Loading...
PDI Access Agreement Information-KJ-020118South Y Feasibility Pre-Design Investigation Site Access Agreement Information Liberty Utilities (APN 023-30-111; 933 Eloise Avenue) The proposed work site for the test well drilling program would encompass an area of approximately ##,###5,500 sf (70’x 77’) on the Liberty property (APN 023-30-111); and ##,### 4,000 sf (57’x77’) on the City of South Lake Tahoe (CSLT) property (APN 023-30-109) shown in red shading above. The drilling and testing equipment, support vehicles, materials and supplies would be set-up on the paved are of the Liberty property. The Test Well will be located on the CSLT property. Storage tanks for the temporary containment of waste water will likely be located ……in the north shoulder of the road right of way on the CSLT property or in the land north east of the site on the bank of the detention basin (shown in purple shading above, about 20’ x 130’) which straddles the property line. The site needs could vary during the various phases of drilling, well development, and aquifer testing and we can work with you to minimize site access impacts to Liberty Utilities. Equipment Drilling: A LS 250 MiniSonic™ Rig will be used for the drilling program. The MiniSonic™ Rig is a compact , low ground pressure drilling rig designed for drilling in environmentally sensitive areas. Technical APN 023-30-109 APN 023-30-111 Maximum Work Site Area (proposed) Formatted: Not Highlight Formatted: Not Highlight Formatted: Not Highlight Comment [IB1]: Sachi- Please complete. Comment [SI2]: Note – am enquiring re weekend work which could further limit duration on site and site access. South Y Feasibility Pre-Design Investigation Site Access Agreement Information information for the drilling equipment is attached. In addition to the drill rig and guide rig, an area for equipment and casing as well as storage bins for waste will be needed. Well Development and Aquifer Testing: After the drilling is complete, the drill rig and equipment will be removed, and replaced with pump and tanks for temporary containment of waste water and a small water treatment unit. Schedule The drilling and testing program is anticipated to be completed within 30 days, including Contractor mob./demob., on and off the work site. The project is intended to be completed on or before June 1st, 2018.