District Board Agenda Packet January 21, 2021 SOUTH TAHOE PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING AGENDA
Thursday, January 21, 2021 - 2:00 p.m. District Board Room
1275 Meadow Crest Drive, South Lake Tahoe, California
David Peterson, Vice President BOARD MEMBERS Kelly Sheehan, President Chris Cefalu, Director Shane Romsos, Director Nick Exline, Director John Thiel, General Manager Paul Hughes, Chief Financial Officer
Public Participation In accordance with Executive Order N-29-20, the District Board Room will be closed to members of
the public and all public participation will be handled remotely through the GoToWebinar listed
below:
1. CALL TO ORDER REGULAR MEETING – PLEDGE OF ALLEGIANCE (At this time, please silence phones and other electronic devices so as not to disrupt the business of the meeting.)
2. COMMENTS FROM THE AUDIENCE (This is an opportunity for members of the public to address the Board on
any short non-agenda items that are within the subject matter jurisdiction of the District. No discussion or action can be taken on matters not listed on the agenda, per the Brown Act. Each member of the public who wishes to comment shall be allotted five minutes, and no more than three individuals shall address the same subject.)
3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR (For purposes of the Brown Act, all Action and
Consent items listed give a brief description of each item of business to be transacted or discussed.
Recommendations of the staff, as shown, do not prevent the Board from taking other action.)
4. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered separately
upon request. Comments and questions from members of the public, staff or Board can be taken when the
comment does not necessitate separate action.)
South Tahoe Public Utility District Board of Directors Meeting
Please join the meeting from your computer, tablet or smartphone:
Please register for South Tahoe Public Utility District Board Meeting - January 21, 2021 2:00 PM
https://attendee.gotowebinar.com/register/8900680080082811659
After registering, you will receive a confirmation email containing information about joining the webinar.
You can also dial in using your phone:
1-866-952-8437
Access Code: 272-778-572
REGULAR BOARD MEETING AGENDA – January 21, 2021 PAGE – 2
5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION/ACTION
6. ITEMS FOR BOARD ACTION
a. Aeration Blower System Emergency Power and Secondary Clarifiers No.’s 1 and 2
Project
(Stephen Caswell, Principal Engineer and Brent Goligoski, Associate Engineer)
(1) Hold a Public Hearing at 2:01 p.m. to receive comments on the designation of the
Project as “substantially complex” under Public Contract Code Section 7201; (2)
Pursuant to the facts, find the Project substantially complex and require a 10% retention
limit; and, (3) Authorize staff to advertise for construction bids for this Project.
b. COVID-19 Rate Relief Program
(Tim Bledsoe, Customer Service Manager) Approve an extension to the Temporary Sewer Rate Relief Program until March 31, 2021.
c. Approve Payment of Claims (Debbie Henderson, Accounting Manager)
Approve Payment of Claims in the amount of $1,390,358.62.
7. ANNOUNCEMENT OF 2021 BOARD APPOINTMENTS (Standing Committees, Ad-Hoc and Liaisons)
8. STANDING AND AD-HOC COMMITTEE REPORTS (Discussions may take place; however, no action will be
taken.) 9. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken.)
10. EL DORADO WATER AGENCY PURVEYOR REPORT
11. GENERAL MANAGER REPORT (Discussion may take place; however, no action will be taken.)
a. Staffing
b. COVID-19
c. Tahoe Keys Water
12. STAFF/ATTORNEY REPORTS (Discussions may take place; however, no action will be taken.)
a. SEED Solar Presentation (Julie Ryan, Engineering Department Manager)
13. NOTICE OF PAST AND FUTURE MEETINGS/EVENTS
Past Meetings/Events
01/07/2021 – 2:00 p.m. Regular Board Meeting at the District
01/13/2021 – 10:00 a.m. El Dorado Water Agency Meeting in Placerville
01/19/2021 – 3:30 p.m. Operations Committee Meeting at the District
Future Meetings/Events
02/04/2021 - 2:00 p.m. Regular Board Meeting at the District
14. ITEMS FOR CLOSED SESSION (The Board will adjourn to Closed Session to discuss items identified below. Closed
Session is not open to the public; however, an opportunity will be provided at this time if members of the public
would like to comment on any item listed – three minute limit.)
a. Pursuant to Section 54957 of the California Government Code, Closed Session may be
held regarding public employee evaluation for unrepresented employee position -
General Manager.
REGULAR BOARD MEETING AGENDA – January 21, 2021 PAGE – 3
ADJOURNMENT (The next Regular Board Meeting is Thursday, February 4, 2021, at 2:00 p.m.)
The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete Agenda
packet is available for review at the meeting and at the District office during the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after Minutes of the meeting have been approved. Items on the Agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified, but may occur slightly later than the specified time.
Public participation is encouraged. Public comments on items appearing on the Agenda will be taken at the same time the Agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Please provide the Clerk of the Board with a copy of all written materials presented at the meeting. Comments on items not on the Agenda can be heard during “Comments from the Audience;” however, action cannot be taken on items not on the Agenda.
Backup materials relating to an open session item on this Agenda, which are not included with the Board packet, will be made available for public inspection at the same time they are distributed or made available to the Board, and can be viewed at the District office, at the Board meeting and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the
disabled in all of the District’s public meetings. If particular accommodations are needed, please contact the Clerk of the Board at (530)
544-6474, extension 6203. All inquiries must be made at least 48 hours in advance of the meeting.
REGULAR BOARD MEETING AGENDA – January 21, 2021 PAGE – 4
SOUTH TAHOE PUBLIC UTILITY DISTRICT
CONSENT CALENDAR
Thursday, January 21, 2021 ITEMS FOR CONSENT a. CALPERS REQUIRED PAY LISTING BY POSITION
(Debbie Henderson, Accounting Manager) Adopt Resolution No.’s 3160-21 and 3161-21 which incorporates the Pay Listing by Position for
the pay listings effective December 24, 2020, and January 1, 2021.
b. GENERAL MANAGER SALARY
(Liz Kauffman, Human Resources Director) Approve the General Manager’s Salary for 2021-2022 Contract year. c. 2019 ROCKY POINT II WATERLINE REPLACEMENT REBID AND LARGE METERS REPLACEMENT PROJECT
(Adrian Combes, Senior Engineer) (1) Approve Change Order No. 2 to Haen Constructors in a credit amount of $107,946.50; and,
(2) Approve the Partial Closeout Agreement and Release of Claims for Haen Constructors for
the 2019 Rocky Point II Waterline Replacement Rebid and for the 2019 Rocky Pressure
Regulating Valve Replacement Portions of the Contract.
d. REGULAR BOARD MEETING MINUTES: January 7, 2021
(Melonie Guttry, Executive Services Manager/Clerk of the Board) Approve January 7, 2021, Minutes.
BOARD AGENDA ITEM 4a
TO: Board of Directors
FROM: Debbie Henderson, Accounting Manager
MEETING DATE: January 21, 2021
ITEM – PROJECT NAME: CalPERS Required Pay Listing by Position
REQUESTED BOARD ACTION: Adopt Resolution No.’s 3160-21 and 3161-21 which
incorporates the Pay Listing by Position for the pay listings effective December 24, 2020,
and January 1, 2021.
DISCUSSION: California Public Employees’ Retirement System (CalPERS) requires each
revision of a combined salary schedule listing all positions at the District be formally
adopted by the Board of Directors. The listing must be retained by the District and must
be available for public inspection for not less than five (5) years. These revisions address
the following:
1.Addition of Operator in Training Position effective December 24, 2020, and the
elimination of Part-Time Grant Assistant position
2.Increase in minimum wage for Part-Time I and Student Helper positions
effective January 1, 2021.
SCHEDULE: Post Pay Listing effective January 1, 2021 on website upon Board approval
COSTS: N/A
ACCOUNT NO: N/A
BUDGETED AMOUNT AVAILABLE: N/A
ATTACHMENTS: Resolution No. 3160-21 and Resolution No. 3161-21, Pay Listing by Position for effective dates December 24, 2020, and January 1, 2021 ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
General Manager
John Thiel
Directors
Chris Cefalu
Shane Romsos
David Peterson
Kelly Sheehan
Nick Exline
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RESOLUTION NO. 3160-21
A RESOLUTION BY THE BOARD OF DIRECTORS
OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT FORMALLY
ADOPTING PAY LISTING BY POSITION FOR THE
EFFECTIVE DATE OF DECEMBER 24, 2020
WHEREAS, the Board of Directors of South Tahoe Public Utility District and the
Board of Administration of California Public Employees’ Retirement System entered into
a Contract, effective June 19, 2003, and amended effective April 19, 2007, providing for
the participation of said public agency in the California Public Employees’ Retirement
System; and,
WHEREAS, the Government Code and CCR, Title 2, Section 570.5 requires that
one combined pay schedule, adopted by the Board of Directors, for every employee
position, including the Board of Directors, be made available for public inspection and
retained for not less than five years; and
WHEREAS, the South Tahoe Public Utility District Pay Listing by Position for the
effective dates of December 24, 2020, is incorporated herein.
NOW, THEREFORE, BE IT RESOLVED that the Board of Directors of South Tahoe
Public Utility District hereby formally adopts the above-mentioned Pay Listing by Position
for the effective date of December 24, 2020.
WE, THE UNDERSIGNED, do hereby certify that the above and foregoing
Resolution was duly and regularly adopted and passed by the Board of Directors of the
South Tahoe Public Utility District at a regular meeting held on the 21st day of January,
2021, by the following vote:
AYES:
NOES:
ABSENT:
_________________________________
Kelly Sheehan, Board President
South Tahoe Public Utility District
ATTEST: _________________________________
Melonie Guttry, Clerk of the Board
South Tahoe Public Utility District
2
3
4
5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RESOLUTION NO. 3161-21
A RESOLUTION BY THE BOARD OF DIRECTORS
OF THE SOUTH TAHOE PUBLIC UTILITY DISTRICT FORMALLY
ADOPTING PAY LISTING BY POSITION FOR THE
EFFECTIVE DATE OF JANUARY 1, 2021
WHEREAS, the Board of Directors of South Tahoe Public Utility District and the
Board of Administration of California Public Employees’ Retirement System entered into
a Contract, effective June 19, 2003, and amended effective April 19, 2007, providing for
the participation of said public agency in the California Public Employees’ Retirement
System; and,
WHEREAS, the Government Code and CCR, Title 2, Section 570.5 requires that
one combined pay schedule, adopted by the Board of Directors, for every employee
position, including the Board of Directors, be made available for public inspection and
retained for not less than five years; and
WHEREAS, the South Tahoe Public Utility District Pay Listing by Position for the
effective dates of January 1, 2021, is incorporated herein.
NOW, THEREFORE, BE IT RESOLVED that the Board of Directors of South Tahoe
Public Utility District hereby formally adopts the above-mentioned Pay Listing by Position
for the effective date of January 1, 2021.
WE, THE UNDERSIGNED, do hereby certify that the above and foregoing
Resolution was duly and regularly adopted and passed by the Board of Directors of the
South Tahoe Public Utility District at a regular meeting held on the 21st day of January,
2021, by the following vote:
AYES:
NOES:
ABSENT:
______________________________
Kelly Sheehan, Board President
South Tahoe Public Utility District
ATTEST: _________________________________
Melonie Guttry, Clerk of the Board
South Tahoe Public Utility District
6
SOUTH TAHOE PUBLIC UTILITY DISTRICT
ANNUAL SALARY SCHEDULE
EFFECTIVE JANUARY 1, 2021
MINIMUM MAXIMUM
ANNUAL ANNUAL
ACCOUNT CLERK I $ 47,398 $ 60,494
ACCOUNT CLERK II $ 52,871 $ 67,478
ACCOUNTING MANAGER $ 113,172 $ 144,439
ACCOUNTING SUPERVISOR $ 77,889 $ 99,409
ACCOUNTING TECH I $ 56,450 $ 72,046
ACCT TECH II/GRANT ASST $ 62,095 $ 79,251 ADMINISTRATIVE ASST $ 57,977 $ 73,995
ADMINISTRATIVE ASST/ASST CLERK OF THE BOARD $ 57,977 $ 73,995
ASSET MANAGEMENT ANALYST I $ 62,401 $ 79,641
ASSET MANAGEMENT ANALYST II $ 83,623 $ 106,727
ASSOCIATE ENGINEER $ 99,604 $ 127,123
ASST GENERAL MANAGER $ 170,316 $ 217,371
BOARD OF DIRECTOR $ 4,800 $ 4,800
CHIEF FINANCIAL OFFICER $ 152,069 $ 194,082
CHIEF PLANT OPERATOR $ 99,088 $ 126,464
CONTRACT ADMINISTRATOR $ 61,668 $ 78,705
CUSTOMER SERVICE MANAGER $ 111,169 $ 141,883
CUSTOMER SERVICE REP I $ 46,932 $ 59,898
CUSTOMER SERVICE REP II $ 52,350 $ 66,813
CUSTOMER SERVICE SPECIALIST $ 59,377 $ 75,781
CUSTOMER SERVICE SUPERVISOR $ 77,889 $ 99,409
ELECTRICAL/INSTR SUPERVISOR $ 99,630 $ 127,156
ELECTRICAL/INSTR TECH I $ 68,316 $ 87,190
ELECTRICAL/INSTR TECH II $ 79,680 $ 101,694
ENG/CAD/GIS SPECIALIST I $ 62,401 $ 79,641
ENG/CAD/GIS SPECIALIST II $ 83,623 $ 106,727
ENGINEERING DEPT MANAGER $ 153,442 $ 195,836
ENGINEERING TECH I $ 73,599 $ 93,933
ENGINEERING TECH II $ 84,664 $ 108,055
EXECUTIVE SERVICES MANAGER $ 99,085 $ 126,460
GENERAL MANAGER $ 192,925 $ 246,226
GRANT ASSISTANT $ 62,095 $ 79,251
GRANT COORDINATOR $ 89,660 $ 114,431
HR ANALYST $ 71,056 $ 90,688
HR COORDINATOR $ 57,977 $ 73,995
HUMAN RESOURCES DIRECTOR $ 118,359 $ 151,060
HYDROGEOLOGIST $ 114,493 $ 146,126
INFO TECHNOLOGY MANAGER $ 119,516 $ 152,536
Effective 1/1/21
7
SOUTH TAHOE PUBLIC UTILITY DISTRICT
ANNUAL SALARY SCHEDULE
EFFECTIVE JANUARY 1, 2021
MINIMUM MAXIMUM
ANNUAL ANNUAL
INSPECTIONS SUPERVISOR $ 82,821 $ 105,703
INSPECTOR I $ 59,915 $ 76,468
INSPECTOR II $ 70,611 $ 90,120
IT SYSTEMS SPECIALIST I $ 61,946 $ 79,060
IT SYSTEMS SPECIALIST II $ 72,632 $ 92,699
LAB ASST $ 50,872 $ 64,927
LAB DIRECTOR $ 104,940 $ 133,932
LAB TECH I $ 63,391 $ 80,905
LAB TECH II $ 74,505 $ 95,089
LT CUSTOMER SERVICE REP I $ 46,932 $ 59,898
LT CUSTOMER SERVICE REP II $ 52,350 $ 66,813
LT METER SERVICE TECH $ 59,915 $ 76,468
LT STAFF ENGINEER I $ 73,590 $ 93,921
LT WATER METER INSTALL COORD $ 62,559 $ 79,843
MAINT MECHANIC TECH I $ 56,624 $ 72,268
MAINT MECHANIC TECH I-SPECIAL RATE $ 79,045 $ 79,045
MAINT MECHANIC TECH II $ 66,670 $ 85,090
MAINTENANCE SUPERVISOR $ 94,011 $ 119,984
MANAGER OF FIELD OPERATIONS $ 125,933 $ 160,726
MANAGER OF PLANT OPERATIONS $ 125,937 $ 160,731
NETWORK/TEL SYS ADMIN I $ 83,947 $ 107,140
NETWORK/TEL SYS ADMIN II $ 90,065 $ 114,948
OPERATIONS SUPERVISOR $ 83,099 $ 106,058
OPERATOR IN TRAINING $ 56,792 $ 56,792
PART TIME PERMANENT I $ 13,986 $ 17,850
PART TIME PERMANENT II $ 18,054 $ 23,042
PLANT OPERATOR I $ 56,792 $ 72,483
PLANT OPERATOR Ill $ 71,791 $ 91,626
PRINCIPAL ENGINEER $ 133,050 $ 169,809
PUBLIC AFFAIRS/CONSERVATION MANAGER $ 99,974 $ 127,595
PUMP STATION LEAD $ 76,544 $ 97,692
PUMP STATION OPERATOR I $ 54,853 $ 70,008
PUMP STATION OPERATOR II $ 67,133 $ 85,681
PUMP STATION SUPERVISOR $ 90,988 $ 116,126
PURCHASING AGENT $ 99,085 $ 126,460
SEASONAL $ 18,054 $ 23,042
SENIOR CUSTOMER SERVICE REP $ 59,377 $ 75,781
SENIOR ENGINEER $ 114,493 $ 146,126
Effective 1/1/21
8
SOUTH TAHOE PUBLIC UTILITY DISTRICT
ANNUAL SALARY SCHEDULE
EFFECTIVE JANUARY 1, 2021
MINIMUM MAXIMUM
ANNUAL ANNUAL
SHIPPING AND RECEIVING CLERK $ 55,509 $ 70,845
STAFF ENGINEER I $ 73,590 $ 93,921
STAFF ENGINEER II $ 84,664 $ 108,055
STUDENT HELPER $ 13,986 $ 17,850
UNDERGROUND REPAIR SEWER I $ 47,752 $ 60,945
UNDERGROUND REPAIR SEWER I -SPECIAL RATE $ 65,031 $ 65,031
UNDERGROUND REPAIR SEWER II $ 58,985 $ 75,281
UNDERGROUND REPAIR SEWER LEAD $ 67,735 $ 86,449
UNDERGROUND REPAIR SEWER SUPERVISOR $ 86,781 $ 110,758
UNDERGROUND REPAIR WATER I $ 47,752 $ 60,945
UNDERGROUND REPAIR WATER II $ 58,985 $ 75,281
UNDERGROUND REPAIR WATER LEAD $ 67,735 $ 86,449
UNDERGROUND REPAIR WATER SUPERVISOR $ 86,781 $ 110,758
UTILITY PERSON I $ 42,976 $ 54,850
UTILITY PERSON II $ 51,123 $ 65,247
VEHICLE/HVY EQUIP MECH I $ 56,624 $ 72,268
VEHICLE/HVY EQUIP MECH II $ 66,670 $ 85,090
VEHICLE/HVY EQUIP MECH SUPERVISOR $ 86,781 $ 110,758
WATER CONSERVATION SPECIALIST $ 66,429 $ 84,782
WATER REUSE LEAD $ 67,735 $ 86,449
WATER REUSE MANAGER $ 114,493 $ 146,126
WATER REUSE WORKER I $ 47,752 $ 60,945
WATER REUSE WORKER II $ 58,985 $ 75,281
WATER SERVICE REP $ 67,735 $ 86,449
Effective 1/1/21
9
BOARD AGENDA ITEM 4b
TO: Board of Directors FROM: Liz Kauffman, Human Resources Director
MEETING DATE: January 21, 2021
ITEM – PROJECT NAME: General Manager Salary REQUESTED BOARD ACTION: Approve the General Manager’s Salary for 2021-2022
Contract year.
DISCUSSION: The Board reviewed the annual performance evaluation for John Thiel,
General Manager. The Contract for the General Manager provides eligibility for a merit
increase to the next step in the salary range on an annual basis, as approved by the
Board of Directors and based upon satisfactory performance.
The current Contract states that on annual basis, the General Manager will be eligible
for a potential merit increase to the next step in the salary range, as approved by the
Board of Directors and based on satisfactory performance. The current salary for the
General Manager is Step C of the Management Salary Schedule, $17,724.94 per month, $212,699.30 annually. This salary was approved January 9, 2020, through January 6,
2021. It is recommended that the General Manager’s salary be increased to Step D of the Management Salary Schedule, $18,611.19 per month, $223,334.27 annually,
effective January 7, 2021, through January 5, 2022.
SCHEDULE: Upon approval, notify Payroll of salary adjustment effective January 7, 2021
COSTS: N/A
ACCOUNT NO: N/A
BUDGETED AMOUNT AVAILABLE: N/A
ATTACHMENTS: N/A ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
General Manager
John Thiel
Directors
Chris Cefalu
Shane Romsos
David Peterson
Kelly Sheehan
Nick Exline
10
Adrian Combes
Page 2 January 21, 2021
BOARD AGENDA ITEM 4c
TO: Board of Directors
FROM: Adrian Combes, Senior Engineer
MEETING DATE: January 21, 2021
ITEM – PROJECT NAME: 2019 Rocky Point II Waterline Replacement REBID and Large
Meters Replacement Project REQUESTED BOARD ACTION: (1) Approve Change Order No. 2 to Haen Constructors in
a credit amount of $107,946.50; and, (2) Approve the Partial Closeout Agreement and Release of Claims for Haen Constructors for the 2019 Rocky Point II Waterline
Replacement Rebid and for the 2019 Rocky Pressure Regulating Valve Replacement Portions of the Contract.
DISCUSSION: The Rocky Point II Waterline Replacement and Large Meters Replacement
Project consists of four portions of work, including: 1) Rocky II Waterline, 2) Rocky PRV, 3) Large Meter Replacements; and, 4) Miscellaneous Water/Sewer Improvements. The
work is being completed by Haen Constructors of South Lake Tahoe, CA. The Rocky II Waterline and Large Meter Replacements are being funded by a loan from the State
Revolving Fund (SRF). The Rocky PRV is being funded, in part, by a grant from the Bureau of Reclamation (BOR). Staff requests that these portions of the Contract be
closed out to meet SRF and BOR deadlines for reimbursement.
Change Order No. 2 decreases the overall Contract amount by $107,946.50 as included in the proposed Balancing Change Order No. 2, reducing the overall Contract
cost to $2,400,195.
With Board approval, staff filed the Notice of Completion (NOC) with El Dorado County
on December 8, 2020. El Dorado County Recorded the NOC on December 14, 2020.
The 35-day Stop Notice filing period ended on January 19, 2021. No Stop Notices were
filed within the filing period. With authorization of Change Order No. 2, Haen
Constructors will have met all the requirements for the Rocky Waterline and Rocky PRV
portions of the work. Staff recommends approval of the Partial Closeout Agreement
and Release of Claims for those two portions of the Contract.
General Manager
John Thiel
Directors
Chris Cefalu
Shane Romsos
David Peterson
Kelly Sheehan
Nick Exline
11
Adrian Combes
Page 2 January 21, 2021
The remaining portions of work are expected to be complete by March 2021 as they are not subject to the same funding deadlines and will be closed out as the work is
completed.
SCHEDULE: Upon Board Approval
COSTS: <107,946.50>
ACCOUNT NO: 2030-7053, 2030-8093, 2030-7065, 2030-2504, 1030-2504,
BUDGETED AMOUNT AVAILABLE: N/A
ATTACHMENTS: Change Order No. 2; Partial Closeout Agreement will be provided
prior to the Board Meeting. ___________________________________________________________________________________
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
12
1
CHANGE ORDER NUMBER 02
Project: Rocky Point II Waterline Replacement REBID and
Large Meters Replacement Project
Contractor: HAEN CONSTRUCTORS
Date: 1.21.2021 PO #: 2020-273; 2020-274; 2020-275;
2020-76, 020-277; 2020-278; 2020-291
The Contract Shall Be Changed As Follows:
A. Increase Bid Item 6 by $3,700.00 from $30,000.00 to $33,700.00 to reflect additional
work required to pothole mismarked and untraceable facilities at the direction of
District staff. The increased cost was agreed upon as a lump sum. TOTAL FOR ITEM A IS $3,700.00
TOTAL FOR CHANGE ORDER NUMBER 2 IS
A+B+C+D+E+F+G+H+I+J+K+L+M+N+O+P+Q+R+S+T+U+V+W+X+Y+Z = <$4,909.38>
Dollar Amounts Contract Time
Original Contract $2,358,141.50 403 Calendar Days
Previous Change Orders $150,000.00 403 Calendar Days
Current Contract $2,508,141.50 403 Calendar Days
THIS CHANGE ORDER <$107,946.50> 0 Calendar Days
New Contract Total $2,400,195.00 403 Calendar Days
Contractor agrees to make the herein-described changes in accordance with the terms hereof. The
change in contract price and/or contract time noted is full settlement for costs incurred as a result of the
change(s) described, unless specifically noted in individual description(s).
Date: ____________________
Authorized By STPUD Board President
Date: _____________________
Accepted By Contractor
Date: _____________________
Reviewed By
13
2
B. Amend Bid Item 7 to reflect a decrease in the number of linear feet of 8-inch water
main from 3977 linear feet (LF) to 3785 LF, the actual footage installed. At the
contract rate of $111.00 per linear foot, the reduction in the Contract quantity results
in a credit to the District in the amount of $21,312.00. TOTAL FOR ITEM B IS <$21,312.00>
C. Amend Bid Item 7 to reflect an increase in the cost for 8-inch water main installation.
The increased cost is due to the need for a significant increase in upgraded pipe
material and bell joint restraints required to be in compliance with Department of Drinking Water separation requirements as well as the installation of two additional
valves. The modifications were agreed upon as a lump sum amount of $16,000.00
for all material, labor and equipment required for installation.
TOTAL FOR ITEM C IS $16,000.00 D. Amend Bid Item 8 to reflect a decrease in the number of ¾” single water services
from 52 to 50, the actual number of services installed. At the contract rate of
$3,500.00 per each, the reduction in the Contract quantity results in a credit to the
District in the amount of $7,000.00. TOTAL FOR ITEM D IS <$7,000.00>
E. Amend Bid Item 9 to reflect an increase in the number of 1” services for a double ¾”
connection from 4 to 5, the actual number of services installed. At the contract rate
of $3,800.00 per each, the increase in the Contract quantity results in an additional
cost to the District in the amount of $3,800.00. TOTAL FOR ITEM E IS $3,800.00
F. Increase Bid Item 21 by $2,780.00 from $7,600.00 to $10,380.00 to reflect an
additional valve and fittings required at the tie-in point located at Shepherds Dr. and
Steven Ln. The increased cost was agreed upon as a lump sum. TOTAL FOR ITEM F IS $2,780.00
G. Amend Bid Item 24 to reflect an increase in the number of abandonments of valves
and water mains from 6 to 7, the actual number of abandonments performed. At the
contract rate of $900.00 per abandonment, the increase in the Contract quantity results in an additional cost of $900.00.
TOTAL FOR ITEM G IS $900.00
H. Delete Bid Item 25 to omit all labor, equipment and subcontractor costs for work not
performed in response to non-excavatable rock resulting in a credit to the District of $10,500.00.
TOTAL FOR ITEM H IS <$10,500.00>
14
3
I. Amend Bid Item 26 to reflect a 4,028 square foot decrease of 4-inch trench patch
from 19,148 square feet to 15,120 square feet, the actual square footage installed.
At the contract rate of $9.25 per square foot, the reduction in the Contract quantity results in a credit to the District in the amount of $37,259.00. TOTAL FOR ITEM I IS <$37,259.00>
J. Amend Bid Item 27 to reflect a 3,023 square foot decrease of 2-inch mill and overlay
from 46,823 square feet to 43,800 square feet, the actual square footage installed. At the contract rate of $3.50 per square foot, the reduction in the Contract quantity results in a credit to the District in the amount of $10,580.50.
TOTAL FOR ITEM J IS <$10,580.50>
K. Amend Bid Item 28 to reflect a 122 square foot increase of 3-inch miscellaneous patch paving from 120 square feet to 242 square feet, the actual square footage installed. At the contract rate of $18.00 per square foot, the increase in the Contract
quantity results in an additional cost to the District in the amount of $2,196.00.
TOTAL FOR ITEM K IS $2,196.00
L. Increase Bid Item 29 $1,350.00 from $40,000.00 to $41,350.00 to reflect the actual cost of unanticipated work on the project and the transfer of materials on hand. The
unanticipated work includes repairs on the existing water system as work was
conducted; repairing mismarked and unmarked District facilities and relocation of a
fire hydrant. The price for unanticipated work was agreed upon as a lump sum amount of $25,611.00. The cost also includes the transfer of materials on hand that cannot be returned in the amount of $15,739.00 for 2,500 feet of DR25 C900 pipe.
TOTAL FOR ITEM L IS $1,350.00
M. Amend Bid Item 38 to reflect a 6 square foot decrease of 3-inch miscellaneous patch paving from 149 square feet to 143.04 square feet, the actual square footage installed. At the contract rate of $25.00 per square foot, the reduction in the
Contract quantity results in a credit to the District in the amount of $149.00.
TOTAL FOR ITEM N IS <$149.00>
N. Delete Bid Item 39 to omit all labor, equipment and subcontractor costs for work not performed in response to unanticipated conditions resulting in a credit to the District
of $15,000.00.
TOTAL FOR ITEM O IS <$15,000.00>
O. Increase Bid Item 45 $10,750.00 from $72,000.00 to $82,750.00 to reflect an increase in cost due to a modification from the plan requiring meter bypass piping to
be run outside of the existing vault and an additional valve. The modifications were
agreed upon as a lump sum amount.
TOTAL FOR ITEM P IS $10,750.00
15
4
P. Amend Bid Item 48 to reflect a 366 square foot increase of 3-inch miscellaneous patch paving from 494 square feet to 860 square feet, the actual square footage
installed. At the contract rate of $15.00 per square foot, the increase in the Contract
quantity results in an additional cost to the District in the amount of $5,490.00.
TOTAL FOR ITEM Q IS $5,490.00 Q. Decrease Bid Item 49 by $28,950.00 to reflect actual work performed in response to
unanticipated conditions to understand the existing underground piping. The
additional work was agreed upon as a lump sum price of $1,050.00.
TOTAL FOR ITEM R IS <$28,950.00> R. Increase Bid Item 55 $4,150.00 from $87,000.00 to $91,150.00 to reflect an increase
in cost due to relocation of the meter vault as a result of existing utilities. The
modifications were agreed upon as a lump sum amount of $4,150 based on the
additional time to pothole the new location, excavate, backfill and resurface the original location. TOTAL FOR ITEM S IS $4,150.00
S. Increase Bid Item 56 $1,274.00 from the contract price of $15,000.00 to $16,274.00
to reflect the actual cost of contingency items due to the need for paving in the alternate meter location as well as abandonments of the existing meter locations on property. The paving was agreed upon at a unit price of $17.80 and 340 square feet
resulting in a cost of $6,052.00. The abandonments were agreed upon as a lump
sum amount of $10,220.00 based on the labor, equipment and materials required to
perform the work. TOTAL FOR ITEM T IS $1,274.00
T. Increase Bid Item 60 $8,000.00 from $1,000.00 to $9,000.00 to reflect the cost of
traffic control due to relocation of the PRV vault from the original location due to
utility conflicts resulting in the need for flaggers throughout the installation. The increase in price was agreed upon as a lump sum. TOTAL FOR ITEM T IS $8,000.00
U. Increase Bid Item 61 $2,100.00 from $600.00 to $2,700.00 to reflect additional costs
for steel plating of the PRV vault excavation from the original location. The increased cost was agreed upon as a lump sum. TOTAL FOR ITEM U IS $2,100.00
V. Amend Bid Item 64 to reflect an increase in cost due to the need to modify the
Pressure Regulating Valve after installation by adding a CRD-L to mitigate concerns of over pressurizing the system. The increase in price was agreed upon as a lump sum of $1,664.00.
TOTAL FOR ITEM V IS $1,664.00
16
5
W. Amend Bid Item 65 to reflect a decrease in the quantity of pipe installed due to the
relocation of the vault and revised piping layout. The 6-inch piping was agreed upon
to be installed at a lump sum price of $17,000. This results in a credit to the District of $10,000.00. TOTAL FOR ITEM W IS <$10,000.00>
X. Delete Bid Item 68 to omit all labor, equipment and subcontractor costs for work not
performed to Demo the existing PRV and Vault resulting in a credit to the District of $6,000.00. TOTAL FOR ITEM X IS <$6,000.00>
Y. Amend Bid Item 69 to reflect a decrease in the length of trench for electrical and
instrumentation installed due to the relocation of the vault and control panel. The electrical and instrumentation trenches was agreed upon to be installed at a lump sum price of $6,150, resulting in a credit to the District of $1,350.00.
TOTAL FOR ITEM Y IS <$1,350.00>
Z. Amend Bid Item 72 to reflect the actual cost of contingency work associated with the revised layout of the vault location including, sketches, site meetings, takeoffs, potholing and procurement. The costs associated for the revised layout was agreed
upon as a lump sum cost of $1,000.00. This results in a credit to the district of
$24,000.00.
TOTAL FOR ITEM Z IS <$24,000.00>
TOTAL FOR CHANGE ORDER 2 IS
A+B+C+D+E+F+G+H+I+J+K+L+M+N+O+P+Q+R+S+T+U+V+W+X+Y+Z = <$107,946.50>
17
SOUTH TAHOE PUBLIC UTILITY DISTRICT
David Peterson, Director BOARD MEMBERS Kelly Sheehan, Vice President Chris Cefalu, Director Shane Romsos, Director Nick Exline, Director
John Thiel, General Manager Paul Hughes, Chief Financial Officer
REGULAR MEETING OF THE BOARD OF DIRECTORS SOUTH TAHOE PUBLIC UTILITY DISTRICT January 7, 2021 MINUTES
The South Tahoe Public Utility District Board of Directors met in a regular session, 2:00 p.m., via
GotoWebinar in accordance with Executive Order N-29-20.
ROLL CALL: Board of Directors: Vice President Sheehan, Directors Cefalu, Romsos, Peterson, Exline Staff: John Thiel, Paul Hughes, Gary Kvistad, Melonie Guttry, Gary Kvistad, Julie Ryan, Tim Bledsoe,
Marla Sharp, Bren Borley, Brent Goligoski, Chris Skelly, Chris Stanley, Heidi Baugh, Judy Leong, Julie
Ryan, Liz Kauffman, Mary Alsbury, Shelly Thomsen, Stephen Caswell, Trevor Coolidge, Brian Bartlett Guests: Denver Williams, CORE; Andrew Borman CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR: None
CONSENT CALENDAR: Moved Sheehan/Second Peterson/Sheehan Yes/Cefalu Yes/Romsos Yes/Peterson Yes/Exline Yes to approve the Consent Calendar as presented.
a. PURCHASING LIMITS
(Paul Hughes, Chief Financial Officer)
Approved an increase to the Engineering Department Manager’s Purchasing Authority of
$5,000, for a new purchasing limit of $10,000.
b. 2020 ASPHALT PATCHING AND TRENCH PAVING SERVICES (Tony Prieto, Underground Repair Water Supervisor and Chris Stanley, Manager of Field Operations)
1) Approved Change Order No. 3 to GB General Engineering Contractor, Inc., for the 2020 Asphalt Patching and Trench Paving Services Contract in the credit amount to the District of
$74,599.46; 2) Approved the Closeout Agreement and Release of Claims; and, 3) Approved the Notice of Completion of this Contract.
c. 2021 ROCKY I WATERLINE REPLACEMENT PROJECT (Adrian Combes, Senior Engineer) Authorized staff to advertise for construction bids for the 2021 Rocky I Waterline Replacement
Project.
18
REGULAR BOARD MEETING MINUTES January 7, 2021 PAGE – 2
d. REGULAR BOARD MEETING MINUTES: December 3, 2020, and December 17, 2020
(Melonie Guttry, Executive Services Manager/Clerk of the Board)
Approved December 3, 2020, and December 17, 2020 Minutes
PRESENTATION Vice President Sheehan presented the Municipal Information Systems Association of California Excellence in Information Technology Practices for 2020 award to the District’s Information
Technology Department. The Board congratulated the IT Department on this award. ITEMS FOR BOARD ACTION
a. Wastewater Treatment Plant and Field Stations Condition Assessment (Julie Ryan, Engineering
Department Manager) – Julie Ryan presented details regarding the Wastewater Treatment Plant
and Field Stations Condition Assessment project and addressed questions from the Board.
Director Peterson reported that he has worked with the owner of Water Systems Consulting, Inc.
in the past, but is retired now and no longer has business dealings with him nor HDR.
Moved Peterson/Second Sheehan/Sheehan Yes/Cefalu Yes/Romsos Yes/Peterson Yes/Exline
Yes to (1) Authorize staff to make minor modifications to the proposed Scope of Work from
Water Systems Consultants to perform the Wastewater Treatment Plant and Field Stations
Condition Assessment; (2) Approve the revised Scope of Work; and, (3) Authorize the General
Manager to execute Task Order No. 1 in the amount $159,645.
b. Department of Energy, Connected Communities Grant (John Thiel, General Manger) – John Thiel
reported regarding a meeting with the City to participate in a Concept Paper to the
Department of Energy for a potential Connected Communities Grant and addressed questions
from the Board. Director Exline expressed his support of this opportunity and Director Romsos
agreed, suggested highlighting the 30% match by the District.
Moved Cefalu/Second Exline/Sheehan Yes/Cefalu Yes/Romsos Yes/Peterson Yes/Exline Yes to
authorize the District to join the City of South Lake Tahoe and other community partners in the
submittal of a Concept Paper to the Department of Energy for a potential Connected
Communities Grant and subject to edits to accommodate Board of Director comments.
c. Election of Board Officers (Melonie Guttry, Executive Services Manager/Board Clerk) – The Board discussed
nominations.
Moved Cefalu/Second Peterson/Sheehan Yes/Cefalu Yes/Romsos Yes/Peterson Yes/Exline Yes
to elect Kelly Sheehan as Board President for 2021 Calendar Year.
d. Election of Board Officers (Melonie Guttry, Executive Services Manager/Board Clerk) – Dave Peterson Moved Cefalu/Second Sheehan/Sheehan Yes/Cefalu Yes/Romsos Yes/Peterson Yes/Exline Yes
to elect David Peterson as Vice President for 2021 Calendar Year.
e. Approve Payment of Claims (Debbie Henderson, Accounting Manager) Moved Sheehan/Second Cefalu/Sheehan Yes/Cefalu Yes/Romsos Yes/Peterson Yes/Exline Yes to approve Payment of Claims in the amount of $2,323,241.16.
19
REGULAR BOARD MEETING MINUTES January 7, 2021 PAGE – 3
STANDING AND AD-HOC COMMITTEE REPORTS: President Sheehan announced the next Operations Committee Meeting will be held before Committee Appointments on January 19 and Directors Peterson and Romsos will attend.
BOARD MEMBER REPORTS: Director Romsos wished everyone a healthy New Year, and Director Exline congratulated President Sheehan on her nomination.
EL DORADO WATER AGENCY PURVEYOR REPORT: President Sheehan reported the next meeting is Wednesday, January 13, and Director Peterson
would like to attend. GENERAL MANAGER REPORT: John Thiel reported on several items:
• Provided a staffing update.
• Provided a COVID-19 update reporting the District is currently operating at Risk Level 3 with no
current staff illness.
• Water flows are averaging just over 4 million gallons per day, slightly above average, and
sewer flows are slightly lower than average, likely due to low precipitation and groundwater
levels. He further reported that, based on City data, they collected approximately $2 million in
Transient Occupancy Tax for September 2020 which was the highest September on record.
Down about 15 to 20 percent for the year however.
• District staff is preparing to meet with Tahoe Keys Property Owners Association Water
Company representatives to review their current water challenges and potential need for assistance from the District.
He is working on a draft set of 2021 goals, which will be brought back to the Board on January 21, 2021.
STAFF/ATTORNEY REPORTS: Tim Bledsoe reported the second round of COVID-19 relief ended December 31, 2020, and the
District received 537 applications, totaling $99,262 for the quarter, which totals approximately
$280,000 spent on the relief program to date. Paul Hughes reported that an additional $260,000 of
late fees have been waived so far. Director Exline suggested that possibly a broader relief program
could be reviewed going forward for rate payers who are continuing to struggle. The Board discussed
continuing the COVID-19 relief program, versus a more expansive, ongoing program. Paul Hughes
reported the allocation for the entire program was $1.1 million, which approximately half has been
spent to date. This item will be brought back for Board consideration on January 21, with additional
information as requested.
Julie Ryan reported there is not much of an update regarding the solar project at this time, but she
provided details regarding the project progress since the last report and addressed questions from
the Board. Attorney Kvistad added comments regarding three areas that the consultant requested
clarification on and addressed questions from the Board. Denver Williams provided information
regarding the project and reported that he plans to have a comprehensive update on January 21,
2021. BREAK AND ADJOURN TO CLOSED SESSION: 3:32 p.m.
20
REGULAR BOARD MEETING MINUTES January 7, 2021 PAGE – 4
RECONVENE TO OPEN SESSION: 4:00 p.m.
a. Pursuant to Government Code Section 54956.9(b) of the California Government Code,
Conference with Legal Counsel regarding Potential Litigation (one case).
No reportable Board action
b. Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be
held for conference with legal counsel regarding existing litigation: False Claims Act Case: United States, the States of California, Delaware, Florida, Nevada, and Tennessee and
the Commonwealths of Massachusetts and Virginia ex rel. John Hendrix v. J-M Manufacturing
Company, Inc. and Formosa Plastics Corporation, U.S.A., Civil Action No. ED CV06-0055-GW,
United States District Court for the Central District of California.
No reportable Board action
c. Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be
held for conference with legal counsel regarding existing litigation: Los Angeles County
Superior Court, Case No. BC459943, State of Nevada, et al. v. J-M Manufacturing, et al.
No reportable Board action
d. Pursuant to Section 54957 of the California Government Code, Closed Session may be held
regarding public employee evaluation for unrepresented employee position –
General Manager.
No reportable Board action
15. Mobley Claim for Damages (John Thiel, General Manager)
Moved Sheehan/Second Cefalu/Sheehan Yes/Cefalu Yes/Romsos Yes/Peterson Yes/Exline Yes to reject the Mobley Claim for Damages and direct staff to send a written rejection notice
to the Claimants. ADJOURNMENT: 4:03 p.m.
_______________________________________
Kelly Sheehan, Board President
South Tahoe Public Utility District
__________________________________
Melonie Guttry, Clerk of the Board South Tahoe Public Utility District
21
Stephen Caswell
Brent Goligoski Page 3 January 21, 2021
BOARD AGENDA ITEM 7a
TO: Board of Directors
FROM: Stephen Caswell, Principal Engineer
Brent Goligoski, Associate Engineer
MEETING DATE: January 21, 2021
ITEM – PROJECT NAME: Aeration Blower System Emergency Power and
Secondary Clarifiers No.’s.1 and 2 Project (Project) REQUESTED BOARD ACTION: (1 Hold a Public Hearing at 2:01 p.m. to receive
comments on the designation of the Project as “substantially complex” under Public
Contract Code Section 7201; (2) Pursuant to the facts, find the Project substantially complex and require a 10% retention limit; and, (3) Authorize staff to advertise for
construction bids for this Project. DISCUSSION: At 2:01 p.m. open the Public Hearing to receive public comments on the designation of the Aeration Blower System Emergency Power and Secondary Clarifiers
No.’s 1 and 2 Project as substantially complex.
For economy of scale, this Project combines the following three unique scopes of work into a single construction project:
1) Purchase and installation of one new 700 kilowatt (kW) diesel engine-driven standby
generator at the Wastewater Treatment Plant in a sound attenuated enclosure,
including related electrical and control improvements to provide standby power supply
to the aeration system. This will effectively replace the existing engine-driven backup
blower which was constructed in 1987 and fell out of compliance for air quality in 2020.
This new emergency power system will be configured to power any one of the existing
aeration blowers, providing more redundancy than the existing system. The aeration
blower system is a critical component in the secondary treatment process. The
consequence of failure for the activated sludge system is very high; within 15 minutes
without aeration, the biological process will begin to fail.
General Manager
John Thiel
Directors
Chris Cefalu
Shane Romsos
David Peterson
Kelly Sheehan
Nick Exline
22
Stephen Caswell
Brent Goligoski Page 2 January 21, 2021
In addition to the regulatory deadline, the District has a funding deadline for the completion of this Project. The District has been granted $775,000 by the Federal
Emergency Management Agency (FEMA) (of which $193,750 is District match) for design and construction of the emergency generator. To comply with grant
requirements, construction must be completed by June 2022.
2) Rehabilitation of the Secondary Clarifier Nos. 1 and 2 at the Wastewater Treatment
Plant including mechanical, structural, electrical, and instrumentation improvements.
The work includes the following:
• Demolition of the existing sludge collector mechanisms and replacement with
new sludge collector mechanism and appurtenances
• Seismic retrofits and rehabilitation of the existing concrete tanks
• Replacement of existing secondary clarifier handrail and V-notch weirs
• Installation of new density current baffles
• Demolition and replacement of existing Return Activated Sludge (RAS) piping
• New clarifier drives in existing Motor Control Center (MCC)
• Integration of new sludge collector mechanism controls to the Programmable
Logic Controller (PLC)
• Site civil improvements including excavation, grading, and paving as required to
accommodate new improvements.
The rehabilitation of the Secondary Clarifier No. 2 is scheduled for the 2022 construction season and the rehabilitation of the Secondary Clarifier No. 1 is scheduled for the 2023
construction season.
3) Installation of battery backup systems at 11 remote water tank sites within the
District’s water distribution system. Each battery is sized to provide one week of power
supply to critical loads at the site to allow continued remote operation of the water
system during extended power outages. Additionally, the Project will equip each site
with a hookup for external power supply (i.e., portable diesel generator). This work is
funded in part by a $312,500 Hazard Mitigation Grant from FEMA. To comply with the
current contract schedule, final payment and release of retention must be made by
January 7, 2022.
This Project also includes a $100,000 lump sum bid item for as-needed work on the
sewer system and a $100,000 lump sum bid item for as-needed work on the water
system, to be performed by the contractor on a time-and-materials basis.
District staff is working with Carollo Engineers to complete plans and specifications for
the blower system emergency power and clarifier portions of the Project. District staff is
designing the water tank battery backup portion with in house resources. Staff plans to negotiate the pre-purchase of the generator in February and to advertise for
construction beginning in mid-March, select a contractor in early May, and issue Notice to Proceed in mid-June.
23
Stephen Caswell
Brent Goligoski Page 3 January 21, 2021
Substantially Complex: Legislative amendments to the Public Contract Code, effective January 1, 2012, limit
the amount of retention the District can withhold from a contractor for a capital project to 5% of the total Contract amount. However, the retention amount may exceed 5% if
the Board, at a properly noticed and normally scheduled Public Hearing, finds that the
project is “substantially complex,” and that the nature of the project merits a higher
retention amount. On February 2, 2012, the Board adopted Resolution No. 2904-12,
whereby the Board resolved that when bidding capital projects, the criteria identified
therein will be used to determine whether a project is substantially complex such that it
justifies a retention amount higher than 5%.
Staff recommends that the Board designate the Project as substantially complex and
merits a retention amount of 10%. Staff considers this Project as substantially complex in
accordance with the criteria established in Resolution No. 2904-12:
a. Two or more different trades or subcontractors are anticipated to be involved in
the construction of this project.
b. The Project involves instrumentation, controls, and/or mechanical equipment.
c. The construction schedule is a significant concern because of the compressed
construction season within the Lake Tahoe Basin.
Engineer’s Estimate:
• Engineer’s Estimate for the Aeration Blower System Emergency Power
Improvements is $1,229,000
• Engineer’s Estimate for the Secondary Clarifiers No.’s 1 and 2 Rehabilitations is
$4,171,000
• Engineer’s Estimate for the Water Tank Battery Backup Systems is $312,500
• Lump sum bid as-needed work on the sewer system $100,000
• Lump sum bid as-needed work on the water system $100,000
The total Engineer’s Estimate for this Project is $5,912,500.
SCHEDULE: February 2021-November 2023
COSTS: $1,229,000 (BLOWER); $2,008,000 (SC1RHB); $2,163,500 (SC2RHB); $312.500
(TNKPWR); $100,000 (Sewer); $100,000 (Water)
ACCOUNT NO:10.30.8164/BLOWER; 10.30.8088/SC1RHB; 10.30.8096/SC2RHB;
20.30.8158/TNKPWR
BUDGETED AMOUNT AVAILABLE: $380,091 (20/21); $2,154,000 (21/22); $3,117,000 (22/23)
ATTACHMENTS: None ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO 24
Tim Bledsoe Page 2 January 21, 2021
BOARD AGENDA ITEM 7b
TO: Board of Directors
FROM: Tim Bledsoe, Customer Service Manager
MEETING DATE: January 21, 2021
ITEM – PROJECT NAME: COVID-19 Rate Relief Program
REQUESTED BOARD ACTION: Approve an extension to the Temporary Sewer Rate Relief
Program until March 31, 2021. DISCUSSION: At the September 3, 2020, Regular Board Meeting, action was taken to adopt a Temporary Sewer Rate Relief Program (Program) to provide financial relief to
certain District customers who have been adversely impacted by COVID-19. The Program was formally adopted by Resolution 3152-20. This Program ended on
December 31, 2020.
Staff recommends extending the Program until March 31, 2021, incorporating the same criteria listed below:
• Qualifying customers will receive a 50% reduction up to$3,000 to their most
recent quarterly sewer bill. The reduction would be applied to current sewer charges only, not additional outstanding balances.
There were six commercial accounts that received the maximum credit of $3,000 during
the second phase. District staff believes that this is an appropriate level for a maximum
credit.
The Program, which will be funded with property tax revenue, is available to all
customers experiencing a loss of income due to COVID-19. This includes commercial,
multi-family, and single family dwelling customers whose primary residence is in the
District’s service area. Customers are required to submit to the District a completed
application by March 31, 2021, to participate in the Program.
General Manager
John Thiel
Directors
Chris Cefalu
Duane Wallace
Randy Vogelgesang
Kelly Sheehan
Nick Exline
25
Tim Bledsoe Page 2 January 21, 2021
SCHEDULE: Upon approval
COSTS: $1.1 million maximum
ACCOUNT NO: N/A
BUDGETED AMOUNT AVAILABLE: Funded with property tax revenues
ATTACHMENTS: N/A
___________________________________________________________________________________
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
26
PAYMENT OF CLAIMS
Payroll 1/12/21 699,599.79
Payroll 12/30/20 29.24
Total Payroll 699,629.03
ADP & Insight eTools 5,136.02
AFLAC/WageWorks claims and fees 269.38
BBVA Compass Bank 237,785.72
CalPERS - other 0.00
Cal Bank & Trust fiscal agent fees 58,255.19
California SWRCB SRF loan payments 0.00
CDS - health care payments 624.60
Total Vendor EFT 302,070.91
Accounts Payable Checks-Sewer Fund 235,627.37
Accounts Payable Checks-Water Fund 146,005.04
Total Accounts Payable Checks 381,632.41
Utility Management Refunds 7,026.27
Total Utility Management Checks 7,026.27
Grand Total 1,390,358.62
Payroll EFTs & Checks 1/12/2021 12/30/2020
EFT CA Employment Taxes & W/H 37,541.61 1.80
EFT Federal Employment Taxes & W/H 126,055.30 27.44
EFT CalPERS Contributions 77,431.21 0.00
EFT Empower Retirement-Deferred Comp 64,236.70 0.00
EFT Stationary Engineers Union Dues 2,637.22 0.00
EFT CDHP Health Savings (HSA)113,972.42 0.00
EFT Retirement Health Savings 15,298.27 0.00
EFT United Way Contributions 51.00 0.00
EFT Employee Direct Deposits 262,143.91 0.00
CHK Employee Garnishments 232.15 0.00
CHK Employee Paychecks 0.00 0.00
Total 699,599.79 29.24
FOR APPROVAL
January 21, 2021
27
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 48097 - ACCRUENT
625708 Service Contracts Paid by Check #105803 08/31/2020 01/21/2021 01/21/2021 01/21/2021 21,767.31
631561 Replace ERP System Paid by Check #105803 12/04/2020 01/21/2021 01/21/2021 01/21/2021 587.50
Vendor 48097 - ACCRUENT Totals Invoices 2 $22,354.81
Vendor 44039 - AFLAC
803449 Insurance Supplement Payable Paid by Check #105804 12/01/2020 01/21/2021 12/31/2020 01/21/2021 1,537.74
Vendor 44039 - AFLAC Totals Invoices 1 $1,537.74
Vendor 48136 - AHERN RENTALS
22951775-001 Grounds & Maintenance Paid by Check #105805 12/30/2020 01/21/2021 01/21/2021 01/21/2021 29.26
Vendor 48136 - AHERN RENTALS Totals Invoices 1 $29.26
Vendor 48605 - AIRGAS USA LLC
9108535622 Janitorial Supplies Inventory Paid by Check #105806 12/31/2020 01/21/2021 01/21/2021 01/21/2021 48.11
Vendor 48605 - AIRGAS USA LLC Totals Invoices 1 $48.11
Vendor 48684 - ALLIED ELECTRONICS INC
9013699349 Biosolids Equipment - Building Paid by Check #105807 12/31/2020 01/21/2021 01/21/2021 01/21/2021 457.81
9013718331 Primary Equipment Paid by Check #105807 01/06/2021 01/21/2021 01/21/2021 01/21/2021 273.93
Vendor 48684 - ALLIED ELECTRONICS INC Totals Invoices 2 $731.74
Vendor 43949 - ALPEN SIERRA COFFEE
214531 Office Supply Issues Paid by Check #105808 12/29/2020 01/21/2021 12/31/2020 01/21/2021 89.00
214532 Office Supply Issues Paid by Check #105808 12/29/2020 01/21/2021 12/31/2020 01/21/2021 44.25
214626 Office Supply Issues Paid by Check #105808 01/05/2021 01/21/2021 01/12/2021 01/21/2021 44.25
Vendor 43949 - ALPEN SIERRA COFFEE Totals Invoices 3 $177.50
Vendor 49337 - AMAZON CAPITAL SERVICES INC.
1F7F-7XC3-K19R Primary Equipment Paid by Check #105809 12/10/2020 01/21/2021 12/31/2020 01/21/2021 39.60
1NNT-FG1P-X9VT Wells Paid by Check #105809 12/16/2020 01/21/2021 12/31/2020 01/21/2021 413.90
1MMT-WRWK-3RJV Biosolids Equipment - Building Paid by Check #105809 12/20/2020 01/21/2021 01/21/2021 01/21/2021 550.52
Vendor 49337 - AMAZON CAPITAL SERVICES INC. Totals Invoices 3 $1,004.02
Vendor 44580 - ARAMARK UNIFORM & CAREER APPAREL GRP INC
1102471048 Uniform Payable Paid by Check #105810 12/29/2020 01/21/2021 12/31/2020 01/21/2021 84.67
1102471051 Uniform Payable Paid by Check #105810 12/29/2020 01/21/2021 12/31/2020 01/21/2021 87.19
1102471056 Uniform Payable Paid by Check #105810 12/29/2020 01/21/2021 12/31/2020 01/21/2021 79.44
1102471060 Uniform Payable Paid by Check #105810 12/29/2020 01/21/2021 12/31/2020 01/21/2021 100.51
1102471065 Uniform Payable Paid by Check #105810 12/29/2020 01/21/2021 12/31/2020 01/21/2021 42.02
1102471067 Uniform Payable Paid by Check #105810 12/29/2020 01/21/2021 12/31/2020 01/21/2021 21.17
1102471071 Uniform Payable Paid by Check #105810 12/29/2020 01/21/2021 12/31/2020 01/21/2021 4.49
1102471076 Uniform Payable Paid by Check #105810 12/29/2020 01/21/2021 12/31/2020 01/21/2021 101.71
1102471079 Uniform Payable Paid by Check #105810 12/29/2020 01/21/2021 12/31/2020 01/21/2021 21.71
Run by Theresa Sherman on 01/14/2021 11:05:45 AM Page 1 of 12
Payment of Claims
Payment Date Range 01/08/21 - 01/21/21
Report By Vendor - Invoice
Summary Listing
28
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
1102471081 Uniform Payable Paid by Check #105810 12/29/2020 01/21/2021 12/31/2020 01/21/2021 8.36
1102471083 Uniform Payable Paid by Check #105810 12/29/2020 01/21/2021 12/31/2020 01/21/2021 13.34
1102471087 Uniform Payable Paid by Check #105810 12/29/2020 01/21/2021 12/31/2020 01/21/2021 15.14
1102471088 Uniform Payable Paid by Check #105810 12/29/2020 01/21/2021 12/31/2020 01/21/2021 17.98
1110087331C Uniform Payable Paid by Check #105810 12/29/2020 01/21/2021 12/31/2020 01/21/2021 100.80
1110087496C Uniform Payable Paid by Check #105810 12/29/2020 01/21/2021 12/31/2020 01/21/2021 55.45
1102474282 Uniform Payable Paid by Check #105811 01/05/2021 01/21/2021 01/21/2021 01/21/2021 84.67
1102474284 Uniform Payable Paid by Check #105811 01/05/2021 01/21/2021 01/21/2021 01/21/2021 87.19
1102474288 Uniform Payable Paid by Check #105811 01/05/2021 01/21/2021 01/21/2021 01/21/2021 79.44
1102474295 Uniform Payable Paid by Check #105811 01/05/2021 01/21/2021 01/21/2021 01/21/2021 100.51
1102474300 Uniform Payable Paid by Check #105811 01/05/2021 01/21/2021 01/21/2021 01/21/2021 42.02
1102474305 Uniform Payable Paid by Check #105811 01/05/2021 01/21/2021 01/21/2021 01/21/2021 21.17
1102474308 Uniform Payable Paid by Check #105811 01/05/2021 01/21/2021 01/21/2021 01/21/2021 4.49
1102474314 Uniform Payable Paid by Check #105811 01/05/2021 01/21/2021 01/21/2021 01/21/2021 101.71
1102474320 Uniform Payable Paid by Check #105811 01/05/2021 01/21/2021 01/21/2021 01/21/2021 21.71
1102474323 Uniform Payable Paid by Check #105811 01/05/2021 01/21/2021 01/21/2021 01/21/2021 8.36
1102474325 Uniform Payable Paid by Check #105811 01/05/2021 01/21/2021 01/21/2021 01/21/2021 13.34
1102474326 Uniform Payable Paid by Check #105811 01/05/2021 01/21/2021 01/21/2021 01/21/2021 15.14
1102474328 Uniform Payable Paid by Check #105811 01/05/2021 01/21/2021 01/21/2021 01/21/2021 17.98
Vendor 44580 - ARAMARK UNIFORM & CAREER APPAREL GRP INC Totals Invoices 28 $1,351.71
Vendor 40521 - AT&T
JANUARY2021 TELEPHONE Paid by Check #105812 12/28/2020 01/21/2021 01/21/2021 01/21/2021 80.00
Vendor 40521 - AT&T Totals Invoices 1 $80.00
Vendor 45202 - AT&T MOBILITY
JANUARY2021 TELEPHONE Paid by Check #105813 12/19/2020 01/21/2021 01/21/2021 01/21/2021 1,390.77
Vendor 45202 - AT&T MOBILITY Totals Invoices 1 $1,390.77
Vendor 48000 - AT&T/CALNET 3
JANUARY2021 TELEPHONE Paid by Check #105814 01/12/2021 01/21/2021 01/21/2021 01/21/2021 1,116.89
Vendor 48000 - AT&T/CALNET 3 Totals Invoices 1 $1,116.89
Vendor 48383 - AWWA
7001850017 Dues - Memberships -
Certification
Paid by Check #105815 01/01/2021 01/21/2021 01/12/2021 01/21/2021 4,310.00
Vendor 48383 - AWWA Totals Invoices 1 $4,310.00
Vendor 48284 - BETTY BARSAMIAN
2020 Advisory Paid by Check #105816 12/21/2020 01/21/2021 12/31/2020 01/21/2021 5,500.00
Vendor 48284 - BETTY BARSAMIAN Totals Invoices 1 $5,500.00
Vendor 49339 - BASEFORM INC
12302020-81 Contractual Services Paid by Check #105817 12/30/2020 01/21/2021 12/31/2020 01/21/2021 2,520.00
Run by Theresa Sherman on 01/14/2021 11:05:45 AM Page 2 of 12
Payment of Claims
Payment Date Range 01/08/21 - 01/21/21
Report By Vendor - Invoice
Summary Listing
29
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 49339 - BASEFORM INC Totals Invoices 1 $2,520.00
Vendor 44109 - BB&H BENEFIT DESIGNS
53316 Contractual Services Paid by Check #105818 01/04/2021 01/21/2021 01/31/2021 01/21/2021 232.00
Vendor 44109 - BB&H BENEFIT DESIGNS Totals Invoices 1 $232.00
Vendor 45009 - BENTLY AGROWDYNAMICS
202876 Biosolid Disposal Costs Paid by Check #105819 11/24/2020 01/21/2021 01/12/2021 01/21/2021 1,420.65
203157 Biosolid Disposal Costs Paid by Check #105819 12/08/2020 01/21/2021 01/12/2021 01/21/2021 1,535.40
203163 Biosolid Disposal Costs Paid by Check #105819 12/08/2020 01/21/2021 01/21/2021 01/21/2021 2,861.70
203450A Biosolid Disposal Costs Paid by Check #105819 12/22/2020 01/21/2021 01/21/2021 01/21/2021 228.45
203493 Biosolid Disposal Costs Paid by Check #105819 12/29/2020 01/21/2021 01/12/2021 01/21/2021 1,206.90
203541 Biosolid Disposal Costs Paid by Check #105819 01/04/2021 01/21/2021 01/12/2021 01/21/2021 1,264.65
Vendor 45009 - BENTLY AGROWDYNAMICS Totals Invoices 6 $8,517.75
Vendor 48291 - BEST BEST & KRIEGER LLP
891778 Legal-Regular Paid by Check #105820 12/01/2021 01/21/2021 01/21/2021 01/21/2021 945.40
Vendor 48291 - BEST BEST & KRIEGER LLP Totals Invoices 1 $945.40
Vendor 49488 - BLAISDELLS BUSINESS PRODUCTS
1566975-0 Janitorial Supplies Inventory Paid by Check #105821 11/18/2020 01/21/2021 01/21/2021 01/21/2021 85.98
Vendor 49488 - BLAISDELLS BUSINESS PRODUCTS Totals Invoices 1 $85.98
Vendor 49054 - TIMOTHY BLEDSOE
EDUCATION#5 Tuition & Reimbursement
Program
Paid by Check #105822 09/07/2020 01/21/2021 12/31/2020 01/21/2021 2,299.90
Vendor 49054 - TIMOTHY BLEDSOE Totals Invoices 1 $2,299.90
Vendor 43828 - BLUE RIBBON TEMP PERSONNEL
8830 Contractual Services Paid by Check #105823 12/18/2020 01/21/2021 01/21/2021 01/21/2021 1,320.48
8893 Contractual Services Paid by Check #105823 12/24/2020 01/21/2021 12/31/2020 01/21/2021 410.06
8895 Contractual Services Paid by Check #105823 12/24/2020 01/21/2021 01/21/2021 01/21/2021 861.44
8896 Contractual Services Paid by Check #105823 12/24/2020 01/21/2021 12/31/2020 01/21/2021 1,151.40
8897 Contractual Services Paid by Check #105823 12/24/2020 01/21/2021 01/21/2021 01/21/2021 880.32
8961 Contractual Services Paid by Check #105823 12/31/2020 01/21/2021 12/31/2020 01/21/2021 226.24
8963 Contractual Services Paid by Check #105823 12/31/2020 01/21/2021 01/21/2021 01/21/2021 646.08
8964 Contractual Services Paid by Check #105823 12/31/2020 01/21/2021 12/31/2020 01/21/2021 747.55
Vendor 43828 - BLUE RIBBON TEMP PERSONNEL Totals Invoices 8 $6,243.57
Vendor 44474 - BROWN MILBERY INC
13763 Biosolids Equipment - Building Paid by Check #105824 12/10/2020 01/21/2021 01/21/2021 01/21/2021 885.38
Vendor 44474 - BROWN MILBERY INC Totals Invoices 1 $885.38
Vendor 42978 - BROWNSTEIN HYATT
Run by Theresa Sherman on 01/14/2021 11:05:45 AM Page 3 of 12
Payment of Claims
Payment Date Range 01/08/21 - 01/21/21
Report By Vendor - Invoice
Summary Listing
30
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
824638 Personnel Legal Paid by EFT #37 12/04/2020 01/21/2021 12/31/2020 01/21/2021 4,278.00
Vendor 42978 - BROWNSTEIN HYATT Totals Invoices 1 $4,278.00
Vendor 44730 - BSK ASSOCIATES
SD05455 Monitoring Paid by Check #105825 12/28/2020 01/21/2021 12/31/2020 01/21/2021 810.00
Vendor 44730 - BSK ASSOCIATES Totals Invoices 1 $810.00
Vendor 12890 - CA DEPT OF TAX & FEE ADM
QTR4 2020 USE TAX PMT 4th QTR 2020 Paid by Check #105826 12/31/2020 01/21/2021 01/21/2021 01/21/2021 343.63
Vendor 12890 - CA DEPT OF TAX & FEE ADM Totals Invoices 1 $343.63
Vendor 13230 - CAROLLO ENGINEERS
0192346 Generator, Emergency Blower Paid by Check #105827 11/09/2020 01/21/2021 01/21/2021 01/21/2021 8,513.50
0193774 Blower System Upgrades Paid by Check #105827 12/15/2020 01/21/2021 01/21/2021 01/21/2021 2,520.00
0193775 Generator, Emergency Blower Paid by Check #105827 12/15/2020 01/21/2021 01/21/2021 01/21/2021 85,789.50
0193957 Secondary Clarifier #3 Rehab Paid by Check #105827 12/30/2020 01/21/2021 01/21/2021 01/21/2021 6,387.00
0193959 Sewer Flow Meters Paid by Check #105827 12/31/2020 01/21/2021 01/21/2021 01/21/2021 5,068.25
Vendor 13230 - CAROLLO ENGINEERS Totals Invoices 5 $108,278.25
Vendor 40176 - CASHMAN EQUIPMENT
INPS3231052 Automotive Paid by Check #105828 10/16/2020 01/21/2021 01/21/2021 01/21/2021 69.56
Vendor 40176 - CASHMAN EQUIPMENT Totals Invoices 1 $69.56
Vendor 42328 - CDW-G CORP
5693385 Computer Purchases Paid by Check #105829 12/18/2020 01/21/2021 12/31/2020 01/21/2021 267.57
5710373 District Computer Supplies Paid by Check #105829 12/18/2020 01/21/2021 12/31/2020 01/21/2021 337.96
5724949 Computer Purchases Paid by Check #105829 12/18/2020 01/21/2021 12/31/2020 01/21/2021 6,141.88
6074937 District Computer Supplies Paid by Check #105829 12/30/2020 01/21/2021 01/21/2021 01/21/2021 257.20
6076758 District Computer Supplies Paid by Check #105829 12/30/2020 01/21/2021 01/21/2021 01/21/2021 305.64
Vendor 42328 - CDW-G CORP Totals Invoices 5 $7,310.25
Vendor 40343 - CHEMSEARCH INC
7178262 Service Contracts Paid by Check #105830 11/30/2020 01/21/2021 01/21/2021 01/21/2021 356.46
Vendor 40343 - CHEMSEARCH INC Totals Invoices 1 $356.46
Vendor 42897 - CWEA
CHERNAGO20 Dues - Memberships -
Certification
Paid by Check #105831 11/16/2020 01/21/2021 01/21/2021 01/21/2021 96.00
Vendor 42897 - CWEA Totals Invoices 1 $96.00
Vendor 48654 - D&H BROADCASTING LLC
DEC2020 Public Relations Expense Paid by Check #105832 01/08/2021 01/21/2021 12/31/2020 01/21/2021 1,120.00
Vendor 48654 - D&H BROADCASTING LLC Totals Invoices 1 $1,120.00
Vendor 49533 - COLIN DANIEL
Run by Theresa Sherman on 01/14/2021 11:05:45 AM Page 4 of 12
Payment of Claims
Payment Date Range 01/08/21 - 01/21/21
Report By Vendor - Invoice
Summary Listing
31
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
CWEAMECH1 Dues - Memberships -
Certification
Paid by Check #105833 12/28/2020 01/21/2021 01/21/2021 01/21/2021 116.00
Vendor 49533 - COLIN DANIEL Totals Invoices 1 $116.00
Vendor 48289 - DIY HOME CENTER
5908/21 Luther Pass PS Tanks Rehab Paid by Check #105834 10/26/2020 01/21/2021 12/31/2020 01/21/2021 74.38
7089 Buildings Paid by Check #105834 12/16/2020 01/21/2021 01/12/2021 01/21/2021 41.17
7105 Shop Supplies Paid by Check #105834 12/17/2020 01/21/2021 01/12/2021 01/21/2021 6.78
7266 Mobile Equipment Paid by Check #105834 12/27/2020 01/21/2021 12/31/2020 01/21/2021 2.90
7336 Pump Stations Paid by Check #105834 12/31/2020 01/21/2021 01/12/2021 01/21/2021 95.97
7351 Shop Supplies Paid by Check #105834 01/02/2021 01/21/2021 01/12/2021 01/21/2021 9.20
7389 Primary Equipment Paid by Check #105834 01/05/2021 01/21/2021 01/21/2021 01/21/2021 14.51
7429 Office Supplies Paid by Check #105834 01/06/2021 01/21/2021 01/21/2021 01/21/2021 27.11
Vendor 48289 - DIY HOME CENTER Totals Invoices 8 $272.02
Vendor 43649 - DOUGLAS DISPOSAL
2216651 Refuse Disposal Paid by Check #105835 01/01/2021 01/21/2021 01/12/2021 01/21/2021 20.96
Vendor 43649 - DOUGLAS DISPOSAL Totals Invoices 1 $20.96
Vendor 14683 - EL DORADO COUNTY
16684 Regulatory Operating Permits Paid by Check #105836 12/29/2020 01/21/2021 12/31/2020 01/21/2021 3,757.80
Vendor 14683 - EL DORADO COUNTY Totals Invoices 1 $3,757.80
Vendor 45227 - EMPIRE SAFETY & SUPPLY
0110191-IN Field, Shop & Safety Supplies
Inventory
Paid by Check #105837 12/30/2020 01/21/2021 01/21/2021 01/21/2021 72.08
Vendor 45227 - EMPIRE SAFETY & SUPPLY Totals Invoices 1 $72.08
Vendor 44263 - ENS RESOURCES INC
2778 Contractual Services Paid by Check #105838 01/07/2021 01/21/2021 01/31/2021 01/21/2021 7,300.00
Vendor 44263 - ENS RESOURCES INC Totals Invoices 1 $7,300.00
Vendor 18550 - EUROFINS EATON ANALYTICAL INC
L0548024 Monitoring Paid by Check #105839 12/29/2020 01/21/2021 01/21/2021 01/21/2021 40.00
Vendor 18550 - EUROFINS EATON ANALYTICAL INC Totals Invoices 1 $40.00
Vendor 47836 - EVOQUA WATER TECHNOLOGIES LLC
904738257 Service Contracts Paid by Check #105840 01/01/2021 01/21/2021 01/21/2021 01/21/2021 101.12
Vendor 47836 - EVOQUA WATER TECHNOLOGIES LLC Totals Invoices 1 $101.12
Vendor 49538 - TAYLOR G FARRINGTON
2377331 Clothes Washer Rebate Program Paid by Check #105841 12/22/2020 01/21/2021 01/21/2021 01/21/2021 200.00
Vendor 49538 - TAYLOR G FARRINGTON Totals Invoices 1 $200.00
Vendor 48344 - FASTENAL
Run by Theresa Sherman on 01/14/2021 11:05:45 AM Page 5 of 12
Payment of Claims
Payment Date Range 01/08/21 - 01/21/21
Report By Vendor - Invoice
Summary Listing
32
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
NVMIN87847 Grounds & Maintenance Paid by Check #105842 12/30/2020 01/21/2021 01/21/2021 01/21/2021 136.93
Vendor 48344 - FASTENAL Totals Invoices 1 $136.93
Vendor 14890 - FEDEX
7-225-20545 Postage Expenses Paid by Check #105843 12/25/2020 01/21/2021 12/31/2020 01/21/2021 70.63
7-232-87080 Postage Expenses Paid by Check #105843 01/01/2021 01/21/2021 12/31/2020 01/21/2021 12.74
7-238-94196 Postage Expenses Paid by Check #105843 01/08/2021 01/21/2021 01/21/2021 01/21/2021 26.69
Vendor 14890 - FEDEX Totals Invoices 3 $110.06
Vendor 41263 - FERGUSON ENTERPRISES INC
8928444 Shop Supplies Paid by Check #105844 12/16/2020 01/21/2021 01/12/2021 01/21/2021 96.43
Vendor 41263 - FERGUSON ENTERPRISES INC Totals Invoices 1 $96.43
Vendor 15000 - FISHER SCIENTIFIC
5864789 Laboratory Supplies Paid by Check #105845 12/15/2020 01/21/2021 01/12/2021 01/21/2021 55.41
6328211 Laboratory Supplies Paid by Check #105845 12/22/2020 01/21/2021 12/31/2020 01/21/2021 134.83
Vendor 15000 - FISHER SCIENTIFIC Totals Invoices 2 $190.24
Vendor 48715 - FLEETCREW -ANELLE MGMT SRV
43476 Automotive Paid by Check #105846 12/01/2020 01/21/2021 01/21/2021 01/21/2021 125.00
43478 Automotive Paid by Check #105846 12/01/2020 01/21/2021 01/21/2021 01/21/2021 125.00
Vendor 48715 - FLEETCREW -ANELLE MGMT SRV Totals Invoices 2 $250.00
Vendor 48402 - FLYERS ENERGY LLC
20-240403 Gasoline Fuel Inventory Paid by Check #105847 12/28/2020 01/21/2021 12/31/2020 01/21/2021 1,256.82
20-241819 Gasoline Expense Paid by Check #105847 12/30/2020 01/21/2021 12/31/2020 01/21/2021 872.36
20-242183 Oil & Lubricants Paid by Check #105847 12/31/2020 01/21/2021 12/31/2020 01/21/2021 1,342.86
21-247653 Gasoline Fuel Inventory Paid by Check #105847 01/11/2021 01/21/2021 01/21/2021 01/21/2021 2,238.54
Vendor 48402 - FLYERS ENERGY LLC Totals Invoices 4 $5,710.58
Vendor 48288 - FRONTIER COMMUNICATIONS
JANUARY2021 TELEPHONE Paid by Check #105848 01/01/2021 01/21/2021 01/21/2021 01/21/2021 746.19
Vendor 48288 - FRONTIER COMMUNICATIONS Totals Invoices 1 $746.19
Vendor 49458 - GEOTAB USA INC
IN256934 Service Contracts Paid by Check #105849 12/31/2020 01/21/2021 01/21/2021 01/21/2021 691.25
Vendor 49458 - GEOTAB USA INC Totals Invoices 1 $691.25
Vendor 49329 - GfG INSTRUMENTATION, INC
298659 Safety Equipment - Physicals Paid by Check #105850 12/21/2020 01/21/2021 12/31/2020 01/21/2021 528.77
Vendor 49329 - GfG INSTRUMENTATION, INC Totals Invoices 1 $528.77
Vendor 43111 - GFS CHEMICALS INC
CINV-065802 Laboratory Supplies Paid by Check #105851 12/22/2020 01/21/2021 01/21/2021 01/21/2021 711.90
Run by Theresa Sherman on 01/14/2021 11:05:45 AM Page 6 of 12
Payment of Claims
Payment Date Range 01/08/21 - 01/21/21
Report By Vendor - Invoice
Summary Listing
33
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 43111 - GFS CHEMICALS INC Totals Invoices 1 $711.90
Vendor 45265 - GHD INC
153271 LPPS Power/Control Upgrade Paid by Check #105852 11/28/2020 01/21/2021 01/21/2021 01/21/2021 8,921.50
154753 LPPS Power/Control Upgrade Paid by Check #105852 12/26/2020 01/21/2021 01/21/2021 01/21/2021 3,978.00
Vendor 45265 - GHD INC Totals Invoices 2 $12,899.50
Vendor 49534 - RYAN M GORALSKI
2373221 Clothes Washer Rebate Program Paid by Check #105853 12/16/2020 01/21/2021 01/21/2021 01/21/2021 200.00
Vendor 49534 - RYAN M GORALSKI Totals Invoices 1 $200.00
Vendor 15600 - GRAINGER
9760044090 Biosolids Equipment - Building Paid by Check #105854 12/31/2020 01/21/2021 01/21/2021 01/21/2021 232.32
9760070418 Biosolids Equipment - Building Paid by Check #105854 12/31/2020 01/21/2021 01/21/2021 01/21/2021 1,061.99
Vendor 15600 - GRAINGER Totals Invoices 2 $1,294.31
Vendor 49110 - HATCHBACK CREATIVE
2611 Public Relations Expense Paid by Check #105855 01/06/2021 01/21/2021 12/31/2020 01/21/2021 543.75
Vendor 49110 - HATCHBACK CREATIVE Totals Invoices 1 $543.75
Vendor 48332 - HDR ENGINEERING INC
1200318397 Replace Treatment Plant
Generator
Paid by Check #105856 01/05/2021 01/21/2021 01/21/2021 01/21/2021 2,096.63
Vendor 48332 - HDR ENGINEERING INC Totals Invoices 1 $2,096.63
Vendor 44430 - HIGH SIERRA BUSINESS SYSTEMS
114481 Service Contracts Paid by Check #105857 01/06/2021 01/21/2021 12/31/2020 01/21/2021 52.11
Vendor 44430 - HIGH SIERRA BUSINESS SYSTEMS Totals Invoices 1 $52.11
Vendor 48925 - JASON M HUDAK
SWRCB D3&T3 Dues - Memberships -
Certification
Paid by Check #105858 12/27/2020 01/21/2021 12/31/2020 01/21/2021 180.00
Vendor 48925 - JASON M HUDAK Totals Invoices 1 $180.00
Vendor 43694 - KIMBALL MIDWEST
8464326 Shop Supplies Paid by Check #105859 12/16/2020 01/21/2021 01/12/2021 01/21/2021 450.66
Vendor 43694 - KIMBALL MIDWEST Totals Invoices 1 $450.66
Vendor 17350 - LAKESIDE NAPA
DEC2020 Supplies and Equipment Paid by Check #105860 12/26/2020 01/21/2021 01/21/2021 01/21/2021 2,884.13
Vendor 17350 - LAKESIDE NAPA Totals Invoices 1 $2,884.13
Vendor 22200 - LANGENFELD TRUE VALUE
DEC2020 Dec 2020 Stmt Paid by Check #105861 12/31/2021 01/21/2021 01/12/2021 01/21/2021 46.59
Vendor 22200 - LANGENFELD TRUE VALUE Totals Invoices 1 $46.59
Run by Theresa Sherman on 01/14/2021 11:05:45 AM Page 7 of 12
Payment of Claims
Payment Date Range 01/08/21 - 01/21/21
Report By Vendor - Invoice
Summary Listing
34
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 45135 - LES SCHWAB TIRE CENTER
66100350697 Automotive Paid by Check #105862 11/13/2020 01/21/2021 01/21/2021 01/21/2021 1,002.01
66100355017 Automotive Paid by Check #105862 12/15/2020 01/21/2021 01/21/2021 01/21/2021 1,401.74
66100356758 Automotive Paid by Check #105862 12/29/2020 01/21/2021 01/21/2021 01/21/2021 1,044.67
Vendor 45135 - LES SCHWAB TIRE CENTER Totals Invoices 3 $3,448.42
Vendor 22550 - LIBERTY UTILITIES
JANUARY2021 ELECTRICITY Paid by Check #105863 01/12/2021 01/21/2021 01/21/2021 01/21/2021 57,095.99
Vendor 22550 - LIBERTY UTILITIES Totals Invoices 1 $57,095.99
Vendor 49536 - BRYAN LISCINSKY
3409206 Toilet Rebate Program Paid by Check #105864 12/20/2020 01/21/2021 01/21/2021 01/21/2021 100.00
Vendor 49536 - BRYAN LISCINSKY Totals Invoices 1 $100.00
Vendor 49537 - PHILOMENA LOBO
3375212 Clothes Washer Rebate Program Paid by Check #105865 12/10/2020 01/21/2021 01/21/2021 01/21/2021 200.00
Vendor 49537 - PHILOMENA LOBO Totals Invoices 1 $200.00
Vendor 17900 - MC MASTER CARR SUPPLY CO
49898121 Shop Supplies Paid by Check #105866 12/08/2020 01/21/2021 01/21/2021 01/21/2021 46.39
50936614 Supplies Paid by Check #105866 01/04/2021 01/21/2021 01/21/2021 01/21/2021 188.44
Vendor 17900 - MC MASTER CARR SUPPLY CO Totals Invoices 2 $234.83
Vendor 48821 - MCC CONTROLS LLC
CD99385047 LPPS Power/Control Upgrade Paid by Check #105867 12/30/2020 01/21/2021 01/21/2021 01/21/2021 985.00
Vendor 48821 - MCC CONTROLS LLC Totals Invoices 1 $985.00
Vendor 18150 - MEEKS BUILDING CENTER
DEC2020 Dec 2020 Stmt Paid by Check #105868 12/31/2020 01/21/2021 01/12/2021 01/21/2021 491.91
Vendor 18150 - MEEKS BUILDING CENTER Totals Invoices 1 $491.91
Vendor 43123 - MSC INDUSTRIAL SUPPLY CO
37506683 Small Tools Paid by Check #105869 12/10/2020 01/21/2021 01/21/2021 01/21/2021 1,336.21
Vendor 43123 - MSC INDUSTRIAL SUPPLY CO Totals Invoices 1 $1,336.21
Vendor 19200 - NELS TAHOE HARDWARE
DEC2020 Dec 2020 Stmt Paid by Check #105870 12/31/2020 01/21/2021 01/12/2021 01/21/2021 119.77
Vendor 19200 - NELS TAHOE HARDWARE Totals Invoices 1 $119.77
Vendor 49273 - NEVADA COUNTY PUBLISHING CO
0000275555 Public Relations Expense Paid by Check #105871 12/31/2020 01/21/2021 12/31/2020 01/21/2021 558.00
Vendor 49273 - NEVADA COUNTY PUBLISHING CO Totals Invoices 1 $558.00
Vendor 49208 - NEVADA NEWS GROUP
7421 Ads-Legal Notices Paid by Check #105872 12/23/2020 01/21/2021 12/31/2020 01/21/2021 624.00
Run by Theresa Sherman on 01/14/2021 11:05:45 AM Page 8 of 12
Payment of Claims
Payment Date Range 01/08/21 - 01/21/21
Report By Vendor - Invoice
Summary Listing
35
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 49208 - NEVADA NEWS GROUP Totals Invoices 1 $624.00
Vendor 48655 - REGENTS NEVADA SYS HIGHER EDUCATION
CI-06-4502/10 Wells Paid by Check #105873 12/23/2020 01/21/2021 01/21/2021 01/21/2021 2,043.94
Vendor 48655 - REGENTS NEVADA SYS HIGHER EDUCATION Totals Invoices 1 $2,043.94
Vendor 48858 - LYNN NOLAN
3116412 Clothes Washer Rebate Program Paid by Check #105874 12/29/2020 01/21/2021 01/21/2021 01/21/2021 200.00
Vendor 48858 - LYNN NOLAN Totals Invoices 1 $200.00
Vendor 48315 - O'REILLY AUTO PARTS
DEC2020 Automotive, Shop Supplies Paid by Check #105875 12/28/2020 01/21/2021 12/31/2020 01/21/2021 47.06
Vendor 48315 - O'REILLY AUTO PARTS Totals Invoices 1 $47.06
Vendor 44607 - OLIN CORPORATION
2918482 Hypochlorite Paid by Check #105876 12/30/2020 01/21/2021 12/31/2020 01/21/2021 4,302.69
Vendor 44607 - OLIN CORPORATION Totals Invoices 1 $4,302.69
Vendor 49522 - DMILTRY PEVZNER
3388106A Clothes Washer Rebate Program Paid by Check #105877 12/27/2020 01/21/2021 01/21/2021 01/21/2021 200.00
Vendor 49522 - DMILTRY PEVZNER Totals Invoices 1 $200.00
Vendor 47903 - PRAXAIR 174
95031716 Shop Supplies Paid by Check #105878 02/22/2020 01/21/2021 01/21/2021 01/21/2021 137.05
60110928 Shop Supplies Paid by Check #105878 11/14/2020 01/21/2021 12/31/2020 01/21/2021 361.49
60110929 Shop Supplies Paid by Check #105878 11/14/2020 01/21/2021 01/21/2021 01/21/2021 92.66
60642241 Shop Supplies Paid by Check #105878 12/11/2020 01/21/2021 01/21/2021 01/21/2021 12.24
60754924 Shop Supplies Paid by Check #105878 12/22/2020 01/21/2021 12/31/2020 01/21/2021 54.31
60789116 Shop Supplies Paid by Check #105878 12/22/2020 01/21/2021 01/21/2021 01/21/2021 150.69
Vendor 47903 - PRAXAIR 174 Totals Invoices 6 $808.44
Vendor 43332 - RED WING SHOE STORE
812-99-635710 Safety Equipment - Physicals Paid by Check #105879 11/13/2020 01/21/2021 12/31/2020 01/21/2021 223.03
812-99-635985 Safety Equipment - Physicals Paid by Check #105879 11/13/2020 01/21/2021 12/31/2020 01/21/2021 232.73
812-99-637348 Safety Equipment - Physicals Paid by Check #105879 11/18/2020 01/21/2021 12/31/2020 01/21/2021 305.46
Vendor 43332 - RED WING SHOE STORE Totals Invoices 3 $761.22
Vendor 47803 - REDWOOD PRINTING
333 Office Supplies Paid by Check #105880 01/05/2021 01/21/2021 01/21/2021 01/21/2021 41.94
335 Office Supplies Paid by Check #105880 01/05/2021 01/21/2021 01/21/2021 01/21/2021 227.29
Vendor 47803 - REDWOOD PRINTING Totals Invoices 2 $269.23
Vendor 49539 - BARNEY W RENO
3641206 Clothes Washer Rebate Program Paid by Check #105881 12/19/2020 01/21/2021 01/21/2021 01/21/2021 200.00
Vendor 49539 - BARNEY W RENO Totals Invoices 1 $200.00
Run by Theresa Sherman on 01/14/2021 11:05:45 AM Page 9 of 12
Payment of Claims
Payment Date Range 01/08/21 - 01/21/21
Report By Vendor - Invoice
Summary Listing
36
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 48727 - RESERVE ACCOUNT
January 2021 Postage prepaid Paid by Check #105882 01/11/2021 01/21/2021 01/21/2021 01/21/2021 1,200.00
Vendor 48727 - RESERVE ACCOUNT Totals Invoices 1 $1,200.00
Vendor 49535 - CHERYL RIFFEL
3131409 Clothes Washer Rebate Program Paid by Check #105883 12/30/2020 01/21/2021 01/21/2021 01/21/2021 200.00
Vendor 49535 - CHERYL RIFFEL Totals Invoices 1 $200.00
Vendor 44856 - SCIENTIFIC CONSUMABLES & INSTRUMENTATION
70522 Laboratory Supplies Paid by Check #105884 12/30/2020 01/21/2021 01/21/2021 01/21/2021 341.98
Vendor 44856 - SCIENTIFIC CONSUMABLES & INSTRUMENTATION Totals Invoices 1 $341.98
Vendor 47832 - SHRED-IT
8181127759 Office Supply Issues Paid by Check #105885 12/22/2020 01/21/2021 12/31/2020 01/21/2021 67.00
Vendor 47832 - SHRED-IT Totals Invoices 1 $67.00
Vendor 49140 - SIERRA BUSINESS COUNCIL
123120 Contractual Services Paid by Check #105886 01/01/2021 01/21/2021 12/31/2020 01/21/2021 1,000.00
Vendor 49140 - SIERRA BUSINESS COUNCIL Totals Invoices 1 $1,000.00
Vendor 22620 - SIERRA SPRINGS
121920 Supplies Paid by Check #105887 12/19/2020 01/21/2021 12/31/2020 01/21/2021 64.92
Vendor 22620 - SIERRA SPRINGS Totals Invoices 1 $64.92
Vendor 48735 - SILVER STATE ANALYTICAL LAB
RN263526 Monitoring Paid by Check #105888 12/31/2020 01/21/2021 12/31/2020 01/21/2021 1,459.00
Vendor 48735 - SILVER STATE ANALYTICAL LAB Totals Invoices 1 $1,459.00
Vendor 44577 - SOUNDPROS INC
201222-55 Public Relations Expense Paid by Check #105889 12/22/2020 01/21/2021 12/31/2020 01/21/2021 49.00
Vendor 44577 - SOUNDPROS INC Totals Invoices 1 $49.00
Vendor 23450 - SOUTH TAHOE REFUSE
10121 Refuse Disposal Paid by Check #105890 01/01/2021 01/21/2021 12/31/2020 01/21/2021 2,799.76
Vendor 23450 - SOUTH TAHOE REFUSE Totals Invoices 1 $2,799.76
Vendor 45168 - SOUTHWEST GAS
JANUARY2021 NATURAL GAS Paid by Check #105891 01/12/2021 01/21/2021 01/21/2021 01/21/2021 1,826.73
Vendor 45168 - SOUTHWEST GAS Totals Invoices 1 $1,826.73
Vendor 49064 - Staples Business Advantage
3466131963 Office Supplies Paid by Check #105892 01/02/2021 01/21/2021 01/21/2021 01/21/2021 650.79
3466131965 Office Supply Issues Paid by Check #105892 01/02/2021 01/21/2021 01/21/2021 01/21/2021 (64.94)
3466131967 Office Supplies Paid by Check #105892 01/02/2021 01/21/2021 01/21/2021 01/21/2021 604.70
3466131968 Office Supplies Paid by Check #105892 01/02/2021 01/21/2021 01/21/2021 01/21/2021 2,068.37
Run by Theresa Sherman on 01/14/2021 11:05:45 AM Page 10 of 12
Payment of Claims
Payment Date Range 01/08/21 - 01/21/21
Report By Vendor - Invoice
Summary Listing
37
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 49064 - Staples Business Advantage Totals Invoices 4 $3,258.92
Vendor 48267 - SUMMIT COMPANIES ABC FIRE
571023057 Buildings Paid by Check #105893 12/08/2020 01/21/2021 12/31/2020 01/21/2021 1,801.07
Vendor 48267 - SUMMIT COMPANIES ABC FIRE Totals Invoices 1 $1,801.07
Vendor 48481 - SWRCB ACCOUNTING OFFICE
LW-1027857 Regulatory Operating Permits Paid by Check #105894 12/18/2020 01/21/2021 01/21/2021 01/21/2021 31,059.60
Vendor 48481 - SWRCB ACCOUNTING OFFICE Totals Invoices 1 $31,059.60
Vendor 49528 - SYN-TECH SYSTEMS INC
226502 Service Contracts Paid by Check #105895 01/08/2021 01/21/2021 01/31/2021 01/21/2021 1,175.00
Vendor 49528 - SYN-TECH SYSTEMS INC Totals Invoices 1 $1,175.00
Vendor 24050 - TAHOE BASIN CONTAINER SERVICE
10121 Refuse Disposal Paid by Check #105896 01/01/2021 01/21/2021 12/31/2020 01/21/2021 14,367.25
Vendor 24050 - TAHOE BASIN CONTAINER SERVICE Totals Invoices 1 $14,367.25
Vendor 49032 - TAHOE BEACH & SKI CLUB
959606 Standby Accommodations Paid by Check #105897 12/29/2020 01/21/2021 01/21/2021 01/21/2021 211.60
Vendor 49032 - TAHOE BEACH & SKI CLUB Totals Invoices 1 $211.60
Vendor 24315 - TAHOE PARADISE CHEVRON
5939 Diesel Paid by Check #105898 11/12/2020 01/21/2021 12/31/2020 01/21/2021 52.77
3911 Gasoline Expense Paid by Check #105898 12/18/2020 01/21/2021 01/21/2021 01/21/2021 125.58
Vendor 24315 - TAHOE PARADISE CHEVRON Totals Invoices 2 $178.35
Vendor 24325 - TAHOE SAND & GRAVEL
26061 Pipe - Covers & Manholes Paid by Check #105899 12/04/2020 01/21/2021 12/31/2020 01/21/2021 546.25
Vendor 24325 - TAHOE SAND & GRAVEL Totals Invoices 1 $546.25
Vendor 49420 - THATCHER COMPANY OF NEVADA INC
5064959 Hypochlorite Paid by Check #105900 12/30/2020 01/21/2021 12/31/2020 01/21/2021 3,277.04
Vendor 49420 - THATCHER COMPANY OF NEVADA INC Totals Invoices 1 $3,277.04
Vendor 49343 - THE UNION
0000275615 Ads-Legal Notices Paid by Check #105901 12/31/2020 01/21/2021 12/31/2020 01/21/2021 278.00
Vendor 49343 - THE UNION Totals Invoices 1 $278.00
Vendor 43718 - USA BLUE BOOK
456140 Pump Stations Paid by Check #105902 12/28/2021 01/21/2021 12/31/2020 01/21/2021 1,369.06
Vendor 43718 - USA BLUE BOOK Totals Invoices 1 $1,369.06
Vendor 47992 - VELOCITY DYNAMICS INC
0000023400 Biosolids Equipment - Building Paid by Check #105903 10/28/2020 01/21/2021 01/21/2021 01/21/2021 2,456.16
Run by Theresa Sherman on 01/14/2021 11:05:45 AM Page 11 of 12
Payment of Claims
Payment Date Range 01/08/21 - 01/21/21
Report By Vendor - Invoice
Summary Listing
38
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 47992 - VELOCITY DYNAMICS INC Totals Invoices 1 $2,456.16
Vendor 48794 - VERIZON CONNECT NWF INC
OSV000002318004 Service Contracts Paid by Check #105904 01/01/2021 01/21/2021 01/21/2021 01/21/2021 703.00
Vendor 48794 - VERIZON CONNECT NWF INC Totals Invoices 1 $703.00
Vendor 25700 - WEDCO INC
662092 Buildings Paid by Check #105905 12/18/2020 01/21/2021 01/21/2021 01/21/2021 9.09
Vendor 25700 - WEDCO INC Totals Invoices 1 $9.09
Vendor 25850 - WESTERN NEVADA SUPPLY
18591509-1 Boxes-Lids-Extensions Inventory Paid by Check #105906 12/14/2020 01/21/2021 01/21/2021 01/21/2021 6,384.94
18588245 FLL Sewer PS 6 Upgrade Paid by Check #105906 12/17/2020 01/21/2021 01/21/2021 01/21/2021 3,811.57
18614888 Boxes-Lids-Extensions Inventory Paid by Check #105906 12/28/2020 01/21/2021 12/31/2020 01/21/2021 659.27
38616541 Small Tools Paid by Check #105906 12/28/2020 01/21/2021 01/21/2021 01/21/2021 126.78
18592247 FLL Sewer PS 6 Upgrade Paid by Check #105906 01/07/2021 01/21/2021 01/21/2021 01/21/2021 298.03
18609696 Saddles & Fittings Inventory Paid by Check #105906 12/21/2021 01/21/2021 12/31/2020 01/21/2021 481.64
Vendor 25850 - WESTERN NEVADA SUPPLY Totals Invoices 6 $11,762.23
Vendor 48781 - WORLD OIL REFINING
I500-00622267 Service Contracts Paid by Check #105907 10/05/2020 01/21/2021 01/21/2021 01/21/2021 140.00
I500-00637987 Service Contracts Paid by Check #105907 11/06/2020 01/21/2021 01/21/2021 01/21/2021 55.00
I500-00638469 Service Contracts Paid by Check #105907 11/06/2020 01/21/2021 01/21/2021 01/21/2021 85.00
I500-00652784 Service Contracts Paid by Check #105907 12/14/2020 01/21/2021 01/21/2021 01/21/2021 140.00
Vendor 48781 - WORLD OIL REFINING Totals Invoices 4 $420.00
Grand Totals Invoices 197 $381,632.41
Run by Theresa Sherman on 01/14/2021 11:05:45 AM Page 12 of 12
Payment of Claims
Payment Date Range 01/08/21 - 01/21/21
Report By Vendor - Invoice
Summary Listing
39
BOARD AGENDA ITEM 14a
TO: Board of Directors
FROM: Liz Kauffman, Human Resources Director
MEETING DATE: January 21, 2021
ITEM – PROJECT NAME: Public Employee Evaluation – General Manager
REQUESTED BOARD ACTION: Conduct Evaluation Process
DISCUSSION: Pursuant to Section 54957 of the California Government Code, Closed
Session may be held regarding public employee evaluation for unrepresented
employee position - General Manager.
SCHEDULE: N/A
COSTS: N/A
ACCOUNT NO: N/A
BUDGETED AMOUNT AVAILABLE: N/A
ATTACHMENTS: N/A
_____________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
General Manager
John A. Thiel
Directors
Chris Cefalu
Shane Romsos
David Peterson
Kelly Sheehan
Nick Exline
40