Loading...
06-06-2019 SOUTH TAHOE PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING AGENDA Thursday, June 6, 2019 - 2:00 p.m. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Randy Vogelgesang, President BOARD MEMBERS Kelly Sheehan, Vice President Chris Cefalu, Director James R. Jones, Director Nick Exline, Director John Thiel, General Manager Shannon Cotulla, Assistant General Manager 1. CALL TO ORDER REGULAR MEETING – PLEDGE OF ALLEGIANCE (At this time, please silence phones and other electronic devices so as not to disrupt the business of the meeting.) 2. COMMENTS FROM THE AUDIENCE (This is an opportunity for members of the public to address the Board on any short non-agenda items that are within the subject matter jurisdiction of the District. No discussion or action can be taken on matters not listed on the agenda, per the Brown Act. Each member of the public who wishes to comment shall be allotted five minutes, and no more than three individuals shall address the same subject.) 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR (For purposes of the Brown Act, all Action and Consent items listed give a brief description of each item of business to be transacted or discussed. Recommendations of the staff, as shown, do not prevent the Board from taking other action.) 4. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered separately upon request. Comments and questions from members of the public, staff or Board can be taken when the comment does not necessitate separate action.) 5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION/ACTION 6. ITEMS FOR BOARD ACTION a. Keller-Heavenly Water System Improvements Project (Trevor Coolidge, Associate Engineer) Approve Gannett Fleming, Inc., Proposal for Keller Tanks Rockfall Mitigation design services for the Keller-Heavenly Water System Improvements Project in an amount not to exceed $56,040. b. Approve Payment of Claims (Debbie Henderson, Accounting Manager) Approve Payment of Claims in the amount of $2,426,389.17. 7. STANDING AND AD-HOC COMMITTEE REPORTS (Discussions may take place; however, no action will be taken.) 8. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken.) 9. EL DORADO COUNTY WATER AGENCY PURVEYOR REPORT REGULAR BOARD MEETING AGENDA – June 6, 2019 PAGE – 2 10. GENERAL MANAGER REPORT (Discussion may take place; however, no action will be taken.) a. Staffing Update b. Fire Protection and Response Planning c. California Tahoe Alliance 11. STAFF/ATTORNEY REPORTS (Discussions may take place; however, no action will be taken.) a. Email Security Update (Brian Bartlett, IT Network/Telecom Systems Administrator) b. Public Affairs Update (Shelly Thomsen, Public Affairs and Conservation Manager) c. Street Lights (Shelly Thomsen, Public Affairs and Conservation Manager) 12. NOTICE OF PAST AND FUTURE MEETINGS/EVENTS Past Meetings/Events 05/16/19 – 2:00 p.m. Regular Board Meeting at the District Future Meetings/Events 06/12/19 – El Dorado County Water Agency Meeting in Placerville 06/17/19 – 3:30 p.m. Operations Committee Meeting at the District 06/20/19 – 2:00 p.m. Regular Board Meeting at the District 13. ITEMS FOR CLOSED SESSION (The Board will adjourn to Closed Session to discuss items identified below. Closed Session is not open to the public; however, an opportunity will be provided at this time if members of the public would like to comment on any item listed – three minute limit.) a. Pursuant to Government Code Section 549.57(a)/Conference with Labor Negotiators re: Memorandum of Understanding with Stationary Engineers, Local 39. Present at this Closed Session will be Agency Negotiators: John Thiel/General Manager; Paul Hughes, Chief Financial Officer; Shannon Cotulla, Assistant General Manager; and Nancy A. Hussmann, Human Resources Director. b. Pursuant to Government Code Section 549.57(a)/Conference with Labor Negotiators re: Memorandum of Understanding with the Management Group. Present at this Closed Session will be Agency Negotiators: John Thiel/General Manager; Paul Hughes, Chief Financial Officer; Shannon Cotulla, Assistant General Manager; and Nancy A. Hussmann, Human Resources Director. ADJOURNMENT (The next Regular Board Meeting is Thursday, June 20, 2019, at 2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete Agenda packet is available for review at the meeting and at the District office during the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after Minutes of the meeting have been approved. Items on the Agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified, but may occur slightly later than the specified time. Public participation is encouraged. Public comments on items appearing on the Agenda will be taken at the same time the Agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Please provide the Clerk of the Board with a copy of all written materials presented at the meeting. Comments on items not on the Agenda can be heard during “Comments from the Audience;” however, action cannot be taken on items not on the Agenda. Backup materials relating to an open session item on this Agenda, which are not included with the Board packet, will be made available for public inspection at the same time they are distributed or made available to the Board, and can be viewed at the District office, at the Board meeting and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District’s public meetings. If particular accommodations are needed, please contact the Clerk of the Board at (530) 544-6474, extension 6203. All inquiries must be made at least 48 hours in advance of the meeting. REGULAR BOARD MEETING AGENDA – June 6, 2019 PAGE – 3 SOUTH TAHOE PUBLIC UTILITY DISTRICT CONSENT CALENDAR Thursday, June 6, 2019 ITEMS FOR CONSENT a. CUSTOM HAY HARVESTING AT DIAMOND VALLEY RANCH (Jim Hilton, Water Reuse Operations Manager) Approve the Custom Haying and Brokerage Agreement with Sanchez Ranch, LLC. b. SEWER ENTERPRISE 2019/20 APPROPRIATIONS SUBJECT TO LIMITATION (Debbie Henderson, Accounting Manager) Adopt Resolution No. 3111-19 setting the limitation on Appropriations for Fiscal Year 2019/20. c. SOUTH Y FATE AND TRANSPORT MODEL (Ivo Bergsohn, Hydrogeologist) Authorize staff to raise the cost ceiling for Task Order No. 4 by $1,800 and change the completion date to June 30, 2019, for groundwater modeling work performed for the South Y Feasibility Study. d. KELLER-HEAVENLY WATER SYSTEM IMPROVEMENTS PROJECT ADDITIONAL ENVIRONMENTAL WORK (Trevor Coolidge, Associate Engineer) Increase Task Order No. 10 to Sierra Ecotone Solutions an additional $6,860 to provide supplemental environmental evaluations as per State Water Resource Control Board Drinking Water State Revolving Loan Fund request. e. MARCH 31, 2019, FISCAL YEAR TO DATE FINANCIAL STATEMENTS (Paul Hughes, Chief Financial Officer) Receive and file the March 31, 2019, Income Statement and Balance Sheet Reports. f. FISCAL YEARS 2019, 2020 AND 2021 AUDIT SERVICES (Paul Hughes, Chief Financial Officer) Approve the Cost Proposal from Mann, Urrutia & Nelson to extend their Contract to provide audit services for Fiscal Years 2019, 2020 and 2021 in an amount not to exceed $54,500 per year. g. LIBERTY UTILITIES STREET LIGHTS (Tim Bledsoe, Manager of Customer Service) Direct staff to rescind the current Notice of Termination to Liberty Utilities for the District’s billing of street lights as of June 30, 2019, and provide a new Notice of Termination to December 31, 2019. h. REGULAR BOARD MEETING MINUTES: May 2, 2019, and May 16, 2019 (Melonie Guttry, Executive Services Manager/Clerk of the Board) Approve May 2, 2019, and May 16, 2019, Minutes SOUTH TAHOE PUBLIC UTILITY DISTRICT AGENDA ADDENDUM NO. 1 REGULAR BOARD MEETING Thursday, June 6, 2019 District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California Note: This item, posted June 3, 2019, met noticing requirements and is added to the Items for Action as Item 6c for consideration by the Board. 6. ACTION ITEM c. 2019 Heavenly Tank Improvements Project (Julie Ryan, Engineering Department Manager) Waive minor deviations in the Bid and award project to the lowest responsive, responsible bidder, Haen Constructors, in the amount of $968,255. South Tahoe Public Utility District § 1275 Meadow Crest Drive § South Lake Tahoe, CA 96150 Phone 530.544.6474 § Facsimile 530.541.0614 § www.stpud.us BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Jim Hilton, Water Reuse Operations Manager MEETING DATE: June 6, 2019 ITEM – PROJECT NAME: Custom Hay Harvesting at Diamond Valley Ranch REQUESTED BOARD ACTION: Approve the Custom Haying and Brokerage Agreement with Sanchez Ranch, LLC. DISCUSSION: On April 18, 2019, the Board of Directors (“Board”) authorized District staff to negotiate a five-year haying Agreement with Sanchez Ranch, LLC, (“Sanchez”) to cut, rake, bale, store and broker the District’s alfalfa hay for a term of five years. An Agreement has been negotiated with Sanchez that includes the terms in the Request for Proposals, the costs presented in Sanchez’ proposal, and other negotiated terms and conditions. District staff recommends that the Board approve the Custom Haying and Brokerage Agreement with Sanchez. SCHEDULE: June – October annually for 5 years REVENUE: Estimated income between $70,000 and $90,000 annually ACCOUNT NO: 1000-3540 BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: Custom Haying and Brokerage Agreement ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 1 19097890 1 CUSTOM HAYING AND BROKERAGE AGREEMENT This Custom Haying and Brokerage Agreement (“Agreement”) is made and entered into on June 6, 2019 by and between the South Tahoe Public Utility District (“District”), a California public agency formed in 1950 pursuant to the Public Utility District Act, and Sanchez Ranch, LLC, a Nevada limited liability company (“Sanchez”), at South Lake Tahoe, California, with reference to the following facts and intentions: A.The District is the owner of certain real property and improvements located in Alpine County, California, generally described as assessor parcel numbers 01-080-56, 01-080-60, 01-080-80, 01-080-81, 01-080-82, 01-200-01, 01-200-10, and 01-200-11 and more particularly described in the map attached as Exhibit A, which is incorporated by this reference (collectively “Property”); B.The District prepares fields, plants, irrigates and grows alfalfa hay (“Hay”) on 70 acres of the Property, which is described in the map attached as Exhibit B, which is incorporated by this reference (“Hay Fields”); C.Sanchez is experienced and knowledgeable in the business of custom haying operations and brokering hay to third parties; and, D.The District agrees to retain Sanchez to provide custom haying operations and brokerage services pursuant to the terms and conditions of this Agreement. NOW, THEREFORE, the parties agree as follows: 1.Hay Growing Operations. The District shall be responsible, at its sole cost and expense, for field preparation, planting, fertilizing, irrigation and growing of the Hay on the Hay Fields. Sanchez shall consult and advise the District, at its sole cost and expense, with respect to the District’s development of a plan for plant growth, fertilization, irrigation and harvesting scheduling/timing of the Hay (“Hay Plan”). Sanchez shall consult with the District on implementation of the Hay Plan on at least a weekly basis and more often if needed. 2.Hay Harvesting Operations. 2.1. Responsibilities. Sanchez shall be responsible for determining the timing and scheduling for harvesting the Hay for each cutting. It is anticipated that there will be at least three (3) cuttings of the Hay per season. For each cutting of Hay, Sanchez shall be responsible for the entire hay harvesting operation including, but not limited to, cutting, raking, and baling in order to maximize the value of the Hay. Immediately after the Hay is baled, Sanchez shall notify the District of the number of bales harvested from each field. If the Hay is not pre-sold to a buyer directly from the Hay Fields, Sanchez shall pick-up, transport and store the Hay as provided below. 2.2. Hay Harvesting. The harvesting of the Hay for each cutting shall be performed in the most reasonably efficient manner possible, and in accordance with industry standards and practices, to enable the District to begin irrigation of the Hay as quickly as possible for the next Hay cutting in order to maximize the generation of revenue. The Hay shall be baled in approximately one hundred-pound (100 lb.) bales unless otherwise agreed by the parties. Sanchez shall consult with the District and provide an estimated time period for Hay cutting based on plant growth, fertilization needs, irrigation effectiveness, and availability of resources. Based on weather forecasts and field readiness, Sanchez shall provide the District with three (3) days’ verbal notice of the date of Hay cutting to allow the District to inspect Sanchez’ equipment prior to use on the Hay Fields. After each cutting, baling and stacking of the Hay, Sanchez shall provide the District with a post-cutting report evaluating the Hay tonnage, quality, test results and other issues that should be addressed to improve the quantity, quality and value of the Hay. Sanchez and the District shall then mutually agree upon a corrective action plan to address any such issues which shall be incorporated into the Hay Plan. 2 19097890 2 2.3. Equipment and Personnel. Sanchez shall employ personnel who are experienced in the hay harvesting operations to perform the services required pursuant to this Agreement. Sanchez shall maintain its equipment in good condition and repair in order to prevent delays or disruptions in harvesting operations. In the event of equipment breakdowns, Sanchez shall have skilled mechanics available to immediately make the necessary repairs or have other redundant equipment available. 2.4. Hay Storage. In the event that the Hay is not pre-sold prior to baling so it can be delivered from the Hay Fields directly to a buyer, Sanchez shall transport the Hay to a covered hay storage barn located at 100 Burke Dr., Wellington, Nevada, or at a location designated by Sanchez. Until the stored Hay is sold, Sanchez shall store the Hay in a manner to maintain it in good quality and condition. The Hay shall be segregated from other hay stored in Sanchez’ hay storage barn in order to maintain an accurate inventory of the Hay. 3. Access. Sanchez shall access the Hay Fields utilizing existing roads on the Property as instructed by the District. Access by Sanchez shall only be for the purpose of performing its obligations pursuant to this Agreement. Sanchez shall provide the District with at least three (3) days’ prior written notice of accessing the Property and the Hay Fields. The District shall have the right, but not the obligation, to be present at any time that Sanchez accesses the Property or the Hay Fields. 4. Marketing of the Hay. Sanchez shall use its best efforts to market the Hay to its network of hay brokers and private parties in California and Nevada in order to obtain the highest price for the Hay. Sanchez shall consult with the District to determine marketing strategy, product offering, buyer selection, terms for sales to buyers, pricing, and all other matters relating to marketing and sale in order to maximize the sale of the Hay at the highest price. Sanchez shall provide the District with written notice of the quantity and price after selling all or any portion of the Hay. The District acknowledges that nothing in this Agreement constitutes a guarantee of any specific price for the Hay. 5.Sale of the Hay. Sanchez shall sell the Hay “as is” and “where as” and expressly disclaim any and all warranties. The District and Sanchez shall agree upon the form of the agreement for the sale of the Hay. Transportation of the Hay, whether from the Hay Fields or Sanchez’ hay storage barn, to a buyer shall be the responsibility of Sanchez. The buyer(s) of the Hay shall either pre-pay Sanchez or pay Sanchez upon delivery of the Hay to the buyer(s) location. Sanchez shall pay the District the net price for the Hay no later than thirty (30) days after delivery of the Hay to a buyer. Net price means: (i) the price a buyer agrees to pay Sanchez for the Hay, less Three Dollars and Forty-Nine cents ($3.49) per bale of the Hay and a brokerage fee of twenty-five percent (25%) of the price of the Hay; and, (ii) in addition, if the Hay is required to be transported to Sanchez’ hay storage barn, Ten Dollars ($10.00) for each squeeze (approximately 66 bales of the Hay) and 45 cents (.45¢) per bale of the Hay for transportation. Sanchez shall provide the District, with each payment of the net price, a written report showing the computation of such net price along with a copy of the sales invoice to each buyer. 6.Title and Risk of Loss. The District shall have full legal and beneficial title to the Hay until it is delivered to and accepted by a buyer. The District shall bear the full risk of loss of the Hay during the planting and growing. After the Hay is cut, Sanchez shall bear the full risk of loss of the Hay until delivered and accepted by a buyer(s). 7.Term. The term of this Agreement (“Term”) shall commence on the Effective Date and continue until December 31, 2024 (“Termination Date”), unless terminated earlier pursuant to the provisions of this Agreement. 8.Compliance of Law. Sanchez shall, at Sanchez’ sole cost and expense, comply with all applicable local, state and federal statutes, ordinances, rules, regulations, orders and requirements in effect that relate to the performance of this Agreement. 9. Sanchez’s Conduct. The District shall have the right to require Sanchez, its employees, contractors, consultants, vendors and agents, whom the District determines to be acting in a careless, unsafe, discourteous, or otherwise objectionable manner to immediately vacate the Property. The District 3 19097890 3 may require that Sanchez permanently restrict such persons if such conduct persists on more than two (2) occasions. 10. Taxes/Insurance/Licenses. Sanchez shall be solely responsible for the payment of any federal, state or local income tax, social security tax, worker's compensation insurance, state disability insurance and any other taxes or insurance which Sanchez is responsible for paying as an independent contractor under federal, state or local law. Sanchez shall procure and maintain all licenses necessary for the performance of services hereunder, including, without limitation, business licensing, all at the sole cost of Sanchez. 11. Indemnity and Liability. 11.1 Indemnification. a. Sanchez. To the fullest extent permitted by law, Sanchez shall defend, indemnify and hold harmless the District, its elected officials, officers, employees, agents and contractors, from and against any and all claims, damages, losses, liabilities and expenses, including attorneys’ fees, paralegal and legal fees and costs, which arise out of, relate to or result from, Sanchez’ acts or omissions in performance of this Agreement, except as caused by the District’s sole negligence or willful misconduct.In the event any action or proceeding is brought against the District, Sanchez, upon notice from the District, shall defend the same at Sanchez’ sole cost and expense by legal counsel approved by the District. b. District. To the fullest extent permitted by law, the District shall defend, indemnify and hold harmless Sanchez, its officers, employees, agents and contractors, from and against any and all claims, damages, losses, liabilities and expenses, including attorneys’ fees, paralegal and legal fees and costs, which arise out of, relate to or result from, the District’s acts or omissions in performance of this Agreement, except as caused by Sanchez’ sole negligence or willful misconduct. In the event any action or proceeding is brought against Sanchez, the District, upon notice from Sanchez, shall defend the same at the District’s sole cost and expense by legal counsel approved by Sanchez. 11.2 Exemption From Liability. The District shall not be liable for injury to Sanchez’ business or any loss of income or for damage to the property of Sanchez, Sanchez’ employees, invitees, customers or any other person in or about the Property and the Hay Field nor shall the District be liable for injury to Sanchez, Sanchez’ employees, agents or contractors, whether such damage or injury is caused by or results from fire, explosion, electricity, gas, water, rain, or from any other cause, whether such damage or injury results from conditions arising upon the Hay Field or the Property, or from other sources or places, and regardless of whether the cause of such damage or injury or the means of repairing the same is inaccessible. 12. Insurance. 12.1 Commercial General Liability Insurance. Sanchez shall, at its sole cost and expense, maintain in effect at all times during the Term, commercial general liability insurance which shall include, but shall not be limited to, protection against claims arising from death, bodily or personal injury or damage to property resulting from actions, failures to act, operations or equipment of the insured, or by its employees, agents, consultants or by anyone directly or indirectly employed by the insured. The amount of insurance should not be less than Two Million Dollars ($2,000,000) combined single limit per occurrence coverage applying to bodily and personal injury and property damage. 12.2 Automobile Liability Insurance. Sanchez shall, at its sole cost and expense, maintain in effect at all times during the Term, automobile liability insurance which shall include, but shall not be limited to, protection against claims arising from death, bodily or personal injury, or damage to property resulting from actions, failures to act, operations or equipment of the insured, or by its employees, agents, consultants, or by anyone directly or indirectly employed by the insured. The amount of insurance should not be less than Two Million Dollars ($2,000,000) combined single limit per accident coverage applying to bodily and personal injury and property damage. Coverage shall insure all owned, nonowned and hired automobiles. 4 19097890 4 12.3 Endorsements. The commercial general liability and automobile liability insurance coverages required by this Agreement shall include the following provisions and endorsements: a. The South Tahoe Public Utility District and its elected officials, officers and employees will be a named or an additional insured in regard to liability; b. Written notice shall be given to the District at least thirty (30) days prior to termination, suspension, voiding, cancellation or reduction of coverage in the policy, except that if cancellation is for nonpayment of premiums, written notice shall be given to the District at least ten (10) calendar days prior to cancellation; c. The insurance shall be primary as with respect to the interest of the named and/or additional insureds, any other insurance maintained by the named and/or additional insureds is excess and not contributing insurance; d. The insurance, subject to all of its other terms and conditions, applies to the liability assumed by Sanchez under this Agreement; e. Cross liability and severability of interest; and f. The insurer shall waive and transfer all rights of recovery (subrogation) it may have against the name and/or additional insureds for claims and/or losses. 12.4 Farm Owner’s Insurance. Sanchez shall, at its sole cost and expense, maintain in effect at all times during the Term, farmer owner’s insurance, or equivalent insurance coverage, endorsed with a farm property coverage form to insure the full value of the Hay after it is cut, whether stored in the Hay Fields or in Sanchez’ hay storage barn. 12.5 Workers’ Compensation and Employer’s Liability Insurance. Sanchez shall, at its sole cost and expense, maintain in effect at all times during the Term, workers’ compensation insurance, all of its employees employed directly by them or through sub-contractors in accordance with statutory requirements. Sanchez shall provide employer’s liability insurance with limits of not less than One Million Dollars ($1,000,000) each accident, One Million Dollars ($1,000,000) policy limit, and One Million Dollars ($1,000,000) each employee. The workers’ compensation insurance policy shall contain, or be endorsed to contain, a provision that the insurer waives any and all transfer rights of recovery (subrogation) it may have against the additional insureds. 12.6 General Insurance Requirements. Sanchez shall not be entitled to perform any activities pursuant to this Agreement until all required insurance has been obtained, required submittals delivered to the District and the submittals reviewed and approved by the District for general conformance with this Agreement. The procurement and maintenance of the insurance required by this section is a material element of this Agreement and failure to timely procure and/or maintain such insurance shall be a material breach of this Agreement. Sanchez shall deliver the following to the District: a. A copy of each insurance policy that provides insurance required by this section (and additional copies as requested by the District in writing). Each policy copy shall be certified by placing a statement on the policy(ies) stating that “this copy of the policy is certified to be true, correct and complete” and signed by an authorized representative of the insurer. The copy of each policy shall include each and every cover page, declaration page, form, schedule, endorsement, etc., that is a part of the policy; b. Certificate(s) of Insurance, issued in duplicate, covering all policies. Such certificates shall make explicit reference to each of the provisions and endorsements required in this section, and shall be signed on behalf of the insurer by an authorized representative; 5 19097890 5 c. Original endorsements for each policy of insurance required by this section and signed on behalf of the insurer by an authorized representative; d. All insurance required by this section shall be placed with insurance companies authorized to transact business in the State of California for the types or insurance required by the contract. Each insurance company shall have a current A. M. Best Insurance Guide rating of not less than A-/VII unless prior written approval is secured from the District as to the use of such insurer; e. The requirements as to the types, limits, deductibles and the District's review and/or approval of insurance coverages to be maintained by Sanchez are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by Sanchez under this Agreement. Further, the District's review and approval of any section, unless specifically stated in writing and signed by the District, shall not release or relieve Sanchez or its subcontractors from complying with the requirements of this section; f. Any policy of insurance required by this section shall be an “occurrence” policy; g. In the event Sanchez changes any insurance company(ies) providing the insurance coverage required by this section, Sanchez shall timely resubmit to the District for review and approval, the insurance documents required by this section for each new insurance company providing insurance coverage. Sanchez shall submit such documents at least thirty (30) days prior to the change in any required insurance to enable the District to timely review and approve the insurance coverages provided by such new insurance company(ies); and h. Insurance policies providing coverage which contains self-insured retention shall not be acceptable except with the prior written approval of the District regardless of the amount of the self-insured retention. 13. Default. 13.1 Definition of Default. The occurrence of one or more of the following events shall constitute a material default and breach of this Agreement by Sanchez: a. Payment Default. Failure by Sanchez to make, when due, any payment payable by Sanchez where such failure has continued for a period of ten (10) days after written notice from the District to Sanchez; provided, however, that any such notice shall be in lieu of, and not in addition to, any notice required under section 1161 of the Code of Civil Procedure of California; b. Breach of Contract. Failure by Sanchez to observe or perform any of the expressed or implied nonmonetary covenants, promises, agreements or provisions of this Agreement to be observed or performed, where such failure has continued for a period of thirty (30) days after written notice from the District to Sanchez specifying the particulars of such failure; provided, however, that such notice shall be in lieu of and not in addition to any notice required under section 1161 of the Code of Civil Procedure;and c. Bankruptcy and Insolvency. The making by Sanchez of any general assignment or general arrangement for the benefit of creditors; the filing by or against Sanchez of a petition to have Sanchez judged bankrupt or a petition for reorganization or arrangements under any law relating to bankruptcy (unless, in the case of a petition filed against Sanchez, the same is dismissed within sixty (60) days; the appointment of a trustee or receiver to take possession of substantially all of Sanchez’ assets, where possession is not restored to Sanchez within thirty (30) days; or the attachment, execution or other judicial procedure substantially all of Sanchez’ assets, where such procedure is not discharged within thirty (30) days. 13.2 Remedies Upon Default. Upon a default, the District may at its option (but without obligation to do so), perform Sanchez’ duty or obligation. The costs and expenses of any such performance by the District shall be due and payable by Sanchez upon submittal of an invoice. In the 6 19097890 6 event of a default by Sanchez with respect to a material provision of this Agreement, without limiting the District in the exercise of any right or remedy which the District may have by reason of such default, the District may terminate the Agreement and/or pursue any remedy now or hereafter available to the District under the Laws or judicial decisions of the state in which the Property is located; provided, however, the Parties shall use reasonable efforts to mitigate its damages in connection with a default by the other Party. If the District performs any of Sanchez’ obligations, the full amount of the reasonable and actual cost and expense incurred shall immediately be due and payable, and Sanchez shall pay the District upon demand the full undisputed amount thereof with interest thereon from the date of payment at the greater of: (i) ten percent (10%) per annum, or (ii) the highest rate permitted by applicable laws. 14. General Provisions. 14.1 Recitals. The recitals stated at the beginning of this Agreement of any matters or facts shall be conclusive proof of the truthfulness thereof and the terms and conditions of the recitals, if any, shall be deemed a part of this Agreement. 14.2 Notices. All notices, approvals, acceptances, requests, demands and other communications required or permitted, to be effective, shall be in writing and shall be delivered, either in person or by mailing the same by United States mail (postage prepaid, registered or certified, return receipt requested) or by Federal Express or other similar overnight delivery service, to the party to whom the notice is directed at the address of such party as follows: To: District South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Attn: General Manager With a copy to: Gary M. Kvistad, Esq. Brownstein Hyatt Farber Schreck, LLP 1021 Anacapa Street, 2nd Floor Santa Barbara, CA 93101 To: Sanchez Jon G. Sanchez, Managing Member 142 Lower Colony Road Wellington, NV 894444 With a copy to: Rick R. Hsu, Esq. Maupin, Cox & LeGoy 4785 Caughlin Parkway Reno, NV 89519 Any communication given by mail shall be deemed delivered two (2) business days after such mailing date, and any written communication given by overnight delivery service shall be deemed delivered one (1) business day after the dispatch date. Either party may change its address by giving the other party written notice of its new address. 14.3 Successors and Assigns. This Agreement shall be binding on and shall inure to the benefit of the parties and their respective heirs, successors and assigns. Nothing in this Agreement, express or implied, is intended to confer on any person other than the parties or their respective heirs, successors and assigns, any rights, remedies, obligations or liabilities under or by reason of this Agreement. 14.4 Assignability. Sanchez shall not assign this Agreement, or any rights to it, or any right or privilege appurtenant to the Agreement or permit or transfer interest therein without first obtaining the written consent of the District, which may be withheld by the District in its sole and absolute discretion. Any assignment without the District’s consent shall be void and shall, at the District’s option, terminate 7 19097890 7 this Agreement. No interest of Sanchez in this Agreement shall be assignable by operation law without the District’s prior written consent. 14.5 Waiver. No waiver by any party of any of the provisions shall be effective unless explicitly stated in writing and executed by the party so waiving. Except as provided in the preceding sentence, no action taken pursuant to this Agreement, including, without limitation, any investigation by or on behalf of any party, shall be deemed to constitute a waiver by the party taking such action of compliance with any representations, warranties, covenants, or agreements contained in this Agreement, and in any documents delivered or to be delivered pursuant to this Agreement. The waiver by any party of a breach of any provision of this Agreement shall not operate or be construed as a waiver of any subsequent breach. No waiver of any of the provisions of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any waiver constitute a continuing waiver. 14.6 Severability. If any term, provision, covenant or condition of this Agreement shall be or become illegal, null, void or against public policy, or shall be held by any court of competent jurisdiction to be illegal, null, void or against policy, the remaining provisions of this Agreement shall remain in full force and effect, and shall not be affected, impaired or invalidated. The term, provision, covenant or condition that is so invalidated, voided or held to be unenforceable, shall be modified or changed by the parties to the extent possible to carry out the intentions and directives set forth in this Agreement. 14.7 Counterparts. This Agreement may be executed in any number of counterparts, each of which shall be deemed to be an original, but all of which shall constitute one and the same instrument. 14.8 Governing Law. This Agreement shall be governed by, and interpreted in accordance with, the laws of the State of California to the extent California law is applicable to the United States, with venue proper only in the County of El Dorado, State of California. 14.9 Attorney Fees. If any legal proceeding (lawsuit, arbitration, etc.), including an action for declaratory relief, is brought to enforce or interpret the provisions of this Agreement, the prevailing party shall be entitled to recover actual attorneys' fees and costs, which may be determined by the court in the same action or in a separate action brought for that purpose. The attorneys' fees award shall be made as to fully reimburse for all attorneys' fees, paralegal fees, costs and expenses actually incurred in good faith, regardless of the size of the judgment, it being the intention of the parties to fully compensate for all attorneys' fees, paralegal fees, costs and expenses paid or incurred in good faith. 14.10 Good Faith. The parties agree to exercise their best efforts and utmost good faith to effectuate all the terms and conditions of this Agreement and to execute such further instruments and documents as are necessary or appropriate to effectuate all of the terms and conditions of this Agreement. 14.11 Construction. The provisions of this Agreement should be liberally construed to effectuate its purposes. The language of all parts of this Agreement shall be construed simply according to its plain meaning and shall not be construed for or against either party, as each party had the opportunity to have their counsel review it. Whenever the context and construction so requires, all words used in the singular shall be deemed to be used in the plural, all masculine shall include the feminine and neuter, and vice versa. 14.12 Several Obligations. Except where specifically stated in this Agreement to be otherwise, the duties, obligations, and liabilities of the parties are intended to be several and not joint or collective. Nothing contained in this Agreement shall be construed to create an association, trust, partnership, or joint venture or impose a trust or partnership duty, obligation, or liability on or with regard to either party. Each party shall be individually and severally liable for its own obligations under this Agreement. 14.13 Authority. The individuals executing this Agreement represent and warrant that they have the authority to enter into this Agreement and to perform all acts required by this Agreement, and that the consent, approval or execution of or by any third party is not required to legally bind either party to the terms and conditions of this Agreement. 8 19097890 8 14.14 Entire Agreement. This Agreement contains the entire understanding and agreement of the parties, and supersedes all prior agreements and understandings, oral and written, between the parties. There have been no binding promises, representations, agreements, warranties or undertakings by any of the parties, either oral or written, of any character or nature, except as stated in this Agreement. This Agreement may be altered, amended or modified only by an instrument in writing, executed by the parties to this Agreement and by no other means. Each party waives its future right to claim, contest or assert that this Agreement was modified, canceled, superseded or changed by any oral agreement, course of conduct, waiver or estoppel. IN WITNESS WHEREOF, the parties have executed this Agreement on the day and year and at the place first written above. DISTRICT SANCHEZ South Tahoe Public Utility District Sanchez Ranch, LLC By: By: Randy Vogelgesang, Board President Jon G. Sanchez, Managing Member ATTEST: By: Melonie Guttry, Clerk of the Board/ Executive Services Manager 9 BOARD AGENDA ITEM 4b TO: Board of Directors FROM: Debbie Henderson, Accounting Manager MEETING DATE: June 6, 2019 ITEM – PROJECT NAME: Sewer Enterprise 2019/20 Appropriations Subject to Limitation REQUESTED BOARD ACTION: Adopt Resolution No. 3111-19 setting the limitation on Appropriations for Fiscal Year 2019/20. DISCUSSION: This is the District’s annual Resolution called for by Constitutional Amendment XIIIB. The limitation on Appropriations for Fiscal Year 2019/20 is $79,986,199. The Sewer Enterprise fund budget for Fiscal Year 2019/20 appropriates $36,064,877. As such, the District is $43,921,322 below the state mandated spending limit. SCHEDULE: Adopt Resolution No. 3111-19 June 6, 2019 COSTS: $0 ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: Resolution No. 3111-19 and a Calculation of the Permitted Appropriation Growth Rate ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 RESOLUTION NO. 3111-19 A RESOLUTION BY THE BOARD OF DIRECTORS OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT ADOPTING THE SEWER ENTERPRISE FUND APPROPRIATIONS SUBJECT TO LIMITATION AND PROCEEDS OF TAXES FOR FISCAL YEAR 2019/20 WHEREAS, the people of the State of California have elected to approve Constitutional Amendment XIIIB, and the Legislature of the State of California has voted to adopt Senate Bill No. 1352, which implements Constitutional Amendment XIIIB, setting the method of computing annual appropriations subject to limitation of local non- residential construction and population; and, WHEREAS, the Directors selected the change in per capital personal income; and, WHEREAS, such legislation sets the base year for this computation as Fiscal Year 1978/79; and, WHEREAS, such legislation required documentation setting such appropriation limitations shall be available to the public fifteen days prior to the adoption of this Resolution; and, WHEREAS, on May 16, 2019, such documentation was made public: NOW, THEREFORE, BE IT RESOLVED, that the Board of Directors of the South Tahoe Public Utility District does find and declare that the appropriations subject to limitation for Fiscal Year 2019/20 are $36,064,877; and that for Fiscal Year 2019/20, the proceeds of taxes as defined in the enabling statutes are: $8,860,000; and that the increase in proceeds of taxes over the appropriations subject to limitations is: $-0. 11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 WE, THE UNDERSIGNED, do hereby certify that the above and foregoing Resolution No. 3111-19 was duly and regularly adopted and passed by the Board of Directors of the South Tahoe Public Utility District at a regular meeting held on the 6th day of June, 2019, by the following vote: AYES: NOES: ABSENT: _____________________________________ Randy Vogelgesang, Board President South Tahoe Public Utility District ATTEST: ____________________________ Melonie Guttry, Clerk of the Board South Tahoe Public Utility District Resolution No. 3111-19 Page 2 June 6, 2019 12 13 Ivo Bergsohn Page 2 June 6, 2019 BOARD AGENDA ITEM 4c TO: Board of Directors FROM: Ivo Bergsohn, Hydrogeologist MEETING DATE: June 6, 2019 ITEM – PROJECT NAME: South Y Fate and Transport Model REQUESTED BOARD ACTION: Authorize staff to raise the cost ceiling for Task Order No. 4 by $1,800 and change the completion date to June 30, 2019, for groundwater modeling work performed for the South Y Feasibility Study. DISCUSSION: The Desert Research Institute (DRI) is in the process of conducting its final alternatives modeling for the South Y Feasibility Study. This will complete the modeling analysis and evaluation work for this project. Following completion of this work and preparation of the Fate and Transport Modeling Report, DRI will compile the groundwater files for delivery to the District. In order to use the final South Y PCE Fate and Transport Model, staff requested that DRI prepare a guidance document for running this Fate and Transport Model. The document would describe with text and accompanying screenshots the process of providing input data (e.g., pumping rates, boundary conditions) to the model and extracting results (e.g., groundwater heads, contaminant concentrations) from the model. DRI has provided staff an estimate of approximately $1,800 for preparation of the guidance document. On May 10, 2019, staff submitted a Request for Time Extension to the State Water Resources Control Board Division of Financial Assistance (SWRCB-DOFA) changing the completion date for the South Y Feasibility Study from June 30, 2019, to January 31, 2020. As part of this request, the completion date for the final Fate and Transport Modeling Report was changed from March 2019 to June 2019. Staff is proposing to change the completion date for Task Order No. 4 to June 30, 2019, in conformance with the updated project schedule recently submitted to SWRCB-DOFA. General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 14 Ivo Bergsohn Page 2 June 6, 2019 Staff is requesting that the Board approve this item allowing staff to; 1) increase the cost ceiling for Task Order No. 4 by $1,800 to allow for preparation of a guidance document to run the South Y PCE Fate and Transport Model. Approval of this increase will raise the cost ceiling for Task Order No. 4 to $119,016; and 2)change the completion date for Task Order No. 4 to June 30, 2019. This is a no-cost time extension to Task Order No. 4. Funding for this project is provided on a 50% cost share basis with the El Dorado County Water Agency (EDCWA). SCHEDULE: May – June 2019 COSTS: $1,800 ACCOUNT NO: 2030-6050 BUDGETED AMOUNT AVAILABLE: $145,000 2019/20 ATTACHMENTS: None ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO 15 BOARD AGENDA ITEM 4d TO: Board of Directors FROM: Trevor Coolidge, Associate Engineer MEETING DATE: June 6, 2019 ITEM – PROJECT NAME: Keller-Heavenly Water System Improvements Project Additional Environmental Work REQUESTED BOARD ACTION: Increase Task Order No. 10 to Sierra Ecotone Solutions an additional $6,860 to provide supplemental environmental evaluations as per State Water Resource Control Board Drinking Water State Revolving Loan Fund request. DISCUSSION: The Keller-Heavenly Water System Improvements Project has a pending Drinking Water State Revolving Loan Fund (DWSRF) application for funding for a low- interest loan. As part of the application review, environmental documents are evaluated to ensure they meet State Water Resource Control Board (SWRCB) loan requirements. The environmental staff for the DWSRF has requested additional information to complete this review. The original Task Order No. 10 was for the environmental packet submitted with the Keller-Heavenly application to the state. The amended Task Order No. 10 will include the additional work as needed to complete the application packet for funding. SCHEDULE: Completed by July 30, 2019 COSTS: $6,860 ACCOUNT NO: 2030.7022 BUDGETED AMOUNT AVAILABLE: $1,199,751 ATTACHMENTS: Additional Scope of Work to Revised Task Order No. 10 ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 16 9 May 2019 Mr. Trevor Coolidge South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 RE: STPUD Keller Tank Replacement Project, Biological Assessment, Initial Study Update Scope and Budget Dear Mr. Coolidge: Sierra Ecotone Solutions (SES) appreciates the opportunity to support South Tahoe Public Utility District’s (District) environmental and permitting requirements for the Keller Tank Replacement Project. As requested, SES has prepared a scope of work and estimated budget for the preparation of a Biological Assessment (BA) to support the Keller Tank project. The format for the BA will follow the guidance letter provided via email on 26 April 2019. Scope of Work Task 1 – Preparation of Biological Assessment SES will prepare a Biological Assessment (BA) to analyze potential impacts to wildlife (terrestrial and aquatic) and vegetation in accordance with US Fish and Wildlife Service guidelines as outlined in the attached guidance memorandum. Direct, indirect and cumulative effects will be disclosed for special status species and habitats that may be present within the project areas and defined area of potential effects (). Recommendations will be included if necessary to reduce or avoid adverse impacts to sensitive and special status species and habitats that may be present within the project area or APE. Based on the analysis and determinations in the BA, CA Waterboard will coordinate needs for consultation, conference, and or technical assistance between US Fish and Wildlife Service and Contractor. Task 2 – Update Initial Study SES will update the IS with the analysis and determinations in the BA and include figures and maps that reflect the updated analysis. In addition to the biological analysis, the IS 17 Mr. Coolidge 9 May 2019 Page 2 will be updated with current information on wetland impacts, staging and parking and other areas identified in SES’s phone call with Waterboard staff. Schedule Tasks 1 will be completed within 60 days of approval to proceed. Upon receiving comments on the BA from the Waterboard, any updates to the IS (Task 2) will be made within 30 days from receipt of comments. Estimated Budget The estimated work effort for each task is provided below. Tasks will be completed by Garth Alling (Project Manager and Senior Scientist), and Jennifer DeMartino (GIS and Mapping Support). Task Hours/Rate Cost Task 1 - Review Background Information/Prepare Project Description/Attend meetings (2) 50 at $130 $5,200 Task 2 – Update IS 12 at $130 $1,560 Direct Costs $100 Total Estimated Costs $6,860 Should you have any questions concerning our assumptions or proposed scope/costs, please do not hesitate to contact me at 530.416.2440. Sincerely, Garth Alling Manager/Owner CC: Lynn Nolan, STPUD 18 Paul Hughes Page 2 June 6, 2019 BOARD AGENDA ITEM 4e TO: Board of Directors FROM: Paul Hughes, Chief Financial Officer MEETING DATE: June 6, 2019 ITEM – PROJECT NAME: March 31, 2019, Fiscal Year to Date Financial Statements REQUESTED BOARD ACTION: Receive and file the March 31, 2019, Income Statement and Balance Sheet Reports. DISCUSSION: At the completion of the fiscal year 2017 audit, the District auditors Mann, Urrutia, Nelson CPA’s and Associates recommended that the District’s quarterly financial statements be placed on the Board meeting Agenda for receipt and file by the Board of Directors. Attached are the March 31, 2019, third quarter ending income statements and balance sheet for the water and sewer funds. Water and sewer service charge revenues through March 31, 2019, are at 73% and 75% of budget – where they should be. Water service charges are below budget by 2%, but this amount will be made up during the last quarter of the year due to increased consumption. Other revenues included in the category “Charges for Sales and Services” include capacity fees and permit fees, the majority of which are generally received by the District near the beginning of the fiscal year. This is why the total water and sewer Charges for Sales and Services received through March 31, 2019, are above budget at 76% and 81%. All other water and sewer revenue categories combined through March 31, 2019, are at 24% and 63% of budget. The low collection percentage in the water fund is due to the timing of grant revenue receipts. Sewer fund is below budget due to the second property tax payment not being received until the last quarter of the fiscal year. Water and sewer operating expenses less depreciation through March 31, 2019, are at 72% and 69% of budget. Depreciation is recorded as part of the fiscal year-end process. Both funds are currently below budget, but when entered, fourth quarter year end accrual entries may make up the difference. Debt service payments are recorded on specific due dates, not evenly distributed throughout the year, so the percent of budget spent is not a relevant statistic until all payments for the year have been made. Water and sewer capital outlay spending through March 31, 2019, is $4.4 million and General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 19 Paul Hughes Page 2 June 6, 2019 $3.6 million representing 39% and 30% of budget. The majority of these expenditures are incurred at the beginning and end of the fiscal year, during construction season. At the end of the fiscal year an analysis is performed to determine the status of projects and the potential need to roll budgeted funds into the next year for incomplete projects, or to increase capital reserves for future use. District staff recommends the Board receive and file the attached March 31, 2019, income statements and balance sheet as presented. SCHEDULE: N/A COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: March 31, 2019, Income Statement and Balance Sheet ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO 20 Fund Category Proprietary Funds Fund Type Enterprise Funds Fund 10 - Sewer Fund Operating Revenue Charges for sales and services 14,956,100.00 57,052.64 12,049,770.00 2,906,330.00 81 14,866,150.16 Operating Revenue Totals $14,956,100.00 $57,052.64 $12,049,770.00 $2,906,330.00 81%$14,866,150.16 Non Operating Revenue Tax revenue 8,341,000.00 164,640.70 4,901,535.41 3,439,464.59 59 8,324,372.76 Investment earnings 370,000.00 343.39 506,074.96 (136,074.96)137 208,117.55 Aid from governmental agencies .00 .00 (58,350.51)58,350.51 +++4,508.47 Other nonoperating income 102,500.00 39,214.00 162,274.00 (59,774.00)158 213,295.86 Non Operating Revenue Totals $8,813,500.00 $204,198.09 $5,511,533.86 $3,301,966.14 63%$8,750,294.64 Operating Expenses Wages Full Time 6,951,190.00 827,502.79 5,033,415.52 1,917,774.48 72 5,872,279.68 Wages Part-Time 127,200.00 471.07 63,931.41 63,268.59 50 39,108.45 Benefits 3,778,735.00 287,798.71 2,470,113.48 1,308,621.52 65 4,331,617.58 Depreciation and amortization 4,811,000.00 .00 408,638.90 4,402,361.10 8 4,802,028.00 Utilities 2,176,050.00 190,174.24 1,465,065.50 710,984.50 67 2,079,288.60 Repairs and maintenance 822,965.00 40,142.86 738,590.27 84,374.73 90 993,410.70 Other operating expenses 2,647,255.00 207,552.45 1,653,395.28 993,859.72 62 2,239,816.11 Operating Expenses Totals $21,314,395.00 $1,553,642.12 $11,833,150.36 $9,481,244.64 56%$20,357,549.12 Nonoperating Expenses Debt Service - Net 2,469,100.00 .00 .00 2,469,100.00 0 .00 Interest expense 876,150.00 65,085.76 442,428.96 433,721.04 50 621,488.21 Other expense 611,550.00 2,111.71 265,139.31 346,410.69 43 627,267.45 Nonoperating Expenses Totals $3,956,800.00 $67,197.47 $707,568.27 $3,249,231.73 18%$1,248,755.66 Capital Outlay Expenditures 11,874,803.00 162,193.39 3,591,249.55 8,283,553.45 30 .00 Fund 10 - Sewer Fund Totals REVENUE TOTALS 23,769,600.00 261,250.73 17,561,303.86 6,208,296.14 74%23,616,444.80 EXPENSE TOTALS 37,145,998.00 1,783,032.98 16,131,968.18 21,014,029.82 43%21,606,304.78 Fund 10 - Sewer Fund Net Gain (Loss)($13,376,398.00)($1,521,782.25)$1,429,335.68 $14,805,733.68 (11%)$2,010,140.02 Page 1 of 3Run by Paul Hughes on 04/24/2019 13:14:55 PM Income Statement Through 03/31/19 Summary Listing Annual MTD YTD Budget Less % of Prior Year Budget Amount Actual Amount Actual Amount YTD Actual Budget Total ActualClassification 21 Fund Category Proprietary Funds Fund Type Enterprise Funds Fund 20 - Water Fund Operating Revenue Charges for sales and services 13,332,001.00 36,092.87 10,147,101.17 3,184,899.83 76 13,171,645.48 Operating Revenue Totals $13,332,001.00 $36,092.87 $10,147,101.17 $3,184,899.83 76%$13,171,645.48 Non Operating Revenue Tax revenue 30,000.00 .00 20,785.11 9,214.89 69 36,056.94 Investment earnings 68,000.00 39.74 192,019.27 (124,019.27)282 30,056.84 Aid from governmental agencies 1,391,250.00 .00 88,253.63 1,302,996.37 6 372,236.94 Other nonoperating income 290,300.00 54,214.00 129,757.28 160,542.72 45 296,759.79 Non Operating Revenue Totals $1,779,550.00 $54,253.74 $430,815.29 $1,348,734.71 24%$735,110.51 Operating Expenses Wages Full Time 4,355,865.00 548,212.49 3,487,075.34 868,789.66 80 3,782,943.19 Wages Part-Time 112,900.00 470.91 58,767.95 54,132.05 52 67,415.00 Benefits 2,352,950.00 189,649.61 1,643,034.83 709,915.17 70 2,854,461.55 Depreciation and amortization 3,180,000.00 .00 328,784.80 2,851,215.20 10 3,582,452.38 Utilities 788,550.00 49,816.18 557,643.95 230,906.05 71 742,590.64 Repairs and maintenance 1,047,335.00 83,971.66 1,077,245.42 (29,910.42)103 1,398,206.28 Other operating expenses 2,309,565.00 100,037.62 1,058,046.02 1,251,518.98 46 1,492,034.56 Operating Expenses Totals $14,147,165.00 $972,158.47 $8,210,598.31 $5,936,566.69 58%$13,920,103.60 Nonoperating Expenses Debt Service - Net 815,175.00 .00 .00 815,175.00 0 .00 Interest expense 150,200.00 .00 81,113.88 69,086.12 54 57,652.02 Other expense 43,550.00 886.24 20,993.70 22,556.30 48 38,140.35 Nonoperating Expenses Totals $1,008,925.00 $886.24 $102,107.58 $906,817.42 10%$95,792.37 Capital Outlay Expenditures 11,335,218.00 107,400.21 4,421,596.24 6,913,621.76 39 .00 Fund 20 - Water Fund Totals REVENUE TOTALS 15,111,551.00 90,346.61 10,577,916.46 4,533,634.54 70%13,906,755.99 EXPENSE TOTALS 26,491,308.00 1,080,444.92 12,734,302.13 13,757,005.87 48%14,015,895.97 Fund 20 - Water Fund Net Gain (Loss)($11,379,757.00)($990,098.31)($2,156,385.67)$9,223,371.33 19%($109,139.98) Fund Type Enterprise Funds Totals REVENUE TOTALS 38,881,151.00 351,597.34 28,139,220.32 10,741,930.68 72%37,523,200.79 EXPENSE TOTALS 63,637,306.00 2,863,477.90 28,866,270.31 34,771,035.69 45%35,622,200.75 Page 2 of 3Run by Paul Hughes on 04/24/2019 13:14:55 PM Income Statement Through 03/31/19 Summary Listing Annual MTD YTD Budget Less % of Prior Year Budget Amount Actual Amount Actual Amount YTD Actual Budget Total ActualClassification 22 Fund Category Proprietary Funds Fund Type Enterprise Funds Net Gain (Loss)($24,756,155.00)($2,511,880.56)($727,049.99)$24,029,105.01 3%$1,901,000.04 Fund Category Proprietary Funds Totals REVENUE TOTALS 38,881,151.00 351,597.34 28,139,220.32 10,741,930.68 72%37,523,200.79 EXPENSE TOTALS 63,637,306.00 2,863,477.90 28,866,270.31 34,771,035.69 45%35,622,200.75 Fund Category Proprietary Funds Net Gain (Loss)($24,756,155.00)($2,511,880.56)($727,049.99)$24,029,105.01 3%$1,901,000.04 Grand Totals REVENUE TOTALS 38,881,151.00 351,597.34 28,139,220.32 10,741,930.68 72%37,523,200.79 EXPENSE TOTALS 63,637,306.00 2,863,477.90 28,866,270.31 34,771,035.69 45%35,622,200.75 Grand Total Net Gain (Loss)($24,756,155.00)($2,511,880.56)($727,049.99)$24,029,105.01 3%$1,901,000.04 Page 3 of 3Run by Paul Hughes on 04/24/2019 13:14:55 PM Income Statement Through 03/31/19 Summary Listing Annual MTD YTD Budget Less % of Prior Year Budget Amount Actual Amount Actual Amount YTD Actual Budget Total ActualClassification 23 Current YTD Prior Year Classification Balance Total Actual Net Change Change % Fund Category Proprietary Funds Fund Type Enterprise Funds ASSETS Current Assets Cash and Cash Equivalents 35,349,548.26 14,026,641.72 21,322,906.54 152.02 Investments .00 3,660,015.24 (3,660,015.24)(100.00) Accounts Receivable 1,525,969.96 1,217,689.48 308,280.48 25.32 Due From Governmental Agencies 88,220.46 725,522.92 (637,302.46)(87.84) Property Tax Receivable .00 7,994,808.00 (7,994,808.00)(100.00) Interest Receivable 5,399.62 162,117.01 (156,717.39)(96.67) Other Current Assets 1,154,593.90 1,126,517.26 28,076.64 2.49 Current Assets Totals $38,123,732.20 $28,913,311.63 $9,210,420.57 31.86% Noncurrent Assets Restricted Assets 3,502,347.13 5,218,431.38 (1,716,084.25)(32.89) Long-Term Accounts Receivable 332,629.91 600,177.14 (267,547.23)(44.58) Due From Other Governmental Agencies 146,040.00 146,040.00 .00 .00 Interfund Loan Receivable 3,000,000.00 3,000,000.00 .00 .00 Investments .00 22,111,077.97 (22,111,077.97)(100.00) Capital Assets 201,018,732.52 201,756,156.22 (737,423.70)(.37) Construction in Progress 21,308,129.96 21,182,782.79 125,347.17 .59 Noncurrent Assets Totals $229,307,879.52 $254,014,665.50 ($24,706,785.98)(9.73%) Deferred Outflows of Resources Refunding Loan Costs 197,785.55 216,630.57 (18,845.02)(8.70) Changes in the Pension Liability 5,076,142.00 5,076,142.00 .00 .00 Deferred Outflows of Resources Totals $5,273,927.55 $5,292,772.57 ($18,845.02)(0.36%) ASSETS TOTALS $272,705,539.27 $288,220,749.70 ($15,515,210.43)(5.38%) LIABILITIES AND FUND EQUITY LIABILITIES Current Liabilities Accounts Payable and Other Liabilities 505,680.48 2,871,659.35 (2,365,978.87)(82.39) Unearned Revenue 885,784.74 1,840,498.92 (954,714.18)(51.87) Accrued Expenses 263,543.47 1,401,847.66 (1,138,304.19)(81.20) Accrued Interest Payable .00 455,700.35 (455,700.35)(100.00) Compensated Absences 1,214,938.40 1,228,981.24 (14,042.84)(1.14) Long Term Liabilities - Current Portion 3,410,413.87 3,404,398.39 6,015.48 .18 Current Liabilities Totals $6,280,360.96 $11,203,085.91 ($4,922,724.95)(43.94%) Noncurrent Liabilities Compensated Absences - Long Term Portion 1,930,280.69 1,839,149.34 91,131.35 4.96 Long Term Liabilities - Long Term Portion 47,574,400.33 49,818,658.54 (2,244,258.21)(4.50) Interfund Loan Payable 3,000,000.00 3,000,000.00 .00 .00 Page 1 of 2Run by Paul Hughes on 04/24/2019 13:35:29 PM Balance Sheet Through 03/31/19 Consolidated Summary Listing 24 Current YTD Prior Year Classification Balance Total Actual Net Change Change % Fund Category Proprietary Funds Fund Type Enterprise Funds LIABILITIES AND FUND EQUITY LIABILITIES Noncurrent Liabilities Net Pension Liability 10,139,961.00 10,140,589.00 (628.00)(.01) Noncurrent Liabilities Totals $62,644,642.02 $64,798,396.88 ($2,153,754.86)(3.32%) Deferred Inflows of Resources Property Tax Receivable .00 7,994,808.00 (7,994,808.00)(100.00) Changes in Net Pension Liabilty 401,075.00 401,075.00 .00 .00 Deferred Inflows of Resources Totals $401,075.00 $8,395,883.00 ($7,994,808.00)(95.22%) LIABILITIES TOTALS $69,326,077.98 $84,397,365.79 ($15,071,287.81)(17.86%) FUND EQUITY Restricted for capital asset purchases 106,708,082.24 106,708,082.24 .00 .00 Unrestricted 97,405,400.67 97,115,301.67 290,099.00 .30 FUND EQUITY TOTALS Prior to Current Year Changes $204,113,482.91 $203,823,383.91 $290,099.00 0.14% Prior Year Fund Equity Adjustment .00 Fund Revenues (28,139,220.32) Fund Expenses 28,873,241.94 FUND EQUITY TOTALS $203,379,461.29 $203,823,383.91 ($443,922.62)(0.22%) LIABILITIES AND FUND EQUITY $272,705,539.27 $288,220,749.70 ($15,515,210.43)(5.38%) Fund Type Enterprise Funds Totals $0.00 $0.00 $0.00 +++ Fund Category Proprietary Funds Totals $0.00 $0.00 $0.00 +++ Grand Totals $0.00 $0.00 $0.00 +++ Page 2 of 2Run by Paul Hughes on 04/24/2019 13:35:30 PM Balance Sheet Through 03/31/19 Consolidated Summary Listing 25 BOARD AGENDA ITEM 4f TO: Board of Directors FROM: Paul Hughes, Chief Financial Officer MEETING DATE: June 6, 2019 ITEM – PROJECT NAME: Fiscal Years 2019, 2020 and 2021 Audit Services REQUESTED BOARD ACTION: Approve the Cost Proposal from Mann, Urrutia & Nelson to extend their Contract to provide audit services for Fiscal Years 2019, 2020 and 2021 in an amount not to exceed $54,500 per year. DISCUSSION: Mann, Urrutia & Nelson (MUN) has been providing annual audit services for the District for the last three years. District staff has been very satisfied with the work quality, professionalism and knowledge of MUN. They have met all required timelines and have been very responsive to staff requests. The three year extension proposed by MUN for 2019, 2020 and 2021 is to provide audit services for the District in an annual amount not to exceed $54,500. This is the same amount the District was charged for year ending June 30, 2018. SCHEDULE: Audit services for years ending June 30, 2019, 2020 and 2021 COSTS: $54,500 annually ACCOUNT NO: 10/2050.4470 BUDGETED AMOUNT AVAILABLE: $57,000 ATTACHMENTS: Cost Proposal ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 26 COST PROPOSAL TO P ROVIDE A UDIT S ERVICES S OUTH T AHOE P UBLIC U TILITY D ISTRICT M AY 8, 2019 MANN URRUTIA NELSON CPA’S & ASSOCIATES, LLP CONTACT JUSTIN WILLIAMS, CPA, PARTNER JJW@MUNCPAS.COM S ACRAMENTO O FFICE • 1760 C REEKSIDE O AKS D R ., S UITE 160 • S ACRAMENTO, CA 95833 O .916.929.0540 • F .916.929.0541 WWW.MUNCPAS.COM 27 Paul Hughes Chief Financial Officer South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe. CA 96150 Dear Paul, On behalf of our partners and staff of MUN CPAs, I am pleased to present our Cost Proposal to extend audit services to the South Tahoe Public Utility District. We greatly value the relationship that our firm and the South Tahoe Public Utility District has fostered and are more than happy to continue this growth. As we have performed audit services for the District since the year ended June 30, 2016, we fully understand the audit requirements, as well as your expectations. Our fees are based on estimated hours and hourly rates, determined by each professional’s level of experience. We hereby submit the following Cost Proposal to the South Tahoe Public Utility District for the years ending June 30, 2019 through June 30 2021. FEES FOR SERVICES SUPPORTING SCHEDULE FOR ALL-INCLUSIVE MAXIMUM PRICE Partners 52 250 200 10,400 Managers 62 190 165 10,200 Supervisory Staff 130 160 135 17,600 Staff 140 110 95 13,300 Out of Pocket Expenses 3,000 Total 384 54,500 Service 6/30/2019 6/30/2020 6/30/2021 District Audit, related reports and assistance with CAFR $48,000 $48,000 $48,000 Single Audit and related reports 3,500 3,500 3,500 Management Letter Included Included Included Out-of-Pocket Expenses 3,000 3,000 3,000 Not-To-Exceed Total Fees $54,500 $54,500 $54,500 Staff Level Hours Standard Hourly Rate Quoted Hourly Rate Cost (rounded) MANN • URRUTIA • NELSON CPAs & ASSOCIATES, LLP GLENDALE • ROSEVILLE • SACRAMENTO • SOUTH LAKE TAHOE • KAUAI, HAWAII 28 Additional Professional Services Mann, Urrutia, Nelson, CPAs and Associates, LLP may also furnish other accounting services, which may include advisory and system accounting services as requested by the North Tahoe Public Utility District. If it should become necessary for the District to request Mann, Urrutia, Nelson, CPAs and Associates, LLP to render any additional services to either supplement the services requested to perform additional work as a result of the specific recommendations included in any report issued on this engagement, then such additional work shall be performed only if set forth in an addendum to the contract between the District and Mann, Urrutia, Nelson, CPAs and Associates, LLP. Any such additional work agreed to between the District and Mann, Urrutia, Nelson, CPAs and Associates, LLP shall be performed at the quoted supplemental hourly rates listed above. Position Standard Hourly Rates Partner $250 Manager 190 Senior Staff 160 Staff 110 29 BOARD AGENDA ITEM 4g TO: Board of Directors FROM: Tim Bledsoe, Manager of Customer Service MEETING DATE: June 6, 2019 ITEM – PROJECT NAME: Liberty Utilities Street Lights REQUESTED BOARD ACTION: Direct staff to rescind the current Notice of Termination to Liberty Utilities for the District’s billing of street lights as of June 30, 2019, and provide a new Notice of Termination to December 31, 2019. DISCUSSION: Liberty Utilities has been working with staff and the City of South Lake Tahoe to find a better solution to transfer the street light billing to the City of South Lake Tahoe. Staff recommends allowing Liberty Utilities more time to complete the transfer by extending the current Notice of Termination to December 31, 2019. District staff will contact the 358 customers of the Notice to Terminate street lights and discontinue billing them for this service as of January 1, 2020. SCHEDULE: As listed above COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: None ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 30 SOUTH TAHOE PUBLIC UTILITY DISTRICT Randy Vogelgesang, President BOARD MEMBERS Kelly Sheehan, Vice President Chris Cefalu, Director James R. Jones, Director Nick Exline, Director John Thiel, General Manager Shannon Cotulla, Assistant General Manager REGULAR MEETING OF THE BOARD OF DIRECTORS SOUTH TAHOE PUBLIC UTILITY DISTRICT May 2, 2019 MINUTES The South Tahoe Public Utility District Board of Directors met in a regular session, 2:01 p.m., at the District Office, located at 1275 Meadow Crest Drive, South Lake Tahoe, California. ROLL CALL: Board of Directors: President Vogelgesang, Directors Jones, Sheehan, Exline Absent: Director Cefalu Staff: John Thiel, Paul Hughes, Shannon Cotulla, Gary Kvistad, Melonie Guttry, Ivo Bergsohn, Bren Hoyle, Nancy Hussmann, Chris Skelly, Chris Stanley, Trevor Coolidge, Raina Blasser, Tim Bledsoe, Shelly Thomsen, Steve Caswell, Guests: John Freidrich, Liberty Utilities CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR: None CONSENT CALENDAR: Moved Sheehan/Second Exline/Vogelgesang Yes/Cefalu Absent/Jones Yes/Sheehan Yes/Exline Yes to approve the Consent Calendar as presented. a. CLOSED CIRCUIT TELEVISION (CCTV) CODING PROFESSIONAL SERVICES (Brent Goligoski, Asset Management Analyst) Authorized staff to amend Task Order No. 1 for Sewer Knowledge Services, LLC, to raise the cost ceiling to $39,000 and extend the schedule to June 30, 2019, for professional services for condition assessment scoring of gravity sewer mains. b. CALPERS REQUIRED PAY LISTING BY POSITION (Debbie Henderson, Accounting Manager) Adopted Resolution No. 3107-19 which incorporates the Pay Listing by Position for the pay listing effective April 18, 2019. 31 REGULAR BOARD MEETING MINUTES May 2, 2019 PAGE – 2 c. REGULAR BOARD MEETING MINUTES: April 18, 2019 (Melonie Guttry, Executive Services Manager/Clerk of the Board) Approved April 18, 2019, Minutes ITEMS FOR BOARD ACTION a. Ordinance Regarding Theft of Water and Tampering with District Facilities (Tim Bledsoe, Manager of Customer Service ) – Tim Bledsoe explained the necessity for Ordinance No. 572-19 addressing the theft of water and tampering with District facilities. Attorney Kvistad added this Ordinance is modeled after several Ordinances from other agencies. Moved Sheehan/Second Jones/Vogelgesang Yes/Cefalu Absent/Jones Yes/Sheehan Yes/Exline Yes to adopt Ordinance No. 572-19 of the South Tahoe Public Utility District adding Section 6.5.7 to the Administrative Code regarding Theft of Water and Tampering with District Facilities. b. South Y Feasibility Study (Ivo Bergsohn, Hydrogeologist) – Ivo Bergsohn provided a PowerPoint Presentation regarding the South Y Feasibility Study and addressed questions from the Board and staff. c. Approve Payment of Claims (Debbie Henderson, Accounting Manager) Moved Sheehan/Second Exline/Vogelgesang Yes/Cefalu Absent/Jones Yes/Sheehan Yes/Exline Yes to approve Payment of Claims in the amount of $1,102,653.37. STANDING AND AD-HOC COMMITTEE REPORTS: Nothing to report BOARD MEMBER REPORTS: Director Exline reported he attended the Earth Day Celebration at Bijou Park and provided kudos to Shelly Thomsen for her efforts. Director Jones reported he will be attending the Association of California Water Agencies Conference next week along with several staff. EL DORADO COUNTY WATER AGENCY PURVEYOR REPORT: John Thiel reported he attended the El Dorado County Water Agency Board Meeting on May 1. The next meeting is scheduled for June 12. GENERAL MANAGER REPORT: John Thiel reported on several items: • Provided a staffing update including current position recruitments. • Provided an overview of several community outreach efforts including presentations to local services clubs and organizations. STAFF/ATTORNEY REPORTS: Shelly Thomsen provided an overview regarding the online forum by the name “Nextdoor” including recent misinformation posted regarding the District’s rate increases. She explained that public water agencies are not allowed to have an account on Nextdoor’s forum so she has not responded, but that several community members are sharing links to the District website with accurate information. Tim Bledsoe provided updated Proposition 218 opposition counts of 227 water protests representing 1.6%, and 234 sewer protests representing 1.3%. There are two weeks remaining to file a protest. 32 REGULAR BOARD MEETING MINUTES May 2, 2019 PAGE – 3 Shelly Thomsen is submitting a press release to local media regarding the Proposition 218 Public Hearing scheduled for May 16. Shelly Thomsen and Tim Bledsoe provided an update regarding the District continuing to bill for Liberty Utilities (Liberty) streetlights including Liberty’s 132% rate increase. Liberty is drafting a notice to customers providing information regarding the rate increase. If Liberty is not able to send the notice by June 1, the District will send it. Meanwhile, the City of South Lake Tahoe is considering options for being responsible for the streetlights, and the District will continue to work with both Liberty and the City moving forward. John Friedrich addressed questions from the Board and staff. Shelley Thomson reported that she attended the Housing Tahoe Partnership meeting on May 1, and was inspired by the community involvement. There is a Spring Garden Workshop scheduled for Saturday, May 4, at the South Lake Tahoe Library. Shelly Thomsen reminded the Board that the District is at the top of the watershed and is very fortunate to have some of the cleanest water available anywhere. Raina Blasser, Grants Assistant, provided an update regarding grants through the California Governor’s Office of Emergency Services (Cal OES). District staff has been notified by Cal OES that it has recommended two District projects for Federal Emergency Management Agency (FEMA) funding. Staff expects to hear final approval by September 2019, for the following projects: 1) Emergency generator at the blower building to operate the District’s blower system during loss of power events. The total project cost is $775,000, of which the District would be responsible for a 25% match; and, 2) Backup power supply for District water infrastructure at 11 of the District’s water tank sites. Backup power supplies, such as batteries, would be installed to provide backup power during loss of power events. This project cost is $312,000, of which the District would be responsible for a 25% match. She further explained the FEMA application process and the Board provided kudos to the Grants Department. Staff is also looking to pursue electric charging station grants. BREAK AND ADJOURN TO CLOSED SESSION: 3:41 p.m. RECONVENE TO OPEN SESSION: 5:02 CLOSED SESSION: a. Pursuant to Government Code Section 549.57(a)/Conference with Labor Negotiators regarding Memorandum of Understanding with Stationary Engineers, Local 39. Present at this Closed Session will be Agency Negotiators: John Thiel, General Manager, Shannon Cotulla, Assistant General Manager, Paul Hughes, Chief Financial Officer; and Nancy A. Hussmann, Human Resources Director. No reportable Board action b. Pursuant to Government Code Section 549.57(a)/Conference with Labor Negotiators regarding Memorandum of Understanding with the Management Group. Present at this Closed Session will be Agency Negotiators: John Thiel, General Manager, Shannon Cotulla, Assistant General Manager, Paul Hughes, Chief Financial Officer; and Nancy A. Hussmann, Human Resources Director. No reportable Board action 33 REGULAR BOARD MEETING MINUTES May 2, 2019 PAGE – 4 c. Pursuant to Government Code Section 54956.9(d)(4)/Conference with Legal Counsel regarding Potential Initiation of Litigation (one case). Reportable Board Action The Board authorized 1) filing a draft Amended Application No. A 023393 and request an extension of time to file the final Amended Application No. A 023393; 2) Authorized Gary Kvistad and Jena Acos to be the assigned agents for Amended Application No. A 023393; 3) Authorized withdrawal of the three pending change petitions for Permit Nos. 013527, 013528, 013529, 013530, and 014335; 4) Authorized cancelling Application No. 023502. d. Pursuant to Section 54956.9(a) of the California Government code, Closed Session may be held for conference with legal counsel regarding existing litigation: El Dorado County Superior Court Case SC20190072, South Tahoe Public Utility District vs. Philip L. McNamar. No reportable Board action ADJOURNMENT: 5:03 p.m. ____________________________________ Randy Vogelgesang, Board President South Tahoe Public Utility District __________________________________ Melonie Guttry, Clerk of the Board South Tahoe Public Utility District 34 SOUTH TAHOE PUBLIC UTILITY DISTRICT Randy Vogelgesang, President BOARD MEMBERS Kelly Sheehan, Vice President Chris Cefalu, Director James R. Jones, Director Nick Exline, Director John Thiel, General Manager Shannon Cotulla, Assistant General Manager REGULAR MEETING OF THE BOARD OF DIRECTORS SOUTH TAHOE PUBLIC UTILITY DISTRICT May 16, 2019 MINUTES The South Tahoe Public Utility District Board of Directors met in a regular session, 2:02 p.m., at the District Office, located at 1275 Meadow Crest Drive, South Lake Tahoe, California. ROLL CALL: Board of Directors: President Vogelgesang, Directors Cefalu, Jones, Sheehan, Exline Staff: John Thiel, Paul Hughes, Shannon Cotulla, Gary Kvistad, Melonie Guttry, Bren Hoyle, Tim Bledsoe, Jessica Henderson, Brian Bartlett, Chris Stanley, Jeremy Rutherdale, Nancy Hussmann, Chris Skelly, Brian Bartlett, Shelly Thomsen, Susan Rasmussen, Brent Goligoski, Julie Ryan, Tiffany Racz, Jim Kelly, Ryan Lee, Ivo Bergsohn, Jason Brand, Theresa Sherman, Steve Caswell, Cuz Cullen, Trevor Coolidge, Doug Van Gordon Guests: Larry Foster, John Cefalu, Jeff Tillman, Jennifer Lukins, Theresa Peshon, Kenny Curtzwiler, Mike and Sharon Marlowe, Joe Cardinale, Heinz Neiger, Keith and Laura Wilkinson, Fran Papandrea, Sue Quinn, Pat Okacza, Penny Weare, Erin Terry, Lynda Bourgeois CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR: None COMMENTS FROM THE AUDIENCE: Sue Quinn reported there is water flowing from a culvert at D Street and Tata Lane. Chris Stanley reported he will send District staff to investigate. CONSENT CALENDAR: Director Jones requested staff provide a presentation regarding the District’s Geographic Information System at a future Board meeting. Moved Cefalu/Second Sheehan/Vogelgesang Yes/Cefalu Yes/Jones Yes/Sheehan Yes/Exline Yes to approve the Consent Calendar as presented. 35 REGULAR BOARD MEETING MINUTES May 16, 2019 PAGE – 2 a. RESOLUTION FOR CALIFORNIA GOVERNOR’S OFFICE OF EMERGENCY SERVICES/FEDERAL EMERGENCY MANAGEMENT AGENCY HAZARD MITIGATION GRANT PROGRAM FUNDING (Lynn Nolan, Grants Coordinator) Adopted California Governor’s Office of Emergency Services Federal Emergency Management Agency Hazard Mitigation Grant Program Funding Resolution No. 3108-19 approving grant funding for the Paloma Well and Keller Booster Emergency Generators. b. 2019 HEAVENLY TANK IMPROVEMENTS PROJECT (Julie Ryan, Engineering Department Manger) Approved the proposal from Bay Area Coating Consultants for coating inspection services in an amount not to exceed $41,068.80. c. GEOGRAPHIC INFORMATION SYSTEMS (GIS) DATA SHARING LICENSE AGREEMENT (Jim Kelly, GIS Specialist and Steve Caswell, Principal Engineer) 1) Approved the Geographic Information Systems Data Sharing License Agreement; and, 2) Authorized staff positions including Engineering Department Manager, Assistant General Manager and/or General Manager to sign the Agreement on behalf of South Tahoe Public Utility District. d. SOUTH Y PCE REGIONAL INVESTIGATION (Ivo Bergsohn, Hydrogeologist) Entered into an Access Agreement with AECOM Technical Services, Inc., for temporary use of the Tata Well Site as a staging area for plume characterization. PROPOSITION 218 PUBLIC HEARING TO RECEIVE PUBLIC PROTESTS REGARDING PROPOSED WATER AND SEWER RATE INCREASES President Vogelgesang opened the Public Hearing at 2:07 p.m. to receive public protests regarding the proposed water and sewer rate increases. Tim Bledsoe provided a PowerPoint presentation, reporting that the Proposition 218 notices were mailed on March 29. He further provided an overview of the public outreach efforts conducted throughout the Proposition 218 process. Several community members asked questions related to the proposed rates and many stated their opposition to the increases. The Board and staff provided answers to the questions and President Vogelgesang expressed to the audience that the Board is listening to every comment. President Vogelgesang closed the Public Hearing at 3:50 p.m. Tim Bledsoe reported that 425 sewer protests were received, of which 417 are valid protests for a total of 2.28% sewer protests; and 414 water protests were received, of which 406 are valid protests for a total of 2.85% water protests. ITEMS FOR BOARD ACTION a. Water and Sewer Rate Ordinance (Paul Hughes, Chief Financial Officer) – Paul Hughes reviewed Ordinance No. 573-19, prepared for Board consideration to adopt the five-year rate schedule for fiscal years 2020 through 2024, with up to 5% per year increase for the sewer fund and up to 6% per year increase for the water fund. This Ordinance is only to implement the fiscal year 2020 rates. The remaining four years are considered by the Board on an annual basis. Staff recommends approval as presented. All five Board Members individually presented their perspective on the rate increases and discussed the maximum proposed on the Proposition 218 notices. Staff provided comments focused on the proposed rate increases as well. 36 REGULAR BOARD MEETING MINUTES May 16, 2019 PAGE – 3 Moved Exline/Second Vogelgesang/Vogelgesang Yes/Cefalu No/Jones No/Sheehan Yes/Exline Yes to enact Ordinance No. 573-19, an amendment to the South Tahoe Public Utility District’s Ordinance No. 464 superseding water and sewer rate Ordinance No. 557-14 in its entirety, and incorporating a 4% districtwide water rate increase and a 5% districtwide sewer rate increase in year 2020, of the five year rate schedule. b. Fiscal Year 2019/20 Water Enterprise Fund Budget (Paul Hughes, Chief Financial Officer) – Paul Hughes reviewed Resolution No. 3109-19, which staff recommends for Board approval. Moved Vogelgesang/Second Exline/Vogelgesang Yes/Cefalu Yes/Jones No/Sheehan Yes/Exline Yes to adopt Resolution No. 3109-19 adopting the Fiscal Year 2019/20 Water Enterprise Fund Budget, and authorize staff to incorporate any adjustments or changes necessary as a result of Board action. c. Fiscal Year 2019/20 Sewer Enterprise Fund Budget (Paul Hughes, Chief Financial Officer) – Paul Hughes reviewed Resolution No. 3110-19, which staff recommends for Board approval. Moved Vogelgesang/Second Sheehan/Vogelgesang Yes/Cefalu Yes/Jones No/Sheehan Yes/Exline Yes to adopt Resolution No. 3110-19 adopting the Fiscal Year 2019/20 Sewer Enterprise Fund Budget. Director Sheehan departed the meeting at 4:42 p.m. d. Sewer Line Spot Repair and Lateral Abandonment Services (Doug Van Gorden, Underground Repair Sewer Supervisor) – Brent Goligoski and IV Jones presented information regarding the sewer line spot repair and lateral abandonment services. Moved Exline/Second Vogelgesang/Vogelgesang Yes/Cefalu Yes/Jones Yes/Sheehan Absent/Exline Yes to 1) Award bid to the lowest responsive, responsible bidder, Robotic Sewer Solutions, Inc., in the amount $159,200; and, 2) Authorize staff to allow for changes (size estimates or repair site additions) in the Contract not to exceed an additional 10% of the Contract price. e. Approve Payment of Claims (Debbie Henderson, Accounting Manager) Moved Cefalu/Second Vogelgesang/Vogelgesang Yes/Cefalu Yes/Jones Yes/Sheehan Absent/Exline Yes to approve Payment of Claims in the amount of $1,473,375.10 STANDING AND AD-HOC COMMITTEE REPORTS: Director Exline reported there is a fire fuels presentation scheduled at Lake Tahoe Community College on Saturday, May 18. BOARD MEMBER REPORTS: Director Jones reported he attended the Association of Water Agencies (ACWA) Conference and will provide a report at the June 6 Board meeting. EL DORADO COUNTY WATER AGENCY PURVEYOR REPORT: John Thiel reported the District is working on an expanded project list for the Water Agency June 12 meeting. 37 REGULAR BOARD MEETING MINUTES May 16, 2019 PAGE – 4 GENERAL MANAGER REPORT: John Thiel reported on several items: • Provided a staffing update • Announced he attended a Community Wildfire Planning meeting on April 25, with more than 100 community members in attendance • He is scheduling a meeting with the United States Forest Service regarding preparedness around District facilities • Provided a public outreach update STAFF/ATTORNEY REPORTS: Chris Stanley and Jeremy Rutherdale provided details regarding a leak on Luther Pass Tank No. 2, including steps taken to stop and repair the leak. Shannon Cotulla provided information regarding the consequences of having this tank offline. BREAK AND ADJOURN TO CLOSED SESSION: 5:15 p.m. RECONVENE TO OPEN SESSION: 5:32 CLOSED SESSION: a. Pursuant to Government Code Section 54956(d)(2)/Conference with Legal Counsel regarding potential exposure to litigation (one case). Reportable Board action The Board adopted a legal budget for potential litigation. b. Pursuant to Section 54956.9(a) of the California Government code, Closed Session may be held for conference with legal counsel regarding existing litigation: El Dorado County Superior Court Case SC20190072, South Tahoe Public Utility District vs. Philip L. McNamar. No reportable Board action c. Pursuant to Government Code Section 549.57(a)/Conference with Labor Negotiators regarding Memorandum of Understanding with Stationary Engineers, Local 39. Present at this Closed Session will be Agency Negotiators: John Thiel, General Manager, Shannon Cotulla, Assistant General Manager, Paul Hughes, Chief Financial Officer; and Nancy A. Hussmann, Human Resources Director. No reportable Board action d. Pursuant to Government Code Section 549.57(a)/Conference with Labor Negotiators regarding Memorandum of Understanding with the Management Group. Present at this Closed Session will be Agency Negotiators: John Thiel, General Manager, Shannon Cotulla, Assistant General Manager, Paul Hughes, Chief Financial Officer; and Nancy A. Hussmann, Human Resources Director. No reportable Board action 38 REGULAR BOARD MEETING MINUTES May 16, 2019 PAGE – 5 ADJOURNMENT: 5:33 p.m. _______________________________________ Randy Vogelgesang, Board President South Tahoe Public Utility District ________________________________________ Melonie Guttry, Clerk of the Board South Tahoe Public Utility District 39 Trevor Coolidge Page 2 June 6, 2019 BOARD AGENDA ITEM 6a TO: Board of Directors FROM: Trevor Coolidge, Associate Engineer MEETING DATE: June 6, 2019 ITEM – PROJECT NAME: Keller-Heavenly Water System Improvements Project REQUESTED BOARD ACTION: Approve Gannett Fleming, Inc., Proposal for Keller Tanks Rockfall Mitigation design services for the Keller-Heavenly Water System Improvements Project in an amount not to exceed $56,040. DISCUSSION: The Keller Water System provides water to the area adjacent to and above the California Lodge at the Heavenly Ski Resort; the area is supplied by a high pressure main from the Keller Booster Pump Station that feeds two high elevation water tanks, before gravity feeding back into several subzones through a series of pressure reducing valves (PRVs), with one subzone intertied to the adjacent Heavenly pressure zone. The service area includes both resort and residential properties within a wildland- urban interface (WUI) area. The Keller-Heavenly Water System Improvements Project includes upsizing of water mains, replacement and instrumentation of pressure reducing valves and vaults, communication upgrades, and replacement of the Keller water tanks. Stabilization of the mountainside and mitigation of significant rockfall hazards that threaten the Keller tanks is also a key project element. The District requested an outside review of the rockfall mitigation plans at the 60% design level by Sage Engineers that identified the potential for significant value engineering of the rockfall design element. The original rockfall subconsultant (Kane GeoTech) had a minimal Contract under the District’s primary design consultant (Farr West Engineering) that did not provide for the level of plans required for bidding in utilizing a design-build model for construction that the District does not use for contracting nor find competitive. The reduced scale of construction work is anticipated to also reduce permit challenges for work occurring on United States Forest Services (USFS) lands adjacent to the District owned tank site. Due to the significant construction phase cost savings and concerns over the preliminary plans, the District intends to release Kane Geotech, and transfer final design work to Gannett Fleming, Inc., (Garnett Fleming) formerly Sage Engineers. General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 40 Trevor Coolidge Page 2 June 6, 2019 Sage Engineers was purchased by Gannett Fleming while maintaining the same local office and staff; the new Task Order will be awarded under an updated Master Services Agreement (MSA). Work to complete the 100% design plans and specifications for the rockfall mitigation element will be performed on a time-and-materials basis not to exceed $56,040, including a contingency for requested services, such as assistance with USFS permitting. The proposed scope of work does not include project bidding or construction support services. Staff will request approval of an additional Task Order when seeking Board authorization to bid the Keller-Heavenly Water System Improvements Project. Staff recommends that the Board approve Gannett Fleming proposal for Keller Tanks Rockfall Mitigation for the Keller-Heavenly Water System Improvements Project in an amount not to exceed $56,040. SCHEDULE: June 7, 2019 – October 1, 2019 COSTS: $56,040 ACCOUNT NO: 2030-7022/15W007 BUDGETED AMOUNT AVAILABLE: $1,199,751 ATTACHMENTS: Gannett Fleming Proposal for Keller Tanks Rockfall Mitigation ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO 41 Gannett Fleming, Inc. Suite 200 • 2251 Douglas Blvd • Roseville, CA 95661 t: 916.677.4800 • www.gannettfleming.com TASK ORDER NO. 1 REQUEST To: Trevor Coolidge, PE South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96510 From: Casey Smith, PG, CEG Gannett Fleming, Inc. 2251 Douglas Blvd. Suite 200 Roseville, CA 95661 Date: May 22, 2019 Re: Keller Tanks Rockfall Mitigation – Engineering Services Keller Water Tanks Replacement Project El Dorado County, CA We have prepared this Task Order No. 1 request to provide engineering services for rockfall mitigation measures that will be installed as part of the Keller Water Tanks Replacement Project. We understand that South Tahoe Public Utility District (STPUD) intends to replace two existing bolted-steel water storage tanks, one 123,000 gallons and the other 208,000 gallons, with a new 150,000-gallon bolted-steel tank. The new storage tank will be situated slightly northwest of the existing northern tank. STPUD would like to reduce the vulnerability of the new tank from rockfall hazards originating from the steep slopes above the tank bench. This will be accomplished by locating the new tank farther away from the steep slope and by installing rockfall mitigation measures. Kane GeoTech, Inc. (Kane) performed a rockfall investigation in 2016 to assess rockfall hazards at the current tank site and at two other potential locations for the new tank (Ref. 1). At the current tank location, they concluded that continued rockfall is probable, and that rockfall mitigation is necessary to protect the new tank. Alternatives for rockfall mitigation measures and estimated costs are provided in the Kane report. As a result of this investigation, the existing tank site was selected as the preferred location for the new tank. Based on the foregoing, Kane prepared plans and details for rockfall mitigation measures, which were included in the 60% design drawing package (Ref. 2) prepared by Farr West Engineering, who is the overall design engineer for the tank replacement project. The rockfall mitigation plans include rocks to be scaled from the site, rocks to be stabilized in place with netting and anchors, a rockfall barrier/drapery system installed above/on the lower slope, and a rockfall barrier fence at the toe of the slope. At STPUD’s request and under a separate authorization, SAGE Engineers, Inc. performed an engineering peer review to assist STPUD in evaluating the design and layout of the proposed rockfall mitigation measures (Ref. 3). Based on the results of the engineering peer review and subsequent response from Kane, STPUD has requested that Gannett Fleming, Inc. (formerly SAGE Engineers, Inc.) finalize the engineering design and produce 90% and 100% design document submittals. We understand based on conversations with STPUD that the primary goals of the rockfall mitigation measure design is to provide an effective, low maintenance, and cost-effective mitigation solution. Based on our review of the previous project documents, the rockfall 42 Task Order No. 1 Request – Keller Tanks Rockfall Mitigation - Engineering Services Keller Water Tanks Replacement Project Page 2 of 4 mitigation measures are anticipated to consist of localized scaling of hazard rocks, and installation of a rockfall barrier. The design documents will provide locations, quantities, and sufficient details for the rockfall barrier system so the contractors can produce similar construction bids for the rockfall mitigation work. The scope of work below was developed based on the discussion during our conference call on April 16, 2019, subsequent follow-up discussions, and task order review comments received on May 20, 2019. SCOPE OF WORK Item 1 – Engineering Design • Site Visit - Two geologists will perform a site visit to collect geologic information for performing the finalized engineering design of the rockfall mitigation measures. It is anticipated that up to twelve (12) hours will be required for the site visit, including travel time from/to the Roseville office. The slope and tank area will be viewed from safely accessible areas only during the site visit; fall protection and/or rope access methods will not be used. • 90% Tank Design Review Meeting – A Gannett representative will attend a 90% tank design review meeting with Farr West and STPUD project personnel to meet the project team and discuss the conceptual rockfall mitigation measures. We assume that the meeting will be held in STPUD’s main office and will be up to four hours long. • Design Criteria Memorandum (DCM) – Prepare a DCM summarizing the parameters and criteria to be used for design of rockfall mitigation measures. The DCM will include supporting rockfall simulation results prepared by Gannett for the designed mitigation measures. The rockfall simulations will be performed using the available background information, topographic survey, and the findings of our site visit. • Construction Drawings – Gannett will prepare 90% and 100% design documents including design calculations and construction drawings. The construction drawings will include notes, site plan and layout(s), typical sections, and details for the rockfall mitigation measures, and erosion control details for the areas of the slope that become disturbed by the rockfall mitigation work. The drawings prepared by Gannett will be incorporated into the design drawing package prepared by Farr West Engineering and will utilize the existing title block template (with updating) shown on the 60% drawings. • Technical Specifications – In addition to the notes on the drawings, technical specifications will be prepared as appropriate for the scaling and the rockfall mitigation measures. It is anticipated that Gannett will prepare standalone technical specifications for Scaling, Rockfall Barriers, and Cast-In- Place Concrete. • Opinion of Probable Construction Costs (OPCC) – An engineer’s OPCC will be prepared based on previous rockfall project experience and the previous estimate construction obtained for this project. Deliverables • We anticipate 90% and 100% design documents submittals, which will include the DCM, construction drawings, technical specifications, and OPCC. We will facilitate a 90% design review web conference with STPUD personnel, and then finalize the design package following the conference. All documents will be submitted electronically in PDF format. 43 Task Order No. 1 Request – Keller Tanks Rockfall Mitigation - Engineering Services Keller Water Tanks Replacement Project Page 3 of 4 Item 2 – Project Management/Coordination • Perform project management and coordination activities on an ongoing basis throughout the design stage. Tasks include invoicing, budget review and tracking, staffing control, information distribution, and periodic conference calls. Item 3 – Additional Services (Contingency) • We have included a stipend of $10,000 to cover additional services that may arise during the execution of the engineering design. These additional items may include design changes due to the tank replacement design changes, changes to the project schedule, or permitting support. The contingency will not be utilized without advanced notification and approval of STPUD. ASSUMPTIONS • STPUD will provide Gannett the existing 90% design drawings and topographic survey in electronic format (AutoCAD .dwg) for reference and use in preparing the final design. The existing topographic survey is sufficient for design of the rockfall protection system. • Quality Assurance (QA) and Quality Control (QC) is included in the above tasks. • Gannett may provide additional engineering support to STPUD during bidding, construction, and project closeout; these services are not included in this request and will be provided under future task order requests. • Gannett’s scope of work does not include the following items: o Engineering design of road improvements, tank improvements, or other civil site improvements; o Development of comprehensive project SWPPP plans or coordination; o Additional geotechnical subsurface investigations; o Alternatives analyses; or o Rope access work. ESTIMATED SCHEDULE Based on our understanding of the project we have tentatively assumed the following preliminary milestone schedule. A final project schedule will be established at the start of the project. Description Estimated Milestone Date Receive Notice to Proceed June 7, 2019 90% Tank Design Review Meeting Mid-June Submit 90% Rockfall Mitigation Design Package July 19, 2019 Design Review Conference Call August 2, 2019 Submit 100% Design Package August 16, 2019 44 Task Order No. 1 Request – Keller Tanks Rockfall Mitigation - Engineering Services Keller Water Tanks Replacement Project Page 4 of 4 ESTIMATED FEES Our estimated fees to perform the foregoing Scope of Work to be billed on a ‘time and expenses’ basis in accordance with our Schedule of Charges, are as follows: Item Subtask Total Item 1.0 – Engineering Design $ 42,300 Item 2.0 – Project Management/Coordination $ 3,740 Item 3.0 – Additional Services (Contingency) $ 10,000 TOTAL $ 56,040 Our anticipated level of effort for this project is shown on the attached Budget Backup. We will not exceed the budget presented above to perform the proposed Scope of Work. Should additional work, site visits, or meetings be required in addition to the Scope of Work above, or should significant changes be required due to reasons beyond the control of Gannett, STPUD will be notified, and the time required for these items will be billed on a ‘time and expenses’ basis in accordance with our attached Schedule of Charges. If this proposal is acceptable, please forward the necessary contract documentation, referencing this Scope of Services, in accordance with our Master Agreement for Consulting Services for our review and signature. CLOSURE We appreciate the opportunity to provide these services to STPUD. If you have any questions, please call. Sincerely yours, Casey D. Smith, PG, CEG Jerry S. Pascoe, PE, GE Senior Project Geologist Principal Engineer Attachments: Schedule of Charges Budget Backup References: 1. Keller Tank Rockfall Investigation, El Dorado County, California; prepared by Kane GeoTech, Inc., dated December 13, 2016. 2. 60% Submittal, Heavenly/Keller Water System Improvements, South Tahoe Public Utility District, prepared by Farr West Engineering, dated November 19, 2018. 3. Rockfall Mitigation Measures - Peer Review, Keller Water Tanks Replacement Project, El Dorado County, CA, prepared by SAGE Engineers, Inc., dated January 11, 2019. 45 2251 Douglas Blvd., Ste. 200, Roseville, CA 95661, (916) 677-4800 SCHEDULE OF CHARGES South Tahoe Public Utility District (STPUD) 2019 Master Agreement The Schedule of Charges applies to all services provided by and/or through Gannett Fleming, Inc. (Gannett). Charges for our services are divided into three categories: Personnel, Travel/Reimbursables and Outside Services. A new Schedule of Charges is issued at the beginning of each year. The Schedule of Charges may also be revised during the year, as conditions require. Changes will not be made within a calendar year on a project in progress without prior authorization from Client. PERSONNEL Personnel charges are for technical work, including technical typing, editing, graphics and support services involved in the preparation of reports and correspondence, and for the time associated with production of such documents. Personnel category per-hour charge rates are as follows: Civil/Geotechnical/Geological Hourly Rate Senior Principal Engineer/Geologist $ 320.00 Principal Engineer/Geologist 275.00 Senior Associate Engineer/Geologist 240.00 Senior Consultant 240.00 Associate Engineer/Geologist 220.00 Senior Engineer/Geologist 190.00 Senior Project Engineer/Geologist 175.00 Project Engineer/Geologist 165.00 Senior Staff Engineer/Geologist 145.00 Staff Engineer/Geologist 130.00 Electrical/Mechanical Principal Electrical/Mechanical Engineer 275.00 Senior Electrical/Mechanical Engineer 240.00 Senior Project Electrical/Mechanical Engineer 190.00 Project Electrical/Mechanical Engineer 175.00 Senior Staff Electrical/Mechanical Engineer 155.00 Staff Electrical/Mechanical Engineer 140.00 Support Services Senior CADD/GIS Technician 155.00 CADD/GIS Technician 130.00 Senior Admin 135.00 Admin 110.00 The charge for expert witness services, depositions (2-hour minimum per day) and court (4-hour minimum per day) is $525 per hour. TRAVEL / REIMBURSABLES Time spent in travel in the interest of the Client will be charged at the above hourly rates plus mileage at the current IRS rate, except that no more than eight (8) hours of travel time will be charged in any day. 46 South Tahoe Public Utility District (STPUD) 2019 Master Agreement Page 2 of 2 When it is necessary for an employee to be away from the office overnight, all actual costs including out- of-pocket expenses will be charged. Meals will be charged on a per diem basis at $64.00. Reimbursable items (e.g., airfare, hotel, automobile/equipment rental, supplies etc.) will be charged at cost plus fifteen percent (15%). Specialty Design Software Hourly Rate I-Site Studio $85.00 FLAC 60.00 ArcGIS 35.00 GeoStudio (SEEP/W, SLOPE/W, SIGMA/W) 35.00 RISA-3D 35.00 SAFE 35.00 UTEXAS4 35.00 Ensoft (APILE,LPILE,SHAFT) 25.00 EZ-FRISK 25.00 SAP 2000 25.00 RockWorks 25.00 Rocscience (Dips, Swedge, RocPlane, and RocFall) 15.00 Specialty Field Equipment Daily Rate Trimble GPS Unit+Antenna $250.00 Protective Relay Test Set 250.00 Rope Access Gear 200.00 Concrete Thickness Gage 150.00 Dynamic Cone Penetrometer (DCP) and Hand Auger Kit 75.00 Automatic Level 50.00 Water Level Meter 25.00 OUTSIDE SERVICES Outside services will be charged at cost plus fifteen percent (15%). Common outside items to which this 1.15 multiplier applies include, but are not limited to drilling services, laboratory testing, printing and photographic work, special insurance and outside consultants. 47 Project Phase Planned Hrs Billing Rate Planned Bill Conrad, Ryan 36.00 $135.00 $ 4,860.00 Renner, Joey 60.00 $145.00 $ 8,700.00 Luna, Alma 8.00 $175.00 $ 1,400.00 Barber, Paul 36.00 $155.00 $ 5,580.00 Ul Haque, Syed 34.00 $190.00 $ 6,460.00 Smith, Casey 48.00 $220.00 $ 10,560.00 Millhone, William 12.00 $275.00 $ 3,300.00 Pascoe, Jerry 4.00 $275.00 $ 1,100.00 Travel: Fuel, Parking $ 100.00 Travel: Vehicle Rental $ 240.00 238.00 $ 42,300.00 Smith, Casey 12.00 $220.00 $ 2,640.00 Pascoe, Jerry 4.00 $275.00 $ 1,100.00 16.00 $ 3,740.00 $ 10,000.00 Totals 254.00 56,040.00 Task 2 - Project Management/Coordination Labor Project Budget Backup Gannett Fleming, Inc. Task Keller Water Tanks Rockfall Mitigation - Engineering Support Task 1 - Engineering Design Labor Totals Expense Task 3 - Additional Services (Contingency) Totals v7.6.732 (SULHAQUE) - Page 1 of 1 48 PAYMENT OF CLAIMS Payroll 5/21/2019 483,063.75 Total Payroll 483,063.75 ADP & Insight eTools 0.00 AFLAC/WageWorks claims and fees 1,672.98 BBVA Compass Bank 0.00 Cal Bank & Trust fiscal agent fees 0.00 California SWRCB SRF loan payments 0.00 CDS - health care payments 8,874.17 Total Vendor EFT 10,547.15 Accounts Payable Checks-Sewer Fund 1,200,815.04 Accounts Payable Checks-Water Fund 731,963.23 Total Accounts Payable Checks 1,932,778.27 Grand Total 2,426,389.17 Payroll EFTs & Checks 5/21/2019 MM/DD/2019 EFT CA Employment Taxes & W/H 20,386.00 0.00 EFT Federal Employment Taxes & W/H 104,329.84 0.00 EFT CalPERS Contributions 68,526.20 0.00 EFT Empower Retirement-Deferred Comp 20,702.98 0.00 EFT Stationary Engineers Union Dues 2,650.98 0.00 EFT CDHP Health Savings (HSA)4,068.41 0.00 EFT Retirement Health Savings 0.00 0.00 EFT United Way Contributions 111.00 0.00 EFT Employee Direct Deposits 258,891.79 0.00 CHK Employee Garnishments 344.76 0.00 CHK Employee Paychecks 3,051.79 0.00 Total 483,063.75 0.00 FOR APPROVAL June 6, 2019 49 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 48379 - A-L SIERRA WELDING PRODUCTS 57377 Laboratory Supplies Paid by Check #101520 04/30/2019 06/06/2019 05/31/2019 06/06/2019 71.50 Vendor 48379 - A-L SIERRA WELDING PRODUCTS Totals Invoices 1 $71.50 Vendor 49052 - FRANK ABBONDANDOLO 786905 Travel - Meetings - Education Paid by Check #101521 04/23/2019 06/06/2019 05/31/2019 06/06/2019 50.00 Vendor 49052 - FRANK ABBONDANDOLO Totals Invoices 1 $50.00 Vendor 48573 - AESSEAL INC OP1405465 Secondary Equipment Paid by Check #101522 05/01/2019 06/06/2019 05/31/2019 06/06/2019 1,875.53 Vendor 48573 - AESSEAL INC Totals Invoices 1 $1,875.53 Vendor 44039 - AFLAC 404786 Insurance Supplement Payable Paid by Check #101523 05/15/2019 06/06/2019 05/31/2019 06/06/2019 1,063.36 Vendor 44039 - AFLAC Totals Invoices 1 $1,063.36 Vendor 48136 - AHERN RENTALS 20518835-001 Automotive Paid by Check #101524 05/09/2019 06/06/2019 05/31/2019 06/06/2019 496.65 Vendor 48136 - AHERN RENTALS Totals Invoices 1 $496.65 Vendor 48605 - AIRGAS USA LLC 9088754523 Safety Supplies Inventory Paid by Check #101525 05/14/2019 06/06/2019 05/31/2019 06/06/2019 260.54 Vendor 48605 - AIRGAS USA LLC Totals Invoices 1 $260.54 Vendor 48684 - ALLIED ELECTRONICS INC 9011067295 Primary Equipment Paid by Check #101526 05/14/2019 06/06/2019 05/31/2019 06/06/2019 873.86 Vendor 48684 - ALLIED ELECTRONICS INC Totals Invoices 1 $873.86 Vendor 43949 - ALPEN SIERRA COFFEE 204034 Office Supply Issues Paid by Check #101527 05/14/2019 06/06/2019 05/31/2019 06/06/2019 89.00 204035 Office Supply Issues Paid by Check #101527 05/14/2019 06/06/2019 05/31/2019 06/06/2019 44.25 204165 Office Supply Issues Paid by Check #101527 05/21/2019 06/04/2019 05/31/2019 06/06/2019 89.00 Vendor 43949 - ALPEN SIERRA COFFEE Totals Invoices 3 $222.25 Vendor 48073 - AMERIPRIDE UNIFORM SERVICES 50719 Uniform Payable Paid by Check #101528 05/07/2019 06/06/2019 05/31/2019 06/06/2019 612.51 52119 Uniform Payable Paid by Check #101528 05/21/2019 06/04/2019 05/31/2019 06/06/2019 623.64 Vendor 48073 - AMERIPRIDE UNIFORM SERVICES Totals Invoices 2 $1,236.15 Vendor 48759 - AT&T MAY2 TELEPHONE Paid by Check #101529 05/19/2019 06/06/2019 06/06/2019 06/06/2019 1,218.19 Vendor 48759 - AT&T Totals Invoices 1 $1,218.19 Vendor 45202 - AT&T MOBILITY MAY2 TELEPHONE Paid by Check #101530 05/19/2019 06/06/2019 06/06/2019 06/06/2019 1,600.56 Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 1 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 50 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 45202 - AT&T MOBILITY Totals Invoices 1 $1,600.56 Vendor 48000 - AT&T/CALNET 3 MAY2 TELEPHONE Paid by Check #101531 05/20/2019 06/06/2019 06/06/2019 06/06/2019 1,056.56 Vendor 48000 - AT&T/CALNET 3 Totals Invoices 1 $1,056.56 Vendor 48724 - AWARD ZONE 4682 Incentive & Recognition Program Paid by Check #101532 05/22/2019 06/06/2019 05/31/2019 06/06/2019 28.95 Vendor 48724 - AWARD ZONE Totals Invoices 1 $28.95 Vendor 11551 - AXELSON IRON SHOP 889695 Force Main Repairs Paid by Check #101533 04/18/2019 06/06/2019 05/31/2019 06/06/2019 2,009.54 889712 Shop Supplies Paid by Check #101533 05/15/2019 06/04/2019 05/31/2019 06/06/2019 138.35 Vendor 11551 - AXELSON IRON SHOP Totals Invoices 2 $2,147.89 Vendor 44948 - B&L BACKFLOW TESTING 20222-GAUGE Small Tools Paid by Check #101534 05/10/2019 06/06/2019 05/31/2019 06/06/2019 75.00 Vendor 44948 - B&L BACKFLOW TESTING Totals Invoices 1 $75.00 Vendor 48926 - BRIAN BARTLETT 051119 Travel - Meetings - Education Paid by Check #101535 05/11/2019 06/04/2019 05/31/2019 06/06/2019 435.00 Vendor 48926 - BRIAN BARTLETT Totals Invoices 1 $435.00 Vendor 11800 - BARTON HEALTHCARE SYSTEM MAY2019 Safety Equipment - Physicals Paid by Check #101536 05/20/2019 06/06/2019 05/31/2019 06/06/2019 983.00 Vendor 11800 - BARTON HEALTHCARE SYSTEM Totals Invoices 1 $983.00 Vendor 45009 - BENTLY AGROWDYNAMICS 169159 Biosolid Disposal Costs Paid by Check #101537 05/08/2019 06/06/2019 05/31/2019 06/06/2019 1,175.02 Vendor 45009 - BENTLY AGROWDYNAMICS Totals Invoices 1 $1,175.02 Vendor 48291 - BEST BEST & KRIEGER LLP 849291 Legal-Special Projects Paid by Check #101538 05/14/2019 06/06/2019 05/31/2019 06/06/2019 6,448.00 Vendor 48291 - BEST BEST & KRIEGER LLP Totals Invoices 1 $6,448.00 Vendor 12070 - BING MATERIALS 186983 Pipe - Covers & Manholes Paid by Check #101539 05/13/2019 06/06/2019 05/31/2019 06/06/2019 187.43 187293 Pipe - Covers & Manholes Paid by Check #101539 05/22/2019 06/06/2019 05/31/2019 06/06/2019 552.22 187294 Pipe - Covers & Manholes Paid by Check #101539 05/22/2019 06/06/2019 05/31/2019 06/06/2019 721.37 Vendor 12070 - BING MATERIALS Totals Invoices 3 $1,461.02 Vendor 49054 - TIMOTHY BLEDSOE EDUCATION1 Tuition & Reimbursement Program Paid by Check #101540 05/15/2019 06/06/2019 05/31/2019 06/06/2019 3,743.65 Vendor 49054 - TIMOTHY BLEDSOE Totals Invoices 1 $3,743.65 Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 2 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 51 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 43828 - BLUE RIBBON TEMP PERSONNEL 1688 Contractual Services Paid by Check #101541 05/03/2019 06/06/2019 05/31/2019 06/06/2019 482.40 1782 Contractual Services Paid by Check #101541 05/10/2019 06/06/2019 05/31/2019 06/06/2019 761.76 1800 Contractual Services Paid by Check #101541 05/10/2019 06/06/2019 05/31/2019 06/06/2019 1,501.36 1801 Contractual Services Paid by Check #101541 05/10/2019 06/06/2019 05/31/2019 06/06/2019 24.87 1803 Contractual Services Paid by Check #101541 05/10/2019 06/06/2019 05/31/2019 06/06/2019 622.00 1804 Contractual Services Paid by Check #101541 05/10/2019 06/06/2019 05/31/2019 06/06/2019 1,286.40 1889 Contractual Services Paid by Check #101541 05/10/2019 06/06/2019 05/31/2019 06/06/2019 10,500.00 1890 Contractual Services Paid by Check #101541 05/17/2019 06/06/2019 05/31/2019 06/06/2019 650.67 1908 Contractual Services Paid by Check #101541 05/17/2019 06/06/2019 05/31/2019 06/06/2019 1,606.11 1909 Contractual Services Paid by Check #101541 05/17/2019 06/06/2019 05/31/2019 06/06/2019 49.74 1911 Contractual Services Paid by Check #101541 05/17/2019 06/06/2019 05/31/2019 06/06/2019 1,244.00 1912 Contractual Services Paid by Check #101541 06/17/2019 06/06/2019 05/31/2019 06/06/2019 1,286.40 Vendor 43828 - BLUE RIBBON TEMP PERSONNEL Totals Invoices 12 $20,015.71 Vendor 42978 - BROWNSTEIN HYATT 758805 Suspense April 2019 Services Paid by EFT #13 04/30/2019 06/06/2019 05/31/2019 06/06/2019 54,520.50 Vendor 42978 - BROWNSTEIN HYATT Totals Invoices 1 $54,520.50 Vendor 12890 - CA DEPT OF TAX & FEE ADM 2018 Regulatory Operating Permits Paid by Check #101542 02/28/2019 06/06/2019 05/31/2019 06/06/2019 756.00 Vendor 12890 - CA DEPT OF TAX & FEE ADM Totals Invoices 1 $756.00 Vendor 48799 - CAL ELECTRO INC 19-09A Breakpoint Chamber Modification Paid by Check #101543 06/06/2019 06/06/2019 05/31/2019 06/06/2019 14,536.74 19-09AR Accrued Construction Retainage Paid by Check #101543 06/06/2019 06/06/2019 05/31/2019 06/06/2019 (1,453.67) 19-09B Replace Treatment Plant Generator Paid by Check #101543 06/06/2019 06/06/2019 05/31/2019 06/06/2019 867,702.15 19-09BR Accrued Construction Retainage Paid by Check #101543 06/06/2019 06/06/2019 05/31/2019 06/06/2019 (86,770.22) 19-09C Emergency Pump Station Rehab Paid by Check #101543 06/06/2019 06/06/2019 05/31/2019 06/06/2019 113,960.00 19-09CR Accrued Construction Retainage Paid by Check #101543 06/06/2019 06/06/2019 05/31/2019 06/06/2019 (11,396.00) Vendor 48799 - CAL ELECTRO INC Totals Invoices 6 $896,579.00 Vendor 40877 - CALIF DEPT OF CONSUMER AFFAIR 2019 Dues - Memberships - Certification Paid by Check #101544 06/01/2019 06/06/2019 06/06/2019 06/06/2019 115.00 Vendor 40877 - CALIF DEPT OF CONSUMER AFFAIR Totals Invoices 1 $115.00 Vendor 42125 - CALPELRA 2019 Travel - Meetings - Education Paid by Check #101545 05/01/2019 06/06/2019 07/01/2019 06/06/2019 1,259.00 Vendor 42125 - CALPELRA Totals Invoices 1 $1,259.00 Vendor 40766 - CAMPBELL SCIENTIFIC INC 255271 Laboratory Supplies Paid by Check #101546 05/08/2019 06/06/2019 05/31/2019 06/06/2019 483.23 Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 3 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 52 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 40766 - CAMPBELL SCIENTIFIC INC Totals Invoices 1 $483.23 Vendor 13230 - CAROLLO ENGINEERS 0176526 Contractual Services Paid by Check #101547 04/19/2019 06/06/2019 05/31/2019 06/06/2019 4,186.65 0176815 Upper Truckee Sewer PS Rehab Paid by Check #101547 05/07/2019 06/06/2019 05/31/2019 06/06/2019 4,036.50 0176816 Tahoe Keys Sewer PS Rehab Paid by Check #101547 05/07/2019 06/06/2019 05/31/2019 06/06/2019 4,133.00 Vendor 13230 - CAROLLO ENGINEERS Totals Invoices 3 $12,356.15 Vendor 40176 - CASHMAN EQUIPMENT INPS2940278 Automotive Paid by Check #101548 05/03/2019 06/06/2019 05/31/2019 06/06/2019 1,279.79 I1577505 generator rental Paid by Check #101548 05/06/2019 06/06/2019 05/31/2019 06/06/2019 16,981.72 inps2948735 Automotive Paid by Check #101548 05/20/2019 06/06/2019 05/31/2019 06/06/2019 157.89 Vendor 40176 - CASHMAN EQUIPMENT Totals Invoices 3 $18,419.40 Vendor 48838 - STEPHEN CASWELL 060919 Travel - Meetings - Education Paid by Check #101549 06/09/2019 06/06/2019 06/06/2019 06/06/2019 248.00 Vendor 48838 - STEPHEN CASWELL Totals Invoices 1 $248.00 Vendor 42328 - CDW-G CORP RBC3844 Computer Purchases Paid by Check #101550 02/08/2019 06/06/2019 05/31/2019 06/06/2019 83.20 SFL6385 District Computer Supplies Paid by Check #101550 05/08/2019 06/06/2019 05/31/2019 06/06/2019 40.62 SHQ6591 Office Supplies Paid by Check #101550 05/15/2019 06/06/2019 05/31/2019 06/06/2019 95.74 Vendor 42328 - CDW-G CORP Totals Invoices 3 $219.56 Vendor 40343 - CHEMSEARCH INC 3532753 Shop Supplies Paid by Check #101551 05/06/2019 06/06/2019 05/31/2019 06/06/2019 581.41 Vendor 40343 - CHEMSEARCH INC Totals Invoices 1 $581.41 Vendor 48672 - CINTAS CORP 5013629991 Safety Equipment - Physicals Paid by Check #101552 05/20/2019 06/04/2019 05/31/2019 06/06/2019 373.74 Vendor 48672 - CINTAS CORP Totals Invoices 1 $373.74 Vendor 12535 - CITY OF SOUTH LAKE TAHOE 071118 PERMIT Paid by Check #101553 07/11/2018 07/19/2018 07/19/2018 06/06/2019 2,321.50 Vendor 12535 - CITY OF SOUTH LAKE TAHOE Totals Invoices 1 $2,321.50 Vendor 48037 - CLEAN HARBORS ENVIR SRVS INC 1002820199 Service Contracts Paid by Check #101554 04/25/2019 06/06/2019 05/31/2019 06/06/2019 728.26 Vendor 48037 - CLEAN HARBORS ENVIR SRVS INC Totals Invoices 1 $728.26 Vendor 40512 - CODALE ELECTRIC SUPPLY S6626345.002 Biosolids Equipment - Building Paid by Check #101555 05/23/2019 06/06/2019 05/31/2019 06/06/2019 325.13 Vendor 40512 - CODALE ELECTRIC SUPPLY Totals Invoices 1 $325.13 Vendor 48811 - CORIX WATER PRODUCTS (US) INC Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 4 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 53 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 17913012677 Meters Phase 5A Paid by Check #101556 05/20/2019 06/06/2019 05/31/2019 06/06/2019 14,341.53 Vendor 48811 - CORIX WATER PRODUCTS (US) INC Totals Invoices 1 $14,341.53 Vendor 44779 - CPI INTERNATIONAL 20042269 Laboratory Supplies Paid by Check #101557 04/04/2019 06/06/2019 05/31/2019 06/06/2019 31.84 Vendor 44779 - CPI INTERNATIONAL Totals Invoices 1 $31.84 Vendor 48872 - JENNIFER CRESSY JUNE19 Water Conservation Supplies Paid by Check #101558 06/01/2019 06/06/2019 06/06/2019 06/06/2019 40.00 Vendor 48872 - JENNIFER CRESSY Totals Invoices 1 $40.00 Vendor 48281 - CRYSTAL DAIRY FOODS 12198 Supplies Paid by Check #101559 05/16/2019 06/06/2019 05/31/2019 06/06/2019 8.06 Vendor 48281 - CRYSTAL DAIRY FOODS Totals Invoices 1 $8.06 Vendor 42897 - CWEA ALSBURY19 Dues - Memberships - Certification Paid by Check #101560 05/08/2019 06/06/2019 06/06/2019 06/06/2019 179.00 Vendor 42897 - CWEA Totals Invoices 1 $179.00 Vendor 48654 - D&H BROADCASTING LLC APRIL19 Public Relations Expense Paid by Check #101561 04/30/2019 06/06/2019 05/31/2019 06/06/2019 1,120.00 Vendor 48654 - D&H BROADCASTING LLC Totals Invoices 1 $1,120.00 Vendor 49109 - DEPUTY OPTICS INC 7468-CONTI Safety Equipment - Physicals Paid by Check #101562 05/08/2019 06/04/2019 05/31/2019 06/06/2019 254.00 Vendor 49109 - DEPUTY OPTICS INC Totals Invoices 1 $254.00 Vendor 48289 - DIY HOME CENTER 48228 Buildings Paid by Check #101563 04/25/2019 06/04/2019 05/31/2019 06/06/2019 20.33 48505 Primary Equipment Paid by Check #101563 05/06/2019 06/06/2019 05/31/2019 06/06/2019 30.94 48602 Primary Equipment Paid by Check #101563 05/09/2019 06/06/2019 05/31/2019 06/06/2019 4.91 48686 Shop Supplies Paid by Check #101563 05/13/2019 06/04/2019 05/31/2019 06/06/2019 29.88 48728 Grounds & Maintenance Paid by Check #101563 05/15/2019 06/04/2019 05/31/2019 06/06/2019 91.11 48733 Shop Supplies Paid by Check #101563 05/15/2019 06/06/2019 05/31/2019 06/06/2019 8.71 48797 Small Tools Paid by Check #101563 05/17/2019 06/04/2019 05/31/2019 06/06/2019 80.98 48865 Wells Paid by Check #101563 05/21/2019 06/04/2019 05/31/2019 06/06/2019 54.22 48906 Shop Supplies Paid by Check #101563 05/22/2019 06/04/2019 05/31/2019 06/06/2019 10.05 48909 Buildings Paid by Check #101563 05/22/2019 06/04/2019 05/31/2019 06/06/2019 13.55 48912 Shop Supplies Paid by Check #101563 05/22/2019 06/04/2019 05/31/2019 06/06/2019 18.40 48944 Small Tools Paid by Check #101563 05/23/2019 06/04/2019 05/31/2019 06/06/2019 19.25 Vendor 48289 - DIY HOME CENTER Totals Invoices 12 $382.33 Vendor 43649 - DOUGLAS DISPOSAL Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 5 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 54 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 1952729 Refuse Disposal Paid by Check #101564 05/01/2019 06/06/2019 05/31/2019 06/06/2019 25.50 Vendor 43649 - DOUGLAS DISPOSAL Totals Invoices 1 $25.50 Vendor 48656 - E-CONOLIGHT 1017515 Buildings Paid by Check #101565 05/20/2019 06/06/2019 05/31/2019 06/06/2019 1,292.92 Vendor 48656 - E-CONOLIGHT Totals Invoices 1 $1,292.92 Vendor 45115 - EBIX, INC 620793 Subscription Expense Paid by Check #101566 04/03/2019 06/06/2019 06/06/2019 06/06/2019 183.47 Vendor 45115 - EBIX, INC Totals Invoices 1 $183.47 Vendor 45227 - EMPIRE SAFETY & SUPPLY 0100417-IN Safety Supplies Inventory Paid by Check #101567 05/13/2019 06/06/2019 05/31/2019 06/06/2019 226.40 Vendor 45227 - EMPIRE SAFETY & SUPPLY Totals Invoices 1 $226.40 Vendor 48570 - EMPLOYMENT DEVELOPMENT DEPT L1389158752 Unemployment Insurance Benefit Charge Paid by Check #101568 05/01/2019 06/06/2019 05/31/2019 06/06/2019 9,216.97 Vendor 48570 - EMPLOYMENT DEVELOPMENT DEPT Totals Invoices 1 $9,216.97 Vendor 44032 - ENVIRONMENTAL EXPRESS 1000554109 Laboratory Supplies Paid by Check #101569 05/09/2019 06/06/2019 05/31/2019 06/06/2019 257.84 Vendor 44032 - ENVIRONMENTAL EXPRESS Totals Invoices 1 $257.84 Vendor 18550 - EUROFINS EATON ANALYTICAL INC L0449385 Monitoring Paid by Check #101570 04/30/2019 06/06/2019 05/31/2019 06/06/2019 675.00 L0450416 Monitoring Paid by Check #101570 05/07/2019 06/06/2019 05/31/2019 06/06/2019 105.00 L0450844 Monitoring Paid by Check #101570 05/09/2019 06/06/2019 05/31/2019 06/06/2019 35.00 L0452086 Monitoring Paid by Check #101570 05/16/2019 06/06/2019 05/31/2019 06/06/2019 100.00 L0452329 Monitoring Paid by Check #101570 05/17/2019 06/06/2019 05/31/2019 06/06/2019 225.00 Vendor 18550 - EUROFINS EATON ANALYTICAL INC Totals Invoices 5 $1,140.00 Vendor 47836 - EVOQUA WATER TECHNOLOGIES LLC 903989809 Laboratory Supplies Paid by Check #101571 05/01/2019 06/06/2019 05/31/2019 06/06/2019 90.00 Vendor 47836 - EVOQUA WATER TECHNOLOGIES LLC Totals Invoices 1 $90.00 Vendor 48551 - EZKEM 3949 Laboratory Supplies Paid by Check #101572 02/13/2019 06/06/2019 05/31/2019 06/06/2019 67.00 Vendor 48551 - EZKEM Totals Invoices 1 $67.00 Vendor 14890 - FEDEX 6-540-78447 Postage Expenses Paid by Check #101573 05/03/2019 06/06/2019 05/31/2019 06/06/2019 34.97 6-556-23421 Postage Expenses Paid by Check #101573 05/17/2019 06/06/2019 05/31/2019 06/06/2019 60.99 Vendor 14890 - FEDEX Totals Invoices 2 $95.96 Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 6 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 55 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 49111 - GAVIN FEIGER 3109328 Clothes Washer Rebate Program Paid by Check #101574 05/21/2019 06/06/2019 05/31/2019 06/06/2019 200.00 Vendor 49111 - GAVIN FEIGER Totals Invoices 1 $200.00 Vendor 41263 - FERGUSON ENTERPRISES INC 6671417 Secondary Equipment Paid by Check #101575 05/10/2019 05/06/2019 05/31/2019 06/06/2019 38.15 6679132 Primary Equipment Paid by Check #101575 05/14/2019 05/06/2019 05/31/2019 06/06/2019 42.44 6683203 Pump Stations Paid by Check #101575 05/15/2019 06/06/2019 05/31/2019 06/06/2019 29.60 Vendor 41263 - FERGUSON ENTERPRISES INC Totals Invoices 3 $110.19 Vendor 40252 - FGL ENVIRONMENTAL 904729A Monitoring Paid by Check #101576 04/29/2019 06/06/2019 05/31/2019 06/06/2019 75.00 Vendor 40252 - FGL ENVIRONMENTAL Totals Invoices 1 $75.00 Vendor 49107 - NATHAN FISCHER 050419 Safety Equipment - Physicals Paid by Check #101577 05/04/2019 06/06/2019 05/31/2019 06/06/2019 100.00 Vendor 49107 - NATHAN FISCHER Totals Invoices 1 $100.00 Vendor 15000 - FISHER SCIENTIFIC 0592354 Laboratory Supplies Paid by Check #101578 04/22/2019 06/06/2019 05/31/2019 06/06/2019 1,052.72 Vendor 15000 - FISHER SCIENTIFIC Totals Invoices 1 $1,052.72 Vendor 48402 - FLYERS ENERGY LLC 19-902906 Gasoline Fuel Inventory Paid by Check #101579 05/02/2019 05/06/2019 05/31/2019 06/06/2019 2,883.83 19-905110 Oil & Lubricants Paid by Check #101579 05/10/2019 05/06/2019 05/31/2019 06/06/2019 572.64 19-907365 Gasoline Fuel Inventory Paid by Check #101579 05/10/2019 05/06/2019 05/31/2019 06/06/2019 4,442.99 19-910659 Oil & Lubricants Paid by Check #101579 05/20/2019 05/06/2019 05/31/2019 06/06/2019 92.79 Vendor 48402 - FLYERS ENERGY LLC Totals Invoices 4 $7,992.25 Vendor 49108 - ARTHUR GARNEY 48900 Safety Equipment - Physicals Paid by Check #101580 04/05/2019 06/06/2019 05/31/2019 06/06/2019 100.00 Vendor 49108 - ARTHUR GARNEY Totals Invoices 1 $100.00 Vendor 49102 - Global Test Supply LLC 161448-00 Wells Paid by Check #101581 05/17/2019 06/06/2019 05/31/2019 06/06/2019 3,573.99 Vendor 49102 - Global Test Supply LLC Totals Invoices 1 $3,573.99 Vendor 15600 - GRAINGER 9161075321 Pump Stations Paid by Check #101582 04/30/2019 06/06/2019 05/31/2019 06/06/2019 24.12 9071325864 Secondary Equipment Paid by Check #101582 05/09/2019 06/06/2019 05/31/2019 06/06/2019 472.27 9174722372 Pipe - Covers & Manholes Paid by Check #101582 05/13/2019 06/06/2019 05/31/2019 06/06/2019 1,570.07 Vendor 15600 - GRAINGER Totals Invoices 3 $2,066.46 Vendor 49112 - CHRISTOPHER & ANNA HAPPY HOMESTEAD CEMETERY DISTRICT 02501056 Toilet Rebate Program Paid by Check #101583 05/02/2019 06/06/2019 05/31/2019 06/06/2019 200.00 Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 7 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 56 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 49112 - CHRISTOPHER & ANNA HAPPY HOMESTEAD CEMETERY DISTRICT Totals Invoices 1 $200.00 Vendor 49110 - HATCHBACK CREATIVE 2194 Public Relations Expense Paid by Check #101584 05/10/2019 05/06/2019 05/31/2019 06/06/2019 1,332.50 Vendor 49110 - HATCHBACK CREATIVE Totals Invoices 1 $1,332.50 Vendor 44430 - HIGH SIERRA BUSINESS SYSTEMS 103015 Service Contracts Paid by Check #101585 05/03/2019 06/06/2019 05/31/2019 06/06/2019 305.01 103016 Service Contracts Paid by Check #101585 05/03/2019 05/06/2019 05/31/2019 06/06/2019 886.37 Vendor 44430 - HIGH SIERRA BUSINESS SYSTEMS Totals Invoices 2 $1,191.38 Vendor 48832 - NANCY HUSSMANN 050719 Travel - Meetings - Education Paid by Check #101586 05/07/2019 06/06/2019 05/31/2019 06/06/2019 587.14 050719A Travel - Meetings - Education Paid by Check #101586 05/07/2019 06/06/2019 05/31/2019 06/06/2019 335.94 Vendor 48832 - NANCY HUSSMANN Totals Invoices 2 $923.08 Vendor 48056 - INFOSEND INC 153281 Printing Paid by Check #101587 04/30/2019 06/06/2019 05/31/2019 06/06/2019 8,352.04 153412 Printing Paid by Check #101587 05/01/2019 06/06/2019 05/31/2019 06/06/2019 787.54 Vendor 48056 - INFOSEND INC Totals Invoices 2 $9,139.58 Vendor 48140 - INTEGRITY LOCKSMITH I24436 Shop Supplies Paid by Check #101588 05/06/2019 05/06/2019 05/31/2019 06/06/2019 8.89 Vendor 48140 - INTEGRITY LOCKSMITH Totals Invoices 1 $8.89 Vendor 44110 - J&L PRO KLEEN INC 27803 Janitorial Services Paid by Check #101589 05/14/2019 06/06/2019 05/31/2019 06/06/2019 4,242.00 Vendor 44110 - J&L PRO KLEEN INC Totals Invoices 1 $4,242.00 Vendor 48808 - JPR SYSTEMS 6001963103 Buildings Paid by Check #101590 04/25/2018 06/06/2019 06/06/2019 06/06/2019 375.45 Vendor 48808 - JPR SYSTEMS Totals Invoices 1 $375.45 Vendor 48865 - JAMES KELLY 051419 Travel - Meetings - Education Paid by Check #101591 05/14/2019 05/06/2019 05/31/2019 06/06/2019 98.60 Vendor 48865 - JAMES KELLY Totals Invoices 1 $98.60 Vendor 44209 - L A PERKS PLUMBING & HEAT INC 860541 LPPS Power/Control Upgrade Paid by Check #101592 05/17/2019 06/06/2019 05/31/2019 06/06/2019 2,667.00 Vendor 44209 - L A PERKS PLUMBING & HEAT INC Totals Invoices 1 $2,667.00 Vendor 48489 - LAKESIDE PARK ASSOCIATION 6LPA17DG Suspense-2017 Fire Ptshp Pass Through Paid by Check #101593 05/09/2019 06/06/2019 05/31/2019 06/06/2019 11,418.00 Vendor 48489 - LAKESIDE PARK ASSOCIATION Totals Invoices 1 $11,418.00 Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 8 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 57 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 22550 - LIBERTY UTILITIES MAY2 ELECTRICITY Paid by Check #101594 05/23/2019 06/06/2019 06/06/2019 06/06/2019 102,992.71 Vendor 22550 - LIBERTY UTILITIES Totals Invoices 1 $102,992.71 Vendor 17600 - LILLY'S TIRE SERVICE INC 72718 Automotive Paid by Check #101595 05/17/2019 06/06/2019 05/31/2019 06/06/2019 24.50 Vendor 17600 - LILLY'S TIRE SERVICE INC Totals Invoices 1 $24.50 Vendor 17900 - MC MASTER CARR SUPPLY CO 93532041 Pump Stations Paid by Check #101596 04/30/2019 06/06/2019 05/31/2019 06/06/2019 1,871.90 94443472 Pump Stations Paid by Check #101596 05/09/2019 06/06/2019 05/31/2019 06/06/2019 1,236.54 94761794 PRV, Pine Valley Rd Paid by Check #101596 05/14/2019 06/06/2019 05/31/2019 06/06/2019 528.52 95445199 Pump Stations Paid by Check #101596 05/21/2019 06/06/2019 05/31/2019 06/06/2019 161.50 Vendor 17900 - MC MASTER CARR SUPPLY CO Totals Invoices 4 $3,798.46 Vendor 48821 - MCC CONTROLS LLC CD99332639 LPPS Power/Control Upgrade Paid by Check #101597 04/30/2019 06/06/2019 05/31/2019 06/06/2019 1,083.50 Vendor 48821 - MCC CONTROLS LLC Totals Invoices 1 $1,083.50 Vendor 18150 - MEEKS BUILDING CENTER APRIL19 April Stmt Paid by Check #101598 04/30/2019 05/06/2019 05/31/2019 06/06/2019 946.68 Vendor 18150 - MEEKS BUILDING CENTER Totals Invoices 1 $946.68 Vendor 48731 - NEENAH FOUNDRY COMPANY 321134 Meters Phase 5A Paid by Check #101599 05/20/2019 06/06/2019 05/31/2019 06/06/2019 69,477.20 Vendor 48731 - NEENAH FOUNDRY COMPANY Totals Invoices 1 $69,477.20 Vendor 40274 - NEVADA DIVISION OF FORESTRY 19-10-0069 Contractual Services Paid by Check #101600 05/07/2019 06/06/2019 05/31/2019 06/06/2019 5,722.08 Vendor 40274 - NEVADA DIVISION OF FORESTRY Totals Invoices 1 $5,722.08 Vendor 48655 - REGENTS NEVADA SYS HIGHER EDUCATION CI-06-1969/18 Wells Paid by Check #101601 04/10/2019 06/06/2019 05/31/2019 06/06/2019 3,911.66 CI-06-2183/19 Wells Paid by Check #101601 05/22/2019 06/06/2019 05/31/2019 06/06/2019 451.77 Vendor 48655 - REGENTS NEVADA SYS HIGHER EDUCATION Totals Invoices 2 $4,363.43 Vendor 48470 - NIXON'S HEATING/AIR CONDIT INC 35695 Buildings Paid by Check #101602 04/29/2019 06/06/2019 05/31/2019 06/06/2019 115.00 Vendor 48470 - NIXON'S HEATING/AIR CONDIT INC Totals Invoices 1 $115.00 Vendor 48306 - OUTSIDE TELEVISION 0000031753 Public Relations Expense Paid by Check #101603 04/30/2019 06/06/2019 05/31/2019 06/06/2019 2,011.00 Vendor 48306 - OUTSIDE TELEVISION Totals Invoices 1 $2,011.00 Vendor 20150 - PETTY CASH Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 9 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 58 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount May 2019 Replenish Petty Cash Fund Paid by Check #101604 05/24/2019 06/06/2019 05/31/2019 06/06/2019 143.00 Vendor 20150 - PETTY CASH Totals Invoices 1 $143.00 Vendor 47903 - PRAXAIR 174 89401310 Shop Supplies Paid by Check #101605 05/15/2019 06/06/2019 05/31/2019 06/06/2019 72.02 89421751 Shop Supplies Paid by Check #101605 05/16/2019 06/06/2019 05/31/2019 06/06/2019 95.88 89499998 Shop Supplies Paid by Check #101605 05/22/2019 06/06/2019 05/31/2019 06/06/2019 176.40 89532532 Shop Supplies Paid by Check #101605 05/22/2019 06/06/2019 05/31/2019 06/06/2019 127.35 Vendor 47903 - PRAXAIR 174 Totals Invoices 4 $471.65 Vendor 48443 - QUALITY CONTROL SERVICES INC 56060 Laboratory Equipment Paid by Check #101606 04/19/2019 06/06/2019 05/31/2019 06/06/2019 960.00 Vendor 48443 - QUALITY CONTROL SERVICES INC Totals Invoices 1 $960.00 Vendor 43332 - RED WING SHOE STORE 39707 Safety Equipment - Physicals Paid by Check #101607 05/20/2019 06/06/2019 05/31/2019 06/06/2019 266.67 Vendor 43332 - RED WING SHOE STORE Totals Invoices 1 $266.67 Vendor 47803 - REDWOOD PRINTING 29614 Meters Phase 5A Paid by Check #101608 05/17/2019 06/06/2019 05/31/2019 06/06/2019 58.49 Vendor 47803 - REDWOOD PRINTING Totals Invoices 1 $58.49 Vendor 21116 - RENO GAZETTE-JOURNAL 0002440754 Heavenly Tank Rehabilitation Paid by Check #101609 05/20/2019 06/06/2019 05/31/2019 06/06/2019 383.00 Vendor 21116 - RENO GAZETTE-JOURNAL Totals Invoices 1 $383.00 Vendor 47914 - TIM RUTHERFORD 1039 Replace ERP System Paid by Check #101610 05/17/2019 06/06/2019 05/31/2019 06/06/2019 1,000.00 Vendor 47914 - TIM RUTHERFORD Totals Invoices 1 $1,000.00 Vendor 21701 - THE SACRAMENTO BEE APRIL19 Heavenly Tank Rehabilitation Paid by Check #101611 05/05/2019 06/06/2019 05/31/2019 06/06/2019 1,004.86 Vendor 21701 - THE SACRAMENTO BEE Totals Invoices 1 $1,004.86 Vendor 48911 - JOHN SHERIDAN WEF2019 Dues - Memberships - Certification Paid by Check #101612 05/04/2019 06/06/2019 05/31/2019 06/06/2019 143.00 Vendor 48911 - JOHN SHERIDAN Totals Invoices 1 $143.00 Vendor 43552 - SHERWIN-WILLIAMS 5354-5 Wells Paid by Check #101613 05/08/2019 06/06/2019 05/31/2019 06/06/2019 16.53 Vendor 43552 - SHERWIN-WILLIAMS Totals Invoices 1 $16.53 Vendor 47956 - SIERRA CRANE AND HOIST INC RO51139 Pump Stations Paid by Check #101614 05/03/2019 06/06/2019 05/31/2019 06/06/2019 5,875.00 Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 10 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 59 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 47956 - SIERRA CRANE AND HOIST INC Totals Invoices 1 $5,875.00 Vendor 24150 - SIERRA NEVADA MEDIA GROUP 0000168572 Public Relations Expense Paid by Check #101615 04/30/2019 06/06/2019 05/31/2019 06/06/2019 1,418.33 Vendor 24150 - SIERRA NEVADA MEDIA GROUP Totals Invoices 1 $1,418.33 Vendor 22620 - SIERRA SPRINGS 051119 Supplies Paid by Check #101616 05/11/2019 06/06/2019 05/31/2019 06/06/2019 78.14 Vendor 22620 - SIERRA SPRINGS Totals Invoices 1 $78.14 Vendor 22655 - SIERRA TAHOE READY MIX 77413 Wells Paid by Check #101617 05/08/2019 06/06/2019 05/31/2019 06/06/2019 689.11 Vendor 22655 - SIERRA TAHOE READY MIX Totals Invoices 1 $689.11 Vendor 22731 - SIGNS OF TAHOE 190507 Automotive Paid by Check #101618 04/24/2019 06/06/2019 05/31/2019 06/06/2019 1,228.35 Vendor 22731 - SIGNS OF TAHOE Totals Invoices 1 $1,228.35 Vendor 48735 - SILVER STATE ANALYTICAL LAB RN237431 Monitoring Paid by Check #101619 04/30/2019 06/06/2019 05/31/2019 06/06/2019 258.00 Vendor 48735 - SILVER STATE ANALYTICAL LAB Totals Invoices 1 $258.00 Vendor 40233 - SILVER STATE INT'L INC SP514493 Automotive Paid by Check #101620 05/20/2019 06/06/2019 05/31/2019 06/06/2019 67.99 Vendor 40233 - SILVER STATE INT'L INC Totals Invoices 1 $67.99 Vendor 48924 - SLAKEY BROTHERS INC 11282588-00 Wells Paid by Check #101621 05/03/2019 06/06/2019 05/31/2019 06/06/2019 425.38 Vendor 48924 - SLAKEY BROTHERS INC Totals Invoices 1 $425.38 Vendor 48172 - SNAP ON TOOLS 05221941449 Small Tools Paid by Check #101622 05/22/2019 06/06/2019 05/31/2019 06/06/2019 150.31 Vendor 48172 - SNAP ON TOOLS Totals Invoices 1 $150.31 Vendor 44594 - SOLENIS LLC 131451295 Polymer Paid by Check #101623 05/10/2019 06/06/2019 05/31/2019 06/06/2019 24,279.95 Vendor 44594 - SOLENIS LLC Totals Invoices 1 $24,279.95 Vendor 45168 - SOUTHWEST GAS MAY2 NATURAL GAS Paid by Check #101624 05/13/2019 06/06/2019 06/06/2019 06/06/2019 426.95 Vendor 45168 - SOUTHWEST GAS Totals Invoices 1 $426.95 Vendor 49064 - Staples Business Advantage 3413167113 Office Supplies Paid by Check #101625 04/10/2019 06/06/2019 05/31/2019 06/06/2019 206.83 Vendor 49064 - Staples Business Advantage Totals Invoices 1 $206.83 Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 11 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 60 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 48617 - STEEL-TOE-SHOES.COM STP091018 Safety Equipment - Physicals Paid by Check #101626 09/10/2018 06/06/2019 05/31/2019 06/06/2019 356.98 STP092718 Safety Equipment - Physicals Paid by Check #101626 09/27/2018 06/06/2019 05/31/2019 06/06/2019 169.99 STP051619 Safety Equipment - Physicals Paid by Check #101626 05/16/2019 06/06/2019 05/31/2019 06/06/2019 203.64 Vendor 48617 - STEEL-TOE-SHOES.COM Totals Invoices 3 $730.61 Vendor 48511 - SWRCB CONTI19A Dues - Memberships - Certification Paid by Check #101627 06/01/2019 06/06/2019 06/06/2019 06/06/2019 65.00 CONTI19B Dues - Memberships - Certification Paid by Check #101627 06/01/2019 06/06/2019 06/06/2019 06/06/2019 65.00 Vendor 48511 - SWRCB Totals Invoices 2 $130.00 Vendor 48481 - SWRCB ACCOUNTING OFFICE LW-1018827-R1 Regulatory Operating Permits Paid by Check #101628 05/24/2019 06/06/2019 05/31/2019 06/06/2019 28,386.00 Vendor 48481 - SWRCB ACCOUNTING OFFICE Totals Invoices 1 $28,386.00 Vendor 24315 - TAHOE PARADISE CHEVRON April19 Stmt Gasoline Expense Paid by Check #101629 04/30/2019 06/06/2019 05/31/2019 06/06/2019 10.53 Vendor 24315 - TAHOE PARADISE CHEVRON Totals Invoices 1 $10.53 Vendor 24325 - TAHOE SAND & GRAVEL T25246 Pipe - Covers & Manholes Paid by Check #101630 05/10/2019 06/06/2019 05/31/2019 06/06/2019 261.91 T25247 Pipe - Covers & Manholes Paid by Check #101630 05/16/2019 06/06/2019 05/31/2019 06/06/2019 771.65 T25164 Pipe - Covers & Manholes Paid by Check #101630 05/20/2019 06/06/2019 05/31/2019 06/06/2019 1,008.04 T25258 Pipe - Covers & Manholes Paid by Check #101630 05/22/2019 06/06/2019 05/31/2019 06/06/2019 1,027.95 Vendor 24325 - TAHOE SAND & GRAVEL Totals Invoices 4 $3,069.55 Vendor 49036 - TALMONT RESORT IMPROVEMENT DISTRICT 6TALMONT17DG Suspense-2017 Fire Ptshp Pass Through Paid by Check #101631 05/09/2019 06/06/2019 05/31/2019 06/06/2019 11,695.15 Vendor 49036 - TALMONT RESORT IMPROVEMENT DISTRICT Totals Invoices 1 $11,695.15 Vendor 22450 - THATCHER COMPANY INC 5048041 Hypochlorite Paid by Check #101632 04/24/2019 06/06/2019 05/31/2019 06/06/2019 2,581.12 Vendor 22450 - THATCHER COMPANY INC Totals Invoices 1 $2,581.12 Vendor 15750 - THOMAS HAEN CO INC 19-04A 2018 Hydrants Project Paid by Check #101633 06/06/2019 06/06/2019 05/31/2019 06/06/2019 (137.39) 19-04AR Accrued Construction Retainage Paid by Check #101633 06/06/2019 06/06/2019 05/31/2019 06/06/2019 6.87 19-04B Forcemain Bypass Al Tahoe Paid by Check #101633 06/06/2019 06/06/2019 05/31/2019 06/06/2019 27,507.37 19-04BR Accrued Construction Retainage Paid by Check #101633 06/06/2019 06/06/2019 05/31/2019 06/06/2019 (1,375.37) Vendor 15750 - THOMAS HAEN CO INC Totals Invoices 4 $26,001.48 Vendor 47973 - U S BANK CORPORATE Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 12 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 61 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount ARCE0419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 1,064.30 ASCHENBACH419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 1,373.76 BARTLETTB419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 1,799.22 BARTLETTC419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 686.33 BERGSOHN419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 513.87 BLEDSOE419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 187.47 CASWELL419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 916.00 COOLIDGE419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 302.43 COTULLA419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 746.00 CULLEN419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 139.99 GUTTRY419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 299.56 HENDERSON419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 4,586.86 HILTON419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 265.48 HUGHES419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 1,163.08 HUSSMANN419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 2,580.91 KOSCIOLIEK419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 780.01 NOLAN419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 110.30 NUROCK419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 1,499.87 PRIETO419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 1,007.23 RUIZ419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 88.56 RUTHERDALE419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 328.53 RYAN419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 811.29 SCHLANGE419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 352.32 SCHRAUBEN419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 334.44 SIANO419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 13.98 SKELLY419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 1,840.55 THIEL419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 404.20 THOMSEN419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 820.44 VANGORDEN419 April Stmt Paid by Check #101634 04/22/2019 06/04/2019 05/31/2019 06/06/2019 487.73 Vendor 47973 - U S BANK CORPORATE Totals Invoices 29 $25,504.71 Vendor 43718 - USA BLUE BOOK 888451 Laboratory Supplies Paid by Check #101635 05/07/2019 06/06/2019 05/31/2019 06/06/2019 852.10 891268 Pump Stations Paid by Check #101635 05/09/2019 06/06/2019 05/31/2019 06/06/2019 410.88 891456 PRV, Pine Valley Rd Paid by Check #101635 05/09/2019 06/06/2019 05/31/2019 06/06/2019 (1,422.25) 896603 PRV, Pine Valley Rd Paid by Check #101635 05/15/2019 06/06/2019 05/31/2019 06/06/2019 81.85 896671 PRV, Pine Valley Rd Paid by Check #101635 05/15/2019 06/06/2019 05/31/2019 06/06/2019 1,575.60 899241 Pipe - Covers & Manholes Paid by Check #101635 05/17/2019 06/06/2019 05/31/2019 06/06/2019 196.48 Vendor 43718 - USA BLUE BOOK Totals Invoices 6 $1,694.66 Vendor 48794 - VERIZON CONNECT NWF INC OSV000001751724 Service Contracts Paid by Check #101636 05/01/2019 06/06/2019 05/31/2019 06/06/2019 703.00 Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 13 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 62 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 48794 - VERIZON CONNECT NWF INC Totals Invoices 1 $703.00 Vendor 48586 - VINCIGUERRA CONSTRUCTION 19-01 Meters Phase 5A Paid by Check #101637 06/06/2019 06/06/2019 05/31/2019 06/06/2019 463,811.42 19-01R Accrued Construction Retainage Paid by Check #101637 06/06/2019 06/06/2019 05/31/2019 06/06/2019 (23,190.57) Vendor 48586 - VINCIGUERRA CONSTRUCTION Totals Invoices 2 $440,620.85 Vendor 25700 - WEDCO INC 549649 Small Tools Paid by Check #101638 05/13/2019 06/06/2019 05/31/2019 06/06/2019 13.91 550212 Small Tools Paid by Check #101638 05/15/2019 06/06/2019 05/31/2019 06/06/2019 220.28 550876 Small Tools Paid by Check #101638 05/17/2019 06/06/2019 05/31/2019 06/06/2019 74.20 550877 Buildings Paid by Check #101638 05/17/2019 06/06/2019 05/31/2019 06/06/2019 44.98 550878 Shop Supplies Paid by Check #101638 05/17/2019 06/06/2019 05/31/2019 06/06/2019 228.12 551363 Shop Supplies Paid by Check #101638 05/21/2019 06/06/2019 05/31/2019 06/06/2019 172.84 Vendor 25700 - WEDCO INC Totals Invoices 6 $754.33 Vendor 49106 - STEPHEN WEISS 2614709 Toilet Rebate Program Paid by Check #101639 05/16/2019 06/06/2019 05/31/2019 06/06/2019 50.60 Vendor 49106 - STEPHEN WEISS Totals Invoices 1 $50.60 Vendor 44489 - WESTCOAST ROTOR INC 27705 Primary Equipment Paid by Check #101640 01/23/2019 04/18/2019 03/31/2019 06/06/2019 20.30 Vendor 44489 - WESTCOAST ROTOR INC Totals Invoices 1 $20.30 Vendor 25850 - WESTERN NEVADA SUPPLY 37810430 Biosolids Equipment - Building Paid by Check #101641 04/05/2019 06/06/2019 05/31/2019 06/06/2019 562.09 CM37810430 Biosolids Equipment - Building Paid by Check #101641 04/05/2019 06/06/2019 05/31/2019 06/06/2019 (500.65) 37854226 Pipe - Covers & Manholes Paid by Check #101641 05/08/2019 06/06/2019 05/31/2019 06/06/2019 71.20 17717328-4 Meters & Parts Inventory Paid by Check #101641 05/15/2019 06/06/2019 05/31/2019 06/06/2019 16,220.69 37853879 Pump Stations Paid by Check #101641 05/15/2019 06/06/2019 05/31/2019 06/06/2019 995.42 17866509 Saddles & Fittings Inventory Paid by Check #101641 05/20/2019 06/06/2019 05/31/2019 06/06/2019 3,710.69 37875066 Shop Supplies Paid by Check #101641 05/22/2019 06/06/2019 05/31/2019 06/06/2019 39.50 37856281 Small Tools Paid by Check #101641 05/23/2019 06/06/2019 05/31/2019 06/06/2019 58.16 Vendor 25850 - WESTERN NEVADA SUPPLY Totals Invoices 8 $21,157.10 Vendor 49113 - DONALD E YOUNG 023732033 Toilet Rebate Program Paid by Check #101642 05/13/2019 06/06/2019 05/31/2019 06/06/2019 90.39 Vendor 49113 - DONALD E YOUNG Totals Invoices 1 $90.39 Vendor WESLEY & SANDRA BENNION 026947 _Customer Refund Paid by Check #101643 05/16/2019 06/06/2019 05/31/2019 06/06/2019 1,284.87 Vendor WESLEY & SANDRA BENNION Totals Invoices 1 $1,284.87 Vendor SANDRA BRYSON 028419 _Customer Refund Paid by Check #101644 05/17/2019 06/06/2019 05/31/2019 06/06/2019 2,351.89 Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 14 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 63 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor SANDRA BRYSON Totals Invoices 1 $2,351.89 Vendor DUGGAN SMITH 051319 Waterline - Ponder osa Paid by Check #101645 05/13/2019 06/06/2019 05/31/2019 06/06/2019 5,000.00 Vendor DUGGAN SMITH Totals Invoices 1 $5,000.00 Vendor MADELINE JO GRONEMAN 016615 _Customer Refund Paid by Check #101646 05/15/2019 06/06/2019 05/31/2019 06/06/2019 2,439.29 Vendor MADELINE JO GRONEMAN Totals Invoices 1 $2,439.29 Vendor XIAO & WEN HONG 1157 _Customer Refund Paid by Check #101647 05/24/2019 06/06/2019 05/31/2019 06/06/2019 200.00 Vendor XIAO & WEN HONG Totals Invoices 1 $200.00 Vendor CANDACE JORDAN 051019 Miscellaneous Liability Claims Paid by Check #101648 05/10/2019 06/06/2019 05/31/2019 06/06/2019 47.06 Vendor CANDACE JORDAN Totals Invoices 1 $47.06 Vendor DEL LAFOUNTAIN 028235 _Customer Refund Paid by Check #101649 05/15/2019 06/06/2019 05/31/2019 06/06/2019 443.90 Vendor DEL LAFOUNTAIN Totals Invoices 1 $443.90 Vendor LAUREN PAYNE & TIM ZLENDICH 1313 Waterline - Ponderosa Paid by Check #101650 05/09/2019 06/06/2019 05/31/2019 06/06/2019 5,000.00 Vendor LAUREN PAYNE & TIM ZLENDICH Totals Invoices 1 $5,000.00 Vendor BRIAN & KIRSTEN LUEHRS 23093 _Customer Refund Paid by Check #101651 05/08/2019 06/06/2019 05/31/2019 06/06/2019 398.79 Vendor BRIAN & KIRSTEN LUEHRS Totals Invoices 1 $398.79 Vendor ALBANO MARGARIT 15757 _Customer Refund Paid by Check #101652 05/23/2019 06/06/2019 05/31/2019 06/06/2019 291.47 Vendor ALBANO MARGARIT Totals Invoices 1 $291.47 Vendor ONE STOP POOL PROS SUSPENSE _Customer Refund Paid by Check #101653 05/22/2019 06/06/2019 05/31/2019 06/06/2019 2,823.66 Vendor ONE STOP POOL PROS Totals Invoices 1 $2,823.66 Vendor HUMBERT & PAULA ARMELLINO 2572405 Meters Phase 5A Paid by Check #101654 05/01/2019 06/06/2019 05/31/2019 06/06/2019 3,410.00 Vendor HUMBERT & PAULA ARMELLINO Totals Invoices 1 $3,410.00 Vendor GREG REDMAN 027909 _Customer Refund Paid by Check #101655 05/14/2019 06/06/2019 05/31/2019 06/06/2019 857.39 Vendor GREG REDMAN Totals Invoices 1 $857.39 Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 15 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 64 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor GARRICK & BECKI TERRELL 028308 _Customer Refund Paid by Check #101656 05/15/2019 06/06/2019 05/31/2019 06/06/2019 1,467.47 Vendor GARRICK & BECKI TERRELL Totals Invoices 1 $1,467.47 Vendor DALE TURNAGE 2708 Miscellaneous Liability Claims Paid by Check #101657 03/14/2019 06/06/2019 05/31/2019 06/06/2019 1,831.82 Vendor DALE TURNAGE Totals Invoices 1 $1,831.82 Grand Totals Invoices 255 $1,932,778.27 Run by Theresa Sherman on 05/31/2019 09:34:35 AM Page 16 of 16 Payment of Claims Payment Date Range 06/06/19 - 06/06/19 Report By Vendor - Invoice Summary Listing 65 Julie Ryan June 6, 2019 Page 2 BOARD AGENDA ITEM 6c TO: Board of Directors FROM: Julie Ryan, Engineering Department Manager MEETING DATE: June 6, 2019 ITEM – PROJECT NAME: 2019 Heavenly Tank Improvements Project REQUESTED BOARD ACTION: Waive minor deviations in the Bid and award project to the lowest responsive, responsible bidder, Haen Constructors, in the amount of $968,255. DISCUSSION: On Thursday, May 9, 2019, 11 general contractors attended a mandatory pre-bid meeting for the above Project. This Contract, located at the Heavenly Valley Tank site, includes the following work: Replacing the tank’s interior coating because it has reached the end of its useful life; Replacing the tank’s exterior coating on the roof and knuckle because it has reached the end of its useful life; Performing site maintenance and erosion control Best Management Practices (BMPs) for the tank site, including installing a new interlocking block retaining wall; Installing miscellaneous improvements to the tank appurtenances; Installing a passive mixing system to improve tank water quality; Installing a passive cathodic protection system to prevent corrosion and improve the coating’s service life; Replacing and relocating the water meter for Vail Ski Resort’s secondary snow- making system, and; Performing an exterior coating overcoat with anti-graffiti coating to combat the historic graffiti issues at this site. The last item on this list was bid as an alternate bid item, to be included only if the price allowed it to be added to the scope. Bids were opened at the District offices on Tuesday, May 28, 2019, at 2:00 p.m. Three (3) bids were received. The total bid amounts ranged from $968,255 to $1,359,060. Haen Constructors was the apparent low bidder. Staff has reviewed the bids for conformance with the bidding requirements. The results of this review are attached; there were only minor deviations in Haen Constructors’ bid. Staff recommends that the Board waive the minor deviations in the Bid, and award the project to Haen Constructors in the amount $968,255. General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline Julie Ryan June 6, 2019 Page 2 The Engineer’s Estimate for construction of this project, based on recent bid results and general bidding climate, is $827,673.26. The total budget for this project, including funding for design, permitting and inspection, is $820,000 (FY 18/19 and 19/20). A breakdown of the Engineer’s Estimate and Bid Summary is attached. Following award, staff will review the price deviations of individual work items, work with the Contractor for value engineered solutions, and if warranted, return to the Board for authorization to modify the Contract Scope of Work to accommodate these cost-saving alternatives. SCHEDULE: Upon Board approval COSTS: $968,255 (HVNTNK) ACCOUNT NO: 2030.8930 BUDGETED AMOUNT AVAILABLE: 2018/19 $150,000; 2019/20 $670,000 ATTACHMENTS: Bid Memo to Board with Attachments _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water/Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO South Tahoe Public Utility District ● 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Phone 530.544.6474 ● Facsimile 530.541.0614 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Telephone: (530)544-6474 Fax: (530)541-4319 Memorandum Date: June 6, 2019 To: Board Members, John Thiel, Shannon D. Cotulla From: Starlet Glaze, Contracts Administrator Subject: 2019 Heavenly Tank Improvements Project At 2:00 o’clock on the afternoon of May 28, 2019 we received three (3) electronic bids via PlanetBids for the above-referenced project. Bids ranged from $968,255.00 to $1,359,060.00. The engineer’s estimate was $827,673.26. The second lowest bid submitted by Farr Construction Corporation dba Resource Development Company was found by staff to be non-responsive due to the original Bid Bond not being provided to the District prior to the Bid opening as specified. The third lowest bid submitted by MKD Construction, Inc., was found by staff to be non- responsive due to the original Bid Bond not being provided to the District prior to the Bid opening as specified. A careful review and analysis of the three lowest bids was completed by staff. See attached spreadsheet and list of deviations for a full breakdown of each bid. Haen Constructors is the apparent low bidder. Haen Constructors had only two minor deviations I contacted the Contractors License Board and was given the following information: License Number 1045625 is current and active and expires 10/31/2020. The company is a Corporation. Haen Constructors holds the following License Classifications: Class A – General Engineering; Class B – General Building; Class C21 – Building Moving, Demolition. I also contacted the California Department of Industrial Relations Contractor Registration site and verified that Haen Constructors is registered under PWCR Number 1000063197. Advertised on 4/12/19 Bid on 5/28/19 Item No.Description Unit of Measure Quantity Engineers Estimate Haen Constructors Resource Development Company MKD CONSTRUCTION, INC. 1 Mobilization and Demobilization (Note: This lump sum figure cannot exceed 10 percent of the total cost of the total bid (excluding this item)LS 1 71,183.00$ $45,000.00 $66,800.00 $85,000.00 2 Temporary BMP's LS 1 13,002.00$ $6,200.00 $14,700.00 $16,000.00 3 Clearing and Grubbing LS 1 2,167.00$ $2,500.00 $6,600.00 $9,500.00 4 Sheeting, Shoring and Bracing or Equivalent LS 1 $6,000.00 $9,300.00 $6,675.00 5 Retaining Wall LS 1 45,679.28$ $92,000.00 $104,500.00 $113,400.00 6 Infiltration Trench LS 1 4,875.75$ $10,500.00 $25,200.00 $13,400.00 7 Rock Lined Spill Way LS 1 13,002.00$ $22,500.00 $22,250.00 $12,500.00 8 Miscellaneous Tank Appurtenances LS 1 4,595.12$ $16,500.00 $6,600.00 $21,715.00 9 8" Water Service LS 1 48,757.50$ $70,800.00 $77,200.00 $93,600.00 10 Passive Mixing System LS 1 75,213.21$ $99,500.00 $105,980.00 $86,785.00 11 Interior Tank Recoat LS 1 244,871.00$ $270,000.00 $338,200.00 $390,000.00 12 Exterior Tank Roof and Knuckle Overcoat LS 1 29,254.50$ $37,200.00 $79,250.00 $83,000.00 13 Security Fence LF 355 82,698.14$ $97,980.00 $153,005.00 $175,725.00 14 Security Gates LS 1 18,507.10$ $8,900.00 $13,250.00 $16,000.00 15 Rock Slope Protection SF 1620 14,042.16$ $48,600.00 $23,085.00 $21,060.00 16 Site Restoration LS 1 16,252.50$ $3,000.00 $9,300.00 $24,500.00 17 Passive Cathodic Protection LS 1 38,128.37$ $24,000.00 $65,750.00 $90,000.00 18 Grout Base Repair LF 15 325.05$ $900.00 $8,490.00 $3,000.00 19 Spalling Concrete Ringwall Repair LF 15 325.05$ $975.00 $10,140.00 $3,000.00 20 Exterior Tank Shell Overcoat (Alternate)LS 1 60,134.25$ $55,200.00 $43,080.00 $45,000.00 21 Non-Excavatable Rock CY 20 4,660.28$ $10,000.00 $27,240.00 $9,200.00 22 Unknown Conditions LS 1 $40,000.00 $40,000.00 $40,000.00 $40,000.00 Total $827,673.26 $968,255.00 $1,249,920.00 $1,359,060.00 Bid Results for 2019 Heavenly Tank Improvements Project 2019 Heavenly Tank Improvements Project Bid Opening: 5/28/19 at 2:00 o’clock p.m. Deviations and information gathered during bid analysis of the three lowest bids: Haen Constructors.: • Bidder’s General Information Item 5, name and partial address of surety provided. Did not provide phone number or zip code. We were, however able to verify that the bid bond is valid and that the surety company meets District’s specifications. • Noncolusion Declaration, the notary mistakenly listed the contractors name in the month portion of the date in the subscribed and sworn notary block. Farr Construction Corporation dba Resource Development Company:. • Bid Security, the original Bid Bond was not received by the District prior to the bid opening on May 28, 2019 at 2:00 p.m. making the bid non-responsive. • List of Subcontractors, only the name, city and state was listed for the sub- contractors. The complete addresses were not provided. • Bidder’s General Information Item 5, only the name and address for the surety’s brokerage agency and agent were provided. The phone number for the brokerage agency and the surety information (name, address or phone number) were not provided. • Certification by Contractor’s Insurance Broker form was filled out incorrectly: in the second blank and third paragraph they inserted the brokerage agency instead of the insurance company name(s). I was unable to verify the insurance company provided over the phone by the brokerage company representative through either the California Department of Insurance website or AM Best website. MKD Construction, Inc.: • Bid Security, the original Bid Bond was not received by the District prior to the bid opening on May 28, 2019 at 2:00 p.m. making the bid non-responsive. • Bidder’s General Information, Item 3, the expiration date for the contractor’s license was listed incorrectly as 03/21/2021. I was, however, able to verify through the State Contractor’s License Board website that the correct expiration date is 03/31/2021. • Bidder’s General Information item 5, only the name, address and phone number for the surety’s brokerage agency and agent were provided. No surety information (name, address or phone number) was provided. • Certification by Contractor’s Insurance Broker, I was unable to verify the AM Best rating for the insurance company listed by the brokerage agency in the second blank and the third paragraph. I was, however, able to verify the insurance company through the California Department of Insurance website. 2019 HEAVENLY TANK IMPROVEMENTS PROJECT CONTRACTOR’S SUBCONTRACTORS 1 Haen Constructors Description of Work Subcontractors Name & Address Fencing/Gate 9.6% BI# 13, 14 Tahoe Fence Company, Inc. 36 Brown St. Mound House, NV 89706 CA#305682; CA DIR(PWC)#1000014567 Coatings/Cathodic Protection 31% BI#11, 12, 17, 20 Olympus and Associates P.O. 8015 Reno, NV 89507 CA#777677; CA DIR(PWC)#1000007287 Pipe Insulation 1% BI#9 K C Insulation, Inc. 989 Lydia Ct. Sparks, NV 89436 CA#830494; CA DIR(PWC)#1000016899 Named Equipment/Material Supplier List: Equipment/Material Supplier Aggregate Base Material Bing / Bing Water Meter Iconix / McCrometer Concrete and Grout Mixes Haen Constructors / STRM/Whitecap Piping, Fittings, and Specials Iconix / CPF/EBAA/Romac Valves and Valve Boxes Iconix / Pratt/Old Castle Pipe Bedding Material Bing / Bing Interior Coating Olympus / Sherwin Williams Exterior Coating Olympus / Sherwin Williams Abrasive Blast Material Olympus / Kleen-blast Revegetation Material Haen Constructors / White Cap Ladder Cable Fall Protection Whitecap / 3M Miscellaneous Steel Haen Constructors / Alpine Welding Rock Slope Protection Haen Constructors / Brunswick Canyon/Amacker Steel Security Fence Tahoe Fence / Ameristar Farr Construction Corporation dba Resource Devolopment Company Description of Work Subcontractors & Address All the work except fence,CP,electrical 84.23% Farr Construction Corp. dba Resource Development Co. Sparks, NV 89431 CA#1050646A; CA DIR(PWC)#100006035 Fencing 13.25% Tholl Fence Sparks, NV CA#199672; CA DIR(PWC)#1000009335 2019 HEAVENLY TANK IMPROVEMENTS PROJECT CONTRACTOR’S SUBCONTRACTORS 2 Cathodic Protection 1.84% Corrpro Waterworks Tempe, AZ 85282 CA#764878A; CA DIR(PWC)#1000002963 Electrical .68% Creekside Electrical Carson City, NV CA#915754; CA DIR(PWC)#1000016544 Named Equipment/Material Supplier List: Equipment/Material Supplier Aggregate Base Material Tahoe Sand & Gravel Water Meter Western NV Supply / Ultra-Mag Concrete and Grout Mixes Sierra Tahoe Redimix Piping, Fittings, and Specials Western NV Supply Valves and Valve Boxes Western NV Supply Pipe Bedding Material Tahoe Sand & Gravel Interior Coating Sherwin Williams Exterior Coating Sherwin Williams Abrasive Blast Material Green Diamond Revegetation Material EPS Ladder Cable Fall Protection Cardinal Safety / 3M DBI Sala Miscellaneous Steel PDM Rock Slope Protection Jensen Precast / Redi Rock Steel Security Fence Tholl Fence MKD Construction, Inc. Description of Work Subcontractors & Address Electrical .006% Creekside Electrical Contractor, Inc. 3059 Airport Road Carson City, NV 89706 CA#915754; CA DIR(PWC)#1000016544 Fence and Gates 12.2% Tholl Fence, Inc. 800 Glendale Ave. PO Box 855 Sparks, NV 89432 CA#199672; CA DIR(PWC)#1000009335 Cathodic Protection 1.6% Corrpro Companies, Inc. 17988 Edison Avenue Chesterfield, MO 63005 CA#764878; CA DIR(PWC)#1000002693 Interior/Exterior Blasting & Recoat 36.4% Farr Construction Corporation dba Resource Devolopment Company 1050 Linda Way Sparks, NV 89431 CA#1050646; CA DIR(PWC)#1000006035 2019 HEAVENLY TANK IMPROVEMENTS PROJECT CONTRACTOR’S SUBCONTRACTORS 3 Equipment/Material Supplier List Equipment/Material Supplier Aggregate Base Material Bing Materials / Bing Materials Water Meter Western Nevada Supply / Ultra Mag Concrete and Grout Mixes Bing Ready Mix / Bing Materials Piping, Fittings, and Specials Western Nevada Supply / US Pipe Valves and Valve Boxes Western Nevada Supply / Mueller & AVK Pipe Bedding Material Bing Materials / Bing Materials Interior Coating Sherwin Williams / Sherwin Williams Exterior Coating Sherwin Williams / Sherwin Williams Abrasive Blast Material Green Diamond / Green Diamond Revegetation Material Full Circle Compost / Full Circle Compost Ladder Cable Fall Protection Fastenal / 3M LAD-SAF Miscellaneous Steel PDM Steel / US Steel Rock Slope Protection Cinderlite / Cinderlite Steel Security Fence Tholl Fence / Tholl Fence Julie Ryan June 6, 2019 Page 2 BOARD AGENDA ITEM 6c TO: Board of Directors FROM: Julie Ryan, Engineering Department Manager MEETING DATE: June 6, 2019 ITEM – PROJECT NAME: 2019 Heavenly Tank Improvements Project REQUESTED BOARD ACTION: Waive minor deviations in the Bid and award project to the lowest responsive, responsible bidder, Haen Constructors, in the amount of $968,255. DISCUSSION: On Thursday, May 9, 2019, 11 general contractors attended a mandatory pre-bid meeting for the above Project. This Contract, located at the Heavenly Valley Tank site, includes the following work: Replacing the tank’s interior coating because it has reached the end of its useful life; Replacing the tank’s exterior coating on the roof and knuckle because it has reached the end of its useful life; Performing site maintenance and erosion control Best Management Practices (BMPs) for the tank site, including installing a new interlocking block retaining wall; Installing miscellaneous improvements to the tank appurtenances; Installing a passive mixing system to improve tank water quality; Installing a passive cathodic protection system to prevent corrosion and improve the coating’s service life; Replacing and relocating the water meter for Vail Ski Resort’s secondary snow- making system, and; Performing an exterior coating overcoat with anti-graffiti coating to combat the historic graffiti issues at this site. The last item on this list was bid as an alternate bid item, to be included only if the price allowed it to be added to the scope. Bids were opened at the District offices on Tuesday, May 28, 2019, at 2:00 p.m. Three (3) bids were received. The total bid amounts ranged from $968,255 to $1,359,060. Haen Constructors was the apparent low bidder. Staff has reviewed the bids for conformance with the bidding requirements. The results of this review are attached; there were only minor deviations in Haen Constructors’ bid. Staff recommends that the Board waive the minor deviations in the Bid, and award the project to Haen Constructors in the amount $968,255. General Manager John Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline Julie Ryan June 6, 2019 Page 2 The Engineer’s Estimate for construction of this project, based on recent bid results and general bidding climate, is $827,673.26. The total budget for this project, including funding for design, permitting and inspection, is $820,000 (FY 18/19 and 19/20). A breakdown of the Engineer’s Estimate and Bid Summary is attached. Following award, staff will review the price deviations of individual work items, work with the Contractor for value engineered solutions, and if warranted, return to the Board for authorization to modify the Contract Scope of Work to accommodate these cost-saving alternatives. SCHEDULE: Upon Board approval COSTS: $968,255 (HVNTNK) ACCOUNT NO: 2030.8930 BUDGETED AMOUNT AVAILABLE: 2018/19 $150,000; 2019/20 $670,000 ATTACHMENTS: Bid Memo to Board with Attachments _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water/Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO South Tahoe Public Utility District ● 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Phone 530.544.6474 ● Facsimile 530.541.0614 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Telephone: (530)544-6474 Fax: (530)541-4319 Memorandum Date: June 6, 2019 To: Board Members, John Thiel, Shannon D. Cotulla From: Starlet Glaze, Contracts Administrator Subject: 2019 Heavenly Tank Improvements Project At 2:00 o’clock on the afternoon of May 28, 2019 we received three (3) electronic bids via PlanetBids for the above-referenced project. Bids ranged from $968,255.00 to $1,359,060.00. The engineer’s estimate was $827,673.26. The second lowest bid submitted by Farr Construction Corporation dba Resource Development Company was found by staff to be non-responsive due to the original Bid Bond not being provided to the District prior to the Bid opening as specified. The third lowest bid submitted by MKD Construction, Inc., was found by staff to be non- responsive due to the original Bid Bond not being provided to the District prior to the Bid opening as specified. A careful review and analysis of the three lowest bids was completed by staff. See attached spreadsheet and list of deviations for a full breakdown of each bid. Haen Constructors is the apparent low bidder. Haen Constructors had only two minor deviations I contacted the Contractors License Board and was given the following information: License Number 1045625 is current and active and expires 10/31/2020. The company is a Corporation. Haen Constructors holds the following License Classifications: Class A – General Engineering; Class B – General Building; Class C21 – Building Moving, Demolition. I also contacted the California Department of Industrial Relations Contractor Registration site and verified that Haen Constructors is registered under PWCR Number 1000063197. Advertised on 4/12/19 Bid on 5/28/19 Item No.Description Unit of Measure Quantity Engineers Estimate Haen Constructors Resource Development Company MKD CONSTRUCTION, INC. 1 Mobilization and Demobilization (Note: This lump sum figure cannot exceed 10 percent of the total cost of the total bid (excluding this item)LS 1 71,183.00$ $45,000.00 $66,800.00 $85,000.00 2 Temporary BMP's LS 1 13,002.00$ $6,200.00 $14,700.00 $16,000.00 3 Clearing and Grubbing LS 1 2,167.00$ $2,500.00 $6,600.00 $9,500.00 4 Sheeting, Shoring and Bracing or Equivalent LS 1 $6,000.00 $9,300.00 $6,675.00 5 Retaining Wall LS 1 45,679.28$ $92,000.00 $104,500.00 $113,400.00 6 Infiltration Trench LS 1 4,875.75$ $10,500.00 $25,200.00 $13,400.00 7 Rock Lined Spill Way LS 1 13,002.00$ $22,500.00 $22,250.00 $12,500.00 8 Miscellaneous Tank Appurtenances LS 1 4,595.12$ $16,500.00 $6,600.00 $21,715.00 9 8" Water Service LS 1 48,757.50$ $70,800.00 $77,200.00 $93,600.00 10 Passive Mixing System LS 1 75,213.21$ $99,500.00 $105,980.00 $86,785.00 11 Interior Tank Recoat LS 1 244,871.00$ $270,000.00 $338,200.00 $390,000.00 12 Exterior Tank Roof and Knuckle Overcoat LS 1 29,254.50$ $37,200.00 $79,250.00 $83,000.00 13 Security Fence LF 355 82,698.14$ $97,980.00 $153,005.00 $175,725.00 14 Security Gates LS 1 18,507.10$ $8,900.00 $13,250.00 $16,000.00 15 Rock Slope Protection SF 1620 14,042.16$ $48,600.00 $23,085.00 $21,060.00 16 Site Restoration LS 1 16,252.50$ $3,000.00 $9,300.00 $24,500.00 17 Passive Cathodic Protection LS 1 38,128.37$ $24,000.00 $65,750.00 $90,000.00 18 Grout Base Repair LF 15 325.05$ $900.00 $8,490.00 $3,000.00 19 Spalling Concrete Ringwall Repair LF 15 325.05$ $975.00 $10,140.00 $3,000.00 20 Exterior Tank Shell Overcoat (Alternate)LS 1 60,134.25$ $55,200.00 $43,080.00 $45,000.00 21 Non-Excavatable Rock CY 20 4,660.28$ $10,000.00 $27,240.00 $9,200.00 22 Unknown Conditions LS 1 $40,000.00 $40,000.00 $40,000.00 $40,000.00 Total $827,673.26 $968,255.00 $1,249,920.00 $1,359,060.00 Bid Results for 2019 Heavenly Tank Improvements Project 2019 Heavenly Tank Improvements Project Bid Opening: 5/28/19 at 2:00 o’clock p.m. Deviations and information gathered during bid analysis of the three lowest bids: Haen Constructors.: • Bidder’s General Information Item 5, name and partial address of surety provided. Did not provide phone number or zip code. We were, however able to verify that the bid bond is valid and that the surety company meets District’s specifications. • Noncolusion Declaration, the notary mistakenly listed the contractors name in the month portion of the date in the subscribed and sworn notary block. Farr Construction Corporation dba Resource Development Company:. • Bid Security, the original Bid Bond was not received by the District prior to the bid opening on May 28, 2019 at 2:00 p.m. making the bid non-responsive. • List of Subcontractors, only the name, city and state was listed for the sub- contractors. The complete addresses were not provided. • Bidder’s General Information Item 5, only the name and address for the surety’s brokerage agency and agent were provided. The phone number for the brokerage agency and the surety information (name, address or phone number) were not provided. • Certification by Contractor’s Insurance Broker form was filled out incorrectly: in the second blank and third paragraph they inserted the brokerage agency instead of the insurance company name(s). I was unable to verify the insurance company provided over the phone by the brokerage company representative through either the California Department of Insurance website or AM Best website. MKD Construction, Inc.: • Bid Security, the original Bid Bond was not received by the District prior to the bid opening on May 28, 2019 at 2:00 p.m. making the bid non-responsive. • Bidder’s General Information, Item 3, the expiration date for the contractor’s license was listed incorrectly as 03/21/2021. I was, however, able to verify through the State Contractor’s License Board website that the correct expiration date is 03/31/2021. • Bidder’s General Information item 5, only the name, address and phone number for the surety’s brokerage agency and agent were provided. No surety information (name, address or phone number) was provided. • Certification by Contractor’s Insurance Broker, I was unable to verify the AM Best rating for the insurance company listed by the brokerage agency in the second blank and the third paragraph. I was, however, able to verify the insurance company through the California Department of Insurance website. 2019 HEAVENLY TANK IMPROVEMENTS PROJECT CONTRACTOR’S SUBCONTRACTORS 1 Haen Constructors Description of Work Subcontractors Name & Address Fencing/Gate 9.6% BI# 13, 14 Tahoe Fence Company, Inc. 36 Brown St. Mound House, NV 89706 CA#305682; CA DIR(PWC)#1000014567 Coatings/Cathodic Protection 31% BI#11, 12, 17, 20 Olympus and Associates P.O. 8015 Reno, NV 89507 CA#777677; CA DIR(PWC)#1000007287 Pipe Insulation 1% BI#9 K C Insulation, Inc. 989 Lydia Ct. Sparks, NV 89436 CA#830494; CA DIR(PWC)#1000016899 Named Equipment/Material Supplier List: Equipment/Material Supplier Aggregate Base Material Bing / Bing Water Meter Iconix / McCrometer Concrete and Grout Mixes Haen Constructors / STRM/Whitecap Piping, Fittings, and Specials Iconix / CPF/EBAA/Romac Valves and Valve Boxes Iconix / Pratt/Old Castle Pipe Bedding Material Bing / Bing Interior Coating Olympus / Sherwin Williams Exterior Coating Olympus / Sherwin Williams Abrasive Blast Material Olympus / Kleen-blast Revegetation Material Haen Constructors / White Cap Ladder Cable Fall Protection Whitecap / 3M Miscellaneous Steel Haen Constructors / Alpine Welding Rock Slope Protection Haen Constructors / Brunswick Canyon/Amacker Steel Security Fence Tahoe Fence / Ameristar Farr Construction Corporation dba Resource Devolopment Company Description of Work Subcontractors & Address All the work except fence,CP,electrical 84.23% Farr Construction Corp. dba Resource Development Co. Sparks, NV 89431 CA#1050646A; CA DIR(PWC)#100006035 Fencing 13.25% Tholl Fence Sparks, NV CA#199672; CA DIR(PWC)#1000009335 2019 HEAVENLY TANK IMPROVEMENTS PROJECT CONTRACTOR’S SUBCONTRACTORS 2 Cathodic Protection 1.84% Corrpro Waterworks Tempe, AZ 85282 CA#764878A; CA DIR(PWC)#1000002963 Electrical .68% Creekside Electrical Carson City, NV CA#915754; CA DIR(PWC)#1000016544 Named Equipment/Material Supplier List: Equipment/Material Supplier Aggregate Base Material Tahoe Sand & Gravel Water Meter Western NV Supply / Ultra-Mag Concrete and Grout Mixes Sierra Tahoe Redimix Piping, Fittings, and Specials Western NV Supply Valves and Valve Boxes Western NV Supply Pipe Bedding Material Tahoe Sand & Gravel Interior Coating Sherwin Williams Exterior Coating Sherwin Williams Abrasive Blast Material Green Diamond Revegetation Material EPS Ladder Cable Fall Protection Cardinal Safety / 3M DBI Sala Miscellaneous Steel PDM Rock Slope Protection Jensen Precast / Redi Rock Steel Security Fence Tholl Fence MKD Construction, Inc. Description of Work Subcontractors & Address Electrical .006% Creekside Electrical Contractor, Inc. 3059 Airport Road Carson City, NV 89706 CA#915754; CA DIR(PWC)#1000016544 Fence and Gates 12.2% Tholl Fence, Inc. 800 Glendale Ave. PO Box 855 Sparks, NV 89432 CA#199672; CA DIR(PWC)#1000009335 Cathodic Protection 1.6% Corrpro Companies, Inc. 17988 Edison Avenue Chesterfield, MO 63005 CA#764878; CA DIR(PWC)#1000002693 Interior/Exterior Blasting & Recoat 36.4% Farr Construction Corporation dba Resource Devolopment Company 1050 Linda Way Sparks, NV 89431 CA#1050646; CA DIR(PWC)#1000006035 2019 HEAVENLY TANK IMPROVEMENTS PROJECT CONTRACTOR’S SUBCONTRACTORS 3 Equipment/Material Supplier List Equipment/Material Supplier Aggregate Base Material Bing Materials / Bing Materials Water Meter Western Nevada Supply / Ultra Mag Concrete and Grout Mixes Bing Ready Mix / Bing Materials Piping, Fittings, and Specials Western Nevada Supply / US Pipe Valves and Valve Boxes Western Nevada Supply / Mueller & AVK Pipe Bedding Material Bing Materials / Bing Materials Interior Coating Sherwin Williams / Sherwin Williams Exterior Coating Sherwin Williams / Sherwin Williams Abrasive Blast Material Green Diamond / Green Diamond Revegetation Material Full Circle Compost / Full Circle Compost Ladder Cable Fall Protection Fastenal / 3M LAD-SAF Miscellaneous Steel PDM Steel / US Steel Rock Slope Protection Cinderlite / Cinderlite Steel Security Fence Tholl Fence / Tholl Fence BOARD AGENDA ITEM 13a TO: Board of Directors FROM: John Thiel, General Manager Shannon Cotulla, Assistant General Manager Paul Hughes, Chief Financial Officer Nancy Hussmann, Human Resources Director MEETING DATE: June 6, 2019 ITEM – PROJECT NAME: Closed Session – New Union Memorandum of Understanding Negotiating Implementation of Compensation Study REQUESTED BOARD ACTION: Direct Staff DISCUSSION: Pursuant to Government Code Section 549.57(a)/Conference with Labor Negotiators re: Memorandum of Understanding with Stationary Engineers, Local 39. Present at this Closed Session will be Agency Negotiators: John Thiel/General Manager; Paul Hughes, Chief Financial Officer; Shannon Cotulla, Assistant General Manager; and Nancy A. Hussmann, Human Resources Director. SCHEDULE: N/A COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: N/A _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John A. Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 66 BOARD AGENDA ITEM 13b TO: Board of Directors FROM: John Thiel, General Manager Shannon Cotulla, Assistant General Manager Paul Hughes, Chief Financial Officer Nancy Hussmann, Human Resources Director MEETING DATE: June 6, 2019 ITEM – PROJECT NAME: Closed Session – New Management Group Memorandum of Understanding - Negotiating Implementation of Compensation Study REQUESTED BOARD ACTION: Direct Staff DISCUSSION: Pursuant to Government Code Section 549.57(a)/Conference with Labor Negotiators re: Memorandum of Understanding with the Management Group. Present at this Closed Session will be Agency Negotiators: John Thiel/General Manager; Paul Hughes, Chief Financial Officer; Shannon Cotulla, Assistant General Manager; and Nancy A. Hussmann, Human Resources Director. SCHEDULE: N/A COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: N/A _____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: General GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager John A. Thiel Directors Chris Cefalu James R. Jones Randy Vogelgesang Kelly Sheehan Nick Exline 67