Loading...
Itm 5a_South Y PCE_Jun19_TAC_KJ-061819AGENDA ITEM 5. REQUEST FOR TIME EXTENSION REQUEST FOR TIME EXTENSION •Pre-Design Investigation Report – June 2019 •Final Fate and Transport Modeling Report – June 2019 •Feasibility Study Report – September 2019 TAC DISCUSSION RE REQUEST FOR TIME EXTENSION