Loading...
2019.3.14 Lahontan Board Presentation v3South Lake Tahoe PCE Contamination March 13-14, 2019 Lahontan Regional Water Quality Control Board| South Lake Tahoe 1 introductions Lukins Brothers Water Company, Inc. 2 CHALLENGE PCE contaminant plume 400+ acres Impaired both private and public water system wells PCE Detection LBWC – 3 Wells TKWC – 2 Wells Water production capacity reduced by 3.25 MGD 3 South Tahoe PCE projects PCE detected in TKWC Well 1under MCL Planning, design & engineering for GAC treatment on LBWC Well 5 (grant funding) Monitor TKWC Well 2 for vertical contamination extent 2015 2016 GAC filtration at LBWC Well 5 implementation grant awarded (grant funding) 2017-Present Feasibility Study to identify recommended alternatives (grant funding) PCE detected in TKWC Well 2 over MCL, well shut-down Preliminary Eng Report completed for treatment alternatives on LBWC Well 2&5 GAC filtration installed on TKWC Well 2, capacity limited 2014 2013 PCE detected in LBWC Well 2&5 over MCL, wells shut-down, STPUD intertie opened 2008 Groundwater Investigation (grant funding) TKWC Facilities Plan developed to address PCE 2017 2018 2016-2017 Money spent to date??? 4 South Tahoe PCE costs 5 Request for Lrwqcb NEAR-TERM Sentinel wells to monitor PCE movement toward water sources TKWC Well 1 piping modification to be able to hook up to portable GAC Zone testing for TKWC Well 2 to determine extent of contamination Well destruction for LBWC Well 2 and LBWC Well 4 to remove possible contaminant pathways LONG-TERM Support for implementation funding for recommended alternative identified in Feasibility Study 6 Question and answers 7