Loading...
South Y PCE PW 4_6 Mar 2019_2 slide per page3/5/2019 1 GROUNDWATER AT THE SOUTH Y March 6, 2019 6:00 PM – 7:30 pm City of South Lake Tahoe | Council Chambers Lukins Brothers Water Company, Inc. INTRODUCTIONS NAME TITLE AFFILIATION John Thiel, PE General Manager Jennifer Lukins Assistant Manager Kirk Woolridge General Manager Ivo Bergsohn, PG, CHG Hydrogeologist Scott Ferguson, PE Supervising WRC Engineer Susan Rybarski Assistant Research Scientist Lukins Brothers Water Company, Inc. 3/5/2019 2 OVERVIEW WORKSHOP DATE TOPICS PW 1 2/7/2018 •Groundwater & PCE Overview •Water Agency Approach to Solution •South Y Feasibility Study PW 2 8/8/2018 •Water Agency/LRWQCB Updates •Pre-Design Investigation – Initial Findings PW 3 11/7/2018 •Water Agency/LRWQCB Updates •South Y Feasibility Study - Alternatives PW 4 Today •Water Agency/LRWQCB Updates •Groundwater Model Evaluation SOUTH “Y” PLUME •COC: Tetrachloroethylene (PCE; MCL = 5 ppb) •Plume Area: 400+ acres •Impaired Private and Public Water System wells •Reduces available water production capacity by 3.25 MGD (~5,000 average CA households) 3/5/2019 3 LUKINS BROTHERS WATER COMPANY California Public Utilities Commission approval of Resolution W-5159 (Grants LBWC Authority for funding) LBWC Well 5 Results: PCE: 58 ppb and 60ppb; TCE: 1.3 ppb and 1.4ppb Grant awarded for GAC filtration system at Well 5 April 2018 June 2018 2019 Anticipated construction of filtration system Next Steps Awaiting California Department of Water Resources State Revolving Fund Grant for Feasibility Study to locate potential new water sources for Lukins Initial detection over MCL Planning grant awarded Preliminary Engineering Report for water system improvements finalized July 2017 May 2015 Began engineering for GAC filtration system at Well 5 Summer 2014 TAHOE KEYS WATER COMPANY Hired engineering consultant to develop facilities plan to address contamination and provide alternatives to safe, reliable water 2009 Fall 2018 Approval to perform water quality monitoring on Well 2 to determine vertical extent of PCE. Project under review. Next Steps Use DRI Groundwater Model to determine potential alternatives. Initial detection in Well 2 over MCL, well shut-down Installed GAC filtration to Well 2. Limits pumping capacity Initial detection in Well 1below MCL, monitor monthly 2012 2016 2017 3/5/2019 4 LRWQCB UPDATE GROUNDWATER MODEL 3/5/2019 5 QUESTION AND ANSWERS EXTRA SLIDES 3/5/2019 6 AGENDA •Introductions •Overview •Water Agency Updates •LRWQCB Update •Groundwater Model •Questions and Answers •Adjourn BREAK 10- minutes