Loading...
RE_ PDI Site Access InformationFrom:Sachi Itagaki To:Ivo Bergsohn Cc:Jennifer Lau; Eddy Teasdale; Sachi Itagaki Subject:RE: PDI Site Access Information Date:Thursday, February 1, 2018 12:41:47 PM Attachments:PDI Access Agreement Information-KJ-020118.docx Hi Ivo – a few edits (the dimension labels of the red box were a little off, so I corrected them). Also, I added a bit of description/differentiation between the drilling phase and the well development/aquifer testing phase. I’m checking with Eddy to see if weekend drilling/testing is an option to see if we can help avoid site access impacts to Liberty- I’ve got a call at 1 -2:30 (which can be interrupted) and at 4 but it would be good to discuss. Thanks! Sachi ____________________________________________________ Sachi Itagaki, P.E., QSD | Principal, One Water Practice Kennedy/Jenks Consultants Direct: 650.852.2817 | Cell: 415.350.7803 From: Ivo Bergsohn [mailto:Ibergsohn@stpud.dst.ca.us] Sent: Wednesday, January 31, 2018 12:50 PM To: Sachi Itagaki <SachiItagaki@kennedyjenks.com> Cc: Jennifer Lau <JenniferLau@kennedyjenks.com>; Eddy Teasdale <EddyTeasdale@kennedyjenks.com> Subject: RE: PDI Site Access Information Sachi- Storage Tanks – I would recommend that we plan on using 500-bbl. Frac Tanks for temporary fluid containment. These could be rented from Carson Pump. I would suggest set-up of the Frac Tank (s) within the CSLT ROW along the north shoulder of Eloise Avenue. -Ivo From: Ivo Bergsohn Sent: Wednesday, January 31, 2018 10:17 AMTo: 'Sachi Itagaki'Cc: 'Jennifer Lau'; 'Eddy Teasdale (EddyTeasdale@kennedyjenks.com)'Subject: PDI Site Access Information Sachi- Please review and feel free to add further detail, as needed. We may also want to provide a PDF of the draft work plan as an attachment for Liberty/CSLT consideration. Ivo Bergsohn, PG, HG Hydrogeologist South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 (530)543-6204 From: Ivo Bergsohn Sent: Wednesday, January 31, 2018 8:49 AMTo: 'Eddy Teasdale (EddyTeasdale@kennedyjenks.com)'Cc: 'Sachi Itagaki'; 'Jennifer Lau'Subject: RE: PDI Drilling Equipment FYI- Tech Info for LS600 Rig. From: Ivo Bergsohn Sent: Wednesday, January 31, 2018 8:47 AMTo: Eddy Teasdale (EddyTeasdale@kennedyjenks.com)Cc: Sachi Itagaki; Jennifer LauSubject: PDI Drilling EquipmentImportance: High Hi Eddy- Can you please confirm the drilling equipment and support vehicles that are proposed for use under the attached quote from Cascade Drilling. Looking at the technical specs for the LS250 and LS600 rigs, it looks like the MiniSonic Rig (LS250) could possibly meet our needs, if the drilling program could be completed using a telescoped bore hole, drilled using 12” Drill Casing to 100’; and 8” Drill Casing below 100’ to TD (150 feet). Given the Recent PCE Results (see App C of Work Plan), it is likely that the 8” Test Well would be constructed to a depth of less than 100 feet. The footprint of the MiniSonic Rig (~18.5’) is almost ½ of the full-size LS600 Rig (~31.5’). With its smaller size it would be easier to Mob/DeMob ; have a lower ground pressure (protecting underlying pavement); and would require less support equipment. Please let me know ASAP, as I want to provide the Technical Information on the Sonic Drilling equipment proposed for the PDI to Liberty Utilities for their review and consideration. Thanks, Ivo Bergsohn, PG, HG Hydrogeologist South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 (530)543-6204 This email message has been delivered safely and archived online by Mimecast. This email message has been delivered safely and archived online by Mimecast.