Combined slides 8.8.18_STGroundwater AT THE South Y August 8, 2018 6:00 PM – 7:30 pm City of south lake tahoe | Council chambers 1 Agenda Introductions overview WATER Agency updates Lukins brothers water company Tahoe keys water company South tahoe Public utility District California Water Board Update PREDESIGN INVESTIGATION Next steps BREAK Questions and answers 2 introductions 3 SOURCE WATER DRINKING WATER GROUNDWATER GROUNDWATER 4 Groundwater BASIN Tahoe valley south basin Sedimentary Geologic Basin Highly productive for groundwater Recharged from surrounding watersheds Excellent water quality High reliance on WELLS Susceptible to contamination Figure from Fig 3-2 of 2014 GWMP 5 Current situation PCE contaminant plume 400+ acres impaired both private and public water system wells total available water production capacity reduced by 3.25 MGD (~5,000 average Ca households) Pce detections Lukins Bros – 3 wells Tahoe Keys – 2 wells 6 Water Agency Updates Lukins brothers water company Tahoe keys water company South tahoe public utility district 7 Lukins brothers water company California Public Utilities Commission approval of Resolution W-5159. Granting LBWC Authority for funding Water testing at Well #5. Results for PCE: 58ppb and 60ppb. TCE: 1.3ppb and 1.4ppb Filtration system project plans and specification at Division of Drinking Water and Division of Financial Assistance for final review. Next step: budgetary review Working with local, regional and state agencies to move funding forward Awaiting direction fro Water Board on enforcement to determine direction of legal action Engage public in investigation and clean up process. Raise awareness about third party water contamination April 2018 June 2018 August 2018 2019 Anticipated construction of filtration system Next Steps Submitted California Department of Water Resources State Revolving Fund Application for Feasibility study to locate potential new water sources for Lukins 8 Tahoe keys water company Continue to operate filtration system on Well #2 to remove PCE. 2018 Monitor Well #1 monthly. Samples continues to be below maximum contaminant level (MCL) of 5ppb. Fall 2018 Perform water quality monitoring on Well #2 to determine vertical extent of PCE. Next Steps Use DRI Groundwater Model to determine potential location for replacement well. Note for 3rd bullet – data show Well 1 had low levels of detection 1996 at 0.65 ug/l and 0.6 in 2002, no samples from 2005-2014; 0.4 ug/L is Method detection limit 9 South tahoe public utility district April 2018 2018 June-July 2018 Continue to meet regularly with the Technical Advisory Committee Received Prop 1 Planning Grant $504,295 Predesign Investigation (Field Work 95% Complete) 10 PREDESIGN INVESTIGATION Objectives: assess the vertical extent of PCE contamination; Collect water quality and engineering information for engineering design 11 953 Eloise FIELD SITE EW1 12 BASELINE SAMPLING 13 PCE Plume (LRWQCB, 2016) 14 EW-1 Borehole log (0 – 150’) 15 Initial findings Multi-layer aquifer Minor aquitards separate upper layer into 3 zones (A, B and C) overlying a major aquitard (94 - 100’ ) Pce contamination within Zone b & upper part of zone c (26 – 52’) Trace levels of tce detected below 100’ in zone d (119 – 124’) Baseline sampling Pce not detected in monitoring wells west of field site Pce detected in monitoring wells & public supply wells north of field site Major aquitard may have limited lateral extent north of the field site. 16 Initial findings Aquifer test extraction well pumping rate(s): Zone B : up to 20 gpm Zone C: Up to 40 GPM 17 NEXT STEPS Predesign investigation Data Analysis & reporting GROUNDWATER MODELING PERFORM PRELIMINARY RUNS FOR REMEDIAL ALTERNATIVE SIMULATIONS NO-ACTION MID-PLUME CONTAINMENT/REMOVAL WITH WELL-HEAD TREATMENT; WELL-HEAD TREATMENT FEASIBILITY STUDY 18 BREAK 10- minutes 19 Question and answers 20 MW-4B ANALYSIS (preliminary) 21 953 eloise SITE SECTION 22 EW-1C Pumping well 23 MW-4B Observation Well (r=78’) 24 25 26