Loading...
03-07-2019SOUTH TAHOE PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING AGENDA Thursday, March 7, 2019 - 2:00 p.m. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Randy Vogelgesang, President BOARD MEMBERS Kelly Sheehan, Vice President Chris Cefalu, Director James R. Jones, Director Nick Exline, Director John Thiel, General Manager Shannon Cotulla, Assistant General Manager 1.CALL TO ORDER REGULAR MEETING – PLEDGE OF ALLEGIANCE (At this time, please silence phones and other electronic devices so as not to disrupt the business of the meeting.) 2.COMMENTS FROM THE AUDIENCE (This is an opportunity for members of the public to address the Board on any short non-agenda items that are within the subject matter jurisdiction of the District. No discussion or action can be taken on matters not listed on the agenda, per the Brown Act. Each member of the public who wishes to comment shall be allotted five minutes, and no more than three individuals shall address the same subject.) 3.CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR (For purposes of the Brown Act, all Action and Consent items listed give a brief description of each item of business to be transacted or discussed. Recommendations of the staff, as shown, do not prevent the Board from taking other action.) 4.ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered separately upon request. Comments and questions from members of the public, staff or Board can be taken when the comment does not necessitate separate action.) 5.CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION/ACTION 6.ITEMS FOR BOARD ACTION a.Purchase of 2020 Western Star Dump Truck (Cliff Bartlett, Fleet/Equipment Repair Supervisor) Approve the purchase of one 2020 Western Star 4700 Chassis with a 15 foot dump bed from National Auto Fleet Group in conjunction with Sourcewell Contract No. 081716- NAF in the estimated amount of $163,530.02. b.2018 Water Meter Installation Project – Phase 4 (Trevor Coolidge, Associate Engineer) Approve the Final Balancing Change Order No. 1 and the Closeout Agreement and Release of Claims for the 2018 Water Meter Installation Project - Phase 4. c.Sensus Water Meters for the 2019 Water Meter Project (Trevor Coolidge, Associate Engineer) (1)Authorize exception to bidding procedures as outlined in the Purchasing Policy for a sole source purchase of standardized supplies; and (2) Authorize purchase of Sensus Meters and Radio-Read Units from Western Nevada Supply in the estimated amount of $346,534.78. REGULAR BOARD MEETING AGENDA – March 7, 2019 PAGE – 2 d.2019 Water Meter Installation Project – Phase 5 (Trevor Coolidge, Associate Engineer) Award the 2019 Water Meter Installation Project - Phase 5 Contract to the lowest responsive, responsible bidder, Vinciguerra Construction, in the amount of $3,292,055. e.2019 Asphalt Patching & Trench Paving Services (Tony Prieto, Underground Repair Water Supervisor and Heidi Baugh, Purchasing Agent) Award bid in the amount of $193,387 to GB General Engineering Contractor, Inc., the lowest responsive, responsible bidder. f.Approve Payment of Claims (Debbie Henderson, Accounting Manager) Approve Payment of Claims in the amount of $ 1,377,356.15 7.STANDING AND AD-HOC COMMITTEE REPORTS (Discussions may take place; however, no action will be taken.) 8.BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken.) 9.EL DORADO COUNTY WATER AGENCY PURVEYOR REPORT 10.GENERAL MANAGER REPORT (Discussion may take place; however, no action will be taken.) a.Staffing Update b.Salary Survey c.Budget Process d.Outreach e.PCE Update f.Lukins Intertie Update g.Streetlights h.Fire Protection i.Tahoe Keys Sewer Update 11.STAFF/ATTORNEY REPORTS (Discussions may take place; however, no action will be taken.) 12.NOTICE OF PAST AND FUTURE MEETINGS/EVENTS Past Meetings/Events 02/21/19 – 2:00 p.m. Regular Board Meeting at the District 03/06/19 – 6:00 p.m. PCE Public Meeting at the City Future Meetings/Events 03/07/19 – 5:30 p.m. Meet & Greet at South Lake Tahoe Brewing Company 03/13/19 – 10:00 a.m. El Dorado County Water Agency Meeting in Placerville 03/13/19 – 2:00 p.m. Proposition 218 Board Workshop at the District 03/18/19 – 3:30 p.m. Operations Committee Meeting at the District 03/20/19 – 8:00 a.m. Employee Communications Committee Meeting (Sheehan Representing) 03/21/19 – 9:00 a.m. Ad-Hoc City Council Committee Meeting at the City 03/21/19 – 2:00 p.m. Regular Board Meeting at the District REGULAR BOARD MEETING AGENDA – March 7, 2019 PAGE – 3 13.CLOSED SESSION (The Board will adjourn to Closed Session to discuss items identified below. Closed Session is not open to the public; however, an opportunity will be provided at this time if members of the public would like to comment on any item listed – three minute limit.) a.Pursuant to Government Code Section 54956.9(b)/Conference with Legal Counsel Potential Litigation (one case). b.Significant exposure to litigation pursuant to paragraph (2) of subdivision (d) of Section 54956.9: One Case. ADJOURNMENT (The next Regular Board Meeting is Thursday, March 21, 2019, at 2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete Agenda packet is available for review at the meeting and at the District office during the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after Minutes of the meeting have been approved. Items on the Agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified, but may occur slightly later than the specified time. Public participation is encouraged. Public comments on items appearing on the Agenda will be taken at the same time the Agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Please provide the Clerk of the Board with a copy of all written materials presented at the meeting. Comments on items not on the Agenda can be heard during “Comments from the Audience;” however, action cannot be taken on items not on the Agenda. Backup materials relating to an open session item on this Agenda, which are not included with the Board packet, will be made available for public inspection at the same time they are distributed or made available to the Board, and can be viewed at the District office, at the Board meeting and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District’s public meetings. If particular accommodations are needed, please contact the Clerk of the Board at (530) 544-6474, extension 6203. All inquiries must be made at least 48 hours in advance of the meeting. REGULAR BOARD MEETING AGENDA – March 7, 2019 PAGE – 4 SOUTH TAHOE PUBLIC UTILITY DISTRICT CONSENT CALENDAR Thursday, March 7, 2019 ITEMS a.RESOLUTION FOR BUREAU OF RECLAMATION 2019 WATERSMART SMALL-SCALE WATER EFFICIENCY PROJECTS GRANT (Lynn Nolan, Grants Coordinator) Adopt Bureau of Reclamation WaterSMART Small-Scale Water Efficiency Projects Grant program Resolution No. 3103-19 approving grant funding for a Pressure Reducing Valve Program. b.RESOLUTION FO BUREAU OF RECLAMATION 2019 WATERSMART GRANT (Lynn Nolan, Grants Coordinator) Adopt Bureau of Reclamation WaterSMART Program Resolution No. 3104-19 approving grant funding for Water Infrastructure Efficiencies Project. c.RESOLUTION FOR CALIFORNIA GOVERNOR’S OFFICE OF EMERGENCY SERVICES/FEDERAL EMERGENCY MANAGEMENT AGENCY HAZARD MITIGATION GRANT PROGRAM FUNDING (Raina Blasser, Grants Assistant) Adopt California Governor’s Office of Emergency Services/Federal Emergency Management Hazard Mitigation Grant Program Resolution No. 3105-19 approving grant funding for the Upper Truckee River Wastewater Pump Station Generator Project. d.RESOLUTION FOR CALIFORNIA GOVERNOR’S OFFICE OF EMERGENCY SERVICES/FEDERAL EMERGENCY MANAGEMENT AGENCY HAZARD MITIGATION GRANT PROGRAM FUNDING (Raina Blasser, Grants Assistant) Adopt California Governor’s Office of Emergency Services/Federal Emergency Management Agency Hazard Mitigation Grant Program Resolution No. 3106-19 approving grant funding for the Al Tahoe Sewer Pump Generator Project. e.ALPINE COUNTY’S SUMMER 2019 FISH PURCHASE (Jim Hilton, Water Reuse Manager and Heidi Baugh, Purchasing Agent) Authorize payment to Alpine County in the amount of $56,250, to purchase fish for the Summer 2019 planting season. f.REQUEST FOR PROPOSALS FOR HAY HARVESTING AT DIAMOND VALLEY RANCH (Jim Hilton, Water Reuse Manager) Authorize a Request for Proposals for hay harvesting at Diamond Valley Ranch. g.SEASONAL HELP FOR UNDERGROUND REPAIR, SEWER (Doug Van Gorden, Supervisor, Underground Repair Sewer and Chris Stanley, Manager of Field Operations) Approve hiring of three seasonal employees for Underground Repair, Sewer in the estimated amount of $57,850. REGULAR BOARD MEETING AGENDA – March 7, 2019 PAGE – 5 h.TEMPORARY WATER EFFICIENCY TECHNICIAN AND WATER EDUCATOR (Shelly Thomsen, Water Conservation Specialist) Approve a Contract with Blue Ribbon Personnel Services for one temporary Water Efficiency Technician and one temporary Water Educator in the estimated amount of $42,000. i.2019 WATER METER INSTALLATION PROJECT – PHASE 5 (Trevor Coolidge, Associate Engineer) Authorize staff to place the 2019 water meter lid order of 1,040 lids with Neenah Foundry at a total cost of $69,477.20. j.REGULAR BOARD MEETING MINUTES: FEBRUARY 21, 2019 (Melonie Guttry, Executive Services Manager/Clerk of the Board) Approve February 21, 2019, Minutes BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Lynn Nolan, Grants Coordinator MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: Resolution for Bureau of Reclamation 2019 WaterSMART Small-Scale Water Efficiency Projects Grant REQUESTED BOARD ACTION: Adopt Bureau of Reclamation Water SMART Small-Scale Water Efficiency Projects Grant program Resolution No. 3103-19 approving grant funding for a Pressure Reducing Valve Program. DISCUSSION: South Tahoe Public Utility District (District) staff is requesting approval to submit a grant application to the Bureau of Reclamation WaterSMART 2019 grant program for a Pressure Reducing Valve Installation Program on the District’s largest water producing infrastructure. The grant is limited to $75,000 with a $75,000 match. The attached Resolution is a requirement of the funding application. SCHEDULE: Final application will be submitted April 24, 2019 COSTS: Match costs are associated with this item ACCOUNT NO: N/A BUDGETED AMOUNT REMAINING: N/A ATTACHMENTS: Resolution No. 3103-19 _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 RESOLUTION NO. 3103-19 A RESOLUTION BY THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT BUREAU OF RECLAMATION WaterSMART: SMALL-SCALE WATER EFFICIENCY GRANT 2019 BE IT RESOLVED by the South Tahoe Public Utility District (STPUD) Board of Directors that the General Manager, Assistant General Manager and/or the Chief Financial Officer is hereby authorized and directed to sign and file, for and on behalf of the STPUD, a Financial Assistance Application for a financing agreement from the Bureau of Reclamation for the planning, design, and construction of the following project: Pressure Reducing Valve SCADA Improvements Project; and BE IT FURTHER RESOLVED that the STPUD hereby agrees and further does authorize the aforementioned representative or his/her designee to certify that the Agency has and will comply with all applicable state and federal statutory and regulatory requirements related to any financing or financial assistance received from the Bureau of Reclamation; and BE IT FURTHER RESOLVED that the STPUD Board of Directors supports the submission of an application under the Bureau of Reclamation WaterSMART Grant Program and certifies that STPUD is capable of the providing the amount of funding and in-kind contributions specified in the funding application; and BE IT FURTHER RESOLVED that STPUD will work with Reclamation to meet established deadlines for entering into a grant or cooperative agreement; WE, THE UNDERSIGNED, do hereby certify that the above and foregoing Resolution No. 3103-19 was duly and regularly adopted and passed by the Board of Directors of the South Tahoe Public Utility District at a regular meeting held on the 7th day of March, 2019, by the following vote: AYES: NOES: BSENT: 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 _____________________________________ Randy Vogelgesang, Board President South Tahoe Public Utility District ATTEST: _________________________________ Melonie Guttry, Clerk of the Board South Tahoe Public Utility District Resolution No. 3103-19 March 7, 2019 Page 2 3 BOARD AGENDA ITEM 4b TO: Board of Directors FROM: Lynn Nolan, Grants Coordinator MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: Resolution for Bureau of Reclamation 2019 WaterSMART Grant REQUESTED BOARD ACTION: Adopt Bureau of Reclamation WaterSMART Program Resolution No. 3104-19 approving grant funding for Water Infrastructure Efficiencies Project. DISCUSSION: South Tahoe Public Utility District (District) staff is requesting approval to submit a grant application to the Bureau of Reclamation WaterSMART 2019 Grant Program for a Water Infrastructure Efficiencies Project on the District’s largest water producing infrastructure. Cost for this project is approximately $300,000 from grant funding and an additional $300,000 match requirement. The attached Resolution No. 3104-19 is a requirement of the funding application. SCHEDULE: Final application will be submitted March 19, 2019. COSTS: Match costs are associated with this Item ACCOUNT NO: N/A BUDGETED AMOUNT REMAINING: N/A ATTACHMENTS: Resolution No. 3104-19 _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 RESOLUTION NO. 3104-19 A RESOLUTION BY THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT BUREAU OF RECLAMATION WaterSMART: WATER AND ENERGY EFFICIENCY GRANT 2019 BE IT RESOLVED by the South Tahoe Public Utility District (STPUD) Board of Directors that the General Manager, Assistant General Manager and/or the Chief Financial Officer or their designee, is hereby authorized and directed to sign and file, for and on behalf of the STPUD, a Financial Assistance Application for a financing agreement from the Bureau of Reclamation for the planning, design, and construction of the following project: Water Infrastructure Efficiencies Project; and BE IT FURTHER RESOLVED that the STPUD hereby agrees and further does authorize the aforementioned representative or his/her designee to certify that the Agency has and will comply with all applicable state and federal statutory and regulatory requirements related to any financing or financial assistance received from the Bureau of Reclamation; and BE IT FURTHER RESOLVED that the STPUD Board of Directors supports the submission of an application under the Bureau of Reclamation WaterSMART Grant Program and certifies that STPUD is capable of the providing the amount of funding and in-kind contributions specified in the funding plan and application; and BE IT FURTHER RESOLVED that STPUD will work with Reclamation to meet established deadlines for entering into a grant or cooperative agreement; WE, THE UNDERSIGNED, do hereby certify that the above and foregoing Resolution No. 3104-19 was duly and regularly adopted and passed by the Board of Directors of the South Tahoe Public Utility District at a regular meeting held on the 7th day of March, 2019, by the following vote: AYES: NOES: ABSENT: 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 _____________________________________ Randy Vogelgesang, Board President South Tahoe Public Utility District ATTEST: _________________________________ Melonie Guttry, Clerk of the Board South Tahoe Public Utility District Resolution No. 3104-19 March 7, 2019 Page 2 6 BOARD AGENDA ITEM 4c TO: Board of Directors FROM: Raina Blasser, Grants Assistant MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: Resolution for California Governor’s Office of Emergency Services Federal Emergency Management Agency Mitigation Grant Program Funding REQUESTED BOARD ACTION: Adopt California Governor’s Office of Emergency Services /Federal Emergency Management Hazard Mitigation Grant Program Resolution No. 3105-19 approving grant funding for the Upper Truckee River Wastewater Pump Station Generator Project DISCUSSION: South Tahoe Public Utility District staff is requesting approval to submit a grant application to the California Governor’s Office of Emergency Services (Cal OES)/Federal Emergency Management Agency (FEMA) Hazard Mitigation Grant Program (HMGP) for a back-up generator upgrade project at the Upper Truckee River Wastewater Pump Station. Total activity cost for this Project is approximately $315,000; the Federal Requested Share is $236,250 (75%) and the District Match requirement is $78,750 (25%). SCHEDULE: Final application will be submitted April 18, 2019 COSTS: Applicant Match of $78,750 is required with this item ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: Resolution No. 3105-19 Upper Truckee River Wastewater Pump Station Generator _________________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 RESOLUTION NO. 3105-19 A RESOLUTION BY THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT APPROVING A GRANT APPLICATION TO CALIFORNIA GOVERNOR’S OFFICE OF EMERGENCY SERVICES/FEDERAL EMERGENCY MANAGEMENT AGENCY FOR THE UPPER TRUCKEE RIVER WASTEWATER PUMP STATION GENERATOR PROJECT BE IT RESOLVED by the South Tahoe Public Utility District (STPUD) Board of Directors that the General Manager, Assistant General Manager and/or the Chief Financial Officer is hereby authorized and directed to sign and file, for and on behalf of the STPUD, a Financial Assistance Application for a financing agreement from the California Governor’s Office of Emergency Services (Cal OES)/Federal Emergency Management Agency (FEMA) Hazard Mitigation Grant Program (HMGP) for the planning, design, and construction of the following project: Upper Truckee River Wastewater Pump Station Generator; and BE IT FURTHER RESOLVED that the STPUD hereby agrees and further does authorize the aforementioned representative or his/her designee to certify that the Agency has and will comply with all applicable state and federal statutory and regulatory requirements related to any financing or financial assistance received from the Cal OES/FEMA HMGP; and BE IT FURTHER RESOLVED that the STPUD Board of Directors supports the submission of an application under the Cal OES/FEMA HMGP and certifies that STPUD is capable of providing the amount of funding and in-kind contributions specified in the funding application; and BE IT FURTHER RESOLVED that STPUD will work with Cal OES/FEMA to meet established deadlines for entering into a grant or cooperative agreement; WE, THE UNDERSIGNED, do hereby certify that the above and foregoing Resolution No. 3105-19 was duly and regularly adopted and passed by the Board of Directors of the South Tahoe Public Utility District at a regular meeting held on the 7th day of March, 2019, by the following vote: 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AYES: NOES: ABSENT: _____________________________________ Randy Vogelgesang, Board President South Tahoe Public Utility District ATTEST: _________________________________ Melonie Guttry, Clerk of the Board South Tahoe Public Utility District Resolution No.3105-19 March 7, 2019 Page 2 9 BOARD AGENDA ITEM 4d TO: Board of Directors FROM: Raina Blasser, Grants Assistant MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: Resolution for California Governor’s Office of Emergency Services/Federal Emergency Management Agency Hazard Mitigation Grant Program Funding REQUESTED BOARD ACTION: Adopt California Governor’s Office of Emergency Services/ Federal Emergency Management Agency Hazard Mitigation Grant Program Resolution No. 3106-19 approving grant funding for the Al Tahoe Sewer Pump Generator Project. DISCUSSION: South Tahoe Public Utility District staff is requesting approval to submit a grant application to the California Governor’s Office of Emergency Services (Cal OES)/Federal Emergency Management Agency (FEMA) Hazard Mitigation Grant Program (HMGP) for a back-up generator upgrade project at the Al Tahoe Sewer Pump Station. Total activity cost for this project is approximately $315,000; Federal Requested Share is $236,250 (75%) and the District Match requirement is $78,750 (25%). SCHEDULE: Final application will be submitted April 18, 2019 COSTS: Applicant Match of $78,750 is required with this item ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: Resolution No. 3106-19 Al Tahoe Sewer Pump Generator ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 RESOLUTION NO. 3106-19 A RESOLUTION BY THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT APPROVING A GRANT APPLICATION TO CALIFORNIA GOVERNOR’S OFFICE OF EMERGENCY SERVICES/FEDERAL EMERGENCY MANAGEMENT AGENCY FOR THE AL TAHOE SEWER PUMP GENERATOR PROJECT BE IT RESOLVED by the South Tahoe Public Utility District (STPUD) Board of Directors that the General Manager, Assistant General Manager and/or the Chief Financial Officer is hereby authorized and directed to sign and file, for and on behalf of the STPUD, a Financial Assistance Application for a financing agreement from the California Governor’s Office of Emergency Services (Cal OES)/Federal Emergency Management Age ncy (FEMA) Hazard Mitigation Grant Program (HMGP) for the planning, design, and construction of the following project: Al Tahoe Sewer Pump Generator; and BE IT FURTHER RESOLVED that the STPUD hereby agrees and further does authorize the aforementioned representative or his/her designee to certify that the Agency has and will comply with all applicable state and federal statutory and regulatory requirements related to any financing or financial assistance received from the Cal OES/FEMA HMGP; and BE IT FURTHER RESOLVED that the STPUD Board of Directors supports the submission of an application under the Cal OES/FEMA HMGP and certifies that STPUD is capable of providing the amount of funding and in-kind contributions specified in the funding application; and BE IT FURTHER RESOLVED that STPUD will work with Cal OES/FEMA to meet established deadlines for entering into a grant or cooperative agreement; WE, THE UNDERSIGNED, do hereby certify that the above and foregoing Resolution No. 3106-19 was duly and regularly adopted and passed by the Board of Directors of the South Tahoe Public Utility District at a regular meeting held on the 7th day of March, 2019, by the following vote: 11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AYES: NOES: ABSENT: _____________________________________ Randy Vogelgesang, Board President South Tahoe Public Utility District ATTEST: _________________________________ Melonie Guttry, Clerk of the Board South Tahoe Public Utility District Resolution No. 3106-19 March 7, 2019 Page 2 12 BOARD AGENDA ITEM 4e TO: Board of Directors FROM: Jim Hilton, Water Reuse Manager Heidi Baugh, Purchasing Agent MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: Alpine County’s Summer 2019 Fish Purchase REQUESTED BOARD ACTION: Authorize payment to Alpine County in the amount of $56,250, to purchase fish for the Summer 2019 planting season. DISCUSSION: The District has paid Alpine County for fish plants since 1988 as required by Contract. Alpine County requested two quotes for the 2019 fish planting season and intends to purchase from the farm with the least expensive prices. Desert Springs Trout Farm is the same trout farm they have used for many years. The prices did not increase in 2019. Staff audited summer 2018 fish purchase and all funds were spent. SCHEDULE: Payment required before April 15, 2019 COSTS: $56,250 ACCOUNT NO: 1034-6649 BUDGETED AMOUNT AVAILABLE: $57,000 ATTACHMENTS: Letter from Alpine County & Quotes _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 13 14 15 16 BOARD AGENDA ITEM 4f TO: Board of Directors FROM: Jim Hilton, Water Reuse Operations Manager MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: Request for Proposals for Hay Harvesting at Diamond Valley Ranch REQUESTED BOARD ACTION: Authorize a Request for Proposals for hay harvesting at Diamond Valley Ranch. DISCUSSION: Staff is requesting authorization to proceed with a Request for Proposals to seek a custom haying operator who will cut, rake, bale, and broker the alfalfa hay for the District for a term of five years. The intent of soliciting a five-year term is to attract a custom haying operator who will establish a vested interest in the District’s alfalfa hay fields for the term of the Contract, as well as provide District staff a period of time necessary to assess the economic viability of District personnel conducting the haying operations in the future. SCHEDULE: June – October REVENUE: Unknown ACCOUNT NO: 1000-3540 BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: N/A ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 17 BOARD AGENDA ITEM 4g TO: Board of Directors FROM: Doug Van Gorden, Supervisor, Underground Repair, Sewer Chris Stanley, Manager of Field Operations MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: Seasonal Help for Underground Repair, Sewer REQUESTED BOARD ACTION: Approve hiring of three seasonal employees for Underground Repair, Sewer in the estimated amount of $57,850. DISCUSSION: With approximately 15% - 20% of the collection system located in easements, the clearing of these easements is an important and continual part of the overall maintenance of the collection system. The clearing of these easements is performed by the hiring of three seasonal employees. These seasonal employees locate manholes, clear and chip brush, stake the location of the manhole and stencil the manhole number on the cover for easy recognition within the easements. The seasonal employees also cover vacation schedules for regular employees on the hydro trucks and Underground Repair Sewer crews. Staff requests that the Board authorize the hiring of three seasonal employees from May 6, 2019, through October 31, 2019. SCHEDULE: May 6, 2019, through October 31, 2019 COSTS: $57,850 ACCOUNT NO: 10.22.4201 BUDGETED AMOUNT AVAILABLE: $9,480 (2018/19); $48,450 (2019/20) ATTACHMENTS: N/A _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 18 Shelly Thomsen March 7, 2019 Page 2 – 4h BOARD AGENDA ITEM 4h TO: Board of Directors FROM: Shelly Thomsen, Water Conservation Specialist MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: Temporary Water Efficiency Technician and Water Educator REQUESTED BOARD ACTION: Approve a Contract with Blue Ribbon Personnel Services for one temporary Water Efficiency Technician and one temporary Water Educator in the estimated amount of $42,000. DISCUSSION: Due to the continued need for water conservation to meet state mandates, the District expects to see a continued increase in participation in the District’s Water Conservation Program. In order to meet this increase during the busy summer season, it is necessary to hire a Water Efficiency Technician to assist with the implementation of the Water Conservation Program and a Water Educator to enforce our Water Waste Prohibition. The Water Efficiency Technician will work from approximately April 15, 2019, through November 1, 2019, for approximately 40 hours per week, not to exceed 999 hours. Under the supervision of the Water Conservation Specialist, duties include: assisting with the implementation of the Turf Buy Back Program; performing Water Wise House Calls and Leak Detection services; assisting with community and educational outreach; enforcement of the District’s Water Conservation Ordinance; administrative duties as assigned. The Water Educator will work from approximately June 3, 2019, through August 30, 2019, for 20 hours per week, not to exceed 999 hours total. Under the supervision of the Water Conservation Specialist, this position would enforce the District’s Water Conservation Ordinance; specifically the Water Waste Prohibition and Stage One conditions as described in Section 3.4: Water Shortage and Drought Response Standards in the Administrative Code. General Manager John Thiel Directors Chris Cefalu James R . Jones Randy Vogelgesang Kelly Sheehan Nick Exline 19 Shelly Thomsen March 7, 2019 Page 2 – 4h SCHEDULE: April to October 2019 COSTS: $42,000 (estimated) ACCOUNT NO: 2064-4405 BUDGETED AMOUNT AVAILABLE: $6,224 (2018/19), $39,000 (2019/20) ATTACHMENTS: N/A _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO 20 Trevor Coolidge March 7, 2019 Page 2 – 4i BOARD AGENDA ITEM 4i TO: Board of Directors FROM: Trevor Coolidge, Associate Engineer MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: 2019 Water Meter Installation Project - Phase 5 REQUESTED BOARD ACTION: Authorize staff to place the 2019 water meter lid order of 1,040 lids with Neenah Foundry at a total cost of $69,477.20. DISCUSSION: The District currently has approximately 1,900 remaining water meter installations to complete as part of the ongoing Residential Water Metering Project. A total of 1,316 meter installations are planned for 2019; for each meter installation, a new water meter pit is installed that requires a water meter lid, designed to accommodate pedestrian or traffic loading, depending on the installation location. Based on input from Engineering, Underground Water Repair, and Customer Service, the District designed water meter lids that feature a recess to protect water meter antennas from snow removal, a lifting hole that can be readily cleared of ice, and are manufactured in accordance with recognized national material and loading standards. The lids also meet the American Iron and Steel provisions required as a funding provision by the United States Environmental Protection Agency and the State Water Resources Control Board’s (SWRCB) Clean Water State Revolving Fund (CWSRF). In 2017, the District pre-qualified four foundries to bid on the District’s multi-year meter lid and frame procurement Contract; Neenah Foundry was found to be the lowest responsive, responsible bidder and was awarded the supply Contract that extends through 2020. The lids have worked successfully with the District’s AMI system and have reduced issues associated with broken or misplaced meter lids. Neenah has continued to meet the District’s delivery needs, including a second delivery in 2018 to meet the increased number of meter installations completed by Vinciguerra Construction that exceeded the initial annual order. The Board previously approved up to $149,697.08 for the 2019 order; based on the District’s inventory of lids and planned installations for 2019. Staff anticipates requiring an order of 1,040 lids at a total cost of $69,477.20. General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 21 Trevor Coolidge March 7, 2019 Page 2 – 4i Based on Neenah’s performance and the continued need for water meter lids, staff recommends that the Board authorize the 2019 water meter lid order from Neenah Foundry. SCHEDULE: As soon as possible. COSTS: $69,477.20 ACCOUNT NO: 2030-8929, METR5A BUDGETED AMOUNT AVAILABLE: $1,497,680 ATTACHMENTS: N/A ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO 22 SOUTH TAHOE PUBLIC UTILITY DISTRICT Randy Vogelgesang, President BOARD MEMBERS Kelly Sheehan, Vice President Chris Cefalu, Director James R. Jones, Director Nick Exline, Director John Thiel, General Manager Shannon Cotulla, Assistant General Manager REGULAR MEETING OF THE BOARD OF DIRECTORS SOUTH TAHOE PUBLIC UTILITY DISTRICT February 21, 2019 MINUTES The South Tahoe Public Utility District Board of Directors met in a regular session, 2:01 p.m., at the District Office, located at 1275 Meadow Crest Drive, South Lake Tahoe, California. ROLL CALL: Board of Directors: President Vogelgesang, Directors Jones, Sheehan, Exline Absent: Director Cefalu Staff: John Thiel, Paul Hughes, Shannon Cotulla, Gary Kvistad, Melonie Guttry, Bren Hoyle, Chris Stanley, Jared Aschenbach, Tony Prieto, Brent Goligoski, Ivo Bergsohn, Jim Kelly, Shelly Thomsen, Star Glaze, Trevor Coolidge, Steve Caswell Guests: Rick Lind, El Dorado County Water Agency Liaison CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR: President Vogelgesang announced Action Item 6a is being pulled from the Agenda. CONSENT CALENDAR: Moved Sheehan/Second Exline/Vogelgesang Yes/Cefalu Absent/Jones Yes/Sheehan Yes/Exline Yes to approve the Consent Calendar with changes as presented. a. DECEMBER 31, 2018, FINANCIAL STATEMENTS (Paul Hughes, Chief Financial Officer) Received and filed the December 31, 2018, Income Statement and Balance Sheet Reports. b. SOUTH Y FATE AND TRANSPORT MODEL (Ivo Bergsohn, Hydrogeologist) Authorized staff to raise the cost ceiling for Task Order No. 4 by $6,885 and extend the schedule to May 1, 2019, to accommodate additional time required for development of remedial alternatives for modeling services approved for the South Y Feasibility Study. c. REGULAR BOARD MEETING MINUTES: February 7, 2019 (Melonie Guttry, Executive Services Manager/Clerk of the Board) Approved February 7, 2019, Minutes. 23 REGULAR BOARD MEETING MINUTES February 21, 2019 PAGE – 2 ITEMS FOR BOARD ACTION a. Field Communications Improvements Projects (Julie Ryan, Engineering Department Manager) – Shannon Cotulla provided an overview of the project and addressed questions from the Board. District staff is planning to provide the labor for this project. Jared Aschenbach and Chris Stanley provided additional details regarding the proposed upgrades. Moved Sheehan/Second Exline/Vogelgesang Yes/Cefalu Absent/Jones Yes/ Sheehan Yes/Exline Yes to approve proposal from Thunderbird Communications for upgrades to the Fallen Leaf Lake radio system in an amount not to exceed $61,000. b. 2019 Well and Pump Test Performance Monitoring (Ivo Bergsohn, Hydrogeologist) – Ivo Bergsohn provided details including a PowerPoint presentation and addressed questions from the Board. This project is being 50% funded by El Dorado County Water Agency, with a 50% match by the District. Moved Jones/Second Exline/Vogelgesang Yes/Cefalu Absent/Jones Yes/Sheehan Yes/Exline Yes to accept the Proposal from Wood Rodgers received to provide engineering services for the 2019 well project in response to the District’s Routine Well and Pump Performance Monitoring Request for Proposals and accept the revised cost proposal in the amount not to exceed $66,717. c. Approve Payment of Claims (Debbie Henderson, Accounting Manager) Moved Sheehan/Second Vogelgesang/Vogelgesang Yes/ Cefalu Absent /Jones Yes/Sheehan Yes/Exline Yes to approve Payment of Claims in the amount of $1,485,106.49. STANDING AND AD-HOC COMMITTEE REPORTS: President Vogelgesang reported the Ad-Hoc City Council Committee met this morning and discussed several issues including the street lighting deadline of March 31, 2019, and the future of Snow Globe. Attorney Kvistad offered suggestions regarding covering the cost for the street lighting increase. Director Jones reported the Operations Committee met on Tuesday, February 19, and provided details regarding the discussions. Director Exline added comments regarding the importance of collecting data to optimize savings. Director Sheehan reported there was a Finance Committee Meeting on February 20, where the entire budget was reviewed. The next Board Workshop is March 13, at 2:00 p.m. BOARD MEMBER REPORTS: Nothing to report EL DORADO COUNTY WATER AGENCY PURVEYOR REPORT: Director Sheehan reported Rick Lind, El Dorado County Water Agency liaison, is attending the Board Meeting today. She and John Thiel were unable to attend the meeting last week due to weather. GENERAL MANAGER REPORT: John Thiel reported on several items: • Provided a staff update 24 REGULAR BOARD MEETING MINUTES February 21, 2019 PAGE – 3 •Updated the Board regarding the budget process, including discussions regarding proposed heavy equipment purchases. The next Proposition 218 Public Workshop is scheduled for Wednesday, March 13, 2019, at 2:00 p.m. •Provided an update regarding Public Outreach and acknowledged Shelly Thompson for her assistance with those efforts. He provided information regarding several upcoming presentations, a lunch on Monday, February 25, with other local Chief Executive Officers, and a Meet and Greet at South Lake Tahoe Brewery on March 7, from 5:30 to 7:30 p.m. • Provided a PCE update including a joint presentation for the Lahontan Board scheduled for March 14, at 8:30 a.m. The next PCE Public Meeting is scheduled for March 6, at 6:00 p.m. • Provided a Lukins intertie meter update STAFF/ATTORNEY REPORTS: Shannon Cotulla provided a storm update including maintaining the District systems throughout the storm. There were daily flows up to 8.5 million gallons per day during the storm. Chris Stanley reported that Trevor Coolidge discovered a system called Quick Lock Sewer Repair System as a potential solution for the Tahoe Keys sewer leak. Chris Stanley explained the details and addressed questions from the Board. A Proposal has been received from Summit Plumbing from Gardnerville who will perform the work for approximately $5,500, which is a huge savings compared to other alternatives. The Board commended staff on their efforts. Chris Stanley provided photos of the manhole cover situation near Sawmill Pond in the County. The County used a loader to move snow off the road in the area and in the process moved the District’s manhole, allowing up to 400,000 gallons of water per day into the District’s system. Thanks to the District’s flow monitoring system and quick reaction from staff, the manhole has been fixed. The Board commended staff for their efforts in mitigating the situation and precautions have been taken to prevent this situation from happening in the future. Chris Stanley showed an example of deteriorated steel pipe from a leak on Bertha Avenue in the Sierra Tract. Attorney Kvistad reported he has been working with staff to update the District’s Administrative Code, due to a recently discovered customer meter bypass. They have found examples from other District’s that are helpful, which are appropriate to address comprehensive changes to the Administrative Code. There will be a recommended action brought to the Board in the future. Shelly Thomsen reminded the Board that professional photos will be taken before the March 7, 2019, Board Meeting. ADJOURNMENT: 3:51 p.m. _______________________________________ Randy Vogelgesang, Board President South Tahoe Public Utility District ________________________________________ Melonie Guttry, Clerk of the Board South Tahoe Public Utility District 25 BOARD AGENDA ITEM 6a TO: Board of Directors FROM: Cliff Bartlett, Fleet/Equipment Repair Supervisor MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: Purchase of 2020 Western Star Dump Truck REQUESTED BOARD ACTION: Approve the purchase of one 2020 Western Star 4700 Chassis with a 15 foot dump bed from National Auto Fleet Group in conjunction with Sourcewell Contract No. 081716-NAF in the estimated amount of $163,530.02. DISCUSSION: This vehicle purchase is to replace Vehicle #8, a 1995 International, Model 2574 12-yard dump truck that is used daily in the Water/Sewer Departments. This diesel vehicle is out of compliance with the C.A.R.B. and is required to be replaced by the year 2020. Vehicle #8 is budgeted for the 2018/19 Fiscal Year. The new vehicle is being purchased through National Auto Fleet Group who is under Contract (No. 081716-NAF) with Sourcewell (a California Co-op whose contracts are competitively bid). The District has used this supplier several times in the past with excellent results. Participating in or matching other government or purchasing coalition contracts, which have recently been competitively awarded, qualifies as having met the District’s formal public competitive bid requirement. Staff requests that the Board approve the purchase of one 2020 Western Star 4700 Chassis with a 15 foot dump bed from National Auto Fleet Group in conjunction with Sourcewell Contract NO. 081716-NAF in the estimated amount of $163,530.02. SCHEDULE: As soon as possible COSTS: Estimated total including tax, delivery, and fees $163,530.02 ACCOUNT NO: 20.28.8951 BUDGETED AMOUNT AVAILABLE: $240,000 ATTACHMENTS: National Auto Fleet Group/Sourcewell Contract Number 081716-NAF _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 26 27 Trevor Coolidge March 7, 2019 Page 2 – 6b BOARD AGENDA ITEM 6b TO: Board of Directors FROM: Trevor Coolidge, Associate Engineer MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: 2018 Water Meter Installation Project - Phase 4 REQUESTED BOARD ACTION: Approve the Final Balancing Change Order No. 1and the Closeout Agreement and Release of Claims for the 2018 Water Meter Installation Project - Phase 4. DISCUSSION: The Water Meter Installation Project – Phase 4 completed a total of 1,606 new water meter installations and 338 water service valve replacements during the 2018 construction season in the Tahoe Sierra, Black Bart, and Montgomery Estates Springwood neighborhoods of the District’s service area. The contractor, Vinciguerra Construction, achieved substantial completion on November 7, 2018, after starting work on May 17, 2018. Vinciguerra worked closely with District staff to minimize time and materials work and additional material costs to $40,800.24, representing 1% of the final Contract amount. The proposed Final Balancing Change Order No. 1 increases the original Contract amount by $144,469.24, bringing the final Contract cost to $3,817,676.24. The increase reflects the completion of 145 additional meter installations that were not included in the original Contract total. Staff recommends approval of both the Final Balancing Change Order No. 1 and the Closeout Agreement and Release of Claims for the 2018 Water Meter Installation Project – Phase 4. General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 28 Trevor Coolidge March 7, 2019 Page 2 – 6b SCHEDULE: As soon as possible COSTS: $144,469.24 ACCOUNT NO: 2030-8859, METER4 BUDGETED AMOUNT AVAILABLE: 180,326 ATTACHMENTS: Final Balancing Change Order, Closeout Agreement and Release of Claims ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO 29 CLOSEOUT AGREEMENT AND RELEASE OF CLAIMS THIS AGREEMENT AND RELEASE OF CLAIMS is made in South Lake Tahoe, California, this 7th day of March 2019, by and between South Tahoe Public Utility DISTRICT, hereinafter referred to as "DISTRICT", and Vinciguerra Construction, hereinafter referred to as "CONTRACTOR". KNOW ALL PERSONS BY THESE PRESENTS: 1. That the undersigned, as the authorized representative of CONTRACTOR, for and in consideration of Three Million Six Hundred Seventy-Three Thousand Two Hundred Seven Dollars and Zero Cents ($3,673,207.00), contract amount, and the sum of One Hundred Forty- Four Thousand Four Hundred Sixty-Nine Dollars and Twenty-Four Cents ($144,469.24) for said Contract Change Order No. 1, receipt of which is hereby acknowledged, has submitted waivers from all subcontractors and suppliers in the form required by Civil Code §8132 - 8138, and does hereby and for each of its successors, assigns and partners, release acquit and forever discharge the SOUTH TAHOE PUBLIC UTILITY DISTRICT OF EL DORADO COUNTY, CALIFORNIA, and each of its successors, assigns, officers, agents, servants, and employees, from any and all rights, claims, demands, debts, obligations, liabilities, actions, damages, costs, expenses and other claims whatsoever, which might have been asserted against DISTRICT by reason of any matter or thing which was the subject matter of or basis for: A. The performance of all terms and conditions of that certain agreement dated March 15, 2018 for Purchase Order No. 18-92 DISTRICT project described as Water Meter Installation Project – Phase 4. B. Change Order No. 1 as approved by the parties, pertaining to Purchase Order No. 18-92 and shown in Payment Request No. 7 dated March 7, 2019. 2. That the undersigned, as the authorized representative of DISTRICT, for and in consideration of the CONTRACTOR’s completion of Purchase Order No. 18-92 does hereby and for each of its successors, and assigns, releases, acquits and forever discharge Vinciguerra Construction and each of its successors, assigns, officers, agents, servants, and employees, and sureties from any and all rights, claims, demands, debts, obligations, liability, actions, costs, expenses whatsoever which might have been asserted against CONTRACTOR, except for the rights accruing to the DISTRICT in California Code of Civil Procedure Section 337.15, Entitled "Ten Years - Action to Recover Damage from Latent Deficiencies in Planning or Construction of Improvements to Real Property," which rights are specifically not released, and except for warranties and sureties provided by reason of any matter or thing which was the subject matter of or basis for: A. The performance of all terms and conditions of that certain agreement dated March 15, 2018 for Purchase Order No. 18-92 DISTRICT project described as Water Meter Installation Project – Phase 4. B. Change Order No. 1 and as approved by the parties, pertaining to Purchase Order No. 18-92 and shown in Payment Request No.7 dated March 7, 2019. 3. Nothing contained herein shall waive or alter the rights, privileges, and powers of the DISTRICT or the duties, liabilities and obligations of the CONTRACTOR and its surety in respect to any portions of the Specifications for Purchase Order No. 18-92. 30 4. The DISTRICT has received no claims from the CONTRACTOR. 5. The DISTRICT filed and recorded a NOTICE OF COMPLETION with the County Recorder on November 20, 2018 as such the statutory lien period expired on December 25, 2018. 6. Original Contract Amount $3,673,207.00 Total Change Order Amount $144,469.24 Less: Amount Previously Paid (Request Nos. 1 through 6) $3,489,546.65 Less: Amount to Be Paid in Payment Request No. 7 on March 7, 2019 $328,129.59 Balance $0 The retainage will be released to the CONTRACTOR as the expiration of the lien period 35 (thirty-five) calendar days after date of recording a NOTICE OF COMPLETION by El Dorado County Recorder has passed. Release pursuant to this agreement shall not apply to CONTRACTOR’s rights to the presently retained amount until such time as such amounts are received in full by CONTRACTOR. 7. CONTRACTOR and DISTRICT agree that the total adjusted contract price and time of performance for Purchase Order No. 18-92 after the execution of change orders shall be as follows: Original Contract Price $3,673,207.00 Original Calendar Days 150 Total Adjusted Price $3,817,676.24 Total Adjusted Calendar Days 174 8. It is understood and agreed by the undersigneds that the facts with respect to which the foregoing Release is given may hereafter turn out to be other than or different from the facts in that connection now known to be or believed by said undersigneds to be true, and the undersigneds hereto expressly assume the risk of the facts turning out to be different than they now so appear, and agree that the foregoing Release shall be, in all respects, effective and not subject to termination or recession by any such difference in facts and undersigneds hereby expressly waive any and all rights the undersigneds have or may have under California Civil Code Section 1542, which provides as follows: "A general release does not extend to claims which the creditor does not know or suspect to exist in his favor at the time of executing the Release which if known by him must have materially affected his settlement with the debtor." 9. The releases made by the CONTRACTOR and the DISTRICT herein are not to be construed as an admission or admissions of liability on the part of either party and that the parties deny liability hereof. The undersigneds agree that they will forever refrain and forebear from commencing, instituting or prosecuting any lawsuit, action or other proceeding against the other party based on, arising out of, or in any way connected with the subject matter of this Release. 31 10. The CONTRACTOR hereby releases the DISTRICT from all claims, including those of its Subcontractors for all delay and impact costs, if any. 11. The CONTRACTOR represents and warrants to the DISTRICT that the CONTRACTOR has not heretofore assigned or transferred or purported to assign or transfer to any person, firm, corporation, association or entity any of the rights, claims, warranties, demands, debts, obligations, liabilities, actions, damages, costs, expenses and other claims whatsoever and the CONTRACTOR agrees to indemnify and hold harmless the DISTRICT against, without limitation, any and all rights, claims, warranties, demands, debts, obligations, liabilities, actions, damages, costs, expenses and other claims, including attorney's fees, arising out of or connected with any such assignment or transfer or purported assignment or transfer. 12. The undersigned acknowledge that they have been represented by counsel of their own choice in connection with the preparation and execution of this Closeout Agreement and Release of Claims. The undersigned acknowledge and represent that they understand and voluntarily consent and agree to each and every provision contained herein. 13. The undersigned further declare and represent that no promise, inducement or agreement, not herein expressed, have been made to the undersigned and that this Release contains the entire agreement among the parties hereto and that the terms of the Release are contractual and not a mere recital. 14. The persons executing this Closeout Agreement and Release of Claims represent and warrant to the other party that the execution and performance of the terms of this Release have been duly authorized by all requisite corporate, partnership, individual, or other entity requirements and that said persons have the right, power, legal capacity and authority to execute and enter in the Closeout Agreement and Release of Claims. JOHN A. THIEL, P.E., M.B.A., GENERAL MANAGER DATED ATTEST: MELONIE GUTTRY, CLERK OF BOARD DATED VINCIGUERRA CONSTRUCTION By Signature DATED Print Name Print Title 32 1 CHANGE ORDER NUMBER 01 Project: 2018 Water Meter Installation Project – Phase 4 Contractor: Vinciguerra Construction Date: 3/7/2019 PO #: P18-92 The Contract Shall Be Changed As Follows: TOTAL FOR CHANGE ORDER NUMBER 1 IS A+B+C+D+E+F+G+H+I+J+K+L+M+N+O+P+Q+R = $144,469.24 Dollar Amounts Contract Time Original Contract $3,673,207.00 150 Calendar Days Previous Change Orders $0 0 Calendar Days Current Contract $3,817,676.24 174 Calendar Days THIS CHANGE ORDER $144,469.24 24 Calendar Days New Contract Total $3,817,676.24 174 Calendar Days Contractor agrees to make the herein-described changes in accordance with the terms hereof. The change in contract price and/or contract time noted is full settlement for costs incurred as a result of the change(s) described, unless specifically noted in individual description(s). Date: ____________________ Authorized By STPUD Board President Date: _____________________ Accepted By Contractor Date: _____________________ Reviewed By 33 2 A. Amend Bid Item 4 to reflect a 268 unit increase in the number of Base Water Meter Installation, 3/4" on single water service. At the contract rate of $2000.00 per EACH, the additional cost to the District is $536,000.00. TOTAL FOR ITEM A IS $536,000.00 B. Amend Bid Item 5 to reflect a 11 unit decrease in the number of Base Water Meter Installation, 3/4" on double water service, for work not performed. At the contract rate of $2000.00 per EACH, the reduction in the Contract quantity results in a credit to the District in the amount of $22,000.00. TOTAL FOR ITEM B IS <$22,000.00> C. Amend Bid Item 6 to reflect a 96 unit decrease in the number of Base Water Meter Installation, 1" on single water service, for work not performed. At the contract rate of $1900.00 per EACH, the reduction in the Contract quantity results in a credit to the District in the amount of $182,400.00. TOTAL FOR ITEM C IS <$182,400.00> D. Amend Bid Item 7 to reflect a 16 unit decrease in the number of Base Water Meter Installation, 1" on double water service, for work not performed. At the contract rate of $1900.00 per EACH, the reduction in the Contract quantity results in a credit to the District in the amount of $30,400.00. TOTAL FOR ITEM D IS <$30,400.00> E. Amend Bid Item 8 to reflect a 28 unit increase in the number of Add for Traffic-Rated Installations - 3/4". At the contract rate of $250.00 per EACH, the additional cost to the District is $7,000.00. TOTAL FOR ITEM E IS $7,000.00 F. Amend Bid Item 9 to reflect a 77 unit decrease in the number of Add for Traffic-Rated Installations - 1", for work not performed. At the contract rate of $275.00 per EACH, the reduction in the Contract quantity results in a credit to the District in the amount of $21175.00. TOTAL FOR ITEM F IS <$21,175.00> G. Amend Bid Item 10 to reflect a 640 unit decrease in the number of 3" Asphalt Patch Paving, for work not performed. At the contract rate of $5.00 per SF, the reduction in the Contract quantity results in a credit to the District in the amount of $3200.00. TOTAL FOR ITEM G IS <$3,200.00> H. Amend Bid Item 11 to reflect a 54 unit decrease in the number of Add for Groundwater Dewatering, for work not performed. At the contract rate of $1.00 per EACH, the reduction in the Contract quantity results in a credit to the District in the amount of $54.00. TOTAL FOR ITEM H IS <$54.00> 34 3 I. Amend Bid Item 12 to reflect a 19 unit decrease in the number of Increased Excavation Depth for Non-traffic Installs: 61" to 76" Deep, for work not performed. At the contract rate of $1.00 per EACH, the reduction in the Contract quantity results in a credit to the District in the amount of $19.00. TOTAL FOR ITEM I IS <$19.00> J. Amend Bid Item 13 to reflect a 57 unit decrease in the number of Increased Excavation Depth for Traffic-rated Installs: 61" to 76" Deep, for work not performed. At the contract rate of $1.00 per EACH, the reduction in the Contract quantity results in a credit to the District in the amount of $57.00. TOTAL FOR ITEM J IS <$57.00> K. Amend Bid Item 14 to reflect a 152 unit decrease in the number of Water Service Valve Replacement, 3/4" Single, for work not performed. At the contract rate of $1.00 per EACH, the reduction in the Contract quantity results in a credit to the District in the amount of $152.00. TOTAL FOR ITEM K IS <$152.00> L. Amend Bid Item 15 to reflect a 3 unit decrease in the number of Water Service Valve Replacement, 1" Single, for work not performed. At the contract rate of $1.00 per EACH, the reduction in the Contract quantity results in a credit to the District in the amount of $3.00. TOTAL FOR ITEM L IS <$3.00> M. Amend Bid Item 16 to reflect a 4 unit increase in the number of Water Service Valve Replacement, 3/4" Double. At the contract rate of $1.00 per EACH, the additional cost to the District is $4.00. TOTAL FOR ITEM M IS $4.00 N. Amend Bid Item 17 to reflect a 73 unit decrease in the number of Water Service Valve In-Line, 3/4", for work not performed. At the contract rate of $1.00 per EACH, the reduction in the Contract quantity results in a credit to the District in the amount of $73.00. TOTAL FOR ITEM N IS <$73.00> O. Amend Bid Item 18 to reflect a 2 unit decrease in the number of Water Service Valve In-Line, 1", for work not performed. At the contract rate of $1.00 per EACH, the reduction in the Contract quantity results in a credit to the District in the amount of $2.00. TOTAL FOR ITEM O IS <$2.00> P. Amend Bid Item 19 to reflect a 240 unit decrease in the number of Paver Driveway Restoration, for work not performed. At the contract rate of $20.00 per SF, the reduction in the Contract quantity results in a credit to the District in the amount of $4800.00. TOTAL FOR ITEM P IS <$4,800.00> Q. Amend Bid Item 21 to reflect a decrease in the Unknown Conditions - Paid for on a 35 4 Time-and-Materials Basis Lump Sum line pay item, for work not performed. Work performed on a time and materials basis totaled $22,171.90. Additional materials for the project (valve boxes), supplied by the Contractor, and remaining non-returnable items provided to the District totaled $18,628.34. The contract included $175,000.00 for unknown conditions; the reduction in the Contract amount results in a credit to the District in the amount of $134,199.76. TOTAL FOR ITEM Q IS <$134,199.76> R. Change the Contract Time, identified in Section 007200, Part 2.04 of the Contract Specifications, from one-hundred-fifty (150) calendar days to one-hundred-seventy-three (173) calendar days, to account for additions to the Scope of Work. This item addresses in full additional time required to complete extra work and the procurement of materials requested by the District. No compensation is awarded due to the time extension. All additional costs for the extra work related to this item are addressed separately. TOTAL FOR ITEM R IS $0.00 TOTAL FOR CHANGE ORDER NUMBER 1 IS A+B+C+D+E+F+G+H+I+J+K+L+M+N+O+P+Q+R = $144,469.24 36 Trevor Coolidge March 7, 2019 Page 2 – 6c BOARD AGENDA ITEM 6c TO: Board of Directors FROM: Trevor Coolidge, Associate Engineer MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: Sensus Water Meters for the 2019 Water Meter Project REQUESTED BOARD ACTION: (1) Authorize exception to bidding procedures as outlined in the Purchasing Policy for a sole source purchase of standardized supplies; and (2) Authorize purchase of Sensus Meters and Radio-Read Units from Western Nevada Supply in the estimated amount of $346,534.78. DISCUSSION: This purchase will provide the Sensus Meters and Sensus radio-read units required for the 2019 Water Meter Installation Project. These materials will be provided to the contractor for installation. On May 21, 2009, the Board reaffirmed Sensus Meters and Sensus Radio-Read units as sole-brand items to ensure that all parts will perform with the District’s electronic meter reading system, and to facilitate the ongoing, cost-effective operation and maintenance of the metering system. As authorized, the District only purchases meters and radio-read units manufactured by Sensus. As Western Nevada Supply is the sole source supplier for Sensus in this area, staff has negotiated preferential pricing based on past purchases, expected future purchases, and potential additions to the metering system such as the radio frequency based communications network. Funding for the purchase is provided by a low-interest loan through the State Water Resources Control Board’s (SWRCB) Clean Water State Revolving Fund (CWSRF). Staff recommends that the Board authorize exception to bidding procedures as outlined in the Purchasing Policy for a sole source purchase of standardized supplies and authorize purchase of Sensus Meters and Radio-Read Units from Western Nevada Supply in the estimated amount of $346,534.78. General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 37 Trevor Coolidge March 7, 2019 Page 2 – 6c SCHEDULE: As soon as possible COSTS: $346,534.78 ACCOUNT NO: 2030-8929, METR5A BUDGETED AMOUNT AVAILABLE: $1,497,680 ATTACHMENTS: Western Nevada Quote No. 818070 _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO 38 WESTERN NEVADA SUPPLY * * Q U O T A T I O N * * TO: SOUTH TAHOE PUD DATE: 02/14/19 NO. 818070 1275 MEADOW CREST DRIVE EFFECTIVE 02/14/19 TO 06/30/19 SOUTH LAKE TAHOE, CA 96150-74 TERMS: NET 30 PAGE# 1 FOB: FFA JOB:Project Phase 5 PREP. BY: BARNEY ARNESON 775-353-1250 barneson@goblueteam.com WE ARE PLEASED TO QUOTE YOU ON THE FOLLOWING MATERIAL *** SALES TAX NOT INCLUDED *** ==================================================================================== Qty Part # Description Price..... Extended ==================================================================================== 1 ===> SMARTPOINTS 1269 WKZ1101104 SENSUS M2 FLEXNET 520M SINGLE 136.00 172584.00 ------------- SEGMENT 1 TOTAL 172,584.00 2 ===> IPERL METERS 1076 WKZ1359012 IPERL 3/4 7.5LL 1 CUFT TRPL MTR 138.50 149026.00 ------------- SEGMENT 2 TOTAL 149,026.00 3 ===> TAX (7.750) 1 WZNS354319 TAX [7.750] 24924.78 24924.78 ------------- SEGMENT 3 TOTAL 24,924.78 =========== QUOTATION TOTALS 346,534.78 * * * SALES TAX NOT INCLUDED * * * THE MATERIAL LISTED ABOVE IS QUOTED PER THE PLANS AND SPECS PROVIDED TO WNS, AND WHETHER SPECIFIED OR NOT WILL BE SUBJECT TO THE ENGINEER’S APPROVAL. ALL SALES ARE SUBJECT TO TAX. 39 Trevor Coolidge March 7, 2019 Page 2 – 6d BOARD AGENDA ITEM 6d TO: Board of Directors FROM: Trevor Coolidge, Associate Engineer MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: 2019 Water Meter Installation Project - Phase 5 REQUESTED BOARD ACTION: Award the 2019 Water Meter Installation Project - Phase 5 Contract to the lowest responsive, responsible bidder, Vinciguerra Construction, in the amount of $3,292,055. DISCUSSION: The District currently has approximately 1,900 remaining water meter installations to complete as part of the ongoing Residential Water Metering Project. The remaining meter installations are funded through a Funding Agreement with the State Water Resources Control Board’s Clean Water State Revolving Fund (CWSRF). Phase 5 of the project includes 1,316 water meter installations for completion during the 2019 construction season. On February 12, 2019, at 2:00 p.m., four bids for the Project were received by the District. The apparent low bid of $3,292,055 was from Vinciguerra Construction of Jackson, California, followed by Thomas Haen Company at $3,820,358, and White Rock Construction at $4,362,775. A fourth bid for $4,751,765 was received from Vulcan Construction, but was found to be non-responsive due to an original Bid Bond not being provided in advance to the electronic bid opening as specified in the Contract documents and emphasized at the mandatory pre-bid meeting. The engineer’s estimate was $4,650,000. In reviewing Vinciguerra Construction’s bid, staff finds the bid competitive, with the overall average cost per meter increasing by 3.9% increase over 2018 contract, while remaining over $500,000 below the second bidder. Staff reviewed Vinciguerra’s bid package and confirmed conformance with contractual and Disadvantaged Business Enterprises (DBE) requirements. General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 40 Trevor Coolidge March 7, 2019 Page 2 – 6d Staff recommends awarding the 2019 Water Meter Installation Project Contract to Vinciguerra Construction as the lowest responsive, responsible bidder, in the amount of $3,292,055. SCHEDULE: As soon as possible. COSTS: $3,292,055 ACCOUNT NO: 2030-8929, METR5A BUDGETED AMOUNT AVAILABLE: $1,497,680 (2018/19), $3,625,000 (2019/20) ATTACHMENTS: Bid Results and Evaluation ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO 41 South Tahoe Public Utility District ● 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Phone 530.544.6474 ● Facsimile 530.541.0614 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Telephone: (530)544-6474 Fax: (530)541-4319 Memorandum Date: March 7, 2019 To: Board Members, John Thiel, Shannon D. Cotulla From: Starlet Glaze, Contracts Administrator Subject: 2019 Water Meter Installation Project – Phase 5 At 2:00 o’clock on the afternoon of February 12, 2019 we received four (4) electronic bids via PlanetBids for the above-referenced project. Bids ranged from $3,292,055.00 to $4,751,765.00. The engineer’s estimate was $4,650,000.00. The fourth lowest bid submitted by Vulcan Construction & Maintenance, Inc., was found by staff to be non-responsive due to the original Bid Bond not being provided to the District prior to the Bid opening as specified. A careful review and analysis of the remaining three lowest bids showed only minor deviations. See attached spreadsheet and list of deviations for full breakdown of each bid. Vinciguerra Construction is the apparent low bidder. Vinciguerra Construction had two minor deviations. I contacted the Contractors License Board and was given the following information: License Number 358838 is current and active and expires 02/28/2021. The company is a sole ownership. Vinciguerra Construction holds a Class A – General Engineering license and a Class B – General Building Contractor license. I also contacted the California Department of Industrial Relations Contractor Registration site and verified that Vinciguerra Construction is registered under PWCR Number 1000008694. 42 43 2019 Water Meter Installation Project – Phase 5 Bid Opening: 2/12/2019 at 2:00 o’clock p.m. Deviations and information gathered during bid analysis of the three lowest bids: Vinciguerra Construction: • Bidders General Information Item 3, the expiration date for the Contractor’s license was incorrect. We were, however, able to verify that this Contractor has a current and active California license and is registered and current with the CA DIR. • Bidders General Information Item 5, the full name of the surety was not provided. We were, however, able to verify the correct name through the California Department of Insurance and AM Best websites. We were also able to verify that the bid bond is valid and the surety company meets District specifications. Thomas Haen Company, Inc.: • List of Subcontractors, the Bid Item numbers from the Contract Bid Schedule were listed by the Contractor rather than the actual work to be performed by each Subcontractor. • Bidders General Information item 5, the name of the surety was provided but not the zip code or telephone number. We were, however, able to obtain and verify the information through the California Department of Insurance and AM Best websites. We were also able to verify that the bid bond is valid and the surety company meets District’s specifications. White Rock Construction: • Bidders General Information Item 5, only the name, address and phone number for the surety’s brokerage agency and agent were provided. No surety information (name, address or phone number) was provided. We were, however, able to verify that the bid bond is valid and the surety company meets District’s specifications. 44 2019 WATER METER INSTALLATION PROJECT – PHASE 5 CONTRACTOR’S SUBCONTRACTORS 1 Vinciguerra Construction Description of Work Subcontractors Name & Address Sawcutting <1% Accurate Sawcutting P.O. Box 506 Turlock, CA 95381 CA#984161; DIR (PWC)#1000012274 Named Equipment/Material Supplier List: Equipment/Material Supplier Virgin Aggregate Base Material Bing Asphalt Tahoe Western Asphalt Concrete Sierra Tahoe Ready Mix Pipe Ferguson Waterworks / ADS – Poly ¾” Ferguson Waterworks / Vinyl Tech Corporation–4” Ferguson Waterworks/North American Pipe Co-4” Ferguson Waterworks / Diamond Plastics – 4” Pipe Fittings and Water Service Valves Ferguson Waterworks / Ford Meter Box Meter Pits and Setters Ferguson Waterworks / Ford Meter Box Thomas Haen Company, Inc. Description of Work Subcontractors & Address Bid Item 4 & 5 5% Four Point Engineering 11 Red Canyon Rd. Wellington, NV 89444 CA#1033039; DIR (PWC)#1000055219 Bid Item 7 1% Qualcon Contractors P.O. Box 2889 Minden, NV 89423 CA#684075; DIR (PWC)#1000007403 Named Equipment/Material Supplier List: Equipment/Material Supplier Virgin Aggregate Base Material Bing Materials Asphalt Qualcon / Tahoe Asphalt Concrete Sierra Tahoe Ready Mix Pipe Ferguson / VinylTech North American/Diamond Plastics Pipe Pipe Fittings and Water Service Valves Ferguson / Ford Meter Box/Advanced Drainage Systems Meter Pits and Setters Ferguson / Ford Meter Box 45 2019 WATER METER INSTALLATION PROJECT – PHASE 5 CONTRACTOR’S SUBCONTRACTORS 2 White Rock Construction, Inc. Description of Work Subcontractors & Address AC Paving 0.825% Ron Fuller Construction, Inc. 2092 Eloise Ave. South Lake Tahoe, CA 96150 CA#517412; DIR (PWC)#1000018557 Equipment/Material Supplier List Equipment/Material Supplier Virgin Aggregate Base Material White Rock Construction / Bing Materials Asphalt Ron Fuller Construction, Inc. / Tahoe Asphalt Concrete Sierra Tahoe Ready Mix Pipe Western Nevada Supply / ADS (HDPE) Pipe Fittings and Water Service Valves Western Nevada Supply / Ford/Mueller Meter Pits and Setters Western Nevada Supply / Mueller Vulcan Construction & Maintenance, Inc. Description of Work Subcontractors & Address None None Named Equipment/Material Supplier List: Equipment/Material Supplier Virgin Aggregate Base Material Bing Materials Asphalt Tahoe Asphalt Concrete Sierra Tahoe Ready Mix Pipe Western Nevada Supply Ford / Mueller Pipe Fittings and Water Service Valves Western Nevada Supply Ford / Mueller Meter Pits and Setters Western Nevada Supply Ford / Mueller 46 Tony Prieto March 7, 2019 Page 2 – 6e BOARD AGENDA ITEM 6e TO: Board of Directors FROM: Tony Prieto, Underground Repair Water Supervisor Heidi Baugh, Purchasing Agent MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: 2019 Asphalt Patching & Trench Paving Services REQUESTED BOARD ACTION: Award bid in the amount of $193,387 to GB General Engineering Contractor, Inc., the lowest responsive, responsible bidder. DISCUSSION: Underground Repair Water/Sewer Departments complete numerous water leaks, service tie-ins and sewer line repairs. Then temporary patch repairs are made to the damaged or cut asphalt. When weather permits, professional paving contractors must permanently repair these patches. Staff advertised publicly, and solicited bids from 14 contractors for the permanent repairs on February 1, 2019. Three bids were received and opened on February 21, 2019. Upon review of the bids it was determined that GB General Engineering Contractor, Inc., (GB General) is the lowest responsive, responsible bidder; GB General is currently registered with the State Department of I ndustrial Relations and has a current and active “A” contractor’s license. GB General was the contractor awarded the District’s 2018 Asphalt Patching Services Contract. As the attached Bid Summary reveals, the subtotals for patch paving services indicates a 24.8% decrease from last year’s Contract for the patching work. This year’s bid includes two large trench paving pieces of work adding a significant amount of work but still only increasing the Contract by 5.8% overall. Total bid values are estimates based upon bid prices multiplied by an estimated number of patches of various sizes plus related work. The estimated factors are based upon historical data together with new projections of work. Although, the actual quantities and total may vary, unit bid prices will remain firm. General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 47 Tony Prieto March 7, 2019 Page 2 – 6e Staff recommends awarding the Contract to GB General Engineering Contractor, Inc., the lowest responsive, responsible bidder in the amount of $193,387. SCHEDULE: As soon as possible COSTS: Not to Exceed $193,387 ACCOUNT NO: 2024/6052, 1022/6052; BUDGETED AMOUNT AVAILABLE: 2019/20 $75,000, $350,000 ATTACHMENTS: Bid Summary _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water/Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO 48 49 PAYMENT OF CLAIMS Payroll 2/26/2019 472,599.12 Total Payroll 472,599.12 ADP & Insight eTools 1,210.00 AFLAC/WageWorks claims and fees 1,799.00 BBVA Compass Bank 0.00 BHFS legal services 31,520.50 Cal Bank & Trust fiscal agent fees 0.00 California SWRCB SRF loan payments 0.00 CDS - health care payments 2,366.90 Total Vendor EFT 36,896.40 Accounts Payable Checks-Sewer Fund 449,252.81 Accounts Payable Checks-Water Fund 418,607.82 Total Accounts Payable Checks 867,860.63 Grand Total 1,377,356.15 Payroll EFTs & Checks 2/26/2019 MM/DD/2019 EFT CA Employment Taxes & W/H 20,167.26 0.00 EFT Federal Employment Taxes & W/H 101,659.34 0.00 EFT CalPERS Contributions 67,058.04 0.00 EFT Empower Retirement-Deferred Comp 20,092.98 0.00 EFT Stationary Engineers Union Dues 2,706.23 0.00 EFT CDHP Health Savings (HSA)4,183.41 0.00 EFT Retirement Health Savings 0.00 0.00 EFT United Way Contributions 111.00 0.00 EFT Employee Direct Deposits 254,227.90 0.00 CHK Employee Garnishments 344.76 0.00 CHK Employee Paychecks 2,048.20 0.00 Total 472,599.12 0.00 FOR APPROVAL March 7, 2019 50 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 42363 - A-1 CHEMICAL INC 6310914 Grounds & Maintenance Paid by Check #100908 02/13/2019 03/07/2019 02/28/2019 03/07/2019 699.57 Vendor 42363 - A-1 CHEMICAL INC Totals Invoices 1 $699.57 Vendor 43721 - ACWA/JPIA 0592498 ACWA Medical/Vision Insurance Payable Paid by Check #100909 01/09/2019 03/07/2019 02/28/2019 03/07/2019 229,876.48 Vendor 43721 - ACWA/JPIA Totals Invoices 1 $229,876.48 Vendor 44039 - AFLAC 170272 Insurance Supplement Payable Paid by Check #100910 02/15/2019 03/07/2019 02/28/2019 03/07/2019 1,580.01 Vendor 44039 - AFLAC Totals Invoices 1 $1,580.01 Vendor 48605 - AIRGAS USA LLC 9085562098 Shop Supplies Inventory Paid by Check #100911 02/14/2019 03/07/2019 02/28/2019 03/07/2019 82.16 9085562100 Shop Supplies Inventory Paid by Check #100911 02/14/2019 03/07/2019 02/28/2019 03/07/2019 463.65 Vendor 48605 - AIRGAS USA LLC Totals Invoices 2 $545.81 Vendor 43949 - ALPEN SIERRA COFFEE 202526 Office Supply Issues Paid by Check #100912 02/12/2019 03/07/2019 02/28/2019 03/07/2019 89.00 202527 Office Supply Issues Paid by Check #100912 02/12/2019 03/07/2019 02/28/2019 03/07/2019 44.25 202641 Office Supply Issues Paid by Check #100912 02/19/2019 03/07/2019 02/28/2019 03/07/2019 44.25 202642 Office Supply Issues Paid by Check #100912 02/19/2019 03/07/2019 02/28/2019 03/07/2019 89.00 Vendor 43949 - ALPEN SIERRA COFFEE Totals Invoices 4 $266.50 Vendor 48817 - MARY ALSBURY 020819 Travel - Meetings - Education Paid by Check #100913 02/08/2019 03/07/2019 02/28/2019 03/07/2019 1,139.18 Vendor 48817 - MARY ALSBURY Totals Invoices 1 $1,139.18 Vendor 48073 - AMERIPRIDE UNIFORM SERVICES 20519 Uniform Payable Paid by Check #100914 02/05/2019 03/07/2019 02/28/2019 03/07/2019 611.82 21919 Uniform Payable Paid by Check #100914 02/19/2019 03/07/2019 02/28/2019 03/07/2019 609.62 Vendor 48073 - AMERIPRIDE UNIFORM SERVICES Totals Invoices 2 $1,221.44 Vendor 48000 - AT&T/CALNET 3 FEBRUARY2 TELEPHONE Paid by Check #100915 02/20/2019 03/07/2019 03/07/2019 03/07/2019 778.62 Vendor 48000 - AT&T/CALNET 3 Totals Invoices 1 $778.62 Vendor 48612 - AUTOMATION DIRECT 9516086 Pump Stations Paid by Check #100916 01/16/2019 03/07/2019 02/28/2019 03/07/2019 43.00 9635285 Buildings Paid by Check #100916 02/21/2019 03/07/2019 02/28/2019 03/07/2019 98.00 Vendor 48612 - AUTOMATION DIRECT Totals Invoices 2 $141.00 Vendor 11800 - BARTON HEALTHCARE SYSTEM 021919 Safety Equipment - Physicals Paid by Check #100917 02/19/2019 03/07/2019 02/28/2019 03/07/2019 488.00 Run by Kim Garon on 02/28/2019 10:53:20 AM Page 1 of 10 Payment of Claims Payment Date Range 02/22/19 - 03/07/19 Report By Vendor - Invoice Summary Listing 51 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 11800 - BARTON HEALTHCARE SYSTEM Totals Invoices 1 $488.00 Vendor 43828 - BLUE RIBBON TEMP PERSONNEL 8144 Contractual Services Paid by Check #100918 12/28/2018 03/07/2019 02/28/2019 03/07/2019 356.04 295 Contractual Services Paid by Check #100918 01/25/2019 03/07/2019 02/28/2019 03/07/2019 618.93 395 Contractual Services Paid by Check #100918 02/01/2019 03/07/2019 02/28/2019 03/07/2019 571.32 494 Contractual Services Paid by Check #100918 02/08/2019 03/07/2019 02/28/2019 03/07/2019 642.74 568 Contractual Services Paid by Check #100918 02/15/2019 03/07/2019 02/28/2019 03/07/2019 634.80 588 Contractual Services Paid by Check #100918 02/15/2019 03/07/2019 02/28/2019 03/07/2019 24.87 589 Contractual Services Paid by Check #100918 02/15/2019 03/07/2019 02/28/2019 03/07/2019 969.93 664 Contractual Services Paid by Check #100918 02/22/2019 03/07/2019 02/28/2019 03/07/2019 634.80 685 Contractual Services Paid by Check #100918 02/22/2019 03/07/2019 02/28/2019 03/07/2019 596.88 Vendor 43828 - BLUE RIBBON TEMP PERSONNEL Totals Invoices 9 $5,050.31 Vendor 42978 - BROWNSTEIN HYATT 749322 Suspense January 2019 Services Paid by EFT #10 02/13/2019 03/07/2019 02/28/2019 03/07/2019 31,520.50 Vendor 42978 - BROWNSTEIN HYATT Totals Invoices 1 $31,520.50 Vendor 44730 - BSK ASSOCIATES A902325 Monitoring Paid by Check #100919 01/28/2019 03/07/2019 02/28/2019 03/07/2019 35.00 Vendor 44730 - BSK ASSOCIATES Totals Invoices 1 $35.00 Vendor 43598 - CARBON ACTIVATED CORPORATION 44276 Carbon Paid by Check #100920 02/15/2019 03/07/2019 02/28/2019 03/07/2019 4,955.79 Vendor 43598 - CARBON ACTIVATED CORPORATION Totals Invoices 1 $4,955.79 Vendor 13230 - CAROLLO ENGINEERS 0174264 Upper Truckee Sewer PS Rehab Paid by Check #100921 02/08/2019 03/07/2019 02/28/2019 03/07/2019 17,834.75 0174265 Tahoe Keys Sewer PS Rehab Paid by Check #100921 02/08/2019 03/07/2019 02/28/2019 03/07/2019 19,423.00 Vendor 13230 - CAROLLO ENGINEERS Totals Invoices 2 $37,257.75 Vendor 48838 - STEPHEN CASWELL 110818 Travel - Meetings - Education Paid by Check #100922 11/08/2018 03/07/2019 02/28/2019 03/07/2019 33.00 Vendor 48838 - STEPHEN CASWELL Totals Invoices 1 $33.00 Vendor 48014 - CDS GROUP HEALTH FEB2019 Dental Self Insurance Paid by Check #100923 02/01/2019 03/07/2019 02/28/2019 03/07/2019 649.00 Vendor 48014 - CDS GROUP HEALTH Totals Invoices 1 $649.00 Vendor 42328 - CDW-G CORP QWW9004 Service Contracts Paid by Check #100924 01/31/2019 03/07/2019 02/28/2019 03/07/2019 1,911.52 QXC7948 Service Contracts Paid by Check #100924 01/31/2019 03/07/2019 02/28/2019 03/07/2019 32.58 RBG1233 Service Contracts Paid by Check #100924 02/08/2019 03/07/2019 02/28/2019 03/07/2019 1,872.50 RBS6978 Computer Purchases Paid by Check #100924 02/11/2019 03/07/2019 02/28/2019 03/07/2019 326.04 Run by Kim Garon on 02/28/2019 10:53:20 AM Page 2 of 10 Payment of Claims Payment Date Range 02/22/19 - 03/07/19 Report By Vendor - Invoice Summary Listing 52 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 42328 - CDW-G CORP Totals Invoices 4 $4,142.64 Vendor 49016 - MICHAEL CHIEFFO 031219 Travel - Meetings - Education Paid by Check #100925 03/12/2019 03/07/2019 03/07/2019 03/07/2019 111.00 Vendor 49016 - MICHAEL CHIEFFO Totals Invoices 1 $111.00 Vendor 48672 - CINTAS CORP 5013187138 Safety Equipment - Physicals Paid by Check #100926 02/22/2019 03/07/2019 02/28/2019 03/07/2019 148.45 Vendor 48672 - CINTAS CORP Totals Invoices 1 $148.45 Vendor 48281 - CRYSTAL DAIRY FOODS 12056 Safety Equipment - Physicals Paid by Check #100927 02/21/2019 03/07/2019 02/28/2019 03/07/2019 8.07 Vendor 48281 - CRYSTAL DAIRY FOODS Totals Invoices 1 $8.07 Vendor 44856 - DEPENDABLE SCIENTIFIC GLASS 59052 Laboratory Supplies Paid by Check #100928 01/14/2019 03/07/2019 02/28/2019 03/07/2019 26.35 59053 Laboratory Supplies Paid by Check #100928 01/14/2019 03/07/2019 02/28/2019 03/07/2019 340.00 Vendor 44856 - DEPENDABLE SCIENTIFIC GLASS Totals Invoices 2 $366.35 Vendor 48289 - DIY HOME CENTER 46908 Small Tools Paid by Check #100929 02/12/2019 03/07/2019 02/28/2019 03/07/2019 58.17 46918 Wells Paid by Check #100929 02/12/2019 03/07/2019 02/28/2019 03/07/2019 22.29 46926 Office Supplies Paid by Check #100929 02/12/2019 03/07/2019 02/28/2019 03/07/2019 18.39 46930 Pump Stations Paid by Check #100929 02/12/2019 03/07/2019 02/28/2019 03/07/2019 58.17 46939 Buildings Paid by Check #100929 02/13/2019 03/07/2019 02/28/2019 03/07/2019 15.49 46959 Small Tools Paid by Check #100929 02/13/2019 03/07/2019 02/28/2019 03/07/2019 31.99 46986 Repair - Maintenance Water Tanks Paid by Check #100929 02/15/2019 03/07/2019 02/28/2019 03/07/2019 17.21 47058 Water Meters & Parts Paid by Check #100929 02/20/2019 03/07/2019 02/28/2019 03/07/2019 13.05 47070 Small Tools Paid by Check #100929 02/21/2019 03/07/2019 02/28/2019 03/07/2019 14.04 47071 Pump Stations Paid by Check #100929 02/21/2019 03/07/2019 02/28/2019 03/07/2019 21.11 47072 Propane Paid by Check #100929 02/21/2019 03/07/2019 02/28/2019 03/07/2019 19.38 47112 Pump Stations Paid by Check #100929 02/22/2019 03/07/2019 02/28/2019 03/07/2019 53.85 47165 Pump Stations Paid by Check #100929 02/26/2019 03/07/2019 02/28/2019 03/07/2019 16.47 Vendor 48289 - DIY HOME CENTER Totals Invoices 13 $359.61 Vendor 44263 - ENS RESOURCES INC 2382 Contractual Services Paid by Check #100930 02/16/2019 03/07/2019 02/28/2019 03/07/2019 7,042.00 Vendor 44263 - ENS RESOURCES INC Totals Invoices 1 $7,042.00 Vendor 18550 - EUROFINS EATON ANALYTICAL INC L0435118 Monitoring Paid by Check #100931 02/05/2019 03/07/2019 02/28/2019 03/07/2019 10.00 L0435628 Monitoring Paid by Check #100931 02/08/2019 03/07/2019 02/28/2019 03/07/2019 275.00 L0435629 Monitoring Paid by Check #100931 02/08/2019 03/07/2019 02/28/2019 03/07/2019 495.00 Run by Kim Garon on 02/28/2019 10:53:20 AM Page 3 of 10 Payment of Claims Payment Date Range 02/22/19 - 03/07/19 Report By Vendor - Invoice Summary Listing 53 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount L0436064 Monitoring Paid by Check #100931 02/12/2019 03/07/2019 02/28/2019 03/07/2019 260.00 L0436067 Monitoring Paid by Check #100931 02/12/2019 03/07/2019 02/28/2019 03/07/2019 100.00 L0436180 Monitoring Paid by Check #100931 02/13/2019 03/07/2019 02/28/2019 03/07/2019 40.00 L0436408 Monitoring Paid by Check #100931 02/14/2019 03/07/2019 02/28/2019 03/07/2019 1,880.00 L0436409 Monitoring Paid by Check #100931 02/14/2019 03/07/2019 02/28/2019 03/07/2019 940.00 L0437038 Monitoring Paid by Check #100931 02/18/2019 03/07/2019 02/28/2019 03/07/2019 40.00 L0437459 Monitoring Paid by Check #100931 02/20/2019 03/07/2019 02/28/2019 03/07/2019 225.00 Vendor 18550 - EUROFINS EATON ANALYTICAL INC Totals Invoices 10 $4,265.00 Vendor 14890 - FEDEX 6-461-89492 Postage Expenses Paid by Check #100932 02/15/2019 03/07/2019 02/28/2019 03/07/2019 60.98 6-469-94646 Postage Expenses Paid by Check #100932 02/22/2019 03/07/2019 02/28/2019 03/07/2019 34.64 6-441-80956 Postage Expenses Paid by Check #100932 02/25/2019 03/07/2019 02/28/2019 03/07/2019 77.51 Vendor 14890 - FEDEX Totals Invoices 3 $173.13 Vendor 41263 - FERGUSON ENTERPRISES INC 6448786 Force Main Repairs Paid by Check #100933 01/14/2019 03/07/2019 02/28/2019 03/07/2019 394.85 6505145 Buildings Paid by Check #100933 02/07/2019 03/07/2019 02/28/2019 03/07/2019 104.12 Vendor 41263 - FERGUSON ENTERPRISES INC Totals Invoices 2 $498.97 Vendor 15000 - FISHER SCIENTIFIC 8671410 Laboratory Supplies Paid by Check #100934 01/04/2019 03/07/2019 02/28/2019 03/07/2019 49.08 7697011 Laboratory Supplies Paid by Check #100934 02/04/2019 03/07/2019 02/28/2019 03/07/2019 26.26 9635141 Laboratory Supplies Paid by Check #100934 02/15/2019 03/07/2019 02/28/2019 03/07/2019 284.52 Vendor 15000 - FISHER SCIENTIFIC Totals Invoices 3 $359.86 Vendor 48402 - FLYERS ENERGY LLC 19-844900 Oil & Lubricants Paid by Check #100935 01/31/2018 03/07/2019 02/28/2019 03/07/2019 888.08 19-833629 Gasoline Fuel Inventory Paid by Check #100935 01/11/2019 03/07/2019 02/28/2019 03/07/2019 1,290.42 19-837958 Gasoline Fuel Inventory Paid by Check #100935 01/18/2019 03/07/2019 02/28/2019 03/07/2019 4,857.15 19-846487 Gasoline Fuel Inventory Paid by Check #100935 02/01/2019 03/07/2019 02/28/2019 03/07/2019 2,798.10 19-849951 Gasoline Fuel Inventory Paid by Check #100935 02/07/2019 03/07/2019 02/28/2019 03/07/2019 1,332.96 19-853233 Diesel Fuel Inventory Paid by Check #100935 02/13/2019 03/07/2019 02/28/2019 03/07/2019 6,591.49 Vendor 48402 - FLYERS ENERGY LLC Totals Invoices 6 $17,758.20 Vendor 43111 - GFS CHEMICALS INC CINV-027829 Laboratory Supplies Paid by Check #100936 02/15/2019 03/07/2019 02/28/2019 03/07/2019 221.60 Vendor 43111 - GFS CHEMICALS INC Totals Invoices 1 $221.60 Vendor 48826 - JASON GLAZE 031219 Travel - Meetings - Education Paid by Check #100937 03/12/2019 02/27/2019 03/07/2019 03/07/2019 49.00 Vendor 48826 - JASON GLAZE Totals Invoices 1 $49.00 Vendor 15600 - GRAINGER Run by Kim Garon on 02/28/2019 10:53:20 AM Page 4 of 10 Payment of Claims Payment Date Range 02/22/19 - 03/07/19 Report By Vendor - Invoice Summary Listing 54 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 9082450728 Buildings Paid by Check #100938 02/08/2019 03/07/2019 02/28/2019 03/07/2019 188.33 Vendor 15600 - GRAINGER Totals Invoices 1 $188.33 Vendor 48332 - HDR ENGINEERING INC 1200173409 Advisory Paid by Check #100939 02/15/2019 03/07/2019 02/28/2019 03/07/2019 25,052.78 1200174781 Replace Treatment Plant Generator Paid by Check #100939 02/20/2019 03/07/2019 02/28/2019 03/07/2019 6,996.03 Vendor 48332 - HDR ENGINEERING INC Totals Invoices 2 $32,048.81 Vendor 44430 - HIGH SIERRA BUSINESS SYSTEMS 101178 Service Contracts Paid by Check #100940 02/01/2019 03/07/2019 02/28/2019 03/07/2019 773.77 Vendor 44430 - HIGH SIERRA BUSINESS SYSTEMS Totals Invoices 1 $773.77 Vendor 48995 - BRENLYN HOYLE 121218 Travel - Meetings - Education Paid by Check #100941 12/12/2018 03/07/2019 02/28/2019 03/07/2019 27.25 013119 Travel - Meetings - Education Paid by Check #100941 01/31/2019 03/07/2019 02/28/2019 03/07/2019 29.00 Vendor 48995 - BRENLYN HOYLE Totals Invoices 2 $56.25 Vendor 48832 - NANCY HUSSMANN 031319 Travel - Meetings - Education Paid by Check #100942 03/13/2019 03/07/2019 03/07/2019 03/07/2019 186.00 Vendor 48832 - NANCY HUSSMANN Totals Invoices 1 $186.00 Vendor 48056 - INFOSEND INC 149279 Service Contracts Paid by Check #100943 01/31/2019 03/07/2019 02/28/2019 03/07/2019 558.80 149473 Service Contracts Paid by Check #100943 02/14/2019 03/07/2019 02/28/2019 03/07/2019 130.00 Vendor 48056 - INFOSEND INC Totals Invoices 2 $688.80 Vendor 44110 - J&L PRO KLEEN INC 27640 Janitorial Services Paid by Check #100944 02/15/2019 03/07/2019 02/28/2019 03/07/2019 4,242.00 Vendor 44110 - J&L PRO KLEEN INC Totals Invoices 1 $4,242.00 Vendor 42710 - JACKSON-HIRSH INC 1004240 Office Supplies Paid by Check #100945 01/31/2019 03/07/2019 02/28/2019 03/07/2019 488.43 Vendor 42710 - JACKSON-HIRSH INC Totals Invoices 1 $488.43 Vendor 16649 - JENSEN INSTRUMENT CO OF NO CAL INC 19074 Luther Pass Pump Station Paid by Check #100946 04/11/2018 03/07/2019 02/28/2019 03/07/2019 406.30 Vendor 16649 - JENSEN INSTRUMENT CO OF NO CAL INC Totals Invoices 1 $406.30 Vendor 48828 - LIZ KAUFFMAN 121818 Travel - Meetings - Education Paid by Check #100947 12/18/2018 03/07/2019 02/28/2019 03/07/2019 24.96 013119 Travel - Meetings - Education Paid by Check #100947 01/31/2019 03/07/2019 02/28/2019 03/07/2019 9.86 Vendor 48828 - LIZ KAUFFMAN Totals Invoices 2 $34.82 Vendor 48457 - KINECT ENERGY INC Run by Kim Garon on 02/28/2019 10:53:20 AM Page 5 of 10 Payment of Claims Payment Date Range 02/22/19 - 03/07/19 Report By Vendor - Invoice Summary Listing 55 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 288544 Advisory Paid by Check #100948 01/21/2019 03/07/2019 02/28/2019 03/07/2019 658.52 Vendor 48457 - KINECT ENERGY INC Totals Invoices 1 $658.52 Vendor 44209 - L A PERKS PLUMBING & HEAT INC 857481 Grounds & Maintenance Paid by Check #100949 10/31/2018 03/07/2019 02/28/2019 03/07/2019 531.30 Vendor 44209 - L A PERKS PLUMBING & HEAT INC Totals Invoices 1 $531.30 Vendor 48719 - LABWORKS LLC LW-1983 Service Contracts Paid by Check #100950 02/14/2019 03/07/2019 02/28/2019 03/07/2019 5,820.00 Vendor 48719 - LABWORKS LLC Totals Invoices 1 $5,820.00 Vendor 22550 - LIBERTY UTILITIES FEBRUARY2 ELECTRICITY Paid by Check #100951 02/25/2019 03/07/2019 02/28/2019 03/07/2019 88,903.54 Vendor 22550 - LIBERTY UTILITIES Totals Invoices 1 $88,903.54 Vendor 17600 - LILLY'S TIRE SERVICE INC 72508 Automotive Paid by Check #100952 02/11/2019 03/07/2019 02/28/2019 03/07/2019 32.50 72514 Automotive Paid by Check #100952 02/14/2019 03/07/2019 02/28/2019 03/07/2019 1,440.05 72516 Automotive Paid by Check #100952 02/14/2019 03/07/2019 02/28/2019 03/07/2019 1,389.99 72530 Automotive Paid by Check #100952 02/22/2019 03/07/2019 02/28/2019 03/07/2019 869.41 Vendor 17600 - LILLY'S TIRE SERVICE INC Totals Invoices 4 $3,731.95 Vendor 49076 - BUCK McLELLAND 031219 Travel - Meetings - Education Paid by Check #100953 03/12/2019 03/07/2019 03/07/2019 03/07/2019 111.00 Vendor 49076 - BUCK McLELLAND Totals Invoices 1 $111.00 Vendor 18600 - MOTION INDUSTRIES INC NV25-607094 Pump Stations Paid by Check #100954 02/15/2019 03/07/2019 02/28/2019 03/07/2019 167.08 Vendor 18600 - MOTION INDUSTRIES INC Totals Invoices 1 $167.08 Vendor 43123 - MSC INDUSTRIAL SUPPLY CO 53380760 Pump Stations Paid by Check #100955 01/22/2019 03/07/2019 02/28/2019 03/07/2019 96.35 58349390 Pump Stations Paid by Check #100955 02/05/2019 03/07/2019 02/28/2019 03/07/2019 206.97 59395600 Pump Stations Paid by Check #100955 02/08/2019 03/07/2019 02/28/2019 03/07/2019 3,924.18 Vendor 43123 - MSC INDUSTRIAL SUPPLY CO Totals Invoices 3 $4,227.50 Vendor 43796 - NORTHWEST HYD CONSULT INC 23484 Tallac Creek Sewer Crossing Paid by Check #100956 02/13/2019 03/07/2019 02/28/2019 03/07/2019 1,112.64 Vendor 43796 - NORTHWEST HYD CONSULT INC Totals Invoices 1 $1,112.64 Vendor 44607 - OLIN CORPORATION 2646124 Hypochlorite Paid by Check #100957 02/22/2019 03/07/2019 02/28/2019 03/07/2019 3,886.29 Vendor 44607 - OLIN CORPORATION Totals Invoices 1 $3,886.29 Vendor 20450 - PDM STEEL Run by Kim Garon on 02/28/2019 10:53:20 AM Page 6 of 10 Payment of Claims Payment Date Range 02/22/19 - 03/07/19 Report By Vendor - Invoice Summary Listing 56 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 370296-01 Pipe - Covers & Manholes Paid by Check #100958 02/12/2019 03/07/2019 02/28/2019 03/07/2019 1,262.29 370301-01 Pipe - Covers & Manholes Paid by Check #100958 02/12/2019 03/07/2019 02/28/2019 03/07/2019 1,370.54 Vendor 20450 - PDM STEEL Totals Invoices 2 $2,632.83 Vendor 47903 - PRAXAIR 174 87085858 Shop Supplies Paid by Check #100959 01/12/2019 03/07/2019 02/28/2019 03/07/2019 284.67 87754385 Shop Supplies Paid by Check #100959 02/21/2019 03/07/2019 02/28/2019 03/07/2019 181.47 87788027 Shop Supplies Paid by Check #100959 02/21/2019 03/07/2019 02/28/2019 03/07/2019 130.78 Vendor 47903 - PRAXAIR 174 Totals Invoices 3 $596.92 Vendor 48144 - RELIANCE STANDARD FEB19A Life Insurance Union/LTD/Board Payable Paid by Check #100960 02/01/2019 03/07/2019 02/28/2019 03/07/2019 3,280.55 FEB19B Long Term Disability/Life Ins Management Payable Paid by Check #100960 02/01/2019 03/07/2019 02/28/2019 03/07/2019 2,039.70 Vendor 48144 - RELIANCE STANDARD Totals Invoices 2 $5,320.25 Vendor 48727 - RESERVE ACCOUNT FEB 2019 Postage prepaid Paid by Check #100961 02/14/2019 03/07/2019 02/28/2019 03/07/2019 1,000.00 Vendor 48727 - RESERVE ACCOUNT Totals Invoices 1 $1,000.00 Vendor 48055 - SAGE Engineers Inc 00018-111.00-3 Contractual Services Paid by Check #100962 02/11/2019 03/07/2019 02/28/2019 03/07/2019 10,361.25 Vendor 48055 - SAGE Engineers Inc Totals Invoices 1 $10,361.25 Vendor 48825 - PAUL SCHLANGE 031219 Travel - Meetings - Education Paid by Check #100963 03/12/2019 03/07/2019 03/07/2019 03/07/2019 49.00 Vendor 48825 - PAUL SCHLANGE Totals Invoices 1 $49.00 Vendor 48911 - JOHN SHERIDAN CWEA2019 Dues - Memberships - Certification Paid by Check #100964 02/12/2019 03/07/2019 02/28/2019 03/07/2019 92.00 Vendor 48911 - JOHN SHERIDAN Totals Invoices 1 $92.00 Vendor 24150 - SIERRA NEVADA MEDIA GROUP 0000154872 Public Relations Expense Paid by Check #100965 01/31/2019 03/07/2019 02/28/2019 03/07/2019 672.07 Vendor 24150 - SIERRA NEVADA MEDIA GROUP Totals Invoices 1 $672.07 Vendor 22620 - SIERRA SPRINGS 021619 Supplies Paid by Check #100966 02/16/2019 03/07/2019 02/28/2019 03/07/2019 40.22 Vendor 22620 - SIERRA SPRINGS Totals Invoices 1 $40.22 Vendor 48944 - CHRIS SKELLY 022219 Travel - Meetings - Education Paid by Check #100967 02/22/2019 03/07/2019 02/28/2019 03/07/2019 49.00 Vendor 48944 - CHRIS SKELLY Totals Invoices 1 $49.00 Run by Kim Garon on 02/28/2019 10:53:20 AM Page 7 of 10 Payment of Claims Payment Date Range 02/22/19 - 03/07/19 Report By Vendor - Invoice Summary Listing 57 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 49004 - GREG SMITH 031219 Travel - Meetings - Education Paid by Check #100968 03/12/2019 03/07/2019 03/07/2019 03/07/2019 111.00 Vendor 49004 - GREG SMITH Totals Invoices 1 $111.00 Vendor 45168 - SOUTHWEST GAS FEBRUARY2 NATURAL GAS Paid by Check #100969 02/19/2019 03/07/2019 02/28/2019 03/07/2019 497.03 Vendor 45168 - SOUTHWEST GAS Totals Invoices 1 $497.03 Vendor 48617 - STEEL-TOE-SHOES.COM STP013119 Safety Equipment - Physicals Paid by Check #100970 01/31/2019 03/07/2019 02/28/2019 03/07/2019 213.33 STP021419 Safety Equipment - Physicals Paid by Check #100970 02/14/2019 03/07/2019 02/28/2019 03/07/2019 213.33 Vendor 48617 - STEEL-TOE-SHOES.COM Totals Invoices 2 $426.66 Vendor 49073 - STICKER MULE R651046467 Safety Programs Paid by Check #100971 02/22/2019 03/07/2019 02/28/2019 03/07/2019 111.00 Vendor 49073 - STICKER MULE Totals Invoices 1 $111.00 Vendor 24100 - TAHOE BLUEPRINT 44363 Heavenly Tank Rehabilitation Paid by Check #100972 02/14/2019 03/07/2019 02/28/2019 03/07/2019 29.26 Vendor 24100 - TAHOE BLUEPRINT Totals Invoices 1 $29.26 Vendor 45148 - TAHOE EARTH DAY FOUNDATION 2019 Public Relations Expense Paid by Check #100973 02/01/2019 03/07/2019 02/28/2019 03/07/2019 1,500.00 Vendor 45148 - TAHOE EARTH DAY FOUNDATION Totals Invoices 1 $1,500.00 Vendor 22450 - THATCHER COMPANY INC 5046259 Hypochlorite Paid by Check #100974 02/21/2019 03/07/2019 02/28/2019 03/07/2019 900.88 Vendor 22450 - THATCHER COMPANY INC Totals Invoices 1 $900.88 Vendor 47973 - U S BANK CORPORATE ARCE119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 934.52 ASCHENBACK119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 2,413.84 BARTLETTB119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 27.86 BARTLETTC119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 17.46 BAUGH119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 873.28 BERGSOHN119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 115.00 BLEDSOE119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 222.08 CASWELL119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 73.24 CEFALU119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 3,291.00 COLTULLA119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 769.52 COOLIDGE119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 104.00 CULLEN119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 44.01 GUTTRY119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 1,930.11 HENDERSON119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 767.88 Run by Kim Garon on 02/28/2019 10:53:20 AM Page 8 of 10 Payment of Claims Payment Date Range 02/22/19 - 03/07/19 Report By Vendor - Invoice Summary Listing 58 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount HILTON119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 875.50 HUGHES119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 390.24 HUSSMANN119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 2,415.27 JONES119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 695.00 KOSCIOLEK119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 70.25 NOLAN119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 67.86 NUROCK119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 99.00 RUTHERDALE119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 584.25 RYAN119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 212.57 SCHLANGE119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 205.00 SCHRAUBEN119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 729.85 SKELLY119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 384.61 STANLEY119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 69.81 THIEL119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 85.62 THOMSEN119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 245.00 VANGORDEN119 Jan 19 Stmt Paid by Check #100975 01/22/2019 02/21/2019 02/21/2019 03/07/2019 885.50 Vendor 47973 - U S BANK CORPORATE Totals Invoices 30 $19,599.13 Vendor 43718 - USA BLUE BOOK 816567 Pump Stations Paid by Check #100976 02/19/2019 03/07/2019 02/28/2019 03/07/2019 158.23 Vendor 43718 - USA BLUE BOOK Totals Invoices 1 $158.23 Vendor 49074 - USA NORTH 811 1701002019DIG Contractual Services Paid by Check #100977 02/13/2019 03/07/2019 02/28/2019 03/07/2019 1,815.60 Vendor 49074 - USA NORTH 811 Totals Invoices 1 $1,815.60 Vendor 48586 - VINCIGUERRA CONSTRUCTION 18-07 Meters Phase 4 Paid by Check #100978 03/07/2019 03/07/2019 02/28/2019 03/07/2019 144,469.24 18-07R Accrued Construction Retainage Paid by Check #100978 03/07/2019 03/07/2019 02/28/2019 03/07/2019 183,660.35 Vendor 48586 - VINCIGUERRA CONSTRUCTION Totals Invoices 2 $328,129.59 Vendor 25700 - WEDCO INC 532951 Lighting Supply Parts Paid by Check #100979 02/08/2019 03/07/2019 02/28/2019 03/07/2019 74.97 533245 Pump Stations Paid by Check #100979 02/11/2019 03/07/2019 02/28/2019 03/07/2019 55.92 533246 Pump Stations Paid by Check #100979 02/11/2019 03/07/2019 02/28/2019 03/07/2019 17.58 533618 Pump Stations Paid by Check #100979 02/13/2019 03/07/2019 02/28/2019 03/07/2019 365.09 534362 Small Tools Paid by Check #100979 02/19/2019 03/07/2019 02/28/2019 03/07/2019 27.37 534363 Buildings Paid by Check #100979 02/19/2019 03/07/2019 02/28/2019 03/07/2019 59.85 534364 Buildings Paid by Check #100979 02/19/2019 03/07/2019 02/28/2019 03/07/2019 43.64 534863 Buildings Paid by Check #100979 02/21/2019 03/07/2019 02/28/2019 03/07/2019 64.57 534864 Pump Stations Paid by Check #100979 02/21/2019 03/07/2019 02/28/2019 03/07/2019 490.02 Vendor 25700 - WEDCO INC Totals Invoices 9 $1,199.01 Run by Kim Garon on 02/28/2019 10:53:20 AM Page 9 of 10 Payment of Claims Payment Date Range 02/22/19 - 03/07/19 Report By Vendor - Invoice Summary Listing 59 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 25850 - WESTERN NEVADA SUPPLY 37618701 Small Tools Paid by Check #100980 10/03/2018 03/07/2019 02/28/2019 03/07/2019 178.97 37634695 Pipe - Covers & Manholes Paid by Check #100980 10/15/2018 03/07/2019 02/28/2019 03/07/2019 27.96 17664718 Water Meters & Parts Paid by Check #100980 11/09/2018 03/07/2019 02/28/2019 03/07/2019 259.67 37684731 Pipe - Covers & Manholes Paid by Check #100980 12/31/2018 03/07/2019 02/28/2019 03/07/2019 2,313.87 37684743 Pipe - Covers & Manholes Paid by Check #100980 12/31/2018 03/07/2019 02/28/2019 03/07/2019 759.84 17732475 Water Meters & Parts Paid by Check #100980 02/04/2019 03/07/2019 02/28/2019 03/07/2019 1,131.33 17717328-1 Meters & Parts Inventory Paid by Check #100980 02/13/2019 03/07/2019 02/28/2019 03/07/2019 15,688.40 37715622 Primary Equipment Paid by Check #100980 02/13/2019 03/07/2019 02/28/2019 03/07/2019 437.11 37758741 Secondary Equipment Paid by Check #100980 02/14/2019 03/07/2019 02/28/2019 03/07/2019 97.23 17754626 Water Meters & Parts Paid by Check #100980 02/18/2019 03/07/2019 02/28/2019 03/07/2019 152.63 17721003 Pump Stations Paid by Check #100980 02/19/2019 03/07/2019 02/28/2019 03/07/2019 2,402.83 Vendor 25850 - WESTERN NEVADA SUPPLY Totals Invoices 11 $23,449.84 Vendor JON BLACK 14644 Utility Billing Suspense Paid by Check #100981 02/13/2019 03/07/2019 02/28/2019 03/07/2019 500.00 Vendor JON BLACK Totals Invoices 1 $500.00 Vendor DOUGLAS GAYNER 002144 Utility Billing Suspense Paid by Check #100982 02/25/2019 03/07/2019 02/28/2019 03/07/2019 135.19 Vendor DOUGLAS GAYNER Totals Invoices 1 $135.19 Grand Totals Invoices 188 $899,381.13 Run by Kim Garon on 02/28/2019 10:53:20 AM Page 10 of 10 Payment of Claims Payment Date Range 02/22/19 - 03/07/19 Report By Vendor - Invoice Summary Listing 60 BOARD AGENDA ITEM 13a TO: Board of Directors FROM: John Thiel, General Manager MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: Conference with Legal Counsel – Potential Initiation of Litigation REQUESTED BOARD ACTION: Direct Staff DISCUSSION: Pursuant to Government Code Section 54956.9(d)(4)/Conference with Legal Counsel regarding Potential Initiation of Litigation (one case). SCHEDULE: N/A COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: N/A ______________________________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 61 BOARD AGENDA ITEM 13b TO: Board of Directors FROM: John Thiel, General Manager MEETING DATE: March 7, 2019 ITEM – PROJECT NAME: Conference with Legal Counsel – Significant Exposure to Litigation REQUESTED BOARD ACTION: Direct Staff DISCUSSION: Pursuant to Government Code Section 54956.9(d)(2)/Conference with Legal Counsel regarding Significant Exposure to Litigation (One Case) SCHEDULE: N/A COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: N/A ______________________________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 62