments, service orders, usage, credit and payment for an unlimited period of time. It can manage single accounts, master accounts and temporary accounts. CIS Infinity also provides access to available and installed service offerings, product offerings, equipment offerings and program offerings. The South Tahoe Public Utility District needs to use the customer account for multi views into account transactions, consumption, payments, billings and adjustments. Account specific notes are readily handled by CIS Infinity. Menus are dynamic and as such users can decide what to call files and how the menus are to be organized. Navigation throughout CIS Infinity is simple. All information associated with a customer is available on a single, easy to read window. Common functions are available on the toolbar at the top. Below the toolbar is the Customer Information Band, which provides the most commonly accessed data at a glance. Seventeen well-organized tabs provide further information regarding the account. Data associated with that tab is available in the center of the window along with functional buttons. Accounts are located by simply typing the account number at any location throughout the software. A detailed search is available which may be customized to locate particular criteria. Clicking 'More' on the toolbar exposes a browser-like history of the most recently accessed accounts. (ii) Billing Management Cycle Billing Final Billing Regular Billing Manual Billing Flat Rate Billing Meter AdcVRemove Rate Code Changes Service Add/Remove All billing processes within CIS Infinity, including manual, estimated, budget, flat rate and rental, are simplified. Real time transactions eliminate the need for day-end processes. The integration of the customer information component and the billing component of CIS Infinity makes processing adjustments, estimates and final bills quick and easy. You can define your own exception parameters and processes, make special discount and credit arrangements for individual customers, implement alternative tax rates and apply multiple taxes. Cycle, date and event driven billing schedules are all supported by CIS Infinity. Time and volume based consumption are tracked and recorded through interval meters, while South Tahoe Public Utility District March 15, 2002 Page 9 of 48 ADVANCED consumption validation and estimation algorithms are handled through customer-based exception checking and billing. CIS Infinity provides you with simplified billing processes, including cancel and re-bill, bill re-print based on revised consumption history, single bill print from archives and bill register re-print. Bill registers are archived electronically. You have greater precision for exception checking, usage quoting and estimating based on unlimited reading history. CIS Infinity can be configured to offer different estimating procedures for each service. Bills, deposits and equalized billing can be estimated based on a user-defined formula, for example the amount of the last bill, the average of the last six months, year or two years, same as the bill six months, year or two years ago. With CIS Infinity you can also track the history of the service address and the previous customer's history for greater estimating precision. The software makes it possible for your organization to offer five different types of pre- authorized payment plans, including equalized and actual billing. CIS Infinity interfaces with all major financial institutions. Users can define the equalized payment quote formula based on consumption history. Payment plan accounts can be automatically reconciled and reminders and/or labels can be produced. Customers are able to choose which days their payments are drawn from their accounts. South Tahoe Public Utility District March 15, 2002 Page 10 of 4~ ADVANCED UTILITY SYSTEMS (iii) Credit and Collections Management Collections procedures including penalty pick up are automated based on collection parameters defined by the user. CIS Infinity will build credit ratings based on your specifications. The software stores unlimited collection history for each account, which is quickly accessible through the customer information screen. Collection history is customer specific and aggregates a customer's credit rating based on all of their previous properties. CIS Infinity automatically tracks payment arrangements and their current status, initiates collections procedures (call, notice and print) and assigns follow-up tasks. Collection parameters are specifically designed for deposits. CIS Infinity can be configured to provide automated interest pick up with interest applied to either the deposit or the account. CIS Infinity provides for the set-up of late payment and retumed check penalties. The system can also be easily configured to accommodate third party, guarantor and co-signer relationships. Arrangements may be added from the Main Customer Information Form by clicking on the 'Contact' tab. After clicking on the 'Add' button the Customer Account Arrangement window appears which allows for data entry. Once entered, the information appears in the Arrangement list. South Tahoe Public Utility District March 15, 2002 Page 11 of 48 ADVANCED (iv) Customer Service and Care The extensive contact module built in CIS Infinity will meet the South Tahoe Public Utility District need for complete customer contact - both direct-serve and self-serve. In the past the primary customer contact was done through the telephone or through walk-in visits. In the future tins will change as more and more customers wish to use the Interact to access details on their account and ultimately pay their bills. In either case the CIS solution must provide the information to the customer, and must provide the mechanisms the staffneed at the South Tahoe Public Utility District to complete the required "tasks" to meet the customers' requests. Of criticai importance are the features available to your CSRs, so that they can provide information to clients not seeking self-service, and can assign tasks from customers seeking self-service or direct service. The comprehensive integrated contact management system allows users to assign tasks and automatically generate them for many aspects of their business, creating a tool that supervisors and managers can use to manage workflow. All contact with a customer is available from one tab including notes, tasks, payment arrangements, letters, service orders, notice history, contact history and inquiry history. A simple click of the mouse allows you to view all of the customer's Instory at once. Users can use control files to configure CIS Infinity to automatically assign tasks for many activities. Users can assign tasks to specific users or to departments, set the date for the task to be performed and have the sof~vare track the task to completion. Integrated with the contact management component of the software, the service order system can be configured to automatically generate service orders in response to other activity within the system. For example, CIS Infinity will automatically issue a service order for a final meter reading on an account when the move out is entered. Whether generated automatically or manually, the service order system will schedule the service order, assign it to a user or department and track it through the entire CIS system until completion. CIS Infinity can store unlimited customer information including multiple names on accounts, all service address information including lot, plan concession and roll number, phone numbers for home, business, fmc, cellular, pager, employer, lawyer (and more) as well as e-mail and web addresses. CIS Infinity can be used to track customer demograpinc information. The open data structure allows for data exchange and integration with Interactive Voice Response. CIS Infinity supports and tracks all correspondence. It automatically imports customer information into your word processing program for the creation of individual letters or for the generation of form letters. All types of correspondence can be faxed or e-mailed directly fi.om the software, if your internal network supports these functions. South Tahoe Public Utility District March 15, 2002 Page 12 of 48 ADVANCED UTILITy SYSTEMS (v) Customer Management When customers call into the South Tahoe Public Utility District, they expect their Customer Service Representative to have knowledge of all correspondence with that customer. The contact tab is available on the Main Customer Service Form. Not only is there a record of historical transactions, but newsletters, notes, and service orders may be generated and tracked. See the section below titled Ad Hoc Letter Generation for further detail on these functions. The sof~ware allows you to identify and track customers independent of the service address. Customers in or out of the service area cannot only be tracked, but also a complete listing of services they utilize or can utilize can be associated to them. New move-ins, or move-outs can be identified and procedures are in place to then process these accounts. Detailed account summaries and account listings with drill down capabilities are available within the system. Each account may be defined as a member of a special group. These groups may be billed independently. South Tahoe Public Utility District March 15, 2002 Page 13 of 48 ADVANCED UTILITy SyST E H S (vi) Financial Management Advanced Utility Systems Corporation develops and implements Customer Information and Utility Billing Solutions exclusively. By following this "best-of-breed" approach, the development and implementation teams at Advanced have become experts in interface construction to meet the requirements of our clients. (vii) Inventory Management CIS Infinity provides for meter based billing activities, meter inventory based activities and meter testing programs. The meter inventory functionality of CIS Infinity supports multiple meter changes and tracks meters in the field, in stock, and scrapped. Through the automated link to the contact management system, CIS Infinity generates service orders for re-verification or repairs and produces reports for service orders and replacements. Lt* :~:r -,,.,... ~ ....... lt/'z4/1990 / I South Tahoe Public Utility District March 15, 2002 Page 14 of 48 ADVANCED UTILITy SYSTEMS (viii) Rate Management A key strength of CIS Infinity is its ability to handle a myriad of rates and contracts. CIS Infinity can handle every residential, commercial, and industrial rate currently in place. Using Rate Infinity TechnologyTM, we have developed a new rate engine that allows extremely complicated formulae and calculations that can be woven into individual rates, making secondary spreadsheets and manual work redundant. This total flexibility allows the software to accommodate rates, charges, fees, surcharges, taxes, adjustment clauses, rate determinants and dynamic rate assignments. CIS Infinity is also designed to handle more complex applications such as evapo-transpiration rates. 400278477 Service Ad~'ess 1220 ShllrH RD. ; T~ ~ter I Rate Des~iption South Tahoe Public Utility District March 15, 2002 Page 15 of 48 ADVANCED UTILITY SYSTE D*I S (ix) Service Address Management CIS Infinity separates the customer account number from the service address number. Combined they represent the complete customer account. Separated they allow information about the service address to be maintained with the building or premises. With the automated contact management system in CIS Infinity, the move in/move out process is simplified. With the completion of a move in/move out entry on CIS Infinity, the meter reading is automatically scheduled, the necessary service orders are generated and all information for processing deposits and final bills are prepared. South Tahoe Public Utility District March 15, 2002 Page 16 of 48 ADVANCED UTILITY SYSTEMS (x) Usage Tracking CIS Infinity is used in over 40 sites throughout North America to effectively manage usage. At each of these sites an interface has been developed with the meter reading systems including hand-held, automated meter reading systems, and large time-of-use systems. All Advanced clients use handheld reading devices for meter reading, and as a result CIS Infinity can fully accommodate your needs in this area. CIS Infinity has the ability to capture and track consumption-based usage based on the passage of time as well as measured flow. The system also validates consumption, processes reads and tracks unauthorized use. South Tahoe Public Utility District March 15, 2002 Page 17 of 48 ADVANCED UTILITy SYSTEMS (xi) On Line Help Documentation On-Line help is context sensitive allowing users to research activities specific to their needs, without needing to flip through a large cumbersome manual. It is not a one-time automation process, or the creation ora PDF file rather; it is accessible and readable, presenting information to users in a logical, hierarchical structure so that they can "drill- down" to collect more information if necessary, and easily navigate between topics. The on-line help is newly developed, allowing CIS Infinity to take advantage of current help techniques such as a series of drop-down menus and call-out boxes. The three main menu tabs are Contents, Index, and Search. These tabs can guide users and allow them to collect the information they need quickly and effectively. Users can printout topics if they wish to retain written help records. Changes to on-line help are made through advising one of the company's documentation experts, and letting them coordinate changes. A sample screen shot is shown below: ~ ,~o~u~o. Notice exempt customers : ~1 Modiyng a metea With the exception of equalized payment plan customers ~ ~g a met~ ~ ~9 with no draw Dom a bank, ail pre-authorized payment ~ ~g~e~~ ~ plan customers are automatically notice exempt. You do ;.. ~ R~e~ter not need to set the flag on their accounts. ~ ~ E~ m~a ~o~ ~ ~ ~t. ~ What do ~ou want to do? ~ co~ [~t~*op~I South Tahoe Public Utility District March 15, 2002 Page 18 of 48 ADVANCED Securi~ Security in CIS Infinity is extremely sophisticated but user friendly. The security has been structured in an "open" manner, in that upon the receipt of CIS Infinity there have been no pre-patterned security features. The system administrator can prepare a security plan, and designate rights and restrictions by user, group and section down to the field and table level. File Recovery Each Advanced client's DBA or IT department handles data backup and recovery. There are a wide variety of tools available, and we recommend scheduling regular nightly backups. Hand-Held Meter Reading Devices CIS Infinity is in-use or in-implementation at approximately 50 sites throughout North America to effectively manage usage. At each of these sites an interface has been developed with the meter reading systems including hand-held and automated meter reading systems. The majority of our clients use ITRON, RADIX, Sensus or DAP handheld reading devices. We are certain that we would be able to meet the needs of the South Tahoe Public Utility District in this area. Internet Capabilities A new module is nearing completion that will allow a utility's clients to "self serve" via the Interuet. Named Customer Infinity, and sold separately from CIS Infinity as a complementary module, the system will allow your customers to log-in via the web and review their bill, make a payment (using a third-party financial institution to link to banks and provide security), collect account information or history, and ultimately in future upgrades schedule service work and enter meter readings. User Defined Fields Field labels can be changed by users in some cases. In addition the extensive use of control forms allows users to define field names and values. The development team at Advanced is able to add fields if necessary, which would be priced based on hours of work necessary. Scanning of Documents and Pictures Advanced Utility Systems currently has one client using an imaging system for remittance processing purposes to which we have built an interface. CIS Infinity also has the ability to store hyperlinks within certain fields attached to documents or images stored on the District intranet. Further information would be required to determine the exact needs of the District in this area before commenting on the possibility and extent of any modifications for this purpose. South Tahoe Public Utility District March 15, 2002 Page 25 of 48 ADVANCED (B) Modifications Required to Meet the District's Needs After reading the South Tahoe Public Utility District RFP, Advanced Utility Systems sees no modifications necessary, except for the development of proper interfaces, to meet the District's needs. If the implementation process identifies unique custom needs, specifications could be established and an estimate of work requirements and price prepared. The South Tahoe PUD could consider whether to develop the customization or delay the work effort. (C) Maintaining CIS Infinity After Implementation Advanced Utility Systems Corporation has developed three levels of support, enabling you to pick the level that best suits your needs. Each of the plans provides coverage for the software application that includes three main elements - a support desk, product upgrades/updates, and ongoing training services. The support package does not cover hardware maintenance. "Gold" level is the premier support package. - We advise new clients to take the Gold level of support in order to ensure that all of your needs are met. Here are some of the features of the Gold Level of support: v' At its core, support services provide full access to new soRware upgrades and product releases. This means we will have our development team working on enhancing the software throughout the year, providing you with product upgrades and releases which are included as part of the Support Agreement. We are committed to providing you with new features to the software by investing in ongoing development without having you absorb the cost of these new features. · / Access to your own Support Web page. ,/ Access to Support Knowledge Base via the Web. · / Access to Frequently Asked Questions page via the Web. v' Access to useful Advanced Searches via the Web. ,/ Access to Build Logs and Build Downloads via the Web. · / Access to the Support Department via the Web, e-mail, fax, and 1-800 Support Hot Line. ,/ Regular updates issued to users regarding the status of your support items and the option of having them posted on your Web page. · / 24 hour, 7 days a week Support (weekends must be scheduled in advance). This pertains not just to the support desk, but also to activities during evening and night hours when the system is not in use (for example, Builds). ,/ Up to five Individual Users may send items to the Support Department for investigation. South Tahoe Public Utility District March 15, 2002 Page 26 of 48 ADVANCED ,/ All changes to documents requiring less than 30 minutes to complete, for example, Bill Prints, Form Letters, and Notices. · / Two Days of Workshop Training at Advanced Utility Systems provided free of charge for a User at your organization. ,/ Set-up of a test system at your organization, and training for your staff on how to maintain the test system. ,/ Annual Fee is 25% of your Current License Fees, with a minimum orS10,000 per annum. Current License Fees change annually, as determined in January of each year. This policy keeps support fees in line with the current state of software. "Silver" level offers the same upgrade/update services as Gold, but is priced at a lower level and provides a lower level of services available 8:00 a.m. until 8:00 p.m. Pricing is set at 22% of total license fees. "Bronze" service also offers the same level of upgrade/update service, but with still lower service levels. Only a few clients select it, generally mature clients with expert users. It is priced at 20% of license fees. In general the following process is in place to receive calls, or electronic support requests. This also highlights the rare occasions when problems are not solved immediately and require escalation procedures. Our front line support desk staff (analysts) initially receives problems. They solve many problems directly. For those problems that cannot be resolved in this manner a senior analyst/technician is called in. If their involvement is not sufficient, the expertise of system developers is sought. ri Issues are prioritized as Critical and High, Critical issues which impact overall system operation are dealt with immediately. High priority items are further prioritized, and handled over a 4 hour to 3-day period depending on the individual problem. Upon issue resolution the utility is notified. If the problem reoccurs, consultation with our director of customer service, and the utility staff is arranged to identify the root of the problem. In every case a solution is arranged. Our Vice President of software development plays an active role in ensuring all problems are resolved. We strive to create a formal solution process, but still maintain a flexible and personal approach We are able to use a series of network tools to remotely access your application - for example using Citrix Metaffame or Terminal Server and provide support on your system during daytime and evening hours. "Edits" and "fixes" that impact the system of all users South Tahoe Public Utility Dis~ct March 15, 2002 Page 27 of 48 ADVANCED UTILITy SYSTEMS are built into the base product, and issued with updates. We can also provide on-site support if needed. There are two main occasions when on-site support is requested. The first is immediately following the go-live where users seek immediate support. The second is after the system has been operating for a per/od of time and new users are using the system - perhaps existing users have moved into other roles or companies, and processes and practices are passed down without a full explanation. This is also a good opportunity to schedule refresher training to cover topics long forgotten. A new soRware management tool is now in use to manage the tracking of problems and the status of fixes and overall activity. The product is a third party tool called Service Wise. Each of our client's have/or soon will receive their own password protected web page to enter and monitor the status of support items. It has just completed testing at several current clients and is being extended to all our clients within the next few months. Updates and Upgrades Advanced has never had a customer not take an upgrade. Our conversion/upgrade process is very well managed, and we anticipate the South Tahoe Public Utility District would also upgrade as new releases are issued. As the rollout of a new version takes several months we support two versions while this is occurring. However after everyone has upgraded we focus on the new release. When enhancements are made - through customizations required for a client that are rolled out into the software, or through a modification - they are made through the web download process described below. Documentation is extensive and thorough. First, the software application is created to reflect the latest software changes. Second, this new update is posted to an FTP site, to which all clients have access, so that a copy of the new application can be loaded onto their server. Once clients have confirmed that the new update is on their server, they are ready to begin the last step in the update process. A time and date is established with each client, at a time of their convenience, to allow us to dial-in to their system to complete the final update. Updates and Upgrades are provided to all clients to ensure that our users are mrming the same version. These new versions of the software are provided to our clients free of charge, as part of their ongoing support agreement. Upgrades do require set-up, with the team at Advanced required to lead the effort. They are billed at market rates. In addition many users require training on the new system functionality, which is also offered at market rates. Generally updates do not require training or set-up hours from Advanced. We define Upgrades as "major" additions, modifications, or overall changes to the software application. Updates are "minor" additions, modifications or changes. Minor Updates are clearly reflected in a change to the third or fourth digit of the build number, for example, from Version 1.6.2 to Version 1.6.4, or Version 1.6.41 to Version 1.6.42. Upgrades involve major changes to the software and therefore are reflected in South Tahoe Public Utility District March 15, 2002 Page 28 of 48 ADVANCED larger incremental steps in the first or second digit of the version number, i.e. from Version 1.4 to Version 1.6, or from Version 1.6 to Version 2.0. In this way, all changes to the application are clearly identified through our effective version control methods. Updates to the software occur approximately once a month. They can incorporate new functionalities, new processes, and/or corrections to the code. Upgrades occur less frequently, historically once a year. They incorporate major changes to the software that integrates new functions, and new processes. In addition upgrades provide the mechanism for technical or architectural change, such as the introduction of database independence. New version releases require a structured plan of product release, set-up and training provided by experts from Advanced to maximize the effectiveness of the new functionality. Update and Upgrade procedures are straightforward and follow similar processes. Updates to the software occur approximately once a month. First, the software application is created to reflect the latest soRware changes. Second, this new update is posted to an FTP site, to which all clients have access, so that a copy of the new application can be loaded onto their server. Once clients have confirmed that the new update is on their server, they are ready to begin the last step in the update process. A time and date is established with each client, at a time of their convenience, to allow us to dial-in to their system to complete the final update. Upgrades occur less frequently, historically once every 18 months, and follow a similar efficient procedure as the one pertaining to updates. South Tahoe Public Utility District March 15, 2002 Page 29 of 48 ADVANCED UTILITY SYSTEMS Section 5: Itemized Costs Please find below a detailed breakdown of the price proposal for the South Tahoe Public Utility District. This breakdown includes a brief explanation of six main sub-sections: Conversion, System Installation/Setup, Training, Total Fees, and Support and Maintenance. Also included is a summary ofhourly rates for additional work efforts. (A) Conversion To provide an accurate and comprehensive assessment of the conversion process and the installation of the system, Advanced Utility Systems would usually propose to spend a several days analyzing your current system. At this time, Advanced Utility Systems is prepared to provide a detailed proposal, including an hourly estimate and a schedule for both the conversion and installation processes. However, it should be recognized that changes would be required once the assessment takes place. It covers most elements of data conversion, assuming your experts undertake the data extraction from your current system into Access files. rrn , l Diagnose existing system 20 a) Determine what data is available b) Determine what data is not available c) Determine what data can be trusted Map data fields from the existing system to new system 70 Programming/testing of conversion code on the existing system 40 Identify and correct exceptions and problems in conversion 70 Perform on-going conversions and ensure data mapping is correct 76 Formulate a "going-live" strategy 24 Total: 300 South Tahoe Public Utility District March 15, 2002 Page 30 of 48 ADVANCED (B) System Installation/Setup System Installation includes physically setting up the software at your site, as well as activity required to develop interfaces to other systems in place, and extensive system testing. In addition, setting up the control files will involve an assessment of current practices and processes, and input fi.om the implementation team on overall "best practices". Install Server Software 16 Install Client Software 8 Configuration of the control files 200 Set up interfaces with third party packages quoted only (General Ledger, 64 Itron MVRS, etc.) Additional hours will be required for new development once the complete interface needs of the South Tahoe Public Utility District are accurately determined. For example: complexity of data exchange. Test billings/cash processing/adjustments with installed settings 100 Full testing of processes of CIS Infinity with existing system. 100 Advanced staff on-site during the initial phase of parallel testing and live. Set-up of reporting using Ad-Hoc reporting tool 50 Total: 538 (C) Training Training is vital to maximizing the benefits of CIS Infinity. Classroom training is assumed, augmented by one to one training staff will receive during installation, parallel testing and going live. The training hours quoted are based on 25 hours per user, which in our experience is the minimum required for each user who actively uses the billing and customer service aspects of the software. In some cases, the requirement per user is less and in others, for example, administrator training, it will be more. We have assumed training for 12 users. Total training hours required: 300 classroom hours South Tahoe Public Utility Disthct March 15, 2002 Page 31 of 48 ADVANCED UTILITY SYSTEMS (D) Project Management The implementation of CIS Infinity will require Project Management efforts from both the South Tahoe Public Utility District and from Advanced Utility Systems. Advanced Utility Systems proposes the appointment of joint Project Managers, who receive guidance from an executive level steering committee. In addition to overseeing day-to- day activities the key activities of the Project Managers will include keeping the implementation schedule on-track, securing proper resources for the project, management reporting and issue resolution. (E) Total Fees Server License User Licenses Subtotal: Conversion Installation and Configuration Training Project Management Sub-Total: Total: 5@$3,000 300 hours~$150/hour 538 hours~$150/hour 300 hours~$150/hour 344 hours~$180/hour $35,000 $15,000 $45,000 $80,700 $45,000 $61,920 $ 50,000 $232,620 $282.620 This pricing will be considered valid for 90 days following the submission date of this proposal. F. SUPPORT Support and Maintenance Services are priced as a percentage of server and user licenses. To receive 7 days, 24-hour service our Gold support program is recommended. This coverage not only covers the phone or electronic time with the support desk, but also the time our technical staff work on fixing the problem, and accessing your system to make the fixes. This amounts to $12,500 per annum, which commences after the conclusion of a three-month warranty period. South Tahoe Public Utility District March 15, 2002 Page 32 of 48 ADVANCED U?ILITY SYSTEHS Hourly Rates The following is a listing of hourly staff rates for any additional work required by the South Tahoe Public Utility District outside the scope of any contract. Executive Consultant (ex. COO, CIO) Senior Development Consultant $ 250 $ 200 Product Development $180 Project Management $180 Product Configuration Interface Set-Up Product Testing Product Training $150 $150 $150 $150 Quotation: Only those items mentioned are included in the price. Prices are not valid after 90 days from the date of quotation. Stenographic and clerical errors are subject to correction. Travel, Meals, Lodging or relocation costs are reimbursed at cost. Please note that the above fees are based on our limited knowledge of your operation and may require revision following a more in-depth analysis. Rates: Hourly rates quoted apply to the roles quoted. Rates are subject to change with 90 days prior notice. Additional specialists may be used at differing rates. License fees apply to the blocks as quoted. License prices are based on Concurrent users. If additional licenses are sought, or if fewer licenses are purchased, adjustments will be required for both the Server and User license charges. Costs associated with Special Insurance and/or Bonding costs are passed to the client. This quotation is confidential and will not be shared with other entities. South Tahoe Public Utility District March 15, 2002 Page 33 of 48 ADVANCED Section 8: Implementation Advanced Utility Systems is expertly qualified and fully able to act as the single point of responsibility and sole implementer of the Customer Information Solution. Advanced will work with South Tahoe Public Utility District management, technical staff and users, as well as any necessary third-party vendors required to ensure successful product implementation and that hardware specifications meet your needs. Advanced also recommends the formation of a South Tahoe Public Utility District project team headed by a project manager. The Advanced implementation team will have a complete understanding of the software, as well as the experience gained from numerous successful implementations. The team from the District will have a complete understanding of your operations, needs, and specific functional expertise. Combined, the two groups will be able to successfully implement the software and develop solutions to the most complex problems. Involving the two parties to work together ensures total team support and commitment. Implementing a mission critical software solution requires a great deal of change and turmoil. Involving people from all levels in your organization can help your people understand the change and support the change. The following service components will be provided: Project Management Advanced Utility Systems will provide a senior level project manager to oversee all elements of the implementation including activities conducted by other vendors and South Tahoe Public Utility District personnel. Activities of the project manager will include: project supervision, work program administration and coordination activities; project time and expense management; project status reporting; change control management; and quality management. Product Configuration, Engineering and Conversion Advanced Utility Systems, working alongside the team from the South Tahoe Public Utility District will be responsible for each of these activities. Product Reporting Crystal Reports V8.5 is embedded in CIS Infinity. Users can take advantage of this to create over 100 standard reports, and virtually unlimited ad-hoc reports. For stylish presentation we recommend a few key "report-generating" users purchase Crystal Reports to allow reports to be formatted for presentation purposes. A listing of some ofCIS Infinity's 100 standard reports is provided below: South Tahoe Public Utility District March 15, 2002 Page 37 of 48 ADVANCED AGED ARREARS BLOCK SUMMARY COMPLETED TASK BY STAFF CONTACT CREDIT RATING CUSTOMER AR LISTING CUSTOMER AR SUMMARY LISTING CUSTOMER BY BILL CODE DETAIL CUSTOMER BY BILL CODE DETAIL CUSTOMER DEPOSIT INTEREST LISTING CUSTOMER DEPOSIT INTEREST SUMMARY CUSTOMER DEPOSIT LISTING CUSTOMER DEPOSIT SUMMARY LISTING CUSTOMER MOVING LIST CUSTOMER DETAIL LISTING Account Status Account Type Cycle Company Month Year Cycle Company Assigned To Company Date Completed Range Cycle Company Credit Rating Range Account Type Account Status Cycle Company Account Type Account Status Cycle Company Bill Code Account Status Company Bill Code Account Status Company Account Type Account Status Cycle Company Account Type Account Status Cycle Company Account Type Account Status Cycle Company Account Type Account Status Cycle Company Cycle Company Effective Date Range Account Type Account Status Owner/Tenant Company Produces a listing of Custumers with a current .4JR balance and 30, 60, and 90 aged arrears total. (This report uses the aging formulas as set up on the system). Produces a sutranary report for all consumption and revenue, broken down by service and block within each service. Produces a detailed listing of all completed tasks by staff. Produces a detailed listing of all customers by their credit rating. Produces a detailed listing of all customer A/R balances. Produces a summary listing of all A/R balances by cycle (1 page report). Produces a detailed listing of all customers with a bill code. Produces a summary listing of all customers with a bill code. Produces a detailed listing of all customers with deposit interest. Produces a summary listing of all customers with deposit interest. Produces a detailed listing of all customer deposits. Produces a list of all customer deposits in summary format by cycle (1 page report). Produces a listing of all customers moving in and out. Produces a list of customer #, account #, name and service address. South Tahoe Public Utility District March 15, 2002 Page 38 of 48 ADVANCED CUSTOMER TRANSACTION INFORMATION FLAT RATE BILL CODES AND RATES FLAT RATE AND RENTAL DETAIL Transaction Code Range Month Year Cycle Bill Code Company Effective Date Range Service Bill Code Produces a detailed listing of all customer transactions. Produces a reference listing of all Flat Rate Bill Codes with the corresponding rate. Produces a detail listing of flat rate and rental accounts, consumption and charges. FLAT RATE AND Company Produces a surmmary report of flat rate and rental RENTAL SUMMARY Month Range accounts, consumption and charges. GL ELEMENT DAILY Company Produces a detailed daily listing of all GL Element DETAIL Transaction Date transactions. GL ELEMENT MONTHLY DETAIL GL ELEMENT MONTHLY SUMMARY GL ELEMENT YEARLY DETAIL GL Number Range Company Date Range Month Year GL Number Range Year Range Company Account Status Account Type Company Letter of Credit Type Date Removed Range LETTER OF CREDIT METER CHANGE LISTING Produces a detailed monthly listing of all GL Element transactions broken down by day. Produces a monthly summary hsting of all GL transactions. OUTSTANDING TASK BY STAFF Produces a yearly summary listing of all GL transactions. Produces a detailed listing of all accounts with a letter of credit. Produces a detailed listing of all accounts that have a meter change. NOTICE EXEMPT Account Status Produces a detailed listing of all accounts that are CUSTOMER Account Type notice exempted. Company OTHER BILL CODE Effective Date Range Produces a listing of other bill codes and their rates. AND RATES Produces a detailed listing of all outstanding tasks assigned. PAP - LIST WITH AR BALANCE Assigned To Company Due Date Range Plan Type Cycle Account Status Corr~pany Bill Code Effective Date Range RENTAL EQUIPMENT BILL CODES AND RATES Service Order Type Company Completed Date Range SERVICE ORDER COMPLETED Produces a list of all customers on a payment plan, summarized by payment plan. Produces a reference listing of all Rental Equipment with the corresponding rate. SERVICE ORDER Service Order Type Produces a detailed listing of all cancelled service CANCELLED Company orders. Produces a detailed listing of all completed service orders. South Tahoe Public Utility District March 15, 2002 Page 39 of 48 ADVANCED UTILITy SYSTEMS SERVICE ORDER Service Order Type [ Produces a detailed listing of all pending service PENDING Company I orders. SERVICE ORDER Company I Produces a detailed listing of all printed service orders. PRINTED Print Require Date / Print Date / Service Order Number I Range SERVICE ORDERS Service Order Type I Produces a detailed listing of all service orders. Created By / Assigned To User / Assigned To Department I Print Require Date l Print Date [ Service Order Number P, un e | SEWER BILL CODE Effective Date Range [ Produces a reference list displaying the charges for the ISewer aND RATES [Bill Codes. TAX EXEMPT Account Status [ Produces a detailed listing of all accounts that are tax CUSTOMERS Account Type [ exempted. Company l TRANSACTION CODE [Produces a reference list of all txansaction codes in the LISTING [system. It will display the code, the description, the [debit and credit GL numbers, the element number and [the transaction type. TRANSACTION DAILY GL Number I Produces a detailed listing of daily transactions. SUMMARY Transaction Code Company TRANSACTION GL Number ] Produces a detailed listing of monthly txansactions. MONTItLY DETAIL AR Code Company / Date Range / TRANSACTION Transaction Month I Produces a summary listing of monthly transactions. MONTHLY SUMMARY Transaction Year / Transaction Code GL Number TRANSACTION Transaction Year [Produces a summary listing of yearly transactions. YEARLY SUMMARY / I2'NBILLED REVENUE Date Range I Produces a listing by cycle of estimated unbilled WATER BILL CODE Effective Date Range'1 ~;~;;'s a reference list displaying the consumption AND RATES [by blocks and charges for the Water Bill Codes. WATER METER BY Account Type [ Produces a detailed listing of all accounts with a Water ACCOUNT Account Status I Meter. Meter Status l Company WATER METER BY Account Type ] Produces a detailed listing of all Water Meters, by South Tahoe Public Utility District March 15, 2002 Page 40 of 48 ADVANCED CYCLE WATER METER BY METER WATER METER BY METER TYPE WATER METER BY REMOTE TYPE WATER METER BY SUBGROUP WATER METER BY TEST YEAR WATERMETER INACTIVE Account Status Cycle Company Meter Status Meter Type Company Meter Status Meter Type Company Meter Status Remote Type Company Meter Status Subgroup Company Meter Type Company Test Date Range Meter Type Meter Status cycle. Produces a detailed listing of all Water Meters by meter number. Produces a detailed listing of all Water Meters by meter type. Produces a detailed listing of all Water Meters by remote type. Produces a detailed listing of all Water Meters by subgroup. Produces a detailed listing of all Water Meters that need to be tested for a specific date range. To list all inactive Water Meters. CIS Infinity contains two powerful features to create quality reporting. The first is Advanced Search, and the second is Ad-Hoc reporting. Advanced search is built-in to the software, using internally developed tools. It allows users to identify any item stored in the database and present the findings. Through the use of conditional query building including if/then/andJor/greater than/less than and other commands allows users to find and group any information then use ad-hoc reporting to create a high quality report. Ad hoc reports, and Advanced Search queries can be saved for future use. These can also be edited for future revisions, saved or discarded. In terms of wild card usage the system supports partial and phonetic search plus on-line Ad Hoc queries. To ensure all users can take advantage of these capabilities we provide half or full-day training in the use of this tool. Query commands can be of unlimited length and the complexity is only limited by your need-to-know, and user skills. If Advanced Utility Systems is chosen to move to your next stage we can demonstrate this powerful technology through a product demonstration. Advanced searches can be done using the partial entry of text fields. CIS Infinity utilizes Advanced Automation to schedule numerous operations. This includes reports, which allows users to establish a production schedule for running all reports. South Tahoe Public Utility District March 15, 2002 Page 41 of 48 ADVANCED Product Interfaces CIS Infinity is a "best-of-breed" solution. As a result when it is installed numerous interfaces are required to ensure data is shared between systems. The implementation team at Advanced is skilled and experienced at developing these interfaces. Product Testing Advanced have a Quality Assurance Department in place to formally guide all product testing - be it Product Updates, Product Upgrades or Customizations. New development is tested before leaving the offices of Advanced. This testing is a critical step in software evaluation, but it must also be accompanied by on-site beta testing fi:om select clients. Before CIS Infinity is put into use at the South Tahoe Public Utility District numerous individuals will have tested it in innumerable ways. There are three main testing stages, performed at Advanced Utility Systems, between the sofavare development and its use at the South Tahoe Public Utility District. 1) Quality Assurance Testing The team of developers tests their work as it is completed, but these tests alone are not sufficient for the company to issue software to our customers. Therefore we have created a process to fully test the software before it is put into operation. When the developers feel the software application meets the design specifications they forward a test version of the software to independent testers. The test group evaluates the new programming to ensure it performs exactly as planned. If any problems are encountered they are entered into an internal tracking program called DevTrack where all errors or changes are tracked. Errors logged in DevTrack are returned to the software developers, who ensure proper edits are made. The revised program is then tested again. Those elements of the program that pass the testing are then incorporated in the "live" environment of the software, so that testing can occur at a client's site. This process is called Beta testing, where the software is tested in a live environment, facing real-world conditions. If the system does not perform as planned it is returned to the software developers for editing. If the system meets the rigorous conditions of the live environment, it is ready for production at all client sites, as well as implementation at the South Tahoe Public Utility District. South Tahoe Public Utility District March 15, 2002 Page 42 of 48 ADVANCED 2) Data Conversion Testing One of the most difficult aspects of implementing new software, particularly in the area of Customer Information Systems, which are rich databases, is the conversion of data from the old to the new system. Advanced Utility Systems has an established test procedure in place to ensure high quality data is moved from the old system to CIS Infinity. The following describes the key tools used in the test process. Once the initial conversion is complete, the data is used to produce practice bills at Advanced. The Advanced team will test the data from the perspective of a programmer and an end user. From this testing a list of changes is sent to the Advanced conversion team in order to re-write or modify the conversion routines. After these changes have been implemented the data will go through a second phase of testing. Converted data is then transferred to the South Tahoe Public Utility District system for the purpose of on- site testing. The District will complete a series of Conversion Test Reports as provided by Advanced in the Project Binder. Staff will identify anomalies in the conversion, missing data and any incorrect mapping of files. Conversion Test Reports are completed on a daily basis over several weeks comparing the current system to CIS Infinity to ensure that CIS Infinity is performing accurately and calculating properly. Advanced will continue to modify and re-mn conversions on an ongoing basis during the parallel phase to ensure that data is accurate and mapping appropriately for comparison purposes and that all anomalies have been effectively dealt with prior to Go Live date. 3) Soft/Hard Software Parallel Testing Testing of the system is an essential aspect of going live on CIS Infinity. We feel that our testing protocols have enabled users to understand CIS Infinity and its capabilities. Although the testing stages may seem lengthy, our current users have identified that the testing has aided them in facing the transition with ease and confidence. After training on several processes, staff will be ready to start a soft parallel on the system - this is defined as performing identified processes on both systems - allowing the monitoring of processes on CIS Infinity compared to the South Tahoe Public Utility District's current billing system. During parallel testing, all functions (billing, cash, collections, new services, etc.) are mn simultaneously on the current system and on CIS Infinity. The resulting comparison between the output from the current billing system and CIS Infinity ensures that the new system is performing accurately and calculating properly. South Tahoe Public Utility District staff will be asked to complete a series of Parallel Worksheets that support the staff to work through the more complex processes involved in paralleling. The South Tahoe Public Utility District will need to provide Advanced with the information gathered in order to adjust training and set up if necessary. These worksheets are integrated with the training process to provide staff with full documentation to refer to during parallel testing. South Tahoe Public Utility District March 15, 2002 Page 43 of 415 ADVANCED UTILITY SYSTEMS Product Installation and Post-Installation Support Advanced Utility Systems will provide immediate production critical support during the first 30 days of operation. As well the company warranties the system for 90 days after the "go-live", with resources available to provide the production critical support needed to ensure the software application is full functional. As part of the initial project plan the teams Mil determine what is necessary to achieve final system acceptance on behalf of the South Tahoe Public Utility District. Training Days Required Training is vital to optimizing the benefits of CIS Infinity. The more confident your staff is with using CIS Infinity the smoother the implementation process will be and the more effectively CIS Infinity will perform for you when you go live. Advanced Utility Systems believes that each client has unique training needs. The course offerings listed below are intended to give a sample outline of the foundation of the training program during the installation 0£CIS Infinity. All training will be provided on-site at the South Tahoe Public Utility District. Training is designed to be "hands-on", supported by documentation of the topics covered, so attendees can take away the information they need. Classroom training will augment the one-on-one instruction staff will receive during installation and parallel testing. In this case, we generally train billing and cash staff, customer service staff and meter inventory staff in separate groups, to ensure that we are making the most effective use of their time. The skill level of your staff (particularly their experience with Windows) and the way you allocate your staffing resources (whether staff are assigned individual aspects of the billing process or whether all staff use all aspects) are the primary factors which will be taken into consideration when we determine a final training plan for your staff. By the completion of Administrator Training, you will be able to set up new rates and services, implement multiple rate classes and structures, and customize bills by customer type. We will also train you to utilize aspects of the system that will be crucial to your future growth. The Staff Training usually takes place in distinct sessions throughout the installation and post-live stages depending on your needs. Based on our experience with previous implementations, we have developed an integrated approach to training - one that not only reflects the set-up of CIS Infinity at your utility but also progresses logically for your staff. As each training component is completed, your staff will be ready to run parallel with those functions. South Tahoe Public Utility District March 15, 2002 Page 44 of 48 ADVANCED Throughout the implementation phase and the first several weeks live on CIS Infinity your staffwill have full access to the same Advanced team members who trained them. This ensures that we are totally familiar with the needs of your staff and that your staff has a h/gh level of comfort. Our commitment to training and client support means that we do not leave until your staff has everything they need to do their jobs. The training needs of each client differ from site to site dependent on factors such as the complexity of business procedures and functionality required atthe District. For the purpose of this response, based on our experience with clients of similar size and services offered, we believe between 35 and 40 days of training will be required. Applicable Courses and Target Audience The course offerings listed below are intended to give an outline of the foundation of the classroom-training program during the installation of CIS Infinity. ISystemOverview i 2 days Daily Processing 2 days Any staff who will be using the system in any capacity. Any staff who process daily functions on the system - moves, meter changes, adding new accounts, etc. 8-10 On site On site Cash Processing 1 day Any staff who process 8 On site cash. Collections 1 day Any staff who monitor 8 On site or process account collections. Billing 3 days Any staff who bill 8 On site accounts on a regular basis. Service Orders l day Any staff who would 8 On site be working with or creating service orders. South Tahoe Public Utility District March 15, 2002 Page 45 of 48 ADVANCED UTILITY SYSTEMS Asset Management - Overview Asset Management - Detail Reports System Administration 1 day per Inventory System 1 day per Inventory System I day 2 days Any staff who monitor the company's asset inventory systems including meters, transformers, water heaters and instrument transformers. Also, any staff who report on the systems assets or manipulate data for reporting purposes. Any staff who monitor the company's asset inventory systems including meters, transformers, water heaters and instrument transformers. Also, any staff who report on the systems assets or manipulate data for reporting purposes. Any staff with responsibility for reporting on system data and/or month and year end procedures. Usually one or two staff members in a supervisory capacity who are responsible for administering the system - changing control files, altering user menus, etc. 8 On site On site On site On site or at Advanced Utility Systems Offices South Tahoe Public Utility District March 15, 2002 Page 46 of 48 ADVANCED UTILITY SyST E H S Refresher l ay This course is usually a combination of any aspects of the previous courses. It can be attended by new staff or staff with specific questions. This course is most effective, several months from the 'live' date. 8-10 On site South Tahoe Public utility District March 15, 2002 Page 47 of 48 PI:tlNC, BPEOOK SOFTWARE Ms. Carol Swain South Tahoe PUD 1275 Meadow Crest Dr. South Lake Tahoe, CA 96150 March 15, 2002 Dear Carol: Thank you for your interest in our company and its products and for asking us to respond to your RFP. Springbrook has been providing a wide variety of comprehensive, fully integrated software solutions to local governments and special districts for over 16 years. We are currently one of the fastest growing governmental software providers in the nation. We currently service over 230 clients across 16 states. All of our software applications were developed utilizing 100% graphical development tools, resulting in a tree 32 bit, Windows-based product. Our software is available for use on Windows NT based networks, as well as a number of manufacturers' UNIX based machines. Why Springbrook is Different: Unlike many software products that grow stagnant over time, our systems are constantly improving and evolving both technically as well as functionally. Our user group provides input concerning new product features. We pride ourselves in keeping our products on the forefront of technology so our customers will never find themselves stuck with a technically obsolete product. Springbrook Software, Taking Advantage of the Power of the Web: We have just recently announced our optional ASP (application service provider) delivery model. This type of software delivery model has become quite popular in recent years. Many of the fortune 500 companies are taking advantage of this software delivery model in order to increase efficiency and reduce costs. In the ASP delivery model the software applications reside on our server and your agency accesses the software over the web, as compared to traditional direct licensing where the software resides on your machine. There are numerous advantages to tiffs approach, including reduced implementation costs, reduced hardware and hardware maintenance costs, as well as reduced costs associated with system updates, backup, disaster recovery, etc. Your data is totally secure. Springbrook Software has also developed a way for you, as a city, to allow your customers access to their account information 24/7. This product, LIB Payments.corn, gives them the ability to search their payment history, current balances and even input a service request all via the Internet. To learn more of this product and others, please visit our web page at www.springbrooksoftware.com for more information. Jay Kendell Account Executive iavk(&sprbrk.com m:jk attachments: 720 SWWashington Street, Suite 330, Portland, OR 97205 Ph: (503) 973-7750 Fax: {503) 973-7760 Section I: Section II: Section III: Section IV: Section V: Section VI: Section VII: Section VIII: Section IX: Section X: SPRINGBI OK 501 '1 \~, .,'\R I Response to RFP For South Tahoe PUD Executive Summary & Company Profile Applications Information RFP Questions Implementation -Training - Documentation Examples Software Support and Maintenance Hardware Requirements Reference Lists Standard Agreements Miscellaneous Information Cost Analysis SOl '1 \¥/\1~.1 I. Executive Summary Background Spr/ngbrook Software is a corporation specializing in integrated fund accounting. Financial applications include General Ledger, Accounts Payable, Budgeting, Payroll, Accounts Receivable, Fixed Assets, Central Cash Management, and Inventory. Customer Information Service applications include Utility Billing, Licensing and Permitting, and Special Assessments. Our clients include cities, counties, special districts, utilities and non-profit organizations. The flexibility of our Windows applications allows us to empower clients with the fight tools for their particular needs. Up until four and a half years ago, Springbrook Software provided fully integrated, DOS based systems to local Municipalities. Customers loved the flexibility and functionality of the applications. One major issue was outstanding, the year 2000. Most software vendors patched their existing software and attempted to put in a front-end GUI/Windows patch. At Springbrook we took a different approach and rewrote the entire suite of applications in a state of the art database called Progress. These applications are 100% windows oriented. Today, with the development of our new Client/Server products and ASP Interact based solutions, we market to and support customers across the Country. Kev Requirements The desired system must provide a complete solution that can address the information management needs of all departments. This includes all required computer sofavare, installation, mining and post implementation support and assistance. Application software must be designed to process and maintain a Financial Accounting Sofavare system and other requested applications. The entire system should allow each department to function independently and yet enable selected resources and information to be shared. Proposed Solution Springbrook Software is proposing a complete system solution designed to satisfy the needs of the organization. We are proposing a total solution that is currently relied on by local government agencies throughout the United States. The Springbrook solution includes computer application software and a full program of implementation and support services. Application Software The next ingredient in a successful computer system is quality application software. In this case, Sprmgbrook can propose a complete family of applications designed with two important considerations in mind. One, the programs were created to meet the specific needs of municipalities and utility districts. Two, the sof[ware was designed to be a true Client/Server application; completely Windows based, with GUI (Graphical User Interface) screens. Springbrook utilizes the Progress Database, which is one of the top databases in the world. Over sixty percent of the fortune 100 companies use Progress in their operations. Open Data Base Connection allows for easy integration to all other applications, such as spreadsheets, other databases and GIS systems. The system can also be nm on multiple platforms such as Windows NT, 2000, and UNIX. The Springbrook applications were designed with the active participation of experts from local government agencies and are therefore proven programs for agencies like yours. Each application software module is designed to provide the appropriate integration with other applications in the system. This means that once the data is entered in the system computer and/or communication systems within the organization, it is automatically transferred to all other records or files that should be updated. This integrated soRware design enables all deparhnents to have access to current information without unnecessary duplication of efforts. All of this integration and interface flexibility is possible without jeopardizing the required confidentiality and security of the data contained in the system. Each of the proposed applications includes multiple levels of security control to insure data integhty. Implementation Services and Support Finally, to bring the system together into a working unit, we are proposing a complete program of implementation and on-going support services. The implementation services include implementation plans, installation and testing of the softxvare; set-up, operator training and general assistance as you conve~t from your existing system to a computerized system. Our installation and customer support department will work closely with you to expedite the introduction of the computer system. The on-going support services include sofavare maintenance and updates, and operator assistance. Our support services include the use of remote on-line access that enables us to provide immediate response to most of the situations for which your operators require assistance. In addition, we maintain a support section on our web site that enables clients to view their own open work orders and their status on line and download their own service packs right over the Intemet! This package of services is designed to help you achieve "full system productivity" as quickly as is possible. Company Profile SPEINGB K S~DI ' I \V,'\I( F ORGANIZATIONAL INFORMATION - Implementation Division The Spdngbrook Software Company 720 SW Washington Street Suite 330 Portland, Oregon 97205 Phone: 503-973-7750 Fax: 503-973-7760 Fed Tax ID: 93-0933508 w~vw.sprbrk.com Sales/Marketing Department: Jay Kendell Vice-President of Marketing Contracts Administration Account Executive Scott Stickel Madly Rementeria Extension 330 Extension 334 Extension 301 Implementation Services Department: Project Manager John Rowe Extension 317 Customer Support and Services Department: (support requests may be sent on line at www.sprbrk.com/customersonlv/cosupport) Customer Services Manager Customer Support Char Baumgardner Call Center-Amanda Dredge Extension 341 503-820-2240 Key Management Experience: About Springbrook Software What we do Springbrook SoRware develops and markets cliendserver software solutions for local government, special districts, and non-profit organizations. More than simply sot~ware, these innovative applications are tools designed to aid our customers in managing large flows of information with efficiency, speed, and convenience. Springbrook understands the importance of flexibility in software design necessary to meet the frequently changing demands facing our clients. We never cease striving to provide only the best possible solutions for whatever demands our customers may face. Our Past In 1985 our founder, Rick Rementeria, was asked to help a local city with its search for a utility billing package. After discouraging results Rick sat down and began creating what would become both our first product and a successful sof~are company. Since that time our product line has continued to grow and individual applications have evolved as we have added features, efficiency, and ease of use. Springbrook's headquarter office is located in downtown Portland, Oregon. The company currently employs 40+ people, including a number of former local government employees and elected officials who provide a unique insight into the problems facing our clients. Our staff, coupled with the company's 16 years of experience in this industry, gives us the unique advantage of truly understanding your business. Our Present and Future Springbrook currently services over 200 customers in fourteen states throughout the country. The company is actively pursuing growth in all parts of the US and is positioning itself to be the dominant local government software vendor in its market. Our training services are provided either on site or in our training center in Portland, Oregon. We are also able to provide these and many other services to you and for you (and YOUR customers as well) over the Intemet. Corporate Summary Springbrook Software is the emerging leader in Government Software, speciali25ng in Financial and Utility Billing so~vare for local government, non-profits, and special districts. Established in 1985, Springbrook Software developed its first application for an Oregon city. Since then, the product line has grown to 16 applications. The software is known as being mature, 100% windows oriented, powerful, and intuitive. · Established in 1985 · Privately held corporation · Headquarters in Portland, Oregon, with offices, Business Partners in; Eugene, OR; Jackson, MI; Springfield, I1; Woodbury, MN; Cape Coral, FL and San Leandro, CA. · Serving municipalities, special districts, and non-profit agencies Wide range of Support: (Technical support, management services, implementation and training) 4m Generation Relational Database (SQL and ODBC compliance) · Software is 100% windows, with GUI screens · Open Systems Environment- NT, Unix · National and Regional User Group Meetings ! ! I I Utitity Biliin9 Features · Meter reading interface · Bar-code scanning · CASS certification/Postalbar.coding · Up to eight services with unlimited charges/rates within a service · Service orders · Backflow (cross-connect) scheduling · Shared lot master with Business License and Assessment Accounting · Shared master file with Business License, Assessment Accounting, and Miscellaneous Accounts Receivable · Real time data entry (Cycles can be billed while cash receipts are entered) · Interface with GIS systems · Unlimited notes per customer · Date sensitive comment/status section (i.e. 'Promise to pay by') · Unlimited consumption and transactional history · Simplified closing procedure · Credit and delinquent notice tracking · Meter change-out routines and automatic tracking · Deposit and refund capabilities · Winter and sewer averaging available by user-defined criteria · Automatic direct debit for customers · Internet access for account inquiry and bill payment · Debit and credit card payments using the Intemet, touch-tone phone, and kiosks · Delinquency notification by phone, fax, pager, and email · Automated cash payment and receipting system interfacing to POS cash drawers · Scanning capabilities · All rates are tax ready UtiiJty ~illin~ Features (continued) · Unlimited meters per account · Three name files: Master, Owner, and Bill-To · Payment processing (lock box) services · User-defined partial payment order with override capabilities · Supports up to 999 cycle/routes with unlimited number of customers · Ability to change meter reading sequence without changing account number · Integrated to General Ledger ~,?1 I\\ \1~.1 Sot'tware goes through a cycle of development stages. A product beg/ns its l/re cycle in the envision stage, where ideas are created and modified. Ideas then are evaluated, modified and finalized prior to design and coding. Springbrook Software uses a multi stage approach to testing. Below is a very brief synopsis of the product testing cycle. Plan n in g - This includes numerous reiterations of defining objectives, goals and product functionality. Comparative product evaluations and analysis are performed to insure product interface capabilities and task differentiation. Design - This stage involves the both the internal (interaction and integration) and external (user point of view) function of how to provide the planned capabilities of the product. External design includes all screens and other input and output information. Internal design is comprised of three separate and distinct task, structural design, data design and logic design. Coding and Documentation - During this phase the programmers write and begin the initial test for the product. Initial testing is done with glass box code testing, sometimes called white box testing. It is a focused test where the programmer tests each piece of the product, check for control flow, verify data integhty, check internal programming boundaries and do specific software testing. Final Testing and Maintenance - Performance testing may involve glass or black box testing or a combination of both. By further applying regression and acceptance testing Springbrook can be assured that the product is ready for beta release. The betaphase oftestingincludes initial stability assessments, functionality and system tests, and integrity release testing. Post Release and Maintenance - Springbrook is constantly having its users evaluate current software for overall functionality, keyboard handling, terminal handling, screen identification, eh:or handling and interface style. Any customer comments are routed through the Change Control Committee (which is comprised of Springbrook personnel and Springbrook customers), which summarizes the changes and ask the entire user base to vote on what they would like to see in the next revision. SPRINGBOK SOI IWARI IV. Implementation - Training. Documentation Migrating to a new financial software application can be both an exciting and exhausting undertaking. At Springbrook Software, we consider Implementation Management Services as vital to a successful implementation. We assign an Implementation Manager to manage all aspects of your implementation. This manager works as a consultant to your team; managing your workload, checklists, task lists and keeping you apprised of the status of your project. Your Implementation Manager will communicate with your team via on-going telephone and conference calls as well as written documentation. Springbrook Financial specialists conducts an [PS (Implementation Planning Session), a thorough review with your employees, reviewing your current business practices and the way you wish to perform those practices after going live with your new software. We feel you deserve to know how much your project is going to cost and what it will involve before signing contracts. We therefore require that this billable service (cost is included in implementation management services) be conducted prior to contracts being signed. Both sides need to know everything possible about each other, the scope of the project, and how Springbrook wilI address your needs and requirements. After the IPS has been conducted Springbrook will give you a write up of our findings about how your agency needs to implement the new software. In addition you will receive a firm price on doing a data conversion, any requested programming modifications, and/or all other potential costs relevant to this project. Springbrook Software also provides a resource manual (Implementation Planning Session manual) designed to help make your transition a smooth one. This manual contains information about sofavare installation, training, data conversions, user support, hardware and networking requirements and other topics. Worksheets and checklists are included to fill out as you progress through the implementation process. The following excerpts from our resource manuals illustrate what you can expect in a Springbrook implementation. Implementation Launch When we launch an implementation, we begin by making sure that you have an implementation team assigned to you. Your implementation team launches you implementation by: gathering information about your site from the sales team, outlining your particular implementation, and sending you an implementation manual. Implementation Plan Using all the information gathered from the IPS regarding the hardware and networking evaluation and the finance structure and system evaluation, the Implementation Project Leader will work with you to establish a plan and timeline for your implementation of the Springbrook applications. This plan will take into account all of the standard elements involved in implementing the V6 applications and any necessary non-standard elements. Despite the care taken to prepare well-informed and accurate timelines, there are several vahables that could disrupt an otherwise smooth implementation process. Springbrook cannot be held responsible for implementation delays caused by: delay in networking set-up; networking or hardware conflicts; corrupt, inaccurate, or incomplete data; delay in on-site testing of custom programming; bad weather; client employee absence; and other matters beyond our control. Training Information No software conversion is ever completely painless or effort-free. Your new Version 5 software has been written in a completely different programming language (Progress) and on a different operating system (Windows) than your previous software. There will be many new features to get adjusted to and several processes that may work entirely differently than in your old system. Together, we will all work to ensure a successful conversion to your new Springbrook V6 system. Your trainer will play a key role in helping you smoothly complete this transition. Typically Springbrook will train one or two of your staff members on the new applications. If more users are required to know any particular system, the "train the trainer" approach is most often used, meaning that after the Springbrook representative leaves, those who were initially trained go on to train additional personnel. This approach can be taken in order to cut your costs and to cut the length of time you spend implementing the new system. Your initial training on the V6 applications can be provided on site or at Springbrook. We recommend that you arrange to have at least some of your training at the Springbrook training center, if possible. The training center provides you with an environment where you can devote full attention to learning the Springbrook application. Your training at Springbrook will be hands- on training. You will have your own client machine to work on in the Springbrook classroom. You must register for your classroom training with full payment in order to confirm your enrollment in the class. Before your register, you should confer with your Springbrook implementation project leader. If your training is to take place at your site, please make sure that the person(s) being trained will be able to devote full attention to the training. Please arrange to take messages for the trainee or have another employee the trainee's desk. We understand that these arrangements are not always possible, but it is important that the trainee's day be as interruption-free as possible. If you will have someone who is mining as a backup person, that person should also be available to join the training. If there are several persons training at the same time, try to make sure that an extra computer is available to use. The computers should be fairly close to one another. If extra computers are not available, don't worry. We can still do the training. Based on the time frame for your data conversion and installation, your implementation project leader will confirm the schedule for your training. Before your training begins, your trainer will contact you. You will have a chance to get acquainted and to express any concerns or problems you may have. The trainers have all been in your position before and they are familiar the "training-day jitters." As you are getting-acquainted, you will finalize some arrangements. What time do you begin business? When would you like to see the trainer arrive? With whom will the trainer be working? Whether your training occurs at Springbrook or at your site, the curriculum for the first stage of training is designed to introduce you to many of the major processes in the applications. If the initial training is to occur at your site you may wish to request a two-hour kick-offpresantation. Th/s presentation is designed to give your department heads and anyone else you may wish to invite an overview of the application you are about to be trained on. This is a great opportunity to involve those staffmembers who may not be part of the hands on training to follow and is a good way to favorably set the political climate for this implementation. Some clients even use this time to host a kick offparty for their staff. We realize that training can be an exhausting experience. Tell your trainer if you need a break. Tell your miner if you don't understand something. Your trainer will gladly explain something or go over a procedure until you feel confident in your knowledge. Relax! Enjoy! You are getting a great software program! Once your implementation is officially completed, you will need to arrange for your after live assessment. This is your opportunity to obtain training to further enhance your skills, pick up the bells and whistles that were missed in lieu of getting live as quickly as possible, and for a software consultant to assess whether your users are truly using the system correctly. Additional training can also be useful after you have received a major upgrade so that you are sure to understand any new functionality in the application. Springbrook also offers training for clients working with Report Builder. After Live Assessment Training A software specialist will do a follow up assessment with each organization after they are live on the Springbrook applications. This consulting service is included in your services quote. This session, lasting generally one to two days, is designed to give us the opportunity to advise you of better ways to utilize the software to its fullest, and to verify that our clients are not using the software in a manner which might cause them problems in the future. More often than not while implementing new software the users simply want to learn and use the basics only of their new system. This after live assessment gives them a chance to learn and start to use the enhanced features found in each application. Post Implementation Training There are several circumstances when you might want to arrange for training to further enhance your skills in working with the Springbrook applications. The most common of these is following employee turnover, and the other is after a installation ora new release containing many new features and functionality. Report Builder Training Report Builder is a Progress application that enables you to produce reports from your Progress database. Periodically, Springbrook offers training for clients who wish to work with Report Builder to produce their own reports. Full day, hands-on classes are held in Springbrook's training room. Utility Billing Implementation Planning Session (IPS) Every Agency is unique in the way it conducts business. In Utility Billing, rates are different, the frequency in which routes are billed is different, the way past dues are issued and how late fees are calculated is different. In addition, other factors need to be considered, such as what, if any, interfaces need to be written to connect Springbrook to vendors' applications and what type, size, and complexity will the forms be that you present to your clients, including billing statements, past due statements, door hanger, etc. Your Implementation Project Leader will guide you through the implementation process, but there are several tasks that you will need to accomplish in order to help us make your implementation progress smoothly. The [PS manual outlines those tasks. Your Implementation Project Leader can answer any questions you might have. IPS (Information Planning Session) Preparation The [PS is primarily designed as a time for the implementation team to gather information about how your site will use the UB application. There are several things that you will need to do to prepare for your ][PS. Prior to your Implementation Project Leader's arrival you should: Familiarize yourself with this manual (The more you know about the implementation process, the smoother your implementation will progress!) Be prepared to answer detailed questions about your current billing and accounting processes. Your Implementation Project Leader will need to ask you very specific questions about: · How you process meter readings · How you calculate your bills · How you handle payments and other financial transactions · How you handle past due accounts and how you calculate past due charges · What ordinances guide your billing and accounting practices · What your types of reports your auditor expects to see (A more detailed list of the types of questions your implementation project leader will ask is located in the Implementation Planning Session manual under the Process Evaluation Outline in the Functionality Information.) Complete the worksheets in the manual There are several worksheets for you to complete throughout the manual. Each of these is marked with a red flag so that you can easily find it. Some of the worksheets you will be able to complete in their entirety before your IPS. You may have questions about other worksheets. Please complete each sheet to the best of your ability before your IPS so that you and your Implementation Project Leader can focus on your questions during the [PS. · Gather samples and files to give to your implementation team After your IPS, your Implementation Project Leader will share the information he or she has gathered from you with our systems analyst. The systems analyst will use that information to evaluate how the UB application can meet your needs. There are several additional items that our systems analyst will need to effectively complete the evaluation. These include: · The layout of any necessary interface files, including your meter reading import and export files · Contact information for your meter reading vendor · Samples of any necessary reports from your current system that am not duplicated in the V6 system · Copies of your ordinances IPS Meeting During your IPS, you and your Implementation Project Leader will exchange a great deal of information. Together you will review: · The general implementation process · Your completed client information worksheet · The V6 hardware and networking requirements · Your completed Hardware and Networking worksheet. · Your current billing and accounting practices. · Your Billing Statement worksheet and Past Due Statement worksheet · Your completed Meter Reading worksheet · Any necessary samples or files IPS Follow-up After your IPS, your Implementation Project Leader will supply you with a summary of what was discussed in your IPS. This summary will include information about any special changes that will need to be made for thc UB system to meet your needs and a request for any information we may still nccd you to provide. You will be asked to: · Review the 1PS summary that your Implementation Project Leader sends to you · Finish any outstanding worksheets and send them to your Implementation Project Leader · Obtain any additionally requested material and send it to your Implementation Project Leader Systems Analysis Based on the information that you have provided to your Implementation Project Leader, our Systems Analyst will evaluate how the LIB system will meet your needs. If your site requires any customization of the UB application, the systems analyst will provide specifications for how those changes will work. Also, a bid will be supplied on what that customization will cost. The Systems Analyst will determine how your billing statements, past due statements and meter reading interface will be formatted and how much it will cost to format them. As the Systems Analyst is completing her evaluation, you should: · Review customization specifications and bids sent by systems analyst and provide authorization for billable work. · Finalize your contract (if not previously completed) and make your initial payment · Review bids for statement formatting, meter interfaces and provide authorization for billable work. V. Software Support and Maintenance What type of support is available? The primary goal of Springbrook's user support team is to provide clients with Springbrook application software support. The support team can: Answer your questions about how the V6 applications work Help you troubleshoot problems you experience in working with the V6 applications Unfortunately, Springbrook cannot provide networking, hardware or 3ra party software support. However, if a problem occurs while you are working in the Springbrook applications, the support team can assist you in determining if that problem is due to a V6/Progress application issue. What does support cost? Do you have a maintenance contract with Springbrook? For clients with maintenance agreements, support is available during regular support hours (Monday - Friday, 5am-5pm Pacific Time) at no additional cost. Off-hours support must be prearranged and will be billed at $150.00 per hour. Clients without maintenance agreements are billed $250.00 per hour for support obtained during regular hours, with a minimum charge per call of $125.00. Clients not on maintenance will not be eligible for upgrades. How do I get help from the support team? To reach the Springbrook support team by phone, dial the support line number: (503) 820-2240. To reach the Springbrook support team over the Intemet, log into wwwv.sprbrk.com and go into the Support page. There you will be directed in how to send an email message to support. From that page you can also view the status of any open work order your organization has, as well as find out if other customers have reported similar problems. Ifa service pack (fix) has already been created for your problem you may also download that fix over the Interact. Here's what you can expect when you request support assistance: Springbrook's support receptionist will answer your call and ask for your customer ID. (Your Implementation coordinator will supply you with your site's ID number. The ID is designed to ensure that your call is documented and returned correctly.) The support receptionist will also ask you for a small amount of information, including: Your name The phone number where you can be reached The product(s) you are having difficulty with A one-sentence description of the issue The support receptionist will provide you with a call number and place your information in a call queue. This same person also monitors the on-line Support queue, so please provide the above list when reporting trouble through the on-line support page as well. Requests placed through the Intemet will be handled in the same manner and be placed in the same call queue with those requests placed via telephone. Calls in the queue are retumed as support representatives become available. As soon your call is the first unanswered cai1 in the queue, a support representative will call you. Springbrook makes every attempt to have a response to the customer within two hours. What if my problem is an emergency? The support team considers your issue an emergency I: You cannot open the application You are nmning live unable to send out bills (Utility Billing) You are running live and cannot get your payroll out on time without assistance If you are having such an emergency, your call will be given a higher priority in the call queue. Otherwise, the support team will return calls strictly on a first call, first serve basis. What kind of information will the support team need from me? When you talk to a support representative, she or he will want to know some specific details about the nature of your issue. She or he may ask you: What exactly were you doing in the system when the problem occurred? What happened? If you were generating a report or generating information from the data, what did you enter in the generate window? If you received an error message, what is the exact message? What did you try to do to resolve the problem? If it was an error in the system, did you try to reboot? If it is a balancing problem, did you look at your reports and accounts to try to track down the source of the error? If you are prepared to answer these questions with specific information, using the exact window and report titles, the support representative will be able to help you much more quickly. The support representative may ask you to fax information or a report to Springbrook. Faxes should be clearly labeled and directed to the support contact you have been working with on this particular issue. Often, when the support team asks you to supply them with additional information, they need that information before they can progress toward finding a solution for you. Please provide any requested information in a timely manner. What happens after I report a problem to the support team? The support team will work directly with you to try and resolve your issue. If they resolve the issue for you, they will note the solution in our call tracking system, and close out your call. If the issue requires a programmer's assistance, the support team will create a work order for the programming staff. When an issue needs to be addressed by the programming department, the support team will continue to U'ack the issue for you - so you will always have a single point of contact to help you reach a satisfactory resolution. How can I get information about an outstanding issue? If the support team is unable to resolve an issue for you within a single phone call, they will work diligently to keep you informed about the status of that issue. However, if you have a question about an ongoing issue, you can simply log into the Springbrook website at www.sprbrk.com and access thc support section using your customer number and password to view your open work orders, or call the support line: (503) 820-2240. Simply provide the support receptionist with your call number or work order number. If the support receptionist cannot answer your question, he or she will refer you to the person whom can best assist you. Customer Care Program In an effort to provide you with another layer of assurance and comfort we have Customer Care Representatives assigned to each client. This person is your lifeline and is to be used in cases where you feel you need to ask a question but just don't know where to go to get the answer or help. Your Customer Care Representative is ultimately responsible for your overall satisfaction as a client, so if you feel we are falling short of your expectations, this is the person who can help! Source Code Availability Springbrook Software source code is in escrow with the Springbrook User Group. User Groups Springbrook has a national user group which meets once a year in May. In addition to the national meeting there are regional groups established in several states as well. Maintenance Regular upgrades to the software can provide the user with increased functionality and a more efficient application. Clients with maintenance agreements generally receive free upgrades for the product licensed to them. If these upgrades can be transmitted to the client via modem, there is no upgrade charge. However, if a representative of Springbrook has to travel to the client's location to install the upgrade, clients are charged on a time and material basis. Maintenance agreements on the Springbrook applications are issued by Springbrook on an annual basis and are currently priced at 20% of the then current retail price on the licensed products. Maintenance agreements on the Database Manager and Report Writer are issued by Springbrook and are also based currently on 25% of the retail price of the products. If replacement products are written, these are offered to existing clients at significant discounts. X. Cost Analysis This price quote is valid for 90 days from the date of quote. First year maintenance is based on 20% of the then current retail value of the application software and 25% of the then current retail value of the database manager and report builder. Maintenance on the Springbrook applications is provided by Springbrook Software and includes telephone and modem support, as well as enhancements to the version purchased. Maintenance on the database manager is provided by Springbrook software and includes telephone and modem support, as well as updates to the database as provided by Progress. Maintenance on the Progress Report Builder includes updates as provided by Progress, as well as telephone and modem support from Springbrook for standard reports written by Springbrook and included as part of the standard releases. Operatinq Environment: - Client. Server Option: Either NT or various options of UNiX are required to run Springbrook multi-user client/server applications. These can run over a Novell network as long as a workstation with NT server or windows 2000 is attached to the Novell LAN. A single user version will run on a Windows 98, NT or 2000 pc. ASP Option: PC's accessing the Springbrook applications via the Intemet also need Windows 98, NT or 2000 installed. In addition, high speed (preferably DSL line) Internet access is required. Printing of forms needs to be pert'ormed on a laser or desk-jet type printer. Please call with any questions regarding hardware or operating system environments. Telephone/Modem Support. - Springbrook shall maintain a telephone and modem support line, or DSL Internet connection, or T1 connection to the Internet that permits Customer to receive assistance. Customer must provide and maintain a modem, or DSL Internet connection, or T1 Internet connection, PC Anywhere, and dedicated modem line on Customer's NT server and allow Springbrook to maintain and support Spdngbrook's application software via one of the above stated options, with full administrative permissions to the drive where the application resides. It is customer's responsibility to obtain the version of PC Anywhere that works with their particular operating system. Database Manager: - Client-Server Option: Progress is not sold on a "per seat" basis; it is sold by concurrent user. Example - if your organization has 20 full time users of the application software you are purchasing from Spdngbreok, you can buy a 20-user license and install it on 100 pc's or more, if you so desire. Progress will count each consecutively logged on user, but they do not care where those users reside. ASP Option: The monthly rental fee for this Internet option is based on the applications purchased and the number of concurrent users logged into the Springbrook applications over the Internet at any given time. Example - if five users in your organization need access, but never more than three users will be signed in at any given time, you will only be charged for 3 users. This will be monitored and if usage increases an additional fee of $100 per month per concurrent user will be applied to the monthly rental fee. There is a one time set up charge per licensed (not concurrent) user for the ASP option of $400 per license. PC Anywhere: - Most organizations already own this product, but it is also available at any local software outlet or via the Internet. Springbreok can provide this product if you are unable to find it locally. It is required for us to provide modem assistance for the client-server offering only. Meter Readinq Devices: - Price quoted above is estimate for our standard interfaces to Sensus, Itron, Logicon, Badger, Radix, Schlumberger and certain other major brand meter reading devices. We will provide file layouts to pass on to the handheld company representative in advance, as these interfaces can be very time consuming. Annual maintenance charges will apply to this and to any other interfaces written and maintained by Springbrook. Implementation Manaqement Services: - Implementation Management Services are vital to a successful implementation, and are considered consulting rather than training. An IM Specialist is assigned to manage your implementation, managing your workload, checklists, task lists and keeping you apprised of the status of your project. This involves on-going telephone and conference calls as well as written documentation. An implementation planning session is held prior to signing contracts or beginning the implementation of each separate product line (one for finance/payroll and one for utility billing). The cost of this line item in your quote may go up or down after the IPS (see below) depending on the complexity of your implementation (will you be using the system(s)as they are provided, will you be implementing all the features contained in the application(s), will modifications be required, etc. - note: these conditions may also effect the training estimate listed in this quote). Implementation Planning Session (IPS): - Every Agency is unique in the way it conducts business. In Utility Billing Rates are different, the frequency in which routes are billed is different, the way past dues are issued and how late fees are calculated is different. In addition, other factors need to be considered, such as what, if any, interfaces need to be written to connect Springbrook to vendors' applications and what type, size, and complexity will the forms be that you present to your clients, including billing statements, past due statements, door hanger, etc. These types of conditions are also true for the financial and payroll applications. We consult with your staff on the best way to build your chart of accounts to fit your organization's reporting requirements. We assist you in defining all of the set ups required for payroll and accounts payable. In summary, we help you maximize the benefits while minimizing any misunderstandings about the functionality or implementation of your new software. Following your IPS you will receive a written document outlining our findings for your review and approval. Subsequent to your approval, this document will then become part of your contract and any associated costs uncovered during this session will be included in your project total. Springbrook personnel conducts a review with your employees, reviewing your current business practices and the way you wish to perform those practices after going live with your new software. We feel you deserve to know how much your project is going to cost and what it will involve before signing contracts. We therefore request that in the majority of situations this billable service (cost, excluding travel expenses) is included in implementation management services) be conducted prior to contracts being signed. Both sides need to know everything possible about each other, the scope of the project, and how Springbrook will address your needs and requirements. After the IPS has been conducted Springbrook will give you a write up of our findings about how your agency needs to implement the new software. You will receive a firm price on the implementation management services, the cost for formatting bills, past due statements, doing a data conversion, any requested programming modifications, and/or all other potential costs relevant to this project. We can also verify whether the training estimate provided with this quote is appropriate for your organization. ASP OFFERING: In most cases Springbrook will not modify the feature/functions of the applications for use via ASP (Internet). If extensive modifications are required your Implementation Manager may steer you towards the traditional Client-Server model. In many cases initial quotes for the ASP offering will show training and implementation management services combined into one Up-Front Fees column, or these services may also be added to your monthly payment amount. Consulting & Trainin,q Services: - The amounts listed in this quote do not include travel time or expenses. Amounts listed are based on services at $125/hr (e.g.; a quote that shows $5000 equates to 40 hours of services). One half of the travel time for each on-site services visit is billed back to the client at the standard hourly rate (Springbrook pays for the other half). In addition, all out of pocket travel related expenses will be billed (this includes reasonable car rental and hotel expense, airfare, mileage, taxis, parking, toll fares, and meals). The amount listed is based on the requirements of the average client. Variables that could cause the need for additional time include, but are not limited to: employees at your organization that are unfamiliar with their job responsibilities; users who are unfamiliar with Windows; multiple users who need to be trained at separate times and/or locations; or turnover in application software personnel. Consulting/l'raining days must be completed within one year of signing the contract. Service Fees: These fees are based on $125/hr and do not include travel time, which is billed one way or half the actual time spent. Travel expenses wilt be billed for each trip, including the IPS and after live assessment. After Live Assessment: - A software specialist may request to do a follow up assessment with your organization after you are live on the Springbrook applications. This only additional cost to your organization for this consulting service is travel costs, if any. This session, lasting generally anywhere from two hours to two days, is designed to give us the opportunity to advise you of better ways to utilize the software to its fullest, and to verify that our clients are not using the software in a manner which might cause them problems in the future. More often than not while implementing new software the users simply want to learn and use the basics only of their new system. This after live assessment gives them a chance to learn and start to use the enhanced features found in each application. Hardware/Consultinq Services: Hardware sold by Springbrook, including cash drawers, cash receipt printers and scanners, as well as all third party software (such as Azalea and Postalsoft) is considered customer installable. If assistance is requested for the installation and/or configuration of these products those services will be billed at our then standard service fee rate. Custom Pro,qrammin,q: This will be done on a bid basis. Please note that annual maintenance charges will apply to all interfaces and other major custom programs written and maintained by Springbrook. Pricing Proposal for South Tahoe PUD Application/Products Utility Billing ~1 Interface Total Sprin~brook Progress Fees Application License Fees $41,90¢ $3,000 $44,90C $2,75C To be Determined Total Other $2,750 total Proiect Costs $84,918 Training Services $14,400 $6OO $15,000 Implementation Management $12,000 $600 $12,600 1st Year Maintenance ** $8,380 $600 $8,980 $688 $688 Total Concurrent Users = 5 Prices valid for 90 days Pricing is based on standard contract - deviation from standard contract terms may result in modified prices. ** Maintenance is Prorated for: 1..~2 Months Leasing Options are available Training Estimates are based on a train the trainer concept and include training for up to four people lappl. Optional Selections for South Tahoe PUD Application Training Implementation 1st Year Application/Products License Fees Services Mana~lement Maintenance** Central Cash ManagementJP.O.S. $11,000 $1,200 $1,20(3 $2,201 Standard ArcView GIS Interface $3,000 $600 $60n $601 Application Server (suggested) $5,000 $600 $60(~ $1,00i Scanner - LS 9100 (+ Azalea Sftwre) $1,650 (plus shipping) Cash Drawer-APG $500 (plus shipping) ~xiohm Receipt Printer (~:470 w/validation) $1,395 (plus shipping) =ostalsoft Software $1,800 $1,50( Web Based UB Payments-Setup $10,000 $500 $500 Transactional Fees Progress Report Writer - One User $1,000 Training available ~_~, $25( Prices vali~tfor 90 days Web-based payments require a set-up fee and a small monthly transaction fee. ** Maintenance is Prorated for: 12 Months Estimates are based on a train the trainer concept and include training for up to four people lapp/l~ Training Pricing Proposal for South Tahoe PUD Conversion Estimate Conversion Application to be converted Estimates Utility Billing Masters -Customers $3,750 Utility Billing History $7,000 iTotal Estimated Conversion Costs $10,750 Cost of Data Conversion: An estimated cost ofyour data conversion has been provided in this quote. This estimate is for up to three separate data pulls and conversions from those pulls. We will need to review an actual sample of your data to confirm this estimate. Certain factors may cause the cost to exceed the amount quoted. See section below titled "Not Included in Estimate". Not Included in Estimate: rhere are a variety of factors that can influence the cost of a conversion and a variety of items that are not included in the standard cost estimate for your conversion. For example, your estimate will not include the following: · Removal of data from your existing system. · Consulting on removal of data from your existing system. · Changes or modifications requested after the first conversion and different from the specifications we originally received. · Changes in the format we receive the data in after the first conversion. More than three conversions. Cost Factors: In addition, the following items can increase the cost of your conversion: · Mixed formats of data (a file containing tab delimited and comma delimited format). · Problems with data integrity. · Data manipulation not for the purpose of the conversion, but for the purpose of supplying you with information you did not previously have access to. · Changes in the file format after the first conversion. · Changes requested to the data after the second conversion. · Upgrades to application software during a data conversion. · No file or incorrect file layouts (May also prevent conversion) . No cost or fees in exeessofthoseset forth in theSeheduleofFeeswillbeincurred by Licensee without prior acceptance of Licensee as indicated on a signed work order. UB Software Finalists - Cost Comparisons Springbrook ~ Advanced License Fees 41,900 5 users 50,000 5 users Meter read interface 3,000 ? Bar code scarmer & 1,650 1,650 interface Print form standard GL interface ACH interface Receipt printer 1,395 1,395 Cash drawer software 500 included Intemet Capability 10,000 "Add-on" Database license fees 2,750 Progress 1,000 SQL Serv Report Writer 1,000 Progress 500 Crystal GIS Interface 3,000 ? Appl Server soffwre 5,000 N/A Central Cash soFtwre 11,000 included Sql?ware Totals 81,195 54,545 Note: All Professional Services quotes are estimates only. Some are definitely high; others may be low. Software install 12,600 +expenses 80,700 538 hrs !! Training 15,000 125/hr 45,000 300 hrs Conversion 10,750 estimate 45,000 300 hrs (Julie?) Other? 2,750 Services Totals 41,100 170,700 amnualMaintenance I 8,980 20% 12,500 22-25% 1 688 25% (db) +(db) TO: FR: SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM BOARD OF DIRECTORS Accounts Payable RE: BOARD MEETING June 6, 2000 AGENDA ITEM: ACTION ITEM NO: 6. f CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: PAYMENT OF CLAIMS REQUESTED BOARD ACTION: Approve Pavment DISCUSSION: The Payment of Claims was not available when this ac~enda was published, it will be delivered separately prior to the Board Meetinc~. SCHEDULE: COSTS:. ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: To be distributed prior to Board Meetinq CONCURRENCE WITH REQUESTED A/C~ION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES/ NO CATEGORY: GENERAL X WATER SEWER Payment of Claims June 06, 2002 Chk# Name Amount FOR APPROVAL June 06, 2002 Payroll 05/15~02 262,802.86 Payroll 05~29~02 244,648.93 Total Payroll $ 507,451.79 Cost Containment - health care payments IGI Resources - natural gas LaSalle Natl Bank - loan payment Total Vendor EFT Accounts Payable Checks Sewer Fund Accounts Payable Checks Water Fund Accounts Payable Checks Self-funded Ins Accounts Payable Checks Grant Funds Total Accounts Payable 61,883.40 18,103.40 156,572.80 $ 236,559.60 371,033.22 484,058.53 13,538.15 36,053.15 $ 904,683.05 $ 1,64&694.44 Grand Total Payroll Related EFTs & Checks 05/29/02 EFT URM & Dependent Care/AFLAC EFT Employment Dev Dept EFT Direct Deposit EFT The Hartford EFT ManuLife Pension EFT ManuLife Pension Loan Payments EFT Orchard Trust Co. EFT US Bank EFT Time Out Fitness EFT United Way Stationary Engineers Local 39 Net Payroll Adjustments Sub-total 2,138.76 10,627.15 121,623.58 1,454.99 0.00 6,515.74 12,092.27 62,309.68 0.00 77.18 0.00 27,809.58 0.00 $ 244,648.93 T ~ACCT~DOUGLAS/SPREADSHEET/Payrnent of Claims wb3 31 May-02 South Tahoe P . U . D . 05/31/02 P A Y M E N T O F C L A I M S R E P O R T 05/17/2002 - 06/06/2002 Page 1 FRI, MAY 31, 2002, 2:11 PM - - -req: DOUGLAS -- -leg: GL JL - -loc: ONSITE-- - -job: 249298 #J2764-- -prog: CK509 'x1.07 > -- report id: CKRECSPC 7 IDefault Selection: Check Stock ID: AP i Check Types: MW,HW,RV,VH .I Vendor Name Account # Department Description Amount Check # Type ii rl _ A C 5 NORTHWEST INC 20 -01 -7425 UNDERGROUND REPAIR BUCKET -4 TN 1 -F05 LOADFR 9.420 -0n Check Total: 9,420.00 00050096 MW A C_W A SERVICES CORP (ASC) 10 -00 -2530 GENERAL & ADMINISTRATION EMPI nYFF VLaInN TNR -a-254 12 Check Total: 2,254.1E 00050097 MW z A P G ANALYTICAL PRODUCT GROUP 10- 07 -665Q LABORATORY _OPERATING EERMITS -15.00 20 -07 -6650 LABORATORY OPERATING PERMITS 12.00 Check Total: 30.00 00050090 MW AERVOE- PACIFIC 20 -01 -6052 UNDERGROUND REPAIR PIPE, COVERS, & MANHOLES 337.28 Check Total: 337.28 00050099 MW AFLAC 10 -00 -2532 GENERAL & ADMINISTRATION INSURANCE SUPPLEMENT 1,040.22 Check Total: 1,040.22 00050100 MW 2 ALPEN SIERRA COFFEE COMPANY 10 -00 -6520 GENERAL & ADMINISTRATION SUPPLIES 60.90 20 -00 -6520 GENERAL & ADMINISTRATION SUPPLIES 40.60 Check Total 101-50-00050-1-01---MW s ALSBURY, MARY 10 -37 -6200 INFORMATION SYSTEMS TRAVEL /MEETINGS /EDUCATION 122.06 20 -37 -6200 INFORMATION SYSTEMS TRAVEI /MFFTINGE EDUCATION 13 z7—_ Check Total: 203.43 00050102 MW o] AMANATULLAH, MUSTAFA 20 -00 -3545 GENERAL & A.pMINISTRATION WATEILMETER SALES 132.00 10 -00 -2002 GENERAL & ADMINISTRATION .UTILITY BILLING SUSPENSE 0,701.88 20 -00 -2002 GENERAL & ADMINISTRATION UTILITY BILLING SUSPENSE 1,550.00 10 -00 -6710 GENERAL & ADMINISTRATION INTFRFRT FXPFN'F 939 48 20 -00 -6710 GENERAL & ADMINISTRATIOIJ INTEREST EXPENSE 228.51 Check Total: 11,551.87 00050103 MW 7 APOLLO PLUMBING & HEATING INC 10 -01 -6052 UNDERGROUND REPAIR PIPE, COVERS, & MANHOLES 385.00 Check Total: 305.00 00050104 MW ° ARAMARK UNIFORM SERVICES 10 -00 -2518 GENERAL & ADMINISTRATION UNIFORM /RUGS /TOWELS PAYABLE 1,738.56 Check Total: 1,738.56 00050105 MW 3 ARIZONA INSTRUMENT CORP 10 -06 -8220 OPERATIONS REPLACE H2S METER 8,523.56 Check Total: 8,523.56 00050106 MW 6 AVAYA FINANCIAL SERVICES 10 -39 -6709 FINANCE LOAN PRINCIPAL PAYMENTS 613.81 J 20 -39 -6710 FINANCE INTEREST EXPENSE 76.17 a Chalk Total. 63938 -000.501n7 _MW- -- 1 AVISTA UTILITIES 10 -00 -6350 GENERAL & ADMINISTRATION NATURAL GAS 145.20 20 -00 -6350 GENERAL & ADMINISTRATION NATURAL SAS 1.50 5R Check Total: 303.78 00050108 MW 3 < B B 5 H BENEFIT DESIGNS 10 -22 -4405 HUMAN RESOURCES CONTRACTUALEERVICFS 75n no 5 20 -22 -4405 HUMAN RESOURCES DIRECTOR CONTRACTUAL SERVICES 500.00 South Tahoe P . U . D . 05/31/02 P A Y M E N T O F C L A I M S R E P O R T 05/17/2002- 06/06/2002 Page 2 FRI, MAY 31, 2002, 2:11 PM - -req: DOUGLAS -- --leg: GL JL - -loc: ONSITE-- - -job: 249298 #J2764-- -prog: CK509 <1.07 > -- report id: CKRECSPC Default Selection: Check Stock ID: AP ; Check Types: MW,HW,RV,VH Vendor Name Account # Department Description Amount Check # Type _Ct acJ_Tnta1 - 1.250- 00- 00050109 -MW B S K ANALYTICAL LABS 20 -29 -8290 ENGINEERING TREATMENT, ARROWHEAD WL #3 Check Tnfat. 270.00 270 00-00050440 MW 1 BACON CO INC, EDWARD R 20 -01 -7431 UNDERGROUND REPAIR _ - ENGINE - WACHER B /U- SHORTBLOCK 2,202.19 Check Total. 24_202 19 -00050111 MW BARTON MEMORIAL HOSPITAL 10 -01 -6075 UNDERGROUND REPAIR SAFETY EQUIPMENT /PHYSICALS 302.69 Check— Total. 302,69 000504 -1-2 -M4 BAY TOOL & SUPPLY INC 10 -00 -0421 GENERAL & ADMINISTRATION SHOP SUPPLY INVENTORY 83.67 10 -00 -0422 GENERAL & ADMINISTRATION ..1ANLTORIAI SUPPI LEE INVENTOR 388 18- 10 -00 -0423 GENERAL & ADMINISTRATION SMALL TOOLS INVENTORY 134.97 1 Check Total: 606.82 00050113 MW BENDER & CO. INC., MATTHEW 10 -21 -4830 ADMINISTRATION SUBSCRIPTIONS EXPENSE 35.79 20 -21 -4830 ADMINISTRATION SUBSCRIPTIONS EXPENSE 23.85 _Check_Intal. --- .59_64-000501-69 NW- -_. -.- jBERRY- HINCKLEY INDUSTRIES 10 -00 -0415 GENERAL & ADMINISTRATION GASOLINE INVENTORY 3,209.89 J 10 -04 -6023 HEAVY MAINTENANCE FIL ER_EQUIELBLDQ 129 29 Check Total: 3,338.17 00050114 MW BING MATERIALS 20 -01 -6052 UNDERGROUND REPAIR PIPE, COVERS, & MANHOLES 4.083 .63 Check Total: 4,083.63 00050115 MW BROWN & CALDWELL CONSULTANTS 20 -39 -4440 FINANCE ADVISORY 74R 41 Check Total: 748.41 00050116 MW C C P INDUSTRIES INC. 10 -00 -0422 GENERAL & ADMINISTRATION JANITORIAL SUPPLIES INVENTOR 146 21 10 -39 -6077 FINANCE INVENTORY FREIGHT /DISCOUNTS 31.20 Check Total: 227.47 00050117 MW o C S U S FOUNDATION INC. 20 -02 -6200 PUMPS TRAVEL /MEETINGS /EDUCATION 40.00 Check Total: 40.00 00050118 MW C W E A 10 -02 -6250 PUMPS DUES /MEMBERSHIPS /CERTIFICATI 70.00 10 -02 -6200 PUMPS TRAVEL /MEETINGS /EDUCATION 70.00 5 10 -04 -6250 HEAVY MAINTENANCE DUES /MEMfERSHIPS/CERTIFLCAII 70 00 10 -07 -6250 LABORATORY DUES /MEMBERSHIPS /GERTIFICATI 70.00 Check Total: 280.00 00050119 MW 91 CALIF DEPT OF HEALTH SERVICES 10 -07 -6650 LABORATORY OPERATING PERMITS 2,130.60 1 20 -07 -6650 LABORATORY OPERATING PERMITS 1,420.40 1 Check Total- 7,591 00 00050120 _MW a CALIF WATER RESOURCES CTRL BD 10 -06 -6250 OPERATIONS DUES /MEMBERSHIPS / CERTIFICATI 50.00 - • - 50 00 00050.121 Mw _ South Tahoe P . U . D . 05/31/02 P A Y M E N T O F C L A I M S R E P O R T 05/17/2002-06/06/2002 Page 3 FRI, MAY 31, 2002, 2:11. PM --rag: DOUGLAS -- --leg: GL JL - -loc: ONSITE-- - -job: 249298 #J2764-- -prog: CK509 <1.07 > -- report id: CKRECSPC l Default Selection: Check Stock ID: AP i Check Types: MW,HW, RV,VH J Vendor Name ___- _ Account # Department Description Amount Check # Type • CALIFORNIA. OVERNIGHT 20 -07 -4810 LABORATORY ___. ____ _. 20 -29 -8290 ENGINEERING HOSTAGE EXPENSES TREATMENT, ARROWHEAD WL #3 13 25 82.25 20 -29 -8273 ENGINEERING WATERLINE, LONGS 9.00 20 -29 -8264 E@9I_NEER1 I+LG WELL, GI FNWOOD_REDRILI 13.56 _ 10-07-4810 LABORATORY POSTAGE EXPENSES 16.00 10 -29 -8235 ENGINEERING SLUDGE HANDLING FACILITY 8.50 = 20 -29 -4810 ENGINEERING - _ POSTAGE EXPENSES- - - 1-3.-50 Check Total: 156.00 00050122 MW CANADA LIFE 10 -00 -251^6 GENERAL '< ADMINISTRATION LIFE INSURANCE 725-47 10 -00 -2525 GENERAL & ADMINISTRATION LIFE INSURANCE -MGMT 394.29 30 -00 -6744 SELF FUNDED INSURANCE EXCESS INS SELF INSURED MED 11,324.76 10 -01 -4311 UNDERGROUND.RFPAIR I IFE INSURANCR 13.78- Check Total: 12,458.30 00050123 MW CAROLLO ENGINEERS 90 -98 -8828 EXPORT PIPELINE GRJyf BLINE_PHS III LPP =CAMP.GRDUN 3 J70_00 10 -29 -8235 ENGINEERING SLUDGE HANDLING FACILITY 206,843.00 20 -29 -8356 ENGINEERING TANK, KELLER (REPLACE) 160.77 10 -06 -8328 OPERATIONS PLANT SCADA SYSTEM 34757 98 Check Total: 213,891.75 00050124 MW CARSON'S OAK OUTLET 10 -37 -8299 INFORMATION SYSTEMS RFPL DESK, IS MGR 1.399 83 Check Total: 1,999.83 00050125 MW CHARTS INC 10 -02 -6051 PUMPS PUMP STATIONS 76 67 lCheck Total: 76.67 00050126 MW COBRA PRO 10 -22 -4405 HUMAN RESOURCES CONTRACTUAL SFRVTCFS P4 00__ 41— 20 -22 -4405 HUMAN RESOURCES DIRECTOR CONTRACTUAL SERVICES 16.00 Check Total: 40.00 00050127 MW r COCKING DENNIS 10 -27 -6200 DISTRICT INFORMATION TRAVEL /MEETINGS /EDUCATION 137.03 3 20 -27 -6200 DISTRICT INFORMATION TRAVEL /MEETINGS /EDUCATION 91.35 20 -19 -6200 BOARD OF DIRECTORS TRAVFI /MFFTTNGS /FTUCATTIIN 154 nn Check Total: 382.38 00050128 MW COST CONTAINMENT CONCEPTS INC 30 -00 -6745 SELF FUNDED INSURANCE CLAIMS SELF INS MEDICAL PLAN 38.19 30 -00 -6742 SELF FUNDED INSURANCE PPO FEE 333.00 30 -00 -6741 SELF FUNDED INSURANCE ADMLN.ISTRAIION FFF 1 842.20 Check Total: 2.213.39 00050129 MW COZZAGLI_A, GABRIEL 10 -00 -2002 GENERAL R< ADMINISTRATION UTILITY RTI I IN(' SUSPENSE 142. -02 20 -00 -2002 GENERAL & ADMINISTRATION UTILITY BILLING SUSPENSE 184.75 3 Check Total: 326.77 00050130 MW CULLEN, JAMES W 10 -01 -6250 UNDERGROUND REPAIR DUES /MEMBERSHIPS /CERTIFICATI 64.00 South Tahoe P . U . D . 05/31/02 P A Y M E N T O F C L A I M S R E P O R T 05/17/2002 - 06/06/2002 Page 4 FRI, MAY 31, 2002, 2:11 PM - -req: DOUGLAS -- -leg: GL UL - -loc: ONSITE - -- -job: 249298 #32764 -- -prog: CK509 .1.07> -- report id: CKRECSPC L I Default Selection: Check Stock ID: AP ; Check Types: MW,HW,RV,VH Vendor Name Account # Department Description Amount Check # Type .Check— Tnta1. —64-00- 00050 - 131 --MW— 2,573.76 E N 5 RESOURCES INC 10 -21 -4405 ADMINISTRATION CONTRACTUAL SERVICESS 7 20 -21 -4405 ADMINISTRATION CONJRACTUAL_SERVICES P4-573-75— _ Check Total: 5,147.51 00050133 MW EL DORADO COUNTY 10 -00 -2504 GENERAL I ADMTNISTRAT10N 4HCPFNGF 0.00 Check Total: 0.00 00044931 HW o EL DORADO COUNTY 10 -3$ -4820 CUSTOMER SERVICF OFFICE 4UPPl7FS —€0.80 20 -38 -4820 CUSTOMER SERVICE OFFICE SUPPLIES 46.58 Check Total: 116.47 00050134 MW Vendor Total: 116.47 EN POINTE TECHNOLOGIES 20 -37 -4840 INFORMATION SYSTEMS DISTRICT CQMPU_TFR SUPPLIES 19 -.31r- Check Total: 19.31 00050135 MW ENVIRONMENTAL RESOURCES 10 -07 -4760 LABORATORY 1 ARORATOR`_SIIPPLIES_ P31 60 20 -07 -4760 LABORATORY LABORATORY SUPPLIES 61.90 Check Total: 293.50 00050136 MW FEDEX 10 -07 -4810 LABORATORY POSTAGE EXPENSES 10.44 20 -07 -4810 LABORATORY POSTAGE EXPENSES 6.96 10 -39 -4810 FINANCE POSTAGE EXPENSES 9 3n 20 -39 -4810 FINANCE POSTAGE EXPENSES 42.10 20 -29 -8264 ENGINEERING WELL GLENWOOD REDRILL 16.17 10 -29 -8235 ENGINEERING SLUDGF_HANG FACILITY PP n5 90 -98 -8828 EXPORT PIPELINE GRANT DLINE PHS III LPPS- CAMPGROUN - 50.78 Check Total: 157.80 00050137 MW o FISHER SCIENTIFIC 10 -07 -4760 LABORATORY LABORATORY SUPPLIES 1,048.61 20 -07 -4760 LABORATORY LABORATORY SUPPLIES 690.15 Check Tnt1. 1.73Ft 76 0003a138 —MLA FRIEDEL OFFICE MACHINES, SCOTT 10 -39 -6027 FINANCE OFFICE EQUIPMENT REPAIR 24.00 20 -39 -6027 FINANCE OFFICE EQUIPMENT REPAIR 16_00 Check Total: 40.00 00050139 MW FRYE, WILLIAM 10 -37 -6200 INFORMATION SYSTEMS TRAVFLLMEETINGS /FDUCAIIAN 43 80- 20 -37 -6200 INFORMATION SYSTEMS TRAVEL /MEETINGS /EDUCATION 29.20 Check Total: 73.00 00050140 MW a G D GENERAL ENG CONTRACTOR INC 20 -01 -6052 UNDERGROUND REPAIR PIPE, COVERS, & MANHOLES 7,576.90 10 -01 -6052. UNDERGROUND REPAIR PIPE, COVERS, & MANHOLES 603.55 Cherk_In +.al. _also 45_00090141—MU South Tahoe P . V . D . 05/31/02 P A Y M E N T O F C L A I M S R E P O R T 05/17/2002 - 06/06/2002 Page 5 FRI, MAY 31, 2002, 2:11 PM - -req: DOUGLAS -- -leg: GL JL - -loc: ONSITE-- - -job: 249298 #J2764-- -prog: CK509 :1.07.`• -- report id: CKRECSPC II— Default Selection: Check Stock ID: AP Check Types: MW,HW,RV,VH Vendor Name G F S CHEMICAL cL — _. G S CONCEPTS GEOTRANS INC Account # Department Description Amount Check # Type 10 -07 -4760 LABORATORY_ 20 -07 -4760 LABORATORY __LABOR.4102Y SUPPLIES_ LABORATORY SUPPLIES Check Total: 47 12 31.41 78.53 000501.42 MW 10 -29 -8130 ENGINEERING ADMIN MSTR PLAN, ROAD /HDORTRS 2,800.00 Check Total: 2,800.00 00050143 MW 10 -37 -8262 INFORMATION SYSTEMS SOFTWARE, GIS 4,407.31 20 -37 -8224 INFORMATION SYSTEMS GIS EQUIPMENT 2,938.21 _Chack_Tota1 7.345..52- 00050 -160 MW , GILLESPIE ENTERPRISES INC GNOMON INC 20 -29 -8290 ENGINEERING 20 -02 -4405 PUMPS TREATMENT, ARROWHEAD WL #3 CONTRACTUAL SERVICES __Che.ck_7 n t,a t 320.00 - 320 _00 00050145 -MW 18.75 _18 75 00050146 MW- , GRAINGER INC, W. W. 10 -03 -6021 ELECTRICAL SHOP 10 -04 -6071 HEAVY MAINTENANCE 10-04-6041 HEAVY MAINTENANCE PRIMARY EQUIPMENT SHOP SUPPLIES 123.16 38 97 BUILDINGS 344.27 Check Total: 506.36 00050147 MW GUARDIAN. THE l0-00 -2531 GENERAL & ADMINISTRATION LONG TERM DISABILI'iV, MGMT 1,661.40 Check Total: 1,661.40 00050148 MW HACH COMPANY 10 -07 -4760 LABORATORY LABORATORY SUPPLIES 22.52 1 20 -07 -4760 LABORATORY LABORATORY SUPPLIES 15.01 , Check Tatal: 37 53 00050149 hill HANSEN INFO TECHNOLOGIES 10 -01 -6200 UNDERGROUND REPAIR TRAVEL /MEETINGS /EDUCATION 197.50 20 -01 -6200 UNDERGROUND REPAIR TRAVEL /MEETINGS /EDUCATION — ..____1v82_.5 v. . I 10 -37 -6200 INFORMATION SYSTEMS TRAVEL /MEETINGS /EDUCATION 237.00 4 20 -37 -6200 INFORMATION SYSTEMS TRAVEL /MEETINGS /EDUCATION 158.00 s Cjieck TotaL t_975 QQ 00050150 _MW____ HEWLETT PACKARD 10 -37 -6030 INFORMATION SYSTEMS SERVICE CONTRACTS 575.00 20 -37 -6030 INFORMATION SYSTEMS SERVICE CONTRACTS PO 44 Check Total: 595.44 00050151 MW HIGH SIERRA BUSINESS SYSTEMS 10 -39 -6030 FINANCE SERVICE CONTRACTS _93_65 20 -39 -6030 FINANCE SERVICE CONTRACTS 529.10 Check Total: 1,322.75 00050152 MW si HINES CONSULTING INC, 10 -21 -6200 ADMINISTRATION TRAVEL /MEETINGS /EDUCATION 900.00 20 -21 -6200 ADMINISTRATION TRAVEL /MEETINGS /EDUCATION 600.00 10 -37 -8958 INFORMATION SYSTEMS INDEXING SOFTWARE 2,033 A0 Check Total: 3,533.60 00050153 MW HOEFER, MARK 10 -00 -2002 GENERAL 1. ADMINISTRATION UTILITY BI NG S • 1 71 n1 Check Total: 71.01 00050154 MW South Tahoe P . U . D . 05/31/02 P A Y M E N T O F C L A I M S R E P O R T 05/17/2002 - 06/06/2002 Page 6 FRI, MAY 31, 2002, 2:11 PM - -req: DOUGLAS -- -leg: GL JL--loc: ONSITE-- - -job: 249298 #J2764-- -prog: CK509 (1.071: -- -report id: CKRECSPC Default Selection: Check Stock ID: AP Check Types: MW,HW,RV,VH Vendor Name Account # Department Description Amount Check # Type 1 HYDRICK, RICK 20 -19 -6200 BOARD OF__DIRECTDRS ___ TRASLFI /MEETINGSLEDUCATIONL - 68 00 — Check Total: 68.00 00050155 MW IDEXX DISTRIBUTION CORP. 10 -07 -4760 LABORATORY LABORATORY SUPPI TES_ ,.-684-89 20 -07 -4760 LABORATORY LABORATORY SUPPLIES 1,123.25 Check Total: 2,808.14 00050156 MW IMPACT STRATEGIES 10 -21 -4405 ADMINISTRATION CONTRACTUAL SERVICES 2,500.00 20 -21 -4405 ADMINISTRATION CONTRACTUAL SERVICES 2,500.00 S 000.^ -.0- 00050-157 MW INDUSTRIAL SUPPORT TECH INC 20 -01 -8266 UNDERGROUND REPAIR .Chac_k_T_ata1' WTRLN, CARSON (IN HOUSE) 524.70 ' - Check TataL 524-70-00050158--MW -- 1 INN BY THE LAKE 10 -29 -8235 ENGINEERING SLUDGE HANDLING FACILITY check Tntat' 75.00 — 75.00- 410050429— MW_..___ ] INTERSTATE SAFETY & SUPPLY 10 -00 -0425 GENERAL & ADMINISTRATION SAFETY SUPPLIES INVENTORY 343.09 10 -00 -0421 N RAL_& ADMINISTRATION SHOP SLURP! Y TNVENTTORY 305_67 10 -39 -6077 INVENTORY FREIGHT /DISCOUNTS 19.00 FINANCE Check Total: 667.76 00050160 MW ISCO 10 -07 -4760 LABORATORY LABORATORY SUPPLIES 248.81 Check Total: 248.81 00050161 MW 1 J & L PRO KLEEN INC 10 -39 -6074 FINANCE JANITORIAL SERVICES 1,648,20 20 -39 -6074 FINANCE JANITORIAL SERVICES 1,096.80 Cheri Tntal' P 747 00-- 30050163 MW JOB'S PEAK PRIMARY CARE 20 -01 -6075 UNDERGROUND REPAIR SAFETY EQUIPMENT /PHYSICALS 105.00 10 -30 -6075 CUSTOMER SERVICE iSAFETY EQUIPMENT / PHYSICALS. -AA 00 20 -38 -6075 CUSTOMER SERVICE SAFETY EQUIPMENT /PHYSICALS 44.00 Check Total: 215.00 00050163 MW JORDAN'S TRUCK & TRAILER EQUIP 20 -01 -8202 UNDERGROUND REPAIR REPLACE TRUCK 61 4,269.30 Check Total: 4,269.30 00050164 MW R L T T & K O W L RADIO 20 -27 -6660 DISTRICT INFORMATION WATER CONSERVATION EXPENSE 1,300.00 Check Total: 1,300.00 00050165 MW KENNEDY /JENKS CONSULTANTS INC 10 -28 -8285 ALPINE COUNTY ALPINE CNTY MASTER PLAN 6,116.26 1 Check Total: 6,116.26 00050166 MW 4 L B R MARKETING 10 -07 -4760 LABORATORY LABORATORY SUPPLIES 23.86 20 -07 -4760 LABORATORY LABORATORY SUPPLIES 11.90 rhark Total- 5 76- 00o-5a147 —MW LAB SCIENCE INC 20 -07 -4760 LABORATORY LABORATORY SUPPLIES 313.86 10 -07 -4760 LABORATORY SUPPI TFR ____5-0 1 __LABORATORY Check Total: 318.90 00050168 MW South Tahoe P . U . D . 05/31/02 P A Y M E N T O F C L A I M S R E P O R T 05/17/2002 - 06/06/2002 Page 7 FRI, MAY 31, 2002, 2:11 PM - -req: DOUGLAS -- -leg: GL JL - -loc: ONSITE-- - -job: 249299 #J2764-- -prog: CK509 ±1.07) -- report id: CKRECSPC Default Selection: Check Stock ID: AP ; Check Types: MW, HW, RV, VH Account # Department Description Amount Check # Type Vendor Name Ji -- LIFT EQUIPMENT CER T. CO. INC. 10 -04 -4405 HEAVY MAINTENANCE CONTRACTUAL SERV.ILFG 1 350.00 1,350.00 00050170 MW - Check Total: TIRE SERVICE INC. 10 -05 -6011 EQUIPMENLREPAIR AUTOMOTIVE 3,030-28 LILLY'S 20 -05 -6011 EQUIPMENT REPAIR AUTOMOTIVE 969.71 Check Total: 3,898.99 00050171 MW LOOMIS FARGO & CO. 10 -39 -4405 FINANCE CONTRACTUAL SERVICES 299.65 20- 39-4405 FINANCE CONTRACTUAL SERVICES 199.76 s r h o r k_Tot .z1 - -494-4-1---00050472--MW 6 7 LYNCH, LARRY 10 -04 -6250 HEAVY MAINTENANCE DUES /MEMBERSHIPS /CERTIFICATI 64.00 B ('hark TutaL_ F.4.00- 00050-17- 3 —MW 9 9 o M W H LABORATORIES 20 -29 -8290 ENGINEERING TREATMENT, ARROWHEAD WL #3 510.00 Ch a r k Total. 510-00--000501-74--MW MARKSON LAD SALES 10 -07 -4760 LABORATORY LABORATORY SUPPLIES 79.82 20 -07 -4760 LABORATORY SUPPI IFS- -53 2? s __LABORATORY Check Total: 133.04 00050175 MW MC FARLANE, RHONDA 20 -19 -6200 BOARD OF DIRECTORS TRAVFI/MEETINGSLFT,UCATTON Pn7.2a. ii Check Total: 207.24 00050176 MW MC MASTER CARR SUPPLY CO 20 -29 -8290 ENGINEERING 'TREATMENT, ARROWHEAD WI #3 P13 1? 10 -04 -6023 HEAVY MAINTENANCE FILTER EQUIP /BLDG 118.12 . 10 -04 -6073 HEAVY MAINTENANCE SMALL TOOLS 278.44 20 -02 -6051 PUMPS PUMP STATIRNS 435 P1 10 -01 -6052 UNDERGROUND REPAIR PIPE, COVERS, & MANHOLES 85.90 10 -04 -6021 HEAVY MAINTENANCE PRIMARY EQUIPMENT 156.69 6 10 -04 -6041 HEAVY MAINTENANCE BUILD,_NQS 359 R9 7 Check Total: 1,647.37 00050179 MW MENGORE, JOSEPH 10 -06 -6200 OPERATIONS TRAVEL /MEETINGS /EDUCATION L3 An Check Total: 63.60 00050179 MW 2 MID MOUNTAIN MOBILE COMM. 20 -05 -6071 EQUIPMENT REPAIR SHOP SUPPLIES_ 361_78 a Check Total: 361.78 00050180 MW s MOTION INDUSTRIES INC 10 -04 -6023 HEAVY MAINTENANCE FILTER- Eo1IPLBLDG. _44_79 _ Check Total: 44.79 00050181 MW MOTOR CARGO 20 -01 -7429 UNDERGROUND REPAIR ENGINE - WATER- PUMP -TAN _TRK # 27 9P 9 Check Total: 97.92 00050182 MW MOUNTAIN CELLULAR 10 -29 -6310 ENGINEERING SEIEEHf1NE 70 33 20 -29 -6310 ENGINEERING TELEPHONE 46.82 10 -38 -6310 CUSTOMER SERVICE TELEPHONE 9.81 20 -30 -6310 CUSTOMER SERVICE TO FPHONE A 54 fi 10 -02 -6310 PUMPS TELEPHONE 25.29 South Tahoe P . U . D . 05/31/02 P A Y M E N T O F C L A I M S R E P O R T 05/17/2002- 06/06/2002 FRI, MAY 31, 2002, 2:11 PM - -req: DOUGLAS -- -leg: GL JL - -loc: ONSITE-- - -joh: 249298 #J2764-- -prog: CK509 01.07 > -- report id Page 8 KRECSPC 1 Default Selection: Check Stock ID: AP Check Types: MW,HW,RV,VH Vendor Name Account # Department sl 7 20 -02 -6310 10 -21 -6310 20 -21 -6310 10 -27 -6310 20 -27 -6310 10 -07 -6310 20-07-6310 10 -03 -6310 20 -03 -6310 10 -05 -6310 20 -05 -6310 10 -28 -6310 10 -39 -6310 20 -39 -6310 10 -01 -6310 20 -01 -6310 Description Amount Check # Type PUMPS ADMINISTRATION ADMINISTRATION DISTRICT INFORMATION ...._ DISTRICT INFORMATION LABORATORY LABORATORY ELECTRICAL SHOP ELECTRICAL SHOP EQUIPMENT REPAIR EQUIPMENT REPAIR ALPINE COUNTY FINANCE FINANCE UNDERGROUND REPAIR UNDERGROUND RERAIR NEVADA DIVISION OF FORESTRY 10 -28 -6042 ALPINE COUNTY NEVADA STATE BOARD OF 10 -29 -6250 ENGINEERING NEWARK ELECTRONICS 20 -29 -6250 ENGINEERING TELEPHONE__ TELEPHONE TELEPHONE TELFPHONF_._ TELEPHONE TELEPHONE TELEPHONE— TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE_ 20 -03 -6073 ELECTRICAL SHOP Check Total: GRQUNDS i.i'1AINTENANCF Check Total: DUESLFIEMBERSHIESCCERJIFSCATI DUES /MEMBERSHIPS /CERTIFICATI Check Total: SMALL TOOLS Check Total: '+jj -4P 19.15 12.76 _4_22- -. —. —. 2.82 3.56 2_ 38 - 2.57 2.57 a 57 2.57 9.19 3 0a 2.06 14.61 P() 32 293.70 00050183 MW 5,Jj73 41 5,673.41 00050184 MW 60_00 40.00 100.00 00050185 MW 57.70 57.70 00050186 MW NOLAN, LYNN 10 -39 -4405 FINANCE 90 -98 -8829 EXPORT PIPELINE GRANT 10 -26 -8285 ALPINE COUNTY NORTH AMERICAN FUNDING 10- 38-5010 CUSTOMER SERVICE 20 -38 -5010 CUSTOMER SERVICE CONTRACTUAL SERVICES BLINE PHASE II DIP TO END ALPINE CNTY MAETFR PLAN Check Total: LAND LAND AND BUILDINGS AND BUILDINGS Check Total: 75.00 255.00 1,155 DO 1,485.00 00050187 MW 1,17R_22 785.94 1.964.86 00050188 MW 3 1 NUROCK, DOUG w 10 -06 -6250 OPERATIONS 10 -06 -6200 OPERATIONS DUES /MEMBERSHIPS /CERTIFICATI TRAVEL /MEETINGS /EDUCATION CheckSASa1- OFFICE DEPOT DUSINESS SERV DIV 10 -27 -4920 20 -27 -4920 10 -21 -4820 20 -21 -4620 10 -00 -0428 10 -39 -4820 20 -39 -4820 10 -29 -4820 20 -29 -4820 DISTRICT INFORMATION DISTRICT INFORMATION ADMINISTRATION ADMINISTRATION GENERAL & ADMINISTRATION FINANCE FINANCE ENGINEERING ENGINEERING PRINTING PRINTING OFFICE SUPPLIES OFFICE SUPPLIES OFFICE_SUPPI IFS INVENTORY OFFICE SUPPLIES OFFICE SUPPLIES 0FFJCE _SUPPLIES OFFICE SUPPLIES 130.00 63.60 197 AO 00050189 Ml.l 617.76 411 R4 7.50 5.00 1 10.5 AR 188.15 125.40 PA 66 17.76 South Tahoe P . U . D . 05/31/02 P A Y M E N T O F C L A I M S R E P O R T 05/17/22002- 06/06/2002 Page 9 FRI. MAY 31, 2002, 2:11 PM - -req: DOUGLAS -- -leg: GL ,JL - -loc: ONSITE-- - -job: 249298 #32764-- -prog: CR509 <1.07D -- report id: CKRECSPC Default Selection: Check Stock ID: AP ; Check Types: MW,HW,RV,VH Vendor Name Account # Department Description Amount Check # Type 1 10- 37- 4E20_IN.FORMATION SYSTEMS nFFTCE SUPPI TFS 123-2 20 -37 -4820 INFORMATION SYSTEMS OFFICE SUPPLIES 82.12 1 10 -38 -4820 CUSTOMER SERVICE OFFICE SUPPLIES 26.05 20-38 -48P0 CUaTOIMFR S RVrCF OFFICE - SUP_PLTF,___ 17 3c 10 -22 -4820 HUMAN RESOURCES OFFICE SUPPLIES 29.37 20 -22 -4820 HUMAN RESOURCES DIRECTOR OFFICE SUPPLIES 19.58 10701 -6052 UNDERGROUND_REPATR L9IPE,- C011ERS,_E_CtANHOLES -- - -- -- -44.7, -- _.. _- 10 -21 -6621 ADPtINISTRATI0i4 INCENTIVE & RECOGNITION PRGR 3.56 20 -21 -6621 ADMINISTRATION INCENTIVE & RECOGNITION PRGR 2.37 10 -01 -4820 UNDERGROUND REPAIR OFFICE 511PPI 7FR 10-47 20 -01 -4820 UNDERGROUND REPAIR OFFICE SUPPLIES 18.16 Check Total: 2,857.45 00050191 MW P D M STEEL 10 -04 -6071 HEAVY MAINTENANCE SHOP SUPPLIES 371.10 > 10 -01 -6052 UNDERGROUND REPAIR PIPE, COVERS, & MANHOLES 494.06 Check Total: 865 000504-9 -3 —MW' PACIFIC DELL 10 -00 -6320 GENERAL & ADMINISTRATION SIGNAL CHARGES -I8- 247.99 20- 00 -632Q GENERAL_&_ADMINISIRATION SIGNAL CHARGES 3-2-91 Check Total: 279.90 00050195 MW PACIFIC DELL /WORLDCOM 10 -00 -6310 GENERAL & ADMINISTRATION TELEPHONE 578.31 10 -01 -6310 UNDERGROUND REPAIR TELEPHONE 4.61 01 -631Q UNDERGROUND12EP_AIB. ._. - 4 ,_60 -- - -- - __0- _— _TELEPHONE 20 -02 -6310 PUMPS TELEPHONE 11.13 10 -06 -6310 OPERATIONS TELEPHONE 51.02 10 -07 -6310 LABORATORY TEl FPHI1NF 7 10 20 -07 -6310 LABORATORY TELEPHONE 4.74 10- 05-6310 EQUIPMENT REPAIR TELEPHONE 4.37 20 -05 -6310 EQUIPMENT_REPAIR SFJFPHONF 4.36- + 10 -21 -6310 ADMINISTRATION TELEPHONE 5.75 20 -21 -6310 ADMINISTRATION TELEPHONE 3.83 10 -22 -6310 HUMAN RESOURCES TELEPHONE A A5 20 -22 -6310 HUMAN RESOURCES DIRECTOR TELEPHONE 4.43 10 -37 -6310 INFORMATION SYSTEMS TELEPHONE 112.98 20 -37 -6310 INFORMATION SYSTEMS _TELEPHONE 7S 32 10 -39 -6310 FINANCE TELEPHONE 6.05 20 -39 -6310 FINANCE TELEPHONE 4.04 10 -27 -6310 DISTRICT INFORMATION TFIFPHONP 5 2A 20 -27 -6310 DISTRICT INFORMATION TELEPHONE 3.51 Check Total: 927.94 00050194 MW 4,255.68 PACIFIC UTILITY EQUIPMENT 20 -01 -8202 UNDERGROUND REPAIR REPLACE TRUCK 61 < Cherk Total.: a 255-68--00050197 MW South Tahoe P.U.D. 05/31/02 P A Y M E N T O F C L A I M S R E P O R T 05/17/2002 - 06/06/2002 Page 10 FRI, MAY 31, 2002, 2:11 PM - -req: DOUGLAS -- -leg: GL JL - -loc: ONSITE - -- -job: 249298 #02764 -- -prog: CK509 <1.07> -- report id: CKRECSPC Default Selection: Check Stock ID: AP ; Check Types: MW,HW,RV,VH • d Vendor Name PARSONS HL+A Account # Department 90 -98 -8828 EXPORT PIPELINE_GRANT Description BLINF PHs TiT IPPS- CAMEOO2OUN SLUDGE HANDLING FACILITY ADMIN MSTR PLAN,ROAD /HDGRTRS Chock Tnta1-___ Amount Check # Type al 997-37- 1,416.68 1,416.68 P4.E30 73- 0085,015 10 -29 -8235 ENGINEERING 10 -29 -8130 ENGINEERING - - -MW oT PEGASUS SATELLITE TV INC. 10 -27 -4830 DISTRICT INFORMATION SUBSCRIPTIONS EXPENSE 16.80 ;l 220 -27 -4830 DISTRICT INFORMATION 5UBSCPIPTIPNS EXPENSE__ !1 19 _ Check Total: 27.99 00050199 MW PIONEER AMERICAS INC 10 -06 -4750 OPERATIONS CHI ORINF 1 942,00. Check Total: 1,962.00 00050200 MW 1 PIP PRINTING 10 -22 -4920 HUMAN RESOURCES _PRIMING — 11A-48- s _ 20 -22 -4920 HUMAN RESOURCES DIRECTOR PRINTING 76.31 Check Total: 190.79 00050201 MW POWERS, TERENCE H 10 -07 -6200 LABORATORY TRAVEL /MEETINGS /EDUCATION 114.97 20-07 -6200 LABORATORY TRAVEL /MEETINGS /EDUCATION 76.64 _Ohetk_7nta1' 791 Al 00050202 MW e R SUPPLY 20 -38 -8269 CUSTOMER SERVICE WATER METERS, LARGE 609.37 20 -01 -8266 UNDERGROUND REPAIR WTRLN,_ CARSON (IN HIIURF) 27,574 61 20 -01 -6073 UNDERGROUND REPAIR SMALL TOOLS 202.62 20 -29 -7027 ENGINEERING WATERLINE, PARK AVE PHASE II 526.85 Check Total. P13,917 45- 0Q050P0'i MW- 1 RACK IT RACKS 20 -05 -6011 EQUIPMENT REPAIR AUTOMOTIVE 186.62 Cherk TotaL— IRA AP 00050PO4 MW 5 RASMUSSEN, SUSAN 10 -39 -6200 FINANCE TRAVEL /MEETINGS /EDUCATION 10.20 20 -39 -6200 FINANCE TRAVEL /MEETINGS /EDUCATION A RO Check Total: 17.00 00050205 MW RED WING SHOE STORE 10 -01 -6075 UNDERGROUND REPAIR SAFETY EQUIPMENT /PHYSTCAI5 160 PR Check Total: 160.28 00050206 MW REED ELECTRIC 10 -03 -7430 ELECTRICAL SHOP MOTOR - REBUILD- 5QQHP - #3 FINAL 9 -{PA 9n a Check Total: 9,326.90 00050207 MW 5 REMEL INC (CHRISOPE) 10 -07 -4760 LABORATORY LABORATORY SUPPLIER MP A7 20 -07 -4760 LABORATORY LABORATORY SUPPLIES 87.42 Check Total: 196.05 00050208 MW SANI -HUT CO INC 20 -29 -8290 ENGINEERING TREATMENT, ARROWHEAD WL #3 104.98 20 -01 -8266 UNDERGROUND REPAIR WTRLN, CARSON (IN HOUSE) 104.98 Che.c.ls_Tnta1. P09 26_00050209 NW_ 6 SCOTT SPECIALTY GASES 10 -06 -8112 OPERATIONS CONTINUOUS EMISSIONS MNTRNG 67.57 a Cherk Total- A7 57 000,in91n _MW 5 fi _ South Tahoe P . U . D . 05/31/02 P A Y M E N T O F C L A I M S R E P O R T 05/17/2002 - 06/06/2002 Page 11 FRI, MAY 31, 2002, 2:11 PM - -req: DOUGLAS -- -leg: GL JL - -loc ONSITE - -- -job: 249298 #J2764-- -prog: CK509 <1.07 ? -- report id: CKRECSPC Default Selection: Check Stock ID: AP i Check Types: MW,HW,RV,VH Vendor Name Account # Department Description Amount Check # Type SETON NAME PLATE CORP 10 -28 -6042 ALPINE COUNTY GROUNDS & MAINTENANrF 517 05_ Check Total: 517.95 00050211 MW SIERRA NEVADA MEDICAL IMAGING 10-01 -6075 UNDERGROlUNn REPAI& _SAFETY EQUIPMENT /PHYSICALS 51.00 Check Total: 51.00 00050212 MW 7 SIERRA PACIFIC POWER 10 -00 -6740 GENERAL_& ADMINISTRATION STREET LIGHT EXPENSE SAL 10 -00 -6330 GENERAL & ADMINISTRATION ELECTRICITY 38,855.67 20 -00 -6330 GENERAL & ADMINISTRATION ELECTRICITY 19,647.54 rherk SotAl' 58.508 bP QG05021 -3 941 SIERRA SPRING WATER CO 10 -01 -6520 UNDERGROUND REPAIR SUPPLIES 37.60 20 -01 -6520 UNDERGROUND REPAIR -_ __SUPPLIES - - 37-60 10 -02 -6520 PUMPS SUPPLIES 25.06 10 -03 -6520 ELECTRICAL SHOP SUPPLIES 12.54 20 -03 -6520 ELECTRICAL SHOP SUPPLIES 12--54 10 -04 -6520 HEAVY MAINTENANCE SUPPLIES 10 -06 -6520 OPERATIONS SUPPLIES 10 -05 -6520 EQUIPMENT REPAIR SUPPLIES 20 -05 -6520 EQUIPMENT REPAIR SUPPLIES Check Total: 50.11 50.11 12 54 12.54 250.64 00050214 MW SIERRA TAHOE READY MIX 10 -02 -6051 PUMPS PUMP STATIONS Check Total: 8.58 8.58 00050215 MW SIERRA VALLEY ELECTRIC INC C 20 -29 -8290 ENGINEERING TREATMENT, ARROWHEAD WL. #3 20 -00 -2605 GENERAL & ADMINISTRATION ACCRD CONST RETNGE Check Thiel: 8,244.02 - 824.41 7,412 Al 00050P16 MW SOL ➢RIG, RICHARD 20 -19 -6200 BUAHU UP UIHEC IUHS 10 -29 -6520 ENGINEERING IHAVtL /MttILNdt /tUUCAILUN SUPPLIES 121.Vu 4504 - -- -- �- 20 -29 -6520 ENGINEERING SUPPLIES Check Total: 30.02 196.06 00050217 MW SOUTH LAKE TAHOE, CITY OF 20 -29 -0353 ENGINEERING REDEVELOPMENT PHASE III 64,341.37 Check Total: 64,341.37 00050218 MW SOUTH SIDE AUTO BODY 20 -05 -6011 EQUIPMENT REPAIR AUTOMOTIVE 3,214.70 Check Total: 3,214.70 00050219 MW s---SOU7H TAHOE NEWSPAPER AGENCY 10 -21 -4830 ADMINISTRATION SUBSCRIPTIONS EXPENSE 50.50 20 -21 -4830 ADMINISTRATION SUBSCRIPTIONS EXPENSE 38.99 Chpck Total' 97 49 0n05n2P0_MW 9 al SOUTH TAHOE REFUSE 10 -00 -6370 GENERAL & ADMINISTRATION REFUSE DISPOSAL 20.00 1 Check Total' Pn on nn050P21 Mw e _ _ SOUTHWEST PRODUCTS /HANCO IND 20 -01 -7429 UNDERGROUND REPAIR ENGINE -WATER PUMP -TANK TRK # 4,021.88 -, Ck.e.ck Tntel• 4 OP1 149 nnn50222 --MW South Tahoe P . U . D . 05/31/02 P A Y M E N T O F C L A I M S R E P O R T 05/17/2002 - 06/06/2002 Page 12 FRI, MAY 31, 2002, 2:11 PM - -req: DOUGLAS -- -leg: GL JL - -loc: ONSITE - - -- job: 2249298 #J2764 -- -prog: CK509 01.07: -- report id: CKRECSPC Default Selection: Check Stock ID: AP Check Types: MW,HW,RV,VH Vendor Name Account # Department Description Amount Check # Type SUB_ STATION DELI 10 -39 -6290 FINANCE —_ IRAVELLNEETTNGSLEDNCATTON - 19-.50 20 -39 -6200 FINANCE TRAVEL /MEETINGS /EDUCATION 13.00 Check Total: 32.50 00050223 MW SUBSTITUTE PERSONNEL & 10 -01 -4405 UNDERGROUND REPAIR 20 -02 -4405 PUMPS CONTRACTUAL SERVICES CONTRACTUAL SERVICES Check T.nt,l. SUNGARD BI -TECH INC, 10 -37 -6030 INFORMATION SYSTEMS 20 -37 -6030 INFORMATION SYSTEMS 890.00 775.25 1.4665-. 5__{10050224 -- -t4W SERVICE CONTRACTS 569.76 SERS2_I CE f0NTRACTR 379 -.04 Check Total: 949.60 00050225 MW ,l SUTER ASSOCIATES, LYNN M. 10 -27 -4405 I1ISTRICT__INFORMATION CoNIRACTUAI SERVTCFS T 20 -27 -4405 DISTRICT INFORMATION CONTRACTUAL SERVICES Check Total: 4,1-99=79-- 2, 800.00 6,999.99 00050226 MW AIN, CAROL 10 -37 -6200 INFORMATION SYSTEMS 20- 37-6200 INFORMATION SYSTEMS TRAVEL /MEETINGS /EDUCATION TRAVEL /MEETINGS /EDUCATION 152.73 101.82 '"h ack— To r ta 254-55 — 000auce,— MW I 1 T C M DIGITAL SOLUTIONS 10 -21 -6030 ADMINISTRATION SERVICE CONTRACTS 73.56 20 -21 -6030 ADMINISTRATION SFRVIPF CONTRACTS 45 09 Check Total: 118.65 00050220 MW TAHOE BLUEPRINT 10 -29 -8235 ENGINEERING 5LURGE_HAND ING FACILITY 60_33 10 -28 -8285 ALPINE COUNTY 32.18 ALPINE CNTY MASTER PLAN 20 -3B -4420 CUSTOMER SERVICE MAPPING 718.58 rhprk Tnta1• 811 nR nn0502^9 MW TAHOE CARSON AREA NEWS 10 -38 -4920 CUSTOMER SERVICE PRINTING 136.48 10 -28 -8285 ALPINE COUNTY _ ALPTNE_CNIY MASTER Pi AN 47P RO 20 -27 -6660 DISTRICT INFORMATION WATER CONSERVATION EXPENSE 530.00 10 -39 -4930 FINANCE ADS /LEGAL NOTICES 209.11 20 -39 -4930 FINANCE ADS+ /I FI. LNOTTCFS 142 73 10 -39 -4920 FINANCE PRINTING 12.00 20 -39 -4920 FINANCE PRINTING 8.00 10 -27 -4920 DISTRICT INFORMATION PR.NTIN.G 1.440 00 20 -27 -4920 DISTRICT INFORMATION PRINTING 960.00 20 -29 -8273 ENGINEERING WATERLINE, LONGS 261.60 , Check TntaL 4302 72 00050-230—MW--- TAHOE FIRE CONTROL 10 -28 -6075 ALPINE COUNTY SAFETY EQUIPMENT /PHYSICALS 109.62 10 -22 -6079 HUMAN RESOURCES SAFETY PROGRAMS __84_00---- 9 20 -22 -6079 HUMAN RESOURCES DIRECTOR SAFETY PROGRAMS 56.00 10 -04 -6075 HEAVY MAINTENANCE SAFETY EQUIPMENT /PHYSICALS 646.91 , rhprk Total' £5&..53_00050231 MW-.-- TAHOE KEYS PROPERTY 10 -00 -6340 GENERAL & ADMINISTRATION WATER 534.00 , Chprk Tnta1• 5'4.-Q0--.-.0o0-5O32 _MM„- s 1 South Tahoe P.U.D. 05/31/02 P A Y M E N T O F C L A I M S R E P O R T 05/17/2002- 06/06/2002 Page 13 FRI, MAY 31, 2002, 2:11 PM - -req: DOUGLAS - -- -leg: GL JL- -loc: ONSITE - -- -job: 249298 #J2764-- -prog: CK509 01.07 > -- report id: CKRECSPC 1 Default Selection: Check Stock ID: AP Check Types: MW,NW,RV,VH Vendor Name Account # Department Description Amount Check # Type TAHOE MOUNTAIN NEWS 20 -27 -6660 DISTRICT INFORMATION WATER. CONSER-VATSPN _ XPFNSF 200-00 Check Total: 200.00 00050233 MW TAHOE VALLEY ELECTRIC SUPPLY 20 -03 -6071 ELECTRICAL SHOP SHOP SUPELIES -- 40 RP 20-01-8266 UNDERGROUND REPAIR WTRI_N, CARSON (IN HOUSE) 429.00 Check Total: 469.62 00050234 MW TRUCK PARTS & EQUIPMENT CO 10 -05 -6013 EQUIPMENT REPAIR GENERATORS 8.53 Check Total: 8.53 00050235 MW s TURNER & ASSOCIATES INC 10 -37 -8262 INFORMATION SYSTEMS SOFTWARE, GI5 5,000.00 Check Total: 5,000.00 00050236 MW s U S D A FOREST SERVICE 90 -98 -8828 EXPORT PIPELINE GRANT BLINE PHS IIi LPPS- CAMPGROUN 10,620.00 Check Total: 10,620.00 00050237 MW 2 V W R CORPORATION 10 -06 -4760 OPERATIONS LABORATORY SUPPLIES 616.01 Check Total: 616.01 00050238 MW s VIKING FREIGHT SYSTEM 20 -03 -6041 ELECTRICAL SHOP BUILDINGS 326.21 10 -07 -4810 LABORATORY POSTAGE EXPENSES 115.33 20 -07 -4810 LABORATORY POSTAGE FXPENSES 16 RP _ Check Total: 518.42 00050239 MW o WALLACE, P DUANE 20 -19 -6200 BOARD OF DIRECTORS /MEETINGS/EDUCATION 75 QP 1 _TRAVEL Check Total: 75.92 00050240 MW WASHOE COUNTY HEALTH DEPT 10 -06 -6650 OPERATIONS OPERATING_RERMITS ?Pi 00 Check Total: 223.00 00050241 MW s WECO INDUSTRIES INC 10 -01 -6052 UNDERGROUND REPAIR PIPE, COVERS, & MA1kinI FR 1,..617 In - 10 -01 -6075 UNDERGROUND REPAIR SAFETY EQUIPMENT /PHYSICALS 60.78 Check Total: 1,673.88 00050242 MW o WEDCO INC 20 -03 -6050 ELECTRICAL SHOP WELLS 235.76 10 -03 -6041 ELECTRICAL SHOP BUILDINGS 82.57 z 10 -03 -6071 ELECTRICAL SHOP SHOP SUPPLIES 274 15 3 10 -03 -6200 ELECTRICAL SHOP TRAVEL /MEETINGS /EDUCATION 120.00 a Check Total: 712.48 00050243 MW s e WEST COAST ANALYTICAL 20 -29 -8290 ENGINEERING TREATMENT, ARROWHEAD WL #3 250.00 Check Total: 250.00 00050244 MW o WEST VALLEY CONSTRUCTION INC 20 -29 -8273 ENGINEERING WATERLINE, LONGS 279,503.60 o 20 -00 -2605 GENERAL & ADMINISTRATION ACCRD CONST RETNGE - 27,950.36 Check Total. P51..S93 24 0nn5nP45_ Mu o WESTERN CITY MAGAZINE 10 -21 -4830 ADMINISTRATION SUBSCRIPTIONS EXPENSE 37.80 1 20 -21 -4830 ADMINISTRATION SUBSCRIPTION EENNSE— P5 PO , - Check Total: 63.00 00050246 MW a South Tahoe P.U.D. 05/31/oe P A Y M E N T 0 F C L A I M S R E P O R T 05/17/e002-06/06/e00e Page 14 rnz' MAY s/, eoou, e:11 PM --,eq. DOUGLAS---leg: GL ONSITE----job: 249298 #J2764---proy: cnonp <1.07)--,e,ort m: nxnscypc Default Selection: Check Stock ID: AP i Check Types: nw,ow.nv,vo • � . �--'��— / Vendor 7Name � - �-- WESTERN NEVADA SUPPLY Account 44 Department e0-38-60*5 CUSTOMER SERVICE Description �-��*&su-nszsaa-_- pzps, COVERS, & MANHOLES wTnLw, CARSON (IN HOUSE/ _' u Amount 11.*en no 612 .10 165.85 141 n� Check * ----- Type ---- - eo-oz-aone UNDERGROUND REPAIR 20-01-8e66 UNDERGROUND REPAIR 10-04-604e HEAVY MAINTENANCE ----_- 00050e47 00050e*8 00050249 00050250 00050e51 MW MW MW MW MW � 20-01-6073 UNDERGROUND REPAIR 10-04-6071 HEAVY MAINTENANCE 10-04-6073 MAINTENANCE SMALL TOOLS SHOP SUPPLIES -um*u Tno/s e56.12 146.54 7o'9s�� 1e,851.e8 A16 `o 639 .10 oaa_zs 858 .75 600 00 600.00 436 00 3e6.00 762.00 , ^ ; WHITE CAP zo-o�-�o�� HEAVY MAINTENANCE �u�n�-�o�� OPERATIONS _ 20-07-4760 LABORATORY Check Total: onnUMo= & MAINTENANCE Check Total: __LABORATORY Check Total: _LABORATORY m/pp/ Tr9 ^ / ; - , a z zwc onpgnorso INC ' ZANDE ENVIRONMENTAL SERV , ^ 5 ^ , ZYMAX smv�noTs�xmo�oov e0-07-6110 LABORATORY Check Total: 20-29-8290 ENGINEERING -muwzTcmlwo TREATMENT, ARROWHEAD WL #3 � Check Total: " 9' an or u Total: oo , � po� ao� L,1 " " ` ^ • ^ - , -- - ^ - ^ 2 ` 1!] * - " n - 13 - ^ 4 - 0 - " TO: FR: SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM BOARD OF DIRECTORS Robert Baer, General Manager BOARD MEETING RE: ACTION ITEM NO: ITEM-PROJECT NAME: REQUESTED BOARD ACTION: June 6,2002 AGENDA ITEM: ~_3.a CONSENT CALENDAR ITEM NO: CONFERENCE WITH LABOR NEGOTIATORS Direct negotiators DISCUSSION: Pursuant to Section 54957.6(a) of the California Government Code, Closed Session may be held for the purpose of directinq negotiating team. Aqency Negotiators: Robert Baer/General Manager Employee Organization: International Union of Operating Engineers, Stationary Local 39, SCHEDULE: COSTS: BUDGETED AMOUNT REMAINING: A'FrACHMENTS: ACCOUNT NO: CONCURRENCE WITH REQUESTED ACTION: ,.~ GENERAL MANAGER: YES.~_~-~ NO CHIEF FINANCIAL OFFICER: YES~ NO CATEGORY: GENERAL X WATER SEWER SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Robert Baer, General Manager RE: BOARD MEETING June 6, 2002 AGENDA ITEM: ACTION ITEM NO: CONSENT CALENDAR ITEM NO: 13.b ITEM-PROJECT NAME: CONFERENCE WITH REAL PROPERTY NEGOTIATORS REQUESTED BOARD ACTION: Direct negotiators DISCUSSION: Pursuant to Government Code Section 54956.8, Closed Session may be held for conference regarding property negotiations. Negotiatinq Parties: Board of Directors, Robert Baer / General Manager Under Neqotiation: Consideration of Property Purchase Property Identification: APN 1-080-80 APN 1-080-81 APN 1-080-82 APN 1-080-56 APN 1-080-60 APN 1-200-01 APN 1-200-10 APN 1-200-11 SCHEDULE: COSTS: BUDGETED AMOUNT REMAINING: AI-rACHMENTS: ACCOUNT NO: CONCURRENCE WITH REQUESTED ~,~_"I'ION: GENERAL MANAGER: YES_/~ NO CHIEF FINANCIAL OFFICER: YES~ NO CATEGORY: GENERAL WATER SEWER X TO: FR: RE: ACTION ITEM NO: ITEM-PROJECT NAME: SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM BOARD OF DIRECTORS Robert Baer, General Manaqer BOARD MEETING June 6, 2002 AGENDA ITEM: CONSENT CALENDAR ITEM NO: 13.C CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION: F. HEISE LAND & LIVESTOCK vs. STPUD and DOES 1 THROUGH 10; INCLUSIVE; ALPINE COUNTY SUPERIOR COURT CASE NO. C18644 REQUESTED BOARD ACTION: Direct staff DISCUSSION: Pursuant to Government Code Section 54956.9(a), Closed Session may be held for conference with leqal counsel regardinq existinq litigation. SCHEDULE: COSTS: BUDGETED AMOUNT REMAINING: ATTACHMENTS: ACCOUNT NO: CONCURRENCE WITH REQUESTED ~,~T~ION: GENERAL MANAGER: YES.7~ NO CHIEF FINANCIAL OFFICER: YES/ NO CATEGORY: GENERAL WATER SEWER X TO: FR: RE: ACTION ITEM NO: ITEM-PROJECT NAME: SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM BOARD OF DIRECTORS Robert Baer, General Manaqer BOARD MEETING June 6, 2002 AGENDA ITEM: CONSENT CALENDAR ITEM NO: 13.d CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION: F. HEISE LAND & LIVESTOCK vs. STPUD and DOES 1 THROUGH 10; INCLUSIVE; ALPINE COUNTY SUPERIOR COURT CASE NO, C18733 REQUESTED BOARD ACTION: Direct staff DISCUSSION: Pursuant to Government Code Section 54956.9(a), Closed Session may be held for conference with leqal counsel regardinq existinq litigation. SCHEDULE: COSTS: BUDGETED AMOUNT REMAINING: ATTACHMENTS: ACCOUNT NO: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO CATEGORY: GENERAL WATER SEWER X SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Robert Baer/General Manager, Garv Kvistad/District General Counsel RE: BOARD MEETING June 6, 2002 AGENDA ITEM: ~_3.e ACTION ITEM NO: CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: CONFERENCE WITH LEGAL COUNSEL- EXISTING LITIGATION: STPUD VS. F. HEISE LAND & LIVESTOCK COMPANY, INC., WILLIAM WEAVER, EDDIE R. SYNDER, CROCKETT ENTERPRISES, INC. CIV S-02-0238 MLS JFM UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF CALIFORNIA, SACRAMENTO, CA REQUESTED BOARD ACTION: Direct staff DISCUSSION: Pursuant to Government Code Section 54956.9(a), Closed Session may be held for conference with leqal counsel reqarding existing litiqation. SCHEDULE: COSTS: BUDGETED AMOUNT REMAINING: A'i-FACHMENTS: ACCOUNT NO: CONCURRENCE WITH REQUESTED A~.TION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES~ NO CATEGORY: GENERAL WATER SEWER X TO: FR: RE: ACTION ITEM NO: ITEM-PROJECT NAME: LITIGATION (ONE CASE) SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM BOARD OF DIRECTORS Robert Baer, General Manager BOARD MEETING June 6, 2002 AGENDA ITEM: CONSENT CALENDAR ITEM NO: 13.f CONFERENCE WITH LEGAL COUNSEL - ANTICIPATED REQUESTED BOARD ACTION: Direct legal counsel DISCUSSION: Pursuant to Government Code Section 54956.9 (c), Closed Session may be held for conference with leqal counsel reqardinq anticipated litiqation. SCHEDULE: COSTS: BUDGETED AMOUNT REMAINING: ATTACHMENTS: ACCOUNT NO: CONCURRENCE WITH REQUESTED ,~IAON: GENERAL MANAGER: YES~--C~-/'""- NO, CHIEF FINANCIAL OFFICER: YES ' NO CATEGORY: GENERAL WATER SEWER SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: FR: RE: ACTION ITEM NO: BOARD OF DIRECTORS Robert Baer, General Manager BOARD MEETING June 6, 2002 AGENDA ITEM: CONSENT CALENDAR ITEM NO: 13.g ITEM-PROJECT NAME: CONFERENCE WITH LEGAL COUNSEL- EXISTING LITIGATION: STPUD VS. ARCO, ET AL, SAN FRANCISCO COUNTY SUPERIOR COURT CASE NO. 999128 REQUESTED BOARD ACTION: Direct staff DISCUSSION: Pursuant to Government Code Section 54956.9(a), Closed Session may be held for conference with legal counsel regarding existinq litigation. SCHEDULE: COSTS: BUDGETED AMOUNT REMAINING: A'I-rACHMENTS: ACCOUNT NO: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~,~....._ NO CHIEF FINANCIAL OFFICER: YES// NO CATEGORY: GENERAL WATER X SEWER TO: FR: RE: BOARD MEETING ACTION ITEM NO: ITEM-PROJECT NAME: SOUTH TAHOE PUBLIC UTILITY DISTRICT ADDENDUM TO BOARD AGENDA BOARD OF DIRECTORS Robert Baer, General Manaqer June 6, 2002 AGENDA ITEM: 13. h CONSENT CALENDAR ITEM NO: CONFERENCE WITH LEGAL COUNSEL- EXISTING LITIGATION RE: MEYERS LANDFILL SITE: UNITED STATES OF AMERICA V. EL DORADO COUNTY AND CITY OF SOUTH LAKE TAHOE AND THIRD PARTY DEFENDANTS, CIVIL ACTION NO. S-01- 1520 LKK GGH, UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF CALIFORNIA REQUESTED BOARD ACTION: Direct staff DISCUSSION: Pursuant to Government Code Section 54956.9(a), Closed Session may be held for conference with legal counsel reqardinq existing litiqation. SCHEDULE: COSTS: BUDGETED AMOUNT REMAINING: ATTACHMENTS: ACCOUNT NO: CONCURRENCE WITH REQUESTED ~:.TION: GENERAL MANAGER: YES~=~__~ NO / CHIEF FINANCIAL OFFICER: YES/ NO CATEGORY: GENERAL X WATER SEWER SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Robert Baer, General Manager RE: BOARD MEETING June 6, 2002 AGENDA ITEM: ACTION ITEM NO: CONSENT CALENDAR ITEM NO: 13.i ITEM-PROJECT NAME: CONFERENCE WiTH LEGAL COUNSEL- EXISTING LITIGATION: STPUD VS. LAKESIDE PARK ASSOCIATION, SUPERIOR COURT CASE NO. SC20010165 REQUESTED BOARD ACTION: Direct staff DISCUSSION: Pursuant to Government Code Section 54956.9(a), Closed Session mav be held for conference with leqal counsel regarding existing litiqation. SCHEDULE: COSTS: BUDGETED AMOUNT REMAINING: ATTACHMENTS: ACCOUNT NO: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES / NO CATEGORY: GENERAL WATER X SEWER CONSENT CALENDAR JUNE 6, 2002 ITEMS REQUESTED ACTION Liability Claim Received from Mr. Bryan Nelson, APN 33-501-17-002-01 (Lisa Coyner) Reject Claim in the Amount of $132.32 Delinquent Assessments: Fallen Leaf Lake (Debbie Henderson) Authorize Legal Counsel to Begin Foreclosure Proceedings on Seven (7) Fallen Leaf Lake Assessment District Properties in Arrears on Their Assess- ments, as Provided by Resolution No. 2536, Adopted July 16, 1990 Sewer Enterprise 2002-03 Appropriations Subject to Limitation (Debbie Henderson) Adopt Resolution No. 2743-02 Setting the Limitation on Appropriations for Fiscal Year 2002-03 Gardner Mountain Tank Replacement Project (John Thiel) Authorize Staff to Advertise for Bids Sludge Handling Facilities and Odor Control Project (John Thiel) Approve Consultant Services Agreement with Tahoe Regional Planning Agency for Services of Michael Rhoades in an Amount Not to Exceed $5,000 Glenwood Well Building and Equipment (Jim Hoggatt) Approve Task Order No. 3 to Haen Engineering to Provide the Design for the Roof Replacement in the Amount of $70O Administration Building Modification (Jim Hoggatt) Approve Task Order No. 1 to Jacobs & Tolhurst Architects to Evaluate the Administration Building to Determine if it Meets Code Requirements for Seismic and ADA Regulations in the Amount of $11,000 CONSENT CALENDAR - JUNE 6, 2002 PAGE - 2 Contract for Auditing Services (Rhonda McFarlane) Pension Plan Audit (Rhonda McFarlane) Regular Board Meeting Minutes: May 2, 2002 (Kathy Sharp) Authorize a Two-Year Extension to the Contract for Auditing Services with Grant Thornton LLP in the Amount of $56,710 Amend the Scope of Work in the Contract for Auditing Services to Include Auditing the District's Pension Plan in the Amount of $6,500 Approve Minutes South Tahoe Public Utility District · 1275 Meadow Crest Ddve, South Lake Tahoe, CA 96150 · Phone 530/544~474 · Facsimile 530/541-O614 SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Lisa Coyner, Customer Service Manaqer RE: BOARD MEETING June 6, 2002 AGENDA ITEM: ACTION ITEM NO: CONSENT CALENDAR ITEM NO: ~. ITEM-PROJECT NAME: LIABILITY CLAIM: RECEIVED FROM MR. BRYAN NELSON, APN 33-501-17-002-01 REQUESTED BOARD ACTION: Reject claim in the amount of $132.32 DISCUSSION: Claimant submitted claim for damac~es allegedly caused by excessive sand in his waterline. Staff does not believe the District has any culpability. SCHEDULE: COSTS: $132.32 ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: Claim, correspondence CONCURRENCE WITH REQUESTED AC.R'ION: CHIEF FINANCIAL OFFICER:YES/ NO CATEGORY: GENERAL WATER X SEWER South Tahoe Public Utility District Cathie Be&er James P. Jone~ Mar~ Leu Mesbachcr Ouane Wallace 1275 Meadow Crest Drive · South Lake Tahoe, · CA 96150-7401 Phone 530 544-6474 · Fax 530 541-0614 May 15, 2002 Mr. Bryan J. Nelson P. O. Box 8215 South Lake Tahoe, CA 96158 Re; APN: 33-501-17-002-01 520 Little Mountain Lane Dear Mr. Nelson: I am in receipt of your claim dated April 18, 2002 and received in our office on May 10, 2002 for damages which you stated occurred as a result of sand in your water lines. I have discussed the claim at length with our Water Operations and Pumps departments. It is the determination of the District staffthat the damages to your property was not in any way caused by extensive sand in your water lines. A member of our Pump crew investigated the complaint and found very little sediment in the lines. Staff will recommend that the Board of Directors reject your claim at the June 6, 2002 Board meeting, City Council Chambers, 1900 Lake Tahoe Boulevard, 2:00pm. You are certainly welcome to attend and express your views directly to the Board at that time, or communicate with the Board in writing prior to the meeting. Please contact Ms. Kathy Sharp, Cerk of the Board, at 544-6474, extension 203, if you intend to appear. I am happy to discuss this further if you wish. Please call me at any time at 544-6474, extension 221. Customer Service Manager cc: Rick Hydrick, STPUD File ate ura~m South Tahoe,, P,ubljc~Dtilitv District RECEIVED LiSA M. South Tahoe PubJic Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 (530) 544-6474 (530) 54!-0614 (fax) Name of Claimant Physical Address of Claimant Malting Address of Claimant City and State Telephone Number Circle One: Other (Explein) When did damage or injury occur: (Give exact date and hour). Where did damage or injury occur? How did damage or injury occur? Give full details; add supplemental sheets, if required. ~-. /-- / ' . What particular act or omission on the part of the District's officers or employees caused the injury or damage? What d~maqe or iniudes do you claim resulted? Please i~dicate the dollar amount of all damages that you are claiming. (include the estimated amount of any prospective injury or damage.) If this is a claim for indemnity, on what date were you served with underlying lawsuit? (Please attach proof of service.) 8. Names and addresses of witnesses, doctors, and hospitals. Date Notice Section 72 of the Penal Code provides: Every person who, with intent to defraud, presents for allowance or for payment to any state board or officer, or to any county, city, of district board or officer., authorized to allow or pay the same if genuine, any false or fraudulent claim, bill account, voucher, or writing, is punishable either by imprisonment in the coun~ jail for a period of not more than one year, by a fine of not exceeding one thousand doIlars ($1,000), or by both such imprisonment and fine, er by imprisonment in the state prison, by a fine of not exceeding ten thousand (S10,000), or by bcth such imprisonment and fine. (Emphasis added) Section 911.2 of the Government code states that a claim relating to a cause of action for death or for injury to a person or to personal properly or growing crops shall be presented .., not later than six months a~er the accrual of the cause of action, A claim relating to any other cause of Action shall be presented ... not later than one year after the accrual of the cause of action. ~ECEIVED BY Section 911.4 provides that with respect to a claim not timely filed, a written app~ii:~i~h 8~y~'m. ade to the public entity for leave to present this c a m and that such application sba be presente~ ~idlil~ a reasonable time not to exceed one year after the accrual of the cause of act[on. The c a m m~ii~}e ~a~a~'~!~_' to the application. P:\CUST_SVCIC/aim ferm. wp.d CUSTOME~ SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Debbie Henderson, Accountinq Manaqer RE: BOARD MEETING June 6, 2002 AGENDA ITEM: ACTION ITEM NO: CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: DELINQUENT ASSESSMENTS: FALLEN LEAF LAKE REQUESTED BOARD ACTION: Authorize Leqal Counsel to beqin foreclosure proceeding~ on seven (7) Fallen Leaf Lake Assessment District properties in arrears on their assessments, an provided by Resolution No. 2536, adopted July 16, 1990 DISCUSSION: In order to comply with the Fallen Leaf Lake Assessment District Bond covenant, the District is required to commence foreclosure proceedinqs within 150 days followin0 delinquency of any assessment of installment thereof. Failure to comply with this covenant could make the District liable for unpaid assessments. SCHEDULE: Action must commence within 150 days of delinquency (by 5/9/02 for Installment No. 1 due 12/10/01; by 9/7/02 for Installment No. 2 due 4/10/02) COSTS: $2,000 (estimated) ACCOUNT NO: 1039-4480/FLLSAD BUDGETED AMOUNT REMAINING: <$10,854> ATTACHMENTS: Resolution No. 2536, Article V, Section 5.02; List of Unpaid Parcels; Copy of representative letter sent to the propertv owners CONCURRENCE WITH REQUESTED ACTION: CHIEF FINANCIAL OFFICER: NO CATEGORY: GENERAL WATER SEWER X ARTICLE V COVENANTS OF THE DISTRICT, TAX COVENANTS Section 5.01. COLLECTION OF UNPAID ASSESSMENTS. The unpaid assessments as set forth on the list thereof on file with the Treasurer together with the interest thereto, shall be payable in annual series corresponding in number to the number of serial maturities of the Bonds fssued. An annual proportion of each unpaid assessment shall be payable in each year preceding the date of maturity of each of the several series of Bonds issued, sufficient to pay the Bonds when due and such proportion of each unpaid assessment coming due in any year, together with the annual interest thereon, shall be payable in the same manner and at the same time and in the same installments as the general taxes on real property are payable, and become delinquent at the s~me times and in the same proportionate amounts and bear the same proportionate penalties and interests after delinquency as do the general taxes on real property. Ail sums received from the coliection of said unpaid assessments and of the interest and penalties thereon shall be placed in the Redemption Fund. Section 5.02. FORECLOSURE. The District hereby covenants with and for the benefit of the Owners of the Bonds that it will order, and cause to be commenced within 150 days following the date'of delinquency, and thereafter diligently prosecuted, an action in the superior court to foreclose the lien of any · assessment or ins.~allment thereof not paid when due, pursuant to Resolution No. 2536 Page 25 and as provided in sections 5830 through 8835, in.clusive, Bond Law. Section 5.03. NO ADVANCES FROM AVAILABLE SURPLUS FUNDS. The District shall not be obligated to advance available surplus funds of the District to cure any deficienc~which may occur in the Redemption Fund, and the Resolution of Intention to make Acquisitions and Improvements No. 2517 is hereby amended to correct a statement of i~tention of the Board to the contrary. However, the foregoing determination shall not prevent the District, in its sole discretion, from so-advancing funds.' Section 5.04. PUNCTUAL PAYMENT, COMPLIANCE WITH DOCUMENTS. The District shall punctually pay or cause to be paid the interest and principal to become due with respect to all of the Bonds in str±ct conformity with the terms of the Bonds and of this Resolution, and will faithfully observe and perform all of the conditions, covehants and requirements of this Resolution and all Supplemental Resolutions. Section 5.05. NO PRIORITY FOR ADDITIONAL OBLIGATIONS. The District covenants that no additional bonds or other obligations shall be issued or incurred having any priority over the Bonds in payment of principal or interest out of the Assessments. Nothing in this Resolution shall prohibit or impair the authority of the District to issue bonds or other obligations secured by and payable from Assessments which are on a parity with the Bonds, upon such terms and in such principal'amounts as the District may determine. of the ~ Resolution No. 2536 Page 26 South Tahoe Public Utility District 0< County of El Dorado, California 90 -1 - Fallen Leaf Lake Assessment District 1990 -1 0 O Delinquency Detail Report N As Of 05/24/2002 (n O N uene 9 7 K mt Account 1D Property II) Owner Due Date Amount Penalty Interest Fees Total Delia M 1 0 O Misc (2) 021 - 180 -11200 021- 180-11200 D ANNE () ANDREW 11 04.10/2001 _W3 '19057 M (M n00 0 o vonn 2800 SETON HILL CT Z SACRAMENTO. CA 95816 W in Account Subtotal: 5290.87 529.09 50.00 50.00 5319.96 G) 021 - 210-06 -100 021- 210-06 -100 MADERIOUSJENNIEM TR& ARLENE 12/10/2000 287.00 28.70 4736 65.00 428.06 BL FL M. 11 0 MIR P 000A 36 04/10/2001 287.00 28.70 47.36 65.00 428.06 RL FL SC 1,1 RODEO. CA 04572 11 Account Subtotal: 5574.00 557.40 $94.77 5130.00 5856.12 ..o. 021 25120.100 021- 25120100 SMITH MANSFIELD F W TR 04/10/2002 385.15 18.52 000 3 417 MACE BLVD 01330 0.00 423,67 w DAVIS, CA 95616 3 n Account Subtotal: 5385.15 538.52 50.00 50.00 542167 ID 021.25121 -100 021.251 -21 -100 KEVILLEELISABF.1IIIITR 04/104/002 290.87 29.09 000 000 319.96 s) 2741 DI V ISADER() ST SAN FRANCISCO. CA 94123 -0 Accouot Subtotal: S290.87 519.09 50.00 50.00 5319.96 021- 261 -1oo 100 021.26416400 ALGER GEORGE &BEATRICE.. 04/10/2002 290.87 29.09 0.00 0.00 319.96 1' 0110X 234 BODEGA BAY, CA 94923 021391 -05-100 021 -191 -05 -100 Account Subtotal: AN I1R SULA F 09/10/2002 917 ATit/CR AVE BE Y, CA 94707 5290.87 290.87 529.09 29.09 50.00 0.00 50.00 5319.96 0.00 319.96 Account Subtotal: 5290.87 529.09 50.00 50.00 5319.96 021-410-15 100 021- 41043 -100 FALLEN LEAF LAKE COMM SERV 04 /10/2002 354.74 35.47 0.00 0.00 39021 %C BLOCK 7607 LEVI.STON AVE EL CERRITO, CA 04530 Account Sublolal: 5354.74 S35.47 50.00 50.00 5390.21 DB (1) Delinquency Management Codes: lit- Remnder Sent; DL= Demond letter Sent: SR -Tan gull Removal Requested; SC -Tax Roll Removal Confirmed: FL=Foleclnsure Letler Sent; OL =Ocher letter Sent; F(- Judicial Foreclosure Inililaled: F11- iudicia I Fora)usurc on Hold/Special Case; FC- Foreclosure Complete; 1.1'f- Litigation Guarantee: LGL =Legal Fees and Costs; O -01her Fees; SO =fax Roll Removal County Err; PP = Payment Plan. (2) Misrxlbneous Codes: DB =Direct Bill Sent ;BK -Uoc laced Bankruptcy;PM- Partirl Payment made. remainder delinquent. C 1999 -2000 NUS Government Finance Group Page 1 oft Printed On: 05 /24/2002 04:03:01 PM (0 O to N 10 01 10 O) 3 South Tahoe Public Utility District County of El Dorado, California ro 90-1 - Fallen Leaf Lake Assessment District 1990 -1 Delinquency Detail Report 0 As Of 05/24/2002 0 N N Account ID Property ID Owner Due Date Amount Penalty Interest Fees Total Delinquency. Mgmt (I) Mise (2) V 02142Ud4.I00 021420.]4100 SI.ADF. SC017 M 44 WENDY L 04 %10%2002 '61105 76 in n nn non 204 q6. z 1670 SAN ANSELMO AVE 0) SAN ANSELMO, CA 99960 01 Account Subtotal: 5268.05 526.81 50.00 50.00 529456 a 0 Mitred Totals: 8 Accounts 52,745,42 5274.56 594.72 5130.00 53,244.70 h -1. Report Totals: 8 Accounts 52,745.42 5274.56 j 594.72 f1J0.00 53,244.70 a 3 n N G7 1 D (1) Delinquency Management Codes: RL- Reminder Sent; DL---Demand Letter Sent; SR= Tax Roll Removal Requested; SC Tax Roll Removal Confirmed; FLoForeclusurc Le tier Sent; OL °Other Letter Sent; FI= Judicial For cc bsure lnititated; EH-Judicial Foreclosure on Hold/Special Case; FC= Foreclosure Complete; 1JI- I.itipation Guarantee; LGL=Legal Fees and Costs- O Olhcr Fees' SO -d Roll Removal (bunts F,.• pp = Yaymonl Plan. (2) Miscellaneous Codes �,'� 0 1999-2000 it; NDS Government Finance Group DR -Direct Dill Sent ; 13K-Dec Imed Bankmptcy; PM= Partial Payment made, remainder delinquent. Page 2 of 2 Printed On: 05/24/2002 04:03:01 PM 8661 96Z 606 O 01 Date SAMPLE REMINDER LETTER OWNER NAME ADDRESS CITY, STATE, ZI~ RE: SOUTH TAHOE PUBLIC UTILITY DISTRICT LEVY DELINQUENCY FALLEN LEAF LAKE ASSESSMENT DISTRICT N0.1990-1 PROPERTY ID: XXX-X;~-XXX ACCOUNTID: XXX-XXX-XXX _ _. Dear Property. Owner: Your property is located within the above-referenced District. According to the E1 Dorado County Tax Collector, as of April 19, 2002, there are delinquent levy installments due on this property. This District was created by the South Tahoe Public Utility District to fund public improvements in your area. When the District was created, bonds were sold to investors to raise money to pay for the improvements. A levy is billed annually against your property to pay off the bonds. The District has covenanted to the owners of the bonds that it will take certain steps, including the eventual initiation of judicial foreclosure proceedings, on properties that have levy delinquencies. The District may need to enforce this covenant even if you are delinquent for only one installment. Please note that this still applies even if you are participating in an El Dorado County Tax Collector payment plan. Please pay the delinquent levy installments due on your property along with other delinquent property taxes directly to the El Dorado County Tax Collector. If you have recently paid, please discard this letter. If you have any general questions regarding this District or the levy, please call me at (800) 676- 7516. Sincerely, Loraine Olvero Loraine Olvera Resource Analyst Q:\ STPUD\I 915%LTR~SAMPLEREM INDER~DOC SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Debbie Henderson, Accounting Manager RE: BOARD MEETING June 6, 2002 AGENDA ITEM: ACTION ITEM NO: CONSENT CALENDAR ITEM NO: c. ITEM-PROJECT NAME: SEWER ENTERPRISE 2002-03 APPROPRIATIONS SUBJECT TO LIMITATION REQUESTED BOARD ACTION: Adopt Resolution No. 2743-02 setting the limitation on appropriations for fiscal year 2002-03 DISCUSSION: This is the District's annual resolution, called for by Constitutional Amendment XIIIB. The limitation on appropriations for fiscal year 2002-03 is $40,696,003. The Sewer Enterprise fund budget for fiscal year 2002-03 budget appropriates is $25,472,721. As such, the District is $15,223,282 below the state mandated spending limit. SCHEDULE: The resolution must be adopted as soon as possible COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: Resolution No. 2743-02 and a calculation of the permitted appropriation growth rate CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~=~.~_ NO / CHIEF FINANCIAL OFFICER: YES/ NO CATEGORY: GENERAL WATER SEWER X 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 2743-02 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT ADOPTING THE SEWER ENTERPRISE FUND APPROPRIATIONS SUBJECT TO LIMITATION AND PROCEEDS OF TAXES FOR FISCAL YEAR 2002-03 WHEREAS, the people of the State of California have elected to approve Constitutional Amendment XIIIB, and the Legislature of the State of California has voted to adopt Senate Bill No. 1352, which implements Constitutional Amendment XIIIB, setting the method of computing annual appropriations subject to limitation of local non-residential construction and population; and WHEREAS, the Directors selected the change in per capita personal income; and WHEREAS, such legislation sets the base year for this computation as Fiscal Year 1978-79; and WHEREAS, such legislation requires documentation setting such appropriation limitations shall be available to the public fifteen days prior to the adoption of this resolution; and WHEREAS, on May 20, 2002, such documentation was made public; NOW, THEREFORE, BE IT RESOLVED, that the Board of Directors of the South Tahoe Public Utility District does find and declare that the appropriations subject to limitation for the Fiscal Year 2002-03 are: $25,472,721; and that for Fiscal Year 2002-03, the proceeds of taxes as defined in the enabling statues are: $3,976,000; and that the increase in proceeds of taxes over the appropriations subject to limitations is: $-0. PASSED AND ADOPTED at a duly held Regular Meeting of the Board of Directors of the South Tahoe Public Utility District on the 6th day of June, 2002 by the following vote: AYES: NOES: ABSENT: /////////////// ////////////// 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Resolution No. 2743-02 Page No. 2 Duane Wallace, President of the Board South Tahoe Public Utility District ATTEST: Kathy Sharp, Clerk of the Board and Ex-Officio Secretary of the Board of Directors SOUTH TAHOE PUBLIC UTILITY DISTRICT Permitted Growth Rate in Appropriations for 2002-03 Appropriation Limitation 2001-02 $40,724,510 Increase In CA Per Capita Personal Income -1.27 + 100.00 = .9873 100 Increase In Population E1 Dorado County 1.22+ 100.00 = 1.0122 100 Change Ratio .9873 x 1.0122 x 0.9993 Appropriations Limitation for 2002/03 Actual Appropriations 2002/03 Limitation Exceeding Actual Appropriations 2002/03 $40,696,003 $25,472,721 $15,223~282 Historical Appropriations Limitations & Proceeds Of Taxes $45 $40 $35 $30 $25 $20 $15 $10 $5 1986-87 1902-93 1998-99 1990-91 1996-97 1988-89 1994-95 2000-01 Fiscal Year I -- Appropriation Limitation ~,., Actual Appropriations l 2002/03 Actual Appropriations: Cash Expenditures $21,523,721 Depreciation $3~949r000 Total Expenditures $25~472r721 SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: John Thiel, Senior Enqineer RE: BOARD MEETING ACTION ITEM NO: June 6, 2002 AGENDA ITEM: CONSENT CALENDAR ITEM NO: do ITEM-PROJECT NAME: GARDNER MOUNTAIN TANK REPLACEMENT PROJECT REQUESTED BOARD ACTION:. Authorize staff to advertise for bids DISCUSSION:. The District intends to construct a new 210,000 gallon tank on the new foundation that was installed last year. The construction of the foundation and tank shell being completed over two seasons due to time constraints imposed by the USFS for th~ protection of spotted owl habitat. This will be the final phase of tank construction on Gardne~ Mountain which included the replacement of two leaking tanks, the installation of a new waterlin. ~Jp to the tanks, and siqnificant access road and other BMP improvements SCHEDULE: Advertise for bids 6/10/02; award 7/3/02; beqin construction 8/5/02; complet. 10/15/02 COSTS: $140.000 BUDGETED AMOUNT REMAINING: ATrACHMENTS: None ACCOUNT NO: 2029-8157 GMTNK1 <$49,186> in 2002, $150,00 in 2003 CONCURRENCE WITH REQUESTED A~TION: GENERAL MANAGER: YES ~ NO CHIEF FINANCIAL OFFICER: YES/' NO CATEGORY: GENERAL WATER X SEWER SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: John Thiel, Senior Engineer RE: BOARD MEETING June 6,2002 AGENDA ITEM: ACTION ITEM NO: CONSENT CALENDAR ITEM NO: e. ITEM-PROJECT NAME: SLUDGE HANDLING FACILITIES AND ODOR CONTROL PROJECT REQUESTED BOARD ACTION: Approve Consultant Services Aqreement with Tahoe Regional Planning Agency for services of Michael Rhoades in an amount not to exceed $5,000 DISCUSSION: The permit application for the referenced proiect has been submitted to Tahoe, Reqional Planning Agency (TRPA) for review and action. Due to the large workload of priority proiects in the queue, including two of the District's proiects, and the recent loss of planning staff, the TRPA has indicated that they will be unable to meet the District's project schedule with their remaininq resources. One of their departing planners, Michael Rhoades, has agreed to work on the District's proiect, as a consultant to the TRPA, so that this proiect can continue on schedule. Under tho attached aqreement, the District would pay the additional cost of $3,300 for these services in addition to the normal TRPA filing fee, for a total not to exceed $5,000. Due to the large amount of work to be completed under the forthcoming construction contract in the remaining construction season, staff needs to qet this contractor going as soon an possible. Since even a few weeks delay in the permitting process are likely to cause greater construction challenges and higher costs, staff recommends the approval of the Consultant Services Aqreement SCHEDULE: Award bid 6/20/02; begin construction 7/8/02 COSTS: $5,000 ACCOUNT NO: 1029-8234,8235,8236,8130, SLGTNK BUDGETED AMOUNT REMAINING: $385,000, <$1,135,333>, $400,000, $784,070 ATrACHMENTS: Consultant Services Aqreement CONCURRENCE WITH REQUESTED A/]CTION: GENERAL MANAGER: YES J/c~'.Z.~.-.- NO CHIEF FINANCIAL OFFICER: YES'/ NO CATEGORY: GENERAL WATER SEWER X CONSULTANT SERVICES AGREEMENT TH IS AGREEMENT (hereinafter the "Agreement") is made this day of ,2002, (the "Effective Date") by and between the Tahoe Regional Planning Agency, a bi-state regional planning agency created by Public Law 96-551 (1980) (hereinafter "TRPA"), Michael Rhoades (hereinafter the "Consultant"), and the South Tahoe Public Utilities District (hereinafter "STPUD"). TRPA, the Consultant, and STPUD are sometimes hereinafter individually referred to as "Party" and hereinafter collectively referred to as the "Parties." RECITALS A. The Consultant desires to perform and assume responsibility and obligations for the services, as hereinafter described on the terms and conditions set forth herein. B. TRPA desires to contract for such services as hereinafter described on the terms and conditions set forth herein. C. STPUD desires to contract for such services as hereinafter described on the terms and conditions set forth herein. NOW, THEREFORE, in consideration of the mutual covenants and conditions contained herein, TRPA, the Consultant, and STPUD agree as follows: OPERATIVE PROVISIONS SECTION t ENGAGEMENT AND SERVICES OF THE CONSULTANT 1. Enqaf:lement of Consultant. TRPA and STPUD hereby engages the Consultant, subject to the terms and conditions set forth in this Agreement, to perform the services set forth in Exhibit "A" (the "Services"). The Consultant agrees to perform the Services in accordance with the terms and conditions of this Agreement. Performance of the Consultant. It is understood that the Services to be prepared under this Agreement are to be prepared in and wilh cooperation from TRPA and its staffs, as well as STPUD, and that the Consultant's respa~sibility will be to TRPA. Accordingly, Consultant shall perform said Services so as to result in a technically adequate document which complies with the Tahoe Regional Planning Compact, P.L 96-551 (1980), TRPA Code of Ordinances, and all applicable planning and planning-related statutes, laws, regulations, ordinances and guidelines. It is further agreed that in all matters pertaining to the Services, the Consultant shall act as consultant to only TRPA and STPUD and shall not act as consultant to any other individual or entity affected by the Services in any manner that would conflict with Consultant's responsibilities to TRPA and STPUD during the term of this Agreement. 3. The Consultant's Personnel. The Consultant shall perform all services himself. -1- 4. The Consultant's Responsibilities for Costs and Expenses Unless otherwise specified, the Consultant shall be responsible for all costs and expenses incurred relative to the Consultant, personnel of the Consultant, and subcontractors of the Consultant, in connection with the performance of the Services, including, without limitation, payment of salaries, fringe benefits contributions, payroll taxes, withholding taxes and other taxes or levies, office overhead expense, travel expenses, telephone and other telecommunication expenses, and document reproduction expenses. Payment to TRPA. STPUD agrees to pay to TRPA according to Exhibit "B" (the Compensation") as the sole compensation under this Agreement for the Services as described in Exhibit "A.' This payment shall be made in accordance with Section III of this Agreement. Any alterations to the Compensation shall be accomplished by written amendment to this Agreement. Payment to Consultant. TRPA agrees to pay to the Consultant according to Exhibit "B" (the "Compensation~) as the sole compensation under this Agreement for the Services as described in Exhibit "A." This payment shall be made in accordance with Section ~11 of this Agreement. Any alterations to the Compensation shall be accomplished by written amendment to this Agreement. SECTION II RESPONSIBILITIES OF THE CONSULTANT Personnel. The Services shall be performed by Consultant or under its supervision. The Consultant represents that it possesses the professional and technical personnel required to perform the Services. TRPA retains Consultant on an independent contractor basis and Consultant is not an employee of TRPA. The personnel performing the Services on behalf of the Consultant shall at all times be under the Consultant's exclusive direction and control. The Consultant shall pay all expenses including, without limitation, salaries, fringe benefit contributions, payroll taxes, withholding taxes and other taxes or levies, and all other amounts due such personnel or due others as a result of the performance by such personnel of the Services in connection with their performance of the Services and other amounts due such personnel in connection with their performance of the Services. Consultant shall also be responsible for all reports and documentation required for its employees. Cooperation/Proiect Administrator. The consultant shall work closely and cooperate fully with TRPA's designated Project Administrator, and any other agencies which may have jurisdiction or interest in the Services. This Agreement will be administered by the Project Administrator. The Project Administrator, or his/her designee, shall be the principal officer of TRPA, for liaison with the Consultant, and shall review and give approval to the details of the Services as they are performed. TRPA designates Lyn Barnett, project Review Chief, as its Project Administrator, but reserves the right to appoint another person as Project Administrator upon written notice to the Consultant and approval by STPUD. Proiect Manaqer. The Consultant shall designate and assign a project manager ("Project Manager"), who shall coordinate all phases of the Services. The Project Manager shall be available to TRPA at all reasonable times. The Consultant designates Michael Rhoades to be its Project Manager. -2- Time of Pedormance. The Services to be performed by Consultant under and pursuant to this Agreement shall be conducted in accordance with Exhibit "A". Report Materials. At the completion of the Services, the Consultant shall deliver to TRPA all documents, data, studies, surveys, drawings, maps, models, photographs, and reports prepared by the Consultant, or prepared by others for the use and/or benefit of the Consultant, or otherwise provided to the Consultant by TRPA or by others under this Agreement (the "Report Materials"). Any text work and / or graphic work product shall be submitted to TRPA together with a copy in a digital format that is compatible with either:. 1) Microsoft Word for Windows, or 2) Excel for Windows. Any graphic work product submitted to TRPA in digital format must be submitted in one of the following formats: 1)Adobe Illustrator; 2) EPS (encapsulated postscript); 3) Adobe photoshop files; 4) Tiff flies; 5) Pict files; or, 6) ARC/Info graphic files. Any graphic work product prepared for TRPA shall, whenever feasible, also be submitted with a copy in digital format compatible with one of the six formats outlined above. TRPA Policy. The Consultant shall discuss and review all matters relating to the Services with the Project Administrator in advance of all critical decision points in order to ensure that the Services proceed in a manner consistent with the goals and policies of TRPA. Conformance to Applicable Requirements. All aspects of the provision of the Services by Consultant shall at all times conform to applicable city, county, state, and federal requirements and be subject to approval of the Project Administrator and TRPA. Indemnification. The Consultant shall indemnify, defend and hold harmless TRPA, its officers, employees, and agents against, and will hold and save them and each of them, harmless from any and all actions, claims, penalties, obligations, liabilities, or damages that may be asserted or claimed by any person, firm, entity, corporation, political subdivision, or other organization arising out of or in connection with the provision of the Services by the Consultant, or arising out of the operations or activities of the Consultant, its agents, employees, or subcontractors provided for herein in connection therewith: The Consultant will defend any action or actions filed in connection with any of said claims, damages, penalties, obligations, or liabilities and will pay all costs and expenses, including attomey's fees, with an attorney of TRPA's own choosing, incurred in connection therewith. The Consultant will promptly pay any judgment rendered against the Consultant and/or TRPA covering such claims, damages, penalties, obligations, and liabilities arising out of or in connection with such Services, operations, or activities of the Consultant hereunder, and the Consultant agrees to save and hold TRPA harmless there from. In the event TRPA is made a party to any action or proceeding filed or persecuted against the Consultant for such damages or other claims arising out of or in connection with the work, operations, or activities of the Consultant hereunder, the Consultant agrees to pay to TRPA any and all costs and expenses incurred by TRPA in such actions or proceedings, together with reasonable attorneys' fees for an attorney of TRPA's own choosing. 10. Standard of Care; Licenses. The Consultant represents and warrants that it and all personnel engaged in performing Services are and shall be fully qualified and are authorized or permitted under state and local law to perform such Services. The Consultant shall perform the Services in a skillful and competent manner. The Consultant shall be responsible to TRPA for any errors or omissions in the execution of its duties hereunder. The Consultant represents and warrants that it and all personnel engaged in performing the Services have all licenses, permits, qualifications, and approvals of whatever nature that are legally required to practice its profession. The Consultant further represents and warrants that it shall keep in effect all such licenses, permits, and other approvals during the term of this Agreement. Insurance. Without limiting the Consultant's indemnification of TRPA, the Consultant shall obtain and provide and maintain at its own expense during the term of this Agreement a policy or policies of liability insurance of the type and amounts described below and satisfactory to TRPA, in its sole discretion. Such policies shall be signed by a person authorized by that insurer to bind coverage on its behalf and must be filed with TRPA prior to exercising any right or performing the Services. Said policies shall add as insufeds TRPA, its elected officials, officers and employees, and agents for all liability arising from the Consultant's Services as described herein. Prior to the commencement of the Services, the Consultant shall provide to TRPA certificates of insurance with original endorsements and copies of policies, if requested by TRPA, of the following insurance, with Best's Class A - or better carriers: (1) Personal auto liability and property insurance covering any owned and rented vehicles of Consultant in a minimum amount of $250,000 combined single limit per accident for bodily injury and property damage. Said policy or policies shall be endorsed to state that coverage shall not be suspended, voided, cancelled by either party, or reduced in coverage or in limits except after thirty (30) days prior notice has been given in writing to TRPA. The Consultant shall give to TRPA prompt and timely notice of claim made or suit instituted arising out of the Consultant's operation hereunder. The Consultant shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and performance of the Services. The Consultant shall include subcontracting consultants, if any, as insureds under its policies, or shall furnish separate certificates and endorsements for each subcontractor. All coverage for each subcontractor shall be subject to the requirements stated herein. 11. Prohibition Against Assiqnments The Consultant shall not assign, sublease, hypothecate, or t~ansfer this Agreement, or any interest therein, directly or indirectly by operation of law, without the prior written consent of TRPA. Any attempt to do so without the of TRPA shall be null and void, and any assignee, sublesee, hypothecate or transferee shall acquire no right or interest by reason of such attempted assignment, hypothecation, or transfer. i assignment, transfer, or other disposition of any of the issued and r~g capital stock of the Consultant, if the Consultant is a corporation or of the ~ any general partner or joint venturer or syndicate member or co-tenant of ultant, if the Consultant is a partnership or a joint venture, or a syndicate or ~ncy, which shall result in changing the control of the Consultant, shall be an assignment ofthis Agreement. For purposes of this paragraph, "control" ie ownership of fifty percent (50%) or more of the voting power of the ~n or fifty percent (50%) or more of the voting power of a partnership, joint Syndicate, or co-tenancy. ! Consultant is responsible to keep the Project Administrator and/or his duly i~gnee informed on a regular basis regarding the status and progress of the iities performed and planned, and any meetings that have been scheduled 'relative to the Services or relative to this Agreement. No news releases, including photographs, public announcements, or ~f the same, of any part of the subject matter of this Agreement or any phase shall be made without prior written consent of TRPA. The information ~om the Services in this Agreement is to be kept confidential unless the 'mation is authorized by TRPA. 'he Consultant shall generally have no obligation to work any particular 'ided the Consultant will coordinate with TRPA in achieving the results ~e terms of this Agreement. Right to Contract. The Consultant's obligation hereunder is to complete the o meet any deadlines set forth therein. Except as provided herein, the ~ no obligation to work any particular hours or days or any particular number ~'s. In this regard, the Consultant retains the right to contract for similar ~ny other entity, public or private. A agrees that it will have no dght to control or direct the details, manner, or ;h the Consultant accomplishes the results of the Services performed SECTION III RESPONSIBILITIES OF TRPA AND STPUD 2. In consideration of the performance by the Consultant of the Services, ~y to the Consultant the fixed price set forth on Exhibit "B" (the 'he Consultant shall not receive additional compensation for any extra work xtra work has been authorized in wdting by TRPA prior to the mt of the extra work. TRPA shall pay the Consultant for extra work in 'ith the fee schedule set fodh on Exhibit "B'. -5- Invoicinq. The Consultant shall submit invoices to TRPA and STPUD on a monthly basis for work performed during the billing period. Each invoice shall show percent progress by task and the cumulative percentage of the Services completed in each billing period. The invoice will describe the nature of the work performed. Each invoice shall also include copies of all invoices to date and a statement of the dollars received by the Consultant to date. Payment to Consultant. TRPA shall make payments to the Consultant within thirty (30) days following the date of upon the decision of the TRPA Governing Board to approve or deny the project, or within 30 days after delivery of the Governing Board staff summary and draft permit to the TRPA Contact, if the project is continued to a later Governing Board hearing. Deposit Schedule. TRPA shall have received from STPUD and shall at all times during the term of this Agreement have on deposit within its exclusive control, sufficient funds from the STPUD to satisfy all the Agreement Costs in sufficient time prior to the earlier of, the date of accrual of the Agreement Costs or the due date for payment of the Agreement Costs to the Consultant as determined by TRPA in its sole discretion. If the payments due to the Consultant exceed the amounts deposited by STPUD, STPUD shall pay to TRPA such additional amounts owed Consultant. 1 ) Withholding. Disputed Sums. TRPA may withhold payment of any portion of the compensation if payment is disputed until resolution of the dispute with the Consultant. Such withholding byTRPA shall not be deemed, bythe Consultant, to constitute a failure to pay by TRPA. The consultant shall not discontinue the performance of the Services for a period of thirty (30) days from the date Compensation is withheld hereunder. The Consultant shall have an immediate right to appeal to TRPA with respect to withheld amounts. The determination of TRPA with respect to such matters shall be final. The Consultant shall be entitled to receive from TRPA interest on any portions of the Compensation withheld which are thereafter deemed to be properly payable to the consultant at the rate of seven percent (7 percent) per annum, simple interest. Retention. TRPA shall have the right to retain an amount equal to thirty-five percent (35 percent) of the Compensation ("RetenlJon"). The Retention shall be released to the Consultant upon final approval and acceptance of the Services by TRPA. TRPA shall have the right without further liability to the Consultant, to utilize the Retention to satisfy obligations of TRPA relative to the Services in the event the Consultant does not complete the Services satisfactory to TRPA. SECTION IV -6- TERMINATION 1. Events of Default. Each of the following events shall constitute an "Event of Default": The Consultant shall fail to observe, perform, or comply with any material term, covenant, agreement, or condition of this Agreement which is to be observed, performed, or complied with by the consultant, of such failure to continue uncured for three (3) calendar days after TRPA gives the Consultant notice of any failure and specified the nature of such failure. The Consultant shall commit any fraud, misrepresentation, breach of fiduciary duty, willful misconduct, or intentional or breach of any provision of this Agreement. Termination Upon Event of Default. Upon a termination of this Agreement due to an Event of Default, TRPA shall pay to the Consultant the part of the Compensation which would otherwise be payable to the Consultant with respect to the Services which had been completed as of the date of termination, less the amount of all previous payments with respect to the Compensation. SECTION V GENERAL PROVISIONS Nondiscrimination by the Consultant. The Consultant represents and agrees that the Consultant, its affiliates, subsidiaries, or holding companies do not and will not discriminate against any subcontractor, consultant, employee, or applicant for employment because of race, religion, color, sex, handicap, or national origin. Such nondiscrimination shall include, but not be limited to, the following: employment, upgrading, demotion, transfers, recruitment, recruitment advertising, layoff, termination, rates of pay, or other forms of compensation, and selection for training, including apprenticeship. TRPA's Riqhts to Employ Other Consultants. TRPA reserves the right to employ other consultants in connection with the projects assigned to the Consultant. Conflicts of Interest. The Consultant or its employees may be subject to the provisions of the California Political Reform Act of 1974 (the "Act"), which (1) requires such persons to disclose financial interests that may foreseeably be materially affected by the work performed under this Agreement, and (2) prohibits such persons from making or participating in making, decisions that will foreseeably financially affect such interests. If subject to the Act, the Consultant shall conform to all requirements of the Act. Failure to do so constitutes a material breach and is grounds for termination of this Agreement by TRPA. Assiqnments and Subcontractors. The Consultant shall not subcontract any portion of the Services except as expressly stated herein, without prior written consent of TRPA. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement. -7- Notices. All notices required hereunder shall be given in wdting to the following addresses or such other addresses as the parties may designate by written notice: To TRPA: Tahoe Regional Planning Agency Attn: Lyn Barnett P.O. Box 1038 308 Dorla Court Zephyr Cove, Nevada 89448-1038 (775) 588-4547 fax: (775) 588-4527 email: lbarnett@trpa.org To the Consultant: Michael Rhoades 641 Eloise Ave. South Lake Tahoe, CA 96150 (530) 541-6997 email: mrrhoades@yahoo.com To STPUD: STPUD Attn: John Thiel 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 (530) 544-6474 Notice shall be deemed received as follows, depending upon the method of transmittal by facsimile, as of the date and time sent; by messenger, as of the date delivered; and by U.S. Mail, certified, upon receipt requested, as of 72 hours after deposit in the U.S. Mail. Authority to Enter Aqreement. The Consultant warrants that it has all requisite power and authority to conduct its business and to execute and deliver, and to perform all of its obligations under this Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to enter into this Agreement so as to bind each respective Party to perform the conditions contemplated herein. If Consultant is a corporation or partnership, Consultant also warrants that it is duly organized, validly existing in good standing under the laws of the State of Nevada, and will continue to be so during the term of this Agreement Severability/llleqality. If any portion of this Agreement is declared by a court of competent jurisdiction to be invalid or unenforceable, the remaining provisions of this Agreement shall continue in full force and effect. The illegality of any provision of this Agreement shall not affect the remainder of this Agreement. Time is of the Essence. Time is of the essence in this Agreement, and all parties agree to execute all documents and to proceed with due diligence to complete all covenants and conditions set forth herein. Attorneys' Fees and Costs. If any legal action or other proceeding is brought for the enforcement of this Agreement, or because of an alleged dispute, breach, default, or -8- 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. misrepresentation in connection with any provisions of this Agreement, the successful or prevailing party shall be entitled to recover reasonable attorneys' fees and other costs incurred in that action or proceeding, in addition to any other relief to which it may be entitled. Governinq Law and Venue. This Agreement shall be construed in accordance with and governed by the laws of the State of Nevada. Any lawsuit brought to enforce this Agreement shall be brought in the appropriate court in Nevada. Waiver. No waiver of any provision of this Agreement shall be deemed or shall constitute a waiver of any of the provision, whether or not similar, nor shall any waiver constitute a continuing waiver. No waiver shall be deemed a waiver and no waiver shall be binding unless executed in writing by the party making the waiver. No waiver, benefit, privilege, or service voluntarily given or performed by other parties shall give the other party any contractual right by custom, estoppel, or otherwise. Days. Any term in this Agreement referencing time, days, or period of performance shall be deemed to be calendar days and not work days. Entire Apreement. This Agreement contains the entire agreement of TRPA and the Consultant and supersedes any prior or written statements or agreements between TRPA and the Consultant. No supplement, modification, or amendment of this Agreement shall be binding unless executed in writing by both parties. Bindinq on Assiqns. Each and all of the covenants and conditions of this Agreement shall be binding on and shall inure to tt~ benefit of the successors and assigns of the respective parties. Counterparts. This Agreement may be signed in counterparts, each of which shall constitute an original and which colleclively shall constitute one instrument. Captions. The captions of the various articles and paragraphs of this Agreement are for the convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Agreement or of any part or parts of this Agreement. Construction. In all cases, the language in all parts of this Agreement shall be construed simply, according to its fair meaning and not strictly for or against any party, it being agreed that the parties or their agents have all participated in the preparation of this Agreement. Cooperation/Further Acts. The parties shall fully cooperate with one another in attaining the purposes of this Agreement and, in connection therewith, shall take any such additional further acts and steps and sign any such additional documents as may be necessary, appropriate, and convenient as related thereto. Survival. The obligations of the Consultant under this Agreement including, without limitation, the obligations set forth in Section II, Paragraph 8 (Indemnification), and Section Il, Paragraph 10 (Insurance), as they relate to the Services, shall survive the termination of expiration of this Agreement. 20. Incorporation of Recitals and Exhibits. -9- 21. 22. A. The "Recitals" constitute a material part hereof, and are hereby incorporated by reference herein as though fully set fodh. B. The "Exhibits" constitute a material part hereof, and are hereby incorporated by reference herein as though fully set forth. References. All references to the Consultant shall include all personnel, employees, agents, and subcontractors of the Consultant. No Funds to Unqualified Aliens. Under law, no funds received under this Agreement shall be paid to any alien who is "not a qualified alien" within the meaning of the Personal Responsibility and Work Opportunity Reconciliation Act of 1996 ("Act"). The Consultant shall be responsible to ensure that no funds Consultant receives from TRPA are paid to any employee or subcontractor in violation of this Act. IN WITNESS WHEREOF, the padies hereto have accepted and made and executed this Agreement upon the terms, conditions, and provisions set forth above as of the Effective Date. MICHAEL RHOADES MICHAEL RHOADES Dat~ / TAHOE REGIONAL PLANNING AGENCY EXECUTIVE DIRECTOR SOUTH TAHOE PUBLIC UTILITY DISTRICT BY: ROBERT BAER Date MANAGER -10- EXHIBIT "A" Scope of Consultant Services Task 1. Review the STPUD Sludge Handling and Odor Control Facility Project, (El Dorado County Assessor's Parcel No. 25-061-32, TRPA File No. 20020983), for consistency with all applicable TRPA regulations. This review includes site visits to the affected property and review of environmental and planning documents prepared for the project for TRPA technical adequacy. It also includes TRPA archival research and other research appropriate for accurate review of the project application. Task 2. Prepare a Finding of No Significant Effect, if appropriate, based information contained in the project application. Task 3_ Prepare Governing Board Staff Summary for the project, including draft permit with special conditions of approval, if required. The preparation of the Staff Summary shall include notification of affected property owners and placement of the project on the June 2002 TRPA Governing Board agenda. Task 4. Present the project to the TRPA Governing Board, with a recommended action. Product 1. A TRPA Governing Board Staff Summary, including draft permit (if the staff summary recommends approval). Product 2. A final TRPA permit, dependent on approval of the Project by the TRPA Governing Board. This permit shall also include appropriate mitigation measures contained in the Environmental Assessment. The consultant shall complete the Tasks and deliver Product #1 by June 11, 2002. Product #2 is due within five working days of Governing Board Action. END EXHIBIT "B" Schedule of Payment for Consultant Services The Tasks defined in Exhibit "A" shall be completed in due time so that the Project will be heard by the TRPA Governing Board on June 26, 2002. The Products defined in Exhibit "A" shall be rendered by the noted deadlines. The TRPA shall charge STPUD $5,000 for the Tasks and Products described in Exhibit "A". Of this amount, $3,300 shall be paid to the Consultant by TRPA upon satisfactory completion of all Tasks and Products described in Exhibit "A". TRPA shall retain $1,700.00 in application fees. END SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Jim Hoggatt, Construction ManagedEngineer RE: BOARD MEETING June 6, 2002 AGENDA ITEM: ACTION ITEM NO: CONSENT CALENDAR ITEM NO: f. ITEM-PROJECT NAME: GLENWOOD WELL BUILDING AND EQUIPMENT REQUESTED BOARD ACTION: Approve Task Order No. 3 to Haen Engineering to provide the design for the roof replacement on Glenwood Well Building in the amount of $700 DISCUSSION: The existinq building that staff intends to use for the equipment and controls for the new Glenwood Well has a flat roof and leaks. The roof needs to be replaced with a pitched roof. Staff requests the Board approve Task Order No. 3 to Haen Enqineering to provide the design for the new roof. SCHEDULE: As soon as possible COSTS: $700 ACCOUNT NO: 2029-8264 GLWOOD BUDGETED AMOUNT REMAINING: <$88,967> in 2002, $100,000 in 2003 ATTACHMENTS: Haen Engineering Proposal, Task Order No. 3 CONCURRENCE WITH REQUESTED A,~TION: GENERAL MANAGER: YES~ NO / CHIEF FINANCIAL OFFICER: YES NO CATEGORY: GENERAL WATER X SEWER FROH : Haen Engmeerm9 - G5 Concepts FAX NO. : Apr. 88 2002 05:~4Pr'1 P2 I-IAI-=N ENGINEERING JAMES F. HAEN -- Civil Engineer April g, 2002 California Lic.# 40357 Nevada Lic.# 07021 Mr. Jim Hoggatt South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 RE: Glenwood Well Building Dear Jim: At your request I am submitting the attached contract proposal. The project entails replacing the fiat roof with manufactured trusses. My proposal includes pro¥iding one plan sheet and the supporting structural calculations sufficient to obtain a building permit trader the cun'mxt applicable 1987 LIBC. The work will be completed within 3 weeks of receiving a signed contract. Sincerely, James F Haen, C E 1950 Lake Tahoe Blvd., Suite 9 P.O. Box 11609 South Lake Tahoe, CA 96155 (530) 541-4343 Fax (530) 541.4461 STANDARD CLIENT/CONSULTANT AGREEMENT Consultant: James ¥.Haen, P.E. CA License #40357 P.O. Box 11609 South LakeTahoe, CA 96155 530-541-4343 530-541-4461 fax haeneng~aol.com NV License #7021 Client: Name: Billing Address: Phone (home): (work): (fax): (email): Project: Owner: Billing Address: Project Type: Street Address: Cig, and County: APN: Description of Professional Engineering Services: P~av'tZ~ Compensation and Method of Payment: $ 7a0. ~0 Lump Sum $ Time and Materials (Fee Schedule attached) $ Retainer Payment in full ia' required tlffOlt htvoice receipg Relalner payment, If applicable, due prior to commencement of work. Interest at I ~ % per month Is charged after 30 days. Notes: Additional Services: Additional services will be provided on a time and materials basis per the cmxent Haen Engineering Fee Schedule or as agreed to by both parties. Termination: This Agreement may be terminated by the Client immediately for cause or without cause upon fifteen days' written notice of termination. Upon termination, Consultant shall be entitled to compensation for services performed up to the effective date of termination, and Client shall be entitled to all work performed to that date. Acceptance: Client Signature Print Name Date Consultant Signature Date FROM : Haen En@~nm~r~n9 - GS Conc~_~ts FAX NO. : Apr. ~8 2~2 ~5:~$PM P4 STANDA~ PROVISIONS OF AG~EMENT HAEN ENGINEERING TASK ORDER NO. 3 ENGINEERING SERVICES This Agreement is made and entered into as of the 6th day of June, 2002 by and between South Tahoe Public Utility District, hereinafter referred to as "DISTRICT" and Haen Engineering, hereinafter referred to as "ENGINEER". In consideration of the mutual promises, covenants, and conditions as addressed in the Master Agreement dated July 21, 1998 and as specifically hereinafter set forth, the parties do hereby agree as follows: I. PURPOSE The purpose of this Task Order is to prepare one plan sheet and supporting structural calculations for GlenwoodWell Building Roof Replacement with manufactured trusses sufficient to obtain a building permit under the current requirements of 1987 UBC. 2. SCOPE OF WORK The scope of work for these Engineering services is contained in the ENGINEER's letter proposal of April 8, 2002 as outlined in Standard Client/Consultant Agreement attached thereto and marked Exhibit "A". This proposal becomes a part of this Task Order by reference herein. 3. STAFFING Staffing will be under the direction of Jim Haen. ENGINEER shall not change staffing without approval by DISTRICT. Any changes shall provide for equivalent qualifications as far as possible and practical. 4. TIME OF PERFORMANCE All services for this Task Order will be completed within three weeks of receiving a signed agreement. 6. PAYMENT Payment to ENGINEER for services performed under this Task Order shall be in fuji (lump sum) upon completion of the task and submission of invoice to DISTRICT from ENGINEER, and shall not exceed the amount of Seven Hundred Dollars ($700.00) unless the scope of work is changed and an increase is authorized by DISTRICT. 7. INSURANCE COVERAGE ENGINEER's Errors & Omissions coverage shall be $1,000,000 aggregate with a deductible of not more than $500,000 for the duration of this Task Order. 8. LABOR CODE REOUIREMENTS All State of California prevailing wage laws must be complied with in the performance of work related to this Task Order. These include, but are not limited to, Labor Code Sections 1720 through 1860. 9. EFFECTIVE DATE This Task Order No. 3 will become effective upon execution by both parties and shall serve as a Notice to Proceed upon execution by District. IN WITNESS WHEREOF, this Agreement is executed by the General Manager and Clerk of the Board of the South Tahoe Public Utility District, and ENGINEER has caused this Agreement to be executed the day and year first above written. Robert G. Baer, General Manager/Engineer lune 6, 2002 Board Approval Date Attest Kathy Sharp, Clerk of Board Haen Engineering James F. Haen, Engineer 2 I-IAI--N ENGINEERING JAMES F. HAEN -- Civil Engineer Apdl $, 2002 California Lic.# 40357 Nevada Lic.# 07021 Mr. Jim Hogg-art South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 RE: Glenwood Well Building Dear Jim: At your request 1 am submitting the attached contract proposal. The project entails replacing the fiat roof with manufactured trasses. My proposal [ncludes providing one plan sheet and the supporting structural calculations sufficicnt to obtain a building permit under thc curry-mt applicabIe 1987 UBC. The work will be completed within 3 weeks of rcc¢ivin£ a signed contract. Sincerely, Jan~es F. I-hen, C.E. 1950 Lake Tahoe Blvd., Suite 9 P.O. Box 11609 South Lake Tahoe, CA 96155 (530) 541-4343 Fax (530) 541.4461 F~'~3F1 : Ha~-rn E'~9;n~-~r~.n9 - G'~ Conce'pts FRX biO. : ,qp'~. (38 2992 05:85FH P'~ STANDARD CLIENT/CONSULTANT AGREEMENT Consultant: James F. l-hen, P.E. CA License #40357 P.O. Box I 1609 South Lake Tahoe, CA 95155 530-541-4343 530-541-4461 fax haeneng~waol.com NV License #7021 Client: N&me: Billing Address: Phone (home): (work): (fax): (email): Project: Owner: Billing Address: Project T,vpe: Street Ad&ess: Ciw ~md County: APN: Description of Professional Engineering Services: /~t/tD~ o~' P~'~J 5'w/~',~-~ ~ Compensation and Method of Payment: $ 7~. ~ Lump Sum $ Time and Materials (Yee Schedule attached) $ Retainer Payment in full lc required upon invoice receipt Retainer payment, If applicable, due prior to commencement of work. Interest at 1 ~ 74 per month lc charged after 30 days. Notes: Additional Services: Additional services will be provided on a time and materials basis per the current l-hen Engineering Fee Schedule or as agreed to by both parties. Termination: Th~s Agreement may be terminated by the Client immediately for cause or without cause upon fi~een days' written notice of termination. Upon termination. Consultant shall be eraitled to compensation for services performed up to the effe~ive date of t~xmLnadon, and Client shall be entitled to all work performed to that date. Acceptance: Client Signature Print Name Date EXHIBIT "A" FRet1 : Haen Engin~-~-rin9 - GS Conc~-pts FAX b40. : Apr. ¢~ 29~2 85:~Prl P4 STANDA~ PROVISIONS OF AG~EMENT ~e ~a~-~ ~ ~ in de,alt oft~ a~m~mem ~4 rh~sagmem~nrshailb~gov=rn~bya~mnstru~ina~o~nn~ht~lawsof~h~Star~ofC~lit~rnm. EXHIBIT "A" SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: FR: RE: ACTION ITEM NO: BOARD OF DIRECTORS Jim Hocjgatt, Construction Manager/Encjineer BOARD MEETING June 6, 2002 AGENDA ITEM: CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: ADMINISTRATION BUILDING MODIFICATION REQUESTED BOARD ACTION: Approve Task Order No. 1 to Jacobs & Tolhurst Architects to evaluate the Administration Buildinq to determine if it meets code requirements for seismic and ADA requlations in the amount of $11,000 DISCUSSION: An Administration Building Committee, consistincJ of at least a manager from each department, has been formed to evaluate the needs of additional office space for the Administration Buildinq. The committee has reviewed the Ward Young Report in which they recommended the District build a new administration building on Al Tahoe Boulevard. The committee recommended the District should also look into expandinq the existin.q Administration building as an alternative. To evaluate this alternative, the District needs to have the existing Administration Building evaluated to determine if it meets seismic and ADA regulations, or what work would be involved to brinq it up to code. Once the committee has this information they can compare the two alternatives equally and meet with the Board with a recommendation. Staff recommends the Board approve the Task Order No. 1 to Jacobs & Tolhurst Architects to evaluate the existinq Administration Building to determine if it meets code requirements for seismic and ADA regulations. SCHEDULE: As soon as possible COSTS: $11,000 ACCOUNT NO: 1029/8130 ADMMOD BUDGETED AMOUNT REMAINING: $784,070 ATFACHMENTS: Proposal from Jacobs & Tolhurst Architects. Task Order No. 1 will be distributed prior to the Board Meetinq CONCURRENCE WITH REQUESTED~TION:__ GENERAL MANAGER: YES/(-~)~' NO CHIEF FINANCIAL OFFICER: YES./ NO CATEGORY: GENERAL WATER X SEWER. JACOBS & TOLHURST ARCHITECTS 2264 Lake Tahoe Blvd. Suite 3 South Lake Tahoe, CA 96150 (530) 544-1587 Fax (530) 544-0572 PROPOSAL FOR ARCHITECTURAL SERVICES May 17, 2002 Jim Hoggatt and Richard Solbrig South Tahoe Public Utility District 1275 Meadow Crest Drive S Lake Tahoe, CA 96150 (530) 544-6474 Office (530) 541-0614 Fax RE: Proposed Analysis of Existing Administration Building South Tahoe Public Utility District S Lake Tahoe, CA Dear Jim and Richard: We are pleased to submit to you this proposal to provide architectural services in connection with the analysis of the existing STPUD administration building located at 1275 Meadow Crest Drive in S Lake Tahoe. Work shall be as directed by task order. 1) We propose to provide the following services: PHASE 1 - INITIAL STUDY A) Review As-built Drawinqs and On-Site Conditions: Review as-built building drawings and other data provided by the district. Perform visual on-site inspection of building conditions to the extent possible. Destructive testing if deemed necessary shall be performed by others and is not included in this proposal. B) Analysis of Data: Analyze as-built and collected field data and perform structural calculations as necessary to determine code compliance of existing building with respect to seismic structural integrity including applicable FEMA documents and California Building Code requirements. Subsequent to determination of structural integrity of existing building, analyze as-built and field data to determine handicapped accessibility requirements based upon current ADA regulations and California Title 24 accessibility standards. c) Report Findinqs and Meet with Client: Prepare a written report of initial study findings for client review and approval. Meet with client to discuss findings. D) Coordinate work provided by consultants: Coordinate work provided by consultin9 structural engineer. Jacobs & Tolhurst Architects Licensed Architects CA & NV PROPOSAL FOR ARCHITECTURAL SERVICES Page 2 of 4 South Tahoe Public Utility District PHASE 2 - PRELIMINARY DOCUMENTATION & COST ANALYSIS A) B) C) As-built and Preliminary Drawinqs: Based upon findings and options selected by client, prepare as-built and preliminary compliance drawings with applicable code analysis and structural calculations, for client review and approval. These drawings shall be sufficient for cost analysis and budget purposes only. Coordinate Cost Analysis: Consult with client-selected qualified contractor (s) to determine preliminary cost analysis for proposed building modifications. Report Findinqs and Meet with Client: Prepare a written report of cost analysis for client review and approval. Meet with client to discuss findings. PHASE 3 - CONSTRUCTION DOCUMENTATION A) Construction documents (workinq drawinqs): Based on options selected by client, prepare construction documents for client review and approval. Documents shall be sufficient for permit application, bidding and construction. B) Coordinate work provided by consultants: Coordinate design work provided by mechanical, plumbing and electrical consultants. Coordinate with soils, civil and geological and structural engineering consultants and other consultants as required. c) Contractor Coordination: Coordinate with client-selected contractor(s) to review or discuss the progress of the above services. Coordinate bidding process. D) Aqency Review, Approvals and Coordination: Provide as directed by client. Prepare agency and governmental application forms and coordinate the review and approval process. Provide agency and building department plan check comment response. E) Additional Services: Provide as directed by client. Additional services may include revisions to work previously completed, preparation of additional drawings, expansion of scope of work, on-site construction observation, contract administration, and coordination with contractors, vendors or material suppliers and similar services. PROPOSAL FOR ARCHITECTURAL SERVICES Page 3 of 4 South Tahoe Public Utility District 2) Proiect Timinq: Phase 1 of services shall be completed within 60 days after written acceptance of proposal and client provided agreements. Additional phases of service shall be completed based upon client selected options (to be determined). Architect shall endeavor to complete services in a timely manner. Architect cannot be held liable for delays caused by others, including any delay caused or requested by client. Also, due to the complex nature of regulations affecting projects in the Tahoe basin, receipt of necessary clearances / approvals in a timely manner as work progresses is critical. 3) 4) Cost estimation and control: Client shall work closely with selected contractor (s) in order to establish and control construction costs as preliminary drawings and construction documents are developed. As drawings progress, client shall advise architect of any required adjustments to scope of work made necessary in order to control construction costs. Compensation schedule: for services performed, payment shall be as follows: A) Billings for services and direct expenses shall be sent to client at the end of each month during which work was performed and shall be due and payable upon receipt. Payments received more than 60 days from date of invoice shall be subject to interest at the current legal rate. B) Services will be provided hourly at a rate of $120.00 / Architect and $100.00 / Consulting Structural Engineer. Billing amounts will be in keeping with progress of services. C) Reimbursable direct expenses such as filing fees, consulting fees, materials, plotting, printing, travel, etc at 110% of cost. D) In accordance with provisions of the Master Agreement, we project maximum total fees to be as follows: Phase 1 Phase 2 Phase 3 completed. $11,000.00 To be determined after initial study has been completed. To be determined after preliminary documentation is PROPOSAL FOR ARCHITECTURAL SERVICES Page 4 of 4 South Tahoe Public Utility District 5) Architect may rely on information provided by other parties or consultants, but shall not be held liable for inaccuracies therein. 6) All drawings and specifications as instruments of service are and shall remain the property of the Architect. Client may not use instruments of service for any other project without Architect's written permission and appropriate compensation. In the event of any unauthorized use of Architect's work, Client agrees to indemnify Architect against any and all claims, demands and expenses, including reasonable attorney's fees, growing out of their unauthorized use. The information, plans, designs, notes and arrangements shown on the documents may not be reproduced in whole or in part without express written consent of the Architect. Copies retained by Client and Client's representatives shall be utilized for this specific project only. 7) Cancellation: Client agrees to pay for all services and expenses incurred for the work, up to date of completion or until such time either party gives written notice of cancellation of this agreement to the other. In the event of such notice, payment shall be immediately made for all services and expenses incurred to date of notice. We look forward to being of service to you. Should you have any questions regarding the above, please feel free to contact me. Please sign and return one copy of this proposal to initiate the Agreement. Sincerely, Steve Jacobs, Architect License CA C10650 NV 4399 AGREED AND ACCEPTED: South Tahoe Public Utility District Date JACOBS & TOLHURST, ARCHITECTS TASK ORDER NO. 1 ARCHITECTURAL SERVICES This Agreement is made and entered into as of the 6th day of June, 2002 by and between South Tahoe Public Utility District, hereinafter referred to as "DISTRICT" and Jacobs & Tolhurst, Architects, hereinafter referred to as "ARCHITECT". In consideration of the mutual promises, covenants, and conditions as addressed in the Master Agreement dated June 5, 2002 and as specifically hereinafter set forth, the parties do hereby agree as follows: I. PURPOSE The purpose of this Task Order is to provide architectural services in connection with the analysis of the existing South Tahoe Public Utility District administration building located at 1275 Meadow Crest Drive in South Lake Tahoe. 2. SCOPE OF WORK The scope of work for these architectural services is contained and outlined in the ARCHITECT's letter proposal of May 1 7, 2002 specifically described therein in Phase 1, consisting of the review of as-built drawings and on-site conditions, analysis of data, report findings and meet with District staff, and coordinate work provided by consultants. This proposal becomes a part of this Task Order by reference herein. 3. STAFFING Staffing will be underthedirection of SteveJacobs,^rchitect. ARCHITECT shall not change staffing without approval by DISTRICT. Any changes shall provide for equivalent qualifications as far as possible and practical. 4. DISTRICT RESPONSIBILITIES DISTRICT agrees that its officers and employees will cooperate with ARCHITECT in the performance of services under this Task Order and will provide on request, existing information, data and as-built building drawings of existing administration building. 5. TIME OF PERFORMANCE Tasks will commence with approval of Board on June 6, 2002, and end with the submittal of the written report of initial study findings, and subsequent meeting-to-discuss with District staff, on or before August 5, 2002. 6. PAYMENT Payment to ARCHITECT for services performed under this Task Order shall be as provided in Article IV of the June 5, 2002 Master Non-Grant Agreement and shall not exceed the amount of Eleven Thousand Dollars ($11,000.00) unless the scope of work is changed and an increase is authorized by DISTRICT. 7. INSURANCE COVERAGE ARCHITECT's Errors & Omissions coverage shall be $1,000,000 aggregate with a deductible of not more than $500,000 for the duration of this '[ask Order. 8. LABOR CODE REC)UIREMENTS All State of California prevailing wage laws must be complied with in the performance of work related to this 'Eask Order. These include., but are not limited to, Labor Code Sections 1720 through 1860. 9. EFFECTIVE DATE This Task Order No. 1 will become effective upon execution by both parties and shall serve as a Notice to PToceed upon execution by District. IN WITNESS WHEREOF, this Agreement is executed by the General Manager and Clerk of the Board of the South Tahoe I~ublic Utility District, and ARCHITECT has caused this Agreement to be executed the day and year first above written. Rober~ G. Baer, General Manager/Engineer tune 6, 2002 Board Approval Date JACOBS & TOLHURST, ARCHITECTS Attest Kathy Sharp, Clerk of Board Steve Jacobs, Architect License No. CA: C10650 NV: 4399 2 JACOBS & TOLHURST ARCHITECTS 2264 Lake Tahoe Blvd. Suite 3 South Lake Tahoe, CA 96150 (530) 544-1587 Fax (530) 544-0572 PROPOSAL FOR ARCHITECTURAL SERVICES May 17,2002 Jim Hoggatt and Richard Solbrig South Tahoe Public Utility District 1275 Meadow Crest Drive S Lake Tahoe, CA 96150 (530) 544-6474 Office (530) 541-0614 Fax RE: Proposed Analysis of Existing Administration Building South Tahoe Public Utility District S Lake Tahoe, CA Dear Jim and Richard: We are pleased to submit to you this proposal to provide architectural services in connection with the analysis of the existing STPUD administration building located at 1275 Meadow Crest Drive in S Lake Tahoe. Work shall be as directed by task order. 1) We propose to provide the following services: PHASE 1 - INITIAL STUDY A) Review As-built Drawinqs and On-Site Conditions: Review as-built building drawings and other data provided by the district. Perform visual on-site inspection of building conditions to the extent possible. Destructive testing if deemed necessary shall be performed by others and is not included in this proposal. B) Analysis of Data: Anaiy'ze as-built and collected field data and perform structural calculations as necessary to determine code compliance of existing building with respect to seismic structural integrity including applicable FEMA documents and California Building Code requirements. Subsequent to determination of structural integrity of existing building, analyze as-built and field data to determine handicapped accessibility requirements based upon current ADA regulations and California Title 24 accessibility standards. c) Report Findinqs and Meet with Client: Prepare a written report of initial study findings for client review and approval. Meet with client to discuss findings. D) Coordinate work provided by consultants: Coordinate work provided by consulting structural engineer. Jacobs & Tolhurst Architects Licensed Architects CA & NV PROPOSAL FOR ARCHITECTURAL SERVICES Page 2 of 4 South Tahoe Public Utility District PHASE 2 - PRELIMINARY DOCUMENTATION & COST ANALYSIS A) B) C) As-built and Preliminary Drawinqs: Based upon findings and options selected by client, prepare as-built and preliminary compliance drawings with applicable code analysis and structural calculations, for client review and approval These drawings shall be sufficient for cost analysis and budget purposes only. Coordinate Cost Analysis: Consult with client-selected qualified contractor (s) to determine preliminary cost analysis for proposed building modifications. Report Findinqs and Meet with Client: Prepare a written report of cost analysis for client review and approval. Meet with client to discuss findings. PHASE 3 - CONSTRUCTION DOCUMENTATION A) Construction documents (workinq drawin.qs): Based on options selected by client, prepare construction documents for client review and approval. Documents shall be sufficient for permit application, bidding and construction. B) Coordinate work provided by consultants: Coordinate design work provided by mechanical, plumbing and electrical consultants. Coordinate with soils, civil and geological and structural engineering consultants and other consultants as required. c) Contractor Coordination: Coordinate with client-selected contractor(s) to review or discuss the progress of the above services. Coordinate bidding process. D) Agency Review, Approvals and Coordination: Provide as directed by client. Prepare agency and governmental application forms and coordinate the review and approval process. Provide agency and building department plan check comment response. E) Additional Services: Provide as directed by client. Additional services may include revisions to work previously completed, preparation of additional drawings, expansion of scope of work, on-site construction observation, contract administration, and coordination with contractors, vendors or matedal suppliers and similar services. PROPOSAL FOR ARCHITECTURAL SERVICES Page 3 of 4 South Tahoe Public Utility Distdct 2) Proiect Timin;l: Phase I of services shall be completed within 60 days after written acceptance of proposal and client provided agreements. Additional phases of service shall be completed based upon client selected options (to be determined). Architect shall endeavor to complete services in a timely manner. Architect cannot be held liable for delays caused by others, including any delay caused or requested by client. Also, due to the complex nature of regulations affecting projects in the Tahoe basin, receipt of necessary clearances / approvals in a timely manner as work progresses is critical. 3) 4) Cost estimation and control: Client shall work closely with selected contractor (s) in order to establish and control construction costs as preliminary drawings and construction documents are developed. As drawings progress, client shall advise architect of any required adjustments to scope of work made necessary in order to control construction costs. Compensation schedule: for services performed, payment shall be as follows: A) Billings for services and direct expenses shall be sent to client at the end of each month dudng which work was performed and shall be due and payable upon receipt. Payments received more than 60 days from date of invoice shall be subject to interest at the current legal rate. B) Services will be provided hourly at a rate of $120.00 / Architect and $100.00 / Consulting Structural Engineer. Billing amounts will be in keeping with progress of servicers. C) Reimbursable direct expenses such as filing fees, consulting fees, materials, plotting, printing, travel, etc at 110% of cost. D) In acoordance with provisions of the Master Agreement, we project maximum total fees to be as follows: Phase 1 Phase 2 Phase 3 completed. $11,000.00 To be determined after initial study has been completed. To be determined after preliminary documentation is PROPOSAL FOR ARCHITECTURAL SERVICES Page 4 of 4 South Tahoe Public Utility District 5) Architect may rely on information provided by other parties or consultants, but shall not be held liable for inaccuracies therein. 6) All drawings and specifications as instruments of service are and shall remain the property of the Architect. Client may not use instruments of service for any other project without Architect's written permission and appropriate compensation. In the event of any unauthorized use of Architect's work, Client agrees to indemnify Architect against any and all claims, demands and expenses, including reasonable attorney's fees, growing out of their unauthorized use. The information, plans, designs, notes and arrangements shown on the documents may not be reproduced in whole or in part without express written consent of the Architect. Copies retained by Client and Client's representatives shall be utilized for this specific project only. 7) Cancellation: Client agrees to pay for all services and expenses incurred for the work, up to date of completion or until such time either party gives written notice of cancellation of this agreement to the other. In the event of such notice, payment shall be immediately made for all services and expenses incurred to date of notice. We look forward to being of service to you. Should you have any questions regarding the above, please feel free to contact me. Please sign and return one copy of this proposal to initiate the Agreement. Sincere;7, Steve Jacobs, Amhitect License CAC10650 NV 4399 AGREED AND ACCEPTED: South Tahoe Public Utility District Date TO: FR: SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM BOARD OF DIRECTORS Rhonda McFarlane, Chief Financial Officer RE: BOARD MEETING June 6, 2002 AGENDA ITEM: ACTION ITEM NO: CONSENT CALENDAR ITEM NO: h. ITEM-PROJECT NAME: CONTRACT FOR AUDITING SERVICES REQUESTED BOARD ACTION: Authorize a two-year extension to the contract for auditinq services with Grant Thornton LLP in the amount of $561710 DISCUSSION: The present contract with Grant Thornton for Financial Statement auditinq services will end after the June 30, 2002 audit. The Finance Committee is very satisfied with the professional services provided by Grant Thornton and is recommending an extension of their contract for an additional two years. The District will benefit greatly from the experience Grant Thornton has with the District's operations. Grant Thornton has aqreed to perform the audits for 2002/03 and 2003/04 for $28,355 per year, including Single Audit work associated with the District's federal grant. This is a seven percent increase from the present rates. The price includes both fees and expenses of the auditors. The new rate is still twenty-one percent less that the audit fees paid to our former auditors for fiscal year 1999. Grant Thornton was selected through a competitive RFP process in 2000. SCHEDULE: Execute extension of the contract as soon as possible. COSTS: $56,710 ($28,355 per ,/ear) ACCOUNT NO: 1039/2039-4470 BUDGETED AMOUNT REMAINING: $38,600 (2003 budget) A'I-FACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES~ NO CHIEF FINANCIAL OFFICER: YES/ NO CATEGORY: GENERAL X WATER SEWER TO: FR: SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM BOARD OF DIRECTORS Rhonda McFarlane, Chief Financial Officer RE: BOARD MEETING Juno 6, 2002 AGENDA ITEM: ACTION ITEM NO: CONSENT CALENDAR ITEM NO: i. ITEM-PROJECT NAME: PENSION PLAN AUDIT REQUESTED BOARD ACTION: Amend the scope of work in the contract for auditing services to include auditing the District's Pension Plan in the amount of $6,500 DISCUSSION: Government Code Section 7504 requires the District to secure the services of a qualified person to perform an attest audit of the South Tahoe Public Utility District Pension Plan (the Plan}. It is customary and most efficient to have a pension plan audit performed by the same auditors that audit the orqanization's financial statements. Grant Thornton has agreed to audit the Plan for a cost not to exceed $6,500 includin¢] expenses. Staff and the Finance Committee have reviewed the cost in detail and find it to be reasonable and competitive. They recommend engaginq Grant Thornton to audit the Plan. The fiscal 2003 budget is sufficient to cover both the financial statement audit and the self- insurance audit. Fees for the Plan audit are not included in the fiscal 2003 budget because staff only recently learned of this audit requirement. The amount for the audit will need to come from the District's continqency budget. SCHEDULE: The audit must be submitted to the State Controller's Office by December 31,2002. COSTS: $6,500 ACCOUNT NO: 1039/2039-4470 BUDGETED AMOUNT REMAINING: $38,600 (2003 budget} ATTACHMENTS: None CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: Y E S -~':~/~, ~,,,,.~,~ N O CHIEF FINANCIAL OFFICER: YES NO CATEGORY: GENERAL X WATER SEWER Consent Item j. SOUTH TAHOE PUBLIC UTILITY DISTRICT "Basic Services for a Complex World" Robe[t G. Baer General Duane Wallace, President BOARD MEMBER James R. Jones, Vice President REGULAR MEETING OF THE BOARD OF DIRECTORS SOUTH TAHOE PUBLIC UTILITY DISTRICT MAY 2, 2002 MINUTES The Board of Directors of the South Tahoe Public Utility District met in a regular session, May 2, 2002, 2:00 P.M., City Council Chambers, 1900 Lake Tahoe Boulevard, South Lake Tahoe, California. BOARD OF DIRECTORS: President Wallace, Directors Jones, Schafer, Mosbacher. Director Becker was absent. ROLL CALL ,STAFF: Baer, Solbrig, Sharp, McFarlane, Adams, Schroeder, Coyner, Bergsohn, Cocking, Henderson, Hussmann, Donovan, Bird, Attorney Kvistad Consent Item a. was brought forward for discussion prior to Board action. Consent Item f. was brought forward for a separate vote. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR Moved Jones / Second Mosbacher / Becker Absent / Passed to approve the Consent Calendar as amended: CONSENT CALENDAR a. See Consent Items Brought Forward; b. Financial Transaction Authorization - Adopted Resolution No. 2739-02 authorizing certain staff to conduct financial transactions, Superceding Resolution No. 2724-01; REGULAR BOARD MEETING MINUTES - MAY 2, 2002 PAGE - 2 c. Recycled Water Master Plan Budget Augmentation - Approved request for budget augmentation to Kennedy/Jenks Consultants in the amount of $55,420; CONSENT CALENDAR (continued) d. Main 480 Switch Gear Replacement - Authorized staff to advertise for bids for the design/build of 480 volt switch gear; e. Manhole Lining - (1) Authorized an exception to the bidding procedures as outlined in the Public Contract Code for sole source provider; and (2) Awarded con- tract to Tejon Constructors, Inc., in the amount of $34,850; f. See Consent Items Brought Forward; CONSENT ITEMS BROUGHT FORWARD FOR DISCUSSION / ACTION Lisa Coyner reported a mobile office trailer is needed to house the Inspections Department staff due to the new inspector position and lack of office space in the Administration Building. The cost will be funded from the District's contingency reserve. TRAILER FOR INSPECTIONS DEPARTMENT (Consent Item a.) Coyner reviewed a lease/purchase option where the trailer could be purchased for $1 at the end of the three year lease. It was the consensus of the Board although the monthly payment would be higher, the lease/purchase option would make better sense. Moved Mosbacher / Second Schafer / Becker Absent / Passed to agree to a lease/purchase agreement (instead of a lease agreement) in an amount not to exceed $26,000. Moved Wallace / Second Schafer / Mosbacher Abstained / REGULAR BOARD MEETING Becker Absent / Passed to approve Regular Board Meeting MINUTES: APRIL 18, 2002 Minutes of April 18, 2002. (Director Mosbacher abstained (Consent Item f.) from voting because she did not attend that Board meeting.) ITEMSFOR BOARD ACTION Richard Solbrig reported the Administrative Draft Impact Report (DEIR) has been submitted to respective agencies for review, with staff comments to be completed by May 13, 2002. District staff expects, based upon comments B-LINE REPLACEMENT: PHASE 3 REGULAR BOARD MEETING MINUTES ~ MAY 2, 2002 PAGE - 3 received during the scoping of the EIR, that the parallel existing pipe alternative will be the environmentally pre- ferred alternative, and possibly the only alternative which could successfully be permitted for construction. In order to be able to construct the project in 2003, staff needs to direct Carollo Engineers to proceed with survey- ing and final design this month, prior to completion of the environmental process. The risk, as indicated by EPA, is that any work undertaken prior to EIR certification, which might have to be redone, would not be deemed as eligible to be counted towards the local share of the grant. Staff and the Operations Committee recommend taking the risk of proceeding with the design work after receipt of the agencies comments, rather than taking the risk of operat- ing the existing pipeline for an extra year. Moved Mosbacher / Second Jones / Becker Absent / Passed to approve Task Order No. 53Ato Carollo Engineers in the amount of $167,900. Ivo Bergsohn reported a Request for Qualifications (RFQ) was solicited to identify a hydro-geologist consultant with necessary qualifications and experience to provide field services under the direction of the District hydro-geologist. Eight firms responded to the RFQ. Portions of the planned water resources development pro- jects will require around the clock (24-hour supervision) of District contractor activities, as well as providing required hydro-geologic field sampling and logging services. The District does not have sufficient staff to provide the con- stant field oversight required of these activities. Therefore, staff prepared the RFQ to find a consultant to assist the District in meeting these project staffing needs. Bergsohn estimated three projects will be covered if used for the geologic season. The Operations Committee reviewed this item and recom- mended approval. Moved Jones / Second Schafer / Becker Absent / Passed to authorize staff to select a consultant to provide hydro- geological field services, on an as-needed basis, in support of planned water resource development projects in an amount not to exceed (instead of an estimated amount) $75,000. B-LINE REPLACEMENT: PHASE 3 (continued) WATER RESOURCES DEVELOPMENT REGULAR BOARD MEETING MINUTES - MAY 2~ 2002 PAGE - 4 Moved Jones / Second Schafer / Becker Absent / Passed to approve payment in the amount of $625,491.02, Water and Wastewater Operations Committee: The committee met April 29. Minutes of the meeting are available upon request. Planning Committee: The committee met May 1 to discuss additional expenditures and the schedule for the Alpine County Master Plan. Federal Le.qislative Ad Hoc Committee: Discussion was held regarding how the money from the Lake Tahoe Restoration Act (related to MTBE cleanup) would be spent. Directors Becker and Wallace attended the last agency meeting. Topics of discussion: 1 ) A controversial bill was introduced by Senator Torlakson to give rafters top priority use of the American River. 2) An agreement regarding who would pay for SMUD projects. 3) Project 184 is still under litigation. Director Mosbacher reported on two items: 1 ) She attended the fishery review meeting held in Alpine County. Trout stocking will be impacted if the yellow leg- ged frog is included on the endangered species list. 2) She attended the Alpine County Contracts Commission meeting. Dennis Crabb will work with the District's legal counsel to clarify and consolidate the Alpine County Agree- ments. Director Schafer congratulated the entire staff of the District for participating in the QualServe program. He encouraged interest in becoming a peer reviewer. Director Jones will attend the ACWA spring conference. He is the chairman of ACWA's MTBE committee. Director Jones reported he also enjoyed the QuaIServe program. PAYMENT OFCLAIMS BOARD MEMBER STANDING COMMITTEE REPORTS BOARD MEMBER AD HOC COMMI'I-I'EE REPORTS EL DORADO COUNTY WATER AGENCY PURVEYOR REPRE- SENTATIVES REPORT BOARD MEMBER REPORTS REGULAR BOARD MEETING MINUTES - MAY 2~ 2002 PAGE President Wallace reported he drafted a letter in response to the letter received from the Washoe Tribe regarding the Alpine County Master Plan process. General Mana,qer: Robert Baer reported on two items: 1 ) He recommended that staff draft a position paper for the Board's consideration related to Senator Boxer's wilderness proposal. 2) Baer thanked the Board for their support and partici- pation in the QualServe program. Assistant Mana,qer / Engineer: Richard Solbrig reported: 1 ) The District's waterline replacement project is going well. Easements dating back to 1912 are being researched. 2) Heidi Donovan, Contracts Administrator, was voted May's Employee of the Month. Staff received notification of an existing lawsuit in which the District has been named as a third party defendant. The lawsuit, related to the Meyers Landfill, was served subsequent to the Regular Board Meeting Agenda being posted. A separate vote with 2/3 Board approval is re- quired to add this to Closed Session for discussion. Moved Mosbacher / Second Schafer / Becker Absent / Passed to add this Addendum to the Agenda as Closed Session Item i. 3:15 - 3:30 P.M. 3:30 P.M. 5:30 P.M. BOARD MEMBER REPORTS (continued) GENERAL MANAGER REPORTS ADDENDUM TO THEAGENDA MEETING BREAK ADJOURNED TO CLOSED SESSION RECONVENED TO REGULAR SESSION ACTION / REPORT ON ITEM DISCUSSED DURING CLOSED SESSION No reportable Board action. Pursuant to Government Code Section 54957.6(a)/Conference with Labor Negotiators - Agency Negotiators: Robert Baer/Genersl Manager, Management Committee; Employee Organization: Inter- national Union of Operating REGULAR BOARD MEETING MINUTES - MAY 2~ 2002 PAGE - 6 No reportable Board action. No reportable Board action. No reportable Board action. No reportable Board action. No reportable Board action. Pursuant to Government Code Section 54956.8/Conference with Real Property Negotiators - Negotiating Parties: Board of Directors, Robert Baer/General Manager. Under Negotiation: Consideration of Property Purchase; Property Identification: APN 1-080-80, APN 1-080-81, APN 1-080-82, APN 1-080-56, APN 1-080-60, APN 1-200-01, APN 1-200-10, APN 1-200-11 Pursuant to Government Code Section 54956.(a)/Conference with Legal Counsel - Existing Litigation: F. Heise Land & Livestock Com- pany vs. STPUD and Does 1 - 10 Inclusive; Alpine County Superior Court Case No. C18644 Pursuant to Government Code Section 54956.(a)/Conference with Legal Counsel - Existing Litigation: F. Heise Land & Livestock Com- pany vs. STPUD and Does I - 10 Inclusive; Alpine County Superior Court Case No. C18733 Pursuant to Government Code Section 54956(a)/Conference with Legal Counsel - Existing Litigation: STPUD vs. F. Heise Land & Live Stock Company, Inc., William Weaver, Eddie R. Snyder, Crockett Enterprises, Inc., CIV. S-02-0238 MLS JFM United States District Court for the Eastern District of California, Sacramento, CA Pursuant to Government Code Section 54956.9(c)/Conference with Legal Counsel - Anticipated Liti.qation (one case) REGULAR BOARD MEETING MINUTES - MAY 2~ 2002 NO reportable Board action. No reportable Board action. No reportable Board action. 5:30 P.M. PAGE-7 Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel - Existing Litigation: STPUD vs. ARCO, et. al., San Francisco County Superior Court Case No. 999128 Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel - Existing Litigation: STPUD vs. Lakeside Park Associa- tion, et al, County of El Dorado, Superior Court Case No. SC20010165 Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel - Existing Litigation: United States of America vs. El Dorado County and City of South Lake Tahoe and Third Party Defen- dants, Civil Action No. S-01-1520 LKK GGH, United States District Court for the Eastern District of California ADJOURNMENT Duane Wallace, Board President South Tahoe Public Utility District A'I-rEST: Kathy Sharp, Clerk of the Board South Tahoe Public Utility District